पता सच Address List
1 मख य अभयता (एचपीसी व जल परयोजना) एपीजनको 4वी मिजल गणदल वजयवाडा आ amp 520004 Chief
Engineer (Generation) APGENCO 4th
Floor Vidyut Soudha Eluru Road Gunadala Vijayawada AP ndash 520
004
2 मख य अभयता (परयोजना) एपीजनको 4वी मिजल गणदल वजयवाडा आ amp 520004 Chief Engineer (Projects)
APGENCO 4th
Floor Vidyut Soudha Eluru Road Gunadala Vijayawada AP ndash 520 004
3 मख य अभयता (आईपीसी व वयत ampणाल-) एपीान स को3र- मिजल गणदल वजयवाडा आ amp 520004 Chief
Engineer (IPC amp Power Systems) APTRANSCO 3rd
Floor Vidyut Soudha Eluru Road Gunadala
Vijayawada AP ndash 520 004
4 मख य अभयता ( उत पादन) ट-एसजनको हदराबाद Chief Engineer (Generation) TSGENCO Hyderabad
5 मख य अभयता (परयोजना) ट-एसजनको हदराबाद Chief Engineer (Projects) TSGENCO Hyderabad
6 मख य अभयता (वयत ampणाल-) ट-एसान स को हदराबाद Chief Engineer (Power System) TSTRANSCO
Hyderabad
7 मख य अभयता (इल6डज़ाईन) कपीसीएल ब8गलर Chief Engineer (Ele Designs) KPCL Bangalore
8 मख य अभयता ( आर ट- और आर amp डी) कपीट-सीएल ब8गलर Chief Engineer (RT and RampD) KPTCL
Bangalore
9 मख य अभयता एसएलडीसी कपीट-सीएल ब8गलर Chief Engineer SLDC KPTCL Bangalore
10 मख य अभयता (एमट-एस) टनजोडको चन न Chief Engineer (MTS) TANGEDCO Chennai
(Fax No 044 ndash 28585804)
11 मख य अभयता (जल वयत) टनजोडको चन न Chief Engineer (Hydro)TANGEDCO Chennai
(Fax No 044 ndash 28553356)
12 मख य अभयता (सर=ण एव सचार) ट- एन ई बी चन न Chief Engineer (Protection amp Communication)
TANTRANSCO Chennai
13 मख य अभयता (पारषण) ampणाल- ampचालन एचएमट- कालोनी कएसईबी कलमस सर--683503 Chief Engineer
(Transmission) System Operation HMT Colony KSEB Kalamassery-683503
14 अधी=क अभयता- वयत वभाग 137 एनएससी बोस साल पदचर-- 605001 Superintending Engineer ndashI
Electricity Department 137 NSC Bose Salai Puducherry ndash 605001 (Fax No 0413-2331556)
15 जी एम ( ampचा व अन) द=- पावरEFड सकदराबाद GM (OampM) SR-I PGCIL Secunderabad
16 जी एम ( ampचा व अन) द=- पावरEFड ब8गलर GM (OampM) SR-II PGCIL Bengaluru
17 महाampबधक (ओ एस) एनट-पीसी दH=ण =Iीय मख यालय सकदराबाद General Manager (OS) NTPC SRHQ
Secunderabad
18 मख य महाampबधक ट-पीएस - वस तार एनएलसीआईएल नवल- - 607807 Chief General Manager TPS-I Expn
NLCIL Neyveli-607807 (Fax No 04142 ndash 265303)
19 मख य अभयता (पारषण) एनपीसीआईएल मबई Chief Engineer (Transmission) NPCIL Mumbai
20 क8 J Kनदशक कजीएस कगा कनाMटक Station Director KGS Kaiga Karnataka
21 क8 J Kनदशक एमएपीएस कल पक कम Station Director MAPS Kalpakkam
22 क8 J Kनदशक ककएनपीपी KतNनल वल- िजला तमलनाड- 627106 Station Director KKNPP Thirunelveli Dist
TamilNadu-627106
23 Oी पी पी जस ट-न एजीएम (ईएम) एनट-ईसीएल चन न-103 Shri PP Gestine AGM (EM) NTECL Chennai-103
24 Oी एम ampभाकर महाampबधक (amp व अ) एनट-पीएल हाबMर एP टट ततकडी- 628004 Sh M Prabhakar
GM (OampM) NTPL Harbour Estate Tuticorin ndash 628004 (Fax No 0461 ndash 2352842)
25 Oी सयM ampकाश उपाR य= (ampचालन व अनर=ण) जएसडS T य एनजU ल तोरणगT ल बT लार- ndash 583275
Shri Surya Prakash Vice President (Operations amp Maintenance) Ms JSW Energy Ltd Toranagallu
Bellary-583275
26 Oी शाताराम प सह उपाR य= (वयत एव परयोजना) जएसडS T य एनजU ल तोरणगT ल बT लार- ndash 583275
Shri Shantharam Pai Associate Vice President (Electrical amp Projects) Ms JSW Energy Ltd Toranagallu
Bellary-583275
27 Oी आर वी भWए उपाध य= ( ampचालन) यपीसीएल ब8गलर Shri RVBhat Vice President (Operations) UPCL
Bangalore
28 सह उपाR य= ( सर=ण व मीटरग) अदानी पावर ल 8-ए सभव जज भवन क सामन बोदकदव अहमदाबाद-
380015 गजरात Associate Vice President (Protection amp Metering) Adani Power Ltd 8-A lsquoSambhavrsquo
Opp Judgersquos Bungalow Bodakdev Ahmedabad 380 015 Gujarat India
29 Oी Yबयत चZबतU (ampधान वयत एव सी आई अनर=ण) ट-पीसीआईएल [ यानपरम नल तN Fाम मतकर
मडल एसपीएसआर नT लर- 524344 Sh Bidyut Chakraborty (Head Electrical and CampI Maintenance)
TPCIL Pyanampuram Nelaturu Village Muthukur Mandal SPSR Nellore ndash 524344 (Fax No 0861 ndash 305
2304)
30 Oी आर एस कमारP वामी सलाहार(वयत) सीईपीएल मलमरडर Fाम ओ]Wपदरम ताT लक ततकडी- 628105
तमलनाड Sh RS Kumaraswamy Advisor (Electrical) CEPL Melamarudur Village Ottipidaram Taluk
Tuticorin ndash 628 105 Tamil Nadu (Fax No 0461 ndash 2614297)
31 Oी ^कशोर आकM ट वर उपाR य= (amp व अ) आईएल व एफएस ट-पीसीएल सी पदपW डाक परनगीपW भवनEगर
ताT लक कडलर िजला तमलनाड- 608502 Sh Kishore Arcot Sr Vice President (OampM) ILampFS
Tamilnadu Power Company Ltd CPudhupettai (post) Parnagipettai Bhuvanagiri Taluk Cuddalore Dist
Tamilnadu ndash 608502 (Fax No 0414-4252991)
32 Oी सS यसाची मखजU वर उपाR य= ( amp एव अ) ]हदजा एनपीसीएल पटग`यड मडल वशाखप`नम आ amp-
530031 Sh Sabyasachi Mukherjee Sr Vice President (OampM) Hinduja NPCL Pedagantyada Mandal
Visakhapatnam AP ndash 530031
33 Oी एस सदरमKतM उपाR य= ( ampचालन) लनको कaडपT ल- पावर लमटड आईडीए कaडपT ल- इbा]हमप`नम मडल
कd ण िजT ला आe ampदश- 521228 Sh S Sundaramoorthy-Vice President (operations) Lanco Kondapalli
Power Limited IDA Kondapalli Ibrahimpatnam Mandal Krishna district Andhra Pradesh-521228 (Fax
No 0866-2872801)
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 1
SOUTHERN REGIONAL POWER COMMITTEE BENGALURU
Minutes of the 65th Meeting of Protection Coordination Sub-Committee (PCSC ndash 65) of SRPC held on 29th June 2017
1 Introduction
The 65th meeting of Protection Coordination Sub-Committee (PCSC-65) of SRPC was held on 29th June 2017 at SRPC Secretariat Bengaluru The list of participants is enclosed at Annexure-I Members and Participants were welcomed to the meeting and briefed on the following protection related issues Evaluation of the bids received from various bidders in respect of SRPC project ldquoProcurement of
Web-based Management Software and Protection Setting Calculation Toolrdquo project is under progress by the Bid Evaluation Committee (BEC) of SRPC constituted for the purpose and it is expected that the award for the same would be placed in August 2017
Wrt perturbations experienced at TPCIL plant in Nellore protection audit of Nellore PS (NPS) of PGCIL (SR-I) was conducted during 19 -20 June 2017 Then a special meeting was also convened at TPCIL plant premises on 21062017 It was noted that there was nothing amiss at NPS So the cause of TPCIL perturbations was further analysed by correlating their time-stamps with that obtained from SRLDC and SLDC-APTRANSCO From them it was seen that frequent faults on 400 kV SDSTPS ndash Nellore-AP (Manubolu) DC line were the cause of observed perturbations at TPCIL plant Accordingly certain remedial measures were suggested for the parties involved APTRANSCO APGENCO and TPCIL were requested to take suitable action to comply with the recommendations given
UPCL vide their mail dated 22052017 had proposed a revised SPS at their Udupi plant in place of the existing one to take care of oscillations and power swings that would result under various contingencies All concerned members were requested to take part when the issue is taken up for discussion later in the meeting
It was also informed that in view of the frequent tripping of ICTrsquos at 400220 kV Hoody SS it was proposed to conduct PSAG-18 meeting on 03072017 to ascertain the action taken by KPTCL to attend to various measures that had been suggested by PCSC forum in their previous meetings
Wrt implementing AR on all 220 kV lines amp above it was stated that the action plan including feeder details for implemented AR are yet to be furnished by APGENCO APTRANSCO TSGENCO and TSTRANSCO KPTCL and NTPC-Ramagundam The respective Constituents were requested to furnish the sought details at the earliest and take concrete action towards implementing AR in all 220 kV amp above transmission lines
2 Confirmation of the Minutes of the 64th meeting of PCSC held on 25th May 2017
The minutes of the 64th meeting of PCSC had been circulated vide SRPC letter No SRPCSE-III PCSC-64 20173216 - 51 dated 09062017 As no comments had been received from any of the Constituents the minutes of the 64th Meeting of PCSC were confirmed
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 2
3 Details of Grid Disturbances (GDrsquos) Grid Incidents (GIrsquos) and Line Trippings due to Auto-
Reclose (AR) failure non-operation amp PLCC mal-operation
The trippings due to GDrsquos GIrsquos AR failure non-operation and PLCC mal-operation that had occurred
during May 2017 were discussed in the Meeting The deliberations and recommendations of the PCSC Forum are enclosed at AnnexurendashII for further needful action The details of the tripping events including relevant PMU plots presented by SRLDC in the meeting are also enclosed at AnnexurendashVI for kind reference
4 Status of pending PCSC Recommendations (P-REC)
The status of implementation of pending PCSC recommendations was discussed in the meeting The
Constituents were asked to take steps to comply with the same and requested to submit the status of their compliance latest by 10082017 The updated status of the same as on 25072017 is enclosed at AnnexurendashIII
5 Remedial measures Action taken for the tripping incidents of the transmission elements
under forced outage (PRM)
The tripping incidents of the transmission elements under forced outage for which the remedial action
taken had not been furnished were discussed in the meeting The Constituents were asked to kindly furnish specific remedial measures action taken covering one or the other items from the following indicative list in time so as to forward the same to Central Electricity Authority
Brief details of line patrolling carried out (with tower location)
Brief details of RoW maintenance (by proper Tree-cutting) resorted to
De-capped insulators replacement
DC earth fault removal
PLCC cards replacement
Relay settings modification
Steps taken to put AR or CB into service after they have been locked-out
Faulty equipment replacement
Reference to OEM in case of equipment failure
Brief Details of tests carried out to ascertain the healthiness of various equipment (Power Transformer Reactors Surge Arrestors Circuit Breakers CTs PTsCVTs) like Insulation Resistance (IR) test Winding Resistance test Capacitance test Tan delta test DGA test Leakage current test CRM DCRM test etc
Any other appropriate remedial measure
The updated list of PRM as on 25072017 is enclosed at Annexure-IV
6 Certificate for Healthiness of Batteries
As per the MoP CEA direction given in pursuant to recommendations of the Enquiry Committee (NEW Grid Disturbance on 30th amp 31st July 2012) RPCrsquos are required to obtain from their respective Constituents a monthly certificate for healthiness of batteries installed at 220 KV amp above voltage level Substations (for power supply to Relays RTUs and PLCC equipment) and furnish the same to CEA MoP
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 3
With reference to above the Constituents had been requested to submit the certificate on healthiness of batteries on monthly basis (ie status for a month shall be sent by the 7th day of the following month) to SRPC as per the format given below
Sl No
Station Application Battery Battery Charger Remarks
Station Name
Code Type
(PS SS)
Protection
Communication
Details Status (Healthy Unhealthy)
Details Status (Healthy Unhealthy)
1 Station-A Protection (Bank-1)
Protection (Bank-2)
Communication (Bank-1)
Communication (Bank-2)
2 Station-B hellip
hellip hellip hellip
Note 1 Code is the short name of the Station
2 PS ndash Power Station SS - Substation
The sought status for the months of May 2017 had not been received from the following SR-Constituents
TANTRANSCO NTPL amp NTECL
7 Implementation of Line Differential Protection (LDP) in Nellore and Simhadri complexes
The issue had been discussed in the 64th meeting of PCSC held on 25052017 when it was agreed that the concerned Constituents would take steps to implement LDP in both Nellore and Simhadri Complexes by December 2017
Subsequently MEPL (vide their mail dated 14062017) and SEL (vide their mail dated 27062017) informed that in view of their present financial condition they may kindly be exempted for the time being from implementing LDP on the lines belonging to them in Nellore Complex However they assured that suitable action would be taken to implement the same once their situation improves
In this regard it was clarified that PGCIL (SR-I) can go ahead procuring LDP relays without considering MEPL and SEL requirement Accordingly the following Constituents were asked to take appropriate steps to put LDP in place by December 2017
Nellore Complex Constituents responsible for LDP implementation
Timeline for LDP implementation
Line Differential Protection (LDP) to be implemented on all 400 kV lines (lt 50 km)
PGCIL (SR-I) APGENCO APTRANSCO TPCIL SGPL
December 2017
MEPL and SEL As and when their financial healthiness improves
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 4
Simhadri Complex Constituents responsible for LDP implementation
Timeline for LDP implementation
Line Differential Protection would be implemented in Simhadri Complex on all 400 kV lines inter-connecting Gajuwaka SS Kalpaka SS Simhadri STPP and Hinduja TPS
PGCIL (SR-I) NTPC APTRANSCO and HNPCL
December 2017
8 Installation of PMU by POWERGRID at 400kV NP Kunta
In PCSC-64 meeting held on 25052017 the following was noted
SRLDC stated that NP Kunta is a critical station where in addition to injection of large quantum of solar power reactive power control is also being exercised by way of the recently commissioned STATCOM Thus to better monitor the LVRT effects of Solar power station and functioning of STATCOM installed at NPKunta station it is necessary to have a PMU installed there To this PGCIL (SR-I) informed that provision for PMU at NP Kunta had not been envisaged in Part-I of URTDSM Further as per the decision taken in the 3rd Communication meeting held at SRPC Bengaluru the quantity of Phase-I of URTDSM project was freezed On this SRLDC mentioned that PGCIL need not procure an additional PMU for the purpose instead they can divert the PMU identified for Vijayawada to NP Kunta The issue was further discussed and in view of the stated significance of NP Kunta PGCIL (SR-I) was asked to divert PMU identified for Vijayawada to NP Kunta as part of Phase-I of URTDSM project
However in view of the difficulty expressed by PGCIL (SR-I) in shifting the (already commissioned) PMU and its associated cabling and communication modules from Vijayawada to NP Kunta the issue was again discussed by PCSC forum in the meeting During the meeting the necessity of having PMU at NP Kunta was once again emphasised It was also noted that a PMU had been identified for installation at GMR-Vemagiri as part of URTDSM project in Phase-I However as APTRANSCO and GMR had not agreed for the same the same was not yet carried out In view of above PCSC forum decided that PGCIL (SR-I) take steps to shift the PMU and associated cabling and communication interface modules identified for commissioning at GMR-Vemagiri to NP Kunta and install the same at the earliest
9 Revision of Special Protection Scheme (SPS) implemented at UPCLrsquos plant at Udupi
UPCL vide their mail dated 22052017 requested to review the SPS implemented at their plant in view of the changed grid conditions and furnished a proposal for consideration by SRPC SRLDC
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 5
In this regard the existing SPS and the proposed SPS by UPCL were discussed Existing SPS Both 400 kV lines unavailable amp Generation gt 650 Trip Unit-2 Both 400 kV line and one of the two 220 kV lines unavailable
amp Generation gt 300 MW Trip Both Units Proposed SPS Under this the following five contingencies have been considered 1 Tripping of one 400 kV line 2 Tripping of one 400 kV line with the other already tripped 3 Tripping of both 400 kV lies simultaneously 4 Overloading of any 220 kV line 5 Tripping of all Lines emanating from UPCL (Zero Power condition) The details of the proposed SPS by UPCL are enclosed at Annexure-V With regard to above it was noted that even though the proposed SPS may effectively take care of the oscillations power swings that may occur at UPCL during above stated contingencies the following concerns need to be properly addressed from the grid perspective Since the line breaker is not allowed to be tripped in the event of occurrence of power swing
(even when it enters Zone-1) and a definite possibility exists for it to be transmitted to the other adjacent connected stations it needs to be shown by conducting proper system studies that tripping of UPCL running Unit (s) by virtue of operation of corresponding SPS would act negatively on the sustenance of the power swing
It was felt that the Contingencies at 2 amp 3 can be combined since they essentially result in the same Further the reference power value assumed for comparing with actual generation to effect tripping of Unit-2 under Contingency-2 may be appropriately revised to 325 MW to avoid overloading of Varahi ndash Shimoga lines (in the extreme case of full generation at Varahi GS)
Study results for all Contingencies considered shall be shared Given the complexity of the proposed SPS issues pertaining to non-reliability of its operation may
also be suitably factored into Accordingly UPCL was requested to review the proposed SPS addressing above concerns and furnish the thus modified scheme to PCSC forum along with supporting study results
10 Auto-Reclosure Implementation on all 220 kV amp above Transmission Lines of
Southern Region
It was noted that APGENCO (Hydro) amp APGENCO (RTTP) are yet to furnish their action plan for implementing AR in their respective networks Similarly though TSGENCO (Thermal) amp TSGENCO (Hydro) had stated that they were coordinating with TSTRANSCO to obtain revised settings they are also yet to furnish Action Plan Time-frame for implementing AR It was also noted that in the Action Plan furnished by APTRANSCO feeder details were not mentioned Similarly in the Action Plan furnished by TSTRANSCO time-frame for implementing AR was not mentioned Action Plan for implementing AR is also yet to be furnished by NTPC-Ramagundam (for Tie-CBrsquos of 400 kV lines)
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 6
It was further noted that even though KPTCL had furnished the details of 220 kV amp 400 kV lines where AR is already in place the details of 220 kV lines where AR is not presently in service along with Action Plan for implementing same are yet to be furnished
All above Constituents were asked to kindly furnish required details by 08082017
Since the main issues in implementing AR are the adopted conservative protection philosophies lack of proper PLCC communication and breakersrsquo suitability supportability it is intimated in view of above that if there are no issues wrt carrier communication and breakersrsquo supportability concerned Constituents shall make efforts to implement AR immediately in their respective networks Where communication amp breaker related issues stand in the way of implementing AR concerned Constituents shall take steps to address them appropriately on priority basis and implement AR in their respective networks in a phased manner at the earliest
In the previously held PCSC meetings the following logics have been clarified for implementing AR
Normally high speed single-ph single-shot AR scheme (with simultaneous opening at both ends of feeder with a dead-time of 1 sec and reclaim-time of 25 sec) may be used by all Utilities (including Generators)
However those generators (Coal Gas Nuclear Hydro) who have concerns wrt closing on to un-cleared fault can make use of the following time-differentiated single-ph single-shot AR scheme
ldquoIn this after a line has been opened from both ends (generator end amp grid end) on AR operation the grid end will be auto-reclosed as usual after the elapse of its dead-time (say 1 sec) However the generator end relay will check for the line voltage after elapse of an extended dead time say 15 sec [here the additional time delay of 05 sec which has been included as a safety margin shall be so chosen that the extended dead-time is less than the adopted Pole Discrepancy time delay] If the line voltage so sensed is healthy amp normal (which implies that the fault has already been cleared) then generator end will be auto-reclosed else 3-ph trip will be given at generator end to open the other two phase polesrdquo Further wherever Trip-on-Reclose (ToR) feature is available at grid-end station it shall be configured such that it sends Direct Trip (DT) command to generator end upon its operation
It is also clarified that the above scheme can be as it is used to Line-CBrsquos of all bus configurations (including Main-CBrsquos of one-and-half breaker bus configuration) For Tie-CBrsquos in one-and-half breaker configuration employing priority scheme (which also happens to be the recommended practice) above logic is not be required since the employed priority scheme anyway checks for CLOSE_STATUS of Main-CB before closing Tie-CB However if required the above logic can be applied to Tie-CBrsquos also by adopting a suitable extended dead-time considering the remote end stationrsquos AR dead time
