Upload
others
View
8
Download
0
Embed Size (px)
Citation preview
A Better Building…A Better Building Experience!
Flint is passionate about evaluating design for constructability and providing input on best practices for construction means and methods. As can be proven from many of our past successful projects, we have the knowledge, skills, and manpower to not only manage construction by others, but to construct the major project components ourselves. These include:
» Metal work
» Wood and metal stud framing
» Drywall
» Flashings
» Doors
» Frames
» Hardware
Our capability and expertise to both manage and self-perform work offers that much more to an owner and design team looking for constructability insight. We bring a true “builder’s approach” to the design process, thereby eliminating critical construction impacts to both cost and schedule early.
OUR HISTORYFlint Builders is a general contracting firm, licensed in five states, with corporate offices in Roseville and San Jose, California. Specializing in a variety of delivery methods allows us to develop collaboration between the owner, contractor, designers, and subcontractor partners for an extraordinary building experience. The Design-Build Institute of America has honored Flint four times in recent years, and the Associated Subcontractors Alliance of Sacramento selected Flint as the General Contractor of the Year in 2015, 2016, 2017, 2018 and 2019.
We believe our success is dependent upon the success of our clients and partners. Our clients understand most reputable construction companies can get to an acceptable ending, but the “Flint Experience” is why they choose us. Our employees and partners truly are some of the best professionals you will ever work with in the industry. When it comes to delivering quality projects, it’s not just about the bricks and mortar, it’s the people who make the difference. Our ongoing quest for quality has led us to integrate quality assurance
into the very essence of our culture. Our value-added services such as design and constructability reviews, value engineering, LEED/sustainability management and phased construction can reduce costs, enhance schedules, and make your building run smoother.
OUR QUALIFICATIONSFlint specializes in complex multistory, concrete and structural steel framed projects, with fast-track schedules and extreme site logistical challenges. Our team members have professional designations that include P.E., DBIA, LEED AP BD+C and belong to associations such as LEAN Construction Institute, U.S. Green Building Council, Design-Build Institute of America, AIA, A4LE, and the Association of General Contractors.
Our team brings an extensive experience that ranges from education, healthcare, hospitality, entertainment, industrial, government, office, and retail. This diversity of project experience allows us to provide a solution oriented project team with a vast depth of skills and support.
We’re interested in building lasting relationships based on a collaborative approach. Left to right: Robert Downey, Kevin Mosher, John Stump, Cathy Robb, and Jared Wright.
Client Testimonials
OUR PLEDGE TO OUR CLIENTSOur goal is to provide a quality of work and standard of excellence that surpasses the expectations of our partners and clients alike. At Flint, we create an extraordinary building experience through collaboration with passionate professionals. We strive to:
Manage Complexity. We pre-plan every detail and deliver the most respected professionals from every trade.
Create Value. We ask the right questions and navigate the best options, always with a focus on value, efficiency, and sustainability.
Mitigate Risk. We listen, think, plan, and protect our client, in an effort to guide them to smart decisions, predictable processes, successful outcomes, consistent high quality, and reduced stress.
Integrate Sustainability. Our sustainable solutions add value and mitigate risk. Beginning with the end
in mind, we are working toward a legacy that our clients, and Flint, can be proud of.
Assure Safety. Flint is proud to be a partner with Cal/OSHA. This partnership helps Flint improve workplace safety and health and effectively prevent and control injuries and illnesses. Safety of the students, faculty, public and our construction personnel are the number one priority for Flint on our projects. All Flint personnel and our subcontractors maintain safety in every action, on every project, every day.
Evolve Delivery. Every member of the extended project team is part of the solution. When we all come together, we see the big picture: budget, schedule, constructability, safety, efficiency, sustainability, efficient communication, life cycle, and every other factor that impacts project success-both today and in the future.
