SOIL RESISTIVITY TESTREPORT

(JU-13-34-05)FOR THE CONSTRUCTION OF 380KV D/C OHTL FROM SHOAIBA-3

S/S TO AL-LITH BSP, UNDER SEC- WOA CONTRACT # 31131150/00,K.S.A

Prepared for:M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Ltd.

RIYADHKingdom of Saudi Arabia 

Client File # JU-13-034-05 November 2013

Page 3: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 3/73

 

Client File # JU-13-034-05  Jubail BranchSaudi Arabia.

Messrs, 21st November 2013. M/s. Saudi Electricity Company EHV Projects WOA & SOADepartmentJeddahKingdom of Saudi Arabia. Tel.: 01-462 5511 Fax. 01-462 7804 & 279 1709

Attn: Engr. Abdullah H. Al-Malki / Projects Manager OHT/LS & U/G

SUB: - SOIL RESISTIVITY REPORT FOR CONSTRUCTION OF 380KV D/C OHTL FROMSHOAIBA-3 S/S TO AL-LITH BSP, UNDER SEC- WOA CONTRACT # 31131150/00, K.S.A

Dear Sirs,

We are pleased to hereby transmit one two (02) original and four (04) photocopies of our SoilResistivity Report for the captioned project.

Should you have any questions, please do not hesitate to contact this office.

We note that our final report is deemed acceptable to you, if we do not hear from you in writing

within 14 calendar days from the date that you received it.

It has been a pleasure being of service to you on this project. Assuring you of our continued co-operation, we remain.

Yours very truly,FOR OMAR JAZZAR CONSULTING ENGINEERS (Geotechnical & Materials Engineers)

Engr. Ikram Ahmed Maqbool,Area Manager-ER.

CC: SSEM Company (Closed Joint Stock Company) – Al Jeddah

Attn.: Mr. Aijaz Hussain / Project Manager

Page 4: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 4/73

 EARTH RESISTIVITY TEST REPORT

SOIL RESISTIVITY REPORT FOR THE CONSTRUCTION OF 380KV D/C OHTL FROM

SHOAIBA-3 S/S TO AL-LITH BSP, UNDER SEC- WOA CONTRACT # 31131150/00, K.S.A 

TABLE OF CONTENTS 

CONTENTS PAGE NO.

1. INTRODUCTION 2

1.1 PURPOSE & SCOPE OF WORK  2

2. PROCEDURE OF TEST  2

2.1 INSTRUMENTATION 3

2.2 DATA ANALYSIS 3

3. RESULTS OF ELECTRICAL RESISTIVITY MEASUREMENTS  4

4. GENERAL COMMENTS 4

Table – 1 EARTH RESISTIVITY TEST RESULTS

Table - 2 TYPICAL RESISTIVITY VALUES FOR DIFFERENT

SOILS AND ROCK.

Table - 3 CORRELATION BETWEEN CORROSIVITY & SOIL

RESISTIVITY

Ref.: CALIBRATION CERTIFICATE OF ERT EQUIPMENT

Page 5: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 5/73

 EARTH RESISTIVITY TEST REPORT

SOIL RESISTIVITY REPORT FOR THE CONSTRUCTION OF 380KV D/C OHTL FROM

SHOAIBA-3 S/S TO AL-LITH BSP, UNDER SEC- WOA CONTRACT # 31131150/00, K.S.A 

1. INTRODUCTIONThis report  presents the results of the Earth Resistivity Tests carried out by AL JAZZAR

(Omar Jazzar Consulting Engineers), Geotechnical & Materials Engineers , for the proposedconstruction of 380kV Over Head Transmission Line (OHTL) from Shoaiba-3 S/S to Al-LithBSP, K.S.A. The work was authorized by M/s. Saudi Services for Electro Mechanic WorksCompany (SSEM) Ltd., Riyadh, Kingdom of Saudi Arabia.

The field work was conducted at (Tower # 08 to 68) sixty one (61) locations between 27th

September and 13th November 2013.

This report describes the work done and the results obtained at the site of proposed

construction of 380kV Over Head Transmission Line (OHTL) from Shoaiba-3 S/S to Al-LithBSP, Kingdom of Saudi Arabia.

1.1 PURPOSE & SCOPE OF WORK

T  he purpose of conducting earth resistivity test for the construction of construction of 380kV

Over Head Transmission Line (OHTL) from Shoaiba-3 S/S to Al-Lith BSP,, K.S.A, is toevaluate the surface condition and to determine the apparent electrical resistivity values foruse in the design of earthing and grounding system and also for the evaluation of thecorrosion potential on buried pipes as well as concrete in general.

2. PROCEDURE OF TEST

V  ertical electrical sounding were conducted at each test location. The electrical resistivity

was measured by using Wenner Array Method in accordance with ASTM G57-78 and IEEE-81 Standards.

Variations in resistivity at depth were obtained by increasing the spacing of the electrodes.The increased spacing forces the current to flow deeper into the earth in order to completethe circuit, thereby increasing the depth of penetration. The depth of penetration equalsapproximately the electrode spacing ‘a’. The electrode spacing used was 0.5, 1, 2, 3, 5, 7, 9,11, 13 & 15 meter along the North-South and the East-West direction at the test location.

Page 6: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 6/73

 EARTH RESISTIVITY TEST REPORT

SOIL RESISTIVITY REPORT FOR THE CONSTRUCTION OF 380KV D/C OHTL FROM

SHOAIBA-3 S/S TO AL-LITH BSP, UNDER SEC- WOA CONTRACT # 31131150/00, K.S.A 

2.1 INSTRUMENTATION

T  he    instrument is battery powered with an output voltage up to 90 volts which is called

Meggar. The current output range of the transmitter is up to 150 milli amperes. The Receiverunit has a range of 1 to 4,000 milli volts. 12 volt rechargeable battery supplies initial powerfor the instrument.