It is further clarified that AR functionality for a transmission line shall be preferably put into service using (i) Bay Control Unit (BCU) or (ii) separate External AR Relay Where these are not available only then should the AR functionality of Main protection relays of lines be used
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 7
Here it is assumed that both Main-relays are deriving their Voltage Input from the Line CVTrsquos (from different cores as per the recommended practice) However if this is not the case and the concerned Utility has a practice of using Line-CVT voltage input to one of the Main relays and Bus-CVT voltage input to the other Main relay it is recommended that voltage input to be used in time-differentiated AR logic shall be exclusively derived from the line-CVT for use in both the Main relays
It is also clarified that AR implementation is not required in case of radial feeders cables amp composite feeders and is optional for the lines interconnecting two generating stations
In addition to above the following logics (applicable to the Cases where AR is being proposed to be implemented from Main Protection Relays) are also intimated for the benefit of the Constituents
Since there are two Main protection relays (Main-I and Main- II) to decide upon proper way of implementing AR for achieving fool-proof AR operation it has been advised that instead of implementing AR from only one of the Main relays (in light of its low success rate) the following Alternatives be considered Alternative ndash 1 AR is implemented and kept functional from Main ndash I [Main-II] only but with feedback from Main-II [Main-I]
In this scheme AR is implemented and kept in service from Main-I [Main-II] as usual
Additionally Main-II [Main-I] relay is configured for single-pole (1-ph) tripping and the OPEN (TRIP) status of the concerned trip relay is used for triggering AR functionality in Main-I [Main-II] By this even if the fault is not sensed in the beginning by Main-I [Main-II] but sensed by Main-II [Main-I] AR operation is guaranteed However it may be noted that in cases of permanent faults this scheme may result in unsuccessful AR operation with Pole Discrepancy Relay coming to rescue if the fault is not sensed by Main-I [Main-II] but by Main-II [Main-I] at the time of auto-reclosing instant
Alternative ndash 2 AR is implemented and kept functional from both Main ndash I and Main-II
In this scheme AR is implemented and kept in service from both Main ndash I and Main-II as
usual As can be seen the scheme is reliable and is without any additional logics However to avoid the possibility of both relays racing for CLOSE-OPEN-CLOSE-OPEN operation in case of permanent faults it shall be ensured that along with other conditions ldquoAR BLOCK with 3-ph TRIPrdquo is also effected for the same phase fault as the original one that occurs during AR dead-time
Out of the above two also it has been suggested to consider Alternative-2 for implementing AR in view of its higher success rate
11 Network Configuration Changes
As per the information furnished by SR-Constituents to the OCC forum in their 132nd meeting (held on
09062017 Minutes circulated on 04072017) it is formed that the following configuration changes (additions deletions modifications of transmission elements) took place in the southern grid during
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 8
April 2017
Two STATCOMs (+- 50 MVAR Each) at NP Kunta commissioned on 16052017
Kudgi Unit I 72 Hrs trail run completed Successfully
400 kV Shankarapally-Suryapet I amp II commissioned on 05052017
22033kV SS at Hayathnagar IampII in Ranga reddy district of 50 MVA Capacity was commissioned on 03052017 by TSTRANSCO
SR II Power grid vide letter dated 10062017 had informed that consequent to the successful completion of Trial Operation the following assets under transmission system associated with ldquoSystem strengthening ndashXX in Southern Regional Gridrdquo have been put under Commercial Operation wef 0000 hrs of 10062017 in terms of clause 4 of CERC (Terms and Conditions of Tariff Regulations 2014)
1 x 500 MVA 40022033kV ICT at Trichy Substation along with associated bays and equipments
SR I Power grid vide letter dated 04062017 had informed that consequent to the successful completion of Trial Operation the following assets of ldquoTransmission System for Ultra Mega Solar Park in Anantapur Dist Andhra Pradesh- Part ndash A (Phase-I)rdquo have been put under Commercial Operation wef 0000 hrs of 04062017 in terms of clause 4 of CERC (Terms and Conditions of Tariff Regulations 2014)
+- 100 MVAR STATCOM at NP Kunta Pooling Station along with associated bays and equipment
12 Instances of SPS Operation
Based on the information furnished by SRLDC it is informed that there occurred no SPS operations in SR during the period 25052017 ndash 28062017
13 Status of Implementation of Protection Audit Recommendations (Phase-I amp Phase-II)
With reference to the petitions filed by KSEB (88MP2016) and KPTCL (135MP2016) for seeking further time-extension for completing their respective Protection Audit Recommendations (PAR) the final Order of Honrsquoble CERC disposing of petitions was issued on 15122016 In this Order the Commission apart from granting last-chance time-extensions to various SR-Constituents had also directed SRPC to monitor the status of completion of PAR regularly in PCSC meetings and submit bi-monthly report to the Commission confirming the completion of Phase-I and Phase-II of PAR of the Constituents of Southern Region
In this regard based on the information furnished various Constituents a summary table showing the
compliance status of various SR-Constituents as in July 2017 is given below
SlNo
Constituent
PAR (Phase-I) Activities
PAR (Phase-II) Activities
PAR (Ph-I amp Ph-II) Compliance ()
Remarks
Stipulated Completion
Date
Stipulated Completion
Date
1 APGENCO (Hydel)
31122017 31122017 40 ---
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 9
2 APGENCO (Thermal)
30072017 --- 75 Based on the status furnished timeline for complying with the remaining pending recommendations (3 in no) is expected by 31122017
3 APTRANSCO 31032017 --- 9571 Out of the 3 remaining pending recommendations two are expected to be completed in three months while the other is expected by 31122017
4 TSGENCO (Hydel)
31032017 31032017 8823 Based on the status furnished timeline for complying with the remaining pending recommendations (4 in no) is expected by 31122017
5 TSGENCO (Thermal)
31032017 31032017 80 Based on the status furnished timeline for complying with the remaining pending recommendations (3 in no) is expected by 31072017
6 TSTRANSCO 31032017 31032017 8523 Based on the status furnished timeline for complying with the remaining pending recommendations (13 in no) is expected by 30092017
7 KPCL --- 31112016 100 ---
8 KPTCL 31052017 31052017 2817 Based on the status furnished timeline for complying with the remaining pending recommendations (51 in no) is expected by 30092017
9 TANGEDCO 31122017 31122017 6389 ---
10 TANTRANSCO 31122017 31122017 50 ---
11 KSEB 30112016 31122017 9481 ---
12 NPCIL (MAPS) 31012017 --- 8889 Based on the status furnished timeline for complying with the remaining pending recommendation (ONE in no) is expected by 31122017
All above SR-Constituents are requested to adhere strictly to the time-lines given in the Order for
completing their respective pending PAR The IPPrsquos for whom there are pending PAR [viz Spectrum PGL GMR Barge - Kakinada Konaseema GPL APGPCL Vijjeswaram (Stage-I amp Stage-II) amp LANCO-Kondapalli PL] are also requested to complete them at the earliest
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 10
14 Nomenclature for naming various files uploaded in web-based Tripping Monitoring
System of SRLDC Portal
The nomenclature to be followed by the Constituents in naming various files (FIR DR EL TR) corresponding to a tripping incident was brought out in the SRPC letter No SRPC SE-III PCSC-45 4609 ndash 649 dated 26062015 and in the minutes of PCSC-45 issued vide SRPC letter No SRPCSE-III PCSC-45 2015 5422-455 dated 21072015 As illustrated therein the format to be followed for the user entered part-name is given below
Transmission Element File Name to be given by the user
Transmission Line SSN_DSN_line_FT
Inter-connecting Transformer SSN_ICT_FT
Generating Transformer SSN_GT_FT
Generating Unit SSN_Unit_FT
Where SSN = Source Station Name From end Station Name Sending end Station Name DSN = Destination Station Name To end Station Name Receiving end Station Name FT = File Type (FIR DR EL TR)
All SR-Constituents are requested to kindly intimate the above file naming nomenclature to all the concerned and ensure that it is strictly followed at all the stations in their respective control areas so that tripping analysis can be done systematically
15 Date amp Venue of the next PCSC Meeting
It is informed that the 66th meeting of PCSC will be held on 17th August 2017 (Thursday) from 1030 hrs onwards in the Conference Hall of SRPC Secretariat Bengaluru
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 132
Analysis of Grid Occurrences - 65
I Details of Grid Disturbances
Sl No
Details of Event Date amp Time Reason Remarks Category
1
Complete outage of 230 kV Villianur Substation of Pondicherry
19-05-2017 at 1235 hrs
Triggering incident was failure of CT in 110 kV Villianur-Kurumbapet at Villianur substation 230KV Villianur ndash NLC2 and 230 kV Villianur - Pondy lines got tripped from Pondy end (on operation of DEF) and NLC end (on operation of Zone-3) respectively resulting in loss of supply to 230 kV Villianur substation
Load Loss 140 MW
GD-1
SLD
The single line diagram of 230 kV Villianur SS as furnished by PED is attached at the end 230 kV Villianur ndash Pondy line Villianur (PED) end
As per FIR TR line was kept holding
The following was also stated in FIRTR
Remedial action Relay testing amp calibration proposed during total shutdown on 13062017
DR amp EL not furnished Pondy (PGCIL-SR2) end
As per FIRDRELTR line tripped at 123559270 hrs on B-E fault due to DPR Z3 (98 km 156 kA) operation From DR amp EL Z3 time delay was observed to be about 06 sec
230 kV Villianur ndash NLC2 line Villianur (PED) end
As per FIR TR line was kept holding
The following was also stated in FIRTR
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 232
Remedial action Relay testing amp calibration proposed during total shutdown on 13062017
DR amp EL not furnished NLC2 (NLCIL) end
As per FIRDRELTR line tripped at 123551016 hrs on B-E fault due to DEFR operation From DR amp EL DEFR time of operation was observed to be about 07 sec
Time sync of Protection relays with GPS at NLC TPS-II needed to be ensured SRPC SRLDC
It was noted that the triggering incident was failure of B-ph CT in 110 kV Villianur-Kurumbapet line at Villianur SS
It was noted that for the above fault distance protection at Villianur end on 110 kV Villianur-Kurumbapet line had not operated probably due to absence of current input (hence impedance becoming infinite)
Further since there was no busbar protection to 110 kV buses the fault continued to be fed from the remote ends (Pondy-PG and NLC-2) through 100 MVA Transformers (Txr ndash 1 amp Txr ndash 2)
So the transformersrsquo back-up protections were called into action But since OC protections provided on both HV amp LV sides had no high-set Units and since they were kept non-directional [Relay make ER TJM 10] LV (110 kV) side OC protections of both transformers had acted to give trip command Even though the 110 kV CB of Txr ndash 1 got opened that of Txr-2 had not opened due to which the fault continued to be fed from the remote ends (Pondy-PG amp NLC-2)
It was noted that the HV (230 kV) side OC protection of Txr-2 which was supposed to act under above situation had NOT acted
Due to above the remote end back-up protections were called into action
It was noted that even though Pondy-PG end CB tripped on DPR Z3 protection the time delay observed was on the lower side of about 06 sec
It was also observed that DEF protection had acted to trip its CB at NLC-2 without giving any chance for its distance protection to operate
In view of the above observed inconsistencies at Villianur SS it was decided to review various feeder amp transformer protections kept at Villanur SS during its scheduled protection audit on 10072017
Subsequently protection audit of 230 110 kV Villianur SS of PED was conducted on 10072017 during which several lacunae were noted Accordingly a comprehensive set of recommendations were given to PED for early compliance
Recommendations
PED to furnish an action taken report wrt complying with the protection audit recommendations PGCIL (SR-II) to review Zone-3 and DEF protection setting at Pondicherry end 230 kV Pondicherry ndash
Villianur and 230 kV Pondicherry ndash Bahour line and set them appropriately to achieve required
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 332
time-coordination with OC protections of ICTrsquos at Villianur SS NLCIL to keep DEF protection in blocked condition as long as Distance Protection is active and
configure it to become active only when distance protection does not pickup to avoid time-coordination issues
2
Complete outage of 400kV Uravakonda and Jammalamadugu Substations
31-05-2017 at 1744 hrs
Triggering incident was tripping of 400 kV Kurnool-PG - Narnoor line - 1 amp 2 and 400 kV Narnoor-Jamalamadugu line-2 which led to loss of supply to 400kV Uravakonda and Jamalamadugu 400kV Gooty-Narnoor 400kV Narnoor-Jamalamadugu-1 400kV Srisailam-Narnoor 400kV Uruvakonda-Mahboobnagar-1amp2 were out of service in antecedent condition
Gen Loss 500 MW
GD-1
FNN not followed by APTRANSCO FIR amp TR in prescribed formats not furnished by APTRANSCO SLD
The single line diagram 400 kV Jammalamadugu SS as furnished by APTRANSCO are attached at the end
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 432
Antecedent Conditions
The following lines were kept out of service 400kV Narnoor-Srisailam SC line 400kV Narnoor-Gooty SC line 400kV Narnoor-Hyderabad SC line 400kV Narnoor-Jamalamadugu-1 line 400kV Uravakonda-Jamalamadugu-1 line 400kV Uravakonda-Mahboobnagar line-1amp2
Above means Uravakonda SS and Jammalamadugu SS were effectively hanging on to 400 kV Jamalamadugu - Narnoor line-2 for supply
A Tripping of 400 kV Kurnool (PG) - Narnoor line-1 Kurnool-PG (PGCIL-SR1) end
As per FIRTR line tripped at 174418601 hrs due to DPR Z3 (5703 km) operation
As per DREL line tripped at 174418601 hrs due to Stub Protection operation Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 173620637 hrs due to operation of Igt4 (B-ph) protection
From EL Igt4 time delay was observed as 100 msec
Time sync of protection relays with GPS needed to be ensured B Tripping of 400 kV Kurnool (PG) - Narnoor line-2 Kurnool-PG (PGCIL-SR1) end
As per FIRTR line tripped at 174418601 hrs due to DPR Z3 (5703 km) operation
As per DREL line tripped at 174418601 hrs due to Stub Protection operation Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 174306388 hrs due to operation of Igt4 (B-ph) protection
From EL Igt4 time delay was observed to be about 100 msec
Time sync of protection relays with GPS needed to be ensured C Tripping of 400 kV Narnoor ndash Jammalamadugu line-2 Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 174423979 hrs due to OVR-I operation (From EL OVR-I Time delay was observed as 5 sec which is in line with SRPC provided gradings)
Jammalamadugu (APTRANSCO) end
As per FIR line tripped at 1744 due to DT receipt from Narnoor end
As per DR line tripped at 174415040 hrs (Type of Protection operated was not recorded)
In EL events recording started from 174424037 hrs Line was observed to have got tripped around this time due to 862 operation (Type of Protection operated was not recorded)
Time sync of Protection relays with GPS needed to be ensured SRPC SRLDC
As informed by APTRANSCO it was noted that the triggering cause for operation of Stub protection Igt4 protection was a line fault on 400 kV Ghani ndash Narnoor line-1 Even though Ghani end had tripped on DPR Z1 protection and sent carrier to Narnoor due to unhealthiness of carrier communication (PLCC related issues) Narnoor end tripped on DPR Z2 protection
The above fault was seen by relays at both ends of 400 kV Narnoor ndash Kurnool-PG lines 1 amp 2 (the relays of P444 make are owned by PGCIL-SR1 and the relay settings were also provided by PGCIL-SR1)
As in formed by PGCIL (SR-I) it was noted that there was an instantaneous non-directional Igt4 protection setting in the specific relay style (defined by relay make model and version) which operates without checking for isolator status During the above instant the flow of heavy fault
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 532
current led to its operation both ends
To this PGCIL (SR-I) was informed that by default Igt4 or stub protection is configured for instantaneous operation with corresponding isolator open position interlock So further instantaneous high-set functionality that operates without checking isolator positional status is not desirable since it can lead to unwarranted trippings as in the present case Therefore the said setting shall be kept disabled If there is no provision to effect this (by means of changing relay settings) the issue may be referred to its OEM for obtaining modified firmware suitable solution PGCIL (SR-I) can also make use of other relays with different style in place of the existing relays
Recommendations
For 400 kV Ghani ndashNarnoor line the following shall be carried out by APTRANSCO End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced PGCIL (SR-II) to take appropriate action wrt disabling non-directional instantaneous Igt4 protection
that operates without checking existence of stub If required the issue may be referred to relays OEM for appropriate solution or the present relays may be replaced with other relays with different styles that donrsquot have the issue observed
II Details of Grid Incidents
Sl No Details of Event Date amp Time Reason Category
1 Tripping of 220 kV Idukki ndashUdumalpet line
05-05-2017 at 1702 hrs
Line tripped due to B-N and R-N fault in line
GI-1
Idukki (KSEB) end
As per FIRDREL line tripped (in 3-ph) at 170200500 hrs on B-E fault due to operation of DPR Z1 (3661 km) protection
Udumalpet (TANTRANSCO) end
As per FIRDRELTR line tripped (in B-ph) at 165741907 hrs on B-E fault due to DPR Z2 (CAT AR 1025 km) operation However during AR dead-time another R-E fault was detected at 165742252 hrs in Zone-2 due to which line tripped in 3-ph after Z2 time delay of 350 msec at 165742594 hrs [It may be noted that all this happened during the AR dead-time]
Time-sync of Protection Relays with GPS needed to be ensured at 220 kV Udumalpet SS KSEB
During the instant case line did not try for AR as the external VARM AR relay was faulty and kept out of service
Remedial action Problem with VARM relay had been rectified and put into service on 10052017
SRPC SRLDC
From the DR of Udumalpet it can be seen that the relay had tried for AR even after giving three phase trip during AR dead-time due to occurrence of two different faults which is not desirable
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 632
Recommendations TANTANSCO to correctly configure AR logic at Udumalpet so that in the event of 3-ph trip being
given during AR dead-time the relay will not try for auto-reclosure TANTRANSCO to keep AR dead-time as 1 sec for all 220 kV amp above transmission lines
2
Tripping of 400 kV Kudgi (PG) - Tumkur line-2 and Kudgi (PG) ndash Kudgi (NTPC) line-1
06-05-2017 at 1605 hrs
Kudgi (NTPC) feeder tripped at Kudgi (PG) end on operation of distance protection R-N Zone-1 Tumkur feeder tripped at Kudgi(PG) end on operation of NGR buchholtz relay
GI-2
SLD
The single line diagram of 765 400 kV Kudgi-PG SS as furnished by are attached at the end 400 kV Kudgi (PG) ndash Kudgi (NTPC) line-1 Kudgi (PGCIL-SR2) end
As per FIRDRELTR line tripped (in 3-ph) at 160547499 hrs on R-E fault due to DPR Z1 (M1 79 km 013 kA M2 88 km 318 kA) operation
Kudgi (NTPC) end
FIRDRELTR not furnished 400 kV Kudgi (PG) ndash Tumkur line-2 Kudgi (PGCIL-SR2) end
As per FIRDRELTR line tripped (in 3-ph) at 160547450 hrs due to operation of NGR Buccholtz trip protection
Tumkur (PGCIL-SR2) end
As per FIRELTR line tripped (in 3-ph) at 160547596 hrs due to DT receipt from Kudgi-PG end
In DR this time was mentioned as 160512593 hrs
Time-sync of protection relays with GPS needed to be ensured PGCIL (SR-II)
With regard to tripping of 400 kV Kudgi (PG) ndash Kudgi (NTPC) line ndash 1 and AR non-operation it was informed that prior to above fault there were multiple faults on all four lines between Kudgi (PG) and Kudgi (NTPC) due to prevailing stormy weather
