27
A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator Division Antiproton Source Department Anthony Leveling

A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

Embed Size (px)

Citation preview

Page 1: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

Recent Operating Experience at the Antiproton Source

Target Hall

3rd High Power Targetry WorkshopSeptember 12, 2007

FermilabAccelerator Division

Antiproton Source Department

Anthony Leveling

Page 2: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

Synopsis of this talk

• Tevatron collider performance– Integrated luminosity by year

• Anti-proton source role– Prior to May 2004– After May 2004– Performance

• Target station operating experience– Target developments since 2003– Recent observations and developments

Page 3: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

Tevatron Collider Program

Page 4: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

Aerial photograph of Pbar Source

& Recycler

Page 5: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

Co

llec

tio

n l

ens

gra

die

nt

incr

eas

es

Old

len

s an

d

Sm

all

er s

po

t si

ze o

n t

arg

et

Booster improvements

MI slip stacking

Begin pbars from Recycler to Tevatron

Page 6: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

Page 7: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

0

20

40

60

80

100

0

20

40

60

80

100

Recycler shotsTransfer Efficiency and Setup Time

Acc

umul

ator

to R

ecyc

ler

effi

cien

cy (

%)

Setup T

ime (m

inutes)

Jan 2005 Jan 2006 Jun 2007Jan 2007

Sh

utd

ow

n

Page 8: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

beam absorber & sh ie ld

concre te sh ie ld ing

concre te vau lt sh ie ld w a ll

g ranu la r f ill a ir gap

a ir ba rrie r

be rm

prevau lt enclosu re

AP O Service B uild ing Upstream Endand Target V ault P artia l E levation V iew

P Q 8B P Q 9A P Q 9BV T108

726 '

754 '

s tee l sh ie ld ing

180 cm

Final focusing quads

8E12 to 9E12 protons@ 120 GeV every 2.4 s

9 steel modules30 X 180 cm

Vacuum window 120 cm

cap

8 GeV negative secondaries bend 3 degrees into page by

pulsed magnet

Page 9: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

Target 2Six 0.95 X 10 cm diameter target disks

Seven copper cooling disksAir exhaust

3.1E19 protons – 525 day service life1/03 to 7/04

Air supply

Page 10: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

Target 3Four 0.95 X 10 cm disks with carbon-carbon cover

Two 0.95 X 12.7 cm disks with Ti cover (destroyed by the beam)

3.2E19 protons – 420 day service life7/04 to 8/05

Air cooling flowsimilar to target 2

Page 11: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

Target 4 – newSix 1.6 X 11.4 cm disks

With carbon-carbon cover

Air cooling flowsimilar to target 2

Page 12: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

•Target 4 end of life

•Improved 120 GeV optics

•120 um spot size

•First target to sputter target material

•October 2005 had to increase spot size to 200 um(?)

2E19 Protons - 260 day service life8/05 to 5/06

Page 13: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - FermilabTarget 5

Three disks 2.15 X 11.4 cm

Air flow

Page 14: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

Center 10 days

Above/belowcenter 7 days

Outer positions4 to 5 days

Page 15: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

1.7E19 protons133 day service life

5/06 to 9/06

2E19 protons119 day service life

9/06 to 1/07

2E19 protons105 day service life

1/07 to 5/08

Target 5 Target 6 Target 7

200 um spot size

Page 16: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

High Gradient Collection Lens

• Introduced 10/2006 to 12/2006

–15% improvement in target yield

• Record stacking rate achieved 2/2007

• Lens (transformer) failed in 5/2007

• Had to revert to original lens design

–Stacking rate dropped off 10 to 15% A. Leveling - Fermilab

Page 17: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

US Beam Sweeping System

• Commissioned beginning end 04/2007

• Just the upstream system

• 50% improvement in target lifetime

• 1 to 2% reduction in yield

• Reduced spot size to ~140 um

– regained stacking rate lost by lens changeout

A. Leveling - Fermilab

Page 18: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

Target 8

1.8E19 protons88 days service life

5/07 to present

Top disk - 200 micron beam sigmawith beam sweeping radius ~0.3 mm

Middle disk – 140 micron beam sigmaWith beam sweeping radius ~0.6 mm

Beam sweeping systemcommissioned late 4/07

Page 19: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

Page 20: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

Inconel 600 Target Energy Deposition per 8E12 protonssigma - 200 microns

0.00E+00

5.00E+02

1.00E+03

1.50E+03

2.00E+03

2.50E+03

3.00E+03

3.50E+03

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

radial bin (0.004 cm/bin)

Jou

les

per

gra

m

longitudinal bin 1

longitudinal bin 2

longitudinal bin 3

longitudinal bin 4

longitudinal bin 5

MARS 1507 result

1 sigma

Page 21: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

Target center to lens faceat low gradient ~ 17 cm

9cm

Page 22: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

Inconel 600 Target Energy Deposition per 9E12 protonssigma - 140 microns

0.00E+00

5.00E+02

1.00E+03

1.50E+03

2.00E+03

2.50E+03

3.00E+03

3.50E+03

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

radial bin (0.004 cm/bin)

longitudinal bin 1

longitudinal bin 2

longitudinal bin 3

longitudinal bin 4

longitudinal bin 5

Jo

ule

s p

er

gra

m

1 sigma

Page 23: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab45 cm

Page 24: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - FermilabTarget center to lens faceat low gradient ~ 14 cm

Page 25: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - Fermilab

Target SEM 30 cm upstream of targetTarget sputtering events:

October 2005 (cone)June through July 2007

Page 26: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

A. Leveling - FermilabThe next generation target – December 2007

•Inconel 600 cylinder

•Copper cooling•Copper pipe shell•6 to 12 mm Cu balls•H2 brazed construction

•Be or ALBEMET outer shell•Interference fit•Excludes air at surface

Page 27: A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator

Pbar Target Station Summary• Startup in October 2007

– Install high gradient lens (to improve yield)– Remove damaged target SEM (BL obstacle!)– evaluate pulsed magnet for replacement– restore to larger spot size (stop sputtering)

• Build next generation target– Return to 140 um spot size (to improve yield)

• Build new target SEM (spot size understanding)• Continue building spare lenses• Run, run, run . . . and integrate luminosity

A. Leveling - Fermilab