We maintain fully-collaborative project environments that use cutting-edge technology and state-of-the-art planning practices,
including BIM technology and the LEAN process. Design and construction is streamlined through the LEAN pull-planning system, integrating relationships and interactions within the network of specialized professionals. Communication is seamless and timely with use of the latest P-6 scheduling software, SharePoint collaboration sites, and hyper-linked construction documents.
EDUCATION
“The Flint team had a tremendous amount of cooperation and a real team spirit. ”
Jaime Derrick, DSA Inspector
Goleman LRC
» San Joaquin Delta College Student Center
Higher Education » UC Davis Recreation Pool Complex
» UC Santa Cruz Upper Quarry Amphitheater
» UC Davis International Center
» UC Davis Student Community Ctr.
» UC Davis Chilled Water
» UC Davis Core Greenhouse Complex
» UC Davis Earth & Physical Science
» UC Davis Mondavi Institute for Wine & Food Science
» UC Davis Tupper Hall 2nd Floor Laboratory
» UC Davis Veterinary Medicine 3A Building
» UC Davis Giedt Hall
» UC Merced Science and Engineering Building
EDUCATION PROJECTS » Dublin High School Science & Math
Building Phase 1
» Napa Memorial Stadium
» Arcohe Middle School Addition and Renovation
» West Placer MS Phase 2
» Mitchell Middle School Modernization
» American River College STEM Building
» Allan Hancock Industrial Technology & Physical Education
» CSU Hayward Business and Technology
» Diablo Valley College Student Commons
» Folsom Lake College New Gymnasium Building
» San Joaquin Delta College Budd Center Locker Room
» San Joaquin Delta College Data Center
» San Joaquin Delta College
EDUCATION
K-14 » Twelve Bridges High School
» Casa Roble Fundamental High School Student Union, Administration and SCORE Health Academy
» Roseville High School Auxiliary Gymnasium
» W.C Overfelt High School Music, Arts, Administration and Quad Transformation
» Yerba Buena High School Student Union & Quad Transformation
» Bell Avenue Elementary School Reconstruction
» Folsom Hills Elementary School Modernization
» Theodore Judah Elementary School Media Center & Classrooms
» Los Gatos High School New Classroom and Music Building
» Lincoln High School Addition and Modernization
» San Juan USD “Unschool”
HEALTHCARE
HEALTHCARE PROJECTS » UC Davis Roseville Medical Office
Building
» San Jose Valley Health Center
» Mariposa Indian Health Clinic
» Boulder Plaza Health Clinic Renovation
» Shingle Springs Tribal Health Clinic
» Toiyabe Indian Health Clinic
» Tule River Indian Health Center
» Tuolumne Native American Health Clinic
» Warner Mountain Indian Health Project
» Yocha Dehe, Wintun Nation Community Center Renovations Health and Wellness Offices
» University of California, Davis Veterinary Medicine 3A Building Laboratory
CLIENT TESTIMONIAL
We placed our trust and confidence in Flint Builders to deliver a quality project on time and at a fair price, and were rewarded with comradery, a great relationship. and an overall building experience that was exceptional.
Brian Schmidt-SJRRC Director of Operations
INDUSTRIAL
INDUSTRIAL PROJECTS » Altamont Commuter Express
Maintenance Facility
» Sacramento FedEx Hub
» American Modular Systems Manufacturing Facility
» Sacramento Airport Fuel Dispensing Facility
We have confidence that Flint is a professional organization that is interested in delivering that happy client. We have similar focus on a happy client and Flint will do whatever it takes to make sure we achieve that.
Tyler Babcock, MFDB Architects
OFFICE/RETAIL
OFFICE/RETAIL PROJECTS » San Jose Downtown Health
Center
» Franchise Tax Board Tenant Improvement
» Shingle Springs Ambulatory Clinic
» Blue Oaks Plaza
» Summit at Douglas Ridge Office Building
» Northern California Power Agency Sound Attenuation
» Barrish Pelham Partners Office Building Tenant Improvement
» Zeiden Properties Structural Repair
» Manderes Tenant Improvement
This was a very challenging project yet the Flint team always provided a positive, results-driven, and highly proactive approach toward a beneficial outcome. Their team has been a pleasure to work with and their commitment to the success of our project is evident in the partnership that we’ve built.
