7/28/2019 A Synchrophasor, Making Grid Smarter7 http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 1/31 1 1 Synchrophasor, How They Making Grid Smarter Kamin Dave Business Development Manager [email protected] Schweitzer Engineering Laboratories, India  www.selinc.com Smart Grid Seminar held on 13&14 th  April2012 at IIT (Kanpur) 2 Synchrophasor: Outline KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE Back Ground  Theory  Application & Benefits  Testing Concluding Observations 3 Smart Grid: KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE Implementation technology will be different at different areas  Transmission: Evolved over 100years periods to deliver power at high voltage on longer distance (400kV line, 500MW power flow, 765kV line 800MW power flow, 1200kV line 2000MW power flow) Complex grid network (interconnections)  with automatic controls, advance protections system and real time monitoring & power dynamics Equipment cost is very high Less Feeders compare to Distribution system

A Synchrophasor, Making Grid Smarter7

Embed Size (px)

Citation preview

Page 1: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 1/31

1

1

Synchrophasor, How They Making Grid Smarter 

Kamin DaveBusiness Development Manager 

[email protected] Engineering Laboratories, India 

 www.selinc.com

Smart Grid Seminar held on 13&14th April2012 at IIT(Kanpur)

2

Synchrophasor: Outline

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Back Ground Theory Application & Benefits TestingConcluding Observations

3

Smart Grid:

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Implementation technology will be different atdifferent areas

 Transmission:Evolved over 100years periods to deliverpower at high voltage on longer distance(400kV line, 500MW power flow, 765kV line800MW power flow, 1200kV line 2000MW power flow)Complex grid network (interconnections)

 with automatic controls, advance protectionssystem and real time monitoring & powerdynamicsEquipment cost is very highLess Feeders compare to Distribution system

Page 2: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 2/31

2

4

Smart Grid:

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Implementation technology will be differentat different areasDistribution:Power distribution on low voltageShorter distanceMost of the places, Radial distribution Amount of power flow lessMore feedersProtection control is much simpler then

 Transmission systemLess Monitoring & power dynamicsSmart meters can reduce distribution loss

5

Smart Grid:

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Implementation technology will be differentat different areasGeneration:Power generation on lower voltage buttransmission on high voltagePower dynamics and oscillations aredangerous for machine operation Automatic generator control Accurate monitoring of power dynamics,Metering & advance protection controlLoss of Synchronism

6

Synchrophasor: Motivation

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Motivation: After 2003 Blackout in North America 

Page 3: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 3/31

3

7

Phasor: Theory 

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Phasor Definition: Pure sinusoidal

 waveform V(t) = Vm*cos(wt + Theta)I(t) = Im*cos(wt + Theta)

VR

 jVX

V = VR + jVX

V = Mag@ Ang

IR

 jIX

I = IR + jIX

I = Mag@Ang

Definition: A complex equivalent of a simple cosine wave quantity such that the complex modulus is the cosine wave amplitude and thecomplex angle (in polar form) is the cosine wave phase angle.

8

Phasor: Theory 

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Phasor Definition: Pure sinusoidal waveform

 V(t) = Vm*cos(wt + Theta) V(t) = Vm*cos(2*pi*F*t + Theta)

0 deg.0 deg.0 deg.0 deg.

1 cycle1 cycle1 cycle1 cycle

0 deg.0 deg.0 deg.0 deg. 360 deg.360 deg.360 deg.360 deg.90 deg.90 deg.90 deg.90 deg. 90 deg.90 deg.90 deg.90 deg.

180 deg.180 deg.180 deg.180 deg.

270 deg.270 deg.270 deg.270 deg.

9

 Theory: Phasor 

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Phasor Definition: Pure sinusoidal waveform

 V(t) = Vm*cos(wt + Theta) V(t) = Vm*cos(2*pi*F*t + Theta)

V@30 Deg.V@30 Deg.V@30 Deg.V@30 Deg.

