MAJOR INDUSTRIAL AND NUCLEAR PROJECTS REFERENCES
A company born in Africa, for Africa, Empowering Afrca
2 www.lesedins.co.za 3www.lesedins.co.za
CONTENTS
04 A company born in Africa, for Africa, empowering Africa
05 Why we do it
06 Our journey
07 Why we do it
08 Operations & Maintenance | International nuclear services
09 Global nuclear expertise
10 Industrial Projects
20 Nuclear Projects
Lesedi is a leading engineering, procurement,
construction (EPC) African company, with a long
history in nuclear, industrial power, mining and oil
and gas environments.
5www.lesedins.co.za4 www.lesedins.co.za
Lesedi Nuclear Services evolved from Intens
Engineering soon after the construction and
commissioning of South Africa’s Nuclear Power
Station (Koeberg) by AREVA in the mid-1980s.
In 2001 Lesedi partnered with global nuclear
leader AREVA NP to acquire a 45% stake in the
company and form Lesedi Nuclear Services, a
BEE shareholding company. In 2006, AREVA NP
acquired another 6% stake in Lesedi, giving it
majority shareholding of 51%. In building capacity
for the “nuclear renaissance”, Lesedi diversified into
other energy-related infrastructure projects in the
South African power industry.
In June 2012, Lesedi was joined by new industrial
partners Group Five and the J&J Group to further
position itself in the South African power industry.
Lesedi has since diversified into a major
engineering, procurement, construction and
maintenance (EPCm) company, having successfully
completed numerous key projects in the nuclear,
industrial power, mining, and oil and gas
environments. Lesedi’s main shareholder, AREVA
was renamed Framatome in January 2018. With
the name change of its principal shareholder, and
with Lesedi evolving to a firmly established African
company with a fully diversified business offering,
the company rebranded to better reflect its purpose
and vision for the future.
A COMPANY BORN IN AFRICA, FOR AFRICA, EMPOWERING AFRICA
WHY WE DO IT
VisionTo be the leading engineering,
procurement and construction enterprise
recognised for empowering and energising
the enrichment of the African continent.
Purpose
Our purpose is to create that which
empowers others to create.
Mission
We will achieve our vision by:
Giving our people the freedom
to create in a purposeful culture that
balances challenge with support and
recognises the achievement of our people.
Focusing on engineering, procurement,
construction and maintenance in the
design, generation and management
of power and energy.
Never compromising on safety and
quality and always being sensitive to the
environment.
Endeavour to improve the lives of everyone
we touch.
And by empowering the communities where
we operate.
Values
In pursuing our mission, we will live
by these values:
Our values at Lesedi are all about the
best possible economic performance as a
company while respecting human rights,
the environment in the broadest sense of
the term, and the laws that protect them.
In a word, these values seek to satisfy
stakeholder requirements, in the present and
over the long term.
• Integrity is an expression of our respect:
Because we respect each other, our
stakeholders and our Earth, we are
honest in making commitments and
keeping them.
• Accountability is integral to integrity:
we see it as personal, with each of us
individually accountable to deliver
safely.
• Quality is the result of our lived values:
our respect for every life we touch, the
integrity with which we make promises
and our accountability in keeping them
is our quality guarantee.
• Safety is top of mind as we always
strive to exceed best practice in every
project.
Core Competence
Solving complex challenges.
Greater GoodCreating the opportunity for the people
of Africa to empower, energise and enrich
our continent.
6 www.lesedins.co.za 7www.lesedins.co.za
Lesedi evolved from Intens Engineering,
which was founded in the mid-1980s.
Lesedi has since diversified into a
major engineering, procurement and
construction (EPC) company, having
successfully completed numerous key
projects in nuclear, industrial power,
mining and oil and gas environments.
The Lesedi shareholders are Framatome
(majority), J&J Group, Group Five and
Lesedi’s local management. Lesedi is a
well established Engineering, project
2015
In August 2015 Lesedi
acquired a specialist
resource pool with over
25 years experience
in the areas of sugar,
biomass, oil and gas,
and pharmaceuticals
to gain access to
these markets and
compliment Lesedi’s
existing resource base.
