    PROJECT : -

    CLIENT :-

    CLIENT'S CONSULTANT :-

    E-BOP CONTRACTOR :-

    i) Input Data :-a) Dimensions of Building / Structure

    Length of the Building L = 60.00 m

    Width of the Building W = 28.00 m

    Height of the Building H = 23.00 m

    b) Lightning Flash Density & Weighing FactorsNumber of Thunderstorm Days / Year N = 100 No. of Days / Year

    Li htnin Flash Densit (Flashes to Ground /km2/ ear) Ng = 9.2 Nos./km

    2/ ear

    Weighting Factor A ( Use of Structure ) A ( Refer Table 1A of IS 2309 ) = 1

    Weighting Factor B ( Type of Construction ) B ( Refer Table 1B of IS 2309 ) = 0.8

    Weighting Factor C ( Content of Consequential Effects ) C ( Refer Table 1C of IS 2309 ) = 1

    Weighting Factor D ( Degree of Isolation ) D ( Refer Table 1D of IS 2309 ) = 0.4

    Weighting Factor E ( Type of Country ) E ( Refer Table 1E of IS 2309 ) = 0.3

    ii) Calculations :-

    Overall Multiplying Factor = AxBxCxDxE = 0.096000

    = 0.006526

    ie 6.5260E-03

    iii) Maximum Acceptable Overall Risk Factor:-

    = 0.000001

    ie 1.000E-06

    iv) Result / Conclusion :-

    >

    Calculations (As per Clause 12.2.3 of IS-2309):-

    Base Area of Structure Ab = = 1680 Meter2Perimeter of Structure P = = 176 Meter

    i) For Base Area (Ab) < 100m2

    a) Number of Down Conductors Required = = 1 Nos

    ii) For Base Area (Ab) > 100m2

    b) Based on Base Area of Structure:-

    = = 6 Nos

    c) Based on Parimeter of Structure:-

    = = 6 Nos.

    Hence, Required Number of Down Conductors = 6 Nos.

    Rev. Date Drg/Doc. No. Reviewed ApprovedR0 12.10.2009 KVP KVP

    Probable Number of Strikes to Building / Structure per Year (

    Refer Clause 8.1.2 of IS 2309 )

    B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS

    ( REFERENCE : IS 2309 )

    = 0.067979 Times per year

    Collection Area ( Refer Clause 8.1.2 of IS 2309 )

    P

    =(L x W) + 2 (L x H) +

    2(W x H) + 3.14 H2=

    1+(Ab-100)/300

    Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309)

    Rf-C

    Rf-AMaximum Acceptable Overall Risk Factor( Refer Clauses 8.1.3 &

    8.1.6 of IS 2309 )

    Hence, Lightning Protection is Required.

    Since Overall Risk Factor Calculated Maximum Acceptable Overall Risk Factor

    HK

    7389.06 Meter2

    Description / Parameter

    A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION

    Ac

    Symbol / Formulae /

    References

    For Ab < 100m2

    Number of Down Conductors Required

    Overall Multiplying

    Factor x P

    ( Refer Fig. 1 of IS 2309 )

    Ac x Ng x 10-6

    times/year

    =

    P/30

    LIGHTNING PROTECTION CALCULATION FOR TG BLDG.AB-BC BAY

    Overall Risk Factor Calculated

    ( L x W )2(L+W)

    Number of Down Conductors Required

    REVISION

    DETAILS

    3VYN855200

    Value

    =

    Prepared

    ( Refer Clause 8.1.2 of

    ( Refer the Relevant Layout

    Drawings of the Building /

    Structure )

    RemarksFirst Submission

    1x 63 MW TPP AT KORBA,CHATTISGARH

    S V POWER PVT LTD

    DESEIN PVT LTD

    ABB LTD,FARIDABAD

    Unit

  • 5/21/2018 99077475 SV POWER Lightning Protection Calculation Sheet T G Building

    2/11

    PROJECT : -

    CLIENT :-

    CONSULTANT :-

    BOP CONTRACTOR :-

    i) Input Data :-a) Dimensions of Building / Structure

    Length of the Building L = 43.62 m

    Width of the Building W = 12.20 m

    Height of the Building H = 17.53 m

    b) Lightning Flash Density & Weighing FactorsNumber of Thunderstorm Days / Year N = 27 No. of Days / Year

