24
A Framework for Enhancing Transportation Asset Management (TAM) Implementation for Sustained TAM Programs Margaret-Avis Akofio-Sowah, Ph.D. WSP | Parsons Brinckerhoff On the Road Again: Implementing a Sustainable Asset Management Program at Your Agency 11 th National Conference on Transportation Asset Management Tuesday July 12 th , 2016

A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

A Framework for Enhancing Transportation Asset Management (TAM) Implementation for

Sustained TAM Programs

Margaret-Avis Akofio-Sowah, Ph.D. WSP | Parsons Brinckerhoff

On the Road Again: Implementing a Sustainable Asset Management Program at Your Agency

11th National Conference on Transportation Asset Management

Tuesday July 12th, 2016

Page 2: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

Acknowledgements

2

• Expert panel

• Practitioner review panel

• Representatives from case study agencies

Page 3: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

Agenda

Conceptual Research

TAM Implementation Review Framework (TIRF)

TIRF Case Studies

3

Page 4: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

Research Objective

• Program sustainment is the extent to which an innovation… ▫ …is maintained within the operations of an organization (Proctor et al.

2011)

▫ …reflects what it was initially intended to look like (Wiltsey Stirman et al. 2012)

▫ …has benefits delivered over an extended period of time, after the initial activity around implementation has reached a steady state (Rabin et al. 2008)

4

To develop a conceptual framework and an approach to guide a review

of an agency’s TAM implementation practices to identify opportunities

for enhancing implementation towards long-term program

sustainment.

Page 5: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

Exploratory Literature Review

5

Change Management

• Change management concepts and models

• Change management drivers

Transportation Asset Management

• Evolution of TAM principles • Historical challenges of TAM

development • Implementation state of the

practice

Policy & Program Implementation

• Implementation theories • Studying and evaluating

implementation • Opportunities and challenges

in implementation

TAM implementation as a process of change

Studying TAM through a policy implementation lens

Change-related opportunities and challenges in instituting

new programs in public agencies

Factors that can influence TAM implementation success and program sustainment

Page 6: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

Implementation “Domain” Implementation Factors TAM Literature

Policy/Program Implementation

Research

Change Management

Organization

Goals, Expectations, Guidance X X X

General Resistance to Change X X

Financial Resources X X

External Factors X X X Organizational Structure & Related Characteristics X X X

Program

Change Implementation Process X X

Characteristics of the Innovation X X

Program Flexibility and Customizability X X X

People Leadership and Management Support X X

Human Capital & Other Resources X X X

Synthesis of Implementation Factors Identified from Literature

6

Implementation Factors TAM Literature Policy/Program Implementation

Research

Change Management

External Factors X X X

Financial Resources X X

Goals, Expectations, Guidance X X X

General Resistance to Change* X X Organizational Structure & Related Characteristics X X X

Change Implementation Process* X X

Characteristics of the Innovation X X

Program Flexibility and Customizability X X X

Human Capital & Other Resources X X X

Leadership and Management Support X X

*Also people-related

Page 7: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

Program Sustainment Influence Factors

7

Goals, Expectations,

Guidance

Change Implementation

Process

Program Flexibility &

Customizability

Other Agency Characteristics

Human Capital & Other

Resources

General Resistance to

Change

Characteristics of the

Innovation

Leadership and

Management

Financial Resources

External Factors

Expert Panel

Lit Review

Key

Employee Awareness &

Understanding of TAM

TAM Guidelines &

Guidance Documents

Applying TAM in Decision Making

Leadership and Executive-

Level Support

Comprehensive Agency

Alignment

Reflection on Agency Culture

Committed Resources

Page 8: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

Agenda

Conceptual Research

TAM Implementation Review Framework (TIRF)

TIRF Case Studies

8

Page 9: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

TIRF Factor Categories (1)

Strategies that address the Guidance category...

...ensure that TAM is reflected in major agency policy documents.

...explain where TAM fits in agency programming.

...provide clarity on how standard operating procedures (SOPs) should change to incorporate TAM. ...provide clear guidelines on how decision making should change, including explanations of risk analysis.

Strategies that address the Leadership category...

...illustrate support and commitment from upper-level employees, management, and executives.

...ensure total agency representation in the TAM governing structure.

...promote accountability for the TAM governing structure.

...reduce chances of diminishing support due to leadership changes.

Strategies that address the Applications category...

...introduce TAM into established decision-making processes.

...incorporate clear metrics and expected outcomes (goals/targets).

...utilize decision-making questions that require reference to data.

...promote decisions based on management systems.

9

Page 10: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

TIRF Factor Categories (2) Strategies that address the Culture category...

