4
LEVEL 1 37' - 0" (11.28 m) LEVEL 2 47' - 0" (14.33 m) LEVEL 3 56' - 0" (17.07 m) LEVEL 4 65' - 0" (19.81 m) LEVEL 5 74' - 0" (22.56 m) U/S CEILING 82' - 0" (24.99 m) TOP 84' - 0" (25.60 m) TOP (ELEVATOR) 89' - 0" (27.13 m) (2.44 m) 8' - 0" (2.74 m) 9' - 0" (2.74 m) 9' - 0" (2.74 m) 9' - 0" (3.05 m) 10' - 0" (1.52 m) 5' - 0" PL PL LEVEL 1 37' - 0" (11.28 m) LEVEL 2 47' - 0" (14.33 m) LEVEL 3 56' - 0" (17.07 m) LEVEL 4 65' - 0" (19.81 m) LEVEL 5 74' - 0" (22.56 m) U/S CEILING 82' - 0" (24.99 m) TOP 84' - 0" (25.60 m) TOP (ELEVATOR) 89' - 0" (27.13 m) (3.05 m) 10' - 0" (2.74 m) 9' - 0" (2.74 m) 9' - 0" (2.74 m) 9' - 0" (2.44 m) 8' - 0" (1.52 m) 5' - 0" PL PL LEVEL 1 37' - 0" (11.28 m) LEVEL 2 47' - 0" (14.33 m) LEVEL 3 56' - 0" (17.07 m) LEVEL 4 65' - 0" (19.81 m) LEVEL 5 74' - 0" (22.56 m) U/S CEILING 82' - 0" (24.99 m) TOP 84' - 0" (25.60 m) TOP (ELEVATOR) 89' - 0" (27.13 m) (3.05 m) 10' - 0" (2.74 m) 9' - 0" (2.74 m) 9' - 0" (2.74 m) 9' - 0" (2.44 m) 8' - 0" ( 1 . 5 2 m ) 5 ' - 0 " PL PL LEVEL 1 37' - 0" (11.28 m) LEVEL 2 47' - 0" (14.33 m) LEVEL 3 56' - 0" (17.07 m) LEVEL 4 65' - 0" (19.81 m) LEVEL 5 74' - 0" (22.56 m) U/S CEILING 82' - 0" (24.99 m) TOP 84' - 0" (25.60 m) TOP (ELEVATOR) 89' - 0" (27.13 m) PL PL ( 3 . 0 5 m ) 1 0 ' - 0 " ( 2 . 7 4 m ) 9 ' - 0 " ( 2 . 7 4 m ) 9 ' - 0 " ( 2 . 7 4 m ) 9 ' - 0 " ( 2 . 4 4 m ) 8 ' - 0 " ( 1 . 5 2 m ) 5 ' - 0 " LEVEL 1 37' - 0" (11.28 m) LEVEL 2 47' - 0" (14.33 m) LEVEL 3 56' - 0" (17.07 m) LEVEL 4 65' - 0" (19.81 m) LEVEL 5 74' - 0" (22.56 m) U/S CEILING 82' - 0" (24.99 m) TOP 84' - 0" (25.60 m) TOP (ELEVATOR) 89' - 0" (27.13 m) ( 3 . 0 5 m ) 1 0 ' - 0 " ( 2 . 7 4 m ) 9 ' - 0 " ( 2 . 7 4 m ) 9 ' - 0 " ( 2 . 7 4 m ) 9 ' - 0 " ( 2 . 4 4 m ) 8 ' - 0 " ( 1 . 5 2 m ) 5 ' - 0 " DWG. NO. BASE FILE : PROJECT NO. D.P. No : ISSUED: PROJECT: CLIENT: ARCHITECTURAL SEAL: www.rharchitects.ca t 604.669.6002 f 604.669.1091 120 Powell Street, Unit 10 Vancouver, BC Canada V6A 1G1 B.P. No : Rositch Hemphill Architects This drawing as an instrument of service is the property of Rositch Hemphill Architects and may not be reproduced without the firm's permission. All information shown on the drawing is for use in this specific project only and shall not be used otherwise without written permission from this office. Contractors shall verify and be responsible for all dimensions on the job and this office shall be informed of any discrepancies and variations shown on drawing. CHECKED: SCALE: PLOT DATE: DRAWN: DATE: REVISION : DATE : DRAWING TITLE : ISSUED FOR 1. DP APPLICATION 30 NOV. 2017 DP RESUBMISSION MARCH 21 2018 2. URBAN DESIGN PANEL JAN. 2018 3. DP RESUBMISSION MAR. 21 2018 MARCH 21 2018 JH / JB AH E : \ a c a d j o b \ 2 0 1 7 \ 1 7 2 6 - L o t 4 3 A B o u n d a r y R o a d \ B I M F i l e s \ 1 7 2 6 _ B u i l d i n g . r v t 3 / 2 1 / 2 0 1 8 2 : 3 8 : 0 0 P M 1/16" = 1'-0" A4.0 Social Housing Development OVERALL ELEVATIONS DE- BU- 3625 Sawmill Crescent, Vancouver BC SOUTH ELEVATION OVERALL NORTH ELEVATION OVERALL WEST ELEVATION EAST ELEVATION SOUTHWEST ELEVATION No. Description Date

