Sponsored by the U.S. Department of Defense© 2004 by Carnegie Mellon University
Version 1.0 page 1
Pittsburgh, PA 15213-3890
Carnegie MellonS oftware Engineer ing Inst itute
A Measurement & Analysis Training Solution SupportingCMMI & Six Sigma Transition
Dave HallowellJeannine M. Siviy
Report Documentation Page Form ApprovedOMB No. 0704-0188
Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering andmaintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, ArlingtonVA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.
1. REPORT DATE OCT 2004 2. REPORT TYPE
3. DATES COVERED 00-00-2004 to 00-00-2004
4. TITLE AND SUBTITLE A Measurement & Analysis Training Solution Supporting CMMI & SixSigma Transition
5a. CONTRACT NUMBER
5b. GRANT NUMBER
5c. PROGRAM ELEMENT NUMBER
6. AUTHOR(S) 5d. PROJECT NUMBER
5e. TASK NUMBER
5f. WORK UNIT NUMBER
7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Carnegie Mellon University,Software Engineering Institute,Pittsburgh,PA,15213
8. PERFORMING ORGANIZATIONREPORT NUMBER
9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S)
11. SPONSOR/MONITOR’S REPORT NUMBER(S)
12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited
13. SUPPLEMENTARY NOTES
14. ABSTRACT
15. SUBJECT TERMS
16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT Same as
Report (SAR)
18. NUMBEROF PAGES
55
19a. NAME OFRESPONSIBLE PERSON
a. REPORT unclassified
b. ABSTRACT unclassified
c. THIS PAGE unclassified
Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18
© 2004 by Carnegie Mellon University Version 1.0 page 2
Carnegie MellonS oftware Engineer ing Inst itute
Trademarks and Service Marks® Capability Maturity Model, Capability Maturity Modeling, Carnegie Mellon, CERT, CERT Coordination Center, CMM,and CMMI are registered in the U.S. Patent and TrademarkOffice by Carnegie Mellon University.
SM Architecture Tradeoff Analysis Method; ATAM;CMM Integration; CURE; IDEAL; Interim Profile; OCTAVE; Operationally Critical Threat, Asset, and Vulnerability Evaluation; Personal Software Process; PSP; SCAMPI; SCAMPI Lead Assessor; SCAMPI Lead Appraiser; SCE; SEI; SEPG; Team Software Process; and TSP are servicemarks of Carnegie Mellon University.
© 2004 by Carnegie Mellon University Version 1.0 page 3
Carnegie MellonS oftware Engineer ing Inst itute
Objectives
Primary• Trace the design and development of a measurement &
analysis course that integrates CMMI and Six Sigma• Show why such integration is important
Secondary• Highlight the complexities of process improvement in a
“multi-technology world”• Share issues related to technology transition• Describe instructional design choices• Illustrate a course case study in Six Sigma project form
© 2004 by Carnegie Mellon University Version 1.0 page 4
Carnegie MellonS oftware Engineer ing Inst itute
Outline
Motivations for process improvement
Process improvement solutions• Roots, evolutions, and integrations• Transitioning your solution
Training as part of your “whole product”• Designing an integrated training solution• Illustration(s)
© 2004 by Carnegie Mellon University Version 1.0 page 5
Carnegie MellonS oftware Engineer ing Inst itute
What Drives “Process Improvement”?
Performance issues: product, project• And, eventually, process issues
Regulations and mandates• Sarbanes Oxley• “Level 3” requirements to win contracts
Business issues and “burning platforms”• Lost market share or contracts• Continuous cost and cycle time improvement• Capitalizing on new opportunities
There is compliance-driven improvement.And there is performance-driven improvement.
© 2004 by Carnegie Mellon University Version 1.0 page 6
Carnegie MellonS oftware Engineer ing Inst itute
Solutions
CMMI®
EIA 731
TSPSM
ISO12207
Score-card
EIA 632
ISO9000
ITIL
COBIT
PSM
GQIM
© 2004 by Carnegie Mellon University Version 1.0 page 7
Carnegie MellonS oftware Engineer ing Inst itute
More Solutions: SPC Frameworks Quagmire
Cop
yrig
ht 2
001,
Sof
twar
e P
rodu
ctiv
ity C
onso
rtiu
m.