0 Deg.0 Deg.0 Deg.0 Deg.

Angle Rotation counter clockwiseAngle Rotation counter clockwiseAngle Rotation counter clockwiseAngle Rotation counter clockwise

§

V@30 Deg.V@30 Deg.V@30 Deg.V@30 Deg.

0 Deg.0 Deg.0 Deg.0 Deg.

Angle Rotation clockwiseAngle Rotation clockwiseAngle Rotation clockwiseAngle Rotation clockwise

§

90 Deg.90 Deg.90 Deg.90 Deg.

----90 Deg.90 Deg.90 Deg.90 Deg.

180 Deg.180 Deg.180 Deg.180 Deg.90 Deg.90 Deg.90 Deg.90 Deg.

180 Deg.180 Deg.180 Deg.180 Deg.

----90 Deg.90 Deg.90 Deg.90 Deg.

Page 4: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 4/31

4

10

Phasor: Theory 

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Water Flow is from Higher level to Lower level

High level TankHigh level TankHigh level TankHigh level Tank

Low level TankLow level TankLow level TankLow level Tank

 Water Flows Power Flows

 Terminology

11

Phasor: Theory 

G1 G2

21

ZsZLZs

Vx <00

X Y

VY <-300

Ix Iy

Ix+Iy <-Ө

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Ix

Iy

Ix + Iy

 Terminology: Power Flow 

12

Phasor: Theory 

G1 G2

21

ZsZLZs

Vx <00

X Y

VY <+300

Ix Iy

Ix+Iy <+Ө

Ix

IyIx + Iy

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

 Terminology: Power Flow 

Page 5: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 5/31

5

13

Phasor: Theory 

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Phase angle difference of  various buses Vs Dadri400kV Station

 Angle between buses playingmore important role inpower system

14

Phasor Estimation: Theory 

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

S1

CB1 CB3

S2

CB2 CB4

R1 R2

R3 R4CB5

S3

CB6 R5

CB5

S3

CB6R6

Lag Lead

Lag Lead

Lead Lag

Can we guess!!! Which Load &Can we guess!!! Which Load &Can we guess!!! Which Load &Can we guess!!! Which Load &

Gen Bus in grid network???Gen Bus in grid network???Gen Bus in grid network???Gen Bus in grid network???

PhasorPhasorPhasorPhasor Estimation on Local time stampsEstimation on Local time stampsEstimation on Local time stampsEstimation on Local time stampswithout common referencewithout common referencewithout common referencewithout common reference

15

Synchrophasor: Theory 

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Synchrophasor: Pure sinusoidal waveform

Instantaneous phase angle relative to a cosine function at

nominal frequency synchronized to universal time co-ordinated (UTC)Measurement should be tag with UTC timeMeasurement sent over high speed communication link

VR

 jVX

V = VR + jVX = V{cos(theta) + sin(theta)}

Definition: A phasor calculated from data samples using a standard timesignal as the reference for the measurement.

Page 6: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 6/31

6

16

Synchrophasor: Theory 

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Synchrophasor: Sinusoidal waveform

Synchronized to UTC time with Higher accuracy1micro s Error corresponds Phase Angle Error is 0.018O

Magnitude and Phase Angles of voltages & currentsmeasured at different locations at same instant across thesystem

VR

 jVX

V = VR + jVX = V{cos(theta) + sin(theta)}

Measurement Error 

17

Synchrophasor: Basic Structure

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Synchrophasor System have major threecomponents:

PMU: Phase Measurement Unit Estimates multiple phasors (VR, VY, VB, IR, IY,IB and symmetrical components)Class M & P type PMUs

PDC: Phasor Data Concentrator It Receives data from PMU/s (One or multiple

PMUs)

High Precision Clock for Accurate TimeSynchronization to transmit real time data 

18

Synchrophasor: Theory 

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Synchrophasor: Sinusoidal waveform

Phasor Estimation Transmitted as a Data Frame at a Rate FSData Frame Includes “Multiple Channel of Phasor Estimate”,

 Analogue words, Digital Words combined with Single Time Tag

Page 7: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 7/31

7

19

Synchrophasor: Basic Structure

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

16 bits A/D or 32 bits A/D

20

Synchrophasor: Standards

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

 Time Synchronization:1 pulse per second (PPS): Signal consisting of 

square pluses occurring at frequency of 1Hz.

