911
पिचम रलवWESTERN RAILWAYपजी पजी िनिध मआिन िविन सिन रारसको जोड़िववरण Particulars Capital CF DRF DF SF RRSK TOTAL
11 () New Lines (Construction) 2110000 1000000 3110000
14 Gauge Conversion 9817890 9817890
15 ह Doubling 90000 90000
16 - $ amp (
Traffic Facilities-Yard
Remodelling amp Others
236314 171 11114 332638 580237
17 ) Computerisation 201 34972 6302 41475
21 + Rolling Stock 130667 115811 246478
22 ) - - 0) 0)
Leased Assets - Payment
of Capital Component
5667326 2249674 7917000
29 1 2 - Road Safety Works-Level
Crossings
648951 648951
30 1 2 -3 1
Road Safety Works-Road
OverUnder Bridges
3925272 3925272
31 amp Track Renewals 5128883 5128883
32 Bridge Works 562617 562617
33 ) 5 Signalling and
Telecommunication
25000 939004 964004
36 ( - 6 7
Other Electrical Works
excl TRD
10100 7940 2125 5271 25436
37 6 Traction Distribution
Works
20101 194226 214327
41 8 5 9 Machinery amp Plant 93214 35435 56821 157434 342904
42 - lt = ह Workshops including
Production Units
538465 60400 106744 212897 918506
51 = 7+ Staff Quarters 25200 220400 245600
52 = Amenities for Staff 30000 68902 201903 300805
53 9 Passenger Amenities 1252170 125000 225000 1200000 2802170
64 ( gt+ Other Specified Works 231500 89800 73302 581100 975703
65 82 TrainingHRD 30000 12200 470500 512700
71 0 Stores Suspense 12495880 12495880
72 Manufacture Suspense 9408291 9408291
73 A Miscellaneous Advances 3000 3000 कल योगकल योगकल योगकल योग Total Gross 42215320 2249674 643020 695511 1000000 14474604 61278129 जमा या वसिलया Credits or Recoveries(क) िविनम सामिय13 क िलए (a) For Released
Materials
299400 1484965 1784365 (ख) अय जमा (b) Other Credits 79400 79400 (ग) भडार उचत (c) Stores Suspense 12409880 12409880 (ध) िनमाण उचत (d) Manufacture Suspense 9297246 9297246 (ड) िविवध अिम (e) Miscellaneous
Advances
3000 3000 कल जमा या वसिलया Total - Credits or
Recoveries
21789526 299400 1484965 23573891 योजना परय योजना परय योजना परय योजना परय ((((श13श13श13श13)))) Plan Outlay (Net) 20425794 2249674 343620 695511 1000000 12989639 37704238
2019201920192019----20 20 20 20 क िलए परसपिय क खरीदक िलए परसपिय क खरीदक िलए परसपिय क खरीदक िलए परसपिय क खरीद िनमाण और बदलाव िनमाण और बदलाव िनमाण और बदलाव िनमाण और बदलाव Assets-Acquisition Construction and Replacement for 2019-20 (Figures in thousand of Rupees)(आकड़ हजार म13)
911
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
1 Dahod-Indore via Sardarpur Jhabua amp Dhar (20097 km) incl
material modification for change in alignment via Amjhera (482 km)
Cap 16000400 4209282 1786104 1000000
SFund 1400000 387667 1000000
2 Chhota Udepur-Dhar (157 km) Cap 13472600 5050913 1072649 1000000
SFund 1000000 291339
3 Bhimnath - Dholera (28 km) Cap 1349900 300 10000
SFund 100 34
Deposit 50000 50000
EBR(IF) 1400000
4 Nimach-Badi Sadri (48 km) Cap 4747600 -11438 1000 100000
5 Estimated investment through EBR (Partnership) for high speed
railway (Mumbai-Ahmedabad)
EBR(P) 100000000 70000000 100000000
TOTAL-WORKS IN PROGRESS Cap 2110000
SFund 1000000
Deposit 50000
EBR(P) 100000000
TOTAL-New Lines (Construction) Cap 2110000
SFund 1000000
Deposit 50000
EBR(P) 100000000
6 Rajkot-Veraval Wansjalia-Jetalsar with new material modification
for Shapur-Saradiya (46 km) and new line Veraval-Somnath (281
km) amp Somnath-Kodinar (3691 km)
Cap 10552600 5442476 6000 1000
CFund 1728566
DRF 1000000
SFund 500000 47465
7 Bhildi-Viramgam (157 km) with new material modification for
Mehsana-Taranga Hill (574 km) - gauge conversion
Cap 4852007 3120353 938813 600000
CFund 564885
DRF 10614
SFund 1000000 1055678
EBR 663200
EBR(IF) 1000000
8 Ratlam-Mhow-Khandwa-Akola (47264 km) including material
modification for Fatehabad-Chandrawati Ganj-Ujjain (2296 km)
Cap 7872971 7545234 1810000 3550000
Deposit 5272500 2000000
EBR(IF) 100000 3180000
9 Ahmedabad-Himmatnagar-Udaipur (2992 km) incl Modasa-
Shamlaji Road (2253 km)
Cap 3856000 2054463 1125
SFund 940000
EBR(IF) 100000 5605798 5250000 5323800
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
NEW LINES (CONSTRUCTION)
A - Works in Progress
GAUGE CONVERSION
A - Works in Progress
912
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
10 Bhuj-Naliya (10135 km) with extension from Naliya to Vayor (2465
km)
Cap 3216200 282960 25000
SFund 500000 535847
Deposit 800000 250000
EBR(IF) 100000
11 Miyagam-Karjan-Dabhoi-Samlaya (9646 km)- Gauge conversion
with electrification
Cap 9499600 161432 465000 249890
SFund 150000 683
12 Dhasa - Jetalsar (10444 km) Cap 3765900 333270 545100 2500000
SFund 420000
EBR(IF) 100000
13 Ahmedabad - Botad (17048 km) Cap 9756200 2245143 2320000 1400000
SFund 520000 108800
EBR(IF) 100000 1100000
14 Ahmedabad - Mehsana (6878 km) Cap 3200000 411688 150523 1000
SFund 500000 299299
EBR(IF) 4775600 876292 2000000
15 Kalol-Kadi-Katosan Road (3723 km) Cap 2792300 1 1000
16 Katosan Road-Chanasma (5172 km) Cap 3679000 1 1000
Deposit 200000 200000
17 Chanasma-Ranuj (1284 km) Cap 763000 1 1000
Deposit 200000 200000
18 Adraj Moti-Viajapur (3975 km) Cap 2965400 1 1000
19 Vijapur-Ambliyasan (4153 km) Cap 3098100 1 1000
20 Khijadiya-Visavdar (9127 km) Cap 5476200 1 1000
21 Junagarh-Visavadar (4228 km) Cap 2536800 1 1000
22 Veraval-Talala-Visavadar (7195 km) Cap 4602300 1 1000
23 Samni-Jambusar (2408 km) Cap 2167200 1 1000
24 Jambusar-Vishvamitri (482 km) Cap 4338000 1 1000
25 Samlaya-Timba Road (5353 km) Cap 4014800 1 1000
26 Nadiad-Petlad (3726 km) Cap 3353400 1 1000
27 Petlad-Bhadran (225 km) Cap 2025000 1 1000
28 Dabhoi-Chandod - Gauge conversion with extension upto Kevadiya
(4975 km)
Cap 6918400 958 275000 1500000
29 Talala-Delwada (70 km) Cap 5253000 1 1000
30 Prachi Road - Kodinar (26 km) Cap 1932000 38 1 1000
31 Himmatnagar-Khedbrahma (5483 km) Cap 3548900 1 1000
TOTAL-WORKS IN PROGRESS Cap 9817890
Deposit 2650000
EBR(IF) 7323800
TOTAL-Gauge Conversion Cap 9817890
Deposit 2650000
EBR(IF) 7323800
GAUGE CONVERSION
913
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
32 Surat-Kosamba (Phase-I) (35 km) Cap 489999
EBR 40000
EBR(IF) 10000 1 1
33 Akodia-Mohamed Khera-Shujalpur - Patch doubling (1315 km) Cap 343984 464438 4000
CFund 439999
EBR(IF) 10000 10000
34 Udhna-Jalgaon with electrification (30693 km) Cap 21638000 11321617
CFund 5107 5117
EBR 1200000 900000
EBR(IF) 6000000 9037857 1509613 400000
35 Viramgam-Surendranagar (6526 km) Cap 2794000 2778993
EBR(IF) 410000 516473 13000 10000
36 Viramgram-Samakhiali (18223 km) Cap 4450000 2568180
EBR(IF) 10371500 5702122 1165000 700000
37 Vatva-Ahmedabad - 3rd line with automatic signalling (750 tkm) Cap 397800
EBR(IF) 210000 340087 44150 1000
38 Palanpur-Samakhiali (27473 km) Cap 100000
Deposit 4000000 5901300
EBR(P) 1250000 1530800
39 Surendranagar-Rajkot - Doubling of broad gauge single line section
(11617 km)
Cap 100000 19997 70000
EBR(IF) 10023900 1616552 1550000 2500000
40 Nimuch-Chittaurgarh (5573 km) Cap 50000 614
EBR(IF) 2596800 432206 950000 1390000
41 Vatva - Ahmedabad - Sabarmati - 4th line (1798km) Cap 100000
EBR(IF) 2314300 539537 280000 1
42 Nagda-Ujjain - Doubling of Gambhir Bridge (158 km) Cap 156450 380 19
EBR(IF) 156450 150000 150000
43 Indore -Devas -Ujjain (7923 km) Cap 3500000 901 100000 20000
EBR(IF) 3500000 300000 750000
44 Anand-Godhra (79 km) Cap 6630000 162 1
EBR(IF) 200000 200000
45 Nimach-Ratlam (133 km) Cap 9050000 1
EBR(IF) 50000 50000
46 Mehsana-Palanpur (651 km) Cap 5243000 1
EBR(IF) 50000 50000
47 Rajkot-Kanalus (11120 km) Cap 10117199 1
EBR(IF) 1 1
TOTAL-WORKS IN PROGRESS Cap 90000
Deposit 5901300
EBR(IF) 6211003
DOUBLING
A - Works in Progress
914
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
48 Lumpsum Provision For New Works EBR(IF) 10000
TOTAL-NEW WORKS EBR(IF) 10000
TOTAL-Doubling Cap 90000
Deposit 5901300
EBR(IF) 6221003
49 Navlakhi - Development of basic facilities for goods shed DF(3) 38686 16895 1 1000
50 Valsad - High level platform with addl loop Cap 104859 53434 6500 5000
RRSK 66495
51 Bhimasar - Addl loadingunloading line with rail level platform Cap 53547 21379 12291 5000
DF(3) 33517 11816
52 Ahmedabad-Viramgam - Intermediate block signalling (3 blocks) Cap 87695 56496 20 500
EBR 15000 15000
53 Kandla Port - Yard remodelling Cap 142496 73175 2400 500
DF(3) 53911 19529
54 Ratlam - Yard remodelling DF(3) 178295 47012
RRSK 120288 8154 26185 1000
55 Bisalwas Kalan Gamdhiri Road amp Ordi - Full length addl loop lines
with simultaneous reception facilities amp extension of running lines
Cap 102496 35111 9000 100
DF(3) 41292 25253
56 Duskheda Siding - Development of goods facilities DF(3) 74016 57087 3300 114
57 Gandhidham - Addl loop line at bypass line to Adipur DF(3) 40531 35889
RRSK 7737 5050 14774
58 Samakhiali-Gandhidham - Intermediate block stop signal DF(3) 160566 49260
RRSK 111554 500 1
59 Barayla Piplia amp Harkiakhal - Full length addl loop line amp extension
of running lines to standard clear standing room
Cap 145462 84225 9000 5000
DF(1) 56836 23065
60 Chandlodiya - Full length loop line amp rail level passenger platform
for 24 coaches
Cap 37179 21666 5600 8513
61 Sabarmati - 2nd coaching terminal Cap 283400 183446 3000 1000
DF(3) 41398
62 Binjana - Crossing station DF(3) 128529 77711
RRSK 32388 19011 5748 22938
63 Ahmedabad - Exten of pit lines (4 Nos) amp stabling line (3 Nos)
towards Maninagar for 24 coaches
DF(3) 40719
RRSK 40069 3772 6375 49105
DOUBLING
B - New Works
TRAFFIC FACILITIES-YARD REMODELLING amp OTHERS
A - Works in Progress
915
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
64 Boradi-Dahod - Repl of Dhamarada station by intermediate block
signaling
Cap 26557 20000 1
65 Tarana Road-Tajpur - Providing intermediate block signaling RRSK 36204 9633 10910
66 Vadodara Yard - Segregation of Ahmedabad and Godhra Cap 266139 3066 57364 20000
67 Vasai Road - Provision of a new crossover amp shifting of signals RRSK 33470 2310 35144
68 Sabarmati - Left over facilities for operationalisation of coaching
terminal
Cap 311538 50203 80000
69 Gandhidham - CC surfaced platform between goods shed line No3
amp 4
Cap 48808 32000 10000
70 Raising of speed to 160 kmph200 kmph on existing New Delhi-
Mumbai route (incl Vadodara-Ahmedabad) - A mission to achieve
a travel time of 12 hours between Delhi iquestiquestiquest Mumbai
Cap 11188900 10 100
EBR(IF) 100700100 5000000
71 Andheri-Virar - Extension of suburban platforms for running15-car
services on slow corridor
RRSK 595600 1 120000
72 Western Railway - New works for development of 2nd terminal
removal of diamond crossing amp provision of cross overs
Cap 450000 100
RRSK 50000 1000
73 Estimated investment through EBR(Partnership) for private freight
terminals
EBR(P) 858711 1560000 858711
74 Works costing below Rs25 crore each Cap 100000
DRF 171
DF(3) 10000
RRSK 77766
TOTAL-WORKS IN PROGRESS Cap 235814
DRF 171
DF(3) 11114
RRSK 332638
EBR(IF) 5000000
EBR(P) 858711
75 Lumpsum Provision For New Works Cap 500
TOTAL-NEW WORKS Cap 500
TOTAL-Traffic Facilities-Yard Remodelling amp Others Cap 236314
DRF 171
DF(3) 11114
RRSK 332638
EBR(IF) 5000000
EBR(P) 858711
B - New Works
TRAFFIC FACILITIES-YARD REMODELLING amp OTHERS
916
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
76 Western Railway - Extension of RDBMS (Phase-II) DF(3) 25588 16702 1000 1000
77 Western Railway - Automatic ticket vending machines (pilot project) Cap 88930 81047 1 1
78 Western Railway - Extension of unreserved ticketing system to E-
category stations
DF(1) 348701 238185 1000 1000
79 Western Railway - Extension of automatic ticket vending machines Cap 314899 90611 32000 100
80 Western Railway - Repl of unreserved ticketing system equipment DRF 45400 41347 1186 1
81 Western Railway - Repl of 1675 thin clients for unreserved ticketing
system
DRF 55200 47061 10 10
82 Western Railway - Repl of datacom equipment of unreserved
ticketing system
DRF 35600 12500 500 10
83 Replacement of 377 ATVMs (PB2292018-19NR) DRF 67033 16493 1
84 Works costing below Rs25 crore each DRF 24950
DF(1) 3602
TOTAL-WORKS IN PROGRESS Cap 101
DRF 24972
DF(1) 4602
DF(3) 1000
85 Lumpsum Provision For New Works Cap 100
DRF 10000
DF(1) 600
DF(3) 100
TOTAL-NEW WORKS Cap 100
DRF 10000
DF(1) 600
DF(3) 100
TOTAL-Computerisation Cap 201
DRF 34972
DF(1) 5202
DF(3) 1100
86 Leased Assets - Payment of Capital component of lease charges to
Indian Railway Finance Corporation
Cap 5667326 8838029 6651500 5667326
CFund 2249674 2303171 2249674
TOTAL-WORKS IN PROGRESS Cap 5667326
CFund 2249674
TOTAL-Leased Assets - Payment of Capital Component Cap 5667326
CFund 2249674
COMPUTERISATION
A - Works in Progress
A - Works in Progress
B - New Works
LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT
917
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
87 Nadiad-Modasa Anand-Khambhat amp Vasad-Kathana - Elimination
of various level crossings
RRSK 28928 500 1000
88 Vadodara Division - Manning of level crossings (15 Nos) RRSK 32650 500 1000
89 Ahmedabad Division - Manning of level crossings (26 Nos) RRSK 97716 14823 19703
90 Udhna-Jalgaon - Manning of unmanned level crossing of level
crossings (5 Nos)
RRSK 30296 4000 18038
91 Vadodara Division - Toilet block with dugwell arrangements on
manned level crossing (227 Nos)
RRSK 31607 500 2000
92 Bhavnagar Division - Toilet facilities at manned level crossings
(345 nos)
RRSK 107276 2000 40000
93 Udhna-Jalgaon - Toilets facilities at manned level crossings RRSK 64061 4000 5000
94 Ahmedabad Division - Basic facilities (toilet amp others) at various
manned level crossings
RRSK 56061 2000 13061
95 Vaitarna-Umbergaon - Provision of height gauges amp fencing at level
crossings
RRSK 27823 2000 13845
96 Ahmedabad Division - Interlocking of level crossings (6 Nos) RRSK 33706 18245 20000
97 Bhavnagar Division - Interlocking of level crossings (4 Nos) RRSK 29391 4000
98 Ratlam Division - Removing deficiencies from various manned level
crossings
RRSK 120396 16778 25000
99 Ahmedabad Division - Interlocking (14 level crossing gates) SFund 67385 54317
RRSK 9664 1705 1
100 Vadodara Divisions - Upgradation amp re-classification of level
crossings from A-class to spl-class (13 Nos)
SFund 55279 39072
RRSK 5384 4944 2000
101 Ahmedabad Division - Data loggers (remote terminal units) (77
level crossing gates)
SFund 26337 20207
RRSK 5557 1057 1
102 Ahmedabad Division - Solar power system (77 level crossing gates) SFund 82816 49327
RRSK 31071 1443 1444 1
103 Vadodara Division - Duty bunks on level crossings (100 Nos) SFund 34979 22131
RRSK 14192 6830 1875 3819
104 Vadodara Division - Interlocking of level crossing gates (tvu more
than 20000) (8 Nos) amp long block section (3 Nos)
SFund 44223 22240
RRSK 21864 1265 2000
105 Bhavnagar Division- Manning of unmanned level crossings (26 Nos) SFund 83827 376
RRSK 68827 2759 15000 25000
106 Vadodara Division- Manning of unmanned level crossings (35 Nos) SFund 105609 17632
RRSK 85609 17587 5971 2000
107 Ahmedabad Division - Upgradation and reclassification of level
crossings (15 Nos)
SFund 37939 261
RRSK 36939 1659 5725 26404
ROAD SAFETY WORKS-LEVEL CROSSINGS
A - Works in Progress
918
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
108 Vadodara Division - Interlocking of level crossings having ATVU
more than 20000
SFund 50441 13680
RRSK 29049 10000 4000
109 Rajkot Division- Manning of unmanned level crossings (69 Nos) SFund 352803
RRSK 352303 14601 60000 30000
110 Porbandar-Kanalus - Repl of lower quadrant mechanical signaling
system at level crossing gates amp repl of mechanical lifting barriers
with electrical barriers
SFund 73182 13504
RRSK 53182 18417 12500 20000
111 Western Railway - Electrical lifting barriers (33 level crossing
gates) relay termination material wiring material power cable etc
for electrical lifting barriers
SFund 30290 1043
RRSK 29190 9145 13026 4000
112 Ratlam Division- Manning of unmanned level crossings (33 Nos) SFund 99157 5923
RRSK 78463 24262 15000 30000
113 Ahmedabad - Interlocking of level crossing gates (8 Nos) SFund 47324
RRSK 47224 100 100
114 Vadodara - Interlocking of level crossing gates SFund 89993 423
RRSK 88993 17482 5000
115 Ratlam - Manning of unmanned level crossings (20 Nos) SFund 33132
RRSK 89817 8271 2000 10000
116 Vadodara - Manning of unmanned level crossings (66 Nos) SFund 200962
RRSK 198462 25401 40453 5000
117 Bhavnagar - Manning of unmanned level crossing (83 Nos) SFund 309164
RRSK 309064 62540 237609 40000
118 Viramgam - Okha - Manning of unmanned level crossings (82 Nos) SFund 250100
RRSK 250000 35000 40000
119 Ahmedabad - Manning of unmanned level crossings (80 Nos) SFund 244000 6132
RRSK 241000 41384 62413 34978
120 Manning of unmanned level crossings between Radhanpur-
Gandhidham section (43 Nos) (KRCL)
RRSK 161606 15367 1000
121 Manning of unmanned level crossing between Radhanpur-Palanpur
section (46 nos) KRCL
RRSK 172881 7539 1000
122 Works costing below Rs25 crore each RRSK 150000
TOTAL-WORKS IN PROGRESS RRSK 598951
123 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Road Safety Works-Level Crossings RRSK 648951
ROAD SAFETY WORKS-LEVEL CROSSINGS
B - New Works
919
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
124 Bhandu Moti Dab-Mahesana - Road over bridge in lieu of level
crossing No 211
SFund 79627 79577
RRSK 68683 -5545 1 1
EBR(Dep) 76908
125 Meghnagar - Road over bridge in lieu of level crossing No60-B SFund 2000
RRSK 34653 5000 33400
EBR(Dep) 31876
126 Maroli-Sachin - Road over bridge in lieu of level crossing No133 SFund 4000
RRSK 22546 1000 50000
127 Virar-Surat - Road over bridge in lieu of level crossing No138 near
Sachin (4-lane)
SFund 54643 82256
RRSK 1000 25797 3300 1000
EBR(Dep) 55643
128 Viramgam-Jhund - Road over bridge in lieu of level crossing No42
(2-lane)
SFund 63739 67339
RRSK 1000 4008 4000 1
EBR(Dep) 110479
129 Surat-Vadodara - Road over bridge in lieu of level crossing No213
near Miyagam Karjan
SFund 53983 45913
RRSK 2881 503 2248 1000
EBR(Dep) 52400
130 Kim-Kosamba - Road over bridge in lieu of level crossing No160 (2-
lane)
SFund 72068 80284
RRSK 1000 1 100
EBR(Dep) 73068
131 Pratapnagar-Vishwamitri - Road over bridge in lieu of level crossing
No 2
SFund 48817 47817
RRSK 6135 1 1
EBR(Dep) 51100
132 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No2-A
SFund 1
RRSK 35999 100 1000
EBR(Dep) 36000
133 Bharuch-Dahej - 2- lane road over bridge in lieu of level crossing
No22 near Samni station
SFund 46790 57359
RRSK 1000 38 1 1
EBR(Dep) 57737
134 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No178 near Bharuch yard
SFund 92806 88666
RRSK 25994 1593 100 500
EBR(Dep) 233200
135 Bharuch-Dahej - 4-lane road over bridge in lieu of level crossing
No50
SFund 1
RRSK 50899 1
EBR(Dep) 50900
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
A - Works in Progress
9110
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
136 Dharangaon-Thakherkhed - 2-lane road over bridge on level
crossing No144 on state highway No185
SFund 50170 45820
RRSK 8572 1979 1200 500
EBR(Dep) 102582
137 Ujjain-Bhopal - Road over bridge in lieu of level crossing No101B
near Shore
SFund 2500 -24
RRSK 41006 39894 94500 1000
EBR(Dep) 46195
138 Amalner-Marwad Nim Road - Road over bridge in lieu of level
crossing No135
SFund 50239 44239
RRSK 1597 28 1200 500
EBR(Dep) 95487
139 Palanpur-Khodiyar - Road under bridges in lieu of level crossings
on dedicated freight corridor route (42 Nos)
SFund 313449 250867
RRSK 308394 96112 30000 30000
140 Bajana-Jatpipli - Road over bridge in lieu of level crossing No 25 SFund 1000
RRSK 87051 1 20000
EBR(Dep) 203052
141 Udhna-Jalgaon - Road over bridge in lieu of level crossing No37 SFund 5000
RRSK 72704 5000
EBR(Dep) 232887
142 Bhavnagar Divsion - Limited height subways in lieu of level
crossings (33 Nos)
SFund 196681 203596
RRSK 63911 28554 10000 20000
143 Palanpur-Khodiyar - Road ovrer bridges in lieu of level crossing
Nos191A 199A amp 227 on dedicated freight corridor route
SFund 34780 40000
RRSK 514304 23900 30000 30000
EBR(Dep) 274542
144 Ratlam-Godhara - 2-lane road over bridge in lieu of level crossing
No61-A
SFund 2000
RRSK 66459 100 5000
EBR(Dep) 64858
145 Surat - Vadodara - Limited height subways in lieu of level crossing
Nos162 amp 168
SFund 17645 18414
RRSK 22527 6306 500
146 Virar - Surat - Subwaysroad under bridge at level crossing Nos
55x 58 142 amp LC-1 (Udhna-Niyol)
SFund 500
RRSK 61898 5000 5000
147 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos171-A 188-A amp 208-B
SFund 26085 20900
RRSK 548600 22800 30000 30000
EBR(Dep) 287342
148 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos208 211-C 214 amp 220
SFund 69560 120000
RRSK 695510 59400 50000 50000
EBR(Dep) 382535
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9111
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
149 Ahmedabad-Palanpur - Road over bridge in lieu of level crossing
Nos165 166 amp 169 and level crossing No17 of Ahmedabad -
Viramgam
SFund 26085
RRSK 679207 30000 30000
EBR(Dep) 352646
150 Virar - Surat - SubwaysRoad under bridges in lieu of level
crossings (34 Nos)
SFund 175900 175900
RRSK 578938 89650 90000 10000
151 Ahmedabad Division - Road under bridges in lieu of level crossings
(58 Nos)
SFund 265089 247530 42610
RRSK 545731 19586 3570 30000
152 Timba-Tuva - Road over bridges in lieu of level crossing No58 SFund 1500
RRSK 93474 100 500
EBR(Dep) 584974
153 Bhatiel-Petlad - Road over bridge in lieu of level crossing No28 SFund 1500
RRSK 174899 500 500
EBR(Dep) 271399
154 Kosad-Gothangam - Road over bridge in lieu of level crossing
No149
SFund 435
RRSK 154072 1 1
EBR(Dep) 154508
155 Sayan-Kim - Road over bridge in lieu of level crossing No156 SFund 4348
RRSK 168868 10000 30000
EBR(Dep) 173216
156 Kosamba-Hathuran - Road over bridge in lieu of level crossing
No163
SFund 4348
RRSK 138655 6800 20000
EBR(Dep) 143004
157 Virar-Surat - Road over bridge in lieu of level crossing Nos 92 94 amp
97 along dedicated freight corridor route
SFund 17390
RRSK 321310 10000 20000
EBR(Dep) 406369
158 Naikheri-Ujjain - Road over bridge in lieu of level crossing No25
and Chintamanganesh-Ujjain - level crossing No8 (metre gauge)
SFund 51115 50818
RRSK 55413 788 100 500
EBR(Dep) 183072
159 Sehore-Phanda - Road over bridge in lieu of level crossing No104 SFund 1000
RRSK 88484 100 5000
EBR(Dep) 89484
160 Naikheri-Ujjain - Road over bridge in lieu of level crossing No23 SFund 100
RRSK 77002 5000 46100
EBR(Dep) 137068
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9112
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
161 Ratlam-Khandwa - 2-lane road over bridge in lieu of level crossing
No250
SFund 2000 41 20000
RRSK 95436 20299 1203 500
EBR(Dep) 97436
162 Bairagarh-Bakaniabhori - Road over bridge in lieu of level crossing
No115
SFund 1000
RRSK 189403 1
EBR(Dep) 190403
163 Sehore-Phanda - Road over bridge in lieu of level crossing No107 SFund 500
RRSK 91224 100 5000
EBR(Dep) 91724
164 Bamania-Amargarh - Road over bridge in lieu of level crossing
No72
SFund 2000
RRSK 104079 100 100
EBR(Dep) 106079
165 Virar-Surat - Road over bridge in lieu of level crossing Nos109
111 114 115 amp 118 along dedicated freight corridor route
SFund 17390 1452
RRSK 368510 12500 30000
EBR(Dep) 460095
166 Gothangam-Sayan - Road over bridge in lieu of level crossing
No151
SFund 31997 29797
RRSK 14313 -78 100
EBR(Dep) 77827
167 Virar-Surat - Road over bridge in lieu of level crossing Nos60 64
66 68 69 71 74 75 77 81 amp 82 along dedicated freight corridor
route
SFund 10000 27000
RRSK 932200 15000 30000
EBR(Dep) 1540420
168 Virar-Surat - Road over bridge in lieu of level crosisng No61 along
dedicated freight corridor route
SFund 4348
RRSK 67642 5000 10000
EBR(Dep) 71993
169 Derol-Kharsaliya - Road over bridge in lieu of level crossing No32 SFund 1500
RRSK 93474 100 500
EBR(Dep) 399974
170 Gothangam-Sayan - Road over bridge in lieu of level crossing
No150
SFund 4348
RRSK 150714 10000 20000
EBR(Dep) 155063
171 Virar-Surat - Road over bridge in lieu of level crossing Nos57 amp
143 along dedicated freight corridor route
SFund 1
RRSK 170312 1
EBR(Dep) 170312
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9113
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
172 Virar-Surat - Road over bridge in lieu of level crossing Nos84 88 amp
90 along dedicated freight corridor route
SFund 10000
RRSK 362918 15000 20000
EBR(Dep) 529675
173 Kim-Kosamba - Road over bridge in lieu of level crossing No161 SFund 4348
RRSK 162307 10 10
EBR(Dep) 166655
174 Virar-Surat - Road over bridge in lieu of level crossing
Nos124126amp 127 along dedicated freight corridor route
SFund 10000 53500
RRSK 429771 10000 16990
EBR(Dep) 529173
175 Sayan-Kim - Road over bridge in lieu of level crossing No154 SFund 4000
RRSK 138094 10000 10000
EBR(Dep) 142094
176 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No165
SFund 4348
RRSK 207011 10 10
EBR(Dep) 211359
177 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No166
SFund 4348
RRSK 135056 10 10
EBR(Dep) 139404
178 Virar-Surat - Road over bridge in lieu of level crossing Nos42 46A
48 52 55 102 106 108 130 amp 137 along dedicated freight
corridor route
SFund 10000 72200
RRSK 929294 10000 10000
EBR(Dep) 1234542
179 Udhna - Jalgaon - Road over bridge in lieu of level crossing No51 SFund 5000
RRSK 75295 10000
EBR(Dep) 250296
180 Sadnapura - Bhalej - Road over bridge in lieu of level crossing No
11
SFund 1500
RRSK 93474 100 10
EBR(Dep) 249974
181 Sayan-Kim - Road over bridge in lieu of level crossing No153 SFund 4348
RRSK 134797 6900 20000
EBR(Dep) 139145
182 Derol - Kharsaliya - Road over bridge in lieu of level crossing No41 SFund 1500
RRSK 93474 500 500
EBR(Dep) 204974
183 Rajkot - Okha - Road over bridge in lieu of level crossing No197 SFund 100
RRSK 94049 19493 9868 1000
EBR(Dep) 94148
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9114
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
184 Rajkot Division - Limited height subways in lieu of level crossings
(36 Nos)
SFund 192337 145046
RRSK 68323 68445 65000 20000
185 Chanderiya-Ratlam - Limited height subways in lieu of level
crossings (No121 amp 183)
SFund 22614 22603
RRSK 2700 1 1
186 Dabhoi-Pratpnagar amp Dabhoi-Chhota Udepur - Limited height
subways (25 Nos)
SFund 203310 202077
RRSK 274218 44171 40000 1000
187 Surat-Vadodara-Godhra - Limited height subway at level crossings
(11 Nos)
SFund 133888 88592
RRSK 79889 40000 100
188 Ankleshwar-Rajpipla - Limited height subways road under bridges
in lieu of level crossings (36 Nos)
SFund 297860 248077 20000
RRSK 284870 80559 10919 20000
189 Ujjain-Bhopal - Limited height subways at level crossings (No88
89 amp 91)
SFund 54571 58450
RRSK 1000 11823 1 1
190 Udhna-Jalgaon - Limited height subways at level crossings (No38
108 127 128 145 146147 amp 134)
SFund 40087 87
RRSK 75049 230000 30000
191 Ahmedabad Division - Elimination of level crossings by road under
bridges (90 Nos)
SFund 11356 45
RRSK 1000 165047 20000
192 Ujjain-Bhopal - Limited height subway at level crossings (No43 44
amp 58)
SFund 67442 69163
RRSK 1900 259 1 1
193 Vadodara Division - Limited height subway in lieu of level crossings
(2 Nos on double line amp 19 Nos on single line)
SFund 69263 85693
RRSK 236140 1626 31000 200
194 Ratlam Division - Limited height subway in lieu of level crossings
(22 Nos)
SFund 272546 366104
RRSK 1000 36466 1000 1
195 Mehsana-Patan - Road over bridge in lieu of level crossing No40X SFund 53406 57194
RRSK 16245 1549 100 100
EBR(Dep) 287771
196 Gangadhara-Bardoli - Road over bridge in lieu of level crossing
No17A
SFund 32000 9390
RRSK 99253 18000 20000
EBR(Dep) 131253
197 Virpur-Jetalsar - Road over bridge in lieu of level crossing No61 SFund 5000
RRSK 187384 10000 20000
198 Jamnagar-Lakhabawal - Road over bridge in lieu of level crossing
No199
SFund 5000
RRSK 78380 2000 20000
EBR(Dep) 83380
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9115
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
199 Surat-Vadodara - Elimination of level crossing No173 by 4-lane
road over bridge
SFund 5000
RRSK 229396 102600 60000
EBR(Dep) 234397
200 Bhavnagar Division - Limited height subways to eliminate level
crossings (77 Nos)
SFund 87
RRSK 648618 100 100
201 Dewas-Barlai - 2 lane road over bridge in lieu of level crossing
No37
SFund 500
RRSK 36758 144 40000 22000
EBR(Dep) 206948
202 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 216 on DFC route
SFund 17390
RRSK 34932 41600 15000 15000
EBR(Dep) 104645
EBR(P) 52323
203 Surat-Vadodara- Road over bridge in lieu of level crossing No 228
on DFC route
SFund 4348
RRSK 59605 10 10
EBR(P) 127905
204 Jetalsar-Veraval Rajula-Mahuva amp Sihor -Palitana -subways in lieu
of level crossing- 18 Nos
SFund 86950 24787
RRSK 394341 75636 30000 50000
205 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 269
SFund 82792 78119
RRSK 23175 7126 50 500
EBR(P) 105968
206 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 177A on DFC route
SFund 4348
RRSK 48142 15000 15000
EBR(Dep) 104981
207 Surat-Vadodara- 4 Lane Road over bridge in lieu of level crossing
No 220
SFund 100
RRSK 173605 100 5000
EBR(P) 173706
208 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 276
SFund 82792 76527
RRSK 77592 8463 100 500
EBR(P) 160385
209 Dhasa-Jetalsar- subways in lieu of level crossing- 35 Nos RRSK 935106 100000 150000
210 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 179A on DFC route
SFund 4348
RRSK 126868 15000 15000
EBR(Dep) 131216
211 Rajkot-Jetalsar Jetalsar-Wansjaliya amp Kana- subways in lieu of
level crossing (19 Nos)
SFund 86950 50607
RRSK 420729 124972 30000 50000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9116
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
212 Ahmedabad - Viramgam- Road over bridge in lieu of level crossing
No 11A
SFund 500
RRSK 220476 75000 80000
EBR(Dep) 220977
213 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 259
SFund 5000 77
RRSK 168295 128 200 5000
EBR(P) 173296
214 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No37
SFund 500
RRSK 98088 100 80000
EBR(Dep) 98588
215 Charni Road-Grant Road- Regirdering of Road over bridge
between at km 39 - 10
SFund 1739
RRSK 71533 10000 40000
216 Elphinstone Road- Regirdering of Road over bridge at km 815-9 SFund 870
RRSK 105138 1 100
217 Virar-Vaiterna- 4 Lane Road over bridge in lieu of level crossing
No 41
SFund 500
RRSK 153899 1
EBR(Dep) 154399
218 Mumbai Central (South)- Regirdering of Road over bridge at Km
46-8
SFund 4348
RRSK 81412 10000 40000
219 Mahalaxmi- Regirdering of Road over bridge at km 526-27 SFund 4348
RRSK 214187 10000 70000
220 Surat-Vadodara- Road over bridge in lieu of level crossing No 198 SFund 100
RRSK 99900 200 4000
EBR(P) 100001
221 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 240
SFund 2000 316
RRSK 117126 13947 71400 10000
EBR(P) 119127
222 Ahmedabad-New Bhuj- Road over bridge in lieu of level crossing
No 3X
SFund 500
RRSK 175762 500 5000
EBR(Dep) 176262
223 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No 22A
RRSK 187005 23 50000 60000
EBR(Dep) 187006
224 Dadar- Regirdering of Road over bridge at Km 109-10 SFund 1739
RRSK 131731 1 100
225 Lowerparel-Elphinstone Road- Regirdering of Road over bridge at
km 712-13
SFund 1739
RRSK 186842 87000 80000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9117
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
226 Chanderiya-Ratlam - 2-lane road over bridge in lieu of level
crossing No141 near Piplia yard
SFund 1000
RRSK 89000 100 10000
EBR(P) 116700
227 Mandsour-Dalauda - 2-lane road over bridge in lieu of level
crossing No152
SFund 1000
RRSK 99000 5500 43600
EBR(P) 165000
228 Chanderia-Ratlam - 2-lane road over bridge at Chanderia in lieu of
level crossing No86
SFund 1500
RRSK 158500 100 5000
EBR(P) 160000
229 Mahesana-Patan- subways in lieu of level crossing No 27 32 56
amp 62 on Mahesana- Viramgam- level crossing No 4 11 18 19 amp
20 (9 Nos)
SFund 1 3530
RRSK 225598 23196 40000 30000
230 Mahesana-Viramgam- subways in lieu of level crossing No 6 7
14 23 amp 25 (5 Nos)
SFund 101 2015
RRSK 125934 4500 30000
231 Sabarmati-Botad- subways in lieu of level crossing- 23 Nos RRSK 613299 85000 150000
232 Viramgam- samakhiyali-subways in lieu of level crossing No 43
92 amp 108 (3 Nos)
SFund 100
RRSK 84683 1000
233 Udhna-Jalgaon- subways in lieu of level crossing No 87 122 123
133 141 150 amp 152 (7 Nos)
RRSK 218947 91408 100000 10000
234 Anand-Khambhat- subways in lieu of level crossing 10 Nos SFund 32995 60173
RRSK 96662 110623 8132 500
235 Chanderiya-Ratlam-subways in lieu of level crossing No 106 128
131 182 amp IND-Dewas-Ujjain level crossing No 26 (5 Nos)
SFund 26108 4281
RRSK 50310 29276 9571 100
236 Chanderia-Ratlam - 2-lane road under bridge at Nimbahera in lieu
of level crossing No103
SFund 87
RRSK 25313 1308 10000
EBR(P) 25400
237 Rajkot-Hapa- Road over bridge in lieu of level crossing No 145 at
Padadhari
RRSK 87610 1 100
EBR(Dep) 256608
238 Surat-Vadodara- Road over bridge in lieu of level crossing No158
(4-lane) between Sayan-Kim on DFC route
SFund 435
RRSK 120879 10 10
EBR(Dep) 363941
239 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 201 on DFC route
SFund 17390
RRSK 68351 56800 15000 15000
EBR(Dep) 257222
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
911
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
1 Dahod-Indore via Sardarpur Jhabua amp Dhar (20097 km) incl
material modification for change in alignment via Amjhera (482 km)
Cap 16000400 4209282 1786104 1000000
SFund 1400000 387667 1000000
2 Chhota Udepur-Dhar (157 km) Cap 13472600 5050913 1072649 1000000
SFund 1000000 291339
3 Bhimnath - Dholera (28 km) Cap 1349900 300 10000
SFund 100 34
Deposit 50000 50000
EBR(IF) 1400000
4 Nimach-Badi Sadri (48 km) Cap 4747600 -11438 1000 100000
5 Estimated investment through EBR (Partnership) for high speed
railway (Mumbai-Ahmedabad)
EBR(P) 100000000 70000000 100000000
TOTAL-WORKS IN PROGRESS Cap 2110000
SFund 1000000
Deposit 50000
EBR(P) 100000000
TOTAL-New Lines (Construction) Cap 2110000
SFund 1000000
Deposit 50000
EBR(P) 100000000
6 Rajkot-Veraval Wansjalia-Jetalsar with new material modification
for Shapur-Saradiya (46 km) and new line Veraval-Somnath (281
km) amp Somnath-Kodinar (3691 km)
Cap 10552600 5442476 6000 1000
CFund 1728566
DRF 1000000
SFund 500000 47465
7 Bhildi-Viramgam (157 km) with new material modification for
Mehsana-Taranga Hill (574 km) - gauge conversion
Cap 4852007 3120353 938813 600000
CFund 564885
DRF 10614
SFund 1000000 1055678
EBR 663200
EBR(IF) 1000000
8 Ratlam-Mhow-Khandwa-Akola (47264 km) including material
modification for Fatehabad-Chandrawati Ganj-Ujjain (2296 km)
Cap 7872971 7545234 1810000 3550000
Deposit 5272500 2000000
EBR(IF) 100000 3180000
9 Ahmedabad-Himmatnagar-Udaipur (2992 km) incl Modasa-
Shamlaji Road (2253 km)
Cap 3856000 2054463 1125
SFund 940000
EBR(IF) 100000 5605798 5250000 5323800
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
NEW LINES (CONSTRUCTION)
A - Works in Progress
GAUGE CONVERSION
A - Works in Progress
912
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
10 Bhuj-Naliya (10135 km) with extension from Naliya to Vayor (2465
km)
Cap 3216200 282960 25000
SFund 500000 535847
Deposit 800000 250000
EBR(IF) 100000
11 Miyagam-Karjan-Dabhoi-Samlaya (9646 km)- Gauge conversion
with electrification
Cap 9499600 161432 465000 249890
SFund 150000 683
12 Dhasa - Jetalsar (10444 km) Cap 3765900 333270 545100 2500000
SFund 420000
EBR(IF) 100000
13 Ahmedabad - Botad (17048 km) Cap 9756200 2245143 2320000 1400000
SFund 520000 108800
EBR(IF) 100000 1100000
14 Ahmedabad - Mehsana (6878 km) Cap 3200000 411688 150523 1000
SFund 500000 299299
EBR(IF) 4775600 876292 2000000
15 Kalol-Kadi-Katosan Road (3723 km) Cap 2792300 1 1000
16 Katosan Road-Chanasma (5172 km) Cap 3679000 1 1000
Deposit 200000 200000
17 Chanasma-Ranuj (1284 km) Cap 763000 1 1000
Deposit 200000 200000
18 Adraj Moti-Viajapur (3975 km) Cap 2965400 1 1000
19 Vijapur-Ambliyasan (4153 km) Cap 3098100 1 1000
20 Khijadiya-Visavdar (9127 km) Cap 5476200 1 1000
21 Junagarh-Visavadar (4228 km) Cap 2536800 1 1000
22 Veraval-Talala-Visavadar (7195 km) Cap 4602300 1 1000
23 Samni-Jambusar (2408 km) Cap 2167200 1 1000
24 Jambusar-Vishvamitri (482 km) Cap 4338000 1 1000
25 Samlaya-Timba Road (5353 km) Cap 4014800 1 1000
26 Nadiad-Petlad (3726 km) Cap 3353400 1 1000
27 Petlad-Bhadran (225 km) Cap 2025000 1 1000
28 Dabhoi-Chandod - Gauge conversion with extension upto Kevadiya
(4975 km)
Cap 6918400 958 275000 1500000
29 Talala-Delwada (70 km) Cap 5253000 1 1000
30 Prachi Road - Kodinar (26 km) Cap 1932000 38 1 1000
31 Himmatnagar-Khedbrahma (5483 km) Cap 3548900 1 1000
TOTAL-WORKS IN PROGRESS Cap 9817890
Deposit 2650000
EBR(IF) 7323800
TOTAL-Gauge Conversion Cap 9817890
Deposit 2650000
EBR(IF) 7323800
GAUGE CONVERSION
913
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
32 Surat-Kosamba (Phase-I) (35 km) Cap 489999
EBR 40000
EBR(IF) 10000 1 1
33 Akodia-Mohamed Khera-Shujalpur - Patch doubling (1315 km) Cap 343984 464438 4000
CFund 439999
EBR(IF) 10000 10000
34 Udhna-Jalgaon with electrification (30693 km) Cap 21638000 11321617
CFund 5107 5117
EBR 1200000 900000
EBR(IF) 6000000 9037857 1509613 400000
35 Viramgam-Surendranagar (6526 km) Cap 2794000 2778993
EBR(IF) 410000 516473 13000 10000
36 Viramgram-Samakhiali (18223 km) Cap 4450000 2568180
EBR(IF) 10371500 5702122 1165000 700000
37 Vatva-Ahmedabad - 3rd line with automatic signalling (750 tkm) Cap 397800
EBR(IF) 210000 340087 44150 1000
38 Palanpur-Samakhiali (27473 km) Cap 100000
Deposit 4000000 5901300
EBR(P) 1250000 1530800
39 Surendranagar-Rajkot - Doubling of broad gauge single line section
(11617 km)
Cap 100000 19997 70000
EBR(IF) 10023900 1616552 1550000 2500000
40 Nimuch-Chittaurgarh (5573 km) Cap 50000 614
EBR(IF) 2596800 432206 950000 1390000
41 Vatva - Ahmedabad - Sabarmati - 4th line (1798km) Cap 100000
EBR(IF) 2314300 539537 280000 1
42 Nagda-Ujjain - Doubling of Gambhir Bridge (158 km) Cap 156450 380 19
EBR(IF) 156450 150000 150000
43 Indore -Devas -Ujjain (7923 km) Cap 3500000 901 100000 20000
EBR(IF) 3500000 300000 750000
44 Anand-Godhra (79 km) Cap 6630000 162 1
EBR(IF) 200000 200000
45 Nimach-Ratlam (133 km) Cap 9050000 1
EBR(IF) 50000 50000
46 Mehsana-Palanpur (651 km) Cap 5243000 1
EBR(IF) 50000 50000
47 Rajkot-Kanalus (11120 km) Cap 10117199 1
EBR(IF) 1 1
TOTAL-WORKS IN PROGRESS Cap 90000
Deposit 5901300
EBR(IF) 6211003
DOUBLING
A - Works in Progress
914
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
48 Lumpsum Provision For New Works EBR(IF) 10000
TOTAL-NEW WORKS EBR(IF) 10000
TOTAL-Doubling Cap 90000
Deposit 5901300
EBR(IF) 6221003
49 Navlakhi - Development of basic facilities for goods shed DF(3) 38686 16895 1 1000
50 Valsad - High level platform with addl loop Cap 104859 53434 6500 5000
RRSK 66495
51 Bhimasar - Addl loadingunloading line with rail level platform Cap 53547 21379 12291 5000
DF(3) 33517 11816
52 Ahmedabad-Viramgam - Intermediate block signalling (3 blocks) Cap 87695 56496 20 500
EBR 15000 15000
53 Kandla Port - Yard remodelling Cap 142496 73175 2400 500
DF(3) 53911 19529
54 Ratlam - Yard remodelling DF(3) 178295 47012
RRSK 120288 8154 26185 1000
55 Bisalwas Kalan Gamdhiri Road amp Ordi - Full length addl loop lines
with simultaneous reception facilities amp extension of running lines
Cap 102496 35111 9000 100
DF(3) 41292 25253
56 Duskheda Siding - Development of goods facilities DF(3) 74016 57087 3300 114
57 Gandhidham - Addl loop line at bypass line to Adipur DF(3) 40531 35889
RRSK 7737 5050 14774
58 Samakhiali-Gandhidham - Intermediate block stop signal DF(3) 160566 49260
RRSK 111554 500 1
59 Barayla Piplia amp Harkiakhal - Full length addl loop line amp extension
of running lines to standard clear standing room
Cap 145462 84225 9000 5000
DF(1) 56836 23065
60 Chandlodiya - Full length loop line amp rail level passenger platform
for 24 coaches
Cap 37179 21666 5600 8513
61 Sabarmati - 2nd coaching terminal Cap 283400 183446 3000 1000
DF(3) 41398
62 Binjana - Crossing station DF(3) 128529 77711
RRSK 32388 19011 5748 22938
63 Ahmedabad - Exten of pit lines (4 Nos) amp stabling line (3 Nos)
towards Maninagar for 24 coaches
DF(3) 40719
RRSK 40069 3772 6375 49105
DOUBLING
B - New Works
TRAFFIC FACILITIES-YARD REMODELLING amp OTHERS
A - Works in Progress
915
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
64 Boradi-Dahod - Repl of Dhamarada station by intermediate block
signaling
Cap 26557 20000 1
65 Tarana Road-Tajpur - Providing intermediate block signaling RRSK 36204 9633 10910
66 Vadodara Yard - Segregation of Ahmedabad and Godhra Cap 266139 3066 57364 20000
67 Vasai Road - Provision of a new crossover amp shifting of signals RRSK 33470 2310 35144
68 Sabarmati - Left over facilities for operationalisation of coaching
terminal
Cap 311538 50203 80000
69 Gandhidham - CC surfaced platform between goods shed line No3
amp 4
Cap 48808 32000 10000
70 Raising of speed to 160 kmph200 kmph on existing New Delhi-
Mumbai route (incl Vadodara-Ahmedabad) - A mission to achieve
a travel time of 12 hours between Delhi iquestiquestiquest Mumbai
Cap 11188900 10 100
EBR(IF) 100700100 5000000
71 Andheri-Virar - Extension of suburban platforms for running15-car
services on slow corridor
RRSK 595600 1 120000
72 Western Railway - New works for development of 2nd terminal
removal of diamond crossing amp provision of cross overs
Cap 450000 100
RRSK 50000 1000
73 Estimated investment through EBR(Partnership) for private freight
terminals
EBR(P) 858711 1560000 858711
74 Works costing below Rs25 crore each Cap 100000
DRF 171
DF(3) 10000
RRSK 77766
TOTAL-WORKS IN PROGRESS Cap 235814
DRF 171
DF(3) 11114
RRSK 332638
EBR(IF) 5000000
EBR(P) 858711
75 Lumpsum Provision For New Works Cap 500
TOTAL-NEW WORKS Cap 500
TOTAL-Traffic Facilities-Yard Remodelling amp Others Cap 236314
DRF 171
DF(3) 11114
RRSK 332638
EBR(IF) 5000000
EBR(P) 858711
B - New Works
TRAFFIC FACILITIES-YARD REMODELLING amp OTHERS
916
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
76 Western Railway - Extension of RDBMS (Phase-II) DF(3) 25588 16702 1000 1000
77 Western Railway - Automatic ticket vending machines (pilot project) Cap 88930 81047 1 1
78 Western Railway - Extension of unreserved ticketing system to E-
category stations
DF(1) 348701 238185 1000 1000
79 Western Railway - Extension of automatic ticket vending machines Cap 314899 90611 32000 100
80 Western Railway - Repl of unreserved ticketing system equipment DRF 45400 41347 1186 1
81 Western Railway - Repl of 1675 thin clients for unreserved ticketing
system
DRF 55200 47061 10 10
82 Western Railway - Repl of datacom equipment of unreserved
ticketing system
DRF 35600 12500 500 10
83 Replacement of 377 ATVMs (PB2292018-19NR) DRF 67033 16493 1
84 Works costing below Rs25 crore each DRF 24950
DF(1) 3602
TOTAL-WORKS IN PROGRESS Cap 101
DRF 24972
DF(1) 4602
DF(3) 1000
85 Lumpsum Provision For New Works Cap 100
DRF 10000
DF(1) 600
DF(3) 100
TOTAL-NEW WORKS Cap 100
DRF 10000
DF(1) 600
DF(3) 100
TOTAL-Computerisation Cap 201
DRF 34972
DF(1) 5202
DF(3) 1100
86 Leased Assets - Payment of Capital component of lease charges to
Indian Railway Finance Corporation
Cap 5667326 8838029 6651500 5667326
CFund 2249674 2303171 2249674
TOTAL-WORKS IN PROGRESS Cap 5667326
CFund 2249674
TOTAL-Leased Assets - Payment of Capital Component Cap 5667326
CFund 2249674
COMPUTERISATION
A - Works in Progress
A - Works in Progress
B - New Works
LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT
917
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
87 Nadiad-Modasa Anand-Khambhat amp Vasad-Kathana - Elimination
of various level crossings
RRSK 28928 500 1000
88 Vadodara Division - Manning of level crossings (15 Nos) RRSK 32650 500 1000
89 Ahmedabad Division - Manning of level crossings (26 Nos) RRSK 97716 14823 19703
90 Udhna-Jalgaon - Manning of unmanned level crossing of level
crossings (5 Nos)
RRSK 30296 4000 18038
91 Vadodara Division - Toilet block with dugwell arrangements on
manned level crossing (227 Nos)
RRSK 31607 500 2000
92 Bhavnagar Division - Toilet facilities at manned level crossings
(345 nos)
RRSK 107276 2000 40000
93 Udhna-Jalgaon - Toilets facilities at manned level crossings RRSK 64061 4000 5000
94 Ahmedabad Division - Basic facilities (toilet amp others) at various
manned level crossings
RRSK 56061 2000 13061
95 Vaitarna-Umbergaon - Provision of height gauges amp fencing at level
crossings
RRSK 27823 2000 13845
96 Ahmedabad Division - Interlocking of level crossings (6 Nos) RRSK 33706 18245 20000
97 Bhavnagar Division - Interlocking of level crossings (4 Nos) RRSK 29391 4000
98 Ratlam Division - Removing deficiencies from various manned level
crossings
RRSK 120396 16778 25000
99 Ahmedabad Division - Interlocking (14 level crossing gates) SFund 67385 54317
RRSK 9664 1705 1
100 Vadodara Divisions - Upgradation amp re-classification of level
crossings from A-class to spl-class (13 Nos)
SFund 55279 39072
RRSK 5384 4944 2000
101 Ahmedabad Division - Data loggers (remote terminal units) (77
level crossing gates)
SFund 26337 20207
RRSK 5557 1057 1
102 Ahmedabad Division - Solar power system (77 level crossing gates) SFund 82816 49327
RRSK 31071 1443 1444 1
103 Vadodara Division - Duty bunks on level crossings (100 Nos) SFund 34979 22131
RRSK 14192 6830 1875 3819
104 Vadodara Division - Interlocking of level crossing gates (tvu more
than 20000) (8 Nos) amp long block section (3 Nos)
SFund 44223 22240
RRSK 21864 1265 2000
105 Bhavnagar Division- Manning of unmanned level crossings (26 Nos) SFund 83827 376
RRSK 68827 2759 15000 25000
106 Vadodara Division- Manning of unmanned level crossings (35 Nos) SFund 105609 17632
RRSK 85609 17587 5971 2000
107 Ahmedabad Division - Upgradation and reclassification of level
crossings (15 Nos)
SFund 37939 261
RRSK 36939 1659 5725 26404
ROAD SAFETY WORKS-LEVEL CROSSINGS
A - Works in Progress
918
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
108 Vadodara Division - Interlocking of level crossings having ATVU
more than 20000
SFund 50441 13680
RRSK 29049 10000 4000
109 Rajkot Division- Manning of unmanned level crossings (69 Nos) SFund 352803
RRSK 352303 14601 60000 30000
110 Porbandar-Kanalus - Repl of lower quadrant mechanical signaling
system at level crossing gates amp repl of mechanical lifting barriers
with electrical barriers
SFund 73182 13504
RRSK 53182 18417 12500 20000