Incl
uded
her
e w
ith p
erm
issi
on.
© 2004 by Carnegie Mellon University Version 1.0 page 8
Carnegie MellonS oftware Engineer ing Inst itute
And Yet More Solutions
[CIO 04]
CIO Magazine: “Quality Model Mania”
© 2004 by Carnegie Mellon University Version 1.0 page 9
Carnegie MellonS oftware Engineer ing Inst itute
And There Are Still More…
In addition to the traditional list of “process improvement”models, methods, and standards, there are life-cycle,business-sector-specific, and other types of relevanttechnologies.
For instance:• Rational Unified Process (RUP)• Agile• Architecture Tradeoff Analysis Method (ATAM)• TL9000• People CMM
© 2004 by Carnegie Mellon University Version 1.0 page 10
Carnegie MellonS oftware Engineer ing Inst itute
Do You Have a Headache Yet?
© 2004 by Carnegie Mellon University Version 1.0 page 11
Carnegie MellonS oftware Engineer ing Inst itute
Observations
Organizations are implementing one or more of thesesolutions simultaneously.
Economies of scale are needed in training.
A holistic, “connected” approach is needed in training• Leaving students to their own devices to make
connections can be risky and/or time-consuming.
Before we discuss our project, let’s unfold the story…
© 2004 by Carnegie Mellon University Version 1.0 page 12
Carnegie MellonS oftware Engineer ing Inst itute
Evolutions (examples)Six Sigma• Evolved at Motorola in the 1980s from TQM• First focused on reducing process defects and cycle
time in manufacturing• Later expanded to address design (DFSS)• Spread to services and is in early stages in software
CMMI• Released in 2000• Evolved from several Capability Maturity Models,
reflects Crosby’s 5 maturity levels• Focuses on infrastructure and process maturity• Intended for software and systems engineering
Common roots and common improvement intent[BPD]
© 2004 by Carnegie Mellon University Version 1.0 page 13
Carnegie MellonS oftware Engineer ing Inst itute
A Technology Adoption Process
EstablishBusinessDrivers
SelectTechnology
Implement Solution Measureimpact
Organization’s Process Improvement Groups:SEPGs, Six Sigma Practitioners, et. al.
SEI (or other institution)
developtechnology
transition tech-nology
LevelRating,
BusinessResults
Implement/Integrate tech.
Project Team
Execute project life cycle phases, steps
Measureresults
ProjResults,
transitiondevelop
© 2004 by Carnegie Mellon University Version 1.0 page 14
Carnegie MellonS oftware Engineer ing Inst itute
Designing Your ApproachSelection and development considerations include:• What is the goal?• What model(s) or references should be used?• Should they be implemented in parallel or sequentially?• Can they be used “off the shelf” or is tailoring needed?• What needs to be created internally?
Integrated process solutions that are seamless andtransparent to the engineer in the field significantlycontribute to an organization’s success.
Your Six Sigma skills can play a role in the design.
© 2004 by Carnegie Mellon University Version 1.0 page 15
Carnegie MellonS oftware Engineer ing Inst itute
Transitioning Your SolutionTechnology transition is the process of creating or maturinga technology, introducing it to its intended adopters, andfacilitating its acceptance and use.
Technology is• Any tool, technique, physical equipment or method of
doing or making, by which human capability isextended.”
• “The means or capacity to perform a particular activity.”
Do you use the words maturation, introduction, adoption,implementation, dissemination, rollout, deployment, or fielding inyour improvement approach? Each indicates transition.
