QUALITY ASSURANCE DATA BOOK TRANSIERRA S.A. SIERRA 1 & 2, PD# 72871 2 EACH - TAURUS 70 GAS TURBINE DRIVEN COMPRESSOR SET Solar Turbines  A Caterpillar Company Volume 1, Unit Number 1 Back to Cover

72871 Sierra Data Book u1

Embed Size (px)

Citation preview

  • QUALITY ASSURANCE DATA BOOK

    TRANSIERRA S.A.

    SIERRA 1 & 2, PD# 728712 EACH - TAURUS 70 GAS TURBINE DRIVEN COMPRESSOR SET

    Solar TurbinesA Caterpillar Company

    Volume 1, Unit Number 1

  • Solar TurbinesA Caterpillar Company

    FOREWORD

    This technical manual contains manufacturing records and quality/test documentation for Gas Turbine Driven equipment designed and manufactured by Solar Turbines Incorporated in San Diego, California.

    TECHNICAL MANUAL OVERVIEW

    The technical manual is provided in volume sets. The manual contains the approved Inspection and Test Plan, Package C of C, required records, reports, data sheets and inspection and test reports. Each volume is complete and described below.

    TRANSIERRA S.A.

    Volume 1, Unit Number 1

    SIERRA 1 & 2, PD# 728712 EACH - TAURUS 70 GAS TURBINE DRIVEN COMPRESSOR SET

  • SIERRA 1 & 2, PD # 72871Table of Contents

    ITEMNUMBER

    Solar TurbinesA Caterpillar Company

    The Table of Contents items for this project correspond to the ITP item numbers identified within each section of the ITP (Inspection and Test Plan). These items are identified with an "X" in column A of the project ITP. A copy of the Project ITP is supplied in section 10.00 for reference.

    1. Asme Data Report

    LUBE OIL COOLER01.06

    2. Pressure Test And Flush Certificate

    LUBE OIL COOLER01.06

    Asme Data Report

    LUBE OIL FILTERS01.07

    Asme Data Report

    GAS FUEL FILTERS01.08

    Certificate

    ENGINE HANDLING KIT01.09

    Certificate

    PACKAGE LIFTING KIT01.10

    Pqr, Wps

    REVIEW WELDING PROCEDURES02.01

    Wqr

    REVIEW WELDER QUALIFICATIONS02.02

    Traveler

    WELD SKID/LIFTING BOLLARDS02.03

  • SIERRA 1 & 2, PD # 72871 Table of Contents, Continued

    ITEMNUMBER

    C Of C

    LUBE OIL TANK - PNEUMATIC LEAK TEST02.04

    C Of C

    SURFACE PREPARATION AND PAINT02.05

    C Of C

    LUBE OIL TANK - INTERNALLY COATED WITH BRAYCO 78502.06

    Wps, Pqr

    REVIEW WELDING PROCEDURES03.01

    Wqr

    REVIEW WELDER QUALIFICATION03.02

    C Of C

    WELD MANIFOLDS DIMENSIONAL CHECK 03.03

    C Of C

    NDE MANIFOLDS (RADIOGRAPHY - RT)03.04

    Hydro Test Log

    HYDROSTATIC TEST MANIFOLDS 03.05

    Included In The Certified Test Data In Section 08.01

    VISUAL INSPECTION OF CONTROL WIRING04.01

    Included In The Certified Test Data In Section 08.01

    HARDWARE VERIFICATION 04.02

    Included In The Certified Test Data In Section 08.01

    PROJECT SOFTWARE VERIFICATION 04.03

  • SIERRA 1 & 2, PD # 72871 Table of Contents, Continued

    ITEMNUMBER

    Leak Test Chart

    COMPRESSOR CASE LEAK TEST05.03.A

    Leak Test Chart

    COMBUSTOR CASE LEAK TEST05.03.B

    Leak Test Chart

    ENGINE FUEL MANIFOLD LEAK TEST05.03.C

    Shop Floor Information System (inspection Data)

    GAS PRODUCER COMPRESSOR ROTOR05.04.A

    Shop Floor Information System (inspection Data)

    GAS PRODUCER TURBINE ROTOR05.04.B

    Shop Floor Information System (inspection Data)

    POWER TURBINE ROTOR05.04.C

    Shop Floor Information System (inspection Data)

    BALANCE GAS PRODUCER COMPRESSOR ROTOR05.04.D

    Shop Floor Information System (inspection Data)

    BALANCE GAS PRODUCER TURBINE ROTOR05.04.E

    Shop Floor Information System (inspection Data)

    BALANCE POWER TURBINE ROTOR05.04.F

    Included In The Certified Test Data In Section 08.01

    ENGINE PERFORMANCE TEST05.07

    Shop Floor Information System

    IMPELLER OVERSPEED SPIN TEST 06.05

  • SIERRA 1 & 2, PD # 72871 Table of Contents, Continued

    ITEMNUMBER

    Shop Floor Information System (inspection Data)

    CENTER BODY HYDRO TEST06.06

    Shop Floor Information System (inspection Data)

    END CAPS HYDRO TEST 06.07

    Inspection Data

    MECHANICAL AND ELECTRICAL RUNOUT06.08

    Balance Computer Printout

    ROTOR BALANCE06.08.A

    Air Test*

    GAS COMPRESSOR AIR TEST 06.10

    No Documents Required

    PACKAGE ASSEMBLY07.00

    Certified Test Data

    PACKAGE/CONSOLE ACCEPTANCE TEST08.01

    Included In The Certified Test Data In Section 08.01

    ENCLOSURE ASSEMBLY STATIC TEST 08.02

    Included In The Certified Test Data In Section 08.01

    NO LOAD MECHANICAL STRING TEST (ONE UNIT ONLY)08.03

    No Documents Required

    PACKAGE FINAL INSPECTION09.00

    1. Package Certificate Of Compliance

    QC DATA BOOK REVIEW 10.01

  • SIERRA 1 & 2, PD # 72871 Table of Contents, Continued

    ITEMNUMBER

    2. Itp (reference Copy)

    QC DATA BOOK REVIEW 10.01

  • SECTION: 01.06

    LUBE OIL COOLER

    1. ASME DATA REPORT

  • To: Date:

    AXC Job Number

    Solar Project Name

    Solar PD Number

    Attn: Solar Part Number

    complete this job manual:

    6) Murphy-VS-2EX Vibration Switch

    Very truly yours,

    AIR-X-CHANGERS

    Pamela A. Thomas

    9330 SKY PARK COURT

    SAN DIEGO, CA 92123

    LYNNE MELENDREZ & SOLAR QUALITY DOCS

    023115AB

    TRANSIERRA

    PD 72871

    154765-72871

    3) Metrix-Vibration Switch

    April 11, 2003SOLAR TURBINES

    The following AXC Library Manual and Vendor files from the Air-X-Changers Library CD are required to

    cc: WESTLAND ENGINEERING

    Dear Customer:

    1) Installation, Maintenance, and Operating Instructions for Electric Drive Units.

    2) Moore Fan-EM

    4) Siemens -Motor Data

    5) Dodge-S-2000 Fan Shaft Bearing

    P.O. Box 1804 Tulsa, Oklahoma 74101 918-266-1850 FAX 918-266-1322

  • Table of Contents

    Job Specific DocumentationTransmittal1Table of Contents2Certified Drawing3Parts List4Spec. Sheet 5U1A Data Reports6-7Nameplate8Hydrostatic Test Certifications 9-10Heat Treat Charts11X-Ray Test Reports12-15Ultrasonic Test Reports 16Hardness Survey17Material Traceability Records11-13X-Ray Test Reports14-21Dye Penetrant Test Report22-25Flushing Record 26-31Final Acceptance Certificate 32Form 101633Electrical Device List34Final-In Process35-36Additional-In Process 37-38Paint-In Process 39-40Fan Data41-42Motor Data43-45

    P.O. Box 1804 Tulsa, Oklahoma 74101 918-266-1850 FAX 918-266-1322

  • PARTS LIST

    Post Office Box 1804Tulsa, OK 74015Phone: (918) 266-1850Fax (918) 266-1322

    JOB NUMBER: 023115 CUSTOMER: SOLAR TURBINES ORDER COVERS: (2) Model 60A-2H

    FINISH: GALVANIZED FAN GUARDS (AND HAIL GUARDS IF REQUIRED) SURFACE PREPARATION: Commercial Blast Cleaning - (SSP-SP6) PRIMER COAT: Amercoat 68HS; Minimun of 3 MILS. DFT. FINISH COAT: Amershield Color Solar Grey (RAL 7032); Minimum of 3 MILS. DFT. (Note: Motors and Slidebases are to be painted with the above system, except no sandblast)

    P.O. QTY. DESCRIPTION OF COMPONENTS

    NOTE: AN ASTERIK (*) IN QUANTITY COLUMN INDICATES A RECOMMENDED SPARE PART 2 SECTION(S) IN ACCORDANCE WITH SPECIFICATION SHEET DATED: 1/30/03

