PLANOS AS BUILT SEPTIEMBRE 2013

9.- Planos as Built

Embed Size (px)

Citation preview

Page 1: 9.- Planos as Built

  

 

 

 

 

 

PLANOS AS BUILT

 

  

  

SEPTIEMBRE 2013

 

Page 2: 9.- Planos as Built

To: GENTE OIL September 17, 2013 Attention: Danny Cuenca By: TECMEINDUS S.A. (Javier Donoso)

CC: Victor Sánchez

DRAWING NAME Issued For Dwgs List Number

001-01 ISOMETRIC PLAN: INGRESO DE CRUDO AL TANQUE T-700 ASB 1

002-001 ISOMETRIC PLAN: LÍNEA DE SUCCIÓN AL TANQUE T-720 ASB 2

003-01 ISOMETRIC PLAN: DESCARGA DE CRUDO ASB 3

004-01 ISOMETRIC PLAN: AREA TRAMPA RECEPTORA ASB 4

005-01 ISOMETRIC PLAN:DESCARGA BOMBA NETZSCH ASB 5

006-01 ISOMETRIC PLAN:SUCCIÓN BOMBA NETZSCH ASB 6

007-01 ISOMETRIC PLAN:DESCARGA BOMBA NETZSCH ASB 7

008-01 ISOMETRIC PLAN:LÍNEA DE SALIDA TANQUE T-770 ASB 8

009-01 ISOMETRIC PLAN:LÍNEA DE SALIDA TANQUE T-770 ASB 9

010-01 ISOMETRIC PLAN:LÍNEA DE SALIDA TANQUE T-770 ASB 10

011-01 ISOMETRIC PLEN:LÍNEA DE SUCCIÓN DESDE TANQUE T700 ASB 11

TOTAL: 11

"ISSUED FOR" COLUMN DENOTES DRAWINGS PERTAINING TO CURRENT ISSUE.

I: (information, approval, preliminary or design stage) B: (Bid) C: (For Construction) ASB: (As Built)

PIPING DRAWING RECORD

EPF TIPISHCA (Upg 2013)GENTE OIL

Page 3: 9.- Planos as Built
Page 4: 9.- Planos as Built
Page 5: 9.- Planos as Built
Page 6: 9.- Planos as Built
Page 7: 9.- Planos as Built
Page 8: 9.- Planos as Built
Page 9: 9.- Planos as Built
Page 10: 9.- Planos as Built
Page 11: 9.- Planos as Built
Page 12: 9.- Planos as Built
Page 13: 9.- Planos as Built
Page 14: 9.- Planos as Built

To: GENTE OIL September 17, 2013 Attention: Danny Cuenca By: TECMEINDUS S.A. (Javier Donoso)

CC: Victor Sánchez

DRAWING NAME Issued For Dwgs List Number

001-01 P&D: DIAGRAMA DE TUBERÍAS ENTREGA DE CRUDO Y AGUA ESTACIÓN EPF TIPISHCA ASB 1

TOTAL: 1

"ISSUED FOR" COLUMN DENOTES DRAWINGS PERTAINING TO CURRENT ISSUE.

I: (information, approval, preliminary or design stage) B: (Bid) C: (For Construction) ASB: (As Built)

PROCESS DRAWING RECORD

EPF TIPISHCA (Upg 2013)GENTE OIL

Page 15: 9.- Planos as Built
Page 16: 9.- Planos as Built

To: GENTE OIL September 17, 2013 Attention: Danny Cuenca By: TECMEINDUS S.A. (Javier Donoso)

CC: Victor Sánchez

DRAWING NAME Issued For Dwgs List Number

001-01 UNIFILAR DIAGRAM: CONEXIÓN DE BOMBAS PEERLESS Y NETZSCH ASB 1

TOTAL: 1

"ISSUED FOR" COLUMN DENOTES DRAWINGS PERTAINING TO CURRENT ISSUE.

I: (information, approval, preliminary or design stage) B: (Bid) C: (For Construction) ASB: (As Built)

INSTRUMENTATION DRAWING RECORD

EPF TIPISHCA (Upg 2013)GENTE OIL