[Forrester], [Schon], [Gruber]
© 2004 by Carnegie Mellon University Version 1.0 page 16
Carnegie MellonS oftware Engineer ing Inst itute
Effective Transition Planning
Features include:• Precision about the problem, clarity about the solution• Transition goals & a strategy to achieve them• Definition of all adopters and stakeholders and
deliberate design of interactions among them• Complete set of transition mechanisms — a whole
product• Risk management• Either a documented plan or extraordinary leadership
throughout transition
[Forrester]
© 2004 by Carnegie Mellon University Version 1.0 page 17
Carnegie MellonS oftware Engineer ing Inst itute
The “Whole Product” Concept*
and Policies
T
Installationand
Additional
CoreCoreProductProduct
Standards
Training
Debugging
Software
Etc.Introduction
Support
ororTechnologyTechnology
[Moore]
© 2004 by Carnegie Mellon University Version 1.0 page 18
Carnegie MellonS oftware Engineer ing Inst itute
Outline
Motivations for process improvement
Process Improvement Solutions• Roots, evolutions, and integrations• Transitioning your solution
Training as part of your “whole product”• Designing an integrated training solution• Illustration(s)
© 2004 by Carnegie Mellon University Version 1.0 page 19
Carnegie MellonS oftware Engineer ing Inst itute
Training ChallengesMany technologies have their own training.• It’s not practical to send everyone to all training courses.• Yet it’s also not practical to custom build all training.
Cross training (i.e., CMMI & Six Sigma)• At a strategic level: how to increase awareness so that
experts in one technology can make judicious decisions aboutadoption and implementation of another technology
• At a tactical level: how to balance the expertise
Who and how many should be trained? For instance,• Train whole organization in internal process standards and
possibly basic Six Sigma concepts• Train fewer in Six Sigma BB, CMMI, measurement and
analysis, other specialty areas
© 2004 by Carnegie Mellon University Version 1.0 page 20
Carnegie MellonS oftware Engineer ing Inst itute
Benchmarking
Integrated training solutions underway:• DFSS training that includes awareness
sessions of relevant technologies- SEI’s Product Line Practices, ATAM, CMMI
engineering PAs• DFSS training that leverages ATAM• DMAIC training that references PSP-based
instrumented processes
StrategicEmphasis
TacticalEmphasis
Our approach uses measurement & analysis as an integrator.
Highlights of our course design and content follow.
© 2004 by Carnegie Mellon University Version 1.0 page 21
Carnegie MellonS oftware Engineer ing Inst itute
Scope of New Analysis CoursesOur task is to build new courses that• Focus on analysis
- But more than just SPC• Focus on skills-building• Support CMMI• Appeal to many roles
- process improvement personnel- measurement personnel- project team members- CMMI appraisers (maybe)- Six Sigma practitioners- and so on
• Resonate with organizations at any maturity level
© 2004 by Carnegie Mellon University Version 1.0 page 22
Carnegie MellonS oftware Engineer ing Inst itute
Approach• Leverage other technologies and initiatives.
- Reuse demonstrated frameworks and toolkits- Build explicit connections to models- Define “certification” boundaries and options- Return to common roots but don’t reinvent the wheel
• Assemble a cross-organizational, cross-functionaldevelopment team
• Use Gagne’s Model for Instructional Design• Use Kirkpatrick’s Four-Level Evaluation Model• Design for extensibility: case study approach
- Allows easy swap-in of other domains, technologies- Allows easy updates as core technologies evolve
© 2004 by Carnegie Mellon University Version 1.0 page 23
Carnegie MellonS oftware Engineer ing Inst itute
Considerations
• Integrate product, process, project analysis- Focus on process- Reuse SEI “Analysis Dynamics”
• Use aspects of Six Sigma- DMAIC problem solving framework- Toolkit- Training philosophy (hands on, practitioner focus)
• Make CMMI links explicit• Determine fit with existing measurement courses• Couple with an annual Measurement Practices
Workshop (future)
© 2004 by Carnegie Mellon University Version 1.0 page 24
Carnegie MellonS oftware Engineer ing Inst itute
A Base Architecture - Connecting all the Improvement Models
Fuzzy Senseof a Problem
or Opportunity
Typeof Data
LanguageStatementsObservations
NumbersActual Capability
Variation Over TimeSample Data
Models
Language + Numbers
Focus on key aspects
Product/Process Improvement Progress
Dis
till
Plan to
Gath
er
Monitored Results
Dis
till
Plan to G
ather
Plan to G
ather
Dis
till
Solution& Standards
Distilling &Understanding
Experience: Gathering &
Discovering
Teams moveback and
forthbetween..
