PROJECT LOCATION
E MARY ANN CLEVELAND WAY
E C
OLO
SS
AL
CA
VE
RD
I - 10
N
TACIFI
AD
DENGS
TE
I
R
C
ET E
O.
H
S.
MARK E.
EG
RA
R
NZI O U.A
BOLLARD
23459
ISD
ETER ARC
CE
A.
T
IT
job
date
revisions
7350 EAST SPEEDWAY 210TUCSON, ARIZONA 85710
(520) 326-3700(520) 326-1148
www.swaimaia.com
OFFICEFAX
ASSOCIATES LTDARCHITECTS AIA
/
/
8/1
2/2
020
8:2
7:1
1 A
MC
:\A
ctive
Revit P
roje
cts
\111
6.6
2_
R19
_O
ld V
ail
Wea
the
rization
_C
F_js
eym
ou
r.rv
t
g1.0
co
ve
r sh
ee
tV
US
DO
LD
VA
IL M
IDD
LE
SC
HO
OL
132
99
E C
OL
OS
SA
L C
AV
E R
D
VA
IL, A
Z 8
56
41
08.07.20
1116.62
0708
20
sheet index
VAIL UNIFIED SCHOOL DISTRICT
CONSTRUCTION DOCUMENTS
SWAIM ASSOCIATES LTD. ARCHITECTS AIA
architect
7350 E. Speedway 210
Tucson, AZ 85710
(520) 326-3700 - fax: (520) 326-1148
www.swaimaia.com
Mark Bollard, AIA [email protected]
design team
OLD VAIL MIDDLE SCHOOL - WEATHERIZATION PROJECTSFB RENEWAL GRANT SFB # 100220104-9999-009BRG
no
rthN.T.S.g1.0
1Project Location
no
rthN.T.S.g1.0
2Scope of Work
GENERALg1.0 COVER SHEETg1.1 ABBREVIATIONS AND SYMBOLS
ARCHITECTURALa1.0 SITE PLANa4.0 BUILDING 100 - ELEVATIONSa4.1 BUILDING 200 - ELEVATIONSa4.2 KITCHEN - ELEVATIONSa4.3 BUILDING 300 - ELEVATIONSa4.4 BUILDING 400 - ELEVATIONSa4.4 BUILDING 400 - ELEVATIONSa4.6 GYMNASIUM - ELEVATIONSa4.7 LIBRARY - ELEVATIONSa4.8 BUILDING 800 - ELEVATIONSa4.9 BUILDING 800 - ELEVATIONSa4.10 BUILDING 600 - ELEVATIONSa4.11 BUILDING 600 - ELEVATIONS
1
a7.1
N-S section1/8" = 1'-0"
CLASS
129
A129B
10'-0"
11'-3 3/4"
LANDING 2
1
a1.0
A
5
a6.3
G
F
E
D
a6.1
1
a9.2
1
a1.0
1
a1.0
2
a7.2
2
a7.2
2
a5.2
ELEVATION INDICATOR
PARTITION TYPE
KEYNOTE
CEILING HEIGHT
WINDOW MARK
DOOR NUMBER
ROOM NAME / NUMBER
EXTERIOR ELEVATIONS
INTERIOR ELEVATIONS
ENLARGED AREA
SECTION / DETAIL TAG
BUILDING SECTION TAG
DRAWING TITLE
WALL SECTION TAG
2
symbols legend
3
N
TACIFI
AD
DENGS
TE
I
R
C
ET E
O.
H
S.
MARK E.
EG
RA
R
NZI O U.A
BOLLARD
23459
ISD
ETER ARC
CE
A.
T
IT
job
date
revisions
7350 EAST SPEEDWAY 210TUCSON, ARIZONA 85710
(520) 326-3700(520) 326-1148
www.swaimaia.com
OFFICEFAX
ASSOCIATES LTDARCHITECTS AIA
/
/
8/1
2/2
020
8:2
7:1
3 A
MC
:\A
ctive
Revit P
roje
cts
\111
6.6
2_
R19
_O
ld V
ail
Wea
the
rization
_C
F_js
eym
ou
r.rv
t
g1.1
ab
bre
via
tio
ns a
nd
sym
bo
ls
VU
SD
OL
D V
AIL
MID
DL
E S
CH
OO
L
132
99
E C
OL
OS
SA
L C
AV
E R
D
VA
IL, A
Z 8
56
41
08.07.20
1116.62
0708
20
general project notesabbreviations
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTEDOTHERWISE
UON UNLESS OTHERWISENOTED
URNL URINAL
VAC VENTILATION AND AIRCONDITIONING
VAR VARIES
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VP VISION PANEL
VR VAPOR RETARDER
VT VINYL TILE
VWC VINYL WALL COVERING
W WIDE/WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WIN WINDOW
WM WIRE MESH
WP WATERPROOF/WATERPROOFING
WPM WATERPROOF MEMBRANE
WS WEATHER-STRIPPING
WSCT WAINSCOT
WT WEIGHT
WV WATER VALVE
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
OD OUTSIDE DIAMETER
OD OVERFLOW DRAIN
OFCI OWNER FURNISHED,CONTRACTOR INSTALLED
OFF OFFICE
OFOI OWNER FURNISHED,OWNER INSTALLED
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
P PAINT
PAV PAVING
PBD PARTICLE BOARD
PC PRECAST
PDF POWER DRIVEN FASTENER
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PI. PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PNL PANEL
PNT PAINT OR PAINTED
POL POLISHED
PR PAIR
PREFAB PREFABRICATED
PROJ PROJECT
PSF POUNDS PER SQUAREFOOT
PT POINT
PT PRESSURE TREATED
PTD PAINTED
PTN PARTITION
PVC POLYVINYL CHLORIDE
QT QUARRY TILE
QTY QUANTITY
R RADIUS/RISER
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE
RBR RUBBER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
RECPT RECEPTACLE
REF REFERENCE
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCEDREINFORCING
REINF REINFORCED
REL RELOCATE
REM REMOVABLE
REOOM RECOMMENDED
REQ REQUIRE/REQUIRED
REQD REQUIRED
RESIL RESILIENT
REV REVISION/REVISED
RM ROOM
RO ROUGH OPENING
RTD RATED
RTG RATING
RWL RAIN WATER LEADER
S SOUTH
SA SUPPLY AIR
SAF SELF ADHERED FLASHING
SC SOLID CORE
SCHED SCHEDULE
SD STORM DRAIN
SECT SECTION
SF SQUARE FEET/FOOT
SH SPRINKLER HEAD
SHR SHOWER
SHT SHEET
SIM SIMILAR
SM SHEET METAL
SM SURFACE MOUNTED
SP STANDPIPE
SPEC SPECIFICATION
SPEC SPECIFIED ORSPECIFICATION
SPK SPRINKLER OR SPEAKER
SPKR SPEAKER
SQ SQUARE
SS STAINLESS STEEL
SSK SERVICE SINK
STA STATION
STC SOUND TRANSMISSIONCOEFFICIENT
STL STEEL
STOR STORAGE
STRG STRINGER
STRUCT STRUCTURAL
STRUCT STRUCTURE ORSTRUCTURAL
SUBCAT SUBCATEGORY
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TB TOWEL BAR
TEL TELEPHONE/TELECOM
TELE TELEPHONE
TEMP TEMPERATURE
TEMP TEMPORARY
THK THICKNESS
THRU THROUGH
TKBD TACK BOARD
TLT TOILET
TMPD TEMPERED
TO TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOS TOP OF STEEL
TS TUBE STEEL
TV TELEVISION
EQUIP EQUIPMENT
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FB FACE BRICK
FD FLOOR DRAIN
FD FLOOR DRAIN OR FIREDEPARTMENT
FDC FIRE DEPARTMENTCONNECTION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHERCABINET
FF&E FURNITURE, FIXTURES ANDEQUIPMENT
FFB FLUSH FLOOR BOX
FFEL FINISH FLOOR ELEVATION
FH FLAT HEAD
FHC FIRE HOSE CABINET
FIN FINISH
FIXT FIXTURE
FLASH FLASHING
FLR FLOOR
FLUOR FLUORESCENT
FND FOUNDATION
FO FACE OF
FP FIRE PROTECTION
FPG FIREPROOFING
FR FIRE RESISTANT
FRC FIBER REINFORCEDCONCRETE
FRT FIRE RETARDANT TREATED
FT FEET/FOOT
FTG FOOTING
FURN FURNITURE
FURR FURRING
FWC FABRIC WALL COVERING
FWP FABRIC WRAPPED PANEL
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACT(OR)
GEN GENERAL
GFRC GLASS FIBER REINFORCEDCONCRETE
GL GLASS
GLAZ GLAZING
GRAN GRANULAR
GRD GROUND
GRFG GLASS FIBER REINFORCEDGYPSUM
GSM GALVANIZED SHEET METAL
GV GAS VALVE
GWB GYPSUM WALL BOARD
GYP GYPSUM
H HIGH/HEIGHT
HB HOSE BIB
HB HOSE BIBB
HC HANDICAPPED
HDWD HARDWOOD
HDWR HARDWARE
HGT HEIGHT
HM HOLLOW METAL
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HR HOUR
HRC HOSE REEL CABINET
HTG HEATING
HVAC HEATING VENTILATION ANDAIR CONDITIONING
HW HOT WATER
ID INSIDE DIAMETER
IN INCH/INCHES
INCAND INCANDESCENT
INCL INCLUDED/INCLUDING
INFO INFORMATION
INSUL INSULATION
INSUL INSULATED OR INSULATION
INT INTERIOR
INTERM INTERMEDIATE
INV INVERT
JAN JANITOR
JC JANITOR'S CLOSET
JST JOIST
JT JOINT
KIT KITCHEN
KO KNOCK OUT
LAM LAMINATE
LAV LAVATORY
LB POUNDS
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LT LIGHT
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MED MEDIUM
MEMBR MEMBRANE
MFR MANUFACTURER
MH MAN HOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MR MOISTURE RESISTANT
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
N NORTH
NA NOT APPLICABLE
NC NOISE CRITERIA
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NONCOMB
NON COMBUSTIBLE
NTS NOT TO SCALE
OA OUTSIDE AIR
OC ON CENTER
& AND
@ AT
AB ANCHOR BOLT
ABC AGGREGATE BASECOURSE
ABI ADDITIVE BID ITEM
AC AIR CONDITIONING
ACC ACCESSIBLE
ACOUST ACOUSTICAL
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AGGR AGGREGATE
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
AP ACCESS PANEL
APC ACOUSTICAL PANELCEILING
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
ATTN ATTENTION
AUTO AUTOMATIC
AV AUDIOVISUAL
BD BOARD
BET BUILDING ENTRANCETERMINAL
BFF BELOW FINISHED FLOOR
BIT BITUMINOUS
BL BASELINE
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM, BENCHMARK
BO BOTTOM OF
BOS BOTTOM OF STEEL
BOT BOTTOM
BRG BEARING
BRK BRICK
BRKT BRACKET
BSMNT BASEMENT
BUR BUILT-UP ROOFING
C CONDUIT
CA COMPRESSED AIR
CAB CABINET
CAT CATEGORY
CB CATCH BASIN
CB CEMENT BOARD
CBU CEMENTITIOUS BACKERUNIT
CC CENTER TO CENTER
CCTV CLOSED CIRCUITTELEVISION
CEM CEMENT
CER CERAMIC
CG CORNER GUARD
CH CHILLER
CI CAST IRON
CIP CAST-lN-PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLKG CAULKING
CLR CLEAR
CNTR COUNTER
CO CLEANOUT
COL COLUMN
CONC CONCRETE
COND CONDITION
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPT CARPET
CT CERAMIC TILE
CTR CENTER
CTSK COUNTERSUNK
CW COLD WATER
D DEEP, DEPTH
DBL DOUBLE
DEG DEGREE
DEMO DEMOLISH OR DEMOLITION
DEMO DEMOLITION
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA DIAMETER
DIFF DIFFUSER
DIM DIMENSION
DIMS DIMENSIONS
DISP DISPENSER
DIV DIVISION
DMPF DAMP PROOFING
DN DOWN
DO DOOR OPENING
DR DOOR
DRN DRAIN
DS DOWNSPOUT
DS DOWN SPOUT
DTL DETAIL
DW DISHWASHER
DWG DRAWING
DWR DRAWER
CMU CONCRETE MASONRY UNIT
E EAST
EA EACH
EB EXPANSION BOLT
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENG ENGINEER
EP ELECTRICAL PANEL
EPDM ETHYLENE PROPYLENEDIENE M-CLASS
EQ EQUAL
A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE EXISTENCE AND LOCATION OF ALL UNDERGROUND OR CONCEALED UTILITIES IN ADVANCE OF ANY CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE TO HIRE A PRIVATE UTILITY LOCATING SERVICE TO LOCATE ALL UNDERGROUND UTILITIES ON OR NEAR THE PROJECT SITE.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ANY OR ALL EXISTING CONDITIONS PRIOR TO THE START OF CONSTRUCTION. ANY UTILITIES FOUND TO BE IN THE WAY OF THE NEW CONSTRUCTION SHALL BE REMOVED, RELOCATED OR REPLACED AS DIRECTED. REFER TO PLUMBING, ELECTRICAL, MECHANICAL AND/OR CIVIL PLANS FOR SPECIFIC REQUIREMENTS.
C. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REMOVE ALL ABANDONED (RETIRED) UTILITIES THAT INTERFERE WITH THE CONSTRUCTION PROJECT. THE CONTRACTORS AND LOCAL UTILITY AND TRAFFIC CREWS SHALL COORDINATE WORK SCHEDULES SO AS TO PREVENT ANY CONFLICTING WORK CONDITIONS.
D. CONTRACTOR SHALL REPAIR ANY AND ALL UTILITIES DAMAGED DURING THE COURSE OF CONSTRUCTION IN ACCORDANCE WITH LOCAL SPECIFICATIONS, AT NO ADDITIONAL COST.
E. CONTRACTOR TO NOTIFY "BLUE STAKE" @ 1-800-782-5348, AT LEAST 48-HOURS IN ADVANCE OF ANY EXCAVATION. UTILITY LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT.
F. ALL ITEMS REMOVED SHALL BE TEMPORARILY STORED IN A LOCATION APPROVED BY THE OWNER, AND THE OWNER SHALL REVIEW ALL ITEMS PRIOR TO ANY DISPOSAL. ANY ITEM WHICH IS DEEMED SALVAGEABLE SHALL REMAIN THE OWNER'S PROPERTY, AND WILL BE REMOVED TO STORAGE FACILITIES DESIGNATED BY THE OWNER FOR FUTURE USE. IF THE OWNER DEEMS AN ITEM AS NON-SALVAGEABLE, THE CONTRACTOR SHALL DISPOSE OF IT.
G. THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF ANY DEBRIS RESULTING FROM THE DEMOLITION AND CONSTRUCTION. AT NO TIME SHALL ANY OF THIS MATERIAL OBSTRUCT THE NORMAL OPERATION.
H. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY OR ALL EXCESS EXCAVATION AND CONSTRUCTION RELATED DEBRIS, AT THE END OF EACH WORK DAY.
I. THE CONTRACTOR IS ADVISED THAT DAMAGE TO ANY PORTION OF THIS PROJECT'S BUILDING(s) & SURROUNDING AREA AS A RESULT OF THIS PROJECT IS TO BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
J. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT THE JOB SITE TO FAMILIARIZE HER/HIM SELF WITH ALL THE EXISTING CONDITIONS THAT COULD AFFECT THE INSTALLATION OF ANY WORK SET FORTH IN THESE PLANS.
K. THE JOB SITE, AT THE COMPLETION OF CONSTRUCTION, SHALL BE CLEANED OF ANY DEBRIS OR SPOILS RESULTING FROM THE CONSTRUCTION.
L. THE CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL EXISTING RECORDED DIMENSIONS INDICATED AND ALL EXISTING CONDITIONS THAT IMPACT NEW CONSTRUCTION.
M. THE CONTRACTOR SHALL ESTABLISH ALL QUANTITIES BASED ON ACTUAL CONDITIONS. THESE DRAWINGS ARE NOT TO BE SCALED.
N. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT AT LEAST 72 HOURS IN ADVANCE OF ANY CONSTRUCTION THAT REQUIRES SPECIAL/REQUIRED INSPECTION(s).
O. ALL MATERIALS REQUIRED SHALL BE OF A GRADE AND QUALITY CONSISTENT WITH THE INTENDED USE AS SPECIFIED & APPROVED BY THE ARCHITECT.
P. INSTALL A CONTINUOUS BEAD OF SEALANT AT ALL GAPS/SEAMS BETWEEN IMMOVABLE EQUIPMENT AND WALLS.
Q. FIRE LANES SHALL BE MAINTAINED IN A CONDITION TO ASSURE ACCESS TO ALL BUILDINGS DURING CONSTRUCTION.
R. SMOKING IS PROHIBITED ON CAMPUS.
MULTI-PURPOSE
BUILDING 200
CLASSROOM
BUILDING 300
CLASSROOM
BUILDING 400
BUILDING 500
GYMNASIUM
BUILDING
KITCHEN
BUILDING
ADMIN BUILDING 100
a4.6
1
a4.62
a4.6
3
a4.6 4
a4.4
1
a4.42
a4.4
3
a4.4 4
a4.3
1
a4.32
a4.3
3
a4.3 4
a4.0
1
a4.02
a4.0
3
a4.0 4a4.1
1
a4.12
a4.5
1
a4.52
a4.5
3
a4.5 4a4.2
2
a4.2 3
a4.21
a4.1 3
a4.8
1
a4.9 1a4.92
a4.8
3
a4.82
a4.8 4
BU
ILD
ING
80
0A
BUILDING 800B
BU
ILD
ING
80
0C
a4.1
4
LIBRARY
a4.7
1
a4.7 4
a4.7
3
a4.72
BUILDING 600B
BU
ILD
ING
60
0A
BU
ILD
ING
60
0C
BU
ILD
ING
60
0D
a4.10 1
a4.10
2
a4.103
a4.10
4
a4.10
5
a4.106
a4.10
7
a4.10 8
a4.11
1
a4.112
a4.11
3
a4.11 4
a4.11
5
a4.116
a4.11
7
a4.11 8
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
1. DO NOT SCALE DRAWINGS. COORDINATE ALL WORK WITH THE SCHOOL SCHEDULE.
2. THE EXTERIOR COATING SYSTEM WILL INCLUDE MULTIPLE COLORS. REFER TO GRAPHIC TEXTURE ON EXTERIOR ELEVATIONS FOR LOCATIONS.
3. NOT ALL ELEVATIONS ARE REPRESENTED IN THE EXTERIOR ELEVATION SHEETS. RECESSED ALCOVES SHALL BE FIELD VERIFIED. ALL EXTERIOR ENVELOPE SURFACES SHALL BE COATED.
4. ALL EXTERIOR DOORS SHALL RECEIVE NEW HARDWARE. REFERENCE OVERALL SITE PLAN & EXTERIOR BUILDING ELEVATIONS.
5. ALL ADHESIVE APPLIED SIGNAGE AT CLASS & ENTRY DOORS SHALL BE REMOVED. REMOVE ADHESIVE RESIDUE FOR PAINTING. REINSTALL SIGNAGE.
6. FIELD VERIFY ALL DOOR LOCATIONS. DUE TO ELEVATION VIEW, SOME DOORS AND SURFACES ARE NOT VISIBLE.
general notes
keynotes
8.1 HM DOOR & DRAME. REMOVE PERIMETER DOOR SEALS,DOOR SHOE & DRIP. FILL ALL HOLES. PREPARE, PRIME &PAINT DOOR. INSTALL NEW HARDWARE. PERIMETERSEALS - 379 AS. DOOR SHOE - 345-ANB. DRIP - 346APEMKO OR EQUAL.
N
TACIFI
AD
DENGS
TE
I
R
C
ET E
O.
H
S.
MARK E.
EG
RA
R
NZI O U.A
BOLLARD
23459
ISD
ETER ARC
CE
A.
