- Alle Maße sind in mm- Draufsicht siehe Zeichnung E50105-R3422-V995
400kV TERMINAL TOWERTBC
DEERFENCE
15000 5000
APPROX. 25000
7.3m
SECTION A-ASCALE 1:500
EXISTING GROUND LVL TBC
115.0000
115.0000115.0000
115.0000
65000
ORIENTATION OF TOWERS TBC
CONDUCTORS & CLEARANCESTO BE DESIGNED
CONDUCTORS & CLEARANCESTO BE DESIGNED
400kV TERMINAL TOWER
E=276993.776N=755756.288
LVL=TBC
TOWER 230R
400kV OHLMELGARVE-DENNY [ELY1]
TOP = RMID= B
BOT = Y
400kV OHLMELGARVE-DENNY [ELY1]
TOP = RMID= B
BOT = Y
ORIENTATION OF TOWERS TBC
275kV OHLFUTURE KINARDOCHY-BRACO WEST [KB1]TOP = BMID= RBOT = Y
275kV OHLFUTURE TUMMEL-KINARDOCHY [MK1]TOP = BMID= RBOT = Y
PHASING TBC
AA
BB
C
C
4mHIGH SECURITY FENCE
STATCOM BUILDING
GIS & CONTROL BUILDINGOHL GANTRY
GIB
4m HIGH SECURITY FENCE2m WIDE PERIMETER WALKWAY/PATH
STATCOM BUILDING
100 MVAR MSCDN
GIB
GIB
GIB
GIB
DIESELGENERATOR
OHL GANTRY
DNO SUPPLIES
GIS & CONTROLBUILDING
5m WIDE ROAD
DIESELGENERATOR
301700
2117
00
6801
5
22355
3450
0
39000
100150
22015 21245
3024
0
3200
5
4000
9850
1350
0
1332
5
1071
2
9242
9209
8349
±225 MVAR STATCOM
PRELIMINARY DESIGN ONLY
NOT TO BE USED FOR
CONSTRUCTION
Rev:
Checked:
Drawn: Approved:
Date:
Description:
0BPMR
23.10.19
ACCESS GATE AMENDED.
0m
SCALE AT 1:500
37.5m25m12.5m 50m
SUBSTATION MINIMUM ELECTRICAL CLEARANCESREQUIREMENTS TO BE IN ACCORDANCE WITH SSE SUBSTATION DESIGN SPECIFICATION DOC No. SP-PS-399
REF CLEARANCE (mm)NOMINAL SYSTEM VOLTAGE
400kV 275kV 132kV 33kV
E PHASE TO EARTH 2800 2100 1200 500
Ph PHASE TO PHASE 3600 2400 1400 430
S DESIGN CLEARANCE FOR SAFETY 5500 4800 3500 2900
SD SAFETY DISTANCE 3100 2400 1400 800
Ds WORKING & ACCESS CLEARANCE (VERTICAL) 5200 4500 3500 2900
Dsh WORKING & ACCESS CLEARANCE (HORIZONTAL) 4600 3900 2900 2300
IH INSULATION HEIGHT (PEDESTRIAN ACCESS) 2400 2400 2400 2400
WHERE EQUIPMENT CONFIGURATIONS HAVE NOT BEEN SUBJECT TO TYPE OF ROUTINE TESTS IN ACCORDANCE WITH IEC 60694 THECLEARANCES FOR PHASE TO EARTH AND PHASE TO PHASE ABOVE SHALL APPLY.THEY APPLY UNDER CONDITIONS OF MAXIMUM SWING AND SAG.
WHEN DESIGNING ELECTRICAL CONNECTIONS THE FOLLOWING ALLOWANCES HAVE BEEN MADE TO COVER TOLERANCES IN ELECTRICALAND CIVIL WORK AND THE SETTLEMENT OF FOUNDATIONS:- 132kV - 80mm; 33kV - 80mm
NOTES:-1. BASED ON DESIGN REQUIREMENTS TAKEN FROM KINARDOCHY
SUBSTATION DRD LT96-DRD-G1-REV1 (TBC).2. LAYOUT SHOULD BE READ IN CONJUNCTION WITH SLD SSEN DRAWING
NUMBER: LT96_KIND_1117_00_0004_0D_DRAFT.3. ALL DIMENSIONS SHOWN IN MILLIMETRES (mm) U.N.O.4. PROPOSED LAYOUT FOR DEVELOPMENT PURPOSES ONLY.5. SITE DEVELOPED FOR POTENTIAL UPGRADE TO 400kV IN FUTURE
THEREFORE 400kV ELECTRICAL CLEARANCES HAVE BEEN USED WHEREAPPROPRIATE.