 Time stamp in IRIG-B format:Inter-Range instrumentation Group (IRIG)Most common used Version – B Transmits day of year, hour, minute and secondonce per second

 The standard also defines a high precision IRIG-Bformat suitable for fiber optic links.

21

Synchrophasor: Standards

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

IEEE C37.118

Message Type:Command (Receive by PMU/PDC)Data (Transmit from PMU/PDC)Configuration (Transmit from PMU/PDC)Header (Transmit from PMU/PDC)

Page 8: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 8/31

8

22

Synchrophasor: Basic Structure

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

PDC

23

Synchrophasor: Basic Structure

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

NRLDC (Northern Grid, India)

24

Synchrophasor: Basic Structure

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

NRLDC (Northern Grid, India)

PMU

Clock 

Page 9: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 9/31

9

25

Synchrophasor: Basic Structure

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

NRLDC (Northern Grid, India)

26

Synchrophasor: Theory 

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

S1

CB1 CB3

S2

CB2 CB4

PMU1 PMU2

UTC

UTC

PMU3 PMU4CB5

S3

CB6 PMU5

CB5

S4

CB6PMU6

Lag Lead

Lag Lead

Lead Lag

27

Synchrophasor: Standards

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

IEEE standard for SYNCHROPHASORS forPower Systems

IEEE Std 1344-1995 Released in 1995IEEE Std ANSIC37.118C37.118.1 (Measurement)C37.118.2 (Communication)

IEC61850-9-5IEEE Std ANSIC37.238 (SGAC)

Page 10: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 10/31

10

28

Synchrophasor: Standards

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

C37.118C37.118C37.118C37.118PublishedPublishedPublishedPublished

2005200520052005

IEEE requestIEEE requestIEEE requestIEEE requestIEC toIEC toIEC toIEC to

developdevelopdevelopdevelopIEC61850IEC61850IEC61850IEC61850----9999----5555

2009200920092009

IEEE Split inIEEE Split inIEEE Split inIEEE Split into C37.118to C37.118to C37.118to C37.118----1111& C37.118& C37.118& C37.118& C37.118----2222AndAndAndAndSGIPSGIPSGIPSGIP----PAP13PAP13PAP13PAP13

2010201020102010

IEEEIEEEIEEEIEEEC37.118C37.118C37.118C37.118----1 &1 &1 &1 &C37.118C37.118C37.118C37.118----2222AndAndAndAndC37.238C37.238C37.238C37.238Submitted toSubmitted toSubmitted toSubmitted toIEEE SAIEEE SAIEEE SAIEEE SA

2011201120112011

29

Synchrophasor: Standards

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

PDCPDCPDCPDC

MeasurementMeasurementMeasurementMeasurement

StandardsStandardsStandardsStandardsC37.118C37.118C37.118C37.118----1111

TimingTimingTimingTiming

StandardsStandardsStandardsStandardsC37.238C37.238C37.238C37.238----2011201120112011

CommunicationCommunicationCommunicationCommunication

StandardsStandardsStandardsStandardsC37.118C37.118C37.118C37.118----2222

IEC61850IEC61850IEC61850IEC61850----9999----5555

Data storageData storageData storageData storageStandards C37.111Standards C37.111Standards C37.111Standards C37.111

(COMTRADE)(COMTRADE)(COMTRADE)(COMTRADE)

PDC GuidePDC GuidePDC GuidePDC Guide ––––

Requirements, systemRequirements, systemRequirements, systemRequirements, systemcommunication & testingcommunication & testingcommunication & testingcommunication & testing

