42A06SW0002 2.13510 DELORO 010 A Pilot Plant Production of A MAGNESITE CONCENTRATE from a sample of the Timmins deposit of MAGNESIUM REFRACTORIES LTD. Progress Report No. 4 Project No. L.R. 3778 NOTE: This report refers to the samples as received. The practice of this Company in issuing reports of this nature is to require the recipient not to publish the report or any part thereof without the written consent of Lakefield Research. LAKEFIELD RESEARCH A DIVISION OF FALCONBRIDGE LIMITED December 12, 1989

A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

42A06SW0002 2.13510 DELORO 010

A Pilot Plant Production of

A MAGNESITE CONCENTRATE

from a sample of the Timmins deposit of

MAGNESIUM REFRACTORIES LTD.

Progress Report No. 4

Project No. L.R. 3778

NOTE:

This report refers to the samples as received.

The practice of this Company in issuing reports of this nature is to require the recipient not to publish the report or any part thereof without the written consent of Lakefield Research.

LAKEFIELD RESEARCHA DIVISION OF FALCONBRIDGE LIMITED

December 12, 1989

Page 2: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

42A06SW0002 2.13510 DELORO

TABLE OF GC

Page No.

010C

INTRODUCTION.

SUMMARY

3

4

1. Bench Tests .......................1.1 Feed Ore.................1.2 Metallurgical Results.

2. Pilot Plant Tests ...................2.12.22.32.3.12.3.22.3.3

Feed Ore ................................Grinding .................................Flotation .................................Circuit Configuration ...............Metallurgical Results................Magnesite Concentrate Quality

SAMPLE PREPARATION AND DISPOSITION

EQUIPMENT DESCRIPTION ........................

TEST DETAILS .............................................

444

5556689

10

11

13

Table of Contents

Page 3: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

INTRODUCTION

Mr. J. A. Bates of Magnesium Refractories Ltd. and Mr. R. A. Elliott, Consultant,

requested that a high quality magnesite concentrate be produced from approximately 1.0 tonne

of ore from Timmins, Ontario. In addition to the magnesite concentrate, quartz and talc

concentrates were requested to be produced.

Low silica content in the magnesite concentrate was very important. The

recovery of magnesite was of secondary importance. Details of the testwork are contained in this

report.

The testwork was observed and directed by Mr. R. A. Elliott.

LAKEFIELD RESEARCH

I

R.S. Salter General Manager

A.C.T. Bigg, P. Eng. Senior Engineer

R.H.O. Wagner, P. Eng. Project Engineer

Introduction

Page 4: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

SUMMARY

•L. Bench Tests

1.1 Feed Ore

The ore sample was crushed in stages to a nominal 10 mesh passing size. Ten, 2 kg.

charges were riffled out for flotation testwork. Some of these charges were further roll crushed to

minus 20 mesh in preparation for bench grinding and flotation work.

One sample was riffled out and the head assayed:

Total Iron (Fej)

Acid Soluble Iron (FeSol)

Lime (CaO)

Silica (SiO2)

Acid Insolubles (Insol)

3.9407o as (F62O3) = 5.630/0

3.4707o

28.50/0

42.60/0

1.2 Metallurgical Results: Table 1

Test

1

2

Conditions

Grind

Min

20

7.5

o/o

-200

91.2

66.2

PH

9.2

6.5

DF 250

.045

-

Ib

MIBC

-

.105

s/ton Armac

T

.24

.09

DoumacT

.03

.39

Magnesite Concentrate Product

Wt.%

61.1

26.2

Assayo/o

Insol

13.6

6.44

o/o

Fe20s

7.7

3.0

Dist"/o

Insol

21.3

3.8

ributiono/o

F62O3

86.0

13.9

Summary

Page 5: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

2, Pilot Plant Tests

2.1 Feed

The pilot plant feed was stage crushed to nominally 10 mesh. The pilot plant

feed ore size distribution is presented in Table 2.

Table 2: Ball Mill Feed Size Distribution

i

m: a

3.3272.3621.6511.1680.8330.5890.4170.2950.2080.1470.1040.0740.0530.038

Mesh(Tyler)

6810142028354865100150200270400-400Total

Weight Grams

0.010.823.060.865.558.249.239.738.135.828.525.423.117.558.0533.6

Vo WeightInd.

0.02.04.311.412.310.99.27.47.16.75.34.84.33.310.9

100.0

Cum.

0.02.06.317.730.040.950.157.664.771.476.881.585.989.1100.0

-

Passing

100.098.093.782.370.059.149.942.435.328.623.218.514.110.9

--

i Si":

e

2.2 Grinding

The small Sala ball mill was charged with 250 kg of ceramic balls to grind the ore

without discoloration. The ball mill was in closed circuit with a 178 micron (80 mesh) aperture

screen. This configuration as in Figure 1 remained constant for the entire run.

Feed Ore- Ball Mill Screen Product

Figure 1. Grinding Flowsheet

Summary

Page 6: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

Table 3: Grinding Circuit Summary

TestNo.

123

Averages

FeedRatekg/hr

495051

50

Ball Mill DischargePulp, density

9/L

142014311441

1431

"/o

-200

mesh

73.773.775.1

74.2

Product SizeKBO urn

Feed

100411121123

1080

ScreenU/S

858782

85

NetPowerConskWh/t

17.215.915.0

16.0

WorkIndex

(Metric)Wl

22.420.618.5

20.5

2.3 Flotation

2.3.1 Circuit Configuration

For pilot plant tests PP1 and PP2 the flotation circuit was as in Figure 2. A

conditioner was added in PP3 to stabilize the pH to the flotation circuit and is illustrated in Figure

3.

Summary

Page 7: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

Flotation Feed TALC FLOTATION

-*J| Rougher IV

TALC CLEANER

CONC.

QUARTZ

FLOTATION

Tailings

QUARTZ

CONC.

MAGNESITE

Fig. 2 PPI and PP2 Flowsheet

Flotation Feed

QUARTZ

FLOTATION

QUARTZ

CONC.

TALC CLEANER

CONC.

MAGNESITE

CONC.

Fig. 3 PP3 Flowsheet

Summary

Page 8: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

2.3.2 Metallurgical Results

The flotation conditions are summarized in Table 4.

Table 4: Flotation Conditions

No.

123

F MIBC

.54

.50

.24

Reagents It ArmacT

.11

.11

.07

js/ton DuomacT

.09

.09

.08

Talc Rougher

PH

5.56.16.1

Quart 1

(feedpump)

PH

4.55.95.6

:Rot 2 PH

6.57.1

gher ( 3

PH

7.47.07.3

Dells 4

pH

7.57.07.6

Density Screen US

g/L

111211331160

T (n

Talc

678

me nin) Si02

789

* Armac T additions were to: Quartz Rougher Feed Pulp and Cell 2

Duomac T additions were to: Cells 3 and 4

The flotation magnesite production is summarized in Table 5.

Table 5: Quartz Tailing (magnesite cone) Production

Test No.

123

Avg. Magnesite

Conc.(calc)

Weightkg

106106149

120

Weight

40.630.441.7

37.6

HOSol

97.894.997.2

96.6

As:

3.85.44.4

4.5

says "/o FeSol

2.553.773.36

3.2

Si02

1.283.871.84

2.3

HCISol

67.449.868.4

"/o Dist

28.637.647.0

61.9

ibution FeSol

29.838.150.6

37.7

SJO2

1.9-

2.9

39.5

The weight "/o of magnesite concentrate is: 37.60X0 , and the silica content is approximately

2.307o.

Summary

Page 9: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

The talc cleaner concentrate production is summarized in Table 5.

Table 5: Talc Cleaner Concentrate Production

Test No.

1 2 3

Arithmetic Avg (calc)

Weight 0Xo

30.3 31.5 26.5

29.4

HCI Sol

5.55 5.94 4.97

5.49

Assays 0/

1.1 1.2

1.2

i Fe Sol

0.56 0.52

0.54

"/o

HCI Sol

2.9 3.2 2.2

2.8

Distributk Fe203

5.5 6.1

5.8

)n Fe Sol

3.5 3.7

3.6

2.3.3 Magnesite Concentrate Quality

A quality of magnesite concentrate with less than 1 0X0 SiO2 was not achieved by

bench or pilot plant test using these test conditions.

