Abbreviations definitions within () are content specific, or optional, depending on the note.For example: Content: Refer to Arch. would be read: "Refer to Architectural" Contact Arch. would be read: "Contact Architect" Optional: Dwg.=Drawing and Dwgs.=Drawings
NECESSARY:REQUIRED:
PROVIDE:
FURNISH:INSTALL:
WORK NEEDED TO COMPLETE THE WORK. TO: "MAKE IT OPERATIONAL".WORK NEEDED TO BE IN COMPLIANCE WITH BUILDING CODE, GOVERNING CODE, ORJURISDICTION HAVING AUTHORITY.RESPONSIBLE FOR PURCHASE, DELIVERY, RECEIVING, INSPECTION, STORAGE,PREPARATION, AND INSTALLATION OF ITEM(S).RESPONSIBLE FOR PURCHASE AND DELIVERY OF ITEM(S)RESPONSIBLE FOR RECEIVING, INSPECTION, STORAGE, PREPARATION AND INSTALLATIONOF ITEM(S).
+-
COLORMATERIAL FINISH IDENTIFICATION
OR MILLWORK REFERENCE
ROOM IDENTIFICATION
DOOR IDENTIFICATION
ELEVATION REFERENCEREFERENCE TAG
ELEVATION REFERENCE
SECTION REFERENCE
ELEVATION, WORK POINT
REVISION CLOUD & DELTA
STRUCTURAL GRID
ROOM ID. No.ROOM NAME
DOOR ID NO.
ALIGNMENT SIDE
5900
16750 SPOT ELEVATION
REFER To SHEET
ID. NUMBER
ID. NUMBER
REFER To SHEET
REFER To SHEETxx
xx
xx
xx
ELEVATION ID.
(INTERIOR and\or EXTERIOR)
(INTERIOR ONLY)(GENERAL\TYPICAL USE)
(DETAILS)SECTION REFERENCE(S)
MATCH LINERefer to xxxRefer to xxx
ID. & SHEET
ENLARGED REFERENCE&
KEY NOTE
T \ SLAB
ACCESSORY/FURNITURE,1
ABBREVIATIONS AND DEFINITIONS
INDEX TO DRAWING SYMBOLS
& AndL or Angle@ AtSM or S.M. Square Meters# Pound(s) or Number+/- or Plus Minus
A.B. Anchor BoltACC. AccessibleA/C Air ConditioningACOUST. AcousticalADJ. AdjacentAFF or A.F.F. Above Finish FloorAFG or A.F.G Above Finish GradeALUMN. or ALUM. AluminumANGL. AngleAPPROX. ApproximateARCH. Architect(ural)ASPH. AsphaltATTN. or ATTEN. Attention
B\xxxx Bottom of _____BD. BoardBIT. BituminousBLDG. BuildingBLK. BlockBLKG. BlockingBM. BeamBOT. BottomBRG. BearingBRK. BrickBRKMTL. Break MetalB.U.R. Built Up Roofing
C or CH. ChannelCAB. CabinetCB or C.B. Cement BoardC\C or C.C Center to CenterCCTV or C.C.T.V. Closed Circuit TelevisionCer. CeramicCF or C.F. Communication FeaturesCL or C.L. or CenterlineCLG. or CLNG. CeilingCMU or C.M.U. Concrete Masonry UnitC.O. Closed OpeningCOL. ColumnCOMB. Combination or CombineCOMP. or COMPT. Compact(ed)CONC. ConcreteCONST. ConstructionCONT. ContinuousCORR. CorridorC.W. Cold WaterCJ or C.J. Control JointCLR. Clear
D, DN. DWN. DownDBL. DoubleDEPT. DepartmentDETL. or DTL. DetailDIA. or DiameterD.F. Drinking FountainDIV. DivisionDR. or DRN. DrainDS. or D.S. DownspoutDWG(S). Drawing(s)
E or E. EastEA. EachE.F.S. Exterior Finish SystemEJ or EJ. or E.J. Expansion JointEL. or ELE. ElevationELEC. or ELECT ElectricalELEV. ElevatorEMER. or EMERG. EmergencyENCL. EnclosureENG. EngineerEP or E.P. Electrical PanelEQ. EqualEQUIP. EquipmentEWC or E.W.C. Electrical Water CoolerE.W. Each WayEXIST. ExistingEXP. ExpansionEXT. Exterior
F.A. Fire AlarmF.B. Face BrickFD. or F.D. Floor DrainFDN. FoundationF.E. Fire ExtinguisherF.E.C. Fire Extinguisher CabinetFIN. FinishFL. or FLR. FloorFLUOR. FluorescentFRM. FrameF.R. Fire ResistantF.R.C. Fiber reinforced concreteF.R.T. Fire Retardant TreatedF.R.P. Fiber Reinforced PlasticFT. Foot (feet)FTG. FootingFUT. or FUTR. FutureFV. or F.V. Field Verify
Ga. GaugeGALV. GalvanizedG.B. Gypsum BoardGEN. GeneralGFRC Glass Fiber Reinforced ConcreteGFRG Glass Fiber Reinforced Gypsum
GL. or GLAZ. Glass/GlazingGRAN. GranularG.S.M. Galvanized Sheet MetalG.V. Gas ValveGYP. GypsumGYP. BD. Gypsum Board
H HighHADG Hilton Accessibility Design GuideHC. or H.C. HandicappedH.B. Hose BibHDWD. HardwoodHDWR. HardwareHGT. OR HT. HeightHM. OR H.M. Hollow MetalHORIZ. HorizontalH.P. High PointHTG. HeatingHR. or Hr. HourHVAC or H.V.A.C. Heating, Ventilation and A/CH.W. Hot water
I.D. Inside DiameterIN. Inch(es)INCL. IncludeINFO. InformationINSUL. InsulationINT. InteriorINV. Invert
JC or J.C. Janitor's ClosetJAN. Janitor(ial)JT. or JNT. Joint
KIT. KitchenK.O. Knock out