    Li htnin Flash Densit (Flashes to Ground /km2/ ear) Ng = 5 Nos./km

    2/ ear

    Weighting Factor A ( Use of Structure ) A ( Refer Table 1A of IS 2309 ) = 1

    Weighting Factor B ( Type of Construction ) B ( Refer Table 1B of IS 2309 ) = 0.2

    Weighting Factor C ( Content of Consequential Effects ) C ( Refer Table 1C of IS 2309 ) = 1

    Weighting Factor D ( Degree of Isolation ) D ( Refer Table 1D of IS 2309 ) = 0.4

    Weighting Factor E ( Type of Country ) E ( Refer Table 1E of IS 2309 ) = 0.3

    ii) Calculations :-

    Overall Multiplying Factor = AxBxCxDxE = 0.024000

    = 0.000414

    ie 4.1434E-04

    iii) Maximum Acceptable Overall Risk Factor:-

    = 0.000001

    ie 1.000E-06

    iv) Result / Conclusion :-

    >

    Calculations (As per Clause 12.2.3 of IS-2309):-

    Base Area of Structure Ab = = 532.10 Meter2Perimeter of Structure P = = 111.63 Meter

    i) For Base Area (Ab) < 100m2

    a) Number of Down Conductors Required = = 1 Nos

    ii) For Base Area (Ab) > 100m2

    b) Based on Base Area of Structure:-

    = = 2 Nos

    c) Based on Parimeter of Structure:-

    = = 4 Nos.

    Hence, Required Number of Down Conductors = 2 Nos.

    Rev. Date Drg/Doc. No. Reviewed ApprovedR0 30.06.2009 PS PAS

    REVISION

    DETAILS

    3VYN855200

    RemarksFirst Submission

    Prepared

    1x70 MW TPP AT KORBA,CHATTISGARH

    RRVUNL

    DCPL, New Delhi

    ( Refer Clause 8.1.2 of

    ( Refer the Relevant Layout

    Drawings of the Building /

    Structure )

    ( Refer Fig. 1 of IS 2309 )

    (L x W) + 2 (L x H) +

    2(W x H) + 3.14 H2= 3452.79

    RK

    CW PUMP HOUSE

    Meter2

    Description / Parameter

    A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION

    Ac

    Symbol / Formulae /

    ReferencesValue Unit

    =

    Indure, New Delhi

    For Ab < 100m2

    =

    LIGHTNING PROTECTION CALCULATION ( REFERENCE : IS 2309 ) FOR

    = 0.017264 Times per year

    Collection Area ( Refer Clause 8.1.2 of IS 2309 )

    P

    Overall Multiplying

    Factor x POverall Risk Factor Calculated

    ( L x W )2(L+W)

    Since Overall Risk Factor Calculated Maximum Acceptable Overall Risk Factor

    P/30

    B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS

    Number of Down Conductors Required

    Number of Down Conductors Required 1+(Ab-100)/300

    = Ac x Ng x 10-6

    times/yearProbable Number of Strikes to Building / Structure per Year (

    Refer Clause 8.1.2 of IS 2309 )

    Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309)

    Rf-C

    Rf-AMaximum Acceptable Overall Risk Factor( Refer Clauses 8.1.3 &

    8.1.6 of IS 2309 )

    Hence, Lightning Protection is Required.

  • 5/21/2018 99077475 SV POWER Lightning Protection Calculation Sheet T G Building

    3/11

    PROJECT : -

    CLIENT :-

    CONSULTANT :-

    BOP CONTRACTOR :-

    i) Input Data :-a) Dimensions of Building / Structure

    Length of the Building L = 40.23 m

    Width of the Building W = 30.23 m

    Height of the Building H = 5.00 m

    b) Lightning Flash Density & Weighing FactorsNumber of Thunderstorm Days / Year N = 27 No. of Days / Year

    Li htnin Flash Densit (Flashes to Ground /km2/ ear) Ng = 5 Nos./km

    2/ ear

    Weighting Factor A ( Use of Structure ) A ( Refer Table 1A of IS 2309 ) = 1

    Weighting Factor B ( Type of Construction ) B ( Refer Table 1B of IS 2309 ) = 0.2

    Weighting Factor C ( Content of Consequential Effects ) C ( Refer Table 1C of IS 2309 ) = 1