Suggestions to reduce the silica content:

1) Grind the feed ore to 10007o minus 100 mesh to grind down coarse quartz

particles which did not float

2) Extend the talc flotation time to remove the talc which hindered the

quartz flotation

3) Use pine oil as the frother to enhance talc and quartz removal

4) Evaluate collector

Summary

Page 10: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

10

SAMPLE PREPARATION AND DISPOSITION

Approximately, one tonne of uncrushed ore was received at Lakefield Research

on August 28,1989, as LR 8932638. The ore was crushed to minus 10 mesh and a head sample

was removed. The following products are at present held in storage:

No. of Drums

Quartz Cone PP3 1

1 Tab Cone PP3 1

Talc Tails PP3 1

\ Magnesite Cone PP3 1

Quartz Cone (oven dried) PP1 and 2 1

Talc Cone (oven dried) PP1 and 2 1

Talc Cone (filter cake) PP1 and 2 1

Magnesite Cone (oven dried) PP2 1

2 boxes Test and Assay Rejects

l box Test Charges

Sample Preparation and Disposition

Page 11: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

11

EQUIPMENT DESCRIPTION

Small Sala Mill

The Sala ball mill is an overflow-discharge mill with inside dimensions of 635mm

diameter and 1090mm length and a total volume of 0.34m3 . The Linatex rubber lining is smooth

with six equally spaced litter bars 25mm high by 50mm wide. The mill is on rubberized rollers,

which are driven by torque-arm speed reducers and V-belts from two 3.7KW electric motors. The

mill speed is 36.8 r.p.m. or 690Xo of critical speed.

g)___Power Calculations

The total power is measured by a Sangamo Type KYWP meter, equipped with a

rate meter and a cumulative meter. Power readings are based on instantaneous timed rate

readings of the disc in the meter. The time interval during which the rotating disc made a

specified number of revolutions is measured with a stopwatch. A nominal efficiency of 950Xo is

assumed for the power transmission. Thus the gross power is 950Xo of the total power. The no-

load power is calculated in the same manner, but with the mill operating empty. Net power is

equal to the gross power minus the no-load power.

760mm Sweco Screen

The 760mm diameter Sweco Vibro-Energy Separator was used to classify the

Sala mill discharge. The screen used was:

Aperture in micrometres

80 mesh 178

Denver 20L Conditioner

The tank dimensions are 305mm diameter by 380mm depth with a side outlet for

20L capacity. The agitation is imparted by two opposed-pitch three and two bladed axial-flow

impellers of 100mm and 76mm diameter rotating at a shaft speed of approximately 1150 r.p.m.

Equipment Description

Page 12: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

l 2

The drive is from a 0.75KW motor through V-belts and pulley. This conditioner was used ahead of

the Talc flotation circuit to modify the pH feeding the flotation circuit.

Denver Sub-A No.7 Flotation Cells

Two poly-urethane lined Denver Sub-A No.7 cells were used in the Talc flotation

circuit. Each cell has a volume of 28L and the mechanism is driven through V-belt and pulleys by

a 0.37KW motor. Air is self induced.

Denver Sub-A No. 5 Flotation Cells

Each cell has a volume of 7.7L and the mechanism is driven through V-belts and

pulleys by a 0.37KW motor. Air is self induced. The cells are poly-urethane lined and grouped in

a bank of four cells in series. These cells were used for the quartz flotation.

Equipment Description

Page 13: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

13

TEST DETAILS

Test Details

Page 14: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

Bench Test No. 1

Purpose:

Grinding:

To determine the j/jxirt; and 5otafcn behaviour of the ore sample.

2 kg of minus 20 raesft ere weee ground ter 21 minutes in the Abb6

porcelain mill wSh 2C* *? ^ cerarc pefcties.

Flotation: The ground pulp was iidihiereti me the Denver 2,000 gram

flotation machine anc tt *tfune was adjusted with tap water.

Concentrate 1: The late was floated wtr IF 250.

Concentrate 2: Following the tafc fctaDcr. tte cu*p ransferred to a Denver 1.000

gram flotation madve anc ocrcitioced wth Amiac T (tallow amine

acetate) and DF 251

Concentrate 3: A Doumac T (tafo* oamne decetase; addtion was used to float more

silica. Frothing oxxSxrs *ere TC* tieai. the froth was a creamy

pink and carried rnxr ^TTaenat

Reagent Additions: Pounds per ton of cnxs ore

Concentrate No.

1 2 3

DF 250

.035

.01

AimacT Doumac T

.09

.15 -13

Time, Minutes Cond. Frothing

1 12 1 6 1 12

Test Details

Page 15: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

15

Test No. 1

Purpose: To produce magnesite product

Procedure: Stage flotation of Talc and Silica from Magnesite.Mixed up a 30Xo solution of Armac T 1 mL :^ 15 g/t Mixed up a 30/* solution of Doumac T 1 mL = 15 g/t

No pH modification

Feed: 2 kg charge minus 20 mesh

Grind: 21 minutes with 20.4 kg ceramic pebbles

Conditions: DF250 frother. 1dp = 2.5 g/t

Stage

GrindConditionCon 1 - Talc ConeCon 2 - SiO2

Con 3 -SiO2

Reagents Added, grams per tonne

DF250

-17.55.0

5.0

ArmacT

.-

1515151515151515-

DoumacT

.---.-----15

Time, minutes

Grind

21.0.---.------

Cond.

10111111111

Froth

12222222222

PH

9.2-----------

StageFlotation Cell Speed: r.p.m.

02-2000/after first 12 minutes switched to D1-1000 1800

Test Details

Page 16: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

TesL 1: Metallurgical Results.

Metallurgical Results

16

pH r 9.2

Product

Cone 4 - MgCOaCone 3 - SiO2Cone 2 - SiO2Cone 1 - Talc

Head (calc.)

Head (assay)

Weight "/oInd.

61.13.44.4

31.1

100.0

Cum.

61.164.568.9

100.0

Assays "/oAcidInsol

13.655.270.283.5

39.2

42.6

FeT

5.383.782.400.98

3.83

3.94

Fesol

5.333.532.270.63

3.68

3.47

"/o D istributionAcidInsol

21.34.77.8

66.2

IOO.O

Fei

86.03.32.78.0

100.0

Fe so i

88.83.22.75.3

100.0

Screen Analysis

A 200g composite sample of product was made up using the Ind. weight 0X0 of the

four products.

Project No: 3778 Test No:

Product: Comb. Prod.

M.B.

Microns

0.074

Mesh

200-200Total

WeightGrams

17.7182.3200.0

?0 WeightInd.

8.991.2100.0

Cum.

8.9100.0

-

Passing

91.2.-

Test Details

Page 17: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

17

Bench Test No. 2

Purpose:

Grinding:

Flotation:

Repeat test No. 1 with a coarser grind and to modify the pH to 6.5, anduse MIBC as the f rather.

7.5 minutes at 66*^ solids.

The pH was conditioned from 9.1 after grinding to 6.5 with additions of100 g/L sulphuric acid. Use MIBC frother as required. All stages werefloated in the 2,000 gram Denver Cell.

Reagent Addition: Pound per ton of crude ore

Concentrate No.

1234

MIBC

.095-

.01-

ArmacT

.09--

Doumac T

.-

.27

.12

Time, MinutesCond. Frothing

2 251 61 161 4

Test 2: Metallurgical Results at 0 ^=6.5

Product

Cone 5 - MgCC-3Cone 4 - QuartzCone 3 - QuartzCone 2 - QuartzCone 1 - Talc

Head (calc.)

Head (assay)

Weight "/0Ind.

26.211.15.8

26.430.5

100.0

Cum.

26.237.343.169.5

100.0

Assays "/oAcidInsol

6.446.0274.137.692.4

44.8

42.6

FeT

2.104.363.609.300.76

3.94

3.94

FeSO i

1.513.523.019.390.29

3.54

3.47

07o DistributionAcidInsol

3.81.59.6

22.262.9

Fer

13.912.35.3

62.65.9

Fe so i

11.211.14.9

70.32.5

Screen Analysis

A 100 gram composite sample was made up by combining by Ind. weight "/o a portion of the five products.

Test Details

Page 18: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

18

Product: Combined Product Test No:

Microns

208147104745338-38

Mesh

65100150200270400-400

Total

Weight Grams

1.56.411.614.314.710.940.6100.0

o/o WeightInd.

1.56.411.614.314.710.940.6100.0

Cum.

