Upload
minoj-sarasan
View
4
Download
0
Embed Size (px)
Citation preview
Development of Muscat International and Salalah Airports
INSPECTION REQUEST FORM
IR no:SA-LTG-05EL-INR-73464Rev.no: 02Date:27.04.2015
Contract no.:MC- 5Contractor:LTG
Originator :Suresh BalakrishnanSubmitted to:Hill International
Inspection Date/ Time:28.04.201511 AMSub-Contractor:
Discipline:ELArea:Grid-105
Type of workPermanent/External/OtherSite:Onsite/Offsite
Location & Elevation :- Document Reference No. & Rev No.
Zone-16
MST:SA-LTG-05EL-MST-0129 Rev 02
ITP:SA-LTG-05CW-ITP-014 Rev 01
IFC Drawing:SA-LTG-LPLA-P-020GOXX-04044-BSA-LTG-LPLA-P-020GOXX-04025-D
Other: eg Spec
Item to be inspectedType of inspection
Installation of land scape lighting luminaries Type A1
Witness
Hold
Contractor Representative
Sub-Contractor Initiator:Sign.:Date:
Sub-Contractor Quality :Sign.:Date:
Contractor Initiator: SalimSign.:Date: 27.04.2015
Contractor Quality :MinojSign.:Date: 27.04.2015
Engineer Inspection comments
InspectiondateDesignationCommentsSignature
Site Surveyor
Site Inspector/ Engineer
MaterialInspector/Engineer
Remarks:
FINALSTATUS CODE
EngineerRepresentativeName:Date:
Signature:
Notes: Engineer inspection shall only occur after the Inspection File is signed off by the Contractor QC Representative confirming the acceptance of the work.STATUS CODE: A- Approved : B-Approved with comments : C- Rejected : W-Witness
SA-LTG-05AP-TEM-0015_Rev04 dt. 07.01.2013