Mandy Mager, Assistant Planning Director Yurok Tribe
HOSPITALITY/ ENTERTAINMENT
» Cachil DeHe Village Gymnasium and Wellness Center
» Colusa Casino Remodel and Expansion
» Colusa Community Building
» Coyote Valley Recreational Facility
» Donner Comfort Stations and Safety Roadside Rest Area
» Folsom Public Library
» Gold Run Comfort Stations and Safety Roadside Rest Area
» Hilton Garden Inn
» Sacramento Regional Arts Music Circus at Wells Fargo Pavilion
» The Lodge at Feather Falls
» Thunder Valley Casino Resort
» Redwood Hotel Casino
» Winchester Golf Club House
HOSPITALITY/ENTERTAINMENT PROJECTS
OUR TEAM
JOHN STUMP, DBIA President
KEVIN MOSHER, DBIA, LEED AP Vice President of Operations
RYAN TOGNETTI Preconstruction Manager
ROB DOWNEY, P.E., LEED AP Director of Preconstruction
CATHY ROBB Director of Administration
JARED WRIGHT, CPE, DBIA, LEED AP BD + C Chief Estimator
DONATA GILLILAND, CPSM Director of Marketing
MARK MENNUCCI, DBIA, LEED AP Senior Project Manager
ANDY ROLFS, DBIA, LEED AP BD+C Quality Control Manager
CRAIG SMART Project Manager
MICHAEL KLINGMAN, ASSOC. DBIA Project Manager
DAVID GARNER, DBIA, LEED AP Senior Project Manager
CRAIG KINSMAN, DBIA, LEED AP Senior Project Manager
KELLY PIPPIN, LEED GA Project Manager
JOE WINDMILLER Project Manager
JOE HUCIK, LEED GA Senior Project Manager
MATT BRANDON Project Manager
TYLER SWANSON, AEP Estimator
NATHAN STILES Project Manager
FRANK RILEY Senior Superintendent
DOUG GAMMELGARD, QSP, CESSWI Senior Superintendent
BRIAN HANSEN, QSP Senior Superintendent
JUSTIN SIEBERT, DBIA, QSP, CESSWI Senior Superintendent
TOM WILTSEY, QSP, CESSWI Superintendent
ZACH DZERIGIAN, QSP, CESSWI, IT Superintendent
JOHN GILLIS, QSP Superintendent
PATRICK JAMES, QSP, CISEC Superintendent
RANDY TSCHARNER Superintendent
MICHAEL DELLA ROSA, LEED AP BD+C Senior Superintendent
ALAINA ROSSI, ASSOC. DBIA Assistant Project Manager
STEVEN GATHARD Superintendent
At Flint, we do not consider ourselves just a brick and mortar business. Our business is people. Over the years, our success has been a direct result of the high caliber, innovative, and motivated professionals we bring together to provide the best service to our clients. Flint’s ongoing education and certification programs, firm culture, and entrepreneurial structure help us attract, develop, and retain the finest construction professionals in the industry.
ALEX KOKOLOGIANNAKIS, LEED AP Project Engineer
SHANE BRADLEY Project Engineer
COURTNEY LOWE Project Engineer
GREGG ARIOTO Project Engineer
DAN BRIGHT Project Engineer
KENNY PIETROBONO Assistant Superintendent
HINA CHAUDHRY Project Engineer
TOMMY KREBS Project Engineer
Flint brings the best and brightest team for superior quality construction. Our value-added services such as design and constructability reviews, value engineering, LEED/Sustainability management and phased construction, can reduce costs, enhance the construction schedule, and make your building project run smoother. Flint’s fiscally-responsible schedule and budget is added value you can take to the bank.