Remedial action Actual reasons for AR failure in the instant case were being investigated The issue was also
referred to its OEM for suitable advice
With regard to tripping 400 kV Kudgi (PG) ndash Tumkur line ndash 2 it was suspected that NGR Buchholtz relay might have mal-functioned as there was no gas collected in the bucholtz relay of NGR It may be noted that NGR buchholtz trip is present in REF relay
Remedial action Oil sample of NGR taken and sent to RTDC
Recommendations PGCIL (SR-II) to sort out AR related issues at Kudgi (PG) end on 400 kV Kudgi (PG) ndash Kudgi (NTPC)
lines and put AR into service PGCIL (SR-II) investigate the reasons for NGR Buccholtz trip on 400 kV Kudgi (PG) ndash Tumkur line-2
and furnish an action taken report wrt rectifying the same
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 732
3 Tripping of 220 kV Edamon-Tirunelveli lines - 1amp2
06-05-2017 at 1809 hrs
220kV Edamon-Tirunelveli - 1amp2 tripped from Tirunelveli end only and was in service from Edamon end
GI-1
Edamon (KSEB) end
As per FIR line was kept holding from Edamon end Tirunelveli (PGCIL-SR2) end
As per FIRDRELTR lines tripped (in 3-ph) at 180921343 hrs on R-B fault due to DPR Z1 (532 km) operation
It was stated in TR that Edamon ndash Pothencode lines 1 amp 2 had tripped around the same time and it was suspected that DPRrsquos at Tirunelveli end on 220 kV Tirunelveli ndash Edamon lines 1 amp 2 might have over-reached for the fault in 220 kV Edamon - Pothencode lines
PGCIL (SR-II)
The instant case was a typical case of overreaching of distance relays at Tirunelveli being experienced for quite a while It may be probably due to bunching of the conductors involved
Remedial action It was proposed to modify Z1 setting as 50 of line impedance with POR and would be done
within one-week time They had also proposed to measure the actual line impedance of the line and adjust Z1 settings
accordingly
06-03-2017at 0607 hrs
4 Tripping of 400220 kV Ghani ICT-2amp3
07-05-2017 at 1405 hrs
ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
GI-2
FNN not followed by APTRANSCO FIRrsquos in prescribed format not furnished by APTRANSCO SLD
The single line diagrams of 400220 kV Ghani SS as furnished by APTRANSCO is attached at the end Tripping of 500 MVA 400 220 kV ICT-2
As per FIR ICT-2 tripped at 1405 hrs due to operation of Y-ph OC amp EF protections
DR amp EL not furnished Tripping of 500 mVA 400 220 kV ICT-3
As per FIR ICT-3 tripped at 1405 hrs due to operation of Y-ph OC amp EF protections
DR amp EL not furnished SRPC SRLDC
When enquired about the reasons for operation of back-up protections of ICTrsquos ndash 2 amp 3 APTRANSCO replied that there was actually a fault on the 220 kV feeders emanating from 400 220 kV Ghani PS However since the CT Neutral connection setting had been wrongly set as ldquoTowards Bus siderdquo instead of the correct ldquoTowards Transformer siderdquo the back-up protections on 220 kV side operated for the said 220 kV line fault
APTRANSCO also informed that first ICT-2 tripped followed by ICT-3
But since it was not clear from the above explanation whether line protection on 220 kV side had operated or not and the delayed clearance of the fault observed during the incident (about 400 msec) APTRANSCO was asked to investigate the reasons for the same
APTRANSCO was also asked to check whether carrier aided protection is healthy on 220 kV lines emanating from 400 220 kV Ghani PS
07-03-2017 at 1602 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 832
Recommendations APTRANSCO to check and correct all CT Neutral Connection settings in various protection relays at
their 400 220 kV Ghani PS APTRANSCO to ensure that PLCC carrier aided protection is maintained healthy on 220 kV lines
emanating from their 400 220 kV Ghani PS APTRANSCO to take steps to complete configuration works of DRrsquos amp ELrsquos of various protection
relays at their 400 220 kV Ghani SS and furnish the same as and when required in compliance of IEGC Regulation 52 (r)
5 Tripping of 400 kV Ghanapur-Mamidapalli line
08-05-2017 at 1915 hrs
Line tripped at Ghanapur end only and was holding from Mamidapalli Ghanapur end protection had sensed R-phase to earth fault
GI-2
Mamidipalli (TSTRANSCO) end
As per FIR line was kept holding from Mamidipalli end
In DR R-E fault current (2894 kA) along with dip in R-ph voltage could be seen but if any protection relay had picked could not be verified Also EL furnished did not contain events for this time (In fact no events were found recorded after 160610859 hrs)
Ghanapur (PGCIL-SR1) end
As per FIRTR line tripped (in 3-ph) at 1915 hrs on R-E fault due to DPR Z1 (49 km 2547 kA) operation
As per DR line tripped (in 3-ph) at 191330020 hrs on R-E fault due to 3-ph Group-B Trip relay operation (Zone-3 pick-up also could be observed)
As per EL line tripped (in 3-ph) at 191541722 hrs on R-E fault due to 3-ph Group-B Protection Trip relay operation
Time-sync of protection relays with GPS needed to be ensured
When enquired about the reasons for observed discrepancies PGCIL (SR-I) informed that line tripped on operation of distance protection Since last 2-3 trippings permissive carrier was not being received at Mamidipally end
Further since PLCC at both ends belong to TSTRANSCO thorough check-up of PLCC carrier communication and tuning of PLCC link needed to be undertaken
For above one-day shut-down of line was requested to which SRLDC agreed
Recommendations For the line under consideration the following shall be carried out by TSTRANSCO in coordination
with PGCIL (SR-I) End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
08-03-2017 at 1033 hrs
6 Tripping of 400220kV ICT-1 at Guttur
09-05-2017 at 2215 hrs
ICT-1 tripped on HV side only without any relay indications GI-2
As per FIRTR ICT-1 tripped at 2215 hrs only on HV side without any relay indications KPTCL
ABB make RXMS trip relays provided in various lineICT panels were found to be mal-operating and the phenomenon observed was suspected due to raise in earth potential during any fault in Guttur substation
10-03-2017 at 1801 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 932
Remedial action Action wass being taken to provide 10kΩ resistor in series with the RXMS relay coil for all trip
relays of this type at Guttur Total 170 nos of such resistors were required Now purchase formalities were finalised and work of supply and fixing of resistors would be taken up and completed within a monthrsquos time
7 Tripping of 400 kV Narsapur-Shankarapalli line
10-05-2017 at 0007 hrs
Line tripped at Narsapur end only on B-Phase to earth fault and line did not trip from Shankarapalli
GI-2
SLD
Shankarapally (TSTRANSCO) end
As per FIR line was kept holding from Shankarapally end Narsapur (TSTRANSCO) end
As per FIRDREL line tripped in 3-ph at 000720105 hrs on B-E fault due 86 Trip relay (130 km) operation
The type of protection operated was not recorded shown in either DR or EL
TR not furnished TSTRANSCO
For the fault on 400 kV Shankarapalli-Mamidapalli line Narsapur end picked up in Z3 However due to configuration issues relating to programmable Zone Zp (this was being used as Zone-3 and its time-setting was found to be kept as zero sec) it tripped instantaneously instead of tripping after Zone3 time delay
Remedial action PSL Configuration for Zp was set right on 01-06-2017
13-03-2017 at 2347 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1032
8
Tripping of 400220 kV Hyderabad ICT-4 and 220 kV lines at Hyderabad substation
10-05-2017 at 239 hrs
Operation of busbar protection due to fault in 220 kV Bus at 220kV Hyderabad Substation
GI-1
SLD
1 2 1 2
Bus-1
Bus-2
x
xx
x
BUS BAR ACTED AT 220KV GHANAPUR SS ON 10-05-2017
CHANDRAYANAGUTTA HAYATHNAGAR
132KV BUS
160MVA-3 100MVA-1
400kV PGCIL
x x
160MVA-2ICT-1 ICT-2 ICT-3
NAGOLE
x x
ICT-4
x
MOULALI
INFOSYS
x
x
1 2
Y-Ph disc
flash over at
LocNo95
Y amp B-Ph
disc flash
over at
LocNo95
RELAY INDICATIONS ON THE FEEDER
AT GHANAPUR END AT CHANDRAYANGUTTA END
Chandrayangutta-I feeder Ghanapur-I feeder
Main-1 relayYNZ1 071kM Main-1 relayYN254kM
Main-2 relayYNZ1 09kM Main-2 relayYN
Chandrayangutta-II feeder Ghanapur-II feeder
Main-1 relayYB Z1378kM Main-1 relayRYB
Main-2 relayYBZ111kM Main-2 relayRYB
BC
14-03-2017 at 1911 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1132
Tripping of ICT-4
As per FIR ICT-4 tripped at 0240 hrs on 220 kV side only due to BBP operation on 220 kV Bus
As per DR ICT-4 tripped at 220941165 hrs apparently due to LBB operation
EL not furnished
Date amp Time-sync of DR not in order (09052017 220940682 hrs)
TR furnished did not contain any analysis or remedial action taken
It was noted that BBP for 220 kV Bus-2 had operated for a close-in line fault on 220 kV Chandrayanagutta line-2 tripping ICT-4 and other connected 220 kV feeders (It was informed that ICT-2 was not in service at the time of instant tripping)
When enquired about the reasons TSTRANSCO informed that presence sudden appearance of current in the corresponding Peripheral Unit (PU-2) of the Chandrayanagutta line-2 had led to BBP operation And the reasons for the same were being investigated
To this it was suggested to check corresponding CT neutral connection integrity of cable wiring from CT to Busbar panel as also carry out stability-check of busbar protection
Recommendations TSTRANSCO to investigate the reasons for BBP operation for 220 kV Bus-2 and furnish a report on
the remedial measures taken
9 Tripping of 400220 kV ICT-1 at BTPS
13-05-2017 at 1941 hrs
ICT-1 got tripped on operation of LV side earth fault protection during R-phase to earth fault in 220 kV BTPS-Lingapur line
GI-1
SLD
The single line diagram of 400220 kV BTPS as furnished by KPCL is attached at the end
As per FIRTR ICT-1 tripped at 1942 hrs on LV side earth fault protection due to fault in 220 kV BTPS ndash Lingapur line It was stated that the line also tripped around the same time on R-E fault due to DPR Z1 (2438 km) operation
DR amp EL pertaining to ICT-1 tripping not furnished
As per furnished DREL 220 kV BTPS ndash Lingapur line tripped from BTPS end at 194124719 hrs due to DT receipt from the remote end
KPCL
ICT-1 tripped due to non-directional sensitive earth fault protection provided on LV (220 kV) side
Remedial action The time lever for above protection was increased from 0025 to 01 in the third week of May
2017 in consultation with KPTCL KPTCL
220kV BTPS- Lingapur line tripped at both the ends with following indications At BTPS Lingapur Line tripped on DPRZone-1RN24km78kA
At Lingapur BTPS line tripped on DPRZone-2RN66km29kA
It was reported that 315MVA ICT-1 tripped on LV side earth fault protection along with Lingapur line
Remedial action Existing settings of ICT back up protection is obtained from local RT wing of KPTCL for review
Revised settings communicated to KPCL for implementation
16- 03-2017 at 0118 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1232
SRPC SRLDC
Since the ICT has been provided with normal back-up directional OC amp EF protections a separate non-directional sensitive earth fault protection is not desirable hence the need for the same may be reviewed Otherwise its time lever shall be suitably increased to a higher value (say 035) so as not to cause unwarranted trippings
Further tripping of 220 kV BTPS ndash Lingapura line from BTPS end on DT receipt was not in order
When enquired about the reasons for AR non-operation in the instant case for the above line KPCL replied that there were issues with PLCC carrier communication hence it was kept out of service
Recommendations KPCL to review the need for providing separate non-directional sensitive earth fault protection for
ICTrsquos at their BTPS station and take steps to disable the same For 220 kV BTPS ndashLingapura line KPCL to resolve issues relating to PLCC carrier communication and
put AR into service
10 Tripping of 765 kV Kurnool-Tiruvalam line-2
19-05-2017 at 2003 hrs
Failure of R-phase LA at Tiruvalam end REF operation and DT send were observed from EL of Kurnool station
GI-2
Kurnool (PGCIL-SR1) end
As per FIRTR the line tripped in 3-ph at 200318272 on R-B-E fault due to DPR Z2 (CDistance = 912) operation
As per DR line tripped in 3-ph at 200318272 hrs on R-E fault (B-E fault did not appear to be strong) due to DPR Z2 (CAT) operation and 3-ph Group - A amp B Trip relay operation (In DR DT receipt event was observed around the same time)
In EL REF protection operation of PU-P141 operation and DT_SEND to the remote end was observed at 200318340 hrs
Tiruvalam (PGCIL-SR2) end
As per FIRDRELTR the line tripped in 3 ph at 200318269 on R-E fault due to DPR Z1 operation and DT receipt from the remote end
It was stated in TR that 707 RLA (Reactor LA) had fallen down due to heavy wind and caused R-E fault
When enquired about the reasons for REF protection operation and consequent sending of DT to the other end PGCIL (SR-I) informed that the fault was detected as R-B-E fault hence three-phase trip was given However even though Main-CB got opened with its three poles opening simultaneously Tie-CB got opened in R-ph immediately while the other two phase poles took a while to open This had caused Tie-CB LB operation Since this protection was implemented in REF relay trip was extended from the same along with sending of DT to the other end
To this it was pointed out that in the instant case only R-E fault was apparent and the current in B-ph was almost at the normal value hence the sensitivity of distance relay zone elements may be checked Further Tie-CB LBB operation points to sluggishness of the CB-poles hence the opening time of tie-CB may be checked and properly set
It was also noted that in the EL of Tiruvalam DT Send event was observed after tripping of the line on R-E fault PGCIL (SR-II) was asked to look into the reasons for the same and take suitable remedial action
16-03-2017 at 1023 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1332
11 Tripping of 400220 kV ICT-2 at Kalpaka SS
20-05-2017 at 1502 hrs
ICT-2 tripped due to operation of Transformer Buchholtz relay
GI-2
As per FIR ICT-2 tripped at 15053283 hrs due to its Buccholtz relay operation It was stated in FIR that heavy rain amp gale had been reported at the time of tripping
APTRANSCO
Just prior to above tripping event station transformer supply went off When the supply came back the two oil cooling pumps which were supposed to start one after another with a time gap of 15 sec had started simultaneously due to problem in the timer module Due to this there was a sudden flow of oil which shorted the contacts of the micro-switch that gives buchholtz trip
Remedial action The faulty timer module of oil cooling pump had been replaced
On this SRPC asked for the details of AC auxiliary supply about its redundancy details of DG-set and the mode of starting (manual or auto) To this APTRANSCO informed that redundancy for AC auxiliary supply is present and the lost supply during the instant case had been restored immediately
Recommendations
APTRANSCO to furnish AC auxiliary supply details including its redundancy DG set details and its mode of starting at their 400 220 kV Kalpaka SS Further corresponding AC auxiliary supply changeover scheme drawing shall also be furnished
16-03-2017 at 1132 hrs
12 Tripping of 400220 kV ICT-2 at KV Kota SS
23-05-2017 at 1021 hrs
ICT-2 got tripped due to mal-operation of transformer oil temperature indicator
GI-2
As per FIR ICT-2 tripped at 1021 hrs on both HV and LV sides due to transformer oil temperature indicator mal-operation
As per EL ICT-2 tripped at 1019XXXXX192 hrs on due to operation of OTI protection
It was stated that DR had not been triggered for the event
Time-sync of protection relays with GPS needed to be ensured
EL was not configured to show SECONDS in time-stamp of the events (This had been brought to APTRANSCOrsquos attention in previous PCSC meetings also)
APTRANSCO
At KV Kota SS OTI got stuck While checking the same its position indicator got changed and mal-operated resulting in 3-ph trip
Remedial action Ms CGL had visited the substation and declared the relay faulty It was proposed to replace the faulty OTI on 10072017
APTRANSCO was asked to configure Event Loggers at their KV Kota SS properly so that SECONDS are also displayed in the time stamp of the events recorded
16-03-2017 at 1245 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1432
13
Tripping of 220 kV Kaniampeta - Kadakola line (Load Loss at Kaniampeta = 36 MW)
23-05-2017 at 1350 hrs
EFR relay operated and B-ph pole discrepancy relay operated leading to tripping of Bus-Coupler CB
GI-1
Kaniampeta (KSEB) end
As per FIR in Kaniyampetta 220 kV substation all transformers tripped (Load loss 36 MW) at 1339 hrs due to the tripping of 220 kV Kaniyampetta-Kadakola feeder (B phase) at Kadakola end Later 220 kV Kaniyampetta-Kadakola feeder was hand tripped at 1426 hrs from Kaniyampetta end
Kadakola (KPTCL) end
As per FIR line tripped at 1350 hrs due to EFR operation of Bus-Coupler CB and PDR operation
It was also stated that at the time of tripping Kaniampeta panel had been taken up for RampU work hence distance relay was not in service Kaniampeta CB was bypassed by keeping protection through 220 kV Bus-Coupler CB
DR amp EL not furnished KPTCL
At Kadakola during the instance protection to Kaniambetta line was provided through 220kV bus coupler breaker bay as Kadakola relay panel was taken out for M-2 retrofitting work under RampU
Bus coupler breaker tripping was suspected due to problem in the pole discrepancy relay and there was no fault in the line
Remedial action Problem with the PD relay of Bus coupler breaker was rectified on 24052017
16-03-2017 at 2026 hrs
14 Tripping of 400 220 kV ICT-1 at Somanahalli substation
24-05-2017 at 1724 hrs
ICT-1 at Somanahalli substation got tripped due to DC Earth fault
GI-2
Somanahalli (PGCIL-SR2) end
As per FIRTR ICT-1 tripped (on HV side) at 172809 hrs on momentary DC Earth fault
As per DREL ICT-1 tripped (on HV side) at 172809812 hrs due to operation of Group AB trip relays In DR manual trigger signal becoming HIGH was observed at above instant
In EL time resolution for recording events was limited to seconds (events were not shown at msec level)
PGCIL (SR-II)
At Somanahally SS 3x167 MVA single phase units had been replaced by 1x500 MVA ICT Subsequently CSD works were taken up At the time of tripping event CSD wiring works were going on During the process positive DC supply got extended to 86A trip relay inadvertently
Remedial action DC earth fault had been removed
PGCIL (SR-II) was asked to configure Event Loggers at their Somanahalli SS properly so that time resolution for recording events was set u pto msec
16-03-2017 at 118 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1532
15 Tripping of HVDC Gazuwaka Pole-1amp2
25-05-2017 at 0945 hrs
HVDC pole-1 got tripped due to operation of South filter inter zone protection and HVDC pole-2 got tripped due to operation of differential protection
GI-2
SLD
Pole-1
27-03-2017 at 1016 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1632
Pole-2
Tripping of HVDC Pole-1 (PGCIL-SR1)
As per FIRELTR Pole-1 tripped at 094513960 hrs due to operation of South Filter inter-zone protection [
It was stated that DR was not available Tripping of HVDC Pole-2 (PGCIL-SR1)
As per FIRDRELTR Pole-2 tripped at 094512906 hrs due to operation of WIN Differential protection
It was noted that no representative from Gajuwaka (HVDC amp HVAC) SS had come to attend the meeting to explain as to what caused the pole trippings
PGCIL (SR-I) representative informed that at the time of tripping RTV Coating works for switchyard equipment were going on In the process when CWC35 filterrsquos bus-side isolator was opened it feel down unexpectedly and resulted in inter-zone filter protection operation
Wrt HVDC Pole-2 tripping PGCIL (SR-I) representative informed that oscillations in voltage and current were noticed prior to tripping of HVDC Pole-2 And differential current was also observed for the extended AC bus Due to this WIN differential protection had operated resulting in tripping of HVDC Pole-2 It was also informed that the issue was referred to its OEM ABB (Sweden) for suitable advice
However since no detailed tripping report explaining the causes that led to tripping of HVDC poles and the remedial action taken had been furnished PGCIL (SR-I) was asked to submit the same
Recommendations PGCIL (SR-I) to furnish detailed report on the events that led to tripping of HVDC Poles ndash 1 amp 2
including remedial measures taken to PCSC forum Further the OEM report wrt tripping of HVDC Pole-2 shall also be furnished
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1732
16 Tripping of 400 kV Kayathar-Karaikudi line
25-05-2017 at 1552 hrs
R-phase to earth fault had occurred in line There was Zone-2 3 phase trip operation at Kayathar end and Zone-1 3 phase trip at Karaikudi end
