DESIGNcollaboration documentation constructionFood and Drug Administration Consolidation

The Campus

9

TRUCK SCREENINGAREA

VISITORPARKING LOT, 282 CARS NORTHWEST

EMPLOYEEPARKING LOT, 450 CARS

MICHELSONROAD

SOUTHEASTPARKING GARAGE, 1730 CARS

CBER LAB

CDER OFFICE II

BROADCAST STUDIO

SOUTHWESTPARKING GARAGE, 1400 CARS

CBER/CVMOFFICE

CDER OFFICE I

CDER OFFICE I

CENTRAL SHARED USE

BUILDING ONE

OC/ORAOFFICE

CHILD CARECENTER

CBER LAB

CDRHOFFICE

ENTRY FORECOURT

NORTHPARKING GARAGE, 1050 CARS

NORTHEASTPARKING GARAGE, 634 CARS

CO-GENERATIONPLANT

ENGINEERING/PHYSICSLABORATORY

LIFE SCIENCESLABORATORY VIVARIUM

GATE

VISITOR SCREENING

MAHAN ROAD

LOGISTICSBUILDING

MAINCOMMONS

THE CAMPUSThe Food and Drug Administra-tion consists of approximately sev-en thousand employees spread throughout forty buildings in eighteen separate locations around the Wash-ington, DC metropolitan area. A new state-of-the-art campus currently un-derway in White Oak, Maryland, will consolidate most of the organization’s employees into one location and will better serve the agency’s needs from an efficiency, space utilization, work-flow and knowledge-sharing basis.

The current plan calls for a 4.7 mil-lion sq-ft campus that will comprise twenty structures to be constructed in phases over eleven years. Included in the plan are lab spaces, offices, a credit union, conference areas, train-ing spaces and cafeterias.

LEGEND

COMPLETEDUNDER CONSTRUCTIONUNDER DESIGNFUTURE

Page 3: A Iab 081575

DESIGNcollaboration documentation constructionFood and Drug Administration Consolidation

Office of the Commissioner/ Office of Regulatory Affairs

Phase V

OC/ORAWhen completed, the Office of the Commissioner/Office of Regulatory Affairs (OC/ORA) complex will be an essential component of the FDA campus, housing 1258 employees in an 82-foot-wide footprint, along with training spaces, a credit union and a cafeteria. The wings of the complex are connected through two atriums that enclose the full height of the building between a pair of bowed curtain walls. Each curtain wall is equipped with horizontal sun fins that appropriately limit or accentuate the amount of light entering the spaces.

Page 4: A Iab 081575

DESIGNcollaboration documentation constructionFood and Drug Administration Consolidation

Revit Building was instrumental in the architecture of the two earlier of-fice complexes on the FDA campus. OC/ORA is the first structure on the campus whose design involved a collaboration between architects and engineers on a BIM platform. In addition, the software has been configured to generate dynamic area analyses, detailed solar studies and renderings of the building during de-velopment to better relate the design intent to the client.

MASSINGRevit offered the ability to quickly generate and calculate both mass-ing and floor area totals for numer-ous options simultaneously for the study of massing elements. This procedure allowed the design team to make the most informed, efficient decisions about which design option would yield the best configuration.

Office of the Commissioner/ Office of Regulatory Affairs

Option # 1 is studied further

Initial Massing Studies Advanced Massing Studies

Option # 2

Option # 3

Option # 4 Option # 1C

Option # 1B

Option # 1A

Phase V

Total Gross Gross Office Gross SU Office Population Utilization RateTotal Program 546,600 453,600 93,000 1,440 315

TotalBuilding break down Total Gross Gross Office Gross SU Gross Tunnel Gross BridgeBuilding 1 93,452 78,452 15,000 140 560Wing F 94,950 74,950 20,000 238 315Total for Bld 1 and Wing F 188,402 153,402 35,000

Total Program for G,H,I 358,198 300,198 58,000 953 315

Difference from program wing GHI (44,629) (31,606) - (100) Total Current G,H,I 402,827 331,804 58,000 1053 315Wing G 139,285 139,285 - Wing H 126,079 107,879 18,200 1st floor onlyWing I 124,440 84,640 39,800 1st and 2nd floorTunnel 13,023

Grand Total 591,229 485,206 93,000 1,431 339

Area and Program Summary - OPTION 6-6-6

K:\FDA_SU\1000General\1600Calcs\Area\FDA-OC-ORA Area and Program Summary.xls 2006-05-30 Summary(666)

Area Schedule

Page 5: A Iab 081575

DESIGNcollaboration documentation constructionFood and Drug Administration Consolidation

Office of the Commissioner/ Office of Regulatory Affairs

Phase V

SOLAR STUDIESUsing the tools within Revit, the de-sign team performed solar studies on a variety of shading devices. These studies enabled the design team to best select the optimum configura-tion to maximize energy efficiency and limit solar glare. In this case, sun shades were selected for the win-dows with the most exposure, which limited cost to the owner as well.

6/21 12:00

6/21 13:00

6/21 14:00

6/21 15:00

6/21 16:00

Page 6: A Iab 081575

COLLABORATIONdesign documentation constructionFood and Drug Administration Consolidation

MULTI-DISCIPLINEThe project is a strong example of the collaboration that can be achieved with Revit Building, Revit Structure and Revit Systems. The project team worked together to create a single, unified model that would more ac-curately represent the building in its completed state. From edge-of-slab dimensions and duct locations to column sizes and curtain walls, the models that were developed were a result of a dialogue between team members that instigated resolution in the initial stages of development, rather than late in the construction documents phase.

The collaboration that was achieved through the use of Revit Building, Structure and Systems allowed de-signers to focus on the problematic areas of the building together as a team, rather than individually.

Phase V

Architecture

Structure

MechanicalElectricalPlumbing

Interiors

Page 7: A Iab 081575

COLLABORATIONdesign documentation constructionFood and Drug Administration Consolidation

Phase V

STRUCTURERevit Structure provided yet another dimension to the evolving benefits of BIM modeling. With the advantage of Copy/Monitor and interference checking, the engineers were able to coordinate column sizes, beam sizes and locations, slab openings, duct runs and shear walls with the archi-tects with minimal disruptions.

Revit Interference Checker identifies a structural column protruding through an architectural roof

Revit structure model exported to ETABS for structural analysis

Office of the Commissioner/ Office of Regulatory Affairs

Page 8: A Iab 081575

DOCUMENTATIONdesign constructioncollaborationFood and Drug Administration Consolidation

Center for Devices and Radiological Health

Phase IV

CDRHCurrently under construction, the Center for Devices and Radiologi-cal Health (CDRH) will house 1277 employees and support spaces in a six-story, 62-foot-wide footprint. One dominant design strategy incorpo-rates a saw-tooth skylight over the interior atrium in order to enhance the lighting of the interior space. Out-side, a network of paths and court-yards unites the building with the other structures on the campus.

Following CDER 2 and the North Ga-rage, the CDRH Office Building be-came the third complex on the FDA campus to achieve a complete set of bidding documents utilizing Revit Building. The design team incorpo-rated the lessons learned from pre-vious projects to increase efficiency, precision and productivity.

UPDN

A-210 21

8G

A-405

MATCH�LINE

C/B

MATCH�LINE

C/B

8G

A-410

OPEN�TO�BELOW

MATCH�LINEA/B

MATCH�LINEA/B

TELE3689

WOMEN3673

MEN3603

MECHANICAL3209

8D

A-300

5D

A-300

A-211

8G

A-2208D

8H

A-407

A-7505E

SIM.WO/�SUNSHADE

A-7108E

A-205 8A

A-204

4C

A-2048CA-205 8E

8D

A-6303F

A-8056F

OPP.WO/�SUNSHADE

A-8062F

R13

R12

R11

RG

RHRH.7 RJ

RK

RLWP7

WP6HGF

WP5

J J.7 K K.6 L

13.5

13

12

11

10

9

8

WP4

WP3

RM

RNRP

R14

13.2

ELECT3683

MECHANICAL3539

ELECT3103

ELEV�#4ELEV�#3 12.1

12.4

MECH3687 A-660

2B

A-8062A

8A

A-800

8C

A-800SIM.