1.57.919.533.848.559.4100.0

-

Passing

98.592.180.566.251.540.6

--

Test Details

Page 19: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

19

Test No. 2

Purpose: To float Talc and Silica from Magnesite

Procedure: Mix 1 0X0 solution of Armac T 3 mLs ': 15gA Mix 1 0X0 solution of Ooumac T

Modify pH from 6 to 6.5 with 100 g/L sulphuric acid, 2 mLs = 100 g/t Use MIBC frother as required, 1 dp * 2 .5 gt

Feed: 2 kg charge minus 20 mesh, add 1030 mLs H2O, 20.4 kg ceramic balls

Grind: 660Xo solids - 7.5 minutes

Conditions: Float in D2 cell.

Stage

GrindConditionCone 1 -TalcCone 2-SiO2

Cone 3-SiC-2

Cone 4 - SiC-2

Reagents Added, grams per tonne

MIBC

48.--.--5----------

Armac T

-~.151515-------------

Doumac T

-.--.

15151515151515151515151515

H 2SO4

480790130

-.

9070

-5095

----

100---

Time, minutes

Grind

7.5-0------------0--

-

Cond.

1-1111111111111111

Froth

25222222222

1.51.51.51.01.01.01.0

pH

9.16.5

.---

6.2-

5.5-----

6.26.2

---

Flotation Cell Speed: r.p.m.

D2 1900

Test Details

Page 20: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

Test No. PP-1

20

1. Purpose: To mechanically check the circuit and to produce a high quality

magnesite concentrate.

2. Adjustments: M IBC was added as required.

Equal dosages of Armac T and Doumac T were applied to the circuit.

Frequency: Sampling was from 1:30 to 4:00 p.m. every 30 minutes.

Flowsheet: See the following page.

Equipment List: Small Sala Ball Mill, 635mm diameter x 1090mm long.

760mm diameter Sweco vibro-energy screen, 80 mesh deck.

2 x poly-urethane lined Denver Sub-A No. 7, 28L, 0.37kW motor

4 x poly-urethane lined Denver Sub-A No. 5, 7.7L, 0.37 kW motor.

3. Results: Magnesite specifications not met.

Test Details

Page 21: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

Crushed Ore

21

fl 60 mesh l

^

TALC FLOTATION QUARTZ FLOTATION

Talc Cleaner 11-^ Tailings

TALC CLEANER CONC.

PILOT PLANT 1 FLOWSHEET

MAGNESITE CONC.

Test Details

Page 22: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

22

4-

TRST PP]

1.1.1. Sal! Kill Report

Peed:

Feed Rate:

Classifiration:

Hill Speed:

Ceraaic Ball Load:

Pulp

Kill Discharqe:

Undersize:

Input Pover:

Fffirtency:

Avpraqe Pover:

Net Pnwer Tonsmption:

K80 Peed:

K80 Product:

Work Index (lettic):

Hinus i. inn ore

W k q./h

Sweco Screen

36.8 r.p.i.

60 lesh deck 178 nicron aperture

Total

69 \ of critical speed

125 kg125 kq

250 kq

1420 q/L 46

26.3 \ p lus 200 lesh50.4 t linus 400 nesh

\ solids Solids S.G. 2JO

sees for 3 disc revolutions2.03 ki

95 \

Gross No Load Net

1.93 ktfl.O'l kBG.84 kV

17.16 kWh/t

1004 aicrons

85 sicrons

22.4

Test Details

Page 23: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

I 23

3.2.Reaqent Additions PPI

Point of Addition

Talc RouqherTalc RouqherQuartz Rougher Feed PuspQuart? Rouqher Feed PuipQuartz Rouqher Cell 1Quartz Rouqher Cell 3Quartz Rouqher Cell 4

Reaqent Naie

H2S(M HIBC HIBC ARMAC T ARKAC T DOUHAC T OOUHAC T

Solution Strenqth

t

Rate iL/ain q/t

or dr/iin

1011

0.1O.I0.1O.I

21.7??:01.0

26.017.520.317.0

2902269

1232212521

FeedRatet/h

pH, Pulp Density and Tenperature

ProductPulp density

q/LTenperature

'C

Rail Mill nisrharqe Bal l Hill Screen Undersize Talc VounherQuartz Rouqher Feed Puip Quartz ?ouqher Cell 2 Quartz Rouqher Cell 3

Pouqher Cell 4

H20 1112

5.5 4.5

7.5

Test Details

Page 24: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

24

Project No: 3778

Product: B M Screen Under Size Test No:

AR

PP-1

Microns

208147104745338-38

Mesh

65100150200270400-400Total

Weight Grams

0.14.99.114.312.512.754.4108.0

*7o WeightInd.

0.14.58.413.211.611.850.4100.0

Cum.

0.14.613.126.337.949.6100.0

-

Passing

99.995.486.973.762.150.4

--

Product: B M Feed Test No: PP-1

Microns

3,3272,3621,6511,168833589417295208147104745338-38

Mesh

6810142028354865100150200270400-400Total

Weight Grams

0.02.08.019.922.320.217.514.913.012.410.110.46.75.620.7183.7

9fc WeightInd.

0.01.14.410.812.111.09.58.17.16.85.55.73.63.011.3

100.0

Cum.

0.01.15.416.328.439.448.957.064.170.976.482.085.788.7100.0

-

Passing

100.098.994.683.771.660.651.143.035.929.123.618.014.311.3

--

Test Details

Page 25: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

25

3.4.Assays PPI

Product

Ball Kill Feed Screen Undersize Talc "leaner Cone Talc Cleaner Tai l Talc RouqtiT Cone Talc Rougher Tail Quartz Concentrate Quartz Tai linn Built Haqnesite(Grab)

3.5.Netdlliirqir;)l Balance Product

Talc Cleaner Concentrate Talc c leaner Tail Talc Snuqher Conc(calc)

(assay)

Talc Rougher Cone Talc Rmjnher Tail B.H. F-ed(calc)

(assay) ilndemzolassavi

Qiprfz Concent rate Quartz Tailinq Talc Rnuqher TaiUrslc!

(assay!

Veiqht \

30.291.94

32.22

32.2267.78

100.00

21.2340.5567.78

Assay \HC1 PeSol totai

58.8 i. 78S9.llS. 5520. iS. 4}83.762.797J 2.6799.0 2.66

Assay \HCl FeSol total

5.5520.26.436.43

6.4183.758.8 3.7858.8 3.7859.0

62.797.8 2.6783.783.7

f e S i 02Sol

3.47 27.3

2.55 1.282.41 1.5?

Fe Si02So!

3.47 27.33.47 27.3

2.55 1.28

l Distribution HCl Fe ?e Si02 Sol total Sol

2.9 0.7 3.5

3.5 96.5

100.0 100.0 100.0 100.(

29.067.496.5

29.8

SUHHARY leiqht t

FINAL PRODUCTS

Talc Cleaner Concentrate 30.29 Talc Cleaner *ail 1.94 Quartz Concentrate 27.23 Quartz Tailinq (Haq Cone] 40.55 Ball Hill Feedfcalc.) 100.00 Ball Hill Feed(assay)

Assay tHCl Fe Fe Si02Sol total Sol

5.5520.262.797.8 2.67 2.55 1,2858.8 3.78 3.47 27.358.8 3.78 3.47 27,3

l Distribution RC1 Fe Fe Sol total Sol

2.9 0.7

29.0 67.4 23.6 29.8

100.0 100.0 100.0

Si02

1.9 100. 0

Test Details

Page 26: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

Test No. PP-2

26

1. Purpose: To produce a high quality magnesite concentrate.

2. Adjustments: Additional pH monitoring equipment was brought into service.

2.1 Frequency: The sample period was for the last 3 hours of the test, every 30

minutes.

2.2 Flowsheet: See next page

2.3 Equipment List: Added two portable pH meters.

3. Results: The silica content was higher than PP1 and the weight recovery to

concentrate was lower than in PP1.

Test Details

Page 27: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

27

Crushed Ore

fl 80 mesh i

TALC FLOTATION

TalcClMiwr It*- Tailings

QUARTZ FLOTATION

Rougher

^^^^^^h

TALC CLEANER CONC. QUARTZ CONC.

MAGNESITE CONC.

PILOT PLANT 2 FLOWSHEET

Test Details

Page 28: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

28

TEST m

3.1.1. lall K ill Report

Feed:

Peed Rate:

Class; ficaMnn:

Hill Speed:

i" B"11 Load:

Pulp Densities:

Hill Oisrharqe:

Screen tlnd-r? ize:

Input Power:

Drive Efficiency:

Averaqe Power:

Net ?over Consuiiption:

Ul) Feed:

MO Product:

Index (letric):

Minus 3. lil ore

50 tq/h

IS. 8 r .p. i.