Flint has a sterling reputation as a premier Master Builder, focusing on design-build and design-assist delivery methods. Our track record of innovation, integrated technologies, sustainability, and quality assurances delivers the highest quality and best value for our clients. A few specific processes that make our team qualified to provide highly effective and valuable services include:
Partnering, Collaboration and Communication—Understanding the client’s priorities, needs and goals serves as the starting point for the preconstruction process. Developing a partnership with the client and their
team is essential to success moving forward.
Methodology for Controlling Costs—Our team’s cost control strategy works in harmony with the intercommunications of the design team and client. Evaluation of alternate materials and products, and thoroughly analyzing the energy and efficiency of the buildings systems, allows the client to select systems that provide the best value. All equipment and systems will be evaluated for initial costs, energy consumption, carbon output, system service/maintenance cost, and overall efficiency or replacement costs.
Budget Development—Developing a comprehensive cost model/budget for the project allows the client to make critical decisions based on accurate cost data. Before the design process proceeds to the next stage of development, a fully detailed and comprehensive cost estimate is provided and reviewed with the entire project team for approval.
Coordination—Building Information
Modeling (BIM) is utilized to coordinate, detect, and resolve potential clashes between building systems. Using BIM programs, specifically Revit, Flint increases the accuracy and quality of construction, reduces costly construction issues, and achieves greater predictability with more insight. Our proven modeling protocols provide a streamlined process that focuses on integrated project delivery.
Constructability and Site Logistics—Evaluating the design for constructability and providing input on the construction means and methods allows Flint to bring a builder’s approach to the design process, reducing critical construction impacts to both cost and schedule.
Lean Pull Planning—Our team uses the latest Oracle P6 scheduling software with enhanced capabilities such as collaborative features available through on-line access. We genuinely believe schedule and cost are directly related, and have a direct affect on the overall success of the project.
THE FLINT EXPERIENCE
OUR PROCESS
BEING GREENLEED is the nationally accepted benchmark for the design, construction and operations of high-performance green buildings. Flint’s LEED APs have proven experience in navigating the owner and project team successfully through the LEED project certification process. They help owners find environmentally friendly construction alternatives and save money. More companies and building owners are considering the future of building and operational systems that bring a reduction in dependence on renewable resources. Flint has a firm belief that green construction is not just good stewardship of the earth, it’s good business that can produce significant cost savings related to both energy consumption and the use and reuse of more economical building materials.
Flint established a benchmark in green construction through early adoption of, and ongoing education on, emerging techniques and products resulting in buildings in synchronism with the environmental concerns. Our team consists of top professionals who have been certified by the USGBC as LEED Accredited Professionals (LEED APs) to promote sustainability throughout the industry. These individuals include estimators, project managers, and executives who are qualified to manage the process required to certify buildings based on LEED design guidelines.
LEEDING THE INDUSTRY
TAKING A “WHOLISTIC” APPROACHOur top LEED APs are focused on a whole-building approach by providing owners with the knowledge and skills to guide the team through the rigorous building certification process that involves improving building performance in five key areas:
1. Sustainable site development
2. Water savings
3. Energy savings
4. Materials selection
5. Indoor environmental quality
LEED ProjectsPLATINUM
UC, Davis Student Community Center, Davis, CA
UC Davis Robert Mondavi Institute for Wine and Food Sciences, Davis, CA
GOLD
Valley Health Center, San Jose, CA
UC, Davis International Center, Davis, CA
UC Davis Warren and Leta Giedt Hall, Davis, CA
UC, Merced Science & Engineering Building, Merced, CA
SILVER
Yerba Buena High School Student Union, San Jose, CA
Altamont Commuter Express Train Maintenance Facility, Stockton, CA
Moffett Field Pararescue Training Facility, Moffett Field, CA
SUSTAINABILITY
RECOGNITION
DBIA AWARDS
“Flint was responsive and accommodating. The design-build team listened and delivered a facility that exceeded all of our expectations.”