A4 - development.vancouver.ca · A4.0 Social Housing Development OVERALL ELEVATIONS DE-BU-3625 Sawmill Crescent, Vancouver BC SOUTH ELEVATION OVERALL NORTH ELEVATION OVERALL WEST

  • Upload
    others

  • View
    23

  • Download
    2

Embed Size (px)

Citation preview

Page 1: A4 - development.vancouver.ca · A4.0 Social Housing Development OVERALL ELEVATIONS DE-BU-3625 Sawmill Crescent, Vancouver BC SOUTH ELEVATION OVERALL NORTH ELEVATION OVERALL WEST

LEVEL 137' - 0"

(11.28 m)

LEVEL 247' - 0"

(14.33 m)

LEVEL 356' - 0"

(17.07 m)

LEVEL 465' - 0"

(19.81 m)

LEVEL 574' - 0"

(22.56 m)

U/S CEILING82' - 0"

(24.99 m)

TOP84' - 0"

(25.60 m)

TOP (ELEVATOR)89' - 0"

(27.13 m)

(2.4

4 m

)8'

- 0

"(2

.74

m)

9' -

0"

(2.7

4 m

)9'

- 0

"(2

.74

m)

9' -

0"

(3.0

5 m

)10

' - 0

"

(1.5

2 m

)

5' -

0"

PL PL

LEVEL 137' - 0"

(11.28 m)

LEVEL 247' - 0"

(14.33 m)

LEVEL 356' - 0"

(17.07 m)

LEVEL 465' - 0"

(19.81 m)

LEVEL 574' - 0"

(22.56 m)

U/S CEILING82' - 0"

(24.99 m)

TOP84' - 0"

(25.60 m)

TOP (ELEVATOR)89' - 0"

(27.13 m)

(3.0

5 m

)10

' - 0

"(2

.74

m)

9' -

0"

(2.7

4 m

)9'

- 0

"(2

.74

m)

9' -

0"

(2.4

4 m

)8'

- 0

"

(1.5

2 m

)

5' -

0"

PL PL

LEVEL 137' - 0"

(11.28 m)

LEVEL 247' - 0"

(14.33 m)

LEVEL 356' - 0"

(17.07 m)

LEVEL 465' - 0"

(19.81 m)

LEVEL 574' - 0"

(22.56 m)

U/S CEILING82' - 0"

(24.99 m)

TOP84' - 0"

(25.60 m)

TOP (ELEVATOR)89' - 0"

(27.13 m)