9100

9100

9000

3130

8870

6675

3376

9100 9100 2785 11785 9100 9100

5180

12315

3550

4250

9000

3000

9000

9000

9000

INTERIOR�RAILINGSYSTEM

8A

A-410

3673Y 211

3603Y 211

3683B 830

3687B 816

3689C1825

3539C1 826

G10C

G10C

G10C

G10CG10C

G10C

G15C

G15C

G15CG15C

S22D

G15CS22D

S22D

S22D

G10C

G15C

G10C

G15CG10C G10C

G15C

G15C

S22DS22D

G15C S22D

S22D

3209C 826

3205B 8163275

C 825

3103B 830

3119K1816

G10C H21C

H21CH21C

G10C

3052K 115

A-5658A

A-5654D

BRIDGE3100

G15C

3100AM 441

3100BM 441

TELE3275

MECH3205

MECH3119

H21C

STAIR�#2

36483648356

356

1100

1709

2938

4848

48

3648 3648

2958

104

3648 3648

1100

4878

3048

200

200

ALIGN

ALIGN

2106

1659

5467

1659

1689

5467

1659

2106

200

200

170

EQ

EQ

RG.5

11.311.1

10.3

10.6

9.8

9.6

8.88.6

5452

4200

3552

2100

200

8F

A-410

1247

750

48

8E

A-410

J.8 K.3

TYP.

A-7503F

A-7503FTYP.TYP.

OPP

A-7503E TYP.

3607C 826

A-8004E

GENERAL�SERVICES�ADMINISTRATION

PUBLIC�BUILDING�SERVICE

MARK DATE DESCRIPTION

K�E�Y���P�L�A�N

C�E�R�T�I�F�I�C�A�T�I�O�N

R�E�V�I�S�I�O�N��N�O�T�E�S

GRAPHIC�SCALE

A/E�CONC.�NO.

A/E�TASK�NO.

CONS.�CONTR.

CONS.�WORK

PRIME�A/E

SUB��A/E

CONSTR.�CON.C�O�N�T�R�A�C�T�O�R�S

B�U�I�L�D�I�N�G

NAME

STREET

CITY/ST./ZIP

BUILDING�NO.

OTHER

BUILDING�NO.

FACILITY�CODE

PROJECT

TITLE

PROJECT

DESCRIPTION

P�R�O�J�E�C�T

PROJECT�NO.

GSA��PM

SUBMISSION

SUB.�DATE

DRAWING�TITLE

FILE�NAME

FLOOR�NO.

DRAWN�BY

CHECKED�BY

D�R�A�W�I�N�G

DRAWING�NO.DISCIPLINE SHEET�TYPE SEQUENCE

SHEET�SIZE:�914�X�1219

51�Mahan�Road

White�Oak,�Maryland

GS11P94EGC0011

Food�and�Drug�AdministrationConsolidationMontgomery�County�Campus

.DWG

DATE�DRAFTED:

RTKL�Associates�Inc.

RTKL�Associates,�Inc.Site/Civil/Environmental

Greenhorne�&O'�Mara,�Inc.

Topographic�Surveying

A.�Morton�Thomas�&Associates,�Inc.

Geotechnical�Engineering

Schnabel�EngineeringAssociates

Elevators

LBH�Consulting�GroupLife�Safety

Rolf�Jensen�&Associates,�Inc.

Cost�Estimating

HanscombAssociates,�Inc.

Acoustics

Shen�Milson�&�Wilke,�Inc.

PROPERTY�OF�THE�US�GOVERNMENT.�COPYING,�DISSEMINATION,�OR�DISTRIBUTION�OF�THESE�DRAWINGS,�PLANS,�OR�SPECIFICATIONS�TO�UNAUTHORIZED�PERSONS�IS�PROHIBITED.

NATIONAL�CAPITAL�REGION

In�association�with

A B C D E F G H

1

2

3

4

5

6

7

8

PLANNORTH

N

MD0821

ABC

D

MATCH�LINE

MATCH�LINE

MATCH�LINEMATCH�LINE

MATCH�LINE

MATCH�LINE

A-103B

THIRD�FLOOR�PLAN�-�AREA�B

A-103B

Author

Checker

09/07/05

FDA�CDRH�Office�Building

FDA�CDRH�Office�Building

ISSUE�FOR�CONSTRUCTION

200307320

06-15-2006

�1�:�100A-103B A�-103

LEVEL�03B8E

0 5 10�m

1:100

LEVEL�01112300

LEVEL�02116364

level��03120428

LEVEL�04124492

level�05128556

ROOF�H.P.132823

GROUND107931

PARAPET133239

H21F�INTERIOR�WALLASSEMBLY,�2HRRATED.

4267

4064

4064

4064

8433

LOBBY

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

SPRINKLER�(REF�TOFIRE�PROTECTIONDWGS.)

SPRINKLER�(REF�TOFIRE�PROTECTIONDWGS.)

H8�HORIZONTALASSEMBLY�(STANDINGSEAM�MTL�ROOFINGSYSTEM)

IW1�ASSEMBLY

IW1�ASSEMBLY

SF2�WALL�ASSEMBLY

H21F�INTERIOR�WALLASSEMBLY,�2HRRATED.

MW5�WALL�ASSEMBLY(INTERIOR)

H

ROOF�L.P.132620

4064

4369

EMR133891

MW1�WALL�ASSEMBLY

2060

758

2060

758

2060

758

2060

758

R.O.

R.O.

R.O.

R.O.

A-5228C

A-5225C

A-5223A

A-5225A

A-5228A

620

668

2776

H21F�INTERIOR�WALLASSEMBLY,�2HRRATED.

MW5F2�WALLASSEMBLY

W/�GL-08

3075

3000

S3�CEILING/SOFFITASSEMBLY

.

A-5043A

A-5034G

900

300

SEE�INTERIOR�DWGS.

LEVEL�01112300

LEVEL�02116364

level��03120428

LEVEL�04124492

level�05128556

ROOF�H.P.132823

GROUND107931

PARAPET133239

J

ROOF�L.P.132620

EMR133891

Ground107931

305

Ground107931

LEVEL�01112300

LEVEL�02116364

level��03120428

LEVEL�04124492

level�05128556

ROOF�H.P.132823

GROUND107931

PARAPET133239

H

ROOF�L.P.132620

EMR133891

Ground107931

A-5032D

MECHGRILL

INTERIOR�EXPANSIONJOINT�COVER,�CUSTOMCOLOR,�2�HR�RATED

4064

4064

4064

4064

4369

A-5238F

3075

2854

2821

2854

2814

2854

RO

RO

RO

RO

RO

RO

600

A-5238A

900

300

Ground107931

1078

1078

105

SEE��RCPS

MECHGRILL

LEVEL�01112300

LEVEL�02116364

level��03120428

LEVEL�04124492

level�05128556

ROOF�H.P.132823

PENTHOUSE�TOPOF�STEEL�L.P.

137506

GROUND107931

PARAPET133239

H

ROOF�L.P.132620

EMR133891

Ground107931

A-5224F

A-5228F

A-5228C

A-5228F

SIM

1210

2854

R.O.

1210

2797

571250

2814

1210

2797

571243

2821

R.O.

R.O.

R.O.

R.O.