    Weighting Factor D ( Degree of Isolation ) D ( Refer Table 1D of IS 2309 ) = 0.4

    Weighting Factor E ( Type of Country ) E ( Refer Table 1E of IS 2309 ) = 0.3

    ii) Calculations :-

    Overall Multiplying Factor = AxBxCxDxE = 0.024000

    = 0.000240

    ie 2.3991E-04

    iii) Maximum Acceptable Overall Risk Factor:-

    = 0.000001

    ie 1.000E-06

    iv) Result / Conclusion :-

    >

    Calculations (As per Clause 12.2.3 of IS-2309):-

    Base Area of Structure Ab = = 1216.15 Meter2Perimeter of Structure P = = 140.92 Meter

    i) For Base Area (Ab) < 100m2

    a) Number of Down Conductors Required = = 1 Nos

    ii) For Base Area (Ab) > 100m2

    b) Based on Base Area of Structure:-

    = = 5 Nos

    c) Based on Parimeter of Structure:-

    = = 5 Nos.

    Hence, Required Number of Down Conductors = 5 Nos.

    Rev. Date Drg/Doc. No. Reviewed ApprovedR0 30.06.2009 PS PAS

    = Ac x Ng x 10-6

    times/yearProbable Number of Strikes to Building / Structure per Year (

    Refer Clause 8.1.2 of IS 2309 )

    Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309)

    Rf-C

    Rf-AMaximum Acceptable Overall Risk Factor( Refer Clauses 8.1.3 &

    8.1.6 of IS 2309 )

    Hence, Lightning Protection is Required.

    P/30

    B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS

    Number of Down Conductors Required

    Number of Down Conductors Required 1+(Ab-100)/300

    Overall Risk Factor Calculated

    ( L x W )2(L+W)

    Since Overall Risk Factor Calculated Maximum Acceptable Overall Risk Factor

    Indure, New Delhi

    For Ab < 100m2

    =

    LIGHTNING PROTECTION CALCULATION ( REFERENCE : IS 2309 ) FOR

    = 0.009996 Times per year

    Collection Area ( Refer Clause 8.1.2 of IS 2309 )

    P

    Overall Multiplying

    Factor x P

    Description / Parameter

    A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION

    Ac

    Symbol / Formulae /

    ReferencesValue Unit

    =(L x W) + 2 (L x H) +

    2(W x H) + 3.14 H2= 1999.25

    Prepared

    1x250MW SURATGARH S.T.P.S. Unit-6 (Stage-IV)

    RRVUNL

    DCPL, New Delhi

    ( Refer Clause 8.1.2 of

    ( Refer the Relevant Layout

    Drawings of the Building /

    Structure )

    ( Refer Fig. 1 of IS 2309 )

    RK

    Meter2

    CW TREATMENT AREA

    REVISION

    DETAILS

    3VYN855200

    RemarksFirst Submission

  • 5/21/2018 99077475 SV POWER Lightning Protection Calculation Sheet T G Building

    4/11

    PROJECT : -

    CLIENT :-

    CONSULTANT :-

    BOP CONTRACTOR :-

    i) Input Data :-a) Dimensions of Building / Structure

    Length of the Building L = 33.30 m

    Width of the Building W = 8.60 m

    Height of the Building H = 10.70 m

    b) Lightning Flash Density & Weighing FactorsNumber of Thunderstorm Days / Year N = 27 No. of Days / Year

    Li htnin Flash Densit (Flashes to Ground /km2/ ear) Ng = 5 Nos./km

    2/ ear

    Weighting Factor A ( Use of Structure ) A ( Refer Table 1A of IS 2309 ) = 1

    Weighting Factor B ( Type of Construction ) B ( Refer Table 1B of IS 2309 ) = 0.2

    Weighting Factor C ( Content of Consequential Effects ) C ( Refer Table 1C of IS 2309 ) = 1

    Weighting Factor D ( Degree of Isolation ) D ( Refer Table 1D of IS 2309 ) = 0.4

    Weighting Factor E ( Type of Country ) E ( Refer Table 1E of IS 2309 ) = 0.3

    ii) Calculations :-

    Overall Multiplying Factor = AxBxCxDxE = 0.024000

    = 0.000185

    ie 1.8510E-04

    iii) Maximum Acceptable Overall Risk Factor:-

    = 0.000001ie 1.000E-06

    iv) Result / Conclusion :-

    >

    Calculations (As per Clause 12.2.3 of IS-2309):-

    Base Area of Structure Ab = = 286.38 Meter2Perimeter of Structure P = = 83.8 Meter

    i) For Base Area (Ab) < 100m2

    a) Number of Down Conductors Required = = 1 Nos

    ii) For Base Area (Ab) > 100m2

    b) Based on Base Area of Structure:-

    = = 2 Nos

    c) Based on Parimeter of Structure:-

    = = 3 Nos.