Total

lies h deck 178 aicron aperture

6s l of critical speed

kq kq

kq

HJ1 q/L 47

26.3 \ p lus 200 sesh 'S.5 \ K ilius 400 lesh

11.SO sees for 1.98 W

solids Solids S.G. 2.80

3 disc revolutions

IS

Gross No Load Net

1.88 kV1.09 kYfi.79 kY

15J9 ktfh/t

1112 nicrons

87 licrons

20.6

Test Details

Page 29: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

29

Additions PP2

Point of Addition ReagentNaie

Talc Rougher H2S04Talc Rooqher HIBCQuartz Rougher Feed Putp H2S04Quart? Rouqher Peed Puip HIBCQuartz Rouqher Peed Puip ARHAC TQuartz Rmjqher fei] 2 ARHAC TQuarts Rouqher Co! l ] OOUMAC TQuartz Pmiqher Cell ^ D OdHAC T

Solution Strength

Rate L/iin q/t

ordr/Bin

51S1

0.10.10.10.1

}fl.)20.0.4.80.7

24.720.022.113.3

2312241290

830242716

FeedRatet/h

0.050

pH, Pulp Density and Tepperature

ProductPulp density

q/tTeiperature

pH

Ball Hill DischargeSail Hill Screen UndersizeTalc RouqherQuartz Rougher Feed PuipQuartz Rouqher Cell 2Quartz Rouqher Cell 3Quartz Rougher Cell 4

14311133

(.1 5.9 6.5 7.0 7.0

Test Details

Page 30: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

30

3.4.Assays PP2

Product

3.)l! Hill feed Screen 'inri-rsiie Talc Cleaner Cnne Tale Cleaner Tai l Talc Rnnqher Cone T^M- Rouqher Tai l Quart: Concentrate Ouar f z Tail:nq

Cone [Grab 1:10 p.*.l

Assay \HCl' Pe Pe 5i02 Sol total Sol

5S 59 S. 21 6. 83 73 94 95

.n

.0 94 .0 66 .4 .8 .9 .8

3. 3. 0. 2. 0. 5. 4. 3.

47 80 74 22 72 28 76 82

i 3 (1 2 0 5 4 3

.71

.84

.56

.19

.48

.^

.77

.77

12 20 3.

.9

.2 87

3.5.Metallurgical Balance Product Seiqht \

Talc Cleaner Concentrate 31.52 Talc Cleaner Tail 1.58 Talc Rouqher Cone(ea l r! .'3.10

(assay!

Talc Rouqher Cone 33.10 T^r Pouqhor Tail 66.90 B.M. Peedlcalc) 100.00

(a5?ayj Se iJ'Shelassayj

Quart'7 Concentrate 36.46 Quartz Tailinq 30. H TS!I- Pnnqhpr TaiHcalc) 66.90

(assay)

SUMMARY tfeiqht t

FINAL PRODUCTS

Talc Cleaner Concentrate 31.52 Talc Cleaner Tail 1.58 Quartz Concentrate 36.46 Qiiart7 TailinqfHaq Cone) 30.M Ball Mill Peed(calc) 100.00 Ball Hill Peedfassay)

Assay \ HCl PeSol

5.216.fi.

6.8]585859

73948383

94.066(6

66.4.0.0.0

J.q.4.4

AssayHClSol

5.2173945858

94.0.8.9.0.0

total

0200

0s33J

4

345

\Pe

.74

.22

.81

.72

.72

.28

.77

.47

.80

.76

.82

.33

.28

Pe Si02Sol

0.2.0.0.

0.5.3.3.3.

4.3.4.5.

56196448

4839 12.9767184

77 20.277 3.8732 12.7739 12.90

Pe S102total

024333

.74

.22

.76

.82

.17

.47

Sol

0.2.4.3.3.3.

561977 20.277 3.871071

\ Distribution HCl Pe PeSol

303

396

105

464996

\

.2

.6

.8

.8

.2

.0

.4

.8

.2

total

5.0.6.

6.93.

100.

56.37.93.

583

370

167

Sol

3.0.4.

4.95.

100.

57.38.35.

572

280

713

DistributionHClSol

30

4649

100

.2

.6

.4

.8

.0

Petotal

5.0.

56.37.

100.

58160

PeSol

3.0.

57.38.

100.

cj

7710

Test Details

Page 31: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

3 l

Project No: 3778

Product: B M Screen Under Size Test No:

RC

PP-2

Microns

208147104745338-38

Mesh

65100150200270400-400Total

Weight Grams

0.15.211.215.116.913.058.5120.0

7o WeightInd.

0.14.39.312.614.110.848.8100.0

Cum.

0.14.413.826.340.451.3100.0

-

Passing

99.995.686.373.759.648.8

--

Product: B M Feed Test No: PP-2

Microns

3,3272,3621,6511,168833589417295208147104745338-38

Mesh

6810142028354865100150200270400-400Total

Weight Grams

1.95.614.635.836.130.425.020.319.918.415.015.810.79.1

33.0291.6

7o WeightInd.

0.71.95.012.312.410.48.67.06.86.35.15.43.73.111.3100.0

Cum.

0.72.67.619.932.242.751.258.265.071.376.581.985.688.7100.0

-

Passing

99.397.492.480.167.857.348.841.835.028.723.518.114.411.3

--

Test Details

Page 32: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

Test No. PP-3

32

1. Purpose: Same as the previous test.

2. Adjustments:

2.1 Frequency:

2.2 Flowsheet:

During the last two hours the level of MIBC frother was decreased in

an effort to control the froth condition and increase the weight

recovery to magnesite concentrate.

During the last hour the Armac T reagent dosage to quartz rougher

was decreased to increase recovery to magnesite concentrate.

The circuit was sampled from 2:00 to 4:00 p.m. every 30 minutes.

See next page

2.3 Equipment List: A 20L Denver conditioner was added in front of the Talc circuit.

3. Results: Reducing the reagent levels increased the weight percent recovery of

magnesite and insolubles.

Test Details

Page 33: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

33

Crushed Ore

TALC FLOTATION QUARTZ FLOTATION

Talc Cleaner |}-*- Tailings

TALC CLEANER CONC.

PILOT PLANT 3 FLOWSHEET

MAGNESITE CONC.

Test Details

Page 34: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

34

TEST PP3

3.1.1. Ball Hill Report

Foxl:

Feed Rate:

fUssif ication:

Hill Speed:

Ball Load:

Pulp Densities:

Mill Discharqe:

Screen Undersize:

fnpnt Pnwer:

Drive Efficiency:

Averaqe Power:

Het Pover Consuiption:

K80 Feed:

K80 Product:

Vork Index (letric):

lHinus 3.3*s ore

51 kq/h

Sveco Screen

36.8 r.p.i.

-38*142511-25iiU9n

Total

q/L

lesh deck 178 licron aperture

69 \ of critical speed

125 kq125 kg

250 kq

48 X solids Solids S.G. 2.80

24.9 t plus 200 iesh48.6 \ l inus 400 iesh

19.t? sees for1.95 kH

3 disc revolutions

95 V

Gross No Load Net

US k v1.01 kV0.76 ktf

14.98 kBh/t

1123 nicrons

82 licrons

18.5

Test Details

Page 35: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

i."-'

l: 35

i.2.R*3qent Additions PPj

Point of Reaqent Ha ne

Pnuqhcr Conditioner H2SCMTalc Roiiqher Conditioner H!RCQuartz Rouqhet Peed Puip H2SCHQuart: Rougher Feed Pu*p ARHAC TQuart? Rouqher Cell 1 A RHAC TQuartz Pnuqher Cell l OOUKHC TQuartz Router Cell ( DOUHAC T

Solution Rate Strength nL/uin g/t

\ o r dr/iin

S1s

0.10.10.10.1

16.010.013.512.016.016.016.3

941119800

14191919

PeedRatet/h

0.05L

pu, Pulp Density and Temperature

ProductPulp density

q/L pHTenperatare

'C

Ball Mill Discharge Ball Hill Screen Undersize Talc Rougher Quartz Rouqher ?Vcd Quartz Rouqher Cell Q'Mttz Rouqher Cell Quartz Rougher Cell Tai l

miIHO

^

6.1 S.fi 7.1 7.3 7.6 7.6

Test Details

Page 36: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

36

M.Assays PP3

Product

Ball Hill PeedScreen 'JndersizeTak Cleaner ConeTalc Cleaner TailTalc Rougher ConeTalc Rougher TailQuartz ConcentrateQuartz TailingKaqnesite Cone (Grab 4:15 pi.)