2731

2731

702731

2731

2731

A-5228F

SIM

SF2�WALL�ASSEMBLY

SF2�WALL�ASSEMBLY

SF2�WALL�ASSEMBLY

SF2�WALL�ASSEMBLY

SF2�WALL�ASSEMBLY

MW5F2�WALLASSEMBLY

MW5F2�WALLASSEMBLY

MW9E2�WALLASSEMBLY

A-5048A

A-8177D

W2A�WALL�ASSEMBLY

W2A�WALL�ASSEMBLY

W2A�WALL�ASSEMBLY

W2B�WALL�ASSEMBLY

Ground107931

4369

900

300

150

A-5034G

LEVEL�01112300

LEVEL�02116364

level��03120428

LEVEL�04124492

level�05128556

ROOF�H.P.132823

GROUND107931

PARAPET133239

J

ROOF�L.P.132620

Ground107931

1246

2060

758

1246

2060

758

1246

2060

758

1246

2060

758

2719

571369

3000

4064

4064

4064

4064

4064

4369

668

620

IW1�ASSEMBLY

A-5228A

OH

TYP.

A-5223A

A-5225A

H21F�INTERIOR�WALLASSEMBLY,�2HRRATED.

SF2�WALL�ASSEMBLY

MW5F2�WALLASSEMBLY

MW5F2�WALLASSEMBLY

OH

TYP.

OH

TYP.

W/GL-08

SF2�WALL�ASSEMBLYW/GL-06

A-5225C

A-5224F

OH

OH

A-5034G

Opp

A-5043D

Ground107931

900

300

150

LEVEL�01112300

LEVEL�02116364

level��03120428

LEVEL�04124492

level�05128556

ROOF�H.P.132823

GROUND107931

PARAPET133239

J

ROOF�L.P.132620

EMR133891

Ground107931

A-5233F

A-5236F

4064

4064

4064

4064

4064

4369

2754

57R.O.

729

2002

2731

1253

2064

748

R.O.

1253

2754

57R.O.

R.O.

R.O.

R.O.

2002

729

2271

716

A-5224FOH

A-5225C

OH

SIM

1253

2064

748

620

668

2719

571369

3000

1990

729

A-5224F

OH

SIM

SF2�WALL�ASSEMBLY

SF2�WALL�ASSEMBLY

SF2�WALL�ASSEMBLY

SF2�WALL�ASSEMBLY

SF2�WALL�ASSEMBLY

SF2�WALL�ASSEMBLY

MW5F2�WALLASSEMBLY

MW5F2�WALLASSEMBLY

MW5F2�WALLASSEMBLY

MW5F2�WALLASSEMBLY

H21F�INTERIOR�WALLASSEMBLY,�2HRRATED.

GWB�W/�METAL�STUD

H21F�INTERIOR�WALLASSEMBLY,�2HRRATED.

GWB�W/�METAL�STUD

H21F�INTERIOR�WALLASSEMBLY,�2HRRATED.GWB�W/�METAL�STUD

A-5043D

A-5034G

Opp

150

450

30090

0Ground107931

GENERAL�SERVICES�ADMINISTRATION

PUBLIC�BUILDING�SERVICE

MARK DATE DESCRIPTION

K�E�Y���P�L�A�N

C�E�R�T�I�F�I�C�A�T�I�O�N

R�E�V�I�S�I�O�N��N�O�T�E�S

GRAPHIC�SCALE

A/E�CONC.�NO.

A/E�TASK�NO.

CONS.�CONTR.

CONS.�WORK

PRIME�A/E

SUB��A/E

CONSTR.�CON.C�O�N�T�R�A�C�T�O�R�S

B�U�I�L�D�I�N�G

NAME

STREET

CITY/ST./ZIP

BUILDING�NO.

OTHER

BUILDING�NO.

FACILITY�CODE

PROJECT

TITLE

PROJECT

DESCRIPTION

P�R�O�J�E�C�T

PROJECT�NO.

GSA��PM

SUBMISSION

SUB.�DATE

DRAWING�TITLE

FILE�NAME

FLOOR�NO.

DRAWN�BY

CHECKED�BY

D�R�A�W�I�N�G

DRAWING�NO.DISCIPLINE SHEET�TYPE SEQUENCE

SHEET�SIZE:�914�X�1219

51�Mahan�Road

White�Oak,�Maryland

GS11P94EGC0011

Food�and�Drug�AdministrationConsolidationMontgomery�County�Campus

.DWG

DATE�DRAFTED:

RTKL�Associates�Inc.

RTKL�Associates,�Inc.Site/Civil/Environmental

Greenhorne�&O'�Mara,�Inc.

Topographic�Surveying

A.�Morton�Thomas�&Associates,�Inc.

Geotechnical�Engineering

Schnabel�EngineeringAssociates

Elevators

LBH�Consulting�GroupLife�Safety

Rolf�Jensen�&Associates,�Inc.

Cost�Estimating

HanscombAssociates,�Inc.

Acoustics

Shen�Milson�&�Wilke,�Inc.

PROPERTY�OF�THE�US�GOVERNMENT.�COPYING,�DISSEMINATION,�OR�DISTRIBUTION�OF�THESE�DRAWINGS,�PLANS,�OR�SPECIFICATIONS�TO�UNAUTHORIZED�PERSONS�IS�PROHIBITED.

NATIONAL�CAPITAL�REGION

In�association�with

A B C D E F G H

1

2

3

4

5

6

7

8

PLANNORTH

N

MD0821

ABC

D

MATCH�LINE

MATCH�LINE

MATCH�LINEMATCH�LINE

MATCH�LINE

MATCH�LINE

A-410

WALL�SECTIONS

A-410

Author

Checker

01/27/06

FDA�CDRH�Office�Building

FDA�CDRH�Office�Building

ISSUE�FOR�CONSTRUCTION

200307320

06-15-2006

�1�:�50A-410 A-100B

TYPICAL�LOBBY�INTERIOR�WALL8G

�1�:�50A-410 A-100B

WALL�SECTION�@�ATRIUM��BRIDGE,�EAST8C

�1�:�50A-410 A-100B

WALL�SECTION�@�ATRIUM�BRIDGE,�WEST8A

�1�:�50A-410 A-100B

ATRIUM�LOBBY�WALL�SECTION-18F

�1�:�50A-410 A-100B

WALL�SECTION�@�ATRIUM�EAST8E

�1�:�50A-410 A-100C

ATRIUM�LOBBY�WALL�SECTION-28D

FOR�DIMENSIONS�ANDNIOTES,�SEE�8A,�THIS�SHEET

H

SPRINKLER�(REF�TOFIRE�PROTECTIONDWGS.)

184H21F�INTERIOR�WALLASSEMBLY,�2HRRATED.

STEEL�STUD

JOINT�SEALANT

WINDOW�ANCHOR

48 140 60

32 32

IW1�ASSEMBLY

IW1

H

FIXED�INTERIORWINDOW�SYS.

WINDOW�ANCHOR

JOINT�SEALANT

STEEL�STUD

H21F�INTERIOR�WALLASSEMBLY,�2HRRATED.32 184 32

48 140 60

level��03120428

H

H21F�INTERIOR�WALLASSEMBLY,�2HRRATED.

STEEL�STUD

FURRING�CHANEL

ANGLE�FRAMES

ANGLE�FRAMES

STEEL�STUD

32 184 32H21F�INTERIOR�WALLASSEMBLY,�2HRRATED.

LEVEL�02116364

H

SF2�WALL�ASSEMBLY

SPRINKLER�(REF�TOFIRE�PROTECTIONDWGS.)

FIRE�SAFING

JOINT�SEALANT

MW5F2�WALLASSEMBLY

H21F�INTERIOR�WALLASSEMBLY,�2HRRATED.

FURRING�CHANEL

FURRING�CHANEL

ANGLE�FRAMES

STEEL�STUD

JOINT�SEALANT

32 184 32

89

152

29

60

620

668

114 212

66 48

1313

124

LEVEL�01112300

H

1426

13

57

330

SF2�WALL�ASSEMBLY

JOINT�SEALANT

CONT.�MTL�ANGLECLOSURE�(BY�MANUF.)

FIRE�SAFING

ANCHOR�DEVICE

MW5F2�WALLASSEMBLY

66 48

114 209

S3�CEILING/SOFFITASSEMBLY

152

ALIGN

75

level�05128556

H

CONT.�MTL�ANGLECLOSURE�(BY�MANUF.)