    Hence, Required Number of Down Conductors = 2 Nos.

    Rev. Date Drg/Doc. No. Reviewed ApprovedR0 30.06.2009 PS PAS

    REVISION

    DETAILS

    3VYN855200

    RemarksFirst Submission

    Prepared

    1x250MW SURATGARH S.T.P.S. Unit-6 (Stage-IV)

    RRVUNL

    DCPL, New Delhi

    ( Refer Clause 8.1.2 of

    ( Refer the Relevant Layout

    Drawings of the Building /

    Structure )

    ( Refer Fig. 1 of IS 2309 )

    (L x W) + 2 (L x H) +

    2(W x H) + 3.14 H2= 1542.54

    RK

    RAW WATER PUMP HOUSE

    Meter2

    Description / Parameter

    A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION

    Ac

    Symbol / Formulae /

    ReferencesValue Unit

    =

    Indure, New Delhi

    For Ab < 100m2

    =

    LIGHTNING PROTECTION CALCULATION ( REFERENCE : IS 2309 ) FOR

    = 0.007713 Times per year

    Collection Area ( Refer Clause 8.1.2 of IS 2309 )

    P

    Overall Multiplying

    Factor x POverall Risk Factor Calculated

    ( L x W )2(L+W)

    Since Overall Risk Factor Calculated Maximum Acceptable Overall Risk Factor

    P/30

    B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS

    Number of Down Conductors Required

    Number of Down Conductors Required 1+(Ab-100)/300

    = Ac x Ng x 10-6

    times/yearProbable Number of Strikes to Building / Structure per Year (

    Refer Clause 8.1.2 of IS 2309 )

    Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309)

    Rf-C

    Rf-AMaximum Acceptable Overall Risk Factor( Refer Clauses 8.1.3 &

    8.1.6 of IS 2309 )

    Hence, Lightning Protection is Required.

  • 5/21/2018 99077475 SV POWER Lightning Protection Calculation Sheet T G Building

    5/11

    PROJECT : -

    CLIENT :-

    CONSULTANT :-

    BOP CONTRACTOR :-

    i) Input Data :-a) Dimensions of Building / Structure

    Length of the Building L = 22.80 m

    Width of the Building W = 9.81 m

    Height of the Building H = 5.00 m

    b) Lightning Flash Density & Weighing Factors

    Number of Thunderstorm Days / Year N = 27 No. of Days / Year

    Lightning Flash Density (Flashes to Ground /km2/year) Ng = 5 Nos./km

    2/year

    Weighting Factor A ( Use of Structure ) A ( Refer Table 1A of IS 2309 ) = 1

    Weighting Factor B ( Type of Construction ) B ( Refer Table 1B of IS 2309 ) = 0.2

    Weighting Factor C ( Content of Consequential Effects ) C ( Refer Table 1C of IS 2309 ) = 1

    Weighting Factor D ( Degree of Isolation ) D ( Refer Table 1D of IS 2309 ) = 0.4

    Weighting Factor E ( Type of Country ) E ( Refer Table 1E of IS 2309 ) = 0.3

    ii) Calculations :-

    Overall Multiplying Factor = AxBxCxDxE = 0.024000

    = 0.000075

    ie 7.5392E-05

    iii) Maximum Acceptable Overall Risk Factor:-

    = 0.000001

    ie 1.000E-06

    iv) Result / Conclusion :-

    >

    Calculations (As per Clause 12.2.3 of IS-2309):-Base Area of Structure Ab = = 223.67 Meter2

    Perimeter of Structure P = = 65.22 Meter

    i) For Base Area (Ab) < 100m2

    a) Number of Down Conductors Required = = 1 Nos

    ii) For Base Area (Ab) > 100m2

    b) Based on Base Area of Structure:-

    = = 1 Nos

    c) Based on Parimeter of Structure:-

    = = 2 Nos.

    Hence, Required Number of Down Conductors = 1 Nos.