2018
Responsibility for the
future. A new era: Lesedi
has diversified into a
major engineering,
procurement and
construction (EPC)
company, having
successfully completed
numerous key projects
in nuclear, industrial,
power, mining and, oil
and gas.
EmPOWERing
Africa: Lesedi
comes into its
own - a home
grown South
African Company,
ready to take on
the next challenge
for Africa; A
company born in
Africa, for Africa,
emPOWERing
Africa.
1980
Lesedi Nuclear
Services evolved
from Intens
Engineering soon
after the construction
and commissioning
of South Africa’s
Nuclear Power
Station by AREVA NP
in the mid 1980s.
AREVA NP
Lesedi
Local Management
5545
2001
In 2001 Lesedi
Engineering
partnered with global
nuclear leader AREVA
NP to acquire a 45%
stake in the company
and form Lesedi
Nuclear Services, a
BEE company.
AREVA NP
Lesedi
Local Management
49 51
2006
In 2006, AREVA
NP acquired 6%
stake in Lesedi,
giving it majority
shareholding
of 51%.
AREVA NP
Lesedi
Local Management
J&J Group
Group 5
28.9
16.516.5
39
2012
In June 2012,
Lesedi was joined
by new industrial
partners Group
Five and the J&J
Group to further
position itself in
the South African
power industry.
Lesedi launches
new identity. Lesedi
is on a journey of
transformation. With
Lesedi evolving to
a firmly established
African company, the
time to rebrand the
company to reflect its
purpose and vision
for the future.
Lesedi’s main shareholder,
AREVA, was renamed
Framatome in January 2018.
With the name change of
its principal shareholder,
and with Lesedi evolving
to a firmly established
African company with a fully
diversified business offering,
the company rebranded to
better reflect its purpose and
vision for the future.
OUR JOURNEY
management and maintenance solutions
house that conceptualises, manages, and
implements its own engineering projects.
Lesedi boasts a world-class post project
support system with engineering
solutions that meet all the clients’ briefs
and requirements. Lesedi has vast
experience in collaborating with original
equipment manufacturers (OEMs) in
a variety of contractual arrangements
including consortium, JV and Sub-
Contracting.
In building capacity
for the “nuclear
renaissance”, Lesedi
diversified into
other energy-related
infrastructure
projects in the
South African power
industry.
Lesedi has been executing upgrade and
maintenance projects at Eskom’s Koeberg
Nuclear Power Station in Cape Town, South Africa
for almost 30 years. This work includes having
completed over 150 modifications on the plant
and is supplemented by nuclear services contracts
with a number of foreign nuclear power stations
and includes over 75 interventions located in
England, Brazil, China, France and the USA and
includes the following:
NUCLEAR RESOURCES
• Power island modifications and upgrades
• Outage maintenance services (valves, pumps)
• Nuclear & conventional HVAC maintenance & upgrades
• OEM support for projects
• Nuclear fuel handling
• Life extension modifications & upgrades
Sizewell B Nuclear Power Station, UK
9www.lesedins.co.za8 www.lesedins.co.za
International nuclear services
Provision of personnel globally enables Lesedi to:
• Retain and maintain certified and authorised nuclear skills for Koeberg
• Recruit and train additional resources
• Assemble a core international team of 40 people
• Assemble a local South African team of 130 people
• Make substantial upfront financial commitments for training
• Offer planned and unplanned maintenance
OPERATIONS & MAINTENANCE
10 www.lesedins.co.za 11www.lesedins.co.za
INDUSTRIAL PROJECTS
12 www.lesedins.co.za 13www.lesedins.co.za
Project: EPC for the Balance of Plant ( BOP) for all Low Pressure Services
Client: Eskom; Medupi Power Station ( 4800MW)
Contact: Roman Crookes ([email protected])
Value: R2,5000,000,000
Start Date: September 2009
Completion: December 2019
Description: Engineering, procurement, and construction of 18 low pressure
services including raw water, potable water, demineralised water,
effluent water, fire water, process air, service air, instrument air, oil,
and fuel for the BOP.