C37.244C37.244C37.244C37.244

Real TimeReal TimeReal TimeReal Time----

MonitoringMonitoringMonitoringMonitoring& Alarming& Alarming& Alarming& Alarming

devicedevicedevicedevice

Offline dynamicOffline dynamicOffline dynamicOffline dynamic

analysisanalysisanalysisanalysis

Data StorageData StorageData StorageData Storage

Real Time ControlReal Time ControlReal Time ControlReal Time Control

30

Synchrophasor: Standards

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

IEC61850-9-5: Edition2 includedSynchrophasor over IEC61850-9-5

 TC57-WG10 group is working on Draft report Draft report is under preparationIEC61850-9-5 will support event driven (GOOSE) & SV communicationsRemote PDC control will be achieved (LN: PDC1name,PDC2name……PDCNnameStandard Name of Voltage, Current, Sequence Voltage& Current will be achieved

Page 11: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 11/31

11

31

Synchrophasor: Why 

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Measurement under operationalconditionsNot faults or failed equipments

High Speed & High AccuratemeasurementsSystem wide & long record measurementOperational analysis WAMPC

32

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Phasor Information Applications Analysis & ControlSituational Awareness continuouslyIncreasing visibility of SAG & SWELL in voltageReal time Angle checkLoad duration plotMW/MVAR Oscillation viewing & detectionReal time Load flow study

Determine dynamic ratings of equipments (Lines& Generator)Online continuously thermal over loadprotection

33

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

NRLDC (Northern Grid, India)Situational Awareness Continuously

Page 12: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 12/31

12

34

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

35

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

PMUs Installation400kV North Bus of Vindhyachal HVDC back to backstation

Proximity to major pithead thermal generationcomplex Proximity to HVDC rihand terminal of +/-500kV rihand-dadri bipole

400kV Kanpur stationConnectivity with generation complex 

Connectivity with major load centre400kV Bus of HVDC Dadri station

+/-500kV rihand-dadri HVDC bipoleClose proximity to major load centre and power stations

36

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

PMUs Installation

400kV Moga stationPooling station for present & future haydro power stations Will be upgraded to 765kV levelProximity to Bhiwadi terminal of +/-500kV HVDC

 baliya-bhiwadi bipole

Page 13: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 13/31

13

37

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Other critical locations

38

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

39

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Page 14: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 14/31

14

40

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Oscillation in volta ge observed at various location

41

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

42

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Case Study1

Loss of 2000MW at Rihand STPS on dated 1

st

 June2010 All four running units trippedUnit 1 & 2 Tripped on Pole slipping due to fault insystem at far endUnit 3 & 4 Tripped on Auxiliary supply failure

 Analysis of Tripping with synchrophasor data Phase VoltagesFrequencies

Rate of Change of Frequency  Angles

Page 15: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 15/31

15

43

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Oscillation in voltage observed at various location

400kV Dadri voltage  Angular separation betweenfew locations

44

Synchronism: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

All the trucks & loaders have Same speedsSame speedsSame speedsSame speeds

Pulling load on almost at same angles!!!same angles!!!same angles!!!same angles!!!

SpeedSpeedSpeedSpeed

Trucks/LoadersTrucks/LoadersTrucks/LoadersTrucks/Loaders

LoadsLoadsLoadsLoadsSpeedSpeedSpeedSpeed

ForceForceForceForce

GeneratorsGeneratorsGeneratorsGenerators

Electrical LoadsElectrical LoadsElectrical LoadsElectrical LoadsFrequencyFrequencyFrequencyFrequency

Power FlowsPower FlowsPower FlowsPower Flows

45

Synchronism: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

§1111

§2222

Pullout

SpeedSpeedSpeedSpeed

All the trucks & loaders have different speedsdifferent speedsdifferent speedsdifferent speeds

Pulling load on different anglesdifferent anglesdifferent anglesdifferent angles!!!

§3333

Page 16: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 16/31

16

46

Synchronism: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

All the trucks & loaders have different speedsdifferent speedsdifferent speedsdifferent speedsPulling load on different anglesdifferent anglesdifferent anglesdifferent angles!!!