    2 60A-2H STRUCTURE(S), COMPLETE WITH: Seal Weld Entire Cooler

    * 4 FAN(S): 60 Inch DIAMETER, 3 BLADES, RH ROTATION, MOORE-CL5K MAKE, 6.1 ANGLE @ Clevis, 2-3/16 Inch BORE WITH 1/2 Inch X 1/4 Inch KEYWAY. MODEL/PITCH: 27-VT/Manual, HUB:TAPER

    * 4 FAN SHAFT(S): 2-3/16 Inch DIA. X 32 Inch LONG WITH 1/2 Inch SQ. KEYS each END, KEYWAY LENGTH(DRIVE END): 6 Inch, KEYWAY LENGTH(FAN END): 6 Inch, KEY LENGTH: 5.5 Inch

    * 8 2-3/16 Inch FAN SHAFT BEARINGS, MAKE/MODEL: Dodge-S2000/P2B-S2-203R, AXC P/N BR1106

    * 4 MOTOR(S) Reliance, Siemens, Baldor MAKE, 5 H.P., 1800 RPM, 3 PHASE, 60 Hz, 460 VOLTS, (CSA), (115 volt Space Heater), Per Specification ES1923, w/ a 3/8-16, 1-1/8 deep threaded hole for grounding stud. Explosion Proof (Type 5), Solar P/N: None ENCL.VARIABLE TORQUE, SINGLE WINDING, Vertical SHAFT, W-6 MOUNTING, 184T FRAME, With SLIDEBASE, CUST. SPECIFICATIONS Yes, MOTOR DATA REQUIRED Yes, WIRING DIAGRAMS Yes

    * 8 V-BELTS: 3VX-750 TYPE, 17.5 Inch CENTER DISTANCE, 5.3 HP EACH, MATCHED SETS OF 2

    4 SHEAVE SET(S): 2 GROOVES, 3V PITCH, FAN SHEAVE: 19 Inch OD, 2-3/16 Inch BORE WITH 1/2 Inch X 1/4 Inch KEYWAY MOTOR SHEAVE: 4.75 Inch OD, 1-1/8 Inch BORE WITH 1/4 Inch X 1/8 Inch KEYWAY

    4 VIBRATION SWITCH(ES): Murphy MAKE, VS-2EX, XP MODEL, CSA: YES

    4 VELOCITY TRANSMITTER(S): Metrix MAKE, 164V-121 MODEL, CSA: YES 2 SET(S) WIRE BUGSCREENS PER DRAWING 023115-BPL 2 PIPE NIPPLE: O.D., 80 SCHEDULE, 2 LENGTH, 316L MATERIAL 2 UNION ORFICE: N.P.S., 3000# RATING, 1/8 ORFICE, 316L MATERIAL 6 GROUND CONNECTOR: Burndy MAKE, KC23B1 MODEL, MS7001 SYMIX PART NUMBER 2 OUNCE(S) OF CONDUCTIVE ELECTRICAL LUBRICANT: Penetrox MAKE, P8A TYPE, MS7000 SYMIX 4 feet GROUND WIRE: 8 AWG, Tinned, Stranded, copper wire, green insulation with yellow longitudinal stripe,

    MS7002 SYMIX PART NUMBER (Contact Boyce Owens of Nelson Electric Supply)

  • SECTION: 01.07

    LUBE OIL FILTERS

    ASME DATA REPORT

  • SECTION: 01.08

    GAS FUEL FILTERS

    ASME DATA REPORT

  • SECTION: 01.09

    ENGINE HANDLING KIT

    CERTIFICATE

  • LOAD TEST NOT REQUIRED

  • SECTION: 01.10

    PACKAGE LIFTING KIT

    CERTIFICATE

  • SECTION: 02.01

    REVIEW WELDING PROCEDURES

    PQR, WPS

  • SECTION: 02.02

    REVIEW WELDER QUALIFICATIONS

    WQR

  • SECTION: 02.03

    WELD SKID/LIFTING BOLLARDS

    TRAVELER

  • SECTION: 02.04

    LUBE OIL TANK - PNEUMATIC LEAK TEST

    C OF C

  • SECTION: 02.05

    SURFACE PREPARATION AND PAINT

    C OF C

  • SECTION: 02.06

    LUBE OIL TANK - INTERNALLY COATED WITH BRAYCO 785

    C OF C

  • SECTION: 03.01

    REVIEW WELDING PROCEDURES

    WPS, PQR

  • SECTION: 03.02

    REVIEW WELDER QUALIFICATION

    WQR

  • SECTION: 03.03

    WELD MANIFOLDS DIMENSIONAL CHECK

    C OF C

  • SECTION: 03.04

    NDE MANIFOLDS (RADIOGRAPHY - RT)

    C OF C

  • SECTION: 03.05

    HYDROSTATIC TEST MANIFOLDS

    HYDRO TEST LOG

  • Part Number: M.O. #: QTY. Customer:

    Test Pressure: HOLD 10 MIN. Type in other

    times.

    Date: Badge #:

