    Communications and datahandling

    Session 7

    ECRA Workshop on Smart Meters and Smart Grid Strategy

    DAY 2: Sunday14th October 2012

  • 8/9/2019 7. Communications and Data Handling.pdf

    2/23

    -

    Communications and Data Handling

    Data

    communicationcenter GPRS

    CommunicationNetworkIntranet

    PLC 

    MV/LVSubstation

    Concentrator

    with modem

       G   P   R   S

    VPN network 

    Remote Control Centre

       G   P   R   S

       G   P   R   S

    AMMMDM/R

    Legacy billing system

    Telecommunication architecture for smart metering system

    119/11/2012

  • 8/9/2019 7. Communications and Data Handling.pdf

    3/23

  • 8/9/2019 7. Communications and Data Handling.pdf

    4/23

    -

    Communications and Data Handling

    S-FSK- 2 carriers, narrow band- Baudrate: up to

    2.4kBaud- Strong against in-band

    noise

    B-PSK- Multiple modulation- Baudrate: up to

    28.8kBaud- Strong immunity against

    noise

    OFDM- Narrowband multicarrier- Baudrate: up to

    128kBaud- Strong immunity against

    noise, reducing baudrate

    Which type of PLC?

    • Communication on Power Lines. Avoids need of dedicated infrastructure forcommunication.

    • different frequency bands and modulations.

    The modulation techniques have been improved in the last years, towards to mainaspects:1. better rejection to noise on LV network2. Higher baud-rate

    Modulation techniques are coded according to international normative.

    319/11/2012

  • 8/9/2019 7. Communications and Data Handling.pdf

    5/23

    -

    Communications and Data Handling

    Interoperability “recipe”:• adopt of a suite of protocols which covers the levels of stack from physical

    communication to application level.• choose of a well defined and stable suite of protocols will allow the

    interchangeability of meters produced by different Manufacturers.

    The choice of a standard for Meter. Interoperability

    Different suite of protocols have been created by Associations to create Openstandards.

    • … helps the Utility to foster competition among the Manufacturers and tohave always a second choice in case of lack of availability (temporary ordefinitive) of the chosen Supplier.

    419/11/2012

  • 8/9/2019 7. Communications and Data Handling.pdf

    6/23

    -

    Communications and Data Handling

    •An open standard for communication among different equipments is basedon a “suite of protocols” 

    • Interoperability at meter level cannot be achieved among devices withdifferent suites of protocols, even though the protocols adopted for somelayers are common

    Upper layer

    (i.e.

    DLMS/COSEM)

    Lower layer

    (i.e. ODFM)

    Meter Type A

    Power-line

    Upper layer

    (i.e.

    DLMS/COSEM)

    Lower layer

    (i.e. ODFM)

    Meter Type A

    Upper layer

    (i.e.DLMS/COSEM)

    Lower layer

    (i.e. S-FSK)

    Meter Type B

    Upper layer

    (i.e.

    DLMS/COSEM)

    Lower layer

    (i.e. S-FSK)

    Meter Type B

    XAn example:Type B can talk only with type BType A can talk only with type AType A could potentially prevent proper communication for Type B and vice-versa

    Interoperability and protocols

    519/11/2012

  • 8/9/2019 7. Communications and Data Handling.pdf

    7/23- 719/11/2012

    OPENmeter (European Project. www.openmeter.com):“The result of the project will be a set of draft standards, based on alreadyexisting and accepted standards wherever possible. These standards include theIEC 61334 series PLC standards, the IEC 62056 DLMS/COSEM standards forelectricity metering, the EN 13757 series of standards for utility metering otherthan electricity using M-Bus and other media.” 

    NOTE: Includes different standards

    • ENEL• NETBEHEER NEDERLANDS• KEMA• LANDIS+GYR• RWE

    • ST MICROELECTRONICS• UNIVERSITY OF KARLSRUHE• USYSCOM• ZIV MEDIDA• CENELEC

    • IBERDROLA DISTRIBUCIÓN• ACTARIS (ITRON),• ADVANCED DIGITAL

    DESIGN• CESI RICERCA

    • CURRENT TECHNOLOGIESINTERNATIONAL• DLMS USER ASSOCIATION• EDF• ELSTER• ENDESA

     –Members:

    Communications and Data Handling

    Associations and standards on the market

    http://www.openmeter.com/http://www.openmeter.com/

  • 8/9/2019 7. Communications and Data Handling.pdf

    8/23- 819/11/2012

    Prime Alliance www.prime-alliance.org (Powerline Related IntelligentMetering Evolution).

    “The end objective of PRIME is to establish a complete set of standardson an international level that will permit interoperability amongequipment and systems from different manufacturers.” 

