1
SECTION Y1 - Y1 02-03-2015 1 : 100 STARTING DATE DATE SCALE DRAWN BY CHECKED BY MEASURED BY DRAWING NO. SHEET NO. PROJECT TITLE 19-01-2015 KOH JING HAO & SANJEH KUMAR RAMAN PENANG GROUP DRAWING TITLE LHCO. 009 9 40 LEGENDS : 1 FIVE FOOT WALKWAY 2 HALL 1 3 AIR WELL 1 4 HALL 2 5 TO LOT 138 6 HALL 3 7 HALL 4 8 INACCESSIBLE STAIRCASE 9 UTILITIES ROOM 10 INACCESSBLE ROOM 11 ROOM 1 12 ROOM 2 13 CORRIDOR 1 14 ROOM 3 15 TO LOT 138 ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG LIAN HUAT COMPANY 16 CORRIDOR 2 17 ROOM 4 18 ROOM 5 19 ROOM 6 20 CORRIDOR 4 21 KITCHEN 22 W.C PENANG GROUP A1 1 1 FFL : 0.000 SPACE NO. FINISH FLOOR LEVEL TIMBER DRAWING SHEET NO. DRAWING NAME TILES FINISHING

9 final-section-y1-ready-plot-y1 - y1

Embed Size (px)

Citation preview

Page 1: 9 final-section-y1-ready-plot-y1 - y1

SECTION Y1 - Y1

02-03-2015

1 : 100

STARTING DATE

DATE

SCALE

DRAWN BY

CHECKED BY

MEASURED BY

DRAWING NO. SHEET NO.PROJECT TITLE

19-01-2015

KOH JING HAO & SANJEH KUMAR RAMAN

PENANG GROUP

DRAWING TITLE

LHCO. 009

9

40

LEGENDS :

1 FIVE FOOT WALKWAY

2 HALL 1

3 AIR WELL 1

4 HALL 2

5 TO LOT 138

6 HALL 3

7 HALL 4

8 INACCESSIBLE STAIRCASE

9 UTILITIES ROOM

10 INACCESSBLE ROOM

11 ROOM 1

12 ROOM 2

13 CORRIDOR 1

14 ROOM 3

15 TO LOT 138

ARC1215

METHODS OF DOCUMENTATION AND

MEASURED DRAWINGS

LIAN HUAT COMPANY, 140 LEBUH

CARNARVON, GEORGETOWN

PENANG

LIAN HUAT COMPANY

16 CORRIDOR 2

17 ROOM 4

18 ROOM 5

19 ROOM 6

20 CORRIDOR 4

21 KITCHEN

22 W.C

PENANG GROUP

A1

1

1

FFL : 0.000

SPACE NO.

FINISH FLOOR LEVEL

TIMBER

DRAWING SHEET NO.

DRAWING NAME

TILES FINISHING