1.5.Hptal'urnical Balance Product

Talr Cipher Concentrate Talc Cleaner Tail Talc Rougher Conc'calc)

(assay)

Talc Rounder Cone Talc Rougher Tail 8.K. Feed(calc)

(assay) .Se U

Quartz Concentrate Quartz Tailing Talc Rouqher Tail(calc)

(assay)

SUHHARY

FINAL PRODUCTS

Talc Cleaner Concentrate Talc Cleaner Tail Quart? Concentrate Quartz Tailinq(Haq Cone) Ball Hill Peed(calc) Ball Hill Peed(assay)

Height

7.61 H.70

33.7056.30

100.00

24.5641.7466.30

Height \

A3S3Y V

HCl FeSol

59604.228."4649782

.3

.S97.S93.9.0.2..1

AssayHC!Sol

4.

228.8.

8.84

59

5960

64

978484

17.S

91

93

13.9.1

.3

.fi

.(1

.2

.9

.9

total

330104

43

\Pe

.51

.72

.87

.55

.98

.88

.91

.11

total

01l0

0437 J

1

4

334

.87

.55

.02

.98

.98J8.57.51.72

.91

.11

.78

.88

Pe Si02Sol

330104

43

.37

.60

.52

.51

.72

.97

.79

.36

Pe

27.28.

1 7

31.1.8

Si02

71

434

Sol

nln0

0433

4334

.52

.51

.74

.72

.72

.97

.54

.373.6

.79

.36

.89

.97

13.27.27.28.

31.

4971

31J412.13.

84

Assay \HCl "Pe Pe Si02Sol total Sol

26.0?7.6]

24.5641.74

100.00

4.97 11.87 0.5272.5 1.55 1.5164.5 4.91 4.79 31.397.2 3.11 3.36 1.8459.3 2. 85 2.8359.3 3.51 3.37 27.7

2.2 6.1 3,77.9 3.2 3.1

1 26.5 43.7 42.5 29.068.4 47.0 50.6 2.9

lOfl.fl 100.0 100.0-

\ D istributionHClSol

2.22.95.1

5.194.9

100.0

26.568.494.9

Petotal

6.13.29.3

9.390.7100.0

43.747.090.7

PeSol

3.73.16.9

6.993.1

100. 0

42.550.693.1

Si02

31.8103.0

29.02.9

31.8

t DistributionHClSol

2.22.9

26.568.4

Petotal

6.13.2

43.747.0

PeSol

3,73.1

42.550.6

Si02

29.02.9

Test Details

Page 37: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

37

Project No: 3778

Product: B.M. Screen undersize Test No:

AR

PP-3

Microns

208147104745338-38

Mesh

65100150200270400-400Total

Weight Grams

0.01.9

12.618.919.715.865.2134.1

9fc WeightInd.

0.01.49.414.114.711.848.6100.0

Cum.

0.01.4

10.824.939.651.4100.0

-

Passing

100.098.689.275.160.448.6

--

Product: Ball Mill Feed Test No: PP-3

Microns

3,3272,3621,6511,168833589417295208147104745338-38

Mesh

6810142028354865100150200270400-400Total

Weight Grams

1.23.914.629.729.825.321.517.117.215.813.012.010.27.8

25.9245.0

Jo WeightInd.

0.51.66.012.112.210.38.87.07.06.45.34.94.23.210.6

100.0

Cum.

0.52.18.0

20.232.342.751.458.465.471.977.282.186.289.4100.0

-

Passing

99.597.992.079.867.757.348.641.634.628.122.817.913.810.6

--

Test Details

Page 38: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

38

Calcine Production Test C1:

19 kg of sample from PP2 were calcined by the following procedure:

1. Approximately 2 kg of magnesite was placed in a tray.2. The tray was transferred to a high temperature muffle preheated to 7500C.3. The sample was calcined at temperature for a minimum of 6 hours.4. The tray was removed from the furnace and the contents air cooled.

HCI Leach Test No. 1:

Leaching of Quartz Concentrate from PP2

1. 1 kg of PP-2 quartz concentrate was pulped with 2L of water. The pulp was constantly mechanically agitated during leaching process.

2. 2L of HCI was slowly added (approximately 15 mL/minute). A strong froth was created when the acid contacted the pulp.

3. The mixture was heated to a gentle boil and allowed to continue boiling until reaction was complete. Upon completion the residue was allowed to settle to the bottom of the 4L beaker.

4. The residue was filtered and washed three times. The residue was then dried and assayed.

Results The acid leach residue assayed Q .0% Fe and 63.lVo SiO2-

Calcine Production Test C2

The Jones middling and non-mags of Test No. 3 (21.1 kg were used to produce calcine by the same procedure as in C1).

Test Details

Page 39: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

39

Hydration of MaQ

1. Approximately 10 kg of calcined MgO were combined and riffled in 1 kg charges.

2. Separate charges were hydrated by placing the MgO powder in a pyrex dish with

approximately 440 mL of water. This mixture was placed in a drying oven set at

2500F for approximately 12 hours. The average weight gain of the dried powder

was 200Xo.

3. The hydrated 1 kg charges were ground in pebble mills at a rate of 2.5 hours per kg

of powder. This gives a surface area of approximately 6400 cm27g.

Sample

Head 2 hr Grind 5 hr Grind

Specific Gravity

3.84 2.63 2.64

Specific Surface Area crr^/cm2

16246 15564 16909

Surface Area cm27gm

4230 5918 6405

Calcine Production Test C3

to S.3% SiOa-

Wilfley tabling was done to reduce the silica content of C2 hydrated calcine material

Nov. 13/89

Sample3778-3B

Wt = 2.8kg7 hour grindHydrated Calcine

SpecificGravity

2.48

Specific Surface Areacrr^/cm3

12189

Surface Areacrr^/gm

4915

Test Details

Page 40: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

40

This was reground again for 3 hours with 23.0 kg of ceramic balls, to increase the

surface area. The resultant 2.5 kg charge was used by R. A. Elliot for further testwork.

Nov. 14/89

Sample 3778-3B

Wt = 2.5kg 10 hou r grind Hydrated Calcine

Specific Gravity

2.45

Specific Surface Area cm27cm3

12821

Surface Area cm27gm

5233

LAKEFIELD RESEARCHA Division of Falconbridge LimitedLakefield, OntarioDecember 12, 1989/mo

Test Details

Page 41: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

DELORO MAGNESITE VENTURE FUNDADELAIDE ST. WEST, SUITE 3310, TORONTO. ONTARIO M5H 3P5

r AY TO THE ORDER OF

0022; . - : December 14 to 89

RossMcPhail -- —————————————— 4 *? i/m^g*

TS".

SUM OF . ./100 DOLLARS

Re: December 7, 1989 Invoice

Canadian Imperial Bank of CommerceMAIN BRANCH-COMMERCE COURT TORONTO, ONTARIO MSL 1G9

ii'OOOO 5 E"1 iIOOOO 2-0

DELORQxMAGNESITE VENTURE FUND

PER

3D" 1 5 IR IR"1

DE W 21 iMKOf lOlTREALs V•^•^"SS^I -4

Page 42: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

FROM LflSTCORP IHUESTMEHTS ( UED )07. l l . ' 90 10:45 HO. 3 PRGE 3

! ^ 1989

84 Hemlock Street Timmins, ON, P2*N6S3 December 7,1989

Lastcorp Investments Ltd*Suite 3310, 130 Adelaide Street WestToronto, Off, M5H3P5

Attentions Mr, James A* Bates, P. Eng

In account with Ross MacPhail, P. Eng for services in securing and delivery of ore samples from the magnesite pit in Deloro Twp. for testing at Wakefield Research, Lakefield, Ontario.

Three days for securing and delivery of a one tonsample, aug. 2^-30, 1989. S900.00

Two days for arranging for the delivery of a 13ton sample to Lakefieid Research on Rev* 3, 1989and to assisting Mr. Ted HacKay of ICG Utilities( Ontario ) Ltd. in the location of the proposedmine site. S600.GO

Truck rental re. Tilden, Msl Murdock, invoice T3-268^9 - 3553.80Gasoline, Shell Canada slips _ ^ S86.79

Total Sauo. 59

~^7

Page 43: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

DELORO MAGNESITE VENTURE FUND, -O ADELAIDE ST. WEST, SUITE 3310,

TORONTO, ONTARIO M5H 3P5February

0119-28__19- 90.