LAM. LaminateLAV. LavatoryLB. or LBS. Pound(s)LT. MTL. Light Gauge Metal FramingL.A. Low PointLT. LightLT. WT. Light WeightL.L.H. or LLH Long Leg HorizontalL.L.V. or LLV Long Leg Vertical
MAS. MasonryMAX. MaximumMED. MediumMDO or M.D.O. Medium Density OverlayMECH. MechanicalMFR. or MANUF. ManufacturerM.H. Man Hole
MIN. MinimumMISC. MiscellaneousM.O. Masonry OpeningMR. or M.R. Moisture ResistantMTD. MountedMTG. MountingMTL. MetalMULL. Mullion
N or N. NorthNA. or N.A. Not ApplicableNEC'Y NecessaryN.I.C. Not in ContractNo. NumberNOM. NominalNON COMB. Non CombustibleN.T.S. Not to Scale
O.A. OverallO.C. On CenterO.D. Overflow Drain or Outside DiaOFF OfficeO.F.O.I Owner Furnished, Owner InstalledO.H. Overhead or Opposite HandOPNG OpeningOPP. OppositeO.T.O. Out to Cut
PART Particle, Partial or PartitionPL PlateP. LAM or P.L. Plastic LaminatePLAS. PlasterPLBG. PlumbingPLWD. or PLYWD. PlywoodPNL. PanelPORC. PorcelainPR. PairP.S.F. Pounds per Square FootP.T. Pressure TreatedPOST TEN. Post TensionedPTN. or PARTN. Partition
R RiserR.A. Return AirRAD. RadiusRD. or R.D. Roof DrainRD Reference DimensionREC. RecessedREC'V or REC'VD Receive or ReceivedREF. or RE. Refer or ReferencedRM. RefrigeratorREG. Regular or RegisterREINF. Reinforce(d)REQ'D RequiredRES. Resilient
CEILING HEIGHT / FINISH,
ROOM SIZESKING:
DOUBLE QUEEN:
ACCESSIBLE KING:
ACCESSIBLE DOUBLE QUEEN:
11' X 21'
11' X 25'-5"
14'6" X 25'-5"
14'6" X 27'-6"
RM. RoomR.O. Rough Opening
S or S. SouthSCHED or SCHEDL. ScheduleSECT. SectionSHT. SheetSIM. SimilarSM. or S.M. Surface MountedSPEC. SpecificationSQ. SquareSQFT Square FootSS OR S.S. Stainless SteelST. StreetSTD. StandardSTL. SteelSTOR. StorageSTRUCT. StructuralSUSP. SuspendedSYM. Symmetrical
T\xxxx Top of ____T or T. TreadTEL. TelephoneTEMP. Temporary or TemperedT&B Top and BottomT&G Tongue and GrooveTHRU ThroughTS or T.S. Tube SteelTV OR T.V. TelevisionTYP. Typical
U.N.O. Unless Noted OtherwiseUR. or URNL. Urinal
VAR. Varies/ VariableVCT or V.C.T. Vinyl Composition TileVB or VB. or V.B. Vertical BracingVERT. VerticalVIF. or V.I.F. Verify in Field
W or W. WestW/ WithW/O WithoutW.C. Water ClosetWD. WoodW.F. Wide FlangeWIN WindowW.P. WaterproofW.M. Wire MeshWWF or W.W.F. Welded Wire FabricWWM or W.W.M. Welded Wire MeshWSCT. WainscotWT. WeightW.V. Water Valve
COUNTCOUNTPROVIDED
REMARKSREMARKS
TOTAL
TOTAL
ACCESSIBLE KING
ACCESSIBLE DOUBLE QUEEN
C.F. KING
ROOM TYPEROOM TYPE COUNTREQ'D REQ'D
COUNTPROVIDED
BUILDING AREA STATISTICS
AALIGN CONSTRUCTION
GUEST ROOM COUNT BREAKDOWNKING:
ACCESSIBLE KING:
2ND FLOOR 3RD FLOOR 4TH FLOOR3
1
--
1
1
1
1
1
1
TOTAL51
4
3
962929299
DOUBLE QUEEN:
16 16 16
385 11 11 11
GROUND FLR
C.F. DOUBLE QUEEN
ACCESSIBLE DOUBLE QUEEN:
C.F. DENOTES ROOMS THAT HAVE COMMUNICATING FEATURES. ONE (1) COMMUNICATIONFEATURE ROOM MUST ALSO BE ACCESSIBLE, BUT NO MORE THAN 10% OF ROOMS THATCOUNT TOWARDS THE REQUIRED C.F. TOTAL ROOM
OR TOILET ACCESSORIES
FIRE RESISTANCE RATINGS TYPE VA (IBC TABLE 601):
CODE SUMMARY:
ACCESSIBLE RM. MATRIX
Vertical Room Chart
Col. Bayx03
x02x05
x04x07
x06x09
x08x11
x10x13
x12x30
x14x33
x16x17
x18x21
x22x23
x24
Col. Bay Col. Bay Col. Bay Col. Bay Col. Bay Col. Bay Col. Bay Col. Bay Col. Bay Col. Bay Col. Bay Col. Bay
FL. 4
FL. 3
FL. 2
FL. 1
x01x50
KNGStair
KNGStair
KNGStair
KNGKNG
KNGKNG
KNGKNG
DQNKNG
DQNKNG
DQNKNG
DQNKNG
DQNKNG
DQNKNG
KNGKNG
KNGKNG
KNGKNG
KNGKNG
KNGKNG
KNGKNG
KNGKNG
KNGKNG
KNGKNG
PBHKNG
PBHDQN
DQNDQN
ADQNAKG
x25x26
x27x28
x32x15
x19x20
PBHKNG
PBHKNG
PBHKNG
PBHKNG
PBHKNG
PBHDQN
PBHDQN
DQNDQN
DQNDQN
ADQNAKG
ADQNAKG
x29x51
KNGKNG
KNGKNG
KNGKNG
KNGStair
KNGStair
KNGStair
AKG
DQNDQN
DQNDQN
DQNDQN
DQNDQN
DQNDQN
DQNDQN
DQNDQN
DQNDQN
DQNDQN
DQNDQN
DQNDQN
KNGKNG
KNGStairPBH
Col. Bay Col. Bay Col. Bay Col. Bay
DQN
5*
5*
4
7
3
*MINIMUM (1) OF EACHROOM TYPE REQUIRED
4
1C.F. ACCESSIBLE KING 9
9 10
5
RM#127, 208, 328, 429
RM#124, 205, 218, 307, 423
RM#120
(1) ADDED TO MEET 10% RULE
C.F. RM#120
KNG = KINGDQN = DOUBLE QUEEN
AKG = ACCESSIBLE KINGADQN = ACCESSIBLE DOUBLE QUEENPBH = PUBLIC & BACK OF HOUSE
NOTE:
ALL INTERIOR AREAS ARECALCULATED TO FACE OFINTERIOR FINISH (DRYWALL).