GI-2
Kayathar (TANTRANSCO) end
As per FIRDRELTR line tripped in 3-ph at 155236989 hrs on R-E fault due to DPR Z2 operation (Z2 time delay observed was about 390 msec)
It was stated in TR that carrier channel was not healthy at the time of tripping and carrier signal was not received at this end during the fault
Remedial action Protection Coupler and OLTE were reset at both Karaikudi amp Kayathar ends and carrier channel
was made available Karaikudi (PGCIL-SR2) end
As per FIRDRELTR line tripped in 3-ph at 155236592 hrs on R-E fault due to DPR Z1 (186 km) operation
It was stated in TR that DPC had failed at the other end and resulted in Carrier Fail alarm at Karaikudi end issuing 3-ph trip
Recommendations
For the line under consideration the following shall be carried out by TANTRANSCO in coordination with PGCIL (SR-II) End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
17
Tripping of 400220 kV ICT - 1 amp 3 at Hoody substation of KPTCL (Load Loss 750 MW)
26-05-2017 at 1230 hrs
R phase limb of ICT-1 bank pre-close supervision contact of trip coil -2 had arc over ICT-3 got tripped on over-loading
GI-2
Tripping of ICT-1
As per FIR ICT-1 tripped at 1230 hrs due to arcing over of R phase limb of ICT-1 bankrsquos pre-close supervision contact of trip coil -2
As per DR the tripping took place at 114128806 hrs (Type of protection operated not recorded)
EL not furnished
Time sync of PRrsquos with GPS needed to be ensured
Remedial action The same was rectified and the circuit was changed by utilizing the spare auxiliary contact of CB
for R-ph limb by availing LC on 29052017 and charged the ICT-1 bank at 0432 hrs by getting the SRLDC code 1360
Tripping of ICT-3
As per FIR ICT-3 tripped at 1230 hrs due to operation of INV OC FWD protection amp 86A master trip relay
From the DR furnished (with trigger time = 114254202 hrs) tripping of ICT-3 and the type of protection operated were not clear
EL not furnished
Time sync of protection relays with GPS needed to be ensured at Hoody
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1832
KPTCL
At Hoody 500 MVA ICT-1 tripped without any relay indication ICT-1 and 3 were in parallel each ICT carrying about 390MW of load Due to tripping of ICT-1 ICT-3 got over loaded and hence tripped on over current protection
Remedial action After detailed inspection it was observed that pre-close supervision contact of trip coil -2 arced
over in R phase limb of the 400kV side breaker Hence it was suspected that R-pole might have opened initially and remaining poles on PD operation
The problem was rectified and attended on 29052017 by availing shut down In order to avoid tripping of another ICT operating in parallel whenever one ICT trips on fault an
SPS is being finalized by KPTCL which is to be implemented at Hoody Any time each ICT at Hoody will be catering around 400MW of load Such huge load shedding by tripping 66kV loads of Hoody station is difficult to achieve Hence 220kV radial feeders may also have to be tripped to get desired load shedding
It was noted that frequent tripping of 400 2220 kV ICTrsquos at Hoody SS had been observed in the past few months And during their discussion in various PCSC meetings the following issues have come to the for urgent action by KPTCL Implementation of Special Protection Scheme (SPS) to take care of over-loading of the other ICT
when one out of two ICTrsquos operating in parallel trips Provision of Bus-bar protection to 220 kV buses Compliance of Third Party Protection Audit Recommendations Ensuring supply reliability to Metro-services Action plan on the proposed system strengthening measures in Bengaluru area in the context
of continued use of Split-Bus operation
Thus to ascertain the action taken by KPTCL wrt above issues a Protection System Analysis Group (PSAG-18) meeting was proposed to be conducted on 03082017
Recommendations KPTCL to furnish compliance report on the recommendations given in PSAG-18 meeting to PCSC
forum
18 Tripping of 400 kV Simhadri - Kalpaka line-2
28-05-2017 at 503 hrs
Line tripped on mal-operation of Tee Differential Protection at Simhadri end and Direct Trip was received at Kalpaka
GI-2
Kalpaka (APTRANSCO) end
As per FIR line tripped at 0503 hrs due to DT receipt from the remote end
DR amp RL amp TR not furnished Simhadri STPS (NTPC) end
As per FIRTR line tripped at 050350408 hrs due to operation T-differential protection which in turn was attributed to spurious pick-up during the fault at Vemagiri end
The following was stated in TR Kalpaka Line-1amp2 Tie bays were under PTW And R-Ph CT (16CTA R-Ph) was under erection Primary connection was over secondary
connection was pending The CT secondary wires used in T-Diff protection of Kalpaka Line-2 might be touching the earth and during fault at Vemagiri some stray voltage developed across CT secondary cores might have resulted into operation of T-Diff protection Trip values are 100mA in secondary
During the operation of T-diff protection there was no change in current magnitudes of Kalpaka Line-2 and hence the tripping could be considered as spurious one
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1932
As per DR line tripped at 050350442 hrs But the type protection operated was not recorded in it
EL not furnished (In place of EL DRrsquos eventsrsquo summary was furnished)
19 Tripping of 400 kV Ramagundam - Gajwel line
29-05-2017 at 0007 hrs
Over Voltage Stage-1 had operated at Gajwel end Ramagundam end did not trip as Direct Trip was not received from Gajwel end
GI-2
Ramagundam STPS (NTPC) end
As per FIR line was kept holding from Ramagundam end Gajwel (TSTRANSCO) end
As per FIR line tripped at 0007 hrs due to OVR-I operation
DR amp EL amp TR not furnished
The tripping was not in order as per the SRPC given OVR gradings as shown below
When enquired about the reasons for OVR-I operation TSTRANSCO informed that OVR functionality implemented in REL 521 had mal-operated
Remedial action The OVR functionality had been moved to an external Over Voltage relay
Recommendations
For the line under consideration the following shall be carried out by TSTRANSCO in coordination with NTPC-Ramagundam End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
20 Tripping of 400 kV Gajwel-Ghanapur line
29-05-2017 at 0007 hrs
Line tripped on operation of over voltage protection at Gajwel and direct trip was received at Ghanapur DR and EL of Gajwel end were not furnished
GI-2
Ghanapur (PGCIL-SR1) end
As per FIRELTR line tripped at 000731885 hrs due to DT receipt from the remote end
As per DR line tripped at 000257163 hrs due to DT receipt from the remote end
Time-sync of DR amp EL with GPS needed to be ensured Gajwel (TSTRANSCO) end
As per FIR line tripped at 0007 hrs due to OVR-I operation
DR amp EL amp TR not furnished
The tripping was not in order as per the SRPC given OVR gradings as shown below
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2032
When enquired about the reasons for OVR-I operation TSTRANSCO informed that there was a loose
wiring in Y-ph CVT wiring which resulted in mal-operation of OVR-I protection
Remedial action All CVT wirings had been tightened for fool-proof operation
III Details of Trippings due to Failure or Non-operation of Auto-Reclose
Sl No Element Date amp Time Reason
Category
1 Tripping of 400 kV Hiryur-
BTPS line-1 06-05-2017 at 1401 hrs
Y-phase to earth fault had occurred in line Direct trip was sent from BTPS to Hiryur end
GI-2
Hiryur (PGCIL-SR1) end
As per FIRDRELTR line tripped (in Y-ph) at 140009730 hrs on Y-E fault due to DPR Z1 (AR 82 km 1034 kA) operation Just prior to auto-reclosing DT was received at 140010730 hrs and line tripped in 3-ph
BTPS (KPCL) end
As per FIRTR line tripped (in Y-ph) at 1400 hrs on Y-E fault due to DPR Z1 (AR 1173 km) operation AR was stated to be attempted but unsuccessful due to persistent fault
As per DREL line tripped (in Y-ph) at 125520000 hrs on Y-E fault due to DPR Z2 (CAT AR) operation and tried to auto-reclose after about 1 sec but tripped in 3-ph due to persistent (Z1) fault
Time-sync of Protection Relayrsquos with GPS needed to be ensured at BTPS
When enquired about the reasons for sending of DT to Hiriyur end KPCL informed that when the line tripped on Y-E fault and the AR operation was in progress Under-Voltage relay at BTPS end had sensed under-voltage and sent DT to Hiriyur end
It was noted that instantaneous tripping of UV relay and consequent of sending of DT to the other end are undesirable It was therefore suggested to introduce suitable delay (say 3 sec) for UVR tripping and disable sending of DT to the other end
Recommendations
KPCL to introduce suitable delay (say 3 sec) for UVR tripping and disable sending of DT to the other end on UVR operation at their BTPS station
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2132
2 Tripping of 400 kV Munirabad-Guttur line
06-05-2017 at 1702 hrs
R-phase to earth fault Auto-reclose was successful at Guttur and Breakers at Munirabad end got tripped
GI-2
Munirabad (PGCIL-SR1) end
As per FIRDRELTR line tripped (in 3-ph) at 170231624 hrs on Y-E fault due to DPR Z2 (AR CAT 1145 km) operation
Guttur (KPTCL) end
As per FIR line tripped (in R-ph) at 1702 hrs on Y-E fault due to DPR Z1 (AR 4708 km Ir=6877 kA) operation and successfully auto-reclosed
As per DREL line tripped (in R-ph) at 165933499 hrs on Y-E fault due to DPR Z1 (AR) and successfully auto-reclosed after about 1 sec
Time-sync of Protection Relays with GPS needed to be ensured at Guttur SS
When enquired about the reasons for AR non-operation at Munirabad end PGCIL (SR-I) informed that the external VARM relay through which AR had been implemented had not operated Since the relay belonged to KPTCL suitable action needed to be taken by them
On this KPTCL was asked to look into the issue and replace the relay if required PGCIL (SR-I) was also requested to coordinate with KPTCL in attending to this matter
3
Tripping of 765kV Kurnool-NPS line -2
07-05-2017 at 1405 hrs
Y phase to earth fault had occurred in line Auto-reclose was successful at Kurnool end and AR was not attempted at NPS end
GI-2
Kurnool-PG (PGIL-SR1) end
As per FIRELTR line tripped (in Y-ph) at 140543316 hrs on Y-E fault due to DPR Z1 (AR 328 km 166 kA) operation and successfully auto-reclosed after about 11 sec After about further 6 sec (ie at 140550470) line tripped in 3-ph due to receipt of DT from the remote end
It was stated in FIR that 765 kV Kurnool ndash NPS line-1 was under LVRD
As per DR line tripped (in 3-ph) at 140550470 hrs due to DT receipt from remote end
DR corresponding to successful AR operation not furnished NPS (PGIL-SR1) end
FIR amp TR furnished were that of Kurnool station
As per DREL line tripped (in 3-ph) at 140543351 hrs on Y-E fault due to AR (Z2 CAT) operation It was noted from EL that AR LOCKOUT had operated around the same time due to which line had not tried for AR
From EL it was further observed that DT was sent to the remote end at 020550419 hrs However the cause of DT send was not recorded in EL
DR pertaining to DT send was not furnished
If DT send was because of OVR-I protection operation then also tripping was not in order as it does not match with the settings provided
PGCIL (SR-I)
Non-operation of AR from NPS was due to wiring mistake made during installation of Controlled Switching Devices (CSD) for the line reactor on this line
Remedial action The wiring issues in CSD installation were rectified on 18052017
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2232
4
Tripping of 400 kV Krishnapatnam-Chittoor line-1
07-05-2017 at 1441 hrs
R-phase to earth fault Main CB Auto-reclose was successful at Chittoor end and Tie CB got tripped Breakers tripped at Krishnapatnam end and did not attempt auto-reclose
GI-2
FNN not followed by APTRANSCO and APGENCO SDSTPS (APGENCO) end
As per FIRDREL line tripped (in 3-ph) at 144113756 hrs on R-E fault due to DPR Z1 (628 km) operation It was observed from EL that the line was given 3-ph trip straight way without initiating AR
Chittoor (APTRANSCO) end
As per FIRDRELTR line tripped (in R-ph) at 144113759 hrs on R-E fault due to DPR Z1 (1147 km) operation and successfully auto-reclosed after about 1sec However it was observed that only Main-CB got auto-reclosed successfully whereas Tie-CB got tripped in 3-ph while attempting AR
Remedial action When enquired about the reasons for AR failure at SDSTPS end APGENCO representative
informed that as informed in last PCSC meeting AR configuration logic is scheduled to be reviewed by ABB in July 2017 when all issues pertaining to AR operation would be sorted out
When asked about the reasons for AR failure for Tie-CB at Chittoor end APTRANSCO informed that Tie-CB AR dead-time and PDR operational time were inadvertently kept equal As remedial action PDR operational time was increased to 25 sec
5 Tripping of 765 kV Raichur-Solapur line-2
07-05-2017 at 1918 hrs
Y-phase to earth fault Auto-reclose was successful at Solapur and breakers at Raichur end got tripped
GI-2
Solapur (PGCIL-WR1) end
As per FIRTR line tripped (in Y-ph) at 1918 hrs on Y-E fault due to DPR Z1 (AR 66 km 572 kA) operation and successfully auto-reclosed
DR amp EL not furnished Raichur (PGCIL (SR-I) end
As per FIRDRELTR line tripped (in 3-ph) at 191836810 hrs on Y-E fault due to DPR Z1 (145 km) operation It was observed from DR that AR lock-out had operated that resulted in tripping of Main-CB and Tie-CB But while Main-CB got tripped immediately Tie-CB got tripped in Y-ph only And the other two phase poles got tripped due to PDR operation after about 21 sec at 191838910 hrs
EL time-stamp resolution was limited to SECONDS instead of millisec
Tie-CB OPEN digital signals were observed to have employed NEGATIVE LOGIC PGCIL (SR-I)
The observed discrepancies at Raichur end were due to the hardware error caused by hanging of Main-CBrsquos BCU
Remedial action The problem with Main-CBrsquos BCU had been resolved by restarting it
Recommendations
PGCIL (SR-I) to configure Event Loggerrsquos time-resolution up to millisec level in all protection relays at their 765 400 kV Raichur SS
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2332
6
Tripping of 400 kV Neyveli TS2-Pugalur line
07-05-2017 at 1955 hrs
Y-phase to earth fault Neyveli TS2 end relay issued a 3-phase trip 220ms after issue of Y phase trip Direct Trip was sent to Pugalur end preventing auto-reclose
GI-2
NLC TS2 (NLCIL) end
As per FIRDRELTR line tripped in 3-ph at 195526677 hrs due to DT receipt from the other end
It was stated in TR that even though respective zones had picked up on fault DT receipt at the same time resulted in tripping of the line in 3-ph
In DR 3-ph trip was found to be issued 220 msec after Y-ph trip was issued It was also noted that DT receipt signal remained high for a duration of about 220 msec
Time sync of Protection Relays with GPS needed to be ensured at NLC-TS2
Pugalur (PGCIL-SR2) end
As per FIRDRELTR line tripped (in Y-ph) at 195534241 hrs on Y-E fault due to DPR Z1 (AR) operation However line tripped in 3-ph during AR dead-time at 195534353 hrs due to DT receipt from Neyveli end
In view of DT receipt at both ends it was suggested to carry out PLCC end-to-end testing to ensure healthiness of carrier communication
Recommendations
For the line under consideration the following shall be carried out by NLCIL in coordination with PGCIL (SR-II) End-to-end communication for DT permissive amp other signals may be ensured by testing at both
the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
7 Tripping of 400 kV NCTPS -SVChatram line-2
09-05-2017 at 1843 hrs
R-phase to earth fault Auto-reclose is not in service since Fibre optic cable link is not healthy
GI-2
NCTPS (TANGEDCO) end
As per FIRDRELTR the line tripped in 3-ph at 184223424 hrs on R-E fault due to DPR Z1 (9159 km 29 kA) operation (Given the length of this line as 95 km it may be verified whether Z1 setting is correct)
It was stated in FIR that AR was kept out of service due to defective FO communication link
Remedial action Line patrol done by lines wing and declared No Visible fault FO link cut was rectified on 13052017 and AR scheme restored
S V Chatram (TANTRANSCO) end
As per FIRDRELTR the line tripped in 3-ph at 184357616 hrs on R-E fault due to operation of DPR Z1 (32 km) operation
Time sync of protection relays with GPS needed to be ensured at both NCTPS and SV Chatram stations
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2432
8 Tripping of 400 kV Madurai-Kudankulam line
10-05-2017 at 1940hrs
B-E Fault Auto-reclose successful at Madurai and breakers tripped at Kudankulam
GI-2
Madurai (PGCIL-SR2) end
As per FIRDRELTR line tripped (in B-ph) at 194040402 hrs on B-E fault due to DPR Z1 (AR 137 km 114 kA) operation and successfully auto-reclosed after about 11 sec
Kudankulam NPP (NPCIL) end
As per FIRTR line tripped (in 3-ph) at 192936910 hrs on B-E fault due to DPR Z2 (CAT 2071 km) operation
It was informed that AR had not been kept in service as per SRPC decision Hence the tripping was in order
9 Tripping of 220 kV Idukki-Udumalpet line
14-05-2017 at 1345 hrs
Y-phase to earth fault had occurred in line Auto-reclose was successful at Idukki and breakers at Udumalpet end tripped on pole discrepancy
GI-2
Idukki (KSEB) end
As per DRTR line tripped (in Y-ph) at 134620509 hrs on Y-E fault due to DPR Z2 (CAT 83125 km) and successfully auto-reclosed after about 08 sec
EL not submitted (In its place DRrsquos events summary was furnished)
Udumalpet (TANTRANSCO) end
As per FIRTR line tripped in Y-ph at 1345 hrs on Y-N fault on DPR Z1 (2834 km) operation Subsequently tripped in 3-ph on PDR operation
As per DR line tripped in Y-ph at 134151100 hrs on Y-E fault due to DPR (AR) operation But as DRrsquos time scale was limited to 1 sec post triggering AR complete operation could not be verified
From EL line all poles dead was observed at 134152102 hrs Cause of line tripping as stated in FIRTR was not observed in EL
The following was stated in TR The fault resistance measured in the M1 relay (MicomP442) was high resulting in Z3 pickup It was
evident from the fault record that M2 relay (7SA522) had cleared the fault in Z1 by opening Y-ph pole However since AR was implemented in only M1 relay and M2 (Z1) operation had not initiated AR in M1 it resulted in opening of the other two phase poles on PDR operation
The cause of non-initiation of AR of M1 relay on external initiation was found to be logic configuration mistake in the Main 1 relay
Remedial action The AR logic configuration in the PSL of Main 1 relay had been corrected However a special relay
test would be conducted to verify AR operation during the next opportunity shutdown
Time sync of protection relays with GPS needed to be ensured at Idukki and Udumalpet
10 Tripping of 400 kV Vemagiri - Gazuwaka line
14-05-2017 at 1654 hrs
Y-phase to earth fault Auto-reclose was not successful due to persistent fault Vemagiri end had sent a Direct Trip after un-successful Auto-reclose AR attempt was observed in Gazuwaka end DR after 3 phase trip
GI-2
Vemagiri (PGCIL-SR1) end
As per FIRDRELTR line tripped in (Y-ph) at 165411968 hrs on Y-E fault due to operation of DPR Z1 (AR 1512 km) operation It tried to auto-reclose after about 11 sec but tripped in 3-ph due to persistent fault
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2532
It was noted that AR was attempted by Tie-CB only the Main-CB tripped in 3-ph at the beginning of AR initiation
Also Tie-CB AR dead-time was observed to be one second
Reasons 3-ph trip of Main-CB needed to be furnished Gazuwaka (PGCIL-SR1) end
As per FIRDRTR line tripped in Y-ph at 165330242 hrs on Y-E fault due to operation of DPR Z1 (AR 1677 km) operation But during AR dead-time it tripped in 3-ph after about 115 sec due to DT receipt from the remote end This resulted in 3-ph opening of both Main-CB and Tie-CB However after 125 sec Main-CB Y-ph limb tried for auto-reclosure and tripped due to persistent fault
As per EL line tripped in (Y-ph) at 165351597 hrs on Y-E fault due to operation of DPR Z1 (AR) operation But during AR dead-time it tripped in 3-ph at 165352620 hrs due to DT receipt from the remote end This resulted in 3-ph opening of both Main-CB and Tie-CB However at 165352687 hrs Main-CB Y-ph limb tried for auto-reclosure and tripped due to persistent fault
Reasons for AR attempt by Main-CB event after opening in 3-ph due to DT receipt needed to be explained
Time sync of DRrsquos amp ELrsquos with GPS needed to be ensured at Gajuwaka SS Recommendations
PGCIL (SR-I) to sort out issues relating to AR functionality operation for both Main-CB and Tie-CB at both Vemagiri and Gajuwaka substations
For the line under consideration the following shall be carried out by PGCIL (SR-I) End-to-end communication for DT permissive amp other signals may be ensured by testing at both
the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