Isolated and Accelerating Speed

Decreasing Speed

§1111

§2222§3333

47

Synchrophasor: Electrical center 

§: Load Angle: Load Angle: Load Angle: Load Angle

§ = 90= 90= 90= 90OOOO

RRRR---- RRRR

XXXX

XXXX

XXXX””””dddd

ZZZZTTTT

ZZZZTLTLTLTL

             Z             ZZ             Z                         T                 TT                T

          +

             Z

          +

             Z

          +

             Z

          +

             Z                         T                 L

                 T                 L                  T                 L

                 T                 L

XXXX””””dddd: Generator Impedance: Generator Impedance: Generator Impedance: Generator Impedance

ZZZZTTTT: GT Impedance: GT Impedance: GT Impedance: GT Impedance

ZZZZTLTLTLTL : Transmission line: Transmission line: Transmission line: Transmission lineImpedanceImpedanceImpedanceImpedance

GGGG DDDD YYYY

SysSysSysSys

GTGTGTGT

TLTLTLTL

Electrical CentreElectrical CentreElectrical CentreElectrical Centre

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

48

Synchrophasor: Pole Slipping

§ = 90= 90= 90= 90OOOO

RRRR---- RRRR

XXXX

XXXX

XXXX””””dddd

ZZZZTTTT

ZZZZTLTLTLTL

             Z             ZZ             Z                         T                 TT                T

          +

             Z

          +

             Z

          +

             Z

          +

             Z                         T                 L

                 T                 L                 T                 L

                 T                 L

GGGG DDDD YYYY

SysSysSysSys

GTGTGTGT

TLTLTLTLElectrical CentreElectrical CentreElectrical CentreElectrical Centre

Electrical Centre movesElectrical Centre movesElectrical Centre movesElectrical Centre moves

towards machine createtowards machine createtowards machine createtowards machine createswing on generatorswing on generatorswing on generatorswing on generatorterminalterminalterminalterminal

Swing locusSwing locusSwing locusSwing locus

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Page 17: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 17/31

17

49

Power Swing in Transmission Lines

• Power Flow from A to BPower Flow from A to BPower Flow from A to BPower Flow from A to B

– EEEEAAAA leads Eleads Eleads Eleads EBBBB by angleby angleby angleby angle δ

• Total impedance : Z=ZTotal impedance : Z=ZTotal impedance : Z=ZTotal impedance : Z=ZSASASASA +Z+Z+Z+ZLLLL+Z+Z+Z+ZSBSBSBSB

• Current I = (ECurrent I = (ECurrent I = (ECurrent I = (EAAAA----EEEEBBBB)/Z)/Z)/Z)/Z

• Voltage E at the Relay = EAVoltage E at the Relay = EAVoltage E at the Relay = EAVoltage E at the Relay = EA----I*ZI*ZI*ZI*ZSASASASA

• Power Flow from A to BPower Flow from A to BPower Flow from A to BPower Flow from A to B

– EEEEAAAA leads Eleads Eleads Eleads EBBBB by angleby angleby angleby angle δ

• Total impedance : Z=ZTotal impedance : Z=ZTotal impedance : Z=ZTotal impedance : Z=ZSASASASA +Z+Z+Z+ZLLLL+Z+Z+Z+ZSBSBSBSB

• Current I = (ECurrent I = (ECurrent I = (ECurrent I = (EAAAA----EEEEBBBB)/Z)/Z)/Z)/Z

• Voltage E at the Relay = EAVoltage E at the Relay = EAVoltage E at the Relay = EAVoltage E at the Relay = EA----I*ZI*ZI*ZI*ZSASASASA