Project: Palmiet Blowdown Air Compressors
Client: Eskom
Contact: Vuyokazi Mlungwana ([email protected])
Value: R18,000,000
Start Date: August 2017
Completion: December 2018
Description: Replacement of four Blowdown Air Compressors at Palmiet.
The scope includes the design, manufacture, factory acceptance
testing, supply, delivery, installation and commissioning of four air
compressors and associated equipment such as controls, piping,
valves, fittings and other accessories to enable satisfactory operation
of the blowdown air system for Palmiet Pumped Storage Scheme.
Project: Gas1 Balance of Plant
Client: Eskom Ankerlig Power Station Expansion
Contact: Roderick Beckmann ([email protected])
Value: R85,700,000
Start Date: 2006
Completion: 2008
Description: Engineering, procurement, and construction of the Balance of Plant
for Eskom’s Ankerlig Power Station. The site has a generating capacity
of 750MWe made up of 5 x 150MW Siemens OCGT’s. The BOP
systems included potable water, demineralised water, fire water,
compressed air, fuel unloading, fuel forwarding, fuel treatment, fuel
storage, fire detection, fire protection, including process, mechanical,
electrical and C&I.
Project: Amatikulu Optimisation Project
Client: Aveng
Value: R550,000
Start Date: October 2015
Completion: November 2015
Description: A Feasibility study and review of a Bagasse fired Power Plant and the
Concept Design of the Bagasse Bulk Storage Facility. Lesedi’s value of
the Construction phase of the Project is R160 million.
14 www.lesedins.co.za 15www.lesedins.co.za
Project: Technical Services for the Installation of Guide Vane Bushes on Unit 1
Turbine Refurbishment Outage at Palmiet Pumped Storage Scheme
Client: Eskom; Palmiet Hydro Power Station
Contact: Philemon Maimela ([email protected])
Value: R7,500,000
Start Date: February 2016
Completion: April 2016
Description: A turn-key contract for the dismantling and re-assembly of Guide
Vane Bush Seals and related components to facilitate the machining.
Services included Contract and Project Management, Safety Officers,
Supervisors with PSR qualifications, Mechanical Fitters, Riggers,
Welders, and Semi-Skilled Assistants.
Project: OCGT Balance of Plant
Client: Eskom Ankerlig Power Station
Contact: Roderick Beckmann ([email protected])
Value: R52,600,000
Start Date: May 2006
Completion: 2007
Description: Engineering, procurement, and construction of the Balance of Plant
for Eskom’s Ankerlig Power Station. The site has a generating capacity
of 600MWe made up of 4 x 150MW Siemens OCGT’s. The BOP
systems included potable water, demineralised water, fire water,
compressed air, fuel unloading, fuel forwarding, fuel treatment, fuel
storage, fire detection, fire protection, including process, mechanical,
electrical and C&I.
Project: EPCM HUSAB Uranium Mine – Tank Farm
Client: Engen Namibia
Value: R7,300,000
Start Date: June 2015
Completion: September 2016
Description: The Design, Engineering, prepare Tender documents, Construction
& Management of pump stations & overland pipeline between self-
bunded diesel storage tanks facilities at HUSAB Uranium Mine.
Project: Ankerlig Transmission Koeberg Second Supply Project (ATKSS)
at Ankerlig Power Station
Client: Group Five
Contact: Jacques Sowden ([email protected])
Value: R337,000,000
Start Date: July 2017
Completion: 28 June 2019
Description: Balance of Plant Systems turn-key design, manufacture, supply, install,
commission and testing the gas turbine power station for the Ankerlig
Transmission Koeberg Second Supply project at Ankerlig Power
Station in Western Cape South Africa. The scope of works included all
civil and structural designs but excluded the civil construction and Gas
Turbine supply.
16 www.lesedins.co.za 17www.lesedins.co.za
Project: EPCM Tank Refurbishment Kurasini Depot Dar Es Salaam Tanzania
Client: Engen Tanzania
Value: R13,520,000
Start Date: 2011
Completion: 2014
Description: The Design, Engineering, Prepare Tender Documentation,
Construction & Management of the Civil / Mechanical / Painting
refurbishment on fuel tanks 401, 402 & 601.