11 Tripping of 400 kV VTPS-Sattenapalli line-2
21-05-2017 at 1706 hrs
B-phase to earth fault Auto-reclose successful at Sattenapalli and breakers got tripped at VTPS end
GI-2
Sattenapalli (APTRANSCO) end
As per FIRDRELTR line tripped (in Y-ph) at 170653038 hrs on B-E fault due to DPR Z1 operation and successfully auto-reclosed after about 1 sec
VTPS (APGENCO) end
As per FIRDRELTR line tripped in 3-ph at 170653133 hrs on B-E fault due to DEFR (33 kA) operation (DPR Z2 had picked up and Carrier was also received from the other end)
APGENCO
Before the LILOing of 400 kV VTPS-Srisailam DC line at Sattenapalli DEF protection had been provided from a separate REX521 relay Subsequently even though all protections at VTPS had been revised the above DEF protection implemented from the REX521 relay had been somehow left out and it only had extended 3-ph trip during the current instant
Remedial action The DEF functionality from the said REX521 had been disabled
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2632
12 Tripping of 400 kV Srisailam-Dindi line-2
24-05-2017 at 1502 hrs
R-phase to earth fault Auto-reclose was successful at Dindi and Zone - 1 3-phase trip at Srisailam
GI-2
Srisailam (TSGENCO) end
As per FIRDREL line tripped in 3-ph at 150253522 hrs on R-E fault due to DPR Z1 operation
TR contained no information Dindi (TSTRANSCO) end
As per FIRDRELTR line tripped (in R-ph) at 150253487 hrs on R-E fault due to DPR Z1 operation and successfully auto-reclosed after about 1 sec
Recommendations Since all 400 kV lines emanating from Srisailam LB are composite feeders APTRANSCO TSTRANSCO
can keep AR functionality disabled at respective remote end stations under their control
IV Details of Trippings due to PLCC mal-operation
Sl No Element Date amp Time Reason
Category
1 Tripping of 400 kV Kalpakka-Gazuwaka line-1amp2
18-05-2017 at 1108 hrs
Line tripped at Kalpakka end only on Direct Trip receive and was holding from Gazuwaka
GI-2
Tripping of 400 kV Kalpaka ndash Gajuwaka line-1
Gazuwaka (PGCIL-SR-2) end
As per FIR line was kept holding from Gazuwaka end Kalpakka (APTRANSCO) end
As per FIREL line tripped at 110625955 hrs to DT receipt from Gazuwaka end
Tripping of 400 kV Kalpaka ndash Gajuwaka line-2
Gazuwaka (PGCIL-SR2) end
As per FIR line was kept holding from Gazuwaka end Kalpakka (APTRANSCO) end
As per FIREL line tripped at 110625955 hrs to DT receipt from Gazuwaka end
Remedial action taken by APTRANSCO subsequent PCSC-65 meeting as informed vide their internal communication dated 20072017
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2732
2 Tripping of 400 kV Tumkur-Bidadi line-1 amp 2
30-05-2017 at 1139 hrs
Line tripped due to suspected PLCC mal-operation at Tumkur end and direct trip was received at Bidadi
GI-2
Tripping of 400 kV Tumkur ndash Bidadi line-1 Tumkur (PGCIL-SR2)) end
As per FIRDRELTR line tripped in 3-ph at 113515534 along with DT SEND to the remote end
PLCC mal-operation was suspected to have caused above tripping Bidadi(PGCIL-SR2) end
As per FIRTR line tripped in 3-ph at 113515 hrs due to DT receipt from Tumkur end Tripping of 400 kV Tumkur ndash Bidadi line-2 Tumkur (PGCIL-SR2)) end
As per FIRDRELTR line tripped in 3-ph at 113515534 along with DT SEND to the remote end
PLCC mal-operation was suspected to have caused above tripping Bidadi(PGCIL-SR2) end
As per FIRTR line tripped in 3-ph at 113515 hrs due to DT receipt from Tumkur end PGCIL (SR-II)
Remedial action The above trippings were due to PLCC mal-operation which in turn was due to shifting of its
coaxial cable The related circuitry was subsequently rectified
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2832
Single Line Diagram of 230 kV Villianur SS of PED [Ref I1]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2932
Single Line Diagram of 400 kV Jammalamadugu SS of APTRANSCO [Ref I2]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3032
Single Line Diagram of 400 kV Judgi-PG GIS SS of PGCIL (SR-II) [Ref II4]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3132
Single Line Diagram of 400 kV Ghani SS of APTRANSCO [Ref II4]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3232
Single Line Diagram of 400 kV BTPS of KPCL [Ref II9]
Annexure-II
Meeting No
Index
Details of Event Date amp Time Reason PCSC Recommendations Utility responsible for
Implementation
Status of Recommendations
as on 25072017
Remarks
Pending Implementation of PCSC Recommendations (up to 65th Meeting)
Complete outage of 220kV Yerraguntla
substation and tripping of running Units
at Rayalaseema TPS
52I2 (GD) PendingMail received on 27-07-2016
1The drop out relays of reducer oil pumps time setting was increased for
all millsSo there will not be any trip under transient low voltage condition--
--Complied
2The recommendation regarding 2 sec time delay will be implemented
during unit shut down and will be intimated immediately after
implementation------Pending
APGENCO 1 APGENCO to check associated logic for lube oil pump for correct
operation under transient low voltage conditions at Rayalaseema TPS
Unit-1
2 APGENCO to keep appropriate time delay fault ride through
delay (typically 2 sec) in VFD speed sensor relay at all its generating
Units including Rayalaseema TPS Units
HV B-Ph Current transformer of 100MVA Power
Transformer -1 failed resulting into a bus fault on
220KV Bus-1 Unit-1 and Unit-5 at RYTPS tripped
during the fault at Yerraguntla substation
21-02-2016 at
1039 hrs
Andhra Pradesh
APGENCO to furnish a report on the remedial action implemented
wrt overreaching of Krishnapatnam end distance relays during the
tripping of 400 kV Nellore (PG) - NPS line-1
APGENCO Yet to be informed Pending57II9 Tripping of 400 kV Nellore (PG) - NPS
line-1 400 kV Krishnapatnam-Nellore
(AP) lines -1amp2 and 400kV NPS -
MEPL line
18-07-2016 at
1905 hrs
Triggering incident was snapping of Y phase
conductor in 400kV Nellore (PG) - NPS line-1
Distance relay at Krishnapatnam end over-reached in
Zone-1 and resulted in tripping of 400kV
Krishnapatnam ndash Nellore (AP) lines - 1amp2 from
Krishnapatnam end Distance relay at MEPL over-
reached and resulted in tripping of MEPL-NPS line
from MEPL end
Yet to be informed Pending
APTRANSCO mail dated on 31-08-2016
To avoid the unwanted malopeartions due to the external LBB trip
initiation from PGCIL Vide letter Dt 04-08-2016 APTRANSCO has
requsted the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1 amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 15-11-2016
To avoid the unwanted maloperations due to the external LBB trip
initiation from PGCIL vide letter Dt 04-08-2016 ARTRANSCO has
requested the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 20-12-2016
Waiting for the PGCIL response
APTRANSCO mail dated 04032017 amp 24052017
SRPC is requested to coordinate with PGCIL in takind necessary action
Pending
Tripping of 400kV Krishnapatnam-
Nellore line-1
Line tripped on B-phase to earth fault and auto-
reclose was successful at Nellore(AP) end and un-
successful at Krishnapatnam end
APGENCO
56II13 Tripping at 220kV Gooty Substation of
APTRANSCO
24-06-2016 at
1604 hrs
LBB protection got operated for 400220kV ICT-2
breaker which had resulted in tripping of 220kV Bus-
2 at 220kV Gooty Substation
1 APGENCO SDSTPS to correct logic and ensure healthiness of ARscheme employed for transmission lines emanating from SDSTPSand furnish an action taken report to PCSC forum
2 APGENCO SDSTPS to configure DRrsquos of line protection relaysfor a post triggering period of 2 sec to capture complete ARoperation at their SDSTPS
Yet to be informed Pending63III1 28-02-2017 at
0516 hrs
1 APGENCO SDSTPS to correct logic and ensure healthiness of AR
scheme employed for transmission lines emanating from SDSTPS
and furnish an action taken report to PCSC forum
2 APGENCO SDSTPS to configure DRrsquos of line protection relays
for a post triggering period of 2 sec to capture complete AR
operation at their SDSTPS
Tripping of 400kV Krishnapatnam-Nellore line-2
R-phase to earth fault had occurred in line Auto reclose was successful at Nellore however protection at Krishnapatnam end issued a 3 phase
trip
APGENCO63III3 02-03-2017 at 455 hrs
1APTRANSCO to check the healthiness of the connecting cable
between Gooty (PGCIL) and Gooty (APTRANSCO) and replace it
if required
2APTRANSCO to ensure that the distributed architecture employed
in implementing busbar protection at their Gooty 220 kV SS does not
introduce any unwarranted delays in transmitting the triggering signals
to the Central Unit
APTRANSCO
Annexure-III
Page 1 of 31
63II2 Tripping of 400 kV KV Kota-Suryapet
line
01-03-2017 at
2005 hrs
Line tripped on operation of over-voltage protection
at KV Kota and Direct Trip was received at Suryapet
1 APTRANSCO to furnish (i) FIR amp TR for tripping events as
per SRLDC provided formats and (ii) DR amp EL within 24-hrs of
occurrence of tripping event in line with IEGC Regulation 52
(r)
2 APTRANSCO to adopt new OVR gradings for KV Kota
feeders and confirm the same
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
1 FIR furnished amp DR configured
Pending
63II16 Multiple Trippings at 220kV Vizag
Switching Station (VSS) of APTRANSCO
27-03-2017 at
1016 hrs
Bus-2 bus bar protection operated at 220kV VSS
end resulting in the tripping of all the elements
connected to bus-2
1 APTRANSCO to furnish a detailed report on the reasons for LBB
BBP operation at 220 kV VSS for a fault on 220 kV Gangavaram
feeder and remedial action taken to prevent recurrence of such
events
APTRANSCO Yet to be informed Pending
64II1 Tripping of 400220KV 315MVA ICT-
1and 230kV elements at 400kV Vemagiri
substation of APTRANSCO
09-04-2017
at 1231 hrs
Suspected mal-operation of Busbar protection had
caused tripping of 220kV Bus-1 at Vemagiri
APTRANSCO to furnish a report on the remedial action taken along
with single line diagram of 400220 kV Vemagiri SS indicating fault
location and CBs involved and protections operated
APTRANSCO Yet to be informed Pending
64II2 Tripping of 400220 kV ICTrsquos ndash 2 amp 3 at
400 kV Ghani substation of APTRANSCO
10-04-2017
at 1729 hrs
ICTrsquos ndash 2 amp 3 got tripped due to operation of 220 kV
Bus-2 busbar protection at 400220KV Ghani
substation
APTRANSCO to furnish single line diagram of 400 220 kV Ghani SS
clearly indicating (i) bus-configuration (ii) location of fault (iii)
breakers involved and type of protections operated
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
Single line diagram sent vide mail dated 27062017
Pending
64III1 Tripping of 400 kV Uravakonda-
Jammalamadugu line-1
02-04-2017 at
1758 hrs
R-phase to earth fault and line did not auto-reclose
Fault clearing time - 500ms
For the line under consideration APTRANSCO to check amp ensure
healthiness of carrier protection and make Auto-Reclosure
functional
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
Carrier aided protection scheme has been tested end to end and rectified
the problem
Pending
64III5 Tripping of 400kV Krishnapatnam-
Nellore line-2
11-04-2017 at
241 hrs
Line tripped on Y-phase earth fault Line auto-
reclosed at Krishnapatnam and did not auto-reclose
at Nellore-AP (Manubolu)
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a report
on the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64III6 Tripping of 400kV Krishnapatnam-
Nellore line-1
12-04-2017 at
251 hrs
Line tripped on Y-phase earth fault Line auto-
reclosed at Krishnapatnam and did not auto-reclose
at Nellore-AP (Manubolu)
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a report
on the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64III10 Tripping of 400kV Krishnapatnam ndash
Nellore_AP line-1
13-04-2017 at
438hrs
Y-phase to earth fault Line auto-reclosed from
Krishnapatnam end and did not auto-reclose fromNellore-AP end
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a reporton the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64IV4 Tripping of 400 kV VTPS-Malkaram line 20-04-2017 at
1624 hrs
Line tripped on Direct Trip Receive at Malkaram and
was in service from VTPS
For the line under consideration APTRANSCO to check the
healthiness of protection couplers and take suitable remedial action including replacement of the same
APTRANSCO Yet to be informed Pending
65II10 Tripping of 400220 kV ICT-2 at Kalpaka
SS
20-05-2017 at
1502 hrs
ICT-2 tripped due to operation of Transformer
Buchholtz relay
APTRANSCO to furnish details of AC auxiliary supply details
including its redundancy DG set details and its mode of
starting AC auxiliary supply changeover scheme drawing shall
also be furnished
APTRANSCO Yet to be informed Pending
1 APTRANSCO to check and correct all CT Neutral
Connection settings in various protection relays at their 400
220 kV Ghani PS
2 APTRANSCO to ensure that PLCC carrier aided protection
is maintained healthy on 220 kV lines emanating from their
400 220 kV Ghani PS
3 APTRANSCO to take steps to complete configuration works
of DR‟s amp EL‟s of various protection relays at their 400 220
kV Ghani SS and furnish the same as and when required in
compliance of IEGC Regulation 52 (r)
ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
07-05-2017Tripping of 400220 kV Ghani ICT-2amp3 65II4 APTRANSCO Yet to be informed Pending
APTRANSCO mail dated on 31-08-2016
To avoid the unwanted malopeartions due to the external LBB trip
initiation from PGCIL Vide letter Dt 04-08-2016 APTRANSCO has
requsted the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1 amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 15-11-2016
To avoid the unwanted maloperations due to the external LBB trip
initiation from PGCIL vide letter Dt 04-08-2016 ARTRANSCO has
requested the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 20-12-2016
Waiting for the PGCIL response
APTRANSCO mail dated 04032017 amp 24052017
SRPC is requested to coordinate with PGCIL in takind necessary action
Pending56II13 Tripping at 220kV Gooty Substation of
APTRANSCO
24-06-2016 at
1604 hrs
LBB protection got operated for 400220kV ICT-2
breaker which had resulted in tripping of 220kV Bus-
2 at 220kV Gooty Substation
63III2 02-03-2017 at
157 hrs
1 APTRANSCO to check and ensure correctness of AR operation
for the lines emanating from their Nellore-AP (Manubolu) SS
2 APTRANSCO to configure DR‟s of line protection relays for a
post triggering period of 2 sec to capture complete AR operation at
their Nellore-AP (Manubolu) SS
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
1The ABB make REL 670 type main-2 distance relay seen the fault as Y-
B phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
1APTRANSCO to check the healthiness of the connecting cable
between Gooty (PGCIL) and Gooty (APTRANSCO) and replace it
if required
2APTRANSCO to ensure that the distributed architecture employed
in implementing busbar protection at their Gooty 220 kV SS does not
introduce any unwarranted delays in transmitting the triggering signals
to the Central Unit
APTRANSCO
Tripping of 400kV Krishnapatnam-
Nellore line-1
Line tripped on B-phase to earth fault and line auto-
reclosed from Krishnapatnam end but did not auto-
reclose from Nellore-AP end
Annexure-III
Page 2 of 31
64II16 Tripping of 400 kV VTPS-Satenapalli line-
2
30-Apr-17 at
428 hrs
Line tripped on B-phase to earth fault FIR DR and
EL of both ends were not furnished to validate the
tripping
APGENCO and APTRANSCO to furnish a detailed report on the
events leading to tripping of the line along with remedial measures
taken to PCSC forum
APGENCO
APTRANSCO
Yet to be informed Pending
65II8 Tripping of 400220 kV Hyderabad ICT-
4 and 220 kV lines at Hyderabad
substation
10-05-2017 at
239 hrs
Operation of busbar protection due to fault in 220 kV
Bus at 220kV Hyderabad Substation
TSTRANSCO to investigate the reasons for BBP operation for 220
kV Bus-2 and furnish a report on the remedial measures taken
TSTRANSCO Yet to be informed Pending
24-12-2016 at
1052 hrs
Line tripped on B-phase to earth fault First fault was
persistent for 380 ms Auto-reclose was successful at
Khammam end during 1st fault 2nd fault occurred
during re-claim time of breaker hence Khammam end
breakers also got tripped
1 TSGENCO to implement the SRPC agreed philosophy for Power
Swing Blocking in all distance relays on the feeders emanating from
KTPS
2 For the line under consideration TSGENCO to consult relays
OEM to migrate to new versions of Firmware (from to 47201) and
Pset (to 47002)
61III5 Tripping of 400 kV Khammam - KTPS
line-2
The issue was discussed in PCSC-58 meeting held on 18102016 when
PCSC forum agreed to de-link the implementation of the Item from the
scope of Protection Audit Recommendations (PAR) and pursue it as part
of PCSC Recommendations
TSGENCO mail dated 30-05-2017
Procurement of Differential Protection relays is under process and the
work will be completed by the end of November 2017
TSGENCOProvision of line differential protection for Jurala line 1 amp 2 (line length-145 KM) feeders at 220 kV Jurala HPS [Carry-Over from Protection Audit Recommendations]58 Pending
Pendingline tripped on direct trip receive at Gajwel and was
holding from Hyderabad
Pending
06-10-2016 at
1216 hrs
For the line under consideration TSTRANSCO to carry out the
following in coordination with TSGENCO
(i) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
(ii) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(iii) Frequency bandwidth tuning of PLCC link for faithful
transmission of signals shall be carried out
62IV5 Tripping of 400 kV Gajwel-
Bhoopalapalli line-1
Telangana
TSGENCO TSGENCO mail dated 30032017
1 According to SRPC phylosphy power swing block settings are changed
to ALL ZONES BLOCK EXCEPT ZONE1
---------- Completed
2 Ms Siemens is requested to depute the service Engineer to update the
firm ware of existing SIPROTEC relays in 400KV switch yard This work
will be completed on or before 15042017 -------------- Pending
Pending
TSGENCO
TSTRANSCO
TSTRANSCO mail dated on 31-05-2017
1 Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Bhoopalpalli-1 line
59IV3
Line tripped at Bhoopalapally on DT receive and was
holding from Gajwel
TSTRANSCO mail dated on 21-12-2016
(i) Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Ghanapur line
(ii) Healthiness of PLCC system components will be checked while
conducting end to end testing
TSTRANSCO mail dated on 31-05-2017
1 Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Ghanapur line
TSTRANSCO
16-02-2017
at 1500 hrs
For the line under consideration the following shall be carried out by
TSTRANSCO in coordination with PGCIL (SR-I)
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
Tripping of 400 kV Gaiwel-Hyderabad
line
Annexure-III
Page 3 of 31
Karnataka
Annexure-III
Page 4 of 31
KPCL
38GD35 Pending13-11-2014 at
1931hrs
1 KPCL to make functional the Main2 (EPAC) relay with the
help of KPTCL at the earliest
2 KPCL to investigate the reason for DC fuse fail during
transient fault in 220kV Kadra-Kodasalli line including the testing
checking of DC supply cables breaker control cables and trip coils
3 KPCL to ensure supply for Main-1amp Main-2 protections Trip
Coils (TC1 TC2) from separate battery banks
Triggering incident was B-phase to earth fault had
occurred in 220kV Kadra-Kodasalli line Line tripped
from Kodasalli end only 220kV Kaiga-Kadra tripped
in Zone-3 from Kaiga end Tripping of evacuating
lines caused bus shut down at Kadra hydro station
16-02-2015 at
1256 hrs
GD-1 at Kadra and Kodasalli hydro
power station
GD-1 at 220kV Kadra power Station of
KPCL
41I1 Mail received on 28-05-2015
1 Main-2 relays already installed and commissioned
2 DC fuses are intact Till date no such incidence occurred
3 Possibility of DC-1 amp DC-2 arrangement and splitting of DC will be
reviewed
Mail received on 07-07-2015 21-10-2015 and 23-11-2015
1 Completed
2 Completed
3 Possibility of DC-1 amp DC-2 arrangement and splitting of DC will be
reviewed
Status received vide KPCL mail dated 14062017
1 Completed
2 Completed
3 Providing 2 separate DC sources is under process
Pending
Mail recieved on 28-05-2015
1) e-NIT floated on 28072014 for procurement of Numerical distance
relays amp GPS As there is change in scope of work and quantity of relays
by more than 25 which is not permitted as per KTPP act Hence tender
cancelled and refloated on 05052015 with revised scope of work and
revised PQR
2 However as per the recommendations of PSAG Relays were
temporarily rearranged replaced and wired up testing amp commissioning
shall be completed with the assistance of KPTCL
Mail recieved on 07-07-2015
1 Cover -1 of the bid is scheduled for open eing on 25062015
2 As per the recommendations of PSAG Relays were temporarily
rearranged testing amp commissioning completed with the assistance of
KPTCL
Mail recieved on 07-09-2015
NIT floated on 5515 through e-portal Bid evaluation completed
Obtaining of Administration approval to place PO is in progress
However as per therecommendationsof PSAG-10 Relays