    1038463-301 3857632 2 SIERRA N/A 2/12/03 39211

    1011087-300 3857304 2 SIERRA N/A 2/12/03 23120

    1014525-302 3857312 1 SIERRA 150 2/13/03 22463

    1044497-301 3857313 2 SIERRA 900 2/13/03 39211

    201632-300 3857281 2 SIERRA 225 2/13/03 22463

    1015583-301 3857273 2 SIERRA 225 2/13/03 23120

    1015648-300 3857274 2 SIERRA 225 2/13/03 23120

    1036476-300 3857300 2 SIERRA 600 2/13/03 23120

    1042817-301 3857297 2 SIERRA 225 2/13/03 23120

    1009336-301 3857268 1 SIERRA N/A 2/14/03 23120

    1011087-300 3857342 10 SIERRA N\A 2/17/03 22463

    1044675-300 3857282 2 SIERRA 225 2/17/03 22463

    1051762-300 3857314 2 SIERRA 900 2/17/03 22463

    1008396-301 3857305 2 SIERRA 225 2/17/03 23120

    1008396-301 3857285 2 SIERRA 225 2/17/03 23120

    1008394-301 3857286 2 SIERRA 225 2/17/03 23120

    1055704-300 38573156 2 SIERRA 900 2/18/03 39211

    1020153-301 3857633 1 SIERRA N/A 2/18/03 39211

    1046284-300 3857271 2 SIERRA N/A 2/18/03 39211

    1037008-301 3857301 2 SIERRA 600 2/18/03 39211

    1007065-300 3857278 2 SIERRA 225 2/18/03 23120

    1046283-300 3857270 2 SIERRA N\A 2/19/03 22463

    1028668-301 3857306 2 SIERRA 225/450 2/19/03 39211

    66-16013-300 3857272 1 SIERRA N\A 2/19/03 22463

    1008394-301 3857307 2 SIERRA 225 2/19/03 39211

    1044765-300 3857436 1 SIERRA 1075 2/19/03 39211

    1008448-301 3857289 2 SIERRA N/A 2/19/03 39211

    1008447-300 3857288 4 SIERRA N/A 2/19/03 39211

    1018011-301 3857634 1 SIERRA 225 2/19/03 39211

    1008871-301 3857341 4 SIERRA N/A 2/19/03 39211

    1007064-300 3857277 2 SIERRA 225 2/19/03 23120

    1028081-300 3857291 2 SIERRA 300 2/20/03 22463

  • 1044678-300 3857284 2 SIERRA 225 2/20/03 22463

    1045040-300 3857276 2 SIERRA 225 2/20/03 23120

    1044677-300 3857283 1 SIERRA 225 2/21/03 22463

    1042956-300 3857299 1 SIERRA 225 2/21/03 22463

    1031750-301 3857295 2 SIERRA 300 2/21/03 23120

    1042020-301 3857309 2 SIERRA 300 2/21/03 23120

    1031286-302 3857292 2 SIERRA 300 2/25/03 39211

    1031751-302 3857296 2 SIERRA 300 2/25/03 22463

    1020287-300 3857279 2 SIERRA N\A 2/25/03 22463

    1014911-301 3857635 1 SIERRA N/A 2/25/03 39211

    1008872-301 3857290 2 SIERRA N\A 2/26/03 22463

    1008394-301 3857718 2 SIERRA 225 2/26/03 22463

    1039160-301 3857308 2 SIERRA 100 2/26/03 39211

    1042024-300 3857310 2 SIERRA 225 2/26/03 39211

    1046140-300 3857819 1 SIERRA 500 2/27/03 39211

    1037121-300 3857302 2 SIERRA 600 2/27/03 39211

    1031289-302 3857293 2 SIERRA 300 2/27/03 39211

    1055248-300 3857298 2 SIERRA 300 2/27/03 23120

    1025957-300 3857280 2 SIERRA 100 3/4/03 36068

    1008403-301 3857287 2 SIERRA 225 3/4/03 36068

    1031548-300 3857294 1 SIERRA 300 3/7/03 22463

    1042437-300 3858140 1 SIERRA 225 3/13/03 23120

    1042166-300 3858138 1 SIERRA N\A 3/14/03 22463

    1031548-300 3857294 1 SIERRA 300 3/19/03 22463

    1038463-301 3858136 2 SIERRA N\A 3/21/03 22463

    1042220-301 3858139 1 SIERRA N/A 3/26/03 39211

    1058189-300 3100612 2 SIERRA N\A 3/27/03 22463

    1042094-300 3858137 1 SIERRA 225 3/27/03 22463

    1040959-301 8085975 1 SIERRA 225 4/21/03 22463

    1040959-301 8085876 1 SIERRA 225 4/21/03 22463

    1042817-301 3100613 1 SIERRA 225 4/23/03 22463

    1040959-300 3857802 2 SIERRA 1/2 225 2/26/03 39211

    1018011-301 3857782 1 SIERRA -2 225 2/26/03 39211

    1018007-301 3857781 1 SIERRA-2 2250/225 2/25/03 39211

    1008396-301 3857719 2 SIERRA-2 225 2/25/03 39211

  • 1020153-301 3857783 1 SIERRA-2 N/A 2/26/03 39211

    1044765-300 3857311 2 SIERRA 1075 1/30/03 22463

  • SECTION: 04.01

    VISUAL INSPECTION OF CONTROL WIRING

    INCLUDED IN THE CERTIFIED TEST DATA IN SECTION 08.01

  • SECTION: 04.02

    HARDWARE VERIFICATION

    INCLUDED IN THE CERTIFIED TEST DATA IN SECTION 08.01

  • SECTION: 04.03

    PROJECT SOFTWARE VERIFICATION

    INCLUDED IN THE CERTIFIED TEST DATA IN SECTION 08.01

  • SECTION: 05.03.A

    COMPRESSOR CASE LEAK TEST

    LEAK TEST CHART

  • SECTION: 05.03.B

    COMBUSTOR CASE LEAK TEST

    LEAK TEST CHART

  • SECTION: 05.03.C

    ENGINE FUEL MANIFOLD LEAK TEST

    LEAK TEST CHART

  • Plotter4.viC:\Prueba de Presion\Plotter4.viLast modified on 1/24/03 at 10:57 AMPrinted on 1/24/03 at 3:53 PM

    P a g e 1

    3 0 1 5 0 4 - 1 0 1P a r t N u m b e r

    T T A 0 3 - 8 4 1 5 2 A N D 8 4 1 5 3Serial Number

    3 1N u m b e r o f M e a s u r e m e n t s

    0 - 500 psia

    S e n s o r

    C o m m e n t s

    J O S E MO p e r a t o r

    1 5 1 4 2 5Start Time

    Fri 01- 24- 2003 Start Date

    1T i m e B e t w e e n M e a s u r e m e n t s

    5 0 0

    0

    1 0 0

    2 0 0

    3 0 0

    4 0 0

    1 2 5

    0

    2 5

    5 0

    7 5

    1 0 0

    3 10 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 3 0

    1 3

    7

    Printer StatusY e s

    Print Report?

    Fri 01- 24- 2003 Finish Date

    1 5 4 8 0 1Finish Time

    P r e s s u r e

    T e m p e r a t u r e

    p

    s

    i

    a

    oF

    Time (mins.)

    4 0 8 . 7M aximum Pressure

    7 1 . 0M a x i m u m T e m p e r a t u r e

    Turbotec Pressure Test

    )2* 4GX

    4 0 6 . 7 3First Pressure Reading

    4 0 8 . 6 9Last Pressure Reading

    4 0 8 . 6 9M a x i m u m T e s t P r e s s u r e

    4 0 6 . 2 4M i n i m u m T e s t P r e s s u r e

    2 . 4 5Test Pressure Diference

  • Sensor 0-500 PSIGComments: Date: Fri 01- 24- 2003Time: 15 14 25Operator: JOSE MSerial Number: TTA03-84152 AND 84153Part Number: 301504-101Nominal Test Pressure: *********Sampling Time (mins): 31

    Time (mins) Pressure (psia) Temperature (F)0.000 15.216 70.7441.000 406.726 70.7322.000 406.408 70.8233.000 406.253 70.8494.000 406.245 70.7175.000 406.269 70.9026.000 406.416 70.8617.000 406.563 70.7388.000 406.620 71.0059.000 406.734 70.82310.000 406.864 70.84311.000 406.897 70.74712.000 407.052 70.71413.000 407.215 70.62014.000 407.288 70.79415.000 407.402 70.81116.000 407.549 70.82617.000 407.696 70.81118.000 407.737 70.70319.000 407.867 70.82920.000 407.924 70.94621.000 408.038 70.63522.000 408.177 70.72623.000 408.209 70.74424.000 408.356 70.61725.000 408.405 70.89626.000 408.519 70.91427.000 408.527 70.78228.000 408.601 70.83529.000 408.690 70.77630.000 408.690 70.65931.000 13.961 70.703First Pressure Reading: 406.73

    Last Pressure Reading: 408.69

    Maximum Test Pressure: 408.69

    Minimum Test Pressure: 406.24

    Maximum Temperature: 71.004925

    Finish Date: Fri 01- 24- 2003Finish Time: 15 48 01These results are a verified copy of the data maintained in the testconputer, according toEs 9-78. No leaks.

  • SECTION: 05.04.A

    GAS PRODUCER COMPRESSOR ROTOR

    SHOP FLOOR INFORMATION SYSTEM (INSPECTION DATA)

  • CERTIFICATE OF COMPLIANCESOLAR TURBINES INCORPORATED, HEADQUARTERED IN SAN DIEGO, CALIFORNIA,

    HEREWITH CERTIFIES ON INFORMATION AND BELIEF:

    ROTORS ASSEMBLY COMPRESSOR AND TURBINEMECHANICAL/ELECTRICAL RUNOUTS AND BALANCE DATA

    The following rotors and their supporting documents for Engine Serial # 0203B,PD72871 have been reviewed to ensure that they are in accordance with Solarstandards, drawings, specifications and practices and Quality requirements.

    Compressor Rotor Mechanical /Electrical 05.04.A P/N 330206-103 S/N ROB03-25533Balance 05.04.D P/N S/N

    GP RotorMechanical/Electrical 05.04.B P/N 199270-200 S/N ROB03-26931Balance 05.04.E P/N S/N

    PT RotorMechanical/Electrical 05.04.C P/N 199351-101 S/N ROB03-26932Balance 05.04.F P/N S/N

  • March 28, 2003Dimensional summary sheet for serial number:

    (Dim_Rpt_Opn.Rdf)

    ROB03-25533

    COMPANY CONFIDENTIAL For Reference Only

    Page 1 of 1

    ER0 #1ERO #2MRO #1MRO #2SPLINE

    Dimension

    ELECT R/O NO.1 BRGELECT R/O NO.2 BRGMECH R/O NO.1 BRGMECH R/O NO.2 BRGFWD CONE SPLINE R/O

    Description

    00500050005000500050

    Op#

    .04

    .02

    .00005

    .00005

    .0001

    Result

    00000

    Minimum

    .05

    .05.0002.0002.0002

    Maximum Red

    3921939219392193921939219

    Badge

    24-FEB-0324-FEB-0324-FEB-0324-FEB-0324-FEB-03

    Date Initials Red Sign Off

  • SECTION: 05.04.B

    GAS PRODUCER TURBINE ROTOR

    SHOP FLOOR INFORMATION SYSTEM (INSPECTION DATA)

  • March 28, 2003Dimensional summary sheet for serial number:

    (Dim_Rpt_Opn.Rdf)

    ROB03-26931

    COMPANY CONFIDENTIAL For Reference Only

    Page 1 of 1

    ELECTMECH

    Dimension

    RUNOUT #3 BEARING JOURNALRUNOUT #3 BEARING JOURNAL

    Description

    00200020

    Op#

    .02

    .00005

    Result

    00

    Minimum

    .05.0002

    Maximum Red

    2972829728

    Badge

    21-FEB-0321-FEB-03

    Date Initials Red Sign Off

  • SECTION: 05.04.C

    POWER TURBINE ROTOR

    SHOP FLOOR INFORMATION SYSTEM (INSPECTION DATA)

  • March 28, 2003Dimensional summary sheet for serial number:

    (Dim_Rpt_Opn.Rdf)

    ROB03-26932

    COMPANY CONFIDENTIAL For Reference Only

    Page 1 of 1

    #4ELEC#4MECH#5ELEC#5MECH

    Dimension

    BEARING JOURNAL RUNOUTBEARING JOURNAL RUNOUTBEARING JOURNAL RUNOUTBEARING JOURNAL RUNOUT

    Description

    0020002000200020

    Op#

    .02

    .00005

    .02

    .00005

    Result

    0000

    Minimum

    .05.0002.05

    .0002

    Maximum Red

    28052280522805228052

    Badge

    22-FEB-0322-FEB-0322-FEB-0322-FEB-03

    Date Initials Red Sign Off

  • SECTION: 05.04.D

    BALANCE GAS PRODUCER COMPRESSOR ROTOR

    SHOP FLOOR INFORMATION SYSTEM (INSPECTION DATA)