[Kawakita], [Shiba]
© 2004 by Carnegie Mellon University Version 1.0 page 25
Carnegie MellonS oftware Engineer ing Inst itute
Design & Development Process
• Identify needs, requirements• Update overall measurement curriculum design
- Integrate with “certificate programs”• Establish learning objectives• High-level design of measurement & analysis courses
- Course themes and storyboards- Desired student capability level in specific methods
• Detailed design of measurement & analysis courses- Including case study storylines
• Module development, including reviews• Pilot
© 2004 by Carnegie Mellon University Version 1.0 page 26
Carnegie MellonS oftware Engineer ing Inst itute
Curriculum
© 2004 by Carnegie Mellon University Version 1.0 page 27
Carnegie MellonS oftware Engineer ing Inst itute
Certificates and Certifications
SEI Certificate Programs• Analyst (future)
Six Sigma Practitioner Certification• SEI Partners who provide Six Sigma training and
certification can leverage courses- Adjunct, domain-specific, Black Belt training- Domain-specific Yellow Belt training
© 2004 by Carnegie Mellon University Version 1.0 page 28
Carnegie MellonS oftware Engineer ing Inst itute
Learning ObjectivesStudents should be able to• Describe the methodology (DMAIC + thoughtmap), incl
- improved process behavior for business benefit- how this methodology “plays” in the CMMI world
• Decide how, when and why to use selected key toolsand interpret their outputs.
• Demonstrate how effective measurement & analysiscontributes to a paradigm shift from a compliance-driven to performance-driven improvement.
• Analyze, interpret, and report data using “x” tools.• Explain statistical thinking, central tendency,
uncertainty and risk.
© 2004 by Carnegie Mellon University Version 1.0 page 29
Carnegie MellonS oftware Engineer ing Inst itute
Design Highlights: Course Themes
Maps to GP3.2 and GP4.2 atany maturity level.Maps to Level 5 thinking.
Maps to GP2.8 and GP3.2 atany maturity level.Maps to Level 4 thinking.
CMMI Relationship
Prevent defects, ensurecost/schedule performanceby using real-time data andoptimizing front-end planning,requirements, and designprocesses.
Reduce defects, waste (effort,resources, etc), and cycle timeby correcting special causevariation, repairing, and/orimproving processes.
ImprovementOrientation
Process Measurement &Analysis II
Process Measurement &Analysis I
© 2004 by Carnegie Mellon University Version 1.0 page 30
Carnegie MellonS oftware Engineer ing Inst itute
Design Highlights: Course Outline
Process Measurement & Analysis I• Introduce DMAIC flowchart• Call Center Case: DMAIC Process• Defect Containment Case: Data Stratification• Cost & Schedule Case: Variance Reduction
Process Measurement & Analysis II• Recap DMAIC• Project Simulation: Organization and Project Baseline• Defect Containment Case:
- Optimize inspections and improve design• Cost & Schedule Case:
- Optimize estimating and improve requirements
illustration
© 2004 by Carnegie Mellon University Version 1.0 page 31
Carnegie MellonS oftware Engineer ing Inst itute
Skills Capability Matrix (excerpt)Analytical Methods
desired student capability
addressed in course
7+ basic tools (histogram, scatterplot, pareto, etc.) skill 1process mapping / SIPOC skill 1