A COVER SHEETA 0.00 GENERAL INFORMATION
A 3.01 OVERALL CEILING PLANS
A 2.01 OVERALL FLOOR PLANS
A 6.01 BUILDING SECTIONS
A 2.02 ROOF PLAN
A 4.01 GUESTROOM ENLARGED PLANS AND ELEVATIONS: KINGA 4.02 GUESTROOM ENLARGED PLANS AND ELEVATIONS: DOUBLE QUEEN
A 4.03 GUESTROOM ENLARGED PLANS AND ELEVATIONS: ACCESSIBLE KING
A 2.03 OVERALL FLOOR FINISH PLANS
A 4.05 GUESTROOM ENLARGED PLANS AND ELEVATIONS: ACCESSIBLE DOUBLE QUEEN
A 4.04 GUESTROOM ENLARGED PLANS: ACCESSIBLE KING
A 4.51 ENLARGED GROUND FLOOR CONSTRUCTION PLAN
A 4.06 GUESTROOM ENLARGED PLANS: ACCESSIBLE DOUBLE QUEEN
A 4.11 BATHROOM ENLARGED PLANS AND ELEVATIONS
A 4.52 ENLARGED GROUND FLOOR FINISH PLAN
A 4.55 ENLARGED GROUND FLOOR CEILING PLAN
A 4.61 INTERIOR ELEVATIONS: GROUND FLOORA 4.62 INTERIOR ELEVATIONS: GROUND FLOOR
A 5.01 EXTERIOR ELEVATIONS
A 6.11 WALL SECTIONS
A 6.12 WALL SECTIONS
A 4.12 ACCESSIBLE BATHROOM ENLARGED PLANS AND ELEVATIONS
A 4.63 INTERIOR ELEVATIONS: GROUND FLOOR AND TYPICAL FLOORS
A 1.01 ACCESSIBILITY FLOOR PLANS
A 4.54 ENLARGED GROUND FLOOR FURNISHINGS PLAN
Drawing No. Drawing Description
INDEX OF DRAWINGS: ARCHITECTURALPrototype
1.2
A 10.01 DOOR SCHEDULEA 10.02 ROOM FINISH SCHEDULE
A 6.21 BUILDING DETAILSA 6.22 ENTRY CANOPY SECTIONS/DETAILS
A 4.72 INTERIOR DETAILS AND MILLWORK: COMMAND CENTER - BREAKFAST ISLAND
A 4.73 INTERIOR DETAILS AND MILLWORK: BREAKFAST ISLAND
A 4.71 INTERIOR DETAILS AND MILLWORK: COMMAND CENTER
A 2.04 OVERALL POWER PLANS
A 4.53 ENLARGED GROUND FLOOR POWER PLAN
A 2.05 ENLARGED PATIO 1.2
LOCATION
Drawing No. Drawing Description
INDEX OF DRAWINGS: ELECTRICAL
A 2.06 EXTERIOR ELEVATIONS: PORTE COCHERE
A 6.23 ENTRY CANOPY AND PORTE COCHERE SECTIONS/ DETAILS
A 4.07
A 4.70 INTERIOR CEILING DETAILS
Stair
1.2
1.2
1.21.2
1.21.2
1.2
1.21.2
1.21.2
1.21.2
1.2
1.2
1.2
1.21.2
1.21.2
1.2
1.21.2
1.21.2
1.21.2
1.21.2
1.2
1.2
1.21.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
A 4.76 INTERIOR DETAILS AND MILLWORK: EMPLOYEE BREAKROOM 1.2
A 4.75 INTERIOR DETAILS AND MILLWORK: TRELLIS - ICE FITNESS ROOM
A 4.74 INTERIOR DETAILS AND MILLWORK: BREAKFAST/DINING - WATER/ICE
DQNDQN
A 4.77 INTERIOR DETAILS AND MILLWORK: MEDIA WALL 1.2
Revision
06-2017
06-2017
06-2017
06-201706-2017
06-201706-2017
06-201706-2017
06-2017
06-2017
06-2017
06-201706-2017
06-201706-2017
06-2017
06-201706-2017
06-2017
2
2
2
2
06-201706-2017
06-2017
06-2017
06-2017
2
06-2017
06-2017
FS 1 EQUIPMENT PLAN AND SCHEDULE 1.31.3
1.31.3
1.3
FS 2 ELECTRICAL ROUGH-INS PLANFS 3 PLUMBING ROUGH-INS PLAN
FS 4 BUILDING WORKS PLANFS 5 INTERIOR ELEVATIONS AND DETAILS
C1 COVER SHEET
Drawing No. Drawing Description
INDEX OF DRAWINGS: CIVIL50% IssueDate Revision
03-2018C2 OVERALL SITE/DEMO PLAN
C3 SITE PLANC4 GRADING & DRAINAGE PLAN
C5 STORM SEWER PROFILE & PIPE CHARTC6 DECEL LANE PLAN & PROFILE
C7 UTILITY PLANC8 INITIAL PERIMETER ES & PC PLAN
C9 INTERMEDIATE ES & PC PLANC10 FINAL ES & PC PLAN
C11 EROSION CONTROL DETAILSC12 WATER QUALITY POND PLAN & DETAILS
C13 NPDES NOTES
03-2018
03-201803-2018
03-201803-2018
03-201803-2018
03-201803-2018
03-201803-2018
03-2018
PROJECT OWNER / DEVELOPER:PRIMARY PERMITTEE: ROBBIE MOORE PALACE HOSPITALITY, LLC
807 BLACK DIAMOND DRIVEMCDONOUGH, GA 30253404.401.0641
PROJECT ARCHITECT:ARCHITECT: KIP OLDHAM K.A. OLDHAM DESIGN, INC.