(3.0

5 m

)

10' -

0"

(2.7

4 m

)

9' -

0"

(2.7

4 m

)

9' -

0"

(2.7

4 m

)

9' -

0"

(2.4

4 m

)

8' -

0"

(1.5

2 m

)

5' -

0"

PL PL

LEVEL 137' - 0"

(11.28 m)

LEVEL 247' - 0"

(14.33 m)

LEVEL 356' - 0"

(17.07 m)

LEVEL 465' - 0"

(19.81 m)

LEVEL 574' - 0"

(22.56 m)

U/S CEILING82' - 0"

(24.99 m)

TOP84' - 0"

(25.60 m)

TOP (ELEVATOR)89' - 0"

(27.13 m)

PL PL

(3.0

5 m

)

10' -

0"

(2.7

4 m

)

9' -

0"

(2.7

4 m

)

9' -

0"

(2.7

4 m

)

9' -

0"

(2.4

4 m

)

8' -

0"

(1.5

2 m

)

5' -

0"

LEVEL 137' - 0"

(11.28 m)

LEVEL 247' - 0"

(14.33 m)

LEVEL 356' - 0"

(17.07 m)

LEVEL 465' - 0"

(19.81 m)

LEVEL 574' - 0"

(22.56 m)

U/S CEILING82' - 0"

(24.99 m)

TOP84' - 0"

(25.60 m)

TOP (ELEVATOR)89' - 0"

(27.13 m)

(3.0

5 m

)

10' -

0"

(2.7

4 m

)

9' -

0"

(2.7

4 m

)

9' -

0"

(2.7

4 m

)

9' -

0"

(2.4

4 m

)

8' -

0"

(1.5

2 m

)

5' -

0"

DWG. NO.

BASE FILE :

PROJECT NO.

D.P. No :

ISSUED:

PROJECT:

CLIENT:

ARCHITECTURAL SEAL:

www.rharchitects.ca

t 604.669.6002

f 604.669.1091

120 Powell Street, Unit 10

Vancouver, BC Canada

V6A 1G1

B.P. No :

Rositch HemphillArchitects

This drawing as an instrument of service is the property ofRositch Hemphill Architects and may not be reproducedwithout the firm's permission. All information shown on

thedrawing is for use in this specific project only and shall notbe used otherwise without written permission from thisoffice. Contractors shall verify and be responsible for all

dimensions on the job and this office shall be informed ofany discrepancies and variations shown on drawing.

CHECKED:

SCALE:

PLOT DATE:

DRAWN:

DATE:

REVISION : DATE :

DRAWING TITLE :

ISSUED FOR

1. DP APPLICATION 30 NOV. 2017

DP RESUBMISSIONMARCH 21 2018

2. URBAN DESIGN PANEL JAN. 2018

3. DP RESUBMISSION MAR. 21 2018

MARCH 21 2018

JH / JB

AH

E:\aca

djo

b\2

01

7\1

726

- L

ot 4

3A

Bound

ary

Ro

ad\B

IM F

il es\1

726_B

ui ld

ing.r

vt

3/2

1/2

018 2

:38:0

0 P

M

1/16" = 1'-0"

A4.0

Social HousingDevelopment

OVERALLELEVATIONS

DE-

BU-

3625 Sawmill Crescent, Vancouver BC

SOUTH ELEVATION OVERALL

NORTH ELEVATION OVERALL

WEST ELEVATION

EAST ELEVATION

SOUTHWEST ELEVATIONNo. Description Date

Page 2: A4 - development.vancouver.ca · A4.0 Social Housing Development OVERALL ELEVATIONS DE-BU-3625 Sawmill Crescent, Vancouver BC SOUTH ELEVATION OVERALL NORTH ELEVATION OVERALL WEST

LEVEL 137' - 0"

(11.28 m)

LEVEL 247' - 0"

(14.33 m)

LEVEL 356' - 0"