  • March 28, 2003Dimensional summary sheet for serial number:

    (Dim_Rpt_Opn.Rdf)

    ROB03-25533

    COMPANY CONFIDENTIAL For Reference Only

    Page 1 of 1

    AFTAMTFWDAMT

    Dimension

    FINAL RESIDUAL BALFINAL RESIDUAL BAL

    Description

    00900090

    Op#

    .0253

    .0435

    Result

    00

    Minimum

    .18

    .18

    Maximum Red

    2862228622

    Badge

    25-FEB-0325-FEB-03

    Date Initials Red Sign Off

  • SECTION: 05.04.E

    BALANCE GAS PRODUCER TURBINE ROTOR

    SHOP FLOOR INFORMATION SYSTEM (INSPECTION DATA)

  • March 28, 2003Dimensional summary sheet for serial number:

    (Dim_Rpt_Opn.Rdf)

    ROB03-26931

    COMPANY CONFIDENTIAL For Reference Only

    Page 1 of 1

    ANG.-EANG.-FOZ.IN-EOZ.IN-FR/O1R/O2

    Dimension

    ANGLE OF IMBALANCEANGLE OF IMBALANCEALLOWABLE IMBALANCE PLANE -E-ALLOWABLE IMBALANCE PLANE -F-FACE RUNOUT DISC #1FACE RUNOUT DISC #2

    Description

    006000600060006000600060

    Op#

    246108.023.031.0005.001

    Result

    000000

    Minimum

    360360.1.1

    .003

    .003

    Maximum Red

    336443364433644336443364433644

    Badge

    21-FEB-0321-FEB-0321-FEB-0321-FEB-0321-FEB-0321-FEB-03

    Date Initials Red Sign Off

  • SECTION: 05.04.F

    BALANCE POWER TURBINE ROTOR

    SHOP FLOOR INFORMATION SYSTEM (INSPECTION DATA)

  • March 28, 2003Dimensional summary sheet for serial number:

    (Dim_Rpt_Opn.Rdf)

    ROB03-26932

    COMPANY CONFIDENTIAL For Reference Only

    Page 1 of 1

    #3R/O#4R/OANGLE-FANGLE-GOZ.IN.-FOZ.IN.-G

    Dimension

    DISC #3 FACE RUNOUTDISC #4 FACE RUNOUTANGLE OF IMBALANCEANGLE OF IMBALANCEALLOWABLE IMBALANCE @ PLANE -F-ALLOWABLE IMBALANCE AT PLANE -G-

    Description

    006500650065006500650065

    Op#

    .001

    .001291180.08.07

    Result

    000000

    Minimum

    .004

    .003360360.2.2

    Maximum Red

    336443364433644336443364433644

    Badge

    22-FEB-0322-FEB-0322-FEB-0322-FEB-0322-FEB-0322-FEB-03

    Date Initials Red Sign Off

  • SECTION: 05.07

    ENGINE PERFORMANCE TEST

    INCLUDED IN THE CERTIFIED TEST DATA IN SECTION 08.01

  • SECTION: 06.05

    IMPELLER OVERSPEED SPIN TEST

    SHOP FLOOR INFORMATION SYSTEM

  • SECTION: 06.06

    CENTER BODY HYDRO TEST

    SHOP FLOOR INFORMATION SYSTEM (INSPECTION DATA)

  • SECTION: 06.07

    END CAPS HYDRO TEST

    SHOP FLOOR INFORMATION SYSTEM (INSPECTION DATA)

  • SECTION: 06.08

    MECHANICAL AND ELECTRICAL RUNOUT

    INSPECTION DATA

  • SECTION: 06.08.A

    ROTOR BALANCE

    BALANCE COMPUTER PRINTOUT

  • SECTION: 06.10

    GAS COMPRESSOR AIR TEST

    AIR TEST*

  • SECTION: 07.00

    PACKAGE ASSEMBLY

    NO DOCUMENTS REQUIRED

  • SECTION: 08.01

    PACKAGE/CONSOLE ACCEPTANCE TEST

    CERTIFIED TEST DATA

  • SECTION: 08.02

    ENCLOSURE ASSEMBLY STATIC TEST

    INCLUDED IN THE CERTIFIED TEST DATA IN SECTION 08.01

  • SECTION: 08.03

    NO LOAD MECHANICAL STRING TEST (ONE UNIT ONLY)

    INCLUDED IN THE CERTIFIED TEST DATA IN SECTION 08.01

  • SECTION: 09.00

    PACKAGE FINAL INSPECTION

    NO DOCUMENTS REQUIRED

  • SECTION: 10.01

    QC DATA BOOK REVIEW

    1. PACKAGE CERTIFICATE OF COMPLIANCE

  • SECTION: 10.01

    QC DATA BOOK REVIEW

    2. ITP (REFERENCE COPY)

  • Inspection and Test Plan

    PAGE 1

    Solar TurbinesA Caterpillar Company

    The legend at the bottom of each page indicates what inspection / test points or documents are required.

    '01'

    '02'

    'A1'

    'R1'

    'X'

    'M2'

    Indicates Customer, Third Party or Certifying Agency inspection on 100% of units, operations or tests on that project. Every effort is made to have the inspector present when these operations are conducted. The inspection or test has not necessarily been performed in advance, prior to the observation point. Should the inspector be unavailable at the time of the actual inspection or test, production is not stopped. Review of verifying documents is included. Equipment in ITP Section 1.0 shall be released if Customer's Inspector fails to respond or fails to appear.

    Identical to 'O1', but performed on a sampling of units, operations or tests on that project (not necessarily 100%). Every effort is made to have the inspector present when these operations are conducted. The inspection or test has not necessarily been performed in advance, prior to the observation point. Should the inspector be unavailable at the time of the actual inspection or test, production is not stopped. Notification requirements are the same as for '01'. Equipment in ITP Section 1.0 shall be released if Customer's Inspector fails to respond or fails to appear.

    Indicates Solar inspection or test on 100% of units, operations or tests on that project.

    Indicates an in-process document review is required on 100% of units on that project. The in-process review is to take place at the operation or test location unless the document is included in the databook. A copy of the verifying document is not supplied unless also identified with an 'X' in Solar's column 'A'.

    In Solar's column 'A' indicates a copy of the document will be supplied in the Project Quality Assurance Data Book. The Databook contains a reference copy of the ITP. Individual documents are identified with the ITP Item number and are found in the corresponding sections. The documents consist of supplier information and Solar information.

    Indicates a sample monitoring of Solar's system is required. This monitoring will be on random equipment, and may not be project specific.

    The ITP is developed from the Solar Application Check Sheet (ACS) and information provided by the Business Manager and the Project Applications Engineer. Revisions are based on Customer input provided during project execution.

    Inspection Points: Column A is

    Special inspections, documents or tests above and beyond our standard are shown.

    Column B is Column C isASTRA TRANS

    Transierra

    Equipment includes 2 Each, Taurus CS Package(s). Powered by Taurus 70-10302 turbine(s).

    SIERRA 1 & 2 PD # 72871

    Solar Inspector / Engineer

    Driving a C402 Compressor.

    'A2' Indicates Solar inspection or test on only a sampling of units, operations or tests on that project.

    'R2' Indicates an in-process document review is required on only a sample of units on that project. The in-process review is to take place at the operation or test location unless the document is included in the databook. A copy of the verifying document is not supplied unless also identified with an 'X' in Solar's column 'A'.

    All documents are to be submitted to: or Emailed to: [email protected] Document CoordinatorSolar Turbines Incorporated (KM20)4200 Ruffin Rd.San Diego CA 92123-1836, USA

    FIVE (5) Working Days Notification Required For All Customer INSPECTION/OBSERVATION Items.

    Prepared for

    This ITP was Prepared By: Larry Proctor, Quality Engineer

    Column D isOther

    Certification:

    NECRevision Number: 4 Dated: May 01, 2003

    Caterpillar Confidential: Yellow

  • Inspection and Test Plan PAGESolar TurbinesA Caterpillar Company

    2

    Source Inspection Instructions for ITP Section 1.0 ONLY Solar Turbines Supplier Quality Engineer- (Ray Greeves) 1. Create Project File. 2. Send (email/fax/mail) copies of latest revisions of ITP, Unpriced Purchase Order,

    Drawings, etc. to assigned contracted Inspector. 3. Send (email/fax/mail) copies of latest revisions of ITP, Unpriced Purchase Order to

    Drawings to Inspection Agency. 4. Follow up on Supplier to Inspector Second Notifications. 5. Reassign inspection to different Solar Inspector and/or Inspection Agency 24 hours after

    Supplier notification to Solar that Inspector did not respond to Second Notice (see Supplier item number 6).