[email protected] 75 JACKSON STREET SUITE 401NEWNAN, GA 30263770.683.9170
PROJECT CIVIL ENGINEER:ENGINEER: GEORGE HARPER PARAMOUNT ENGINEERING, LLC
[email protected] 11 EAST BROAD STREETNEWNAN, GA 30263770.473.9576
PROJECT MECHANICAL / PLUMBING ENGINEER:
PROJECT ELECTRICAL ENGINEER:
PROJECT STRUCTURAL ENGINEER:
ENGINEER: ROBERT M. MADDOX, P.E. MADDOX GROUP [email protected] 9309 SEMINOLE ROAD
JONESBORO, GA 30236770.471.9076
ENGINEER: ROY H. MAYO, JR., P.E. AUBURN STRUCTURAL DESIGN, [email protected] 2008 JANABROOKE LANE
AUBURN, AL 36830334.826.8040
ENGINEER: MARTIN S. GEORGE, P.E. GEORGE ENGINEERING ASSOCIATES, [email protected] 405 MILLARD FARMER ROAD
NEWNAN, GA 30263770.252.4669
E 0.1 ELECTRICAL CRITERIA
100% REVIEWDate
05-31-2018
100% IssueDate
A 2.07 WALL TYPES
GUESTROOMSQUANTITY
KING
DOUBLE QUEENACCESSIBLE KING
ACCESSIBLE DOUBLE QUEEN
5138
43
SF EACH TOTAL SF
231280
369399
1178110640
14761197
SUBTOTAL GUESTROOMS 98 25094
GUESTROOM SUPPORTGUEST ROOM CORRIDOR - GROUND LEVEL 1 418 418
991164
164120
206
34
44
3
656
656
2973
480
6185801
STAIR #1
ELEVATORSELEVATOR LOBBY - UPPER LEVELS
GUEST ROOM CORRIDOR - UPPER LEVELS
STAIR #2
SUBTOTAL GUEST ROOM SUPPORT
PUBLIC SPACEVESTIBULE 1 110
2827
58276
19771
4592
RESTROOMS
ELEVATOR LOBBY - GROUND LEVEL
WATER AND ICE
LOBBY
CIRCULATION - GROUND LEVEL
SUBTOTAL PUBLIC SPACE
FITNESS CENTER 433
1
21
11
1
1102827
116276
19771
433
BACK OF HOUSEOPEN OFFICE 1 84
99344
5690
326
PANTRY
MECHANICALEMPLOYEE BREAK ROOM
GENERAL MANAGER'S OFFICE
PBX
1
11
1
1
462
79
LAUNDRY
LINEN STORAGE
PUMP ROOM 85
1
11
MAIN MECHANICAL/ELECTRICAL 2911
MECHANICAL - UPPER LEVELS 563
LINEN STORAGE - UPPER LEVELS 2563
84
99344
5690
326462
7985
291168
7682852SUBTOTAL BACK OF HOUSE
TOTALSTOTAL USEABLE SQUARE FOOTAGE
AREA OF WALLS, SHAFTS, ETC
GROSS HOTEL AREA
38339
414142480
Drawing No. Drawing Description
INDEX OF DRAWINGS: STRUCTURAL
S 2.01 FOUNDATION AND SECOND FLOOR FRAMING PLANS
S 2.02 THIRD & FOURTH FLOOR FRAMING AND ROOF FRAMING PLANSS 3.01 FOUNDATION SECTIONS & DETAILS
S 4.01 FLOOR FRAMING SECTIONS & DETAILSS 5.01 ROOF FRAMING SECTIONS & DETAILS
50% IssueDate
03-2018
03-201803-2018
03-201803-2018
Drawing No. Drawing Description
INDEX OF DRAWINGS: MECHANICAL
M 1.01 HVAC SYMBOLS AND SCHEDULES
50% IssueDate
03-201803-2018
Drawing No. Drawing Description
INDEX OF DRAWINGS: PLUMBING
P 1.01 PLUMBING SYMBOLS, DETAILS AND SCHEDULES
100% IssueDate
05-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
E 02 RISER & SCHEDULES
E 03 RISER & SCHEDULESE 04 ELECTRICAL SCHEDULES
E 2.1 ELECTRICAL PLAN - LEVELS 1 & 2E 2.2 ELECTRICAL PLAN - LEVELS 3 & 4
E 2.3 ELECTRICAL PLAN - MAIN LOBBY PART PLANE 2.4 ELECTRICAL PLAN - FOOD SERVICE PART PLAN
E 3.1 PLAN LIGHTING - LEVELS 1 & 2E 3.2 PLAN LIGHTING - LEVELS 3 & 4
E 3.3 PLAN LIGHTING - MAIN LEVEL - PUBLIC & SERVICE AREASE 10 ELECTRICAL TYPICAL GUEST ROOM PLANS
E 20 ELECTRICAL SYMBOLS & SCHEDULESE 30 LIGHTING SCHEDULES
05-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
100% REVIEWDate
100% REVIEWDate
05-31-201805-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
05-31-2018
100% REVIEWDate
05-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
05-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
05-31-2018
05-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
05-31-2018
05-31-2018
05-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
05-31-2018
05-31-201805-31-2018
05-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
05-31-2018
05-31-2018
05-31-201805-31-2018
05-31-2018
05-31-201805-31-2018
05-31-2018
05-31-2018
05-31-201805-31-2018
05-31-201805-31-2018
