125 a. Inspection of rail ends b. Rail cutting and set the required gap c. Loosening of rail fastenings d. Rail end preparation and alignment e. Preheating and welding f. Finishing and alignment g. Weld testing h. Replacement of defective welds i. Records of thermit welding Each procedure shall be in accordance with the AREA Manual for Railway Engineering, the products or welding kit specifications itself and other applicable standards. 13.1.3.10.2 Quality Assurance This section shall conform to requirement in 2.1.3.1.1 Quality Assurance Program. 13.1.3.10.3 Weld Testing All weld testing and submittals shall be performed by a duly accredited independent testing laboratory in accordance with quality control requirements and applicable standards. In order to qualify the welding kits, welding crews, and production welds; the following test shall be carried out: a. Radiographic testing b. Ultrasonic testing c. Slow bend testing d. Hardness test e. Rolling load test f. Magnetic particle test g. Visual test 13.1.3.10.4 Tolerances All alumino-thermic welds will be in the suspended portion of rail between supports. The weld shall not encroach 150mm from tie ends or baseplate support. Finished weld using 1 meter straight edge shall have the following tolerances: a. Rail head surface +0.3 / 0.0 mm b. Rail gauge face +0.3 / 0.0 mm 13.1.3.10.5 Submittals The Contractor shall submit the following: a. Detailed specifications, proposed materials, methods and procedures to be used for the thermit welding process, b. Certification from the supplier or manufacturer that the materials delivered to site conforms to the specifications,

a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

Embed Size (px)

Citation preview

Page 1: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

125

a. Inspection of rail ends

b. Rail cutting and set the required gap

c. Loosening of rail fastenings

d. Rail end preparation and alignment

e. Preheating and welding

f. Finishing and alignment

g. Weld testing

h. Replacement of defective welds

i. Records of thermit welding

Each procedure shall be in accordance with the AREA Manual for Railway

Engineering, the products or welding kit specifications itself and other

applicable standards.

13.1.3.10.2 Quality Assurance

This section shall conform to requirement in 2.1.3.1.1 Quality Assurance

Program.

13.1.3.10.3 Weld Testing

All weld testing and submittals shall be performed by a duly accredited

independent testing laboratory in accordance with quality control requirements

and applicable standards. In order to qualify the welding kits, welding crews,

and production welds; the following test shall be carried out:

a. Radiographic testing

b. Ultrasonic testing

c. Slow bend testing

d. Hardness test

e. Rolling load test

f. Magnetic particle test

g. Visual test

13.1.3.10.4 Tolerances

All alumino-thermic welds will be in the suspended portion of rail between

supports. The weld shall not encroach 150mm from tie ends or baseplate

support. Finished weld using 1 meter straight edge shall have the following

tolerances:

a. Rail head surface +0.3 / 0.0 mm

b. Rail gauge face +0.3 / 0.0 mm

13.1.3.10.5 Submittals

The Contractor shall submit the following:

a. Detailed specifications, proposed materials, methods and procedures to

be used for the thermit welding process,

b. Certification from the supplier or manufacturer that the materials

delivered to site conforms to the specifications,

Page 2: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

126

c. Welding supervisor qualifications with a minimum 3 years thermit

welding experience. The welding supervisor shall be replaced only

with the Engineer’s prior approval,

d. Schedule of CWR lengths and CWR string Designation system,

e. All material testing and weld test results,

f. Test equipment certificate and calibration,

g. And all submittals shall be in accordance with 2.1.3.1.2 Submittals.

13.1.3.11 Grade/Road Crossing

This section specifies the requirements for the supply and installation of materials

required for the construction of grade/road crossings at MRT3 Depot.

The contractor shall perform the work in accordance to applicable standards and

approved methods, procedures and materials by the Engineer. The Contractor

shall take all necessary safety measures for an organized construction work and to

avoid interruption to depot train movement and maintenance work.

13.1.3.11.1 Bituminous Material Installation It shall conform to Item 307 of DPWH Standard Specifications

13.1.3.11.2 Submittals

a. Shop drawings for the crossing showing details and arrangement of the

rail support and anchoring system including dimensions and tolerances

b. Grade/road crossings installation procedures

c. Approved job mix formula of the bituminous materials to be use

d. And all other required documents to necessary to complete the work

TABLE 1

TRACK CONSTRUCTION TOLERANCES

Notes:

Variation is measured between the designed and actual alignment at any point in the

track

Horizontal alignment is measured in mm by 10m chord placed at the gauge line of the

rail running face.

Vertical alignment is measured in mm by 10m chord at the head of the datum rail.

Rail cant may vary between 1 in 18 and 1 in 22

Type of Track Gauge

Variation

Cant / Cross

Level

Horizontal

Alignment

Vertical

Alignment

Mainline

Ballasted

Track

N/A

N/A

N/A

N/A

Depot

Ballasted

Track

-2, +3 mm

±3 mm

±4 mm

0, +5 mm

Page 3: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

127

Maximum twist is 1 in 1000

14. DEPOT EQUIPMENT/FACILITIES

14.1 INTRODUCTION

Under the capacity expansion project additional trains are to be provided to increase

capacity. Upgrading of existing maintenance facilities and additional workshop

equipments are necessary to support the project.

The overhaul area in MRT3 depot was utilized fully whilst conducting general

overhauling and at times also when carrying out car body repairs. It was necessary for

some parts to be fork lifted in order to transfer to the bogie hoisting area. To

complement the present bogie hoisting area, it is necessary to provide a service track

and turntables for bogies to link the two areas. Please refer to MRT3 Workshop

Improvement Lay-out.

14.2 WORKSHOP IMPROVEMENT (Infrastructure)

14.2.1 General

All works under this section shall be carried out in accordance with all the governing

codes and regulations that are hereby made part of these specifications. The plans and

these specifications are complementary and what is called for in one shall be as if

called for in both.

Applicable Standards

The following are the main reference standard comprises the technical requirements

and the condition to be adopted for the execution of the works.

AASHTO - American Association of State Highway and Transportation Office

ACI - American Concrete Institute

PCI - Prestressed Concrete Institute

ANSI - American National Standard Institute

ASTM - American Society for Testing and Materials

AWS - American Welding Society

PNS - Philippine National Standards DPWH Standard Specification

PEC - Philippine Electrical Code

NEMA - National Electrical Manufacturer’s Association

Work in General

The work shall consist of providing all items, materials, operations or methods listed,

implied, mentioned or scheduled on the drawings and/or herein, including all labor,

supervision and equipment necessary to the proper completion and execution of the

works except those portions of the work that are clearly stated to be done by others.

Page 4: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

128

Work Included

The work to be done under this section shall include the furnishing of all tools, labor,

supervision, equipment, fixtures and all necessary materials, each complete and

proper working condition unless one or other is specifically excluded or stated

otherwise in this specifications but not limited to the works below:

Relocation, removal and demolition, re-installation of existing equipment and other

works as required in carrying out removal, demolition and modifications to existing

lighting, fixtures, pneumatic lines and branch circuits. Such necessary improvements

and modifications to the electrical and mechanical works because of structural and

architectural changes shall form part of the scope of this section even if not

specifically identified.

Visit to Site

The Contractor is advised to visit and satisfy himself as to the local conditions and

facilities that may affect his work. He will be deemed to have fully completed this

study before preparing his proposal and no subsequent claim on the grounds of

inadequate or insufficient information shall be entertained.

14.2.1.1 CONVERSION OF LEVELED TRACK TO

MAINTENANCE PIT TRACK

A portion of Tracks 19 and 20 shall be converted to a maintenance pit (40 M each) so

that bogies can be dismounted from the car using the mobile lifting jacks. All

compressed air supply complete with quick connect coupling, valves and fittings shall

be provided with the same materials used as of the existing pit including other

associated utilities (electrical/ mechanical) inside the pit. The depth of the pit shall be

1.2 M from top of rail. Please refer to MRT3 Workshop Improvement Lay-out.

14.2.1.2 SERVICE TRACK FROM TRACK 17 TO BOGIE

WASH TRACK

A service track from track 17, 18, 19 and 20 to bogie wash track shall be provided to

be connected by means of bogie turn tables for easy access to cleaning in the bogie

wash room during dismounting. Please refer to MRT3 Workshop Improvement Lay-

out.

14.2.2 WORKSHOP EQUIPMENT (Additional)

14.2.2.1 DESCRIPTION

The scope of this section is to provide specification for the supply, installation, testing

and commissioning and subsequent training of operators in relation to additional

Depot Equipment.

Warranty The supplier shall provide the MRT3 with a two (2) year period of warranty coverage

for the equipment issued that will commence upon written confirmation of final

acceptance. Refurbished equipment shall also be guaranteed for not less than 2 years.

Page 5: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

129

Submittals

Supplier shall provide written instruction in English language pertaining to the

operation, servicing and maintenance of the equipment.

The O & M manuals shall be provided from the delivery of equipment. It shall

describe the method and theory of the operation, equipment characteristics and

specifications, as well as maintenance and troubleshooting procedures. Complete

parts list, troubleshooting flowcharts and guidelines and safety precautions shall be

included.

Supplier shall provide shop drawings in A1 size including “As Built” drawing.