    6. Request Customer Inspection Waiver from Project Manager, if Customer Inspector did not respond to Supplier within 48 hours after Supplier issued Second Notice (see Supplier Item 6).

    Suppliers Noted in Section 1.0 of this ITP- 1. Per ITP requirement, send (email/fax) Inspection Notification to Solar Inspector and/or

    Solar Customer Inspector. 2. Send (email/fax) copy(s)of Inspection Notification(s) to Solar Supplier Quality Engineer

    (Ray Greeves). 3. Send (e-mail/fax) copy of Notification to Solar Purchasing Representative. 4. Send (e-mail/fax) Second Notification to Solar Inspector and/or Solar Customer

    Inspector, if required; copy Solar Supplier Quality Engineer. 5. At Inspectors arrival, confirm Inspector has latest Purchase Order and Drawing revision,

    and provide Inspector with current copy(s), if required. 6. If Inspector and/or Solars Customers Inspector has not responded to a Second Notice

    Notification within 48 hours, notify the Solar Turbines Supplier Quality Engineer. Solars Contracted Source Inspector (Column A of Section 1.0)- 1. Upon receipt of Solar ITP, Purchase Order and Drawing, notify Supplier of your

    inspection assignment. 2. Upon receiving Inspection Notification from Supplier, send (e-mail/fax) inspection

    confirmation to the Supplier. 3. Send (e-mail/fax) copy of inspection confirmation to Solar Supplier Quality Engineer and

    Inspection Agency. 4. Respond to Supplier Second Notification within 48 hours (see Supplier Item 6 and Solar

    Turbines Supplier Quality Engineer Item 5). 5. Send Inspection Reports to Solar Quality Engineer. Note: For Solar Source Inspections, only a Quality Engineer, Quality Manager, or Project Manager can waive Source Inspection requirements. For Customer inspections, only the Customer can waive Source Inspection Requirements. All waivers must be in writing (email or faxed). Please address ITP Section 1.0 Source Inspection issues to Ray Greeves 858/292-3146. Email address: [email protected]

    Caterpillar Confidential: Yellow

  • SOLAR TURBINES INCORPORATED INSPECTION AND TEST PLAN

    CLIENT: PROJECT NAME:

    NO. UNITS:PD NO:

    ISSUED BY:

    PURCHASE ORDER:

    REV:

    EQUIPMENT

    72871

    Transierra SIERRA 1 & 2

    Taurus CS

    Taurus 70-10302

    2

    0.0

    0.3

    ITP approval by Solar Project Management.

    DATE:

    COLUMN B CONTACT INFORMATION:

    ITEM DESCRIPTION

    PROJECT QE CONTACT:

    Contact:

    Phone #:

    Fax #:

    Email:

    0.2

    0.4 COLUMN C CONTACT INFORMATION:

    Company:

    Contact:

    Phone #:

    Fax #:

    Cell/Pgr #:

    Company:

    Contact:

    Phone #:

    Fax #:

    Cell/Pgr #:

    Company:

    Contact:

    Phone #:

    Fax #:

    Cell/Pgr #:

    ITEM DESCRIPTIONITEM

    Company:

    Contact:

    Phone #:

    Fax #:

    Email:

    Company:

    Contact:

    Phone #:

    Fax #:

    Cell/Pgr #:

    Company:

    Contact:

    Phone #:

    Fax #:

    Cell/Pgr #:

    ITEM

    PAGE 3

    SOLAR SOURCE INSPECTION CONTACT:

    Contact: Ray Greeves

    Phone: 858-292-3146 Fax: 858-694-6733

    Cristian Alonso - Dto. de COMPRAS - Purchasing Department A-Evangelista S.A. - Phone: 011-54-11-4239-3852 Fax: 011-54-11-4239-3702 [email protected]

    Fabian Rivas - Cristian's backup - Phone: 011-54-11-4239 3706 [email protected]

    Cell/Pgr #:

    Email:

    Email:

    Email:

    Email:

    Email:

    Jaime Mellina, Project Manager

    Larry Proctor

    [email protected]

    Bob Sutherland, Project Engineer

    0.1

    4 May 01, 2003

    Julio Craysman

    5411-4239-3700

    5411-4239-3701

    Astra Evangelista

    [email protected]

    Cesar Coronel

    5411-4239-3760

    5411-4239-3701

    Astra Evangelista

    [email protected]

    5411-15-5400-3760

    See Additional Contact names below

    Jorge Luiz Kauer

    591-335-86-350

    591-335-86-183

    Transierra

    [email protected]

    (858) 694-6851

    (858) 715-7770

    [email protected]

    Larry Proctor

    Caterpillar Confidential: Yellow

  • PAGESOLAR TURBINES INCORPORATED INSPECTION AND TEST PLAN

    CLIENT: PROJECT NAME:

    NO. UNITS:PD NO:

    ISSUED BY:

    PURCHASE ORDER:

    REV:

    EQUIPMENT

    72871

    Transierra SIERRA 1 & 2

    Taurus CS

    Taurus 70-10302

    42

    TRANSITEM ITEM DESCRIPTION CONTROLLING DOCUMENT

    VERIFYING RECORD A B C

    Solar ASTRA

    Larry Proctor 4 May 01, 2003

    01.00 PACKAGING OPERATIONS PURCHASED PARTS Purchase Order

    PSO PQ.S06.06

    Engineering Drawings

    R1POMQ Computer Screen

    01.01 RECEIVING INSPECTION - Inspect material per Solar practices

    SUPPLIERS BELOW TO NOTE THE FOLLOWING:

    ALL DOCUMENTATION MARKED WITH "X" IN COLUMN A SHALL BE PROVIDED TO SOLAR WITHIN 14 CALENDAR DAYS OF COMPLETION OF MANUFACTURING, AND/OR FINAL SOLAR OR CUSTOMER INSPECTION. DOCUMENTATION SHALL INCLUDE SOLAR PO#, SOLAR PART NUMBER AND SOLAR PROJECT NAME/NUMBER.

    ELECTRONIC TRANSMITTAL OF DOCUMENTS IS PREFERRED. SEND TO:[email protected]

    DOCUMENTS SHALL BE MAILED TO:QUALITY DOCUMENTS COORDINATORSOLAR TURBINES, INC. (KM20)4200 RUFFIN RD.SAN DIEGO, CA 92123

    NOTE: RECEIVING INSPECTION VERIFYING DOCUMENTS ARE NOT APPLICABLE TO DROP SHIPPED ITEMS.

    Purchase Order

    PSO PQ.S10.01PSO PQ.S10.02PSO PQ.S10.03PSO PQ.S10.05PSO PQ.S13.08

    Engineering Drawings

    R2On-Line Material Review and Corrective Action System

    01.03 AIR INLET SILENCER(Drop Ship Item)

    Purchase Order

    ES 1692

    Engineering Drawings

    01.04 AIR INLET FILTER(Drop Ship Item)

    Purchase Order

    ES 1725

    Engineering Drawings

    01.05 EXHAUST SILENCER(Drop Ship Item)

    Purchase Order

    ES 1632

    Engineering Drawings

    A2 SOLAR SAMPLE INSP/TEST M2 MONITOR SYSTEM

    R1 100% DOCUMENT REVIEW O1 100% OBSERVE INSP/TEST

    R2 SAMPLE DOCUMENT REVIEW

    SOLAR SUBMIT VERIFYING DOCUMENT

    A1 SOLAR 100% INSP/TEST

    O2 SAMPLE OBSERVE INSP/TEST

    X

    Caterpillar Confidential: Yellow

  • PAGESOLAR TURBINES INCORPORATED INSPECTION AND TEST PLAN

    CLIENT: PROJECT NAME:

    NO. UNITS:PD NO:

    ISSUED BY:

    PURCHASE ORDER:

    REV:

    EQUIPMENT

    72871

    Transierra SIERRA 1 & 2

    Taurus CS

    Taurus 70-10302

    52

    TRANSITEM ITEM DESCRIPTION CONTROLLING DOCUMENT

    VERIFYING RECORD A B C

    Solar ASTRA

    Larry Proctor 4 May 01, 2003

    01.06 LUBE OIL COOLER(Drop Ship Item)

    Must Be ASME Code Stamped

    SOURCE INSPECT PER SOLAR SUPPLIER QUALITY ASSURANCE.