(17.07 m)

LEVEL 465' - 0"

(19.81 m)

LEVEL 574' - 0"

(22.56 m)

U/S CEILING82' - 0"

(24.99 m)

TOP84' - 0"

(25.60 m)

TOP (ELEVATOR)89' - 0"

(27.13 m)(3

.05

m)

10' -

0"

(2.7

4 m

)

9' -

0"

(2.7

4 m

)

9' -

0"

(2.7

4 m

)

9' -

0"

(2.4

4 m

)

8' -

0"

(1.5

2 m

)5'

- 0

"

PL

54A3A 3C 3C 3C 3C3A 3A 3A4A 4A 4A 4A 4A4A4A 4A5 55106 3A 27667 7 77 7 67

LEVEL 137' - 0"

(11.28 m)

LEVEL 247' - 0"

(14.33 m)

LEVEL 356' - 0"

(17.07 m)

LEVEL 465' - 0"

(19.81 m)

LEVEL 574' - 0"

(22.56 m)

U/S CEILING82' - 0"

(24.99 m)

TOP84' - 0"

(25.60 m)

TOP (ELEVATOR)89' - 0"

(27.13 m)

(3.0

5 m

)

10' -

0"

(2.7

4 m

)

9' -

0"

(2.7

4 m

)

9' -

0"

(2.7

4 m

)

9' -

0"

(2.4

4 m

)

8' -

0"

(1.5

2 m

)5'

- 0

"

3B 3D 3D3B 3B 3B4B4A 5 5 5 5 5 17 7 7 76 4C 6 6 4C2 13 1413 4C6

BUILDING MATERIAL LEGEND

1BRICK CLADDINGMUTUAL MATERIALS "EBONY"

2CONCRETE W/ ELASTOMERIC COATINGCOLOUR MATCH TO EXPOSED CONCRETE

3ACEMENTITIOUS SIDING 8" EXPOSURE"BOOTHBAY BLUE" (HARDIE)

CEMENTITIOUS TRIM / FASCIA"CHARCOAL" (HARDIE)

3BCEMENTITIOUS SIDING 8" EXPOSURE "COUNTRYLANE RED" (HARDIE)

3CCEMENTITIOUS SIDING 5" EXPOSURE "ARCTIC WHITE" (HARDIE)

4ACEMENTITIOUS PANEL "IRON GRAY" (HARDIE)

6DOUBLE GLAZED WINDOWS & PATIO DOORSFRAME: WHITE

7ALUMINUM AND GLASS GUARD RAILS"WHITE"

10PAINTED METAL DOORBM CC544 "OVERCOAT"

11 LIGHT FIXTURE

12ALUMINUM STOREFRONT GLAZING & DOORSFRAME: "WHITE"

8ALUMINUM PICKET FENCE & GATES"WHITE"

9O/H DOOR WITH COMPOSITE SLATSBM "GRAY"

5

3DCEMENTITIOUS SIDING 5" EXPOSURE "SANDSTONE BEIGE" (HARDIE)

4BCEMENTITIOUS PANEL "BLACK"

4CCEMENTITIOUS PANEL "ARCTIC WHITE" (HARDIE)

13 SPANDREL GLASS: GRAY

14PAINTED ARCHITECTURAL CONCRETEBLOCK WITH REVEALS: " BLACK/GREY/WHITE

DWG. NO.

BASE FILE :

PROJECT NO.

D.P. No :

ISSUED:

PROJECT:

CLIENT:

ARCHITECTURAL SEAL:

www.rharchitects.ca

t 604.669.6002

f 604.669.1091

120 Powell Street, Unit 10

Vancouver, BC Canada

V6A 1G1

B.P. No :

Rositch HemphillArchitects

This drawing as an instrument of service is the property ofRositch Hemphill Architects and may not be reproducedwithout the firm's permission. All information shown on

thedrawing is for use in this specific project only and shall notbe used otherwise without written permission from thisoffice. Contractors shall verify and be responsible for all

dimensions on the job and this office shall be informed ofany discrepancies and variations shown on drawing.