PAY TO THE .ORDER OF_~ Lakefield Research *1.311.50*

SUM OF . ?I3 T T BOIS g O en ./l00 DOLLARS

Re: Inv 30055DELORO MAGNESITE VENTURE FUND

Canadian Imperial Bank of CommerceMAIN BRANCH-COMMERCE COURT TORONTO. ONTARIO MSL 1G9

mn,

ii'OOO l 1 1"1 00000 30"'S •''0000 l 3 1 L bO,-'

"•OODiiqn- UDODQ 5-0 5 l ^ l S"1 /000013U50,'1

f MR 49tf 03di B C

DATA CENTRITOB OMT.

S& *o o?-T - -c.l.?* c

ATA CCNTRF:TOM. oui:

Page 44: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

FROM LfiSTCORP IHUESTMEHTS CUED )S7. l l. '98 10:46 NO. 3 PRGE 5

INVOICE

LAKEFIELD RESEARCHA DIVISION OF FALCONBRIDGE UM1TED

P.O. Box 430, 185 Concession St,. LakefieM. Ontario KOL 2HO Phone: (70S) 652-3341 Tetex No. 06 962842

Fax No, (706) 652-6365

TO:MAGNESIUM REFRACTORIESSUITE 1300130 ADELAIDE STREET, WESTTORONTO, ONTARIOATTN :MR. J. BATES

NO.: 30055DATE

SENT TO:

February 12 t9 SO

Our Pvo.ject L. R. 3778 - - January Charges

RE: MQO, TALC - PILOT PLANT UNDER: DIft. B. ELLIOT

TO Research Charges:

'5,50 hours at $ 55.008.00 hours at * 65.002.OD hours at S 75.00

TO Analytical Charges-.

5 B 4 NI

@ S 15.00d * u.oo

522.50520.00.150,00

75.0044.00

1. 1-52.50

119.00

1.31 i.5C

PLEASE PAY BY INVOICE - Terms- Net 30 A*** -x*.

Page 45: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

FROM LRSTCORP INVESTMENTS " v'

(UIED)S7.11.'90 10:46 NO. 3 PflGE

{ INVOICE r NOV 23 1989

LAKEFIELD RESEARCHA DIVISION OF FALCONBRIDGE, LIMITED

P.O, Box 430, 185 CofK^ston SI, Lakefieid, Ontario KOL 2HO Phone: (70S) 652-3341 Telex No. 06 962842Fax No. (705)652-6365

TO: MAGNESIUM REFRACTORIESSUITE 1300130 ADELAIDE STREET, WESTTORONTO, ONTARIOATTN :MR. J. BATES

NO, 29554DATE

SENT TO:

November 16 89

Our Project L.R. 3778 - - October chargesRE J MGO, TALC - PILOT PLANT

UNDER DIE. B. ELLIOT

TO Research Charges:

45.00 hours at S 49.50 78.00 hours at S 62.50

TO Analytical Charges:

3 AC @ 3 8.008 FE e S 12.002 3102 @ $ 15.00

2,227.504,875.00

24,0096.0030.00

7,102.50

150.00

7,252.50

PLEASE PAY BY INVOICF -

Page 46: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

DELORO MAGNESITE VENTURE FUND/-"^ADELAIDE ST, WEST, SUITE 3310. X—\

Y ^TORONTO, ONTARIO M5H3P5 *^-''December

003229: . ^

..-v'^V s '-'

DELORO MAQNES1TE VENTURE FUND

Re: :- Iriv29554Imperial Bank of Commerce

; MAIN BRANCH-COMMERCE COURT TORONTO, ONTARIO MSL 109

Page 47: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

FROM LflSTCORP I H U E S T M E H T S (UED )07. l l . '98 10:47

INVOICE (NO. 3 PflGE 9

LAKEFIELD RESEARCHA DIVISION OF FALCONBRiDGE

P.O. Box 430. 185 Concession St, Ukefield. Ontario KOL 2HO Phone: (70S) 652-3341 Telex No. 06 962842

Fax No. (705) 652-6365

NO, 29241DATE September 15 19 89

TO: MAGNESIUM REFRACTORIESSUITE 1300130 ADELAIDE STREE^ WESTTORONTO, ONTARIOATTN :MR. J. BATES

SENT TO:

Our Project L.R. 3778 - - AUGUST Charges

RE: MGO, TALC - PILOT PLANT UNDER DIR. B. ELLIOT

TO RESEARCH CHARGES :

22.00 hours at S 4 9.50 42.50 hours at S 62.50

TO ANALYTICAL CHARGES :

l FE @ $ 12.00

.i./,' r i .'it---i

1,089.00 2.6S6.25

12.00

3/745.25

12.00

3,757.25

PLEASE PAY BY INVOICE — Terms: Net 30 days. 2* st-rvice charge per month on overdue accounts.

Page 48: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

pai4Efpspst' \ 3:^-':.: - r^i:-^^••:-.\^i#^-''-^v;-.- v^r.^.'(.?'-''''..' ' ' '~J'-"-'

.:3Sfe - /v/^-'.

-v.

*#':-^...II*;:^•? -^v -

..-:^-^^;r:^——————;

|.:;^ilil'; ®/;; ' ': :- - '••• ; --'."•••' ': l•; - -' . •••••'^:- ' l/

'

.- - -

•cpiSJ'^ce. . - j •i:-----i.^'..' :" '. " ' - ' ' - ' ;v; " 'i.,' - .- ,'i ;i A- ( ;'1 "';.. ' . ; . ;..',V;:-- i .... ;

^:. •S&&.-. •.•; 1;;. ;- •••' -' . . .-' ; ; :-: ' i l

••'••• ; .' :; - ' ' .. -. ' :-2*91

: v: -. '::'." ',::-:\

•'f':,

Page 49: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

'V.Ministry ofNorthern Developmentand Mines

Ontario

Report of Work

DOCUMENTSU/ 9006

Mining Act ( Expenditures. Subsection 77(19)) /-/'- . 42A06SW0002 2.13510 DELORO 900

Type of Work Performed

T/UL ^ ^)At"P(. l^iG A^7Recorded Holder

//jA'Oc'v /Vl/C .

fiwtfc,*™*STX,,uWining Uivision

2. /3tr,Township or Area

^ /J g L ft# O ^ftsf

't?Address

y .c* . (y fl G x/o/o f/AfA/.'x/j OA'' ' f?t\J~~7x~7Work Pertormed By

1 L-^tF.tLO tLt^C-H

Prospector's Licence No

•"y *?i.Q fi

Telephone No.

Name and Address of Author (of Submission) \ is~f Til Q

/y A - i ^-f / ?0 i4.Dt^-X \f)^ *}1~ t ^J f^ ' ' ^ *~ (- fQf 'O / r^OA/^T/^/*^ 1̂ .f''^^(^1 O/^ f t? ) 6 7^7. ""77y ox/775 /WC// ^/^

All the work was performed on Mining Claim(s): Irrdicaie no. of days performed on each claim. 'See Note No. 1 on reverse side

Mining Claim

Mining Claim

No. of Days

No. of Days

Mining Claim

Mining Claim

No. ot Days

No. ol Days

InstructionsTotal days credits may be distributed at claim holder's choice. Enter number of days credits per claim in the expenditure days credit column (below).

Mining Claim No. of Days Mining Claim

Mining Claim No. of Days Mining Claim

Mining Claim No. of Days Mining Claim

Calculation of Expenditure Days Credits Total Expenditures

s 14,46 /. 34 *

Date When From: -

Da/ | Mo.

No. of Days Mining Claim

No. o1 Days Mining Claim

No. of Days Mining Claim ..

Total Days Credits

is = 3(A

No. ol Days

No. ol Days

No. of Days

Work was Pert

39 J?| W. Day

armed

l Mo. 1 Yr.

Mining Claim

Mining Claim

Mining Claim

No. ol Days

No. ol Days

No. ol Days

Total Number of Mining Claims Covered by this Report of Work

19Mining Claims (List in numerical sequence). If space is insufficient, attach schedules with required information

RECORDED

Total Number of Days Performed Total Number of Days Claimed

Certification of Beneficial Interest *See Note No. 2 on reverse sidel hereby certify that, at the time the work was performed, the claims covered m this report of work were recorded in the current recorded holder's name or held under a beneficial interest by the current recorded holder.