The battery can be recharged by plugging to the external cord to 120 volts 50/60 cycle ACbattery condition which can be determined by the current reading on the front panel orpressing the “Battery Check “push button.

The instrument is supplied with four (4) pieces of steel electrodes and cable reel assembly.The longer cables are meant for connection to current (outer) electrodes to the transmitterunit and the short cables are meant for connection to potential (inner) electrodes to thereceiver.

When current is passed to the ground from the transmitter, through the two outer electrodes,theoretical equi-potential current flow lines are developed by induction around eachelectrode. Consequently, a potential difference is developed between the inner (potential)electrodes.

Potential difference between the potential electrodes can be read from the receiver unit whilethe value of current that give rise to the potential difference can be read from the transmitter

unit.

Figure – 1: Connection Diagram of Wenner four point method.

Page 7: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 7/73

 EARTH RESISTIVITY TEST REPORT

SOIL RESISTIVITY REPORT FOR THE CONSTRUCTION OF 380KV D/C OHTL FROM

SHOAIBA-3 S/S TO AL-LITH BSP, UNDER SEC- WOA CONTRACT # 31131150/00, K.S.A 

2.2 DATA ANALYSIS

T  he    apparent resistivity of the ground between the inner electrodes is given by the formula.

Pa = KR = 2 π a’R 

where, Pa = Apparent resistivity in ohm-meter (or V/I)

K = geometric factor, equals 2π a’ 

R = apparent resistance of the ground between twoinner electrodes.

a’  = electrode spacing in meter.

3. RESULTS OF ELECTRICAL RESISTIVITY MEASUREMENTS

T  he test results are shown in Table 1.1 to 1.61. The Table 2 & 3 given at the end of this

report shall be used for comparing the resistivity values obtained from the different test doneas per the different test directions as well as with the changes of soil strata. The maximumand minimum values of the resistivity tests for the test location shows that the corrosivityobtained from the test results ranges from 0.3 ohm-meter to 3698.1 ohm-meter indicates

very severe to very mild corrosivity of the soil.

4. GENERAL COMMENTS

T  he interpretation of resistivity values should be done carefully as the same type of soil/rock

can show different values at different moisture contents and depending on degree ofweathering. Hence, the information on local geological conditions and experience of thegeologist will lead to the conclusions during interpretations. However, the values obtained attests should not be referred directly on the figures given in the tables 2 & 3. It is a guide forcomparison only.

The measured resistivity will be dependent on the degree of compaction/relative density,

moisture content, type of soil/rock, layering of soil strata, rock fissures, cavities, presence offoreign matter, temperature and so on.Yours very truly, 

OMAR JAZZAR CONSULTING ENGINEERS (Geotechnical & Material Engineers)

Engr. B. M. Jahidul Islam;B.Sc. Engg(Civil), MBA, MIEB;  Engr. Asad Ali, MSc. Geology 

Geotechnical & Material Engineer Senior Geologist

Page 8: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 8/73

 

TABLES

Page 9: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 9/73

Table - 1.1 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 27/09/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 8 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 0.13 0.4

1 0.08 0.5

2 0.02 0.3

3 0.09 1.7

5 0.02 0.6

7 0.02 0.9

9 0.02 1.1

11 0.02 1.4

13 0.02 1.6

15 0.02 1.9

0.5 0.14 0.4

1 0.05 0.3

2 0.03 0.4

3 0.06 1.1

5 0.02 0.6

7 0.02 0.99 0.02 1.1

11 0.02 1.4

13 0.02 1.6

15 0.02 1.9

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 10: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 10/73

Table - 1.2 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 27/09/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 9 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 55.00 172.8

1 14.00 88.0

2 4.00 50.3

3 2.00 37.7

5 1.00 31.4

7 1.00 44.0

9 1.00 56.6

11 1.00 69.1

13 1.00 81.7

15 1.00 94.3

0.5 48.00 150.8

1 13.00 81.7

2 4.00 50.3

3 2.00 37.7

5 1.00 31.4

7 1.00 44.09 1.00 56.6

11 1.00 69.1

13 1.00 81.7

15 1.00 94.3

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 11: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 11/73

Table - 1.3 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 27/09/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 10 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 1.32 4.1

1 0.46 2.9

2 0.11 1.4

3 0.02 0.4

5 0.02 0.6

7 0.02 0.9

9 0.02 1.1

11 0.03 2.1

13 0.02 1.6

15 0.01 0.9

0.5 1.06 3.3

1 0.45 2.8

2 0.40 5.0

3 0.03 0.6

5 0.03 0.9

7 0.03 1.39 0.02 1.1

11 0.01 0.7

13 0.01 0.8

15 0.01 0.9

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 12: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 12/73

Table - 1.4 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 27/09/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 11 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 1.19 3.7

1 0.32 2.0

2 0.30 3.8

3 0.04 0.8

5 0.04 1.3

7 0.03 1.3

9 0.03 1.7

11 0.03 2.1

13 0.02 1.6

15 0.02 1.9

0.5 1.14 3.6

1 0.08 0.5

2 0.07 0.9

3 0.05 0.9

5 0.04 1.3

7 0.03 1.39 0.02 1.1

11 0.02 1.4

13 0.01 0.8

15 0.01 0.9

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 13: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 13/73

Table - 1.5 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 27/09/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 12 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 11.00 34.6

1 2.16 13.6

2 2.10 26.4

3 1.00 18.9

5 0.06 1.9

7 0.03 1.3

9 0.02 1.1

11 0.02 1.4

13 0.02 1.6

15 0.20 18.9

0.5 12.28 38.6

1 3.00 18.9

2 0.54 6.8

3 0.45 8.5

5 0.06 1.9

7 0.05 2.29 0.04 2.3

11 0.03 2.1

13 0.03 2.5

15 0.03 2.8

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 14: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 14/73

