4
Saga Shipbrokers Ltd. Tel: +354 824 2310 [email protected] - www.ships.is Dagur SK-17 IMO NUMBER 9183099 Type : Wet fish stern trawler with stern ramp Main dimensions : Loa 27.00/ Lpp 23.78/ Beam 8.50/Depth 6,7 Built : 1998, Astilleros Armon S.A., Spain Class : Lloyds Register of Shipping, 100 A1, Fishing Vessel, LMC Tonnage : Gross Tonnage 363,08 / Net Tonnage 108,92 Main engine : 744 kW, Caterpillar, 3512 DITA. Propeller : 4 blade Finnoy variable pitch propeller (2400 mm) within a fixed nozzle Generator : Stamford 100 kvA, 380 volt, 3 phase Aux. engines : 2 x Caterpillar aux. engines, type 3304 Side thruster : 100 BHP bow thruster by Astilleros Armon Hold capacity : 185 m3 Bunkers : Fuel: 65,000 ltrs Lub oil: 5,000 ltrs Hyd oil: 5,000 ltrs Fresh water: 25,000 ltrs Deck equipment : Supplier: Rapp Ecosse, Ellon 3 x 20 ts split winches TWS-3020- -each cable 2,400 m of 24 mm 2 x 10 ts sweeplines

› ... › uploads › 2019 › 02 › 2906-Da… · Web view: 4 blade Finnoy variable pitch propeller (2400 mm) within a fixed nozzle Generator: Stamford 100 kvA, 380 volt, 3 phase

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: › ... › uploads › 2019 › 02 › 2906-Da… · Web view: 4 blade Finnoy variable pitch propeller (2400 mm) within a fixed nozzle Generator: Stamford 100 kvA, 380 volt, 3 phase

Saga Shipbrokers Ltd.         Tel:  +354 824 2310          [email protected] - www.ships.is

Dagur SK-17

IMO NUMBER 9183099 Type : Wet fish stern trawler with stern rampMain dimensions : Loa 27.00/ Lpp 23.78/ Beam 8.50/Depth 6,7Built : 1998, Astilleros Armon S.A., SpainClass : Lloyds Register of Shipping, 100 A1, Fishing Vessel, LMCTonnage : Gross Tonnage 363,08 / Net Tonnage 108,92 Main engine : 744 kW, Caterpillar, 3512 DITA. Propeller : 4 blade Finnoy variable pitch propeller (2400 mm) within a fixed nozzleGenerator : Stamford 100 kvA, 380 volt, 3 phaseAux. engines : 2 x Caterpillar aux. engines, type 3304Side thruster : 100 BHP bow thruster by Astilleros ArmonHold capacity : 185 m3 Bunkers : Fuel: 65,000 ltrs

Lub oil: 5,000 ltrs Hyd oil: 5,000 ltrs Fresh water: 25,000 ltrs

Deck equipment : Supplier: Rapp Ecosse, Ellon 3 x 20 ts split winches TWS-3020- -each cable 2,400 m of 24 mm 2 x 10 ts sweeplines 2 x 7 ts split sweeplines 2 x Fleeting winches 2 x Gilson winches, Pullmaster M12 2 x Backstrap winches M5 Pullmaster Landing crane, 1.7m reach, 14 t/m, Atlas AK-140 Pentagon Autotrawl system latest version installed May 2008

Page 2: › ... › uploads › 2019 › 02 › 2906-Da… · Web view: 4 blade Finnoy variable pitch propeller (2400 mm) within a fixed nozzle Generator: Stamford 100 kvA, 380 volt, 3 phase

Cooling : Geneglace ice machine, 2.5 ts. RSW fish washing system

Freezing : Blast freezer - 700kg/4 hours

Electronics : Furuno FCV 10 Scanbeam sounder Furuno Echo Sounder: Furuno CN24 Net monitor: 3 x GPS: Furuno Sat compass : Furuno Sat phone: 2 x Sodena Plotter: Maxsea Plotter 8 : Furuno Radar and remote display : Koden Radar: Seatel Sat TV: 2 x Sailor VHFs: 2 x Sailor MF/HF: VHF and MF/HF DSC: Autopilot, Navitron NT 9200 and MT 920 RNI Nav 5 GMDSS Navtex

receiver : Pentagon Autotrawl system : Scanmar CGM + Door sensors + Catch sensors: Vsat Internet at sea

Accommodation : 10 pers. 5 x 2 berth cabins

Modifications 2016-2019 :New stabilizing tank installed at the rear of the vessel. This has greatly

improved the vessels stability. Cost estimated around 60.000 EUR. :Overhaul of electrical systems on board.

:Kitchen. New cupboards and storage units, new sink,new water faucets, new refrigerator, etc.

:Kitchen, cabins and corridor; new ceiling panels. New panels (ceiling & walls) in captain cabin.

:Captain cabin; New panels(ceiling and walls). WC and shower reinstalled and new pipes installed.

:New pipes in all water system, both for fresh water and draining of WC and shower area.

:New pipes connected to winches. :Deck area. Shrimp processing line installed. Including; graders, fish

separator, shrimp cooker, cooling tank and several conveyor belts. New cladding in deck area to facilitate processing(cooking) on board.

Permanent fixture. :Fishhold area; insulation improved. Pillars installed for tube control. :Pumps. Several new pumps; lens pums, intake pump. Water cleaning

system installed :Engine room; seawater pipes renewed.

:New anchor winch installed :New Maxsea and Marport censor system.

:Gearbox overhaul in 2016/2017.

Page 3: › ... › uploads › 2019 › 02 › 2906-Da… · Web view: 4 blade Finnoy variable pitch propeller (2400 mm) within a fixed nozzle Generator: Stamford 100 kvA, 380 volt, 3 phase

:Engine turbines overhauled:Trawl deck partially replaced and the rest was doubled in size.:Automatic cleaning equipment installed in the engine cooling

system:Bottom valves, zinkanodes renewed:Gearbox overhauled 2019 :Generators overhauled 2019:Front gear overhauled 2019:New hydraulic pipes on middle and trawl deck winch system overhauled 2019:Three new conveyor belts installed 2019

Price : All particulars believed to be correct but not guaranteed