systems thinking - current/future reality trees, causal loop diagrams tbd tbdsampling, grouping, alpha/beta risk understandFMEA skill 1Orthogonal decomposition knowledge tbdmultivariate analysis (principle components) awareness tbdConfidence and prediction intervals understand 2hypothesis tests, Means comparison tests skill 1Variance comparison tests knowledge tbddesign of experiments (DOE) understand 2analysis of variance, incl analysis of error knowledge 2modeling - regression, residual analyis, response surface knowledge 2Rayleigh distributions understand 2chi square distributions understand tbdcapability analysis understand 2KJ skill 2VOC skill 2QFD awareness 2pughs concept selection skill 2process simulation awareness 2
Awareness = on the radarKnowledge = knows basic information
Skill = can do itUnderstand = can do, interpret, explain
© 2004 by Carnegie Mellon University Version 1.0 page 32
Carnegie MellonS oftware Engineer ing Inst itute
Case 1 Storyline 1Define• organization project portfolio includes both new
development and maintenance• project size and complexity varies significantly• project schedules vary from <1 month to >18 months• Primary focus: customer satisfaction as proxied by field
defects and effort & schedule variance• Organization is transitioning from CMM to CMMI,
working toward high maturity• Organization is not a Six Sigma adopter (yet)
Measure• Earned value data• Defect data• Customer satisfaction survey (new)
© 2004 by Carnegie Mellon University Version 1.0 page 33
Carnegie MellonS oftware Engineer ing Inst itute
Case 1 Storyline 2Analyze• Iteration 1: baseline and problem/goal identification
- Reduce cost and schedule variance (in processand closed project)
- Improve data quality (presence, accuracy, etc.)• Subsequent iterations:
- baseline updates- problem/goal refinement- process understanding
• Tools used: boxplots, distributions, time series, paretocharts, capability analysis, basic descriptive statistics,indicator templates, survey analysis, SMART* goals,root cause analysis
Specific, Measurable, Attainable, Realistic, Timely
© 2004 by Carnegie Mellon University Version 1.0 page 34
Carnegie MellonS oftware Engineer ing Inst itute
Case 1 Storyline 3Improve• Measurement infrastructure• Cost and schedule variance cause code taxonomy• Estimating (training, minor process adjustments)• Adoption of “management by fact” (MBF) format• Homogeneous samples for in-process charts
Control• Organization: dashboards with charts for cost, schedule,
defects, data quality, customer satisfaction• Projects: Earned Value (EV) prediction model
© 2004 by Carnegie Mellon University Version 1.0 page 35
Carnegie MellonS oftware Engineer ing Inst itute
Case 1 Sample ArtifactsSample artifacts on following slides include• Baseline charts: boxplots, capability analysis• Co-optimized pareto analysis• SMART goals and root cause analysis• Homogeneous sampling• Earned Value prediction model• Management by Fact
The full case storyline demonstrates the usage of animprovement process• consistent with DMAIC, incl gates• meeting CMMI specific practices• leveraging measurement best practices
© 2004 by Carnegie Mellon University Version 1.0 page 36
Carnegie MellonS oftware Engineer ing Inst itute
Case 1 Artifacts: Goal StructureCustomer Satisfaction
Track/chart fielddefects
Track/chart cost & scheduledeviation
Deliver high quality product
• other factors
Plot, plot, plot:• trends• distributions• control charts (c-charts)• scatter plots
Plot, plot, plot:• trends• distributions• control charts (x-bar, r; x, mr)• scatter plots
otherfactors
Success Indicators,Management Indicators
Analysis Indicators,Progress Indicators
Analysis Indicators,Progress Indicators
SPI TaskPlans
Consonantwith GQIMand SixSigma CTQs
© 2004 by Carnegie Mellon University Version 1.0 page 37
Carnegie MellonS oftware Engineer ing Inst itute
%S
ch. V
ar.
