Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
Mueller Backyard Building Kits are not engineered structures and do not meet any specific building code criteria.
877-2- MUELLER • www.muellerinc.com
12' x 24' Loafing Shed Instructions
Mueller, Inc. 12' x 24' Loafing Shed Instructions 2
PARTS LIST
Refer to the parts list on the itemized invoice delivered with your building.
Purlin
RP-1
MG-1
Channel
EC-1
EC-2
MKB 1EP-183/16"
4"
MG-2MG-2MG-2
MG-1
MG-1
EC-1
EC-2
EC-2
EC-1
RP-1
RP-1
RP-1RP-1
RP-1
RP-1
MG-1
MG-1
MG-1
MG-1
Lap Tek Tek #12 1¼"
Tek-4 #12 1¼" Plated
SD #10 1" Pancake Head
MG-2
Mueller, Inc. 12' x 24' Loafing Shed Instructions 3
LAY OUT AND DIG HOLES FOR LOAFING SHED1. Determine the back corners of your Loafing shed and hammer in stakes 12' center to center. The front
corners will be 12’ from the back. See diagram below for details on squaring the building.
2. Mark the location of the corner posts using the marker/spray paint.
3. Dig the back post holes at marked locations 8" – 12" in diameter and 39" deep.
4. Dig the front post holes at marked locations 8" – 12" in diameter and 27" deep.
Back holes 39" deep
Front holes 27" deep
8" – 12" wide
8" – 12" wide
NOTE: For sloping conditions, hole depths may vary.
Dimensions Must Be Equal
Transit
Measurement:
A same as BC same as DE same as F
A
C
D
FE
B
For best results, locate on level ground
Mueller, Inc. 12' x 24' Loafing Shed Instructions 4
SET POSTS FOR LOAFING SHED (DON’T SET POSTS IN CONCRETE UNTIL ALL RED IRON IS BOLTED TOGETHER)1. Bolt 2 clips to the bottom of each post and mark the uphill side of each post.
Mueller, Inc. 12' x 24' Loafing Shed Instructions 5
NOTE: Clips mount on the high and low side of the posts.
SET POSTS FOR LOAFING SHED (CONTINUED) (DON’T SET POSTS IN CONCRETE UNTIL ALL RED IRON IS BOLTED TOGETHER)2. Put in first post and align back posts where the slope on the bolts is running uphill towards the front.
3. With dry concrete mix (don't add water), tamp in 1 corner post as a starting point for squaring the building.
4. Put the rest of the posts in the holes where the slope on the bolts is running uphill towards the front.
NOTE: Label which sides are the low and high sides with a marker before standing posts to better help insure correct installation.
Slope uphill toward eye brow
Mueller, Inc. 12' x 24' Loafing Shed Instructions 6
SET POSTS FOR LOAFING SHED (CONTINUED) (DON’T SET POSTS IN CONCRETE UNTIL ALL RED IRON IS BOLTED TOGETHER)5. Assemble receiver channel (with triangle facing up) place a nut on the inside bolt to hold in place.
6. Next install the font and back purlin to the top of posts. You will need to place the bottom holes of purlin on bolts, then roll the top into place. You will bolt the top of the purlin to the receiver with 1 bolt, and add the 2 nuts to the bottom.
7. When installing your back center posts, make sure that it is flush with the rest of the back posts. If the post is shorter or taller than the corner post, it can force your roof to bow or sag in the middle. To rectify this, you may need to either dig the hole out a little deeper to lower the post or tamp more dry concrete mix to raise it.
Wrong Wrong Correct
Level
RP-1 PurlinSet purlinon bottom2 boltsthen rolltop intoplace
Put 1 boltand nut onthe top and 2 nuts onthe bottom
Installnut oninsidebolt tohold inplace
Mueller, Inc. 12' x 24' Loafing Shed Instructions 7
SET POSTS FOR LOAFING SHED (CONTINUED) (DON’T SET POSTS IN CONCRETE UNTIL ALL RED IRON IS BOLTED TOGETHER)8. With a 4’ level, check to ensure the front and back purlins are level – you may need to raise or lower a corner post!