    Rev. Date Drg/Doc. No. Reviewed Approved

    R0 30.06.2009 PS PAS

    = Ac x Ng x 10-6

    times/yearProbable Number of Strikes to Building / Structure per Year (

    Refer Clause 8.1.2 of IS 2309 )

    Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309)

    Rf-C

    Rf-AMaximum Acceptable Overall Risk Factor( Refer Clauses 8.1.3 &

    8.1.6 of IS 2309 )

    Hence, Lightning Protection is Required.

    P/30

    B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS

    Number of Down Conductors Required

    Number of Down Conductors Required 1+(Ab-100)/300

    Overall Risk Factor Calculated

    ( L x W )

    2(L+W)

    Since Overall Risk Factor Calculated Maximum Acceptable Overall Risk Factor

    Indure, New Delhi

    For Ab < 100m2

    =

    LIGHTNING PROTECTION CALCULATION ( Reference : IS 2309 ) for

    = 0.003141 Times per year

    Collection Area ( Refer Clause 8.1.2 of IS 2309 )

    P

    Overall Multiplying Factor

    x P

    Description / Parameter

    A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION

    Ac

    Symbol / Formulae / References Value Unit

    =

    (L x W) + 2 (L x H) +

    2(W x H) + 3.14 H2= 628.27

    Prepared

    1x250MW SURATGARH S.T.P.S. Unit-6 (Stage-IV)

    RRVUNL

    DCPL, New Delhi

    (Refer Clause 8.1.2 of IS 2309)

    ( Refer the Relevant Layout

    Drawings of the Building /

    Structure )

    ( Refer Fig. 1 of IS 2309 )

    RK

    Meter2

    RWPH MCC Room

    REVISION

    DETAILS

    3VYN855200

    Remarks

    First Submission

  • 5/21/2018 99077475 SV POWER Lightning Protection Calculation Sheet T G Building

    6/11

    PROJECT : -

    CLIENT :-

    CONSULTANT :-

    BOP CONTRACTOR :-

    LIGHTNING PROTECTION CALCULATION ( REFERENCE : IS 2309 ) FOR PRIMARY CRUSHER HOUSE

    i) Input Data :-a) Dimensions of Building / Structure

    Length of the Building L = 23.00 m

    Width of the Building W = 21.50 m

    Height of the Building H = 21.70 m

    b) Lightning Flash Density & Weighing FactorsNumber of Thunderstorm Days / Year N = 27 No. of Days / Year

    Lightning Flash Density (Flashes to Ground /km2/year) Ng = 5 Nos./km

    2/year

    Weighting Factor A ( Use of Structure ) A ( Refer Table 1A of IS 2309 ) = 1

    Weighting Factor B ( Type of Construction ) B ( Refer Table 1B of IS 2309 ) = 0.2

    Weighting Factor C ( Content of Consequential Effects ) C ( Refer Table 1C of IS 2309 ) = 1

    Weighting Factor D ( Degree of Isolation ) D ( Refer Table 1D of IS 2309 ) = 0.4

    Weighting Factor E ( Type of Country ) E ( Refer Table 1E of IS 2309 ) = 0.3

    ii) Calculations :-

    Overall Multiplying Factor = AxBxCxDxE = 0.024000

    = 0.000469

    ie 4.6853E-04

    iii) Maximum Acceptable Overall Risk Factor:-

    = 0.000001

    ie 1.000E-06

    iv) Result / Conclusion :-

    >

    Calculations (As per Clause 12.2.3 of IS-2309):-

    Base Area of Structure Ab = = 494.50 Meter2

    Perimeter of Structure P = = 89 Meter

    i) For Base Area (Ab) < 100m2

    a) Number of Down Conductors Required = = 1 Nos

    ii) For Base Area (Ab) > 100m2

    b) Based on Base Area of Structure:-

    = = 2 Nos

    c) Based on Parimeter of Structure:-

    = = 3 Nos.

    Hence, Required Number of Down Conductors = 2 Nos.