T
IT
job
date
revisions
7350 EAST SPEEDWAY 210TUCSON, ARIZONA 85710
(520) 326-3700(520) 326-1148
www.swaimaia.com
OFFICEFAX
ASSOCIATES LTDARCHITECTS AIA
/
/
8/1
2/2
020
8:2
6:5
4 A
MC
:\A
ctive
Revit P
roje
cts
\111
6.6
2_
R19
_O
ld V
ail
Wea
the
rization
_C
F_js
eym
ou
r.rv
t
a1.0
sit
e p
lan
VU
SD
OL
D V
AIL
MID
DL
E S
CH
OO
L
132
99
E C
OL
OS
SA
L C
AV
E R
D
VA
IL, A
Z 8
56
41
08.07.20
1116.62
0708
20
no
rth1/32" = 1'-0"a1.0
1site plan - reference
9.11
9.79.7 7.7 8.1 7.7 8.1
7.3 9.99.9
9.7
9.11 7.19
9.7
7.20
9.12
7.20
9.79.7
9.11 7.7
7.37.37.3
9.99.9
7.7 8.1
7.37.3 9.9 9.79.7
9.11
7.20
9.7
8.1 8.1 8.19.79.77.7 7.7 9.3
100
9.3
9.79.7
9.79.79.11
8.1
7.20 7.7
9.139.13
9.11
8.1 8.1
9.11 9.79.79.79.77.37.3
9.9
7.20
1. DO NOT SCALE DRAWINGS. COORDINATE ALL WORK WITH THE SCHOOL SCHEDULE.
2. THE EXTERIOR COATING SYSTEM WILL INCLUDE MULTIPLE COLORS. REFER TO GRAPHIC TEXTURE ON EXTERIOR ELEVATIONS FOR LOCATIONS.
3. NOT ALL ELEVATIONS ARE REPRESENTED IN THE EXTERIOR ELEVATION SHEETS. RECESSED ALCOVES SHALL BE FIELD VERIFIED. ALL EXTERIOR ENVELOPE SURFACES SHALL BE COATED.
4. ALL EXTERIOR DOORS SHALL RECEIVE NEW HARDWARE. REFERENCE OVERALL SITE PLAN & EXTERIOR BUILDING ELEVATIONS.
5. ALL ADHESIVE APPLIED SIGNAGE AT CLASS & ENTRY DOORS SHALL BE REMOVED. REMOVE ADHESIVE RESIDUE FOR PAINTING. REINSTALL SIGNAGE.
general notes
N
TACIFI
AD
DENGS
TE
I
R
C
ET E
O.
H
S.
MARK E.
EG
RA
R
NZI O U.A
BOLLARD
23459
ISD
ETER ARC
CE
A.
T
IT
job
date
revisions
7350 EAST SPEEDWAY 210TUCSON, ARIZONA 85710
(520) 326-3700(520) 326-1148
www.swaimaia.com
OFFICEFAX
ASSOCIATES LTDARCHITECTS AIA
/
/
8/1
2/2
020
8:2
6:5
4 A
MC
:\A
ctive
Revit P
roje
cts
\111
6.6
2_
R19
_O
ld V
ail
Wea
the
rization
_C
F_js
eym
ou
r.rv
t
a4.0
bu
ild
ing
10
0 -
ele
va
tio
nV
US
DO
LD
VA
IL M
IDD
LE
SC
HO
OL
132
99
E C
OL
OS
SA
L C
AV
E R
D
VA
IL, A
Z 8
56
41
08.07.20
1116.62
0708
20
1/8" = 1'-0"a4.0
1building 100 - north elevation
1/8" = 1'-0"a4.0
2Building 100 - east elevation
1/8" = 1'-0"a4.0
3Building 100 - south elevation
1/8" = 1'-0"a4.0
4Building 100 - west elevation
7.3 ELECTRICAL DEVICE. REMOVE ALL EXISTING SEALANT.PREPARE JOINT BETWEEN DEVICE & CONCRETE ANDAPPLY NEW SEALANT.
7.7 EXISTING HM WINDOW FRAME. REMOVE PERIMETERCAULKING & RE-CAULK FRAME TO STUCCO. PREPARE ANDPAINT FRAME.
7.19 REMOVE CAULKING BETWEEN PRE-CAST TEES ANDSTUCC. ADD NEW BACKER ROD AND SEALANT. +/- 3/4"JOINT. APPLIES TO ENTIRE ELEVATION.
7.20 INSTALL A NEW PRE-FINISHED PARAPET CAP FLASHING. 4"VERTICAL LEGS.
8.1 HM DOOR & DRAME. REMOVE PERIMETER DOOR SEALS,DOOR SHOE & DRIP. FILL ALL HOLES. PREPARE, PRIME &PAINT DOOR. INSTALL NEW HARDWARE. PERIMETER SEALS- 379 AS. DOOR SHOE - 345-ANB. DRIP - 346A PEMKO OREQUAL.
9.3 SIGNAGE. TAPE OFF & PROTECT DURING PAINTING.
9.7 SEAL ALL CRACKS, PREPARE, PRIME & APPLYELASTOMERIC COATING OVER STUCCO. INCLUDEBACKSIDE OF PARAPETS. COLUMNS ARE AN ACCENTCOLOR.
9.9 PAINT ALL EXPOSED CONDUIT & PIPING.
9.11 PREPARE, PRIME & PAINT RECESSED WOOD TRIM.CONTINUOUSLY CAULK THE INTERSECTION BETWEEN THESTUCCO METAL AND WOOD TRIM.
9.12 PAINT DRIP EDGE.
9.13 AT PORCH/OVERHANG LOCATIONS, PAINT ALL STUCCOSURFACES ON WALLS AND SOFFITS. PAINT WOOD STUCCOAND CONCRETE SOFFITS. FIELD VERIFY CONDITIONS.
keynotes
9.10
9.7
8.1 7.10ANGLED VIEW
7.7 7.4 7.107.107.4
7.3
9.9
8.1
9.79.11
7.7
7.37.3
7.7 8.1 7.4 8.1 7.77.7
7.3
9.14
9.14
9.13
9.11
9.79.7
8.18.1 9.110.6
7.3
9.119.7 9.7 9.3 0.7 8.18.1
9.7
9.11200
9.3
9.13 9.13
9.22 9.22 9.13
SEE SHEET A4.2 FOR BUILDING CONTINUATION
7.3 9.10
8.1
9.11
9.7
9.79.77.37.3
8.1
9.79.7
9.9
7.3
7.4
9.14
9.13
9.11
9.7
8.1 9.7
7.107.10
BUILDING ADDITION
ANGLED VIEW 9.7
9.11
7.67.6
7.37.39.7
9.14
9.7 9.7
9.14
1. DO NOT SCALE DRAWINGS. COORDINATE ALL WORK WITH THE SCHOOL SCHEDULE.
2. THE EXTERIOR COATING SYSTEM WILL INCLUDE MULTIPLE COLORS. REFER TO GRAPHIC TEXTURE ON EXTERIOR ELEVATIONS FOR LOCATIONS.
3. NOT ALL ELEVATIONS ARE REPRESENTED IN THE EXTERIOR ELEVATION SHEETS. RECESSED ALCOVES SHALL BE FIELD VERIFIED. ALL EXTERIOR ENVELOPE SURFACES SHALL BE COATED.
4. ALL EXTERIOR DOORS SHALL RECEIVE NEW HARDWARE. REFERENCE OVERALL SITE PLAN & EXTERIOR BUILDING ELEVATIONS.
5. ALL ADHESIVE APPLIED SIGNAGE AT CLASS & ENTRY DOORS SHALL BE REMOVED. REMOVE ADHESIVE RESIDUE FOR PAINTING. REINSTALL SIGNAGE.
general notes
N
TACIFI
AD
DENGS
TE
I
R
C
ET E
O.
H
S.
MARK E.
EG
RA
R
NZI O U.A
BOLLARD
23459
ISD
ETER ARC
CE
A.
T
IT
job
date
revisions
7350 EAST SPEEDWAY 210TUCSON, ARIZONA 85710
(520) 326-3700(520) 326-1148
www.swaimaia.com
OFFICEFAX
ASSOCIATES LTDARCHITECTS AIA
/
/
8/1
2/2
020
8:2
6:5
6 A
MC
:\A
ctive
Revit P
roje
cts
\111
6.6
2_
R19
_O
ld V
ail
Wea
the
rization
_C
F_js
eym
ou
r.rv
t
a4.1
bu
ild
ing
20
0 -
ele
va
tio
nV
US
DO
LD
VA
IL M
IDD
LE
SC
HO
OL
132
99
E C
OL
OS
SA
L C
AV
E R
D
VA
IL, A
Z 8
56
41
08.07.20
1116.62
0708
20
1/8" = 1'-0"a4.1
1Building 200 - north elevation
1/8" = 1'-0"a4.1
2Building 200 - elevation
1/8" = 1'-0"a4.1
3Building 200 - west elevation
1/8" = 1'-0"a4.1
4Building 200 - south elevation
0.6 PLEASE NOTE: WALL UNDER CANOPY EXTENDS TO 12'-0".
0.7 PLEASE NOTE: WALL UNDER CANOPY EXTENDS UP TO17'-0".
7.3 ELECTRICAL DEVICE. REMOVE ALL EXISTING SEALANT.PREPARE JOINT BETWEEN DEVICE & CONCRETE ANDAPPLY NEW SEALANT.
7.4 HOSE BIB / ELECTRICAL CONDUIT PENETRATION / PIPEPENETRATION, REMOVE ALL SEALANT. PREPARE JOINT,INSTALL BACKER ROD IF JOINT EXCEEDS 1/4" AND APPLYNEW SEALANT.
7.6 REMOVE CAULKING AT SHADE STRUCTURECOUNTERFLASHING.RE-CAULK.
7.7 EXISTING HM WINDOW FRAME. REMOVE PERIMETERCAULKING & RE-CAULK FRAME TO STUCCO. PREPARE ANDPAINT FRAME.
7.10 MECHANICAL LOUVER, CAULK PERIMETER. PRIME & PAINT.
8.1 HM DOOR & DRAME. REMOVE PERIMETER DOOR SEALS,DOOR SHOE & DRIP. FILL ALL HOLES. PREPARE, PRIME &PAINT DOOR. INSTALL NEW HARDWARE. PERIMETER SEALS- 379 AS. DOOR SHOE - 345-ANB. DRIP - 346A PEMKO OREQUAL.
9.3 SIGNAGE. TAPE OFF & PROTECT DURING PAINTING.
9.7 SEAL ALL CRACKS, PREPARE, PRIME & APPLYELASTOMERIC COATING OVER STUCCO. INCLUDEBACKSIDE OF PARAPETS. COLUMNS ARE AN ACCENTCOLOR.