Table - 1.6 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 27/09/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 13 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 4.66 14.6

1 1.06 6.7

2 1.02 12.8

3 0.19 3.6

5 0.15 4.7

7 0.01 0.4

9 0.02 1.1

11 0.10 6.9

13 0.10 8.2

15 0.10 9.4

0.5 3.98 12.5

1 1.10 6.9

2 1.45 18.2

3 1.20 22.6

5 0.05 1.6

7 0.04 1.89 0.03 1.7

11 0.08 5.5

13 0.05 4.1

15 0.02 1.9

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 15: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 15/73

Table - 1.7 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 04/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 14 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 25.60 80.4

1 10.25 64.4

2 7.62 95.8

3 5.15 97.1

5 3.38 106.2

7 3.10 136.4

9 1.22 69.0

11 1.15 79.5

13 0.43 35.1

15 0.40 37.7

0.5 27.00 84.8

1 11.55 72.6

2 9.25 116.3

3 6.35 119.7

5 4.80 150.8

7 3.00 132.09 2.80 158.4

11 1.00 69.1

13 1.00 81.7

15 1.00 94.3

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 16: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 16/73

Table - 1.8 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 04/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 15 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 28.70 90.2

1 25.00 157.1

2 5.20 65.4

3 4.00 75.4

5 4.50 141.4

7 5.00 219.9

9 3.00 169.7

11 2.00 138.2

13 2.00 163.4

15 2.00 188.5

0.5 35.30 110.9

1 22.00 138.2

2 4.00 50.3

3 3.80 71.6

5 2.00 62.8

7 2.10 92.49 2.00 113.1

11 2.00 138.2

13 2.00 163.4

15 2.00 188.5

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 17: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 17/73

Table - 1.9 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 04/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 16 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 38.00 119.4

1 14.00 88.0

2 10.00 125.7

3 9.00 169.7

5 6.00 188.5

7 4.00 176.0

9 4.60 260.2

11 3.00 207.4

13 3.10 253.2

15 2.00 188.5

0.5 46.00 144.5

1 10.40 65.4

2 8.20 103.1

3 7.50 141.4

5 6.00 188.5

7 4.80 211.19 3.00 169.7

11 3.00 207.4

13 2.00 163.4

15 2.00 188.5

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 18: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 18/73

Table - 1.10 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 04/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 17 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 87.00 273.4

1 16.00 100.5

2 10.00 125.7

3 7.00 132.0

5 6.00 188.5

7 4.00 176.0

9 4.10 231.9

11 3.00 207.4

13 3.50 285.9

15 2.00 188.5

0.5 107.00 336.2

1 21.00 132.0

2 9.00 113.1

3 8.00 150.8

5 5.00 157.1

7 5.20 228.79 4.00 226.2

11 4.00 276.5

13 2.00 163.4

15 2.00 188.5

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 19: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 19/73

Table - 1.11 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 04/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 18 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 41.00 128.8

1 14.00 88.0

2 8.00 100.5

3 5.00 94.3

5 5.20 163.4

7 5.00 219.9

9 4.00 226.2

11 2.98 206.0

13 2.10 171.6

15 2.00 188.5

0.5 24.00 75.4

1 12.00 75.4

2 8.00 100.5

3 6.00 113.1

5 4.00 125.7

7 3.60 158.49 3.00 169.7

11 2.40 165.9

13 2.00 163.4

15 2.00 188.5

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 20: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 20/73

Page 21: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 21/73

Table - 1.13 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 04/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 20 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 32.00 100.5

1 13.00 81.7

2 9.00 113.1

3 7.00 132.0

5 4.30 135.1

7 4.10 180.4

9 4.00 226.2

11 3.00 207.4

13 2.20 179.7

15 1.80 169.7

0.5 28.00 88.0

1 11.00 69.1

2 7.00 88.0

3 6.40 120.7

5 5.10 160.2

7 4.00 176.09 3.20 181.0

11 3.00 207.4

13 2.40 196.1

15 2.00 188.5

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 22: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 22/73

Table - 1.14 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 11/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 21 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 46.00 144.5

1 21.00 132.0

2 18.00 226.2

3 14.00 263.9

5 12.00 377.0

7 10.00 439.9

9 6.00 339.3

11 3.00 207.4

13 3.00 245.1

15 2.00 188.5

0.5 56.00 176.0

1 19.00 119.4

2 13.91 174.8

3 11.50 216.8

5 10.00 314.2

7 8.00 351.99 6.00 339.3

11 4.00 276.5

13 3.20 261.4

15 3.00 282.8

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 23: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 23/73

Table - 1.15 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 11/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 22 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 29.60 93.0

1 57.00 358.2

2 18.00 226.2

3 13.00 245.1

5 11.00 345.6

7 7.00 307.9

9 7.10 401.5

11 5.00 345.6

13 5.20 424.8

15 4.00 377.0

0.5 39.20 123.2

1 53.00 333.1

2 15.00 188.5

3 12.50 235.7

5 10.00 314.2

7 9.10 400.39 8.00 452.4

11 7.60 525.3

13 7.00 571.8

15 5.00 471.3

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 24: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 24/73

Table - 1.16 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 11/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 23 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 331.00 1040.0

1 35.00 219.9

2 8.00 100.5

3 6.00 113.1

5 5.00 157.1

7 4.00 176.0

9 3.00 169.7

11 3.00 207.4

13 3.00 245.1

15 2.00 188.5

0.5 540.00 1696.7

1 37.00 232.5

2 11.00 138.2

3 7.00 132.0

5 6.00 188.5

7 3.00 132.09 3.00 169.7

11 2.00 138.2

13 2.00 163.4

15 2.00 188.5

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 25: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 25/73