...clearly communicate TAM goals and applications throughout the agency.

...promote a uniform TAM language.

...promote a long-term agency focus.

Strategies that address the Employee category...

...expand workforce capacity with respect to TAM.

...promote employee understanding of their role in using TAM or how their job changes to incorporate TAM.

...clarify expected outcomes or benefits of TAM to employees.

Strategies that address the Alignment category...

...create clear links between TAM and agency outcomes/goals.

...incorporate TAM into all aspects of programming (capital-side, maintenance, etc).

...create connections to customer service.

Strategies that address the Resources category...

...allocate financial resources to TAM development and implementation.

...commit human resources efficiently towards TAM programming.

...prioritize and enhance data management.

10

Page 11: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

TAM Implementation Review Framework (TIRF)

• Guides state transportation agencies to conduct a systematic review of their TAM implementation approach using specific implementation strategies

• Produces a descriptive picture of how the overall implementation approach addresses program sustainment implementation factors

11

Implementation Strategy: specific activity or action taken towards TAM implementation

Implementation Approach: general plan of action towards implementation; compilation of

implementation strategies Overall

Approach

Strategy 1 Strategy 2 Strategy 3

Page 12: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

GLACEAR Systematic Review

“Does this implementation strategy address the criteria in

the X category?” Where X = G, L, A, C, E, A, or R

12

• Definition: Use of a well-defined approach to select experiences as evidence for the database based on strict criteria (Rowley 2012; Briner 2009; Stetler 2001)

• Application to this study: Program sustainment implementation factors as systematic review criteria

Systematic reviews to distill and document:

G Guidance and Expectations

L Leadership and Executive-Level Support

A Applications in Decision Making

C Reflection in Agency Culture and Language

E Employee Awareness and Understanding

A Comprehensive Agency Alignment R Resources Committed to TAM

Development

Page 13: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

Agenda

Conceptual Research

TAM Implementation Review Framework (TIRF)

TIRF Case Studies

13

Page 14: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

Case Study Demonstration

• Three DOTs selected based on:

▫ Record of TAM development and implementation experience

▫ Differences in location, size, geography, and climate

• 3-step case study protocol

14

Agency TAM implementation profile developed

Interviews with agency representatives

Validation of TIRF output

Page 15: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

ID Implementation Strategy Primary Observed/Expected Impact (Short Sentence)

Resources Committed to

TAM Development

Employee Awareness &

Understanding

Leadership and Executive-Level

Support

Guidance and Expectations

Reflection in Agency Culture and Language

Comprehensive Agency

Alignment

Applications in Decision Making

14Use "asset managers" in all related divisions

Staff accountability for implementation.The term asset manager became part of the culture Y Y Y Y Y Y Y

6Implemented integrated TAM system (AIMS)

Development of quantitative tool to perform trade-off analysis and cross-asset optimization. Continues to provide informed decision making.Data driven decision making; providing tools for budget setting to decision makers in consistent manner.

Y Y Y Y Y Y

16Agency-wide mid-level management represented on TAM Working Committee

Staff accountability for implementation. Maintains deadlines and prepares for delivery of content to Commission.Provide a forum for discussion and way to communicate change on a monthly basis.

Y Y Y Y Y Y

7Identified TAM champion/point person

Staff accountability. Vital to success to have one individual as recognized authority for the department. Organizational change to elevate Transportation Performance to its own branch, and have the branch manager be the primary contact for asset mgmt.

Y Y Y Y Y

10 NHI Training sessions

Gain staff knowledge of TAM. Beneficial from a standpoint of sharing best practices from other DOTs and of locking a large agency group in a room for two days to focus on TAM.Awareness to staff at HQ and regions; education and sharing of ideas.

Y Y Y Y Y

24 Guidance for AM documentInterim instructions on AM process pending completion of implementation plan. Y Y Y Y Y

8Efforts supported by senior-level management via Oversight Committee

Facilitate staff-level decision making and support Transportation Commission TAM Committee direction and decisions. Important for Oversight Committee to exert influence but more vital for Executive Director and Transportation Commission to demand monthly public meetings on TAM. Alignment between asset mgrs/planners/budget staff with higher organizational concerns.

Y Y Y Y

13Employed Program Leader in change management services

Leverage CM for TAM implementation and awareness. Helped streamline communication and push new information to regions in a manner consistent with other agency initiatives.Asset

Y Y Y Y

Case Study Output

15

ID Implementation Strategy Primary Observed/Expected Impact (Short Sentence)

14Use "asset managers" in all related divisions

Staff accountability for implementation.The term asset manager became part of the culture

6Implemented integrated TAM system (AIMS)

Development of quantitative tool to perform trade-off analysis and cross-asset optimization. Continues to provide informed decision making.Data driven decision making; providing tools for budget setting to decision makers in consistent manner.