111 Western Railway - Electrical lifting barriers (33 level crossing
gates) relay termination material wiring material power cable etc
for electrical lifting barriers
SFund 30290 1043
RRSK 29190 9145 13026 4000
112 Ratlam Division- Manning of unmanned level crossings (33 Nos) SFund 99157 5923
RRSK 78463 24262 15000 30000
113 Ahmedabad - Interlocking of level crossing gates (8 Nos) SFund 47324
RRSK 47224 100 100
114 Vadodara - Interlocking of level crossing gates SFund 89993 423
RRSK 88993 17482 5000
115 Ratlam - Manning of unmanned level crossings (20 Nos) SFund 33132
RRSK 89817 8271 2000 10000
116 Vadodara - Manning of unmanned level crossings (66 Nos) SFund 200962
RRSK 198462 25401 40453 5000
117 Bhavnagar - Manning of unmanned level crossing (83 Nos) SFund 309164
RRSK 309064 62540 237609 40000
118 Viramgam - Okha - Manning of unmanned level crossings (82 Nos) SFund 250100
RRSK 250000 35000 40000
119 Ahmedabad - Manning of unmanned level crossings (80 Nos) SFund 244000 6132
RRSK 241000 41384 62413 34978
120 Manning of unmanned level crossings between Radhanpur-
Gandhidham section (43 Nos) (KRCL)
RRSK 161606 15367 1000
121 Manning of unmanned level crossing between Radhanpur-Palanpur
section (46 nos) KRCL
RRSK 172881 7539 1000
122 Works costing below Rs25 crore each RRSK 150000
TOTAL-WORKS IN PROGRESS RRSK 598951
123 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Road Safety Works-Level Crossings RRSK 648951
ROAD SAFETY WORKS-LEVEL CROSSINGS
B - New Works
919
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
124 Bhandu Moti Dab-Mahesana - Road over bridge in lieu of level
crossing No 211
SFund 79627 79577
RRSK 68683 -5545 1 1
EBR(Dep) 76908
125 Meghnagar - Road over bridge in lieu of level crossing No60-B SFund 2000
RRSK 34653 5000 33400
EBR(Dep) 31876
126 Maroli-Sachin - Road over bridge in lieu of level crossing No133 SFund 4000
RRSK 22546 1000 50000
127 Virar-Surat - Road over bridge in lieu of level crossing No138 near
Sachin (4-lane)
SFund 54643 82256
RRSK 1000 25797 3300 1000
EBR(Dep) 55643
128 Viramgam-Jhund - Road over bridge in lieu of level crossing No42
(2-lane)
SFund 63739 67339
RRSK 1000 4008 4000 1
EBR(Dep) 110479
129 Surat-Vadodara - Road over bridge in lieu of level crossing No213
near Miyagam Karjan
SFund 53983 45913
RRSK 2881 503 2248 1000
EBR(Dep) 52400
130 Kim-Kosamba - Road over bridge in lieu of level crossing No160 (2-
lane)
SFund 72068 80284
RRSK 1000 1 100
EBR(Dep) 73068
131 Pratapnagar-Vishwamitri - Road over bridge in lieu of level crossing
No 2
SFund 48817 47817
RRSK 6135 1 1
EBR(Dep) 51100
132 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No2-A
SFund 1
RRSK 35999 100 1000
EBR(Dep) 36000
133 Bharuch-Dahej - 2- lane road over bridge in lieu of level crossing
No22 near Samni station
SFund 46790 57359
RRSK 1000 38 1 1
EBR(Dep) 57737
134 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No178 near Bharuch yard
SFund 92806 88666
RRSK 25994 1593 100 500
EBR(Dep) 233200
135 Bharuch-Dahej - 4-lane road over bridge in lieu of level crossing
No50
SFund 1
RRSK 50899 1
EBR(Dep) 50900
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
A - Works in Progress
9110
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
136 Dharangaon-Thakherkhed - 2-lane road over bridge on level
crossing No144 on state highway No185
SFund 50170 45820
RRSK 8572 1979 1200 500
EBR(Dep) 102582
137 Ujjain-Bhopal - Road over bridge in lieu of level crossing No101B
near Shore
SFund 2500 -24
RRSK 41006 39894 94500 1000
EBR(Dep) 46195
138 Amalner-Marwad Nim Road - Road over bridge in lieu of level
crossing No135
SFund 50239 44239
RRSK 1597 28 1200 500
EBR(Dep) 95487
139 Palanpur-Khodiyar - Road under bridges in lieu of level crossings
on dedicated freight corridor route (42 Nos)
SFund 313449 250867
RRSK 308394 96112 30000 30000
140 Bajana-Jatpipli - Road over bridge in lieu of level crossing No 25 SFund 1000
RRSK 87051 1 20000
EBR(Dep) 203052
141 Udhna-Jalgaon - Road over bridge in lieu of level crossing No37 SFund 5000
RRSK 72704 5000
EBR(Dep) 232887
142 Bhavnagar Divsion - Limited height subways in lieu of level
crossings (33 Nos)
SFund 196681 203596
RRSK 63911 28554 10000 20000
143 Palanpur-Khodiyar - Road ovrer bridges in lieu of level crossing
Nos191A 199A amp 227 on dedicated freight corridor route
SFund 34780 40000
RRSK 514304 23900 30000 30000
EBR(Dep) 274542
144 Ratlam-Godhara - 2-lane road over bridge in lieu of level crossing
No61-A
SFund 2000
RRSK 66459 100 5000
EBR(Dep) 64858
145 Surat - Vadodara - Limited height subways in lieu of level crossing
Nos162 amp 168
SFund 17645 18414
RRSK 22527 6306 500
146 Virar - Surat - Subwaysroad under bridge at level crossing Nos
55x 58 142 amp LC-1 (Udhna-Niyol)
SFund 500
RRSK 61898 5000 5000
147 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos171-A 188-A amp 208-B
SFund 26085 20900
RRSK 548600 22800 30000 30000
EBR(Dep) 287342
148 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos208 211-C 214 amp 220
SFund 69560 120000
RRSK 695510 59400 50000 50000
EBR(Dep) 382535
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9111
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
149 Ahmedabad-Palanpur - Road over bridge in lieu of level crossing
Nos165 166 amp 169 and level crossing No17 of Ahmedabad -
Viramgam
SFund 26085
RRSK 679207 30000 30000
EBR(Dep) 352646
150 Virar - Surat - SubwaysRoad under bridges in lieu of level
crossings (34 Nos)
SFund 175900 175900
RRSK 578938 89650 90000 10000
151 Ahmedabad Division - Road under bridges in lieu of level crossings
(58 Nos)
SFund 265089 247530 42610
RRSK 545731 19586 3570 30000
152 Timba-Tuva - Road over bridges in lieu of level crossing No58 SFund 1500
RRSK 93474 100 500
EBR(Dep) 584974
153 Bhatiel-Petlad - Road over bridge in lieu of level crossing No28 SFund 1500
RRSK 174899 500 500
EBR(Dep) 271399
154 Kosad-Gothangam - Road over bridge in lieu of level crossing
No149
SFund 435
RRSK 154072 1 1
EBR(Dep) 154508
155 Sayan-Kim - Road over bridge in lieu of level crossing No156 SFund 4348
RRSK 168868 10000 30000
EBR(Dep) 173216
156 Kosamba-Hathuran - Road over bridge in lieu of level crossing
No163
SFund 4348
RRSK 138655 6800 20000
EBR(Dep) 143004
157 Virar-Surat - Road over bridge in lieu of level crossing Nos 92 94 amp
97 along dedicated freight corridor route
SFund 17390
RRSK 321310 10000 20000
EBR(Dep) 406369
158 Naikheri-Ujjain - Road over bridge in lieu of level crossing No25
and Chintamanganesh-Ujjain - level crossing No8 (metre gauge)
SFund 51115 50818
RRSK 55413 788 100 500
EBR(Dep) 183072
159 Sehore-Phanda - Road over bridge in lieu of level crossing No104 SFund 1000
RRSK 88484 100 5000
EBR(Dep) 89484
160 Naikheri-Ujjain - Road over bridge in lieu of level crossing No23 SFund 100
RRSK 77002 5000 46100
EBR(Dep) 137068
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9112
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
161 Ratlam-Khandwa - 2-lane road over bridge in lieu of level crossing
No250
SFund 2000 41 20000
RRSK 95436 20299 1203 500
EBR(Dep) 97436
162 Bairagarh-Bakaniabhori - Road over bridge in lieu of level crossing
No115
SFund 1000
RRSK 189403 1
EBR(Dep) 190403
163 Sehore-Phanda - Road over bridge in lieu of level crossing No107 SFund 500
RRSK 91224 100 5000
EBR(Dep) 91724
164 Bamania-Amargarh - Road over bridge in lieu of level crossing
No72
SFund 2000
RRSK 104079 100 100
EBR(Dep) 106079
165 Virar-Surat - Road over bridge in lieu of level crossing Nos109
111 114 115 amp 118 along dedicated freight corridor route
SFund 17390 1452
RRSK 368510 12500 30000
EBR(Dep) 460095
166 Gothangam-Sayan - Road over bridge in lieu of level crossing
No151
SFund 31997 29797
RRSK 14313 -78 100
EBR(Dep) 77827
167 Virar-Surat - Road over bridge in lieu of level crossing Nos60 64
66 68 69 71 74 75 77 81 amp 82 along dedicated freight corridor
route
SFund 10000 27000
RRSK 932200 15000 30000
EBR(Dep) 1540420
168 Virar-Surat - Road over bridge in lieu of level crosisng No61 along
dedicated freight corridor route
SFund 4348
RRSK 67642 5000 10000
EBR(Dep) 71993
169 Derol-Kharsaliya - Road over bridge in lieu of level crossing No32 SFund 1500
RRSK 93474 100 500
EBR(Dep) 399974
170 Gothangam-Sayan - Road over bridge in lieu of level crossing
No150
SFund 4348
RRSK 150714 10000 20000
EBR(Dep) 155063
171 Virar-Surat - Road over bridge in lieu of level crossing Nos57 amp
143 along dedicated freight corridor route
SFund 1
RRSK 170312 1
EBR(Dep) 170312
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9113
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
172 Virar-Surat - Road over bridge in lieu of level crossing Nos84 88 amp
90 along dedicated freight corridor route
SFund 10000
RRSK 362918 15000 20000
EBR(Dep) 529675
173 Kim-Kosamba - Road over bridge in lieu of level crossing No161 SFund 4348
RRSK 162307 10 10
EBR(Dep) 166655
174 Virar-Surat - Road over bridge in lieu of level crossing
Nos124126amp 127 along dedicated freight corridor route
SFund 10000 53500
RRSK 429771 10000 16990
EBR(Dep) 529173
175 Sayan-Kim - Road over bridge in lieu of level crossing No154 SFund 4000
RRSK 138094 10000 10000
EBR(Dep) 142094
176 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No165
SFund 4348
RRSK 207011 10 10
EBR(Dep) 211359
177 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No166
SFund 4348
RRSK 135056 10 10
EBR(Dep) 139404
178 Virar-Surat - Road over bridge in lieu of level crossing Nos42 46A
48 52 55 102 106 108 130 amp 137 along dedicated freight
corridor route
SFund 10000 72200
RRSK 929294 10000 10000
EBR(Dep) 1234542
179 Udhna - Jalgaon - Road over bridge in lieu of level crossing No51 SFund 5000
RRSK 75295 10000
EBR(Dep) 250296
180 Sadnapura - Bhalej - Road over bridge in lieu of level crossing No
11
SFund 1500
RRSK 93474 100 10
EBR(Dep) 249974
181 Sayan-Kim - Road over bridge in lieu of level crossing No153 SFund 4348
RRSK 134797 6900 20000
EBR(Dep) 139145
182 Derol - Kharsaliya - Road over bridge in lieu of level crossing No41 SFund 1500
RRSK 93474 500 500
EBR(Dep) 204974
183 Rajkot - Okha - Road over bridge in lieu of level crossing No197 SFund 100
RRSK 94049 19493 9868 1000
EBR(Dep) 94148
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9114
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
184 Rajkot Division - Limited height subways in lieu of level crossings
(36 Nos)
SFund 192337 145046
RRSK 68323 68445 65000 20000
185 Chanderiya-Ratlam - Limited height subways in lieu of level
crossings (No121 amp 183)
SFund 22614 22603
RRSK 2700 1 1
186 Dabhoi-Pratpnagar amp Dabhoi-Chhota Udepur - Limited height
subways (25 Nos)
SFund 203310 202077
RRSK 274218 44171 40000 1000
187 Surat-Vadodara-Godhra - Limited height subway at level crossings
(11 Nos)
SFund 133888 88592
RRSK 79889 40000 100
188 Ankleshwar-Rajpipla - Limited height subways road under bridges
in lieu of level crossings (36 Nos)
SFund 297860 248077 20000
RRSK 284870 80559 10919 20000
189 Ujjain-Bhopal - Limited height subways at level crossings (No88
89 amp 91)
SFund 54571 58450
RRSK 1000 11823 1 1
190 Udhna-Jalgaon - Limited height subways at level crossings (No38
108 127 128 145 146147 amp 134)
SFund 40087 87
RRSK 75049 230000 30000
191 Ahmedabad Division - Elimination of level crossings by road under
bridges (90 Nos)
SFund 11356 45
RRSK 1000 165047 20000
192 Ujjain-Bhopal - Limited height subway at level crossings (No43 44
amp 58)
SFund 67442 69163
RRSK 1900 259 1 1
193 Vadodara Division - Limited height subway in lieu of level crossings
(2 Nos on double line amp 19 Nos on single line)
SFund 69263 85693
RRSK 236140 1626 31000 200
194 Ratlam Division - Limited height subway in lieu of level crossings
(22 Nos)
SFund 272546 366104
RRSK 1000 36466 1000 1
195 Mehsana-Patan - Road over bridge in lieu of level crossing No40X SFund 53406 57194
RRSK 16245 1549 100 100
EBR(Dep) 287771
196 Gangadhara-Bardoli - Road over bridge in lieu of level crossing
No17A
SFund 32000 9390
RRSK 99253 18000 20000
EBR(Dep) 131253
197 Virpur-Jetalsar - Road over bridge in lieu of level crossing No61 SFund 5000
RRSK 187384 10000 20000
198 Jamnagar-Lakhabawal - Road over bridge in lieu of level crossing
No199
SFund 5000
RRSK 78380 2000 20000
EBR(Dep) 83380
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9115
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
199 Surat-Vadodara - Elimination of level crossing No173 by 4-lane
road over bridge
SFund 5000
RRSK 229396 102600 60000
EBR(Dep) 234397
200 Bhavnagar Division - Limited height subways to eliminate level
crossings (77 Nos)
SFund 87
RRSK 648618 100 100
201 Dewas-Barlai - 2 lane road over bridge in lieu of level crossing
No37
SFund 500
RRSK 36758 144 40000 22000
EBR(Dep) 206948
202 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 216 on DFC route
SFund 17390
RRSK 34932 41600 15000 15000
EBR(Dep) 104645
EBR(P) 52323
203 Surat-Vadodara- Road over bridge in lieu of level crossing No 228
on DFC route
SFund 4348
RRSK 59605 10 10
EBR(P) 127905
204 Jetalsar-Veraval Rajula-Mahuva amp Sihor -Palitana -subways in lieu
of level crossing- 18 Nos
SFund 86950 24787
RRSK 394341 75636 30000 50000
205 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 269
SFund 82792 78119
RRSK 23175 7126 50 500
EBR(P) 105968
206 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 177A on DFC route
SFund 4348
RRSK 48142 15000 15000
EBR(Dep) 104981
207 Surat-Vadodara- 4 Lane Road over bridge in lieu of level crossing
No 220
SFund 100
RRSK 173605 100 5000
EBR(P) 173706
208 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 276
SFund 82792 76527
RRSK 77592 8463 100 500
EBR(P) 160385
209 Dhasa-Jetalsar- subways in lieu of level crossing- 35 Nos RRSK 935106 100000 150000
210 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 179A on DFC route
SFund 4348
RRSK 126868 15000 15000
EBR(Dep) 131216
211 Rajkot-Jetalsar Jetalsar-Wansjaliya amp Kana- subways in lieu of
level crossing (19 Nos)
SFund 86950 50607
RRSK 420729 124972 30000 50000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9116
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
212 Ahmedabad - Viramgam- Road over bridge in lieu of level crossing
No 11A
SFund 500
RRSK 220476 75000 80000
EBR(Dep) 220977
213 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 259
SFund 5000 77
RRSK 168295 128 200 5000
EBR(P) 173296
214 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No37
SFund 500
RRSK 98088 100 80000
EBR(Dep) 98588
215 Charni Road-Grant Road- Regirdering of Road over bridge
between at km 39 - 10
SFund 1739
RRSK 71533 10000 40000
216 Elphinstone Road- Regirdering of Road over bridge at km 815-9 SFund 870
RRSK 105138 1 100
217 Virar-Vaiterna- 4 Lane Road over bridge in lieu of level crossing
No 41
SFund 500
RRSK 153899 1
EBR(Dep) 154399
218 Mumbai Central (South)- Regirdering of Road over bridge at Km
46-8
SFund 4348
RRSK 81412 10000 40000
219 Mahalaxmi- Regirdering of Road over bridge at km 526-27 SFund 4348
RRSK 214187 10000 70000
220 Surat-Vadodara- Road over bridge in lieu of level crossing No 198 SFund 100
RRSK 99900 200 4000
EBR(P) 100001
221 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 240
SFund 2000 316
RRSK 117126 13947 71400 10000
EBR(P) 119127
222 Ahmedabad-New Bhuj- Road over bridge in lieu of level crossing
No 3X
SFund 500
RRSK 175762 500 5000
EBR(Dep) 176262
223 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No 22A
RRSK 187005 23 50000 60000
EBR(Dep) 187006
224 Dadar- Regirdering of Road over bridge at Km 109-10 SFund 1739
RRSK 131731 1 100
225 Lowerparel-Elphinstone Road- Regirdering of Road over bridge at
km 712-13
SFund 1739
RRSK 186842 87000 80000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9117
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
226 Chanderiya-Ratlam - 2-lane road over bridge in lieu of level
crossing No141 near Piplia yard
SFund 1000
RRSK 89000 100 10000
EBR(P) 116700
227 Mandsour-Dalauda - 2-lane road over bridge in lieu of level
crossing No152
SFund 1000
RRSK 99000 5500 43600
EBR(P) 165000
228 Chanderia-Ratlam - 2-lane road over bridge at Chanderia in lieu of
level crossing No86
SFund 1500
RRSK 158500 100 5000
EBR(P) 160000
229 Mahesana-Patan- subways in lieu of level crossing No 27 32 56
amp 62 on Mahesana- Viramgam- level crossing No 4 11 18 19 amp
20 (9 Nos)
SFund 1 3530
RRSK 225598 23196 40000 30000
230 Mahesana-Viramgam- subways in lieu of level crossing No 6 7
14 23 amp 25 (5 Nos)
SFund 101 2015
RRSK 125934 4500 30000
231 Sabarmati-Botad- subways in lieu of level crossing- 23 Nos RRSK 613299 85000 150000
232 Viramgam- samakhiyali-subways in lieu of level crossing No 43
92 amp 108 (3 Nos)
SFund 100
RRSK 84683 1000
233 Udhna-Jalgaon- subways in lieu of level crossing No 87 122 123
133 141 150 amp 152 (7 Nos)
RRSK 218947 91408 100000 10000
234 Anand-Khambhat- subways in lieu of level crossing 10 Nos SFund 32995 60173
RRSK 96662 110623 8132 500
235 Chanderiya-Ratlam-subways in lieu of level crossing No 106 128
131 182 amp IND-Dewas-Ujjain level crossing No 26 (5 Nos)
SFund 26108 4281
RRSK 50310 29276 9571 100
236 Chanderia-Ratlam - 2-lane road under bridge at Nimbahera in lieu
of level crossing No103
SFund 87
RRSK 25313 1308 10000
EBR(P) 25400
237 Rajkot-Hapa- Road over bridge in lieu of level crossing No 145 at
Padadhari
RRSK 87610 1 100
EBR(Dep) 256608
238 Surat-Vadodara- Road over bridge in lieu of level crossing No158
(4-lane) between Sayan-Kim on DFC route
SFund 435
RRSK 120879 10 10
EBR(Dep) 363941
239 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 201 on DFC route
SFund 17390
RRSK 68351 56800 15000 15000
EBR(Dep) 257222
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
912
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
10 Bhuj-Naliya (10135 km) with extension from Naliya to Vayor (2465
km)
Cap 3216200 282960 25000
SFund 500000 535847
Deposit 800000 250000
EBR(IF) 100000
11 Miyagam-Karjan-Dabhoi-Samlaya (9646 km)- Gauge conversion
with electrification
Cap 9499600 161432 465000 249890
SFund 150000 683
12 Dhasa - Jetalsar (10444 km) Cap 3765900 333270 545100 2500000
SFund 420000
EBR(IF) 100000
13 Ahmedabad - Botad (17048 km) Cap 9756200 2245143 2320000 1400000
SFund 520000 108800
EBR(IF) 100000 1100000
14 Ahmedabad - Mehsana (6878 km) Cap 3200000 411688 150523 1000
SFund 500000 299299
EBR(IF) 4775600 876292 2000000
15 Kalol-Kadi-Katosan Road (3723 km) Cap 2792300 1 1000
16 Katosan Road-Chanasma (5172 km) Cap 3679000 1 1000
Deposit 200000 200000
17 Chanasma-Ranuj (1284 km) Cap 763000 1 1000
Deposit 200000 200000
18 Adraj Moti-Viajapur (3975 km) Cap 2965400 1 1000
19 Vijapur-Ambliyasan (4153 km) Cap 3098100 1 1000
20 Khijadiya-Visavdar (9127 km) Cap 5476200 1 1000
21 Junagarh-Visavadar (4228 km) Cap 2536800 1 1000
22 Veraval-Talala-Visavadar (7195 km) Cap 4602300 1 1000
23 Samni-Jambusar (2408 km) Cap 2167200 1 1000
24 Jambusar-Vishvamitri (482 km) Cap 4338000 1 1000
25 Samlaya-Timba Road (5353 km) Cap 4014800 1 1000
26 Nadiad-Petlad (3726 km) Cap 3353400 1 1000
27 Petlad-Bhadran (225 km) Cap 2025000 1 1000
28 Dabhoi-Chandod - Gauge conversion with extension upto Kevadiya
(4975 km)
Cap 6918400 958 275000 1500000
29 Talala-Delwada (70 km) Cap 5253000 1 1000
30 Prachi Road - Kodinar (26 km) Cap 1932000 38 1 1000
31 Himmatnagar-Khedbrahma (5483 km) Cap 3548900 1 1000
TOTAL-WORKS IN PROGRESS Cap 9817890
Deposit 2650000
EBR(IF) 7323800
TOTAL-Gauge Conversion Cap 9817890
Deposit 2650000
EBR(IF) 7323800
GAUGE CONVERSION
913
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
32 Surat-Kosamba (Phase-I) (35 km) Cap 489999
EBR 40000
EBR(IF) 10000 1 1
33 Akodia-Mohamed Khera-Shujalpur - Patch doubling (1315 km) Cap 343984 464438 4000
CFund 439999
EBR(IF) 10000 10000
34 Udhna-Jalgaon with electrification (30693 km) Cap 21638000 11321617
CFund 5107 5117
EBR 1200000 900000
EBR(IF) 6000000 9037857 1509613 400000
35 Viramgam-Surendranagar (6526 km) Cap 2794000 2778993
EBR(IF) 410000 516473 13000 10000
36 Viramgram-Samakhiali (18223 km) Cap 4450000 2568180
EBR(IF) 10371500 5702122 1165000 700000
37 Vatva-Ahmedabad - 3rd line with automatic signalling (750 tkm) Cap 397800
EBR(IF) 210000 340087 44150 1000
38 Palanpur-Samakhiali (27473 km) Cap 100000
Deposit 4000000 5901300
EBR(P) 1250000 1530800
39 Surendranagar-Rajkot - Doubling of broad gauge single line section
(11617 km)
Cap 100000 19997 70000
EBR(IF) 10023900 1616552 1550000 2500000
40 Nimuch-Chittaurgarh (5573 km) Cap 50000 614
EBR(IF) 2596800 432206 950000 1390000
41 Vatva - Ahmedabad - Sabarmati - 4th line (1798km) Cap 100000
EBR(IF) 2314300 539537 280000 1
42 Nagda-Ujjain - Doubling of Gambhir Bridge (158 km) Cap 156450 380 19
EBR(IF) 156450 150000 150000
43 Indore -Devas -Ujjain (7923 km) Cap 3500000 901 100000 20000
EBR(IF) 3500000 300000 750000
44 Anand-Godhra (79 km) Cap 6630000 162 1
EBR(IF) 200000 200000
45 Nimach-Ratlam (133 km) Cap 9050000 1
EBR(IF) 50000 50000
46 Mehsana-Palanpur (651 km) Cap 5243000 1
EBR(IF) 50000 50000
47 Rajkot-Kanalus (11120 km) Cap 10117199 1
EBR(IF) 1 1
TOTAL-WORKS IN PROGRESS Cap 90000
Deposit 5901300
EBR(IF) 6211003
DOUBLING
A - Works in Progress
914
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
48 Lumpsum Provision For New Works EBR(IF) 10000
TOTAL-NEW WORKS EBR(IF) 10000
TOTAL-Doubling Cap 90000
Deposit 5901300
EBR(IF) 6221003
49 Navlakhi - Development of basic facilities for goods shed DF(3) 38686 16895 1 1000
50 Valsad - High level platform with addl loop Cap 104859 53434 6500 5000
RRSK 66495
51 Bhimasar - Addl loadingunloading line with rail level platform Cap 53547 21379 12291 5000
DF(3) 33517 11816
52 Ahmedabad-Viramgam - Intermediate block signalling (3 blocks) Cap 87695 56496 20 500
EBR 15000 15000
53 Kandla Port - Yard remodelling Cap 142496 73175 2400 500
DF(3) 53911 19529
54 Ratlam - Yard remodelling DF(3) 178295 47012
RRSK 120288 8154 26185 1000
55 Bisalwas Kalan Gamdhiri Road amp Ordi - Full length addl loop lines
with simultaneous reception facilities amp extension of running lines
Cap 102496 35111 9000 100
DF(3) 41292 25253
56 Duskheda Siding - Development of goods facilities DF(3) 74016 57087 3300 114
57 Gandhidham - Addl loop line at bypass line to Adipur DF(3) 40531 35889
RRSK 7737 5050 14774
58 Samakhiali-Gandhidham - Intermediate block stop signal DF(3) 160566 49260
RRSK 111554 500 1
59 Barayla Piplia amp Harkiakhal - Full length addl loop line amp extension
of running lines to standard clear standing room
Cap 145462 84225 9000 5000
DF(1) 56836 23065
60 Chandlodiya - Full length loop line amp rail level passenger platform
for 24 coaches
Cap 37179 21666 5600 8513
61 Sabarmati - 2nd coaching terminal Cap 283400 183446 3000 1000
DF(3) 41398
62 Binjana - Crossing station DF(3) 128529 77711
RRSK 32388 19011 5748 22938
63 Ahmedabad - Exten of pit lines (4 Nos) amp stabling line (3 Nos)
towards Maninagar for 24 coaches
DF(3) 40719
RRSK 40069 3772 6375 49105
DOUBLING
B - New Works
TRAFFIC FACILITIES-YARD REMODELLING amp OTHERS
A - Works in Progress
915
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
64 Boradi-Dahod - Repl of Dhamarada station by intermediate block
signaling
Cap 26557 20000 1
65 Tarana Road-Tajpur - Providing intermediate block signaling RRSK 36204 9633 10910
66 Vadodara Yard - Segregation of Ahmedabad and Godhra Cap 266139 3066 57364 20000
67 Vasai Road - Provision of a new crossover amp shifting of signals RRSK 33470 2310 35144
68 Sabarmati - Left over facilities for operationalisation of coaching
terminal
Cap 311538 50203 80000
69 Gandhidham - CC surfaced platform between goods shed line No3
amp 4
Cap 48808 32000 10000
70 Raising of speed to 160 kmph200 kmph on existing New Delhi-
Mumbai route (incl Vadodara-Ahmedabad) - A mission to achieve
a travel time of 12 hours between Delhi iquestiquestiquest Mumbai
Cap 11188900 10 100
EBR(IF) 100700100 5000000
71 Andheri-Virar - Extension of suburban platforms for running15-car
services on slow corridor
RRSK 595600 1 120000
72 Western Railway - New works for development of 2nd terminal
removal of diamond crossing amp provision of cross overs
Cap 450000 100
RRSK 50000 1000
73 Estimated investment through EBR(Partnership) for private freight
terminals
EBR(P) 858711 1560000 858711
74 Works costing below Rs25 crore each Cap 100000
DRF 171
DF(3) 10000
RRSK 77766
TOTAL-WORKS IN PROGRESS Cap 235814
DRF 171
DF(3) 11114
RRSK 332638
EBR(IF) 5000000
EBR(P) 858711
75 Lumpsum Provision For New Works Cap 500
TOTAL-NEW WORKS Cap 500
TOTAL-Traffic Facilities-Yard Remodelling amp Others Cap 236314
DRF 171
DF(3) 11114
RRSK 332638
EBR(IF) 5000000
EBR(P) 858711
B - New Works
TRAFFIC FACILITIES-YARD REMODELLING amp OTHERS
916
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
76 Western Railway - Extension of RDBMS (Phase-II) DF(3) 25588 16702 1000 1000
77 Western Railway - Automatic ticket vending machines (pilot project) Cap 88930 81047 1 1
78 Western Railway - Extension of unreserved ticketing system to E-
category stations
DF(1) 348701 238185 1000 1000
79 Western Railway - Extension of automatic ticket vending machines Cap 314899 90611 32000 100
80 Western Railway - Repl of unreserved ticketing system equipment DRF 45400 41347 1186 1
81 Western Railway - Repl of 1675 thin clients for unreserved ticketing
system
DRF 55200 47061 10 10
82 Western Railway - Repl of datacom equipment of unreserved
ticketing system
DRF 35600 12500 500 10
83 Replacement of 377 ATVMs (PB2292018-19NR) DRF 67033 16493 1
84 Works costing below Rs25 crore each DRF 24950
DF(1) 3602
TOTAL-WORKS IN PROGRESS Cap 101
DRF 24972
DF(1) 4602
DF(3) 1000
85 Lumpsum Provision For New Works Cap 100
DRF 10000
DF(1) 600
DF(3) 100
TOTAL-NEW WORKS Cap 100
DRF 10000
DF(1) 600
DF(3) 100
TOTAL-Computerisation Cap 201
DRF 34972
DF(1) 5202
DF(3) 1100
86 Leased Assets - Payment of Capital component of lease charges to
Indian Railway Finance Corporation
Cap 5667326 8838029 6651500 5667326
CFund 2249674 2303171 2249674
TOTAL-WORKS IN PROGRESS Cap 5667326
CFund 2249674
TOTAL-Leased Assets - Payment of Capital Component Cap 5667326
CFund 2249674
COMPUTERISATION
A - Works in Progress
A - Works in Progress
B - New Works
LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT
917
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
87 Nadiad-Modasa Anand-Khambhat amp Vasad-Kathana - Elimination
of various level crossings
RRSK 28928 500 1000
88 Vadodara Division - Manning of level crossings (15 Nos) RRSK 32650 500 1000
89 Ahmedabad Division - Manning of level crossings (26 Nos) RRSK 97716 14823 19703
90 Udhna-Jalgaon - Manning of unmanned level crossing of level
crossings (5 Nos)
RRSK 30296 4000 18038
91 Vadodara Division - Toilet block with dugwell arrangements on
manned level crossing (227 Nos)
RRSK 31607 500 2000
92 Bhavnagar Division - Toilet facilities at manned level crossings
(345 nos)
RRSK 107276 2000 40000
93 Udhna-Jalgaon - Toilets facilities at manned level crossings RRSK 64061 4000 5000
94 Ahmedabad Division - Basic facilities (toilet amp others) at various
manned level crossings
RRSK 56061 2000 13061
95 Vaitarna-Umbergaon - Provision of height gauges amp fencing at level
crossings
RRSK 27823 2000 13845
96 Ahmedabad Division - Interlocking of level crossings (6 Nos) RRSK 33706 18245 20000
97 Bhavnagar Division - Interlocking of level crossings (4 Nos) RRSK 29391 4000
98 Ratlam Division - Removing deficiencies from various manned level
crossings
RRSK 120396 16778 25000
99 Ahmedabad Division - Interlocking (14 level crossing gates) SFund 67385 54317
RRSK 9664 1705 1
100 Vadodara Divisions - Upgradation amp re-classification of level
crossings from A-class to spl-class (13 Nos)
SFund 55279 39072
RRSK 5384 4944 2000
101 Ahmedabad Division - Data loggers (remote terminal units) (77
level crossing gates)
SFund 26337 20207
RRSK 5557 1057 1
102 Ahmedabad Division - Solar power system (77 level crossing gates) SFund 82816 49327
RRSK 31071 1443 1444 1
103 Vadodara Division - Duty bunks on level crossings (100 Nos) SFund 34979 22131
RRSK 14192 6830 1875 3819
104 Vadodara Division - Interlocking of level crossing gates (tvu more
than 20000) (8 Nos) amp long block section (3 Nos)
SFund 44223 22240
RRSK 21864 1265 2000
105 Bhavnagar Division- Manning of unmanned level crossings (26 Nos) SFund 83827 376
RRSK 68827 2759 15000 25000
106 Vadodara Division- Manning of unmanned level crossings (35 Nos) SFund 105609 17632
RRSK 85609 17587 5971 2000
107 Ahmedabad Division - Upgradation and reclassification of level
crossings (15 Nos)
SFund 37939 261
RRSK 36939 1659 5725 26404
ROAD SAFETY WORKS-LEVEL CROSSINGS
A - Works in Progress
918
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
108 Vadodara Division - Interlocking of level crossings having ATVU
more than 20000
SFund 50441 13680
RRSK 29049 10000 4000
109 Rajkot Division- Manning of unmanned level crossings (69 Nos) SFund 352803
RRSK 352303 14601 60000 30000
110 Porbandar-Kanalus - Repl of lower quadrant mechanical signaling
system at level crossing gates amp repl of mechanical lifting barriers
with electrical barriers
SFund 73182 13504
RRSK 53182 18417 12500 20000
111 Western Railway - Electrical lifting barriers (33 level crossing
gates) relay termination material wiring material power cable etc
for electrical lifting barriers
SFund 30290 1043
RRSK 29190 9145 13026 4000
112 Ratlam Division- Manning of unmanned level crossings (33 Nos) SFund 99157 5923
RRSK 78463 24262 15000 30000
113 Ahmedabad - Interlocking of level crossing gates (8 Nos) SFund 47324
RRSK 47224 100 100
114 Vadodara - Interlocking of level crossing gates SFund 89993 423
RRSK 88993 17482 5000
115 Ratlam - Manning of unmanned level crossings (20 Nos) SFund 33132
RRSK 89817 8271 2000 10000
116 Vadodara - Manning of unmanned level crossings (66 Nos) SFund 200962
RRSK 198462 25401 40453 5000
117 Bhavnagar - Manning of unmanned level crossing (83 Nos) SFund 309164
RRSK 309064 62540 237609 40000
118 Viramgam - Okha - Manning of unmanned level crossings (82 Nos) SFund 250100
RRSK 250000 35000 40000
119 Ahmedabad - Manning of unmanned level crossings (80 Nos) SFund 244000 6132
RRSK 241000 41384 62413 34978
120 Manning of unmanned level crossings between Radhanpur-
Gandhidham section (43 Nos) (KRCL)
RRSK 161606 15367 1000
121 Manning of unmanned level crossing between Radhanpur-Palanpur
section (46 nos) KRCL
RRSK 172881 7539 1000
122 Works costing below Rs25 crore each RRSK 150000
TOTAL-WORKS IN PROGRESS RRSK 598951
123 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Road Safety Works-Level Crossings RRSK 648951
ROAD SAFETY WORKS-LEVEL CROSSINGS
B - New Works
919
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
124 Bhandu Moti Dab-Mahesana - Road over bridge in lieu of level
crossing No 211
SFund 79627 79577
RRSK 68683 -5545 1 1
EBR(Dep) 76908
125 Meghnagar - Road over bridge in lieu of level crossing No60-B SFund 2000
RRSK 34653 5000 33400
EBR(Dep) 31876
126 Maroli-Sachin - Road over bridge in lieu of level crossing No133 SFund 4000
RRSK 22546 1000 50000
127 Virar-Surat - Road over bridge in lieu of level crossing No138 near
Sachin (4-lane)
SFund 54643 82256
RRSK 1000 25797 3300 1000
EBR(Dep) 55643
128 Viramgam-Jhund - Road over bridge in lieu of level crossing No42
(2-lane)
SFund 63739 67339
RRSK 1000 4008 4000 1
EBR(Dep) 110479
129 Surat-Vadodara - Road over bridge in lieu of level crossing No213
near Miyagam Karjan
SFund 53983 45913
RRSK 2881 503 2248 1000
EBR(Dep) 52400
130 Kim-Kosamba - Road over bridge in lieu of level crossing No160 (2-
lane)
SFund 72068 80284
RRSK 1000 1 100
EBR(Dep) 73068
131 Pratapnagar-Vishwamitri - Road over bridge in lieu of level crossing
No 2
SFund 48817 47817
RRSK 6135 1 1
EBR(Dep) 51100
132 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No2-A
SFund 1
RRSK 35999 100 1000
EBR(Dep) 36000
133 Bharuch-Dahej - 2- lane road over bridge in lieu of level crossing
No22 near Samni station
SFund 46790 57359
RRSK 1000 38 1 1
EBR(Dep) 57737
134 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No178 near Bharuch yard
SFund 92806 88666
RRSK 25994 1593 100 500
EBR(Dep) 233200
135 Bharuch-Dahej - 4-lane road over bridge in lieu of level crossing
No50
SFund 1
RRSK 50899 1
EBR(Dep) 50900
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
A - Works in Progress
9110
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
136 Dharangaon-Thakherkhed - 2-lane road over bridge on level
crossing No144 on state highway No185
SFund 50170 45820
RRSK 8572 1979 1200 500
EBR(Dep) 102582
137 Ujjain-Bhopal - Road over bridge in lieu of level crossing No101B
near Shore
SFund 2500 -24
RRSK 41006 39894 94500 1000
EBR(Dep) 46195
138 Amalner-Marwad Nim Road - Road over bridge in lieu of level
crossing No135
SFund 50239 44239
RRSK 1597 28 1200 500
EBR(Dep) 95487
139 Palanpur-Khodiyar - Road under bridges in lieu of level crossings
on dedicated freight corridor route (42 Nos)
SFund 313449 250867
RRSK 308394 96112 30000 30000
140 Bajana-Jatpipli - Road over bridge in lieu of level crossing No 25 SFund 1000
RRSK 87051 1 20000
EBR(Dep) 203052
141 Udhna-Jalgaon - Road over bridge in lieu of level crossing No37 SFund 5000
RRSK 72704 5000
EBR(Dep) 232887
142 Bhavnagar Divsion - Limited height subways in lieu of level
crossings (33 Nos)
SFund 196681 203596
RRSK 63911 28554 10000 20000
143 Palanpur-Khodiyar - Road ovrer bridges in lieu of level crossing
Nos191A 199A amp 227 on dedicated freight corridor route
SFund 34780 40000
RRSK 514304 23900 30000 30000
EBR(Dep) 274542
144 Ratlam-Godhara - 2-lane road over bridge in lieu of level crossing
No61-A
SFund 2000
RRSK 66459 100 5000
EBR(Dep) 64858
145 Surat - Vadodara - Limited height subways in lieu of level crossing
Nos162 amp 168
SFund 17645 18414
RRSK 22527 6306 500
146 Virar - Surat - Subwaysroad under bridge at level crossing Nos
55x 58 142 amp LC-1 (Udhna-Niyol)
SFund 500
RRSK 61898 5000 5000
147 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos171-A 188-A amp 208-B
SFund 26085 20900
RRSK 548600 22800 30000 30000
EBR(Dep) 287342
148 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos208 211-C 214 amp 220
SFund 69560 120000
RRSK 695510 59400 50000 50000
EBR(Dep) 382535
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9111
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
149 Ahmedabad-Palanpur - Road over bridge in lieu of level crossing
Nos165 166 amp 169 and level crossing No17 of Ahmedabad -
Viramgam
SFund 26085
RRSK 679207 30000 30000
EBR(Dep) 352646
150 Virar - Surat - SubwaysRoad under bridges in lieu of level
crossings (34 Nos)
SFund 175900 175900
RRSK 578938 89650 90000 10000
151 Ahmedabad Division - Road under bridges in lieu of level crossings
(58 Nos)
SFund 265089 247530 42610
RRSK 545731 19586 3570 30000
152 Timba-Tuva - Road over bridges in lieu of level crossing No58 SFund 1500
RRSK 93474 100 500
EBR(Dep) 584974
153 Bhatiel-Petlad - Road over bridge in lieu of level crossing No28 SFund 1500
RRSK 174899 500 500
EBR(Dep) 271399
154 Kosad-Gothangam - Road over bridge in lieu of level crossing
No149
SFund 435
RRSK 154072 1 1
EBR(Dep) 154508
155 Sayan-Kim - Road over bridge in lieu of level crossing No156 SFund 4348
RRSK 168868 10000 30000
EBR(Dep) 173216
156 Kosamba-Hathuran - Road over bridge in lieu of level crossing
No163
SFund 4348
RRSK 138655 6800 20000
EBR(Dep) 143004
157 Virar-Surat - Road over bridge in lieu of level crossing Nos 92 94 amp
97 along dedicated freight corridor route
SFund 17390
RRSK 321310 10000 20000
EBR(Dep) 406369
158 Naikheri-Ujjain - Road over bridge in lieu of level crossing No25
and Chintamanganesh-Ujjain - level crossing No8 (metre gauge)
SFund 51115 50818
RRSK 55413 788 100 500
EBR(Dep) 183072
159 Sehore-Phanda - Road over bridge in lieu of level crossing No104 SFund 1000
RRSK 88484 100 5000
EBR(Dep) 89484
160 Naikheri-Ujjain - Road over bridge in lieu of level crossing No23 SFund 100
RRSK 77002 5000 46100
EBR(Dep) 137068
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9112
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
161 Ratlam-Khandwa - 2-lane road over bridge in lieu of level crossing
No250
SFund 2000 41 20000
RRSK 95436 20299 1203 500
EBR(Dep) 97436
162 Bairagarh-Bakaniabhori - Road over bridge in lieu of level crossing
No115
SFund 1000
RRSK 189403 1
EBR(Dep) 190403
163 Sehore-Phanda - Road over bridge in lieu of level crossing No107 SFund 500
RRSK 91224 100 5000
EBR(Dep) 91724
164 Bamania-Amargarh - Road over bridge in lieu of level crossing
No72
SFund 2000
RRSK 104079 100 100
EBR(Dep) 106079
165 Virar-Surat - Road over bridge in lieu of level crossing Nos109
111 114 115 amp 118 along dedicated freight corridor route
SFund 17390 1452
RRSK 368510 12500 30000
EBR(Dep) 460095
166 Gothangam-Sayan - Road over bridge in lieu of level crossing
No151
SFund 31997 29797
RRSK 14313 -78 100
EBR(Dep) 77827
167 Virar-Surat - Road over bridge in lieu of level crossing Nos60 64
66 68 69 71 74 75 77 81 amp 82 along dedicated freight corridor
route
SFund 10000 27000
RRSK 932200 15000 30000
EBR(Dep) 1540420
168 Virar-Surat - Road over bridge in lieu of level crosisng No61 along
dedicated freight corridor route
SFund 4348
RRSK 67642 5000 10000
EBR(Dep) 71993
169 Derol-Kharsaliya - Road over bridge in lieu of level crossing No32 SFund 1500
RRSK 93474 100 500
EBR(Dep) 399974
170 Gothangam-Sayan - Road over bridge in lieu of level crossing
No150
SFund 4348
RRSK 150714 10000 20000
EBR(Dep) 155063
171 Virar-Surat - Road over bridge in lieu of level crossing Nos57 amp
143 along dedicated freight corridor route
SFund 1
RRSK 170312 1
EBR(Dep) 170312
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9113
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
172 Virar-Surat - Road over bridge in lieu of level crossing Nos84 88 amp
90 along dedicated freight corridor route
SFund 10000
RRSK 362918 15000 20000
EBR(Dep) 529675
173 Kim-Kosamba - Road over bridge in lieu of level crossing No161 SFund 4348
RRSK 162307 10 10
EBR(Dep) 166655
174 Virar-Surat - Road over bridge in lieu of level crossing
Nos124126amp 127 along dedicated freight corridor route
SFund 10000 53500
RRSK 429771 10000 16990
EBR(Dep) 529173
175 Sayan-Kim - Road over bridge in lieu of level crossing No154 SFund 4000
RRSK 138094 10000 10000
EBR(Dep) 142094
176 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No165
SFund 4348
RRSK 207011 10 10
EBR(Dep) 211359
177 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No166
SFund 4348
RRSK 135056 10 10
EBR(Dep) 139404
178 Virar-Surat - Road over bridge in lieu of level crossing Nos42 46A
48 52 55 102 106 108 130 amp 137 along dedicated freight
corridor route
SFund 10000 72200
RRSK 929294 10000 10000
EBR(Dep) 1234542
179 Udhna - Jalgaon - Road over bridge in lieu of level crossing No51 SFund 5000
RRSK 75295 10000
EBR(Dep) 250296
180 Sadnapura - Bhalej - Road over bridge in lieu of level crossing No
11
SFund 1500
RRSK 93474 100 10
EBR(Dep) 249974
181 Sayan-Kim - Road over bridge in lieu of level crossing No153 SFund 4348
RRSK 134797 6900 20000
EBR(Dep) 139145
182 Derol - Kharsaliya - Road over bridge in lieu of level crossing No41 SFund 1500
RRSK 93474 500 500
EBR(Dep) 204974
183 Rajkot - Okha - Road over bridge in lieu of level crossing No197 SFund 100
RRSK 94049 19493 9868 1000
EBR(Dep) 94148
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9114
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
184 Rajkot Division - Limited height subways in lieu of level crossings
(36 Nos)
SFund 192337 145046
RRSK 68323 68445 65000 20000
185 Chanderiya-Ratlam - Limited height subways in lieu of level
crossings (No121 amp 183)
SFund 22614 22603
RRSK 2700 1 1
186 Dabhoi-Pratpnagar amp Dabhoi-Chhota Udepur - Limited height
subways (25 Nos)
SFund 203310 202077
RRSK 274218 44171 40000 1000
187 Surat-Vadodara-Godhra - Limited height subway at level crossings
(11 Nos)
SFund 133888 88592
RRSK 79889 40000 100
188 Ankleshwar-Rajpipla - Limited height subways road under bridges
in lieu of level crossings (36 Nos)
SFund 297860 248077 20000
RRSK 284870 80559 10919 20000
189 Ujjain-Bhopal - Limited height subways at level crossings (No88
89 amp 91)
SFund 54571 58450
RRSK 1000 11823 1 1
190 Udhna-Jalgaon - Limited height subways at level crossings (No38
108 127 128 145 146147 amp 134)
SFund 40087 87
RRSK 75049 230000 30000
191 Ahmedabad Division - Elimination of level crossings by road under
bridges (90 Nos)
SFund 11356 45
RRSK 1000 165047 20000
192 Ujjain-Bhopal - Limited height subway at level crossings (No43 44
amp 58)
SFund 67442 69163
RRSK 1900 259 1 1
193 Vadodara Division - Limited height subway in lieu of level crossings
(2 Nos on double line amp 19 Nos on single line)
SFund 69263 85693
RRSK 236140 1626 31000 200
194 Ratlam Division - Limited height subway in lieu of level crossings
(22 Nos)
SFund 272546 366104
RRSK 1000 36466 1000 1
195 Mehsana-Patan - Road over bridge in lieu of level crossing No40X SFund 53406 57194
RRSK 16245 1549 100 100
EBR(Dep) 287771
196 Gangadhara-Bardoli - Road over bridge in lieu of level crossing
No17A
SFund 32000 9390
RRSK 99253 18000 20000
EBR(Dep) 131253
197 Virpur-Jetalsar - Road over bridge in lieu of level crossing No61 SFund 5000
RRSK 187384 10000 20000
198 Jamnagar-Lakhabawal - Road over bridge in lieu of level crossing
No199
SFund 5000
RRSK 78380 2000 20000
EBR(Dep) 83380
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9115
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
199 Surat-Vadodara - Elimination of level crossing No173 by 4-lane
road over bridge
SFund 5000
RRSK 229396 102600 60000
EBR(Dep) 234397
200 Bhavnagar Division - Limited height subways to eliminate level
crossings (77 Nos)
SFund 87
RRSK 648618 100 100
201 Dewas-Barlai - 2 lane road over bridge in lieu of level crossing
No37
SFund 500
RRSK 36758 144 40000 22000
EBR(Dep) 206948
202 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 216 on DFC route
SFund 17390
RRSK 34932 41600 15000 15000
EBR(Dep) 104645
EBR(P) 52323
203 Surat-Vadodara- Road over bridge in lieu of level crossing No 228
on DFC route
SFund 4348
RRSK 59605 10 10
EBR(P) 127905
204 Jetalsar-Veraval Rajula-Mahuva amp Sihor -Palitana -subways in lieu
of level crossing- 18 Nos
SFund 86950 24787
RRSK 394341 75636 30000 50000
205 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 269
SFund 82792 78119
RRSK 23175 7126 50 500
EBR(P) 105968
206 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 177A on DFC route
SFund 4348
RRSK 48142 15000 15000
EBR(Dep) 104981
207 Surat-Vadodara- 4 Lane Road over bridge in lieu of level crossing
No 220
SFund 100
RRSK 173605 100 5000
EBR(P) 173706
208 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 276
SFund 82792 76527
RRSK 77592 8463 100 500
EBR(P) 160385
209 Dhasa-Jetalsar- subways in lieu of level crossing- 35 Nos RRSK 935106 100000 150000
210 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 179A on DFC route
SFund 4348
RRSK 126868 15000 15000
EBR(Dep) 131216
211 Rajkot-Jetalsar Jetalsar-Wansjaliya amp Kana- subways in lieu of
level crossing (19 Nos)
SFund 86950 50607
RRSK 420729 124972 30000 50000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9116
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
212 Ahmedabad - Viramgam- Road over bridge in lieu of level crossing
No 11A
SFund 500
RRSK 220476 75000 80000
EBR(Dep) 220977
213 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 259
SFund 5000 77
RRSK 168295 128 200 5000
EBR(P) 173296
214 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No37
SFund 500
RRSK 98088 100 80000
EBR(Dep) 98588
215 Charni Road-Grant Road- Regirdering of Road over bridge
between at km 39 - 10
SFund 1739
RRSK 71533 10000 40000
216 Elphinstone Road- Regirdering of Road over bridge at km 815-9 SFund 870
RRSK 105138 1 100
217 Virar-Vaiterna- 4 Lane Road over bridge in lieu of level crossing
No 41
SFund 500
RRSK 153899 1
EBR(Dep) 154399
218 Mumbai Central (South)- Regirdering of Road over bridge at Km
46-8
SFund 4348
RRSK 81412 10000 40000
219 Mahalaxmi- Regirdering of Road over bridge at km 526-27 SFund 4348
RRSK 214187 10000 70000
220 Surat-Vadodara- Road over bridge in lieu of level crossing No 198 SFund 100
RRSK 99900 200 4000
EBR(P) 100001
221 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 240
SFund 2000 316
RRSK 117126 13947 71400 10000
EBR(P) 119127
222 Ahmedabad-New Bhuj- Road over bridge in lieu of level crossing
No 3X
SFund 500
RRSK 175762 500 5000
EBR(Dep) 176262
223 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No 22A
RRSK 187005 23 50000 60000
EBR(Dep) 187006
224 Dadar- Regirdering of Road over bridge at Km 109-10 SFund 1739
RRSK 131731 1 100
225 Lowerparel-Elphinstone Road- Regirdering of Road over bridge at
km 712-13
SFund 1739
RRSK 186842 87000 80000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9117
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
226 Chanderiya-Ratlam - 2-lane road over bridge in lieu of level
crossing No141 near Piplia yard
SFund 1000
RRSK 89000 100 10000
EBR(P) 116700
227 Mandsour-Dalauda - 2-lane road over bridge in lieu of level
crossing No152
SFund 1000
RRSK 99000 5500 43600
EBR(P) 165000
228 Chanderia-Ratlam - 2-lane road over bridge at Chanderia in lieu of
level crossing No86
SFund 1500
RRSK 158500 100 5000
EBR(P) 160000
229 Mahesana-Patan- subways in lieu of level crossing No 27 32 56
amp 62 on Mahesana- Viramgam- level crossing No 4 11 18 19 amp
20 (9 Nos)
SFund 1 3530
RRSK 225598 23196 40000 30000
230 Mahesana-Viramgam- subways in lieu of level crossing No 6 7
14 23 amp 25 (5 Nos)
SFund 101 2015
RRSK 125934 4500 30000
231 Sabarmati-Botad- subways in lieu of level crossing- 23 Nos RRSK 613299 85000 150000
232 Viramgam- samakhiyali-subways in lieu of level crossing No 43
92 amp 108 (3 Nos)
SFund 100
RRSK 84683 1000
233 Udhna-Jalgaon- subways in lieu of level crossing No 87 122 123
133 141 150 amp 152 (7 Nos)
RRSK 218947 91408 100000 10000
234 Anand-Khambhat- subways in lieu of level crossing 10 Nos SFund 32995 60173
RRSK 96662 110623 8132 500
235 Chanderiya-Ratlam-subways in lieu of level crossing No 106 128
131 182 amp IND-Dewas-Ujjain level crossing No 26 (5 Nos)
SFund 26108 4281
RRSK 50310 29276 9571 100
236 Chanderia-Ratlam - 2-lane road under bridge at Nimbahera in lieu
of level crossing No103
SFund 87
RRSK 25313 1308 10000
EBR(P) 25400