Table - 1.17 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 11/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 24 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 37.00 116.3

1 23.00 144.5

2 19.00 238.8

3 16.00 301.6

5 11.00 345.6

7 8.00 351.9

9 6.00 339.3

11 4.00 276.5

13 4.00 326.8

15 4.00 377.0

0.5 30.00 94.3

1 27.00 169.7

2 19.00 238.8

3 15.00 282.8

5 12.00 377.0

7 9.00 395.99 5.00 282.8

11 5.40 373.3

13 4.00 326.8

15 3.00 282.8

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 26: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 26/73

Table - 1.18 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 11/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 25 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 40.00 125.7

1 26.00 163.4

2 18.00 226.2

3 14.00 263.9

5 10.00 314.2

7 7.00 307.9

9 5.00 282.8

11 4.00 276.5

13 3.00 245.1

15 2.00 188.5

0.5 43.00 135.1

1 24.00 150.8

2 16.00 201.1

3 13.00 245.1

5 9.00 282.8

7 5.00 219.99 4.00 226.2

11 4.50 311.1

13 3.00 245.1

15 2.00 188.5

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 27: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 27/73

Table - 1.19 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 11/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 26 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 28.00 88.0

1 21.00 132.0

2 17.00 213.7

3 12.00 226.2

5 10.00 314.2

7 6.00 263.9

9 5.00 282.8

11 4.10 283.4

13 3.80 310.4

15 3.50 329.9

0.5 31.00 97.4

1 23.00 144.5

2 15.00 188.5

3 11.00 207.4

5 8.00 251.4

7 6.00 263.99 5.30 299.7

11 5.00 345.6

13 4.50 367.6

15 4.10 386.5

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 28: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 28/73

Table - 1.20 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 11/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 27 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 35.00 110.0

1 22.00 138.2

2 17.00 213.7

3 14.15 266.8

5 10.00 314.2

7 7.40 325.5

9 5.10 288.4

11 3.20 221.2

13 2.50 204.2

15 2.20 207.4

0.5 37.00 116.3

1 26.00 163.4

2 18.00 226.2

3 12.00 226.2

5 9.00 282.8

7 6.10 268.39 4.80 271.5

11 3.00 207.4

13 2.10 171.6

15 2.00 188.5

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 29: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 29/73

Table - 1.21 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 18/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 28 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 39.00 122.5

1 25.00 157.1

2 15.00 188.5

3 11.00 207.4

5 8.00 251.4

7 6.00 263.9

9 5.00 282.8

11 4.30 297.2

13 3.00 245.1

15 2.50 235.7

0.5 42.00 132.0

1 28.00 176.0

2 20.00 251.4

3 14.00 263.9

5 10.00 314.2

7 7.00 307.99 5.00 282.8

11 4.00 276.5

13 3.00 245.1

15 2.00 188.5

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 30: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 30/73

Table - 1.22 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 18/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 29 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 90.00 282.8

1 35.00 219.9

2 14.00 176.0

3 10.00 188.5

5 8.00 251.4

7 5.00 219.9

9 4.00 226.2

11 4.40 304.1

13 3.00 245.1

15 2.00 188.5

0.5 70.00 219.9

1 16.00 100.5

2 13.00 163.4

3 10.00 188.5

5 7.00 219.9

7 4.00 176.09 4.30 243.2

11 3.00 207.4

13 2.00 163.4

15 1.80 169.7

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 31: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 31/73

Table - 1.23 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 18/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 30 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 76.00 238.8

1 18.60 116.9

2 11.00 138.2

3 9.00 169.7

5 6.00 188.5

7 3.00 132.0

9 2.00 113.1

11 0.67 46.3

13 0.65 53.1

15 0.60 56.6

0.5 57.00 179.1

1 20.00 125.7

2 12.00 150.8

3 8.00 150.8

5 5.00 157.1

7 3.00 132.09 2.00 113.1

11 1.80 124.4

13 1.00 81.7

15 1.00 94.3

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 32: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 32/73

Table - 1.24 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 18/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 31 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 103.00 323.6

1 37.00 232.5

2 18.00 226.2

3 11.00 207.4

5 7.00 219.9

7 5.00 219.9

9 4.00 226.2

11 3.50 241.9

13 3.00 245.1

15 2.00 188.5

0.5 91.00 285.9

1 37.00 232.5

2 16.00 201.1

3 13.00 245.1

5 9.00 282.8

7 3.00 132.09 3.00 169.7

11 3.00 207.4

13 3.10 253.2

15 2.00 188.5

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 33: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 33/73

Table - 1.25 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 18/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 32 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 4.50 14.1

1 5.19 32.6

2 5.22 65.6

3 4.00 75.4

5 3.72 116.9

7 3.00 132.0

9 2.24 126.7

11 2.00 138.2

13 1.80 147.0

15 1.60 150.8

0.5 4.66 14.6

1 4.60 28.9

2 4.30 54.0

3 4.00 75.4

5 3.40 106.8

7 3.20 140.89 2.00 113.1

11 1.43 98.8

13 1.30 106.2

15 1.29 121.6

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 34: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 34/73

Table - 1.26 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 18/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 33 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 61.80 194.2

1 29.70 186.6

2 15.00 188.5

3 7.27 137.1

5 3.00 94.3

7 1.66 73.0

9 1.10 62.2

11 0.73 50.5

13 0.52 42.5

15 0.39 36.8

0.5 62.80 197.3

1 33.40 209.9

2 13.32 167.4

3 8.00 150.8

5 3.19 100.2

7 2.40 105.69 1.23 69.6

11 0.80 55.3

13 0.61 49.8

15 0.42 39.6

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 35: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 35/73

Table - 1.27 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 18/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 34 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 29.20 91.7