    Purchase Order

    Engineering Drawings

    ASME VIII

    R1 X1. ASME Data Report

    A1 X2. Pressure Test and Flush Certificate

    01.07 LUBE OIL FILTERS Purchase Order

    Engineering Drawings

    ASME VIII

    R1 XASME Data Report( if applicable )

    01.08 GAS FUEL FILTERS Purchase Order

    Engineering Drawings

    ASME VIII

    R1 XASME Data Report

    01.09 ENGINE HANDLING KIT Purchase Order

    Engineering Drawings

    R1 XCertificate

    01.10 PACKAGE LIFTING KIT Purchase Order

    Engineering Drawings

    R1 XCertificate

    A2 SOLAR SAMPLE INSP/TEST M2 MONITOR SYSTEM

    R1 100% DOCUMENT REVIEW O1 100% OBSERVE INSP/TEST

    R2 SAMPLE DOCUMENT REVIEW

    SOLAR SUBMIT VERIFYING DOCUMENT

    A1 SOLAR 100% INSP/TEST

    O2 SAMPLE OBSERVE INSP/TEST

    X

    Caterpillar Confidential: Yellow

  • PAGESOLAR TURBINES INCORPORATED INSPECTION AND TEST PLAN

    CLIENT: PROJECT NAME:

    NO. UNITS:PD NO:

    ISSUED BY:

    PURCHASE ORDER:

    REV:

    EQUIPMENT

    72871

    Transierra SIERRA 1 & 2

    Taurus CS

    Taurus 70-10302

    62

    TRANSITEM ITEM DESCRIPTION CONTROLLING DOCUMENT

    VERIFYING RECORD A B C

    Solar ASTRA

    Larry Proctor 4 May 01, 2003

    02.00 SKID BASE PLATE (TURBINE PACKAGE) (TurboFab, Houston)

    TurboFab Contact: Chuck BelsonTel: 281-860-6702

    02.01 Review welding procedures TF 1009

    AWS D1.1

    M2 XPQR, WPS

    02.02 Review welder qualifications TF 1009

    AWS D1.1

    M2 XWQR

    02.03 Weld skid/lifting bollardsDimensional check and visual inspection to AWS D1.1 Section 6.

    (Built to engineering specifications using ASTM A36 material)

    TF 1009

    Fabrication Drawings

    AWS D1.1

    A1 XTraveler

    02.04 Lube Oil Tank - Pneumatic leak test TF 2005 XC of C

    A1Traveler

    02.05 Surface preparation and paint PSO QAS 701PSO QAS 710

    ES 9-58

    XC of C

    A1TurboFab Form 3016

    02.06 Lube Oil Tank - Internally coated with Brayco 785

    PSO QAS 702 XC of C

    A1Traveler

    A2 SOLAR SAMPLE INSP/TEST M2 MONITOR SYSTEM

    R1 100% DOCUMENT REVIEW O1 100% OBSERVE INSP/TEST

    R2 SAMPLE DOCUMENT REVIEW

    SOLAR SUBMIT VERIFYING DOCUMENT

    A1 SOLAR 100% INSP/TEST

    O2 SAMPLE OBSERVE INSP/TEST

    X

    Caterpillar Confidential: Yellow

  • PAGESOLAR TURBINES INCORPORATED INSPECTION AND TEST PLAN

    CLIENT: PROJECT NAME:

    NO. UNITS:PD NO:

    ISSUED BY:

    PURCHASE ORDER:

    REV:

    EQUIPMENT

    72871

    Transierra SIERRA 1 & 2

    Taurus CS

    Taurus 70-10302

    72

    TRANSITEM ITEM DESCRIPTION CONTROLLING DOCUMENT

    VERIFYING RECORD A B C

    Solar ASTRA

    Larry Proctor 4 May 01, 2003

    03.00 MANIFOLDS

    Solar Contact: Ron LangTel: 858-694-6121

    03.01 Review welding procedures ASME IX M2 XWPS, PQR

    03.02 Review welder qualification ASME IX M2 XWQR

    03.03 Weld manifolds Dimensional check and visual inspection

    WPS

    PSO QAS 709

    Engineering Drawings

    XC of C

    A1Traveler

    03.04 NDE Manifolds (Radiography - RT)(Standard is 5% per welder on circumferential butt welds only. NOTE: Not per project)

    ASME B31.3 XC of C

    03.05 Hydrostatic Test Manifolds -(1.5 times design pressure for 10 minutes minimum)

    * Hydro Test Log maintained by part number, not project specific.

    PSO QAS 708

    Engineering Drawings

    ASME B31.3

    A1 XHydro Test Log

    A2 SOLAR SAMPLE INSP/TEST M2 MONITOR SYSTEM

    R1 100% DOCUMENT REVIEW O1 100% OBSERVE INSP/TEST

    R2 SAMPLE DOCUMENT REVIEW

    SOLAR SUBMIT VERIFYING DOCUMENT

    A1 SOLAR 100% INSP/TEST

    O2 SAMPLE OBSERVE INSP/TEST

    X

    Caterpillar Confidential: Yellow

  • PAGESOLAR TURBINES INCORPORATED INSPECTION AND TEST PLAN

    CLIENT: PROJECT NAME:

    NO. UNITS:PD NO:

    ISSUED BY:

    PURCHASE ORDER:

    REV:

    EQUIPMENT

    72871

    Transierra SIERRA 1 & 2

    Taurus CS

    Taurus 70-10302

    82

    TRANSITEM ITEM DESCRIPTION CONTROLLING DOCUMENT

    VERIFYING RECORD A B C

    Solar ASTRA

    Larry Proctor 4 May 01, 2003

    04.00 CONTROLS

    Solar Contact: Ron LangTel: 858-694-6121

    04.01 Visual inspection of control wiring Project Electrical Drawings

    A1 XIncluded in the Certified Test Data in Section 08.01

    04.02 Hardware verification of the project control system. This verification is performed on each unit of a multi-unit Sales Order.

    Project Electrical Drawings

    A1 X O1 O1Included in the Certified Test Data in Section 08.01

    04.03 Project software verification using software simulators to represent the operation of the equipment controlled by the software. This verification is performed only once on a multi-unit Sales Order.

    Project Electrical Drawings

    A1 X O1 O1Included in the Certified Test Data in Section 08.01

    A2 SOLAR SAMPLE INSP/TEST M2 MONITOR SYSTEM

    R1 100% DOCUMENT REVIEW O1 100% OBSERVE INSP/TEST

    R2 SAMPLE DOCUMENT REVIEW

    SOLAR SUBMIT VERIFYING DOCUMENT

    A1 SOLAR 100% INSP/TEST

    O2 SAMPLE OBSERVE INSP/TEST

    X

    Caterpillar Confidential: Yellow

  • PAGESOLAR TURBINES INCORPORATED INSPECTION AND TEST PLAN

    CLIENT: PROJECT NAME:

    NO. UNITS:PD NO:

    ISSUED BY:

    PURCHASE ORDER:

    REV:

    EQUIPMENT

    72871

    Transierra SIERRA 1 & 2

    Taurus CS

    Taurus 70-10302

    92

    TRANSITEM ITEM DESCRIPTION CONTROLLING DOCUMENT

    VERIFYING RECORD A B C

    Solar ASTRA

    Larry Proctor 4 May 01, 2003

    05.00 GAS TURBINE ENGINE

    Solar Contact: Ron LangTel: 858-694-6121

    05.01 SUPPLIER QUALITY ENGINEERING - Review and approval of purchase requisitions for first-time buy or revised parts.

    Purchase Order

    PSO PQ.S6.06

    Engineering Drawings

    POMQ Computer Screen

    05.02 RECEIVING INSPECTION - Inspect material per Solar practices.

    Purchase Order

    PSO PQ.S10.01PSO PQ.S10.02PSO PQ.S10.03PSO PQ.S10.05PSO PQ.S13.08

    Engineering Drawings

    A2Check List, Check Chart, or ENPS Computer Screen

    R2Inspection Accumulation Record Form

    05.03.A Compressor Case Leak Test

    Cases are leak tested at the place of manufacture. Cases are not assigned to a specific project or a specific engine at the time of leak testing.

    Engineering Drawing

    A1 XLeak Test Chart

    05.03.B Combustor Case Leak Test

    Cases are leak tested at the place of manufacture. Cases are not assigned to a specific project or a specific engine at the time of leak testing.

    Engineering Drawing

    A1 XLeak Test Chart

    05.03.C Engine Fuel Manifold Leak Test

    Manifolds are leak tested at the place of manufacture. Manifolds are not assigned to a specific project or a specific engine at the time of leak testing.

    NOTE: Fuel manifolds are manufactured and tested at TurboTec, Tijuana, Mexico.