Reliability, Availability, Maintainability and Safety

The supplier shall provide the equipment’s reliability, availability, maintainability and

safety criteria based on EN 50126 or acceptable equivalent Standard. It shall be based

or compatible with the existing installed equipment or even better.

Training

Supplier shall provide training in the proper and safe use of the equipment proposed

and shall describe/facilitate the proposed training program. The supplier shall provide

all training materials, training tools and venues.

Spare Parts

The supplier shall be responsible for the availability and supply (shall provide) of all

initial spares at site during installation, commissioning and the warranty period.

Consumable spares comprising those items which are required for routine

replacement or usage to meet the manufacturer’s recommended servicing and

maintenance programs shall also be provided for use during the warranty period and

for one (1) year service after the warranty period. Included in this supply shall be

those items which are expected to fail during the specified period based on the

manufacturer’s known or predicted failure rate.

The contractor shall ensure the availability of these spare parts for at least 4-four

years.

Delivery, Storage and Handling Materials shall be delivered to the site in the original sealed containers or packages,

and shall bear the manufacturer’s name and brand designation. Where materials are

covered by a reference specification number, type and plan as applicable. Materials

shall be stored and handled in a manner to protect them from damage during the entire

construction period.

14.2.2.2 HAND ACTUATED TURNTABLE FOR BOGIES (5

Units)

Page 6: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

130

This equipment is designed for transfer of bogies from one track to another for repair

and overhaul and shall be mounted in a concrete pit. The top of the turntable shall be

at the same level of the workshop floor so as not to hinder trolley movement. The

turntable shall be manually operated; at least two-2 personnel could easily rotate the

table with a maximum load of 6 tons. Rail gauge to be used shall be the same as the

existing rail (Rail Gauge = 1,435 mm). The gap between the foundation and the turn

out table shall be less than 10mm. A stopper shall also be provided so that the table

will not move when at rest position. The supply shall include (for each turntable):

The turntable

The running platform

The peripheral joint ring

Each turntable shall consist of mechanical assembly bearing on a center pivot and

several carrier rollers running on circular platform.

14.2.2.3 MOBILE LIFTING JACKS (1 Set / 12 Units – 50 KN Capacity)

This equipment is used to jack-up LRV in simultaneous, synchronized and a safe

manner in order that items of running gear and some under frame mounted equipment,

such as bogies, can be removed and replacement items fitted. The design of the jacks

shall be such that personnel shall be able to work safely under an LRV being

supported by these jacks without the necessity of providing additional supports.

The jacks will be controlled from one control station which will be provided with a

means of enabling the maintainer to monitor the jacking process is proceeding safely

and synchronized. The number of jacks being controlled during jacking operations

will be variable.

Control and power cabling for the jacks that could be under hatches will be strong

enough to bear any likely imposed weight, for example fork lift trucks or another jack.

The intension is to keep this cabling to a minimum on the workshop floor. Connection

between jacks and the floor sockets will be via suitably robust connectors and cables.

It is required to have a set of mobile jacks arranged to be able to lift one single LRV.

RAM CRITERIA DIMENSION

Reliability No more than one failure per year

Availability

95% after breakdowns and maintenance

Maintainability

Equipment to be back in service at maximum tone half day after failure

RAM CRITERIA DIMENSION

Reliability No more than one failure per year Availability 95% after breakdowns and maintenance

Maintainability Equipment to be back in service at maximum two days after failure

Page 7: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

131

14.2.2.4 TRAVELLING LIFTING TABLES IN PIT (1 Unit –

20 KN Capacity)

This equipment is designed for removal of equipment fitted on the under frames of

LRV. It shall also be designed for carrying in the equipment after removal from the

LRV to the end of the pit for transfer to a hoist.

14.2.2.5 JIB CRANES (2 Units – 20 KN Capacity)

This equipment is mainly used in the overhaul workshop. They shall be used for the

movement of large assemblies/sub-assemblies in a single area.

15 TAFT POCKET TRACK

MRT3 presently has already approached the limit of practical capacity. Therefore, capacity

expansion and improvements become particularly timely and an important objective to be

implemented.

The present three-car trains shall be improved to four-car trains in the implementation of this

Capacity Expansion.

The present retaining wall, tracks and wayside equipment installed at Taft Pocket Track

(TPT) shall be modified and lengthened accordingly to accommodate 4-car trains.

Modification works should not in any way disrupt the current system operations.

The extension of the Pocket Track shall be completely interfaced and integrated with the

signaling system, power supply, catenary system and track works.

The works will require demolition and replacement of some length of the affected wall

structure. It requires redesign, relocation and replacement the cables relevant to signaling and

Overhead Catenary System (OCS).

The technical specifications relevant to each portion of the works are as follows, but not

limited to:

a. Part 1 – Civil Works

b. Part 2 – Track works

c. Part 3 – Overhead Catenary System

RAM CRITERIA DIMENSION

Reliability No more than one failure per year Availability 98% after breakdowns and maintenance

Maintainability Equipment to be back in service at maximum one half day after failure

RAM CRITERIA DIMENSION

Reliability No more than one failure per year Availability 97.5% after breakdowns and maintenance

Maintainability Equipment to be back in service at maximum one half day after failure

Page 8: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

132

d. Part 4 – Signaling System

The Signaling Upgrade shall not be included in this contract. The upgrade of the signaling

system shall be carried out by the Signaling Provider of the MRT3.

The contractor shall follow the design requirement and specification of the Signaling system

to make the Power & OCS system, Civil Works and Track Works fully integrated to the

Signaling system.

15.1. CIVIL WORKS

15.1.1. General

The stipulation stated in this Section specifies the requirements applicable to the Civil

Works for the extension of the MRT 3 Taft Pocket Track.

The works shall include the detailed design, supply, delivery, installation, testing &

commissioning, defects warranty and obtaining all permission from government

authorities and everything whether permanent or temporary in nature needed and

necessary for safe and proper execution of work and fulfillment of all obligations

required under this contract.

15.1.1.1. Scope of Work

The Contractor shall be responsible for:

a. Design, plan, and modification of MRT3 retaining wall structures affected

by extension of the Taft Pocket Track.

b. Other Civil Works required for work completion like restoration of MRT 3

perimeter fence, drainage, curbs and etc.

c. Ensure no disruption to MRT 3 daily train operations and adjacent traffic

flow along EDSA.

15.1.1.2. Applicable Standards The following are the main reference standard comprises the technical

requirements and the condition to be adopted for the execution of the works.

American Standards

- AASHTO

- ACI

- ASTM

- AWS

- PCI

British Standards

- BS

- CIRIA

- CRSI

European Norms

- CEN

Page 9: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

133

- SCCEPG

French Norms

- AFNOR

- DTU

DPWH Standard Specifications

PNS

15.1.1.3. Special Site Conditions

Utmost importance shall be taken by the Contractor with regard to the special site

conditions affecting the design and construction of the project.

15.1.1.4. Performance Requirements

The contractor shall prepare design criteria, a preliminary set of standard

drawings, a list of the basic design drawings, and a set of final design drawings

and an outline of the procurement and construction specifications.

15.1.2. Materials Requirements Civil Work materials needed for the extension of Taft Pocket Track shall be complete

with all accessories and passed all the required testing in accordance to specifications

and standards and shall be approved by the Engineer before incorporating to work.

The Contractor shall ensure materials availability for small quantity production

intended for maintenance use.

15.1.2.1. Removal of Structures and Obstructions This Item shall consist of the removal wholly or in part and satisfactory disposal

of all structures, fences, old pavements and any other obstructions which are not

designated to remain. It shall also include salvaging of designated materials and

backfilling with approved fill materials. All rubbish from the TPT area shall

be disposed of and shall not allow accumulations.

15.1.2.2. Earthworks

All materials to be incorporated in the work shall pass all required testing and

certification and in accordance with the requirements of Part C Earthwork

DPWH Standard Specifications.

15.1.2.3. Aggregate Base / Sub-Ballast

The aggregate base (sub-ballast) shall be from approved source and conform to

the requirements of Item 201 Aggregate Base Course of the DPWH Standard

Specifications.

15.1.2.3.1. Geo-Textiles

This item covers geo-textile fabrics for use in subsurface drainage, hydraulic

control, erosion control, sediment control and pavement structures as a

waterproofing and stress relieving membrane in order to prevent mixing of

dissimilar materials.

Page 10: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

134

Geo-textile sheet for MRT3 shall be 13kn tensile strength and at least 0.90mm

thickness.

Materials and specifications for this section shall conform to Item 715 of

DPWH Standard Specifications.

15.1.2.4. Concrete Works

This section refers to the required concreting works for MRT3 retaining wall,

OCS posts unless specified and other concreting works needed for the extension

of Taft Pocket Track.

15.1.2.4.1. Concrete

The concrete shall be adequately workable and of proper consistency to permit

flow to forms and reinforcement during placement and no signs of aggregate

segregation. The designed minimum compressive strength of concrete at 28

days shall be 28 Mpa shall conform to AASHTO, ACI, ASTM and standards

applicable.

15.1.2.4.2. Cement All Portland cements shall be obtained from suppliers which have a quality

system for product conformity and shall conform to ASTM 150 or Item 700

of DPWH Standards Specification or approved equal.

