Upload
chaganti-bhaskar
View
146
Download
2
Embed Size (px)
Citation preview
33 NOS X 1.5 Mega Watt GENERATION DESIGN
BY Dr. C. S. BHASKAR
CASCADING POWER WITH FLOW OF WATER
OVERALL PICTURE
• RAW MATERIAL WATER TO GENERATE POWER• WATER FOR FIRST TIME FILLING• 720 MEGA WATTS EVERY 24 HOURS• 33 INDEPENDENT POWER PLANTS IN CASCADE• 1000 METERS LONG WATER RESERVOIR OF 20
METER WIDTH AND 2 METER DEEP PLACED AT THE GROUND LEVEL
SINGLE POWER GENERATION UNIT
• EACH TURBINE IS OF 1.5 MEGA WATT• HEAD FOR EACH TURBINE IS 6 METERS• EACH TURBINE IS HAVING GAP OF 30 METER• INLET 6 METERS OUTLET 2 METERS RADIUS• CONSTENT FLOW OF WATER @30 CUBIC
METERS PER SECOND INTO EACH TURBINE
Power Generation design
SINGLE CASCADING PROCESS
CASCADING PROCESS• OUTER LAYER OF PIPE IS CONCRETE• INTENAL LAYER IS EXPOXY PAINT COATING• PIPE IS MADE UP OF ANTICORROSIVE STEEL
WITH THICKNESS OF 50MM• PIPE HEAD IS 6 METER, FLOW IS 30m3/SEC
CONTINUES WATER FLOW IN ALL PIPES
COST FOR PRODUCTION
• 330 CRORES INVESTMENT FOR 720MEGA WATT GENERATION PER DAY
COST FOR SALE
EACH DAY 720000 UNITS 240000 UNITS @ 1RUPEES FOR INDUSTRY 240000 UNITS @ 25 PAISA FOR DOMESTIC 240000 UNITS IS FREE FOR AGRICULTUREVERY DAY
REVENUE
• INDUSTRY SALE 365 DAYS 87600000 RUPEES• DOMESTIC SALE 365 DAYS 21900000 RUPEES• EVERY YEAR REVENUE IS 109500000 RUPEES
Thank you