237 Rajkot-Hapa- Road over bridge in lieu of level crossing No 145 at
Padadhari
RRSK 87610 1 100
EBR(Dep) 256608
238 Surat-Vadodara- Road over bridge in lieu of level crossing No158
(4-lane) between Sayan-Kim on DFC route
SFund 435
RRSK 120879 10 10
EBR(Dep) 363941
239 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 201 on DFC route
SFund 17390
RRSK 68351 56800 15000 15000
EBR(Dep) 257222
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
913
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
32 Surat-Kosamba (Phase-I) (35 km) Cap 489999
EBR 40000
EBR(IF) 10000 1 1
33 Akodia-Mohamed Khera-Shujalpur - Patch doubling (1315 km) Cap 343984 464438 4000
CFund 439999
EBR(IF) 10000 10000
34 Udhna-Jalgaon with electrification (30693 km) Cap 21638000 11321617
CFund 5107 5117
EBR 1200000 900000
EBR(IF) 6000000 9037857 1509613 400000
35 Viramgam-Surendranagar (6526 km) Cap 2794000 2778993
EBR(IF) 410000 516473 13000 10000
36 Viramgram-Samakhiali (18223 km) Cap 4450000 2568180
EBR(IF) 10371500 5702122 1165000 700000
37 Vatva-Ahmedabad - 3rd line with automatic signalling (750 tkm) Cap 397800
EBR(IF) 210000 340087 44150 1000
38 Palanpur-Samakhiali (27473 km) Cap 100000
Deposit 4000000 5901300
EBR(P) 1250000 1530800
39 Surendranagar-Rajkot - Doubling of broad gauge single line section
(11617 km)
Cap 100000 19997 70000
EBR(IF) 10023900 1616552 1550000 2500000
40 Nimuch-Chittaurgarh (5573 km) Cap 50000 614
EBR(IF) 2596800 432206 950000 1390000
41 Vatva - Ahmedabad - Sabarmati - 4th line (1798km) Cap 100000
EBR(IF) 2314300 539537 280000 1
42 Nagda-Ujjain - Doubling of Gambhir Bridge (158 km) Cap 156450 380 19
EBR(IF) 156450 150000 150000
43 Indore -Devas -Ujjain (7923 km) Cap 3500000 901 100000 20000
EBR(IF) 3500000 300000 750000
44 Anand-Godhra (79 km) Cap 6630000 162 1
EBR(IF) 200000 200000
45 Nimach-Ratlam (133 km) Cap 9050000 1
EBR(IF) 50000 50000
46 Mehsana-Palanpur (651 km) Cap 5243000 1
EBR(IF) 50000 50000
47 Rajkot-Kanalus (11120 km) Cap 10117199 1
EBR(IF) 1 1
TOTAL-WORKS IN PROGRESS Cap 90000
Deposit 5901300
EBR(IF) 6211003
DOUBLING
A - Works in Progress
914
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
48 Lumpsum Provision For New Works EBR(IF) 10000
TOTAL-NEW WORKS EBR(IF) 10000
TOTAL-Doubling Cap 90000
Deposit 5901300
EBR(IF) 6221003
49 Navlakhi - Development of basic facilities for goods shed DF(3) 38686 16895 1 1000
50 Valsad - High level platform with addl loop Cap 104859 53434 6500 5000
RRSK 66495
51 Bhimasar - Addl loadingunloading line with rail level platform Cap 53547 21379 12291 5000
DF(3) 33517 11816
52 Ahmedabad-Viramgam - Intermediate block signalling (3 blocks) Cap 87695 56496 20 500
EBR 15000 15000
53 Kandla Port - Yard remodelling Cap 142496 73175 2400 500
DF(3) 53911 19529
54 Ratlam - Yard remodelling DF(3) 178295 47012
RRSK 120288 8154 26185 1000
55 Bisalwas Kalan Gamdhiri Road amp Ordi - Full length addl loop lines
with simultaneous reception facilities amp extension of running lines
Cap 102496 35111 9000 100
DF(3) 41292 25253
56 Duskheda Siding - Development of goods facilities DF(3) 74016 57087 3300 114
57 Gandhidham - Addl loop line at bypass line to Adipur DF(3) 40531 35889
RRSK 7737 5050 14774
58 Samakhiali-Gandhidham - Intermediate block stop signal DF(3) 160566 49260
RRSK 111554 500 1
59 Barayla Piplia amp Harkiakhal - Full length addl loop line amp extension
of running lines to standard clear standing room
Cap 145462 84225 9000 5000
DF(1) 56836 23065
60 Chandlodiya - Full length loop line amp rail level passenger platform
for 24 coaches
Cap 37179 21666 5600 8513
61 Sabarmati - 2nd coaching terminal Cap 283400 183446 3000 1000
DF(3) 41398
62 Binjana - Crossing station DF(3) 128529 77711
RRSK 32388 19011 5748 22938
63 Ahmedabad - Exten of pit lines (4 Nos) amp stabling line (3 Nos)
towards Maninagar for 24 coaches
DF(3) 40719
RRSK 40069 3772 6375 49105
DOUBLING
B - New Works
TRAFFIC FACILITIES-YARD REMODELLING amp OTHERS
A - Works in Progress
915
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
64 Boradi-Dahod - Repl of Dhamarada station by intermediate block
signaling
Cap 26557 20000 1
65 Tarana Road-Tajpur - Providing intermediate block signaling RRSK 36204 9633 10910
66 Vadodara Yard - Segregation of Ahmedabad and Godhra Cap 266139 3066 57364 20000
67 Vasai Road - Provision of a new crossover amp shifting of signals RRSK 33470 2310 35144
68 Sabarmati - Left over facilities for operationalisation of coaching
terminal
Cap 311538 50203 80000
69 Gandhidham - CC surfaced platform between goods shed line No3
amp 4
Cap 48808 32000 10000
70 Raising of speed to 160 kmph200 kmph on existing New Delhi-
Mumbai route (incl Vadodara-Ahmedabad) - A mission to achieve
a travel time of 12 hours between Delhi iquestiquestiquest Mumbai
Cap 11188900 10 100
EBR(IF) 100700100 5000000
71 Andheri-Virar - Extension of suburban platforms for running15-car
services on slow corridor
RRSK 595600 1 120000
72 Western Railway - New works for development of 2nd terminal
removal of diamond crossing amp provision of cross overs
Cap 450000 100
RRSK 50000 1000
73 Estimated investment through EBR(Partnership) for private freight
terminals
EBR(P) 858711 1560000 858711
74 Works costing below Rs25 crore each Cap 100000
DRF 171
DF(3) 10000
RRSK 77766
TOTAL-WORKS IN PROGRESS Cap 235814
DRF 171
DF(3) 11114
RRSK 332638
EBR(IF) 5000000
EBR(P) 858711
75 Lumpsum Provision For New Works Cap 500
TOTAL-NEW WORKS Cap 500
TOTAL-Traffic Facilities-Yard Remodelling amp Others Cap 236314
DRF 171
DF(3) 11114
RRSK 332638
EBR(IF) 5000000
EBR(P) 858711
B - New Works
TRAFFIC FACILITIES-YARD REMODELLING amp OTHERS
916
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
76 Western Railway - Extension of RDBMS (Phase-II) DF(3) 25588 16702 1000 1000
77 Western Railway - Automatic ticket vending machines (pilot project) Cap 88930 81047 1 1
78 Western Railway - Extension of unreserved ticketing system to E-
category stations
DF(1) 348701 238185 1000 1000
79 Western Railway - Extension of automatic ticket vending machines Cap 314899 90611 32000 100
80 Western Railway - Repl of unreserved ticketing system equipment DRF 45400 41347 1186 1
81 Western Railway - Repl of 1675 thin clients for unreserved ticketing
system
DRF 55200 47061 10 10
82 Western Railway - Repl of datacom equipment of unreserved
ticketing system
DRF 35600 12500 500 10
83 Replacement of 377 ATVMs (PB2292018-19NR) DRF 67033 16493 1
84 Works costing below Rs25 crore each DRF 24950
DF(1) 3602
TOTAL-WORKS IN PROGRESS Cap 101
DRF 24972
DF(1) 4602
DF(3) 1000
85 Lumpsum Provision For New Works Cap 100
DRF 10000
DF(1) 600
DF(3) 100
TOTAL-NEW WORKS Cap 100
DRF 10000
DF(1) 600
DF(3) 100
TOTAL-Computerisation Cap 201
DRF 34972
DF(1) 5202
DF(3) 1100
86 Leased Assets - Payment of Capital component of lease charges to
Indian Railway Finance Corporation
Cap 5667326 8838029 6651500 5667326
CFund 2249674 2303171 2249674
TOTAL-WORKS IN PROGRESS Cap 5667326
CFund 2249674
TOTAL-Leased Assets - Payment of Capital Component Cap 5667326
CFund 2249674
COMPUTERISATION
A - Works in Progress
A - Works in Progress
B - New Works
LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT
917
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
87 Nadiad-Modasa Anand-Khambhat amp Vasad-Kathana - Elimination
of various level crossings
RRSK 28928 500 1000
88 Vadodara Division - Manning of level crossings (15 Nos) RRSK 32650 500 1000
89 Ahmedabad Division - Manning of level crossings (26 Nos) RRSK 97716 14823 19703
90 Udhna-Jalgaon - Manning of unmanned level crossing of level
crossings (5 Nos)
RRSK 30296 4000 18038
91 Vadodara Division - Toilet block with dugwell arrangements on
manned level crossing (227 Nos)
RRSK 31607 500 2000
92 Bhavnagar Division - Toilet facilities at manned level crossings
(345 nos)
RRSK 107276 2000 40000
93 Udhna-Jalgaon - Toilets facilities at manned level crossings RRSK 64061 4000 5000
94 Ahmedabad Division - Basic facilities (toilet amp others) at various
manned level crossings
RRSK 56061 2000 13061
95 Vaitarna-Umbergaon - Provision of height gauges amp fencing at level
crossings
RRSK 27823 2000 13845
96 Ahmedabad Division - Interlocking of level crossings (6 Nos) RRSK 33706 18245 20000
97 Bhavnagar Division - Interlocking of level crossings (4 Nos) RRSK 29391 4000
98 Ratlam Division - Removing deficiencies from various manned level
crossings
RRSK 120396 16778 25000
99 Ahmedabad Division - Interlocking (14 level crossing gates) SFund 67385 54317
RRSK 9664 1705 1
100 Vadodara Divisions - Upgradation amp re-classification of level
crossings from A-class to spl-class (13 Nos)
SFund 55279 39072
RRSK 5384 4944 2000
101 Ahmedabad Division - Data loggers (remote terminal units) (77
level crossing gates)
SFund 26337 20207
RRSK 5557 1057 1
102 Ahmedabad Division - Solar power system (77 level crossing gates) SFund 82816 49327
RRSK 31071 1443 1444 1
103 Vadodara Division - Duty bunks on level crossings (100 Nos) SFund 34979 22131
RRSK 14192 6830 1875 3819
104 Vadodara Division - Interlocking of level crossing gates (tvu more
than 20000) (8 Nos) amp long block section (3 Nos)
SFund 44223 22240
RRSK 21864 1265 2000
105 Bhavnagar Division- Manning of unmanned level crossings (26 Nos) SFund 83827 376
RRSK 68827 2759 15000 25000
106 Vadodara Division- Manning of unmanned level crossings (35 Nos) SFund 105609 17632
RRSK 85609 17587 5971 2000
107 Ahmedabad Division - Upgradation and reclassification of level
crossings (15 Nos)
SFund 37939 261
RRSK 36939 1659 5725 26404
ROAD SAFETY WORKS-LEVEL CROSSINGS
A - Works in Progress
918
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
108 Vadodara Division - Interlocking of level crossings having ATVU
more than 20000
SFund 50441 13680
RRSK 29049 10000 4000
109 Rajkot Division- Manning of unmanned level crossings (69 Nos) SFund 352803
RRSK 352303 14601 60000 30000
110 Porbandar-Kanalus - Repl of lower quadrant mechanical signaling
system at level crossing gates amp repl of mechanical lifting barriers
with electrical barriers
SFund 73182 13504
RRSK 53182 18417 12500 20000
111 Western Railway - Electrical lifting barriers (33 level crossing
gates) relay termination material wiring material power cable etc
for electrical lifting barriers
SFund 30290 1043
RRSK 29190 9145 13026 4000
112 Ratlam Division- Manning of unmanned level crossings (33 Nos) SFund 99157 5923
RRSK 78463 24262 15000 30000
113 Ahmedabad - Interlocking of level crossing gates (8 Nos) SFund 47324
RRSK 47224 100 100
114 Vadodara - Interlocking of level crossing gates SFund 89993 423
RRSK 88993 17482 5000
115 Ratlam - Manning of unmanned level crossings (20 Nos) SFund 33132
RRSK 89817 8271 2000 10000
116 Vadodara - Manning of unmanned level crossings (66 Nos) SFund 200962
RRSK 198462 25401 40453 5000
117 Bhavnagar - Manning of unmanned level crossing (83 Nos) SFund 309164
RRSK 309064 62540 237609 40000
118 Viramgam - Okha - Manning of unmanned level crossings (82 Nos) SFund 250100
RRSK 250000 35000 40000
119 Ahmedabad - Manning of unmanned level crossings (80 Nos) SFund 244000 6132
RRSK 241000 41384 62413 34978
120 Manning of unmanned level crossings between Radhanpur-
Gandhidham section (43 Nos) (KRCL)
RRSK 161606 15367 1000
121 Manning of unmanned level crossing between Radhanpur-Palanpur
section (46 nos) KRCL
RRSK 172881 7539 1000
122 Works costing below Rs25 crore each RRSK 150000
TOTAL-WORKS IN PROGRESS RRSK 598951
123 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Road Safety Works-Level Crossings RRSK 648951
ROAD SAFETY WORKS-LEVEL CROSSINGS
B - New Works
919
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
124 Bhandu Moti Dab-Mahesana - Road over bridge in lieu of level
crossing No 211
SFund 79627 79577
RRSK 68683 -5545 1 1
EBR(Dep) 76908
125 Meghnagar - Road over bridge in lieu of level crossing No60-B SFund 2000
RRSK 34653 5000 33400
EBR(Dep) 31876
126 Maroli-Sachin - Road over bridge in lieu of level crossing No133 SFund 4000
RRSK 22546 1000 50000
127 Virar-Surat - Road over bridge in lieu of level crossing No138 near
Sachin (4-lane)
SFund 54643 82256
RRSK 1000 25797 3300 1000
EBR(Dep) 55643
128 Viramgam-Jhund - Road over bridge in lieu of level crossing No42
(2-lane)
SFund 63739 67339
RRSK 1000 4008 4000 1
EBR(Dep) 110479
129 Surat-Vadodara - Road over bridge in lieu of level crossing No213
near Miyagam Karjan
SFund 53983 45913
RRSK 2881 503 2248 1000
EBR(Dep) 52400
130 Kim-Kosamba - Road over bridge in lieu of level crossing No160 (2-
lane)
SFund 72068 80284
RRSK 1000 1 100
EBR(Dep) 73068
131 Pratapnagar-Vishwamitri - Road over bridge in lieu of level crossing
No 2
SFund 48817 47817
RRSK 6135 1 1
EBR(Dep) 51100
132 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No2-A
SFund 1
RRSK 35999 100 1000
EBR(Dep) 36000
133 Bharuch-Dahej - 2- lane road over bridge in lieu of level crossing
No22 near Samni station
SFund 46790 57359
RRSK 1000 38 1 1
EBR(Dep) 57737
134 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No178 near Bharuch yard
SFund 92806 88666
RRSK 25994 1593 100 500
EBR(Dep) 233200
135 Bharuch-Dahej - 4-lane road over bridge in lieu of level crossing
No50
SFund 1
RRSK 50899 1
EBR(Dep) 50900
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
A - Works in Progress
9110
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
136 Dharangaon-Thakherkhed - 2-lane road over bridge on level
crossing No144 on state highway No185
SFund 50170 45820
RRSK 8572 1979 1200 500
EBR(Dep) 102582
137 Ujjain-Bhopal - Road over bridge in lieu of level crossing No101B
near Shore
SFund 2500 -24
RRSK 41006 39894 94500 1000
EBR(Dep) 46195
138 Amalner-Marwad Nim Road - Road over bridge in lieu of level
crossing No135
SFund 50239 44239
RRSK 1597 28 1200 500
EBR(Dep) 95487
139 Palanpur-Khodiyar - Road under bridges in lieu of level crossings
on dedicated freight corridor route (42 Nos)
SFund 313449 250867
RRSK 308394 96112 30000 30000
140 Bajana-Jatpipli - Road over bridge in lieu of level crossing No 25 SFund 1000
RRSK 87051 1 20000
EBR(Dep) 203052
141 Udhna-Jalgaon - Road over bridge in lieu of level crossing No37 SFund 5000
RRSK 72704 5000
EBR(Dep) 232887
142 Bhavnagar Divsion - Limited height subways in lieu of level
crossings (33 Nos)
SFund 196681 203596
RRSK 63911 28554 10000 20000
143 Palanpur-Khodiyar - Road ovrer bridges in lieu of level crossing
Nos191A 199A amp 227 on dedicated freight corridor route
SFund 34780 40000
RRSK 514304 23900 30000 30000
EBR(Dep) 274542
144 Ratlam-Godhara - 2-lane road over bridge in lieu of level crossing
No61-A
SFund 2000
RRSK 66459 100 5000
EBR(Dep) 64858
145 Surat - Vadodara - Limited height subways in lieu of level crossing
Nos162 amp 168
SFund 17645 18414
RRSK 22527 6306 500
146 Virar - Surat - Subwaysroad under bridge at level crossing Nos
55x 58 142 amp LC-1 (Udhna-Niyol)
SFund 500
RRSK 61898 5000 5000
147 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos171-A 188-A amp 208-B
SFund 26085 20900
RRSK 548600 22800 30000 30000
EBR(Dep) 287342
148 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos208 211-C 214 amp 220
SFund 69560 120000
RRSK 695510 59400 50000 50000
EBR(Dep) 382535
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9111
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
149 Ahmedabad-Palanpur - Road over bridge in lieu of level crossing
Nos165 166 amp 169 and level crossing No17 of Ahmedabad -
Viramgam
SFund 26085
RRSK 679207 30000 30000
EBR(Dep) 352646
150 Virar - Surat - SubwaysRoad under bridges in lieu of level
crossings (34 Nos)
SFund 175900 175900
RRSK 578938 89650 90000 10000
151 Ahmedabad Division - Road under bridges in lieu of level crossings
(58 Nos)
SFund 265089 247530 42610
RRSK 545731 19586 3570 30000
152 Timba-Tuva - Road over bridges in lieu of level crossing No58 SFund 1500
RRSK 93474 100 500
EBR(Dep) 584974
153 Bhatiel-Petlad - Road over bridge in lieu of level crossing No28 SFund 1500
RRSK 174899 500 500
EBR(Dep) 271399
154 Kosad-Gothangam - Road over bridge in lieu of level crossing
No149
SFund 435
RRSK 154072 1 1
EBR(Dep) 154508
155 Sayan-Kim - Road over bridge in lieu of level crossing No156 SFund 4348
RRSK 168868 10000 30000
EBR(Dep) 173216
156 Kosamba-Hathuran - Road over bridge in lieu of level crossing
No163
SFund 4348
RRSK 138655 6800 20000
EBR(Dep) 143004
157 Virar-Surat - Road over bridge in lieu of level crossing Nos 92 94 amp
97 along dedicated freight corridor route
SFund 17390
RRSK 321310 10000 20000
EBR(Dep) 406369
158 Naikheri-Ujjain - Road over bridge in lieu of level crossing No25
and Chintamanganesh-Ujjain - level crossing No8 (metre gauge)
SFund 51115 50818
RRSK 55413 788 100 500
EBR(Dep) 183072
159 Sehore-Phanda - Road over bridge in lieu of level crossing No104 SFund 1000
RRSK 88484 100 5000
EBR(Dep) 89484
160 Naikheri-Ujjain - Road over bridge in lieu of level crossing No23 SFund 100
RRSK 77002 5000 46100
EBR(Dep) 137068
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9112
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
161 Ratlam-Khandwa - 2-lane road over bridge in lieu of level crossing
No250
SFund 2000 41 20000
RRSK 95436 20299 1203 500
EBR(Dep) 97436
162 Bairagarh-Bakaniabhori - Road over bridge in lieu of level crossing
No115
SFund 1000
RRSK 189403 1
EBR(Dep) 190403
163 Sehore-Phanda - Road over bridge in lieu of level crossing No107 SFund 500
RRSK 91224 100 5000
EBR(Dep) 91724
164 Bamania-Amargarh - Road over bridge in lieu of level crossing
No72
SFund 2000
RRSK 104079 100 100
EBR(Dep) 106079
165 Virar-Surat - Road over bridge in lieu of level crossing Nos109
111 114 115 amp 118 along dedicated freight corridor route
SFund 17390 1452
RRSK 368510 12500 30000
EBR(Dep) 460095
166 Gothangam-Sayan - Road over bridge in lieu of level crossing
No151
SFund 31997 29797
RRSK 14313 -78 100
EBR(Dep) 77827
167 Virar-Surat - Road over bridge in lieu of level crossing Nos60 64
66 68 69 71 74 75 77 81 amp 82 along dedicated freight corridor
route
SFund 10000 27000
RRSK 932200 15000 30000
EBR(Dep) 1540420
168 Virar-Surat - Road over bridge in lieu of level crosisng No61 along
dedicated freight corridor route
SFund 4348
RRSK 67642 5000 10000
EBR(Dep) 71993
169 Derol-Kharsaliya - Road over bridge in lieu of level crossing No32 SFund 1500
RRSK 93474 100 500
EBR(Dep) 399974
170 Gothangam-Sayan - Road over bridge in lieu of level crossing
No150
SFund 4348
RRSK 150714 10000 20000
EBR(Dep) 155063
171 Virar-Surat - Road over bridge in lieu of level crossing Nos57 amp
143 along dedicated freight corridor route
SFund 1
RRSK 170312 1
EBR(Dep) 170312
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9113
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
172 Virar-Surat - Road over bridge in lieu of level crossing Nos84 88 amp
90 along dedicated freight corridor route
SFund 10000
RRSK 362918 15000 20000
EBR(Dep) 529675
173 Kim-Kosamba - Road over bridge in lieu of level crossing No161 SFund 4348
RRSK 162307 10 10
EBR(Dep) 166655
174 Virar-Surat - Road over bridge in lieu of level crossing
Nos124126amp 127 along dedicated freight corridor route
SFund 10000 53500
RRSK 429771 10000 16990
EBR(Dep) 529173
175 Sayan-Kim - Road over bridge in lieu of level crossing No154 SFund 4000
RRSK 138094 10000 10000
EBR(Dep) 142094
176 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No165
SFund 4348
RRSK 207011 10 10
EBR(Dep) 211359
177 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No166
SFund 4348
RRSK 135056 10 10
EBR(Dep) 139404
178 Virar-Surat - Road over bridge in lieu of level crossing Nos42 46A
48 52 55 102 106 108 130 amp 137 along dedicated freight
corridor route
SFund 10000 72200
RRSK 929294 10000 10000
EBR(Dep) 1234542
179 Udhna - Jalgaon - Road over bridge in lieu of level crossing No51 SFund 5000
RRSK 75295 10000
EBR(Dep) 250296
180 Sadnapura - Bhalej - Road over bridge in lieu of level crossing No
11
SFund 1500
RRSK 93474 100 10
EBR(Dep) 249974
181 Sayan-Kim - Road over bridge in lieu of level crossing No153 SFund 4348
RRSK 134797 6900 20000
EBR(Dep) 139145
182 Derol - Kharsaliya - Road over bridge in lieu of level crossing No41 SFund 1500
RRSK 93474 500 500
EBR(Dep) 204974
183 Rajkot - Okha - Road over bridge in lieu of level crossing No197 SFund 100
RRSK 94049 19493 9868 1000
EBR(Dep) 94148
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9114
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
184 Rajkot Division - Limited height subways in lieu of level crossings
(36 Nos)
SFund 192337 145046
RRSK 68323 68445 65000 20000
185 Chanderiya-Ratlam - Limited height subways in lieu of level
crossings (No121 amp 183)
SFund 22614 22603
RRSK 2700 1 1
186 Dabhoi-Pratpnagar amp Dabhoi-Chhota Udepur - Limited height
subways (25 Nos)
SFund 203310 202077
RRSK 274218 44171 40000 1000
187 Surat-Vadodara-Godhra - Limited height subway at level crossings
(11 Nos)
SFund 133888 88592
RRSK 79889 40000 100
188 Ankleshwar-Rajpipla - Limited height subways road under bridges
in lieu of level crossings (36 Nos)
SFund 297860 248077 20000
RRSK 284870 80559 10919 20000
189 Ujjain-Bhopal - Limited height subways at level crossings (No88
89 amp 91)
SFund 54571 58450
RRSK 1000 11823 1 1
190 Udhna-Jalgaon - Limited height subways at level crossings (No38
108 127 128 145 146147 amp 134)
SFund 40087 87
RRSK 75049 230000 30000
191 Ahmedabad Division - Elimination of level crossings by road under
bridges (90 Nos)
SFund 11356 45
RRSK 1000 165047 20000
192 Ujjain-Bhopal - Limited height subway at level crossings (No43 44
amp 58)
SFund 67442 69163
RRSK 1900 259 1 1
193 Vadodara Division - Limited height subway in lieu of level crossings
(2 Nos on double line amp 19 Nos on single line)
SFund 69263 85693
RRSK 236140 1626 31000 200
194 Ratlam Division - Limited height subway in lieu of level crossings
(22 Nos)
SFund 272546 366104
RRSK 1000 36466 1000 1
195 Mehsana-Patan - Road over bridge in lieu of level crossing No40X SFund 53406 57194
RRSK 16245 1549 100 100
EBR(Dep) 287771
196 Gangadhara-Bardoli - Road over bridge in lieu of level crossing
No17A
SFund 32000 9390
RRSK 99253 18000 20000
EBR(Dep) 131253
197 Virpur-Jetalsar - Road over bridge in lieu of level crossing No61 SFund 5000
RRSK 187384 10000 20000
198 Jamnagar-Lakhabawal - Road over bridge in lieu of level crossing
No199
SFund 5000
RRSK 78380 2000 20000
EBR(Dep) 83380
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9115
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
199 Surat-Vadodara - Elimination of level crossing No173 by 4-lane
road over bridge
SFund 5000
RRSK 229396 102600 60000
EBR(Dep) 234397
200 Bhavnagar Division - Limited height subways to eliminate level
crossings (77 Nos)
SFund 87
RRSK 648618 100 100
201 Dewas-Barlai - 2 lane road over bridge in lieu of level crossing
No37
SFund 500
RRSK 36758 144 40000 22000
EBR(Dep) 206948
202 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 216 on DFC route
SFund 17390
RRSK 34932 41600 15000 15000
EBR(Dep) 104645
EBR(P) 52323
203 Surat-Vadodara- Road over bridge in lieu of level crossing No 228
on DFC route
SFund 4348
RRSK 59605 10 10
EBR(P) 127905
204 Jetalsar-Veraval Rajula-Mahuva amp Sihor -Palitana -subways in lieu
of level crossing- 18 Nos
SFund 86950 24787
RRSK 394341 75636 30000 50000
205 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 269
SFund 82792 78119
RRSK 23175 7126 50 500
EBR(P) 105968
206 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 177A on DFC route
SFund 4348
RRSK 48142 15000 15000
EBR(Dep) 104981
207 Surat-Vadodara- 4 Lane Road over bridge in lieu of level crossing
No 220
SFund 100
RRSK 173605 100 5000
EBR(P) 173706
208 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 276
SFund 82792 76527
RRSK 77592 8463 100 500
EBR(P) 160385
209 Dhasa-Jetalsar- subways in lieu of level crossing- 35 Nos RRSK 935106 100000 150000
210 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 179A on DFC route
SFund 4348
RRSK 126868 15000 15000
EBR(Dep) 131216
211 Rajkot-Jetalsar Jetalsar-Wansjaliya amp Kana- subways in lieu of
level crossing (19 Nos)
SFund 86950 50607
RRSK 420729 124972 30000 50000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9116
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
212 Ahmedabad - Viramgam- Road over bridge in lieu of level crossing
No 11A
SFund 500
RRSK 220476 75000 80000
EBR(Dep) 220977
213 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 259
SFund 5000 77
RRSK 168295 128 200 5000
EBR(P) 173296
214 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No37
SFund 500
RRSK 98088 100 80000
EBR(Dep) 98588
215 Charni Road-Grant Road- Regirdering of Road over bridge
between at km 39 - 10
SFund 1739
RRSK 71533 10000 40000
216 Elphinstone Road- Regirdering of Road over bridge at km 815-9 SFund 870
RRSK 105138 1 100
217 Virar-Vaiterna- 4 Lane Road over bridge in lieu of level crossing
No 41
SFund 500
RRSK 153899 1
EBR(Dep) 154399
218 Mumbai Central (South)- Regirdering of Road over bridge at Km
46-8
SFund 4348
RRSK 81412 10000 40000
219 Mahalaxmi- Regirdering of Road over bridge at km 526-27 SFund 4348
RRSK 214187 10000 70000
220 Surat-Vadodara- Road over bridge in lieu of level crossing No 198 SFund 100
RRSK 99900 200 4000
EBR(P) 100001
221 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 240
SFund 2000 316
RRSK 117126 13947 71400 10000
EBR(P) 119127
222 Ahmedabad-New Bhuj- Road over bridge in lieu of level crossing
No 3X
SFund 500
RRSK 175762 500 5000
EBR(Dep) 176262
223 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No 22A
RRSK 187005 23 50000 60000
EBR(Dep) 187006
224 Dadar- Regirdering of Road over bridge at Km 109-10 SFund 1739
RRSK 131731 1 100
225 Lowerparel-Elphinstone Road- Regirdering of Road over bridge at
km 712-13
SFund 1739
RRSK 186842 87000 80000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9117
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
226 Chanderiya-Ratlam - 2-lane road over bridge in lieu of level
crossing No141 near Piplia yard
SFund 1000
RRSK 89000 100 10000
EBR(P) 116700
227 Mandsour-Dalauda - 2-lane road over bridge in lieu of level
crossing No152
SFund 1000
RRSK 99000 5500 43600
EBR(P) 165000
228 Chanderia-Ratlam - 2-lane road over bridge at Chanderia in lieu of
level crossing No86
SFund 1500
RRSK 158500 100 5000
EBR(P) 160000
229 Mahesana-Patan- subways in lieu of level crossing No 27 32 56
amp 62 on Mahesana- Viramgam- level crossing No 4 11 18 19 amp
20 (9 Nos)
SFund 1 3530
RRSK 225598 23196 40000 30000
230 Mahesana-Viramgam- subways in lieu of level crossing No 6 7
14 23 amp 25 (5 Nos)
SFund 101 2015
RRSK 125934 4500 30000
231 Sabarmati-Botad- subways in lieu of level crossing- 23 Nos RRSK 613299 85000 150000
232 Viramgam- samakhiyali-subways in lieu of level crossing No 43
92 amp 108 (3 Nos)
SFund 100
RRSK 84683 1000
233 Udhna-Jalgaon- subways in lieu of level crossing No 87 122 123
133 141 150 amp 152 (7 Nos)
RRSK 218947 91408 100000 10000
234 Anand-Khambhat- subways in lieu of level crossing 10 Nos SFund 32995 60173
RRSK 96662 110623 8132 500
235 Chanderiya-Ratlam-subways in lieu of level crossing No 106 128
131 182 amp IND-Dewas-Ujjain level crossing No 26 (5 Nos)
SFund 26108 4281
RRSK 50310 29276 9571 100
236 Chanderia-Ratlam - 2-lane road under bridge at Nimbahera in lieu
of level crossing No103
SFund 87
RRSK 25313 1308 10000
EBR(P) 25400
237 Rajkot-Hapa- Road over bridge in lieu of level crossing No 145 at
Padadhari
RRSK 87610 1 100
EBR(Dep) 256608
238 Surat-Vadodara- Road over bridge in lieu of level crossing No158
(4-lane) between Sayan-Kim on DFC route
SFund 435
RRSK 120879 10 10
EBR(Dep) 363941
239 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 201 on DFC route
SFund 17390
RRSK 68351 56800 15000 15000
EBR(Dep) 257222
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
914
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
48 Lumpsum Provision For New Works EBR(IF) 10000
TOTAL-NEW WORKS EBR(IF) 10000
TOTAL-Doubling Cap 90000
Deposit 5901300
EBR(IF) 6221003
49 Navlakhi - Development of basic facilities for goods shed DF(3) 38686 16895 1 1000
50 Valsad - High level platform with addl loop Cap 104859 53434 6500 5000
RRSK 66495
51 Bhimasar - Addl loadingunloading line with rail level platform Cap 53547 21379 12291 5000
DF(3) 33517 11816
52 Ahmedabad-Viramgam - Intermediate block signalling (3 blocks) Cap 87695 56496 20 500
EBR 15000 15000
53 Kandla Port - Yard remodelling Cap 142496 73175 2400 500
DF(3) 53911 19529
54 Ratlam - Yard remodelling DF(3) 178295 47012
RRSK 120288 8154 26185 1000
55 Bisalwas Kalan Gamdhiri Road amp Ordi - Full length addl loop lines
with simultaneous reception facilities amp extension of running lines
Cap 102496 35111 9000 100
DF(3) 41292 25253
56 Duskheda Siding - Development of goods facilities DF(3) 74016 57087 3300 114
57 Gandhidham - Addl loop line at bypass line to Adipur DF(3) 40531 35889
RRSK 7737 5050 14774
58 Samakhiali-Gandhidham - Intermediate block stop signal DF(3) 160566 49260
RRSK 111554 500 1
59 Barayla Piplia amp Harkiakhal - Full length addl loop line amp extension
of running lines to standard clear standing room
Cap 145462 84225 9000 5000
DF(1) 56836 23065
60 Chandlodiya - Full length loop line amp rail level passenger platform
for 24 coaches
Cap 37179 21666 5600 8513
61 Sabarmati - 2nd coaching terminal Cap 283400 183446 3000 1000
DF(3) 41398
62 Binjana - Crossing station DF(3) 128529 77711
RRSK 32388 19011 5748 22938
63 Ahmedabad - Exten of pit lines (4 Nos) amp stabling line (3 Nos)
towards Maninagar for 24 coaches
DF(3) 40719
RRSK 40069 3772 6375 49105
DOUBLING
B - New Works
TRAFFIC FACILITIES-YARD REMODELLING amp OTHERS
A - Works in Progress
915
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
64 Boradi-Dahod - Repl of Dhamarada station by intermediate block
signaling
Cap 26557 20000 1
65 Tarana Road-Tajpur - Providing intermediate block signaling RRSK 36204 9633 10910
66 Vadodara Yard - Segregation of Ahmedabad and Godhra Cap 266139 3066 57364 20000
67 Vasai Road - Provision of a new crossover amp shifting of signals RRSK 33470 2310 35144
68 Sabarmati - Left over facilities for operationalisation of coaching
terminal
Cap 311538 50203 80000
69 Gandhidham - CC surfaced platform between goods shed line No3
amp 4
Cap 48808 32000 10000
70 Raising of speed to 160 kmph200 kmph on existing New Delhi-
Mumbai route (incl Vadodara-Ahmedabad) - A mission to achieve
a travel time of 12 hours between Delhi iquestiquestiquest Mumbai
Cap 11188900 10 100
EBR(IF) 100700100 5000000
71 Andheri-Virar - Extension of suburban platforms for running15-car
services on slow corridor
RRSK 595600 1 120000
72 Western Railway - New works for development of 2nd terminal
removal of diamond crossing amp provision of cross overs
Cap 450000 100
RRSK 50000 1000
73 Estimated investment through EBR(Partnership) for private freight
terminals
EBR(P) 858711 1560000 858711
74 Works costing below Rs25 crore each Cap 100000
DRF 171
DF(3) 10000
RRSK 77766
TOTAL-WORKS IN PROGRESS Cap 235814
DRF 171
DF(3) 11114
RRSK 332638
EBR(IF) 5000000
EBR(P) 858711
75 Lumpsum Provision For New Works Cap 500
TOTAL-NEW WORKS Cap 500
TOTAL-Traffic Facilities-Yard Remodelling amp Others Cap 236314
DRF 171
DF(3) 11114
RRSK 332638
EBR(IF) 5000000
EBR(P) 858711
B - New Works
TRAFFIC FACILITIES-YARD REMODELLING amp OTHERS
916
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
76 Western Railway - Extension of RDBMS (Phase-II) DF(3) 25588 16702 1000 1000
77 Western Railway - Automatic ticket vending machines (pilot project) Cap 88930 81047 1 1
78 Western Railway - Extension of unreserved ticketing system to E-
category stations
DF(1) 348701 238185 1000 1000
79 Western Railway - Extension of automatic ticket vending machines Cap 314899 90611 32000 100
80 Western Railway - Repl of unreserved ticketing system equipment DRF 45400 41347 1186 1
81 Western Railway - Repl of 1675 thin clients for unreserved ticketing
system
DRF 55200 47061 10 10
82 Western Railway - Repl of datacom equipment of unreserved
ticketing system
DRF 35600 12500 500 10
83 Replacement of 377 ATVMs (PB2292018-19NR) DRF 67033 16493 1
84 Works costing below Rs25 crore each DRF 24950
DF(1) 3602
TOTAL-WORKS IN PROGRESS Cap 101
DRF 24972
DF(1) 4602
DF(3) 1000
85 Lumpsum Provision For New Works Cap 100
DRF 10000
DF(1) 600
DF(3) 100
TOTAL-NEW WORKS Cap 100
DRF 10000
DF(1) 600
DF(3) 100
TOTAL-Computerisation Cap 201
DRF 34972
DF(1) 5202
DF(3) 1100
86 Leased Assets - Payment of Capital component of lease charges to
Indian Railway Finance Corporation
Cap 5667326 8838029 6651500 5667326
CFund 2249674 2303171 2249674
TOTAL-WORKS IN PROGRESS Cap 5667326
CFund 2249674
TOTAL-Leased Assets - Payment of Capital Component Cap 5667326
CFund 2249674
COMPUTERISATION
A - Works in Progress
A - Works in Progress
B - New Works
LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT
917
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
87 Nadiad-Modasa Anand-Khambhat amp Vasad-Kathana - Elimination
of various level crossings
RRSK 28928 500 1000
88 Vadodara Division - Manning of level crossings (15 Nos) RRSK 32650 500 1000
89 Ahmedabad Division - Manning of level crossings (26 Nos) RRSK 97716 14823 19703
90 Udhna-Jalgaon - Manning of unmanned level crossing of level
crossings (5 Nos)
RRSK 30296 4000 18038
91 Vadodara Division - Toilet block with dugwell arrangements on
manned level crossing (227 Nos)
RRSK 31607 500 2000
92 Bhavnagar Division - Toilet facilities at manned level crossings
(345 nos)
RRSK 107276 2000 40000
93 Udhna-Jalgaon - Toilets facilities at manned level crossings RRSK 64061 4000 5000
94 Ahmedabad Division - Basic facilities (toilet amp others) at various
manned level crossings
RRSK 56061 2000 13061
95 Vaitarna-Umbergaon - Provision of height gauges amp fencing at level
crossings
RRSK 27823 2000 13845
96 Ahmedabad Division - Interlocking of level crossings (6 Nos) RRSK 33706 18245 20000
97 Bhavnagar Division - Interlocking of level crossings (4 Nos) RRSK 29391 4000
98 Ratlam Division - Removing deficiencies from various manned level
crossings
RRSK 120396 16778 25000
99 Ahmedabad Division - Interlocking (14 level crossing gates) SFund 67385 54317
RRSK 9664 1705 1
100 Vadodara Divisions - Upgradation amp re-classification of level
crossings from A-class to spl-class (13 Nos)
SFund 55279 39072
RRSK 5384 4944 2000
101 Ahmedabad Division - Data loggers (remote terminal units) (77
level crossing gates)
SFund 26337 20207
RRSK 5557 1057 1
102 Ahmedabad Division - Solar power system (77 level crossing gates) SFund 82816 49327
RRSK 31071 1443 1444 1
103 Vadodara Division - Duty bunks on level crossings (100 Nos) SFund 34979 22131
RRSK 14192 6830 1875 3819
104 Vadodara Division - Interlocking of level crossing gates (tvu more
than 20000) (8 Nos) amp long block section (3 Nos)
SFund 44223 22240
RRSK 21864 1265 2000
105 Bhavnagar Division- Manning of unmanned level crossings (26 Nos) SFund 83827 376
RRSK 68827 2759 15000 25000
106 Vadodara Division- Manning of unmanned level crossings (35 Nos) SFund 105609 17632
RRSK 85609 17587 5971 2000
107 Ahmedabad Division - Upgradation and reclassification of level
crossings (15 Nos)
SFund 37939 261
RRSK 36939 1659 5725 26404
ROAD SAFETY WORKS-LEVEL CROSSINGS
A - Works in Progress
918
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
108 Vadodara Division - Interlocking of level crossings having ATVU
more than 20000
SFund 50441 13680
RRSK 29049 10000 4000
109 Rajkot Division- Manning of unmanned level crossings (69 Nos) SFund 352803
RRSK 352303 14601 60000 30000
110 Porbandar-Kanalus - Repl of lower quadrant mechanical signaling
system at level crossing gates amp repl of mechanical lifting barriers
with electrical barriers
SFund 73182 13504
RRSK 53182 18417 12500 20000
111 Western Railway - Electrical lifting barriers (33 level crossing
gates) relay termination material wiring material power cable etc
for electrical lifting barriers
SFund 30290 1043
RRSK 29190 9145 13026 4000
112 Ratlam Division- Manning of unmanned level crossings (33 Nos) SFund 99157 5923
RRSK 78463 24262 15000 30000
113 Ahmedabad - Interlocking of level crossing gates (8 Nos) SFund 47324
RRSK 47224 100 100
114 Vadodara - Interlocking of level crossing gates SFund 89993 423
RRSK 88993 17482 5000
115 Ratlam - Manning of unmanned level crossings (20 Nos) SFund 33132
RRSK 89817 8271 2000 10000
116 Vadodara - Manning of unmanned level crossings (66 Nos) SFund 200962
RRSK 198462 25401 40453 5000
117 Bhavnagar - Manning of unmanned level crossing (83 Nos) SFund 309164
RRSK 309064 62540 237609 40000
118 Viramgam - Okha - Manning of unmanned level crossings (82 Nos) SFund 250100
RRSK 250000 35000 40000
119 Ahmedabad - Manning of unmanned level crossings (80 Nos) SFund 244000 6132
RRSK 241000 41384 62413 34978
120 Manning of unmanned level crossings between Radhanpur-
Gandhidham section (43 Nos) (KRCL)
RRSK 161606 15367 1000
121 Manning of unmanned level crossing between Radhanpur-Palanpur
section (46 nos) KRCL
RRSK 172881 7539 1000
122 Works costing below Rs25 crore each RRSK 150000
TOTAL-WORKS IN PROGRESS RRSK 598951
123 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Road Safety Works-Level Crossings RRSK 648951
ROAD SAFETY WORKS-LEVEL CROSSINGS
B - New Works
919
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
124 Bhandu Moti Dab-Mahesana - Road over bridge in lieu of level
crossing No 211
SFund 79627 79577
RRSK 68683 -5545 1 1
EBR(Dep) 76908
125 Meghnagar - Road over bridge in lieu of level crossing No60-B SFund 2000
RRSK 34653 5000 33400
EBR(Dep) 31876
126 Maroli-Sachin - Road over bridge in lieu of level crossing No133 SFund 4000
RRSK 22546 1000 50000
127 Virar-Surat - Road over bridge in lieu of level crossing No138 near
Sachin (4-lane)
SFund 54643 82256
RRSK 1000 25797 3300 1000
EBR(Dep) 55643
128 Viramgam-Jhund - Road over bridge in lieu of level crossing No42
(2-lane)
SFund 63739 67339
RRSK 1000 4008 4000 1
EBR(Dep) 110479
129 Surat-Vadodara - Road over bridge in lieu of level crossing No213
near Miyagam Karjan
SFund 53983 45913
RRSK 2881 503 2248 1000
EBR(Dep) 52400
130 Kim-Kosamba - Road over bridge in lieu of level crossing No160 (2-
lane)
SFund 72068 80284
RRSK 1000 1 100
EBR(Dep) 73068
131 Pratapnagar-Vishwamitri - Road over bridge in lieu of level crossing
No 2
SFund 48817 47817
RRSK 6135 1 1
EBR(Dep) 51100
132 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No2-A
SFund 1
RRSK 35999 100 1000
EBR(Dep) 36000
133 Bharuch-Dahej - 2- lane road over bridge in lieu of level crossing
No22 near Samni station
SFund 46790 57359
RRSK 1000 38 1 1
EBR(Dep) 57737
134 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No178 near Bharuch yard
SFund 92806 88666
RRSK 25994 1593 100 500
EBR(Dep) 233200
135 Bharuch-Dahej - 4-lane road over bridge in lieu of level crossing
No50
SFund 1
RRSK 50899 1
EBR(Dep) 50900
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
A - Works in Progress
9110
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
136 Dharangaon-Thakherkhed - 2-lane road over bridge on level
crossing No144 on state highway No185
SFund 50170 45820
RRSK 8572 1979 1200 500
EBR(Dep) 102582
137 Ujjain-Bhopal - Road over bridge in lieu of level crossing No101B
near Shore
SFund 2500 -24
RRSK 41006 39894 94500 1000
EBR(Dep) 46195
138 Amalner-Marwad Nim Road - Road over bridge in lieu of level
crossing No135
SFund 50239 44239
RRSK 1597 28 1200 500
EBR(Dep) 95487
139 Palanpur-Khodiyar - Road under bridges in lieu of level crossings
on dedicated freight corridor route (42 Nos)
SFund 313449 250867
RRSK 308394 96112 30000 30000
140 Bajana-Jatpipli - Road over bridge in lieu of level crossing No 25 SFund 1000
RRSK 87051 1 20000
EBR(Dep) 203052
141 Udhna-Jalgaon - Road over bridge in lieu of level crossing No37 SFund 5000
RRSK 72704 5000
EBR(Dep) 232887
142 Bhavnagar Divsion - Limited height subways in lieu of level
crossings (33 Nos)
SFund 196681 203596
RRSK 63911 28554 10000 20000
143 Palanpur-Khodiyar - Road ovrer bridges in lieu of level crossing
Nos191A 199A amp 227 on dedicated freight corridor route
SFund 34780 40000
RRSK 514304 23900 30000 30000
EBR(Dep) 274542
144 Ratlam-Godhara - 2-lane road over bridge in lieu of level crossing
No61-A
SFund 2000
RRSK 66459 100 5000
EBR(Dep) 64858
145 Surat - Vadodara - Limited height subways in lieu of level crossing
Nos162 amp 168
SFund 17645 18414
RRSK 22527 6306 500
146 Virar - Surat - Subwaysroad under bridge at level crossing Nos
55x 58 142 amp LC-1 (Udhna-Niyol)
SFund 500
RRSK 61898 5000 5000
147 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos171-A 188-A amp 208-B
SFund 26085 20900
RRSK 548600 22800 30000 30000
EBR(Dep) 287342
148 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos208 211-C 214 amp 220
SFund 69560 120000
RRSK 695510 59400 50000 50000
EBR(Dep) 382535
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9111
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
149 Ahmedabad-Palanpur - Road over bridge in lieu of level crossing
Nos165 166 amp 169 and level crossing No17 of Ahmedabad -
Viramgam
SFund 26085
RRSK 679207 30000 30000
EBR(Dep) 352646
150 Virar - Surat - SubwaysRoad under bridges in lieu of level
crossings (34 Nos)
SFund 175900 175900
RRSK 578938 89650 90000 10000
151 Ahmedabad Division - Road under bridges in lieu of level crossings
(58 Nos)
SFund 265089 247530 42610
RRSK 545731 19586 3570 30000
152 Timba-Tuva - Road over bridges in lieu of level crossing No58 SFund 1500
RRSK 93474 100 500
EBR(Dep) 584974
153 Bhatiel-Petlad - Road over bridge in lieu of level crossing No28 SFund 1500
RRSK 174899 500 500
EBR(Dep) 271399
154 Kosad-Gothangam - Road over bridge in lieu of level crossing
No149
SFund 435
RRSK 154072 1 1
EBR(Dep) 154508
155 Sayan-Kim - Road over bridge in lieu of level crossing No156 SFund 4348
RRSK 168868 10000 30000
EBR(Dep) 173216
156 Kosamba-Hathuran - Road over bridge in lieu of level crossing
No163
SFund 4348
RRSK 138655 6800 20000
EBR(Dep) 143004
157 Virar-Surat - Road over bridge in lieu of level crossing Nos 92 94 amp
97 along dedicated freight corridor route
SFund 17390
RRSK 321310 10000 20000
EBR(Dep) 406369
158 Naikheri-Ujjain - Road over bridge in lieu of level crossing No25
and Chintamanganesh-Ujjain - level crossing No8 (metre gauge)
SFund 51115 50818
RRSK 55413 788 100 500
EBR(Dep) 183072
159 Sehore-Phanda - Road over bridge in lieu of level crossing No104 SFund 1000
RRSK 88484 100 5000
EBR(Dep) 89484
160 Naikheri-Ujjain - Road over bridge in lieu of level crossing No23 SFund 100
RRSK 77002 5000 46100
EBR(Dep) 137068
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9112
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
161 Ratlam-Khandwa - 2-lane road over bridge in lieu of level crossing
No250
SFund 2000 41 20000
RRSK 95436 20299 1203 500
EBR(Dep) 97436
162 Bairagarh-Bakaniabhori - Road over bridge in lieu of level crossing
No115
SFund 1000
RRSK 189403 1
EBR(Dep) 190403
163 Sehore-Phanda - Road over bridge in lieu of level crossing No107 SFund 500
RRSK 91224 100 5000
EBR(Dep) 91724
164 Bamania-Amargarh - Road over bridge in lieu of level crossing
No72
SFund 2000
RRSK 104079 100 100
EBR(Dep) 106079
165 Virar-Surat - Road over bridge in lieu of level crossing Nos109
111 114 115 amp 118 along dedicated freight corridor route
SFund 17390 1452
RRSK 368510 12500 30000
EBR(Dep) 460095
166 Gothangam-Sayan - Road over bridge in lieu of level crossing
No151
SFund 31997 29797
RRSK 14313 -78 100
EBR(Dep) 77827
167 Virar-Surat - Road over bridge in lieu of level crossing Nos60 64
66 68 69 71 74 75 77 81 amp 82 along dedicated freight corridor
route
SFund 10000 27000
RRSK 932200 15000 30000
EBR(Dep) 1540420
168 Virar-Surat - Road over bridge in lieu of level crosisng No61 along
dedicated freight corridor route
SFund 4348
RRSK 67642 5000 10000
EBR(Dep) 71993
169 Derol-Kharsaliya - Road over bridge in lieu of level crossing No32 SFund 1500
RRSK 93474 100 500
EBR(Dep) 399974
170 Gothangam-Sayan - Road over bridge in lieu of level crossing
No150
SFund 4348
RRSK 150714 10000 20000
EBR(Dep) 155063
171 Virar-Surat - Road over bridge in lieu of level crossing Nos57 amp
143 along dedicated freight corridor route
SFund 1
RRSK 170312 1
EBR(Dep) 170312
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9113
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
172 Virar-Surat - Road over bridge in lieu of level crossing Nos84 88 amp
90 along dedicated freight corridor route
SFund 10000
RRSK 362918 15000 20000
EBR(Dep) 529675
173 Kim-Kosamba - Road over bridge in lieu of level crossing No161 SFund 4348
RRSK 162307 10 10
EBR(Dep) 166655
174 Virar-Surat - Road over bridge in lieu of level crossing
Nos124126amp 127 along dedicated freight corridor route
SFund 10000 53500
RRSK 429771 10000 16990
EBR(Dep) 529173
175 Sayan-Kim - Road over bridge in lieu of level crossing No154 SFund 4000
RRSK 138094 10000 10000
EBR(Dep) 142094
176 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No165
SFund 4348
RRSK 207011 10 10
EBR(Dep) 211359
177 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No166
SFund 4348
RRSK 135056 10 10
EBR(Dep) 139404
178 Virar-Surat - Road over bridge in lieu of level crossing Nos42 46A
48 52 55 102 106 108 130 amp 137 along dedicated freight
corridor route
SFund 10000 72200
RRSK 929294 10000 10000
EBR(Dep) 1234542
179 Udhna - Jalgaon - Road over bridge in lieu of level crossing No51 SFund 5000
RRSK 75295 10000
EBR(Dep) 250296
180 Sadnapura - Bhalej - Road over bridge in lieu of level crossing No
11
SFund 1500
RRSK 93474 100 10
EBR(Dep) 249974
181 Sayan-Kim - Road over bridge in lieu of level crossing No153 SFund 4348
RRSK 134797 6900 20000
EBR(Dep) 139145
182 Derol - Kharsaliya - Road over bridge in lieu of level crossing No41 SFund 1500
RRSK 93474 500 500
EBR(Dep) 204974
183 Rajkot - Okha - Road over bridge in lieu of level crossing No197 SFund 100
RRSK 94049 19493 9868 1000
EBR(Dep) 94148
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9114
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
184 Rajkot Division - Limited height subways in lieu of level crossings
(36 Nos)
SFund 192337 145046
RRSK 68323 68445 65000 20000
185 Chanderiya-Ratlam - Limited height subways in lieu of level
crossings (No121 amp 183)
SFund 22614 22603
RRSK 2700 1 1
186 Dabhoi-Pratpnagar amp Dabhoi-Chhota Udepur - Limited height
subways (25 Nos)