SF2�WALL�ASSEMBLY

SF2�WALL�ASSEMBLY

JOINT�SEALANT

FIRE�SAFING

SPRINKLER�(REF�TOFIRE�PROTECTIONDWGS.)

ANCHOR�DEVICE

MW5F2�WALLASSEMBLY

1357

1250

13

FIRE�SAFING

ANCHOR�DEVICE

JOINT�SEALANT

32 203 32 57

66 48

257

20966 48

EXTERIOR�SPRINKLERAPPLICABLE�ONLY�FORGROUND�AND�LEVEL�1

LEVEL�02116364

H

SF2�WALL�ASSEMBLY

JOINT�SEALANT

CONT.�MTL�ANGLECLOSURE�(BY�MANUF.)

ANCHOR�DEVICE

FIRE�SAFING

STEEL�STUD

WOOD�BLOCKING

ANGLE�FRAMES

SPRINKLER�(REF�TOFIRE�PROTECTIONDWGS.)

METAL�PANEL�TRIM

METAL�PANELSILL

401

370

66 48

13

40406

803

57

13

25

370

FACE�BRICK

ANGLE�FRAMES

EXTERIOR�SPINKLERAPPLICABLE�ONLY�FORGROUND�AND�LEVEL�1

235�mm

W2A�WALL�ASSEMBLY

STRUCT.�STEEL(200mm�X�200mm)

66

STRUCT.�STEEL(MC�150mm�X�17.9mm)

GENERAL�SERVICES�ADMINISTRATION

PUBLIC�BUILDING�SERVICE

MARK DATE DESCRIPTION

K�E�Y���P�L�A�N

C�E�R�T�I�F�I�C�A�T�I�O�N

R�E�V�I�S�I�O�N��N�O�T�E�S

GRAPHIC�SCALE

A/E�CONC.�NO.

A/E�TASK�NO.

CONS.�CONTR.

CONS.�WORK

PRIME�A/E

SUB��A/E

CONSTR.�CON.C�O�N�T�R�A�C�T�O�R�S

B�U�I�L�D�I�N�G

NAME

STREET

CITY/ST./ZIP

BUILDING�NO.

OTHER

BUILDING�NO.

FACILITY�CODE

PROJECT

TITLE

PROJECT

DESCRIPTION

P�R�O�J�E�C�T

PROJECT�NO.

GSA��PM

SUBMISSION

SUB.�DATE

DRAWING�TITLE

FILE�NAME

FLOOR�NO.

DRAWN�BY

CHECKED�BY

D�R�A�W�I�N�G

DRAWING�NO.DISCIPLINE SHEET�TYPE SEQUENCE

SHEET�SIZE:�914�X�1219

51�Mahan�Road

White�Oak,�Maryland

GS11P94EGC0011

Food�and�Drug�AdministrationConsolidationMontgomery�County�Campus

.DWG

DATE�DRAFTED:

RTKL�Associates�Inc.

RTKL�Associates,�Inc.Site/Civil/Environmental

Greenhorne�&O'�Mara,�Inc.

Topographic�Surveying

A.�Morton�Thomas�&Associates,�Inc.

Geotechnical�Engineering

Schnabel�EngineeringAssociates

Elevators

LBH�Consulting�GroupLife�Safety

Rolf�Jensen�&Associates,�Inc.

Cost�Estimating

HanscombAssociates,�Inc.

Acoustics

Shen�Milson�&�Wilke,�Inc.

PROPERTY�OF�THE�US�GOVERNMENT.�COPYING,�DISSEMINATION,�OR�DISTRIBUTION�OF�THESE�DRAWINGS,�PLANS,�OR�SPECIFICATIONS�TO�UNAUTHORIZED�PERSONS�IS�PROHIBITED.

NATIONAL�CAPITAL�REGION

In�association�with

A B C D E F G H

1

2

3

4

5

6

7

8

PLANNORTH

N

MD0821

ABC

D

MATCH�LINE

MATCH�LINE

MATCH�LINEMATCH�LINE

MATCH�LINE

MATCH�LINE

A-522

SECTION�DETAILS

A-522

Author

Checker

03/31/06

FDA�CDRH�Office�Building

FDA�CDRH�Office�Building

ISSUE�FOR�CONSTRUCTION

200307320

06-15-2006

�1�:�5A-522 A-410

SECTION�DETAIL�@�TYP.LOBBY�INT.WALL-13A

�1�:�5A-522 A-410

SECTION�DETAIL�@�TYP.LOBBY�INT.WALL-25A

�1�:�5A-522 A-410

SECTION�DETAIL�@�TYP.LOBBY�INT.WALL-38A

�1�:�5A-522 A-410

SECTION�DETAIL�@�TYP.LOBBY�INT.WALL-45C

�1�:�5A-522 A-410

SECTION�DETAIL�@�TYP.LOBBY�INT.WALL-58C

�1�:�5A-522 A-410

SECTION�DETAIL�@�ATRIUM�LOBBY�WALL�SECTION-14F

�1�:�5A-522 A-410

SECTION�DETAIL�@�ATRIUM�LOBBY�WALL�SECTION-38F

01:5

0.1 0.4m0.2

A

BC

U-BOLT

(2x)�3/8-16�MTG.NUTS�PER�MTG.BRACKET

(5.875")

(4.5")

(2.125")

(7.25")(2.5")

(4.5")

A-

Continuous�Raceway�for�Fluorescent&�Downlight�w/�Receptacle�Outlets(Size�of�Raceway�T.B.D.�by�Engineer)

B-

Intermittent�Stock�Steel���O31.75mm�Pipe�(Final�Size�T.B.D.�byStructural�Engineer)

C-

Steel�Flange�w/�Cutout�forContinuous�Raceway

(4.75")

149.225

114.300

53.975

184.15063.5

114.3

120.65

PENTHOUSE�TOPOF�STEEL�L.P.

137506

STEEL�FRAMING�&CROSS�BRACESEE�STRUCTURALDRAWINGS

H11�HORIZONTALASSEMBLY

CW1�WALL�ASSEMBLY

360

127

401

STEEL�SUPPORT

5

EMR133891

4F

A-804

7530

5

200

25°

65°

GUTTER�H.P.

GUTTER�L.P.