05-31-2018
M 2.01 OVERALL FIRST FLOOR TYPICAL FLOOR PLANS - HVAC
M 2.02 OVERALL FOURTH FLOOR & ROOF PLANS -HVAC
50% IssueDate
03-201803-2018
03-2018P 2.01 OVERALL FIRST & TYPICAL FLOOR PLANS - SANITARY PIPING
P 2.02 OVERALL FOURTH FLOOR & ROOF PLANS - SANITARY PIPINGP 2.03 OVERALL FIRST & TYPICAL FLOOR PLANS - WATER PIPING
P 2.04 OVERALL FOURTH FLOOR & ROOF PLANS - WATER PIPINGP 2.05 OVERALL FIRST FLOOR & ROOF PLANS - GAS PIPING
P 3.01 SANITARY PIPING RISER DIAGRAMSF 1.01 FIRE SPRINKLER PLAN
05-31-201805-31-2018
05-31-2018
03-201803-2018
03-2018
S 1.01 GENERAL NOTE, TYPICAL SECTIONS & SCHEDULES 03-2018 05-31-2018
Revision
Revision
C14-C15 CONSTRUCTION DETAILS
C16-C17 WATER & SEWER DETAILSL1 LANDSCAPE PLAN
05-31-2018
05-31-201805-31-2018
MEETING SPACE 5621 562
BUILDING DEPARTMENT
APPLICABLE CODES AND REGULATIONSBUILDING
2012 INTERNATIONAL BUILDING CODE W/ GA AMENDMENTSMECHANICAL
2012 INTERNATIONAL MECHANICAL CODE W/ GA AMENDMENTSPLUMBING
2012 INTERNATIONAL PLUMBING CODE W/ GA AMENDMENTSELECTRICAL
2014 NATIONAL ELECTRICAL CODE W/ GA AMENDMENTSFIRE
2012 INTERNATIONAL FIRE CODE W/ GA AMENDMENTSGAS
2012 INTERNATIONAL FUEL GAS CODE W/ GA AMENDMENTSENERGY
2009 INTERNATIONAL ENERGY CONSERVATION CODEW/ GA AMENDMENTS
2012 NFPA 101: LIFE SAFETY CODE2010 ADA STANDARDS FOR ACCESSIBLE DESIGN
OCCUPANCY CLASSIFICATION PER NFPA 101 (IBC 2012)OCCUPANCY GROUPS:
MIXED OCCUPANCY - WITHIN NEW BUILDING [NFPA 101]
NEW HOTEL (R-1); ASSEMBLY (A-2); BUSINESS (B) ; STORAGE (S-2)
CONSTRUCTION TYPE: VA (IBC TABLE 601 2012)NEW CONSTRUCTION; FULLY SPRINKLERED SUPPRESSIONSYSTEM; COMPLETE FIRE ALARM SYSTEM; CONCRETESLAB; STRUCTURAL WOOD FRAMING; CMUEXTERIOR WALLS: BRICK VENEER, EIFS; HIGH PRESSURELAMINATE PANEL
CONSTRUCTION CLASSIFICATION (IBC TABLE 601)STOCKBRIDGE CITY HALL: BUILDING DEPARTMENT4640 NORTH HENRY BLVDSTOCKBRIDGE, GA 30281770.389.3329 (THOMAS MARSHALL)
ALLOWABLE AREA (IBC 2012)AREA ALLOWED: (FOR RESIDENTIAL (R-1)OCCUPANCY):
12,000 SF PER FLOOR(PER IBC 2012 506.2)
AREA PROVIDED: 10,854 SF PER FLOOR43,417 SF TOTAL
ALLOWABLE HEIGHT
HEIGHT ALLOWED: 3 STORIES 50'-0" MAX BUILDING HT(IBC 2012 TABLE 503)
HEIGHT MODIFICATION: 4 STORIES 70'-0" BUILDING HT(IBC 2012 504.2)
STRUCTURAL ELEMENT
STRUCTURAL FRAME: 1 HOURBEARING WALLS - EXTERIOR: 1 HOURBEARING WALLS - INTERIOR: 1 HOURFLOOR CONSTRUCTION: 1 HOURROOF CONSTRUCTION: 1 HOUR
FIRE BARRIER
STAIR WALLS: 2 HOURELEVATOR WALLS: 2 HOURSHAFT (LAUNDRY): 2 HOUR
INCIDENTAL USE AREA:
- LAUNDRY AREA (+100 SF = 1 HOUR SEPARATION)
- STORAGE AREA (+100 SF = 1 HOUR SEPARATION)
- LINEN COLLECTION ROOMS (1 HOUR SEPARATION)
HEIGHT PROVIDED: 4 STORIES 47'-9" BUILDING HT
EGRESS REQUIREMENTS
EGRESS WIDTH FACTOR (NFPA 2012):LEVEL COMPONENTS = 0.2" PER PERSONEGRESS WIDTH REQUIRED = 64.8"EGRESS WIDTH PROVIDED = 288"( (6) 3'-0" DOORS; (1) 6'-0" SLIDING DOOR)STAIRS = 0.3" PER PERSONEGRESS WIDTH REQUIRED = 97.2"EGRESS WIDTH PROVIDED = 96"
(48" X 2 STAIRS)
SPACE AREA (SF) OCC. LOADOCC. LOAD FACTOR
TOTAL PERSONS 324
BUSINESS (B) 100 SF/PERSON2,779 28
STORAGE (S-2) 200 SF/PERSON1,537 8
ASSEMBLY (A-2) 15 SF/PERSON2,429 162
HOTEL (R-1) 200 SF/PERSON25,094 126
EGRESS REQUIREMENTS (CONTINUED)
TRAVEL DISTANCE (LSC 28.2.6.3.3.1): 200'-0"COMMON PATH OF EGRESS TRAVEL TO AN EXIT (LSC 28.2.5.4): 50-0"DEAD-END CORRIDOR (LSC 28.2.5.6): 50'-0"
NUMBER OF EXITS (LSC 28.2.4.1):
EXITS REQUIRED: 2 PER FLOOR
EXITS PROVIDED: 1ST FL: 6
2ND-4TH FL: 2
MINIMUM EXIT SEPARATION DISTANCE : 101'- 6"
(NFPA 101 7.5.1.3.2-3)
BUILDING OCCUPANT SUMMARY
FIRE PARTITION
CORRIDOR 1 HOURGUESTROOM SEPARATION 1 HOUROFFICE AREA 1 HOURGUESTROOM SHEAR WALLS 1 HOUR