SFund 203310 202077
RRSK 274218 44171 40000 1000
187 Surat-Vadodara-Godhra - Limited height subway at level crossings
(11 Nos)
SFund 133888 88592
RRSK 79889 40000 100
188 Ankleshwar-Rajpipla - Limited height subways road under bridges
in lieu of level crossings (36 Nos)
SFund 297860 248077 20000
RRSK 284870 80559 10919 20000
189 Ujjain-Bhopal - Limited height subways at level crossings (No88
89 amp 91)
SFund 54571 58450
RRSK 1000 11823 1 1
190 Udhna-Jalgaon - Limited height subways at level crossings (No38
108 127 128 145 146147 amp 134)
SFund 40087 87
RRSK 75049 230000 30000
191 Ahmedabad Division - Elimination of level crossings by road under
bridges (90 Nos)
SFund 11356 45
RRSK 1000 165047 20000
192 Ujjain-Bhopal - Limited height subway at level crossings (No43 44
amp 58)
SFund 67442 69163
RRSK 1900 259 1 1
193 Vadodara Division - Limited height subway in lieu of level crossings
(2 Nos on double line amp 19 Nos on single line)
SFund 69263 85693
RRSK 236140 1626 31000 200
194 Ratlam Division - Limited height subway in lieu of level crossings
(22 Nos)
SFund 272546 366104
RRSK 1000 36466 1000 1
195 Mehsana-Patan - Road over bridge in lieu of level crossing No40X SFund 53406 57194
RRSK 16245 1549 100 100
EBR(Dep) 287771
196 Gangadhara-Bardoli - Road over bridge in lieu of level crossing
No17A
SFund 32000 9390
RRSK 99253 18000 20000
EBR(Dep) 131253
197 Virpur-Jetalsar - Road over bridge in lieu of level crossing No61 SFund 5000
RRSK 187384 10000 20000
198 Jamnagar-Lakhabawal - Road over bridge in lieu of level crossing
No199
SFund 5000
RRSK 78380 2000 20000
EBR(Dep) 83380
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9115
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
199 Surat-Vadodara - Elimination of level crossing No173 by 4-lane
road over bridge
SFund 5000
RRSK 229396 102600 60000
EBR(Dep) 234397
200 Bhavnagar Division - Limited height subways to eliminate level
crossings (77 Nos)
SFund 87
RRSK 648618 100 100
201 Dewas-Barlai - 2 lane road over bridge in lieu of level crossing
No37
SFund 500
RRSK 36758 144 40000 22000
EBR(Dep) 206948
202 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 216 on DFC route
SFund 17390
RRSK 34932 41600 15000 15000
EBR(Dep) 104645
EBR(P) 52323
203 Surat-Vadodara- Road over bridge in lieu of level crossing No 228
on DFC route
SFund 4348
RRSK 59605 10 10
EBR(P) 127905
204 Jetalsar-Veraval Rajula-Mahuva amp Sihor -Palitana -subways in lieu
of level crossing- 18 Nos
SFund 86950 24787
RRSK 394341 75636 30000 50000
205 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 269
SFund 82792 78119
RRSK 23175 7126 50 500
EBR(P) 105968
206 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 177A on DFC route
SFund 4348
RRSK 48142 15000 15000
EBR(Dep) 104981
207 Surat-Vadodara- 4 Lane Road over bridge in lieu of level crossing
No 220
SFund 100
RRSK 173605 100 5000
EBR(P) 173706
208 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 276
SFund 82792 76527
RRSK 77592 8463 100 500
EBR(P) 160385
209 Dhasa-Jetalsar- subways in lieu of level crossing- 35 Nos RRSK 935106 100000 150000
210 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 179A on DFC route
SFund 4348
RRSK 126868 15000 15000
EBR(Dep) 131216
211 Rajkot-Jetalsar Jetalsar-Wansjaliya amp Kana- subways in lieu of
level crossing (19 Nos)
SFund 86950 50607
RRSK 420729 124972 30000 50000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9116
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
212 Ahmedabad - Viramgam- Road over bridge in lieu of level crossing
No 11A
SFund 500
RRSK 220476 75000 80000
EBR(Dep) 220977
213 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 259
SFund 5000 77
RRSK 168295 128 200 5000
EBR(P) 173296
214 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No37
SFund 500
RRSK 98088 100 80000
EBR(Dep) 98588
215 Charni Road-Grant Road- Regirdering of Road over bridge
between at km 39 - 10
SFund 1739
RRSK 71533 10000 40000
216 Elphinstone Road- Regirdering of Road over bridge at km 815-9 SFund 870
RRSK 105138 1 100
217 Virar-Vaiterna- 4 Lane Road over bridge in lieu of level crossing
No 41
SFund 500
RRSK 153899 1
EBR(Dep) 154399
218 Mumbai Central (South)- Regirdering of Road over bridge at Km
46-8
SFund 4348
RRSK 81412 10000 40000
219 Mahalaxmi- Regirdering of Road over bridge at km 526-27 SFund 4348
RRSK 214187 10000 70000
220 Surat-Vadodara- Road over bridge in lieu of level crossing No 198 SFund 100
RRSK 99900 200 4000
EBR(P) 100001
221 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 240
SFund 2000 316
RRSK 117126 13947 71400 10000
EBR(P) 119127
222 Ahmedabad-New Bhuj- Road over bridge in lieu of level crossing
No 3X
SFund 500
RRSK 175762 500 5000
EBR(Dep) 176262
223 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No 22A
RRSK 187005 23 50000 60000
EBR(Dep) 187006
224 Dadar- Regirdering of Road over bridge at Km 109-10 SFund 1739
RRSK 131731 1 100
225 Lowerparel-Elphinstone Road- Regirdering of Road over bridge at
km 712-13
SFund 1739
RRSK 186842 87000 80000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9117
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
226 Chanderiya-Ratlam - 2-lane road over bridge in lieu of level
crossing No141 near Piplia yard
SFund 1000
RRSK 89000 100 10000
EBR(P) 116700
227 Mandsour-Dalauda - 2-lane road over bridge in lieu of level
crossing No152
SFund 1000
RRSK 99000 5500 43600
EBR(P) 165000
228 Chanderia-Ratlam - 2-lane road over bridge at Chanderia in lieu of
level crossing No86
SFund 1500
RRSK 158500 100 5000
EBR(P) 160000
229 Mahesana-Patan- subways in lieu of level crossing No 27 32 56
amp 62 on Mahesana- Viramgam- level crossing No 4 11 18 19 amp
20 (9 Nos)
SFund 1 3530
RRSK 225598 23196 40000 30000
230 Mahesana-Viramgam- subways in lieu of level crossing No 6 7
14 23 amp 25 (5 Nos)
SFund 101 2015
RRSK 125934 4500 30000
231 Sabarmati-Botad- subways in lieu of level crossing- 23 Nos RRSK 613299 85000 150000
232 Viramgam- samakhiyali-subways in lieu of level crossing No 43
92 amp 108 (3 Nos)
SFund 100
RRSK 84683 1000
233 Udhna-Jalgaon- subways in lieu of level crossing No 87 122 123
133 141 150 amp 152 (7 Nos)
RRSK 218947 91408 100000 10000
234 Anand-Khambhat- subways in lieu of level crossing 10 Nos SFund 32995 60173
RRSK 96662 110623 8132 500
235 Chanderiya-Ratlam-subways in lieu of level crossing No 106 128
131 182 amp IND-Dewas-Ujjain level crossing No 26 (5 Nos)
SFund 26108 4281
RRSK 50310 29276 9571 100
236 Chanderia-Ratlam - 2-lane road under bridge at Nimbahera in lieu
of level crossing No103
SFund 87
RRSK 25313 1308 10000
EBR(P) 25400
237 Rajkot-Hapa- Road over bridge in lieu of level crossing No 145 at
Padadhari
RRSK 87610 1 100
EBR(Dep) 256608
238 Surat-Vadodara- Road over bridge in lieu of level crossing No158
(4-lane) between Sayan-Kim on DFC route
SFund 435
RRSK 120879 10 10
EBR(Dep) 363941
239 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 201 on DFC route
SFund 17390
RRSK 68351 56800 15000 15000
EBR(Dep) 257222
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
915
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
64 Boradi-Dahod - Repl of Dhamarada station by intermediate block
signaling
Cap 26557 20000 1
65 Tarana Road-Tajpur - Providing intermediate block signaling RRSK 36204 9633 10910
66 Vadodara Yard - Segregation of Ahmedabad and Godhra Cap 266139 3066 57364 20000
67 Vasai Road - Provision of a new crossover amp shifting of signals RRSK 33470 2310 35144
68 Sabarmati - Left over facilities for operationalisation of coaching
terminal
Cap 311538 50203 80000
69 Gandhidham - CC surfaced platform between goods shed line No3
amp 4
Cap 48808 32000 10000
70 Raising of speed to 160 kmph200 kmph on existing New Delhi-
Mumbai route (incl Vadodara-Ahmedabad) - A mission to achieve
a travel time of 12 hours between Delhi iquestiquestiquest Mumbai
Cap 11188900 10 100
EBR(IF) 100700100 5000000
71 Andheri-Virar - Extension of suburban platforms for running15-car
services on slow corridor
RRSK 595600 1 120000
72 Western Railway - New works for development of 2nd terminal
removal of diamond crossing amp provision of cross overs
Cap 450000 100
RRSK 50000 1000
73 Estimated investment through EBR(Partnership) for private freight
terminals
EBR(P) 858711 1560000 858711
74 Works costing below Rs25 crore each Cap 100000
DRF 171
DF(3) 10000
RRSK 77766
TOTAL-WORKS IN PROGRESS Cap 235814
DRF 171
DF(3) 11114
RRSK 332638
EBR(IF) 5000000
EBR(P) 858711
75 Lumpsum Provision For New Works Cap 500
TOTAL-NEW WORKS Cap 500
TOTAL-Traffic Facilities-Yard Remodelling amp Others Cap 236314
DRF 171
DF(3) 11114
RRSK 332638
EBR(IF) 5000000
EBR(P) 858711
B - New Works
TRAFFIC FACILITIES-YARD REMODELLING amp OTHERS
916
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
76 Western Railway - Extension of RDBMS (Phase-II) DF(3) 25588 16702 1000 1000
77 Western Railway - Automatic ticket vending machines (pilot project) Cap 88930 81047 1 1
78 Western Railway - Extension of unreserved ticketing system to E-
category stations
DF(1) 348701 238185 1000 1000
79 Western Railway - Extension of automatic ticket vending machines Cap 314899 90611 32000 100
80 Western Railway - Repl of unreserved ticketing system equipment DRF 45400 41347 1186 1
81 Western Railway - Repl of 1675 thin clients for unreserved ticketing
system
DRF 55200 47061 10 10
82 Western Railway - Repl of datacom equipment of unreserved
ticketing system
DRF 35600 12500 500 10
83 Replacement of 377 ATVMs (PB2292018-19NR) DRF 67033 16493 1
84 Works costing below Rs25 crore each DRF 24950
DF(1) 3602
TOTAL-WORKS IN PROGRESS Cap 101
DRF 24972
DF(1) 4602
DF(3) 1000
85 Lumpsum Provision For New Works Cap 100
DRF 10000
DF(1) 600
DF(3) 100
TOTAL-NEW WORKS Cap 100
DRF 10000
DF(1) 600
DF(3) 100
TOTAL-Computerisation Cap 201
DRF 34972
DF(1) 5202
DF(3) 1100
86 Leased Assets - Payment of Capital component of lease charges to
Indian Railway Finance Corporation
Cap 5667326 8838029 6651500 5667326
CFund 2249674 2303171 2249674
TOTAL-WORKS IN PROGRESS Cap 5667326
CFund 2249674
TOTAL-Leased Assets - Payment of Capital Component Cap 5667326
CFund 2249674
COMPUTERISATION
A - Works in Progress
A - Works in Progress
B - New Works
LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT
917
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
87 Nadiad-Modasa Anand-Khambhat amp Vasad-Kathana - Elimination
of various level crossings
RRSK 28928 500 1000
88 Vadodara Division - Manning of level crossings (15 Nos) RRSK 32650 500 1000
89 Ahmedabad Division - Manning of level crossings (26 Nos) RRSK 97716 14823 19703
90 Udhna-Jalgaon - Manning of unmanned level crossing of level
crossings (5 Nos)
RRSK 30296 4000 18038
91 Vadodara Division - Toilet block with dugwell arrangements on
manned level crossing (227 Nos)
RRSK 31607 500 2000
92 Bhavnagar Division - Toilet facilities at manned level crossings
(345 nos)
RRSK 107276 2000 40000
93 Udhna-Jalgaon - Toilets facilities at manned level crossings RRSK 64061 4000 5000
94 Ahmedabad Division - Basic facilities (toilet amp others) at various
manned level crossings
RRSK 56061 2000 13061
95 Vaitarna-Umbergaon - Provision of height gauges amp fencing at level
crossings
RRSK 27823 2000 13845
96 Ahmedabad Division - Interlocking of level crossings (6 Nos) RRSK 33706 18245 20000
97 Bhavnagar Division - Interlocking of level crossings (4 Nos) RRSK 29391 4000
98 Ratlam Division - Removing deficiencies from various manned level
crossings
RRSK 120396 16778 25000
99 Ahmedabad Division - Interlocking (14 level crossing gates) SFund 67385 54317
RRSK 9664 1705 1
100 Vadodara Divisions - Upgradation amp re-classification of level
crossings from A-class to spl-class (13 Nos)
SFund 55279 39072
RRSK 5384 4944 2000
101 Ahmedabad Division - Data loggers (remote terminal units) (77
level crossing gates)
SFund 26337 20207
RRSK 5557 1057 1
102 Ahmedabad Division - Solar power system (77 level crossing gates) SFund 82816 49327
RRSK 31071 1443 1444 1
103 Vadodara Division - Duty bunks on level crossings (100 Nos) SFund 34979 22131
RRSK 14192 6830 1875 3819
104 Vadodara Division - Interlocking of level crossing gates (tvu more
than 20000) (8 Nos) amp long block section (3 Nos)
SFund 44223 22240
RRSK 21864 1265 2000
105 Bhavnagar Division- Manning of unmanned level crossings (26 Nos) SFund 83827 376
RRSK 68827 2759 15000 25000
106 Vadodara Division- Manning of unmanned level crossings (35 Nos) SFund 105609 17632
RRSK 85609 17587 5971 2000
107 Ahmedabad Division - Upgradation and reclassification of level
crossings (15 Nos)
SFund 37939 261
RRSK 36939 1659 5725 26404
ROAD SAFETY WORKS-LEVEL CROSSINGS
A - Works in Progress
918
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
108 Vadodara Division - Interlocking of level crossings having ATVU
more than 20000
SFund 50441 13680
RRSK 29049 10000 4000
109 Rajkot Division- Manning of unmanned level crossings (69 Nos) SFund 352803
RRSK 352303 14601 60000 30000
110 Porbandar-Kanalus - Repl of lower quadrant mechanical signaling
system at level crossing gates amp repl of mechanical lifting barriers
with electrical barriers
SFund 73182 13504
RRSK 53182 18417 12500 20000
111 Western Railway - Electrical lifting barriers (33 level crossing
gates) relay termination material wiring material power cable etc
for electrical lifting barriers
SFund 30290 1043
RRSK 29190 9145 13026 4000
112 Ratlam Division- Manning of unmanned level crossings (33 Nos) SFund 99157 5923
RRSK 78463 24262 15000 30000
113 Ahmedabad - Interlocking of level crossing gates (8 Nos) SFund 47324
RRSK 47224 100 100
114 Vadodara - Interlocking of level crossing gates SFund 89993 423
RRSK 88993 17482 5000
115 Ratlam - Manning of unmanned level crossings (20 Nos) SFund 33132
RRSK 89817 8271 2000 10000
116 Vadodara - Manning of unmanned level crossings (66 Nos) SFund 200962
RRSK 198462 25401 40453 5000
117 Bhavnagar - Manning of unmanned level crossing (83 Nos) SFund 309164
RRSK 309064 62540 237609 40000
118 Viramgam - Okha - Manning of unmanned level crossings (82 Nos) SFund 250100
RRSK 250000 35000 40000
119 Ahmedabad - Manning of unmanned level crossings (80 Nos) SFund 244000 6132
RRSK 241000 41384 62413 34978
120 Manning of unmanned level crossings between Radhanpur-
Gandhidham section (43 Nos) (KRCL)
RRSK 161606 15367 1000
121 Manning of unmanned level crossing between Radhanpur-Palanpur
section (46 nos) KRCL
RRSK 172881 7539 1000
122 Works costing below Rs25 crore each RRSK 150000
TOTAL-WORKS IN PROGRESS RRSK 598951
123 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Road Safety Works-Level Crossings RRSK 648951
ROAD SAFETY WORKS-LEVEL CROSSINGS
B - New Works
919
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
124 Bhandu Moti Dab-Mahesana - Road over bridge in lieu of level
crossing No 211
SFund 79627 79577
RRSK 68683 -5545 1 1
EBR(Dep) 76908
125 Meghnagar - Road over bridge in lieu of level crossing No60-B SFund 2000
RRSK 34653 5000 33400
EBR(Dep) 31876
126 Maroli-Sachin - Road over bridge in lieu of level crossing No133 SFund 4000
RRSK 22546 1000 50000
127 Virar-Surat - Road over bridge in lieu of level crossing No138 near
Sachin (4-lane)
SFund 54643 82256
RRSK 1000 25797 3300 1000
EBR(Dep) 55643
128 Viramgam-Jhund - Road over bridge in lieu of level crossing No42
(2-lane)
SFund 63739 67339
RRSK 1000 4008 4000 1
EBR(Dep) 110479
129 Surat-Vadodara - Road over bridge in lieu of level crossing No213
near Miyagam Karjan
SFund 53983 45913
RRSK 2881 503 2248 1000
EBR(Dep) 52400
130 Kim-Kosamba - Road over bridge in lieu of level crossing No160 (2-
lane)
SFund 72068 80284
RRSK 1000 1 100
EBR(Dep) 73068
131 Pratapnagar-Vishwamitri - Road over bridge in lieu of level crossing
No 2
SFund 48817 47817
RRSK 6135 1 1
EBR(Dep) 51100
132 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No2-A
SFund 1
RRSK 35999 100 1000
EBR(Dep) 36000
133 Bharuch-Dahej - 2- lane road over bridge in lieu of level crossing
No22 near Samni station
SFund 46790 57359
RRSK 1000 38 1 1
EBR(Dep) 57737
134 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No178 near Bharuch yard
SFund 92806 88666
RRSK 25994 1593 100 500
EBR(Dep) 233200
135 Bharuch-Dahej - 4-lane road over bridge in lieu of level crossing
No50
SFund 1
RRSK 50899 1
EBR(Dep) 50900
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
A - Works in Progress
9110
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
136 Dharangaon-Thakherkhed - 2-lane road over bridge on level
crossing No144 on state highway No185
SFund 50170 45820
RRSK 8572 1979 1200 500
EBR(Dep) 102582
137 Ujjain-Bhopal - Road over bridge in lieu of level crossing No101B
near Shore
SFund 2500 -24
RRSK 41006 39894 94500 1000
EBR(Dep) 46195
138 Amalner-Marwad Nim Road - Road over bridge in lieu of level
crossing No135
SFund 50239 44239
RRSK 1597 28 1200 500
EBR(Dep) 95487
139 Palanpur-Khodiyar - Road under bridges in lieu of level crossings
on dedicated freight corridor route (42 Nos)
SFund 313449 250867
RRSK 308394 96112 30000 30000
140 Bajana-Jatpipli - Road over bridge in lieu of level crossing No 25 SFund 1000
RRSK 87051 1 20000
EBR(Dep) 203052
141 Udhna-Jalgaon - Road over bridge in lieu of level crossing No37 SFund 5000
RRSK 72704 5000
EBR(Dep) 232887
142 Bhavnagar Divsion - Limited height subways in lieu of level
crossings (33 Nos)
SFund 196681 203596
RRSK 63911 28554 10000 20000
143 Palanpur-Khodiyar - Road ovrer bridges in lieu of level crossing
Nos191A 199A amp 227 on dedicated freight corridor route
SFund 34780 40000
RRSK 514304 23900 30000 30000
EBR(Dep) 274542
144 Ratlam-Godhara - 2-lane road over bridge in lieu of level crossing
No61-A
SFund 2000
RRSK 66459 100 5000
EBR(Dep) 64858
145 Surat - Vadodara - Limited height subways in lieu of level crossing
Nos162 amp 168
SFund 17645 18414
RRSK 22527 6306 500
146 Virar - Surat - Subwaysroad under bridge at level crossing Nos
55x 58 142 amp LC-1 (Udhna-Niyol)
SFund 500
RRSK 61898 5000 5000
147 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos171-A 188-A amp 208-B
SFund 26085 20900
RRSK 548600 22800 30000 30000
EBR(Dep) 287342
148 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos208 211-C 214 amp 220
SFund 69560 120000
RRSK 695510 59400 50000 50000
EBR(Dep) 382535
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9111
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
149 Ahmedabad-Palanpur - Road over bridge in lieu of level crossing
Nos165 166 amp 169 and level crossing No17 of Ahmedabad -
Viramgam
SFund 26085
RRSK 679207 30000 30000
EBR(Dep) 352646
150 Virar - Surat - SubwaysRoad under bridges in lieu of level
crossings (34 Nos)
SFund 175900 175900
RRSK 578938 89650 90000 10000
151 Ahmedabad Division - Road under bridges in lieu of level crossings
(58 Nos)
SFund 265089 247530 42610
RRSK 545731 19586 3570 30000
152 Timba-Tuva - Road over bridges in lieu of level crossing No58 SFund 1500
RRSK 93474 100 500
EBR(Dep) 584974
153 Bhatiel-Petlad - Road over bridge in lieu of level crossing No28 SFund 1500
RRSK 174899 500 500
EBR(Dep) 271399
154 Kosad-Gothangam - Road over bridge in lieu of level crossing
No149
SFund 435
RRSK 154072 1 1
EBR(Dep) 154508
155 Sayan-Kim - Road over bridge in lieu of level crossing No156 SFund 4348
RRSK 168868 10000 30000
EBR(Dep) 173216
156 Kosamba-Hathuran - Road over bridge in lieu of level crossing
No163
SFund 4348
RRSK 138655 6800 20000
EBR(Dep) 143004
157 Virar-Surat - Road over bridge in lieu of level crossing Nos 92 94 amp
97 along dedicated freight corridor route
SFund 17390
RRSK 321310 10000 20000
EBR(Dep) 406369
158 Naikheri-Ujjain - Road over bridge in lieu of level crossing No25
and Chintamanganesh-Ujjain - level crossing No8 (metre gauge)
SFund 51115 50818
RRSK 55413 788 100 500
EBR(Dep) 183072
159 Sehore-Phanda - Road over bridge in lieu of level crossing No104 SFund 1000
RRSK 88484 100 5000
EBR(Dep) 89484
160 Naikheri-Ujjain - Road over bridge in lieu of level crossing No23 SFund 100
RRSK 77002 5000 46100
EBR(Dep) 137068
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9112
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
161 Ratlam-Khandwa - 2-lane road over bridge in lieu of level crossing
No250
SFund 2000 41 20000
RRSK 95436 20299 1203 500
EBR(Dep) 97436
162 Bairagarh-Bakaniabhori - Road over bridge in lieu of level crossing
No115
SFund 1000
RRSK 189403 1
EBR(Dep) 190403
163 Sehore-Phanda - Road over bridge in lieu of level crossing No107 SFund 500
RRSK 91224 100 5000
EBR(Dep) 91724
164 Bamania-Amargarh - Road over bridge in lieu of level crossing
No72
SFund 2000
RRSK 104079 100 100
EBR(Dep) 106079
165 Virar-Surat - Road over bridge in lieu of level crossing Nos109
111 114 115 amp 118 along dedicated freight corridor route
SFund 17390 1452
RRSK 368510 12500 30000
EBR(Dep) 460095
166 Gothangam-Sayan - Road over bridge in lieu of level crossing
No151
SFund 31997 29797
RRSK 14313 -78 100
EBR(Dep) 77827
167 Virar-Surat - Road over bridge in lieu of level crossing Nos60 64
66 68 69 71 74 75 77 81 amp 82 along dedicated freight corridor
route
SFund 10000 27000
RRSK 932200 15000 30000
EBR(Dep) 1540420
168 Virar-Surat - Road over bridge in lieu of level crosisng No61 along
dedicated freight corridor route
SFund 4348
RRSK 67642 5000 10000
EBR(Dep) 71993
169 Derol-Kharsaliya - Road over bridge in lieu of level crossing No32 SFund 1500
RRSK 93474 100 500
EBR(Dep) 399974
170 Gothangam-Sayan - Road over bridge in lieu of level crossing
No150
SFund 4348
RRSK 150714 10000 20000
EBR(Dep) 155063
171 Virar-Surat - Road over bridge in lieu of level crossing Nos57 amp
143 along dedicated freight corridor route
SFund 1
RRSK 170312 1
EBR(Dep) 170312
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9113
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
172 Virar-Surat - Road over bridge in lieu of level crossing Nos84 88 amp
90 along dedicated freight corridor route
SFund 10000
RRSK 362918 15000 20000
EBR(Dep) 529675
173 Kim-Kosamba - Road over bridge in lieu of level crossing No161 SFund 4348
RRSK 162307 10 10
EBR(Dep) 166655
174 Virar-Surat - Road over bridge in lieu of level crossing
Nos124126amp 127 along dedicated freight corridor route
SFund 10000 53500
RRSK 429771 10000 16990
EBR(Dep) 529173
175 Sayan-Kim - Road over bridge in lieu of level crossing No154 SFund 4000
RRSK 138094 10000 10000
EBR(Dep) 142094
176 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No165
SFund 4348
RRSK 207011 10 10
EBR(Dep) 211359
177 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No166
SFund 4348
RRSK 135056 10 10
EBR(Dep) 139404
178 Virar-Surat - Road over bridge in lieu of level crossing Nos42 46A
48 52 55 102 106 108 130 amp 137 along dedicated freight
corridor route
SFund 10000 72200
RRSK 929294 10000 10000
EBR(Dep) 1234542
179 Udhna - Jalgaon - Road over bridge in lieu of level crossing No51 SFund 5000
RRSK 75295 10000
EBR(Dep) 250296
180 Sadnapura - Bhalej - Road over bridge in lieu of level crossing No
11
SFund 1500
RRSK 93474 100 10
EBR(Dep) 249974
181 Sayan-Kim - Road over bridge in lieu of level crossing No153 SFund 4348
RRSK 134797 6900 20000
EBR(Dep) 139145
182 Derol - Kharsaliya - Road over bridge in lieu of level crossing No41 SFund 1500
RRSK 93474 500 500
EBR(Dep) 204974
183 Rajkot - Okha - Road over bridge in lieu of level crossing No197 SFund 100
RRSK 94049 19493 9868 1000
EBR(Dep) 94148
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9114
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
184 Rajkot Division - Limited height subways in lieu of level crossings
(36 Nos)
SFund 192337 145046
RRSK 68323 68445 65000 20000
185 Chanderiya-Ratlam - Limited height subways in lieu of level
crossings (No121 amp 183)
SFund 22614 22603
RRSK 2700 1 1
186 Dabhoi-Pratpnagar amp Dabhoi-Chhota Udepur - Limited height
subways (25 Nos)
SFund 203310 202077
RRSK 274218 44171 40000 1000
187 Surat-Vadodara-Godhra - Limited height subway at level crossings
(11 Nos)
SFund 133888 88592
RRSK 79889 40000 100
188 Ankleshwar-Rajpipla - Limited height subways road under bridges
in lieu of level crossings (36 Nos)
SFund 297860 248077 20000
RRSK 284870 80559 10919 20000
189 Ujjain-Bhopal - Limited height subways at level crossings (No88
89 amp 91)
SFund 54571 58450
RRSK 1000 11823 1 1
190 Udhna-Jalgaon - Limited height subways at level crossings (No38
108 127 128 145 146147 amp 134)
SFund 40087 87
RRSK 75049 230000 30000
191 Ahmedabad Division - Elimination of level crossings by road under
bridges (90 Nos)
SFund 11356 45
RRSK 1000 165047 20000
192 Ujjain-Bhopal - Limited height subway at level crossings (No43 44
amp 58)
SFund 67442 69163
RRSK 1900 259 1 1
193 Vadodara Division - Limited height subway in lieu of level crossings
(2 Nos on double line amp 19 Nos on single line)
SFund 69263 85693
RRSK 236140 1626 31000 200
194 Ratlam Division - Limited height subway in lieu of level crossings
(22 Nos)
SFund 272546 366104
RRSK 1000 36466 1000 1
195 Mehsana-Patan - Road over bridge in lieu of level crossing No40X SFund 53406 57194
RRSK 16245 1549 100 100
EBR(Dep) 287771
196 Gangadhara-Bardoli - Road over bridge in lieu of level crossing
No17A
SFund 32000 9390
RRSK 99253 18000 20000
EBR(Dep) 131253
197 Virpur-Jetalsar - Road over bridge in lieu of level crossing No61 SFund 5000
RRSK 187384 10000 20000
198 Jamnagar-Lakhabawal - Road over bridge in lieu of level crossing
No199
SFund 5000
RRSK 78380 2000 20000
EBR(Dep) 83380
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9115
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
199 Surat-Vadodara - Elimination of level crossing No173 by 4-lane
road over bridge
SFund 5000
RRSK 229396 102600 60000
EBR(Dep) 234397
200 Bhavnagar Division - Limited height subways to eliminate level
crossings (77 Nos)
SFund 87
RRSK 648618 100 100
201 Dewas-Barlai - 2 lane road over bridge in lieu of level crossing
No37
SFund 500
RRSK 36758 144 40000 22000
EBR(Dep) 206948
202 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 216 on DFC route
SFund 17390
RRSK 34932 41600 15000 15000
EBR(Dep) 104645
EBR(P) 52323
203 Surat-Vadodara- Road over bridge in lieu of level crossing No 228
on DFC route
SFund 4348
RRSK 59605 10 10
EBR(P) 127905
204 Jetalsar-Veraval Rajula-Mahuva amp Sihor -Palitana -subways in lieu
of level crossing- 18 Nos
SFund 86950 24787
RRSK 394341 75636 30000 50000
205 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 269
SFund 82792 78119
RRSK 23175 7126 50 500
EBR(P) 105968
206 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 177A on DFC route
SFund 4348
RRSK 48142 15000 15000
EBR(Dep) 104981
207 Surat-Vadodara- 4 Lane Road over bridge in lieu of level crossing
No 220
SFund 100
RRSK 173605 100 5000
EBR(P) 173706
208 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 276
SFund 82792 76527
RRSK 77592 8463 100 500
EBR(P) 160385
209 Dhasa-Jetalsar- subways in lieu of level crossing- 35 Nos RRSK 935106 100000 150000
210 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 179A on DFC route
SFund 4348
RRSK 126868 15000 15000
EBR(Dep) 131216
211 Rajkot-Jetalsar Jetalsar-Wansjaliya amp Kana- subways in lieu of
level crossing (19 Nos)
SFund 86950 50607
RRSK 420729 124972 30000 50000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9116
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
212 Ahmedabad - Viramgam- Road over bridge in lieu of level crossing
No 11A
SFund 500
RRSK 220476 75000 80000
EBR(Dep) 220977
213 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 259
SFund 5000 77
RRSK 168295 128 200 5000
EBR(P) 173296
214 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No37
SFund 500
RRSK 98088 100 80000
EBR(Dep) 98588
215 Charni Road-Grant Road- Regirdering of Road over bridge
between at km 39 - 10
SFund 1739
RRSK 71533 10000 40000
216 Elphinstone Road- Regirdering of Road over bridge at km 815-9 SFund 870
RRSK 105138 1 100
217 Virar-Vaiterna- 4 Lane Road over bridge in lieu of level crossing
No 41
SFund 500
RRSK 153899 1
EBR(Dep) 154399
218 Mumbai Central (South)- Regirdering of Road over bridge at Km
46-8
SFund 4348
RRSK 81412 10000 40000
219 Mahalaxmi- Regirdering of Road over bridge at km 526-27 SFund 4348
RRSK 214187 10000 70000
220 Surat-Vadodara- Road over bridge in lieu of level crossing No 198 SFund 100
RRSK 99900 200 4000
EBR(P) 100001
221 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 240
SFund 2000 316
RRSK 117126 13947 71400 10000
EBR(P) 119127
222 Ahmedabad-New Bhuj- Road over bridge in lieu of level crossing
No 3X
SFund 500
RRSK 175762 500 5000
EBR(Dep) 176262
223 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No 22A
RRSK 187005 23 50000 60000
EBR(Dep) 187006
224 Dadar- Regirdering of Road over bridge at Km 109-10 SFund 1739
RRSK 131731 1 100
225 Lowerparel-Elphinstone Road- Regirdering of Road over bridge at
km 712-13
SFund 1739
RRSK 186842 87000 80000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9117
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
226 Chanderiya-Ratlam - 2-lane road over bridge in lieu of level
crossing No141 near Piplia yard
SFund 1000
RRSK 89000 100 10000
EBR(P) 116700
227 Mandsour-Dalauda - 2-lane road over bridge in lieu of level
crossing No152
SFund 1000
RRSK 99000 5500 43600
EBR(P) 165000
228 Chanderia-Ratlam - 2-lane road over bridge at Chanderia in lieu of
level crossing No86
SFund 1500
RRSK 158500 100 5000
EBR(P) 160000
229 Mahesana-Patan- subways in lieu of level crossing No 27 32 56
amp 62 on Mahesana- Viramgam- level crossing No 4 11 18 19 amp
20 (9 Nos)
SFund 1 3530
RRSK 225598 23196 40000 30000
230 Mahesana-Viramgam- subways in lieu of level crossing No 6 7
14 23 amp 25 (5 Nos)
SFund 101 2015
RRSK 125934 4500 30000
231 Sabarmati-Botad- subways in lieu of level crossing- 23 Nos RRSK 613299 85000 150000
232 Viramgam- samakhiyali-subways in lieu of level crossing No 43
92 amp 108 (3 Nos)
SFund 100
RRSK 84683 1000
233 Udhna-Jalgaon- subways in lieu of level crossing No 87 122 123
133 141 150 amp 152 (7 Nos)
RRSK 218947 91408 100000 10000
234 Anand-Khambhat- subways in lieu of level crossing 10 Nos SFund 32995 60173
RRSK 96662 110623 8132 500
235 Chanderiya-Ratlam-subways in lieu of level crossing No 106 128
131 182 amp IND-Dewas-Ujjain level crossing No 26 (5 Nos)
SFund 26108 4281
RRSK 50310 29276 9571 100
236 Chanderia-Ratlam - 2-lane road under bridge at Nimbahera in lieu
of level crossing No103
SFund 87
RRSK 25313 1308 10000
EBR(P) 25400
237 Rajkot-Hapa- Road over bridge in lieu of level crossing No 145 at
Padadhari
RRSK 87610 1 100
EBR(Dep) 256608
238 Surat-Vadodara- Road over bridge in lieu of level crossing No158
(4-lane) between Sayan-Kim on DFC route
SFund 435
RRSK 120879 10 10
EBR(Dep) 363941
239 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 201 on DFC route
SFund 17390
RRSK 68351 56800 15000 15000
EBR(Dep) 257222
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
916
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
76 Western Railway - Extension of RDBMS (Phase-II) DF(3) 25588 16702 1000 1000
77 Western Railway - Automatic ticket vending machines (pilot project) Cap 88930 81047 1 1
78 Western Railway - Extension of unreserved ticketing system to E-
category stations
DF(1) 348701 238185 1000 1000
79 Western Railway - Extension of automatic ticket vending machines Cap 314899 90611 32000 100
80 Western Railway - Repl of unreserved ticketing system equipment DRF 45400 41347 1186 1
81 Western Railway - Repl of 1675 thin clients for unreserved ticketing
system
DRF 55200 47061 10 10
82 Western Railway - Repl of datacom equipment of unreserved
ticketing system
DRF 35600 12500 500 10
83 Replacement of 377 ATVMs (PB2292018-19NR) DRF 67033 16493 1
84 Works costing below Rs25 crore each DRF 24950
DF(1) 3602
TOTAL-WORKS IN PROGRESS Cap 101
DRF 24972
DF(1) 4602
DF(3) 1000
85 Lumpsum Provision For New Works Cap 100
DRF 10000
DF(1) 600
DF(3) 100
TOTAL-NEW WORKS Cap 100
DRF 10000
DF(1) 600
DF(3) 100
TOTAL-Computerisation Cap 201
DRF 34972
DF(1) 5202
DF(3) 1100
86 Leased Assets - Payment of Capital component of lease charges to
Indian Railway Finance Corporation
Cap 5667326 8838029 6651500 5667326
CFund 2249674 2303171 2249674
TOTAL-WORKS IN PROGRESS Cap 5667326
CFund 2249674
TOTAL-Leased Assets - Payment of Capital Component Cap 5667326
CFund 2249674
COMPUTERISATION
A - Works in Progress
A - Works in Progress
B - New Works
LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT
917
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
87 Nadiad-Modasa Anand-Khambhat amp Vasad-Kathana - Elimination
of various level crossings
RRSK 28928 500 1000
88 Vadodara Division - Manning of level crossings (15 Nos) RRSK 32650 500 1000
89 Ahmedabad Division - Manning of level crossings (26 Nos) RRSK 97716 14823 19703
90 Udhna-Jalgaon - Manning of unmanned level crossing of level
crossings (5 Nos)
RRSK 30296 4000 18038
91 Vadodara Division - Toilet block with dugwell arrangements on
manned level crossing (227 Nos)
RRSK 31607 500 2000
92 Bhavnagar Division - Toilet facilities at manned level crossings
(345 nos)
RRSK 107276 2000 40000
93 Udhna-Jalgaon - Toilets facilities at manned level crossings RRSK 64061 4000 5000
94 Ahmedabad Division - Basic facilities (toilet amp others) at various
manned level crossings
RRSK 56061 2000 13061
95 Vaitarna-Umbergaon - Provision of height gauges amp fencing at level
crossings
RRSK 27823 2000 13845
96 Ahmedabad Division - Interlocking of level crossings (6 Nos) RRSK 33706 18245 20000
97 Bhavnagar Division - Interlocking of level crossings (4 Nos) RRSK 29391 4000
98 Ratlam Division - Removing deficiencies from various manned level
crossings
RRSK 120396 16778 25000
99 Ahmedabad Division - Interlocking (14 level crossing gates) SFund 67385 54317
RRSK 9664 1705 1
100 Vadodara Divisions - Upgradation amp re-classification of level
crossings from A-class to spl-class (13 Nos)
SFund 55279 39072
RRSK 5384 4944 2000
101 Ahmedabad Division - Data loggers (remote terminal units) (77
level crossing gates)
SFund 26337 20207
RRSK 5557 1057 1
102 Ahmedabad Division - Solar power system (77 level crossing gates) SFund 82816 49327
RRSK 31071 1443 1444 1
103 Vadodara Division - Duty bunks on level crossings (100 Nos) SFund 34979 22131
RRSK 14192 6830 1875 3819
104 Vadodara Division - Interlocking of level crossing gates (tvu more
than 20000) (8 Nos) amp long block section (3 Nos)
SFund 44223 22240
RRSK 21864 1265 2000
105 Bhavnagar Division- Manning of unmanned level crossings (26 Nos) SFund 83827 376
RRSK 68827 2759 15000 25000
106 Vadodara Division- Manning of unmanned level crossings (35 Nos) SFund 105609 17632
RRSK 85609 17587 5971 2000
107 Ahmedabad Division - Upgradation and reclassification of level
crossings (15 Nos)
SFund 37939 261
RRSK 36939 1659 5725 26404
ROAD SAFETY WORKS-LEVEL CROSSINGS
A - Works in Progress
918
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
108 Vadodara Division - Interlocking of level crossings having ATVU
more than 20000
SFund 50441 13680
RRSK 29049 10000 4000
109 Rajkot Division- Manning of unmanned level crossings (69 Nos) SFund 352803
RRSK 352303 14601 60000 30000
110 Porbandar-Kanalus - Repl of lower quadrant mechanical signaling
system at level crossing gates amp repl of mechanical lifting barriers
with electrical barriers
SFund 73182 13504
RRSK 53182 18417 12500 20000
111 Western Railway - Electrical lifting barriers (33 level crossing
gates) relay termination material wiring material power cable etc
for electrical lifting barriers
SFund 30290 1043
RRSK 29190 9145 13026 4000
112 Ratlam Division- Manning of unmanned level crossings (33 Nos) SFund 99157 5923
RRSK 78463 24262 15000 30000
113 Ahmedabad - Interlocking of level crossing gates (8 Nos) SFund 47324
RRSK 47224 100 100
114 Vadodara - Interlocking of level crossing gates SFund 89993 423
RRSK 88993 17482 5000
115 Ratlam - Manning of unmanned level crossings (20 Nos) SFund 33132
RRSK 89817 8271 2000 10000
116 Vadodara - Manning of unmanned level crossings (66 Nos) SFund 200962
RRSK 198462 25401 40453 5000
117 Bhavnagar - Manning of unmanned level crossing (83 Nos) SFund 309164
RRSK 309064 62540 237609 40000
118 Viramgam - Okha - Manning of unmanned level crossings (82 Nos) SFund 250100
RRSK 250000 35000 40000
119 Ahmedabad - Manning of unmanned level crossings (80 Nos) SFund 244000 6132
RRSK 241000 41384 62413 34978
120 Manning of unmanned level crossings between Radhanpur-
Gandhidham section (43 Nos) (KRCL)
RRSK 161606 15367 1000
121 Manning of unmanned level crossing between Radhanpur-Palanpur
section (46 nos) KRCL
RRSK 172881 7539 1000
122 Works costing below Rs25 crore each RRSK 150000
TOTAL-WORKS IN PROGRESS RRSK 598951
123 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Road Safety Works-Level Crossings RRSK 648951
ROAD SAFETY WORKS-LEVEL CROSSINGS
B - New Works
919
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
124 Bhandu Moti Dab-Mahesana - Road over bridge in lieu of level
crossing No 211
SFund 79627 79577
RRSK 68683 -5545 1 1
EBR(Dep) 76908
125 Meghnagar - Road over bridge in lieu of level crossing No60-B SFund 2000
RRSK 34653 5000 33400
EBR(Dep) 31876
126 Maroli-Sachin - Road over bridge in lieu of level crossing No133 SFund 4000
RRSK 22546 1000 50000
127 Virar-Surat - Road over bridge in lieu of level crossing No138 near
Sachin (4-lane)
SFund 54643 82256
RRSK 1000 25797 3300 1000
EBR(Dep) 55643
128 Viramgam-Jhund - Road over bridge in lieu of level crossing No42
(2-lane)
SFund 63739 67339
RRSK 1000 4008 4000 1
EBR(Dep) 110479
129 Surat-Vadodara - Road over bridge in lieu of level crossing No213
near Miyagam Karjan
SFund 53983 45913
RRSK 2881 503 2248 1000
EBR(Dep) 52400
130 Kim-Kosamba - Road over bridge in lieu of level crossing No160 (2-
lane)
SFund 72068 80284
RRSK 1000 1 100
EBR(Dep) 73068
131 Pratapnagar-Vishwamitri - Road over bridge in lieu of level crossing
No 2
SFund 48817 47817
RRSK 6135 1 1
EBR(Dep) 51100
132 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No2-A
SFund 1
RRSK 35999 100 1000
EBR(Dep) 36000
133 Bharuch-Dahej - 2- lane road over bridge in lieu of level crossing
No22 near Samni station
SFund 46790 57359
RRSK 1000 38 1 1
EBR(Dep) 57737
134 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No178 near Bharuch yard
SFund 92806 88666
RRSK 25994 1593 100 500
EBR(Dep) 233200
135 Bharuch-Dahej - 4-lane road over bridge in lieu of level crossing
No50
SFund 1
RRSK 50899 1
EBR(Dep) 50900
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
A - Works in Progress
9110
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
136 Dharangaon-Thakherkhed - 2-lane road over bridge on level
crossing No144 on state highway No185
SFund 50170 45820
RRSK 8572 1979 1200 500
EBR(Dep) 102582
137 Ujjain-Bhopal - Road over bridge in lieu of level crossing No101B
near Shore
SFund 2500 -24
RRSK 41006 39894 94500 1000
EBR(Dep) 46195
138 Amalner-Marwad Nim Road - Road over bridge in lieu of level
crossing No135
SFund 50239 44239
RRSK 1597 28 1200 500
EBR(Dep) 95487
139 Palanpur-Khodiyar - Road under bridges in lieu of level crossings
on dedicated freight corridor route (42 Nos)
SFund 313449 250867
RRSK 308394 96112 30000 30000
140 Bajana-Jatpipli - Road over bridge in lieu of level crossing No 25 SFund 1000
RRSK 87051 1 20000
EBR(Dep) 203052
141 Udhna-Jalgaon - Road over bridge in lieu of level crossing No37 SFund 5000
RRSK 72704 5000
EBR(Dep) 232887
142 Bhavnagar Divsion - Limited height subways in lieu of level
crossings (33 Nos)
SFund 196681 203596
RRSK 63911 28554 10000 20000
143 Palanpur-Khodiyar - Road ovrer bridges in lieu of level crossing
Nos191A 199A amp 227 on dedicated freight corridor route
SFund 34780 40000
RRSK 514304 23900 30000 30000
EBR(Dep) 274542
144 Ratlam-Godhara - 2-lane road over bridge in lieu of level crossing
No61-A
SFund 2000
RRSK 66459 100 5000
EBR(Dep) 64858
145 Surat - Vadodara - Limited height subways in lieu of level crossing
Nos162 amp 168
SFund 17645 18414
RRSK 22527 6306 500
146 Virar - Surat - Subwaysroad under bridge at level crossing Nos
55x 58 142 amp LC-1 (Udhna-Niyol)
SFund 500
RRSK 61898 5000 5000
147 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos171-A 188-A amp 208-B
SFund 26085 20900
RRSK 548600 22800 30000 30000
EBR(Dep) 287342
148 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos208 211-C 214 amp 220
SFund 69560 120000
RRSK 695510 59400 50000 50000
EBR(Dep) 382535
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9111
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
149 Ahmedabad-Palanpur - Road over bridge in lieu of level crossing
Nos165 166 amp 169 and level crossing No17 of Ahmedabad -
Viramgam
SFund 26085
RRSK 679207 30000 30000
EBR(Dep) 352646
150 Virar - Surat - SubwaysRoad under bridges in lieu of level
crossings (34 Nos)
SFund 175900 175900
RRSK 578938 89650 90000 10000
151 Ahmedabad Division - Road under bridges in lieu of level crossings
(58 Nos)
SFund 265089 247530 42610
RRSK 545731 19586 3570 30000
152 Timba-Tuva - Road over bridges in lieu of level crossing No58 SFund 1500
RRSK 93474 100 500
EBR(Dep) 584974
153 Bhatiel-Petlad - Road over bridge in lieu of level crossing No28 SFund 1500
RRSK 174899 500 500
EBR(Dep) 271399
154 Kosad-Gothangam - Road over bridge in lieu of level crossing
No149
SFund 435
RRSK 154072 1 1
EBR(Dep) 154508
155 Sayan-Kim - Road over bridge in lieu of level crossing No156 SFund 4348
RRSK 168868 10000 30000
EBR(Dep) 173216
156 Kosamba-Hathuran - Road over bridge in lieu of level crossing
No163
SFund 4348
RRSK 138655 6800 20000
EBR(Dep) 143004
157 Virar-Surat - Road over bridge in lieu of level crossing Nos 92 94 amp
97 along dedicated freight corridor route
SFund 17390
RRSK 321310 10000 20000
EBR(Dep) 406369
158 Naikheri-Ujjain - Road over bridge in lieu of level crossing No25
and Chintamanganesh-Ujjain - level crossing No8 (metre gauge)
SFund 51115 50818
RRSK 55413 788 100 500
EBR(Dep) 183072
159 Sehore-Phanda - Road over bridge in lieu of level crossing No104 SFund 1000
RRSK 88484 100 5000
EBR(Dep) 89484
160 Naikheri-Ujjain - Road over bridge in lieu of level crossing No23 SFund 100
RRSK 77002 5000 46100
EBR(Dep) 137068
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9112
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
161 Ratlam-Khandwa - 2-lane road over bridge in lieu of level crossing
No250
SFund 2000 41 20000
RRSK 95436 20299 1203 500
EBR(Dep) 97436
162 Bairagarh-Bakaniabhori - Road over bridge in lieu of level crossing
No115
SFund 1000
RRSK 189403 1
EBR(Dep) 190403
163 Sehore-Phanda - Road over bridge in lieu of level crossing No107 SFund 500
RRSK 91224 100 5000
EBR(Dep) 91724
164 Bamania-Amargarh - Road over bridge in lieu of level crossing
No72
SFund 2000
RRSK 104079 100 100
EBR(Dep) 106079
165 Virar-Surat - Road over bridge in lieu of level crossing Nos109
111 114 115 amp 118 along dedicated freight corridor route
SFund 17390 1452
RRSK 368510 12500 30000
EBR(Dep) 460095
166 Gothangam-Sayan - Road over bridge in lieu of level crossing
No151
SFund 31997 29797
RRSK 14313 -78 100
EBR(Dep) 77827
167 Virar-Surat - Road over bridge in lieu of level crossing Nos60 64
66 68 69 71 74 75 77 81 amp 82 along dedicated freight corridor
route
SFund 10000 27000
RRSK 932200 15000 30000
EBR(Dep) 1540420
168 Virar-Surat - Road over bridge in lieu of level crosisng No61 along
dedicated freight corridor route
SFund 4348
RRSK 67642 5000 10000
EBR(Dep) 71993
169 Derol-Kharsaliya - Road over bridge in lieu of level crossing No32 SFund 1500
RRSK 93474 100 500
EBR(Dep) 399974
170 Gothangam-Sayan - Road over bridge in lieu of level crossing
No150
SFund 4348
RRSK 150714 10000 20000
EBR(Dep) 155063
171 Virar-Surat - Road over bridge in lieu of level crossing Nos57 amp
143 along dedicated freight corridor route
SFund 1
RRSK 170312 1
EBR(Dep) 170312
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9113
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
172 Virar-Surat - Road over bridge in lieu of level crossing Nos84 88 amp
90 along dedicated freight corridor route
SFund 10000
RRSK 362918 15000 20000
EBR(Dep) 529675
173 Kim-Kosamba - Road over bridge in lieu of level crossing No161 SFund 4348
RRSK 162307 10 10
EBR(Dep) 166655
174 Virar-Surat - Road over bridge in lieu of level crossing
Nos124126amp 127 along dedicated freight corridor route
SFund 10000 53500
RRSK 429771 10000 16990
EBR(Dep) 529173
175 Sayan-Kim - Road over bridge in lieu of level crossing No154 SFund 4000
RRSK 138094 10000 10000
EBR(Dep) 142094
176 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No165
SFund 4348
RRSK 207011 10 10
EBR(Dep) 211359
177 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No166
SFund 4348
RRSK 135056 10 10
EBR(Dep) 139404
178 Virar-Surat - Road over bridge in lieu of level crossing Nos42 46A
48 52 55 102 106 108 130 amp 137 along dedicated freight
corridor route
SFund 10000 72200
RRSK 929294 10000 10000
EBR(Dep) 1234542
179 Udhna - Jalgaon - Road over bridge in lieu of level crossing No51 SFund 5000
RRSK 75295 10000
EBR(Dep) 250296
180 Sadnapura - Bhalej - Road over bridge in lieu of level crossing No
11
SFund 1500
RRSK 93474 100 10
EBR(Dep) 249974
181 Sayan-Kim - Road over bridge in lieu of level crossing No153 SFund 4348
RRSK 134797 6900 20000
EBR(Dep) 139145
182 Derol - Kharsaliya - Road over bridge in lieu of level crossing No41 SFund 1500
RRSK 93474 500 500
EBR(Dep) 204974
183 Rajkot - Okha - Road over bridge in lieu of level crossing No197 SFund 100
RRSK 94049 19493 9868 1000
EBR(Dep) 94148
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9114
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
184 Rajkot Division - Limited height subways in lieu of level crossings
(36 Nos)
SFund 192337 145046
RRSK 68323 68445 65000 20000
185 Chanderiya-Ratlam - Limited height subways in lieu of level
crossings (No121 amp 183)
SFund 22614 22603
RRSK 2700 1 1
186 Dabhoi-Pratpnagar amp Dabhoi-Chhota Udepur - Limited height
subways (25 Nos)
SFund 203310 202077
RRSK 274218 44171 40000 1000
187 Surat-Vadodara-Godhra - Limited height subway at level crossings
(11 Nos)
SFund 133888 88592
RRSK 79889 40000 100
188 Ankleshwar-Rajpipla - Limited height subways road under bridges
in lieu of level crossings (36 Nos)
SFund 297860 248077 20000
RRSK 284870 80559 10919 20000
189 Ujjain-Bhopal - Limited height subways at level crossings (No88
89 amp 91)
SFund 54571 58450
RRSK 1000 11823 1 1