Catherine Buscaglia, Senior Project Manager, UC Davis
“Flint’s work was exceptional and a direct result of their quality subcontractor partners, and their ability to effectively pre-plan and coordinate the work. They were innovative in their approach to identifying and resolving unforeseen issues. Flint maintains a high standard of conduct and has a genuine interest in creating win-win solutions to every situation.”
Brian Schmidt, SJRCC Director of Operations Altamont Commuter Express Maintenance Facility
“The ‘best value’ selection of Flint was made easy by their clear understanding of our campus environment and architecture and by their ability to leverage our budget to offer the most ‘building for the budget’... We realized that we had selected a highly collaborative and experienced partner in Flint, whose priority was to ensure the District was completely satisfied.”
Pablo X. Manzo, Los Rios Community College District
“Having worked with Flint Builders on many projects over the years, I can say that no matter who I work with, I can expect a great experience. Their team is always professional, responsive and very collaborative. ”
William B. Rader, S.E., Vice President Buehler & Buehler Structural Engineers, Inc.
“Flint keeps the best interest of the project in the forefront of their discussions and, ultimately, in their decisions.”
Michael Ryan Greenbough Design
The Flint superintendent’s attention for detail and overall concern to do the best job possible is what makes working with Flint a pleasure.
Dan Evans, County of El Dorado
2015 | 2016 2017 | 2018
2019
2015 20142019 2017
Project of the Year
THE COMMUNITIES WE SERVE
Regional Builders Exchange Education FoundationFlint sponsors and mentors design-build teams in an annual competition that successfully grows the collaboration between the building industry and local schools to highlight construction-based career opportunities.
Sierra Forever Families | Copper for KidsFlint president, John Stump, serves on the board of Sierra Forever Families, where Flint donates scrap copper that is redeemed for cash and contributed to the Copper for Kids program through Sierra Forever Families. Copper for Kids recycling bins are installed at every Flint project site.
Camp WinthersFlint is a proud supporter of Camp Winthers. The camp is owned and operated by the San Juan Unified School District with donations and
“The strength of the team is each member. The strength of each member is the team.” – Phil Jackson
support from the local community. Flint built and installed five new tent cabins and a dock in time for the Summer 2018 camp season and is designing and building a new rope challenge course for Summer 2020.
Leap Sandcastle ClassicFlint teamed with El Roble Elementary School students to complete in the 37th Annual Leap Sandcastle Classic that supports arts education in elementary schools in the Bay Area. This fun event raised $268,270.
Mustard Seed SchoolFlint supports the Loaves & Fishes, Mustard Seed School program, which helps meet the needs of homeless children. Our renovation of a classroom included a new power service, audio/visual upgrades, new mechanical equipment, casework, flooring and ceiling. We continue to be involved with Loaves & Fishes through donations of office equipment and supplies.
Sacramento Construction Management Education FoundationOur Industry support contributes to 100% job placement, passionate students, excellent professors, and continued outstanding performance in national competitions leading to on of the nation’s top construction management programs.
California Raptor CenterFlint donated demolition work and construction of the midflight cage and eagle display for the UC Davis Veterinary Medicine California Raptor Center, where we support The California Raptor Center, an educational and research facility dedicated to the rehabilitation of injured and orphaned birds of prey.
Friends of Folsom Turkey DriveFlint employees donated turkeys for the annual Friends of Folsom Turkey Drive which collected over 4,000 turkeys for local families in need.
Rebuilding Together Silicon Valley Our team worked hard to repair two homes that were damaged from heavy rain the past season. Some sections of the Golden Wagon Wheel Park had seen over 3 feet of flooding.
flintbuilders.com
CA Lic 982487
CORPORATE OFFICE
401 Derek Place Roseville, CA 95678
BAY AREA
125 S. Market Street, #110 San Jose, CA 95113
SOUTHERN CALIFORNIA OFFICE
5151 Shoreham Pl, #280San Diego, CA 92122