A 1.02 LIFE SAFETY PLANS 1.2
GUESTROOM ENLARGED PLANS: CONNECTING DOORGUESTROOMS AND BLOCKING DIAGRAM
Revision
3
07-2018 3
307-2018
3
07-17-2018
307-2018
A 1.03 UL FIRE RESISTANCE RATINGS 1.2 07-2018A 1.04 UL FIRE RESISTANCE RATINGS 1.2 07-2018
07-2018
07-2018
07-2018
3
07-2018 3
A 0.01 OVERALL AREA DEVELOPMENT PLAN 07-2018
3
3
A 6.24 STAIR PLAN DETAILS 1.2 3
A 1.05 UL FIRE RESISTANCE RATINGS 1.2 07-2018
A 6.25 STAIR SECTIONS/ DETAILS 1.207-201807-2018
05-31-201805-31-2018
6-29-20186-29-2018
6-29-20186-29-2018
6-29-20186-29-2018
6-29-20186-29-2018
6-29-20186-29-2018
6-29-20186-29-2018
6-29-20186-29-2018
6-29-20186-29-2018
11-19-2018
11-19-201811-19-2018
11-19-201811-19-2018
11-19-2018
08-14-2018
Revision
07-17-2018
3
PLOT
TED:
11/
30/2
018
- 9:4
8 AM
GeneralInformation
A0.00
2018
NORTH AMERICANPROTOTYPE
A
B
C
D
E
F
G
H
J
K
L
M
N
P
1 2 3 4 5 6 7
181716151413121110987654321
REVISIONS:
ISSUED INFORMATIONISSUED:
8 9 10 11 12 13 14 15 16 17 18
C
PROJECT INFORMATION
SHEET INFORMATION
This
dra
win
g, p
rinte
d or
oth
erw
ise,
is th
e co
pyrig
hted
pro
perty
of H
ilton
. Th
e dr
awin
g m
ay n
ot b
e us
ed, r
epro
duce
d or
cop
ied
with
out t
he p
erm
issi
on o
f Hilt
on W
orld
wid
e
VERSION:
tru byHILTON
PATRICK HENRY PKWYSTOCKBRIDGE, GA
1.2
75 Jackson Street Suite 401Newnan, Georgia 30263Telephone: (770) 683-9170Fax: (770) 683-9171E-Mail: [email protected] Site: www.kaod.com
K A O l d h a m D e s i g n , I n c
PLOT
TED:
11/
30/2
018
- 9:4
8 AM
MAY 31, 2018
2 ADDENDUM 2 06.2017
FINAL REVIEW 5.31.2018
FOR PERMIT 5.31.2018
3 REVISION 3 7.31.2018
PERMIT SUBMISSION 11.19.2018
HS
1 23 4 6 7
8 9
D
C
B
A
E
F
G
5
J
J
J
JJJ J
J
J
J
J
J
J
J
J
J
J
TV72"
TV
73"73"73"
34"
J 34"
80"80"80"
TV
72" 72"
80"80"80"
TV
J
J
J
J
J
J
TV
80" 80" 80"
1/4" = 1'-0"16AENLARGED GROUND FLOOR CEILING PLANA4.55
9'-0" A
10'-6" C
8'-3" D
8'-4" A
8'-7" J
8'-2" A
9'-0" A
10'-6" C
7'-6" A
8'-7" A
8'-7" A
10'-6" C
8'-7" A8'-0" B 8'-0" B
9'-0" D
7'-10" A
8'-7" A
9'-0" A
1/4" = 1'-0"16KENLARGED GROUND FLOOR CEILING PLANA4.55
16K/
A4.55
MATC
HLIN
E
16A/
A4.55
MATC
HLIN
E
16A/A4.55MATCHLINE
8'-0" D
10'-6" C
8'-6" F
8'-6" D
8'-6" D
9'-0" F
10'-6" C9'-0" E
10'-6" C
10'-6" C
A4.709F
7'-10" A
7'-10" A
16K
16A
NOTE:
COORDINATE W/FOOD SERVICE DRAWINGS
1SUSPENDED SIGN. REFER TO TRU BY HILTON INTERIOR SIGNAGEPACKAGE FOR GRAPHIC AT THIS LOCATION
DROPPED CEILING FOR HVAC DUCTWORK
APPLIED GRAPHIC OVER PRIMED GYPSUM BOARD ON VERTICALSURFACE OF COMMAND CENTER CEILING DROP. REFER TO TRU BYHILTON INTERIOR SIGNAGE PACKAGE FOR GRAPHIC AT THIS LOCATION
ANGLE OF CEILING TO RADIATE FROM CENTER POINT OF COMMANDCENTER TO FIXED DIMENSION NOTED
ANGLE OF CEILING TO RADIATE FROM CENTER POINT OF COMMANDCENTER TO END WALL
LOCATE J (JUNCTION BOX) ABOVE FIXTURE AS REQUIRED PERMANUFACTUER'S RECOMMENDATIONS
1. REFER TO FF&E PACKAGE FOR FURNITURE, BUILT-INMILLWORK AND FINISH SPECIFICATIONS.
2. FIRE EXTINGUISHERS, SMOKE DETECTORS AND OTHEREMERGENCY DEVICES TO BE LOCATED PER LOCAL CODE. FIREEXTINGUISHER LOCATIONS WITHIN THE PUBLIC SPACE SHALLBE CONTAINED WITHIN FULLY RECESSED CABINETS.
3. PROVIDE EMERGENCY LIGHTING PER LOCAL CODE.4. WALL DEVICES TO BE MOUNTED AT 12" A.F.F. TYPICAL U.N.O.5. REFER TO TRU BY HILTON STANDARDS MANUAL FOR
ADDITIONAL GUESTROOM AND GUESTROOM BATHREQUIREMENTS.
K E Y N O T E S :
G E N E R A L N O T E S :
K E Y P L A N :
C E I L I N G D I M E N S I O N L E G E N D :
ALIGN FIXTURES- ALIGN FIXTURES ALONG CENTERLINE SHOWN
CENTER OVER- CENTER FIXTURE OVER CENTERLINE OFADJACENT CONSTRUCTION
CENTER FIXTURE IN SPACE- CENTER THE FIXTURE IN SPACE IDENTIFIEDBY DIAGONAL LINE.
