A Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning Administrator David Pulay, Transportation Engineer October 2015

A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

A Diet that WorksAMATS Road Diet Analysis

Curtis Baker, Planning AdministratorDavid Pulay, Transportation Engineer

October 2015

Page 2: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Overview

• What is a Road Diet?

• The Big Picture– Why does an MPO care about Road Diets?

• AMATS Road Diet Analysis/Examples

Page 3: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

What is a Road Diet?

• Reduces the number lanes on a roadway• Most common conversion is four lanes to three

lanes• One lane in each direction with a continuous

turn lane• Dropped lane width is allocated to other users• Same pavement width, new lane configuration• Very little additional infrastructure cost

Page 4: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Typical Configuration

Page 5: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Benefits of a Road Diet• Safety

– Overall crash reduction of 19 to 47 percent– Less rear-end and left turn crashes through use of a

dedicated left turn lane– Calming effect on speed

• Fewer lanes for pedestrians to cross

• Extra width can accommodate other transportation modes such as bikes

Page 6: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Benefits of a Road Diet

• Smoother traffic flow, less slow and go flow

• Best use of pavement when the capacity of a roadway is greater than the demand– Highways designed in 50’s and 60’s based on the

current growth patterns– Population projections never materialized

Page 7: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Why We Care About Road Diets

• Transportation Funding Difficulties

• Regional Demographics

• Connecting Communities/Complete Streets

• Re-imagining Spaces

Page 8: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Transportation Funding Difficulties

• Funding has remained unchanged while project costs continue to rise

• Bike and pedestrian connections often foiled by right-of-way/acquisition costs

• We can create important connections with minimal cost

Page 9: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

• Loss of population

• Lower traffic counts

Page 10: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Connecting Communities and the Importance of Complete Streets

Page 11: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Complete Streets

Page 12: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Re-imagining Our Community

N Main St Akron - Existing

Page 13: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Re-imagining Our Community

Photo: Tim FitzwaterN Main St Akron – During Better Block

Page 14: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Re-imagining Our Community

N Main St Akron - Existing

Page 15: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

N Main St Akron – During Better Block

Page 16: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

StreetMix.com

Tempera Paint & Duct Tape

Tools

Baton Rouge

Page 17: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

The AMATS Road Diet Analysis

• Goal was to compile a list of streets where a road diet could be applied

• Start with an accurate inventory of roadways– GIS Database

– ODOT Office of Technical Services

– Highway Maintenance

Wolf Ledges Pkwy Akron

Page 18: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

The AMATS Road Diet Analysis

• Reduce the inventory by eliminating – Interstates and freeways

– Divided roadways (freeway look-alikes)

– Roadways with only two lanes

• In rare cases three lane roads and five lane roads can receive a road diet

Wolf Ledges Pkwy Akron

Page 19: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

The AMATS Road Diet Analysis

• Three lane roads must have unusually wide lanes– Reduce width of each lane– Allocate space for bike lane

Page 20: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

The AMATS Road Diet Analysis

• Road diet applied to five lane roads has to have extra space well defined

Page 21: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

The AMATS Road Diet Analysis

• Find average daily traffic (ADT)– Tier One: less than 10,000

– Tier Two: 10,000 to 15,000

– Tier Three: 15,000 to 20,000

– Over 20,000 is probably not a good choice

Wolf Ledges Pkwy Akron

Page 22: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

The AMATS Road Diet Analysis

• Determine peak hour volume– If this is not provided it is usually 8-12% of the ADT

• Determine directional peak hour volume– If this is not provided use “engineering judgment”– Peak hour directional volume less than 800-900

Page 23: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

The AMATS Road Diet Analysis

• Additional Analysis Recommended

– Tier 2 roadways (ADT 10,000-15,000) key intersections should to be analyzed, intersection spacing and length of queues considered

– Tier 3 roadways (ADT 15,000-20,000) key intersections should to be analyzed and corridor analysis for overall level of service

Page 24: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

The AMATS Road Diet Analysis

• Additional Considerations– Roadway function and it’s environment

– Continuity

– Railroad tracks - queues twice as long with less lanes

– Grades and slow moving vehicles

– Frequently stopping vehicles, especially buses

– Population and traffic volume trends

Opportunity Pkwy Akron

Page 25: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

The AMATS Road Diet Analysis

• Successful Implementation

– All stakeholders are part of the planning process

– Coordinate with resurfacing projects/schedules

– Community support

Page 26: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Road Diet Examples

Copley Rd (SR 162) in Akron, ADT = 13,300

Page 27: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

South St in Akron, ADT = 1,920

Road Diet Examples

Page 28: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

South Main St in Summit Co., ADT ≈ 12,000

Road Diet Examples

Page 29: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Road Diet Projects Planned

• E. Tallmadge Ave in Akron, ADT = 16,610

Page 30: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Road Diet Projects Planned

• Cedar St/Exchange St in Akron, four one-way lanes, ADT = 10,390

Page 31: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Maple St in Akron, ADT = 5,760

High Ranking Candidates

Page 32: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Wolf Ledges Pkwy in Akron, ADT = 8,400

High Ranking Candidates

Page 33: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

E. Exchange St in Akron, ADT ≈ 10,000

High Ranking Candidates

Page 34: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

High Ranking Candidates

N. Main St in Akron, ADT ≈ 10,000

Page 35: A Diet that Works AMATS Road Diet Analysisamatsplanning.org/wp-content/uploads/2015-OTEC-Road-Diet-Presentation1.pdfA Diet that Works AMATS Road Diet Analysis Curtis Baker, Planning

Questions?

Curtis BakerPlanning Administrator, AMATSEmail: [email protected]

David Pulay, PETransportation Engineer, AMATS Email: [email protected]

www.amatsplanning.org