9.9 PAINT ALL EXPOSED CONDUIT & PIPING.
9.10 WOOD FASCIA/RAKE PIECE. SCRAPE, PREPARE, PRIME &PAINT, INCLUDING METAL DRIP EDGE. PAINT UNDER SIDE.
9.11 PREPARE, PRIME & PAINT RECESSED WOOD TRIM.CONTINUOUSLY CAULK THE INTERSECTION BETWEEN THESTUCCO METAL AND WOOD TRIM.
9.13 AT PORCH/OVERHANG LOCATIONS, PAINT ALL STUCCOSURFACES ON WALLS AND SOFFITS. PAINT WOOD STUCCOAND CONCRETE SOFFITS. FIELD VERIFY CONDITIONS.
9.14 PAINT CAP FLASHING, INSIDE, OUTSIDE AND TOP.
9.22 NOTE: UNDER OVERHANG RECAULK PRE-CAST CONCRETETEES PER KEYNOTE 7.19.
keynotes
8.1 8.2 8.1
7.6
7.3
7.3
9.14
9.79.7
9.15
9.7 9.79.7
7.37.3 7.3
9.2 7.4
9.14
9.159.15
8.1 8.1 8.1
7.6
9.9 9.7
7.37.39.7
9.2
7.37.3 9.7 9.14
9.159.15
1. DO NOT SCALE DRAWINGS. COORDINATE ALL WORK WITH THE SCHOOL SCHEDULE.
2. THE EXTERIOR COATING SYSTEM WILL INCLUDE MULTIPLE COLORS. REFER TO GRAPHIC TEXTURE ON EXTERIOR ELEVATIONS FOR LOCATIONS.
3. NOT ALL ELEVATIONS ARE REPRESENTED IN THE EXTERIOR ELEVATION SHEETS. RECESSED ALCOVES SHALL BE FIELD VERIFIED. ALL EXTERIOR ENVELOPE SURFACES SHALL BE COATED.
4. ALL EXTERIOR DOORS SHALL RECEIVE NEW HARDWARE. REFERENCE OVERALL SITE PLAN & EXTERIOR BUILDING ELEVATIONS.
5. ALL ADHESIVE APPLIED SIGNAGE AT CLASS & ENTRY DOORS SHALL BE REMOVED. REMOVE ADHESIVE RESIDUE FOR PAINTING. REINSTALL SIGNAGE.
general notes
N
TACIFI
AD
DENGS
TE
I
R
C
ET E
O.
H
S.
MARK E.
EG
RA
R
NZI O U.A
BOLLARD
23459
ISD
ETER ARC
CE
A.
T
IT
job
date
revisions
7350 EAST SPEEDWAY 210TUCSON, ARIZONA 85710
(520) 326-3700(520) 326-1148
www.swaimaia.com
OFFICEFAX
ASSOCIATES LTDARCHITECTS AIA
/
/
8/1
2/2
020
8:2
6:5
8 A
MC
:\A
ctive
Revit P
roje
cts
\111
6.6
2_
R19
_O
ld V
ail
Wea
the
rization
_C
F_js
eym
ou
r.rv
t
a4.2
kit
ch
en
-e
leva
tio
nV
US
DO
LD
VA
IL M
IDD
LE
SC
HO
OL
132
99
E C
OL
OS
SA
L C
AV
E R
D
VA
IL, A
Z 8
56
41
08.07.20
1116.62
0708
20
1/8" = 1'-0"a4.2
1kitchen - east
1/8" = 1'-0"a4.2
2kitchen - south
1/8" = 1'-0"a4.2
3kitchen - west
7.3 ELECTRICAL DEVICE. REMOVE ALL EXISTING SEALANT.PREPARE JOINT BETWEEN DEVICE & CONCRETE ANDAPPLY NEW SEALANT.
7.4 HOSE BIB / ELECTRICAL CONDUIT PENETRATION / PIPEPENETRATION, REMOVE ALL SEALANT. PREPARE JOINT,INSTALL BACKER ROD IF JOINT EXCEEDS 1/4" AND APPLYNEW SEALANT.
7.6 REMOVE CAULKING AT SHADE STRUCTURECOUNTERFLASHING.RE-CAULK.
8.1 HM DOOR & DRAME. REMOVE PERIMETER DOOR SEALS,DOOR SHOE & DRIP. FILL ALL HOLES. PREPARE, PRIME &PAINT DOOR. INSTALL NEW HARDWARE. PERIMETER SEALS- 379 AS. DOOR SHOE - 345-ANB. DRIP - 346A PEMKO OREQUAL.
8.2 ROLL UP DOORS. CAULK PERIMETER FRAM TO CMU.
9.2 SHEET METAL DOWNSPOUT. RE-CAULK THROUGH WALLSCUPPER. PREPARE, PRIME AND PAINT.
9.7 SEAL ALL CRACKS, PREPARE, PRIME & APPLYELASTOMERIC COATING OVER STUCCO. INCLUDEBACKSIDE OF PARAPETS. COLUMNS ARE AN ACCENTCOLOR.
9.9 PAINT ALL EXPOSED CONDUIT & PIPING.
9.14 PAINT CAP FLASHING, INSIDE, OUTSIDE AND TOP.
9.15 PREPARE AND PAINT ALL STEEL ON CANOPY.
keynotes
9.10
8.17.58.17.5 4.3 4.3
9.10
9.10
4.3
7.57.5
7.6
4.37.37.4 9.9
7.3
9.9
8.1
3009.3
7.5 7.58.1
9.109.10
7.3
7.4
4.3
7.47.4
7.37.37.37.3
7.4
7.37.3
4.37.77.7
7.3
4.3
7.47.3 9.17 9.109.10
4.34.3
7.3
7.6
9.169.16
1. DO NOT SCALE DRAWINGS. COORDINATE ALL WORK WITH THE SCHOOL SCHEDULE.
2. THE EXTERIOR COATING SYSTEM WILL INCLUDE MULTIPLE COLORS. REFER TO GRAPHIC TEXTURE ON EXTERIOR ELEVATIONS FOR LOCATIONS.
3. NOT ALL ELEVATIONS ARE REPRESENTED IN THE EXTERIOR ELEVATION SHEETS. RECESSED ALCOVES SHALL BE FIELD VERIFIED. ALL EXTERIOR ENVELOPE SURFACES SHALL BE COATED.
4. ALL EXTERIOR DOORS SHALL RECEIVE NEW HARDWARE. REFERENCE OVERALL SITE PLAN & EXTERIOR BUILDING ELEVATIONS.
5. ALL ADHESIVE APPLIED SIGNAGE AT CLASS & ENTRY DOORS SHALL BE REMOVED. REMOVE ADHESIVE RESIDUE FOR PAINTING. REINSTALL SIGNAGE.
general notes
N
TACIFI
AD
DENGS
TE
I
R
C
ET E
O.
H
S.
MARK E.
EG
RA
R
NZI O U.A
BOLLARD
23459
ISD
ETER ARC
CE
A.
T
IT
job
date
revisions
7350 EAST SPEEDWAY 210TUCSON, ARIZONA 85710
(520) 326-3700(520) 326-1148
www.swaimaia.com
OFFICEFAX
ASSOCIATES LTDARCHITECTS AIA
/
/
8/1
2/2
020
8:2
6:5
8 A
MC
:\A
ctive
Revit P
roje
cts
\111
6.6
2_
R19
_O
ld V
ail
Wea
the
rization
_C
F_js
eym
ou
r.rv
t
a4.3
bu
ild
ing
30
0 -
ele
va
tio
nV
US
DO
LD
VA
IL M
IDD
LE
SC
HO
OL
132
99
E C
OL
OS
SA
L C
AV
E R
D
VA
IL, A
Z 8
56
41
08.07.20
1116.62
0708
20
1/8" = 1'-0"a4.3
1Building 300 - north elevation
1/8" = 1'-0"a4.3
2Building 300 - east elevation
1/8" = 1'-0"a4.3
3Building 300 - south elevation
1/8" = 1'-0"a4.3
4Building 300 - west elevation
4.3 BRICK MASONRY. RE-POINT JOINTS WITH LOOSE MORTAR.BID 50 L.F. OF JOINT PER ELEVATION. RESEAL BRICK.
7.3 ELECTRICAL DEVICE. REMOVE ALL EXISTING SEALANT.PREPARE JOINT BETWEEN DEVICE & CONCRETE ANDAPPLY NEW SEALANT.
7.4 HOSE BIB / ELECTRICAL CONDUIT PENETRATION / PIPEPENETRATION, REMOVE ALL SEALANT. PREPARE JOINT,INSTALL BACKER ROD IF JOINT EXCEEDS 1/4" AND APPLYNEW SEALANT.
7.5 EXISTING ALUMINUM STOREFRONT WINDOWS. REMOVEALL SEALANT AROUND PERIMETER. PREPARE, ADD ABACKER ROD AND RE-CAULK INTERSECTION BETWEENALUMINUM AND STRUCTURE.
7.6 REMOVE CAULKING AT SHADE STRUCTURECOUNTERFLASHING.RE-CAULK.
7.7 EXISTING HM WINDOW FRAME. REMOVE PERIMETERCAULKING & RE-CAULK FRAME TO STUCCO. PREPARE ANDPAINT FRAME.
8.1 HM DOOR & DRAME. REMOVE PERIMETER DOOR SEALS,DOOR SHOE & DRIP. FILL ALL HOLES. PREPARE, PRIME &PAINT DOOR. INSTALL NEW HARDWARE. PERIMETER SEALS- 379 AS. DOOR SHOE - 345-ANB. DRIP - 346A PEMKO OREQUAL.
9.3 SIGNAGE. TAPE OFF & PROTECT DURING PAINTING.
9.9 PAINT ALL EXPOSED CONDUIT & PIPING.
9.10 WOOD FASCIA/RAKE PIECE. SCRAPE, PREPARE, PRIME &PAINT, INCLUDING METAL DRIP EDGE. PAINT UNDER SIDE.
9.16 PAINT WOOD COLUMNS, BEAMS AND SOFFITS.
9.17 PREPARE AND PAINT DUCTWORK.
keynotes
7.57.57.5 8.1
9.109.10
4.34.3
9.10
4.3
9.18
9.10
9.9
8.18.14.3
9.9
4.3 4.2
7.3
7.3
7.3
9.18
400
9.3
7.57.57.58.1 4.37.11
9.109.10
4.3
7.3
7.3
9.9
7.6
7.5
9.10
9.9
9.10
9.10
4.1
8.1
8.18.17.57.5 4.3 4.37.3
7.3
9.9
9.10
7.39.9 9.18
4.3
4.3
1. DO NOT SCALE DRAWINGS. COORDINATE ALL WORK WITH THE SCHOOL SCHEDULE.
2. THE EXTERIOR COATING SYSTEM WILL INCLUDE MULTIPLE COLORS. REFER TO GRAPHIC TEXTURE ON EXTERIOR ELEVATIONS FOR LOCATIONS.