190 Udhna-Jalgaon - Limited height subways at level crossings (No38
108 127 128 145 146147 amp 134)
SFund 40087 87
RRSK 75049 230000 30000
191 Ahmedabad Division - Elimination of level crossings by road under
bridges (90 Nos)
SFund 11356 45
RRSK 1000 165047 20000
192 Ujjain-Bhopal - Limited height subway at level crossings (No43 44
amp 58)
SFund 67442 69163
RRSK 1900 259 1 1
193 Vadodara Division - Limited height subway in lieu of level crossings
(2 Nos on double line amp 19 Nos on single line)
SFund 69263 85693
RRSK 236140 1626 31000 200
194 Ratlam Division - Limited height subway in lieu of level crossings
(22 Nos)
SFund 272546 366104
RRSK 1000 36466 1000 1
195 Mehsana-Patan - Road over bridge in lieu of level crossing No40X SFund 53406 57194
RRSK 16245 1549 100 100
EBR(Dep) 287771
196 Gangadhara-Bardoli - Road over bridge in lieu of level crossing
No17A
SFund 32000 9390
RRSK 99253 18000 20000
EBR(Dep) 131253
197 Virpur-Jetalsar - Road over bridge in lieu of level crossing No61 SFund 5000
RRSK 187384 10000 20000
198 Jamnagar-Lakhabawal - Road over bridge in lieu of level crossing
No199
SFund 5000
RRSK 78380 2000 20000
EBR(Dep) 83380
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9115
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
199 Surat-Vadodara - Elimination of level crossing No173 by 4-lane
road over bridge
SFund 5000
RRSK 229396 102600 60000
EBR(Dep) 234397
200 Bhavnagar Division - Limited height subways to eliminate level
crossings (77 Nos)
SFund 87
RRSK 648618 100 100
201 Dewas-Barlai - 2 lane road over bridge in lieu of level crossing
No37
SFund 500
RRSK 36758 144 40000 22000
EBR(Dep) 206948
202 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 216 on DFC route
SFund 17390
RRSK 34932 41600 15000 15000
EBR(Dep) 104645
EBR(P) 52323
203 Surat-Vadodara- Road over bridge in lieu of level crossing No 228
on DFC route
SFund 4348
RRSK 59605 10 10
EBR(P) 127905
204 Jetalsar-Veraval Rajula-Mahuva amp Sihor -Palitana -subways in lieu
of level crossing- 18 Nos
SFund 86950 24787
RRSK 394341 75636 30000 50000
205 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 269
SFund 82792 78119
RRSK 23175 7126 50 500
EBR(P) 105968
206 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 177A on DFC route
SFund 4348
RRSK 48142 15000 15000
EBR(Dep) 104981
207 Surat-Vadodara- 4 Lane Road over bridge in lieu of level crossing
No 220
SFund 100
RRSK 173605 100 5000
EBR(P) 173706
208 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 276
SFund 82792 76527
RRSK 77592 8463 100 500
EBR(P) 160385
209 Dhasa-Jetalsar- subways in lieu of level crossing- 35 Nos RRSK 935106 100000 150000
210 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 179A on DFC route
SFund 4348
RRSK 126868 15000 15000
EBR(Dep) 131216
211 Rajkot-Jetalsar Jetalsar-Wansjaliya amp Kana- subways in lieu of
level crossing (19 Nos)
SFund 86950 50607
RRSK 420729 124972 30000 50000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9116
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
212 Ahmedabad - Viramgam- Road over bridge in lieu of level crossing
No 11A
SFund 500
RRSK 220476 75000 80000
EBR(Dep) 220977
213 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 259
SFund 5000 77
RRSK 168295 128 200 5000
EBR(P) 173296
214 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No37
SFund 500
RRSK 98088 100 80000
EBR(Dep) 98588
215 Charni Road-Grant Road- Regirdering of Road over bridge
between at km 39 - 10
SFund 1739
RRSK 71533 10000 40000
216 Elphinstone Road- Regirdering of Road over bridge at km 815-9 SFund 870
RRSK 105138 1 100
217 Virar-Vaiterna- 4 Lane Road over bridge in lieu of level crossing
No 41
SFund 500
RRSK 153899 1
EBR(Dep) 154399
218 Mumbai Central (South)- Regirdering of Road over bridge at Km
46-8
SFund 4348
RRSK 81412 10000 40000
219 Mahalaxmi- Regirdering of Road over bridge at km 526-27 SFund 4348
RRSK 214187 10000 70000
220 Surat-Vadodara- Road over bridge in lieu of level crossing No 198 SFund 100
RRSK 99900 200 4000
EBR(P) 100001
221 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 240
SFund 2000 316
RRSK 117126 13947 71400 10000
EBR(P) 119127
222 Ahmedabad-New Bhuj- Road over bridge in lieu of level crossing
No 3X
SFund 500
RRSK 175762 500 5000
EBR(Dep) 176262
223 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No 22A
RRSK 187005 23 50000 60000
EBR(Dep) 187006
224 Dadar- Regirdering of Road over bridge at Km 109-10 SFund 1739
RRSK 131731 1 100
225 Lowerparel-Elphinstone Road- Regirdering of Road over bridge at
km 712-13
SFund 1739
RRSK 186842 87000 80000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9117
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
226 Chanderiya-Ratlam - 2-lane road over bridge in lieu of level
crossing No141 near Piplia yard
SFund 1000
RRSK 89000 100 10000
EBR(P) 116700
227 Mandsour-Dalauda - 2-lane road over bridge in lieu of level
crossing No152
SFund 1000
RRSK 99000 5500 43600
EBR(P) 165000
228 Chanderia-Ratlam - 2-lane road over bridge at Chanderia in lieu of
level crossing No86
SFund 1500
RRSK 158500 100 5000
EBR(P) 160000
229 Mahesana-Patan- subways in lieu of level crossing No 27 32 56
amp 62 on Mahesana- Viramgam- level crossing No 4 11 18 19 amp
20 (9 Nos)
SFund 1 3530
RRSK 225598 23196 40000 30000
230 Mahesana-Viramgam- subways in lieu of level crossing No 6 7
14 23 amp 25 (5 Nos)
SFund 101 2015
RRSK 125934 4500 30000
231 Sabarmati-Botad- subways in lieu of level crossing- 23 Nos RRSK 613299 85000 150000
232 Viramgam- samakhiyali-subways in lieu of level crossing No 43
92 amp 108 (3 Nos)
SFund 100
RRSK 84683 1000
233 Udhna-Jalgaon- subways in lieu of level crossing No 87 122 123
133 141 150 amp 152 (7 Nos)
RRSK 218947 91408 100000 10000
234 Anand-Khambhat- subways in lieu of level crossing 10 Nos SFund 32995 60173
RRSK 96662 110623 8132 500
235 Chanderiya-Ratlam-subways in lieu of level crossing No 106 128
131 182 amp IND-Dewas-Ujjain level crossing No 26 (5 Nos)
SFund 26108 4281
RRSK 50310 29276 9571 100
236 Chanderia-Ratlam - 2-lane road under bridge at Nimbahera in lieu
of level crossing No103
SFund 87
RRSK 25313 1308 10000
EBR(P) 25400
237 Rajkot-Hapa- Road over bridge in lieu of level crossing No 145 at
Padadhari
RRSK 87610 1 100
EBR(Dep) 256608
238 Surat-Vadodara- Road over bridge in lieu of level crossing No158
(4-lane) between Sayan-Kim on DFC route
SFund 435
RRSK 120879 10 10
EBR(Dep) 363941
239 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 201 on DFC route
SFund 17390
RRSK 68351 56800 15000 15000
EBR(Dep) 257222
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
917
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
87 Nadiad-Modasa Anand-Khambhat amp Vasad-Kathana - Elimination
of various level crossings
RRSK 28928 500 1000
88 Vadodara Division - Manning of level crossings (15 Nos) RRSK 32650 500 1000
89 Ahmedabad Division - Manning of level crossings (26 Nos) RRSK 97716 14823 19703
90 Udhna-Jalgaon - Manning of unmanned level crossing of level
crossings (5 Nos)
RRSK 30296 4000 18038
91 Vadodara Division - Toilet block with dugwell arrangements on
manned level crossing (227 Nos)
RRSK 31607 500 2000
92 Bhavnagar Division - Toilet facilities at manned level crossings
(345 nos)
RRSK 107276 2000 40000
93 Udhna-Jalgaon - Toilets facilities at manned level crossings RRSK 64061 4000 5000
94 Ahmedabad Division - Basic facilities (toilet amp others) at various
manned level crossings
RRSK 56061 2000 13061
95 Vaitarna-Umbergaon - Provision of height gauges amp fencing at level
crossings
RRSK 27823 2000 13845
96 Ahmedabad Division - Interlocking of level crossings (6 Nos) RRSK 33706 18245 20000
97 Bhavnagar Division - Interlocking of level crossings (4 Nos) RRSK 29391 4000
98 Ratlam Division - Removing deficiencies from various manned level
crossings
RRSK 120396 16778 25000
99 Ahmedabad Division - Interlocking (14 level crossing gates) SFund 67385 54317
RRSK 9664 1705 1
100 Vadodara Divisions - Upgradation amp re-classification of level
crossings from A-class to spl-class (13 Nos)
SFund 55279 39072
RRSK 5384 4944 2000
101 Ahmedabad Division - Data loggers (remote terminal units) (77
level crossing gates)
SFund 26337 20207
RRSK 5557 1057 1
102 Ahmedabad Division - Solar power system (77 level crossing gates) SFund 82816 49327
RRSK 31071 1443 1444 1
103 Vadodara Division - Duty bunks on level crossings (100 Nos) SFund 34979 22131
RRSK 14192 6830 1875 3819
104 Vadodara Division - Interlocking of level crossing gates (tvu more
than 20000) (8 Nos) amp long block section (3 Nos)
SFund 44223 22240
RRSK 21864 1265 2000
105 Bhavnagar Division- Manning of unmanned level crossings (26 Nos) SFund 83827 376
RRSK 68827 2759 15000 25000
106 Vadodara Division- Manning of unmanned level crossings (35 Nos) SFund 105609 17632
RRSK 85609 17587 5971 2000
107 Ahmedabad Division - Upgradation and reclassification of level
crossings (15 Nos)
SFund 37939 261
RRSK 36939 1659 5725 26404
ROAD SAFETY WORKS-LEVEL CROSSINGS
A - Works in Progress
918
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
108 Vadodara Division - Interlocking of level crossings having ATVU
more than 20000
SFund 50441 13680
RRSK 29049 10000 4000
109 Rajkot Division- Manning of unmanned level crossings (69 Nos) SFund 352803
RRSK 352303 14601 60000 30000
110 Porbandar-Kanalus - Repl of lower quadrant mechanical signaling
system at level crossing gates amp repl of mechanical lifting barriers
with electrical barriers
SFund 73182 13504
RRSK 53182 18417 12500 20000
111 Western Railway - Electrical lifting barriers (33 level crossing
gates) relay termination material wiring material power cable etc
for electrical lifting barriers
SFund 30290 1043
RRSK 29190 9145 13026 4000
112 Ratlam Division- Manning of unmanned level crossings (33 Nos) SFund 99157 5923
RRSK 78463 24262 15000 30000
113 Ahmedabad - Interlocking of level crossing gates (8 Nos) SFund 47324
RRSK 47224 100 100
114 Vadodara - Interlocking of level crossing gates SFund 89993 423
RRSK 88993 17482 5000
115 Ratlam - Manning of unmanned level crossings (20 Nos) SFund 33132
RRSK 89817 8271 2000 10000
116 Vadodara - Manning of unmanned level crossings (66 Nos) SFund 200962
RRSK 198462 25401 40453 5000
117 Bhavnagar - Manning of unmanned level crossing (83 Nos) SFund 309164
RRSK 309064 62540 237609 40000
118 Viramgam - Okha - Manning of unmanned level crossings (82 Nos) SFund 250100
RRSK 250000 35000 40000
119 Ahmedabad - Manning of unmanned level crossings (80 Nos) SFund 244000 6132
RRSK 241000 41384 62413 34978
120 Manning of unmanned level crossings between Radhanpur-
Gandhidham section (43 Nos) (KRCL)
RRSK 161606 15367 1000
121 Manning of unmanned level crossing between Radhanpur-Palanpur
section (46 nos) KRCL
RRSK 172881 7539 1000
122 Works costing below Rs25 crore each RRSK 150000
TOTAL-WORKS IN PROGRESS RRSK 598951
123 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Road Safety Works-Level Crossings RRSK 648951
ROAD SAFETY WORKS-LEVEL CROSSINGS
B - New Works
919
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
124 Bhandu Moti Dab-Mahesana - Road over bridge in lieu of level
crossing No 211
SFund 79627 79577
RRSK 68683 -5545 1 1
EBR(Dep) 76908
125 Meghnagar - Road over bridge in lieu of level crossing No60-B SFund 2000
RRSK 34653 5000 33400
EBR(Dep) 31876
126 Maroli-Sachin - Road over bridge in lieu of level crossing No133 SFund 4000
RRSK 22546 1000 50000
127 Virar-Surat - Road over bridge in lieu of level crossing No138 near
Sachin (4-lane)
SFund 54643 82256
RRSK 1000 25797 3300 1000
EBR(Dep) 55643
128 Viramgam-Jhund - Road over bridge in lieu of level crossing No42
(2-lane)
SFund 63739 67339
RRSK 1000 4008 4000 1
EBR(Dep) 110479
129 Surat-Vadodara - Road over bridge in lieu of level crossing No213
near Miyagam Karjan
SFund 53983 45913
RRSK 2881 503 2248 1000
EBR(Dep) 52400
130 Kim-Kosamba - Road over bridge in lieu of level crossing No160 (2-
lane)
SFund 72068 80284
RRSK 1000 1 100
EBR(Dep) 73068
131 Pratapnagar-Vishwamitri - Road over bridge in lieu of level crossing
No 2
SFund 48817 47817
RRSK 6135 1 1
EBR(Dep) 51100
132 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No2-A
SFund 1
RRSK 35999 100 1000
EBR(Dep) 36000
133 Bharuch-Dahej - 2- lane road over bridge in lieu of level crossing
No22 near Samni station
SFund 46790 57359
RRSK 1000 38 1 1
EBR(Dep) 57737
134 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No178 near Bharuch yard
SFund 92806 88666
RRSK 25994 1593 100 500
EBR(Dep) 233200
135 Bharuch-Dahej - 4-lane road over bridge in lieu of level crossing
No50
SFund 1
RRSK 50899 1
EBR(Dep) 50900
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
A - Works in Progress
9110
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
136 Dharangaon-Thakherkhed - 2-lane road over bridge on level
crossing No144 on state highway No185
SFund 50170 45820
RRSK 8572 1979 1200 500
EBR(Dep) 102582
137 Ujjain-Bhopal - Road over bridge in lieu of level crossing No101B
near Shore
SFund 2500 -24
RRSK 41006 39894 94500 1000
EBR(Dep) 46195
138 Amalner-Marwad Nim Road - Road over bridge in lieu of level
crossing No135
SFund 50239 44239
RRSK 1597 28 1200 500
EBR(Dep) 95487
139 Palanpur-Khodiyar - Road under bridges in lieu of level crossings
on dedicated freight corridor route (42 Nos)
SFund 313449 250867
RRSK 308394 96112 30000 30000
140 Bajana-Jatpipli - Road over bridge in lieu of level crossing No 25 SFund 1000
RRSK 87051 1 20000
EBR(Dep) 203052
141 Udhna-Jalgaon - Road over bridge in lieu of level crossing No37 SFund 5000
RRSK 72704 5000
EBR(Dep) 232887
142 Bhavnagar Divsion - Limited height subways in lieu of level
crossings (33 Nos)
SFund 196681 203596
RRSK 63911 28554 10000 20000
143 Palanpur-Khodiyar - Road ovrer bridges in lieu of level crossing
Nos191A 199A amp 227 on dedicated freight corridor route
SFund 34780 40000
RRSK 514304 23900 30000 30000
EBR(Dep) 274542
144 Ratlam-Godhara - 2-lane road over bridge in lieu of level crossing
No61-A
SFund 2000
RRSK 66459 100 5000
EBR(Dep) 64858
145 Surat - Vadodara - Limited height subways in lieu of level crossing
Nos162 amp 168
SFund 17645 18414
RRSK 22527 6306 500
146 Virar - Surat - Subwaysroad under bridge at level crossing Nos
55x 58 142 amp LC-1 (Udhna-Niyol)
SFund 500
RRSK 61898 5000 5000
147 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos171-A 188-A amp 208-B
SFund 26085 20900
RRSK 548600 22800 30000 30000
EBR(Dep) 287342
148 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos208 211-C 214 amp 220
SFund 69560 120000
RRSK 695510 59400 50000 50000
EBR(Dep) 382535
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9111
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
149 Ahmedabad-Palanpur - Road over bridge in lieu of level crossing
Nos165 166 amp 169 and level crossing No17 of Ahmedabad -
Viramgam
SFund 26085
RRSK 679207 30000 30000
EBR(Dep) 352646
150 Virar - Surat - SubwaysRoad under bridges in lieu of level
crossings (34 Nos)
SFund 175900 175900
RRSK 578938 89650 90000 10000
151 Ahmedabad Division - Road under bridges in lieu of level crossings
(58 Nos)
SFund 265089 247530 42610
RRSK 545731 19586 3570 30000
152 Timba-Tuva - Road over bridges in lieu of level crossing No58 SFund 1500
RRSK 93474 100 500
EBR(Dep) 584974
153 Bhatiel-Petlad - Road over bridge in lieu of level crossing No28 SFund 1500
RRSK 174899 500 500
EBR(Dep) 271399
154 Kosad-Gothangam - Road over bridge in lieu of level crossing
No149
SFund 435
RRSK 154072 1 1
EBR(Dep) 154508
155 Sayan-Kim - Road over bridge in lieu of level crossing No156 SFund 4348
RRSK 168868 10000 30000
EBR(Dep) 173216
156 Kosamba-Hathuran - Road over bridge in lieu of level crossing
No163
SFund 4348
RRSK 138655 6800 20000
EBR(Dep) 143004
157 Virar-Surat - Road over bridge in lieu of level crossing Nos 92 94 amp
97 along dedicated freight corridor route
SFund 17390
RRSK 321310 10000 20000
EBR(Dep) 406369
158 Naikheri-Ujjain - Road over bridge in lieu of level crossing No25
and Chintamanganesh-Ujjain - level crossing No8 (metre gauge)
SFund 51115 50818
RRSK 55413 788 100 500
EBR(Dep) 183072
159 Sehore-Phanda - Road over bridge in lieu of level crossing No104 SFund 1000
RRSK 88484 100 5000
EBR(Dep) 89484
160 Naikheri-Ujjain - Road over bridge in lieu of level crossing No23 SFund 100
RRSK 77002 5000 46100
EBR(Dep) 137068
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9112
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
161 Ratlam-Khandwa - 2-lane road over bridge in lieu of level crossing
No250
SFund 2000 41 20000
RRSK 95436 20299 1203 500
EBR(Dep) 97436
162 Bairagarh-Bakaniabhori - Road over bridge in lieu of level crossing
No115
SFund 1000
RRSK 189403 1
EBR(Dep) 190403
163 Sehore-Phanda - Road over bridge in lieu of level crossing No107 SFund 500
RRSK 91224 100 5000
EBR(Dep) 91724
164 Bamania-Amargarh - Road over bridge in lieu of level crossing
No72
SFund 2000
RRSK 104079 100 100
EBR(Dep) 106079
165 Virar-Surat - Road over bridge in lieu of level crossing Nos109
111 114 115 amp 118 along dedicated freight corridor route
SFund 17390 1452
RRSK 368510 12500 30000
EBR(Dep) 460095
166 Gothangam-Sayan - Road over bridge in lieu of level crossing
No151
SFund 31997 29797
RRSK 14313 -78 100
EBR(Dep) 77827
167 Virar-Surat - Road over bridge in lieu of level crossing Nos60 64
66 68 69 71 74 75 77 81 amp 82 along dedicated freight corridor
route
SFund 10000 27000
RRSK 932200 15000 30000
EBR(Dep) 1540420
168 Virar-Surat - Road over bridge in lieu of level crosisng No61 along
dedicated freight corridor route
SFund 4348
RRSK 67642 5000 10000
EBR(Dep) 71993
169 Derol-Kharsaliya - Road over bridge in lieu of level crossing No32 SFund 1500
RRSK 93474 100 500
EBR(Dep) 399974
170 Gothangam-Sayan - Road over bridge in lieu of level crossing
No150
SFund 4348
RRSK 150714 10000 20000
EBR(Dep) 155063
171 Virar-Surat - Road over bridge in lieu of level crossing Nos57 amp
143 along dedicated freight corridor route
SFund 1
RRSK 170312 1
EBR(Dep) 170312
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9113
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
172 Virar-Surat - Road over bridge in lieu of level crossing Nos84 88 amp
90 along dedicated freight corridor route
SFund 10000
RRSK 362918 15000 20000
EBR(Dep) 529675
173 Kim-Kosamba - Road over bridge in lieu of level crossing No161 SFund 4348
RRSK 162307 10 10
EBR(Dep) 166655
174 Virar-Surat - Road over bridge in lieu of level crossing
Nos124126amp 127 along dedicated freight corridor route
SFund 10000 53500
RRSK 429771 10000 16990
EBR(Dep) 529173
175 Sayan-Kim - Road over bridge in lieu of level crossing No154 SFund 4000
RRSK 138094 10000 10000
EBR(Dep) 142094
176 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No165
SFund 4348
RRSK 207011 10 10
EBR(Dep) 211359
177 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No166
SFund 4348
RRSK 135056 10 10
EBR(Dep) 139404
178 Virar-Surat - Road over bridge in lieu of level crossing Nos42 46A
48 52 55 102 106 108 130 amp 137 along dedicated freight
corridor route
SFund 10000 72200
RRSK 929294 10000 10000
EBR(Dep) 1234542
179 Udhna - Jalgaon - Road over bridge in lieu of level crossing No51 SFund 5000
RRSK 75295 10000
EBR(Dep) 250296
180 Sadnapura - Bhalej - Road over bridge in lieu of level crossing No
11
SFund 1500
RRSK 93474 100 10
EBR(Dep) 249974
181 Sayan-Kim - Road over bridge in lieu of level crossing No153 SFund 4348
RRSK 134797 6900 20000
EBR(Dep) 139145
182 Derol - Kharsaliya - Road over bridge in lieu of level crossing No41 SFund 1500
RRSK 93474 500 500
EBR(Dep) 204974
183 Rajkot - Okha - Road over bridge in lieu of level crossing No197 SFund 100
RRSK 94049 19493 9868 1000
EBR(Dep) 94148
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9114
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
184 Rajkot Division - Limited height subways in lieu of level crossings
(36 Nos)
SFund 192337 145046
RRSK 68323 68445 65000 20000
185 Chanderiya-Ratlam - Limited height subways in lieu of level
crossings (No121 amp 183)
SFund 22614 22603
RRSK 2700 1 1
186 Dabhoi-Pratpnagar amp Dabhoi-Chhota Udepur - Limited height
subways (25 Nos)
SFund 203310 202077
RRSK 274218 44171 40000 1000
187 Surat-Vadodara-Godhra - Limited height subway at level crossings
(11 Nos)
SFund 133888 88592
RRSK 79889 40000 100
188 Ankleshwar-Rajpipla - Limited height subways road under bridges
in lieu of level crossings (36 Nos)
SFund 297860 248077 20000
RRSK 284870 80559 10919 20000
189 Ujjain-Bhopal - Limited height subways at level crossings (No88
89 amp 91)
SFund 54571 58450
RRSK 1000 11823 1 1
190 Udhna-Jalgaon - Limited height subways at level crossings (No38
108 127 128 145 146147 amp 134)
SFund 40087 87
RRSK 75049 230000 30000
191 Ahmedabad Division - Elimination of level crossings by road under
bridges (90 Nos)
SFund 11356 45
RRSK 1000 165047 20000
192 Ujjain-Bhopal - Limited height subway at level crossings (No43 44
amp 58)
SFund 67442 69163
RRSK 1900 259 1 1
193 Vadodara Division - Limited height subway in lieu of level crossings
(2 Nos on double line amp 19 Nos on single line)
SFund 69263 85693
RRSK 236140 1626 31000 200
194 Ratlam Division - Limited height subway in lieu of level crossings
(22 Nos)
SFund 272546 366104
RRSK 1000 36466 1000 1
195 Mehsana-Patan - Road over bridge in lieu of level crossing No40X SFund 53406 57194
RRSK 16245 1549 100 100
EBR(Dep) 287771
196 Gangadhara-Bardoli - Road over bridge in lieu of level crossing
No17A
SFund 32000 9390
RRSK 99253 18000 20000
EBR(Dep) 131253
197 Virpur-Jetalsar - Road over bridge in lieu of level crossing No61 SFund 5000
RRSK 187384 10000 20000
198 Jamnagar-Lakhabawal - Road over bridge in lieu of level crossing
No199
SFund 5000
RRSK 78380 2000 20000
EBR(Dep) 83380
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9115
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
199 Surat-Vadodara - Elimination of level crossing No173 by 4-lane
road over bridge
SFund 5000
RRSK 229396 102600 60000
EBR(Dep) 234397
200 Bhavnagar Division - Limited height subways to eliminate level
crossings (77 Nos)
SFund 87
RRSK 648618 100 100
201 Dewas-Barlai - 2 lane road over bridge in lieu of level crossing
No37
SFund 500
RRSK 36758 144 40000 22000
EBR(Dep) 206948
202 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 216 on DFC route
SFund 17390
RRSK 34932 41600 15000 15000
EBR(Dep) 104645
EBR(P) 52323
203 Surat-Vadodara- Road over bridge in lieu of level crossing No 228
on DFC route
SFund 4348
RRSK 59605 10 10
EBR(P) 127905
204 Jetalsar-Veraval Rajula-Mahuva amp Sihor -Palitana -subways in lieu
of level crossing- 18 Nos
SFund 86950 24787
RRSK 394341 75636 30000 50000
205 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 269
SFund 82792 78119
RRSK 23175 7126 50 500
EBR(P) 105968
206 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 177A on DFC route
SFund 4348
RRSK 48142 15000 15000
EBR(Dep) 104981
207 Surat-Vadodara- 4 Lane Road over bridge in lieu of level crossing
No 220
SFund 100
RRSK 173605 100 5000
EBR(P) 173706
208 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 276
SFund 82792 76527
RRSK 77592 8463 100 500
EBR(P) 160385
209 Dhasa-Jetalsar- subways in lieu of level crossing- 35 Nos RRSK 935106 100000 150000
210 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 179A on DFC route
SFund 4348
RRSK 126868 15000 15000
EBR(Dep) 131216
211 Rajkot-Jetalsar Jetalsar-Wansjaliya amp Kana- subways in lieu of
level crossing (19 Nos)
SFund 86950 50607
RRSK 420729 124972 30000 50000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9116
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
212 Ahmedabad - Viramgam- Road over bridge in lieu of level crossing
No 11A
SFund 500
RRSK 220476 75000 80000
EBR(Dep) 220977
213 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 259
SFund 5000 77
RRSK 168295 128 200 5000
EBR(P) 173296
214 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No37
SFund 500
RRSK 98088 100 80000
EBR(Dep) 98588
215 Charni Road-Grant Road- Regirdering of Road over bridge
between at km 39 - 10
SFund 1739
RRSK 71533 10000 40000
216 Elphinstone Road- Regirdering of Road over bridge at km 815-9 SFund 870
RRSK 105138 1 100
217 Virar-Vaiterna- 4 Lane Road over bridge in lieu of level crossing
No 41
SFund 500
RRSK 153899 1
EBR(Dep) 154399
218 Mumbai Central (South)- Regirdering of Road over bridge at Km
46-8
SFund 4348
RRSK 81412 10000 40000
219 Mahalaxmi- Regirdering of Road over bridge at km 526-27 SFund 4348
RRSK 214187 10000 70000
220 Surat-Vadodara- Road over bridge in lieu of level crossing No 198 SFund 100
RRSK 99900 200 4000
EBR(P) 100001
221 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 240
SFund 2000 316
RRSK 117126 13947 71400 10000
EBR(P) 119127
222 Ahmedabad-New Bhuj- Road over bridge in lieu of level crossing
No 3X
SFund 500
RRSK 175762 500 5000
EBR(Dep) 176262
223 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No 22A
RRSK 187005 23 50000 60000
EBR(Dep) 187006
224 Dadar- Regirdering of Road over bridge at Km 109-10 SFund 1739
RRSK 131731 1 100
225 Lowerparel-Elphinstone Road- Regirdering of Road over bridge at
km 712-13
SFund 1739
RRSK 186842 87000 80000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9117
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
226 Chanderiya-Ratlam - 2-lane road over bridge in lieu of level
crossing No141 near Piplia yard
SFund 1000
RRSK 89000 100 10000
EBR(P) 116700
227 Mandsour-Dalauda - 2-lane road over bridge in lieu of level
crossing No152
SFund 1000
RRSK 99000 5500 43600
EBR(P) 165000
228 Chanderia-Ratlam - 2-lane road over bridge at Chanderia in lieu of
level crossing No86
SFund 1500
RRSK 158500 100 5000
EBR(P) 160000
229 Mahesana-Patan- subways in lieu of level crossing No 27 32 56
amp 62 on Mahesana- Viramgam- level crossing No 4 11 18 19 amp
20 (9 Nos)
SFund 1 3530
RRSK 225598 23196 40000 30000
230 Mahesana-Viramgam- subways in lieu of level crossing No 6 7
14 23 amp 25 (5 Nos)
SFund 101 2015
RRSK 125934 4500 30000
231 Sabarmati-Botad- subways in lieu of level crossing- 23 Nos RRSK 613299 85000 150000
232 Viramgam- samakhiyali-subways in lieu of level crossing No 43
92 amp 108 (3 Nos)
SFund 100
RRSK 84683 1000
233 Udhna-Jalgaon- subways in lieu of level crossing No 87 122 123
133 141 150 amp 152 (7 Nos)
RRSK 218947 91408 100000 10000
234 Anand-Khambhat- subways in lieu of level crossing 10 Nos SFund 32995 60173
RRSK 96662 110623 8132 500
235 Chanderiya-Ratlam-subways in lieu of level crossing No 106 128
131 182 amp IND-Dewas-Ujjain level crossing No 26 (5 Nos)
SFund 26108 4281
RRSK 50310 29276 9571 100
236 Chanderia-Ratlam - 2-lane road under bridge at Nimbahera in lieu
of level crossing No103
SFund 87
RRSK 25313 1308 10000
EBR(P) 25400
237 Rajkot-Hapa- Road over bridge in lieu of level crossing No 145 at
Padadhari
RRSK 87610 1 100
EBR(Dep) 256608
238 Surat-Vadodara- Road over bridge in lieu of level crossing No158
(4-lane) between Sayan-Kim on DFC route
SFund 435
RRSK 120879 10 10
EBR(Dep) 363941
239 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 201 on DFC route
SFund 17390
RRSK 68351 56800 15000 15000
EBR(Dep) 257222
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
918
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
108 Vadodara Division - Interlocking of level crossings having ATVU
more than 20000
SFund 50441 13680
RRSK 29049 10000 4000
109 Rajkot Division- Manning of unmanned level crossings (69 Nos) SFund 352803
RRSK 352303 14601 60000 30000
110 Porbandar-Kanalus - Repl of lower quadrant mechanical signaling
system at level crossing gates amp repl of mechanical lifting barriers
with electrical barriers
SFund 73182 13504
RRSK 53182 18417 12500 20000
111 Western Railway - Electrical lifting barriers (33 level crossing
gates) relay termination material wiring material power cable etc
for electrical lifting barriers
SFund 30290 1043
RRSK 29190 9145 13026 4000
112 Ratlam Division- Manning of unmanned level crossings (33 Nos) SFund 99157 5923
RRSK 78463 24262 15000 30000
113 Ahmedabad - Interlocking of level crossing gates (8 Nos) SFund 47324
RRSK 47224 100 100
114 Vadodara - Interlocking of level crossing gates SFund 89993 423
RRSK 88993 17482 5000
115 Ratlam - Manning of unmanned level crossings (20 Nos) SFund 33132
RRSK 89817 8271 2000 10000
116 Vadodara - Manning of unmanned level crossings (66 Nos) SFund 200962
RRSK 198462 25401 40453 5000
117 Bhavnagar - Manning of unmanned level crossing (83 Nos) SFund 309164
RRSK 309064 62540 237609 40000
118 Viramgam - Okha - Manning of unmanned level crossings (82 Nos) SFund 250100
RRSK 250000 35000 40000
119 Ahmedabad - Manning of unmanned level crossings (80 Nos) SFund 244000 6132
RRSK 241000 41384 62413 34978
120 Manning of unmanned level crossings between Radhanpur-
Gandhidham section (43 Nos) (KRCL)
RRSK 161606 15367 1000
121 Manning of unmanned level crossing between Radhanpur-Palanpur
section (46 nos) KRCL
RRSK 172881 7539 1000
122 Works costing below Rs25 crore each RRSK 150000
TOTAL-WORKS IN PROGRESS RRSK 598951
123 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Road Safety Works-Level Crossings RRSK 648951
ROAD SAFETY WORKS-LEVEL CROSSINGS
B - New Works
919
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
124 Bhandu Moti Dab-Mahesana - Road over bridge in lieu of level
crossing No 211
SFund 79627 79577
RRSK 68683 -5545 1 1
EBR(Dep) 76908
125 Meghnagar - Road over bridge in lieu of level crossing No60-B SFund 2000
RRSK 34653 5000 33400
EBR(Dep) 31876
126 Maroli-Sachin - Road over bridge in lieu of level crossing No133 SFund 4000
RRSK 22546 1000 50000
127 Virar-Surat - Road over bridge in lieu of level crossing No138 near
Sachin (4-lane)
SFund 54643 82256
RRSK 1000 25797 3300 1000
EBR(Dep) 55643
128 Viramgam-Jhund - Road over bridge in lieu of level crossing No42
(2-lane)
SFund 63739 67339
RRSK 1000 4008 4000 1
EBR(Dep) 110479
129 Surat-Vadodara - Road over bridge in lieu of level crossing No213
near Miyagam Karjan
SFund 53983 45913
RRSK 2881 503 2248 1000
EBR(Dep) 52400
130 Kim-Kosamba - Road over bridge in lieu of level crossing No160 (2-
lane)
SFund 72068 80284
RRSK 1000 1 100
EBR(Dep) 73068
131 Pratapnagar-Vishwamitri - Road over bridge in lieu of level crossing
No 2
SFund 48817 47817
RRSK 6135 1 1
EBR(Dep) 51100
132 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No2-A
SFund 1
RRSK 35999 100 1000
EBR(Dep) 36000
133 Bharuch-Dahej - 2- lane road over bridge in lieu of level crossing
No22 near Samni station
SFund 46790 57359
RRSK 1000 38 1 1
EBR(Dep) 57737
134 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No178 near Bharuch yard
SFund 92806 88666
RRSK 25994 1593 100 500
EBR(Dep) 233200
135 Bharuch-Dahej - 4-lane road over bridge in lieu of level crossing
No50
SFund 1
RRSK 50899 1
EBR(Dep) 50900
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
A - Works in Progress
9110
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
136 Dharangaon-Thakherkhed - 2-lane road over bridge on level
crossing No144 on state highway No185
SFund 50170 45820
RRSK 8572 1979 1200 500
EBR(Dep) 102582
137 Ujjain-Bhopal - Road over bridge in lieu of level crossing No101B
near Shore
SFund 2500 -24
RRSK 41006 39894 94500 1000
EBR(Dep) 46195
138 Amalner-Marwad Nim Road - Road over bridge in lieu of level
crossing No135
SFund 50239 44239
RRSK 1597 28 1200 500
EBR(Dep) 95487
139 Palanpur-Khodiyar - Road under bridges in lieu of level crossings
on dedicated freight corridor route (42 Nos)
SFund 313449 250867
RRSK 308394 96112 30000 30000
140 Bajana-Jatpipli - Road over bridge in lieu of level crossing No 25 SFund 1000
RRSK 87051 1 20000
EBR(Dep) 203052
141 Udhna-Jalgaon - Road over bridge in lieu of level crossing No37 SFund 5000
RRSK 72704 5000
EBR(Dep) 232887
142 Bhavnagar Divsion - Limited height subways in lieu of level
crossings (33 Nos)
SFund 196681 203596
RRSK 63911 28554 10000 20000
143 Palanpur-Khodiyar - Road ovrer bridges in lieu of level crossing
Nos191A 199A amp 227 on dedicated freight corridor route
SFund 34780 40000
RRSK 514304 23900 30000 30000
EBR(Dep) 274542
144 Ratlam-Godhara - 2-lane road over bridge in lieu of level crossing
No61-A
SFund 2000
RRSK 66459 100 5000
EBR(Dep) 64858
145 Surat - Vadodara - Limited height subways in lieu of level crossing
Nos162 amp 168
SFund 17645 18414
RRSK 22527 6306 500
146 Virar - Surat - Subwaysroad under bridge at level crossing Nos
55x 58 142 amp LC-1 (Udhna-Niyol)
SFund 500
RRSK 61898 5000 5000
147 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos171-A 188-A amp 208-B
SFund 26085 20900
RRSK 548600 22800 30000 30000
EBR(Dep) 287342
148 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos208 211-C 214 amp 220
SFund 69560 120000
RRSK 695510 59400 50000 50000
EBR(Dep) 382535
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9111
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
149 Ahmedabad-Palanpur - Road over bridge in lieu of level crossing
Nos165 166 amp 169 and level crossing No17 of Ahmedabad -
Viramgam
SFund 26085
RRSK 679207 30000 30000
EBR(Dep) 352646
150 Virar - Surat - SubwaysRoad under bridges in lieu of level
crossings (34 Nos)
SFund 175900 175900
RRSK 578938 89650 90000 10000
151 Ahmedabad Division - Road under bridges in lieu of level crossings
(58 Nos)
SFund 265089 247530 42610
RRSK 545731 19586 3570 30000
152 Timba-Tuva - Road over bridges in lieu of level crossing No58 SFund 1500
RRSK 93474 100 500
EBR(Dep) 584974
153 Bhatiel-Petlad - Road over bridge in lieu of level crossing No28 SFund 1500
RRSK 174899 500 500
EBR(Dep) 271399
154 Kosad-Gothangam - Road over bridge in lieu of level crossing
No149
SFund 435
RRSK 154072 1 1
EBR(Dep) 154508
155 Sayan-Kim - Road over bridge in lieu of level crossing No156 SFund 4348
RRSK 168868 10000 30000
EBR(Dep) 173216
156 Kosamba-Hathuran - Road over bridge in lieu of level crossing
No163
SFund 4348
RRSK 138655 6800 20000
EBR(Dep) 143004
157 Virar-Surat - Road over bridge in lieu of level crossing Nos 92 94 amp
97 along dedicated freight corridor route
SFund 17390
RRSK 321310 10000 20000
EBR(Dep) 406369
158 Naikheri-Ujjain - Road over bridge in lieu of level crossing No25
and Chintamanganesh-Ujjain - level crossing No8 (metre gauge)
SFund 51115 50818
RRSK 55413 788 100 500
EBR(Dep) 183072
159 Sehore-Phanda - Road over bridge in lieu of level crossing No104 SFund 1000
RRSK 88484 100 5000
EBR(Dep) 89484
160 Naikheri-Ujjain - Road over bridge in lieu of level crossing No23 SFund 100
RRSK 77002 5000 46100
EBR(Dep) 137068
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9112
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
161 Ratlam-Khandwa - 2-lane road over bridge in lieu of level crossing
No250
SFund 2000 41 20000
RRSK 95436 20299 1203 500
EBR(Dep) 97436
162 Bairagarh-Bakaniabhori - Road over bridge in lieu of level crossing
No115
SFund 1000
RRSK 189403 1
EBR(Dep) 190403
163 Sehore-Phanda - Road over bridge in lieu of level crossing No107 SFund 500
RRSK 91224 100 5000
EBR(Dep) 91724
164 Bamania-Amargarh - Road over bridge in lieu of level crossing
No72
SFund 2000
RRSK 104079 100 100
EBR(Dep) 106079
165 Virar-Surat - Road over bridge in lieu of level crossing Nos109
111 114 115 amp 118 along dedicated freight corridor route
SFund 17390 1452
RRSK 368510 12500 30000
EBR(Dep) 460095
166 Gothangam-Sayan - Road over bridge in lieu of level crossing
No151
SFund 31997 29797
RRSK 14313 -78 100
EBR(Dep) 77827
167 Virar-Surat - Road over bridge in lieu of level crossing Nos60 64
66 68 69 71 74 75 77 81 amp 82 along dedicated freight corridor
route
SFund 10000 27000
RRSK 932200 15000 30000
EBR(Dep) 1540420
168 Virar-Surat - Road over bridge in lieu of level crosisng No61 along
dedicated freight corridor route
SFund 4348
RRSK 67642 5000 10000
EBR(Dep) 71993
169 Derol-Kharsaliya - Road over bridge in lieu of level crossing No32 SFund 1500
RRSK 93474 100 500
EBR(Dep) 399974
170 Gothangam-Sayan - Road over bridge in lieu of level crossing
No150
SFund 4348
RRSK 150714 10000 20000
EBR(Dep) 155063
171 Virar-Surat - Road over bridge in lieu of level crossing Nos57 amp
143 along dedicated freight corridor route
SFund 1
RRSK 170312 1
EBR(Dep) 170312
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9113
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
172 Virar-Surat - Road over bridge in lieu of level crossing Nos84 88 amp
90 along dedicated freight corridor route
SFund 10000
RRSK 362918 15000 20000
EBR(Dep) 529675
173 Kim-Kosamba - Road over bridge in lieu of level crossing No161 SFund 4348
RRSK 162307 10 10
EBR(Dep) 166655
174 Virar-Surat - Road over bridge in lieu of level crossing
Nos124126amp 127 along dedicated freight corridor route
SFund 10000 53500
RRSK 429771 10000 16990
EBR(Dep) 529173
175 Sayan-Kim - Road over bridge in lieu of level crossing No154 SFund 4000
RRSK 138094 10000 10000
EBR(Dep) 142094
176 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No165
SFund 4348
RRSK 207011 10 10
EBR(Dep) 211359
177 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No166
SFund 4348
RRSK 135056 10 10
EBR(Dep) 139404
178 Virar-Surat - Road over bridge in lieu of level crossing Nos42 46A
48 52 55 102 106 108 130 amp 137 along dedicated freight
corridor route
SFund 10000 72200
RRSK 929294 10000 10000
EBR(Dep) 1234542
179 Udhna - Jalgaon - Road over bridge in lieu of level crossing No51 SFund 5000
RRSK 75295 10000
EBR(Dep) 250296
180 Sadnapura - Bhalej - Road over bridge in lieu of level crossing No
11
SFund 1500
RRSK 93474 100 10
EBR(Dep) 249974
181 Sayan-Kim - Road over bridge in lieu of level crossing No153 SFund 4348
RRSK 134797 6900 20000
EBR(Dep) 139145
182 Derol - Kharsaliya - Road over bridge in lieu of level crossing No41 SFund 1500
RRSK 93474 500 500
EBR(Dep) 204974
183 Rajkot - Okha - Road over bridge in lieu of level crossing No197 SFund 100
RRSK 94049 19493 9868 1000
EBR(Dep) 94148
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9114
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
184 Rajkot Division - Limited height subways in lieu of level crossings
(36 Nos)
SFund 192337 145046
RRSK 68323 68445 65000 20000
185 Chanderiya-Ratlam - Limited height subways in lieu of level
crossings (No121 amp 183)
SFund 22614 22603
RRSK 2700 1 1
186 Dabhoi-Pratpnagar amp Dabhoi-Chhota Udepur - Limited height
subways (25 Nos)
SFund 203310 202077
RRSK 274218 44171 40000 1000
187 Surat-Vadodara-Godhra - Limited height subway at level crossings
(11 Nos)
SFund 133888 88592
RRSK 79889 40000 100
188 Ankleshwar-Rajpipla - Limited height subways road under bridges
in lieu of level crossings (36 Nos)
SFund 297860 248077 20000
RRSK 284870 80559 10919 20000
189 Ujjain-Bhopal - Limited height subways at level crossings (No88
89 amp 91)
SFund 54571 58450
RRSK 1000 11823 1 1
190 Udhna-Jalgaon - Limited height subways at level crossings (No38
108 127 128 145 146147 amp 134)
SFund 40087 87
RRSK 75049 230000 30000
191 Ahmedabad Division - Elimination of level crossings by road under
bridges (90 Nos)
SFund 11356 45
RRSK 1000 165047 20000
192 Ujjain-Bhopal - Limited height subway at level crossings (No43 44
amp 58)
SFund 67442 69163
RRSK 1900 259 1 1
193 Vadodara Division - Limited height subway in lieu of level crossings
(2 Nos on double line amp 19 Nos on single line)
SFund 69263 85693
RRSK 236140 1626 31000 200
194 Ratlam Division - Limited height subway in lieu of level crossings
(22 Nos)
SFund 272546 366104
RRSK 1000 36466 1000 1
195 Mehsana-Patan - Road over bridge in lieu of level crossing No40X SFund 53406 57194
RRSK 16245 1549 100 100
EBR(Dep) 287771
196 Gangadhara-Bardoli - Road over bridge in lieu of level crossing
No17A
SFund 32000 9390
RRSK 99253 18000 20000
EBR(Dep) 131253
197 Virpur-Jetalsar - Road over bridge in lieu of level crossing No61 SFund 5000
RRSK 187384 10000 20000
198 Jamnagar-Lakhabawal - Road over bridge in lieu of level crossing
No199
SFund 5000
RRSK 78380 2000 20000
EBR(Dep) 83380
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9115
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
199 Surat-Vadodara - Elimination of level crossing No173 by 4-lane
road over bridge
SFund 5000
RRSK 229396 102600 60000
EBR(Dep) 234397
200 Bhavnagar Division - Limited height subways to eliminate level
crossings (77 Nos)
SFund 87
RRSK 648618 100 100
201 Dewas-Barlai - 2 lane road over bridge in lieu of level crossing
No37
SFund 500
RRSK 36758 144 40000 22000
EBR(Dep) 206948
202 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 216 on DFC route
SFund 17390
RRSK 34932 41600 15000 15000
EBR(Dep) 104645
EBR(P) 52323
203 Surat-Vadodara- Road over bridge in lieu of level crossing No 228
on DFC route
SFund 4348
RRSK 59605 10 10
EBR(P) 127905
204 Jetalsar-Veraval Rajula-Mahuva amp Sihor -Palitana -subways in lieu
of level crossing- 18 Nos
SFund 86950 24787
RRSK 394341 75636 30000 50000
205 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 269
SFund 82792 78119
RRSK 23175 7126 50 500
EBR(P) 105968
206 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 177A on DFC route
SFund 4348
RRSK 48142 15000 15000
EBR(Dep) 104981
207 Surat-Vadodara- 4 Lane Road over bridge in lieu of level crossing
No 220
SFund 100
RRSK 173605 100 5000
EBR(P) 173706
208 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 276
SFund 82792 76527
RRSK 77592 8463 100 500
EBR(P) 160385
209 Dhasa-Jetalsar- subways in lieu of level crossing- 35 Nos RRSK 935106 100000 150000
210 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 179A on DFC route
SFund 4348
RRSK 126868 15000 15000
EBR(Dep) 131216
211 Rajkot-Jetalsar Jetalsar-Wansjaliya amp Kana- subways in lieu of
level crossing (19 Nos)
SFund 86950 50607
RRSK 420729 124972 30000 50000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9116
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
212 Ahmedabad - Viramgam- Road over bridge in lieu of level crossing
No 11A
SFund 500
RRSK 220476 75000 80000
EBR(Dep) 220977
213 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 259
SFund 5000 77
RRSK 168295 128 200 5000
EBR(P) 173296
214 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No37
SFund 500
RRSK 98088 100 80000
EBR(Dep) 98588
215 Charni Road-Grant Road- Regirdering of Road over bridge
between at km 39 - 10
SFund 1739
RRSK 71533 10000 40000
216 Elphinstone Road- Regirdering of Road over bridge at km 815-9 SFund 870
RRSK 105138 1 100
217 Virar-Vaiterna- 4 Lane Road over bridge in lieu of level crossing
No 41
SFund 500
RRSK 153899 1
EBR(Dep) 154399
218 Mumbai Central (South)- Regirdering of Road over bridge at Km
46-8
SFund 4348
RRSK 81412 10000 40000
219 Mahalaxmi- Regirdering of Road over bridge at km 526-27 SFund 4348
RRSK 214187 10000 70000
220 Surat-Vadodara- Road over bridge in lieu of level crossing No 198 SFund 100
RRSK 99900 200 4000
EBR(P) 100001
221 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 240
SFund 2000 316
RRSK 117126 13947 71400 10000
EBR(P) 119127
222 Ahmedabad-New Bhuj- Road over bridge in lieu of level crossing
No 3X
SFund 500
RRSK 175762 500 5000
EBR(Dep) 176262
223 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No 22A
RRSK 187005 23 50000 60000
EBR(Dep) 187006
224 Dadar- Regirdering of Road over bridge at Km 109-10 SFund 1739
RRSK 131731 1 100
225 Lowerparel-Elphinstone Road- Regirdering of Road over bridge at
km 712-13
SFund 1739
RRSK 186842 87000 80000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9117
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
226 Chanderiya-Ratlam - 2-lane road over bridge in lieu of level
crossing No141 near Piplia yard
SFund 1000
RRSK 89000 100 10000
EBR(P) 116700
227 Mandsour-Dalauda - 2-lane road over bridge in lieu of level
crossing No152
SFund 1000
RRSK 99000 5500 43600
EBR(P) 165000
228 Chanderia-Ratlam - 2-lane road over bridge at Chanderia in lieu of
level crossing No86
SFund 1500
RRSK 158500 100 5000
EBR(P) 160000
229 Mahesana-Patan- subways in lieu of level crossing No 27 32 56
amp 62 on Mahesana- Viramgam- level crossing No 4 11 18 19 amp
20 (9 Nos)
SFund 1 3530
RRSK 225598 23196 40000 30000
230 Mahesana-Viramgam- subways in lieu of level crossing No 6 7
14 23 amp 25 (5 Nos)
SFund 101 2015
RRSK 125934 4500 30000
231 Sabarmati-Botad- subways in lieu of level crossing- 23 Nos RRSK 613299 85000 150000
232 Viramgam- samakhiyali-subways in lieu of level crossing No 43
92 amp 108 (3 Nos)
SFund 100
RRSK 84683 1000
233 Udhna-Jalgaon- subways in lieu of level crossing No 87 122 123
133 141 150 amp 152 (7 Nos)
RRSK 218947 91408 100000 10000
234 Anand-Khambhat- subways in lieu of level crossing 10 Nos SFund 32995 60173
RRSK 96662 110623 8132 500
235 Chanderiya-Ratlam-subways in lieu of level crossing No 106 128
131 182 amp IND-Dewas-Ujjain level crossing No 26 (5 Nos)
SFund 26108 4281
RRSK 50310 29276 9571 100
236 Chanderia-Ratlam - 2-lane road under bridge at Nimbahera in lieu
of level crossing No103
SFund 87
RRSK 25313 1308 10000
EBR(P) 25400
237 Rajkot-Hapa- Road over bridge in lieu of level crossing No 145 at
Padadhari
RRSK 87610 1 100
EBR(Dep) 256608
238 Surat-Vadodara- Road over bridge in lieu of level crossing No158
(4-lane) between Sayan-Kim on DFC route
SFund 435
RRSK 120879 10 10
EBR(Dep) 363941
239 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 201 on DFC route
SFund 17390
RRSK 68351 56800 15000 15000
EBR(Dep) 257222
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
919
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
124 Bhandu Moti Dab-Mahesana - Road over bridge in lieu of level
crossing No 211
SFund 79627 79577
RRSK 68683 -5545 1 1
EBR(Dep) 76908
125 Meghnagar - Road over bridge in lieu of level crossing No60-B SFund 2000
RRSK 34653 5000 33400
EBR(Dep) 31876
126 Maroli-Sachin - Road over bridge in lieu of level crossing No133 SFund 4000
RRSK 22546 1000 50000
127 Virar-Surat - Road over bridge in lieu of level crossing No138 near
Sachin (4-lane)
SFund 54643 82256
RRSK 1000 25797 3300 1000
EBR(Dep) 55643
128 Viramgam-Jhund - Road over bridge in lieu of level crossing No42
(2-lane)
SFund 63739 67339
RRSK 1000 4008 4000 1
EBR(Dep) 110479
129 Surat-Vadodara - Road over bridge in lieu of level crossing No213
near Miyagam Karjan
SFund 53983 45913
RRSK 2881 503 2248 1000
EBR(Dep) 52400
130 Kim-Kosamba - Road over bridge in lieu of level crossing No160 (2-
lane)
SFund 72068 80284
RRSK 1000 1 100
EBR(Dep) 73068