Project: EPCM Transfer Line – Lusaka, Zambia
Client: Engen Zambia
Value: R6,000,000
Start Date: April 2015
Completion: December 2015
Description: The Design, Engineering, Prepare Tender documents, Construction
and Management of the installation of two custody transfer pipelines
(Diesel and ULP) between Engen depot and the government tank
farm.
Project: EPCM Tank Refurbishment Botswana - Tank 1545
Client: Engen Botswana
Value: R2,540,400
Start Date: August 2016
Completion: November 2016
Description: The Design, Engineering, Prepare Tender Documentation,
Construction and Management of the Civil/Mechanical/Painting
refurbishment on the diesel Tank 1545 refurbishment at Engen
Francistown, Botswana Depot.
Project: EPCM Tank refurbishment Walvis Bay – Tank 383
Client: Engen Zambia
Value: R4,100,000
Start Date: September 2016
Completion: January 2017
Description: The Design, Engineering, Prepare Tender Documentation,
Construction and Management of the Civil/Mechanical/Painting
refurbishment on the Jet A 1 Tank 383 at the Engen Walvis Bay
Namibia Depot.
18 www.lesedins.co.za 19www.lesedins.co.za
Project: OCGT Mechanical Erection
Client: Eskom Ankerlig Power Station
Contact: Roderick Beckmann ([email protected])
Value: R25,100,000
Start Date: 2005
Completion: 2007
Description: The Mechanical Erection of 4 x 150MW Siemens OCGT generators
and associated equipment.
Project: OCGT Balance of Plant
Client: Eskom Gourikwa Power Station
Contact: Roderick Beckmann ([email protected])
Value: R39,400,000
Start Date: 2005
Completion: 2007
Description: Engineering, procurement, and construction of the Balance of Plant
for Eskom’s Ankerlig Power Station. The site has a generating capacity
of 450MWe made up of 3 x 150MW Siemens OCGT’s. The BOP
systems included potable water, demineralised water, fire water,
compressed air, fuel unloading, fuel forwarding, fuel treatment, fuel
storage, fire detection, fire protection, including process, mechanical,
electrical and C&I.
Project: EPCM Blantyre Tank Project
Client: Engen Malawi
Value: R1,500,430
Start Date: November 2015
Completion: April 2016
Description: The design Engineering, Prepare Tender Documentation,
Management of the civil foundations & fuel pipelines installation of
4 self-bunded fuel tank at Engen Blantyre Depot.
Project: EPCM Construction of Three Tanks
Client: Engen Namibia
Value: R29,445,340
Start Date: March 2014
Completion: April 2015
Description: The Design, Engineering, Prepare Tender Documentation and project
management of the tank construction including all mechanical and
blasting and painting for three new build tanks at the Engen Walvis
Bay Namibia Depot.
The tanks were 1 x 8,000m3 Diesel, 1 x 8,000m³ ULP and
1 x 2,900 m³ Jet A1
20 www.lesedins.co.za 21www.lesedins.co.za
Project: Gas1 Balance of Plant
Client: Eskom Gourikwa Power Station Expansion
Contact: Roderick Beckmann ([email protected])
Value: R34,300,000
Start Date: 2006
Completion: 2008
Description: Engineering, procurement, and construction of the Balance of Plant
for Eskom’s Ankerlig Power Station. The site has a generating capacity
of 300MWe made up of 2 x 150MW Siemens OCGT’s. The BOP
systems included potable water, demineralised water, fire water,
compressed air, fuel unloading, fuel forwarding, fuel treatment, fuel
storage, fire detection, fire protection, including process, mechanical,
electrical and C&I.
Project: Procurement of Low Pressure Services Equipment at Kusile
Power Station.