A B

EA EB

21

ZsBZL

ZsA

E

I

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Synchrophasor: Power Swing

50

Power Swing in Transmission LinesA B

EA EB

21

ZsBZL

ZsA

E

I

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Synchrophasor: Power Swing

EB

I I*ZSA

EA

δ

E

EA -EB

EA - EB

ZR=E / I

51

Power Swing in Transmission LinesA

BEA EB

21

ZsBZLZsA

E

I

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Synchrophasor: Power Swing

ZR=E / I

• ZRZRZRZR’’’’ is much smaller then ZRis much smaller then ZRis much smaller then ZRis much smaller then ZR

– EEEE’’’’ is smallis smallis smallis small

– EEEEAAAA----EEEEBBBB is large due largeis large due largeis large due largeis large due large δδδδ

• ZRZRZRZR’’’’ is much smaller then ZRis much smaller then ZRis much smaller then ZRis much smaller then ZR

– EEEE’’’’ is smallis smallis smallis small

– EEEEAAAA----EEEEBBBB is large due largeis large due largeis large due largeis large due large δδδδ

EB

I*ZSAEA

δE’ EA -EB

Page 18: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 18/31

18

52

Synchrophasor: Power Swing

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

P.S. LOCUS

LOAD

R

ZSB

Z L

ZSA

X

53

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Frequency Measurement at all four locations

 Absolute Frequency  Rate of change of Frequency 

54

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Case Study2

Over excitation study  V is high

F is Low  V is Low 

F is high

Page 19: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 19/31

19

55

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

 Transient response of Instrument Transformerscan easily observed

 Transient response of Current Transformer Frequency response during varioustransient condition (Time constant effect)Step response during fault condition(Normal to Fault)Step response during switchingcondition (Breaker Open to Close)CT Saturation phenomena 

 Transient response of Voltage Transformer CVT Transient Phenomena 

56

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Phasor Information Applications Analysis & Control Voltage stability supervisionDetection & Assessment of Power Swing or Outof Step condition in entire networkCentralize control of Tap ChangersSelective & Remote back up ProtectionFACT device control (i.e. HVDC)

Multi wind farm co-ordinationPost event analysis is very much precise (microaccuracy)

57

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Phasor Information Applications

Real time congestion managementDefinition: Adjust Generator dispatch to managereal time flow across transmission line with inreliable transfer capabilityRationale: Synchrophasor can provide improvedcalculation of path limits and flows allowinghigher transfer and reduced congestion paymentBenefits: Potential cost saving

Page 20: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 20/31

20

58

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Phasor Information ApplicationsPost disturbance analysisDescription: Reconstruction of sequence of eventafter wide area power disturbance (i.e. Blackout)has occurred to determine the causes and corrctthemRationale: The availability, higher accuracy of time synchronization of synchrophasor data canreduce effort to analyze complex wide area cascadingBenefits: Much quicker identification of contributory factor and development of correctivemeasure and reduced possibility of future blackout

59

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Phasor Information ApplicationsModel Vs RealityDescription: Theoretically simulated data (PowerDynamics) on software Vs Actual real time powerdynamics recordedRationale: Synchrophasor is offering to recordreal time power dynamics during on loadconditions and fault conditions

Benefits: Much easier to understand

60

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Phasor Information Applications

Model Vs Reality

 Actual Plot 

ModelSimulation

Page 21: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 21/31

Page 22: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 22/31

22

64

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

AmplitudeAmplitudeAmplitudeAmplitude

ModulationModulationModulationModulation

FundamentalFundamentalFundamentalFundamental

AmplitudeAmplitudeAmplitudeAmplitude

FrequencyFrequencyFrequencyFrequencyModulationModulationModulationModulation

FundamentalFundamentalFundamentalFundamentalFrequencyFrequencyFrequencyFrequency

Gen Swing & AVR Control (Gen Swing & AVR Control (Gen Swing & AVR Control (Gen Swing & AVR Control (MVarMVarMVarMVar))))

Gen Swing & Governor Control (MW)Gen Swing & Governor Control (MW)Gen Swing & Governor Control (MW)Gen Swing & Governor Control (MW)