H12�HORIZONTALASSEMBLY

CW1�WALL�ASSEMBLY

788

4�MO

DU

LES

�OF�M

ETA

L�DE

CK

813

STEEL�FRAMINGSEE�STRUCTURAL�DRAWINGS

CABLE�SEESTRUCTURALDRAWINGS

WOOD�BLOCKING

ACOUSTICAL�MATERIAL

102

914

STEEL�FRAMINGSEE�STRUCTURALDRAWINGS

2�BAR�PIPE�SNOW�GUARD

17302750

126

381

127

254

STEEL�FLANGE�WITHCUTOUT�FOR�CONTINUOUSRACEWAY

101

32

PAINTED�ALL�EXPOSEDSURFACES�COLORSELECTED�BY�ARCHITECT

INTERMITTENT�STOCKSTEEL�PIPE

CONTINUOUS�UNISTRUT�RACEWAYFOR�FLUORESCENT

H

9113

176

89

H11�HORIZONTALASSEMBLY

54 200

152 16 184

STEEL�FRAMINGSEE�STRUCTURAL�DRAWINGS

MW1X�WALL�ASSEMBLY

2%�SLOPECOMPOSITE�METALFACED�PANEL�COPING

WOOD�BLOCKING

CROSS�BRACE�SEESTRUCTURAL�DRAWINGS

117 54 58118 64

STEEL�STUD

FURRING�CHANEL64

STEEL�FRAMINGSEE�STRUCTURALDRAWINGS

ROOF�H.P.132823

PARAPET133239

H

ROOF�L.P.132620

400

H12�HORIZONTALASSEMBLY

FLUID�APPLIED(INVERTED)�ROOFSYSTEM

TOP�OF�CURTAIN�WALL

280

DRIP�EDGE

EXANSION�JOINT

9541

620

3

EXPANSION�JOINT�COVER

EXPANSION�JOINTCOVER

STAINLESS�STEELFLASHING

200

130

INSULATION�DRAPE

FIRESTOPPING

H

11

1

EXPANSION�JOINT�COVER

400 200

INTERIOR

EXTERIOR EXTERIOR

CONCRETE�CURBSEE�STRUCTURALDRAWINGS

5A

A-503

INTERIOR�EXPANSIONJOINT�COVER,�CUSTOMCOLOR,�2�HR�RATED

INSULATION�DRAPE

FIRESTOPPING

SECONDARY�SEAL

PARAPET133239

H

17264

153

130

153

EXPANSIONJOINT�COVER

EXPANSIONJOINT�COVER

CONCRETE�CURBSEE�STRUCTURALDRAWINGS

WOOD�BLOCKING

FLEXIBLE�WATERPROOFMEMBRANE�CLOSURE

4E

A-503

INSULATION�DRAPE

FIRESTOPPING

SECONDARY�SEALPARAPET

133239

11

EMR133891

EXPANSIONJOINT�COVER

H11�HORIZONTALASSEMBLY

CONCRETE�CURB

STEEL�FRAMINGSEE�STRUCTURALDRAWINGS

TYPICAL�SLIDEBEARING�ELEMETS�SEESTRUCTURAL�DRAWINGS

369

153

130

INTERIOR�EXPANSIONJOINT�COVER,�CUSTOMCOLOR,�2�HR�RATED

SECONDARY�SEAL

CURTAIN�WALLINSULATION

GENERAL�SERVICES�ADMINISTRATION

PUBLIC�BUILDING�SERVICE

MARK DATE DESCRIPTION

K�E

�Y���

P�L

�A�N

C�E

�R�T

�I�F

�I�C

�A�T

�I�O

�NR

�E�V

�I�S

�I�O

�N��N

�O�T

�E�S

GR

AP

HIC

�SC

ALE

A/E�CONC.�NO.

A/E�TASK�NO.

CONS.�CONTR.

CONS.�WORK

PRIME�A/E

SUB��A/E

CONSTR.�CON.C�O

�N�T

�R�A

�C�T

�O�R

�SB

�U�I�

L�D

�I�N

�G

NAME

STREET

CITY/ST./ZIP

BUILDING�NO.

OTHER

BUILDING�NO.

FACILITY�CODE

PROJECT

TITLE

PROJECT

DESCRIPTION

P�R

�O�J

�E�C

�T

PROJECT�NO.

GSA��PM

SUBMISSION

SUB.�DATE

DRAWING�TITLE

FILE�NAME

FLOOR�NO.

DRAWN�BY

CHECKED�BY

D�R

�A�W

�I�N

�G

DRAWING�NO.DISCIPLINE SHEET�TYPE SEQUENCE

SHEET�SIZE:�914�X�1219

51�Mahan�Road

White�Oak,�Maryland

GS11P94EGC0011

Food�and�Drug�AdministrationConsolidationMontgomery�County�Campus

.DWG

DATE�DRAFTED:

RTKL�Associates�Inc.

RTKL�Associates,�Inc.Site/Civil/Environmental

Greenhorne�&O'�Mara,�Inc.

Topographic�Surveying

A.�Morton�Thomas�&Associates,�Inc.

Geotechnical�Engineering

Schnabel�EngineeringAssociates

Elevators

LBH�Consulting�GroupLife�Safety

Rolf�Jensen�&Associates,�Inc.

Cost�Estimating

HanscombAssociates,�Inc.

Acoustics

Shen�Milson�&�Wilke,�Inc.

PROPERTY�OF�THE�US�GOVERNMENT.�COPYING,�DISSEMINATION,�OR�DISTRIBUTION�OF�THESE�DRAWINGS,�PLANS,�OR�SPECIFICATIONS�TO�UNAUTHORIZED�PERSONS�IS�PROHIBITED.

NATIONAL�CAPITAL�REGION

In�association�with

A B C D E F G H

1

2

3

4

5

6

7

8

PLANNORTH

N

MD0821

ABC

D

MATCH�LINE

MATCH�LINE

MATCH�LINEMATCH�LINE

MATCH�LINE

MATCH�LINE

A-503

SAW�TOOTH�DETAILS

A-503

Author

Checker

11/02/05

FDA�CDRH�Office�Building

FDA�CDRH�Office�Building

ISSUE�FOR�CONSTRUCTION

200307320

06-15-2006

01:50

1/2 1 2 3m

�1�:�5A-503 A-804

SECTION�DETAIL�3�@�SAW�TOOTH4C

�1�:�5A-503 A-804

SECTION�DETAIL�4�@�SAW�TOOTH8G

�1�:�5A-503 A-410

SECTION�DETAIL�6�@�SAW�TOOTH4G

�1�:�5A-503 A-410

EXPANSION�JOINT�3�@�SAW�TOOTH2D

A-503

EXPANSION�JOINT�-�3D2A

EXPANSION�JOINT

EXPANSION�JOINT

SECTION�DETAIL2D/A-503

�1�:�5A-503 A-106B

PLAN�DETAIL�@�SAW�TOOTH2G

�1�:�5A-503 A-503

EXPANSION�JOINT�4�@�SAW�TOOTH5A

PLAN�DETAIL2G/A-503

SECTION�DETAIL5A/A-503

SECTION�DETAIL3E/A-505

�1�:�5A-503 A-503

EXPANSION�JOINT�5�@�SAW�TOOTH4E

SECTION�DETAIL5D/A-503

SECTION�DETAIL3G/A-504

PLAN�DETAIL8A/A-566

�1�:�5A-503

ATRIUM�LIGHTING�FIXTURES8A

Plans, sections and details generated using Revit

Page 9: A Iab 081575

DOCUMENTATIONdesign constructioncollaborationFood and Drug Administration Consolidation

9

4

A-819

2

A-819

A-819 A-81956

R�800

R�1310

R�1460

R�930

R�630

25°

27°

52°

28°

120°93°

60°

70°

130°

12°

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)

ST-3

400

848

30°

KEYBOARD�TRAY

EDGE�OF�STAINLESS�STEEL

GROUND107931

1080

100

765

755

225

100

150510304

38

215

150

STRUCT.�STEEL(76mm�X�76mm)

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED),�6mm�THICK

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)ON�MDF�SUBSTRATE

WD-01

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)ON�MDF�SUBSTRATE

ON�MDF�SUBSTRATE

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED),�6mm�THICK

MEDIUM�DENSITYFIBER�BOARD�(MDF)PAINTED

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)ON�MDF�SUBSTRATE

STRUCT.�STEEL(76mm�X�76mm)

WD-01ON�MDFSUBSTRATE

ST-3

A-5402E

A-5404G

A-5403G

A-5404E

OPP

GROUND107931

100

765

865

1325

510

215

865

215

1080

613

150510 NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)

,�6�mm�THICK.

ON�MDF�SUBSTRATE

MEDIUM�DENSITYFIBER�BOARD�(MDF),PAINTED

ST-3

ST-3

WD-01ON�MDFSUBSTRATE

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)ON�MDF�SUBSTRATE

A-5403E

A-5404E

A-5403G

STRUCT.�STEEL(76mm�X�76mm)

GROUND107931

9

765

100

215

865

ST-3ST-3 NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)

WD-01

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)

GROUND107931

9

100

325

865

215

1080

WD-01NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)

EDGE�OF�STAINLES�STEEL

GENERAL�SERVICES�ADMINISTRATION

PUBLIC�BUILDING�SERVICE

MARK DATE DESCRIPTION

K�E�Y���P�L�A�N

C�E�R�T�I�F�I�C�A�T�I�O�N

R�E�V�I�S�I�O�N��N�O�T�E�S

GRAPHIC�SCALE

A/E�CONC.�NO.