131 Pratapnagar-Vishwamitri - Road over bridge in lieu of level crossing
No 2
SFund 48817 47817
RRSK 6135 1 1
EBR(Dep) 51100
132 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No2-A
SFund 1
RRSK 35999 100 1000
EBR(Dep) 36000
133 Bharuch-Dahej - 2- lane road over bridge in lieu of level crossing
No22 near Samni station
SFund 46790 57359
RRSK 1000 38 1 1
EBR(Dep) 57737
134 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing
No178 near Bharuch yard
SFund 92806 88666
RRSK 25994 1593 100 500
EBR(Dep) 233200
135 Bharuch-Dahej - 4-lane road over bridge in lieu of level crossing
No50
SFund 1
RRSK 50899 1
EBR(Dep) 50900
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
A - Works in Progress
9110
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
136 Dharangaon-Thakherkhed - 2-lane road over bridge on level
crossing No144 on state highway No185
SFund 50170 45820
RRSK 8572 1979 1200 500
EBR(Dep) 102582
137 Ujjain-Bhopal - Road over bridge in lieu of level crossing No101B
near Shore
SFund 2500 -24
RRSK 41006 39894 94500 1000
EBR(Dep) 46195
138 Amalner-Marwad Nim Road - Road over bridge in lieu of level
crossing No135
SFund 50239 44239
RRSK 1597 28 1200 500
EBR(Dep) 95487
139 Palanpur-Khodiyar - Road under bridges in lieu of level crossings
on dedicated freight corridor route (42 Nos)
SFund 313449 250867
RRSK 308394 96112 30000 30000
140 Bajana-Jatpipli - Road over bridge in lieu of level crossing No 25 SFund 1000
RRSK 87051 1 20000
EBR(Dep) 203052
141 Udhna-Jalgaon - Road over bridge in lieu of level crossing No37 SFund 5000
RRSK 72704 5000
EBR(Dep) 232887
142 Bhavnagar Divsion - Limited height subways in lieu of level
crossings (33 Nos)
SFund 196681 203596
RRSK 63911 28554 10000 20000
143 Palanpur-Khodiyar - Road ovrer bridges in lieu of level crossing
Nos191A 199A amp 227 on dedicated freight corridor route
SFund 34780 40000
RRSK 514304 23900 30000 30000
EBR(Dep) 274542
144 Ratlam-Godhara - 2-lane road over bridge in lieu of level crossing
No61-A
SFund 2000
RRSK 66459 100 5000
EBR(Dep) 64858
145 Surat - Vadodara - Limited height subways in lieu of level crossing
Nos162 amp 168
SFund 17645 18414
RRSK 22527 6306 500
146 Virar - Surat - Subwaysroad under bridge at level crossing Nos
55x 58 142 amp LC-1 (Udhna-Niyol)
SFund 500
RRSK 61898 5000 5000
147 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos171-A 188-A amp 208-B
SFund 26085 20900
RRSK 548600 22800 30000 30000
EBR(Dep) 287342
148 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos208 211-C 214 amp 220
SFund 69560 120000
RRSK 695510 59400 50000 50000
EBR(Dep) 382535
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9111
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
149 Ahmedabad-Palanpur - Road over bridge in lieu of level crossing
Nos165 166 amp 169 and level crossing No17 of Ahmedabad -
Viramgam
SFund 26085
RRSK 679207 30000 30000
EBR(Dep) 352646
150 Virar - Surat - SubwaysRoad under bridges in lieu of level
crossings (34 Nos)
SFund 175900 175900
RRSK 578938 89650 90000 10000
151 Ahmedabad Division - Road under bridges in lieu of level crossings
(58 Nos)
SFund 265089 247530 42610
RRSK 545731 19586 3570 30000
152 Timba-Tuva - Road over bridges in lieu of level crossing No58 SFund 1500
RRSK 93474 100 500
EBR(Dep) 584974
153 Bhatiel-Petlad - Road over bridge in lieu of level crossing No28 SFund 1500
RRSK 174899 500 500
EBR(Dep) 271399
154 Kosad-Gothangam - Road over bridge in lieu of level crossing
No149
SFund 435
RRSK 154072 1 1
EBR(Dep) 154508
155 Sayan-Kim - Road over bridge in lieu of level crossing No156 SFund 4348
RRSK 168868 10000 30000
EBR(Dep) 173216
156 Kosamba-Hathuran - Road over bridge in lieu of level crossing
No163
SFund 4348
RRSK 138655 6800 20000
EBR(Dep) 143004
157 Virar-Surat - Road over bridge in lieu of level crossing Nos 92 94 amp
97 along dedicated freight corridor route
SFund 17390
RRSK 321310 10000 20000
EBR(Dep) 406369
158 Naikheri-Ujjain - Road over bridge in lieu of level crossing No25
and Chintamanganesh-Ujjain - level crossing No8 (metre gauge)
SFund 51115 50818
RRSK 55413 788 100 500
EBR(Dep) 183072
159 Sehore-Phanda - Road over bridge in lieu of level crossing No104 SFund 1000
RRSK 88484 100 5000
EBR(Dep) 89484
160 Naikheri-Ujjain - Road over bridge in lieu of level crossing No23 SFund 100
RRSK 77002 5000 46100
EBR(Dep) 137068
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9112
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
161 Ratlam-Khandwa - 2-lane road over bridge in lieu of level crossing
No250
SFund 2000 41 20000
RRSK 95436 20299 1203 500
EBR(Dep) 97436
162 Bairagarh-Bakaniabhori - Road over bridge in lieu of level crossing
No115
SFund 1000
RRSK 189403 1
EBR(Dep) 190403
163 Sehore-Phanda - Road over bridge in lieu of level crossing No107 SFund 500
RRSK 91224 100 5000
EBR(Dep) 91724
164 Bamania-Amargarh - Road over bridge in lieu of level crossing
No72
SFund 2000
RRSK 104079 100 100
EBR(Dep) 106079
165 Virar-Surat - Road over bridge in lieu of level crossing Nos109
111 114 115 amp 118 along dedicated freight corridor route
SFund 17390 1452
RRSK 368510 12500 30000
EBR(Dep) 460095
166 Gothangam-Sayan - Road over bridge in lieu of level crossing
No151
SFund 31997 29797
RRSK 14313 -78 100
EBR(Dep) 77827
167 Virar-Surat - Road over bridge in lieu of level crossing Nos60 64
66 68 69 71 74 75 77 81 amp 82 along dedicated freight corridor
route
SFund 10000 27000
RRSK 932200 15000 30000
EBR(Dep) 1540420
168 Virar-Surat - Road over bridge in lieu of level crosisng No61 along
dedicated freight corridor route
SFund 4348
RRSK 67642 5000 10000
EBR(Dep) 71993
169 Derol-Kharsaliya - Road over bridge in lieu of level crossing No32 SFund 1500
RRSK 93474 100 500
EBR(Dep) 399974
170 Gothangam-Sayan - Road over bridge in lieu of level crossing
No150
SFund 4348
RRSK 150714 10000 20000
EBR(Dep) 155063
171 Virar-Surat - Road over bridge in lieu of level crossing Nos57 amp
143 along dedicated freight corridor route
SFund 1
RRSK 170312 1
EBR(Dep) 170312
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9113
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
172 Virar-Surat - Road over bridge in lieu of level crossing Nos84 88 amp
90 along dedicated freight corridor route
SFund 10000
RRSK 362918 15000 20000
EBR(Dep) 529675
173 Kim-Kosamba - Road over bridge in lieu of level crossing No161 SFund 4348
RRSK 162307 10 10
EBR(Dep) 166655
174 Virar-Surat - Road over bridge in lieu of level crossing
Nos124126amp 127 along dedicated freight corridor route
SFund 10000 53500
RRSK 429771 10000 16990
EBR(Dep) 529173
175 Sayan-Kim - Road over bridge in lieu of level crossing No154 SFund 4000
RRSK 138094 10000 10000
EBR(Dep) 142094
176 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No165
SFund 4348
RRSK 207011 10 10
EBR(Dep) 211359
177 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No166
SFund 4348
RRSK 135056 10 10
EBR(Dep) 139404
178 Virar-Surat - Road over bridge in lieu of level crossing Nos42 46A
48 52 55 102 106 108 130 amp 137 along dedicated freight
corridor route
SFund 10000 72200
RRSK 929294 10000 10000
EBR(Dep) 1234542
179 Udhna - Jalgaon - Road over bridge in lieu of level crossing No51 SFund 5000
RRSK 75295 10000
EBR(Dep) 250296
180 Sadnapura - Bhalej - Road over bridge in lieu of level crossing No
11
SFund 1500
RRSK 93474 100 10
EBR(Dep) 249974
181 Sayan-Kim - Road over bridge in lieu of level crossing No153 SFund 4348
RRSK 134797 6900 20000
EBR(Dep) 139145
182 Derol - Kharsaliya - Road over bridge in lieu of level crossing No41 SFund 1500
RRSK 93474 500 500
EBR(Dep) 204974
183 Rajkot - Okha - Road over bridge in lieu of level crossing No197 SFund 100
RRSK 94049 19493 9868 1000
EBR(Dep) 94148
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9114
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
184 Rajkot Division - Limited height subways in lieu of level crossings
(36 Nos)
SFund 192337 145046
RRSK 68323 68445 65000 20000
185 Chanderiya-Ratlam - Limited height subways in lieu of level
crossings (No121 amp 183)
SFund 22614 22603
RRSK 2700 1 1
186 Dabhoi-Pratpnagar amp Dabhoi-Chhota Udepur - Limited height
subways (25 Nos)
SFund 203310 202077
RRSK 274218 44171 40000 1000
187 Surat-Vadodara-Godhra - Limited height subway at level crossings
(11 Nos)
SFund 133888 88592
RRSK 79889 40000 100
188 Ankleshwar-Rajpipla - Limited height subways road under bridges
in lieu of level crossings (36 Nos)
SFund 297860 248077 20000
RRSK 284870 80559 10919 20000
189 Ujjain-Bhopal - Limited height subways at level crossings (No88
89 amp 91)
SFund 54571 58450
RRSK 1000 11823 1 1
190 Udhna-Jalgaon - Limited height subways at level crossings (No38
108 127 128 145 146147 amp 134)
SFund 40087 87
RRSK 75049 230000 30000
191 Ahmedabad Division - Elimination of level crossings by road under
bridges (90 Nos)
SFund 11356 45
RRSK 1000 165047 20000
192 Ujjain-Bhopal - Limited height subway at level crossings (No43 44
amp 58)
SFund 67442 69163
RRSK 1900 259 1 1
193 Vadodara Division - Limited height subway in lieu of level crossings
(2 Nos on double line amp 19 Nos on single line)
SFund 69263 85693
RRSK 236140 1626 31000 200
194 Ratlam Division - Limited height subway in lieu of level crossings
(22 Nos)
SFund 272546 366104
RRSK 1000 36466 1000 1
195 Mehsana-Patan - Road over bridge in lieu of level crossing No40X SFund 53406 57194
RRSK 16245 1549 100 100
EBR(Dep) 287771
196 Gangadhara-Bardoli - Road over bridge in lieu of level crossing
No17A
SFund 32000 9390
RRSK 99253 18000 20000
EBR(Dep) 131253
197 Virpur-Jetalsar - Road over bridge in lieu of level crossing No61 SFund 5000
RRSK 187384 10000 20000
198 Jamnagar-Lakhabawal - Road over bridge in lieu of level crossing
No199
SFund 5000
RRSK 78380 2000 20000
EBR(Dep) 83380
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9115
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
199 Surat-Vadodara - Elimination of level crossing No173 by 4-lane
road over bridge
SFund 5000
RRSK 229396 102600 60000
EBR(Dep) 234397
200 Bhavnagar Division - Limited height subways to eliminate level
crossings (77 Nos)
SFund 87
RRSK 648618 100 100
201 Dewas-Barlai - 2 lane road over bridge in lieu of level crossing
No37
SFund 500
RRSK 36758 144 40000 22000
EBR(Dep) 206948
202 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 216 on DFC route
SFund 17390
RRSK 34932 41600 15000 15000
EBR(Dep) 104645
EBR(P) 52323
203 Surat-Vadodara- Road over bridge in lieu of level crossing No 228
on DFC route
SFund 4348
RRSK 59605 10 10
EBR(P) 127905
204 Jetalsar-Veraval Rajula-Mahuva amp Sihor -Palitana -subways in lieu
of level crossing- 18 Nos
SFund 86950 24787
RRSK 394341 75636 30000 50000
205 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 269
SFund 82792 78119
RRSK 23175 7126 50 500
EBR(P) 105968
206 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 177A on DFC route
SFund 4348
RRSK 48142 15000 15000
EBR(Dep) 104981
207 Surat-Vadodara- 4 Lane Road over bridge in lieu of level crossing
No 220
SFund 100
RRSK 173605 100 5000
EBR(P) 173706
208 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 276
SFund 82792 76527
RRSK 77592 8463 100 500
EBR(P) 160385
209 Dhasa-Jetalsar- subways in lieu of level crossing- 35 Nos RRSK 935106 100000 150000
210 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 179A on DFC route
SFund 4348
RRSK 126868 15000 15000
EBR(Dep) 131216
211 Rajkot-Jetalsar Jetalsar-Wansjaliya amp Kana- subways in lieu of
level crossing (19 Nos)
SFund 86950 50607
RRSK 420729 124972 30000 50000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9116
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
212 Ahmedabad - Viramgam- Road over bridge in lieu of level crossing
No 11A
SFund 500
RRSK 220476 75000 80000
EBR(Dep) 220977
213 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 259
SFund 5000 77
RRSK 168295 128 200 5000
EBR(P) 173296
214 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No37
SFund 500
RRSK 98088 100 80000
EBR(Dep) 98588
215 Charni Road-Grant Road- Regirdering of Road over bridge
between at km 39 - 10
SFund 1739
RRSK 71533 10000 40000
216 Elphinstone Road- Regirdering of Road over bridge at km 815-9 SFund 870
RRSK 105138 1 100
217 Virar-Vaiterna- 4 Lane Road over bridge in lieu of level crossing
No 41
SFund 500
RRSK 153899 1
EBR(Dep) 154399
218 Mumbai Central (South)- Regirdering of Road over bridge at Km
46-8
SFund 4348
RRSK 81412 10000 40000
219 Mahalaxmi- Regirdering of Road over bridge at km 526-27 SFund 4348
RRSK 214187 10000 70000
220 Surat-Vadodara- Road over bridge in lieu of level crossing No 198 SFund 100
RRSK 99900 200 4000
EBR(P) 100001
221 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 240
SFund 2000 316
RRSK 117126 13947 71400 10000
EBR(P) 119127
222 Ahmedabad-New Bhuj- Road over bridge in lieu of level crossing
No 3X
SFund 500
RRSK 175762 500 5000
EBR(Dep) 176262
223 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No 22A
RRSK 187005 23 50000 60000
EBR(Dep) 187006
224 Dadar- Regirdering of Road over bridge at Km 109-10 SFund 1739
RRSK 131731 1 100
225 Lowerparel-Elphinstone Road- Regirdering of Road over bridge at
km 712-13
SFund 1739
RRSK 186842 87000 80000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9117
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
226 Chanderiya-Ratlam - 2-lane road over bridge in lieu of level
crossing No141 near Piplia yard
SFund 1000
RRSK 89000 100 10000
EBR(P) 116700
227 Mandsour-Dalauda - 2-lane road over bridge in lieu of level
crossing No152
SFund 1000
RRSK 99000 5500 43600
EBR(P) 165000
228 Chanderia-Ratlam - 2-lane road over bridge at Chanderia in lieu of
level crossing No86
SFund 1500
RRSK 158500 100 5000
EBR(P) 160000
229 Mahesana-Patan- subways in lieu of level crossing No 27 32 56
amp 62 on Mahesana- Viramgam- level crossing No 4 11 18 19 amp
20 (9 Nos)
SFund 1 3530
RRSK 225598 23196 40000 30000
230 Mahesana-Viramgam- subways in lieu of level crossing No 6 7
14 23 amp 25 (5 Nos)
SFund 101 2015
RRSK 125934 4500 30000
231 Sabarmati-Botad- subways in lieu of level crossing- 23 Nos RRSK 613299 85000 150000
232 Viramgam- samakhiyali-subways in lieu of level crossing No 43
92 amp 108 (3 Nos)
SFund 100
RRSK 84683 1000
233 Udhna-Jalgaon- subways in lieu of level crossing No 87 122 123
133 141 150 amp 152 (7 Nos)
RRSK 218947 91408 100000 10000
234 Anand-Khambhat- subways in lieu of level crossing 10 Nos SFund 32995 60173
RRSK 96662 110623 8132 500
235 Chanderiya-Ratlam-subways in lieu of level crossing No 106 128
131 182 amp IND-Dewas-Ujjain level crossing No 26 (5 Nos)
SFund 26108 4281
RRSK 50310 29276 9571 100
236 Chanderia-Ratlam - 2-lane road under bridge at Nimbahera in lieu
of level crossing No103
SFund 87
RRSK 25313 1308 10000
EBR(P) 25400
237 Rajkot-Hapa- Road over bridge in lieu of level crossing No 145 at
Padadhari
RRSK 87610 1 100
EBR(Dep) 256608
238 Surat-Vadodara- Road over bridge in lieu of level crossing No158
(4-lane) between Sayan-Kim on DFC route
SFund 435
RRSK 120879 10 10
EBR(Dep) 363941
239 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 201 on DFC route
SFund 17390
RRSK 68351 56800 15000 15000
EBR(Dep) 257222
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9110
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
136 Dharangaon-Thakherkhed - 2-lane road over bridge on level
crossing No144 on state highway No185
SFund 50170 45820
RRSK 8572 1979 1200 500
EBR(Dep) 102582
137 Ujjain-Bhopal - Road over bridge in lieu of level crossing No101B
near Shore
SFund 2500 -24
RRSK 41006 39894 94500 1000
EBR(Dep) 46195
138 Amalner-Marwad Nim Road - Road over bridge in lieu of level
crossing No135
SFund 50239 44239
RRSK 1597 28 1200 500
EBR(Dep) 95487
139 Palanpur-Khodiyar - Road under bridges in lieu of level crossings
on dedicated freight corridor route (42 Nos)
SFund 313449 250867
RRSK 308394 96112 30000 30000
140 Bajana-Jatpipli - Road over bridge in lieu of level crossing No 25 SFund 1000
RRSK 87051 1 20000
EBR(Dep) 203052
141 Udhna-Jalgaon - Road over bridge in lieu of level crossing No37 SFund 5000
RRSK 72704 5000
EBR(Dep) 232887
142 Bhavnagar Divsion - Limited height subways in lieu of level
crossings (33 Nos)
SFund 196681 203596
RRSK 63911 28554 10000 20000
143 Palanpur-Khodiyar - Road ovrer bridges in lieu of level crossing
Nos191A 199A amp 227 on dedicated freight corridor route
SFund 34780 40000
RRSK 514304 23900 30000 30000
EBR(Dep) 274542
144 Ratlam-Godhara - 2-lane road over bridge in lieu of level crossing
No61-A
SFund 2000
RRSK 66459 100 5000
EBR(Dep) 64858
145 Surat - Vadodara - Limited height subways in lieu of level crossing
Nos162 amp 168
SFund 17645 18414
RRSK 22527 6306 500
146 Virar - Surat - Subwaysroad under bridge at level crossing Nos
55x 58 142 amp LC-1 (Udhna-Niyol)
SFund 500
RRSK 61898 5000 5000
147 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos171-A 188-A amp 208-B
SFund 26085 20900
RRSK 548600 22800 30000 30000
EBR(Dep) 287342
148 Palanpur - Khodiar - Road over bridge in lieu of level crossing
Nos208 211-C 214 amp 220
SFund 69560 120000
RRSK 695510 59400 50000 50000
EBR(Dep) 382535
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9111
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
149 Ahmedabad-Palanpur - Road over bridge in lieu of level crossing
Nos165 166 amp 169 and level crossing No17 of Ahmedabad -
Viramgam
SFund 26085
RRSK 679207 30000 30000
EBR(Dep) 352646
150 Virar - Surat - SubwaysRoad under bridges in lieu of level
crossings (34 Nos)
SFund 175900 175900
RRSK 578938 89650 90000 10000
151 Ahmedabad Division - Road under bridges in lieu of level crossings
(58 Nos)
SFund 265089 247530 42610
RRSK 545731 19586 3570 30000
152 Timba-Tuva - Road over bridges in lieu of level crossing No58 SFund 1500
RRSK 93474 100 500
EBR(Dep) 584974
153 Bhatiel-Petlad - Road over bridge in lieu of level crossing No28 SFund 1500
RRSK 174899 500 500
EBR(Dep) 271399
154 Kosad-Gothangam - Road over bridge in lieu of level crossing
No149
SFund 435
RRSK 154072 1 1
EBR(Dep) 154508
155 Sayan-Kim - Road over bridge in lieu of level crossing No156 SFund 4348
RRSK 168868 10000 30000
EBR(Dep) 173216
156 Kosamba-Hathuran - Road over bridge in lieu of level crossing
No163
SFund 4348
RRSK 138655 6800 20000
EBR(Dep) 143004
157 Virar-Surat - Road over bridge in lieu of level crossing Nos 92 94 amp
97 along dedicated freight corridor route
SFund 17390
RRSK 321310 10000 20000
EBR(Dep) 406369
158 Naikheri-Ujjain - Road over bridge in lieu of level crossing No25
and Chintamanganesh-Ujjain - level crossing No8 (metre gauge)
SFund 51115 50818
RRSK 55413 788 100 500
EBR(Dep) 183072
159 Sehore-Phanda - Road over bridge in lieu of level crossing No104 SFund 1000
RRSK 88484 100 5000
EBR(Dep) 89484
160 Naikheri-Ujjain - Road over bridge in lieu of level crossing No23 SFund 100
RRSK 77002 5000 46100
EBR(Dep) 137068
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9112
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
161 Ratlam-Khandwa - 2-lane road over bridge in lieu of level crossing
No250
SFund 2000 41 20000
RRSK 95436 20299 1203 500
EBR(Dep) 97436
162 Bairagarh-Bakaniabhori - Road over bridge in lieu of level crossing
No115
SFund 1000
RRSK 189403 1
EBR(Dep) 190403
163 Sehore-Phanda - Road over bridge in lieu of level crossing No107 SFund 500
RRSK 91224 100 5000
EBR(Dep) 91724
164 Bamania-Amargarh - Road over bridge in lieu of level crossing
No72
SFund 2000
RRSK 104079 100 100
EBR(Dep) 106079
165 Virar-Surat - Road over bridge in lieu of level crossing Nos109
111 114 115 amp 118 along dedicated freight corridor route
SFund 17390 1452
RRSK 368510 12500 30000
EBR(Dep) 460095
166 Gothangam-Sayan - Road over bridge in lieu of level crossing
No151
SFund 31997 29797
RRSK 14313 -78 100
EBR(Dep) 77827
167 Virar-Surat - Road over bridge in lieu of level crossing Nos60 64
66 68 69 71 74 75 77 81 amp 82 along dedicated freight corridor
route
SFund 10000 27000
RRSK 932200 15000 30000
EBR(Dep) 1540420
168 Virar-Surat - Road over bridge in lieu of level crosisng No61 along
dedicated freight corridor route
SFund 4348
RRSK 67642 5000 10000
EBR(Dep) 71993
169 Derol-Kharsaliya - Road over bridge in lieu of level crossing No32 SFund 1500
RRSK 93474 100 500
EBR(Dep) 399974
170 Gothangam-Sayan - Road over bridge in lieu of level crossing
No150
SFund 4348
RRSK 150714 10000 20000
EBR(Dep) 155063
171 Virar-Surat - Road over bridge in lieu of level crossing Nos57 amp
143 along dedicated freight corridor route
SFund 1
RRSK 170312 1
EBR(Dep) 170312
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9113
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
172 Virar-Surat - Road over bridge in lieu of level crossing Nos84 88 amp
90 along dedicated freight corridor route
SFund 10000
RRSK 362918 15000 20000
EBR(Dep) 529675
173 Kim-Kosamba - Road over bridge in lieu of level crossing No161 SFund 4348
RRSK 162307 10 10
EBR(Dep) 166655
174 Virar-Surat - Road over bridge in lieu of level crossing
Nos124126amp 127 along dedicated freight corridor route
SFund 10000 53500
RRSK 429771 10000 16990
EBR(Dep) 529173
175 Sayan-Kim - Road over bridge in lieu of level crossing No154 SFund 4000
RRSK 138094 10000 10000
EBR(Dep) 142094
176 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No165
SFund 4348
RRSK 207011 10 10
EBR(Dep) 211359
177 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No166
SFund 4348
RRSK 135056 10 10
EBR(Dep) 139404
178 Virar-Surat - Road over bridge in lieu of level crossing Nos42 46A
48 52 55 102 106 108 130 amp 137 along dedicated freight
corridor route
SFund 10000 72200
RRSK 929294 10000 10000
EBR(Dep) 1234542
179 Udhna - Jalgaon - Road over bridge in lieu of level crossing No51 SFund 5000
RRSK 75295 10000
EBR(Dep) 250296
180 Sadnapura - Bhalej - Road over bridge in lieu of level crossing No
11
SFund 1500
RRSK 93474 100 10
EBR(Dep) 249974
181 Sayan-Kim - Road over bridge in lieu of level crossing No153 SFund 4348
RRSK 134797 6900 20000
EBR(Dep) 139145
182 Derol - Kharsaliya - Road over bridge in lieu of level crossing No41 SFund 1500
RRSK 93474 500 500
EBR(Dep) 204974
183 Rajkot - Okha - Road over bridge in lieu of level crossing No197 SFund 100
RRSK 94049 19493 9868 1000
EBR(Dep) 94148
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9114
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
184 Rajkot Division - Limited height subways in lieu of level crossings
(36 Nos)
SFund 192337 145046
RRSK 68323 68445 65000 20000
185 Chanderiya-Ratlam - Limited height subways in lieu of level
crossings (No121 amp 183)
SFund 22614 22603
RRSK 2700 1 1
186 Dabhoi-Pratpnagar amp Dabhoi-Chhota Udepur - Limited height
subways (25 Nos)
SFund 203310 202077
RRSK 274218 44171 40000 1000
187 Surat-Vadodara-Godhra - Limited height subway at level crossings
(11 Nos)
SFund 133888 88592
RRSK 79889 40000 100
188 Ankleshwar-Rajpipla - Limited height subways road under bridges
in lieu of level crossings (36 Nos)
SFund 297860 248077 20000
RRSK 284870 80559 10919 20000
189 Ujjain-Bhopal - Limited height subways at level crossings (No88
89 amp 91)
SFund 54571 58450
RRSK 1000 11823 1 1
190 Udhna-Jalgaon - Limited height subways at level crossings (No38
108 127 128 145 146147 amp 134)
SFund 40087 87
RRSK 75049 230000 30000
191 Ahmedabad Division - Elimination of level crossings by road under
bridges (90 Nos)
SFund 11356 45
RRSK 1000 165047 20000
192 Ujjain-Bhopal - Limited height subway at level crossings (No43 44
amp 58)
SFund 67442 69163
RRSK 1900 259 1 1
193 Vadodara Division - Limited height subway in lieu of level crossings
(2 Nos on double line amp 19 Nos on single line)
SFund 69263 85693
RRSK 236140 1626 31000 200
194 Ratlam Division - Limited height subway in lieu of level crossings
(22 Nos)
SFund 272546 366104
RRSK 1000 36466 1000 1
195 Mehsana-Patan - Road over bridge in lieu of level crossing No40X SFund 53406 57194
RRSK 16245 1549 100 100
EBR(Dep) 287771
196 Gangadhara-Bardoli - Road over bridge in lieu of level crossing
No17A
SFund 32000 9390
RRSK 99253 18000 20000
EBR(Dep) 131253
197 Virpur-Jetalsar - Road over bridge in lieu of level crossing No61 SFund 5000
RRSK 187384 10000 20000
198 Jamnagar-Lakhabawal - Road over bridge in lieu of level crossing
No199
SFund 5000
RRSK 78380 2000 20000
EBR(Dep) 83380
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9115
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
199 Surat-Vadodara - Elimination of level crossing No173 by 4-lane
road over bridge
SFund 5000
RRSK 229396 102600 60000
EBR(Dep) 234397
200 Bhavnagar Division - Limited height subways to eliminate level
crossings (77 Nos)
SFund 87
RRSK 648618 100 100
201 Dewas-Barlai - 2 lane road over bridge in lieu of level crossing
No37
SFund 500
RRSK 36758 144 40000 22000
EBR(Dep) 206948
202 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 216 on DFC route
SFund 17390
RRSK 34932 41600 15000 15000
EBR(Dep) 104645
EBR(P) 52323
203 Surat-Vadodara- Road over bridge in lieu of level crossing No 228
on DFC route
SFund 4348
RRSK 59605 10 10
EBR(P) 127905
204 Jetalsar-Veraval Rajula-Mahuva amp Sihor -Palitana -subways in lieu
of level crossing- 18 Nos
SFund 86950 24787
RRSK 394341 75636 30000 50000
205 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 269
SFund 82792 78119
RRSK 23175 7126 50 500
EBR(P) 105968
206 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 177A on DFC route
SFund 4348
RRSK 48142 15000 15000
EBR(Dep) 104981
207 Surat-Vadodara- 4 Lane Road over bridge in lieu of level crossing
No 220
SFund 100
RRSK 173605 100 5000
EBR(P) 173706
208 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 276
SFund 82792 76527
RRSK 77592 8463 100 500
EBR(P) 160385
209 Dhasa-Jetalsar- subways in lieu of level crossing- 35 Nos RRSK 935106 100000 150000
210 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 179A on DFC route
SFund 4348
RRSK 126868 15000 15000
EBR(Dep) 131216
211 Rajkot-Jetalsar Jetalsar-Wansjaliya amp Kana- subways in lieu of
level crossing (19 Nos)
SFund 86950 50607
RRSK 420729 124972 30000 50000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9116
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
212 Ahmedabad - Viramgam- Road over bridge in lieu of level crossing
No 11A
SFund 500
RRSK 220476 75000 80000
EBR(Dep) 220977
213 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 259
SFund 5000 77
RRSK 168295 128 200 5000
EBR(P) 173296
214 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No37
SFund 500
RRSK 98088 100 80000
EBR(Dep) 98588
215 Charni Road-Grant Road- Regirdering of Road over bridge
between at km 39 - 10
SFund 1739
RRSK 71533 10000 40000
216 Elphinstone Road- Regirdering of Road over bridge at km 815-9 SFund 870
RRSK 105138 1 100
217 Virar-Vaiterna- 4 Lane Road over bridge in lieu of level crossing
No 41
SFund 500
RRSK 153899 1
EBR(Dep) 154399
218 Mumbai Central (South)- Regirdering of Road over bridge at Km
46-8
SFund 4348
RRSK 81412 10000 40000
219 Mahalaxmi- Regirdering of Road over bridge at km 526-27 SFund 4348
RRSK 214187 10000 70000
220 Surat-Vadodara- Road over bridge in lieu of level crossing No 198 SFund 100
RRSK 99900 200 4000
EBR(P) 100001
221 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 240
SFund 2000 316
RRSK 117126 13947 71400 10000
EBR(P) 119127
222 Ahmedabad-New Bhuj- Road over bridge in lieu of level crossing
No 3X
SFund 500
RRSK 175762 500 5000
EBR(Dep) 176262
223 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No 22A
RRSK 187005 23 50000 60000
EBR(Dep) 187006
224 Dadar- Regirdering of Road over bridge at Km 109-10 SFund 1739
RRSK 131731 1 100
225 Lowerparel-Elphinstone Road- Regirdering of Road over bridge at
km 712-13
SFund 1739
RRSK 186842 87000 80000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9117
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
226 Chanderiya-Ratlam - 2-lane road over bridge in lieu of level
crossing No141 near Piplia yard
SFund 1000
RRSK 89000 100 10000
EBR(P) 116700
227 Mandsour-Dalauda - 2-lane road over bridge in lieu of level
crossing No152
SFund 1000
RRSK 99000 5500 43600
EBR(P) 165000
228 Chanderia-Ratlam - 2-lane road over bridge at Chanderia in lieu of
level crossing No86
SFund 1500
RRSK 158500 100 5000
EBR(P) 160000
229 Mahesana-Patan- subways in lieu of level crossing No 27 32 56
amp 62 on Mahesana- Viramgam- level crossing No 4 11 18 19 amp
20 (9 Nos)
SFund 1 3530
RRSK 225598 23196 40000 30000
230 Mahesana-Viramgam- subways in lieu of level crossing No 6 7
14 23 amp 25 (5 Nos)
SFund 101 2015
RRSK 125934 4500 30000
231 Sabarmati-Botad- subways in lieu of level crossing- 23 Nos RRSK 613299 85000 150000
232 Viramgam- samakhiyali-subways in lieu of level crossing No 43
92 amp 108 (3 Nos)
SFund 100
RRSK 84683 1000
233 Udhna-Jalgaon- subways in lieu of level crossing No 87 122 123
133 141 150 amp 152 (7 Nos)
RRSK 218947 91408 100000 10000
234 Anand-Khambhat- subways in lieu of level crossing 10 Nos SFund 32995 60173
RRSK 96662 110623 8132 500
235 Chanderiya-Ratlam-subways in lieu of level crossing No 106 128
131 182 amp IND-Dewas-Ujjain level crossing No 26 (5 Nos)
SFund 26108 4281
RRSK 50310 29276 9571 100
236 Chanderia-Ratlam - 2-lane road under bridge at Nimbahera in lieu
of level crossing No103
SFund 87
RRSK 25313 1308 10000
EBR(P) 25400
237 Rajkot-Hapa- Road over bridge in lieu of level crossing No 145 at
Padadhari
RRSK 87610 1 100
EBR(Dep) 256608
238 Surat-Vadodara- Road over bridge in lieu of level crossing No158
(4-lane) between Sayan-Kim on DFC route
SFund 435
RRSK 120879 10 10
EBR(Dep) 363941
239 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 201 on DFC route
SFund 17390
RRSK 68351 56800 15000 15000
EBR(Dep) 257222
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9111
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
149 Ahmedabad-Palanpur - Road over bridge in lieu of level crossing
Nos165 166 amp 169 and level crossing No17 of Ahmedabad -
Viramgam
SFund 26085
RRSK 679207 30000 30000
EBR(Dep) 352646
150 Virar - Surat - SubwaysRoad under bridges in lieu of level
crossings (34 Nos)
SFund 175900 175900
RRSK 578938 89650 90000 10000
151 Ahmedabad Division - Road under bridges in lieu of level crossings
(58 Nos)
SFund 265089 247530 42610
RRSK 545731 19586 3570 30000
152 Timba-Tuva - Road over bridges in lieu of level crossing No58 SFund 1500
RRSK 93474 100 500
EBR(Dep) 584974
153 Bhatiel-Petlad - Road over bridge in lieu of level crossing No28 SFund 1500
RRSK 174899 500 500
EBR(Dep) 271399
154 Kosad-Gothangam - Road over bridge in lieu of level crossing
No149
SFund 435
RRSK 154072 1 1
EBR(Dep) 154508
155 Sayan-Kim - Road over bridge in lieu of level crossing No156 SFund 4348
RRSK 168868 10000 30000
EBR(Dep) 173216
156 Kosamba-Hathuran - Road over bridge in lieu of level crossing
No163
SFund 4348
RRSK 138655 6800 20000
EBR(Dep) 143004
157 Virar-Surat - Road over bridge in lieu of level crossing Nos 92 94 amp
97 along dedicated freight corridor route
SFund 17390
RRSK 321310 10000 20000
EBR(Dep) 406369
158 Naikheri-Ujjain - Road over bridge in lieu of level crossing No25
and Chintamanganesh-Ujjain - level crossing No8 (metre gauge)
SFund 51115 50818
RRSK 55413 788 100 500
EBR(Dep) 183072
159 Sehore-Phanda - Road over bridge in lieu of level crossing No104 SFund 1000
RRSK 88484 100 5000
EBR(Dep) 89484
160 Naikheri-Ujjain - Road over bridge in lieu of level crossing No23 SFund 100
RRSK 77002 5000 46100
EBR(Dep) 137068
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9112
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
161 Ratlam-Khandwa - 2-lane road over bridge in lieu of level crossing
No250
SFund 2000 41 20000
RRSK 95436 20299 1203 500
EBR(Dep) 97436
162 Bairagarh-Bakaniabhori - Road over bridge in lieu of level crossing
No115
SFund 1000
RRSK 189403 1
EBR(Dep) 190403
163 Sehore-Phanda - Road over bridge in lieu of level crossing No107 SFund 500
RRSK 91224 100 5000
EBR(Dep) 91724
164 Bamania-Amargarh - Road over bridge in lieu of level crossing
No72
SFund 2000
RRSK 104079 100 100
EBR(Dep) 106079
165 Virar-Surat - Road over bridge in lieu of level crossing Nos109
111 114 115 amp 118 along dedicated freight corridor route
SFund 17390 1452
RRSK 368510 12500 30000
EBR(Dep) 460095
166 Gothangam-Sayan - Road over bridge in lieu of level crossing
No151
SFund 31997 29797
RRSK 14313 -78 100
EBR(Dep) 77827
167 Virar-Surat - Road over bridge in lieu of level crossing Nos60 64
66 68 69 71 74 75 77 81 amp 82 along dedicated freight corridor
route
SFund 10000 27000
RRSK 932200 15000 30000
EBR(Dep) 1540420
168 Virar-Surat - Road over bridge in lieu of level crosisng No61 along
dedicated freight corridor route
SFund 4348
RRSK 67642 5000 10000
EBR(Dep) 71993
169 Derol-Kharsaliya - Road over bridge in lieu of level crossing No32 SFund 1500
RRSK 93474 100 500
EBR(Dep) 399974
170 Gothangam-Sayan - Road over bridge in lieu of level crossing
No150
SFund 4348
RRSK 150714 10000 20000
EBR(Dep) 155063
171 Virar-Surat - Road over bridge in lieu of level crossing Nos57 amp
143 along dedicated freight corridor route
SFund 1
RRSK 170312 1
EBR(Dep) 170312
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9113
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
172 Virar-Surat - Road over bridge in lieu of level crossing Nos84 88 amp
90 along dedicated freight corridor route
SFund 10000
RRSK 362918 15000 20000
EBR(Dep) 529675
173 Kim-Kosamba - Road over bridge in lieu of level crossing No161 SFund 4348
RRSK 162307 10 10
EBR(Dep) 166655
174 Virar-Surat - Road over bridge in lieu of level crossing
Nos124126amp 127 along dedicated freight corridor route
SFund 10000 53500
RRSK 429771 10000 16990
EBR(Dep) 529173
175 Sayan-Kim - Road over bridge in lieu of level crossing No154 SFund 4000
RRSK 138094 10000 10000
EBR(Dep) 142094
176 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No165
SFund 4348
RRSK 207011 10 10
EBR(Dep) 211359
177 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No166
SFund 4348
RRSK 135056 10 10
EBR(Dep) 139404
178 Virar-Surat - Road over bridge in lieu of level crossing Nos42 46A
48 52 55 102 106 108 130 amp 137 along dedicated freight
corridor route
SFund 10000 72200
RRSK 929294 10000 10000
EBR(Dep) 1234542
179 Udhna - Jalgaon - Road over bridge in lieu of level crossing No51 SFund 5000
RRSK 75295 10000
EBR(Dep) 250296
180 Sadnapura - Bhalej - Road over bridge in lieu of level crossing No
11
SFund 1500
RRSK 93474 100 10
EBR(Dep) 249974
181 Sayan-Kim - Road over bridge in lieu of level crossing No153 SFund 4348
RRSK 134797 6900 20000
EBR(Dep) 139145
182 Derol - Kharsaliya - Road over bridge in lieu of level crossing No41 SFund 1500
RRSK 93474 500 500
EBR(Dep) 204974
183 Rajkot - Okha - Road over bridge in lieu of level crossing No197 SFund 100
RRSK 94049 19493 9868 1000
EBR(Dep) 94148
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9114
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
184 Rajkot Division - Limited height subways in lieu of level crossings
(36 Nos)
SFund 192337 145046
RRSK 68323 68445 65000 20000
185 Chanderiya-Ratlam - Limited height subways in lieu of level
crossings (No121 amp 183)
SFund 22614 22603
RRSK 2700 1 1
186 Dabhoi-Pratpnagar amp Dabhoi-Chhota Udepur - Limited height
subways (25 Nos)
SFund 203310 202077
RRSK 274218 44171 40000 1000
187 Surat-Vadodara-Godhra - Limited height subway at level crossings
(11 Nos)
SFund 133888 88592
RRSK 79889 40000 100
188 Ankleshwar-Rajpipla - Limited height subways road under bridges
in lieu of level crossings (36 Nos)
SFund 297860 248077 20000
RRSK 284870 80559 10919 20000
189 Ujjain-Bhopal - Limited height subways at level crossings (No88
89 amp 91)
SFund 54571 58450
RRSK 1000 11823 1 1
190 Udhna-Jalgaon - Limited height subways at level crossings (No38
108 127 128 145 146147 amp 134)
SFund 40087 87
RRSK 75049 230000 30000
191 Ahmedabad Division - Elimination of level crossings by road under
bridges (90 Nos)
SFund 11356 45
RRSK 1000 165047 20000
192 Ujjain-Bhopal - Limited height subway at level crossings (No43 44
amp 58)
SFund 67442 69163
RRSK 1900 259 1 1
193 Vadodara Division - Limited height subway in lieu of level crossings
(2 Nos on double line amp 19 Nos on single line)
SFund 69263 85693
RRSK 236140 1626 31000 200
194 Ratlam Division - Limited height subway in lieu of level crossings
(22 Nos)
SFund 272546 366104
RRSK 1000 36466 1000 1
195 Mehsana-Patan - Road over bridge in lieu of level crossing No40X SFund 53406 57194
RRSK 16245 1549 100 100
EBR(Dep) 287771
196 Gangadhara-Bardoli - Road over bridge in lieu of level crossing
No17A
SFund 32000 9390
RRSK 99253 18000 20000
EBR(Dep) 131253
197 Virpur-Jetalsar - Road over bridge in lieu of level crossing No61 SFund 5000
RRSK 187384 10000 20000
198 Jamnagar-Lakhabawal - Road over bridge in lieu of level crossing
No199
SFund 5000
RRSK 78380 2000 20000
EBR(Dep) 83380
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9115
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
199 Surat-Vadodara - Elimination of level crossing No173 by 4-lane
road over bridge
SFund 5000
RRSK 229396 102600 60000
EBR(Dep) 234397
200 Bhavnagar Division - Limited height subways to eliminate level
crossings (77 Nos)
SFund 87
RRSK 648618 100 100
201 Dewas-Barlai - 2 lane road over bridge in lieu of level crossing
No37
SFund 500
RRSK 36758 144 40000 22000
EBR(Dep) 206948
202 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 216 on DFC route
SFund 17390
RRSK 34932 41600 15000 15000
EBR(Dep) 104645
EBR(P) 52323
203 Surat-Vadodara- Road over bridge in lieu of level crossing No 228
on DFC route
SFund 4348
RRSK 59605 10 10
EBR(P) 127905
204 Jetalsar-Veraval Rajula-Mahuva amp Sihor -Palitana -subways in lieu
of level crossing- 18 Nos
SFund 86950 24787
RRSK 394341 75636 30000 50000
205 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 269
SFund 82792 78119
RRSK 23175 7126 50 500
EBR(P) 105968
206 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 177A on DFC route
SFund 4348
RRSK 48142 15000 15000
EBR(Dep) 104981
207 Surat-Vadodara- 4 Lane Road over bridge in lieu of level crossing
No 220
SFund 100
RRSK 173605 100 5000
EBR(P) 173706
208 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 276
SFund 82792 76527
RRSK 77592 8463 100 500
EBR(P) 160385
209 Dhasa-Jetalsar- subways in lieu of level crossing- 35 Nos RRSK 935106 100000 150000
210 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 179A on DFC route
SFund 4348
RRSK 126868 15000 15000
EBR(Dep) 131216
211 Rajkot-Jetalsar Jetalsar-Wansjaliya amp Kana- subways in lieu of
level crossing (19 Nos)
SFund 86950 50607
RRSK 420729 124972 30000 50000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9116
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
212 Ahmedabad - Viramgam- Road over bridge in lieu of level crossing
No 11A
SFund 500
RRSK 220476 75000 80000
EBR(Dep) 220977
213 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 259
SFund 5000 77
RRSK 168295 128 200 5000
EBR(P) 173296
214 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No37
SFund 500
RRSK 98088 100 80000
EBR(Dep) 98588
215 Charni Road-Grant Road- Regirdering of Road over bridge
between at km 39 - 10
SFund 1739
RRSK 71533 10000 40000
216 Elphinstone Road- Regirdering of Road over bridge at km 815-9 SFund 870
RRSK 105138 1 100
217 Virar-Vaiterna- 4 Lane Road over bridge in lieu of level crossing
No 41
SFund 500
RRSK 153899 1
EBR(Dep) 154399
218 Mumbai Central (South)- Regirdering of Road over bridge at Km
46-8
SFund 4348
RRSK 81412 10000 40000
219 Mahalaxmi- Regirdering of Road over bridge at km 526-27 SFund 4348
RRSK 214187 10000 70000
220 Surat-Vadodara- Road over bridge in lieu of level crossing No 198 SFund 100
RRSK 99900 200 4000
EBR(P) 100001
221 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 240
SFund 2000 316
RRSK 117126 13947 71400 10000
EBR(P) 119127
222 Ahmedabad-New Bhuj- Road over bridge in lieu of level crossing
No 3X
SFund 500
RRSK 175762 500 5000
EBR(Dep) 176262
223 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No 22A
RRSK 187005 23 50000 60000
EBR(Dep) 187006
224 Dadar- Regirdering of Road over bridge at Km 109-10 SFund 1739
RRSK 131731 1 100
225 Lowerparel-Elphinstone Road- Regirdering of Road over bridge at
km 712-13
SFund 1739
RRSK 186842 87000 80000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9117
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
226 Chanderiya-Ratlam - 2-lane road over bridge in lieu of level
crossing No141 near Piplia yard
SFund 1000
RRSK 89000 100 10000
EBR(P) 116700
227 Mandsour-Dalauda - 2-lane road over bridge in lieu of level
crossing No152
SFund 1000
RRSK 99000 5500 43600
EBR(P) 165000
228 Chanderia-Ratlam - 2-lane road over bridge at Chanderia in lieu of
level crossing No86
SFund 1500
RRSK 158500 100 5000
EBR(P) 160000
229 Mahesana-Patan- subways in lieu of level crossing No 27 32 56
amp 62 on Mahesana- Viramgam- level crossing No 4 11 18 19 amp
20 (9 Nos)
SFund 1 3530
RRSK 225598 23196 40000 30000
230 Mahesana-Viramgam- subways in lieu of level crossing No 6 7
14 23 amp 25 (5 Nos)
SFund 101 2015
RRSK 125934 4500 30000
231 Sabarmati-Botad- subways in lieu of level crossing- 23 Nos RRSK 613299 85000 150000
232 Viramgam- samakhiyali-subways in lieu of level crossing No 43
92 amp 108 (3 Nos)
SFund 100
RRSK 84683 1000
233 Udhna-Jalgaon- subways in lieu of level crossing No 87 122 123
133 141 150 amp 152 (7 Nos)
RRSK 218947 91408 100000 10000
234 Anand-Khambhat- subways in lieu of level crossing 10 Nos SFund 32995 60173
RRSK 96662 110623 8132 500
235 Chanderiya-Ratlam-subways in lieu of level crossing No 106 128
131 182 amp IND-Dewas-Ujjain level crossing No 26 (5 Nos)
SFund 26108 4281
RRSK 50310 29276 9571 100
236 Chanderia-Ratlam - 2-lane road under bridge at Nimbahera in lieu
of level crossing No103
SFund 87
RRSK 25313 1308 10000
EBR(P) 25400
237 Rajkot-Hapa- Road over bridge in lieu of level crossing No 145 at
Padadhari
RRSK 87610 1 100
EBR(Dep) 256608
238 Surat-Vadodara- Road over bridge in lieu of level crossing No158
(4-lane) between Sayan-Kim on DFC route
SFund 435
RRSK 120879 10 10
EBR(Dep) 363941
239 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 201 on DFC route
SFund 17390
RRSK 68351 56800 15000 15000
EBR(Dep) 257222
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9112
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
161 Ratlam-Khandwa - 2-lane road over bridge in lieu of level crossing
No250
SFund 2000 41 20000
RRSK 95436 20299 1203 500
EBR(Dep) 97436
162 Bairagarh-Bakaniabhori - Road over bridge in lieu of level crossing
No115
SFund 1000
RRSK 189403 1
EBR(Dep) 190403
163 Sehore-Phanda - Road over bridge in lieu of level crossing No107 SFund 500
RRSK 91224 100 5000
EBR(Dep) 91724
164 Bamania-Amargarh - Road over bridge in lieu of level crossing
No72
SFund 2000
RRSK 104079 100 100
EBR(Dep) 106079
165 Virar-Surat - Road over bridge in lieu of level crossing Nos109
111 114 115 amp 118 along dedicated freight corridor route
SFund 17390 1452
RRSK 368510 12500 30000
EBR(Dep) 460095
166 Gothangam-Sayan - Road over bridge in lieu of level crossing
No151
SFund 31997 29797
RRSK 14313 -78 100
EBR(Dep) 77827
167 Virar-Surat - Road over bridge in lieu of level crossing Nos60 64
66 68 69 71 74 75 77 81 amp 82 along dedicated freight corridor
route
SFund 10000 27000
RRSK 932200 15000 30000
EBR(Dep) 1540420
168 Virar-Surat - Road over bridge in lieu of level crosisng No61 along
dedicated freight corridor route
SFund 4348
RRSK 67642 5000 10000
EBR(Dep) 71993
169 Derol-Kharsaliya - Road over bridge in lieu of level crossing No32 SFund 1500
RRSK 93474 100 500
EBR(Dep) 399974
170 Gothangam-Sayan - Road over bridge in lieu of level crossing
No150
SFund 4348
RRSK 150714 10000 20000
EBR(Dep) 155063
171 Virar-Surat - Road over bridge in lieu of level crossing Nos57 amp
143 along dedicated freight corridor route
SFund 1
RRSK 170312 1
EBR(Dep) 170312
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9113
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
172 Virar-Surat - Road over bridge in lieu of level crossing Nos84 88 amp
90 along dedicated freight corridor route
SFund 10000
RRSK 362918 15000 20000
EBR(Dep) 529675
173 Kim-Kosamba - Road over bridge in lieu of level crossing No161 SFund 4348
RRSK 162307 10 10
EBR(Dep) 166655
174 Virar-Surat - Road over bridge in lieu of level crossing
Nos124126amp 127 along dedicated freight corridor route
SFund 10000 53500
RRSK 429771 10000 16990
EBR(Dep) 529173
175 Sayan-Kim - Road over bridge in lieu of level crossing No154 SFund 4000
RRSK 138094 10000 10000
EBR(Dep) 142094
176 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No165
SFund 4348
RRSK 207011 10 10
EBR(Dep) 211359
177 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No166
SFund 4348
RRSK 135056 10 10
EBR(Dep) 139404
178 Virar-Surat - Road over bridge in lieu of level crossing Nos42 46A
48 52 55 102 106 108 130 amp 137 along dedicated freight
corridor route
SFund 10000 72200
RRSK 929294 10000 10000
EBR(Dep) 1234542
179 Udhna - Jalgaon - Road over bridge in lieu of level crossing No51 SFund 5000
RRSK 75295 10000
EBR(Dep) 250296
180 Sadnapura - Bhalej - Road over bridge in lieu of level crossing No
11
SFund 1500
RRSK 93474 100 10
EBR(Dep) 249974
181 Sayan-Kim - Road over bridge in lieu of level crossing No153 SFund 4348
RRSK 134797 6900 20000
EBR(Dep) 139145
182 Derol - Kharsaliya - Road over bridge in lieu of level crossing No41 SFund 1500
RRSK 93474 500 500
EBR(Dep) 204974
183 Rajkot - Okha - Road over bridge in lieu of level crossing No197 SFund 100
RRSK 94049 19493 9868 1000
EBR(Dep) 94148
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9114
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
184 Rajkot Division - Limited height subways in lieu of level crossings
(36 Nos)
SFund 192337 145046
RRSK 68323 68445 65000 20000
185 Chanderiya-Ratlam - Limited height subways in lieu of level
crossings (No121 amp 183)
SFund 22614 22603
RRSK 2700 1 1
186 Dabhoi-Pratpnagar amp Dabhoi-Chhota Udepur - Limited height
subways (25 Nos)
SFund 203310 202077
RRSK 274218 44171 40000 1000
187 Surat-Vadodara-Godhra - Limited height subway at level crossings
(11 Nos)
SFund 133888 88592
RRSK 79889 40000 100
188 Ankleshwar-Rajpipla - Limited height subways road under bridges
in lieu of level crossings (36 Nos)
SFund 297860 248077 20000
RRSK 284870 80559 10919 20000
189 Ujjain-Bhopal - Limited height subways at level crossings (No88