-100
-80
-60
-40
-20
0
20
40
60
80
100
1: oct-01 2: nov-01 3: dec-01 4: jan-02 5: feb-02 6: mar-02
month label
In-Process Schedule Variance Boxplot
x
90th percentile75th percentilemedian: 50th percentile25th percentile10th percentile
mean
Data reported monthly for all projects, cycle phases
Conclusion: need to address variability
This andfollowingslidesconsonant withSix Sigmatoolkit, CMMIQPM, OPP,CAR
© 2004 by Carnegie Mellon University Version 1.0 page 38
Carnegie MellonS oftware Engineer ing Inst itute
Completed Project Data Baseline
This represents (initial plan – final actual)• negative numbers are overruns• schedule is in terms of calendar days
It is the total cumulative variance• customer-requested/approved changes are included• one way or another, this is what the customer sees
% effort variance % sched varianceaverage -66.1% -15.0%standard deviation 415.9% 38.3%median 0.9% -8.1%min to max -2689.9% to 50.1% -99.8% to 128.0%n 42 42capability notes(spec = +/- 20%)
45.2%outside spec
40.4%outside spec
-30
-25
-20
-15
-10
-5
0
5
LSL
USL
Target
-1
-0.5
0
0.5
1
1.5
LSL
USLTarget
© 2004 by Carnegie Mellon University Version 1.0 page 39
Carnegie MellonS oftware Engineer ing Inst itute
Transformed original brainstorm list• initial experiential assessment of frequency, impact of each
cause code• refined “operational definitions” and regrouped brainstorm list• tagged causes to historical data• refined again
Final list included such things as• Missed requirements• Underestimated task• Over commitment of personnel• Skills mismatch• Tools unavailable• EV Method problem• Planned work not performed• External
Cause Code Taxonomy
Direct Cause vs.Root Cause
Causes resolved in-process vs. causesthat affect finalperformance
© 2004 by Carnegie Mellon University Version 1.0 page 40
Carnegie MellonS oftware Engineer ing Inst itute
Co-Optimized Pareto Analysis
EV ProblemsUnexpecteddeparture
Planned worknotperformed
Assetavailability
Underestimatedtask
SkillsMismatch
5
Unexpecteddeparture ofpersonnel
MissedRequirements
EV ProblemsUnder plannedrework
Plannedwork notperformed
Missedrequirements
4
Missedrequirements
UnderestimatedTask
Missedrequirements
Missedrequirements
Underplannedrework
EV Problems3
UnderestimatedTask
Skillsmismatch
Underplannedrework
EV ProblemsAssets notavailable
Tools2
ToolsToolsUnderestimatedTask
Underestimated Task
ToolsUnderestimatedTask
1
OrganizationSlice 2 Effort
OrganizationSlice 2
Schedule
OrganizationSlice 1 Effort
OrganizationSlice 1
Schedule
EffortScheduleImpact# (fromPareto)
© 2004 by Carnegie Mellon University Version 1.0 page 41
Carnegie MellonS oftware Engineer ing Inst itute
SMART Schedule Variance GoalReduce the total variance by decreasing the variance ofthe top 3 internal causes by 50% in 1 year.
Reduce the impact of external causes by 50%.
Indicators:• Trend for each cause independently• Trend for total variance
Will focusing on thesecauses give us bottom-lineresults?
© 2004 by Carnegie Mellon University Version 1.0 page 42
Carnegie MellonS oftware Engineer ing Inst itute
Schedule Variance Root Cause 1Cause Code: Underestimated tasksProcess: Project ManagementSubprocesses: Planning
• Establish requirements• Define project process• Perform detailed planning
Requirements Management
As subprocesses are explored, processmapping may be used with (or based on) ETVXdiagrams
CMMIFriendly
SixSigmaFriendly
© 2004 by Carnegie Mellon University Version 1.0 page 43
Carnegie MellonS oftware Engineer ing Inst itute
Schedule Variance Root Cause 2Root causes of common cause variation• Inexperience in estimation process• Flawed resource allocation• Estimator inexperience in product (system)• Requirements not understood
Root causes of special cause variation• Too much multitasking• Budget issues
© 2004 by Carnegie Mellon University Version 1.0 page 44
Carnegie MellonS oftware Engineer ing Inst itute
Improving Sampling HomogeneityOverall rollup:• group data by project milestones
Within project:• identify control limits for each development phase• compare each project’s phase against the history of
similar projects in that same phase• robust sample for limit calculations is critical
A L Q 1 8 4 p r o je c t c o s t in d
- 1 0
- 5
0
5
1 0
1 3 5 7 9 11 13 15
M o n th
project cost index
wider limitsfor projectsin planningphase
narrower limitsfor projects inexecution phase
© 2004 by Carnegie Mellon University Version 1.0 page 45
Carnegie MellonS oftware Engineer ing Inst itute
EV Estimate-At-Completion Model
Earned Value Chart
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
10/1
/200
1
11/1
/200
1
12/1
/200
1
1/1/
2002
2/1/
2002
3/1/
2002
4/1/
2002
5/1/
2002
6/1/
2002
7/1/
2002
8/1/
2002
9/1/
2002
10/1
/200
2
11/1
/200
2
12/1
/200
2
1/1/
2003
2/1/
2003
3/1/
2003
4/1/
2003
5/1/
2003
6/1/
2003
7/1/
2003
8/1/
2003
9/1/
2003
10/1
/200
3
11/1
/200
3
12/1
/200
3
1/1/
2004
2/1/
2004
3/1/
2004
4/1/
2004
Month
Ho
urs
EAC
BCWS
BCWP
ACWP
EAC Line
10% Upper Bounds
10% Lower Bounds
20% Upper Bounds
20% Lower Bounds
UCL
LCL
Process UCL, Effort and Schedule
Process LCL, Effort and Schedule
Internal Spec Limits. 20%
and 10%
Calculated Estimate at Completion
Baseline Estimate at Completion
© 2004 by Carnegie Mellon University Version 1.0 page 46
Carnegie MellonS oftware Engineer ing Inst itute
Management by Fact (see handout)
Reduce the total schedule variance by decreasing thevariance of the top 3 internal causes by 50% in 1 year.