15.1.2.4.3. Water Water shall be clean, fresh and potable and shall conform to Item 714 of

DPWH Standard Specifications.

15.1.2.4.4. Aggregates Aggregates shall be from approved source and shall not contain any deleterious

substances to prevent contamination and cement alkalis reactions.

All aggregates shall pass all required testing and shall conform to ASTM

Standards and Item 703 of DPWH Standard Specifications.

15.1.2.4.5. Admixtures

Suitable admixtures may be used to modify certain properties of concrete and

shall conform to ASTM C494. However, as they may at the same time

adversely affect other important concrete quality, the Contractor shall carry

out testing on concrete to which they are added.

All admixtures shall conform to relevant local and international specifications

and shall be approved by the Engineer.

15.1.2.4.6. Steel Reinforcement

Page 11: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

135

The Contractor shall specify basic and minimum standards for furnishing and

installing steel reinforcement for concrete. All reinforcing steel shall be hot

rolled weldable deformed steel bars obtained from approved supplier as

specified in ASTM A615M or BS 4449 and shall have the following minimum

yield strength:

a. 12 and smaller shall be 275 Mpa or grade 40

b. 16 and larger shall be 414 Mpa or grade 60

15.1.2.4.7. Formwork Forms shall be designed to produce hardened concrete of the shape, lines, levels

and dimensions indicated on the design drawings. The forms including form

supports which shall withstand the worst combination of all loads together with

all incidentals dynamic effects caused by placing, vibrating and compacting

concrete.

The Contractor shall specify basic and minimum standards for forms for

concrete structures and facilities and shall conform to ACI 301 and ACI 347

standards.

15.1.2.4.8. Materials for Curing Concrete

Concrete curing materials shall be of approved materials and conforms to

standards requirements. The materials shall be satisfactory of providing a

curing environment for optimal concrete quality, consistency, strength and

durability.

The following materials can be used for curing concrete by the Contractor or

any approved equal:

a. Liquid membrane forming compounds AASHTO M 148 / ASTM

C1315

b. Previous sheeting AASHTO M 184.3

c. Standard specification for sheet materials for curing compound ASTM

C171

15.1.2.4.9. Joint Fillers

Unless otherwise shown on the plans or in special provisions, materials for

expansion joint filler shall conform to the ASTM D-1751 requirements and

specifications.

15.1.2.4.10. Other Accessories

Reinforcement accessories, consisting of bar supports, spaces, ties, and similar

items as required for spacing, assembling, and supporting concrete in place shall

be provided conforming to reference standards.

15.1.2.5. Civil Miscellaneous Structures

This section refers to miscellaneous materials required and necessary to complete

the work in the extension of Taft Pocket Track.

Page 12: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

136

15.1.2.5.1. Curb and Gutter

Curb and gutter shall be constructed by concrete cast in conformity with the

design drawings and shall be in accordance with the plans and specifications

required by the Engineer.

Materials and execution shall conform to Item 600 of DPWH Standard

Specifications.

15.1.2.5.2. Fences

Fences necessary to maintain system security along the MRT3 perimeter shall

be provided by the Contractor and shall ensure that there are no related or

operational problems. Metal fences should be galvanized and or walls shall

have smooth surfaces and shall be painted.

MRT3 perimeter fence shall be constructed in conformity with the designs and

specifications required by the Engineer and shall be compatible with the

existing fenced materials.

Materials and execution shall conform to Item 604 of DPWH Standard

Specifications.

15.1.2.5.3. Drainage Drainage for MRT3 shall be compatible with the existing drainage system. It shall be designed to remove completely excess water. Drainage pipes of

100mm Ø shall be perforated with 10mm Ø holes connected to PVC drain

pipes of the same diameter and spaced every 3 meters shall be used.

15.1.2.5.4. Cable Trough Cable trough shall be precast concrete provided with 20mm Ø drain holes

spaced every 5 meters. Cable through shall be 50mm thick and at least 270mm

in height. Each cable through of 300mm and 440mm wide respectively shall

consist in 3.2mm Ø welded wire fabrics spaced every 150mm and shall

conform to ASTM A185.

15.1.3. Construction Requirements

The Contractor shall be responsible for the construction means, methods, techniques,

sequences and procedures for coordinating all portions of the Work under the

Contract Documents.

The Contractor shall provide all superintendence during the execution of the Work as

may be necessary for the proper fulfillment of the Contractor’s obligations under the

Contract. It shall include the supervision and inspection by qualified professional

personnel experienced in railway construction whose responsibility shall be to ensure

the technical standards and workmanship, materials, and quality are being maintained

in accordance with the Scope of Work.

Page 13: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

137

The Contractor shall design, supply and install materials for the extension of Taft

Pocket Track which satisfies to the minimum requirements of the specification and

Employer’s Requirements. The Contractor shall submit full details of the proposed

design to the Engineer for review and approval and shall not commence until written

acceptance has been received from the Engineer.

15.1.3.1. Removal of Structures and Obstructions

This Item shall consist in the partial or whole removal responding to the final

disposal of all structures: fences, old pavements and any other obstructions which

are not designated to be remained. It shall also include salvaging of designated

materials for backfilling with approved fill materials. All rubbish from project

area shall be disposed and accumulations shall not be allowed.

15.1.3.1.1. Execution

This section shall conform to Item 101 of DPWH Standard specifications

15.1.3.1.2. Dust control

The Contractor shall take appropriate action to check the spread of the dust in

the project site and avoid the creation of a nuisance in the surrounding area.

The Contractor shall not use water if it results in hazardous conditions such as

flooding or pollution and shall comply with all dust regulations imposed by

the local air pollution agencies.

15.1.3.1.3. Construction Protection

The Contractor shall ensure construction protection adequately during

execution of work in order not to affect the adjacent traffic flow along EDSA

Highway and MRT 3 operations.

The Contractor shall take all necessary precautions to protect personal (ppe)

and private property in the areas of work. Approved barriers and warning

signs shall be provided to reroute personnel/motorists around areas of

dangerous work

15.1.3.1.4. Rubbish / Debris Rubbish/debris shall be placed in approved Contractor furnished containers to

prevent spread and accumulation of dust and dirt. It shall be removed from the

area of work as often as necessary but not less than at least once at the end of

each workday.

15.1.3.1.5. Submittals

The Contractor shall submit the following:

a. Proposed demolition procedures for Engineer’s approval

b. Detailed description of equipment to be used for each sequence of

operation

c. Traffic management plan

Page 14: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

138

d. And other submittals required for work completion.

15.1.3.2. Earthworks

The work specifies in this section consists of stripping topsoil, excavating and

backfilling to attain indicated sub-grades and grades and conforms to Part C

Earthwork of DPWH Standard Specifications latest edition.

15.1.3.2.1. Excavation Remove materials within the indicated limits. The sub-grade is the lowest

elevation of excavation and it shall be inspected and approved by the Engineer

prior to placement of grade materials. Excavated materials satisfying the

requirements of Item 104 of the DPWH Standard Specifications may be used

as fill materials. Remove all surplus excavated materials.

15.1.3.2.2. General Excavation

a. Generally refers to excavation for the construction of track-way and

roadway as indicated on the design drawings.

b. Sub-grade preparation at sub-grade track way and roadway in

excavation areas shall have a minimum bearing capacity of 150 Kpa

and shall conform to Item 105 of DPWH Standard Specification.

c. Fill unauthorized excavation with approved fill materials by the

Engineer and compact to at least 90 percent of maximum dry density in

accordance with ASTM 698 of 200mm per compaction layer.

15.1.3.2.3. Structure Excavation

Ensure that the existing sub-grade, other than rock, will not be disturbed and

get loose by any excavation. If the sub-grade material is disturbed to a lesser

than 90% of FDT, measure should be taken to recover the sub-grade at least

90% FDT or higher, otherwise the disturbed material can be replaced by

equivalent material or with concrete of the same class as the sub-grade

structure.

The Contractor shall ensure that demolition and excavation of the adjacent

existing concrete road which is affected by the project shall not disrupt the

road traffic and not damaging to any other existing facilities.

15.1.3.2.4. Filling, Backfilling and Compacting

Gradation ASTM D422

Liquid Limit ASTM D4318

Plasticity Index ASTM D4318

Resistance (R. Value) ASTM D2844

Maximum Density ASTM D1557

Sand Equivalent California test 217 or ASTM D2419

Page 15: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

139

Refer to Item 104 of DPWH Standard Specifications.

15.1.3.2.5. Contractor’s Quality Control

Prior to and during the execution of the work, the Contractor’s Testing

Laboratory shall perform all necessary tests in accordance with the minimum

testing requirements and Item 104 of DPWH Standard Specifications. Field

Density Test for any sub-grade for track or for any soil for spread foundation

should be higher or at least 90%.

15.1.3.2.6. Submittals

The Contractor shall submit the following for Engineer’s review and approval:

a. Equipment to be utilized in the work

b. All necessary methods and procedures

c. All testing results and other materials certification

15.1.3.3. Aggregate Base / Sub-Ballast

This section specifies the furnishing, placing, spreading and compacting of

crushed aggregate base or sub-ballast in one or more layers in accordance with

specification and contract drawings.