    ES 9-78

    Engineering Drawing

    A1 XLeak Test Chart

    05.04 ROTOR ASSEMBLY - COMPRESSOR AND TURBINENOTE: Customer identification is assigned at this point.

    TMP QP 602.0

    A2 SOLAR SAMPLE INSP/TEST M2 MONITOR SYSTEM

    R1 100% DOCUMENT REVIEW O1 100% OBSERVE INSP/TEST

    R2 SAMPLE DOCUMENT REVIEW

    SOLAR SUBMIT VERIFYING DOCUMENT

    A1 SOLAR 100% INSP/TEST

    O2 SAMPLE OBSERVE INSP/TEST

    X

    Caterpillar Confidential: Yellow

  • PAGESOLAR TURBINES INCORPORATED INSPECTION AND TEST PLAN

    CLIENT: PROJECT NAME:

    NO. UNITS:PD NO:

    ISSUED BY:

    PURCHASE ORDER:

    REV:

    EQUIPMENT

    72871

    Transierra SIERRA 1 & 2

    Taurus CS

    Taurus 70-10302

    102

    TRANSITEM ITEM DESCRIPTION CONTROLLING DOCUMENT

    VERIFYING RECORD A B C

    Solar ASTRA

    Larry Proctor 4 May 01, 2003

    05.04.A Gas Producer Compressor Rotor(Mechanical and Electrical runout)

    Engineering Drawing

    A1 XShop Floor Information System (Inspection Data)

    05.04.B Gas Producer Turbine Rotor(Mechanical and Electrical runout)

    Engineering Drawing

    A1 XShop Floor Information System (Inspection Data)

    05.04.C Power Turbine Rotor(Mechanical and Electrical runout)

    Engineering Drawing

    A1 XShop Floor Information System (Inspection Data)

    05.04.D Balance Gas Producer Compressor Rotor Engineering Drawing

    TMP QAS 712

    A1 XShop Floor Information System (Inspection Data)

    05.04.E Balance Gas Producer Turbine Rotor Engineering Drawing

    TMP QAS 712

    A1 XShop Floor Information System (Inspection Data)

    05.04.F Balance Power Turbine Rotor Engineering Drawing

    TMP QAS 712

    A1 XShop Floor Information System (Inspection Data)

    05.05 ENGINE ASSEMBLY TMP QP 602.0 A1Shop Floor Information System (Inspection Data)

    05.07 ENGINE PERFORMANCE TEST(Utilizing the Facility Test Stand and Dynamometer to load engine)

    *Included In Certified Test Data In Section 8.01

    PSOP P10.11PSOP P10.22PSOP P11.01

    ES 2235

    A1 X O1 O1Acceptance Test Stamp Sheet*

    A2 SOLAR SAMPLE INSP/TEST M2 MONITOR SYSTEM

    R1 100% DOCUMENT REVIEW O1 100% OBSERVE INSP/TEST

    R2 SAMPLE DOCUMENT REVIEW

    SOLAR SUBMIT VERIFYING DOCUMENT

    A1 SOLAR 100% INSP/TEST

    O2 SAMPLE OBSERVE INSP/TEST

    X

    Caterpillar Confidential: Yellow

  • PAGESOLAR TURBINES INCORPORATED INSPECTION AND TEST PLAN

    CLIENT: PROJECT NAME:

    NO. UNITS:PD NO:

    ISSUED BY:

    PURCHASE ORDER:

    REV:

    EQUIPMENT

    72871

    Transierra SIERRA 1 & 2

    Taurus CS

    Taurus 70-10302

    112

    TRANSITEM ITEM DESCRIPTION CONTROLLING DOCUMENT

    VERIFYING RECORD A B C

    Solar ASTRA

    Larry Proctor 4 May 01, 2003

    06.00 GAS COMPRESSOR ASSEMBLY

    Solar Contact: Ron LangTel: 858-694-6121

    06.01 SUPPLIER QUALITY ENGINEERING - Review and approval of purchase requisitions for first-time buy or revised parts.

    Purchase Order

    PSO PQ.S6.06

    POMQ Computer Screen

    Engineering Drawings

    POMQ Computer Screen

    06.02 RECEIVING INSPECTION - Inspect material per Solar practices.

    Purchase Order

    POMQ Computer Screen

    Engineering Drawings or ENPS Computer Screen

    A2Check List, Check Chart, or POMQ Computer Screen

    06.03 Gas Compressor Dry Gas Seals Purchase Order

    POMQ Computer Screen

    Engineering Drawings

    A2POMQ Computer Screen

    06.05 Impeller Overspeed Spin Test and Dimensional Check One Minute at 115% speed.

    Engineering Drawings

    A1 XShop Floor Information Systemor Process Log (Inspection Data)

    06.06 Center Body Hydro Test(center body hydro test at 1.5 times design pressure for 30 minutes minimum)

    NOTES:Hydrotests performed for extended time periods will apply to the centerbody and endcaps only. Additional tests on services ports will be the standard 30 minute duration.

    ES 9-78

    Engineering Drawings

    A1 XShop Floor Information System (Inspection Data)

    06.07 End Caps Hydro Test (end caps hydro test at 1.5 times design pressure for 30 minutes minimum)

    ES 9-78

    Engineering Drawing

    A1 XShop Floor Information System (Inspection Data)

    A2 SOLAR SAMPLE INSP/TEST M2 MONITOR SYSTEM

    R1 100% DOCUMENT REVIEW O1 100% OBSERVE INSP/TEST

    R2 SAMPLE DOCUMENT REVIEW

    SOLAR SUBMIT VERIFYING DOCUMENT

    A1 SOLAR 100% INSP/TEST

    O2 SAMPLE OBSERVE INSP/TEST

    X

    Caterpillar Confidential: Yellow

  • PAGESOLAR TURBINES INCORPORATED INSPECTION AND TEST PLAN

    CLIENT: PROJECT NAME:

    NO. UNITS:PD NO:

    ISSUED BY:

    PURCHASE ORDER:

    REV:

    EQUIPMENT

    72871

    Transierra SIERRA 1 & 2

    Taurus CS

    Taurus 70-10302

    122

    TRANSITEM ITEM DESCRIPTION CONTROLLING DOCUMENT

    VERIFYING RECORD A B C

    Solar ASTRA

    Larry Proctor 4 May 01, 2003

    06.08 Mechanical and electrical runout Engineering Drawings

    A1 XInspection Data

    06.08.A Rotor balance Engineering Drawings

    A1 XBalance Computer Printout

    06.09 Compressor Assembly TMP QP 602.0 A1Shop Floor Information System or Traveler (Assy / Inspection Data)

    06.10 GAS COMPRESSOR AIR TEST (On facility test stand including 100% mechanical run, air test and nitrogen static leak test)

    * Included in the Certified Test Data in Section 08.01

    PSOP P10.22PSOP P11.01

    ES 1597

    A1 X O1 O1Air Test*

    A2 SOLAR SAMPLE INSP/TEST M2 MONITOR SYSTEM

    R1 100% DOCUMENT REVIEW O1 100% OBSERVE INSP/TEST

    R2 SAMPLE DOCUMENT REVIEW

    SOLAR SUBMIT VERIFYING DOCUMENT

    A1 SOLAR 100% INSP/TEST

    O2 SAMPLE OBSERVE INSP/TEST

    X

    Caterpillar Confidential: Yellow

  • PAGESOLAR TURBINES INCORPORATED INSPECTION AND TEST PLAN

    CLIENT: PROJECT NAME:

    NO. UNITS:PD NO:

    ISSUED BY:

    PURCHASE ORDER:

    REV:

    EQUIPMENT

    72871

    Transierra SIERRA 1 & 2

    Taurus CS

    Taurus 70-10302

    132

    TRANSITEM ITEM DESCRIPTION CONTROLLING DOCUMENT

    VERIFYING RECORD A B C

    Solar ASTRA

    Larry Proctor 4 May 01, 2003

    07.00 PACKAGE ASSEMBLY

    Solar Contact: Ron LangTel: 858-694-6121

    PSOP P10.11 .

    07.01 Base qualification of customer fixed interfacepoints prior to build-up of package.

    Project Mechanical Installation Drawings

    A1QC Folder Check List

    07.02 Mechanical Assembly PSO QAS 800PSO QAS 803PSO QAS 804PSO QAS 805PSO QAS 806PSO QAS 812PSO QAS 814PSO QAS 815PSO QAS 816PSO QAS 817PSO QAS 821PSO QAS 826PSO QAS 829PSO QAS 834PSO QAS 835

    A2QC Folder Check List

    07.03 Electrical Assembly PSO QAS 503 PSO QAS 504PSO QAS 506DE.380.F01

    A2QC Folder Check List

    07.04 Review alignments PSO QAS 806

    Project Mechanical Installation Drawings

    A1QC Folder Alignment Sheet

    07.05 Dimensional check of customer connections and interface points during build-up of package. (Including customer connection plates and flanges)

    Project Mechanical Installation Drawings

    A1Dimensional Verification Sheet

    A1QC Folder Check List

    A2 SOLAR SAMPLE INSP/TEST M2 MONITOR SYSTEM

    R1 100% DOCUMENT REVIEW O1 100% OBSERVE INSP/TEST

    R2 SAMPLE DOCUMENT REVIEW

    SOLAR SUBMIT VERIFYING DOCUMENT

    A1 SOLAR 100% INSP/TEST

    O2 SAMPLE OBSERVE INSP/TEST

    X

    Caterpillar Confidential: Yellow

  • PAGESOLAR TURBINES INCORPORATED INSPECTION AND TEST PLAN

    CLIENT: PROJECT NAME:

    NO. UNITS:PD NO:

    ISSUED BY:

    PURCHASE ORDER:

    REV:

    EQUIPMENT

    72871

    Transierra SIERRA 1 & 2

    Taurus CS

    Taurus 70-10302

    142

    TRANSITEM ITEM DESCRIPTION CONTROLLING DOCUMENT

    VERIFYING RECORD A B C

    Solar ASTRA

    Larry Proctor 4 May 01, 2003

    08.00 PACKAGE TEST

    Solar Contact: Ron LangTel: 858-694-6121

    08.01 Package/Console Acceptance Test PSOP P10.11PSOP P10.22PSOP P11.01

    ES 2153 (T70)

    A1 O1 O1Acceptance Test Stamp Sheet

    A1 XCertified Test Data

    08.02 Enclosure assembly static test including simulated test of fire and combustible gas system (if present).

    *Included in the Certified Test Data in Section 08.01

    See PSO QAS list in section 07.02 and 07.03.