9'-6" A
CEILING LEGEND:
A. PRIMED & PAINTED GYPSUM BOARD
B. PRIMED & PAINTED GYPSUM BOARD - MOISTURE RESISTANT
C. OPEN TO UNDERSIDE OF FLOOR/ROOF SYSTEM ABOVE --(PROTOTYPE IS BASED ON WOOD STRUCTURE WITH GYPSUMBOARD AS THE EXPOSED UNDERSIDE OF THE FLOOR/ROOFSYSTEM) -- ELEVATION INDICATED IS APPROXIMATE & FOR GEN.REFERENCE ONLY -- REFER TO SECTIONS -- PAINT ALL EXPOSEDELEMENTS
D. 2x2 LAY-IN ACOUSTICAL CLG. TILE SUSPENDED FROM STRUCT.
E. 2X4 LAY-IN ACOUSTICAL CLG. TILE SUSPENDED FROM STRUCT.
F. 2X4 LAY-IN CLG. GRID SYSTEM SUSPENDED FROM STRUCT.--INFILLED W/ 1/2" VINYL FACED GYPSUM BOARD PANELS
G. LARGE FORMAT ACOUSTIC TILE W/ EDGE TRIM
H. DELETED
J. DELETED
CEILING HEIGHT
CEILING FINISH
CEILING - FIXTURE LEGEND:
DECORATIVE LINEAR FIXTURE -- REFER TO FF&EPACKAGE
DECORATIVE ROUND SUSPENDED LIGHT FIXTURE --REFER TO FF&E PACKAGE
DECORATIVE ROUND LIGHT FIXTURE -- REFER TO FF&EPACKAGE
RECESSED DOWNLIGHT
RECESSED WALL WASH
SURFACE MOUNTED CAN DOWNLIGHT
TRACK HEAD ON MONORAIL SYSTEM
SURFACE MOUNTED FIXTURE
2X4 LAY-IN FLUOR. FIXTURE
1X4 SURFACE MOUNTED FLUORESCENT FIXTURE
LINEAR LED WALL GRAZER
WALL MOUNTED STRIP LIGHT
MECHANICAL EXHAUST GRILLE
2X2 MECHANICAL RETURN GRILLE
2X2 MECHANICAL SUPPLY GRILLE
MECHANICAL SUPPLY GRILLE
MECHANICAL RETURN GRILLE
LINEAR SUPPLY DIFFUSER
JUNCTION BOX
SYMBOLS ARE NOT TO SCALE
2
4
3
5
L-01 DELETED
L-02 NOT USED
L-03 LED RECESSED DOWNLIGHT @ LOBBY, ENTRY, CORRIDOR BREAKROOM, PUBLIC RESTROOMS, HYDRATION STATION & INDOOR POOL
L-03.1 DELETED
L-04 LINEAR LED FIXTURE @ LOBBY ENTRY
L-05 LED SURFACE MOUNTED CYLINDRICAL LIGHT FIXTURE @ WORK AREA & DINING
L-08 LINEAR LED WALL GRAZER @ GAME AREA
L-09 TRACK LIGHTING SYSTEM @ COMMAND CENTER SOFFIT
L-10 NOT USED
L-11 LED LAY IN TROFFER @ BACK OF HOUSE
L-13 LED SURFACE MOUNTED TROFFER @ BACK OF HOUSE
L-15 6" LED RECESSED DOWNLIGHT @ GUEST BATH SHOWER
L-16 6" LED RECESSED DOWNLIGHT @ GUEST BATH
L-17 4" LED RECESSED DOWNLIGHT @ GUESTROOM LANDING ZONE & SOFFIT
L-18 COVE LIGHTING @ INDOOR POOL
L-19 DOWNLIGHT @ FACADE RECESSES
L-20 IN-GROUND UPLIGHT @ FACADE RECESSES
L-21 DELETED
L-22 DELETED
L-23 SURFACE MOUNT FIXTURE @ STAIRWALLS
L-24 DELETED
L-25 LED BEAM LIGHT @ BREAKFAST BUFFET
L-26 EXTERIOR RATED LINEAR LED FIXTURE @ LOBBY CANOPY
ARCHITECTURAL LIGHTING LEGEND:
DECORATIVE LIGHTING LEGEND:
PA-300 LARGE DECORATIVE PENDANT @ LOUNGE SEATING
PA-301 SMALL DECORATIVE PENDANT @ LOUNGE SEATING
PA-303 PENDANT LIGHT @ BANQUETTE BENCH AND WORK AREA
PA-304 PENDANT LIGHT @ PAPER AIRPLANE MOBILE
PA-305 LINEAR CEILING MOUNTED LIGHTS @ CORRIDOR
PA-306 LARGE CEILING MOUNTED LIGHTS @ CORRIDOR
PA-307 SMALL CEILING MOUNTED LIGHTS @ CORRIDOR
PA-308 WALL SCONCE @ PUBLIC RESTROOMS
J
6
16K/A4.55MATCHLINE
PT 06
PT 12PT 26 PT 26
PT 25
PT 25
8'-7" APT 12
8'-7" APT 12
PT 068'-7" A PT 12
PT 24
PT 25
PT 25
PT 25
8"10"
2'-4
"2'
-0"
3'-4
"
16'-0 1/2"
2'-0" 2'-0" 2'-0"
3'-11" 3'-4"3'-4" EQ.EQ.
1'-2
"
PT 05
PT 06
PT 059'-0" APT 05
PT 06
PT 06
PT 09
PT 08
PT 11
PT 25
PT 25
PT 25
8'-7" APT 06
3
3
1
PA-304
PA-306
PA-301
PA-303
PA-303
4'-7
1/4
"
A4.7014L
A4.705A
A4.70
18F
A4.7014F
A4.708L
3'-11"3'-4"
1'-1
0"1'
-11"
1'-8" 8"
A4.705F
TYP.
TYP.
7'-0" JWC 03
WC 12
8'-1" JWC 05
ACT 03
9'-0" APT 06
PA-303 TYP.
PA-300
1'-2"
4
4
5
1'-2
"
3'-9"4'-0"
7'-0" APT 25
L 05 TYP.
L 09 TYP.
L 25
L 03 TYP.
L 03 TYP.L 05TYP.
L 04TYP.
L 03 TYP.
L 03 TYP.
L 08
L 03 TYP.
L 03 TYP.
L 03 TYP.
L 03 TYP. L 03 TYP.
L 03 TYP.
13'-8"
EQ.EQ.
3'-1
1"
L 11 TYP.
L 11 TYP.
PT 15
ACT 03-B
ACT 03-B
L 23
L 23
PA-307
L 13
L 13 TYP.
L 11
L 13
L 13
L 11L 11
L 13
L 13
4'-1
0"J-
BOX
4'-8
"J-
BOX
9"3'
-4"
1'-0
"
℄4'-3 3/4"
℄
1'-0
"
7'-7
"J-
BOX
2'-11 3/4"
2'-0
"
2'-0"
4'-0
"
EQEQ
2'-7
"2'
-7"
TYP.