Total variance w/mean comparison
Variance for top 3 causes:• Underestimated Tasks• EV Method Problem• Missed Requirements
Prioritization &Root Cause
• Inexperience• Resource Allocation• Requirements not
understood• ….
Counter Measures
First: Gather realtime data andverify “data archaeology”Then:•….•…
Impact, Capability
In total, thesecountermeasures willremove 15% of typicalvariance.(as possible, list impact ofeach countermeasure)
0
5
10
15
20
25
30
1 2 3 4 5Month
Per
cent
Sch
edul
e V
aria
nce
0123456789
1 2 3 4 5Month
Per
cen
t S
ched
ule
Var
ian
ce
Cause 1Cause 2Cause 3
© 2004 by Carnegie Mellon University Version 1.0 page 47
Carnegie MellonS oftware Engineer ing Inst itute
Case Study 1: The ConnectionsCMMI• Process Areas* used: MA, OPP, QPM, OID, CAR• Process Areas touched: PP, PMC, RD, REQM• Terms addressed: Baseline, process performance
model
Measurement Best Practices• Indicator template key component of measurement plan
Six Sigma• Problem-solving approach influenced design and
definition of measurement & analysis processes• Used MBF as an organizational innovation• Indicator templates added as a domain-specific tool to
the Six Sigma toolkit
*See Addenda for list of CMMI Process Areas
© 2004 by Carnegie Mellon University Version 1.0 page 48
Carnegie MellonS oftware Engineer ing Inst itute
Case Study: Skills-Building
In class practice: statistical skills-building• Boxplots• Tukey Kramer• Adapted FMEA
In class discussions and other exercises• Risks of using historical data• Small sample sizes and homogeneous sampling• Corrective action guidance (as part of indicator template,
esp. for SPC charts)• Evaluate and rewrite goals for SMARTness
© 2004 by Carnegie Mellon University Version 1.0 page 49
Carnegie MellonS oftware Engineer ing Inst itute
Key PointsEffective training is a critical part of your process improvementapproach.
Training can and should be “integrated” (as appropriate).
Measurement & Analysis is an effective platform for integration.• It is a common root!
Integrated approaches to training are win-win propositions.• If you are a Six Sigma adopter, you get exposure to domain
specific technologies that will help solve your problems.• If you are a CMMI adopter, you learn to better leverage the
most current body of knowledge for problem-solving.• If you are adopting both, you spend less time making the
connections and more time making progress!