1 16.05 100.9

2 9.20 115.6

3 6.88 129.7

5 5.00 157.1

7 3.30 145.2

9 3.00 169.7

11 1.64 113.4

13 1.00 81.7

15 0.92 86.7

0.5 35.10 110.3

1 16.40 103.1

2 10.49 131.8

3 6.20 116.9

5 4.73 148.6

7 4.16 183.09 2.07 117.1

11 2.00 138.2

13 1.29 105.4

15 1.10 103.7

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 36: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 36/73

Table - 1.28 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 25/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 35 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 56.20 176.6

1 23.90 150.2

2 13.64 171.4

3 6.20 116.9

5 2.65 83.3

7 1.10 48.4

9 0.36 20.4

11 0.20 13.8

13 0.13 10.6

15 0.10 9.4

0.5 52.20 164.0

1 34.20 214.9

2 15.80 198.6

3 6.51 122.7

5 3.00 94.3

7 0.87 38.39 0.60 33.9

11 0.44 30.4

13 0.40 32.7

15 0.30 28.3

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 37: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 37/73

Table - 1.29 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 25/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 36 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 7.70 24.2

1 4.30 27.0

2 3.10 39.0

3 2.60 49.0

5 1.70 53.4

7 1.40 61.6

9 1.36 76.9

11 1.30 89.9

13 1.25 102.1

15 1.00 94.3

0.5 6.80 21.4

1 5.60 35.2

2 4.10 51.5

3 3.30 62.2

5 2.10 66.0

7 2.00 88.09 1.40 79.2

11 1.10 76.0

13 0.98 80.1

15 0.90 84.8

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 38: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 38/73

Table - 1.30 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 25/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 37 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 8.55 26.9

1 5.28 33.2

2 4.30 54.0

3 3.23 60.9

5 2.20 69.1

7 1.23 54.1

9 1.00 56.6

11 0.79 54.6

13 0.75 61.3

15 0.83 78.2

0.5 6.86 21.6

1 5.00 31.4

2 4.92 61.8

3 3.50 66.0

5 2.29 72.0

7 1.86 81.89 1.18 66.7

11 1.10 76.0

13 0.78 63.7

15 0.75 70.7

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 39: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 39/73

Table - 1.31 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 25/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 38 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 6.36 20.0

1 5.07 31.9

2 4.36 54.8

3 2.44 46.0

5 2.10 66.0

7 0.98 43.1

9 0.80 45.2

11 0.58 40.1

13 0.55 44.9

15 0.50 47.1

0.5 6.96 21.9

1 5.33 33.5

2 3.41 42.9

3 2.86 53.9

5 1.78 55.9

7 1.60 70.49 0.34 19.2

11 0.30 20.7

13 0.30 24.5

15 0.32 30.2

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 40: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 40/73

Table - 1.32 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 25/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 39 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 51.10 160.6

1 27.70 174.1

2 11.74 147.5

3 8.38 158.0

5 4.59 144.2

7 2.34 102.9

9 1.71 96.7

11 1.24 85.7

13 0.99 80.9

15 0.90 84.8

0.5 43.40 136.4

1 31.40 197.3

2 15.29 192.2

3 5.60 105.6

5 2.48 77.9

7 1.78 78.39 1.50 84.8

11 1.19 82.3

13 1.60 130.7

15 0.95 89.5

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 41: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 41/73

Table - 1.33 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 25/10/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 40 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 25.10 78.9

1 21.80 137.0

2 19.10 240.0

3 12.12 228.5

5 4.02 126.3

7 2.59 113.9

9 1.66 93.9

11 1.27 87.8

13 2.00 163.4

15 2.00 188.5

0.5 25.70 80.7

1 20.50 128.8

2 18.50 232.5

3 12.70 239.4

5 4.03 126.6

7 2.69 118.39 2.02 114.2

11 1.17 80.9

13 0.98 80.1

15 0.90 84.8

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 42: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 42/73

Table - 1.34 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 10/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 41 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 43.90 137.9

1 28.40 178.5

2 11.20 140.8

3 6.38 120.3

5 4.00 125.7

7 2.34 102.9

9 2.10 118.8

11 1.15 79.5

13 1.00 81.7

15 0.97 91.4

0.5 37.90 119.1

1 24.00 150.8

2 9.37 117.8

3 6.10 115.0

5 3.43 107.8

7 2.18 95.99 1.25 70.7

11 1.00 69.1

13 2.00 163.4

15 2.00 188.5

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 43: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 43/73

Table - 1.35 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 10/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 42 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 42.40 133.2

1 32.40 203.6

2 18.20 228.7

3 13.14 247.7

5 6.25 196.4

7 3.50 154.0

9 3.00 169.7

11 2.48 171.4

13 2.00 163.4

15 1.52 143.3

0.5 54.00 169.7

1 31.90 200.5

2 18.20 228.7

3 12.00 226.2

5 6.16 193.5

7 5.10 224.39 2.48 140.3

11 2.18 150.7

13 1.40 114.4

15 1.00 94.3

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 44: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 44/73

Table - 1.36 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 10/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 43 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 32.90 103.4

1 37.20 233.8

2 27.00 339.3

3 15.10 284.7

5 6.80 213.7

7 3.37 148.2

9 2.10 118.8

11 0.94 65.0

13 0.90 73.5

15 0.86 81.1

0.5 38.50 121.0

1 33.00 207.4

2 21.60 271.5

3 13.80 260.2

5 5.71 179.4

7 3.50 154.09 1.33 75.2

11 1.00 69.1

13 0.66 53.9

15 0.62 58.4

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 45: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 45/73

Table - 1.37 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 10/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 44 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 77.60 243.8