     –Founders/Members:

    • ST MICROELECTRONICS, Texas Instrument,• ZIV, FujutzuCurrent, CIRCUITOR,• ITRON,• LANDIS+GYR,• ADD group,• SAGEMCOM,

    • ISKRAEMECO• IBERDROLA DISTRIBUCIÓN, CEZ GROUP, EDP• ORBIS, SAC• APATOR• JANZ

     –Association: Prime is a no-profit association.

     – Suite of Protocols: OFDM + DLMS/COSEM

    Communications and Data Handling

    Associations and standards on the market

  • 8/9/2019 7. Communications and Data Handling.pdf

    9/23- 919/11/2012

    IDIS (www.idis-association.com)

    “The IDIS association develops, maintains and promotes publicly availabletechnical interoperability specifications, known as ‘IDIS specifications’, based onopen standards and supports their implementation in interoperable products.” 

     –

    Founders/Members:

    • Iskraemeco,

    • Itron,

    • Landis+Gyr

     –Association: no profit

     –Suite of Protocols: S-FSK + DLMS/COSEM

    Communications and Data Handling

    Associations and standards on the market

    http://www.idis-association.com/http://www.idis-association.com/http://www.idis-association.com/http://www.idis-association.com/

  • 8/9/2019 7. Communications and Data Handling.pdf

    10/23-

    1019/11/2012

    G3 (www.g3-plc.com)

    “G3-PLC enables the high-speed, highly reliable communications on existing powerlines needed to make the "energy Internet" a reality” 

    •Founders:

     – ERDF

    •Members:

     – Maxim

    • Association: consortium

    •Suite of Protocols: OFDM + DLMS/COSEM

    •Notes: allow coexistence with S-FSK modulation

    Communications and Data Handling

    Associations and standards on the market

    http://www.g3-plc.com/http://www.g3-plc.com/http://www.g3-plc.com/http://www.g3-plc.com/

  • 8/9/2019 7. Communications and Data Handling.pdf

    11/23-

    1119/11/2012

    Meters and more. (www.metersandmore.com)“The main goal of the Association is to provide the industry with a provenopen protocol for smart metering, thus being a tangible answer to theEuropean Commission’s Mandate 441 to achieve standard AMM solutionsacross the continent.” 

     – Founders:

    • Enel Distribuzione SpA

    • Endesa Distribución SA – Members:

    • Siemens, ST MICROELECTRONICS,

    • IBM, CESI,

    • Sagemcom,

    • AP Systems, Emeter corporation,

    • Xi’an swip, coelce (electric company)• AMPLA energia

     –Others:

    • Bitron,Kaifa

     – Association: no profit

     –Suite of Protocols: meters and more

    Communications and Data Handling

    Associations and standards on the market

    http://www.metersandmore.com/http://www.metersandmore.com/

  • 8/9/2019 7. Communications and Data Handling.pdf

    12/23-

    Case a) ENEL TELEGESTORE project Italy 

    • Communication modulation: FSK

    • Communication Standard: proprietary

    • Number of meters installed in Italy: 32.000.000

    • Key results: System completed and working since 2009

    Communications and Data Handling

    Main outcomes from ongoing projects

    1219/11/2012

  • 8/9/2019 7. Communications and Data Handling.pdf

    13/23-

    Case b) ENEL + ENDESA project

    • Communication modulation: B-PSK

    • Open protocol: “meters and more” 

    • Number of meters installed in Spain: 2.000.000

    • Key information:

    • Project completion: 13.000.000 meters

    Communications and Data Handling

    Main outcomes from ongoing projects

    1319/11/2012

  • 8/9/2019 7. Communications and Data Handling.pdf

    14/23-

    Case c) ERDF project

    • Communication standard: S-FSK

    • Application Standard: DLMS/COSEM

    • Number of Manufacturers:

     – at least three

    • Number of meters installed:

     – 300.000 (in pilots)

    • Next steps:

     – Introduction of Linky G3 after 2013, capable of coexistence with S-FSK.

    Tests on interoperability are under development; the three main

    Manufacturers are working together in order to assure full

    interoperability based upon DLMS/COSEM IDIS).

    Communications and Data Handling

    Main outcomes from ongoing projects

    1419/11/2012

  • 8/9/2019 7. Communications and Data Handling.pdf

    15/23-

    Case d) IBERDROLA project 

    • Communication modulation: OFDM

    • Application Standard: DLMS/COSEM

    • Number of Manufacturers:

     – Seven (ZIV, Landis&GYR, Sagemcom, Sogecam, Orbis, Elster andG.E.)