9. Check for square – once close, use dry concrete to hold square.
Measurement:
A same as BC same as DE same as F
A
C
D
FE
B
Front High Side
Purlin
PurlinBackwall Low Side
ChannelSidewall
ChannelSidewall
Mueller, Inc. 12' x 24' Loafing Shed Instructions 8
ATTACHING WALL GIRTS AND REMAINING ROOF PURLINS
1. On the back wall corners − Measure down from the top of the roof purlin 9' (This will be where your clip attaches.)
(Note: This clip is facing up and you will need to stagger the back corner screws so they don't hit - see illustration below!)
2. Attach wall girt to back wall corner clips.
3. Use a level to move wall girts running to front corner until they are level with back corner clip. Once the girt is level, mark front columns. This is where your clip will attach. Attach the clip then bolt on the girt.
4. After the bottom row of wall girts are attached, check for square and make sure all columns are plumb, then use dry concrete mix to set all posts.
(Note: You should now have a level run of girts on 3 sides of the building!)
NOTE: 9' down from the top back wall will be the top of this wall girt. Use Tek-4 screws to attach clip to column.
LevelLevel
BackwallSidewall
MG-1MG-2
Post Hole
NOTE: On the back columns, move one inside corner screw up to avoid hitting the other screw.
Mueller, Inc. 12' x 24' Loafing Shed Instructions 9
ATTACHING WALL GIRTS AND REMAINING ROOF PURLINS (CONTINUED)
5. Next, measure up 2' ¾" from bottom of wall girt and mark all columns. This will be the location of the next clip. Set clip and attach the row of girts. (Note: This clip is facing down and you will need to stagger the back corner screws so they don't hit - see illustration below!)
6. Next measure up 4' from the bottom edge of the base girt and mark all columns. This will be the location of the next clip. Attach next row of girts.
4' from bottom of base girt to top of top girt
2' ¾" from bottom of base girt to top of mid girt
Level
Top of girt
Level Backwall Sidewall
MG-1
MG-1
MG-1
MG-2
MG-2
MG-2
9'
This spacingis set up toaccept a 4'
wide sheet ofplywood -
not included!
Mueller, Inc. 12' x 24' Loafing Shed Instructions 10
ATTACHING WALL GIRTS AND REMAINING ROOF PURLINS (CONTINUED)
7. Bolt in the 2 roof purlins (Open part of purlin should open towards back of the building).
Receiver Channel
Purlin (Note orientation of all purlins)
4x4 High side Post
4x4 Low side Post
BackwallLow Side
Front High Side
Sidewall
MG-2MG-2MG-2
MG-1
MG-1
EC-1
EC-1
RP-1
RP-1
RP-1
RP-1
MG-1
MG-1
MG-1
MG-1
Mueller, Inc. 12' x 24' Loafing Shed Instructions 11
ATTACHING EYEBROW (Use the 1 1/4" Bolts for this connection)
1. Find two EP-1's (flat clips with 6 holes) and attach inside and outside the receiver rafter on the high side. These holes are designed for a snug fit - so get all 3 started before proceeding to STEP 2. Don't tighten yet.
2. Next slide the 2'11¼" receiver (EC-2) in between the flat plates to form the rafter eyebrow. These holes are designed for a snug fit - so get all 3 started, then tighten all 6 nuts. Repeat STEPS 1 and 2 for the other side.
3. Next attach the 2 purlins to the eyebrow starting with the one closest to the peak
4. Make sure that building is plumb and square, then ensure that all bolts are tight
5. Concrete in all columns and allow to cure before sheeting the building.
On each side of the building, align (2) EP-1 clips together (one on the inside of the building/eyebrow rafter, and one on the outside), creating a sandwich on the rafter and eyebrow.