15.1.3.3.1. Placing, Spreading and Compacting

The approved aggregate base course (sub-ballast) shall be placed, spread and

compacted in conformity with the requirement of DPWH Standard

Specifications Items 200.3.2 and 200.3.3 and contract drawings.

Geo-textile materials, execution and specifications for this section shall

conform to Item 715 of DPWH Standard Specifications.

15.1.3.3.2. Submittals

The Contractor shall submit the following for Engineer’s review and approval:

a. Geo-textile materials specifications

b. Equipment for to be utilized for the work

c. All necessary methods and procedures

d. Materials grading and testing results

e. Materials source and certificate of compliance

15.1.3.4. Concrete Works for Retaining Wall

This section covers procurement and placing of concrete. It specifies basic and

minimum standards for materials and equipment for the use of plain and

reinforced concrete.

All specifications discussed in this section will technically apply for the

construction of MRT3 retaining walls, OCS foundation if necessary and other

concrete works needed for the extension of the Taft Pocket Track.

Page 16: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

140

15.1.3.4.1. Quality Assurance

The Contractor shall be responsible for the quality control and quality

assurance for materials and construction to be included but not limited to the

following:

a. Complete quality assurance plan

b. Organizational chart for quality control

c. Qualifications of independent testing laboratories as well as names and

experience records of Contractors staff for implementing quality plans

d. Site laboratories locations, layout and equipment

e. Plans for testing products requiring testing and inspection at the

supplier’s premises and proposed procedures for ensuring quality

control is implemented

f. Provision of inspection and testing instruments and devices to ensure

proper performance of quality control

g. Verification by affidavits and certifications that the supplied products

meet requirements of reference specifications as specified in applicable

sections of specification

h. Tests to be regularly performed on all supplied materials

i. Lists of proposed stages at which specified inspection and

documentation shall be performed by the contractor and approved by

the Engineer

j. Forms of all test reports for all materials and items to be tested

k. Quality assurance plan system, documents control, handling and

storage procedures and check on quality records and auditing system

15.1.3.4.2. Execution

The Contractor shall establish methods and procedures for all activities needed

to complete the work in accordance with applicable specifications.

The following works shall be included:

a. Survey and setting out

b. Rebar installations

c. Formwork installations

d. Inspection before placing concrete

e. Handling and placing of concrete

f. Compaction of concrete

g. Concrete surface finishing

h. Concrete curing

15.1.3.4.3. Submittals

Prior to the works, the Contractor shall submit the following documents for

the Engineer’s review and approval:

a. Quality assurance plan

b. Applicable reference codes

Page 17: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

141

c. Sources and characteristics of concrete materials comprising cement,

coarse and fine aggregates, admixtures, water and reinforcement

d. Proposed concrete mix design accompanied by all relevant data for

materials sources and testing

e. Methods of concrete mixing, transportation, placing, compacting and

curing

f. Details of batching plant

g. Quality control procedures comprising methods of sampling as well as

site laboratory equipment and experience records and number of

quality control personnel

h. In addition to other requirements regarding design calculations and

details of proposed construction methods including type of equipment,

plans of execution and corresponding calculations

i. Traffic management plan

j. And other submittals which conform to 4.1.3.4.1 Quality Assurance

15.1.3.4.4. Tolerances The concrete work shall be constructed to an accuracy which shall permit the

proper assembly of components and installations and shall be compatible with

the finish.

The accuracy of the work shall be within the tolerances shown on the

drawings or specified elsewhere and in the absence of any other requirements,

shall comply with the following:

All laying out dimensions ±5 mm

Concrete surface level ±5 mm

15.1.3.5. Civil Miscellaneous Structures

This section shall consist of all Civil Miscellaneous Structures required for supply

and installations necessary to complete the Civil Works for the extension of

MRT3 Taft Pocket Track.

15.1.3.5.1. Submittals

The Contractor shall submit the following for the Engineer’s approval:

a. Detailed design drawings for each Civil Miscellaneous Structures and

Materials

b. Method and procedures for each Civil Miscellaneous Works

c. Materials compliance certificate and testing results

d. And all other submittals needed to complete the work

15.2. TRACK WORKS

15.2.1. General

The provisions stated in this document are related to the specific requirements

applicable to the track system for the extension of MRT3 Taft Pocket Track.

Page 18: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

142

Trackworks system under this Contract shall conform to the most recent practices of

the American Railway Engineering Association (AREA), Union Internationale des

Chemins de Fer (UIC), International Standards Organizations (ISO) and the practices

and specifications of recently constructed mass transit systems of equivalent capacity

and characteristics constructed within the last five (5) years. It shall be of proven

design satisfying the system performance requirements and shall be compatible with

the existing MRT3 system. It shall also satisfy requirements with regards to train

kinematic gauge, service life, reliability, maintainability and safety.

The works shall include design, supply, installation, test & commission and obtaining

all permission from government authorities and everything whether permanent or

temporary in nature necessary for safe and proper execution of work and fulfillment

of all obligations required under this contract. It shall also include the training of the

Employer maintenance personnel, supply of maintenance and repair manuals, as-built

records and rectification of defects liability period of the installed ballasted tracks

system.

15.2.1.1. Scope of Work This section specifies the scope of work of the Contractor as follows:

a. Design, plan, supply and installation of all track materials required for the

extension of Taft Pocket Track in order to accommodate a four-car train,

i.e. to relocate a turnout in order to extend the Taft Pocket Track of about

19m.

b. The workmanship shall be in accordance to specifications and quality

standards and shall not disrupt the MRT3 daily operations and adjacent

traffic flow along EDSA.

15.2.1.2. Standards and Regulations

The work shall conform to the laws and regulations existing in the Philippines and

shall generally be in compliance with the Philippines Standards and Codes of

Practices unless specifically provided for in this document.

In addition, the following standards may be considered as long as they do not

compromise the Employer’s Requirements

ACI - American Concrete Institute

ANSI - American National Standards Institute

ASA - American Standard Association

AREA - American Railway Engineering Association

CEN - Comité Européen de Normalisation

ISO - International Standard Organization

UIC - Union Internationale des Chemins de Fer

JIS - Japanese Industrial Standards

AS - Australian Standards

BS - British Standards

AASHTO - American Association of State Highway &

Transportation Office

Page 19: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

143

ASTM - American Society for Testing and Materials

PCI - Pre-stressed Concrete Institute

15.2.1.3. Special Site Conditions

The Contractor acknowledges that it has thoroughly investigated and satisfied

itself as to all general and local conditions affecting the work. The failure of the

Contractor to accustom himself with such conditions will not relieve him from any

responsibility for completing the works under this contract. The Contractor shall

be fully responsible for any damage caused to the site or other existing facilities

due to his track works equipment movements and transportation and restore these

damages to its original state at his own expense.

15.2.1.4. Design Criteria The following data will constitute for the design of trackworks for MRT3:

a. Track gauge 1435mm

b. Train speed 65kph

c. Concrete tie spacing 750mm

d. Rail inclination 1:20

e. Axle load 90kn

f. Ballasts depth minimum 250mm Mainline

g. Rail profile UIC 54

h. Depot track minimum radius 25m

i. Concrete tie length 2500mm

j. Concrete tie weight 250kg

k. Concrete tie compressive strength 50Mpa

l. Concrete tie stress transfer strength 30Mpa

m. Pre-stressing wire diameter 6.5mm

n. Pre-stressing wire ultimate tensile strength minimum 1700MPa

15.2.2. MATERIALS REQUIREMENTS Trackworks materials needed for the extension of Taft Pocket Track shall be complete

with all accessories and passed all the required testing in accordance to specifications

and standards and shall be approved by the Engineer before incorporating to work.

The Contractor shall ensure materials availability for small quantity production

intended for maintenance use.

15.2.2.1. Ballast

Ballast shall be of crushed rock containing no carbonates or slag; it shall be hard,

strong, angular, and durable particles. Ballast rock shall be highly resistant against

crushing, grinding, and chemically inert. It shall be weather resistant and of

homogenous structure. The Ballast shall be free from dust, soil, clay, plant matter

and substances likely to be detrimental to the rocks.

15.2.2.2. Special Trackworks

Page 20: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

144

Unless specified, the materials required for the extension of Taft Pocket Track

refers to the supply and replacement of timber ties and other defective fastening

system that will not be suitable for their re-installation.

15.2.2.2.1. Switch and Crossing Ties Switch and crossing ties shall conform to 4.2.2.3 Monoblock Concrete Ties

15.2.2.2.2. Joints

All special trackworks joints shall either be alumino-thermic welded by an

approved welding materials and procedures for UIC 54 rail or insulated

fishplates of approved materials and specifications.

15.2.2.2.3. Rail Fastening System

Concrete ties associated rail fastening system shall be Pandrol type e-series

elastic rail clip manufactured by Pandrol Australia Pty. Ltd in accordance with

UIC specifications.

15.2.2.3. Monoblock Concrete Ties

Concrete ties shall be monoblock pre-tensioned concrete. It shall be 250kgs and

2500mm long. Alternative concrete ties could be considered if they are

compatible with the existing concrete ties in MRT3 in terms of general profile,

dimension and strength. The Contractor must ensure that alternative designs must

have a successful history performance of at least five (5) years in service under

comparable conditions. Any alternative design must be specifically approved by

the Engineer.