CHECKED:

SCALE:

PLOT DATE:

DRAWN:

DATE:

REVISION : DATE :

DRAWING TITLE :

ISSUED FOR

1. DP APPLICATION 30 NOV. 2017

DP RESUBMISSIONMARCH 21 2018

2. URBAN DESIGN PANEL JAN. 2018

3. DP RESUBMISSION MAR. 21 2018

MARCH 21 2018

JH / JB

AH

E:\aca

djo

b\2

01

7\1

726

- L

ot 4

3A

Bound

ary

Ro

ad\B

IM F

il es\1

726_B

ui ld

ing.r

vt

3/2

1/2

018 2

:38:1

3 P

M

As indicated

A4.1

Social HousingDevelopment

ELEVATIONS

DE-

BU-

3625 Sawmill Crescent, Vancouver BC

NORTH ELEVATION - EAST PART

NORTH ELEVATION - WEST PART

No. Description Date

Page 3: A4 - development.vancouver.ca · A4.0 Social Housing Development OVERALL ELEVATIONS DE-BU-3625 Sawmill Crescent, Vancouver BC SOUTH ELEVATION OVERALL NORTH ELEVATION OVERALL WEST

LEVEL 137' - 0"

(11.28 m)

LEVEL 247' - 0"

(14.33 m)

LEVEL 356' - 0"

(17.07 m)

LEVEL 465' - 0"

(19.81 m)

LEVEL 574' - 0"

(22.56 m)

U/S CEILING82' - 0"

(24.99 m)

TOP84' - 0"

(25.60 m)

TOP (ELEVATOR)89' - 0"

(27.13 m)

(3.0

5 m

)10

' - 0

"(2

.74

m)

9' -

0"

(2.7

4 m

)9'

- 0

"(2

.74

m)

9' -

0"

(2.4

4 m

)8'

- 0

"

(1.5

2 m

)

5' -

0"

3B3B3D 3D4C 4C 4C 11 17 7 776 2 65 55

LEVEL 137' - 0"

(11.28 m)

LEVEL 247' - 0"

(14.33 m)

LEVEL 356' - 0"

(17.07 m)

LEVEL 465' - 0"

(19.81 m)

LEVEL 574' - 0"

(22.56 m)

U/S CEILING82' - 0"

(24.99 m)

TOP84' - 0"

(25.60 m)

TOP (ELEVATOR)89' - 0"

(27.13 m)PL PL

(3.0

5 m

)

10' -

0"

(2.7

4 m

)

9' -

0"

(2.7

4 m

)

9' -

0"

(2.7

4 m

)

9' -

0"

(2.4

4 m

)

8' -

0"

(1.5

2 m

)

5' -

0"

4B 3A 4B 4B3A 3A3C3C 667 7 55 5

BUILDING MATERIAL LEGEND

1BRICK CLADDINGMUTUAL MATERIALS "EBONY"

2CONCRETE W/ ELASTOMERIC COATINGCOLOUR MATCH TO EXPOSED CONCRETE

3ACEMENTITIOUS SIDING 8" EXPOSURE"BOOTHBAY BLUE" (HARDIE)

CEMENTITIOUS TRIM / FASCIA"CHARCOAL" (HARDIE)

3BCEMENTITIOUS SIDING 8" EXPOSURE "COUNTRYLANE RED" (HARDIE)

3CCEMENTITIOUS SIDING 5" EXPOSURE "ARCTIC WHITE" (HARDIE)

4ACEMENTITIOUS PANEL "IRON GRAY" (HARDIE)

6DOUBLE GLAZED WINDOWS & PATIO DOORSFRAME: WHITE

7ALUMINUM AND GLASS GUARD RAILS"WHITE"