One clip inside and one outside to create a sandwich on the rafter and eyebrow. X2
EC-1
EC-2
RP-1
RP-1
EP-18 3/16"
4"(Use the 1 1/4" Bolts for this connection)
(Use the 1 1/4" Bolts for this connection)
Mueller, Inc. 12' x 24' Loafing Shed Instructions 12
ATTACHING 0330 DRIP FLASHING
1. Attach the 0330 drip flashing 9'1½" down from the back wall (The bottom should be flush with the bottom of your wall girt).
2. Make sure the 0330 drip flashing sticks past the back corner columns 1¾" on both sides. Continue on the 2 sidewalls keeping the drip flashing level.
3. Use the SD #10 1" Pancake head screw (with Phillips head) to attach the 0330 drip flashing every 3' ensuring it is level.
R-Panel Sheet
Drip Trim Mounted Flush with Bottom of Wall Girt
Drip Flashing#0330
4"
1 3/4"
1/2"
Mueller, Inc. 12' x 24' Loafing Shed Instructions 13
ATTACHING 0330 DRIP FLASHING (CONTINUED)
4. On the 2 sidewalls, the drip flashing should be flush with the front corner column, and stick past the backside corner column 1¾". If you cut a 45 off the sidewall piece, the corner will look nice.
Drip Flashing #0330
BackwallSidewall
Square TubingColumn
Note the 45º cuts
Mueller, Inc. 12' x 24' Loafing Shed Instructions 14
ATTACHING WALL SHEETING
1. Next attach the back sidewall sheeting. The first sheet will start flush with the edge of the corner column. Make sure the sheet is level before screwing it to the wall girts with Tek #12 x 1 ¼" Screws. (Same color as wall sheet)
2. Continue across the back wall ensuring the sheets stay level and on 3' center.
3. Next the endwall sheeting. Again start flush at the back corner column attaching endwall sheeting. Your 1st sheet should be 9'1", these are intentionally short so you don’t have to cut the angle. The rake trim will cover at the top.
4. Again make sure the sheets are level and staying on 3’ center before screwing into wall girts.
5. Next attach the 0160 corner trim to the 2 back corners using lap screws. These lap screws should not hit the post or purlin, if they do, use a Tek #12 x 1 ¼" Screws. (Same color as trim)
Outside Corner DetailR-Panel Outside
Corner Trim
Wall Girt
Lap Tek24" O.C.
4x4
Backwall
Side
wal
l
Mueller, Inc. 12' x 24' Loafing Shed Instructions 15
ATTACHING WALL SHEETING (CONTINUED)
6. Next attach the 1492 trim to the front corner with the flat side covering the square tubing. You will have to notch the 5¼" flat side to fit under the receiver rafter of the eyebrow. The flat side will need tek screws, the side will need lap screws.
1"
TOP DOWN VIEW
#1492 Rake
4x4 High side Post
1"
Outside Corner Trim #1492
x cut out
Mueller, Inc. 12' x 24' Loafing Shed Instructions 16
STANDARD EAVE TRIM
7. Next install the 0800 eave trim on the back sidewall (Using the SD #10 1" Pancake head screw (with Phillips head). Attach these screws to the top of the roof purlin on 3' centers. (Align both sides of the 0800 eave to the outside of the corner trim – any excess length can be in the overlap.)
Tek Screw Lap Tek Screw
Wall Panel
Standard Eave Trim
Purlin
Mueller, Inc. 12' x 24' Loafing Shed Instructions 17
ATTACHING ROOF SHEETING
1. Install your inside closure making sure that highs fall on 3' centers (these will tend to stretch if you are not careful.)