    Rev. Date Drg/Doc. No. Reviewed ApprovedR0 30.06.2009 PS PAS

    REVISION

    DETAILS

    3VYN855200

    Remarks

    First Submission

    Prepared

    1x250MW SURATGARH S.T.P.S. Unit-6 (Stage-IV)

    RRVUNL

    DCPL, New Delhi

    (Refer Clause 8.1.2 of IS 2309)

    ( Refer the Relevant Layout

    Drawings of the Building /

    Structure )

    ( Refer Fig. 1 of IS 2309 )

    Indure, New Delhi

    RK

    Description / Parameter

    A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION

    Ac

    Symbol / Formulae / References Value Unit

    =(L x W) + 2 (L x H) +

    2(W x H) + 3.14 H2

    Times per year

    Collection Area ( Refer Clause 8.1.2 of IS 2309 )

    P

    Meter

    2= 3904.39

    = 0.019522

    Overall Risk Factor Calculated

    ( L x W )

    = Ac x Ng x 10-6

    times/yearProbable Number of Strikes to Building / Structure per Year (

    Refer Clause 8.1.2 of IS 2309 )

    =Overall Multiplying Factor

    x P

    P/30

    B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS

    Number of Down Conductors Required

    Number of Down Conductors Required 1+(Ab-100)/300

    For Ab < 100m2

    Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309)

    Rf-C

    Rf-AMaximum Acceptable Overall Risk Factor( Refer Clauses 8.1.3 &

    8.1.6 of IS 2309 )

    Hence, Lightning Protection is Required.

    2(L+W)

    Since Overall Risk Factor Calculated Maximum Acceptable Overall Risk Factor

  • 5/21/2018 99077475 SV POWER Lightning Protection Calculation Sheet T G Building

    7/11

  • 5/21/2018 99077475 SV POWER Lightning Protection Calculation Sheet T G Building

    8/11

    PROJECT : -

    CLIENT :-

    CONSULTANT :-

    BOP CONTRACTOR :-

    LIGHTNING PROTECTION CALCULATION ( REFERENCE : IS 2309 ) FOR SECONDARY CRUSHER HOUSE

    i) Input Data :-a) Dimensions of Building / Structure

    Length of the Building L = 38.00 m

    Width of the Building W = 17.40 m

    Height of the Building H = 24.20 m

    b) Lightning Flash Density & Weighing Factors

    Number of Thunderstorm Days / Year N = 27 No. of Days / Year

    Lightning Flash Density (Flashes to Ground /km2/year) Ng = 5 Nos./km

    2/year

    Weighting Factor A ( Use of Structure ) A ( Refer Table 1A of IS 2309 ) = 1

    Weighting Factor B ( Type of Construction ) B ( Refer Table 1B of IS 2309 ) = 0.2

    Weighting Factor C ( Content of Consequential Effects ) C ( Refer Table 1C of IS 2309 ) = 1

    Weighting Factor D ( Degree of Isolation ) D ( Refer Table 1D of IS 2309 ) = 0.4

    Weighting Factor E ( Type of Country ) E ( Refer Table 1E of IS 2309 ) = 0.3

    ii) Calculations :-

    Overall Multiplying Factor = AxBxCxDxE = 0.024000

    = 0.000622

    ie 6.2178E-04

    iii) Maximum Acceptable Overall Risk Factor:-

    = 0.000001

    ie 1.000E-06

    iv) Result / Conclusion :-

    >

    Calculations (As per Clause 12.2.3 of IS-2309):-Base Area of Structure Ab = = 661.20 Meter

    2

    Perimeter of Structure P = = 110.8 Meter

    i) For Base Area (Ab) < 100m2

    a) Number of Down Conductors Required = = 1 Nos

    ii) For Base Area (Ab) > 100m2

    b) Based on Base Area of Structure:-

    = = 3 Nos

    c) Based on Parimeter of Structure:-

    = = 4 Nos.

    Hence, Required Number of Down Conductors = 3 Nos.

    Rev. Date Drg/Doc. No. Reviewed Approved

    R0 30.06.2009 PS PAS

    Since Overall Risk Factor Calculated

    Overall Multiplying Factor

    x P

    P/30

    B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS

    Number of Down Conductors Required

    Maximum Acceptable Overall Risk Factor( Refer Clauses 8.1.3 &

    8.1.6 of IS 2309 )

    Hence, Lightning Protection is Required.