TYP.
TYP.TYP.
ACT
ACT
A4.7018A
MT 04
MT 04
A4.709F
L 08
OWNER SUPPLIED ITEMS :
REFER TO TRU BY HILTON PROCUREMENT GUIDE AND/ORTRU BY HILTON FOOD SERVICE DOCUMENTS FORSOURCING INFORMATION.
OS-100 55" TELEVISIONOS-101 3-COMPARTMENT TRASH/RECYCLINGOS-102 LARGE TRASH RECEPTACLE ( LOBBY, EMPLOYEE
BREAKROOM, PUBLIC RESTROOM)OS-103 SMALL TRASH RECEPTACLE (FITNESS, HYDRATION
STATION, INDOOR POOL)OS-104 OPEN AIR COOLEROS-105 UNDER COUNTER FREEZEROS-106 MICROWAVEOS-107 MARKET P.O.S.OS-108 PRINTEROS-109 TABLET STATIONOS-110 HOUSE PHONEOS-111 42" TELEVISIONOS-112 65" TELEVISIONOS-113 FRONT LOAD TRASH RECEPTACLE @ ELEVATOR
LOBBIES AND WORK ZONEOS-114 CIRCULAR WALK OFF MATOS-115 VESTIBULE WALK OFF MATOS-116 SECONDARY ENTRANCE WALK OFF MATOS-117 SANITARY WIPE DISPENSEROS-118 WALL CLOCKOS-119 LUGGAGE CARTOS-120 POOL TABLEOS-121 WATER DISPENSER @ HYDRATION STATIONOS-122 ICE MACHINE @ HYDRATION STATIONOS-123 LOCKER STORAGE
6
ALERT:
PROVIDE EMERGENCY LIGHTING ASREQUIRED BY LOCAL CODE
6L A4.55
J
J
Full Scale6LENLARGED PLAN COMMAND CENTER TVS
A4.55
6
6
6
6
6
6
6
J-BOX AND DATA LINES TO FEED THROUGH TVCEILING MOUNT COLUMN - COORDINATE POWERAND DATA REQUIREMENTS WITH TV AND CEILINGMOUNT MANUFACTUERERS' RECOMMENDATIONS
TYP.
PANTRY026
OPENOFFICE
023
GENERALMANAGER
024
STAIR #1150
BREAKFAST005
DINING006
GAMEZONE007
ELEVATORLOBBY
010
EMPLOYEEBREAKROOM
014
FITNESS008
LOUNGE002
VESTIBULE001
WORKZONE004
COMMANDCENTER
003
MECHANICAL022
RESTROOM A012
RESTROOM B013WATER/ICE
009
CORRIDOR011
CORRIDOR021
PBX018
LINENSTORAGE
017
PUMPROOM019
ELEC/MECH020
LAUNDRY016
2
2
2
2
2
2
7'-10" A
8'-7" APT 09
PT 08
3
L 09 TYP.
EQ a
EQ a
EQ b
EQ b
9'-5" APT 06
8'-2" APT 06
9'-5" APT 06
A4.7018L
9'-6" D
10'-0" APT 07
ACT 03
L 03 TYP.
9'-6" DACT 03
9'-6" DACT 03
9'-5" APT 06
L 03 TYP.
L 03 TYP.
2
A4.7012A
OS-111
℄℄℄
2
EQUAL(MIN. 3' 6"-4' 3" MAX.)
L 26TYP.
2
2
2
2
2
2
2
2
2
EQ b
EQ EQ
2018
NORTH AMERICANPROTOTYPE
A
B
C
D
E
F
G
H
J
K
L
M
N
P
1 2 3 4 5 6 7
181716151413121110987654321
REVISIONS:
ISSUED INFORMATIONISSUED:
8 9 10 11 12 13 14 15 16 17 18
C
PROJECT INFORMATION
SHEET INFORMATION
This
dra
win
g, p
rinte
d or
oth
erw
ise,
is th
e co
pyrig
hted
pro
perty
of H
ilton
. Th
e dr
awin
g m
ay n
ot b
e us
ed, r
epro
duce
d or
cop
ied
with
out t
he p
erm
issi
on o
f Hilt
on W
orld
wid
e
VERSION:
tru byHILTON
PATRICK HENRY PKWYSTOCKBRIDGE, GA
1.2
75 Jackson Street Suite 401Newnan, Georgia 30263Telephone: (770) 683-9170Fax: (770) 683-9171E-Mail: [email protected] Site: www.kaod.com
K A O l d h a m D e s i g n , I n c
PLOT
TED:
11/
21/2
018
- 3:0
8 PM
MAY 31, 2018
2 ADDENDUM 2 06.2017
FINAL REVIEW 5.31.2018
FOR PERMIT 5.31.2018
3 REVISION 3 7.31.2018
PERMIT SUBMISSION 11.19.2018
PLOT
TED:
11/
21/2
018
- 3:0
8 PM
A4.55
Enlarged GroundFloor Ceiling Plan
2018
NORTH AMERICANPROTOTYPE
A
B
C
D
E
F
G
H
J
K
L
M
N
P
1 2 3 4 5 6 7
181716151413121110987654321
REVISIONS:
ISSUED INFORMATIONISSUED:
8 9 10 11 12 13 14 15 16 17 18
C
PROJECT INFORMATION
SHEET INFORMATION
VERSION:
tru byHILTON
PATRICK HENRY PKWYSTOCKBRIDGE, GA
1.2
GE
A LLC
MAY 31, 2018
M1.01
HVAC SYMBOLSAND SCHEDULES
2018
NORTH AMERICANPROTOTYPE
A
B
C
D
E
F
G
H
J
K
L
M
N
P
1 2 3 4 5 6 7
181716151413121110987654321
REVISIONS:
ISSUED INFORMATIONISSUED:
8 9 10 11 12 13 14 15 16 17 18
C
PROJECT INFORMATION
SHEET INFORMATION
VERSION:
tru byHILTON
PATRICK HENRY PKWYSTOCKBRIDGE, GA
1.2
GE
A LLC
MAY 31, 2018
M2.02
OVERALL FOURTHFLOOR & ROOFPLANS - HVAC