15.2.2.3.1. Concrete The concrete minimum 28 days design compressive strength for concrete ties

shall be 50 Mpa as determined by ASTM C39.

15.2.2.3.2. Aggregates

Both fine and course aggregates shall meet the requirements of the AREA

specification for aggregates.

All aggregates shall pass all required testing and shall conform to Item 703 of

DPWH Standard Specifications.

15.2.2.3.3. Admixtures

Chemical admixtures for concrete shall conform to ASTM C494. Additives

containing chlorides shall not be used.

Suitable admixtures may be used to modify certain properties of concrete.

However, as they may at the same time adversely affect other important

concrete quality, the Contractor shall carry out testing on concrete to which

they are added.

Page 21: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

145

15.2.2.3.4. Pre-stressing Tendons

The wire shall be 6.5mm diameter complying with ASTM A864 or ASTM

881 and shall have a minimum tensile strength of 1700 MPa. Tendons shall

not be contaminated with mud, oil, grease or chloride salts. Tendons with

corrosion shall not be used.

15.2.2.3.5. Rail Fastening System

Concrete ties associated rail fastening system shall be Pandrol type e-series

elastic rail clip manufactured by Pandrol Australia Pty. Ltd in accordance with

UIC specifications.

15.2.2.4. Timber Cross and Switch Ties

The ties shall be unbored and air dried hardwood of untreated Jarrah timber

species for exposed mainline turnouts or any approved equivalent.

15.2.2.5. Rails

Standard rail cross-section shall be UIC 54 (54.43 kg/m) of grade 900A with a

minimum tensile strength of 880 Mpa and shall meet the requirements of the UIC

Standards.

15.2.2.6. Thermit Welding

This refers to the materials and other services required for joining UIC 54 using

alumino-thermic welding process.

15.2.2.6.1. Thermit Welding Kits

Thermit welding materials shall be manufactured by Thermit Australia Pty Ltd

or approved equivalent compatible to the existing welding materials used in

MRT3.

15.2.2.6.2. Thermit Welding Equipment

Welding equipment and accessories required for welding operation shall be

use and installed in accordance to manufacturer’s recommendation, contract

drawings and applicable specifications.

15.2.2.7. Other Track Materials

Other track materials and appurtenances needed to complete the work shall be

approved materials by the Engineer and installed in accordance to manufacturer’s

recommendation, contract drawings and applicable specifications.

15.2.2.7.1. Insulated Rail Joints

Rail joints shall be made up of two rolled steel fishplates designed to fit UIC

54 rail profile and with four holes drilled by an approved drilling machine.

Page 22: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

146

Bolts shall be of high strength provided with spring and flat washers and shall

conform to applicable UIC standards.

15.2.2.7.2. Check Rails

Check rail shall be machined from UIC 33 profile of not harder than grade

900A rail steel and supported by brackets connected to the rail. Bolt

connection shall utilize steel components conforming to UIC leaflets 864/2.0

and 864/3.0 appertaining to technical specifications for the supply of track

bolts and spring washers respectively.

15.2.2.7.3. Rail Fastening System

Concrete ties associated rail fastening system shall be Pandrol type e-series

elastic rail clip manufactured by Pandrol Australia Pty. Ltd in accordance with

UIC specifications.

15.2.2.7.4. Lubricants The Contractor shall provide a dry film lubricant for application to special

tracks sliding plates. It shall have a low electrical conducting properties and

subject for Engineer’s approval.

15.2.3. CONSTRUCTION REQUIREMENTS The Contractor shall be responsible for the construction means, methods, techniques,

sequences and procedures for coordinating all portions of the Work under the

Contract Documents.

The Contractor shall provide all superintendence during the execution of the Work as

may be necessary for the proper fulfillment of the Contractor’s obligations under the

Contract. It shall include the supervision and inspection by qualified professional

personnel experienced in railway construction whose responsibility shall be to ensure

the technical standards and workmanship, materials, and quality are being maintained

in accordance with the Scope of Work.

The Contractor shall design, supply and install a ballasted tracks system which

satisfies to the minimum requirements of the specification and Employer’s

Requirements. The Contractor shall submit full details of the proposed design to the

Engineer for review and approval and shall not commence until written acceptance

has been received from the Engineer.

15.2.3.1. Ballasted Trackworks Construction

This section applies to construction of all ballasted tracks both plain and special

tracks for MRT3 both Depot and Mainline.

15.2.3.1.1. Quality Assurance Program

a. The Contractor shall establish, implement and maintain a quality

assurance program to provide verification of compliance with contract

requirements. The quality assurance program shall consist of detailed

Page 23: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

147

procedures and instructions for monitoring and controlling those

activities related to quality during design, fabrication, delivery,

handling, storage, installation, inspection and testing. The areas which

the quality assurance program shall address include the following:

Review and control of quality procedures and instructions,

Calibration of construction measuring and testing tools and

equipment,

Qualification and certification of Personnel,

Tests and inspections

Procurement quality assurance,

Identification and control of items, and

Handling, delivery and storage of materials.

b. Adequate records shall be maintained by the Contractor in accordance

with the requirements of his quality assurance program and shall

include the following:

Evaluation of subcontractors’ and suppliers’ qualifications and

past performance,

Results of inspections and tests,

Certificates of compliance,

Qualified procedures for special processes,

Personnel certifications,

Measuring and test equipment calibration certificates, and

Transmittals of contract related information.

c. The appropriate requirements of the Contractor’s quality assurance

program shall be imposed upon subcontractors and suppliers.

d. The quality assurance activities of the Contractors/subcontractors and

suppliers will be subject to Engineer’s verification, inspection and

audit at any time.

15.2.3.1.2. Submittals The Contractor shall submit the following:

a. The Quality Assurance Program

b. Applicable reference codes

c. Detailed construction schedule

d. Detailed design and shop drawings for all Contractors supplied

materials and other track materials required including fastening system

for the construction of both ballasted track and special track works.

e. Pre-construction inspection reports

f. Qualifications of registered Surveyors

g. Certificate of calibration for specified tools and equipment by

independent testing laboratory accepted by the Engineer

h. Details and arrangement of equipment, materials and personnel to be

used during the various construction stages. Maximum construction

Page 24: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

148

loads shall be identified and submitted to the Engineer for review prior

to any construction equipment being allowed to construction site

i. Details for the protection of rails, special track works, other track

materials and facilities from damage by construction equipment and

road traffic,

j. Production information forms and test reports on welds,

k. Rail laying records,

l. Calculation to determine Neutral Rail Temperature for Depot and

Mainline.

m. Method statement for natural or artificial de-stressing works for

ballasted track and ballasted special track works both Depot and

Mainline.

n. Procedures for handling and anchoring CWR,

o. Procedures for rail grinding and subsequent cleanup including a daily

rail grinding log indicating grinding date, locations, number of passes

of grinder, manufacturer and model number of grinder,

p. And all other documents needed for the completion of the work and

subject for Engineer’s review and approval.

15.2.3.1.3. Electrical Testing The Contractor shall perform all tests of electrical resistance and continuity for

insulated rail joints, running rail, running rail to running rail and track to earth.

Any installations which fail shall be rectified by the Contractor at his own

expense and retested until acceptance by the Engineer.

15.2.3.1.4. Inspection

The Contractor shall inspect the construction area prior to installation of

trackworks for any damages and discrepancies with propose installation plan

and correct said discrepancies authorized by the Engineer.

15.2.3.1.5. Track Laying Construction for Ballasted Tracks

The Contractor shall submit method statement for a systematic rail laying

construction for Engineer’s review and approval.

General ballasted tracks construction shall include the following procedures:

a. Survey and setting out correct tracks and special track alignment.

b. Base preparation

c. Placement of bottom ballasts on an approved base

d. Placement of concrete sleepers or timber ties

e. Placing of rails and fastening to concrete sleepers or timber ties

f. Welding of rails to form continues welded rail

g. Fastening of concrete sleepers or timber ties

h. Placement of top ballasts

i. Initial surfacing and aligning

j. De-stressing work

k. Final surfacing and alignment

Page 25: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

149

l. Test and inspection of finished tracks

m. Site Cleaning

Refer to Table 1 “Track Construction Tolerances” where indicated the

allowable geometric design variation for track work construction.

The Contractor shall assists the Engineer in his inspection of the finished track

with a track geometry measuring device that capable of measuring various

track alignment parameters with accuracy more than the tolerances specified

in Table 1 “Track Construction Tolerances” and submit the print-out for

Engineer’s approval and record. Any data being out of tolerance shall be

rectify by the Contractor and shall be re-inspected by the Engineer.

Before final acceptance by the Engineer, the Contractor shall perform

ultrasonic inspection of all running rails and special track works to detect

flaws in rail, joints and welds.

15.2.3.1.6. Track Laying Construction for Ballasted Special Tracks

Special trackwork construction shall conform to Clause 4.2.3.1.5 Track

Laying Construction for Ballasted Tracks except the use of track geometry

measuring device since geometry alignment for special tracks will be checked

manually.