    Number of Down Conductors Required 1+(Ab-100)/300

    (Refer Clause 8.1.2 of IS 2309)

    0.025907 Times per year=Probable Number of Strikes to Building / Structure per Year (

    Refer Clause 8.1.2 of IS 2309 )

    For Ab < 100m2

    =

    ( L x W )

    2(L+W)

    Maximum Acceptable Overall Risk Factor

    Rf-C

    Description / Parameter

    A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION

    Ac

    Symbol / Formulae / References Value Unit

    Collection Area ( Refer Clause 8.1.2 of IS 2309 ) 5181.47 Meter2

    1x250MW SURATGARH S.T.P.S. Unit-6 (Stage-IV)

    RRVUNL

    DCPL, New Delhi

    Indure, New Delhi

    Overall Risk Factor Calculated

    P = Ac x Ng x 10-6

    times/year

    Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309)

    Rf-A

    REVISION

    DETAILS

    3VYN855200

    Remarks

    First Submission

    ( Refer the Relevant Layout

    Drawings of the Building /

    Structure )

    ( Refer Fig. 1 of IS 2309 )

    RK

    Prepared

    =

    (L x W) + 2 (L x H) +

    2(W x H) + 3.14 H2=

  • 5/21/2018 99077475 SV POWER Lightning Protection Calculation Sheet T G Building

    9/11

    PROJECT : -

    CLIENT :-

    CONSULTANT :-

    BOP CONTRACTOR :-

    i) Input Data :-a) Dimensions of Building / Structure

    Length of the Building L = 41.00 m

    Width of the Building W = 18.00 m

    Height of the Building H = 19.00 m

    b) Lightning Flash Density & Weighing FactorsNumber of Thunderstorm Days / Year N = 27 No. of Days / Year

    Lightning Flash Density (Flashes to Ground /km2/year) Ng = 5 Nos./km

    2/year

    Weighting Factor A ( Use of Structure ) A ( Refer Table 1A of IS 2309 ) = 1

    Weighting Factor B ( Type of Construction ) B ( Refer Table 1B of IS 2309 ) = 0.8

    Weighting Factor C ( Content of Consequential Effects ) C ( Refer Table 1C of IS 2309 ) = 1

    Weighting Factor D ( Degree of Isolation ) D ( Refer Table 1D of IS 2309 ) = 0.4

    Weighting Factor E ( Type of Country ) E ( Refer Table 1E of IS 2309 ) = 0.3

    ii) Calculations :-

    Overall Multiplying Factor = AxBxCxDxE = 0.096000

    = 0.001974

    ie 1.9745E-03

    iii) Maximum Acceptable Overall Risk Factor:-

    = 0.000001ie 1.000E-06

    iv) Result / Conclusion :-

    >

    Calculations (As per Clause 12.2.3 of IS-2309):-

    Base Area of Structure Ab = = 738.00 Meter2

    Perimeter of Structure P = = 118 Meter

    i) For Base Area (Ab) < 100m2

    a) Number of Down Conductors Required = = 1 Nos

    ii) For Base Area (Ab) > 100m2

    b) Based on Base Area of Structure:-

    = = 3 Nos

    c) Based on Parimeter of Structure:-

    = = 4 Nos.

    Hence, Required Number of Down Conductors = 3 Nos.

    Rev. Date Drg/Doc. No. Reviewed ApprovedR0 30.06.2009 PS PAS

    REVISION

    DETAILS

    3VYN855200

    RemarksFirst Submission

    Prepared

    1x250MW SURATGARH S.T.P.S. Unit-6 (Stage-IV)

    RRVUNL

    DCPL, New Delhi

    (Refer Clause 8.1.2 of IS 2309)

    ( Refer the Relevant Layout

    Drawings of the Building /

    Structure )

    ( Refer Fig. 1 of IS 2309 )

    (L x W) + 2 (L x H) +

    2(W x H) + 3.14 H2= 4113.54

    RK

    WAGON TIPPLER AREA

    Meter

    2

    Description / Parameter

    A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION

    Ac

    Symbol / Formulae / References Value Unit

    =

    Indure, New Delhi

    For Ab < 100m2

    =

    LIGHTNING PROTECTION CALCULATION ( REFERENCE : IS 2309 ) FOR

    = 0.020568 Times per year

    Collection Area ( Refer Clause 8.1.2 of IS 2309 )

    P

    Overall Multiplying Factor

    x POverall Risk Factor Calculated

    ( L x W )

    2(L+W)

    Since Overall Risk Factor Calculated Maximum Acceptable Overall Risk Factor

    P/30

    B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS

    Number of Down Conductors Required

    Number of Down Conductors Required 1+(Ab-100)/300

    = Ac x Ng x 10-6

    times/yearProbable Number of Strikes to Building / Structure per Year (

    Refer Clause 8.1.2 of IS 2309 )

    Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309)

    Rf-C

    Rf-AMaximum Acceptable Overall Risk Factor( Refer Clauses 8.1.3 &

    8.1.6 of IS 2309 )

    Hence, Lightning Protection is Required.