2. Prior to putting sheet on roof install Sealant Tape on the lap side of the sheet.
3. Next attach the roof sheeting. The first sheet will start flush with the edge of the receiver rafter. Make sure the sheet is overhanging the eave trim 2½" on both ends. Continue across the roof ensuring the sheets stay with a 2½" overhang throughout (your roof sheet ribs should match the ribs of you back sidewall).
4. Again make sure the sheets are staying on 3’ center before screwing into roof purlin.
Lap Tek Screw(20" O.C.)
Sealant Tape
Wall PanelEave Flashing
Inside Closure
PanelPanel Rib
Endwall Roof LinePurlin
2½"
Mueller, Inc. 12' x 24' Loafing Shed Instructions 18
ATTACHING EYEBROW ROOF SHEETING
1. Prior to installing eyebrow check for square using the cross measurement method used previously. (this eyebrow is designed to be moved into square)
2. Install 0806 Rake Spacer Trim on the two outsides of the Receiver Rafter on eyebrow. (You will need to cut this on angle to fit against your corner trim and end flush with the outside eave purlin).
3. Install 0805 Soffit Trim Cover. This will cover the eave purlin on the eyebrow extending upwards 6". This will screw to the bottom of the purlin with a Tek screw and end flush on both sides with your Rake Spacer Trim.
4. Install 0800 Eave Trim. This will cover the remaining exposed purlin also ending flush with your Rake Spacer Trim. This will be screwed into the top of the purlin with #10 1" Pancake head screw (with Phillips head).
0806 Spacer Trim
0800 Eave
4"
Purlin
0805 Eave Soffit Cover
SW Soffit Cover 9.5"#0805
Pitch Required3"
6"
Eyebrow Soffit Cover 12.25"#0806
4"
4½"
1¼"
1"
Mueller, Inc. 12' x 24' Loafing Shed Instructions 19
Lap Tek Screw(20" O.C.)
Sealant Tape
ATTACHING EYEBROW ROOF SHEETING (CONTINUED)
5. Install your inside closure making sure that highs fall on 3' centers (these will tend to stretch if you are not careful).
6. Prior to putting sheet on roof install Sealant Tape on the lap side of the sheet.
7. Next attach the roof sheeting. The first sheet will start flush with the edge of the receiver rafter (should line up with the backwall sheets). Make sure the sheet is overhanging the eave trim 2½" on both ends. Continue across the roof ensuring the sheets stay with a 2½" overhang throughout (your roof sheet ribs should match the ribs of main roof sheets).
8. Again make sure the sheets are staying on 3' center before screwing into roof purlin.
Wall PanelEave Flashing
Inside Closure
PanelPanel Rib
Endwall Roof LinePurlin
2½"
Mueller, Inc. 12' x 24' Loafing Shed Instructions 20
ATTACHING EYEBROW ROOF SHEETING (CONTINUED)
9. Install 1404 Rake Trim. Start by having this flush with the back edge of the main roof sheet. Mark the point where the main roof and the eyebrow meet.
10. Cut upwards on the 7¼" face of the trim to the first bend. Match this on the R panel leg only (you will leave the top 6" face uncut).
11. Fold the rake trim down to where it rests evenly on both the main roof and the eyebrow. Trim the front edge if need be to end flush with your eyebrow sheets.
CUT AND FOLD CENTER AT CENTER
Outside Rake Trim
Loafing Shed Rake - 16.375"#1404
6"
1" 1 5/8"
1/2"
7 1/4"
Eye Brow Detail
Mueller, Inc. 12' x 24' Loafing Shed Instructions 21
RIDGE ROLL INSTALLATION
12. Install 0220 Ridge using lap screws ending flush with the outside edge of your rake trim. Outside foam closures are included if you would like to seal under the ridge or rake trim.
Sealant Tape
Sealant Tape
Outside Closure
Roof Panel
Peak Purlin
Outside Closure
0220 Ridge Flashing
Roof Panel Purlin
Lap TekFastener
Mueller, Inc. 12' x 24' Loafing Shed Instructions 22