1 39.80 250.1

2 18.20 228.7

3 12.24 230.7

5 8.46 265.8

7 5.53 243.3

9 4.26 240.9

11 3.22 222.6

13 3.00 245.1

15 2.00 188.5

0.5 108.80 341.8

1 48.90 307.3

2 16.78 210.9

3 10.12 190.8

5 7.93 249.2

7 5.30 233.19 6.00 339.3

11 3.10 214.3

13 2.77 226.3

15 2.60 245.1

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 46: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 46/73

Table - 1.38 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 10/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 45 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 100.20 314.8

1 58.32 366.5

2 28.00 351.9

3 15.87 299.2

5 11.00 345.6

7 8.48 373.0

9 6.10 345.0

11 5.69 393.3

13 4.90 400.3

15 3.00 282.8

0.5 142.30 447.1

1 61.20 384.6

2 21.40 269.0

3 16.35 308.2

5 9.80 307.9

7 6.24 274.59 6.36 359.7

11 5.20 359.4

13 4.59 375.0

15 3.10 292.2

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 47: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 47/73

Table - 1.39 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 10/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 46 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 291.00 914.3

1 137.00 860.9

2 37.00 465.0

3 30.00 565.6

5 21.50 675.5

7 13.63 599.6

9 12.00 678.7

11 10.00 691.2

13 8.00 653.5

15 7.00 659.8

0.5 271.00 851.5

1 113.00 710.1

2 54.00 678.7

3 31.50 593.8

5 19.40 609.5

7 12.10 532.39 11.18 632.3

11 9.80 677.4

13 6.38 521.2

15 6.00 565.6

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 48: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 48/73

Table - 1.40 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 10/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 47 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 39.40 123.8

1 30.30 190.4

2 24.00 301.6

3 18.00 339.3

5 11.00 345.6

7 6.07 267.0

9 4.85 274.3

11 3.39 234.3

13 3.16 258.1

15 3.00 282.8

0.5 41.00 128.8

1 34.20 214.9

2 21.00 263.9

3 20.40 384.6

5 11.29 354.7

7 5.60 246.39 5.54 313.3

11 4.57 315.9

13 4.24 346.4

15 3.60 339.3

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 49: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 49/73

Table - 1.41 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 11/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 48 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 50.80 159.6

1 45.50 285.9

2 28.30 355.7

3 22.80 429.8

5 12.62 396.5

7 10.29 452.6

9 6.80 384.6

11 4.00 276.5

13 5.00 408.5

15 3.10 292.2

0.5 61.80 194.2

1 46.00 289.1

2 30.60 384.6

3 20.42 385.0

5 11.31 355.4

7 8.62 379.29 5.40 305.4

11 4.14 286.2

13 4.00 326.8

15 2.82 265.8

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 50: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 50/73

Table - 1.42 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 11/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 49 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 81.50 256.1

1 51.80 325.5

2 26.45 332.4

3 18.70 352.5

5 18.10 568.7

7 17.70 778.6

9 11.54 652.7

11 13.92 962.2

13 7.10 580.0

15 5.24 493.9

0.5 62.70 197.0

1 41.20 258.9

2 23.90 300.4

3 16.85 317.7

5 16.84 529.1

7 15.20 668.69 10.78 609.7

11 9.22 637.3

13 6.92 565.3

15 5.36 505.2

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 51: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 51/73

Table - 1.43 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 11/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 50 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 43.90 137.9

1 43.80 275.2

2 33.70 423.5

3 27.10 510.9

5 25.10 788.6

7 18.26 803.2

9 15.43 872.7

11 12.34 853.0

13 11.07 904.3

15 10.00 942.6

0.5 42.50 133.5

1 40.70 255.8

2 35.00 439.9

3 32.10 605.1

5 24.80 779.2

7 14.27 627.79 12.80 723.9

11 8.88 613.8

13 8.00 653.5

15 7.00 659.8

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 52: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 52/73

Table - 1.44 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 11/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 51 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 52.20 164.0

1 41.10 258.3

2 30.00 377.0

3 32.20 607.0

5 26.00 816.9

7 20.00 879.8

9 16.20 916.2

11 11.87 820.5

13 11.00 898.6

15 10.00 942.6

0.5 73.50 230.9

1 49.10 308.5

2 39.00 490.2

3 29.10 548.6

5 25.40 798.1

7 21.00 923.79 15.88 898.1

11 13.00 898.6

13 12.07 986.0

15 12.00 1131.1

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 53: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 53/73

Table - 1.45 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 11/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 52 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 29.10 91.4

1 17.80 111.9

2 15.77 198.2

3 17.80 335.6

5 15.26 479.5

7 13.07 574.9

9 11.00 622.1

11 9.85 680.9

13 11.00 898.6

15 10.00 942.6

0.5 27.40 86.1

1 18.83 118.3

2 18.20 228.7

3 17.50 329.9

5 16.56 520.3

7 15.39 677.09 10.00 565.6

11 11.07 765.2

13 11.00 898.6

15 12.00 1131.1

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 54: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 54/73

Table - 1.46 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 11/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 53 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 510.00 1602.4

1 121.00 760.4

2 28.00 351.9

3 22.00 414.7

5 18.00 565.6

7 16.00 703.8

9 13.00 735.2

11 11.00 760.4

13 10.00 816.9

15 8.00 754.1

0.5 563.00 1768.9

1 112.00 703.8

2 25.00 314.2

3 22.00 414.7

5 19.00 597.0

7 14.00 615.89 12.00 678.7

11 10.00 691.2

13 8.40 686.2

15 7.00 659.8

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 55: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 55/73

Table - 1.47 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 11/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 54 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 137.10 430.8

1 104.00 653.5

2 48.50 609.5

3 45.40 855.9

5 22.00 691.2

7 18.60 818.2

9 15.00 848.3

11 11.58 800.5

13 11.00 898.6

15 9.00 848.3

0.5 132.00 414.7

1 126.00 791.8

2 48.00 603.3

3 42.40 799.3

5 19.00 597.0

7 16.00 703.89 14.00 791.8

11 12.00 829.5

13 7.81 638.0

15 7.00 659.8

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 56: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 56/73