weretemporarilyrearrangedTesting amp commissioning completed with the
assistanceofKPTCL
Mail recieved on 21-10-2015
NIT floated on 5515 through e-portal Bid evaluation completed LOAs
issued to Ms Schneider Electric Infrastructure Ltd on 08102015
Mail recieved on 23-11-2015
LOAs issued to Ms Schneider Electric Infrastructure Ltd on 08102015
Engineering work is in progress
Status informed during Special Meeting held on 03062016
LOA‟s issued to Ms Schneider on 08102015 Inspection of relays
completed and received at site DI issued for all balance materials except
furnitures
Status received vide KPCL mail dated 14062017
Numerical Distance Protection relays commissioned on 12042017
for all 4 lines at Kadra PH
Installation Testing and commissioning of Numerical Distance Protection
Relays for all the 4 outgoing lines is completed in all respect at Kodasalli
power house
KPCL1 The PCSC forum requested KPCL to speed up the installation of
Numerical Distance Protection relay in Kadra ndashKaiga and
Kodasalli ndashKaiga
2 The PCSC forum requested KPCL to submit the implementation
status of PSAG-10 recommendations within a week‟s time
A fault had occurred in 220 kV Kadra and Kodasalli
As A result de-energization of 220kV bus occurred at
Kadra and Kodasalli
Annexure-III
Page 5 of 31
49II15
54II4 Tripping of 400 kV Raichur TPS-
Mahboobnagar line
05-04-2016 at
1023 hrs
Line tripped on operation of Backup impedance
protection of line reactor Direct trip was received at
Mahboobnagar end
KPCL to keep the functioning of the concerned electro-mechanical
back-up impedance protection relay under observation and replace it
with a spare at the earliest
KPCL Status received vide KPCL mail dated 10072017
The electro-mechanical back-up impedance protection relay is in service
However Budgetary offer obtained for the retrofitting of Line reactor
protection with Numerical relay and is under process
Pending
54II9
Pending
PendingStatus informed during Special Meeting held on 03062016
1 Hot line washing was done previouslytender process is on for silicon
coating of insulators
Status received vide mail dated 10-07-2017
1 Off line water washing is being carried out whenever the Unit or Line is
under shutdown Silicon coating for Unit8 main amp tie breakers carried
out in Sep16 and same is under observation Till today in order and good
condition For remaining breakers since it is big order approval for the
same is under process
2 Static Electromechanical relays are existing in all 1 to 7 units Breaker
flash over protection feature will be enabled (if available) in the numerical
relays which will be retrofitted in phased manner during RampM works
KPCL1 KPCL to carry out hot-line washing of RTPS-connected lines
regularly to avoid trippings due to fog and dust
2 KPCL may see the feasibility of providing breaker flashover
protection at RTPS and implement the same if possible
Running Unit-4 5 and Unit-8 and 400kV RTPS-
Yeramaras TPS feeder got tripped due to de-
energization of both 400kV Bus-1amp2 at Raichur TPS
12-11-2015 at
0030 hrs
54I4 220 kV Nagjheri - Bidnal line tripped on B-E fault at
1228 Hrs At the same time five running generating
units (1 2 3 4 amp 6) at Nagjheri tripped on operation
of Generator Transformer‟s back-up Over Current amp
Earth Fault protection
PendingKPCL
1 KPCL to revise the settings of GT‟s back-up OC and EF
protections considering their individual contribution to solid bus fault
at 220 kV bus of Nagjheri PH
2 KPCL to upload make available various tripping files
(FIRDRELTR) for all tripping involving their stations in compliance
of IEGC Regulation 52 (r)
14-04-2016 at
1229 hrs
Tripping of Nagjheri Generators Pending
Trippings at 220kV Raichur TPS
13-04-2016 at
2112 hrs
1KPCL to undertake the following remedial measures to avoid
breaker flashovers
(i) Replacing all porcelain insulators with composite insulators
(ii) Carrying out hot-line water washing of all insulators on regular
basis
(iii) Applying Room Temperature Vulcanizing (RTV) Silicone high
voltage insulator coatings to all bus-connected ceramic insulators of
equipment like CT PT CB Isolators etc
2KPCL to take steps to provide dedicated breaker flashover
protection to all breakers at Raichur TPS at the earliest
KPCL
Tripping of 400kV Raichur TPS Bus-2
46II21
Trippings at Raichur TPS
Status received vide KPCL mail dated 10072017
1 i) Silicon coating for Unit8 main amp tie breakers carried out in Sep16
and same is under observation Till today in order and good condition For
remaining breakers since it is big order approval for the same is under
process ii) Hot line
water washing stopped and off line water washing is carried out whenever
the 400 KV Unit or line is under tripped condition Shutdown condition
2 Static Electromechanical relays are existing in all 1 to 7 units Breaker
flash over protection feature will be enabled (if available) in the numerical
relays which will be retrofitted in phased manner during RampM works
Status received vide KPCL mail dated 14062017
1 GT backup overcurrent amp earth fault settings are revised as per the
recommendations of our head office CEEDBangalore copy of letter
enclosed
2 FIRDRELTR are being uploaded in the recent incidences as all the
main-2 relays are replaced with new numerical relays
Mail received on 21-10-2015
1) Anti-pumping contactors of all the nine 220KV Lines are in circuit and
tested periodically during AOH works of lines along with other protections
2) Completed
3) Possibility to use both the 220kV buses as main bus under normal
operation is under review
Mail recieved on 23-11-2015
1) Completed
3) Two bus operation for 220kV buses In place of existing CT switching
relays High speed manual heavy duty change over switch of sufficient
current capacity will be retrofitted to all feeders at 220kV station and same
will be operated manually during changeover of feeder by one bus to the
other and this arrangement may facilitate to put both buses in service Time
required for this retrofit is around 90days However this work will be
taken up only after retrofitting of electromagnetic relays with numerical
relays for Main-2 protection of all 220kV lines for which work is in
progress
Status received vide mail dated 10-07-2017
1) Completed
2) Completed
3) Two Bus operation for 220kV bus is being carried out whenever
required However scheme for tripping of one bus during LBBfault and
maintaining the other bus intact by tripping BC breaker will be taken up in
RampM works
KPCL1 KPCL to check the operation of anti-pumping relay on 220 kV side
and keep it in healthy condition
2 KPCL to provide manual reset to the 220 kV side master trip relay
3 KPCL to use both the 220 kV buses as main buses under normal
operation and should go for single bus operation only during
emergencies
07-06-2015 at
0135 hrs
Y-ph Pole of Tie-breaker of Unit-4 at RTPS failed
Unit-4 got tripped on operation of Generator
Differential Reverse power amp LBB protection
Operation of LBB protection led to tripping of BUS-2
at RTPS
Annexure-III
Page 6 of 31
55II1
56I2 Complete outage of 220kV Sedam
Substation of KPTCL
19-06-2016 at
1527hrs
220kV Sedam-Humnabad-2 tripped at Sedam on
Distance protection Zone-2 Sedam-RTPS-1 amp2 lines
tripped at RTPS end only 220kV Tandoor inter-state
line was hand tripped due to incoming supply failure
KPCL to disable GFC protection on all lines emanating from their
generating stations
KPCL Status received vide KPCL mail dated 10072017
As per the reccomndations of KPTCL in Feb16 the settings are done with
a time delay of 2 secs
Pending
57II3 Tripping of 400220 kV ICT-2 at Raichur
TPS
07-07-2016 at
332 hrs
ICT-2 tripped on operation 400220KV ICT-2 was
tripped on operation of 220KV side Instantaneous
over current protection during B-phase to earth fault
in 220kV RTPS-Sedam-II line
KPCL to review appropriately the high-set of ICT‟s back-up OC
protection at their 220 kV RTPS so that they do not operate for a
normal through fault
KPCL Status received vide KPCL mail dated 10072017
The settings will be reviewed in co-ordination with KPTCL amp OEM
Pending
KPCL
Pending
Pending
KPCL Status received vide KPCL mail dated 14062017
1 All logics checked and found normal LBB timing checked and found
200msec as per KPTCL MRT recommendation - Completed
2 Work Under Progress
3 New GPS System commissioned along with new numerical and
synchronised with GPS system - Complied
4 Work Under Progress
Status received vide KPCL mail dated 14062017
1 DEF settings in lines are made as per recommendations of CE(RT) amp
RampD KPTCL Bangalore amp EE(RT) KPTCL Hubli
High set operation of DEF relays is disabled at Kodasalli end
2 All these guidelines are incorporated by KPTCL during the replacement
of line protection relays
3 New stand alone event logger is to be procured since spares for old
stand alone event logger are obsolete
KPCL (i) KPCL to disable high-set operation of DEF relays
(ii) KPCL to block DEF relays whenever corresponding distance
protection relays pick up at Kodasally end on Nagjheri ndash Kodasalli
lines and
(iii)KPCL to provide stand-alone Event Logger at their 220 kV
Nagjheri PH
Bus dead occurred at 220kV Nagjheri PH due to
tripping of evacuating lines
KPCL
31-08-2016 at
1247hrs
Pending
Tripping of 400kV Bellary TPS-
Yeramarus TPS line and
400kVYeramarus TPS - Raichur TPS
line
PendingYet to be informed55II19
Tripping of Units at Raichur TPS During testing of retrofitted distance protection in
400kV Raichur-2 feeder LBB protection trip DC got
extended to Bus trip This resulted in tripping of
220kV bus at RTPS and all connected 220 kV
elements Unit-4 which is connected to 400 kV Bus
got tripped due to tripping of Station Utility
Transformer that is connected 220 kV bus
58I2 (GD)
Complete outage of 220 kV Kadra power
station of KPCL
54II13
1KPCL to properly configure the distance relays at YTPS end on
both YTPS ndash BTPS line and YTPS-RTPS line with specific focus on
reaches and timings of Zone-2 Zone-3 and Zone-4 (reverse)
2KPCL to ensure the healthiness of Direct Trip circuits and relay
coils at YTPS
3KPCL to ensure time sync of DR‟s and EL‟s at YTPS with GPS
06-09-2016
at 1440 hrs
31-05-2016 at
1721 hrs
Direct Trip was sent from YTPS to RTPS and BTPS
01-05-2016 at
2144 Hrs
LBB of 220kV Kodasalli breaker at Kadra end got
operated which resulted in tripping of Bus at Kadra
and in turn led to tripping of all elements
(i) KPCL to check settings of LBB protection in all relays from which
it was implemented and ensure that their configuration logic and
timing are in order at their 220 kV Kadra PH
(ii) KPCL to furnish details regarding the existing LT auxiliary
supply arrangement at their 220 kV Kadra PH and take steps to
provide a suitable Auto-Main-Fail (AMF) panel for DG set to effect
its auto-starting in case of failure of LT supply
(iii) KPCL to ensure time-sync of all relays (DR‟s amp EL‟s) with GPS
at their 220 kV Kadra PH
(iv) KPCL to provide stand-alone Event Logger at their 220 kV
Nagjheri PH
Complete outage of 220 kV Nagjheri PH
of KPCL
Multiple tripping at 400 kV Raichur TPS
Station
15-04-2016 at
1536 hrs
Triggering incident was failure of R-phase CT of
400220kV ICT-1 400kV YTPS-RTPS line got
tripped from YTPS end 400kV RTPS-
Mehaboobnagar line tripped on a B-phase to earth
fault
In view of the availability of two buses along with healthy bus-
coupler at 220 kV RTPS KPCL is recommended to put in service the
double-bus operation at 220 kV RTPS by suitably distributing loads
within 15 days
Status received vide KPCL mail dated 10072017
Two Bus operation for 220kV bus is being carried out whenever required
However scheme for tripping of one bus during LBBfault and maintaining
the other bus intact by tripping BC breaker will be taken up in RampM
works
1KPCL to enable zero-sequence compensation feature if not already
done in all differential relays of transformers at RTPS
2KPCL to examine in detail the reasons for SOTF operation at RTPS
end for the fault on RTPS-Veltoor line and if required relay
(configuration) settings at RTPS end may be suitably got revised with
the help of their OEM
3KPCL to take steps to enable auto-reclose for the Tie-CB‟s in the
dias containing Munirabad and Veltoor (Mehboobnagar) at RTPS
KPCL Status received vide KPCL mail dated 10072017
1) Zero-sequence compensation feature is already enabled in all the
differential relays of transformers ---Completed
2) Referred to OEM for the tripping of line on SOTF protection
3) Action has been taken to retrofit the protection relays of tie bays of
Mahbubnagar and Munirabad line to enable Auto-reclosure function
58I3 (GD)
Pending
Annexure-III
Page 7 of 31
Status received vide KPCL mail dated 14062017
1 On 09092016 at STRPTwo units were running(Unit-3 amp Unit-4It is
to clarify that Station tripped due to spurious operationLBB relay in Unit-
4 and not due to operation of Unit-3 LBB as indicated in PCSC
recommendations Unit-3 which was in service tripped as a consequence of
LBB ProtectionHow ever following actions performed in both Units
a) Trip coil-1 and Trip coil-2 circuit (including cable from protection panel
to GCB Marshaling Box)of GT Breakers of Unit 03 and 04 checked found
ok
b) Integrity of Connecting cableconductor from Generating unit no3 and
also to its corresponding GT Breakers inspected and found ok
c) Regarding Spurious operation of Unit No04 LBB relay and its
timerChecked the operation of the LBB overcurrent relay with its external
Timer for repeated correct operations it was found that LBB Timer was
giving correct timing operation for 1 in 3 operations only ie for one of the
operation it was operating within 40ms compare to set value(200ms) hence
declared as faulty and the same has been replaced with new one later
operation of the new Timer checked and found okoperating for gt200mse
only With this cause for spurious operation of LBB and resulting in
complete outage of STRP has been identified and solved -----
Completed
2 In Unit -3MCR is working satisfactorilyit is to clarify that problem was
existing in Unit No4 AVR manual channel reference value of Generator
The Same has been replaced with spare one Manual channel AVR is
found to be Ok ------Completed
3 All the units AVRs Healthyness checked and found Ok -
-----
Completed
4 Presently at GPHno stand alone Event logger exists Since the subject
requirement pertains to all the Generating units and in view of
Standardization of the complete system Networking of numerical relays
carried out and events are availble in networking system
KPCL
Pending
(i) KPCL to ensure the integrity of the connecting cable conductor
from Generating Unit-3 to its corresponding GT breaker at their STR
PH
(ii) KPCL to ensure the healthiness of Manual Current Regulator
(MCR) of Unit-3‟s AVR at their STR PH
(iii) KPCL to ensure the healthiness of AVR‟s of all Units of STR
PH
(iv) KPCL to provide stand-alone Event Logger at their 220 kV STR
PH
Spurious operation of LBB protection of line feeder
had led to tripping of 220 kV bus at Sharavathy Tail
Race power house
9-09-2016 at
1119 hrs
Pending
12-09-2016 at
1447 hrs
(i) KPCL to check and correct configuration settings of LBB
protection in all relays from which it was implemented at their 220
kV Varahi PH
(ii) KPCL to provide stand-alone Event Logger at their 220 kV STR
PH
KPCLLBB protection operated and caused bus shut down at
Varahi PH
Pending
Partial disturbance occurred in central Kerala grid due
to overloading and tripping of 220 kV lines Loss of in-
feed to 220 kV Kalamassery 220 kV Brahmapuram
220 kV Ambalamugal 220 Pallom amp 220 kV Kochi
occurred Generation at Neriamangalam Panniar
Chengulam and Pallivasal also got affected during the
incident
(i) SLDC KSEB to put in place proper mechanism to ensure
adequate load-generation balance is maintained in their control area at
all times and due vigilance is exercised in operating an already
depleted transmission network
(ii) KSEB to put UFR in service at New Pallom end on 220 kV New
Pallom ndash Amabalamugal line as part of Kudankulam Regional
Islanding Scheme
KPCL
Status received vide mail dated 14062017
LBB Protection system is in Bus bar Protection PanelThe Configuration
settings are checkedThey are as follows
Minimum operating primary current is 160A
Stage IIssue of Retrip to the feeder is 100ms after the action of main
distance protection Relayinitiation of LBB
Stage IIBus bar LBB Trip -200ms
Total time of LBB trip is 300ms from the time of occurrence of Line Fault
(i) KPCL to adopt the following VT fuse-fail logic for all 220 kV
lines emanating from NPH
ldquoUnder VT fuse fail condition distance protection shall normally be
kept blocked However upon detection of a fault (sensed by negative
sequence component) blocking of distance protection shall give rise
to operation of its inherent Over-Current protection set with a definite
time delay of 500 msecrdquo
(ii) KPTCL KPCL to revise Zone-2 Zone-3 and Zone-4 (reverse)
timings of DPR of all 220 kV lines emanating from Nagjheri PH in
line with Ramakrishna Committee guidelines
Triggering event was the fault on 220 kV Nagjheri
ndashKodasalli line-2 Both buses of 220 kV Nagjeri
power station of KPCL got
de-energized
62I1 KPCL Status received vide mail dated 14062017
1 Already settings are discussed with EE(RT) Hubli and soon relays will
be tested for VT fuse fail condition
2 Timings of Zones were set as per the recommendations of CE(RT) amp
RampD KPTCL Bangalore amp EE(RT) KPTCL HubliRegarding revision
of timings will be carried out in co- ordination with EE(RT) KPTCL
Hubli
15-09-2016 at
1406 hrs
Complete outage at Varahi Hydro Power
Station
Disturbance in Kerala system Yet to be informed Pending
58I5 (GD)
58I7 (GD)
21-01-2017
at 0038 hrs
Complete outage of 220 kV Sharavathy
Tail Race PH
58I6 (GD)
Complete outage of 220 kV Nagjheri
substation of KPCL
Annexure-III
Page 8 of 31
65II9 Tripping of 400220 kV ICT-1 at BTPS 13-05-2017 at
1941 hrs
ICT-1 got tripped on operation of LV side earth fault
protection during R-phase to earth fault in 220 kV
BTPS-Lingapur line
1 KPCL to review the need for providing separate non-directional
sensitive earth fault protection for ICT‟s at their BTPS station and
take steps to disable the same
2 For 220 kV BTPS ndashLingapura line KPCL to resolve issues relating
to PLCC carrier communication and put AR into service
KPCL Yet to be informed Pending
65III2 Tripping of 400 kV Hiryur-BTPS line-1 06-05-2017
at 1401 hrs
Y-phase to earth fault had occurred in line Direct
trip was sent from BTPS to Hiryur end
KPCL to introduce suitable delay (say 3 sec) for UVR tripping and
disable sending of DT to the other end on UVR operation at their
BTPS station
KPCL Yet to be informed Pending
PendingMail received on 27-05-2015 (KPTCL) amp 29-07-2015
1Existing Back up relays will be replaced by numerical type distance
relaysProcurement is in tendering stage
2 Completed
3 Completed
KPTCL Mail recieved on 23-01-2016
1 Existing back up relays will be replaced by Main-2 protection LOI
issued Ms Alstom for taking up the works
KPTCL Mail Recieved dated 25-05-2016
Under the Scope of RampU The work will be taken up by Ms Alstom
shortly
KPTCL Mail Recieved dated 25-04-2017
1 ALSTOM make P442 type Numerical relays are supplied to the site
replacement of M-1 relays(OPTIMHO) by new relays will be taken up
shortly
KPTCL
KPCL Status received vide mail dated 10072017
1 Furnishing FIR amp TR of the tripping events as per the formats provided
by SRLDC
4 Refered to OEM for the tripping of Tie CB of Munirabad line on SOTF
protection
Pending
1 PCSC forum recommended KPTCL to replace the old static
distance protection relays with numerical relays
2 PCSC forum also requested KPTCL to provide a broken conductor
alarm indication in Control Room
3 Standing instruction needed to be given to the all substation
personnel for not changing the relay settings without approval of
RTMRT wing
Fault had occurred in 220kV
Mahalingapura-Narendra line-2 Due to the failure of
relay operation at Mahalingapura breakers at remote
end tripped which resulted in bus dead condition
1 KPCL to start furnishing FIR and TR of their tripping events as
per the formats provided by SRLDC
2 KPCL to check earth-mat resistance for 400 kV switchyard and
ensure that it is within prescribed limits
3 KPCL to set right operation of SER in CampI Control Room of Unit-
4
4 KPCL to furnish action taken wrt tripping of Tie-CB of
Munirabad line on SOTF protection OEM report in this regsrd may
be furnished
25-10-2014GD-1 at Mahalingapura Substation of
KPTCL
38GD31
63II10 Multiple trippings at 400 kV RTPS
substation of KPCL
16- 03-2017 at
0118 hrs
Bus-2 B-Ph differential bus bar protection operated
at 400 kV RTPS end tripping all the main breakers
connected to Bus-2
Annexure-III
Page 9 of 31
Pending
Suspected mal-operation of 220kV side Rphase
over current relay
Line tripped on Yphase to earth fault from both the
ends
20-12-2014
at 2220 hrs