    • Number of meters installed:

     – 100.000 in pilot in Castellón (2010)

     – March 2012: contracts for total of $395 ML to seven Companies for7.000.000 meters to be installed in Spain

    • Key step:

     – Constitution of PRIME project as a non-profit association for diffusion.Tests on interoperability are under development.

    Communications and Data Handling

    Main outcomes from ongoing projects

    1519/11/2012

  • 8/9/2019 7. Communications and Data Handling.pdf

    16/23

    -

    The following open standards (or candidate to become) havecurrently the greater diffusion in Europe:

    Communications and Data Handling

    Associations and standards on the market. Lessons Learnt

    Most of the suites have adopted, or are going to apply, a commonstandard application protocol, DLMS.They differentiate for the implementation of the OBIS model used inthe meters, the PLC modulation and, obviously for the intermediatelayers.

    1619/11/2012

  • 8/9/2019 7. Communications and Data Handling.pdf

    17/23

    -

    1719/11/2012

    Source: DLMS UA

    Communications and Data Handling

    Associations and standards on the market.

    Unification of different communication technologies within One consistent

    framework

  • 8/9/2019 7. Communications and Data Handling.pdf

    18/23

    -

    PLC

    GPRS

    LAN

    RadioFrequency

    How tochoose?

    Local Bus

    Communication• It must be verified when The Communications and Information

    Technology Commission (CITC) will assign in KSA the frequencies spectrumfor use of PLC as defined in Europe by CENELEC. In KSA pilot installationusing PLC is on-going.

    • In KSA Pilot using Radio frequency, based on liberalized frequencies, is notperforming well, mainly due to interferences.

    Communications and Data Handling

    KSA Smart meter communication

    1819/11/2012

  • 8/9/2019 7. Communications and Data Handling.pdf

    19/23

    -

    KSA LV distribution network has the following characteristics:

    1. Typical MW-LW transformer range: from 400 to 1500kVA;

    2. About 60 PoD (Point of Delivery) are connected to the transformer

    3. The LV distribution is almost radial, with capability to connection of lines

    from near substation in case of failure.

    4. Maximum length of lines from Sub-station to Customer is less than 250m,to avoid voltage drop along the line.

    Communications and Data Handling

    Use of PLC in KSA

    The above characteristics are fully compatible with the PLC communicationand relatively short lines will help the communication between the data

    concentrator (installed in the sub-station) and the meters, which are usuallyinstalled on the border of Customer’s property.

    Perform an assessment in different zones of the LV network before adoptingthe PLC technology in extended pilot, especially in rural areas

    1919/11/2012

  • 8/9/2019 7. Communications and Data Handling.pdf

    20/23

    -

    2019/11/2012

    • At the moment a real consolidated standard is not present on the market.

    • There are four main “lines of development”  associations, consortium, projects):

    PRIME, IDIS, Meters & more, G3.

    • The Manufacturers within each “line of development” are working in order to achieve

    full interoperability, at meter level; many tests are still on going.

    • The DLMS/COSEM protocol:

    – Is widely spread among most of the International and local Manufacturers

    – Most of the on-going international meter pilots are based upon DLMS/COSEM.

    DLMS/COSEM can guarantee an adequate answer from the market

    Communications and Data Handling

    KSA. Next considerations for Choice of PLC standards

  • 8/9/2019 7. Communications and Data Handling.pdf

    21/23

    -

    2119/11/2012

    Flow of information and data handling

    Source: e-utile

  • 8/9/2019 7. Communications and Data Handling.pdf

    22/23

    -

    2219/11/2012

    Flow of information and data handling

    The smart meters, dealing with sensible data, raise a range of securitydata privacy and data privacy requirements.

    Data security issues:Data security issues:

    • Confidentiality of data;• Integrity of the grid in case of

    corrupted commands orinformation;

    • Attaches of third parties tocontrol the grid;

    • Respond to security threats,including acts of terrorism andmanipulation of meter data

    Data privacy issues:Data privacy issues:

    • Consumers could be sensitive to thesharing of their personal data.

    • Load profiles with sufficient samplingperiod could reveal when Customer is

    at home, or if his habits of use ofelectricity are changing

    Use Telecommunications and financial servicesUse Telecommunications and financial services… 

    … as good “case studies” for management of data privacy and cyber-security canbe embedded within current systems and processes.

    Always have back-up and redundancy of machines with smart meter dataAlways have back-up and redundancy of machines with smart meter data… 

    …as loosing data provokes inconsistencies, hard to be fixed.

  • 8/9/2019 7. Communications and Data Handling.pdf

    23/23

    19/11/2012

    Typical set-up of communication network for Smart meters.

    Source: e-utile