16Agency-wide mid-level management represented on TAM Working Committee

Staff accountability for implementation. Maintains deadlines and prepares for delivery of content to Commission.Provide a forum for discussion and way to communicate change on a monthly basis.

Resources Committed to

TAM Development

Employee Awareness &

Understanding of TAM

Comprehensive Agency

Alignment

Applications in Decision Making

Page 16: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

Comparative Analysis: Category Trends

16

DOT 1 (24)

DOT 2 (21)

DOT 3 (27)

G 12 11 8

L 13 8 15

A 6 10 7

C 9 5 6

E 15 3 11

A 7 5 5

R 19 8 18 0

5

10

15

20

25

30

35

40

45Guidance

Leadership

Applications

CultureEmployees

Alignment

Resources

DOT 1

DOT 2

DOT 3

Total

Page 17: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

Comparative Analysis: Strategy Trends • Nine strategies common to more than one DOT ▫ Two common to all three ▫ Seven common to at least two

• Alignment in TIRF categories identified for five strategies

17

ID Implementation StrategyPrimary Observed/Expected Impact

(Short Sentence) G L A C E A R

DOT0121Implementation plan projects have leads assigned with deadlines

Staff accountability for implementation.Emphasizes the need for accountability

Y Y Y

DOT0213TAMP Work Plan developed with clear staff assignments & deadlines

Y Y Y

DOT0218TAM Improvement plan with estimated timeframes and expected outcomes

The TAMP exists, but it is not widely understood by employees in general. Y Y

DOT0322

TAM Implementation Plan has specific list of action items with defined timeframe, unit responsible, resources needed, and expected outcomes

Goals/objectives are clear and targets for specific action items are met.

Y Y Y

Page 18: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

Comparative Analysis: Strategy Trends • Nine strategies common to more than one DOT ▫ Two common to all three ▫ Seven common to at least two

• Alignment in TIRF categories identified for five strategies

18

ID Implementation StrategyPrimary Observed/Expected Impact

(Short Sentence) G L A C E A R

DOT0106 Implemented integrated TAM system (AIMS)

Development of quantitative tool to perform trade-off analysis and cross-asset optimization. Continues to provide informed decision making.Data driven decision making; providing tools for budget setting to decision makers in consistent manner.

Y Y Y Y Y Y

DOT0210Implemented Agile Assets Enterprise Asset Management Program

Y Y

DOT0317

Developed and implemented enterprise-based TAM system (GAMS)

Y Y

Page 19: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

TAM Maturity Scale Level Generalized Description Recommended TIRF

Category Focus

Initial No effective support from strategy, processes, or tools. There can be lack of motivation to improve.

Employees Leadership Resources

Awakening Recognition of a need and basic data collection. There is often reliance on heroic effort of individuals.

Guidance Alignment Resources

Structured Shared understanding, motivation, and coordination. Development of processes, and tools.

Applications Resources

Proficient Expectations and accountability drawn from asset management strategy, processes, and tools.

Culture Resources

Best Practice Asset management strategies, processes, and tools are routinely evaluated and improved

ALL

Context-Sensitive Considerations

• Internal & external environments

• Linking to AASHTO TAM Maturity (AASHTO 2011)

19

TAM Maturity Scale Level Generalized Description

Initial No effective support from strategy, processes, or tools. There can be lack of motivation to improve.

Awakening Recognition of a need and basic data collection. There is often reliance on heroic effort of individuals.

Structured Shared understanding, motivation, and coordination. Development of processes, and tools.

Proficient Expectations and accountability drawn from asset management strategy, processes, and tools.

Best Practice Asset management strategies, processes, and tools are routinely evaluated and improved

Page 20: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

Practitioner Review Survey Statement Strongly

Disagree (1) Disagree

(2) Neutral

(3) Agree

(4) Strongly Agree (5)

Weighted Average

1. The TIRF is useful for reviewing TAM implementation

0 (0%)

0 (0%)

1 (16.67%)

1 (16.67%

)

4 (66.67%) 4.50

2. The TIRF is suitable for DOTs 0 (0%)

0 (0%)

0 (0%)

3 (50%)

3 (50%) 4.50

3. The TIRF is effective for improving TAM implementation

0 (0%)

0 (0%)

1 (17%)

2 (33%)

3 (50%) 4.33

4. The seven criteria categories are important for TAM implementation

0 (0%)

0 (0%)

0 (0%)

