Upload
abdulhmeed-mutalat
View
229
Download
0
Embed Size (px)
DESCRIPTION
Train control management
Citation preview
Report about 1st UIC Asia CCS Workshop
with UIC CCS group of expertsMay 15-16 2008
at JR East HQ (Tokyo)
16 October 200816 October 2008East Japan Railway Co.East Japan Railway Co.Signalling System Management CenterSignalling System Management CenterExecutive OfficerExecutive Officer Masayuki MatsumotoMasayuki Matsumoto
09:30 10:00 Opening10:00 12:00 Session 1
"Trial example of radio-based control command and signalling systems"13:30 15:30 Session 2
"State of the art technology for CCS systems cases in Japan"
ATOS, D-ATC, Network Signalling16:00 17:00 Special Lecture
by CER Dr.Libor LochmanAn overview of the ETCS Level 3 state-of-the-art in Europe and an applicationproposal at Japanese Rail system
09:30 11:00 Session 3"State of the art technology for control command and signalling systems cases throughout the world"
11:00 12:00 Session 4Discussion: "For the future development
of control command and signalling technology"
12:00 12:20 Session 5"Mission of the UIC Asia Regional Projects
May 15 May 16
Significance of the 1st UIC Asia CCS WorkshopProgress Global standardization of ERTMS was proposed to Executive Board held in March 2007, New Delhi.
Mr. Ishida opposed the proposed agenda, because- the technical specifications of various technologies, GSM-R being a typical example, are not specified.
- it is not clear how we or UIC will try to cope with the development of the technology, which is constantly advancing.
CCS workshop held in June 2007 at UIC headquarters. - workshop with the signalling experts all over the world.
Theme - The global application of signalling technology.- To discuss the direction to head for the goal. - To decide the vision for the future.
Direction- CCS is a fundamental system of railways, and we are required to havenot only a short-term but also a long-term perspective like 20-30 years ahead.
- We should consider how we stimulate the development of signalling technology allover the world, not simply consider the expansion of ERTMS.
- Following this workshop, the conference on the same theme will be held in Istanbul, October 2008.
Session1 Trial example of radio-based CCS systemsMr.Barbu, UIC ; Structured approach to baseline of the signalling
system of the futureMr.Konno, JR East ; The outline of ATACSMr.Reinschmidt,TTCI ; The background of PTC)Mr.Senesi, RFI; The introduction of ETCS Level 2Mr. Schmidhalter, SBB ; The introduction of ETCS Level 2
Mr. Kawasaki ; ATOS Mr. Kawano ; D-ATCMr. Kunifuji ; Network SignallingDr. Matsumoto ; Standardization of Radio Based Train Control
System in Japan
Session2 State of the art technology for control command and signalling
Special Lecture by CER Dr.Libor LochmanOverview of ETCS Level 3 state-of-the-art in Europe and an application proposal at Japanese Rail system
CER is considering CCS from a business based perspective. The purpose of the introduction of CCS is the cost reduction
and efficient performance in train operation. ETCS Level 3 is most effective. There are no trains nor railway lines that have adopted
ETCS Level 3 now. The system, called REGIONAL equivalent to ETCS Level 3
will be introduced on West Dalama Line in Sweden in 2009. It is applicable to the Japanese Shinkansen. Results similar to Europe will be expected for the Shinkansen.
Australia ; Queensland Railways (ATP)
Russia ; CCS s technology
Kazakhstan ; Signalling automation equipment
Vietnam Railways ; Various types of signalling technology
RTRI (Railway Technical Research Institute) ; ATS and ATC
Session3 State of the art technology for control command and signalling systems cases throughout the world
Session4 Discussion :
For the future development of control
command and signalling technology
Participants of 1st UIC Asia CCS Workshop with UIC CCS group of experts, with regards to the control command and signalling systems, understand and respect unique creative ideas, various thoughts handed down from the previous generations and the regional reality and customer needs which are reflected in the systems.
The participants will support technological innovations around the world.
"Mission of the UIC Asia Regional Projects"
1
Participants of 1st UIC Asia CCS Workshop with UIC CCS group of experts will, for the time being, concentrate and focus on the development, growth and standardisation of the systems whose basic functions will be the train location and detection with radio & on-board equipment.
The participants agree to meet at least once a year and exchange information on their achievements.
2
"Mission of the UIC Asia Regional Projects"
The UIC Asia CCS Workshop shall be held when UIC CCS group of experts are present.
The achievements of the UIC Asia CCS Workshop will be reported, periodically in the UIC TM & TCS conferences.
(The Chairman of this workshop will report the content of this workshop to 1st UIC TM & TCS Conference that will be held at Istanbul in Turkey on October 15-17 2008).
3
"Mission of the UIC Asia Regional Projects"
Road Map of UIC Asia CCS Workshop
EE--JR, JR, IR,RZDIR,RZD, , KTMB, KTMB, KTZ, KRRI, KTZ, KRRI, PR, VNR,PR, VNR,
...others...others
2007Dec 6Paris
2008 October
1st TM&TCS Conference
Initiation
1st report
+E x p e r t t e a m + U I C l o g i s t i c s ENDEND
Origin1st Workshop
With UIC CCS group of experts
2007Jun5-6Paris
2008May15-16Tokyo
2010
2nd TM&TCS Conference
2nd Workshop
With UIC CCS group of experts
3rd Workshop
With UIC CCS group of experts
2009Feb or March
2009 March
ERTMS Conference
2010
2nd report 3rd report
1. Date (Proposed) March 30, 2009
2. Venue (Proposed) Malaga, Spain
3. Schedule
9:309:50 Opening speech by Chairman and UIC
9:5010:00 Report on the results of the 1st UIC Global Conferenceon TM & TCS (Istanbul, Turkey) by UIC
10:0012:30 Session 1 Current status of worlds interlocking technologies
14:0016:00 Session 2Toward the next generation interlocking system
16:0016:20 Session 3 Free discussions
16:2016:30 Closing speech by Chairman
2nd UIC Asia CCS Workshopwith UIC CCS group of experts
Thank you very much for your kind attention.