A/E�TASK�NO.

CONS.�CONTR.

CONS.�WORK

PRIME�A/E

SUB��A/E

CONSTR.�CON.C�O�N�T�R�A�C�T�O�R�S

B�U�I�L�D�I�N�G

NAME

STREET

CITY/ST./ZIP

BUILDING�NO.

OTHER

BUILDING�NO.

FACILITY�CODE

PROJECT

TITLE

PROJECT

DESCRIPTION

P�R�O�J�E�C�T

PROJECT�NO.

GSA��PM

SUBMISSION

SUB.�DATE

DRAWING�TITLE

FILE�NAME

FLOOR�NO.

DRAWN�BY

CHECKED�BY

D�R�A�W�I�N�G

DRAWING�NO.DISCIPLINE SHEET�TYPE SEQUENCE

SHEET�SIZE:�914�X�1219

51�Mahan�Road

White�Oak,�Maryland

GS11P94EGC0011

Food�and�Drug�AdministrationConsolidationMontgomery�County�Campus

.DWG

DATE�DRAFTED:

RTKL�Associates�Inc.

RTKL�Associates,�Inc.Site/Civil/Environmental

Greenhorne�&O'�Mara,�Inc.

Topographic�Surveying

A.�Morton�Thomas�&Associates,�Inc.

Geotechnical�Engineering

Schnabel�EngineeringAssociates

Elevators

LBH�Consulting�GroupLife�Safety

Rolf�Jensen�&Associates,�Inc.

Cost�Estimating

HanscombAssociates,�Inc.

Acoustics

Shen�Milson�&�Wilke,�Inc.

PROPERTY�OF�THE�US�GOVERNMENT.�COPYING,�DISSEMINATION,�OR�DISTRIBUTION�OF�THESE�DRAWINGS,�PLANS,�OR�SPECIFICATIONS�TO�UNAUTHORIZED�PERSONS�IS�PROHIBITED.

NATIONAL�CAPITAL�REGION

In�association�with

A B C D E F G H

1

2

3

4

5

6

7

8

PLANNORTH

N

MD0821

ABC

D

MATCH�LINE

MATCH�LINE

MATCH�LINEMATCH�LINE

MATCH�LINE

MATCH�LINE

A-819

CONCIERGE�DESK

A-819

Author

Checker

05/09/06

FDA�CDRH�Office�Building

FDA�CDRH�Office�Building

ISSUE�FOR�CONSTRUCTION

200307320

06-15-2006

�1�:�10A-819 A-100B

CONCIERGE�DESK1

A-819 A�-100

CONCIERGE�Isometric3

�1�:�10A-819 A-819

CONCIERGE�DESK4

�1�:�10A-819 A-819

CONCIERGE�DESK�22

�1�:�10A-819 A-810

CONCIERGE�DESK�EAST�ELEV.5

�1�:�10A-819 A-810

CONCIERGE�DESK�WEST�ELV.6

01:10

0.2 0.5m

9

4

A-819

2

A-819

A-819 A-81956

R�800

R�1310

R�1460

R�930

R�630

25°

27°

52°

28°

120°93°

60°

70°

130°

12°

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)

ST-3

400

848

30°

KEYBOARD�TRAY

EDGE�OF�STAINLESS�STEEL

GROUND107931

1080

100

765

755

225

100

150510304

38

215

150

STRUCT.�STEEL(76mm�X�76mm)

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED),�6mm�THICK

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)ON�MDF�SUBSTRATE

WD-01

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)ON�MDF�SUBSTRATE

ON�MDF�SUBSTRATE

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED),�6mm�THICK

MEDIUM�DENSITYFIBER�BOARD�(MDF)PAINTED

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)ON�MDF�SUBSTRATE

STRUCT.�STEEL(76mm�X�76mm)

WD-01ON�MDFSUBSTRATE

ST-3

A-5402E

A-5404G

A-5403G

A-5404E

OPP

GROUND107931

100

765

865

1325

510

215

865

215

1080

613

150510 NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)

,�6�mm�THICK.

ON�MDF�SUBSTRATE

MEDIUM�DENSITYFIBER�BOARD�(MDF),PAINTED

ST-3

ST-3

WD-01ON�MDFSUBSTRATE

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)ON�MDF�SUBSTRATE

A-5403E

A-5404E

A-5403G

STRUCT.�STEEL(76mm�X�76mm)

GROUND107931

9

765

100

215

865

ST-3ST-3 NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)

WD-01

NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)

GROUND107931

9

100

325

865

215

1080

WD-01NO.�4�STAINLESSSTEEL�FINISH(BRUSHED)

EDGE�OF�STAINLES�STEEL

GENERAL�SERVICES�ADMINISTRATION

PUBLIC�BUILDING�SERVICE

MARK DATE DESCRIPTION

K�E�Y���P�L�A�N

C�E�R�T�I�F�I�C�A�T�I�O�N

R�E�V�I�S�I�O�N��N�O�T�E�S

GRAPHIC�SCALE

A/E�CONC.�NO.

A/E�TASK�NO.

CONS.�CONTR.

CONS.�WORK

PRIME�A/E

SUB��A/E

CONSTR.�CON.C�O�N�T�R�A�C�T�O�R�S

B�U�I�L�D�I�N�G

NAME

STREET

CITY/ST./ZIP

BUILDING�NO.

OTHER

BUILDING�NO.

FACILITY�CODE

PROJECT

TITLE

PROJECT

DESCRIPTION

P�R�O�J�E�C�T

PROJECT�NO.

GSA��PM

SUBMISSION

SUB.�DATE

DRAWING�TITLE

FILE�NAME

FLOOR�NO.

DRAWN�BY

CHECKED�BY

D�R�A�W�I�N�G

DRAWING�NO.DISCIPLINE SHEET�TYPE SEQUENCE

SHEET�SIZE:�914�X�1219

51�Mahan�Road

White�Oak,�Maryland

GS11P94EGC0011

Food�and�Drug�AdministrationConsolidationMontgomery�County�Campus

.DWG

DATE�DRAFTED:

RTKL�Associates�Inc.

RTKL�Associates,�Inc.Site/Civil/Environmental

Greenhorne�&O'�Mara,�Inc.

Topographic�Surveying

A.�Morton�Thomas�&Associates,�Inc.

Geotechnical�Engineering

Schnabel�EngineeringAssociates

Elevators

LBH�Consulting�GroupLife�Safety

Rolf�Jensen�&Associates,�Inc.

Cost�Estimating

HanscombAssociates,�Inc.

Acoustics

Shen�Milson�&�Wilke,�Inc.

PROPERTY�OF�THE�US�GOVERNMENT.�COPYING,�DISSEMINATION,�OR�DISTRIBUTION�OF�THESE�DRAWINGS,�PLANS,�OR�SPECIFICATIONS�TO�UNAUTHORIZED�PERSONS�IS�PROHIBITED.

