A mixture of asphalt emulsion, crushed aggregate, mineral filler, water and other additives properly...
If you can't read please download the document
A mixture of asphalt emulsion, crushed aggregate, mineral filler, water and other additives properly proportioned, mixed and spread as a surface treatment
A mixture of asphalt emulsion, crushed aggregate, mineral
filler, water and other additives properly proportioned, mixed and
spread as a surface treatment. When applied the slurry seal shall
have a homogeneous appearance, fill minor cracks, adhere firmly to
the surface and provide a weatherproof friction course.
Slide 3
Very cost effective surface treatment that extends the life of
a pavement 5-7 years + Restores surface texture Will ultimately be
placed at no more than 1.5 times the thickness of the largest stone
Treatment that preserves the underlying pavement from further
oxidation related to climatic conditions. Fast application. A
typical residential street will take 15 minutes to place and 2-4
hours to cure to a point that will again support traffic.
Slide 4
Proven Technology
Slide 5
Slide 6
Early loss of surface fines Protect the pavement from further
oxidation by providing a new wearing layer Only minor cracking
present. Anything grater than 1/8 gets filled prior to slurry
application Alligator cracking and Pot Holes are repaired. Be
careful of placing slurry over fresh patches.
PCI 80 and above Cracks greater that 1/8 filled Alligator
cracking has been repaired No rutting Only minor surface fines
loss
Slide 9
Slide 10
Slide 11
Slide 12
Keep the public in the loop. Try not to package a slurry
project with an overlay project Winter slurry color will vary more
than summer. Give it time. Most power steering scuffs will heal
over time. (Most slurries will take a change of all seasons to
complete its cure) Initial shed or light raveling will occur (large
stones that do not lay down may kick out)
Slide 13
Caltrans Standard Specifications Section 37
http://dot.ca.gov/hq/esc/oe/construction_s tandards.html Greenbook
Section 203 http://www.bnibooks.com/products/standa
rd-specifications-public-works-construction International Slurry
Surfacing Association http://slurry.org/
Slide 14
Verification of material compatibility Provides starting point
for start up of the project. Targets optimum mixture but allows for
minor adjustment in the field.
Slide 15
Too Much oil will provide a long lasting surface but result in
flushing and shoving Too little oil will result in color variation
and excessive rock loss up to and including 100% raveling. Most
materials will provide a good product outside of the recommendation
as long as you evaluate the data. Particularly on the slightly high
side of the oil content.
Slide 16
Aggregate (manufactured) Type 1 Type 2 Type 3 Latex Mineral
Fillers / Additives Emulsion Other Microsurfacing Tire Rubber
Modified RAP
Slide 17
Residential Streets Parking LotsAirports
Slide 18
Finest gradation of aggregate 1/8 top size Fractured faces
Generally parking lots and bike lanes Placed 8-12 lbs per square yd
Low speed traffic or high foot traffic type areas Airports
Slide 19
Residential Streets County RoadsShoulders
Slide 20
Mid size aggregate top size Fractured faces Typically used on
rural county roads, arterial roads, Collectors and primarily
residential. Application rate 10-20 lbs/SY
Slide 21
4 Lane Highways Interstates 2 Lane Highways
Slide 22
Most course gradation Max stone 3/8 Fractured faces Application
Rate 13-30 lbs/SY Typically used on highways, rural county roads,
arterial and collector roadways.
Slide 23
Benefits Increases the softening point of the residual asphalt
Improves early strength of seal (Reduces Power steering burns) Adds
elastomeric properties to the residual binder (Better stone
retention) Typical addition rate of 2.5% of the emulsion
Slide 24
Cement Can act as a retarder or accelerator of break depending
on emulsion and aggregate properties. Generally will make the mix
tougher at least initially Is not compatible with all aggregate
sources Aluminum Sulfate Generally acts as a retarder of break time
in the field. Can act as a viscosity builder in the slurry
preventing separation of the oil and rock during application.
Slide 25
Generally a CQS-1H Cationic Quick Set (To a limited degree it
uses the mineral to assist in the break) Compatible with most
aggregates (negative charge offers resistance to stripping) Other
options could be a QS, SS or CSS
Slide 26
Tire Rubber Slurry Color Multiple products Some old Some New
Micro Surfacing Next Generation Night time Multiple Stone depth
Chemical Break Multi Layer 2 over 3 Cape Seal (Slurry on top of
Chip) RAP Close to a type 2 gradation Lower Oil Content Recycled
Green Value Color
Slide 27
Truck Mount Better in residential and tight areas Most commonly
used Multiple Manufactures Typically multiple trucks per project
that require calibration and adjustment Continuous Machines Same
capabilities with the addition of the ability to resupply while
placing slurry Highways, Freeways Same machine places the entire
project Reduced transverse joints.
Slide 28
Slide 29
Slide 30
Slide 31
Gate settings (Determine rock to oil relationship and product
application rates) Oil Water Fines Feeder (Cement) Sulfate
Feeder
Slide 32
Sets the depth of the slurry Provides the uniform surface
texture of the slurry May or May not be augured Varied widths
Slide 33
Slide 34
Hand held Squeegees Oil Tankers Rock Trucks Loaders Conveyors
Sweeper Traffic Control
Slide 35
Slide 36
Slide 37
Things to consider Time of the year (Weather Conditions) Have
large cracks been filled Is the surface clean and dry Trash trucks
Schools and school traffic Sufficient Traffic Control Application
rate over surface conditions Equipment Calibration
Slide 38
Things to Consider 50 F and rising Slight breeze may be
beneficial. High winds may make it a challenge to keep the surface
clean Sunlight needed to cure. Much shorter work windows in the
cold months. Minimize hand work Overlaps should not be in the
typical wheel paths Chance of Rain?
Slide 39
Slide 40
Slide 41
Slide 42
Slide 43
You only get what you inspect Understand the process and the
materials Use a check list
http://www.fhwa.dot.gov/pavement/preservation/ppcl13.cfm If you
have any questions lean on industry: Most suppliers and contractors
are more than wiling to spend some time and answer your questions.
Learn what 25 tons of aggregate looks like in a stock pile (verify
application rate) Traffic Control Joints Hand work Starts /
Stops
Slide 44
Slide 45
International Slurry Surfacing Association The Greenbook
Standard Specifications for Public Works Construction Caltrans
Specifications section 37 and MTAG Chapter 8 FP2
Slide 46
Todd Vargason Ergon Asphalt and Emulsion