Table - 1.48 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 12/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 55 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 60.60 190.4

1 45.70 287.2

2 23.10 290.3

3 18.50 348.8

5 13.40 421.0

7 10.66 468.9

9 8.00 452.4

11 6.25 432.0

13 6.15 502.4

15 6.00 565.6

0.5 80.70 253.6

1 50.00 314.2

2 22.40 281.5

3 16.20 305.4

5 12.10 380.2

7 11.00 483.99 6.16 348.4

11 6.00 414.7

13 5.54 452.6

15 5.00 471.3

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 57: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 57/73

Table - 1.49 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 12/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 56 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 516.00 1621.3

1 115.00 722.7

2 48.00 603.3

3 38.00 716.4

5 27.00 848.3

7 22.00 967.7

9 16.00 904.9

11 14.00 967.7

13 12.00 980.3

15 10.00 942.6

0.5 532.00 1671.5

1 165.00 1036.9

2 50.00 628.4

3 37.00 697.5

5 28.00 879.8

7 25.00 1099.79 15.00 848.3

11 14.00 967.7

13 12.10 988.5

15 12.00 1131.1

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 58: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 58/73

Table - 1.50 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 12/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 57 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 460.00 1445.3

1 84.00 527.9

2 31.00 389.6

3 24.00 452.4

5 21.00 659.8

7 17.00 747.8

9 14.00 791.8

11 11.00 760.4

13 10.00 816.9

15 10.00 942.6

0.5 545.00 1712.4

1 83.00 521.6

2 30.00 377.0

3 22.00 414.7

5 20.00 628.4

7 18.00 791.89 13.00 735.2

11 10.00 691.2

13 9.00 735.2

15 8.00 754.1

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 59: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 59/73

Table - 1.51 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 12/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 58 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 1177.00 3698.1

1 333.00 2092.6

2 60.00 754.1

3 34.00 641.0

5 28.00 879.8

7 21.00 923.7

9 17.00 961.5

11 13.00 898.6

13 12.00 980.3

15 9.00 848.3

0.5 118.00 370.8

1 289.00 1816.1

2 51.00 641.0

3 32.00 603.3

5 27.00 848.3

7 23.00 1011.79 16.00 904.9

11 12.00 829.5

13 11.00 898.6

15 10.00 942.6

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 60: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 60/73

Table - 1.52 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 12/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 59 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 282.00 886.0

1 127.00 798.1

2 30.00 377.0

3 22.00 414.7

5 16.00 502.7

7 11.00 483.9

9 9.00 509.0

11 7.00 483.9

13 5.00 408.5

15 4.00 377.0

0.5 199.00 625.3

1 75.00 471.3

2 27.00 339.3

3 23.00 433.6

5 17.00 534.1

7 13.00 571.89 9.00 509.0

11 6.00 414.7

13 5.00 408.5

15 4.00 377.0

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 61: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 61/73

Table - 1.53 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 12/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 60 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 627.00 1970.0

1 191.00 1200.2

2 30.00 377.0

3 19.00 358.2

5 15.00 471.3

7 12.00 527.9

9 10.00 565.6

11 8.00 553.0

13 7.00 571.8

15 6.00 565.6

0.5 695.00 2183.7

1 154.00 967.7

2 28.00 351.9

3 19.00 358.2

5 16.00 502.7

7 11.00 483.99 11.00 622.1

11 9.00 622.1

13 8.00 653.5

15 7.00 659.8

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 62: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 62/73

Table - 1.54 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 12/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 61 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 430.00 1351.1

1 150.00 942.6

2 78.00 980.3

3 47.00 886.0

5 28.00 879.8

7 12.00 527.9

9 9.00 509.0

11 6.00 414.7

13 6.00 490.2

15 4.00 377.0

0.5 565.00 1775.2

1 148.00 930.0

2 80.00 1005.4

3 37.00 697.5

5 26.00 816.9

7 13.00 571.89 11.00 622.1

11 7.00 483.9

13 6.00 490.2

15 5.00 471.3

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 63: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 63/73

Table - 1.55 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 13/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 62 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 137.40 431.7

1 60.00 377.0

2 22.00 276.5

3 15.00 282.8

5 12.00 377.0

7 9.00 395.9

9 7.50 424.2

11 6.00 414.7

13 5.00 408.5

15 4.00 377.0

0.5 124.60 391.5

1 52.90 332.4

2 23.00 289.1

3 16.00 301.6

5 10.70 336.2

7 8.00 351.99 6.00 339.3

11 5.00 345.6

13 4.00 326.8

15 4.00 377.0

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 64: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 64/73

Table - 1.56 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 13/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 63 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 874.00 2746.1

1 236.00 1483.0

2 40.00 502.7

3 25.00 471.3

5 21.00 659.8

7 17.00 747.8

9 16.00 904.9

11 11.00 760.4

13 9.00 735.2

15 7.00 659.8

0.5 1045.00 3283.4

1 301.00 1891.5

2 44.00 553.0

3 23.00 433.6

5 19.00 597.0

7 16.00 703.89 14.00 791.8

11 11.00 760.4

13 9.00 735.2

15 8.00 754.1

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 65: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 65/73

Table - 1.57 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 13/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 64 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 531.00 1668.4

1 161.00 1011.7

2 52.00 653.5

3 20.00 377.0

5 18.00 565.6

7 14.00 615.8

9 12.00 678.7

11 10.00 691.2

13 8.00 653.5

15 6.00 565.6

0.5 749.00 2353.4

1 217.00 1363.6

2 27.00 339.3

3 22.00 414.7

5 17.00 534.1

7 13.00 571.89 11.00 622.1

11 9.00 622.1

13 9.00 735.2

15 8.00 754.1

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 66: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 66/73