10PAINTED METAL DOORBM CC544 "OVERCOAT"

11 LIGHT FIXTURE

12ALUMINUM STOREFRONT GLAZING & DOORSFRAME: "WHITE"

8ALUMINUM PICKET FENCE & GATES"WHITE"

9O/H DOOR WITH COMPOSITE SLATSBM "GRAY"

5

3DCEMENTITIOUS SIDING 5" EXPOSURE "SANDSTONE BEIGE" (HARDIE)

4BCEMENTITIOUS PANEL "BLACK"

4CCEMENTITIOUS PANEL "ARCTIC WHITE" (HARDIE)

13 SPANDREL GLASS: GRAY

14PAINTED ARCHITECTURAL CONCRETEBLOCK WITH REVEALS: " BLACK/GREY/WHITE

DWG. NO.

BASE FILE :

PROJECT NO.

D.P. No :

ISSUED:

PROJECT:

CLIENT:

ARCHITECTURAL SEAL:

www.rharchitects.ca

t 604.669.6002

f 604.669.1091

120 Powell Street, Unit 10

Vancouver, BC Canada

V6A 1G1

B.P. No :

Rositch HemphillArchitects

This drawing as an instrument of service is the property ofRositch Hemphill Architects and may not be reproducedwithout the firm's permission. All information shown on

thedrawing is for use in this specific project only and shall notbe used otherwise without written permission from thisoffice. Contractors shall verify and be responsible for all

dimensions on the job and this office shall be informed ofany discrepancies and variations shown on drawing.

CHECKED:

SCALE:

PLOT DATE:

DRAWN:

DATE:

REVISION : DATE :

DRAWING TITLE :

ISSUED FOR

1. DP APPLICATION 30 NOV. 2017

DP RESUBMISSIONMARCH 21 2018

2. URBAN DESIGN PANEL JAN. 2018

3. DP RESUBMISSION MAR. 21 2018

MARCH 21 2018

JH / JB

AH

E:\aca

djo

b\2

01

7\1

726

- L

ot 4

3A

Bound

ary

Ro

ad\B

IM F

il es\1

726_B

ui ld

ing.r

vt

3/2

1/2

018 2

:38:3

3 P

M

As indicated

A4.2

Social HousingDevelopment

ELEVATIONS

DE-

BU-

3625 Sawmill Crescent, Vancouver BC

WEST ELEVATION.

EAST ELEVATION.

No. Description Date

Page 4: A4 - development.vancouver.ca · A4.0 Social Housing Development OVERALL ELEVATIONS DE-BU-3625 Sawmill Crescent, Vancouver BC SOUTH ELEVATION OVERALL NORTH ELEVATION OVERALL WEST

LEVEL 137' - 0"

(11.28 m)

LEVEL 247' - 0"

(14.33 m)

LEVEL 356' - 0"

(17.07 m)

LEVEL 465' - 0"

(19.81 m)

LEVEL 574' - 0"

(22.56 m)

U/S CEILING82' - 0"

(24.99 m)

TOP84' - 0"

(25.60 m)

TOP (ELEVATOR)89' - 0"

(27.13 m)

(2.4

4 m

)8'

- 0

"(2

.74

m)

9' -

0"

(2.7

4 m

)9'

- 0

"(2

.74

m)

9' -

0"

(3.0

5 m

)10

' - 0

"

(1.5

2 m

)

5' -

0"

3B 3B3D 3D 4B2 4C 4C3B 3B4C 4C1 1 1 17 7 7 7 7 666 13 14145 5 5 5

LEVEL 137' - 0"

(11.28 m)

LEVEL 247' - 0"

(14.33 m)

LEVEL 356' - 0"

(17.07 m)

LEVEL 465' - 0"

(19.81 m)

LEVEL 574' - 0"

(22.56 m)

U/S CEILING82' - 0"

(24.99 m)

TOP84' - 0"

(25.60 m)