MultiplicativeMultiplicativeMultiplicativeMultiplicative

MultiplicativeMultiplicativeMultiplicativeMultiplicative

Excitation & SpeedExcitation & SpeedExcitation & SpeedExcitation & SpeedControlControlControlControl

65

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

LowLowLowLowFrequencyFrequencyFrequencyFrequency

ResonanceResonanceResonanceResonance

TL Swing &TL Swing &TL Swing &TL Swing & MVArMVArMVArMVAr Control)Control)Control)Control)

OutputOutputOutputOutput

Series or Shunt LC circuit or seriesSeries or Shunt LC circuit or seriesSeries or Shunt LC circuit or seriesSeries or Shunt LC circuit or seriescompensated linecompensated linecompensated linecompensated line

S1S1S1S1 S2S2S2S2

PMUPMUPMUPMUPMUPMUPMUPMU

66

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

AmplitudeAmplitudeAmplitudeAmplitudeModulationModulationModulationModulation

FundamentalFundamentalFundamentalFundamentalAmplitudeAmplitudeAmplitudeAmplitude

FrequencyFrequencyFrequencyFrequency

ModulationModulationModulationModulation

FundamentalFundamentalFundamentalFundamental

FrequencyFrequencyFrequencyFrequency

Gen Swing & AVR Control (Gen Swing & AVR Control (Gen Swing & AVR Control (Gen Swing & AVR Control (MVarMVarMVarMVar))))

Gen Swing & Governor Control (MW)Gen Swing & Governor Control (MW)Gen Swing & Governor Control (MW)Gen Swing & Governor Control (MW)

MultiplicativeMultiplicativeMultiplicativeMultiplicative

MultiplicativeMultiplicativeMultiplicativeMultiplicative

Excitation & SpeedExcitation & SpeedExcitation & SpeedExcitation & SpeedControlControlControlControl

LowLowLowLowFrequencyFrequencyFrequencyFrequency

ResonanceResonanceResonanceResonance

Series & Shunt LCSeries & Shunt LCSeries & Shunt LCSeries & Shunt LC

circuit (TL lines)circuit (TL lines)circuit (TL lines)circuit (TL lines)

HarmonicsHarmonicsHarmonicsHarmonics

HVDC linkHVDC linkHVDC linkHVDC link

MVarMVarMVarMVar controlcontrolcontrolcontrol

Page 23: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 23/31

23

67

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Phasor Information Applications Adaptive Protection schemeDescription: Protection system design thatprovides for adjustments in protection settingsautomatically as system condition changeRationale: At present condition, the protectionsare set based on normal condition all lines andgenerators are in service. Existing numericalrelays capable of adapting to system changes giventhe real time data Benefits: Adaptive protection can automaticallyperform the number of adjustment, resulting would be greater system reliability and security

68

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Phasor Information Applications Adaptive Protection schemeRelay back up zone supervision: Avoidundesirable and unnecessary Zone3 back up relayoperationIntelligent load shedding: Supervision of loaddropping scheme in emergencies to avoid theformation of “Islands” in grid and to keep the

system frequency stable on 50Hz/60Hz Adaptive loss of field relaying: Online adjustmentof LOF relay to ensure proper relay operation atsystem condition change over time Adaptive reclosingFault location

69

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Phasor Information Applications

 Adaptive Protection scheme Adaptive reclosing: More accurate monitoring of phase angles and voltage amplitude to minimizethe transient switching surge during systemrestoration (Autoreclosing with synchrocheck)Fault location: Precise and quick location of point where a fault occurs

Page 24: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 24/31

24

70

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Remote Backup Protection SchemeZone3 based remote back up protection schemesare dependable but not secure A relay Mal-operation or wrong operation can actas a system collapse situationIncorrect Zone 3 operation may be consequenceof eitherLoad Encroachment, Over load or Under Voltage….Electromechanical Oscillations like PowerSwings or Out of Step condition

71

Zone 3 : Load Encroachment

Load

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

72

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

S1

CB1 CB3

S2

CB2 CB4

PMU1 PMU2

UTC

UTC

PMU3 PMU4

Lag

Lag

Lead

Lead

Substation1Substation1Substation1Substation1 Substation2Substation2Substation2Substation2