Client: Grinaker LTA
Value: R140,000,000
Start Date: April 2011
Completion: July 2017
Description: This involved generating the Technical and Commercial Procurement
Specifications and Data Sheets for the equipment requirements of
eighteen Low Pressure systems. The systems included raw water,
potable water, demineralised water, effluent water, fire water,
process air, service air, instrument air, oil and fuel. The Procurement
Department was responsible for generating the Tender documents,
adjudicating the responses, placing the Purchase Orders, expediting
the deliveries and performing the receipt inspections. The Quality
department was responsible for performing the QC checks required
during the manufacturing and delivery phases of the process.
22 www.lesedins.co.za 23www.lesedins.co.za
NUCLEAR PROJECTS
24 www.lesedins.co.za 25www.lesedins.co.za
Project: Replacement of the Radiation Monitoring System (KRT) at Koeberg
Nuclear Power Station
Client: Eskom; Koeberg Nuclear Power Station
Value: R102,000,000
Contact: Witness Tafeni ([email protected])
Start Date: March 2010
Completion: 2016
Description: The design, manufacture, supply, installation, testing and
commissioning of a new Radiation Monitoring System. The scope
includes replacement of the current 80 channels and the installation
of 16 new channels. It also includes a new power infrastructure for the
system. The disciplines involved are civil, mechanical, electrical and
I&C. Performed in consortium with the OEM and Mirion.
Project: HVAC, Electrical and C&I Upgrade to Existing Moly 99 Facility
at Pelindaba
Client: NTP
Contact: Petrus de Bruyn ([email protected])
Value: Confidential
Start Date: April 2012
Completion: 2013
Description: The Design of the HVAC system at Pelindaba. The scope of work
includes upgrading the HVAC system, a new power supply system
and the replacement/upgrade of the complete HVAC I&C system.
Project: Improving the Leak Tightness of the Fuel Building at Koeberg Nuclear
Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R20,000,000
Start Date: September 2004
Completion: 2010
Description:
Project: Supply of EPDs & Installation of a Radiological Dose Management
System at Koeberg Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R8,000,000
Start Date: May 2006
Completion: 2010
Description: The supply of new MIRION EPDs, & the design, manufacture, supply,
installation, testing & commissioning of a new dose management
system. It included the installation of new EPD readers, radiological
zone entrance and exit controls, interfaces with the existing Canberra
portal monitors, a RADPRO software system from MIRION and a
complete network of servers, PCs & associated infrastructure.
The design, supply, installation, testing and commissioning of
a system that seals off and isolates various parts of the nuclear
auxiliary building to prevent the release of radio-active gases during
an incident or accident. The design included Mechanical, HVAC,
Electrical and I&C Components.
26 www.lesedins.co.za 27www.lesedins.co.za
Project: Rod Control System Replacement at Koeberg Nuclear Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R30,000,000
Start Date: January 2007
Completion: 2010
Description: The design, manufacture, supply, installation, testing and
commissioning of a Replacement Rod Control System RGL,
with AREVA GmbH as a technology partner.
Project: Upgrade of the Control System for Emergency Diesel Generator Sets
at Koeberg Nuclear Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R8,000,000
Start Date: June 2007
Completion: 2010
Description: The design, supply, installation, testing and commissioning of a large
modification to the controls of the 5 Emergency Diesel Generator
sets to ensure that the auxiliaries are started & stopped when there
is reduction in the grid frequency that in the past tripped the power
supplies to important diesel auxiliaries.
Project: Upgrade of Instrumentation required for Accident Mitigation at
Koeberg Nuclear Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R30,000,000
Completion: 2010
Description:
Project: Modification of the Reactor Protection System at Koeberg Nuclear
Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R25,000,000
Completion: 2010
Description: The design, supply, installation, testing and commissioning of an
extensive modification of the Reactor Protection System based on the
lessons learnt at Three Mile Island.
The design, supply, installation, testing and commissioning of new
replacement instrumentation for mitigating specific accidents in the
nuclear auxiliary and reactor buildings. The modification involved
mechanical and I&C.