15.2.3.1.7. Mockup Tracks Not Applicable.

15.2.3.1.8. Final Acceptance Before final acceptance by the Engineer, the Contractor shall perform and

satisfy rail grinding of all rails to remove the corrosion and shall complete

ultrasonic testing inspection to detect flaws for running rails, special

trackworks and welded joints.

15.2.3.2. Ballast The Contractor shall supply and install ballasts of approved materials required for

the extension of the MRT3 Taft Pocket Track.

15.2.3.2.1. Testing Requirements

a. Grading

Size of Sieve Opening % Passing by Weight

Ballast for MRT 3 (Size 3 AREA

Manual)

63.5 mm 100%

50.8 mm 95-100%

38.1 mm 35-70%

25.4 mm 0-15%

12.7 mm 0-5%

Page 26: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

150

b. Deleterious substances present in prepared ballasts shall not exceed the

following:

c. Percentage of wear shall not exceed 25% after testing in a Los Angeles

abrasion testing machine in accordance with ASTM C535. d. The bulk specific gravity and percentage of absorption shall be 2.60

and 1% respectively in accordance with ASTM C127.

e. The magnesium carbonate content shall be tested and defined in

accordance with ASTM C25. No carbonates shall be allowed.

15.2.3.2.2. Submittals

The Contractor shall submit the following for Engineer’s review and approval:

a. Ballast source certificate of compliance

b. Tests results mentioned in 4.2.3.2.1 Testing Requirements

c. And all other test required to complete the work

15.2.3.3. Special Trackworks

The Work of the Contractor in this section refers only for the relocation of the

existing 1:6 turnout and replacement of timber/switch ties and other associated

fastening system that found defective during the execution of the work. It shall be

in accordance to design, specifications, standards and scope of work.

15.2.3.3.1. Quality Assurance

Shall conform to 4.2.3.1.1 Quality Assurance Program

15.2.3.3.2. Submittals

The Contractor shall submit the following for Engineer’s review and approval:

a. Shop drawings showing details and arrangements of special trackwork

relocation,

b. Proposed welding, joining and test procedures for special trackwork,

c. Contractor’s system specification for marking and identifying sizes,

types and composition of products, as well as identifying parts for the

purpose of proper location during installation,

Material Percent by

Weight Method of Test

Soft Pieces 5% AASHTO - T189

Fine less than No. 200

Sieve 1% ASTM C117

Clay lumps and Friable

Particles 0.5% ASTM C142

Flakiness Index 20% BS 812

Page 27: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

151

d. Certificates of material compliance required by this specifications,

e. Test report of chemical analysis and Brinell hardness of running rail,

electric insulation, and other tests required by this specification.

15.2.3.3.3. Inspection and Acceptance For the inspection of material under this Contract, the terms set forth in

“Materials Inspection, Test and Claims,” under the UIC Specifications for

Special Track Work shall apply, except as listed herein.

The Contractor will make available to the Engineer all the necessary facilities

to examine the work during its progress as well as the finished product to

satisfy him that the materials comply with the Specification. The Contractor

will provide templates and 1 meter straight edges to check flangeways, rail

end, and switch rail planing.

15.2.3.4. Monoblock Concrete Ties

This section specifies the requirement for the supply and installation of pre-

stressed monoblock concrete ties with complete rail fastening system compatible

with the existing system of MRT 3.

15.2.3.4.1. Design Criteria

As specified in 4.2.3.1.4 Inspection

15.2.3.4.2. Marking, Delivery, Storage and Stacking

Mark on top of the ties with indented or raised letters to indicate the

manufacturer, year of manufacture, mould number and project identification.

Contractor must securely brace ties during transportation to prevent from any

movement that could cause damage. During transportation, ties should be in

horizontal position supported with wooden spacer blocks so that the top

surface does not make contact with ties loaded above. Do not stack ties more

than 6 layers during transport.

The Contractor shall store concrete ties in a location that would avoid

additional handling until the final distribution or within the area

designated by the Engineer.

15.2.3.4.3. Quality Assurance and Inspection

Before production commences, the Contractor shall prepare a quality control

manual for approval by the Engineer and shall include details of:

Management organization

Responsibilities of production and quality control personnel

Plant standards

Checks to be carried out by the production personnel

Inspection and testing to carried out by quality control personnel

Procedures for approving sources of materials

Page 28: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

152

Procedures to ensure all measuring equipment is properly calibrated

Procedures to ensure that concrete ties are not shipped until acceptance

load testing is complete

Quality audit procedures

This section shall also conform to 4.2.3.1.1 Quality Assurance Program

15.2.3.4.4. Submittals

a. Quality control program

b. Concrete mix design

c. Concrete curing procedures

d. Method and procedures for concrete ties production

e. Tensile strength test results

f. Rail fastening system technical specifications and drawings

g. Pre-stressing wire technical specification

h. All materials test results needed to complete the work and before

incorporating to concrete ties production

This section shall also conform to 4.2.3.1.2 Submittals

15.2.3.5. Timber Cross and Switch Ties

This section comprises specifications for the supply and installation of new timber

cross ties, switch ties, switch machine ties required for the relocation of MRT3

Taft Pocket Track turnout 1:6 of approved source and shall be compatible with the

existing materials.

15.2.3.5.1. Quality Requirements

Ties shall be free of defects that may impair their strength or durability.

Defects such as decay, large splits, large shakes, excessive grain slope, large

holes and large knots will not be acceptable. All timber ties shall be cut by saw

and the cross section shall be 225mm wide and 140mm deep. Standard cross-

ties shall have a length of 2440 mm. Size and length tolerances shall be as

follows:

a. Width - plus 10 mm/minus0

b. Depth - plus 12 mm/minus 0

c. Length - plus 50 mm/minus 0

Each timber shall be examined on the top, bottom, sides and ends. Cross and

switch tie shall not exceed the following allowable amount of defects:

Type of Warp Allowable Amount

Spring 25 mm

Bow 9 mm

Crook 25 mm

Cup 6 mm

Twist 6 mm

Page 29: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

153

All ends of timber ties shall be cut square and provided by anti-

split end plates. End plates shall be applied flush to the end surfaces of the tie and will

remain securely seated and withstand rail vibration.

The Contractor is required to determine the number and dimensions of switch

ties for each turnout and shall be specified in general turnout arrangement

drawing and shall conform to dimension tolerances stated above.

15.2.3.5.2. Testing and Inspection

The Contractor shall assume full responsibility for all required testing and give

the Engineers sufficient notice when testing in any form is proposed so that

Engineers could inspect and witness the tests.

The Engineer may inspect the ties during production process or after delivery

at the job site and or after placement on the grade for track utilization.

Whether or not the Engineer test or inspect any materials, the Contractor will

not be relieved from any responsibility regarding defects or other failures to

meet the contract requirements.

15.2.3.5.3. Marking, Finishing and Workmanship

Ties shall be branded or marked permanently with approved materials to show

ownership, manufacturer’s identification and year of production on one end.

Tie machining and workmanship shall follow and conform to the applicable

standards.

15.2.3.5.4. Submittals

The Contractor shall submit the following requirements:

a. Quality control program for all method and procedures to ensure

compliance with standards quality

b. The name of timber and its source for approval,

c. Timber ties Manufacturers specifications

d. Official certificates of inspection in conformance with the reference

standards including data regarding hammer band confirming timber

grading,

e. Data regarding proposed tie machining & stamping,

f. The Inspectors report form duly accomplished (as described by the

reference standards for Inspection of Timber Products) and submit to

the Engineer prior to tie shipment from the production plant,

g. Certification that the manufacturer has a minimum 5 years experience

in manufacturing timber switch ties and as a supplier to major rail

transit system.

h. Completed tests results.

Page 30: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

154

15.2.3.6. Rails

This section specifies the supply and installation of required rails for the extension

of MRT3 Taft Pocket Track in accordance to specification and standards.

15.2.3.6.1. Test Requirements The Contractor shall perform the following tests:

a. Chemical composition analysis

b. Mechanical property

c. Tensile strength

d. Brinell hardness test

e. Shape, dimension and appearance inspection

f. Ultrasonic test

Each rail shall be ultra sonically tested over its full length to determine its

interior conditions prior to delivery to the work site. The rail must be free

from all detrimental defects having unfavorable effect on the strength of the

rail while in service.

The Contractor shall be responsible for all required testing and shall give

Engineer sufficient notice of proposed testing so that Engineer may inspect

and witness the tests in accordance to UIC specifications.

15.2.3.6.2. Quality Assurance and Inspection This section shall also conform to 4.2.3.1.1 Quality Assurance Program

The quality system for rail manufacture shall be certified at least to ISO 9002

and shall be based on precise terms and conditions which ensure compliance

with the various rail specifications.

The Engineer will monitor from time to time the Contractor’s methods,

procedures, and processes for compliance with the accepted program and all

records of test and inspection.

15.2.3.6.3. Marking, Packaging, Handling, Transporting, and Storage

a. Obligatory marks in the UIC 54 rail shall be in accordance with UIC

Code 860 O as follows in-relief marks which shall be very legible in

characters raised on one side of the web indicating:

Identification mark of the mill,

Year of manufacture (last two figures),

Symbol of steel grade, and

Symbol of rail section in kg/m weight

b. The Contractor shall submit for approval a detailed procedure for

marking, packaging, delivery, handling, transporting and storage of

rails. Contractor shall take all necessary precautions to ensure that

rails will not be bent, deformed or damage during handling and

Page 31: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

155

transporting and it shall be kept clear of any standing water during

stacking and storage.

