Page 1: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

1

FRANK VERHOEVEN

MEMBER OF THE BOARD OF BOSKALIS

ROTTERDAM

JUNE 26, 2012

A CHANGING WORLD

Page 2: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

2

INDEX

01 COMPANY OVERVIEW

02 ASSETS

03 SAFETY

DEVELOPMENTS

04 ENVIRONMENTAL

DEVELOPMENTS

05 CONTRACTUAL

DEVELOPMENTS

07 TECHNICAL

DEVELOPMENTS

08 CHANGING ROLE

Page 3: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

3

Leading global dredging & maritime expert

With 14,000 employees and 1,100 vessels

Active in 75 countries across 6 continents

Customers in Energy, Ports and Infra

Headquarters in Papendrecht, The Netherlands

Record revenue 2011: EUR 2.8 billion

Net profit 2011: EUR 254 million

EBITDA 2011: EUR 591 million

Order book end 2011: EUR 3.5 billion

Listed on NYSE Euronext Amsterdam Exchange

COMPANY

OVERVIEW

Page 4: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

4

INDEX

01 COMPANY OVERVIEW

02 ASSETS

03 SAFETY

DEVELOPMENTS

04 ENVIRONMENTAL

DEVELOPMENTS

05 CONTRACTUAL

DEVELOPMENTS

07 TECHNICAL

DEVELOPMENTS

08 CHANGING ROLE

Page 5: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

5

ASSETS

DREDGING FLEET

Page 6: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

6

ASSETS

TRANSPORT, TUGS, DSV & HEAVY LIFT

Page 7: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

7

ASSETS

ENERGY FLEET

Dynamic Positioned Fallpipe vessel – Rockpiper

Page 8: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

8

STRATEGY

Cost Competitive

Create Added Value

Complexity

Cost

Page 9: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

9

INDEX

01 COMPANY OVERVIEW

02 ASSETS

03 SAFETY

DEVELOPMENTS

04 ENVIRONMENTAL

DEVELOPMENTS

05 CONTRACTUAL

DEVELOPMENTS

07 TECHNICAL

DEVELOPMENTS

08 CHANGING ROLE

Page 10: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

10

SAFETY DEVELOPMENTS

THEN NOW

SAFETY: TOP PRIORITY SAFETY CORE VALUE

REACTIVE APPROACH >

DRIVEN BY PROJECTS

PROACTIVE APPROACH

> DRIVEN BY

CONTRACTOR

TOO THEORETICAL LESS PAPERWORK

Page 11: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

11

HOW TO DECREASE LTI?

Technology

Systems & policies

Awareness / Behavior

Accid

ent/

incid

ent ra

tes

Time

Page 12: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

12

Page 13: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

13

INDEX

01 COMPANY OVERVIEW

02 ASSETS

03 SAFETY

DEVELOPMENTS

04 ENVIRONMENTAL

DEVELOPMENTS

05 CONTRACTUAL

DEVELOPMENTS

07 TECHNICAL

DEVELOPMENTS

08 CHANGING ROLE

Page 14: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

14

ENVIRONMENTAL DEVELOPMENTS

THEN NOW

REACTIVE APPROACH >

DRIVEN BY ENV.

PROTECTION AGENCIES

PROACTIVE APPROACH

FIT WORK METHOD TO

PERMITS

ASSIST IN PREPARATION

OF PERMITS

BUILDING WITH NATURE

Page 15: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

15

BUILDING WITH NATURE

OBJECTIVES

Innovation Program 2008-2012

The mission of BwN: "To show it is possible to develop infrastructure, while

creating opportunities for nature and, where possible, utilizing natural

processes.“

Budget 30 Million Euro

PROGRAM OBJECTIVES

1. Develop ecosystem knowledge enabling ‘Building with Nature (BwN)’

2. Establish how to bring the BwN-concept forward in society and make it

happen

3. Develop scientifically sound design rules and norms

4. Develop expertise to apply the BwN-concept

5. Make the concept tangible using practical BwN-examples

Page 16: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

16

BUILDING WITH NATURE

PROGRAMME BASED ON 3 PILLARS

Page 17: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

17

Power Plant

Page 18: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

18

INDEX

01 COMPANY OVERVIEW

02 ASSETS

03 SAFETY

DEVELOPMENTS

04 ENVIRONMENTAL

DEVELOPMENTS

05 CONTRACTUAL

DEVELOPMENTS

07 TECHNICAL

DEVELOPMENTS

08 CHANGING ROLE

Page 19: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

19

CONTRACTUAL DEVELOPMENTS

THEN NOW

EXTENSIVE DESIGN

WORKS BY CLIENT

EXTENSIVE DESIGN

WORKS BY

CONTRACTOR

SINGLE ACTIVITY

CONTRACTS

EPC / TURN-KEY

CONTRACTS

FIT WORK METHOD TO

DESIGN

FIT DESIGN TO

WORKMETHOD

INTERFACE

MANAGEMENT

Cost Effective and Short time to Market

Page 20: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

20

Design Build Maintain Finance Operate

Traditional

Innovative

D B M F O

D B M

D B M F

D B M F O

D & B

Alliance

CONTRACT TYPES

ECI

Page 21: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

21

Focus on project outcomes (best for

project)