89 amp 91)
SFund 54571 58450
RRSK 1000 11823 1 1
190 Udhna-Jalgaon - Limited height subways at level crossings (No38
108 127 128 145 146147 amp 134)
SFund 40087 87
RRSK 75049 230000 30000
191 Ahmedabad Division - Elimination of level crossings by road under
bridges (90 Nos)
SFund 11356 45
RRSK 1000 165047 20000
192 Ujjain-Bhopal - Limited height subway at level crossings (No43 44
amp 58)
SFund 67442 69163
RRSK 1900 259 1 1
193 Vadodara Division - Limited height subway in lieu of level crossings
(2 Nos on double line amp 19 Nos on single line)
SFund 69263 85693
RRSK 236140 1626 31000 200
194 Ratlam Division - Limited height subway in lieu of level crossings
(22 Nos)
SFund 272546 366104
RRSK 1000 36466 1000 1
195 Mehsana-Patan - Road over bridge in lieu of level crossing No40X SFund 53406 57194
RRSK 16245 1549 100 100
EBR(Dep) 287771
196 Gangadhara-Bardoli - Road over bridge in lieu of level crossing
No17A
SFund 32000 9390
RRSK 99253 18000 20000
EBR(Dep) 131253
197 Virpur-Jetalsar - Road over bridge in lieu of level crossing No61 SFund 5000
RRSK 187384 10000 20000
198 Jamnagar-Lakhabawal - Road over bridge in lieu of level crossing
No199
SFund 5000
RRSK 78380 2000 20000
EBR(Dep) 83380
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9115
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
199 Surat-Vadodara - Elimination of level crossing No173 by 4-lane
road over bridge
SFund 5000
RRSK 229396 102600 60000
EBR(Dep) 234397
200 Bhavnagar Division - Limited height subways to eliminate level
crossings (77 Nos)
SFund 87
RRSK 648618 100 100
201 Dewas-Barlai - 2 lane road over bridge in lieu of level crossing
No37
SFund 500
RRSK 36758 144 40000 22000
EBR(Dep) 206948
202 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 216 on DFC route
SFund 17390
RRSK 34932 41600 15000 15000
EBR(Dep) 104645
EBR(P) 52323
203 Surat-Vadodara- Road over bridge in lieu of level crossing No 228
on DFC route
SFund 4348
RRSK 59605 10 10
EBR(P) 127905
204 Jetalsar-Veraval Rajula-Mahuva amp Sihor -Palitana -subways in lieu
of level crossing- 18 Nos
SFund 86950 24787
RRSK 394341 75636 30000 50000
205 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 269
SFund 82792 78119
RRSK 23175 7126 50 500
EBR(P) 105968
206 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 177A on DFC route
SFund 4348
RRSK 48142 15000 15000
EBR(Dep) 104981
207 Surat-Vadodara- 4 Lane Road over bridge in lieu of level crossing
No 220
SFund 100
RRSK 173605 100 5000
EBR(P) 173706
208 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 276
SFund 82792 76527
RRSK 77592 8463 100 500
EBR(P) 160385
209 Dhasa-Jetalsar- subways in lieu of level crossing- 35 Nos RRSK 935106 100000 150000
210 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 179A on DFC route
SFund 4348
RRSK 126868 15000 15000
EBR(Dep) 131216
211 Rajkot-Jetalsar Jetalsar-Wansjaliya amp Kana- subways in lieu of
level crossing (19 Nos)
SFund 86950 50607
RRSK 420729 124972 30000 50000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9116
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
212 Ahmedabad - Viramgam- Road over bridge in lieu of level crossing
No 11A
SFund 500
RRSK 220476 75000 80000
EBR(Dep) 220977
213 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 259
SFund 5000 77
RRSK 168295 128 200 5000
EBR(P) 173296
214 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No37
SFund 500
RRSK 98088 100 80000
EBR(Dep) 98588
215 Charni Road-Grant Road- Regirdering of Road over bridge
between at km 39 - 10
SFund 1739
RRSK 71533 10000 40000
216 Elphinstone Road- Regirdering of Road over bridge at km 815-9 SFund 870
RRSK 105138 1 100
217 Virar-Vaiterna- 4 Lane Road over bridge in lieu of level crossing
No 41
SFund 500
RRSK 153899 1
EBR(Dep) 154399
218 Mumbai Central (South)- Regirdering of Road over bridge at Km
46-8
SFund 4348
RRSK 81412 10000 40000
219 Mahalaxmi- Regirdering of Road over bridge at km 526-27 SFund 4348
RRSK 214187 10000 70000
220 Surat-Vadodara- Road over bridge in lieu of level crossing No 198 SFund 100
RRSK 99900 200 4000
EBR(P) 100001
221 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 240
SFund 2000 316
RRSK 117126 13947 71400 10000
EBR(P) 119127
222 Ahmedabad-New Bhuj- Road over bridge in lieu of level crossing
No 3X
SFund 500
RRSK 175762 500 5000
EBR(Dep) 176262
223 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No 22A
RRSK 187005 23 50000 60000
EBR(Dep) 187006
224 Dadar- Regirdering of Road over bridge at Km 109-10 SFund 1739
RRSK 131731 1 100
225 Lowerparel-Elphinstone Road- Regirdering of Road over bridge at
km 712-13
SFund 1739
RRSK 186842 87000 80000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9117
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
226 Chanderiya-Ratlam - 2-lane road over bridge in lieu of level
crossing No141 near Piplia yard
SFund 1000
RRSK 89000 100 10000
EBR(P) 116700
227 Mandsour-Dalauda - 2-lane road over bridge in lieu of level
crossing No152
SFund 1000
RRSK 99000 5500 43600
EBR(P) 165000
228 Chanderia-Ratlam - 2-lane road over bridge at Chanderia in lieu of
level crossing No86
SFund 1500
RRSK 158500 100 5000
EBR(P) 160000
229 Mahesana-Patan- subways in lieu of level crossing No 27 32 56
amp 62 on Mahesana- Viramgam- level crossing No 4 11 18 19 amp
20 (9 Nos)
SFund 1 3530
RRSK 225598 23196 40000 30000
230 Mahesana-Viramgam- subways in lieu of level crossing No 6 7
14 23 amp 25 (5 Nos)
SFund 101 2015
RRSK 125934 4500 30000
231 Sabarmati-Botad- subways in lieu of level crossing- 23 Nos RRSK 613299 85000 150000
232 Viramgam- samakhiyali-subways in lieu of level crossing No 43
92 amp 108 (3 Nos)
SFund 100
RRSK 84683 1000
233 Udhna-Jalgaon- subways in lieu of level crossing No 87 122 123
133 141 150 amp 152 (7 Nos)
RRSK 218947 91408 100000 10000
234 Anand-Khambhat- subways in lieu of level crossing 10 Nos SFund 32995 60173
RRSK 96662 110623 8132 500
235 Chanderiya-Ratlam-subways in lieu of level crossing No 106 128
131 182 amp IND-Dewas-Ujjain level crossing No 26 (5 Nos)
SFund 26108 4281
RRSK 50310 29276 9571 100
236 Chanderia-Ratlam - 2-lane road under bridge at Nimbahera in lieu
of level crossing No103
SFund 87
RRSK 25313 1308 10000
EBR(P) 25400
237 Rajkot-Hapa- Road over bridge in lieu of level crossing No 145 at
Padadhari
RRSK 87610 1 100
EBR(Dep) 256608
238 Surat-Vadodara- Road over bridge in lieu of level crossing No158
(4-lane) between Sayan-Kim on DFC route
SFund 435
RRSK 120879 10 10
EBR(Dep) 363941
239 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 201 on DFC route
SFund 17390
RRSK 68351 56800 15000 15000
EBR(Dep) 257222
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9113
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
172 Virar-Surat - Road over bridge in lieu of level crossing Nos84 88 amp
90 along dedicated freight corridor route
SFund 10000
RRSK 362918 15000 20000
EBR(Dep) 529675
173 Kim-Kosamba - Road over bridge in lieu of level crossing No161 SFund 4348
RRSK 162307 10 10
EBR(Dep) 166655
174 Virar-Surat - Road over bridge in lieu of level crossing
Nos124126amp 127 along dedicated freight corridor route
SFund 10000 53500
RRSK 429771 10000 16990
EBR(Dep) 529173
175 Sayan-Kim - Road over bridge in lieu of level crossing No154 SFund 4000
RRSK 138094 10000 10000
EBR(Dep) 142094
176 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No165
SFund 4348
RRSK 207011 10 10
EBR(Dep) 211359
177 Panoli - Ankleshwar - Road over bridge in lieu of level crossing
No166
SFund 4348
RRSK 135056 10 10
EBR(Dep) 139404
178 Virar-Surat - Road over bridge in lieu of level crossing Nos42 46A
48 52 55 102 106 108 130 amp 137 along dedicated freight
corridor route
SFund 10000 72200
RRSK 929294 10000 10000
EBR(Dep) 1234542
179 Udhna - Jalgaon - Road over bridge in lieu of level crossing No51 SFund 5000
RRSK 75295 10000
EBR(Dep) 250296
180 Sadnapura - Bhalej - Road over bridge in lieu of level crossing No
11
SFund 1500
RRSK 93474 100 10
EBR(Dep) 249974
181 Sayan-Kim - Road over bridge in lieu of level crossing No153 SFund 4348
RRSK 134797 6900 20000
EBR(Dep) 139145
182 Derol - Kharsaliya - Road over bridge in lieu of level crossing No41 SFund 1500
RRSK 93474 500 500
EBR(Dep) 204974
183 Rajkot - Okha - Road over bridge in lieu of level crossing No197 SFund 100
RRSK 94049 19493 9868 1000
EBR(Dep) 94148
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9114
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
184 Rajkot Division - Limited height subways in lieu of level crossings
(36 Nos)
SFund 192337 145046
RRSK 68323 68445 65000 20000
185 Chanderiya-Ratlam - Limited height subways in lieu of level
crossings (No121 amp 183)
SFund 22614 22603
RRSK 2700 1 1
186 Dabhoi-Pratpnagar amp Dabhoi-Chhota Udepur - Limited height
subways (25 Nos)
SFund 203310 202077
RRSK 274218 44171 40000 1000
187 Surat-Vadodara-Godhra - Limited height subway at level crossings
(11 Nos)
SFund 133888 88592
RRSK 79889 40000 100
188 Ankleshwar-Rajpipla - Limited height subways road under bridges
in lieu of level crossings (36 Nos)
SFund 297860 248077 20000
RRSK 284870 80559 10919 20000
189 Ujjain-Bhopal - Limited height subways at level crossings (No88
89 amp 91)
SFund 54571 58450
RRSK 1000 11823 1 1
190 Udhna-Jalgaon - Limited height subways at level crossings (No38
108 127 128 145 146147 amp 134)
SFund 40087 87
RRSK 75049 230000 30000
191 Ahmedabad Division - Elimination of level crossings by road under
bridges (90 Nos)
SFund 11356 45
RRSK 1000 165047 20000
192 Ujjain-Bhopal - Limited height subway at level crossings (No43 44
amp 58)
SFund 67442 69163
RRSK 1900 259 1 1
193 Vadodara Division - Limited height subway in lieu of level crossings
(2 Nos on double line amp 19 Nos on single line)
SFund 69263 85693
RRSK 236140 1626 31000 200
194 Ratlam Division - Limited height subway in lieu of level crossings
(22 Nos)
SFund 272546 366104
RRSK 1000 36466 1000 1
195 Mehsana-Patan - Road over bridge in lieu of level crossing No40X SFund 53406 57194
RRSK 16245 1549 100 100
EBR(Dep) 287771
196 Gangadhara-Bardoli - Road over bridge in lieu of level crossing
No17A
SFund 32000 9390
RRSK 99253 18000 20000
EBR(Dep) 131253
197 Virpur-Jetalsar - Road over bridge in lieu of level crossing No61 SFund 5000
RRSK 187384 10000 20000
198 Jamnagar-Lakhabawal - Road over bridge in lieu of level crossing
No199
SFund 5000
RRSK 78380 2000 20000
EBR(Dep) 83380
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9115
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
199 Surat-Vadodara - Elimination of level crossing No173 by 4-lane
road over bridge
SFund 5000
RRSK 229396 102600 60000
EBR(Dep) 234397
200 Bhavnagar Division - Limited height subways to eliminate level
crossings (77 Nos)
SFund 87
RRSK 648618 100 100
201 Dewas-Barlai - 2 lane road over bridge in lieu of level crossing
No37
SFund 500
RRSK 36758 144 40000 22000
EBR(Dep) 206948
202 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 216 on DFC route
SFund 17390
RRSK 34932 41600 15000 15000
EBR(Dep) 104645
EBR(P) 52323
203 Surat-Vadodara- Road over bridge in lieu of level crossing No 228
on DFC route
SFund 4348
RRSK 59605 10 10
EBR(P) 127905
204 Jetalsar-Veraval Rajula-Mahuva amp Sihor -Palitana -subways in lieu
of level crossing- 18 Nos
SFund 86950 24787
RRSK 394341 75636 30000 50000
205 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 269
SFund 82792 78119
RRSK 23175 7126 50 500
EBR(P) 105968
206 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 177A on DFC route
SFund 4348
RRSK 48142 15000 15000
EBR(Dep) 104981
207 Surat-Vadodara- 4 Lane Road over bridge in lieu of level crossing
No 220
SFund 100
RRSK 173605 100 5000
EBR(P) 173706
208 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 276
SFund 82792 76527
RRSK 77592 8463 100 500
EBR(P) 160385
209 Dhasa-Jetalsar- subways in lieu of level crossing- 35 Nos RRSK 935106 100000 150000
210 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 179A on DFC route
SFund 4348
RRSK 126868 15000 15000
EBR(Dep) 131216
211 Rajkot-Jetalsar Jetalsar-Wansjaliya amp Kana- subways in lieu of
level crossing (19 Nos)
SFund 86950 50607
RRSK 420729 124972 30000 50000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9116
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
212 Ahmedabad - Viramgam- Road over bridge in lieu of level crossing
No 11A
SFund 500
RRSK 220476 75000 80000
EBR(Dep) 220977
213 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 259
SFund 5000 77
RRSK 168295 128 200 5000
EBR(P) 173296
214 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No37
SFund 500
RRSK 98088 100 80000
EBR(Dep) 98588
215 Charni Road-Grant Road- Regirdering of Road over bridge
between at km 39 - 10
SFund 1739
RRSK 71533 10000 40000
216 Elphinstone Road- Regirdering of Road over bridge at km 815-9 SFund 870
RRSK 105138 1 100
217 Virar-Vaiterna- 4 Lane Road over bridge in lieu of level crossing
No 41
SFund 500
RRSK 153899 1
EBR(Dep) 154399
218 Mumbai Central (South)- Regirdering of Road over bridge at Km
46-8
SFund 4348
RRSK 81412 10000 40000
219 Mahalaxmi- Regirdering of Road over bridge at km 526-27 SFund 4348
RRSK 214187 10000 70000
220 Surat-Vadodara- Road over bridge in lieu of level crossing No 198 SFund 100
RRSK 99900 200 4000
EBR(P) 100001
221 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 240
SFund 2000 316
RRSK 117126 13947 71400 10000
EBR(P) 119127
222 Ahmedabad-New Bhuj- Road over bridge in lieu of level crossing
No 3X
SFund 500
RRSK 175762 500 5000
EBR(Dep) 176262
223 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No 22A
RRSK 187005 23 50000 60000
EBR(Dep) 187006
224 Dadar- Regirdering of Road over bridge at Km 109-10 SFund 1739
RRSK 131731 1 100
225 Lowerparel-Elphinstone Road- Regirdering of Road over bridge at
km 712-13
SFund 1739
RRSK 186842 87000 80000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9117
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
226 Chanderiya-Ratlam - 2-lane road over bridge in lieu of level
crossing No141 near Piplia yard
SFund 1000
RRSK 89000 100 10000
EBR(P) 116700
227 Mandsour-Dalauda - 2-lane road over bridge in lieu of level
crossing No152
SFund 1000
RRSK 99000 5500 43600
EBR(P) 165000
228 Chanderia-Ratlam - 2-lane road over bridge at Chanderia in lieu of
level crossing No86
SFund 1500
RRSK 158500 100 5000
EBR(P) 160000
229 Mahesana-Patan- subways in lieu of level crossing No 27 32 56
amp 62 on Mahesana- Viramgam- level crossing No 4 11 18 19 amp
20 (9 Nos)
SFund 1 3530
RRSK 225598 23196 40000 30000
230 Mahesana-Viramgam- subways in lieu of level crossing No 6 7
14 23 amp 25 (5 Nos)
SFund 101 2015
RRSK 125934 4500 30000
231 Sabarmati-Botad- subways in lieu of level crossing- 23 Nos RRSK 613299 85000 150000
232 Viramgam- samakhiyali-subways in lieu of level crossing No 43
92 amp 108 (3 Nos)
SFund 100
RRSK 84683 1000
233 Udhna-Jalgaon- subways in lieu of level crossing No 87 122 123
133 141 150 amp 152 (7 Nos)
RRSK 218947 91408 100000 10000
234 Anand-Khambhat- subways in lieu of level crossing 10 Nos SFund 32995 60173
RRSK 96662 110623 8132 500
235 Chanderiya-Ratlam-subways in lieu of level crossing No 106 128
131 182 amp IND-Dewas-Ujjain level crossing No 26 (5 Nos)
SFund 26108 4281
RRSK 50310 29276 9571 100
236 Chanderia-Ratlam - 2-lane road under bridge at Nimbahera in lieu
of level crossing No103
SFund 87
RRSK 25313 1308 10000
EBR(P) 25400
237 Rajkot-Hapa- Road over bridge in lieu of level crossing No 145 at
Padadhari
RRSK 87610 1 100
EBR(Dep) 256608
238 Surat-Vadodara- Road over bridge in lieu of level crossing No158
(4-lane) between Sayan-Kim on DFC route
SFund 435
RRSK 120879 10 10
EBR(Dep) 363941
239 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 201 on DFC route
SFund 17390
RRSK 68351 56800 15000 15000
EBR(Dep) 257222
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9114
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
184 Rajkot Division - Limited height subways in lieu of level crossings
(36 Nos)
SFund 192337 145046
RRSK 68323 68445 65000 20000
185 Chanderiya-Ratlam - Limited height subways in lieu of level
crossings (No121 amp 183)
SFund 22614 22603
RRSK 2700 1 1
186 Dabhoi-Pratpnagar amp Dabhoi-Chhota Udepur - Limited height
subways (25 Nos)
SFund 203310 202077
RRSK 274218 44171 40000 1000
187 Surat-Vadodara-Godhra - Limited height subway at level crossings
(11 Nos)
SFund 133888 88592
RRSK 79889 40000 100
188 Ankleshwar-Rajpipla - Limited height subways road under bridges
in lieu of level crossings (36 Nos)
SFund 297860 248077 20000
RRSK 284870 80559 10919 20000
189 Ujjain-Bhopal - Limited height subways at level crossings (No88
89 amp 91)
SFund 54571 58450
RRSK 1000 11823 1 1
190 Udhna-Jalgaon - Limited height subways at level crossings (No38
108 127 128 145 146147 amp 134)
SFund 40087 87
RRSK 75049 230000 30000
191 Ahmedabad Division - Elimination of level crossings by road under
bridges (90 Nos)
SFund 11356 45
RRSK 1000 165047 20000
192 Ujjain-Bhopal - Limited height subway at level crossings (No43 44
amp 58)
SFund 67442 69163
RRSK 1900 259 1 1
193 Vadodara Division - Limited height subway in lieu of level crossings
(2 Nos on double line amp 19 Nos on single line)
SFund 69263 85693
RRSK 236140 1626 31000 200
194 Ratlam Division - Limited height subway in lieu of level crossings
(22 Nos)
SFund 272546 366104
RRSK 1000 36466 1000 1
195 Mehsana-Patan - Road over bridge in lieu of level crossing No40X SFund 53406 57194
RRSK 16245 1549 100 100
EBR(Dep) 287771
196 Gangadhara-Bardoli - Road over bridge in lieu of level crossing
No17A
SFund 32000 9390
RRSK 99253 18000 20000
EBR(Dep) 131253
197 Virpur-Jetalsar - Road over bridge in lieu of level crossing No61 SFund 5000
RRSK 187384 10000 20000
198 Jamnagar-Lakhabawal - Road over bridge in lieu of level crossing
No199
SFund 5000
RRSK 78380 2000 20000
EBR(Dep) 83380
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9115
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
199 Surat-Vadodara - Elimination of level crossing No173 by 4-lane
road over bridge
SFund 5000
RRSK 229396 102600 60000
EBR(Dep) 234397
200 Bhavnagar Division - Limited height subways to eliminate level
crossings (77 Nos)
SFund 87
RRSK 648618 100 100
201 Dewas-Barlai - 2 lane road over bridge in lieu of level crossing
No37
SFund 500
RRSK 36758 144 40000 22000
EBR(Dep) 206948
202 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 216 on DFC route
SFund 17390
RRSK 34932 41600 15000 15000
EBR(Dep) 104645
EBR(P) 52323
203 Surat-Vadodara- Road over bridge in lieu of level crossing No 228
on DFC route
SFund 4348
RRSK 59605 10 10
EBR(P) 127905
204 Jetalsar-Veraval Rajula-Mahuva amp Sihor -Palitana -subways in lieu
of level crossing- 18 Nos
SFund 86950 24787
RRSK 394341 75636 30000 50000
205 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 269
SFund 82792 78119
RRSK 23175 7126 50 500
EBR(P) 105968
206 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 177A on DFC route
SFund 4348
RRSK 48142 15000 15000
EBR(Dep) 104981
207 Surat-Vadodara- 4 Lane Road over bridge in lieu of level crossing
No 220
SFund 100
RRSK 173605 100 5000
EBR(P) 173706
208 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 276
SFund 82792 76527
RRSK 77592 8463 100 500
EBR(P) 160385
209 Dhasa-Jetalsar- subways in lieu of level crossing- 35 Nos RRSK 935106 100000 150000
210 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 179A on DFC route
SFund 4348
RRSK 126868 15000 15000
EBR(Dep) 131216
211 Rajkot-Jetalsar Jetalsar-Wansjaliya amp Kana- subways in lieu of
level crossing (19 Nos)
SFund 86950 50607
RRSK 420729 124972 30000 50000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9116
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
212 Ahmedabad - Viramgam- Road over bridge in lieu of level crossing
No 11A
SFund 500
RRSK 220476 75000 80000
EBR(Dep) 220977
213 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 259
SFund 5000 77
RRSK 168295 128 200 5000
EBR(P) 173296
214 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No37
SFund 500
RRSK 98088 100 80000
EBR(Dep) 98588
215 Charni Road-Grant Road- Regirdering of Road over bridge
between at km 39 - 10
SFund 1739
RRSK 71533 10000 40000
216 Elphinstone Road- Regirdering of Road over bridge at km 815-9 SFund 870
RRSK 105138 1 100
217 Virar-Vaiterna- 4 Lane Road over bridge in lieu of level crossing
No 41
SFund 500
RRSK 153899 1
EBR(Dep) 154399
218 Mumbai Central (South)- Regirdering of Road over bridge at Km
46-8
SFund 4348
RRSK 81412 10000 40000
219 Mahalaxmi- Regirdering of Road over bridge at km 526-27 SFund 4348
RRSK 214187 10000 70000
220 Surat-Vadodara- Road over bridge in lieu of level crossing No 198 SFund 100
RRSK 99900 200 4000
EBR(P) 100001
221 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 240
SFund 2000 316
RRSK 117126 13947 71400 10000
EBR(P) 119127
222 Ahmedabad-New Bhuj- Road over bridge in lieu of level crossing
No 3X
SFund 500
RRSK 175762 500 5000
EBR(Dep) 176262
223 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No 22A
RRSK 187005 23 50000 60000
EBR(Dep) 187006
224 Dadar- Regirdering of Road over bridge at Km 109-10 SFund 1739
RRSK 131731 1 100
225 Lowerparel-Elphinstone Road- Regirdering of Road over bridge at
km 712-13
SFund 1739
RRSK 186842 87000 80000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9117
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
226 Chanderiya-Ratlam - 2-lane road over bridge in lieu of level
crossing No141 near Piplia yard
SFund 1000
RRSK 89000 100 10000
EBR(P) 116700
227 Mandsour-Dalauda - 2-lane road over bridge in lieu of level
crossing No152
SFund 1000
RRSK 99000 5500 43600
EBR(P) 165000
228 Chanderia-Ratlam - 2-lane road over bridge at Chanderia in lieu of
level crossing No86
SFund 1500
RRSK 158500 100 5000
EBR(P) 160000
229 Mahesana-Patan- subways in lieu of level crossing No 27 32 56
amp 62 on Mahesana- Viramgam- level crossing No 4 11 18 19 amp
20 (9 Nos)
SFund 1 3530
RRSK 225598 23196 40000 30000
230 Mahesana-Viramgam- subways in lieu of level crossing No 6 7
14 23 amp 25 (5 Nos)
SFund 101 2015
RRSK 125934 4500 30000
231 Sabarmati-Botad- subways in lieu of level crossing- 23 Nos RRSK 613299 85000 150000
232 Viramgam- samakhiyali-subways in lieu of level crossing No 43
92 amp 108 (3 Nos)
SFund 100
RRSK 84683 1000
233 Udhna-Jalgaon- subways in lieu of level crossing No 87 122 123
133 141 150 amp 152 (7 Nos)
RRSK 218947 91408 100000 10000
234 Anand-Khambhat- subways in lieu of level crossing 10 Nos SFund 32995 60173
RRSK 96662 110623 8132 500
235 Chanderiya-Ratlam-subways in lieu of level crossing No 106 128
131 182 amp IND-Dewas-Ujjain level crossing No 26 (5 Nos)
SFund 26108 4281
RRSK 50310 29276 9571 100
236 Chanderia-Ratlam - 2-lane road under bridge at Nimbahera in lieu
of level crossing No103
SFund 87
RRSK 25313 1308 10000
EBR(P) 25400
237 Rajkot-Hapa- Road over bridge in lieu of level crossing No 145 at
Padadhari
RRSK 87610 1 100
EBR(Dep) 256608
238 Surat-Vadodara- Road over bridge in lieu of level crossing No158
(4-lane) between Sayan-Kim on DFC route
SFund 435
RRSK 120879 10 10
EBR(Dep) 363941
239 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 201 on DFC route
SFund 17390
RRSK 68351 56800 15000 15000
EBR(Dep) 257222
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9115
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
199 Surat-Vadodara - Elimination of level crossing No173 by 4-lane
road over bridge
SFund 5000
RRSK 229396 102600 60000
EBR(Dep) 234397
200 Bhavnagar Division - Limited height subways to eliminate level
crossings (77 Nos)
SFund 87
RRSK 648618 100 100
201 Dewas-Barlai - 2 lane road over bridge in lieu of level crossing
No37
SFund 500
RRSK 36758 144 40000 22000
EBR(Dep) 206948
202 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 216 on DFC route
SFund 17390
RRSK 34932 41600 15000 15000
EBR(Dep) 104645
EBR(P) 52323
203 Surat-Vadodara- Road over bridge in lieu of level crossing No 228
on DFC route
SFund 4348
RRSK 59605 10 10
EBR(P) 127905
204 Jetalsar-Veraval Rajula-Mahuva amp Sihor -Palitana -subways in lieu
of level crossing- 18 Nos
SFund 86950 24787
RRSK 394341 75636 30000 50000
205 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 269
SFund 82792 78119
RRSK 23175 7126 50 500
EBR(P) 105968
206 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 177A on DFC route
SFund 4348
RRSK 48142 15000 15000
EBR(Dep) 104981
207 Surat-Vadodara- 4 Lane Road over bridge in lieu of level crossing
No 220
SFund 100
RRSK 173605 100 5000
EBR(P) 173706
208 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 276
SFund 82792 76527
RRSK 77592 8463 100 500
EBR(P) 160385
209 Dhasa-Jetalsar- subways in lieu of level crossing- 35 Nos RRSK 935106 100000 150000
210 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 179A on DFC route
SFund 4348
RRSK 126868 15000 15000
EBR(Dep) 131216
211 Rajkot-Jetalsar Jetalsar-Wansjaliya amp Kana- subways in lieu of
level crossing (19 Nos)
SFund 86950 50607
RRSK 420729 124972 30000 50000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9116
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
212 Ahmedabad - Viramgam- Road over bridge in lieu of level crossing
No 11A
SFund 500
RRSK 220476 75000 80000
EBR(Dep) 220977
213 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 259
SFund 5000 77
RRSK 168295 128 200 5000
EBR(P) 173296
214 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No37
SFund 500
RRSK 98088 100 80000
EBR(Dep) 98588
215 Charni Road-Grant Road- Regirdering of Road over bridge
between at km 39 - 10
SFund 1739
RRSK 71533 10000 40000
216 Elphinstone Road- Regirdering of Road over bridge at km 815-9 SFund 870
RRSK 105138 1 100
217 Virar-Vaiterna- 4 Lane Road over bridge in lieu of level crossing
No 41
SFund 500
RRSK 153899 1
EBR(Dep) 154399
218 Mumbai Central (South)- Regirdering of Road over bridge at Km
46-8
SFund 4348
RRSK 81412 10000 40000
219 Mahalaxmi- Regirdering of Road over bridge at km 526-27 SFund 4348
RRSK 214187 10000 70000
220 Surat-Vadodara- Road over bridge in lieu of level crossing No 198 SFund 100
RRSK 99900 200 4000
EBR(P) 100001
221 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 240
SFund 2000 316
RRSK 117126 13947 71400 10000
EBR(P) 119127
222 Ahmedabad-New Bhuj- Road over bridge in lieu of level crossing
No 3X
SFund 500
RRSK 175762 500 5000
EBR(Dep) 176262
223 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No 22A
RRSK 187005 23 50000 60000
EBR(Dep) 187006
224 Dadar- Regirdering of Road over bridge at Km 109-10 SFund 1739
RRSK 131731 1 100
225 Lowerparel-Elphinstone Road- Regirdering of Road over bridge at
km 712-13
SFund 1739
RRSK 186842 87000 80000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9117
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
226 Chanderiya-Ratlam - 2-lane road over bridge in lieu of level
crossing No141 near Piplia yard
SFund 1000
RRSK 89000 100 10000
EBR(P) 116700
227 Mandsour-Dalauda - 2-lane road over bridge in lieu of level
crossing No152
SFund 1000
RRSK 99000 5500 43600
EBR(P) 165000
228 Chanderia-Ratlam - 2-lane road over bridge at Chanderia in lieu of
level crossing No86
SFund 1500
RRSK 158500 100 5000
EBR(P) 160000
229 Mahesana-Patan- subways in lieu of level crossing No 27 32 56
amp 62 on Mahesana- Viramgam- level crossing No 4 11 18 19 amp
20 (9 Nos)
SFund 1 3530
RRSK 225598 23196 40000 30000
230 Mahesana-Viramgam- subways in lieu of level crossing No 6 7
14 23 amp 25 (5 Nos)
SFund 101 2015
RRSK 125934 4500 30000
231 Sabarmati-Botad- subways in lieu of level crossing- 23 Nos RRSK 613299 85000 150000
232 Viramgam- samakhiyali-subways in lieu of level crossing No 43
92 amp 108 (3 Nos)
SFund 100
RRSK 84683 1000
233 Udhna-Jalgaon- subways in lieu of level crossing No 87 122 123
133 141 150 amp 152 (7 Nos)
RRSK 218947 91408 100000 10000
234 Anand-Khambhat- subways in lieu of level crossing 10 Nos SFund 32995 60173
RRSK 96662 110623 8132 500
235 Chanderiya-Ratlam-subways in lieu of level crossing No 106 128
131 182 amp IND-Dewas-Ujjain level crossing No 26 (5 Nos)
SFund 26108 4281
RRSK 50310 29276 9571 100
236 Chanderia-Ratlam - 2-lane road under bridge at Nimbahera in lieu
of level crossing No103
SFund 87
RRSK 25313 1308 10000
EBR(P) 25400
237 Rajkot-Hapa- Road over bridge in lieu of level crossing No 145 at
Padadhari
RRSK 87610 1 100
EBR(Dep) 256608
238 Surat-Vadodara- Road over bridge in lieu of level crossing No158
(4-lane) between Sayan-Kim on DFC route
SFund 435
RRSK 120879 10 10
EBR(Dep) 363941
239 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 201 on DFC route
SFund 17390
RRSK 68351 56800 15000 15000
EBR(Dep) 257222
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9116
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
212 Ahmedabad - Viramgam- Road over bridge in lieu of level crossing
No 11A
SFund 500
RRSK 220476 75000 80000
EBR(Dep) 220977
213 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 259
SFund 5000 77
RRSK 168295 128 200 5000
EBR(P) 173296
214 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No37
SFund 500
RRSK 98088 100 80000
EBR(Dep) 98588
215 Charni Road-Grant Road- Regirdering of Road over bridge
between at km 39 - 10
SFund 1739
RRSK 71533 10000 40000
216 Elphinstone Road- Regirdering of Road over bridge at km 815-9 SFund 870
RRSK 105138 1 100
217 Virar-Vaiterna- 4 Lane Road over bridge in lieu of level crossing
No 41
SFund 500
RRSK 153899 1
EBR(Dep) 154399
218 Mumbai Central (South)- Regirdering of Road over bridge at Km
46-8
SFund 4348
RRSK 81412 10000 40000
219 Mahalaxmi- Regirdering of Road over bridge at km 526-27 SFund 4348
RRSK 214187 10000 70000
220 Surat-Vadodara- Road over bridge in lieu of level crossing No 198 SFund 100
RRSK 99900 200 4000
EBR(P) 100001
221 Vadodara-Geratpur- 4 Lane Road over bridge in lieu of level
crossing No 240
SFund 2000 316
RRSK 117126 13947 71400 10000
EBR(P) 119127
222 Ahmedabad-New Bhuj- Road over bridge in lieu of level crossing
No 3X
SFund 500
RRSK 175762 500 5000
EBR(Dep) 176262
223 Ahmedabad-Viramgam - Road over bridge in lieu of level crossing
No 22A
RRSK 187005 23 50000 60000
EBR(Dep) 187006
224 Dadar- Regirdering of Road over bridge at Km 109-10 SFund 1739
RRSK 131731 1 100
225 Lowerparel-Elphinstone Road- Regirdering of Road over bridge at
km 712-13
SFund 1739
RRSK 186842 87000 80000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9117
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
226 Chanderiya-Ratlam - 2-lane road over bridge in lieu of level
crossing No141 near Piplia yard
SFund 1000
RRSK 89000 100 10000
EBR(P) 116700
227 Mandsour-Dalauda - 2-lane road over bridge in lieu of level
crossing No152
SFund 1000
RRSK 99000 5500 43600
EBR(P) 165000
228 Chanderia-Ratlam - 2-lane road over bridge at Chanderia in lieu of
level crossing No86
SFund 1500
RRSK 158500 100 5000
EBR(P) 160000
229 Mahesana-Patan- subways in lieu of level crossing No 27 32 56
amp 62 on Mahesana- Viramgam- level crossing No 4 11 18 19 amp
20 (9 Nos)
SFund 1 3530
RRSK 225598 23196 40000 30000
230 Mahesana-Viramgam- subways in lieu of level crossing No 6 7
14 23 amp 25 (5 Nos)
SFund 101 2015
RRSK 125934 4500 30000
231 Sabarmati-Botad- subways in lieu of level crossing- 23 Nos RRSK 613299 85000 150000
232 Viramgam- samakhiyali-subways in lieu of level crossing No 43
92 amp 108 (3 Nos)
SFund 100
RRSK 84683 1000
233 Udhna-Jalgaon- subways in lieu of level crossing No 87 122 123
133 141 150 amp 152 (7 Nos)
RRSK 218947 91408 100000 10000
234 Anand-Khambhat- subways in lieu of level crossing 10 Nos SFund 32995 60173
RRSK 96662 110623 8132 500
235 Chanderiya-Ratlam-subways in lieu of level crossing No 106 128
131 182 amp IND-Dewas-Ujjain level crossing No 26 (5 Nos)
SFund 26108 4281
RRSK 50310 29276 9571 100
236 Chanderia-Ratlam - 2-lane road under bridge at Nimbahera in lieu
of level crossing No103
SFund 87
RRSK 25313 1308 10000
EBR(P) 25400
237 Rajkot-Hapa- Road over bridge in lieu of level crossing No 145 at
Padadhari
RRSK 87610 1 100
EBR(Dep) 256608
238 Surat-Vadodara- Road over bridge in lieu of level crossing No158
(4-lane) between Sayan-Kim on DFC route
SFund 435
RRSK 120879 10 10
EBR(Dep) 363941
239 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 201 on DFC route
SFund 17390
RRSK 68351 56800 15000 15000
EBR(Dep) 257222
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9117
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
226 Chanderiya-Ratlam - 2-lane road over bridge in lieu of level
crossing No141 near Piplia yard
SFund 1000
RRSK 89000 100 10000
EBR(P) 116700
227 Mandsour-Dalauda - 2-lane road over bridge in lieu of level
crossing No152
SFund 1000
RRSK 99000 5500 43600
EBR(P) 165000
228 Chanderia-Ratlam - 2-lane road over bridge at Chanderia in lieu of
level crossing No86
SFund 1500
RRSK 158500 100 5000
EBR(P) 160000
229 Mahesana-Patan- subways in lieu of level crossing No 27 32 56
amp 62 on Mahesana- Viramgam- level crossing No 4 11 18 19 amp
20 (9 Nos)
SFund 1 3530
RRSK 225598 23196 40000 30000
230 Mahesana-Viramgam- subways in lieu of level crossing No 6 7
14 23 amp 25 (5 Nos)
SFund 101 2015
RRSK 125934 4500 30000
231 Sabarmati-Botad- subways in lieu of level crossing- 23 Nos RRSK 613299 85000 150000
232 Viramgam- samakhiyali-subways in lieu of level crossing No 43
92 amp 108 (3 Nos)
SFund 100
RRSK 84683 1000
233 Udhna-Jalgaon- subways in lieu of level crossing No 87 122 123
133 141 150 amp 152 (7 Nos)
RRSK 218947 91408 100000 10000
234 Anand-Khambhat- subways in lieu of level crossing 10 Nos SFund 32995 60173
RRSK 96662 110623 8132 500
235 Chanderiya-Ratlam-subways in lieu of level crossing No 106 128
131 182 amp IND-Dewas-Ujjain level crossing No 26 (5 Nos)
SFund 26108 4281
RRSK 50310 29276 9571 100
236 Chanderia-Ratlam - 2-lane road under bridge at Nimbahera in lieu
of level crossing No103
SFund 87
RRSK 25313 1308 10000
EBR(P) 25400
237 Rajkot-Hapa- Road over bridge in lieu of level crossing No 145 at
Padadhari
RRSK 87610 1 100
EBR(Dep) 256608
238 Surat-Vadodara- Road over bridge in lieu of level crossing No158
(4-lane) between Sayan-Kim on DFC route
SFund 435
RRSK 120879 10 10
EBR(Dep) 363941
239 Ahmedabad-Palanpur- Road over bridge in lieu of level crossing
No 201 on DFC route
SFund 17390
RRSK 68351 56800 15000 15000
EBR(Dep) 257222
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9118
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
240 Vadodra-Godhra - Road over bridge in lieu of level crossing No17 SFund 500
RRSK 195732 220 102651 80000
EBR(Dep) 196233
241 Pipliya-Mandsour - Road over bridge in lieu of level crossing No
150
SFund 87 79
RRSK 132513 100 40000
EBR(Dep) 132600
242 Harniya kheri-Mhow - Road over bridge in lieu of level crossing No
258
SFund 100
RRSK 121734 200 10000
EBR(Dep) 121834
243 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 79 SFund 100
RRSK 145803 200 10000
EBR(Dep) 145903
244 Morwani- Ratlam - Road over bridge in lieu of level crossing No 81 SFund 500
RRSK 138501 200 5000
EBR(Dep) 139001
245 Berawanya- Nagda- Road over bridge in lieu of level crossing No
102
SFund 100
RRSK 130582 200 5000
EBR(Dep) 130683
246 Nagda-Ujjain- Road over bridge in lieu of level crossing No 26 SFund 100
RRSK 125632 200 5000
EBR(Dep) 125732
247 Nargipur-Dewas- Road over bridge in lieu of level crossing No 27 SFund 100
RRSK 131404 1000 20000
EBR(Dep) 131505
248 Dewas-Barlai- Road over bridge in lieu of level crossing No 30 SFund 100
RRSK 131893 500 20000
EBR(Dep) 131994
249 Barlai-Mangliyagaon - Road over bridge in lieu of level crossing No
45
SFund 100
RRSK 132205 100 5000
EBR(Dep) 132305
250 Lakshmi Bai Nagar- Road over bridge in lieu of level crossing No
55
SFund 100
RRSK 132194 500 20000
EBR(Dep) 132234
251 Ujjain-Bhopal - Road over bridge in lieu of level crossing No 51 at
Maksi Yard (4-lane)
SFund 100
RRSK 264640 200 5000
EBR(Dep) 264740
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9119
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
252 Ratlam - Khandwa- Road over bridge in lieu of level crossing No
254 X in Rajendra Nagar Yard
SFund 100
RRSK 120013 100 5000
EBR(Dep) 120113
253 Than-Lakhamachi - Road over bridge in lieu of LC No73 (4-lane) RRSK 157557 10 100
EBR(Dep) 157558
254 Joraravason- Bilimora- Road over bridge in lieu of level crossing
No 107
SFund 435
RRSK 138664 2500 5000
EBR(Dep) 201754
255 Dondaiche-Vikhran road- Road over bridge in lieu of level crossing
No 105
RRSK 103056 1 1
EBR(Dep) 131324
256 Sachin-Bhestan- Road over bridge in lieu of level crossing No 142
on DFC route
SFund 435
RRSK 59723 10 10
EBR(Dep) 221910
257 Amalner-Takarkhede road- Road over bridge in lieu of level
crossing No136
RRSK 87598 1 1
EBR(Dep) 111871
258 Udhna-Jalgaon- Subway in lieu of level crossing no 6 SFund 435
RRSK 28745 1000
EBR(Dep) 29180
259 Dhola-Bhavnagar- Subways in lieu of level crossing No 192C amp
193C
SFund 87
RRSK 32832 3575 15000 5000
260 Ahmedabad-Palanpur- Subways in lieu of level crossing No 205
206 210 197 199 amp 170 (6 Nos)
SFund 1 144
RRSK 158053 20706 30000 30000
261 Ahmedabad-Palanpur- Subways in lieu of level crossing No 194
213 amp 225 on DFC route (3 Nos)
SFund 27737 112
RRSK 58553 320 25000 20000
EBR(Dep) 86290
262 Rajkot-Somnath- Subways in lieu of level crossing No 6667 amp 65
(3 Nos)
SFund 87
RRSK 57449 25 100 100
263 Mahesana-Viramgam- Subways in lieu of level crossings (6 Nos) SFund 1
RRSK 130399 4144 10000 30000
264 Sabarmati-Botad- Subways in lieu of level crossings- 14 Nos SFund 87
RRSK 223846 50000 110000
265 Ahmadabad-Himmatnagar - Elimination of unmanned level
crossings by road under bridge (22 Nos)
RRSK 407700 38655 140000 100000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9120
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
266 Mahesana-Taranga Hill - Elimination of unmanned level crossings
by road under bridge (18 Nos)
RRSK 278800 114 80000 150000
267 Than- Lakhamachi - 4-lane road over bridge in lieu of level crossing
No72
RRSK 184101 100 10000
EBR(Dep) 184101
268 Anand-Khambhat - 2-Lane over bridge in lieu of level crossing
No51
RRSK 144800 2500 5000
EBR(Dep) 144800
269 Vyara-Kikakui Road - Road over bridge in lieu of level crossing
No51
RRSK 113300 1 100
EBR(Dep) 144300
270 Sonshule-Sindkheda - Road over bridge in lieu of level crossing
No112A
RRSK 115000 1 1
EBR(Dep) 146400
271 Dondaiche-Vikhran - Road over bridge in lieu of level crossing
No103
RRSK 115000 1 1
EBR(Dep) 146400
272 Nagda Yard - 2-lane road over bridge in lieu of level crossing
No103
RRSK 130800 200 5000
EBR(Dep) 130800
273 Ratlam Division - Elimination of manned level crossings by limited
height subways (10 Nos)
RRSK 225800 81266 50000
274 Ratlam Division - Limited height subway to eliminate unmanned
level crossings (11 Nos)
RRSK 273400 25857 147118 30000
275 Ahmedabad Division - Elimination of level crossings by road under
bridges (19 Nos)
RRSK 479700 876 130000
276 Ratlam Division - Elimination of manned level crossings by road
under bridges (11 Nos)
RRSK 244300 21266 50000
277 Sabarmati-Botad - Road over bride in lieu of level crossing No 28
(PB2912018-19WR)
RRSK 53025 1 20000
EBR(P) 53026
278 Virar-Surat - Road over bridge in lieu of level crossings No 99 on
DFC route (PB2912018-19WR)
RRSK 98176 400 1000
EBR(P) 110677
279 Virar-Surat - Road over bridge in lieu of level crossing No104 on
DFC route (PB2912018-19WR)
RRSK 92094 400 1000
EBR(P) 103031
280 Estimated investment through EBR(Partnership) for works on
Indian Railways on cost share basis incl deposit from State
Government etc
EBR(P) 1300000 1300000 650000
281 Virar-Surat - Road over bridge in lieu of level crossing No 96 on
DFC route (PB2912018-19WR)
RRSK 88218 400 1000
EBR(P) 98061
282 Geratpur-Ahmedabad - Rebuilding of Khokhara road over bridge at
km 4936-7 (PB2912018-19WR)
RRSK 326972 20297 5000
EBR(P) 326972
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9121
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
283 Viramgam-Samakhyali - Road over bridge in lieu of level crossing
No1 (PB2912018-19WR)
RRSK 154012 100
EBR(P) 154012
284 Mehsana-Viramgam - Road over bridge in lieu of level crossing No
2A (PB2912018-19WR)
RRSK 154014 100
EBR(P) 154014
285 Virar-Surat - Road over bridge in lieu of level crossing No103 on
DFC route (PB2912018-19WR)
RRSK 92378 400 1000
EBR(P) 103305
286 Virat-Surat - Road over bridge in lieu of level crossing No112 on
DFC route (PB2912018-19WR)
RRSK 83296 400 1000
EBR(P) 91915
287 Virar-Surat - Road over bridge in lieu of level crossing No70 on
DFC route (PB2912018-19WR)
RRSK 94138 400 1000
EBR(P) 105510
288 Virar-Surat - Road over bridge in lieu of level crossing No67 on
DFC route (PB2912018-19WR)
RRSK 120546 400 1000
EBR(P) 138711
289 Udha-Jalgaon - Road over bridge in lieu of level crossing No8 on
DFC route (PB2912018-19WR)
RRSK 98928 400 1000
EBR(P) 100789
290 Chanderia-Ratlam - 2-lane road over bridge in lieu of level crossing
No177 (PB2912018-19WR)
RRSK 125739 500 5000
EBR(P) 125739
291 Ahmedabad Division - Road over bridge in lieu of level crossing
170 174 204 206 209 16A (6 Nos) (PB2912018-19WR)
RRSK 1089482 800 800
EBR(P) 1089482
292 Mandsaur Yard - Road under bridge in lieu of level crossings
No151 (PB2912018-19WR)
RRSK 36534 400 10000
EBR(P) 36534
293 Udhna-Jalgaon - Subways in lieu of level crossings (8 Nos)
(PB2912018-19WR)
RRSK 347818 1 20000
294 Dabhoi-Samlaya - Subways in lieu of manned level crossings (12
Nos) (PB2912018-19WR)
RRSK 152437 1000
295 Miyagam-Dabhoi - Subways in lieu of level crossings (15 Nos)
(PB2912018-19WR)
RRSK 193237 1000
296 Sabarmati-Botad - Road under bridge in lieu of level crossings 17B
(PB2912018-19WR)
RRSK 30899 1 20000
EBR(P) 488903
297 Ratlam Division - Subways in lieu of level crossings (14 Nos)
(PB2912018-19WR)
RRSK 333207 400 10000
298 Sabarmati-Botad - Subways in lieu of manned level crossing (6
Nos) (PB2912018-19WR)
RRSK 161678 32000 90000
299 Sabarmati-Botad - Subway in lieu of level crossing No62C
(PB2912018-19WR)
RRSK 31881 1 15000
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9122
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
300 Rajkot Division - Subways in lieu of level crossings (5 Nos)
(PB2912018-19WR)
RRSK 102699 1 10000
301 Sabarmati-Botad - Subways in lieu of level crossing No 02 18 25
amp 26 (4 Nos) (PB2912018-19WR)
RRSK 159953 31000 90000
302 Works costing below Rs25 crore each RRSK 542095
TOTAL-WORKS IN PROGRESS RRSK 3785272
EBR(P) 650000
303 Lumpsum Provision For New Works RRSK 140000
TOTAL-NEW WORKS RRSK 140000
TOTAL-Road Safety Works-Road OverUnder Bridges RRSK 3925272
EBR(P) 650000
304 Nagda-Bhopal Indor-Dewas-Ujjain amp Dewas-Maksi - TFR -
218156 km
RRSK 109450 10000 20000
305 Ahmedabad Division - TTR(CMSC) - 30 sets amp TTR(CS) - 61 sets RRSK 42604 3000 15000
306 Mumbai Division - Repl of switches with thick web switches (main
line amp 1st loop of all points amp crossings) (A amp CC+8+2 routes) (1109
sets)
DRF 684412 276695
RRSK 160716 102900 112496 203803
307 Rajkot - Somnath section TBR - 30 Km DRF 57442
SFund 2950 1794
RRSK 52337 8460 5000 5000
R 19774
308 Virar - Surat - TBTR - 5088 No RRSK 194362 15000 52935
Complete Track Renewal
309 Geratpur-Ahmedabad - CTR(PampS) - 3491 km RRSK 48897 5000 15000
R 2068
310 Udhna-Jalgaon - CTR(P) - 15557 km amp TRR(P) - 6942 km RRSK 353199 25000 40000
R 18688
311 Nagda-Bhopal amp Indore-Ujjain - CTR(P) - 2083 km TRR(P) -
12164 km TRR(S) - 0324 km amp CTR(PampS) - 0843 km
RRSK 187459 20000 90000
R 3002
312 Ahmedabad-Viramgam - TFR - 1330 km TBR - 7134 km
TRR(P) - 9144 km CTR(P) - 1053 km amp TTR(CS CMSC) - 3 sets
RRSK 154664 22500 20000
R 11334
313 Samakhiyali-Gandhidham - CTR(P) - 016 km Glued Joints amp SEJ -
73 sets ECW - 3971 km amp TTR(CS CMSC) - 13 sets
RRSK 52782 8000 24600
R 8919
TRACK RENEWALS
A - Works in Progress
ROAD SAFETY WORKS-ROAD OVERUNDER BRIDGES
B - New Works
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9123
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
314 Viramgam-Surendranagar - CTR(P) - 3145 km amp TRR(P) - 2746
km
RRSK 86388 12000 30000
R 3778
315 Surendranagar-Wankaner - CTR(P) - 2076 km amp TRR(P) - 3724
km
RRSK 78358 8000 40000
R 2494
316 Godhra-Nagda - CTR(PampS) - 13875 km RRSK 194341 20000 90000
R 8218
317 Surat-Miyagam CTR(S) - 5371TRR(S) - 10413 Kms in loop
lines TTR of Traps(5) Curved Switches (9) amp CMS crossings - 7
DRF 149334 51964
RRSK 100292 30930 40000 9000
R 4164
318 Ahmedabad -Viramgam amp Chandlodiya - Khodiyar TRR(P) with 52
Kg = 1266 Km Deep screening of 32117 Km
DRF 66908 28575
RRSK 27654 2882 1792 10000
R 21169
319 Udhna - Jalgaon -CTR(P) 35142 kms and TRR(P) 23051Kms DRF 815190 81673
RRSK 630806 269492 118700 90000
R 23163
320 Surendranagar - Rajkot Section CTR(PampS)310 amp TRR(S)146 in
various yards
DRF 44138 14292
RRSK 32340 20839 10000 1
R 2043
321 Udhna-Jalgaon section CTR(S) 5287Km in passenger loop lines DRF 78135 2056
RRSK 64306 23152 23152 25000
R 3485
322 VIramgam-Samakhiyali CTR (P) - 1480 Km TRR(P) 60kg 1030
Km TRR(P) 52 kg 3159 kmsTSR(P) = 233 Km amp TBR 8564
kms
DRF 503597 38464
SFund 23501 103501
RRSK 438716 263571 155473 80000
R 67739
323 Nadiad-Modasa CTR(S) 2844 Kms DRF 344867 30806
RRSK 248923 67958 110965 1
R 18746
324 Nagda-Bhopal - CTR(P) - 19011 Km amp TRR(P) - 20546 Kms DRF 450314
SFund 40000 342302
RRSK 413957 397709 5000 1
R 11621
325 Virar-Surat - CTR(P) - 29242km amp TRR(P) - 25816 km DRF 786301 105754
RRSK 671441 144754 75325 100000
R 17875
TRACK RENEWALS
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9124
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
326 Churchgate - Virar - CTR (S) - 355 Kms DRF 57009 44318
RRSK 43377 25438 21050
R 2170
327 Udhna - Jalgaon - CTR(P) - 27828 km amp TRR(P) - 11688 kms DRF 608065 20648
RRSK 519499 150000 80000
R 17011
328 Viramgam -Samakhayali - CTR(P) - 125 Km TTR(FS CS CMSC)-
3 sets TTR(FS TWS WCMSC)- 5 sets amp Jhund - Kharaghoda
TBR -192 Km
DRF 165321 11629
SFund 93809 97253
RRSK 164380 101405 1 50000
R 22107
329 Ahmedabad -Viramgam - CTR (P) - 145 Km amp TBR - 14111 Kms DRF 51056 7599
RRSK 47633 799 29268 14500
R 9512
330 Viramgam-Samakhiali - CTR(P) -142 km TRR(P) -1937 km CTR
(P) (PampS) - 06 km TRR(S) -12 km TBR - 0517 km TFR -19198
km amp TTR - 6 sets
RRSK 304385 8470 132852 15618
R 21143
331 Virar - Surat - CTR(P) - 22919 km amp TRR(P) - 31778 km RRSK 703043 15000 80000
R 26138
332 Samakhiyali - Gandhidham - Kandlaport - CTR(P) - 0914 km amp