15.2.3.6.4. Submittals

The contractor is required to submit the following:

a. Certification that rail manufacturer has at least 10 years experience in

the large scale manufacture of running rails as specified herein and as a

supplier of rail to major railroads and transit systems.

b. Certification from supplier or manufacturer that all the rails

manufactured and delivered on site are in conformance with UIC

specification and that the required tests were performed as represented

by the submitted test result.

c. Tests Certificates as prescribe in 4.2.3.8.1 Rail Welding

d. Detailed production process of rails

e. Certification of the manufacture’s process in accordance to ISO 9002.

f. And all other documents needed for the completion of work.

Rails shall be guaranteed by the supplier/manufacturer from date of

manufacture plus 5 years to the date of acceptance of works against any

defects attributable to manufacture.

15.2.3.7. Track Appurtenances and Other Track Materials

This section specifies the requirements for the design, supply, and installation of

other track materials required for the extension of MRT3 Taft Pocket Track.

15.2.3.7.1. Submittals

The Contractor shall submit all detailed design drawings for each trackworks

materials in accordance with applicable specifications and subject for

Engineer’s review and approval.

a. Detailed design drawing for each Other Track Materials and

corresponding fastening system

b. Installation methods and procedures

c. Materials manufacturer specifications

d. Material compliance certificate and testing results

e. And other submittals required to complete the work

15.2.3.8. Welding of Rail

Unless specified, this section specifies the furnishing of all labor, material,

equipment and services by the Contractor which are necessary for joining new

UIC 54 rails using alumino-thermic welding process in accordance to approved

specifications, standards and manufacturer specification for materials and

equipment.

15.2.3.8.1. Rail Welding

Welding process shall include the following procedures:

Page 32: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

156

a. Inspection of rail ends

b. Rail cutting and set the required gap

c. Loosening of rail fastenings

d. Rail end preparation and alignment

e. Preheating and welding

f. Finishing and alignment

g. Weld testing

h. Replacement of defective welds

i. Records of thermit welding

Each procedure shall be in accordance with the AREA Manual for Railway

Engineering, the products or welding kit specifications itself and other

applicable standards.

15.2.3.8.2. Quality Assurance

This section shall conform to requirement in 4.2.3.1.1 Quality Assurance

Program

15.2.3.8.3. Weld Testing

All weld testing and submittals shall be performed by a duly accredited

independent testing laboratory in accordance with quality control requirements

and applicable standards. In order to qualify the welding kits, welding crews,

and production welds; the following test shall be carried out:

a. Radiographic testing

b. Ultrasonic testing

c. Slow bend testing

d. Hardness test

e. Rolling load test

f. Magnetic particle test

g. Visual test

15.2.3.8.4. Tolerances

All alumino-thermic welds will be in the suspended portion of rail between

supports. The weld shall not encroach 150mm from tie ends or baseplate

support. Finished weld using 1 meter straight edge shall have the following

tolerances:

a. Rail head surface +0.3 / 0.0 mm

b. Rail gauge face +0.3 / 0.0 mm

15.2.3.8.5. Submittals

The Contractor shall submit the following:

a. Detailed specifications, proposed materials, methods and procedures to

be used for the thermit welding process,

b. Certification from the supplier or manufacturer that the materials

delivered to site conforms to the specifications,

Page 33: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

157

c. Welding supervisor qualifications with a minimum 3 years thermit

welding experience. The welding supervisor shall be replaced only

with the Engineer’s prior approval,

d. All material testing and weld test results,

e. Test equipment certificate and calibration,

f. And all submittals shall be in accordance with 4.2.3.1.2 Submittals

TABLE 1

TRACK CONSTRUCTION TOLERANCES

Notes:

1. Variation is measured between the designed and actual alignment at any point in the

track

2. Horizontal alignment is measured in mm by 10m chord placed at the gauge line of the

rail running face.

3. Vertical alignment is measured in mm by 10m chord at the head of the datum rail.

4. Rail cant may vary between 1 in 18 and 1 in 22

5. Maximum twist is 1 in 1000.

15.3. SIGNALING

15.3.1. Introduction

The Terms of Reference (TOR) for the Pocket Track Extension Project under

Signaling System defines the scope of works to be undertaken in the extension of

pocket track.

The Signaling Upgrade shall not be included in this contract. The upgrade of the

signaling system shall be carried out by the Signaling Provider of the MRT3.

The contractor shall follow the design requirement and specification of the Signaling

system to make the Power & OCS system, Civil Works and Track Works fully

integrated to the Signaling system.

15.3.2. Background

Few months prior to the opening of MRT 3 line (Buendia to Taft station) to the public

on July 2000, the Pocket Track which is linked to the Northbound track of Taft

Avenue was discovered to have insufficient length to accommodate the safe operation

of a 4-car train passing from South side of the Pocket Track. Series of meetings and

Type of Track Gauge

Variation

Cant / Cross

Level

Horizontal

Alignment

Vertical

Alignment

Mainline

Ballasted Track

-2, +3 mm

±3 mm

±3 mm

±3 mm

Depot Ballasted

Track

N/A

N/A

N/A

N/A

Page 34: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

158

discussions have been held between the Contractors, Engineers and Owner to resolve

the issue and finally decided to optimize the pocket track by allowing passage of 3-car

train only. Consequently, the ATP balises were relocated to effectively protect the

train’s operation even considering the worst case scenario of trespassing down the

pocket signal in restricted aspect.

Optimization of pocket track was done through the relocation of balises which

consummates the braking distance of the train. The braking distance calculation was

based on the following data:

Vehicle condition - Empty

Brake Deceleration - 2.09 m/s²

ATP antenna to vehicle face distance - 2.8 m

1st wheel to vehicle face distance - 3m

Gradient - 0.146 %

Over-run speed passing the red signal - 19 KPH

After the relocation of balises, the testing was subsequently undertaken. The 3-car

train operation successfully passed the test. The Contractor henceforth issued a safety

certification that the pocket track is passable to 3-car trains and guaranteed that the

installed ATP was functioning normally whatever the situation or scenario.

The test for the 4-car train operation was also conducted in the pocket track and the

result showed that the fouling point clearance requirement was not able to satisfy the

safety criteria.

15.3.3. Recommendation

In order to meet the requirement for the complete operation of 4-car train

configuration in the pocket track, the only option is to extend the track at the northern

side (going to the direction of Magallanes station), which will include the following

major activities:

a) Re-design / removal / replacement of wall structure.

b) Re-design / removal / replacement of tracks including ballast and installation

of additional rails and accessories.

c) Re-design / removal / replacement of Overhead Catenary Section (OCS)

including posts and installation of additional OCS and post.

d) Re-design / removal / relocation / replacement of Signaling equipment

including hardware/software.

15.3.4. Pocket Track Data

The data presented herein are actual parameters gathered at site which may serve to

aid the Contractor in the conceptual redesign of the pocket track. However, it is the

Contractor’s obligation to confirm the accurate data through site survey before using

them as parameters in the detailed engineering design.

Location of Pocket Track Northbound Track, approx. 300

meters from Taft Avenue

Station

Page 35: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

159

Distance Between Signals 138 m

Straight Track 130 m

3-car Train Length 97 m

IRJ to IRJ Distance 133.8 m

4-car Train Length 127 m

Length Between ATP Antennas (4-car) 121.4 m

Track Circuit TX and RX Distance 1m

from IRJ

15.3.5. Pocket Track Operation

The pocket track is a temporary stabling area for reserve train or even defective train.

Trains can enter in the south side and exit on the north side through route setting.

Train may also exit from the south side going to Taft Avenue station through manual

route setting. Nevertheless, the automaton cannot be used in the pocket track

operation.

15.4. POWER SUPPLY AND OCS

15.4.1. General Requirements

With the intention to extend the length of the Taft Pocket Track to accommodate four-

car trains, the OCS for the TPT shall have to be extended as well.

15.4.1.1. Re-Configuration and Extension of the OCS This Specification defines the minimum requirements to be met by the

Contractor’s proposed reconfiguration and extension of the OCS along the Pocket

Track.

The OCS supplied and erected under this Contract shall be integrated and

compatible with the existing OCS system installed on the MRT 3 line. The new

installation shall satisfy the requirements with respect to vehicle envelope,

pantographs, interface, service life, safety, reliability and maintainability.

All OCS assemblies, fittings and components removed from the existing

installation shall be reused wherever possible for the new installation.

Prior to Contract Award, the Contractor must demonstrate that he has a very clear

understanding of the existing OCS Equipment and Systems. In this connection

visits to MRT 3 are mandatory during the tendering period to ensure that the

Contractor is fully aware of the present ‘as installed’ systems and the necessity for

compatibility and integration with the new equipment and systems.

As the Works under this Contract will involve activities on a ‘live’ railway, the

Contractor shall adopt and adhere to the Operator’s Rules of Procedures at all

times. All works shall be done during non traffic hours.

Under no circumstances, shall the Contractor cause disruption to the revenue

service. All staging works, timing and method statements shall be approved by the

Engineer before any night or day work is permitted to commence.