    A1 X O1 O1Acceptance Test Stamp Sheet*

    08.03 No Load Mechanical String Test (one unit only)

    4 Hour Gas Fuel Run1 Package Only

    *Included in the Certified Test Data in Section 08.01

    ES 1782 A1 X O1 O1Acceptance Test Stamp Sheet*

    A2 SOLAR SAMPLE INSP/TEST M2 MONITOR SYSTEM

    R1 100% DOCUMENT REVIEW O1 100% OBSERVE INSP/TEST

    R2 SAMPLE DOCUMENT REVIEW

    SOLAR SUBMIT VERIFYING DOCUMENT

    A1 SOLAR 100% INSP/TEST

    O2 SAMPLE OBSERVE INSP/TEST

    X

    Caterpillar Confidential: Yellow

  • PAGESOLAR TURBINES INCORPORATED INSPECTION AND TEST PLAN

    CLIENT: PROJECT NAME:

    NO. UNITS:PD NO:

    ISSUED BY:

    PURCHASE ORDER:

    REV:

    EQUIPMENT

    72871

    Transierra SIERRA 1 & 2

    Taurus CS

    Taurus 70-10302

    152

    TRANSITEM ITEM DESCRIPTION CONTROLLING DOCUMENT

    VERIFYING RECORD A B C

    Solar ASTRA

    Larry Proctor 4 May 01, 2003

    09.00 PACKAGE FINAL INSPECTION

    Solar Contact: Ron LangTel: 858-694-6121

    PSOP P10.11 .

    09.01 Mechanical Final Inspection See PSO QAS list in section 07.02.

    Project Mechanical Drawings

    A1 O1 O1QC Folder Check List

    09.02 Electrical Final Inspection See PSO QAS list in section 07.03.

    Project Electrical Drawings

    A1 O1 O1QC Folder Check List

    09.03 Paint Final Inspection PSO QAS 701 A1 O1 O1QC Folder Checklist

    09.04 Loose Ship PSOP P10.11

    PSO QAS 818

    A1 O1 O1Pack Slip

    09.05 Pre-shipment Inspection O1 O1

    09.06 Package preservation and preparation for shipment

    Shipping/Traffic Functional Practices

    PSOP P15.10

    ES 9-249

    ES 9-248

    A1 O1 O1OK to Ship QC Tag

    A2 SOLAR SAMPLE INSP/TEST M2 MONITOR SYSTEM

    R1 100% DOCUMENT REVIEW O1 100% OBSERVE INSP/TEST

    R2 SAMPLE DOCUMENT REVIEW

    SOLAR SUBMIT VERIFYING DOCUMENT

    A1 SOLAR 100% INSP/TEST

    O2 SAMPLE OBSERVE INSP/TEST

    X

    Caterpillar Confidential: Yellow

  • PAGESOLAR TURBINES INCORPORATED INSPECTION AND TEST PLAN

    CLIENT: PROJECT NAME:

    NO. UNITS:PD NO:

    ISSUED BY:

    PURCHASE ORDER:

    REV:

    EQUIPMENT

    72871

    Transierra SIERRA 1 & 2

    Taurus CS

    Taurus 70-10302

    172

    TRANSITEM ITEM DESCRIPTION CONTROLLING DOCUMENT

    VERIFYING RECORD A B C

    Solar ASTRA

    Larry Proctor 4 May 01, 2003

    REVISION RECORD SHEET

    REV DATE BY REMARKS

    0 08/05/02 Larry Proctor Revision 0 is the initial release of the ITP.

    1 10/31/02 Larry Proctor Revision 1: Changed PM. Moved 4 hr run from 05.07 to 08.03. Deleted item 06.11. Changed item 09.05 to 09.06 and then added pre-shipment inspection in 09.05. No other changes.

    2 02/19/03 Larry Proctor Revision 2: Added customer contact information. Added O1's to columns B and C in sections 5, 6, 8. No other changes.

    3 03/11/03 Larry Proctor Revision 3: Changed controlling document from ES2041 to ES2235 in item 05.07. No other changes.

    4 05/01/03 Larry Proctor Revision 4: Added customer contact information. No other changes.

    A2 SOLAR SAMPLE INSP/TEST M2 MONITOR SYSTEM

    R1 100% DOCUMENT REVIEW O1 100% OBSERVE INSP/TEST

    R2 SAMPLE DOCUMENT REVIEW

    SOLAR SUBMIT VERIFYING DOCUMENT

    A1 SOLAR 100% INSP/TEST

    O2 SAMPLE OBSERVE INSP/TEST

    X

    Caterpillar Confidential: Yellow

    Quality Assurance Data Book, SIERRA, PD # 72871, Volume 1ForwardTable of ContentsSection 1: Purchased Parts01.06 Lube Oil CoolerLO Cooler.pdf023115ABTransmittalTable of ContentsCertified DrawingParts ListSpec. SheetU-1A Data Reports023115.1A023115.1B

    NameplateHydrostatic Test Certifications1 of 22 of 2

    Material Traceability RecordsPipePlateTubes

    X-Ray Test Reports1 of 82 of 83 of 84 of 85 of 86 of 87 of 88 of 8

    Dye Penetrant Test Report1 of 42 of 43 of 44 of 4

    Flushing Record1 of 62 of 63 of 64 of 65 of 66 of 6

    Final Acceptance CertificateForm 1016Electrical Device ListFinal-In Process1 of 22 of 2

    Additional Final-In Process1 of 22 of 2

    Paint-In Process1 of 22 of 2

    Fan Data1 of 22 of 2

    Motor Data1 of 32 of 33 of 3

    1. ASME Data Report2. Pressure Test and Flush Certificate

    01.07.A Lube Oil FiltersASME Data Report

    01.08 Gas Fuel Filter01.09 Engine Handling Kit01.10 Package Lift Kit

    Section 2: Skid Base Plate 02.01 Review Welding Procedures02.02 Review Welder Qualifications02.03 Weld Skid/ Lifting Bollards02.04 Lube Oil Tank Pneumatic Leak Test02.05 Skid surface preparation and paint02.06 Lube Oil Tank - Internal Coating

    Section 3: Manifolds 03.01 Review Welding Procedures 03.02 Review Welder Qualifications03.03 Weld Manifolds Dimensional Check03.04 NDE Manifolds03.05 Hydostatic Test Log

    Section 4: Control System04.01 Visual Inspection of Control Console 04.02 Hardware Verification of Control System04.03 Software Verification of Control System

    Section 5: Turbine Engine05 03.A Compressor Case Leak Test05.03.B Combustor Case Leak Test05.03.C Hydrostatic Test Chart05.04.A Gas Producer Compressor Rotor Runout05.04.B Gas Producer Turbine Rotor Runout05.04.C Power Turbine Rotor Runout05.04.D Balance Gas Producer Compressor Rotor05.04.E Balance Gas Producer Turbine Rotor05.04.F Balance Power Turbine Rotor05.07 Engine Performance Test

    Section 6: Gas Compressors06.05 Impeller Overspeed Spin Test 06.06 Center Body Hydro Test06.07 End Caps Hydro Test06.08 Mechanical and Electrical Runout06.08.A Rotor Balance 06.10 Gas Compressor Air Test

    Section 7: Package Assembly07.00 No Documents Required

    Section 8: Package Test08.01 Certified Test ReportCertified Test DataItem 1: Turbine Acceptance TestItem 2: Turbine PerformanceItem 3: Turbine Operating ParametersItem 4: Turbine Vibration DataItem 5: Dry EmissionsItem 6: Package Acceptance TestItem 7: Gas Compressor Acceptance TestItem 8: Gas Compressor DataItem 9: String Test Data

    08.02 Enclosure Assembly Static Test08.03 No Load Mechanical String Test

    Section 9: Package Final Inspection09.00 No Documents Required

    Section 10: Documentation / Certification10.01 Package Certificate of Compliance10.01 ITP (Reference Copy)