3. NOT ALL ELEVATIONS ARE REPRESENTED IN THE EXTERIOR ELEVATION SHEETS. RECESSED ALCOVES SHALL BE FIELD VERIFIED. ALL EXTERIOR ENVELOPE SURFACES SHALL BE COATED.
4. ALL EXTERIOR DOORS SHALL RECEIVE NEW HARDWARE. REFERENCE OVERALL SITE PLAN & EXTERIOR BUILDING ELEVATIONS.
5. ALL ADHESIVE APPLIED SIGNAGE AT CLASS & ENTRY DOORS SHALL BE REMOVED. REMOVE ADHESIVE RESIDUE FOR PAINTING. REINSTALL SIGNAGE.
general notes
N
TACIFI
AD
DENGS
TE
I
R
C
ET E
O.
H
S.
MARK E.
EG
RA
R
NZI O U.A
BOLLARD
23459
ISD
ETER ARC
CE
A.
T
IT
job
date
revisions
7350 EAST SPEEDWAY 210TUCSON, ARIZONA 85710
(520) 326-3700(520) 326-1148
www.swaimaia.com
OFFICEFAX
ASSOCIATES LTDARCHITECTS AIA
/
/
8/1
2/2
020
8:2
7:0
0 A
MC
:\A
ctive
Revit P
roje
cts
\111
6.6
2_
R19
_O
ld V
ail
Wea
the
rization
_C
F_js
eym
ou
r.rv
t
a4.4
bu
ild
ing
40
0 -
ele
va
tio
nV
US
DO
LD
VA
IL M
IDD
LE
SC
HO
OL
132
99
E C
OL
OS
SA
L C
AV
E R
D
VA
IL, A
Z 8
56
41
08.07.20
1116.62
0708
20
1/8" = 1'-0"a4.4
1Building 400 - north elevation
1/8" = 1'-0"a4.4
2Building 400 - east elevation
1/8" = 1'-0"a4.4
3Building 400 - south elevation
1/8" = 1'-0"a4.4
4Building 400 - west elevation
4.1 MASONRY CONTROL JOINT. REMOVE ALL SEALANT ANDBACKER ROD. INSTALL NEW ROD & CAULK JOINT FULLHEIGHT.
4.2 EXPOSED CMU WALL. REPOINT LOOSE MASONRY & FILLANY PIN HOLES. BID 50 L.F. OF JOINT REPAIR ON EACHELEVATION. CLEAN, PREPARE & RESEAL WALL.
4.3 BRICK MASONRY. RE-POINT JOINTS WITH LOOSE MORTAR.BID 50 L.F. OF JOINT PER ELEVATION. RESEAL BRICK.
7.3 ELECTRICAL DEVICE. REMOVE ALL EXISTING SEALANT.PREPARE JOINT BETWEEN DEVICE & CONCRETE ANDAPPLY NEW SEALANT.
7.5 EXISTING ALUMINUM STOREFRONT WINDOWS. REMOVEALL SEALANT AROUND PERIMETER. PREPARE, ADD ABACKER ROD AND RE-CAULK INTERSECTION BETWEENALUMINUM AND STRUCTURE.
7.6 REMOVE CAULKING AT SHADE STRUCTURECOUNTERFLASHING.RE-CAULK.
7.11 DRINKING FOUNTAIN / SINK. CAULK ALL PIPEPENETRATIONS PER KN 7.4.
8.1 HM DOOR & DRAME. REMOVE PERIMETER DOOR SEALS,DOOR SHOE & DRIP. FILL ALL HOLES. PREPARE, PRIME &PAINT DOOR. INSTALL NEW HARDWARE. PERIMETER SEALS- 379 AS. DOOR SHOE - 345-ANB. DRIP - 346A PEMKO OREQUAL.
9.3 SIGNAGE. TAPE OFF & PROTECT DURING PAINTING.
9.9 PAINT ALL EXPOSED CONDUIT & PIPING.
9.10 WOOD FASCIA/RAKE PIECE. SCRAPE, PREPARE, PRIME &PAINT, INCLUDING METAL DRIP EDGE. PAINT UNDER SIDE.
9.18 CMU. REPAIR JOINTS AND PAINT.
keynotes
8.1 8.1 8.1 8.1 8.18.1 8.1
9.11
9.7
9.7
7.77.78.1
9.11
500
9.37.3
9.7
9.14
9.13
9.119.119.11
9.7
7.77.77.7 7.77.77.7
7.3 9.99.9
7.3 7.77.7
9.7 9.117.3
7.3
9.39.10 9.11 7.3
7.3
9.11
7.77.77.7 8.1 8.18.18.1
9.9
7.3
9.7
9.7
9.10 7.3
7.77.77.7
7.37.3 9.7
9.11
9.79.11
9.13 9.7
9.14
9.13
9.7
9.7 7.3
8.1 7.77.77.79.11 7.3
7.4 9.7
9.7 7.77.77.7 8.18.1
9.117.47.39.14 9.11 9.7
1. DO NOT SCALE DRAWINGS. COORDINATE ALL WORK WITH THE SCHOOL SCHEDULE.
2. THE EXTERIOR COATING SYSTEM WILL INCLUDE MULTIPLE COLORS. REFER TO GRAPHIC TEXTURE ON EXTERIOR ELEVATIONS FOR LOCATIONS.
3. NOT ALL ELEVATIONS ARE REPRESENTED IN THE EXTERIOR ELEVATION SHEETS. RECESSED ALCOVES SHALL BE FIELD VERIFIED. ALL EXTERIOR ENVELOPE SURFACES SHALL BE COATED.
4. ALL EXTERIOR DOORS SHALL RECEIVE NEW HARDWARE. REFERENCE OVERALL SITE PLAN & EXTERIOR BUILDING ELEVATIONS.
5. ALL ADHESIVE APPLIED SIGNAGE AT CLASS & ENTRY DOORS SHALL BE REMOVED. REMOVE ADHESIVE RESIDUE FOR PAINTING. REINSTALL SIGNAGE.
general notes
N
TACIFI
AD
DENGS
TE
I
R
C
ET E
O.
H
S.
MARK E.
EG
RA
R
NZI O U.A
BOLLARD
23459
ISD
ETER ARC
CE
A.
T
IT
job
date
revisions
7350 EAST SPEEDWAY 210TUCSON, ARIZONA 85710
(520) 326-3700(520) 326-1148
www.swaimaia.com
OFFICEFAX
ASSOCIATES LTDARCHITECTS AIA
/
/
8/1
2/2
020
8:2
7:0
1 A
MC
:\A
ctive
Revit P
roje
cts
\111
6.6
2_
R19
_O
ld V
ail
Wea
the
rization
_C
F_js
eym
ou
r.rv
t
a4.5
bu
ild
ing
50
0 -
ele
va
tio
nV
US
DO
LD
VA
IL M
IDD
LE
SC
HO
OL
132
99
E C
OL
OS
SA
L C
AV
E R
D
VA
IL, A
Z 8
56
41
08.07.20
1116.62
0708
20
1/8" = 1'-0"a4.5
1Building 500 - north elevation
1/8" = 1'-0"a4.5
2Building 500 - east elevation
1/8" = 1'-0"a4.5
3Building 500 - south elevation
1/8" = 1'-0"a4.5
4Building 500 - west elevation
7.3 ELECTRICAL DEVICE. REMOVE ALL EXISTING SEALANT.PREPARE JOINT BETWEEN DEVICE & CONCRETE ANDAPPLY NEW SEALANT.
7.4 HOSE BIB / ELECTRICAL CONDUIT PENETRATION / PIPEPENETRATION, REMOVE ALL SEALANT. PREPARE JOINT,INSTALL BACKER ROD IF JOINT EXCEEDS 1/4" AND APPLYNEW SEALANT.
7.7 EXISTING HM WINDOW FRAME. REMOVE PERIMETERCAULKING & RE-CAULK FRAME TO STUCCO. PREPARE ANDPAINT FRAME.
8.1 HM DOOR & DRAME. REMOVE PERIMETER DOOR SEALS,DOOR SHOE & DRIP. FILL ALL HOLES. PREPARE, PRIME &PAINT DOOR. INSTALL NEW HARDWARE. PERIMETER SEALS- 379 AS. DOOR SHOE - 345-ANB. DRIP - 346A PEMKO OREQUAL.
9.3 SIGNAGE. TAPE OFF & PROTECT DURING PAINTING.
9.7 SEAL ALL CRACKS, PREPARE, PRIME & APPLYELASTOMERIC COATING OVER STUCCO. INCLUDEBACKSIDE OF PARAPETS. COLUMNS ARE AN ACCENTCOLOR.
9.9 PAINT ALL EXPOSED CONDUIT & PIPING.
9.10 WOOD FASCIA/RAKE PIECE. SCRAPE, PREPARE, PRIME &PAINT, INCLUDING METAL DRIP EDGE. PAINT UNDER SIDE.
9.11 PREPARE, PRIME & PAINT RECESSED WOOD TRIM.CONTINUOUSLY CAULK THE INTERSECTION BETWEEN THESTUCCO METAL AND WOOD TRIM.
9.13 AT PORCH/OVERHANG LOCATIONS, PAINT ALL STUCCOSURFACES ON WALLS AND SOFFITS. PAINT WOOD STUCCOAND CONCRETE SOFFITS. FIELD VERIFY CONDITIONS.
9.14 PAINT CAP FLASHING, INSIDE, OUTSIDE AND TOP.
keynotes
1. DO NOT SCALE DRAWINGS. COORDINATE ALL WORK WITH THE SCHOOL SCHEDULE.
2. THE EXTERIOR COATING SYSTEM WILL INCLUDE MULTIPLE COLORS. REFER TO GRAPHIC TEXTURE ON EXTERIOR ELEVATIONS FOR LOCATIONS.
3. NOT ALL ELEVATIONS ARE REPRESENTED IN THE EXTERIOR ELEVATION SHEETS. RECESSED ALCOVES SHALL BE FIELD VERIFIED. ALL EXTERIOR ENVELOPE SURFACES SHALL BE COATED.