28 www.lesedins.co.za 29www.lesedins.co.za
Project: Priority Extraction of Fuel Building Ventilation at Koeberg Nuclear
Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R15,000,000
Completion: 2009
Description: The design, supply, manufacture, installation, testing and
commissioning of a modification to the Fuel Building Ventilation
System to ensure that the evacuation of the areas where there could
be a release of radiological gases takes priority over the normal
ventilation.
Project: Upgrade of the Containment Electrical Penetrations at Koeberg
Nuclear Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R10,000,000
Completion: 2009
Description: The design, supply, installation, testing and commissioning of
replacement electrical penetrations that can withstand accident
conditions in the reactor building for critical signals.
Project: Replacement of the PORVs at Koeberg Nuclear Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R55,000,000
Completion: 2009
Description: The design, supply, manufacture, installation, testing and
commissioning of a modification to replace the Pressure Operated
Relief Valves with Pilot Operated Relief Valves capable of releasing
water during a Loss of Coolant Accident.
Project: HVAC Maintenance Services
Client: Koeberg; Eskom
Contact: Bongiswa Mqulo ([email protected])
Value: ±R30,000,000
Start Date: 1996
Completion: 2022
Description: Nuclear HVAC Maintenance At Koeberg Nuclear Power Station
(20 Years) Engineering, Construction And Management Of HVAC
Projects (Power Plants – Nuclear, Industrial And Conventional).
30 www.lesedins.co.za 31www.lesedins.co.za
Project: Public Notification Sirens ( Expansion 2017)
Client: Eskom; Koeberg Nuclear Power Station
Contact: David Stuurman ([email protected])
Value: R8,500,000
Start Date: August 2017
Completion: March 2019
Description: Design, Manufacture, Supply, Install, and Commission of Four
Additional Sirens for the DTW System, in Sunningdale and Parklands
areas in Western Cape, South Africa.
Project: The Replacement of the Steam Generators (SGR) at Koeberg Nuclear
Power Station, Unit 1 and 2
Client: AREVA
Contact: Chloe Perbet ([email protected])
Value: Confidential
Start Date: September 2014
Completion: December 2021
Description: Eskom appointed AREVA, the OEM, as the EPC Contractor for
the Steam Generator Replacement (SGR) project. AREVA in turn
subcontracted a Lesedi and Group 5 JV, to perform the tasks
associated with the removal of the six old steam generators and the
installation of their replacements. The JV EPC scope includes: Heavy
lifting of the SG’s, secondary and auxiliary piping removal and re-
installation, platform removal and re-installation, scaffolding, removal
of electrical and mechanical interferences, supply and installation of
an auxiliary crane and reactor cavity deck, concrete drilling.
Project: Upgrade of the Fire Detection System (JDT) in the Reactor Buildings
at Koeberg Nuclear Power Station.
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R40,000,000
Start Date: June 2016
Completion: December 2018
Description: The Project involves the replacement of the fire detection system in
Units 1 and 2 Reactor Buildings with a modernised system combining
intelligent detection with Aspirating Smoke Detection (ASD) to solve
the obsolescence issues and associated risks of equipment failure. The
Scope of work includes the design, manufacture, supply, installation,
testing and commissioning of the replacement fire detection system.
Performed in consortium with the OEM and DEF.
Project: PTR Tank Replacement
Client: Eskom; Koeberg Nuclear Power Station
Contact: Solly Kholong ([email protected])
Value: R71,000,000
Start Date: 13 May 2013
Completion: December 2019
Description: The Design, Procurement, Construction, and Commissioning of two
complete 1,800m³ stainless steel tanks for the Reactor Cavity and
Spent Fuel Pool Cooling System (PTR) at Koeberg Nuclear Power
Station, in consortium with Group Five. The installation includes the
decontamination and removal of the old tanks and the removal and
replacement of the PTR tank room roofs.
32 www.lesedins.co.za 33www.lesedins.co.za
Project: Additional Radiation Monitors for the Nuclear Auxiliary Building
Ventilation System at Koeberg Nuclear Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R10,000,000
Completion: 2008
Description: The design, supply, manufacture, installation, testing and
commissioning of a new radiation monitoring system from MIRION
for the Nuclear Auxiliary Building ventilation system (DVN).