Table - 1.58 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 13/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 65 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 32.00 100.5

1 26.60 167.2

2 17.00 213.7

3 12.03 226.8

5 8.00 251.4

7 5.37 236.2

9 4.00 226.2

11 3.97 274.4

13 3.00 245.1

15 3.00 282.8

0.5 55.90 175.6

1 29.40 184.7

2 10.42 131.0

3 9.10 171.6

5 7.79 244.8

7 6.00 263.99 4.03 227.9

11 3.87 267.5

13 3.40 277.8

15 3.17 298.8

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 67: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 67/73

Table - 1.59 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 13/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 66 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 21.10 66.3

1 24.50 154.0

2 13.20 165.9

3 8.94 168.5

5 7.20 226.2

7 6.08 267.4

9 4.28 242.1

11 3.77 260.6

13 3.30 269.6

15 2.45 230.9

0.5 26.90 84.5

1 23.70 148.9

2 13.06 164.1

3 10.00 188.5

5 9.02 283.4

7 6.10 268.39 4.12 233.0

11 4.10 283.4

13 1.95 159.3

15 1.80 169.7

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 68: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 68/73

Table - 1.60 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 13/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 67 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 78.20 245.7

1 49.60 311.7

2 33.60 422.3

3 21.46 404.6

5 16.65 523.1

7 11.00 483.9

9 9.38 530.5

11 8.26 571.0

13 8.00 653.5

15 7.71 726.7

0.5 67.70 212.7

1 55.80 350.6

2 27.50 345.6

3 20.00 377.0

5 18.20 571.8

7 13.62 599.19 12.00 678.7

11 7.24 500.5

13 4.28 349.6

15 4.56 429.8

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 69: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 69/73

Table - 1.61 : Electrical Resistivity Test Results(ASTM - D - 57)

Client : M/s. Saudi Services for Electro Mechanic Works Company (SSEM) Client File # : JU-13-034-05

Project : The construction of 380kV D/C OHTL from Shoaiba-3 S/S Testing Date : 13/11/2013

: to Al-Lith BSP UNDER SEC- WOA CONTRACT # 31131150/00 Tested By : Shafi

Location : Shoaiba to Al-Lith - Kingdom of Saudi Arabia Witnessed By : SEC Representative

Coordinates:

Equipment Used:- Megger Digital - Earth Tester DET 5 /4R

Electrode Resistance Apparent

Test # 68 Spacing Resistivity

a'

meter Ohm Ohm-Meter

0.5 18.90 59.4

1 14.13 88.8

2 11.64 146.3

3 10.06 189.7

5 7.20 226.2

7 5.22 229.6

9 4.80 271.5

11 4.40 304.1

13 4.71 384.8

15 4.50 424.2

0.5 15.20 47.8

1 14.56 91.5

2 9.88 124.2

3 9.12 171.9

5 6.13 192.6

7 5.10 224.39 4.33 244.9

11 4.26 294.5

13 3.95 322.7

15 3.60 339.3

Direction

N - S

Direction

E - W

ERT rslt._8-68.xls

Page 70: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 70/73

 EARTH RESISTIVITY TEST REPORT

FOR THE CONSTRUCTION OF 380KV D/C OHTL FROM SHOAIBA-3 S/S TO AL-LITH

BSP, UNDER SEC- WOA CONTRACT # 31131150/00, K.S.A 

TABLE – 2

TYPICAL RESISTIVITY VALUES FOR DIFFERENT SOILS AND ROCKS

Material Resistivity ohm-meter. 

Clay 3 - 30

Saturated organic clay or silt 5 - 20

Sandy clay 5 - 40

Saturated inorganic clay or silt 10 - 50

Clayey sand 30 - 100

Hard, partially saturated clays and silts,saturated sand and gravel 50 - 150

Shales, dry clays, silts 100 - 500

Sand, gravel 100 - 4000

Sandstone 100 - 8000

Sandstone, dry sands and gravel 200 - 1000

Crystalline rocks 200 - 10000

Sound crystalline rocks 1000 - 10000

Rock salt, Anhydrite >10000

Page 71: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 71/73

 EARTH RESISTIVITY TEST REPORT

FOR THE CONSTRUCTION OF 380KV D/C OHTL FROM SHOAIBA-3 S/S TO AL-LITH

BSP, UNDER SEC- WOA CONTRACT # 31131150/00, K.S.A 

TABLE – 3

CORRELATION BETWEEN CORROSIVITY & SOIL RESISTIVITY

SOIL RESISTIVITY  CORROSIVITY OHM METER 

0 - 10 VERY SEVERE

10 - 20 SEVERE

20 - 50 MODERATE

50 - 100 MILD

100+ VERY MILD

Corrosivity is based on the correlation presented by JD Palmer in an article entitled “SoilResistivity - Measurement and Analysis” Published in Material Performance Vol.13, 1974. 

Page 72: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 72/73

Page 73: A. Twr# 8 to Twr# 68

8/16/2019 A. Twr# 8 to Twr# 68

http://slidepdf.com/reader/full/a-twr-8-to-twr-68 73/73

46 465.0 914.3

47 123.8 384.6

48 159.6 452.6

49 197.0 962.2

50 133.5 942.6

51 164.0 1131.1

52 86.1 1131.1

53 314.2 1768.9

54 414.7 898.6

55 190.4 565.6

56 603.3 1671.5

57 377.0 1712.4

58 370.8 3698.159 339.3 886.0

60 351.9 2183.7

61 377.0 1775.2

62 276.5 431.7

63 433.6 3283.4

64 339.3 2353.4

65 100.5 298.8

66 66.3 283.4

67 212.7 726.7

68 47.8 424.2