4. ALL EXTERIOR DOORS SHALL RECEIVE NEW HARDWARE. REFERENCE OVERALL SITE PLAN & EXTERIOR BUILDING ELEVATIONS.
5. ALL ADHESIVE APPLIED SIGNAGE AT CLASS & ENTRY DOORS SHALL BE REMOVED. REMOVE ADHESIVE RESIDUE FOR PAINTING. REINSTALL SIGNAGE.
general notes7.16 7.16 7.16 7.169.7 9.7 9.7 9.7
7.15 7.15 7.15
7.97.9
9.2
8.1 8.17.4 7.4
7.3
0.3 9.2
9.79.7
7.5 8.1 7.5
7.3
9.2 7.3
9.99.9
7.3 9.2
9.69.79.14
9.2
9.14
9.79.7
7.6
8.1 7.4
9.79.77.6
7.3 8.1 7.37.37.3
9.7
9.15 9.15
9.14
9.14
9.7
9.9
9.3
7.37.15 7.15 7.15 7.15 7.15
9.2 9.2 9.2 9.2
9.3
9.79.7 9.79.7 9.79.7
9.14
9.14
9.7 9.79.79.7
7.67.6
7.3
9.79.7 8.18.1 8.18.1
7.6
7.11
9.14
9.14
9.159.15
8.1 7.7 9.15
N
TACIFI
AD
DENGS
TE
I
R
C
ET E
O.
H
S.
MARK E.
EG
RA
R
NZI O U.A
BOLLARD
23459
ISD
ETER ARC
CE
A.
T
IT
job
date
revisions
7350 EAST SPEEDWAY 210TUCSON, ARIZONA 85710
(520) 326-3700(520) 326-1148
www.swaimaia.com
OFFICEFAX
ASSOCIATES LTDARCHITECTS AIA
/
/
8/1
2/2
020
8:2
7:0
3 A
MC
:\A
ctive
Revit P
roje
cts
\111
6.6
2_
R19
_O
ld V
ail
Wea
the
rization
_C
F_js
eym
ou
r.rv
t
a4.6
gym
na
siu
m -
ele
va
tio
ns
VU
SD
OL
D V
AIL
MID
DL
E S
CH
OO
L
132
99
E C
OL
OS
SA
L C
AV
E R
D
VA
IL, A
Z 8
56
41
08.07.20
1116.62
0708
20
0.3 REMOVE & REINSTALL STORAGE UNIT TO PERFORMWORK.
7.3 ELECTRICAL DEVICE. REMOVE ALL EXISTING SEALANT.PREPARE JOINT BETWEEN DEVICE & CONCRETE ANDAPPLY NEW SEALANT.
7.4 HOSE BIB / ELECTRICAL CONDUIT PENETRATION / PIPEPENETRATION, REMOVE ALL SEALANT. PREPARE JOINT,INSTALL BACKER ROD IF JOINT EXCEEDS 1/4" AND APPLYNEW SEALANT.
7.5 EXISTING ALUMINUM STOREFRONT WINDOWS. REMOVEALL SEALANT AROUND PERIMETER. PREPARE, ADD ABACKER ROD AND RE-CAULK INTERSECTION BETWEENALUMINUM AND STRUCTURE.
7.6 REMOVE CAULKING AT SHADE STRUCTURECOUNTERFLASHING.RE-CAULK.
7.7 EXISTING HM WINDOW FRAME. REMOVE PERIMETERCAULKING & RE-CAULK FRAME TO STUCCO. PREPAREAND PAINT FRAME.
7.9 CAULK PERIMETER OF WELD PLATE. PREPARE, PRIME &PAINT PLATES.
7.11 DRINKING FOUNTAIN / SINK. CAULK ALL PIPEPENETRATIONS PER KN 7.4.
7.15 KALWELL TRANSLUCENT PANELS. REMOVE CAULKINGAT PERIMETER. RE-CAULK.
7.16 RECESSED ELECTRICAL PANEL. CAULK PERIMETER OFPANEL TO CMU. FOUR SIDES.
8.1 HM DOOR & DRAME. REMOVE PERIMETER DOOR SEALS,DOOR SHOE & DRIP. FILL ALL HOLES. PREPARE, PRIME &PAINT DOOR. INSTALL NEW HARDWARE. PERIMETERSEALS - 379 AS. DOOR SHOE - 345-ANB. DRIP - 346APEMKO OR EQUAL.
9.2 SHEET METAL DOWNSPOUT. RE-CAULK THROUGH WALLSCUPPER. PREPARE, PRIME AND PAINT.
9.3 SIGNAGE. TAPE OFF & PROTECT DURING PAINTING.
9.6 STEEL LADDER. CAULK ALL CONNECTION PLATES @STUCCO. PRIME & PAINT.
9.7 SEAL ALL CRACKS, PREPARE, PRIME & APPLYELASTOMERIC COATING OVER STUCCO. INCLUDEBACKSIDE OF PARAPETS. COLUMNS ARE AN ACCENTCOLOR.
9.9 PAINT ALL EXPOSED CONDUIT & PIPING.
9.14 PAINT CAP FLASHING, INSIDE, OUTSIDE AND TOP.
9.15 PREPARE AND PAINT ALL STEEL ON CANOPY.
keynotes
1/8" = 1'-0"a4.6
1gym - north elevation
1/8" = 1'-0"a4.6
2gym - east elevation
1/8" = 1'-0"a4.6
3gym - south elevation
1/8" = 1'-0"a4.6
4gym - west elevation
9.29.27.5
7.5
9.11
9.79.7
7.3
9.9
7.3
9.14
9.19
7.57.78.17.5
9.79.7
9.11 7.3
7.3
700
9.39.14
9.19
9.27.3 9.29.11
9.79.7
7.5 9.14
9.19
8.17.37.3
9.79.7 9.79.7
9.117.3 9.14
9.19
1. DO NOT SCALE DRAWINGS. COORDINATE ALL WORK WITH THE SCHOOL SCHEDULE.
2. THE EXTERIOR COATING SYSTEM WILL INCLUDE MULTIPLE COLORS. REFER TO GRAPHIC TEXTURE ON EXTERIOR ELEVATIONS FOR LOCATIONS.
3. NOT ALL ELEVATIONS ARE REPRESENTED IN THE EXTERIOR ELEVATION SHEETS. RECESSED ALCOVES SHALL BE FIELD VERIFIED. ALL EXTERIOR ENVELOPE SURFACES SHALL BE COATED.
4. ALL EXTERIOR DOORS SHALL RECEIVE NEW HARDWARE. REFERENCE OVERALL SITE PLAN & EXTERIOR BUILDING ELEVATIONS.
5. ALL ADHESIVE APPLIED SIGNAGE AT CLASS & ENTRY DOORS SHALL BE REMOVED. REMOVE ADHESIVE RESIDUE FOR PAINTING. REINSTALL SIGNAGE.
general notes
N
TACIFI
AD
DENGS
TE
I
R
C
ET E
O.
H
S.
MARK E.
EG
RA
R
NZI O U.A
BOLLARD
23459
ISD
ETER ARC
CE
A.
T
IT
job
date
revisions
7350 EAST SPEEDWAY 210TUCSON, ARIZONA 85710
(520) 326-3700(520) 326-1148
www.swaimaia.com
OFFICEFAX
ASSOCIATES LTDARCHITECTS AIA
/
/
8/1
2/2
020
8:2
7:0
4 A
MC
:\A
ctive
Revit P
roje
cts
\111
6.6
2_
R19
_O
ld V
ail
Wea
the
rization
_C
F_js
eym
ou
r.rv
t
a4.7
lib
rary
-e
leva
tio
ns
VU
SD
OL
D V
AIL
MID
DL
E S
CH
OO
L
132
99
E C
OL
OS
SA
L C
AV
E R
D
VA
IL, A
Z 8
56
41
08.07.20
1116.62
0708
20
1/8" = 1'-0"a4.7
1Library - north elevation
1/8" = 1'-0"a4.7
2Library - east elevation
1/8" = 1'-0"a4.7
3Library - south elevation
1/8" = 1'-0"a4.7
4Library - west elevation
7.3 ELECTRICAL DEVICE. REMOVE ALL EXISTING SEALANT.PREPARE JOINT BETWEEN DEVICE & CONCRETE ANDAPPLY NEW SEALANT.
7.5 EXISTING ALUMINUM STOREFRONT WINDOWS. REMOVEALL SEALANT AROUND PERIMETER. PREPARE, ADD ABACKER ROD AND RE-CAULK INTERSECTION BETWEENALUMINUM AND STRUCTURE.
7.7 EXISTING HM WINDOW FRAME. REMOVE PERIMETERCAULKING & RE-CAULK FRAME TO STUCCO. PREPARE ANDPAINT FRAME.
8.1 HM DOOR & DRAME. REMOVE PERIMETER DOOR SEALS,DOOR SHOE & DRIP. FILL ALL HOLES. PREPARE, PRIME &PAINT DOOR. INSTALL NEW HARDWARE. PERIMETER SEALS- 379 AS. DOOR SHOE - 345-ANB. DRIP - 346A PEMKO OREQUAL.
9.2 SHEET METAL DOWNSPOUT. RE-CAULK THROUGH WALLSCUPPER. PREPARE, PRIME AND PAINT.
9.3 SIGNAGE. TAPE OFF & PROTECT DURING PAINTING.
9.7 SEAL ALL CRACKS, PREPARE, PRIME & APPLYELASTOMERIC COATING OVER STUCCO. INCLUDEBACKSIDE OF PARAPETS. COLUMNS ARE AN ACCENTCOLOR.
9.9 PAINT ALL EXPOSED CONDUIT & PIPING.
9.11 PREPARE, PRIME & PAINT RECESSED WOOD TRIM.CONTINUOUSLY CAULK THE INTERSECTION BETWEEN THESTUCCO METAL AND WOOD TRIM.