6. GIS AND CONTROL BUILDING TAKEN FROM PROPOSED PETERHEAD 400kVSUBSTATION, REFER TO SSEN DRAWING NUMBERS:LT135_PEHE_0805_0001_00_00 - FOR PLANNING-400KV GIS CONTROLBUILDING GA AND LT135_PEHE_0805_0002_00_00 - FORPLANNING-400KV GIS CONTROL BUILDING ELEVATIONS.
7. GIS AND CONTROL BUILDING FOOTPRINT ASSUMED SUITABLE FOR 275kVOR 400kV EQUIPMENT.
8. IT IS ASSUMED THAT MSCDN WOULD REQUIRE TO BE COMPLETELYREDESIGNED FOR UPGRADE TO 400kV.
9. STATCOM MAY BE ABLE TO BE RE-UTILISED IF SUBSTATION IS UPGRADEDTO 400kV BUT WILL REQUIRE AN ADAPTIVE SCT.
10. ALL EQUIPMENT SHOWN TO BE FINALISED AND CONFIRMED BY SSENENGINEER/DESIGN TEAM AND UNTIL DONE SO ALL ASPECTS OF THESHOWN DESIGN ARE SUBJECT TO CHANGE.
11. AIS PLANT INFORMATION TAKEN FROM STANDARD SSE FRAMEWORKLAYOUTS.
12. STATCOM BASED ON SIMILAR UNIT INSTALLED AT MELGARVE; RATINGSTBC - FOR EXAMPLE (±225MVAR, CONNECTED TO 275KV BUSBARRUNNING AT 20KV).
13. ASSUMED STATCOM TRANSFORMER LOCATED ON WEST OF STATCOMCOMPOUND BUT CONNECTUON FROM GIS COULD BE MODIFIED TOACCOMODATE A DIFFERENT TRANSFORMER POSITION.
14. CURRENTLY NO INFORMATION ON MSCDN REQUIRED AT THIS SITE.INDICATIVE SPACE ENVELOPE ONLY.
15. BUILDING OUTLINE INDICATIVE ONLY - DESIGN TO BE CONFIRMED.16. GIS BAYS 8,9,10,11 AND 12 ARE SPACE PROVISION ONLY. GIB ENTRIES TO
BE PROVIDED.17. OVERHEAD LINE ROUTES AND POSITION OF TOWERS (TERMINAL OR
OTHERWISE) TO BE CONFIRMED AND SUBJECT TO SEPARATE SECTION 37CONSENT.
18. OHL REQUIRE TO BE MODELLED TO ENSURE NO INFRINGEMENT OFELECTRICAL CLEARANCES.
19. PLATFORM LEVEL TBC AT DETAIL DESIGN STAGE AFTER GROUNDINVESTIGATION SURVEY AND CUT/FILL BALANCE OPTIMISED.
20. ELECTRICAL PHASING TO BE CONFIRMED.21. ACCESS ROUTE TO SITE TBC.22. PROPOSED PLATFORM AREA = 63870m² / 15.78acres.
!!!TO BE PRINTED IN COLOUR!!!
LEGEND:-SCT STATIC COMPENSATION TRANSFORMERSGT SUPER GRID TRANSFORMERET EARTHING TRANSFORMERNER NEUTRAL EARTHING RESISTORES EARTH SWITCHDISC DISCONNECTOR (RCP)DG DIESEL GENERATORCB CIRCUIT BREAKERCSE CABLE SEALING ENDCVT CAPACITIVE VOLTAGE TRANSFORMERSA SURGE ARRESTERPI POST INSULATORGIB GAS INSULATED BUSBARH HIGH LEVEL (POST INSULATOR)
PLANT PROPOSED
SSE Inveralmond House, 200 Dunkeld RoadPerth, PH1 3AQ, UK www.sse.com
Drawing Status:
Scale:
Date:
Drawing Number: Sheet No: Revision No:
Approved:
Checked:
Drawn:
Title:
Project Number: Location:
Project:
Date Plotted: 23.10.2019
File Name: LT96_KIND_1104_0041_00_00 - Kinardochy Reactive Compensation SS 275(400kV) AIS SUBSTATION (BASED ON SIEMENS SUBMISSION).dwg
A0
DOCUMENT REFERENCE:
LIST OF ALL RELEVANT DRAWINGS OR DOCUMENTS THAT DIRECTLY RELATE TOTHE CURRENT REVISION OF THE DRAWING
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
21 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
KINARDOCHY 275kV REACTIVE COMPENSATION SUBSTATION
LT000096 TUMMEL
KINARDOCHY 275kV REACTIVE COMPENSATION SUBSTATIONPROPOSED SUBSTATION LAYOUT & ELEVATION AT SITE 4FOR PUBLIC CONSULTATION PURPOSE - SHEET 1
FOR INFORMATION
1:500 @ A0
PMR
LT96_KIND_1104_0041 01 0B