NATIONAL�CAPITAL�REGION

In�association�with

A B C D E F G H

1

2

3

4

5

6

7

8

PLANNORTH

N

MD0821

ABC

D

MATCH�LINE

MATCH�LINE

MATCH�LINEMATCH�LINE

MATCH�LINE

MATCH�LINE

A-819

CONCIERGE�DESK

A-819

Author

Checker

05/09/06

FDA�CDRH�Office�Building

FDA�CDRH�Office�Building

ISSUE�FOR�CONSTRUCTION

200307320

06-15-2006

�1�:�10A-819 A-100B

CONCIERGE�DESK1

A-819 A�-100

CONCIERGE�Isometric3

�1�:�10A-819 A-819

CONCIERGE�DESK4

�1�:�10A-819 A-819

CONCIERGE�DESK�22

�1�:�10A-819 A-810

CONCIERGE�DESK�EAST�ELEV.5

�1�:�10A-819 A-810

CONCIERGE�DESK�WEST�ELV.6

01:10

0.2 0.5m

OC/ORA

OFFICE

BUILD

ING

31

BUILD

ING�2

CBER�LA

BBUILD

ING�72

CDER�OFFICE

BUILD

ING�22

BUILD

ING�ONE

CENTRAL

SHARED�USE

LIFE�SCIENCES�LA

BBUILD

ING�64

CDER�OFFICE

BUILD

ING�21

CENTRAL

SHARED

USE�II

BUILD

ING�3

CDER�OFFICE

EXPANSION

BUILD

ING�51

OC/ORA

OFFICE

BUILD

ING�32

CBER/CVM

OFFICE

BUILD

ING�71

CBER�LA

BBUILD

ING�52

ENGINEERING/PHYSICS�LA

BBUILD

ING�62

ANIMAL

FACILIT

YBUILD

ING�10

13510

3307 7

DN

DN

DN

DN

BRIDGE�CBER

BRIDGE�CBER�LAB

BRIDGE�CDER1

BRIDGE�CDER�LAB

BRIDGE�CDRH

BRIDGE�CDRH�LAB

BRIDGE�CSU1

BRIDGE�CSU2

BRIDGE�OC/ORA

TUNNEL�BULD�1

TUNNEL�CBER�LAB

TUNNEL�CDER1

TUNNEL�CDER2

TUNNEL�CDER�LAB

TUNNEL�CDRH�LAB

TUNNEL�CSU1

TUNNEL�CSU2

TUNNEL�OC/ORA

530�m²TUNNEL�CBER�LAB

839�m²TUNNEL�CDER2

633�m²TUNNEL�CSU2

28�m²TUNNEL�OC/ORA

108�m²TUNNEL�OC/ORA

22�m²TUNNEL�BULD�1 485�m²

TUNNEL�CSU1 1101�m²TUNNEL�CDER1

363�m²TUNNEL�CDER�LAB

375�m²TUNNEL�CDRH�LAB

Scale

Project�numberDate

Drawn�by

Checked�by

GENERAL�SERVICES�ADMINISTRATION

PUBLIC�BUILDING�SEVICE

NATIONAL�CAPITAL�REGIONIn�association�with

Food�and�Drug�AdministrationConsolidationMontgomery�County�Campus

�1�:�2000

10/11/2005

�5:48:53�PM

X������100

TUNNEL�AREA�PLAN20030732010-13-2005

Author

CheckerFDA�CDRH�Office

Area�Schedule�Tunnel

Name AreaTunnel�Unit

Price Total�Cost

TUNNEL�BULD�1 22�m² 2384 5206722�m² 52067

TUNNEL�CBER�LAB 530�m² 2384 1263319530�m² 1263319

TUNNEL�CDER1 1101�m² 2384 26238821101�m² 2623882

TUNNEL�CDER2 839�m² 2384 2000021839�m² 2000021

TUNNEL�CDER�LAB 363�m² 2384 865349363�m² 865349

TUNNEL�CDRH�LAB 375�m² 2384 894365375�m² 894365

TUNNEL�CSU1 485�m² 2384 1155152485�m² 1155152

TUNNEL�CSU2 633�m² 2384 1508497633�m² 1508497

TUNNEL�OC/ORA 28�m² 2384 67480TUNNEL�OC/ORA 108�m² 2384 257321

136�m² 324801TUNNEL 4483�m² 10687452

�1�:�20001 TUNNEL

No. Description DateCenter for Devices and Radiological Health

Phase IV

SCHEDULINGDuring the documentation phase, Autodesk Revit allowed the design team to extract critical information from the model in order to precisely quantify materials for cost estimat-ing. This benefit assured the owner that the project budget would be on budget

The schedule shown demonstrates how each tunnel was itemized in re-lation to cost and area. Using simi-lar tools, the design team controlled quantities with information that was constantly updated as the project progressed.

CONSTRUCTION DOCUMENTSWhen developing construction docu-ments, the BIM model becomes highly advantageous by providing the contractor another method of visual-izing the finished product. Since each section, elevation, reference, sched-ule and plan are simply views of the same virtual model, every element of the details become seamlessly coor-dinated with its corresponding refer-ence, increasing clarity in the field.

A

BC

U-BOLT

(2x)�3/8-16�MTG.NUTS�PER�MTG.BRACKET

(5.875")

(4.5")

(2.125")

(7.25")(2.5")

(4.5")

A-

Continuous�Raceway�for�Fluorescent&�Downlight�w/�Receptacle�Outlets(Size�of�Raceway�T.B.D.�by�Engineer)

B-

Intermittent�Stock�Steel���O31.75mm�Pipe�(Final�Size�T.B.D.�byStructural�Engineer)

C-

Steel�Flange�w/�Cutout�forContinuous�Raceway

(4.75")

149.225

114.300

53.975

184.15063.5

114.3

120.65

PENTHOUSE�TOPOF�STEEL�L.P.

137506

STEEL�FRAMING�&CROSS�BRACESEE�STRUCTURALDRAWINGS

H11�HORIZONTALASSEMBLY

CW1�WALL�ASSEMBLY

360

127

401

STEEL�SUPPORT

5

EMR133891

4F

A-804

7530

5

200

25°

65°

GUTTER�H.P.

GUTTER�L.P.

H12�HORIZONTALASSEMBLY

CW1�WALL�ASSEMBLY

788

4�MO

DU

LES

�OF�M

ETA

L�DE

CK

813

STEEL�FRAMINGSEE�STRUCTURAL�DRAWINGS

CABLE�SEESTRUCTURALDRAWINGS

WOOD�BLOCKING

ACOUSTICAL�MATERIAL

102

914

STEEL�FRAMINGSEE�STRUCTURALDRAWINGS

2�BAR�PIPE�SNOW�GUARD

17302750

126

381

127

254

STEEL�FLANGE�WITHCUTOUT�FOR�CONTINUOUSRACEWAY

101

32

PAINTED�ALL�EXPOSEDSURFACES�COLORSELECTED�BY�ARCHITECT

INTERMITTENT�STOCKSTEEL�PIPE

CONTINUOUS�UNISTRUT�RACEWAYFOR�FLUORESCENT

H

9113

176

89

H11�HORIZONTALASSEMBLY

54 200

152 16 184

STEEL�FRAMINGSEE�STRUCTURAL�DRAWINGS

MW1X�WALL�ASSEMBLY

2%�SLOPECOMPOSITE�METALFACED�PANEL�COPING

WOOD�BLOCKING

CROSS�BRACE�SEESTRUCTURAL�DRAWINGS

117 54 58118 64

STEEL�STUD

FURRING�CHANEL64

STEEL�FRAMINGSEE�STRUCTURALDRAWINGS

ROOF�H.P.132823

PARAPET133239

H

ROOF�L.P.132620

400

H12�HORIZONTALASSEMBLY

FLUID�APPLIED(INVERTED)�ROOFSYSTEM

TOP�OF�CURTAIN�WALL

280

DRIP�EDGE

EXANSION�JOINT

9541

620

3

EXPANSION�JOINT�COVER

EXPANSION�JOINTCOVER

STAINLESS�STEELFLASHING

200

130

INSULATION�DRAPE

FIRESTOPPING

H

11

1

EXPANSION�JOINT�COVER

400 200

INTERIOR

EXTERIOR EXTERIOR

CONCRETE�CURBSEE�STRUCTURALDRAWINGS

5A

A-503

INTERIOR�EXPANSIONJOINT�COVER,�CUSTOMCOLOR,�2�HR�RATED

INSULATION�DRAPE

FIRESTOPPING

SECONDARY�SEAL

PARAPET133239

H

17264

153

130

153

EXPANSIONJOINT�COVER

EXPANSIONJOINT�COVER

CONCRETE�CURBSEE�STRUCTURALDRAWINGS

WOOD�BLOCKING

FLEXIBLE�WATERPROOFMEMBRANE�CLOSURE

4E

A-503

INSULATION�DRAPE

FIRESTOPPING

SECONDARY�SEALPARAPET

133239

11

EMR133891

EXPANSIONJOINT�COVER

H11�HORIZONTALASSEMBLY

CONCRETE�CURB

STEEL�FRAMINGSEE�STRUCTURALDRAWINGS

TYPICAL�SLIDEBEARING�ELEMETS�SEESTRUCTURAL�DRAWINGS

369

153

130

INTERIOR�EXPANSIONJOINT�COVER,�CUSTOMCOLOR,�2�HR�RATED

SECONDARY�SEAL

CURTAIN�WALLINSULATION

GENERAL�SERVICES�ADMINISTRATION

PUBLIC�BUILDING�SERVICE

MARK DATE DESCRIPTION

K�E

�Y���

P�L

�A�N

C�E

�R�T

�I�F

�I�C

�A�T

�I�O

�NR

�E�V

�I�S

�I�O

�N��N

�O�T

�E�S

GR

AP

HIC

�SC

ALE

A/E�CONC.�NO.