An emphasis on openness and

communication between participants

A balanced risk/reward balance that

aligns the commercial interest of the

parties

KEY TO SUCCESSFUL PARTNERING

Page 22: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

22

MELBOURNE CHANNEL DEEPENING

Australia

ALLIANCE EXAMPLE

When: during selection phase

Main goal: economic feasibility & environmental permitting / public opinion Port Phillip Heads

Port of

Melbourne

Vessel route

Page 23: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

23

MELBOURNE CHANNEL DEEPENING

Australia

ALLIANCE EXAMPLE

Result : project completed ahead of schedule

actual costs far below budget

high compliance with environmental limits

IPA National Infrastructure Project of 2010

Page 24: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

24

INDEX

01 COMPANY OVERVIEW

02 ASSETS

03 SAFETY

DEVELOPMENTS

04 ENVIRONMENTAL

DEVELOPMENTS

05 CONTRACTUAL

DEVELOPMENTS

07 TECHNICAL

DEVELOPMENTS

08 CHANGING ROLE

Page 25: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

25

TECHNICAL DEVELOPMENTS

THEN NOW

PRODUCTION DRIVEN PRODUCT DRIVEN:

FOCUS ON QUALITY

• ENVIRONMENT

• HIGHER ACCURACIES

• DEEPER WATER

• ARCTIC CONDITIONS

Page 26: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

26

LONGER SHIPS TO DREDGE DEEPER

100M+ WATERDEPTH WITH CM ACCURACY

Page 27: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

27

PUSHING FOR LARGER DEPTHS

60

0m

+

Dre

dg

ing

30

00

m +

Ro

ck

In

sta

lla

tio

n

Page 28: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

28

CHANNEL DEEPENING PROJECT PORT OF MELBOURNE

Dredging soft rock with a hopper dredger: high workability and maneuverability

EXTENDING THE WORKING RANGE OF

TRAILING SUCTION HOPPER DREDGERS

Page 29: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

29

POSTLAY TRENCHING

• Mumbai High Fields to Uran Trunkline, India

• 20km pre-trenching and backfilling

• 420km post-lay trenching in one month

• Suitable for soft soils

Page 30: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

30

DECIMETER ACCURACY DREDGING AT

100M+ WATER DEPTHS

CENTIMETER ACCURACY ROCK

PLACEMENT AT 1000M+ WATER DEPTHS

LOWER VOLUMES > COST EFFECTIVE

UNSURPASSED QUALITY

ACCURACY AND TOLERANCES

Multibeam visualisation of Nordstream

pipe & trench

Page 31: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

31

Page 32: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

32

FALLPIPE ROV WITH INTEGRATED SURVEY ROV:

ROCK INSTALLATION & SURVEYING IN A

SINGLE RUN

Baby ROV for Surveying

Fallpipe ROV to control Fallpipe

Page 33: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

33

TRENCHERS

Rock

Clay

Sand

Trencher 1

Trencher 2

Trencher 3

< 400 km >

Highly Variable Soil Conditions

Trenchers have a

limited operability

range

What to choose? > Multifunctional Trencher with

Attachments

Page 34: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

34

• FROM DIVERS TO DIVERLESS INSPECTION

ACTIVITIES

• TREND TOWARDS WORK CLASS ROV’S

• ANCHORED VESSELS TO DP2/3 VESSELS

SUBSEA

Page 35: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

35

INDEX

01 COMPANY OVERVIEW

02 ASSETS

03 SAFETY

DEVELOPMENTS

04 ENVIRONMENTAL

DEVELOPMENTS

05 CONTRACTUAL

DEVELOPMENTS

07 TECHNICAL

DEVELOPMENTS

08 CHANGING ROLE

Page 36: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

36

CHANGING ROLE

THEN NOW

DREDGING

(SUB)CONTRACTOR

MAIN CONTRACTOR OR

LARGE

SUBCONTRACTOR

LOWER EDUCATION M.SC. & PH.D.

SUPERINTENDENTS PROJECT DIRECTOR

FOCUS ON DREDGING QS, MARINE BIOLOGIST,

PROCUREMENT,

GENERAL MNGMT

CONSTRUCTION

ENGINEERING ONLY

FIT-FOR-PURPOSE

DESIGN

Page 37: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

37

PIPELINE RUSSIA TO GERMANY:

NORDSTREAM

• Subcontractor for Saipem

• Pre and Post lay rock works

• German Landfall

• Over 35 Ships involved

• Natura 2000 Reserve

Page 38: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

38

STRAIT OF MAGELLAN CROSSING,

ARGENTINA

• Main Contractor

• 2 Landfalls

• Trenching & Backfilling

• Long Swells, 10m+ tidal range, 6+ knots current

Page 39: A CHANGING WORLD · A CHANGING WORLD \ 2 INDEX 01 COMPANY OVERVIEW 02 ASSETS 03 SAFETY DEVELOPMENTS 04 ENVIRONMENTAL DEVELOPMENTS 05 CONTRACTUAL DEVELOPMENTS 07 TECHNICAL DEVELOPMENTS

\

39

THANK YOU