1 (17%)

5 (83%) 4.83

5. The seven criteria categories are comprehensive

0 (0%)

0 (0%)

0 (0%)

4 (67%)

2 (33%) 4.33

6. There are some additional criteria that could be included

0 (0%)

2 (33%)

4 (67%)

0 (0%)

0 (0%) 2.67

7. The TIRF output provides misleading information

1 (17%)

5 (83%)

0 (0%)

0 (0%)

0 (0%) 1.83

8. I can see the TIRF in use in DOTs 0 (0%)

0 (0%)

1 (17%)

4 (67%)

1 (17%) 4.00

9. I can see the TIRF in use in other transportation agencies

0 (0%)

1 (17%)

0 (0%)

5 (83%)

0 (0%) 3.67

10. The TIRF is complete 0 (0%)

0 (0%)

2 (33%)

3 (50%)

1 (17%) 3.83

20

Page 21: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

Comments & Feedback • Practitioner Review Panel

▫ Could potentially serve as an objective beacon that agencies can use to measure the extent to which each different approach can help them reach TAM maturity

▫ Useful to assess overall TAM strategies, especially the "soft" side of TAM including dedicating resources, changing culture, etc.

▫ No major weakness

▫ May not be readily applicable to the management of other transportation assets (transit, marine, aviation, etc.) ... but might be applicable to TAM in those modes after a few tweaks

• Case Study DOT Representatives

▫ Straight forward and simple to use

▫ Good method to gauge implementation of TAM

▫ Would like to have a wider range of coworkers complete the survey as part of our gap analysis for updating our TAMP

21

Page 22: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

Summary

• Conceptual framework facilitates a systematic review of agency TAM implementation with respect to TAM program sustainment

▫ Assists agencies in understanding how their implementation approach influences likelihood of sustained TAM programming

▫ Provides descriptive results that can support future decisions on implementation investments, especially when considered in addition to other resources

• Forms the foundation of a catalog (evidence-based database) of systematically reviewed implementation strategies

▫ Allows identification of strategies that can address each category

▫ Reveals the strength of implementation strategies with respect to program sustainment, as additional experiences are documented

• Potential applications

▫ Scheduled agency TAM plan updates

▫ Peer exchanges

▫ TAM Knowledge Portal

22

Page 23: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

Thank You

Margaret-Avis Akofio-Sowah [email protected]

23

Page 24: A Framework for Enhancing Transportation Asset Management ...onlinepubs.trb.org/onlinepubs/conferences/2016/... · A Framework for Enhancing Transportation Asset Management (TAM)

References 1. Briner, R. B., Denyer, D., and Rousseau, D. M. (2009). “Evidence-Based Management: Concept Cleanup Time?” Academy of

Management Perspectives, 23(4), 19–32.

2. Collins, J., Denyer, D., and Turnbull James, K. (2008). “Educating the Evidence-Based Manager: The Executive Doctorate and its Impact on Management Practice.” Organisation Knowledge Learning and Capabilities Conference (OKLC), Copenhagen, Denmark, 14.

3. Proctor, E., Silmere, H., Raghavan, R., Hovmand, P., Aarons, G., Bunger, A., Griffey, R., and Hensley, M. (2011). “Outcomes for implementation research: conceptual distinctions, measurement challenges, and research agenda.” Administration and policy in mental health, 38(2), 65–76.

4. Rabin, B. a, Brownson, R. C., Haire-Joshu, D., Kreuter, M. W., and Weaver, N. L. (2008). “A glossary for dissemination and implementation research in health.” Journal of public health management and practice : JPHMP, 14(2), 117–23.

5. Rowley, J. (2012). “Evidence-based marketing.” International Journal of Market Research, Warc LTD, 54(4), 521–541.

6. Sackett, D. L., Rosenberg, W. M. C., Gray, J. A. M., Haynes, R. B., and Richardson, W. S. (1996). “Evidence based medicine: what it is and what it isn’t.” BMJ: British Medical Journal, 312(7023), 71–72.

7. Stetler, C. B. (2001). Evidence-based Practice and the Use of Research: A Synopsis of Basic Concepts & Strategies to Improve Care. Nova Foundation, 61.

8. Wiltsey Stirman, S., Kimberly, J., Cook, N., Calloway, A., Castro, F., and Charns, M. (2012). “The sustainability of new programs and innovations: a review of the empirical literature and recommendations for future research.” Implementation science : IS, 7, 17.

9. Whitehurst, G. J. (2004). “Making Education Evidence-Based: Premises, Principles, Pragmatics, and Politics.” Institute for Policy Research, Northwestern University, Evanston, Il.

24