Project: Prevention of Farley-Tihange Modification at Koeberg Nuclear
Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R50,000,000
Completion: 2008
Description: The design, supply, installation, testing and commissioning of a
system that will prevent the occurrence of the Farley-Tihange effect,
high differential pressures causing leakage and thermal cycles, on
critical components in the primary reactor circuit. The modification
involved mechanical, electrical and I&C.
Project: RRI Isolation in case of a Break on DEG at Koeberg Nuclear
Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R15,000,000
Completion: 2008
Description:
Project: Replacement of the Containment Sump Filters at Koeberg Nuclear
Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R25,000,000
Completion: 2007
Description: The design, manufacture, supply, installation, testing and
commissioning of new containment sump filters for the Containment
Spray (EAS) and Safety Injection System (RIS).
The design, supply, installation, testing and commissioning of a
system for isolation of the Component Cooling Water supply in
case of a break of a line on the Chilled Water System (DEG). This
modification included mechanical and I&C.
34 www.lesedins.co.za 35www.lesedins.co.za
Project: EAS / RIS Venting at Koeberg Nuclear Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R10,000,000
Completion: 2007
Description: The design, supply, installation, testing and commissioning of a
modification to add vent lines to Containment Spray and Safety
Injection systems, and to drill holes in the top of the Containment
Spray and the Reactor Cavity and Spent Fuel Pool Cooling System
tank suction elbows (inside the tanks).
Project: Auto isolation of RCV Letdown on High Temperature at Koeberg
Nuclear Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R8,000,000
Completion: 2007
Description: The design, supply, manufacture, installation, testing and
commissioning of a modification to isolate the Chemical Volume and
Control System (RCV) when the letdown temperatures are too high.
Project: Installation of a Hydrogen Detection System for the Nuclear Auxiliary
Building at Koeberg Nuclear Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R10,000,000
Completion: 2006
Description:
Project: Hydrogen Management System for Containment at Koeberg Nuclear
Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R20,000,000
Completion: 2006
Description: The design, supply, installation, testing and commissioning of a static
hydrogen management system consisting of hydrogen recombiners in
the reactor building.
The design, supply, installation, testing and commissioning of a
new hydrogen monitoring system in the Koeberg Nuclear Auxiliary
Building to monitor areas where there is a likelihood of hydrogen
release.
36 www.lesedins.co.za 37www.lesedins.co.za
Project: Improvement of the SAR Instrument Air Quality at Koeberg Nuclear
Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R20,000,000
Completion: 2005
Description: The design, manufacture, supply, manufacture, installation, testing
and commissioning of a new air compressor and dryer for the Process
Air System (SAR).
Project: Upgrade of the Spent Fuel Pool Cooling System at Koeberg Nuclear
Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R6,000,000
Completion: 2004
Description: The installation, testing and commissioning of a modification to
upgrade the spent fuel pool cooling system (PTR) from a non-safety
system to a 1E-qualified system (to match the requirements of ANSI
57.2 following the Spent Fuel Pool Re-Racking project). Eskom
provided the design and materials. The project required extensive
replacement of components, like motors, instrumentation, power
supplies and the provision of new and extended operator interfaces.
Project: Additional SAR Tank for ASG at Koeberg Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R12,000,000
Completion: 2004
Description:
Project: Anti-Dilution Modification at Koeberg Nuclear Power Station
Client: Eskom; Koeberg Nuclear Power Station
Contact: Siphokazi Pemba ([email protected])
Value: R30,000,000
Completion: 2004
Description: The design, supply, installation, testing & commissioning of a system
that prevents dilution of the primary water from various water sources
thus preventing the risk of localised criticality in the reactor.
The design, supply, manufacture, installation, testing and
commissioning of an additional nitrogen supply tank (SAR) for the
auxiliary feedwater system, in case of a loss of the compressed air
supply to the Woodward governor of the turbine-driven feedwater
pump (ASG).
