14
A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I North Carolina Water Resource Congress October 30 2014

A World of Solutions Pulling Resources How Communities in Dare County are Working Together to Construct Locally Funded Beach Projects Ken Willson CB&I

Embed Size (px)

Citation preview

A World of Solutions

Pulling ResourcesHow Communities in Dare County are Working Together to Construct Locally

Funded Beach Projects

Ken Willson CB&I

North Carolina Water Resource CongressOctober 30 2014

2A World of Solutions

Background

2000 - Dare County Shoreline Protection Project Authorized

2009 – Kill Devil Hills Feasibility Study

2011 – Nags Head Local Beach Nourishment Project

2012 – Town of Duck Feasibility Study

3A World of Solutions

Coming Together

February 2013 – First Joint Meeting Kill Devil Hills / Kitty Hawk

June 2013 – Kitty Hawk Feasibility / Inter-Agency Meeting (3-Towns and County)

Initial Estimates – 10% - 17% Cost Savings by Combining Projects

Fall 2013 – County Formulates 1st Cost Sharing Model

4A World of Solutions

Initial Cost Estimate - $41 Million

Equitable Cost Sharing (Towns)

County Funding Through Room Occupation Tax

Dare County Up Front Commitment - $24 Million

Local Communities to Finance (Special Obligation Bonds) Balance

County to Subsidize Locals to assist with Debt Payments

Preliminary Cost Sharing Model

5A World of Solutions

Getting Buy In

County / Town Managers Present To Elected Officials

Working Together to Achieve Cost Savings

+

County Financial Support

Buy In from ALL 3 - Towns

6A World of Solutions

Town of Duck: ~ 1.5 Miles Main Section Dune: Elevation 20 ft. NAVD / Crest Width

20 ft.

Design Berm Width: Variable 65 – 75 ft. Ave. Fill Density: 120 cy/ft.

Beach Fill Design

7A World of Solutions

Town of Kitty Hawk: ~ 3.6 Miles Main Section Dune: “Starter Dune” 14 ft. NAVD

Design Berm: 60 ft. Ave. Fill Density: ???

Beach Fill Design

8A World of Solutions

Town of Kill Devil Hills: ~ 2.4 Miles Main Section Dune: Elevation 15 ft. NAVD / Crest Width

20 ft.

Design Berm: Variable 40 cy/ft. Ave. Fill Density: 70 cy/ft.

Beach Fill Design

9A World of Solutions

BOEM / USACE – Co-Lead Agencies (Borrow Source in Federal Waters)

Pre-Application Meeting – KEY

Individual Environmental Assessments (EA)

Batched Biological Assessment (BA) and Essential Fish Habitat (EFH) Documents

Permitting

10A World of Solutions

Cooperative Sand Search Investigation

Total Cost Split 3 Ways

All 3 Communities will Hold Permits for All Resulting Borrow Areas

Borrow Area

11A World of Solutions

Borrow Area

12A World of Solutions

Borrow Area

13A World of Solutions

Keys To Success

Established Working Relationships Between Participants

Honesty and Integrity

Communication: Open and Often

14A World of Solutions

Questions?

Ken Willson(910) 791-9494 – Office

(910) 443-4471 – [email protected] - Email