Date Recorded Holderpr Agent (Signature)

Certification Verifying Report of Workl hereby certify thai l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.

Name and Address of Person Certifying

X //IC. /'o /x/ f. /o fTelephone No.

7- r - i-b i -','f/Date Certified-ByTSBnature)

Received Stpmp ~ '\-^\'-M-. 'V^/'i

For Office Use Only TR\wf^frinn7jV;-i^ plH'J^'-M'.^hr1 "' i,6l990 j

Page 50: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

Magnesium Refractories Ltd.

July 17, 1990 2.13510

Mining RecorderMinistry of Northern Development

and Mines 60 Wilson Avenue Timmins, Ontario P4N 2S7

Dear Sir:

RECEIVED05 1990

MINING LANDS SECTION

The following reports are submitted along, with copies of invoices and payments for assessment credits on the attached claims.

Bulk samples of ore were taken from a previously blasted area on the claims and were sent to Lakefield Research, Lakefield, Ontario. Flotation tests were done at Lakefield Research for preparation of magnesite concentrate which was calcined and then taken elsewhere for compaction and dead burning to produce refractory grain magnesia for market evaluation. A copy of the Lakefield report covering the flotation test work is attached.

Some of the concentrate, both in the magnesite form and in the form of calcined magnesia were submitted to a large magnesium metal operation in Eastern Canada. They raised questions about the content of some of the minor constituents and further work was done at Lakefield Research to try and determine the source of these contaminants. Copies of this work are also attached. This work is continuing.

Yours truly,

R.A. Elliott

RAE/rb

Suite 3310, 130 Adelaide Street West, Toronto, Ontario M5H 3P5 Telephone: (416) 865-9300, Facsimile: (416) 865-1 153

Page 51: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

EXHIBIT ATO

OPTION AGREEMENT DATED AUGUST 22, 1989

Porcupine Mining Division Deloro Township

ClaimRecordNumber

HR1203HR1204P11118P18692P18693P21279P21280P21322P21323P21324P21325P21326P21349P21350P21710P25167P25168P724612P724613P725183P725184P781232P849849P849850P849851P850090P850091P850092P850093P850094P850095P850096P850097P850098P878736P905601

Claim Name

Magnesite Surf. Magnesite Surf. Magnesite Surf. Magnesite Surf. Magnesite Surf. Magnesite Surf. Magnesite Surf. Magnesite Surf. Magnesite Surf. Magnesite Surf. Magnesite Surf. Magnesite Surf. Magnesite Surf. Magnesite Surf. Magnesite Surf. Magnesite Surf. Magnesite Surf. Magnesite Ext. Magnesite Ext. Magnesite Ext. Magnesite Ext. Magnesite Ext. South Magnesite South Magnesite South Magnesite Magnesite Magnesite Magnesite Magnesite Magnesite Magnesite Magnesite Magnesite Magnesite Magnesite Ext. Magnesite West

ClaimStatus

PatentedPatentedPatentedPatentedPatentedPatentedPatentedPatentedPatentedPatentedPatentedPatentedPatentedPatentedPatentedPatentedPatentedStakedStakedStakedStakedStakedStakedStakedStakedStakedStakedStakedStakedStakedStakedStakedStakedStakedStakedStaked

ParcelNumber

2567256849688325833483268327717371747175717671778335

10290832988608860

0000000000000000000

Dis

SecSecSecSecSecSecSecSecSecSecSecSecSecSecSecSecSec

Page 52: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

W'.'

.V j p

ff'

.-i':

li '

f nst

iv'fa

^t^^

'-Trt

t-^

XV

JM

S^S

^-lT

^AnP

am

SC

AL

E

1:2

0

000

HIO

HV

AV

AN

P K

TRA

ILS

'

—SU

RVEY

ED L

INES

.TO

WNSH

IPS. B

ASE

L INES

.*TC

LOTS

. MIN

ING

CLAI

MS. P

ARCE

LS e

re -

lOT

LIN

ES

PA

RC

EL

BO

UN

DA

RY

MIN

ING

CL

AIM

Sf

TC

RA

ILW

AY

AN

D R

IGH

T O

F W

AY

U

TIL

ITY

LIN

ES

FLOO

DING

OR

FLOO

DING

RIG

HTS

SUBD

IVIS

ION

OR C

OMPO

SITE

PLA

N RE

SERV

ATIO

NS

ORIG

INAL

SHO

RELI

NE

MARS

H OR

MUS

KEG

MIN

ES

TRA

VE

RS

E M

ON

UM

EN

TV -f

DISP

OSI

TIO

N OF

CRO

WN

LAM

05

TYP

t O

F D

OC

UM

EN

T

SURF

ACE

RIGH

TS O

NLY.

. MI

NING

RIG

HTS

ONLY

.LE

ASE

SURF

ACE

A MI

NING

RIG

HT

SURF

ACE

RIGH

TSON

LY .

^ MI

NING

RIG

HTS

ONLY

. .

LICEN

CE O

F OC

CUPA

TION

.OR

DER

INCO

UNCI

L ...

.

RESE

RVAT

ION

....

.CA

NCEL

LED

.....

.. .

.SA

NO4G

RAVE

L ...

...

.....

..M

OT

I M

ININ

G

fl'G

nT

S

,H r

kM

ClL

l **

.,...

O

.. ..

O B

....

O

...

B. .

. ,

T

..-

, O

C

,. (J

)

TOW

NS

HIP

DELO

ROM

.N R

A

DM

INIS

TRA

TIV

E

DIS

TRIC

T

TIM

MIN

SM

ININ

G

DIV

ISIO

N

POR

CU

PIN

ELA

ND

.TI

TLES

X R

EGIS

TRY

DIV

ISIO

N

CO

CH

RA

NE

' Min

istry

of

Land

Na

tUra

J

Mln

*g

'.. R

esou

rces

Bu

ncOn

lario-

Page 53: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

J LAKEFIELD RESEARCHMk A DIVISION OF FALCONBRIDGE LIMITED

PHONE (705)652-3341 TELEX NO. 06962842

FACSIMILE NO. (705) 652-6365 A DIVISION OF FALCONBRIDGE LIMITED

December 20, 1989

Mr. Robert A. ElliotMagnesium Refractories Ltd.Suite 3310 P FT FIVE D130 Adelaide Street, West * c v fc ' v b

M5H3P5 SEP Q ̂ "^

MINING LANDS SECTIONDear Mr. Elliot:

Re: LR3778

Please find enclosed two samples produced from magnesite concentrate, provided

by Mr. B. Wyslouzil.

Sample C4 is calcine without grinding or hydration as requested, approximately 2 Ibs. to fill your client's needs.

Sample C5 is calcine which was ground and hydrated. C5 weighs approximately 2.5 Ibs.

The procedures used to generate each sample are attached.

Yours truly, LAKEFIELD RESEARCH

Richard Wagner, P. Eng. Project Engineer

RW:bjs Enclosure

185 CONCESSION STREET. P.O. BOX 430 LAKEFIELD, ONTARIO, CANADA KOL 2HO

Page 54: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

CALCINE PRODUCTION

Tests C4 and C5:

Magnesite samples, from B. Wyslouzil, were calcined by the following procedure:

1. Less than 1.5 kg of magnesite was placed in a tray.

2. The tray was transferred to a high temperature muffle, preheated to l SOOT.

3. The sample was calcined at temperature for a minimum of 6 hours.

4. The furnace was shut off, the door opened, the tray air cooled and removed.

C5 GRINDING AND HYDRATION

Test C5:

Approximately one kg of calcine was dry ground, for 5 hours in the Pebble mill

with 19.1 kg of ceramic balls.

The ground charge was placed in a pyrex dish and 440 mL of 1200F water was added. The mixture was placed in a drying oven, set at 2500F for approximately 12 hours.

A 50 g sample was removed for surface area determination.

Page 55: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

JAN 2 4 1990l AKFFIFI n RFSFARfH sgssrsssLrMXLI ILLLJ l ILOL/VI lUI l F ACSIMILE NO .(70S) 652 6365 A DIVISION OF FALCONBRIDGE LIMITED

January 22, 1990

Mr. James Bates MAGNESIUM REFRACTORIES #3310 - 130 Adelaide Street West Toronto, Ontario M5H 3P5

Dear Jim:

Re:_____Nickel Assays—-—^-^

We have performed nickel analyses on the magnesite concentrate (flotation) and on the various calcines we produced.