  • 5/21/2018 99077475 SV POWER Lightning Protection Calculation Sheet T G Building

    10/11

  • 5/21/2018 99077475 SV POWER Lightning Protection Calculation Sheet T G Building

    11/11

    PROJECT : -

    CLIENT :-

    CONSULTANT :-

    BOP CONTRACTOR :-

    i) Input Data :-a) Dimensions of Building / Structure

    Length of the Building L = 15.50 m

    Width of the Building W = 8.50 m

    Height of the Building H = 5.00 m

    b) Lightning Flash Density & Weighing Factors

    Number of Thunderstorm Days / Year N = 27 No. of Days / Year

    Lightning Flash Density (Flashes to Ground /km2/year) Ng = 5 Nos./km

    2/year

    Weighting Factor A ( Use of Structure ) A ( Refer Table 1A of IS 2309 ) = 1

    Weighting Factor B ( Type of Construction ) B ( Refer Table 1B of IS 2309 ) = 0.2

    Weighting Factor C ( Content of Consequential Effects ) C ( Refer Table 1C of IS 2309 ) = 1

    Weighting Factor D ( Degree of Isolation ) D ( Refer Table 1D of IS 2309 ) = 0.4

    Weighting Factor E ( Type of Country ) E ( Refer Table 1E of IS 2309 ) = 0.3

    ii) Calculations :-

    Overall Multiplying Factor = AxBxCxDxE = 0.024000

    = 0.000054

    ie 5.4030E-05

    iii) Maximum Acceptable Overall Risk Factor:-

    = 0.000001

    ie 1.000E-06

    iv) Result / Conclusion :-

    >

    Calculations (As per Clause 12.2.3 of IS-2309):-Base Area of Structure Ab = = 131.75 Meter2

    Perimeter of Structure P = = 48 Meter

    i) For Base Area (Ab) < 100m2

    a) Number of Down Conductors Required = = 1 Nos

    ii) For Base Area (Ab) > 100m2

    b) Based on Base Area of Structure:-

    = = 1 Nos

    c) Based on Parimeter of Structure:-

    = = 2 Nos.

    Hence, Required Number of Down Conductors = 1 Nos.

    Rev. Date Drg/Doc. No. Reviewed Approved

    R0 30.06.2009 PS PAS

    REVISION

    DETAILS

    3VYN855200

    Remarks

    First Submission

    Prepared

    1x250MW SURATGARH S.T.P.S. Unit-6 (Stage-IV)

    RRVUNL

    DCPL, New Delhi

    (Refer Clause 8.1.2 of IS 2309)

    ( Refer the Relevant Layout

    Drawings of the Building /

    Structure )

    ( Refer Fig. 1 of IS 2309 )

    (L x W) + 2 (L x H) +

    2(W x H) + 3.14 H2= 450.25

    RK

    FOR DRIVE HOUSE

    Meter2

    Description / Parameter

    A) CHECK FOR NEED OF PROVIDING LIGHTNING PROTECTION

    Ac

    Symbol / Formulae / References Value Unit

    =

    Indure, New Delhi

    For Ab < 100m2

    =

    LIGHTNING PROTECTION CALCULATION ( REFERENCE : IS 2309 )

    = 0.002251 Times per year

    Collection Area ( Refer Clause 8.1.2 of IS 2309 )

    P

    Overall Multiplying Factor

    x POverall Risk Factor Calculated

    ( L x W )

    2(L+W)

    Since Overall Risk Factor Calculated Maximum Acceptable Overall Risk Factor

    P/30

    B) CHECK FOR ADEQUACY OF NUMBER OF DOWN CONDUCTORS

    Number of Down Conductors Required

    Number of Down Conductors Required 1+(Ab-100)/300

    = Ac x Ng x 10-6

    times/yearProbable Number of Strikes to Building / Structure per Year (

    Refer Clause 8.1.2 of IS 2309 )

    Note:- The Number of Down Conductor should be at least the smaller between b) & c) (as per clause 12.2.3b of IS-2309)

    Rf-C

    Rf-AMaximum Acceptable Overall Risk Factor( Refer Clauses 8.1.3 &

    8.1.6 of IS 2309 )

    Hence, Lightning Protection is Required.