8/9/2019 9 Mr. Danielsen, Boilers and Waste Incinerators
1/15
Schmidt & Danielsen a/s Establised in 1964 mainly as a service company in the refractory business without
technical support.
In 1985 !ren "anielsen too# over and developed the company so that we$ in thelast %5 years have wor#ed as a complete refractory buisness &'echnic desi(n$trade$ and prof. e)ecution of new orders and doin( maintanance*. +ainly basedon danish customers but also carryin( out ,obs in hole Europa
-or nearly 5 years /asle 0efractories has been delivered 0efractory bric#s$castable$ mortars etc. to chmidt "anielsen
'his is what we are2 " is a family owned company. 3e have 5 technical $ % adm. $ % prod.
and 1% installation peoble employed. nnual turnover has been round 4 mill7year over the last 5 years period.
'his is what we do2 +a#es refractory sollution mainly in waste and biomass boilers$ but also industri
and cremation ovens.
8/9/2019 9 Mr. Danielsen, Boilers and Waste Incinerators
2/15
Why refractory in furnace and boilers It was bac# in 1964$ where we started$ without discussion to prevent heat from
furnaces and boilers to come out in the free.
o it is also to day in many plants. ement$ etrochemical$ etc.
In the bi( plants where they ma#es electricity and district heat out af waste$ it haschan(e over the last 15 years. 'o days plants almost can function withoutrefractory. :are steamboilertubes with or without Inconel cladin( can do it but$
/owever to ma#e sure that the furnace and boilers runs in a proper way withoutpolutin( the suroundin(s$ the (as comin( out of the flames shall be #ept above85 d(. for % sec. after the last secundairy air put in.
'his rule (oes for every type of plant ma#in( ener(y out of waste$ biomas etc.
/asle materials to(ether with our technolo(y can do it
/asle 0efractories bi( ran(e of low cement castables has e)celent properties.'hey have (ood al#ali resistence$ have e)celent stren(th$ low porosity and are;uite (ood wor#in( with.
'his is what we do2 'he ne)t slides shows some cases where we have ta#en that benefit and put it
into pro,ects.
8/9/2019 9 Mr. Danielsen, Boilers and Waste Incinerators
3/15
3aste incinerator '$
8/9/2019 9 Mr. Danielsen, Boilers and Waste Incinerators
4/15
Schmidt & Danielsen a/s 'as ovn 5
8/9/2019 9 Mr. Danielsen, Boilers and Waste Incinerators
5/15
3aste incinerator Indaver$ ounty +eath$ Ireland.=ountry Ireland
=Industry 3aste incinerator
=lant name2 Indaver$ ounty +eath
=+ain e;uipment supplier2 :3 >!lund 7
=roduction capacity2 app. %5 t waste7hourEle#tricity only
=?umber of production lines2 1
=0un factor $95
=Installation materials "@9$ "59$ " 66$ " 65 '
=+ain fi(ures %% m% tubewall with 5 mmthic# linin( cast in " 65 '
8/9/2019 9 Mr. Danielsen, Boilers and Waste Incinerators
6/15
Schmidt & Danielsen a/s Irish +eath
8/9/2019 9 Mr. Danielsen, Boilers and Waste Incinerators
7/15
:iomass furnace for smaller ener(iplants to district heatin(.=ountry "enmar# and europe
=Industry :iomass for district heatin(
=lant name2 everal
=+ain e;uipment supplier2 Bustsen Ener(i$ Crhus
=roduction capacity2 5% +3 plants
=:oiler type Dow pressure 1% d(.
=Installation materials "59 precast
=+ain fi(ures 1% m% area with tiles
precast arch 1$5 @$Am span
8/9/2019 9 Mr. Danielsen, Boilers and Waste Incinerators
8/15
Schmidt & Danielsen a/s Bustsen
8/9/2019 9 Mr. Danielsen, Boilers and Waste Incinerators
9/15
:iomass furnace for lar(er ener(i plants=ountry -rance and Italy
=Industry :iomass for electricity and
heatin( up factories.
=lant name2 ofely$ -rance Fi(na(o$
Italy=+ain e;uipment supplier2 albor( Ener(i 'echni# E'
=roduction capacity2 55 +3 plants
=:oiler type team tube boiler
=Installation materials "59 precast
=+ain fi(ures 5 m% split area with tiles
8/9/2019 9 Mr. Danielsen, Boilers and Waste Incinerators
10/15
Schmidt & Danielsen a/s E' -ran#ri(
8/9/2019 9 Mr. Danielsen, Boilers and Waste Incinerators
11/15
:iomass furnace for burnin( (arden waste and other bad biomass.=ountry "enmar#
=Industry :iomass for district heatin(
=lant name2 :o(ense
=+ain e;uipment supplier2 "all Ener(y
=roduction capacity2 1 +3 plants
=:oiler type Gncooled furnace
=Installation materials "59=+ain fi(ures 4 ton of " 59 casted on top
(unned bac#up insulation
8/9/2019 9 Mr. Danielsen, Boilers and Waste Incinerators
12/15
Schmidt & Danielsen a/s 3eiss :o(ense
8/9/2019 9 Mr. Danielsen, Boilers and Waste Incinerators
13/15
/ow to ma#e functional maintanence and service at refractory
=+a#e (ood solution at start. Hood materials$ (ood anchorin($ correcte)pansions etc
=:y every stop ma#e sure that e)pansion ,oints are in (ood shape and
not filled with sla(. ut in new e)pansion materials.=:y every inspection ma#e notes on the drawin( if any repairs has beenmade and ma#e a forcast for ne)t revision$ so it could be prepared.
=Its a (ood thin( to have a schedule (oin( 5 1 years in the future
so the plant owner can have it in his bud(et.
8/9/2019 9 Mr. Danielsen, Boilers and Waste Incinerators
14/15
Schmidt & Danielsen a/s 'as ovn 5. 0evisioner.
8/9/2019 9 Mr. Danielsen, Boilers and Waste Incinerators
15/15
an /asle 0efractories D materials been (iven a lon(er life time
=3ith (ood and planed service yes.
=3ith (ood and carefull operation of the plant. void hi(h pea#s$ avoidmelted sla(.
=reprotection of a linin( has been tried before. Dately test have beencarried out to ma#e D construction more (as tei(ht$
fter dryin( out the materials to 11 d( the surface is cured by sprayin( the materialon the surface. It penetrate and fill out all smaller holes and chrac#s
fter heatin( it up a(ain the surface is (iven a % layer coatin(.
'his can be done the year aften when the plant is out of operation.
=It has been testet by the "anish manufacture company at a plant insweden. 3e have cured tiles for 1 of the E' plants and the costumer haveordered the same curin( for ne)t delivery. 'hey are very satisfied with thetiles compared with tiles witout coatin(.