A/E�TASK�NO.

CONS.�CONTR.

CONS.�WORK

PRIME�A/E

SUB��A/E

CONSTR.�CON.C�O

�N�T

�R�A

�C�T

�O�R

�SB

�U�I�

L�D

�I�N

�G

NAME

STREET

CITY/ST./ZIP

BUILDING�NO.

OTHER

BUILDING�NO.

FACILITY�CODE

PROJECT

TITLE

PROJECT

DESCRIPTION

P�R

�O�J

�E�C

�T

PROJECT�NO.

GSA��PM

SUBMISSION

SUB.�DATE

DRAWING�TITLE

FILE�NAME

FLOOR�NO.

DRAWN�BY

CHECKED�BY

D�R

�A�W

�I�N

�G

DRAWING�NO.DISCIPLINE SHEET�TYPE SEQUENCE

SHEET�SIZE:�914�X�1219

51�Mahan�Road

White�Oak,�Maryland

GS11P94EGC0011

Food�and�Drug�AdministrationConsolidationMontgomery�County�Campus

.DWG

DATE�DRAFTED:

RTKL�Associates�Inc.

RTKL�Associates,�Inc.Site/Civil/Environmental

Greenhorne�&O'�Mara,�Inc.

Topographic�Surveying

A.�Morton�Thomas�&Associates,�Inc.

Geotechnical�Engineering

Schnabel�EngineeringAssociates

Elevators

LBH�Consulting�GroupLife�Safety

Rolf�Jensen�&Associates,�Inc.

Cost�Estimating

HanscombAssociates,�Inc.

Acoustics

Shen�Milson�&�Wilke,�Inc.

PROPERTY�OF�THE�US�GOVERNMENT.�COPYING,�DISSEMINATION,�OR�DISTRIBUTION�OF�THESE�DRAWINGS,�PLANS,�OR�SPECIFICATIONS�TO�UNAUTHORIZED�PERSONS�IS�PROHIBITED.

NATIONAL�CAPITAL�REGION

In�association�with

A B C D E F G H

1

2

3

4

5

6

7

8

PLANNORTH

N

MD0821

ABC

D

MATCH�LINE

MATCH�LINE

MATCH�LINEMATCH�LINE

MATCH�LINE

MATCH�LINE

A-503

SAW�TOOTH�DETAILS

A-503

Author

Checker

11/02/05

FDA�CDRH�Office�Building

FDA�CDRH�Office�Building

ISSUE�FOR�CONSTRUCTION

200307320

06-15-2006

01:50

1/2 1 2 3m

�1�:�5A-503 A-804

SECTION�DETAIL�3�@�SAW�TOOTH4C

�1�:�5A-503 A-804

SECTION�DETAIL�4�@�SAW�TOOTH8G

�1�:�5A-503 A-410

SECTION�DETAIL�6�@�SAW�TOOTH4G

�1�:�5A-503 A-410

EXPANSION�JOINT�3�@�SAW�TOOTH2D

A-503

EXPANSION�JOINT�-�3D2A

EXPANSION�JOINT

EXPANSION�JOINT

SECTION�DETAIL2D/A-503

�1�:�5A-503 A-106B

PLAN�DETAIL�@�SAW�TOOTH2G

�1�:�5A-503 A-503

EXPANSION�JOINT�4�@�SAW�TOOTH5A

PLAN�DETAIL2G/A-503

SECTION�DETAIL5A/A-503

SECTION�DETAIL3E/A-505

�1�:�5A-503 A-503

EXPANSION�JOINT�5�@�SAW�TOOTH4E

SECTION�DETAIL5D/A-503

SECTION�DETAIL3G/A-504

PLAN�DETAIL8A/A-566

�1�:�5A-503

ATRIUM�LIGHTING�FIXTURES8A

Details can be expressed both two-dimensionally and three-dimensionally

Plan and schedule indicating tunnel dimension and cost

Page 10: A Iab 081575

CONSTRUCTIONdesign collaboration documentationFood and Drug Administration Consolidation

North Garage

View rendered using Accurender incorporated into the BIM software

Construction photo showing nearly complete garagePhase IIIA

PARKING GARAGEThe North Parking Garage was the second project to produce full bid documents using Revit. With a va-riety of elevation changes, the 800-car garage was well-suited to take advantage of Revit’s full range of three-dimensional capabilities. In addition, capacity studies of the ga-rage allowed the architects to design with efficiency of space in mind.

The North Parking Garage is now in use.

Page 11: A Iab 081575

CONSTRUCTIONdesign collaboration documentationFood and Drug Administration Consolidation

Center for Drug Evaluation and Research Building 2

Phase IIIB

CDER 2The Center for Drug Evaluation and Research Office Building 2 (CDER 2) also implements a narrow, 62-foot floor plate, along with under-floor air distribution, to provide an effective floor-to-floor height and superior flex-ibility. This six-story structure houses 1118 employees and support spac-es. The interior atrium incorporates the main entry to the campus as well as break-out spaces for meeting rooms.

The completion of the CDER 2 Of-fice Building construction documents marked the beginning of the design team’s efforts using Revit. Due to its complexity and size, the project pre-sented the team with numerous chal-lenges; however these challenges also provided opportunities and im-mediate benefits that were realized throughout the design process and during coordination.

10.01.06 Construction photo

Revit generated rendering looking SW

Page 12: A Iab 081575

CONSTRUCTIONdesign collaboration documentationFood and Drug Administration Consolidation

Center for Drug Evaluation and Research

Phase IIIB

Revit generated section perspective

Revit generated rendering looking NE

02.02.07 construction photo looking NE

VISUALIZERevit was also instrumental in allow-ing the design team to create real-time architectural building render-ings for use in studies, presentations to the client, in-house coordination and marketing. Within minutes, the team was able to generate render-ings in-house by simply modifying the graphical representation of the building data.

Walk-through images also became a part of our presentations to the client. Using the same model that had been created for building documentation, the design team was able to quickly produce video files that illustrated the design intent.

FEWER RFI’SDue to the precise dimensioning and coordination inherent to BIM, the General Contractor has issued fewer Requests for Information than with standard building documents. This has resulted in more efficient and expedited schedules and less con-struction waste.

Page 13: A Iab 081575

CONSTRUCTIONdesign collaboration documentationFood and Drug Administration Consolidation

Phase IIIB

ATRIUM

Revit geometry rendered using 3d Studio MAX 10.01.06 construction photo

Center for Drug Evaluation and Research

Page 14: A Iab 081575

collaboration documentation construction

Food and Drug Administration Consolidation

design

White Oak, MD

SUMMARYAutodesk Revit was instrumental in the development of the campus for the consolidated Food and Drug Ad-ministration due to its ease of use and precise documentation. As a result, the design team quickly ad-opted Revit as the primary software for both design and documentation for future projects.

Revit generated birds eye view