TTR - 17 set
RRSK 44124 1129 40752 15616
R 12306
333 Anand - Godhra - CTR(P) - 9249 km RRSK 156520 1100 30000 5500
R 10548
334 Khodiayar - Palanpur - CTR(S) (SampP) 609 km amp TRR(S) 36 km in
loop lines
RRSK 99553 9512 18000
R 3762
335 Vadodara - Geratpur Section - CTR (SampP) 7203 Km of various
passenger running loop lines in yards
RRSK 89874 1293 20731 47850
R 4449
336 Miyagam - Godhra - CTR (S amp P) 5791 Kms amp TRR(S) - 8027
Kms in loops
RRSK 138233 3340 60000 40000
R 3577
337 Surat-Miyagam - CTR(S amp P) - 19446 Kmsin various yard lines RRSK 242634 80000 80000
R 12012
338 Ahmedabad - Viramgam - TBR - 94951 kmTFR - 5 km TTR - 7
Nos
RRSK 196074 78534 20000
R 110663
339 Nagda-Bhopal Section - CTR(P) - 7342 km TRR(P)-27686 km
TRR(S)-2429 km amp CTR(S) - 22 km
RRSK 443049 352963 134773 1
R 9732
TRACK RENEWALS
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9125
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
340 Viramgam - Okha - CTR (P) - 195 km amp TRR (P) 1142Kms RRSK 146268 118998 20000 10177
R 2224
Through Rail Renewal
341 Churchgate-Virar - TRR (P) - 26392 km amp CTR (SampP) - 6472 km RRSK 385222 25000 40000
R 3833
342 Virar-Surat - CTR(P) - 5854 km TRR(P) - 17851 km TSR(P) -
7683 km amp CTR (S) - 15355 km
RRSK 566694 35000 41425
R 25356
343 Surat-Miyagam -TRR(P) - 0811 km TSR(P) - 2439 km TTR
(CMS) - 40 sets TTR (CS) - 18 sets TFTR - 800 km amp TFR -
6754 km
RRSK 154445 10000 40000
R 2930
344 Surat-Godhra - TRR(P) -10516 km TFR - 148134 km TBR -
1054 km SEJ - 10 sets TTR (CS) - 69 sets TTR (CS CMSC) - 16
sets amp Casual renewal - 3204 Nos
RRSK 262193 59198 60000
R 22541
345 Godhra-Nagda - TRR(P) - 45311 km amp TRR(S) - 272 km RRSK 529043 49500 250000
346 Vadodara-Geratpur - TFR - 110619 km TRR (P) - 38622 km
TBR - 12778 km CTR(S) - 4659 km SEJ - 8 sets TTR (CMS) -
21 sets amp TTR (CS) - 55 sets
RRSK 604979 60000 73001
R 17187
347 Ratlam-Nimach - TRR (P) - 2608 km (bridges amp approaches) amp
Bassi Berisal - Chanderia - TRR (S) - 2608 km
RRSK 46460 6000 30000
348 Anand-Godhra - TRR(P) -1891 km SWR to LWR - 2165 km
TTR(CS) - 2 sets Glued Joints - 33 sets TBR -1136 km amp TFR -
66974 km
RRSK 105067 10802 20000
R 1283
349 Udhna-Jalgaon - TRR(P) - 8079 km DRF 70470 3890
RRSK 66871 1750 12811 1750
350 Surat-Miyagam-TRR(P) 2343TSR(P)-2485TRR(S)-1130TBR-
57058 Kms amp Switches -49 SEJs -108 and Glued Joints- 620
DRF 410903 213773
RRSK 194621 158775 38000 1
R 37555
351 Vadodara-Ahmedabad -TRR -9373Kms TBR -29731 Kms SEJ-
43 sets and TTR(TWS amp WCMS) -82 sets
DRF 263527 3365
RRSK 233723 63142 52397 80000
R 18174
352 Surat-Miyagam - TRR (P) - 49006 Kms TBR - 18825 Kms amp TFR
- 279 Kms
DRF 349985 2034
SFund 145635 296370
RRSK 310552 211013 36000 50000
R 11508
TRACK RENEWALS
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9126
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
353 Anand - Godhra - TBR - 2340 Kms DRF 30515 394
RRSK 43878 1098 10000 10000
R 14304
354 Miyagam-Godhra - TRR(P)-5012 Kms TBR-42673 Kms CTR(S)-
290 Kms TRR(S)-22 Kms
DRF 466250 2640
SFund 95634 259975
RRSK 393167 218747 50000 50000
R 27858
355 Godhra - Nagda - TRR(P) - 3718 km RRSK 368746 272445 101413 1
356 Chanderiya - Ratlam - ECW - 8 km amp ISD - 1760 km RRSK 89446 135 11149 71498
R 10872
357 Vadodara - Geratpur -TRR(P) - 19205 km TTR - 58 Sets Others -
548 Nos amp TTR - 7 sets
RRSK 374887 63673 30688 90000
358 Miyagam - Godhra - TRR(P) - 78184 km Others - 48 Nos amp TTR -
67 sets
RRSK 815624 306671 200645 180000
359 Palanpur yard - TRR(S) - 270 km TTR(CS) - 5 sets TTR - 5 sets
amp SEJ -128 Nos
RRSK 37623 16276 23482
360 Anand - Khambaht - CTR(P) - 5912 km TRR(P) -1750 km amp TBR -
790 km
RRSK 280224 537 20066 80000
R 12859
361 Vadad - Kathana - TRR(P) - 706 km RRSK 70024 10050 30000
362 Surat - Miyagam - TRR(P) - 55201 km TBR - 26166 km TFR -
20979 km amp TTR (CS) - 58 sets
RRSK 653593 236415 110000 180000
R 30496
363 Udhna - Jalgaon - CTR(P) - 14167 km amp TRR(P) - 3686 km RRSK 276289 31011 45000 50000
R 16156
364 Churchgate - Virar - TRR(P) - 54344 km amp CTR (PS) -168 km RRSK 559967 235939 104401 100000
R 1038
365 Nadiad-Kapadvanj - Modasa - TWR - 60035 km RRSK 116752 86752 20000
366 Khodiar - Mahesana - TRR (P) - 449 km RRSK 39423 11206 31201
Through Sleeper Renewal
367 Indore-Dewas-Ujjain (SL) - TSR (P) - 11742 km RRSK 88570 10000 30000
R 14106
368 Vasad-Kathana - CTR(S ampP) -1180 km amp TRR(S) - 590 km RRSK 215838 10000 30000
R 6989
369 Indore-Ujjain - TSR(P) - 2115 km DRF 110787 110446
RRSK 17630 4772 3252 1
R 10498
370 Miyagam-Godhra -TRR(P)-04TSR(P)=196TBR 69046 TFR
6110 Kms amp TTR 31 Nos and Switch X-ings and SEJ Renewal
DRF 366873 86614
RRSK 306225 106029 50000 40000
R 56886
TRACK RENEWALS
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9127
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
371 Indore - Dewas-Ujjain - TSR(P) - 2738 km RRSK 205813 88045 112577 13044
R 30337
Ballast
372 Churchgate-Virar - TBR - 46623 km amp TFR - 4457 km RRSK 115141 15000 10000
R 52642
373 Nagda-Bhopal amp Indore-Dewas-Ujjain - TBR - 63016 km RRSK 125327 1000 30000
R 71151
374 Mahesana-Viramgam (SL) - TBR - 26315 km RRSK 52336 8000 15000
R 29712
375 Surendranagar - Okha - TBR - 13418 km DRF 113110 95977
RRSK 20665 4945 12533 19337
376 Wankaner-Navlakhi amp Dahinsara-Maliya Miyana - TBR - 4730 km DRF 52239 35254
RRSK 12618 1017 73 10455
377 Rajkot Division - TBR - 14095 km DRF 109871 141455
SFund 9500 17233
RRSK 44386 10626 5000 1
R 24954
378 Godhra-Nagda - TBR - 2286 km DRF 21582 5626
SFund 8184 6088
RRSK 26935 12218 3893 1
R 11347
379 Surendranagar-Bhavnagar - TBR 49 Km DRF 94055 393
SFund 5300 8533
RRSK 110290 12903 20000 10000
R 32297
380 Churchgate-Virar section TBR = 31957 Kms amp TBR of 63
NosPampCs
DRF 80310 1920
RRSK 71091 10290 15435 10000
R 23322
381 Udhna - Jalgaon section TBR = 42951 Kms DRF 73772 3023
RRSK 59943 15435 23152 10000
R 25492
382 Churchgate - Virar - TBR 4176 Kms DRF 102729 47000
RRSK 60229 13075 10000
R 25527
383 Rajkot - Somnath - TBR - 6410 Km DRF 79589
SFund 4000
RRSK 117832 5000 12100
R 39184
384 Godhra - Nagda -TBR - 3540 Km DRF 38163
SFund 8000 4536
RRSK 58862 13257 10986 14317
R 21640
TRACK RENEWALS
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9128
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
385 Hapa - Okha - TBR - 4161 Kms DRF 56269 179
RRSK 74993 7242 33884 14964
R 25436
386 Churchgate - Virar - TBR - 1896 km RRSK 36002 15000 10000
R 22097
387 Rajula - Mahuva - TBR - 31299 kms RRSK 59431 20534 10000
R 36478
388 Godhra - Nagda - TBR - 5918 km RRSK 112370 3371 82261 15000
R 68971
389 Sihor - Palitana - TBR - 11 Kms RRSK 20887 10000 10000
R 12820
390 Rajkot - Somnath - TBR 4320 Km RRSK 82029 20000 27800
R 50348
391 Chanderiya - Ratlam - TBR - 13740 km RRSK 260803 2040 60145 50000
R 160077
392 Ahmedabad - Khodiyar - TBR - 4576 km Khodiyar - Chandlodiya-
Gandhinagar Capital - TRR(S) - 0724 km amp Sabarmati-Khodiyar -
TFR 12545 km
RRSK 25601 10271 21486
R 5333
393 Mahesana - Viramgam - TBR - 2550 km RRSK 48420 22713 25950
R 29719
394 Nagda-Bhopal Indore-Ujjain-Dewas - TBR - 3467 km RRSK 65832 1009 33500 10000
R 40407
Points amp Crossings
395 Churchgate-Virar - TTR(TWS CMSC) - 70 sets amp Glued Joints - 85
sets
RRSK 139916 20000 15000
396 Godhra-Nagda - TTR (CS) - 41 sets TTR (CMSC) - 41 sets amp
Glued Joints - 200 Nos
RRSK 64394 9000 20000
397 Ahmedabad Division - Glued Joints -152 Nos amp SEJ - 24 sets RRSK 26066 3000 15000
398 Ratlam Division - TTR (300 sets) DRF 465522 78827
SFund 25000 283745
RRSK 319518 146619 1166 100
399 Churchgate - Virar Section - TTR (CS+CMSC) -17 Nos DRF 113241
RRSK 94804 5784 20870 20000
R 9237
400 Udhna-Jalgaon section TTR 30 sets (27 Nos 1 in 85 amp 3 Nos amp
Trap Point )
DRF 53703 5632
RRSK 39873 15435 23153 10000
R 8782
401 Nagda- Godhra - TTR(CS) -152 sets TTR(CMSC) - 152 sets
renewal of SEJs - 115 amp renewal of glued joints - 454 Nos
DRF 136271
SFund 10000 261
RRSK 116516 57774 47718 15782
TRACK RENEWALS
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9129
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
402 Churchgate - Virar - TTR(CS) - 76 sets TTR(CMSC) - 44 sets amp
renewal of SEJ - 54 Nos
DRF 68785 4761
SFund 13234 69222
RRSK 27546 14944 22147 5889
403 Churchgate - Virar - TTR(CMS) - 128 sets TTR(CS) -119 sets amp
SEJ - 56 Nos
RRSK 138306 9273 15000 10000
404 Udhna - Jalgaon - TTR(TWS) -153 sets (excluding sleepers) RRSK 243599 15000 10000
405 Virar - Surat - TTR - 66 set RRSK 110409 15000 10000
R 43682
406 Geratpur - Ahmedabad - Viramgam - Samakhiyali Chandlodiya-
Khodiyar-Gandhinagar Khodiyar-Ahmedabad - TTR - 267 nos of
swithches amp traps
RRSK 305723 2888 55437 30000
R 231
407 Indore-Dewas-Ujjain amp Nagda-Ujjain-Bhopal - Renewal of 741
glued joints
RRSK 84424 135 22105 17159
408 Indore - Dewas - Ujjain amp Nagda - Ujjain-Bhopal - TTR (TWS) -
197 set
RRSK 313654 135 101384 94812
Others
409 Viramgam-Samakhiali (SL) - TBTR - 2385 Nos amp Renewal of
channel sleeper fitting of Br No 111 - 2865 Nos
RRSK 58432 8000 20000
410 Virar-Surat - TFR - 16812 km amp TBR - 16187 km RRSK 208497 30000 20000
R 18277
411 Nagda-Bhopal - SEJ - 72 sets RRSK 28817 4500 10000
412 Godhra-Nagda - TFR - 70555 km RRSK 53608 8000 10000
413 Bhavnagar Division - TFR - 45465 km RRSK 179472 30000 50000
414 Nagda-Bhopal amp Indore-Dewas-Ujjain - TFTR - 2330 km RRSK 88506 10000 20000
415 Ratlam-Chanderiya - TFTR - 1472 km RRSK 138813 7000 20000
416 Geratpur-Ahmedabad amp chandlodiya-Khodiyar - Strengthening of
loop lines -13317 km
RRSK 36835 2500 10000
417 Godhra-Nagda - Conversion of SWR into LWR in loops - 13778 km RRSK 38111 5000 20000
418 Godhra - Nagda - TFTR - 45 km DRF 112176 16407
RRSK 87428 6660 35117 1000
419 Maksi - Bhopal - TFTR - 2176 km DRF 93561 20604
RRSK 43669 16097 25587 100
R 6637
420 Surat-Godhra - TTR (310 sets) DRF 459957 72735
RRSK 349785 71928 56036 19649
421 Chanderiya - Nimach Section - TWR 4930 Km Total 7592 Joints DRF 62288 21075
RRSK 46888 45511 6780 1
422 Chanderiya - Ratlam TFR of only Rubber Pads = 19963 Km DRF 33540 17301
RRSK 14960 22374 4014 1
TRACK RENEWALS
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9130
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
423 Viramgam-Okha TFR of only rubber pads 34392 Kms RRSK 54371 46953 9817 1
424 Rajkot - Somanath amp Dhola - Bhavnagar TFR of only Rubber Pads
Total 18190 kms
DRF 37665 4656
RRSK 26266 19486 2500 100
425 Geratpur-Ahmedabad -Viramgam Chandlodiya-Khodiyar
Ahmedabad- Mehsana sections - TFR - 9563 kms
DRF 82840 9532
RRSK 66409 19653 21930 15000
426 Churchgate - Virar section- TFR without ERC - 11544 Kms DRF 55959 7639
RRSK 46740 23352 15435 10000
427 Godhra-Nagda TFR of only Rubber Pads - 29749 Km DRF 49981 26307
RRSK 40762 44365 2289 1
428 Udhna-Jalgaon DN-JL section TFR of rubber pads Total 152 Km DRF 27173 7899
RRSK 18020 15750 12211
429 Nagda-Bhopal and Indore-Dewas-Ujjain -TFR - 99909 Km DRF 88637
SFund 2000 1365
RRSK 87696 28624 49374 1
430 Godhra - Nagda - TFR - 35614 Kms SFund 1500 451
RRSK 30809 23722 7948 188
431 Churchgate - Virar - TWR - 6850 km RRSK 133214 15000 10000
432 Ratlam - Laxmibai Nagar - TFTR - 630 km RRSK 63794 135 30000 4626
433 Virar - Surat - Renewal of 106 Glued joints amp 125 SEJs RRSK 65654 15000 10000
434 Ahmedabad Division - Renewal of glued joints - 390 sets amp SEJ -
78 Nos
RRSK 75166 22384 15000
435 Udhna - Jalgaon - TFR - 227 km RRSK 210395 10303 15000 10000
436 Surat - Miyagam -TFTR - 6 km RRSK 60756 299 15000 25000
437 Udhna-Jalgaon - Renewal of 69 Glued Joints amp 55 SEJs RRSK 29462 15000 14462
438 Churchgate-Virar - TFR - 41787 km RRSK 38730 10120 15000 15000
439 Nagda-Bhopal amp Idu Section-TFR 3910 km RRSK 36240 109 25000 2374
440 Rajkot Division - 573 Nos TTR - 68 sets amp TTR (CS) - 94 sets RRSK 143904 262 32930 55067
441 Khodiyar-Palanpur - Others - 196 Nos amp TTR - 38 sets RRSK 92585 1002 17528 15000
442 Khodiar - Palanpur - TFR - 11480 km (ECRs amp Liners) RRSK 85497 10252 15000
443 Works costing below Rs25 crore each RRSK 194891
TOTAL-WORKS IN PROGRESS RRSK 4418883
444 Lumpsum Provision For New Works RRSK 710000
TOTAL-NEW WORKS RRSK 710000
TOTAL-Track Renewals RRSK 5128883
B - New Works
TRACK RENEWALS
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9131
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
445 Ratlam Division - Regirdering (Bridge No54down amp 292down) RRSK 40000 100 1465
446 Indiranagar-Surbari - Regirdering (Bridge No161) RRSK 334000 100 1076
447 Viramgam-Samakhiyali - Opening of new bridge by providing twin
reinforced cement concrete box
RRSK 35870 100 2930
448 Vasad-Ranoli - Regirdering (Bridge No624up) RRSK 521000 100 293
449 Ujjain-Bhopal - Regirdering (Bridge No51up) RRSK 28200 100 2930
450 Udhna-Jalgaon - Repl of girders rail clusters (9 bridges) RRSK 113900 100 15000
451 Rajkot Division - Reinforced cement concrete box for addl opening
(various locations)
RRSK 30000 100 1379
452 Ahamdabad-Mehsana - Regirdering of under strengthover aged
steel girder (4 bridges)
RRSK 54165 100 1465
453 Nagda-Bhopal - Rebuilding of stone slab by reinforced cement
concrete box (18 Nos)
RRSK 72500 5000 5000
454 Indore-Dewas amp Ujjain - Repl of damaged pipe culvertstone slab
by providing reinforced cement concrete box (21 Nos)
RRSK 94600 4000 5000
455 Bhairongarh-Raoti - Rebuilding (bridge No226 down) DRF 322240 264962
RRSK 57278 80 1
SRSF 75527 75527
456 Virar-Surat - Rebuilding (bridge No166) DRF 117622 85890
RRSK 18127 -5895 23525 50000
SRSF 1
457 Virar-Surat - Rebuilding (bridge No169) DRF 211290 141803
RRSK 58420 10072 30501 60000
458 Mahim-Bandra - Construction strengthening of cast iron screw
piles (bridge No 20)
DRF 58070 260
RRSK 56810 40000
459 Western Railway - Replof early steel girders (915 m) in various
sections with pre-stressed concrete slabs (63 spans)
DRF 84417 80150
RRSK 3499 586 400 4395
460 Western Railway - Strengthening of bridges on feeder routes of
dedicated freight corridor
DF(3) 175700 65140
RRSK 112895 16705 1000 1000
461 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 230200 202997
RRSK 30933 3725 1000
462 Anand Yard - Rebuilding of arch bridge No646 by reinforced
concrete cement RCC box
DRF 52610
RRSK 50110 5318 500 2930
463 Virar-Surat - Rebuilding (9 minor bridges) DRF 65240
RRSK 87877 2013 15000 20919
464 Virar-Surat - Repl of corroded steel girders by precast RCCPSC
slab (bridge Nos99 133 329330 446 amp 280) (47 span)
DRF 36578 3240
RRSK 26578 14729 15000 6323
BRIDGE WORKS
A - Works in Progress
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9132
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
465 Dahod-Dhamarda - Regirdering (bridge No114up) DRF 45739 5428
RRSK 41249 10634 10000 5860
466 Surat-Godhra amp Nagda-Ujjain-Bhopal - Repl of structural members
bearings bed platesholding down bolts etc (various bridges)
DRF 49386 37
RRSK 49286 2854 14000 4395
467 Virar-Ratlam Vadodara-Geratpur Ratlam-Chanderia amp Vadodara-
Chotaudepur - Replstrengthening of members surface
rehabilitation etc (various bridges)
DRF 76814 23
RRSK 75814 10946 15000 8790
468 Anand-Godhara - Repl of steel girders (bridge No65) (6 span) DRF 118983 39873
RRSK 162700 10816 20000 7131
469 Nagda - Ujjain - Maksi - Rebuilding of stone slab by RCC box
bridges (8 Nos)
DRF 26400
RRSK 26680 12210 5000 196
470 Churchgate - Virar - Regirdering of bridge No20 amp 66 DRF 56909
RRSK 56809 5000 4395
471 Geratpur-Khandala Geratpur-Kandla Port and Viramgam-
Kharaghoda - Rehabilitation of different steel girder bridges
DRF 44269
RRSK 44169 4239 20000 9325
472 Sevaliya -Timba Road - Regirdering of bridge No65 over Mahi
river (11 spans out of 17)
DRF 334170 14633
RRSK 334070 185754 100000 58938
473 Vaitarna - Addl spans at bridge No 92 (3 Nos) (1830 m each ) with
guide bund on the north side eastwest approaches
DRF 308362
RRSK 306362 1000 99168
474 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (9 bridges) RRSK 103361 20000 16745
475 Maksi-Bhopal - Rebuilding (9 stone slab bridges) RRSK 32110 800 4395
476 Ahmedabad-Viramgam - Rebuilding (Bridge No59up) RRSK 69038 100 4930
477 Godhara-Ratlam - Regirdering of cracked PSC I-girders (Bridge
No54up)
RRSK 45183 800 10255
478 Godhara-Ratlam amp Indore-Dewas-Ujjain - Regirdering (13 bridges) RRSK 302100 13380 70000 48600
479 Virar~Surat - Regirdering (Bridge No445RUB) RRSK 28574 800 2930
480 Works costing below Rs25 crore each RRSK 43458
TOTAL-WORKS IN PROGRESS RRSK 552617
481 Lumpsum Provision For New Works RRSK 10000
TOTAL-NEW WORKS RRSK 10000
TOTAL-Bridge Works RRSK 562617
BRIDGE WORKS
B - New Works
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9133
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
482 Motikhavadi Sikka amp Lavanpur - Repl of mechanical signalling by
electronic interlocking amp block proving by axle counters
RRSK 219582 100 20000
483 Vadodara RRI and Vadodara C cabin - Repl of indoor amp outdoor
signalling equipments
RRSK 261650 100 10000
484 Bharuch amp Gothaj - Repl of overaged indoor amp outdoor signalling
equipments
RRSK 275679 6000 20000
485 Petlad and Khambhat - Complete track circuiting of station section
amp repl of mechanical signalling by electronic Interlocking
RRSK 84399 2860 10000
486 Dahanu Road - Repl of indoor amp outdoor signaling equipment RRSK 178924 3100 40000
487 Bhavnagar Division - Block proving by axle counters with UFSBI
(21 block sections)
RRSK 129402 100 10000
488 Mahesana-Viramgam amp Mahesana-Patan - HADAC for 10 block
section amp repl of NBT Block instruments by BPAC in 4 Block
section
RRSK 63727 1000 5000
489 Nagda-Bhopal - Repl of existing RE cable by six quad cable RRSK 102902 100 20000
490 Pratapnagar-Surat amp Vadodara-Godhra - Repl of optical fiber
cable equipments
RRSK 33869 100 5000
491 Godhra-Nagda - Repl of Existing STM-1 equipment with STM-4 amp
existing PD Mux equipments
RRSK 32482 100 15000
492 Vadodara Division - Repl of analog axle counters by digital axle
countes
RRSK 96042 100 5000
493 Ratlam Division - High availability digital axle counters (A-route) (8
IBS)
RRSK 130200 100 30000
494 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection
system (500 rkm)
DF(4) 2658752 11402
RRSK 2646732 11261 100 10000
495 Churchgate - Virar - Repl of mobile train communication system of
suburban section amp integration with MTRC of Central Railway
DRF 52289 1
RRSK 48256 100 50000
496 Rajkot-Hapa - Repl of signalling equipment (8 stations) DRF 409529 276787
RRSK 151052 28776 1000 10000
497 Ratlam - Repl of signalling assets by route relay interlocking DRF 171450 95656
RRSK 79999 32499 10000 30000
498 Western Railway - Isolation and upgradation of signalling (13
stations)
DF(4) 549547 111115
RRSK 473885 144326 80000 40000
499 Godhra-Ratlam - Repl of indoor amp outdoor signalling equipment (6
stations)
DRF 288219 194713
RRSK 122397 63314 15000 1
500 Udhana - Repl of complete outdoor signaling gears DRF 69147 52135
RRSK 22490 11309 1419 2500
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9134
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
501 Surat-Vadodara-Geratpur - Repl of indoor amp outdoor signalling
equipment (4 stations)
DRF 174167 183238
RRSK 20000 29331 38000 5000
502 Western Railway - Independent detection arrangement for point
circuits
DF(4) 275527 195970
RRSK 22622 43954 5000 10000
503 Dahod - Repl of indoor amp outdoor signalling (high density network
route)
DRF 104648 51504
RRSK 63749 19000 23875 1000
504 Godhra-Centralised operation of Points and Signals in lieu of end
panels
Cap 157842 100945 7000 5000
505 Rajkot Division Replacement of overaged signalling gears at 17
stations in Surendranagar - Kanalus section excluding 10 nos OSL
LC gates
DRF 654670
RRSK 645680 110000 70000
506 Porbandar- Kanalus amp Jetalsar - Wansjaliya - Optic fibre cable and
its associated equipments (196 rkm)
DF(3) 120815 46649
RRSK 68324 3304 5000 10000
507 Mahesana - Viramgam - Optic fibre communication system (66 rkm) DF(3) 32796 6169
RRSK 24358 1526 2000 5000
508 Churchgate - Vile parle - Churchgate - Vileparle- Provision of
MSDAC in Parellel with existing track circuits to improve reliability
of Signalling gear
DF(4) 169352
RRSK 169290 69030 39340 20000
509 Godhra jn bg - Bhopal - Godhra-Nagda-Bhopal section-
Replacement of old aged BPAC MUX and Analoge Axle Counter by
Digital Axle Counter with UFSBI at
DRF 139837
RRSK 139756 502 32000 30000
510 Bhestan - Bhestan - Replacement of overaged indoor amp outdoor
signaling equipments
DRF 114705 753
RRSK 114624 68143 15000 10000
511 Anand jn bg - Geratpur bg - Anand Geratpur section -
Replacement of over aged AFTC by Multi Section Digital Axle
counters in Automatic section
DRF 496781
RRSK 496378 5459 30000 30000
512 Godhra jn bg - Nagda - Godhra-Nagda Section Replacement of
over aged indoor and outdoor Signaling equipment at 10 stations
and 8 IBS at
DRF 610423
RRSK 610342 93987 154742 70000
513 Bajva bg - Ranoli bg - Bajva and Ranoli - Replacement of over
aged indoor and outdoor Signalling equipments
DRF 239298 873
RRSK 238895 15434 90000 30000
514 Ahmadabad jn bg amp mg - Gandhinagar capital bg - Ahmedabad-
Sabarmati-Chandlodiya-Khodiyar-Gandhinagar-Kalol section-
Replacement of ovreaged RE cable with 6 quad cable
DRF 35786
RRSK 35705 607 4500 5000
SIGNALLING AND TELECOMMUNICATION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9135
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
515 Ujjain amp Ujjain-C - Repl of indoor amp outdoor signalling equipment (D-
Spl route)
RRSK 270283 418 30000 40000
516 Narangipur amp Tarana - Shifting of signalling amp tele equipment from
SampT rooms to new location with electronic interlocking
RRSK 46675 382 36825 10000
517 Anand - Repl of indoor amp outdoor signalling equipment Cap 200009 3000 20000
518 Churchgate-Virar - Repl of auxilary warning system equipment RRSK 1487609 100 1000
519 Boisar-Surat - Reliability improvement by way of redundancy for
track occupancy detection on bridge portion (22 bridges)
RRSK 63700 25000 10000
520 Ratlam Division - Dual detection for track circuits on bridge portion
by digital axle counters
RRSK 29111 227 7033 10000
521 Bhatel-Okha - Repl of signalling gears incl level crossing gates (8
stations)
RRSK 387352 86 90000 30000
522 Virar-Dahanu Road - Repl of audio frequency track circuiting by
digital axle counters
RRSK 373570 10560 20000 50000
523 Optical fiber cable based system in the remaining sections of meter
gauge amp narrow gauge over Indian Railways
RRSK 618589 100 19503
524 Works costing below Rs25 crore each RRSK 90000
TOTAL-WORKS IN PROGRESS Cap 25000
RRSK 889004
525 Lumpsum Provision For New Works RRSK 50000
TOTAL-NEW WORKS RRSK 50000
TOTAL-Signalling and Telecommunication Cap 25000
RRSK 939004
526 Estimated investment through EBR(Partnership) for works of solar
power
EBR(P) 625000 625000 500000
527 Works costing below Rs25 crore each Cap 100
DRF 2940
DF(3) 1125
RRSK 270
TOTAL-WORKS IN PROGRESS Cap 100
DRF 2940
DF(3) 1125
RRSK 270
EBR(P) 500000
528 Lumpsum Provision For New Works Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
TOTAL-NEW WORKS Cap 10000
DRF 5000
DF(3) 1000
RRSK 5001
B - New Works
SIGNALLING AND TELECOMMUNICATION
B - New Works
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9136
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-Other Electrical Works excl TRD Cap 10100
DRF 7940
DF(3) 2125
RRSK 5271
EBR(P) 500000
529 Limkheda - Addl 216 mva traction sub-station with transmission
line (2 Nos)
Cap 143043 155644 1477 100
530 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 106528 141881
RRSK 173848 108500 5000 3050
531 Lakodara - New traction sub-station with transmission line Cap 270509 211643 23 1
532 Surat-Sabarmati - Repl of cantilever assemblies DRF 48142 22375
RRSK 5742 1
533 Ratlam-Bhopal - Repl of SCADA system by new system DRF 30756 26504
RRSK 1035 1
534 Churchgate-Virar section - Replof 30 Km contact wire DRF 43819 1122
RRSK 43069 9217 23000 2350
535 Churchgate-Borivali section - Replacement of 22 KV and 22 KV
cable at different locations on age cum condition basis
DRF 69868 2139
RRSK 69368 20832 25700 2313
536 Virar-Surat section - Replof existing corrodedrusted cantilever
assemblies
RRSK 38045 18290 10000 8095
537 Churchgate-Virar - Repl of droppers respanning retensioning amp
resagging of overhead equipment for adjustment of gradient amp OHE
profile improvement
RRSK 34500 6417 5500 15611
538 Borivali-Bhayandar - Repl of 65 sq mm catenary wire by 125 sq
mm wire
RRSK 49860 16041 11605 11435
539 Churchgate-Virar - Repl of corroded overhead equipment
structures
RRSK 36074 4600 13784
540 Western Railway - Replacement of overaged traction distribution
assets (PB5222018-19SECR)
RRSK 228676 13575 85278
541 Western Railway - Removal of infringements to schedule of
dimension by overhead equipment (PB6222018-19WR)
RRSK 31463 1945 1
542 Works costing below Rs25 crore each RRSK 12307
TOTAL-WORKS IN PROGRESS Cap 101
RRSK 154226
543 Lumpsum Provision For New Works Cap 20000
RRSK 40000
TOTAL-NEW WORKS Cap 20000
RRSK 40000
TOTAL-Traction Distribution Works Cap 20101
RRSK 194226
544 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
increase maintenance facilities from 16 to 24-coach rakes
DF(3) 194482 1 10
TRACTION DISTRIBUTION WORKS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9137
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
545 Bandra Terminus - Well lighted all weather covered shed on pit
lines
DF(3) 348790 1 15000
546 Vadodara - Setting up of new periodical overhauling shop for
electric locos
DF(3) 1178824 257568 29
547 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 79622 26730 6300 10000
548 Ahmedabad - Setting up of new central periodic overhauling
workshop for track machines
DF(3) 273352 99379 7600 1
RRSK 25500 7847 4900
549 Lower Parel Workshop - Augmentation of periodical intermediate
overhauling capacity from 15 to 30 LHB coaches per month
DF(3) 83035 32789 2200 4000
RRSK 32130 150 32000
550 Shambhupura - Setting up of routine overhauling facilities for 300
BCNHL wagons
Cap 327991 245458 32500 6000
551 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity
from 100 to 150 broad gauge EMD locos
Cap 272113 68537 28000 26250
552 Pratapnagar Workshop - Infrastructure for periodical overhauling of
200 BCNHL wagons per month
Cap 672800 119203 45000 100000
553 Bhavnagar Workshop - Augmentation of broad gauge coaches
periodical overhauling capacity from 50 coaches to 100
Cap 493437 79499 27000 198409
554 Vadodara(Y) (Electric loco shed) - Augmentation from 175 to 200
locos
Cap 246737 41170 22500 40000
555 Dahod Workshop-Modernization amp augmentation of POH capacity
to 150 wagons per month
Cap 639177 195000 19177
DF(3) 224080 17780
556 Bandra Terminus - Setting up of water recyling plant Cap 57948 6000 27340
557 Mahalaxmi (EMU Shop) - Construction of pit line No17 amp 7 for
traction workshop addl storm water drain track for traverser and
CC platform for line No4 8 9 11 amp 12
DF(3) 78438 1 18600
558 Sabarmati Yard Karchiya Vadodara Marshaling Yard Hapa amp
Shambhupura - Upgradation of freight train
maintenanceexamination facilities
RRSK 81481 50000 17900
559 Western Railway - Improvement of lighting in BCT BDTS ST BL
INDB RTM BVP VRL Okha amp RJT depots Upgradation of
washing lines apron in Mumbai Central Okha RJT ADI BCT amp ST
RRSK 105294 62000 5600
560 Dahod Workshop - Development of MTR facility for 3-phase
electric locos
Cap 244707 6845 11289
561 Vadodara Yard - Washing amp cleaning pit on line No10 at MEMU
car shed
DF(3) 34297 222 20000 23000
562 Vadodara Yard - Expansion amp modernisation of MEMU car shed to
cater to 16-car 30-rake holding
Cap 310156 20000 100000
563 Western Railway - Setting up of maintenance depots for trainsets at
Virar (PB9992018-19NR)
RRSK 300000 1 50000
WORKSHOPS INCLUDING PRODUCTION UNITS
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9138
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
564 Western Railway - Upgradation of upto 10 coaching pit lines
(PB10022018-19NR)
RRSK 300000 5 50000
565 Western Railway - Upgradation of freight routine overhauling
depots train examination facilities examination yards
(PB10012018-19NR)
RRSK 178000 1703 20000
566 Western Railway - Upgradation of critical work centers of
workshops (PB10002018-19NR)
RRSK 69000 190 51497
567 Works costing below Rs25 crore each DRF 20400
DF(3) 18324
RRSK 17900
TOTAL-WORKS IN PROGRESS Cap 528465
DRF 20400
DF(3) 106744
RRSK 212897
568 Lumpsum Provision For New Works Cap 10000
DRF 40000
TOTAL-NEW WORKS Cap 10000
DRF 40000
TOTAL-Workshops including Production Units Cap 538465
DRF 60400
DF(3) 106744
RRSK 212897
569 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 54
units
DRF 20733 17459 1 300
570 Mumbai Central (Agripada Colony) - Repl of quarters type-II - 56
units
DRF 44540 45909 1 1
571 Mumbai Area - Repl of quaters type-II - 80 units DRF 62433 66610 6000 9300
572 Rajkot Division - Repl of type-I amp II quarters - 233 units DRF 41777 59455 3116 1
573 Dahod - Repl of quarters type-I - 24 type-II - 20 amp type-III - 16
units
DRF 43271 46253 1 1
574 Ratlam - Repl of quarters type-II - 102 units DRF 52817 33378 1 1
575 Bhavnagar Division - Repl of quarters type-II - 85 units DRF 84523 47485 2000 1
576 Bhavnagar Division - Repl of quarters type-IV - 4 type III - 19 amp
type II - 47 units
DRF 79899 40162 1400 900
577 Vadodara Division - Repl of quarters type-II - 100 units DRF 87734 66524 26000 300
578 Bhavnagar Division - Repl of quarters type-V - 2 type-IV - 8 type-
III - 10 amp type-II - 32 units
DRF 77483 37067 2000 2600
579 Ahmedabad - Repl of quarters type-II - 82 type-III - 4 amp type-IV - 3
units
DRF 67951 79454 6000 15400
STAFF QUARTERS
A - Works in Progress
WORKSHOPS INCLUDING PRODUCTION UNITS
B - New Works
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9139
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
580 Gandhidham - Type-II - 50 amp type-III - 20 units Cap 55763 41612 1 1
581 Ratlam - Repl of officer bunglows (15 Nos) DRF 59650 20751 19500 4200
582 Berawanya amp Mangal Mahudi - Repl of quarters type-II - 25 units DRF 25717 10309 8000 1700
583 Lower Parel - Repl of quarters type IV-34 amp type-II-122 units DRF 303800 3364 88100
584 Western Railway - Replacement of olddilapidated quarters at
various locations (PB11072018-19SR)
DRF 1000000 3301 82295
585 Works costing below Rs25 crore each Cap 20199
DRF 10300
TOTAL-WORKS IN PROGRESS Cap 20200
DRF 215400
586 Lumpsum Provision For New Works Cap 5000
DRF 5000
TOTAL-NEW WORKS Cap 5000
DRF 5000
TOTAL-Staff Quarters Cap 25200
DRF 220400
587 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward
with other modifications
DF(2) 40837 2000 1300
588 Mumbai (Suburban) Sabarmati Valsad Ujjain Gandhidham
Godhra amp Hapa - Community halls
DF(2) 43400 43099 1700 300
589 Mahalaxmi - Improvement to infrastructure at Western Railway
sports club
DF(2) 30860 37591 1
590 Dahod - Augmentation of Kalidham reservoir impounding capacity
with development of pumping main amp improvement of filtration plant
DF(2) 28690 42710 1 1
591 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-
vascular department
DF(2) 200421 120651 1 1
592 Vadodara Division - Improvement to watering arrangements DF(2) 76900 41325 1 600
593 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 29717 11560 1 1
594 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 150000 73705 66000 100
595 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 129800 644 3800 12900
596 Mumbai amp Ratlam Divisions - Rewiring of staff quarter (type-I - 650
type-II - 554 type-III - 89 amp type-IV - 25 quaters)
DRF 26796 565 16500 1
597 Ujjain-Bhopal - Rewiring of Staff quarters (1500 units) DRF 25089 3000 8600
598 Western Railway - Improvement to various staff amenities like
water supply arrangement medical facilities in various hospitals
electric wiring in staff quarters etc (PB71918-19CR)
DRF 100000 1900 43000
DF(2) 470000 122100
STAFF QUARTERS
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9140
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
599 Works costing below Rs25 crore each Cap 20000
DRF 13300
DF(2) 60600
TOTAL-WORKS IN PROGRESS Cap 20000
DRF 64902
DF(2) 197903
600 Lumpsum Provision For New Works Cap 10000
DRF 4000
DF(2) 4000
TOTAL-NEW WORKS Cap 10000
DRF 4000
DF(2) 4000
TOTAL-Amenities for Staff Cap 30000
DRF 68902
DF(2) 201903
601 Andheri - Rebuilding of station building DRF 60000 57356 1
602 Borivli - Rebuilding of station building DRF 94701 90890 1
603 Lower Parel Elphinstone Road Goregaon Bandra Vasai Road
Nallasopara amp Virar - Foot over bridges
DF(1) 118707 118707
RRSK 20959 19460 100
604 Surat amp Udhna - Foot over bridges with ramps for physically
handicapped persons
DF(1) 14054 14054 1
RRSK 24678 1 100
605 Valsad Vapi amp Bilimora - Foot over bridges with ramps for
physically handicapped persons
DF(1) 33549 33549 1
RRSK 7622 1 100
606 Western Railway - Escalators at major stations (8 Nos) (4 stations)
(Supplementary 08-09 Item)
DF(1) 42907 42907
RRSK 21856 1000
607 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 18977 18977
RRSK 16182 1000
608 Ahmedabad - Augmentation of coach watering facilities DRF 32705 9404 1 1
609 Ujjain - Improvement to platform cover (platform No23 amp 67)
raising of platforms (platform Nos1 23 amp 45) amp improvement to
circulating area
DF(1) 28812 28812
RRSK 2510 100
610 Goregaon Malad amp Kandivali - New foot over bridges DF(1) 81964 81964 1
RRSK 76402 2380 1 100
611 Borivali - Foot over bridge (12 m wide) DF(1) 84309 84309 1
RRSK 15504 34883 13400 1000
B - New Works
PASSENGER AMENITIES
A - Works in Progress
AMENITIES FOR STAFF
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9141
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
612 Vadodara - Augmentation of train watering facilities (platform No1 -
6)
DF(1) 32659 24631 1
613 Western Railway - Escalators at various stations (18 Nos) (6
stations)
DF(1) 10218 11018
RRSK 139710 681 16665 1000
614 Nagda - Concrete cement apron on platform No1 amp 2 DF(1) 49500 16451 5000
615 Palanpur - Concrete cement apron on platform No1 amp 2 DF(1) 29132 9232 1
616 Western Railway - Escalators at important stations of Indian
Railways (25 Nos) (PB8551415NR)
DF(1) 359 359
RRSK 187141 33465 105276 50000
617 Western Railway - Lifts at A1 A amp other pilgrim stations on Indian
Railways (with high passenger density) (30 Nos)
(PB8541415NR)
DF(1) 18053 27979
RRSK 56947 64671 29518 1000
618 Churchgate-Virar - Raising of suburban section platforms from 840
mm to 920 mm (97 platforms)
DF(1) 89750 89750
RRSK 145484 80693 56255 50000
619 Nagda - Extn of foot over bridge at Ratlam end raising of platform
level from medium to high level amp extn of covered shed on platform
No45 and repl of interconnecting foot over bridge at Kota end in
connection with Singhastha 2016
DF(1) 35539 42379
RRSK 17315 1889 1000
620 Ahmedabad - Renovation of CC aprons with drainages at platform
Nos 1234567 and new CC apron with drainages at platform
No 8
DF(1) 67000 1000
621 Bhayandar - Foot over bridge in lieu of old west span DRF 63262 1
RRSK 63262 163922 -80000 1000
622 Virar - Foot over bridge at platform No 8 DF(1) 49600
RRSK 52159 10691 34601 10000
623 Kandivali - Foot over bridge in lieu of old south foot over bridge DRF 43200
RRSK 48114 1167 40201 10000
624 Elphinstone Road - Foot over bridge and extension of platform No
1 amp 2
DF(1) 118675
RRSK 128352 47460 176924 20000
625 Ahmedabad - Bhuj - Repl of coach guidance system amp train
indicator board (9 stations)
DRF 93446 34400 20000
626 Chandlodiya - Raising of platform No 1 amp 2 DF(1) 5506 13639
RRSK 46864 13070 10000
627 Virar - Surat Section - Raising of platforms (9 stations) DF(1) 1961 1961
RRSK 104880 75402 7584 10000
628 Navsari - Covered shed on platform No 1 amp 23 DF(1) 37215 18318 1000
629 Khar road - Foot over bridge at North end DF(1) 44500
RRSK 48843 13332 22888 10000
PASSENGER AMENITIES
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9142
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
630 Bhavnagar Division - Integrated train guidance amp coach guidance
boards (10 stations)
DF(1) 26767 9884 5000
631 Churchgate-Virar - Replacement of existing foot over bridgeat
Marine Lines Charni Road Grant Road Mumbai CentralLower
Parel and Bandra
RRSK 480900 392800 50000
632 Parel - Extension of north foot over bridge towards west side RRSK 41400 41400 20000
633 Vaitarna-Dahanu Road - Repl of asbestos cement sheets of cover
over platform by galvalume sheets (8 stations)
DF(1) 26080 5715 1000
634 Vadodara Division - Extnraising amp covered shed of platforms (12
stations)
DF(1) 282000
RRSK 282000 3800 41201 10000
635 Andheri Bandra Khar Road amp Malad - Provision rebuilding of foot
over bridges
DRF 80000 1
DF(1) 20000 1
RRSK 100000 115000 10000
636 Mumbai Central Vadodara Ratlam Ahmedabad Rajkot amp
Bhavnagar Para - Provision of lifts (5 each total 30 Nos)
DF(1) 128000
RRSK 128000 24500 10000
637 Gandhinagar - Redevelopment of station alongwith construction of
300-rooms hotel on air-space of station building
DF(1) 586000 400000 1000
EBR(P) 1850000 1850000 1850000
638 Udvada - Development of passenger facilities suitable for
pilgrimage destination
DF(1) 48432 5000
639 Western Railway - Soft upgrades improvements at stations Cap 3000000 281000 1200000
640 Western Railway - Provision of foot over bridges andor high level
platforms at stations as per requirement
RRSK 4500000 185453 796500
641 Estimated investment through EBR(Partnership) for works of
redevelopment and other CSR funding for stations
EBR(P) 5150000 5150000 5150000
642 Churchgate-Virar - Replacement of existing foot over bridgeat
Santacruz Andheri Goregaon Malad NaigaonNallasopara and
Vasai Road
RRSK 655200 240000 10000
643 Churchgate - Virar - Providing foot over bridge without escalators at
Grant Road Mahalakshmi Mahim Vile Parle Jogeshwari Borivli
Dahisar Vasai Road
RRSK 748800 250000 50000
644 Western Railway - Provision of washable aprons over Indian
Railways (PB11062018-19NR)
DF(1) 100000 5000
645 Western Railway - Provision of lifts (70 Nos) at stations 2 lifts
per station (PB11052018-19NR)
RRSK 282800 18000 50000
646 Western Railway - Setting up of quick watering arrangements at 5
railway stations (PB11032018-19NR)
DF(1) 100000 5000
647 Works costing below Rs25 crore each Cap 32170
DRF 75000
DF(1) 125000
RRSK 10000
PASSENGER AMENITIES
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9143
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 1232170
DRF 95003
DF(1) 154002
RRSK 1194000
EBR(P) 7000000
648 Lumpsum Provision For New Works Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-NEW WORKS Cap 20000
DRF 29997
DF(1) 70998
RRSK 6000
TOTAL-Passenger Amenities Cap 1252170
DRF 125000
DF(1) 225000
RRSK 1200000
EBR(P) 7000000
649 Bhayander - Const of administrative office barrack (100 beds)
class rooms ammunition room amp dog squad in RPF barrack
premises
DF(3) 69091 2500 35700
650 Mumbai (Suburban) - Integrated security system (32 stations) Cap 204903 4597 2500 200000
651 Western Railway - Integrated security system (5 stations) Cap 30185 9545 3086 1
652 Western Railway - Boundary wall fencing to prevent
encroachment on railway land (PB 8212012-13NR)
DF(3) 80000 28678 1
RRSK 51322 6500 11100
653 Bandra - Conservation amp restoration of station into grade-I heritage
structure
DRF 120701 1400 56200
654 Western Railway - Boundary wall to prevent encroachment on
railway land
DF(3) 272398 339 1
RRSK 272059 47500 150000
655 Provision of video surveillance system at 1318 stations of Western
region
Cap 3032200 1
656 Western Railway - Upgradation of running rooms air conditioning
of running rooms amp construction of new running rooms
(PB7272018-19WR)
RRSK 353206 16000 100000
657 Western Railway - Construction of boundary wall near stations amp its
approaches as measure to safeguard track and establishments
avoiding encroachments (PB11392018-19NR)
RRSK 1000000 260000
658 Construction of boundary wall compound wall at vulnerable
locations on Golden Quadrilateral Diagonals High Density
Routes and on approaches of major cities vulnerable for
encroachment trespassing on Central Western amp North Western
Railways
RRSK 4500000 3 1
659 Works costing below Rs25 crore each Cap 20000
DRF 28600
DF(3) 32600
RRSK 50000
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9144
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-WORKS IN PROGRESS Cap 220002
DRF 84800
DF(3) 68302
RRSK 571101
660 Lumpsum Provision For New Works Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-NEW WORKS Cap 11498
DRF 5000
DF(3) 5000
RRSK 9999
TOTAL-Other Specified Works Cap 231500
DRF 89800
DF(3) 73302
RRSK 581100
661 Lower Parel (Basic Training Centre) - Upgradation modernisation
of training facilities
DF(2) 29600 35070 500
662 Pratapnagar (Railway Staff College) - Upgradation of facilities at
mess hall guest hall cyber building mehman hostel
DF(2) 30050 34825 100
663 Vadodara (Railway Staff College) - Development of world class
facilities
DF(3) 349128 121508 397
RRSK 175425 59303 8000 50000
664 Vadodara - Setting up of National Railway University (NRU) DF(3) 8610000 11890
RRSK 8609000 41719 193344 250000
665 Western Railway - Augmentation of training facilities
(PB11542018-19NR)
RRSK 50000 1 500
666 Western Railway - Augmentation of training facilities (for DGNAIR
for works of CTIs) (PB11542018-19NR)
RRSK 1000000 100000
667 Works costing below Rs25 crore each Cap 15000
DF(2) 3100
DF(3) 3000
RRSK 40000
TOTAL-WORKS IN PROGRESS Cap 15000
DF(2) 3700
DF(3) 3000
RRSK 440500
668 Lumpsum Provision For New Works Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
TOTAL-NEW WORKS Cap 15000
DF(2) 3000
DF(3) 2500
RRSK 30000
B - New Works
B - New Works
TRAININGHRD
A - Works in Progress
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
9145
WESTERN RAILWAY
ASSETS-ACQUISITION CONSTRUCTION AND REPLACEMENT FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
TOTAL-TrainingHRD Cap 30000
DF(2) 6700
DF(3) 5500
RRSK 470500
TOTAL-WORKS IN PROGRESS Cap 19982169
CFund 2249674
DRF 508588
DF(1) 158604
DF(2) 201603
DF(3) 191285
SFund 1000000
RRSK 13150359
Deposit 8601300
EBR(IF) 18534803
EBR(P) 109008711
TOTAL - NEW WORKS Cap 102098
DRF 98997
DF(1) 71598
DF(2) 7000
DF(3) 8600
RRSK 1051000
EBR(IF) 10000
GRAND TOTAL Cap 20084267
CFund 2249674
DRF 607585
DF(1) 230202
DF(2) 208603
DF(3) 199885
SFund 1000000
RRSK 14201359
Deposit 8601300
EBR(IF) 18544803
EBR(P) 109008711
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
921
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
669 Mahalakshmi - Electric EMUsMEMUs simulator Cap 93500 6594
RRSK 80651 85472 4803
670 Lower Parel - Intelligent warehousing with automated storage amp
retrieval system
Cap 138600 88647 27122 15000
671 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 154000
RRSK 153999 58495 77000
672 Hapa - CNC surface wheel lathe (broad gauge) Cap 63000
RRSK 62999 1
673 Lower Parel - CNC Press Brake Hydraulic 400T Cap 41954 1 2928
674 Non-CNC VERTICAL TURNING amp BORING MC DRF 16540 11339
RRSK 15240 2
675 Parel Workshop - Coil Spring Scragging amp Load Deflection Testing
Machine Cap 25 T
DF(3) 25303
RRSK 25302 14273
676 Vatva Diesel shed - Under Floor Wheel Lathe DRF 58428
RRSK 46628 51300 1
677 Dahod workshop- CNC Portal Wheel Lathe Cap 77503 1 1
678 Bhavnagar Workshop- Wheel Press Hydraulic - 500T Cap 34855 1 15000
679 Babdra Depot- CNC Under Floor Wheel Lathe (BG) RRSK 63624 1 5000
680 Ahmedabad Depot- CNC Under Floor Wheel Lathe BG and MG RRSK 74789 1 5000
681 Western Railway - Acquisition upgradation modification amp
reconditioning of miscellaneous machinery amp plant for emergent
unforeseen circumstances (PB11762018-19NR)
Cap 12232 1
DRF 15290 1
DF(3) 4587 1
RRSK 15290 3633
682 Western Railway - Simulation equipment and application for crew
(PB11772018-19NR)
RRSK 218750 1
683 Works costing below Rs25 crore each Cap 57736
DRF 34234
DF(2) 24597
DF(3) 18028
DF(4) 13833
RRSK 46397
TOTAL-PROGRAMMED DELIVERIES Cap 90666
DRF 34235
DF(2) 24597
DF(3) 18029
DF(4) 13833
RRSK 156111
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
922
WESTERN RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
684 Lumpsum Provision For New Works Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-NEW ACQUISITION Cap 2548
DRF 1200
DF(2) 360
DF(3) 1
DF(4) 1
RRSK 1323
TOTAL-Machinery amp Plant Cap 93214
DRF 35435
DF(2) 24957
DF(3) 18030
DF(4) 13834
RRSK 157434
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION
931
WESTERN RAILWAY
ROLLING STOCK PROGRAMME FOR 2019-20
( INTERIM BUDGET )
Item
No
Sanctioned
Cost
Exp at the
end of
March 2018
Revised
Outlay 2018-
19
Outlay
Proposed for
2019-20
Locomotives
685 Procurement of motorized truck assembly for WDG4D loco DLW
part No 17022642 amp 17022654- 1No
Cap 28291 1 26290
686 Works costing below Rs25 crore each - Locomotives Cap 68853
RRSK 27510
TOTAL-Locomotives Cap 95143
RRSK 27510
Carriages
687 Inputs required for extending the life of 33 overaged EMU rakes
(MX)
DRF 201900 126370
RRSK 75529 1 1
688 Improvement to ventilation of 105 coaches amp improvement of 8
driving cab of AC DC EMU stock (MX)
DRF 50400 6543
RRSK 43856 1 1
689 Mahalakshmi Workshop - Spares for DCAC EMUs Cap 54150 34513 1 1
690 Spares for ACDC Alstom electrical multiple units Cap 65100 52653 6905 1
691 Procrement of unit exchange spares for AC - DC EMUs Siemens
Rake
Cap 122800 76197 18682 1
692 Procurement of Unit Exchange spares for Siemens rakes Cap 65676 3630 1 1
693 Conversion of LHB coaches LS LS(123) (fitted with helical
spring) to LS5 (fitted 140 KN air spring) in secondary suspension-
10 nos
RRSK 92439 18001 74438
694 Works costing below Rs25 crore each - Carriages Cap 35495
RRSK 13836
TOTAL-Carriages Cap 35499
DRF 0
RRSK 88276
TOTAL-PROGRAMMED DELIVERIES Cap 130642
RRSK 115786
Locomotives
695 Lumpsum Provision For New Works - Locomotives Cap 15
RRSK 13
TOTAL-Locomotives Cap 15
RRSK 13
Carriages
696 Lumpsum Provision For New Works - Carriages Cap 10
RRSK 12
TOTAL-Carriages Cap 10
RRSK 12
TOTAL-NEW ACQUISITION Cap 25
RRSK 25
TOTAL-Rolling Stock Cap 130667
RRSK 115811
Alloca-
-tion
Particulars
(Figures in thousand of Rupees)
A - PROGRAMMED DELIVERIES
B - NEW ACQUISITION