TOP (ELEVATOR)89' - 0"

(27.13 m)

(2.4

4 m

)8'

- 0

"(2

.74

m)

9' -

0"

(2.7

4 m

)9'

- 0

"(2

.74

m)

9' -

0"

(3.0

5 m

)10

' - 0

"

(1.5

2 m

)5'

- 0

"

3A 3A 3A 3A 3A 3A 3A3C 3C 3C 3C3C2 4A 4A 4A 4A 4A6 6 6 6 6 6 6 77775 5 54A

BUILDING MATERIAL LEGEND

1BRICK CLADDINGMUTUAL MATERIALS "EBONY"

2CONCRETE W/ ELASTOMERIC COATINGCOLOUR MATCH TO EXPOSED CONCRETE

3ACEMENTITIOUS SIDING 8" EXPOSURE"BOOTHBAY BLUE" (HARDIE)

CEMENTITIOUS TRIM / FASCIA"CHARCOAL" (HARDIE)

3BCEMENTITIOUS SIDING 8" EXPOSURE "COUNTRYLANE RED" (HARDIE)

3CCEMENTITIOUS SIDING 5" EXPOSURE "ARCTIC WHITE" (HARDIE)

4ACEMENTITIOUS PANEL "IRON GRAY" (HARDIE)

6DOUBLE GLAZED WINDOWS & PATIO DOORSFRAME: WHITE

7ALUMINUM AND GLASS GUARD RAILS"WHITE"

10PAINTED METAL DOORBM CC544 "OVERCOAT"

11 LIGHT FIXTURE

12ALUMINUM STOREFRONT GLAZING & DOORSFRAME: "WHITE"

8ALUMINUM PICKET FENCE & GATES"WHITE"

9O/H DOOR WITH COMPOSITE SLATSBM "GRAY"

5

3DCEMENTITIOUS SIDING 5" EXPOSURE "SANDSTONE BEIGE" (HARDIE)

4BCEMENTITIOUS PANEL "BLACK"

4CCEMENTITIOUS PANEL "ARCTIC WHITE" (HARDIE)

13 SPANDREL GLASS: GRAY

14PAINTED ARCHITECTURAL CONCRETEBLOCK WITH REVEALS: " BLACK/GREY/WHITE

DWG. NO.

BASE FILE :

PROJECT NO.

D.P. No :

ISSUED:

PROJECT:

CLIENT:

ARCHITECTURAL SEAL:

www.rharchitects.ca

t 604.669.6002

f 604.669.1091

120 Powell Street, Unit 10

Vancouver, BC Canada

V6A 1G1

B.P. No :

Rositch HemphillArchitects

This drawing as an instrument of service is the property ofRositch Hemphill Architects and may not be reproducedwithout the firm's permission. All information shown on

thedrawing is for use in this specific project only and shall notbe used otherwise without written permission from thisoffice. Contractors shall verify and be responsible for all

dimensions on the job and this office shall be informed ofany discrepancies and variations shown on drawing.

CHECKED:

SCALE:

PLOT DATE:

DRAWN:

DATE:

REVISION : DATE :

DRAWING TITLE :

ISSUED FOR

1. DP APPLICATION 30 NOV. 2017

DP RESUBMISSIONMARCH 21 2018

2. URBAN DESIGN PANEL JAN. 2018

3. DP RESUBMISSION MAR. 21 2018

MARCH 21 2018

JH / JB

AH

E:\aca

djo

b\2

01

7\1

726

- L

ot 4

3A

Bound

ary

Ro

ad\B

IM F

il es\1

726_B

ui ld

ing.r

vt

3/2

1/2

018 2

:38:4

7 P

M

As indicated

A4.3

Social HousingDevelopment

ELEVATIONS

DE-

BU-

3625 Sawmill Crescent, Vancouver BC

SOUTH ELEVATION - WEST PART

SOUTH ELEVATION - EAST PART

No. Description Date