____Product______ Jo N i Ni ppm

Magnesite concentrate 0.074 740Calcine 0.14 1400C-5 Hydrated 0.13 1300C-6 Hydrated 0.13 1300

In order to find the source of the nickel, we would have lo perform some probe work.

Please let us know if you require further work on these products.

Yours sincerely,

LAKEFEELD RESEARCH

Robert S. Salter General Manager

(RSS/Magncsitc/22/01/90)

185 CONCESSION STREET. P.O. BOX 430 LAKEFIELD. ONTARIO. CANADA KOL 2HO

Page 56: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

LAKEFIELD RESEARCH

185 Concession StreetP.O. Box 430

Lakefield, OntarioKOL2HO

Facsimile No. (705) 652-6365 Telephone No, (705) 652-3341

To: Bob Elliott Company: Magnesium Refractories

From: Rod Williamson Fax. No.: 416-865-1153

Date: 6 March, 1990 Reference: 3778

This transmission consists of _5. page(s), including this one.

The typed copy of the tourmaline leach test is attached as promised.

Page 57: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

TEST NO. JG1

PURPOSE.: To examine B and Nl dissolution characteristics from tourmaline

concentrate.

PROCEDURE: Prepare tourmaline concentrate irom hand picked specimen in

magnesite. Crush and concentrate as much as possible using Frantz

Isodynamic separator. Hand mortar to -200 mesh and split concentrate

into 3 tractions. Store 1 fraction, submit 1 fraction for head analysis and

leach 1 fraction sequentially in 200 ml glass volumetric with 1N, 3N and

6N HCI. Repeat test with 1N, 3N and 6N HCI and no sample to determine

B dissolution trom glass.

Page 58: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

FI WP' - eT itum** o——*- (MM* l-** "O™"* in magnestt

Hand mortar In alumina pestle and mortar to-200

mesh

1.328 g 1.045 g

l100mLlNHCl.24h,200C

Fi er- sol'n assay B. Nl. Mg

100mL3NHCI.24h,200C

FI 1 er sol'n assay B. Ni. Mg

lOOmL6NHCI,24h.200C

1.252 g head sample B, Nl and Mg

Fitter- sol'n assay B. Nl. Mg

lResidue0.378 g in filter paper

Page 59: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

RESULTS: The B analyses Irom the 1N. 3N and 6N HCI dissolution from glass was

0.12 mg/L B which was subtracted from the analyses with the sample.

M&tallurolcal Balance.

Magnesium Refractories LR 3778

Tourmaline Concentrate Leacn

Product

1 N HCI Soi'n3 N HCI Sol'n6 N HCI SofnResidue

Head (direct)Head (calc)

Amount

99 ml100 ml96 mL

0.378 g

1.3280i...

Assay (yo.mo/L)Ni

4.95.160.770.19

0.130.13

B"

0.140.350.12

.cO.0005

0.00230.0045

MO

11001200170

20.1*

24.244*1

(*) DistributionNi

28.129.94.337.7

100

B

19.757.919.13.3

100

Ma

33.937.35.123.7

100

* back calculated" detection limit 0.002 mg/V.

Page 60: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

OBSERVATIONS:

1. The leach residue represented 28.5V0 ol the feed weight and assayed Q.19% Ni,

•cO.0005% B and ao.1% Mg (calculated). Unfortunately the Mg assay of the residue was

not measured. It had been assumed that the Mg would dissolve and the emphasis was

placed on the NI and B analyses of the residue.

2. The calculated head tor NI was the same as the direct head * 0.1 3Vo Ni. The NI data Is

excellent.

3. The calculated head for B was 2x the direct head but the results suggest that virtually all

the B leached out. The residue assayed •tO.OOOB'yo B.

4. The relatively low Mg dissolution was unexpected. The results suggest that Mg silicate

was present but this is doubtful.

RECOMMENDATION'

1 . Repeat the test on the 1 .045 g sample in storage but using only the 6N HCI leach. Assay

the residue for NI, B and Mg. Conduct the test in a teflon volumetric but run a standard

leach without sample to determine possible background interference.

2. Repeat the 6N HCI leach on a 20 g cut section of tourmaline In magnesite for 1 week.

Observe the reaction. Replace the solution every 24 hours and assay for B, Ni and Mg.

Page 61: A PILOT PLANT PRODUCTION OF A MAGNESITE CONCENTRATE

SYMBQLO6Y

r*.

**t*. ••••4* f

•rita*

tolMmt Cb

Cliff, Pit, Pile Contour*1*4*

**

O****** **

Control Pointe

Culvert FalltO***i* l * **

j F*nee Hadae -^WallFeature Outline(C***t Mil** l**Ur*i l •t* l

Lon4 cock aa*north er Swamp * Heel a Mm* Hee* From* * Outcrop t -

•il*f l

(to***in* (1*0

•M* •*

kl* It** rt**(f*

Rooarvair fT River, (tree* Ceaoi

Soot devotionll*M •(•••t •••l

Tower *

TrentMleeien Line

Tonne l

Utility Pole* Wfcarf , Dock Pier

Aroo

AREAS WITHDRAWN FROM DISPOSITION

MRO -MINING RIGHTS ONLYt R O - SURFACE RIGHTS ONLYM *S -MINING AND SURFACE RIGHTS

Onto No Dm Dtapovttfen F H*

THE INFORMATION THAT APPEARS ON THIS MAP HAS BEEN COMPILED FROM VARIOUS SOURCES AND ACCURACY IS NOT GUARANTEED THOSE WISHING TO STAKE MIN ING CLAIMS SHOULD CON SULT WITH THE MINING

\ DELORO

CT) K CDrolo

UJo o o

TISDALE TWP G-3976

.f .T'vrei^tirr-L

""•^

"2\-^\*j \ ^' X./V

*-r- \ WI?* \ *V**f \™k?*

ADAII6 TW^"

O O O)ro io

X CO

MKJHOVAV AM) ftQUTf Mo.

OTHER ftOAOt

TRAILS ~ ,

SURVEYED LINESTOWNSHIPS BASE LINES "ETC -LOTS MINING CLAIMS PARCELS ETQ

UNSURVEYEO kINiSLOT LINESPARCEL BOUNDARYMINING CLAIMS ETC

RAILWAY AND RIGHT OF WAY i

UTILITY LINES

NON PERENNIAL STREAM FLOODING OR FLOODING RIGHTS

SUBDIVISION OR COMPOSITE PLAN

RESERVATIONS ORIGINAL SHORELINE

MARSH OR MUSKEG

MINES TRAVERSE MONUMENT

DISPOSmON OF CROWN LAUDS

TYPE OF DOCUMENT

PATENT SURFACE A MINING RIGHTS

SURFACE RIGHTS ONLY _.

MINING RIGHTS ONLY ,. LEASE SURFACE ft MINING RIGHTS

SURFACE RIGHTS ONLY ...

MINING RIGHTSONLY .

LICENCE OF OCCUPATION . . . ,

ORDER IN COUNCIL

RESERVATION

CANCELLED ....

SAND ft GRAVEL _ . . ,,

SYMBOL

fteQ

B T

oc

(DNOTE MINING NIOHTS IN FARCE LS rATCNTEO ^MlOM TO MAY C

1913 VESTED IN ORIGINAL PATENTEE OY THE PUOLIC LANDS ACT H S O 1*70 CHA* MO SEC 03 SUOSCC 1

400

10 O Criwnt - - - rt-c

SCO CH H -" t-

10 20 40

MOO 3000 4000 MOO

SCALE 1 20 000

NOTES

inrREGISTERED PLAN OF SUBDIVISION

MINING f LAIMS SHOWN Wl HI l TI'IS ARLA APF SUBTEC^ T^ THE PIGHTS AND PRIVILPrrS CRANTTD MHDER AN EASCMEN) ORDEP DATED MAi 1 Q 1937 TO DELNITE MINi:S LTD

DOMP MINES LIMITED SUKtACL RIGHTS LEASE 1103926

AT I LIL-ATION LNOER P L, A FOR SURFACE JUCHPS DUCKS UNLIMITED CANADA

IS SURJFCT TD FOR'SI ACTIVITIES fi I99O FURTHER INFORMATION AVAILABLE ON FILE

,iW1990

TOWNSHIP

DELOROMMR ADMINISTRATIVE DISTRICT

TIMMINSMINING DIVISION

PORCUPINELAND TITLES/ REGISTRY DIVISION

COCHRANE

Ministry ofNaturalResources

LandManagement

BranchOntario

0*1* 10*4

G-39?