KPTCL was requested to explore the possibility of providing AR
feature to this line and submit the remedial measures to the PCSC
forum
Pending
KPTCL1 Till the completion of RampM works for bus bar and LBB protection
KPTCL shall explore the possibility of having split bus operation at
Ambewadi and submit the details of the same to PCSC forum
2 KPTCL shall provide the details of the tripping of Supa hydro
station connected downstream from 110 kV bus
39I5
40I1
220kV Sedam-
Tandur line
Triggering incident was B-phase to earth fault in
220kV Ambewadi- Nagzari line-1 B-pole of breaker
did not open at Ambewadi end LBB protection not
available at Ambewadi end All elements tripped on
Zone-2 from remote ends
01-12-2014Tripping of 400220kV
ICT-2 at Hoody
substation of KPTCL
40IV1
Mail received on 27-05-2015 amp 29-07-2015
1 CampR panels of 500MVA ICT 1amp2 will be replaced under scheduled
RampM works
2 OampM personnel are instructed to take sufficient care in order to avoid
unwarrented trippings --- Completed
KPTCL mail received on 23-01-2016
1 New CampR panels(with numerical relays) erected for 500MVA ICT-1
amp2 under RampM work which will be commissioned shortly
KPTCL mail received on 25-05-2016
1 New CampR panels(with numerical relays) erected for 500MVA ICT-1
amp2 under RampM work which will be commissioned shortly
KPTCL mail received on 25-04-201
1 New CRPs mounted in bay KIOSK commissioned under RampM works
KPTCL1 PCSC forum recommended KPTCL to replace the relay with a
different make
2 KPTCL was also requested to train the OampM personnel
adequately before performing any maintenance works to avoid such
unwanted trippings
PendingMail recieved on 29-07-2015
Carrier protection is being restored for 220kV Sedam-Tandoor line at
Sedam end After restoring the carrier protection AR will be enabled
KPTCL mail recieved on 23-01-2016
Carrier protection is being restored for 220kV Sedam-Tandoor line at
Sedam end After restoring the carrier protection AR will be enabled
KPTCL mail recieved on 25-05-2016
SEESCADA to update the latest status
KPTCL mail recieved on 28-06-2016
Action is being taken to restore carrier protectionAR will be enabled once
carrier signal is restored
KPTCL
22-12-2014 at
2122 hrs
Mail received on 28-04-2015
1 In view of operating 220kV Ambewadi SS in split bus mode action is
being taken up by KPTCL Problem in the 220kV bus coupler breaker is
attended and isolator overhauling work is under progress Spilt bus
operation at Ambewadi will be made possible at the earliest
2 ICT Protection system at Ambewadi and trippings occured at Supa GS
during the instance is checked up and remedial measures already furnished
in this regard
---- Completed
Mail recieved on 29-07-2015
1 Action is being taken by KPTCL for operating Ambewadi in split bus
mode Problem in bus coupler breaker is attendedIsolator overhaulling
work is completedPTs are already provided to 220kV Bus-II After
commissioning of Bus-II PTs Ambewadi can be operated in split bus
mode Pending works will be completed within a months time
KPTCL mail recieved on 23-01-2016
1 Bus-II PTs yet to be commissionedPlanned to complete before end of
April-2016
KPTCL mail recieved on 25-04-2017
1 Yet to be attended
GD-1 at 220kV Ambewadi Station of
KPTCL
Annexure-III
Page 10 of 31
1 KPTCL to provide Bus Bar protection and LBB protection at
Sedam Ss and furnish the status of their implementation to PCSC
forum
2 KPTCL to implement AR feature on 220 kV Sedam-Tandur inter-
state line
Mail received on 28-04-2015
Procurement of Bus bar and LBB protection is in the final tendering stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
KPTCL mail received on 23-01-2016
1 Bus bar protection panels pocured and erected at Sedam Wiring
testing commissioning is being taken upPlanned to complete by April
2016
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
KPTCL
12-03-2015 at
751 hrs
1 KPTCL shall provide AR feature on Ambewadi ndash Ponda 220 kV
DC inter-state line
2 Till the completion of RampM works for bus bar and LBB protection
KPTCL shall explore the possibility of having split bus operation at
Ambewadi and submit the details of the
same to PCSC forum
Mail received on 27-05-2015
1 Bus Bar protection will be provded under RampU
2 AR yet to be enabled
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
Fault occurred in 220kV Sedam-Shahpur line
All connected 220kV lines and transformers were
taken on 220kV North bus as South bus was under
shut down for conversion of strung bus to rigid bus
and isolator replacement under RampM works Failure
of HV side Y phase CT of 150MVA Transformer-3
occurred at Peenya Substation which resulted in
operation of Differential and HV REF protection The
failure of CT also resulted in a 220kV bus fault in
North Bus
KPTCL to revise distance relay settings at Nelamangala end for 220
kV Nelamangala ndash Hebbal - Peenya line ndash 1 for the effective line
length of 17 km These new settings can be appropriately reviewed as
and when the tie-arrangement at Hebbal is done away with
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
Pending
PendingKPTCL
30-09-2015 at
1041 hrs
Pending
Outage of 220kV Ambewadi station in
Karnataka
Pending
PendingKPTCL mail received on 23-01-2016
Will be complied in a months time
220kV Ambewadi-Nagjheri line-2 tripped on B-phase
to earth fault This resulted in loss of supply to 220kV
Ambewadi bus 220kV Ambewadi-Ponda line-1amp2
were hand tripped after deenergization of bus at
Ambewadi
KPTCL
Complete outage of 220kV Ambewadi
substation of KPTCL
42I2 (GD)
27-09-2015 at
42317 hrs
Fault in 220kV Ambewadi-Nagjheri line-2
KPTCL
KPTCL
KPTCL mail received on 25-05-2016
Presentl 220kV Nelamangala -Hoody(ie nelamangala-Peenya-Hebbal -
Hoody line is made LIILO at Yelahanka sub station and breaker at
Peenya is kept open necessary modification in distance relay settings
adopted for new configuration
15-02-2015 at
1424 hrs
Complete outage of 220kV Peenya
Substation in Karnataka
R-Phase to ground fault occurred on 220kV Sedam-
Shahpur line Fault not cleared from Sedam end due
to stuck-breaker condition While the Sedam- Sahapur
line tripped from Shahapur end in Zone-1 the other
220 kv lines from Sedam tripped at remote ends in
Zone-2 This caused complete outage of 220kV
Sedam substation
42I1 (GD)
41I4
Complete outage of 220kV Sedam
substation of KPTCL
48I2 (GD)
48I3 (GD) KPTCL to fast-track providing AR on all 220 kV lines emanating
from Ambewadi SS to prevent Station shut-down on temporary faults
06-08-2015 at
451 hrs
220kV RTPS-Lingasugur line-2 tripped at TPS end
on operation of distance
protection zone-1 400220kV ICT-2 got tripped on
operation of earth fault
protection 220kV RTPS-Lingasugur line-1amp3 tripped
on distance protection zone-2 and zone-3
respectively Due to tripping of ICT-2 the running
units got overloaded and it was mentioned that under
frequency occurred as units are on load control The
Units got tripped on under frequency
KPTCL to activate non-directional Over Current protection with a
time delay of 600-800 msec for Fuse
failure condition at Lingasugur
KPTCL Status received vide KPCL mail dated 10072017
LV earth fault relay had an additional default Ef setting having a definite
time which resulted in tripping of ICT-2 and the same was rectified and
already complied
Pending
1 KPTCL to provide Bus bar and LBB protections for 220 kV
bus at Sedam Ss
2 KPTCL to implement AR feature on 220 kV Sedam-Tandur
inter-state line
27-01-2015 at
800 hrs
Complete outage at 220kV Sedam
Substation of KPTCL (GD-1)
Tripping of Unit-1amp2
along with 400220kV
ICT-2 at Raichur TPS
47II13
Annexure-III
Page 11 of 31
52I3 (GD) Complete outage of 220kV Shimoga
substation
22-02-2016 at
1503 hrs
220kV Bus Bar protection operated during failure of
R phase CT in DVG-2 line bay
KPTCL to operate 220 kV Shimoga on multi-bus operation under
normal conditions put it on single-bus operation only under
emergency conditions
KPTCL KPTCL Mail received dated 25-04-2017
Replacement of existing BBP by new BBP with 4 zone protection is being
taken up under RampU
Pending
56II6 Tripping of 220kV Ambewadi-Ponda
(Xeldam) line-1
10-06-2016 at
1333 hrs
Line tripped on Y-E faut due to DPR Z1 operation KPTCL to keep AR for Ambewadi ndash Ponda (Xeldam) line-1 in
service with immediate effect
KPTCL Yet to be informed Pending
59II13 Tripping of 220 kV Bidadi (PG) - Bidadi
lines - 1amp2
02-10-2016 at
1032 hrs
Line-2 tripped in DPR Zone-2 and Line-1 tripped on
operation of EF protection from Bidadi end
KPTCL to resolve PLCC carrier communication issues on 220 kV
Bidadi ndash Bidadi-PG DC lines and subsequently restore Zone-2
timing to normal values
KPTCL Yet to be informed Pending
1 KPTCL to configure all DR‟s and EL‟s at 400 kV Guttur SS so
that they will also get triggered for BBP operation
2 KPTCL to ensure time-synchronization of all DR‟s and EL‟s with
GPS at their 400 kV Guttur SS
KPTCL17-01-2016 at
1853 hrs
Pending
Pending
Yet to be informed PendingKPTCL
KPTCL
30-09-2015 at
1041 hrs
Complete outage of 220kV Ambewadi
Substation of KPTCL
Multiple tripping at 400kV Guttur sub-
station
Outage of 220kV Ambewadi station in
Karnataka
29102015 at
1434 hrs
Complete outage of 220kV Peenya
Substation of KPTCL
PendingKPTCL mail received on 23-01-2016
Will be complied in a months time
220kV Peenya-Nelamangala-3 tripped on B-E fault at
both ends At the same time 220kV Peenya-
Nelamangala-4 tripped on R-Y fault only at
Nelamangala end and was in service from Peenya
end Due to tripping of these two lines 220kV Peenya-
Nelamangala-2 tripped on overcurrent protection
KPTCL to furnish a report on the tripping of 220 kV Peenya-
Nelamangala line-4 Nelamangala detailing the remedial measures
taken including the settings adopted for Z1B (Zone extension) and
Power Swing Block
Pending220kV Nagjheri-Ambewadi line-1 tripped at 1333
hrs due to B phase to earth fault Ambewadi was
radially fed from Nagjheri power station through
220kV Nagjheri-Ambewadi line-2 Tripping of this
line caused 220kV Bus shut down at Ambewadi and
remaining lines and transformers were hand tripped
220kV Ambewadi-Nagjheri line-2 tripped on B-phase
to earth fault This resulted in loss of supply to 220kV
Ambewadi bus 220kV Ambewadi-Ponda line-1amp2
were hand tripped after deenergization of bus at
Ambewadi
KPTCL
Yet to be informedKPTCL
KPTCL Mail received dated 25-05-2016
SEE RTC Bangalore to update the status
KPTCL Mail received dated 28-06-2016
Providing numerical bus bar protection to 400kV buses and GPS time
synchronising equipment at Guttur is considered under RampU Work is
awarded to Ms Alstom execution will be taken up shortly
KPTCL Mail received dated 25-04-2017
GPS and accessories will be supplied during May 2017 expected to
complete the work within a month after supply of materials
53I1
1KPTCL to take steps to provide busbar protection at their 220 kV
Chikkodi inter-regional substation and furnish a time-line for the
same
2KPTCL to review distance protection settings for 220 kV Chikkodi
ndash Kudachi line
3KPTCL to furnish equipment failure report of the current incident to
PSEampTD Division of CEA with a copy marked to SRPC
KPTCL Mail received dated 25-05-2016
SEE RTC Bangalore to update the status
1 KPCL to provide AR on all 220 kV lines emanating from Nagjheri
PH
2 KPTCL to provide AR on all 220 kV lines emanating from
Ambewadi SS
Failure of Lightning Arrestor of Y-phase Line Reactor
of 400kV Guttur-Hiriyur line-1 and line tripped on
distance protection Zone-1 Bus-bar protection of
400kV Bus-2 at Guttur substation also got operated
during the event sensing this through fault 400220
kV ICT-1 amp 2 at Guttur 400kV Kaiga-Guttur-2
400kV
Guttur-Narendra-2 400kV Guttur-Hiriyur-2 and
400kV Guttur-Munirabad which are on 400kV Bus-2
got tripped during the incident 400kV Guttur-
Narendra-1 which was on Bus-1 also tripped at the
same time
49I13 (GD)
Triggering incident was failure of B-ph PT of 220kV
Bus-2 (western bus) at 220KV Chikkodi substation
220KV Chikodi- Belgaum-I line tripped on DEFR
(Inst) 220KV Chikkodi-Kudachi line tripped on
Distance protection and also 100MVA transformer-2
tripped on EF protection
57II1 01-07-2016 at
0303 hrs
Tripping of 220 kV Chikkodi-Mudshingi
and 220 kV Chikkodi-Talandage lines
48I3 (GD) KPTCL to fast-track providing AR on all 220 kV lines emanating
from Ambewadi SS to prevent Station shut-down on temporary faults
51II21
16-03-2016 at
1139 Hrs
Annexure-III
Page 12 of 31
62II3 Tripping of 220 kV Bus 2 and connected
elements (220kV HAL 1 and 2
400220 kV ICT- 1 2 and 22066 kV
ICT-2) at 400220 kV Hoody substation
of KPTCL (Load loss 590 MW)
09-01-2017 at
2306 hrs
Failure of R-phase CT of 220 66 kV transformer-2 at
220kV Hoody end resulted in a bus fault in 220kV
Bus-2 Fault was cleared by backup protection of
ICTs (220kV lines were being radially operated) due
to absence of busbar protection
1 KPTCL to provide Busbar protection at their 220 kV Hoody SS at
the earliest
2 KPTCL to furnish an Equipment Failure Report on CT failure to
CEA with a copy marked to SRPC
KPTCL KPTCL mail received dated 25042017
Numerical BBP is being provided under RampM works
Pending
64II9 Tripping of 400 220 kV ICT-2 and 3 at
Hoody substation of KPTCL
26-04-2017 at
1540 hrs
ICT-2 tripped on suspected mal-operation Oil surge
relay of B-phase Transformer ICT-3 tripped due to
overloading
KPTCL to put in place a suitable SPS at their 400 220 kV Hoody SS
that takes care of over-loading of the other ICT when one ICT out of
ICT‟s ndash 2 amp 3 trips at the earliest and furnish the details of
implemented SPS to PCSC forum
KPTCL Yet to be informed Pending
65II17 Tripping of 400220 kV ICT - 1 amp 3 at
Hoody substation of KPTCL
(Load Loss 750 MW)
26-05-2017 at
1230 hrs
R phase limb of ICT-1 bank pre-close supervision
contact of trip coil -2 had arc over ICT-3 got tripped
on over-loading
KPTCL to furnish compliance report on the recommendations given
in PSAG-18 meeting to PCSC forum
KPTCL Yet to be informed Pending
Complete outage of 220kV Nagjheri
power station and 220kV Ambewadi
substation of KPTCL
51I3 PendingStatus informed during Special Meeting held on 03062016
1 KPTCL informed that the matter had been taken up with concerned Line
Operation and Maintenance wing to carry out corridor clearance and
maintenance as per schedule to avoid frequent line faults in this corridor A
letter had also been addressed to Chief Engineer Bhagalkot zone to ensure
lines in amp around Kali complex are maintained in healthy condition ---
Completed
2 KPTCL assurd that the final modified SPS would be implemented at
Nagjheri PH at the earliest ------ Pending
3 KPCL informed that Nagjhari- Kodasalli Lines 1 amp 2 had been kept in
service since 23052016 0806hrs ---- Completed
KPTCL Mail received dated 28-06-2016
Modifications to be carried in Nagzari SPS logic is submitted to
SRLDCSRPC for verification and approval
Status received vide KPCL mail dated 14062017
1 Will be reviewed in consultation with EE(RT) KPTCL Hubli
2 Both the lines are in charged condition
KPCL KPTCL 1 To avoid tripping of transmission lines on transient faults KPCL
KPTCL is recommended to carry out periodic patrolling of lines and
ensure their proper maintenance by carrying out jungle bushing
clearance and trimming of tree branches within the RoW of
transmission lines as per the SRPC transmission line patrolling
guidelines (available under the menu item All Uploads Operation
Miscellaneous Transmission Line Patrolling Protocol
Guidelines for Southern Region on SRPC website)
2 KPCL KPTCL to review operation of SPS at NPH for
functionality (reduction of generation with tripping of evacuating
lines) and healthiness
3 KPCL to put 220 kV Kodasalli - Nagjheri DC lines into service if
more than 200 MW generation from Kali Complex (with Nagheri
Contribution not less than 50 MW) is ensured on sustained basis
220kV lines from Nagjheri power house started
tripping from 1100 hrs due to fault in lines The
sequence of tripping is shown in SOE list At 1233
hrs 220kV Narendra-Ambewadi lines-1amp2 got
tripped which resulted in loss of evacuation path to
Nagjheri station resulting in tripping of running Units
and complete outage at Nagjhheri power station
220kV Ambewadi station also got de-energized due
to tripping of source feeders ie 220kV Narendra-
Ambewadi-1amp2 and 220kV Nagjheri-Ambewadi-
1amp2
22-02-2016 at
1236 hrs
Pending
Pending
KPTCL
For the line under consideration the following shall be carried out by
KPTCL in coordination with
PGCIL (SR-II)
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
KPTCLLine tripped at Hiryur end due to direct trip receive
and was holding from Guttur
KPTCL mail received dated 25042017
Numerical BBP is being provided under RampM works
KPTCL to provide numerical Busbar Protection at their 220 kV
Somanahalli SS at the earliest
Tripping of 400 kV Neelamangala-
Hoody line-1
KPTCL to carry out the following for the line under consideration
(i) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
(ii) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
Tripping of 400 kV Guttur-Hiryur line-1 10-10-2016 at
315 hrs
62IV4
59IV4
62II5 Tripping of 220 kV South Bus and
connected elements (220kV HSR 220kV
Nagnathpura 220 kV Harohalli 220 kV
Subramanyapura 220 kV Tataguni 220
kV Mallur and 400220kV ICT-2 and 3)
at 400220kV Somanhalli substation of
KPTCL
(Load loss 850 MW)
20-01-2017 at
1434 hrs
Triggering incident was fault in 66 kV Somanahalli -
Bannerghatta line and fault was cleared by operation
of Back-up OCR at Somanahalli end
15-02-2017
at 1344 hrs
Line tripped at Hoody end on direct trip receive and
was holding from Neelamangala end
Yet to be informed
KPTCL
Yet to be informed Pending
Annexure-III
Page 13 of 31
56I3 Complete outage of 220kV Ambewadi
Substation of KPTCL
24-06-2016 at
2057hrs
B phase to earth fault had occurred in 220 kV
Ambewadi-Ponda line-2 Fault was cleared by
tripping of feeders from remote end
1KPCL amp KPTCL to furnish an action taken report on the
recommendations given by PSAG-16 to PCSC forum
2KPTCL to keep AR for Ambewadi ndash Ponda line-2 in non-auto
mode (ie only 3-ph trip should get extended on occurrence of a
fault) till the line is closed from Ponda end
KPCLKPTCL Yet to be informed Pending
Complete outage of 220kV Ambewadi
station of KPTCL and 220kV Nagjheri
of KPCL
Ambewadi Narendra line-2 tripped on fault and
220kV ambewadi Narendra line-1 tripped due to over-
loading Running Units at Nagjheri also tripped during
the event due to tripping of evacuating lines
KPCL KPTCL18-03-2016 at
1440 hrs
1 TANGEDCO to replace existing Check-Zone relay with a new one
possessing required performance
2 TANGEDCO to take steps to provide numerical busbar protection
at their 220 kV Tuticorin TPS TANGEDCO may also explore
providing dual CT‟s (on either side) for all BS breaakers at the time
of commissioning of numerical BBP if there were no space
constraints
3 TANGEDCO to take steps to provide for standalone Event Logger
(EL) and standalone Disturbance Recorder (DR) with automatic
downloading facility to a centralized server
Failure of Bus Section-I Y-ph CT resulted in
operation of bus-bar protection for Bus Sections -I amp
II Running Units1 4 and 5 230 kV Kayathar
230kV Kudankulam 230kV Sterlite Station
Transformer-1 2 amp 3 got tripped during the incident
Unit ndash 2 amp 3 were not in service
22-02-2017 at
0616 hrs
KPCLKPTCL
25-01-2017 at
2236 hrs
R-phase to earth fault due to de-capping of insulator
Auto-reclose attempt was unsuccessful
Tripping of ICT-3 at Raichur Substation
TANGEDCO
Pending
Tripping of running Units amp 230kV
feeders at Tuticorin TPS of TANGEDCO
(Gen Loss 640 MW)
62II7
1 KPCL to furnish a report on the reasons for Unit-6 tripping at
Nagjheri PH
2 KPCL KPTCL to modify suitably the SPS at Nagjheri Power
House such that it would also factor in the over loading of Ambewadi-
Narendra lines
3 KPCL to put 220 kV Kodasalli - Nagjheri DC lines into service if
more than 200 MW generation from Kali Complex (with Nagheri
Contribution not less than 50 MW) is ensured on sustained basis
Pending53I3 (GD)
15-03-2016 at
1228 hrs
ICT-3 tripped due to operation of back-up earth fault
protection during fault in 220kV RTPS-Raichur line-
1
KPCL KPTCL to check the ICT‟s back-up (high-set) protection
settings and ensure that they operate with a time delay of 100 msec
TANTRANSCO mail dated 12042017
1 The recommendation will be ensured AR logic will be configured in
Distance Protection relay itself instead of BCU OEM has been addressed
2 Post triggering period of 2 sec to cover AR operation in DR time scale
will be provided
TANTRANSCO mail dated 01062017 amp 15062017
1 The recommendation will be ensured AR logic will be configured in
Distance Protection relay itself instead of BCU OEM has been addressed
Main-1 amp 2 relays will be replaced for the requirement of more output
contacts for AR logic implementation
2 Post triggering period of 2 sec to cover AR operation in DR time scale
