GLOBAL MOS UPAH GLOBAL MOS UPAH GLOBAL MOS UPAH GLOBAL MOS UPAH GLOBAL MOS UPAH1 3 4 5 6 7 8 = 4 x 5 9 10 11 12 = 5 x 9 13 = 6 x 10 14 = 7 x 11 15 = 12 + 13 +14 16 17 18 19 = 5 x 16 20 = 6 x 17 21 = 7 x 18 22 = 19 + 20 + 21 23 = 22 + 24 24
JUMLAH HARGAHARGA SATUAN
JUMLAHVOLUME
VOLUME
2
NO ITEM PEKERJAAN SATUANADD. 2 TIDAK TERDAMPAK ESKALASIMC. S/D. OKTOBER 2013
TERDAMPAK ESKALASIMC. NOVEMBER 2013 S/D. DESEMBER 2014 TOTAL SETELAH
ESKALASIMC. NOVEMBER 2013S/D. DESEMBER 2014
TOTAL PEMBAYARANESKALASI
MC. NOVEMBER 2013S/D. DESEMBER 2014JUMLAH HARGA
VOLUME JUMLAH HARGAJUMLAH HARGA
Dibuat Oleh,KONTRAKTOR PELAKSANA
PT. WASKITA KARYA (Persero) TbkDivisi Sipil
JAJANG ASFARIN, ST.Kasie Adkon
Disetujui Oleh,PEMILIK PROYEK
DINAS PU. BINA MARGA,Kab. Kutai Barat - Kaltim
SANTONI, ST.PPTK.
Diperiksa Oleh,KONSULTAN PENGAWAS
Ir. MOHAMMAD IKHSANSite Engineer
Mengetahui,PEMILIK PROYEK
DINAS PU. BINA MARGA,Kab. Kutai Barat - Kaltim
PILIP,ST., M.Si.PPK.
4 Pagar Pengaman 75 mm, tebal 3 mm m' 1.360,00 513.000,00 - - 697.680.000,00 - - - - - - - - - - - - - - - -5 Aspal Beton Hotmix tebal 5 cm m2 5.440,00 122.000,00 - - 663.680.000,00 - - - - - - - - - - - - - - - -6 Lampu penerangan jalan (termasuk tiang & tumpuan) buah - - - - - - - - - - - - - - - - - - - - -
6.1 Unit lampu penerangan jalan tunggal type Light Emitting Diode (LED) 160 Wbuah 40,00 31.401.000,00 - - 1.256.040.000,00 - - - - - - - - - - - - - - - -7 Lampu Penerangan tempel di pylon buah 4,00 5.079.000,00 - - 20.316.000,00 - - - - - - - - - - - - - - - -8 Lampu peringatan navigasi di puncak pylon buah 4,00 14.064.000,00 - - 56.256.000,00 - - - - - - - - - - - - - - - -9 Pipa PVC 12" & accercories untuk drainase m' 1.360,00 523.000,00 - - 711.280.000,00 - - - - - - - - - - - - - - - -
10 Pemasangan floor drain termasuk pembuatan manhole drainase dan pipa pembuanganbuah 136,00 1.465.000,00 - - 199.240.000,00 - - - - - - - - - - - - - - - -11 Pekerjaan rambu dan marka jalan m' 2.040,00 122.000,00 - - 248.880.000,00 - - - - - - - - - - - - - - - -12 Pekerjaan penyambungan sumber listrik dan accessories Ls 1,00 122.081.000,00 - - 122.081.000,00 - - - - - - - - - - - - - - - -13 Penangkal petir buah 2,00 146.497.600,00 - - 292.995.200,00 - - - - - - - - - - - - - - 20.615.227,00 20.615.227,0014 Pekerjaan lain - lain yang belum tercakup (taman) Ls 1,00 170.914.000,00 - - 170.914.000,00 - - - - - - - - - - - - - - - -
Page 6 of 6
14 Pekerjaan lain - lain yang belum tercakup (taman) Ls 1,00 170.914.000,00 - - 170.914.000,00 - - - - - - - - - - - - - - - -Jumlah Harga PEKERJAAN LAIN-LAIN 11.637.459.708,00 - 20.615.227,00 20.615.227,00Jumlah Harga BILL No. 3 : PEKERJAAN STRUKTUR ATAS 305.828.647.763,00 19.852.744.326,11 140.791.933.670,00 145.932.366.081,00 5.140.432.411,00
A 340.928.197.618,00 22.497.272.654,60 161.212.086.119,00 167.048.081.111,00 5.835.994.992,00B PPN 10 % 34.092.819.762,00 2.249.727.265,00 16.121.208.612,00 16.704.808.111,00 583.599.499,00C TOTAL 375.021.017.380,00 24.746.999.919,60 177.333.294.731,00 183.752.889.222,00 6.419.594.491,00D DIBULATKAN 375.021.017.400,00 24.746.999.900,00 177.333.294.700,00 183.752.889.200,00 6.419.594.500,00
KESIMPULAN :1 Pengajuan Eskalasi Tahap 1 di Hitung dari MC Bulan November 2013 Sampai dengan MC Bulan Desember 20142 Item Pekerjaan Yang Tidak Terdampak Eskalasi Adalah Item Pekerjaan Yang Sudah Terbayar Pada MC Desember 2012 Sampai Dengan Oktober 20133 Item Pekerjaan Yang Terdampak Eskalasi Adalah Item Pekerjaan Yang Sudah Terbayar Pada MC November 2013 Sampai Dengan Desember 20144 Volume Pekerjaan Yang Di Eskalasi Adalah Perbandingan Antara Volume Schedule (S Curve) Dengan MC, Mana Yang Tercapai Terlebih Dahulu Dan Nilai Komulatifnya Lebih Besar
JUMLAH TOTAL
Dibuat Oleh,KONTRAKTOR PELAKSANA
PT. WASKITA KARYA (Persero) TbkDivisi Sipil
JAJANG ASFARIN, ST.Kasie Adkon
Disetujui Oleh,PEMILIK PROYEK
DINAS PU. BINA MARGA,Kab. Kutai Barat - Kaltim
SANTONI, ST.PPTK.
Diperiksa Oleh,KONSULTAN PENGAWAS
Ir. MOHAMMAD IKHSANSite Engineer
Mengetahui,PEMILIK PROYEK
DINAS PU. BINA MARGA,Kab. Kutai Barat - Kaltim
PILIP,ST., M.Si.PPK.
Dibuat Oleh,KONTRAKTOR PELAKSANA
PT. WASKITA KARYA (Persero) TbkDivisi Sipil
JAJANG ASFARIN, ST.Kasie Adkon
Disetujui Oleh,PEMILIK PROYEK
DINAS PU. BINA MARGA,Kab. Kutai Barat - Kaltim
SANTONI, ST.PPTK.
Diperiksa Oleh,KONSULTAN PENGAWAS
Ir. MOHAMMAD IKHSANSite Engineer
Mengetahui,PEMILIK PROYEK
DINAS PU. BINA MARGA,Kab. Kutai Barat - Kaltim
PILIP,ST., M.Si.PPK.