R5R5R5R5

R6R6R6R6

R7R7R7R7

R8R8R8R8

ControllerControllerControllerController

Supervisory Back protection of a parallel lines with aSupervisory Back protection of a parallel lines with aSupervisory Back protection of a parallel lines with aSupervisory Back protection of a parallel lines with a PMUsPMUsPMUsPMUs at both endsat both endsat both endsat both ends

Page 25: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 25/31

25

73

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Remote Synchronization Applied

74

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Remote Synchronization Applied

75

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Page 26: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 26/31

26

76

Synchrophasor: Application

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

 WAMPCS installed at MEXICO

77

Synchrophasor: Projects

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Implementation of System will be done on Stage wise;

Stage1:- Require to Install PMU & PDC at Major locations or Bays (Generating stations, Loaddespatch centers & Critical & Semi-critical baysof 220kV, 400kV, 765kV) and starts to do realtime monitoring of voltage & current amplitude,frequency & Phase angle parameters (Dynamic

 behaviors of power system). Wide area monitoringimplementation has to be done first.

Stage2:- Wide area Protections (SPS) should beadopted

78

Synchrophasor: Projects

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Implementation of System will be done on Stage

 wise;Stage3:- Wide area control based on monitoring& protection functions

Page 27: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 27/31

27

79

Synchrophasor: ccuracy asper C37.118

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

80

Synchrophasor: Accuracy 

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

PMU1

PDC1

SPDC

PMU2 PMU3 PMU4

PDC2 Level 1Level 1

Level 0 (Regional Level)

Local level Local level

81

Synchrophasor: ccuracy (PMU Class as per C37.118-1)

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Page 28: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 28/31

28

82

Synchrophasor: ccuracy (PMU Class as per C37.118-1)

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

83

Synchrophasor: ccuracy (PMU class as per C37.118-1)

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

84

Synchrophasor: PMU Testing

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Steady State Testing

Page 29: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 29/31

29

85

Synchrophasor: PMU Testing

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

1% PMU Requirement according to IEEEC37.118

0.25% CalibrationDevice Requirement according to IEEEC37.118

0.05% Reference Gradetest set Requirement 

E

86

Synchrophasor: PMU Testing

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

 Transient Testing

87

Synchrophasor: PMU Testing

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

 Test Set

PMU1

PMU2

PMU3

 V&I Signals

GPSPDC

   I   E   E   E

   C   3   7 .   1

   1   8

Interoperability of Multiple PMU’s

Page 30: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 30/31

30

88

Synchrophasor: PMU Testing

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

89

Synchrophasor: PMU Testing

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

90

Synchrophasor: Conclusion

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Synchrophasor have rapidly moved from R&Denvironment into the real time application of Grid

Existing SCADA technology offer the steady state view of Electrical gridIEEE COMTRADE tool provide the offline analysis of fault recordSynchrophasor data can provide enhanced real timesituational awareness (Online & Offline) to enhanceoperator efficiency and performance.PMU shall be design for the future IEC61850advancements and upcoming dynamic synchrophasor standards for better interoperability with other vendor devices

Page 31: A Synchrophasor, Making Grid Smarter7

7/28/2019 A Synchrophasor, Making Grid Smarter7

http://slidepdf.com/reader/full/a-synchrophasor-making-grid-smarter7 31/31

91

Synchrophasor: Conclusion

KNOWLEDGE IS POWER BUT IMMAGINATION IS MORE IMPORTANT THAN KNOWLEDGE 

Synchrophasor system can work as modern power management system which can provides proactiveand reactive power control in transmission systemSynchrophasor data provide real time analysis for post disturbance recordsDynamic performance of synchrophasor system doesnot define in standardsPMUs connected to Metering core of Cts or Protection core of Cts are question to user Out of step protection scheme will be improvedEntire grid stability and reliability will be increased