Page 36: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

160

15.4.2. The Existing OCS System

The existing OCS system is of traditional metro design for a 750 Vdc railway utilizing

pole mounted cantilevers, messenger wires, droppers, contact wires, tensioning

devices, anchor blocks, section insulators, insulators and guy wires. The existing track

length within the Pocket track is 110 m and the extension will add a further 19 m.

The Contractor’s attention is drawn to Section VII Drawings, which shows the present

configuration and linkage to the Mainline.

15.4.3. Scope of Works

The Scope of Works shall include but not limited to:

Detailed design, procurement, delivery, installation, testing and

commissioning.

Integration of the new tension lengths with the existing system utilizing the

same assemblies and components or equivalents as presently installed.

Interfaces with civil, track and signaling works.

Replacement of contact wires, messenger wires and droppers.

Rearrangements of tensioning devices and anchors.

Electrical and Mechanical design calculations.

Submission of material samples for approval by the Engineer inclusive of

corrosion protection such as galvanizing and steel MIL specifications.

Rectification of defects during DLP.

Training of the Owner’s maintenance staff.

O&M manuals inclusive of parts catalogue, repair instructions, maintenance

instructions, test results from commissioning.

As built drawings, schematic drawings, line diagrams, interface drawings and

dimensional/tolerance criteria.

Recommendations for the provision of spares and special tools in

liaison/coordination with the Owner’s Maintenance Provider.

15.4.3.1. Contractor’s Responsibility

The Contractor shall take full responsibility for the detailed design, construction

and performance of the OCS under this section of the overall Contract.

15.4.4. Catenary Conductors

Contact wire shall be made up of 170mm2 solid grooved hard drawn copper

conforming to ASTM B47. The upper lobe of the contact wire shall match the

existing contact wire installed at MRT 3 to assure interchangeability of clips. Other

contact wire particulars include:

Weight : 1.511 kg/m

Breaking Load : 5900 kg

Coefficient of Expansion : 1.7 x 10-5 /0C

Resistance @ 200C : 0.1040 Ω/km

Modulus of Elasticity : 12000 kg/mm2

Page 37: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

161

Conductor tensions shall be in accordance with the requirements of appropriate

ASTM standards. Thirty percent cross-sectional area loss due to wear of the contact

wire and the effect of the temperature change shall be taken into consideration in the

design of the conductor tension and ampacity.

The ampacity of the OCS shall meet the operational requirements of four-car trains

running at 120-second headways with a traction power configuration proposed in the

Concept Design Drawings.

15.4.4.1. Insulators

Insulators shall be porcelain, toughened glass polyester or other material with

proven rail or railway system service. Insulators shall have a single or multiple

sheds designed for minimum maintenance requirements and be self cleaning by

the action of rain. Double insulation is not required as it is not intended to carry

out ‘live line’ work.

15.4.4.2. Splices

Each wire run of contact wire must be continuous from anchor to anchor except in

the case of cut-in insulators. Contact wire splices shall not be permitted. Feeder

wires may have splices as required to connect drum lengths of conductor. The

manufacturer shall warrant that splices are capable of withstanding tensions up to

100% of the breaking load of the conductor.

15.4.4.3. Section Insulators

The OCS Contractor is to provide Section Insulators at locations indicated.

The Section Insulators (SI) shall be designed and installed in such a way that it shall provide a smooth passage to pantographs without any loss of contact and

without the introduction of unreasonable mechanical forces.

The SI shall permit the pantograph on the vehicle to collect the maximum demand

current without interruption during passage across the SI.

16. NORTH TURNBACK

In conjunction with the plan of DOTC-MRT3 to connect LRT Line 1 and MRT3 for the

convenience of the riding public, the “Terminal Station” of LRT Line 1 is to be

constructed near Trinoma.

The LRT Line 1 “Terminal Station” is planned to be located adjacently to MRT3 North

Avenue Station. The said station shall have connecting walkways for the easy transfer of

passengers from Line 1 to MRT3 and vice versa.

Consequently in this concept, the area where the existing turn-back facility of MRT3

would be affected by the “Terminal Station” of LRT Line 1, the turn-back facility of

MRT3 at the North Avenue Station will be modified to a double crossover turnout.

Page 38: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

162

The new double cross-over turnout shall be constructed using track slabs methodology.

The track slab is deemed to be the best option considering that there is an existing track

structure at the site where the new turnout will be installed.

16.1. SIGNALING

The Signaling works shall not be included in this contract.

The contractor shall follow the design requirement and specification of the Signaling

Provider to make the Power & OCS system, Civil Works and Track Works fully

integrated to the Signaling system.

16.2. CIVIL WORKS

The turn-back facility of MRT3 shall be transferred to the front-end (north-end) of the

North Avenue Station using a double crossover turnout.

The new double cross-over turnout shall be constructed using track slabs

methodology.

The civil works on the MRT3 North Avenue turn-back facility shall not be included in

this contract.

16.3. TRACK WORKS

A new double cross over turnout utilizing track slab methodology shall be constructed

at the north-end side of the North Avenue Station.

Please refer to Section VII Drawings A.5.1 for the illustration of the said new turnout.

The track works on the MRT3 North Avenue turn-back facility shall not be included

in this contract.

16.4. CIVIL WORKS

16.4.1. General

This applies to the non- ballasted plain line on the structure in the main line and on

the non-ballasted turnouts. The concrete plinth rest on the elevated structure deck and

transmits the train loads to the deck. The integrity of the track structure in retaining

track gauge and security of the rail requires that the plinth do not move on the

concrete deck.

The concrete plinth should not be subjected to extraneous forces from the flexing of

the structure. This is ensured by the plinth being made in discrete lengths and not

being continuous. The lengths of plinths are planned at 4.0 meters for curved track

with 600 mm fastening spacing and 3.55 meters for the 750 mm fastener spacing of

straight track (>600 meter radius).

Page 39: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

163

The design of plain line non-ballasted track structure assumes the following:

continuous welded rail, plinth design with plinth anchors, starter bars and key

concrete surface of the structure, discrete supports (not continuous support),

baseplates anchored to plinth, rail elasticity fastened to baseplate and rail to baseplate

insulated. To ensure the integrity of the track structure, the concrete plinth to the deck

connection needs to be checked for:

a. Lateral shear under lateral holdings

b. Stability against overturning of the plinth

c. Resistance against longitudinal movement of the plinth

The objectives of the non-ballasted track design will be continuous welded rail,

discrete (not continuous) support to enable matching of rail head top and running

faces when changing rails or making repair insertions to worn rail during

maintenance, ability to make alumino-thermic welds during both constructions and

maintenance and ability to accommodate hog, sag and other tolerances to the finished

supporting structure.

The plain line non-ballasted track structure may be different in the case of turnouts.

There will be also local adjustments to the non-ballasted track design for items such

as expansion switches with baseplates. The objectives of non-ballasted track structure

for switch and crossing work will be as for the plain line track with the following

additional points: ability to use the same or eliminate the steelwork components of

switches and crossings, including the baseplates used on ballasted tracks, ability to

attached powered point machines on required side (or either side), ability to make

reliable attachment of stockrails and switches for signaling to ensure closure and

detection of switch toes and ability to accommodate switch machine rodding,

clamplocks etc. as required by the signaling.

16.2.1.1. Scope of Work

This section defines the scope of work of contractor which is design, supply and

installation of new double cross-over turnout with complete ancillaries at the existing

North Avenue Station turnback, such as but not limited to plinth/switch ties fasteners,

switch/guard rails and relocation/installation of existing & new motorized switches

with LOB.

The workmanship shall be in accordance with specification and quality with minimal

disruption to MRT3 operations.

16.2.1.2. Standards and Regulations

The work shall conform to the laws and regulations existing in the Philippines and

shall generally be in the compliance with the Philippines Standards and Codes of

Practices, unless specifically provided for in this document.

Page 40: a. of rail ends - DOTrdotr.gov.ph/images/Public_Bidding/CivilWorks/Rail_Sector/2016/Lot2... · Inspection of rail ends b. ... It shall conform to Item 307 of DPWH Standard Specifications

164

In addition, the following standards may be considered as long as they do not

compromise the Employer’s Requirements

ACI - American Concrete Institute

ANSI - American National Standards Institute

ASA - American Standard Association

AREA - American Railway Engineering Association

CEN - Comité Européen de Normalisation

ISO - International Standard Organization

UIC - Union Internationale des Chemins de Fer

JIS - Japanese Industrial Standards

AS - Australian Standards

BS - British Standards

AASHTO - American Association of State Highway &

Transportation Office

ASTM - American Society for Testing and Materials

PCI - Prestressed Concrete Institute

The standards and codes used for the track materials shall be as for the relevant

material specification, such as UIC and JIS.

The standard and codes used for the concrete works shall be as for the civil

engineering works on the project. This shall apply for such items as

Cement

Concrete mixes and finishes

Reinforcement

16.2.1.3. Design Criteria

Loads: a) Vertical Loads

1) Wheel Loads (refer to attached MRT3 axle load and 5.2.1.4)

2) Centrifugal Force (lateral and resultant vertical)

3) Wind (lateral and resultant vertical)