9.14 PAINT CAP FLASHING, INSIDE, OUTSIDE AND TOP.
9.19 PAINT WOOD SKIRT AND TRIM.
keynotes
8.18.1
7.37.37.3 7.3
4.14.17.4
9.7
4.20.8 4.1
9.7
4.2 7.38.1
7.37.3
4.1 7.187.18
7.187.187.187.187.189.14
4.2 4.2
9.14 9.14
4.1
7.3
7.3 9.9 9.7
4.2
7.16
9.9
7.47.4
7.7
9.2
4.1 7.16 4.14.2
9.7
7.7
9.2 7.3
7'-0"
4.1 4.1
9.2
7.7
7.18
7.189.14
4.2
7.7
9.2
7.16 7.3
9.2
7.7 4.1 7.7 4.1 4.4 7.77.7
9.2
4.1
9.7 9.7 9.7
4.1
9.2
7.5
7.18
4.1
7.3 7.3
4.1
7.18
7.16
9.14
4.2
4.2 9.14
4.2
7.7
4.1 9.2 7.77.7 4.1 9.2 7.7 4.1 7.7
9.2
4.1 7.77.7
9.2
7.7
7.3
4.17.34.17.3
7.187.18 7.189.14
4.2
9.14
4.2
1. DO NOT SCALE DRAWINGS. COORDINATE ALL WORK WITH THE SCHOOL SCHEDULE.
2. THE EXTERIOR COATING SYSTEM WILL INCLUDE MULTIPLE COLORS. REFER TO GRAPHIC TEXTURE ON EXTERIOR ELEVATIONS FOR LOCATIONS.
3. NOT ALL ELEVATIONS ARE REPRESENTED IN THE EXTERIOR ELEVATION SHEETS. RECESSED ALCOVES SHALL BE FIELD VERIFIED. ALL EXTERIOR ENVELOPE SURFACES SHALL BE COATED.
4. ALL EXTERIOR DOORS SHALL RECEIVE NEW HARDWARE. REFERENCE OVERALL SITE PLAN & EXTERIOR BUILDING ELEVATIONS.
5. ALL ADHESIVE APPLIED SIGNAGE AT CLASS & ENTRY DOORS SHALL BE REMOVED. REMOVE ADHESIVE RESIDUE FOR PAINTING. REINSTALL SIGNAGE.
general notes
N
TACIFI
AD
DENGS
TE
I
R
C
ET E
O.
H
S.
MARK E.
EG
RA
R
NZI O U.A
BOLLARD
23459
ISD
ETER ARC
CE
A.
T
IT
job
date
revisions
7350 EAST SPEEDWAY 210TUCSON, ARIZONA 85710
(520) 326-3700(520) 326-1148
www.swaimaia.com
OFFICEFAX
ASSOCIATES LTDARCHITECTS AIA
/
/
8/1
2/2
020
8:2
7:0
8 A
MC
:\A
ctive
Revit P
roje
cts
\111
6.6
2_
R19
_O
ld V
ail
Wea
the
rization
_C
F_js
eym
ou
r.rv
t
a4.8
bu
ild
ing
s 8
00
-
ele
va
tio
ns
VU
SD
OL
D V
AIL
MID
DL
E S
CH
OO
L
132
99
E C
OL
OS
SA
L C
AV
E R
D
VA
IL, A
Z 8
56
41
08.07.20
1116.62
0708
20
1/8" = 1'-0"a4.8
1buildings 800A/800B/800C - north
1/8" = 1'-0"a4.8
2buildings 800A/800B/800C - east
1/8" = 1'-0"a4.8
3buildings 800A/800B/800C - south
1/8" = 1'-0"a4.8
4buildings 800A/800B/800C - west
0.8 FIRE EXTINGUISHER CABINET.
4.1 MASONRY CONTROL JOINT. REMOVE ALL SEALANT ANDBACKER ROD. INSTALL NEW ROD & CAULK JOINT FULLHEIGHT.
4.2 EXPOSED CMU WALL. REPOINT LOOSE MASONRY & FILLANY PIN HOLES. BID 50 L.F. OF JOINT REPAIR ON EACHELEVATION. CLEAN, PREPARE & RESEAL WALL.
4.4 PLACEHOLDER - NOT SURE WHAT.
7.3 ELECTRICAL DEVICE. REMOVE ALL EXISTING SEALANT.PREPARE JOINT BETWEEN DEVICE & CONCRETE ANDAPPLY NEW SEALANT.
7.4 HOSE BIB / ELECTRICAL CONDUIT PENETRATION / PIPEPENETRATION, REMOVE ALL SEALANT. PREPARE JOINT,INSTALL BACKER ROD IF JOINT EXCEEDS 1/4" AND APPLYNEW SEALANT.
7.5 EXISTING ALUMINUM STOREFRONT WINDOWS. REMOVEALL SEALANT AROUND PERIMETER. PREPARE, ADD ABACKER ROD AND RE-CAULK INTERSECTION BETWEENALUMINUM AND STRUCTURE.
7.7 EXISTING HM WINDOW FRAME. REMOVE PERIMETERCAULKING & RE-CAULK FRAME TO STUCCO. PREPARE ANDPAINT FRAME.
7.16 RECESSED ELECTRICAL PANEL. CAULK PERIMETER OFPANEL TO CMU. FOUR SIDES.
7.18 REMOVE OLD CAULKING ALONG TOP OF CMUWAINSCOTING AND DOOR FRAMES. RE-CAULKCONTINUOUSLY AROUND BUILDING.
8.1 HM DOOR & DRAME. REMOVE PERIMETER DOOR SEALS,DOOR SHOE & DRIP. FILL ALL HOLES. PREPARE, PRIME &PAINT DOOR. INSTALL NEW HARDWARE. PERIMETER SEALS- 379 AS. DOOR SHOE - 345-ANB. DRIP - 346A PEMKO OREQUAL.
9.2 SHEET METAL DOWNSPOUT. RE-CAULK THROUGH WALLSCUPPER. PREPARE, PRIME AND PAINT.
9.7 SEAL ALL CRACKS, PREPARE, PRIME & APPLYELASTOMERIC COATING OVER STUCCO. INCLUDEBACKSIDE OF PARAPETS. COLUMNS ARE AN ACCENTCOLOR.
9.9 PAINT ALL EXPOSED CONDUIT & PIPING.
9.14 PAINT CAP FLASHING, INSIDE, OUTSIDE AND TOP.
keynotes
4.2 8.1 8.1 8.1 8.1
9.7 9.7 9.77.3 7.3 7.3 7.3 7.3 7.3
7.17
7.18 7.187.187.18 9.14
7.4 8.1
7.3
9.9 8.1 8.18.17.17
7.3 7.3
9.9 4.2
7.18 7.18 7.187.189.14
1. DO NOT SCALE DRAWINGS. COORDINATE ALL WORK WITH THE SCHOOL SCHEDULE.
2. THE EXTERIOR COATING SYSTEM WILL INCLUDE MULTIPLE COLORS. REFER TO GRAPHIC TEXTURE ON EXTERIOR ELEVATIONS FOR LOCATIONS.
3. NOT ALL ELEVATIONS ARE REPRESENTED IN THE EXTERIOR ELEVATION SHEETS. RECESSED ALCOVES SHALL BE FIELD VERIFIED. ALL EXTERIOR ENVELOPE SURFACES SHALL BE COATED.
4. ALL EXTERIOR DOORS SHALL RECEIVE NEW HARDWARE. REFERENCE OVERALL SITE PLAN & EXTERIOR BUILDING ELEVATIONS.
5. ALL ADHESIVE APPLIED SIGNAGE AT CLASS & ENTRY DOORS SHALL BE REMOVED. REMOVE ADHESIVE RESIDUE FOR PAINTING. REINSTALL SIGNAGE.
general notes
N
TACIFI
AD
DENGS
TE
I
R
C
ET E
O.
H
S.
MARK E.
EG
RA
R
NZI O U.A
BOLLARD
23459
ISD
ETER ARC
CE
A.
T
IT
job
date
revisions
7350 EAST SPEEDWAY 210TUCSON, ARIZONA 85710
(520) 326-3700(520) 326-1148
www.swaimaia.com
OFFICEFAX
ASSOCIATES LTDARCHITECTS AIA
/
/
8/1
2/2
020
8:2
7:0
9 A
MC
:\A
ctive
Revit P
roje
cts
\111
6.6
2_
R19
_O
ld V
ail
Wea
the
rization
_C
F_js
eym
ou
r.rv
t
a4.9
bu
ild
ing
s 8
00
-
ele
va
tio
ns
VU
SD
OL
D V
AIL
MID
DL
E S
CH
OO
L
132
99
E C
OL
OS
SA
L C
AV
E R
D
VA
IL, A
Z 8
56
41
08.07.20
1116.62
0708
20
1/8" = 1'-0"a4.9
1buildings 800A/800B/800C courtyard - east
1/8" = 1'-0"a4.9
2buildings 800A/800B/800C courtyard - west
4.2 EXPOSED CMU WALL. REPOINT LOOSE MASONRY & FILLANY PIN HOLES. BID 50 L.F. OF JOINT REPAIR ON EACHELEVATION. CLEAN, PREPARE & RESEAL WALL.
7.3 ELECTRICAL DEVICE. REMOVE ALL EXISTING SEALANT.PREPARE JOINT BETWEEN DEVICE & CONCRETE ANDAPPLY NEW SEALANT.
7.4 HOSE BIB / ELECTRICAL CONDUIT PENETRATION / PIPEPENETRATION, REMOVE ALL SEALANT. PREPARE JOINT,INSTALL BACKER ROD IF JOINT EXCEEDS 1/4" AND APPLYNEW SEALANT.
7.17 FIRE EXTINGUISHER PLACEHOLDER.
7.18 REMOVE OLD CAULKING ALONG TOP OF CMUWAINSCOTING AND DOOR FRAMES. RE-CAULKCONTINUOUSLY AROUND BUILDING.
8.1 HM DOOR & DRAME. REMOVE PERIMETER DOOR SEALS,DOOR SHOE & DRIP. FILL ALL HOLES. PREPARE, PRIME &PAINT DOOR. INSTALL NEW HARDWARE. PERIMETER SEALS- 379 AS. DOOR SHOE - 345-ANB. DRIP - 346A PEMKO OREQUAL.
9.7 SEAL ALL CRACKS, PREPARE, PRIME & APPLYELASTOMERIC COATING OVER STUCCO. INCLUDEBACKSIDE OF PARAPETS. COLUMNS ARE AN ACCENTCOLOR.
