Upload
claudio-guin-godoy
View
242
Download
1
Embed Size (px)
Citation preview
7/23/2019 830E Frame Form
1/5CEHQ003200 830E FRAME INSPECTION REPORT Pa
KOMATSU 830E DUMP TRUCK - FRAME INSPECTION REPORT
Unit Unit Hours Inspected By Date Status
(X the applicable box at right)
No Repairs Repairs Requi
Wash unit, clean all weld joints, and visually inspect for cracking or damage. Indicate the location of any cracks on the appropriate drawing
views by marking the approximate location and length of crack. For reference purposes, draw an arrow to the crack location, number the
arrow, and indicate whether inside or outside, top or bottom view, as appropriate. Describe each crack on page 4.
Komatsu Serial Number Customer Name Location
7/23/2019 830E Frame Form
2/5CEHQ003200 830E FRAME INSPECTION REPORT Pa
7/23/2019 830E Frame Form
3/5CEHQ003200 830E FRAME INSPECTION REPORT Pa
7/23/2019 830E Frame Form
4/5CEHQ003200 830E FRAME INSPECTION REPORT Pa
KOMATSU 830E DUMP TRUCK - FRAME INSPECTION REPORT
Describe all frame cracks or related damage.
Reference
NumberDescribe Position Of Crack Or Damage Crack Length Parent Metal Weld Metal
Previous
Repair
SKETCH
7/23/2019 830E Frame Form
5/5CEHQ003200 830E FRAME INSPECTION REPORT Pa
KOMATSU 830E DUMP TRUCK - FRAME INSPECTION REPORT
With the truck unloaded and parked on level ground, inspect the Hydrair suspensions and record these dimensions:
PISTON EXTENSION DIRT RING HEIGHT
LEFT FRONT
RIGHT FRONT
LEFT REAR
RIGHT REAR
Check and record the dump body lateral guide clearances:
LEFT CLEARANCE RIGHT CLEARANCE
Check and record body pad condition and adjustment:
REAR PAD CENTER PAD FORWARD PAD
LEFT
RIGHT
Check and record dump body pivot bushing condition. OK WORN
ADDITIONAL COMMENTS