© 2004 by Carnegie Mellon University Version 1.0 page 50
Carnegie MellonS oftware Engineer ing Inst itute
Contact Information
Dave HallowellSix Sigma AdvantageEmail: [email protected]
Jeannine SiviySoftware Engineering InstituteMeasurement & Analysis InitiativeEmail: [email protected]
© 2004 by Carnegie Mellon University Version 1.0 page 51
Carnegie MellonS oftware Engineer ing Inst itute
References[BPD] Process Maturity / Capability Maturity,
http://www.betterproductdesign.net/maturity.htm(a resource site for the Good Design Practice program, a joint initiative between theInstitute for Manufacturing and the Engineering Design Centre at the University ofCambridge, and the Department of Industrial Design Engineering at the RoyalCollege of Art (RCA) in London)
[CIO 04] Anthes, Gary H., Quality Model Mania, CIO Magazine, 8 March 2004,http://www.computerworld.com/developmenttopics/development/story/0,10801,90797,00.html
[Forrester] Forrester, Eileen, Transition Basics (reference information)
[Gruber] William H. Gruber and Donald G. Marquis, Eds., Factors in the Transfer ofTechnology, 1965.
[Kawakita] Kawakita, Jiro, The Original KJ Method, Kawakita Research Institute
[Moore] Geoffrey Moore, Crossing the Chasm: Marketing and Selling Technology Productsto Mainstream Customers. Harper Business. 1991.
[Schon] Donald A. Schon, Technology and Change: The New Heraclitus, 1967.
[Shiba] Shiba, Shiji, et al., New American TQM – Four Practical Revolutions inManagement, Productivity Press, 1993.
All URLs subject to change
© 2004 by Carnegie Mellon University Version 1.0 page 52
Carnegie MellonS oftware Engineer ing Inst itute
Addenda
CMMI Process Areas and Structure
© 2004 by Carnegie Mellon University Version 1.0 page 53
Carnegie MellonS oftware Engineer ing Inst itute
CMMIProcessAreas
ProjectManagement
Process AreasCategory
Requirements ManagementRequirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidation
Engineering
Configuration ManagementProcess and Product Quality AssuranceMeasurement and Analysis (MA)Causal Analysis and ResolutionDecision Analysis and Resolution
Support
Project Planning (PP)Project Monitoring and Control (PMC)Supplier Agreement Management (SAM)Integrated Project ManagementRisk ManagementQuantitative Project Management (QPM)
Organizational Process FocusOrganizational Process DefinitionOrganizational TrainingOrganizational Process PerformanceOrganizational Innovation and Deployment
ProcessManagement
© 2004 by Carnegie Mellon University Version 1.0 page 54
Carnegie MellonS oftware Engineer ing Inst itute
CMMI StructureAppendixesAppendixes
Maturity Level 5 OID, CAR
Maturity Level 4 OPP, QPM
Maturity Level 3 REQD, TS, PI, VER, VAL, OPF, OPD, OT, IPM, RSKM, DAR
Maturity Level 2 REQM, PP, PMC, SAM, MA, PPQA, CM
Process Management PAs - Goals - Practices
Front Matter Introduction Structure of the Model Model Terminology Maturity Levels, Common Features, and Generic
Practices Understanding the Model Using the Model
CMMI-SE/SEStaged
Support CM, PPQA, MA, CAR, DAR
Engineering REQM, REQD, TS, PI, VER, VAL
Project Management PP, PMC, SAM IPM, RSKM, QPM
Process Management OPF, OPD, OT, OPP, OID
Front Matter Introduction Structure of the Model Model Terminology Capability Levels and Generic Model
Components Understanding the Model Using the Model
CMMI-SE/SWContinuous
© 2004 by Carnegie Mellon University Version 1.0 page 55
Carnegie MellonS oftware Engineer ing Inst itute
CMMI
Engineering SupportProcess
ManagementProject
Management
• Organizational Process Focus• Organizational Process Definition• Organizational Training• Organizational Process Performance• Organizational Innovation and Deployment
• Project Planning• Project Monitoring and Control• Supplier Agreement Mgmt.• Integrated Project Mgmt.• Risk Management• Quantitative Project Mgmt.
• Requirements Management• Requirements Development• Technical Solution• Product Integration• Verification• Validation
• Configuration Mgmt.• Process and Product Quality Assurance• Measurement & Analysis• Decision Analysis and Resolution• Causal Analysis and Resolution
IPPD
• Organizational Environment for Integration • Integrated Team
Acquisition
• Supplier Selection and Monitoring• Integrated Supplier Management• Quantitative Supplier Management
CMMI-SE/SW/IPPD/A - Continuous