9.9 PAINT ALL EXPOSED CONDUIT & PIPING.
9.14 PAINT CAP FLASHING, INSIDE, OUTSIDE AND TOP.
keynotes
7.77.7 7.77.79.11
9.10
9.209.219.21
9.10
9.11
7.3
7.217.21
9.9
9.11
9.21
8.1
7.77.7 7.77.77.6
9.15
9.15
7.6
0.9
9.21
9.20 0.9
8.1
9.107.21
7.3 7.39.9 9.20
9.219.21
7.77.7 7.77.79.20
9.10
9.219.21
9.107.21
9.11
9.9 7.3
9.21
9.20
8.17.77.7
7.6
9.10
8.1 7.77.7
7.6
9.10
9.15
0.9
9.219.21
9.20 0.9
9.15
9.107.21
7.3 7.39.9 9.20
9.21
1. DO NOT SCALE DRAWINGS. COORDINATE ALL WORK WITH THE SCHOOL SCHEDULE.
2. THE EXTERIOR COATING SYSTEM WILL INCLUDE MULTIPLE COLORS. REFER TO GRAPHIC TEXTURE ON EXTERIOR ELEVATIONS FOR LOCATIONS.
3. NOT ALL ELEVATIONS ARE REPRESENTED IN THE EXTERIOR ELEVATION SHEETS. RECESSED ALCOVES SHALL BE FIELD VERIFIED. ALL EXTERIOR ENVELOPE SURFACES SHALL BE COATED.
4. ALL EXTERIOR DOORS SHALL RECEIVE NEW HARDWARE. REFERENCE OVERALL SITE PLAN & EXTERIOR BUILDING ELEVATIONS.
5. ALL ADHESIVE APPLIED SIGNAGE AT CLASS & ENTRY DOORS SHALL BE REMOVED. REMOVE ADHESIVE RESIDUE FOR PAINTING. REINSTALL SIGNAGE.
6. FOR BIDDING PURPOSES, INCLUDE THE FOLLOWING WOOD TRIM IN THE BASE BID. PER PORTABLE INCLUDE:A. 200 L.F. OF 1X4 WOOD TRIMB. 384 S.F. OF T-III SIDINGC. 1000 S.F. OF T-III SKIRTING
general notes
N
TACIFI
AD
DENGS
TE
I
R
C
ET E
O.
H
S.
MARK E.
EG
RA
R
NZI O U.A
BOLLARD
23459
ISD
ETER ARC
CE
A.
T
IT
job
date
revisions
7350 EAST SPEEDWAY 210TUCSON, ARIZONA 85710
(520) 326-3700(520) 326-1148
www.swaimaia.com
OFFICEFAX
ASSOCIATES LTDARCHITECTS AIA
/
/
8/1
2/2
020
8:2
7:1
0 A
MC
:\A
ctive
Revit P
roje
cts
\111
6.6
2_
R19
_O
ld V
ail
Wea
the
rization
_C
F_js
eym
ou
r.rv
t
bu
ild
ing
s 6
00
-
ele
va
tio
ns
VU
SD
OL
D V
AIL
MID
DL
E S
CH
OO
L
132
99
E C
OL
OS
SA
L C
AV
E R
D
VA
IL, A
Z 8
56
41
a4.10
08.07.20
1116.62
0708
20
0.9 REMOVE & REINSTALL STAIRS TO PERFORM WORK.
7.3 ELECTRICAL DEVICE. REMOVE ALL EXISTING SEALANT.PREPARE JOINT BETWEEN DEVICE & CONCRETE ANDAPPLY NEW SEALANT.
7.6 REMOVE CAULKING AT SHADE STRUCTURECOUNTERFLASHING.RE-CAULK.
7.7 EXISTING HM WINDOW FRAME. REMOVE PERIMETERCAULKING & RE-CAULK FRAME TO STUCCO. PREPARE ANDPAINT FRAME.
7.21 CAULK AROUND DUCT PENETRATIONS.
8.1 HM DOOR & DRAME. REMOVE PERIMETER DOOR SEALS,DOOR SHOE & DRIP. FILL ALL HOLES. PREPARE, PRIME &PAINT DOOR. INSTALL NEW HARDWARE. PERIMETER SEALS- 379 AS. DOOR SHOE - 345-ANB. DRIP - 346A PEMKO OREQUAL.
9.9 PAINT ALL EXPOSED CONDUIT & PIPING.
9.10 WOOD FASCIA/RAKE PIECE. SCRAPE, PREPARE, PRIME &PAINT, INCLUDING METAL DRIP EDGE. PAINT UNDER SIDE.
9.11 PREPARE, PRIME & PAINT RECESSED WOOD TRIM.CONTINUOUSLY CAULK THE INTERSECTION BETWEEN THESTUCCO METAL AND WOOD TRIM.
9.15 PREPARE AND PAINT ALL STEEL ON CANOPY.
9.20 PREPARE AND PAINT ALL WOOD TRIM.
9.21 PREPARE AND PAINT ALL WOOD SIDING AND TRIM.
keynotes
1/8" = 1'-0"a4.10
1building 600A - north
1/8" = 1'-0"a4.10
2building 600A - east
1/8" = 1'-0"a4.10
3building 600A - south
1/8" = 1'-0"a4.10
4building 600A - west
1/8" = 1'-0"a4.10
5building 600B - north
1/8" = 1'-0"a4.10
6building 600B - east
1/8" = 1'-0"a4.10
7building 600B - south
1/8" = 1'-0"a4.10
8building 600B - west
9.10
7.39.9
7.21
7.39.9
7.3
9.20
9.219.21
7.77.7 7.77.7
9.10
9.20
9.21
9.10
7.39.99.97.3
7.21
9.21
9.20
8.1
7.6
9.20
9.10 9.10
7.77.7 7.77.79.20
8.1
7.6
0.9
9.21
0.9
9.15
9.107.217.21
9.21
9.207.37.3 9.9
600
9.3
9.20 7.77.7 7.77.7
9.10
9.21
9.117.21
7.39.99.9
9.21
9.20
8.1
7.6
7.77.7 7.77.79.20
8.1
7.6
9.10
0.9
9.20 9.21
9.15
1. DO NOT SCALE DRAWINGS. COORDINATE ALL WORK WITH THE SCHOOL SCHEDULE.
2. THE EXTERIOR COATING SYSTEM WILL INCLUDE MULTIPLE COLORS. REFER TO GRAPHIC TEXTURE ON EXTERIOR ELEVATIONS FOR LOCATIONS.
3. NOT ALL ELEVATIONS ARE REPRESENTED IN THE EXTERIOR ELEVATION SHEETS. RECESSED ALCOVES SHALL BE FIELD VERIFIED. ALL EXTERIOR ENVELOPE SURFACES SHALL BE COATED.
4. ALL EXTERIOR DOORS SHALL RECEIVE NEW HARDWARE. REFERENCE OVERALL SITE PLAN & EXTERIOR BUILDING ELEVATIONS.
5. ALL ADHESIVE APPLIED SIGNAGE AT CLASS & ENTRY DOORS SHALL BE REMOVED. REMOVE ADHESIVE RESIDUE FOR PAINTING. REINSTALL SIGNAGE.
6. FOR BIDDING PURPOSES, INCLUDE THE FOLLOWING WOOD TRIM IN THE BASE BID. PER PORTABLE INCLUDE:A. 200 L.F. OF 1X4 WOOD TRIMB. 384 S.F. OF T-III SIDINGC. 1000 S.F. OF T-III SKIRTING
general notes
N
TACIFI
AD
DENGS
TE
I
R
C
ET E
O.
H
S.
MARK E.
EG
RA
R
NZI O U.A
BOLLARD
23459
ISD
ETER ARC
CE
A.
T
IT
job
date
revisions
7350 EAST SPEEDWAY 210TUCSON, ARIZONA 85710
(520) 326-3700(520) 326-1148
www.swaimaia.com
OFFICEFAX
ASSOCIATES LTDARCHITECTS AIA
/
/
8/1
2/2
020
8:2
7:1
1 A
MC
:\A
ctive
Revit P
roje
cts
\111
6.6
2_
R19
_O
ld V
ail
Wea
the
rization
_C
F_js
eym
ou
r.rv
t
bu
ild
ing
s 6
00
-
ele
va
tio
ns
VU
SD
OL
D V
AIL
MID
DL
E S
CH
OO
L
132
99
E C
OL
OS
SA
L C
AV
E R
D
VA
IL, A
Z 8
56
41
a4.11
08.07.20
1116.62
0708
20
1/8" = 1'-0"a4.11
1building 600C - north
1/8" = 1'-0"a4.11
2building 600C - east
1/8" = 1'-0"a4.11
3building 600C - south
1/8" = 1'-0"a4.11
4building 600C - west
1/8" = 1'-0"a4.11
5building 600D - north
1/8" = 1'-0"a4.11
6building 600D - east
1/8" = 1'-0"a4.11
7building 600D - south
1/8" = 1'-0"a4.11
8building 600D - west
0.9 REMOVE & REINSTALL STAIRS TO PERFORM WORK.
7.3 ELECTRICAL DEVICE. REMOVE ALL EXISTING SEALANT.PREPARE JOINT BETWEEN DEVICE & CONCRETE ANDAPPLY NEW SEALANT.
7.6 REMOVE CAULKING AT SHADE STRUCTURECOUNTERFLASHING.RE-CAULK.
7.7 EXISTING HM WINDOW FRAME. REMOVE PERIMETERCAULKING & RE-CAULK FRAME TO STUCCO. PREPARE ANDPAINT FRAME.
7.21 CAULK AROUND DUCT PENETRATIONS.
8.1 HM DOOR & DRAME. REMOVE PERIMETER DOOR SEALS,DOOR SHOE & DRIP. FILL ALL HOLES. PREPARE, PRIME &PAINT DOOR. INSTALL NEW HARDWARE. PERIMETER SEALS- 379 AS. DOOR SHOE - 345-ANB. DRIP - 346A PEMKO OREQUAL.
9.3 SIGNAGE. TAPE OFF & PROTECT DURING PAINTING.
9.9 PAINT ALL EXPOSED CONDUIT & PIPING.
9.10 WOOD FASCIA/RAKE PIECE. SCRAPE, PREPARE, PRIME &PAINT, INCLUDING METAL DRIP EDGE. PAINT UNDER SIDE.
9.11 PREPARE, PRIME & PAINT RECESSED WOOD TRIM.CONTINUOUSLY CAULK THE INTERSECTION BETWEEN THESTUCCO METAL AND WOOD TRIM.
9.15 PREPARE AND PAINT ALL STEEL ON CANOPY.
9.20 PREPARE AND PAINT ALL WOOD TRIM.
9.21 PREPARE AND PAINT ALL WOOD SIDING AND TRIM.
keynotes