38 www.lesedins.co.za 39www.lesedins.co.za 39www.lesedins.co.za
Project: SGR Lot 3: KIT, Simulator & Secondary Systems
Client: Framatome
Value: R2,500,000
Start Date: 2017
Completion: Dec 2018
Description: Compilation of a study report for the verification of the KIT system
for both SGR and TPU conditions, impact on the Simulator for SGR
conditions, KKO system for both SGR and TPU conditions, DVE and
DVL systems for both SGR and TPU conditions, JPT system for both
SGR and TPU conditions as well as support for AREVA during the
documentation review process with Eskom and the NNR.
Project: SGR Lot 0: Documentation mark-ups
Client: Framatome
Value: R2,500,000
Start Date: 2017
Completion: Dec 2018
Description: This is a sub-section of the Steam Generator Replacement project.
The scope of work is to perform plant documentation Mark-up
and other engineering services, required for the Steam Generator
Replacement and a Thermal Power Uprate at Koeberg Nuclear Power
Station Units 1 and 2.
Project: DEG Chiller Replacement
Client: Eskom
Start Date: 2017
Completion: Dec 2019
Description:
Project: SALTO
Client: Eskom
Value: R83,000,000
Start Date: Feb 2018
Completion: Jul 2019
Description: The Koeberg Safety Aspects of Long Term Operation
(SALTO) assessment project is to enable Koeberg to
provide confidence in the safe extension of the assumed
operational life from 40 years to 60 years. The project
scope encompasses all those elements which impact on
KOU safety-related equipment ageing and degradation.
It includes the KOU plant design and licensing basis
and its physical condition, the South African regulatory
framework, the Employer’s business and operating
environment, and quality management processes.
Design, supply, delivery, removal of existing, installation, testing
and commissioning of 8 new 1500kW chiller units at Koeberg
Operating Unit
40 www.lesedins.co.za 41www.lesedins.co.za 41www.lesedins.co.za
Project: PNS Expansion (2010)
Client: Eskom
Value: R9,500,000
Start Date: 2010
Completion: 2011
Description: Design, Procurement and Construction for the installation of 9
additional Public Notification Sirens in the Parklands/Sunningdale area.
Project: Cask Storage Building Fire Door
Client: Eskom
Value: R2,500,000
Start Date: 2016
Completion: 2017
Description: Design, Procurement & Construction for the replacement of a large
fire door at the nuclear fuel cast storage building.
Project: PMC Sipping
Client: Framatome
Value: R1,200,000
Start Date: 2016
Completion: 2016
Description:
Project: Safety Aspects of Long Term Operation (SALTO)
Client: Eskom; Koeberg Nuclear Power Station
Value: R100,000,000
Start Date: Apr 2018
Completion: Sep 2019
Description: Using the IAEA SALTO methodology to support the extension of the
plant life from 40 years to 60 years.
Packaging of the Framatome design in the Eskom design process, for
the nuclear fuel sipping system in the fuel building.
42 www.lesedins.co.za 43www.lesedins.co.za
Project: DEG Chillers
Client: Eskom; Koeberg Nuclear Power Station
Value: R90,000,000
Start Date:
Completion:
Description: Turn-key replacement of the nuclear island chillers at Koeberg Nuclear
Power Plant.
Project: PBMR Support
Client: Eskom; Koeberg Nuclear Power Station
Value: R6,000,000
Start Date:
Completion: 2004
Description:
The installation, testing and commissioning of a modification to
upgrade the spent fuel pool cooling system (PTR) from a non-safety
system to a 1E-qualified system (to match the requirements of ANSI
57.2 following the Spent Fuel Pool Re-Racking project). Eskom
provided the design and materials. The project required extensive
replacement of components, like motors, instrumentation, power
supplies and the provision of new and extended operator interfaces.
Power Generation, Mining, Oil & Gas
Head Office: 12 Edison Way Century Gate, Century City, 7441, Cape Town, South AfricaJohannesburg Office: Wild Olive Building (1st Floor), 262 Rose Avenue, 0157, Centurion, Johannesburg, South Africa
[email protected] www.lesedins.co.za
+ 27 21 525 1300 +27 21 525 1333
@lesedinuclearservices @LesediNS @Lesedi_NuclServ