is being provided
TANGEDCO1 TANGEDCO to take properly configure AR logic at NCTPS-II in
that in case of unsuccessful auto-reclsoure three-phase trip shall be
given along with AR block
2 TANGEDCO to configure all protection relays DR‟s time scale at
NCTPS-II for a post-triggering period of 2 sec to capture events such
as complete AR operation
Tripping of 400 kV NCTPS-
SVChatram line-2
KPTCL Mail received dated 28-06-2016
Modifications to be carried in Nagzari SPS logic is submitted to
SRLDCSRPC for verification and approval
Status received vide KPCL mail dated 14062017
1 Tripped since there was evacuation problem and there were only two
lines NA-1 and NA-2
2 Will be reviewed in consultation with EE(RT) KPTCL Hubli
3 Both the lines are in charged condition
TANGEDCO mail dated 15042017
1) New Relay is tested and ready for replacementNow all 5 units are in
serviceThe relay will be replaced when lesser units are in service ---
Pending
2a)Steps are taken to renovate amp mordernization of all the control panel
into Numerical based control panels --- Pending
2b) Since 230 KV indoor switchyard has no spare space providing dual
CT`s is not fessible -- Completed
3) Procurement of EL amp DR is under progress --- Pending
TANGEDCO mail dated 26042017
1) Check zone New Relay is replaced on 17042017 -- Completed
2 Pending
3 Pending
KPTCL Mail Recieved dated 25-05-2016
SEESCADA to update the status of healthiness of carrier protection of
220kV RTPS-Raichur 1 amp2 lines
KPTCL Mail Recieved dated 28-06-2016
Details sought from KPCL for review of ICTs back up (high set) proection
settings as suggested KPCL is yet to furnish the details required to give
the revised settings
Status received vide mail dated 10-07-2017
As requested by EEE (protection) CEERT KPTCL the details were sent
to through e-mail dtd 08082016 After receipt of reply from KPTCL will
be implemented accordingly
62V3 Pending
Pending
Tamil Nadu
53II1
Annexure-III
Page 14 of 31
05-09-2015 at
1404 hrs
TANTRANSCO to take suitable measures like installing more stub-
towers along 230 kV OK Mandapam ndash Myvady line to avoid
excessive sag due to over-loading
TANTRANSCO PendingComplete outage of 230kV Palladam 230 kV
Othakalmandapam Ss 230 kV Coimbatore Ss 230
kV Thudialur and 230 kV Sadayapalayam Ss
Pending
Disturbance in 220kV Tamilnadu system48I1 (GD)
TANTRANSCO TANTRANSCO vide their mail dated 240615 informed that different
relays in Main-I amp Main-II would be ensured at the earliest
Mail recieved on 24-07-2015 19-02-2016 and 24-03-2016
Different relays in Main-I amp Main-II will be ensured
Mail received on 27-04-2016
TANTRANSCO Not feasible in the existing SAS sub stations Hence
exemption may be given for these sub stations
Mail received on 20-05-2016 16-06-201625-07-2016 amp 24-09-2016
As discussed in the 52nd PCSC meeting Swapping of Relays between two
stations is not feasible in the existing SAS sub stations Hence exemption
may be given for these sub stations
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15062017
Different make Relays will be ensured for Main-I amp II relays at Alamathy
end
TANTRANSCO Mail received on 19-02-2016 24-03-2016 and 27-04-
2016
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
Mail Received on 20-05-2016 16-06-201625-07-2016 amp 24-09-2016
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
29-03-2015 at
1529 hrs
43II5 Line-2 tripped on R-phase to earth fault
Line autoreclosed at SVChatram end and failed to
reclose at Alamathy end Bphase to earth fault in line-
1 Line tried for Ar but due to permanent fault line
did not reclose ICT tripped on operation of over flux
protection
TANTRANSCO was requested to swap the relays between two
stations so that
Main-1 and Main-2 will be of different make at each station
Tripping of 400kV
Alamathy-
SVChatram line-1amp2
and 400230kV ICT
at SVChatram
Annexure-III
Page 15 of 31
14-09-2016 at 1113Hrs
Bus Bar Protection (Zone-2) of 230 kV Bus-B got operated at Alamathy Station during fault in 230 kV
Alamathy-Korattur feeder
51I1 (GD)
12-05-2016 at
1215 hrs
Fault had occurred in 230kV Madurai-Sembatty line
Trip from distance relay was not extended to breaker
due to protection DC fail LBB protection got
operated resulting in a busbar trip at 230kV Madurai
substation All elements got tripped as there is a
single bus operation at 230kV Madurai Ss
58II17
TANTRANSCO
TANTRANSCODifferent type and Make of distance protection relays to be provided for Main-I amp Main-II protection for 230kV feeders at 400 kV Sunguvarchathiram amp 230 kV Sunguvarchathiram Substation [Carry-Over from Protection Audit Recommendations]
Mail recieved on 25-07-2016 amp 24-09-2016
TANTRANSCO Auto Transformer-2 HV side Bus isolator C-phase
support insulator of 230kV Southern Bus was replaced and Bus Bar
Protection scheme was restored on 12052016
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
CT is not available in the Bus Coupler bay for zone segregation CT latch
relay is to be provided for all bays for zone segregation
TANTRANSCO mail received on 24-03-2016
CMR relay for extending LBB protection was released and LBB extended
from Distance Protection relay directly CT is not available in the Bus
Coupler bay for zone segregation However during commissioning of third
ICT Bus section Breaker will be provided for zone segregation Numerical
BBP relay will be provided
Status received vide mails recieved on 27-04-2016 and 20-05-2016 16-
06-2016 25-07-2016 24-09-201610-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
CT is not available in the Bus Coupler bay for zone segregation However
during commissioning of third ICT Bus section Breaker will be provided
for zone segregation Numerical BBP relay will be provided
PendingComplete outage of 230kV Madurai Ss
(Chekanaurani) of TANTRANSCO
TANTRANSCO
Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
TANTRANSCOMultiple tripping at 230 kV Alamathy Station
Pending
Pending
1 TANTRANSCO to check the healthiness of BBP relay by conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
TANTRANSCO to take steps to provide double-bus operation at
their 230 kV Gummidipoondi SS
Pending
Complete outage of 230 kV
Gummidipoondi Station of
TANTRANSCO
19-01-2016 at
1156 hrs
Flashover of Auto Transformer- 2 HV
B-phase Isolator supporting insulator of 230kV
Southern Bus occurred at Gummidipoondi station At
the time of fault Bus bar protection relay was not in
service for pre-commissioning testing of Auto
Transformer-2 All feeders got tripped due to
operation of zone-2 protection from remote ends
TANTRANSCO1 TANTRANSCO to examine the feasibility of providing two main-
zone operation for bus bar protection by exploring various alternatives
like replacing existing bus-coupler CB with a hybrid bus-coupler CB
that comes with inbuilt CT replacing existing BBP relay with another
suitable relay that supports two main-zone operation and implement
the same
Busbar protection got operated for a fault in 230kV
Mywadi-Anaikadavu line
21-12-2015 at
628 hrs
Complete outage of 230kV Mywadi
station of TANTRANSCO
50I3 (GD) TANTRANSCO Mail received on 19-02-2016 and 24-03-2016
Revision of Bus Bar Protection setting was carried out The stabilizing
voltage setting was raised from 410 to 450 volts After completing the
necessary test the bus bar protection put in to service on 29122015
Mail Received on 27-04-2016 16-06-201625-07-2016 amp 24-09-2016
Revision of Bus Bar Protection setting was carried out After completing
the necessary test the bus bar protection put in to service on 29122015
Mail received on 10-11-2016 amp 20122016
Provision of Bus Coupler bay arrangement was included in the
Upgradation works proposed and the same was sanctioned by MoP
through PSDF
Numerical relay allotted and being commissioned
Mail received on 20-02-2017
Numerical BBP relay was commissioned on 02022017
Status received vide mail dated 12042017 amp 01062017 amp 15-06-
2017
Numerical BBP relay was commissioned on 02022017
Provision of Bus Coupler bay arrangement was included in the
Upgradation works proposed and the same was sanctioned by MoP
through PSDF
The issue was discussed in PCSC-58 meeting held on 18102016 when
PCSC forum agreed to de-link the implementation of the Item from the
scope of Protection Audit Recommendations (PAR) and pursue it as part
of PCSC Recommendations
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp15-06-2017
Different make Relays will be provided for Main-I amp II relays at
Sunguvarchatram end in a phased manner
Pending
1 TANTRANSCO to provide split-bus operation with bus
sectionalizer CB for their 230 kV Madurai (Chekanurani) SS
2 TANTRANSCO to provide two main-zone operation for the
numerical BBP that is being commissioned
3 TANTRANSCO to examine the feasibility of providing Re-Trip
feature for the LBB protection and accordingly take steps for
implementing the same
58
55I1 (GD)
Annexure-III
Page 16 of 31
58II17 Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
TANTRANSCOMultiple tripping at 230 kV Alamathy
Station
15-09-2016 at
2214 hrs
Bus Bar Protection (Zone1) of 230kV Bus-A got
operated at Alamathy Station during fault in 230 kV
Alamathy-OPG-1 feeder
1 TANTRANSCO to check the healthiness of BBP relay by
conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal
winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
Pending
Annexure-III
Page 17 of 31
6414 Complete outage of North Chennai TPS
STG-1
26-03-2017
at 2314hrs
Tripping of evacuating lines due to fault led to
tripping of running Unit at NCTPS Stg-1
1 TANTRANSCO to take steps to complete insulator replacement
works on the 230 kV lines owned by them in NCTPS area within 6
months
2 TANTRANSCO to take steps to implement AR on all 230 kV lines
emanating from NCTPS-I at the earliest
TANTRANSCO Yet to be informed Pending
65II1 Tripping of 220 kV Idukki ndashUdumalpet
line
05-05-2017 at
1702 hrs
Line tripped due to B-N and R-N fault in line 1 TANTANSCO to correctly configure AR logic at Udumalpet so
that in the event of 3-ph trip being given during AR dead-time the
relay will not try for auto-reclosure
2 TANTRANSCO to keep AR dead-time as 1 sec for all 220 kV amp
above transmission lines
TANTRANSCO Yet to be informed Pending
58II17
44I1 (GD)
Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
KSEB Mail received vide dated 17012017
1 110 kV bus bar protection progressing ----Pending
2 Connection of 220kV earth mat and 110 kV plate earthing system
completed---- Completed
3 Redundancy of 110V DC system in progress Complete independent
redundancy is not practical for the time being 48 V DC redundancy was
already there----Pending
4 Instead of stand alone event logger SCADA system of 110 kV feeder is
expected to be completed by the end of 2017 SCADA system of 220kV
side will be taken up after that----Pending
28-04-2015 at
1230 Hrs
Mail received on 31-07-2015
1 Reducing the sensitivity of REF protection of Unit 4 5 6 at Idukki
PH - Generation wing is planning to purchase new transformer
management relays with low impedance REF protection Purchase
procedures initiated ---------Pending
2 The replacement repair of faulty breakers are under the consideration of
Generation wing Breakers will be replaced repaired in a phased manner
Unit 3 breaker was replaced with available breaker from the 220kV
IDMD feeder The 220kV CBs of unit 2 and unit 3 will be replaced with
in two months
3 No abnormalities were noticed in the PLCC equipment at New Pallom
station It is kept under observation
Mail recieved on 30-10-2015
1 Purchase procedures is still in progress
2 Replaced
3 PLCC equipment Tested and found OK
Mail recieved on 03-03-2016
1 Even though repeated plans to have a joint inspection with MsABB
who is the OEM of the relay panel for replacing the relays with numerical
ones the same could not become successful Finally the inspection has
been fixed on 15032016 It has been planned to replace existing REF
protection with low impedance ones after retrofitting the numerical ones of
OEM
Mail recieved on 25-05-2016
1Generation wing is planning ti provide low impedance REF protection by
retrofitting numerical ABB make transformer management relay in the
existing panel ---- Pending
2Faulty breaker of Unit3 has been replaced ---- Completed
3PLCC equipments in the feeder were checked and found OK ------
Completed
TANTRANSCO
KSEB
Complete outage of Idukki Hydro Power
Station (GD-1)
Multiple tripping at 230 kV Alamathy
Station
15-09-2016 at
2214 hrs
58I1 (GD) Complete outage of 220 kV Kalamassery
Substation
23-08-2016
at 1120 hrs
Triggering incident was conductor snapping in 110
kV Kalamassery- Kaloor feeder
KSEB to take steps to provide the following at their 220 110 kV
Kalamassery SS
1 Busbar protection at 110 kV level
2 Connecting 220 kV and 110 kV sides on to a common earthmat
3 Redundant DC supply for both protection (220 V) and
communication (48 V) applications
4 Stand-alone Event Logger
Bus Bar Protection (Zone1) of 230kV Bus-A got
operated at Alamathy Station during fault in 230 kV
Alamathy-OPG-1 feeder
1 TANTRANSCO to check the healthiness of BBP relay by
conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal
winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
KSEB
Pending
220 kV breaker of unit-3 at Idukki Power
house flashed and bus differential protection
acted All Generators (6Nos) along with all
220 kV feeders tripped during the incident
1 KSEB to reduce sensitivity of REF protection appropriately at
Idukki PH
2 KSEB to replace repair the faulty breaker
3 KSEB to check the PLCC equipment at New Pallam and inform
the remedial measures taken to PCSC forum
Kerala
Pending
Pending
(Recommendat
ion No1)
Annexure-III
Page 18 of 31
08-05-2016at
457 hrs
Tripping of 400kV Hyderabad - N‟sagar
line
PGCIL (SR-I amp SR-II)
PendingLine tripped on operation of over-voltage protection at
Hyderabad end and Direct Trip was received at
N‟sagar Over-voltage Stg-2 operation was observed
in EL of Hyderabad station
55II5 1PGCIL (SR-I) to properly configure EL‟s at Hyderabad station
with time-scale resolution up to msec further DR‟s should also be
configured for showing both Analog and Digital data with properly
defined X-axis and Y-axis scales
2PGCIL (SR-I) to follow the FILE Naming Nomenclature provided
by SRPC in naming various tripping files (FIRDRELTR) being
uploaded in SRLDC‟s Tripping Monitor System (TMS) portal
PGCIL (SR-I) Yet to be informed
Annexure-III
Page 19 of 31
55II9 Tripping of HVDC Gazuwaka pole-2 19-05-2016 at
1141 hrs
Pole tripped on operation of differential current
protection of east side of Pole-2
PGCIL (SR-I) to take up the issue of differential protection operation
of converter transformer on low voltage fluctuations with their OEM
and submit a detailed report on it
PGCIL (SR-I) Yet to be informed Pending
56II11 Tripping of HVDC GazuwakaPole-2 19-06-2016 at
520 Hrs
HVDC Pole-2 got tripped on operation of Bus
differential protection
PGCIL (SR-I) to get the tripping of HVDC Pole-2 tripping on Win-
Bus differential protection thoroughly investigated for correctness of
operation and submit a report thereon
PGCIL (SR-I) Yet to be informed Pending
56III7 Tripping of 400 kV Khammam-N‟sagar
line-1
05-06-2016 at
2241 hrs
Line tripped on B-phase to earth fault Line auto-
reclosed successfully at N‟sagar and failed to auto-
reclose at Khammam
1PGCIL (SR-I) to configure DR amp EL at N‟sagar (Tallapalli) end so
that full operation of AR is captured
2PGCIL (SR-I) to investigate the reasons for non-operation of AR of
Tie-CB at N‟Sagar end and resolve them suitably
PGCIL (SR-I) Yet to be informed Pending
58II13 (GI) Tripping of 400 kV Raichur-Gooty line-1
and 400 kV Gooty-Tumkur line-2
01-09-2016 at
517 hrs
400kV Gooty-Raichur line tripped at Gooty end only
and was holding from Raichur 400kV Gooty-Tumkur
line-2 tripped on over voltage
PGCIL (SR-I) to check the operation of OVR relays at their Gooty
SS and properly configure lines‟ DRs amp ELs so that events pertaining
to OVR (Stage-I amp Stage-II) operation (START amp TRIP) get
explicitly recorded
PGCIL (SR-I) Yet to be informed Pending
58II14 (GI) Tripping of 400 kV Gooty-Tumkur line-2 02-09-2016 at
2156 hrs
Line tripped on operation of over-voltage protection at
Gooty end and Direct Trip was received at Tumkur
PGCIL (SR-I) to check the operation of OVR relays at their Gooty
SS and properly configure lines‟ DRs amp ELs so that events pertaining
to OVR (Stage-I amp Stage-II) operation (START amp TRIP) get
explicitly recorded
PGCIL (SR-I) Yet to be informed Pending
61II4 Tripping of HVDC Gazuwaka Pole-2 05-12-2016
at 1503 hrs
Pole-2 tripped due to tripping of AC filter banks
which was due to voltage disturbance in eastern bus at
Gazuwaka
PGCIL (SR-I) to refer the instant trippings to their OEM to ensure
that the settings adopted for pole trippings for low-voltage power
swing and ferro-resonance phenomena are in order and have been set
properly A copy of the OEM‟s reply in this regard shall be furnished
to PCSC forum
PGCIL (SR-I) Yet to be informed Pending
62II4 Tripping of 400 kV Gazuwaka-Vemagiri
(PG) line and 400kV Vemagiri(PG)-
Nunna line
18-01-2017 at
2203 hrs
400 kV Gazuwaka - Vemagiri (PG) line and 400 kV
Vemagiri (PG) - Nunna line got tripped due to Direct
Trip receive at Gazuwaka and Vijayawada respectively
PGCIL (SR-I) to configure triggering of DR amp EL for SF6 gas
compartment Zone trip with suitable legend
PGCIL (SR-I) Yet to be informed Pending
63II11 Tripping of 765 kV Vemagiri-Srikakulam
line-1 and 765400kV ICT-1 at Vemagiri-
PG SS
16-03-2017 at
1023 hrs
Line-1 and ICT-1 which are in the same diameter got
tripped due to operation of Tie bay gas
compartment trip
1 Since tripping of elements on Gas Compartment Trip has been
observed frequently in the past few months at 765 400 kV
Vemagiri SS PGCIL (SR-I) shall furnish a comprehensive report
detailing the remedial measures taken including OEMrsquos suggestions
to prevent their occurrence
PGCIL (SR-I) Yet to be informed Pending
PGCIL (SR-I)12-09-2016 at
1203 hrs
Line tripped on Direct Trip receipt at Ramagundam
end and line was holding from Warangal end
Pending58IV1
400 kV Gazuwaka-Vemagiri (PG) line tripped on Y-E fault However for 400 kV Gazuwaka-Vemagiri (PG) line Direct Trip was received at Gazuwaka after
250ms of occurrence of fault and fault was
persistent for 250ms Then Over-Voltage Stage-1 protection operated from Vemagiri (PG) end in 400 kV Vemagiri (PG) - Nunna line and tripped it
62II1
For the line under consideration the following shall be carried out
by PGCIL (SR-I) in coordination with NTPC-Ramagundam
I)End-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
II)Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be
repaired replaced
Yet to be informedTripping of 400 kV Ramagundam-
Warangal line
Yet to be informed05-01-2017 at 1305 hrs
Tripping of 400kV Gazuwaka - Vemagiri (PG) line and 400 kV Vemagiri (PG ) - Nunna line
1 PGCIL (SR-I) to ensure time-sync of all protections relays at their Vemagiri Gajuwaka and Vijayawada substations2 PGCIL (SR-I) to check OVR settings for correctness of operation
along with proper drop-off to pick-up ratio (gt 097) and configure
OVR_START event in the corresponding Relay BCU Event Logger for all 400 kV lines emanating from their Vemagiri (PG) SS
PGCIL (SR-I) Pending
Annexure-III
Page 20 of 31
64III16 Tripping of 76 5kV Kurnool-Nellore PS
line-2
27-04-2017 at
2222 hrs
R-phase to earth fault had occurred in line Auto-
reclose was successful at Kurnool end and breaker
at Nellore PS end tripped and did not attempt for
auto-reclose
For the line under consideration PGCIL (SR-I) to Configure Event
Logger (EL) to record events at msec level
PGCIL (SR-I) Yet to be informed Pending
65II15 Tripping of HVDC Gazuwaka Pole-1amp2 25-05-2017 at
0945 hrs
HVDC pole-1 got tripped due to operation of South
filter inter zone protection and HVDC pole-2 got
tripped due to operation of differential protection
PGCIL (SR-I) to furnish detailed report on the events that led to
tripping of HVDC Poles ndash 1 amp 2 including remedial measures taken
to PCSC forum Further the OEM report wrt tripping of HVDC
Pole-2 shall also be furnished
PGCIL (SR-I) Yet to be informed Pending
65III5 Tripping of 765 kV Raichur-Solapur line-
2
07-05-2017
at 1918 hrs
Y-phase to earth fault Auto-reclose was successful
at Solapur and breakers at Raichur end got tripped
PGCIL (SR-I) to configure Event Loggerrsquos time-resolution up to
millisec level in all protection relays at their 765 400 kV Raichur SS
PGCIL (SR-I) Yet to be informed Pending
55II7 Tripping of 400kV Kudgi PG (Narendra
New) - Narendra-PG line-2
18-05-2016 at
1625 hrs
line tripped on B-phase to earth fault and line auto-
reclosed successfully from Narendra end Line tripped
from Kudgi-PG due to operation of over-voltage stage-
1
PGCIL (SR-II) to properly configure dead-time of AR (typically 1
sec) on all lines emanating from Narendra (PG) substation
PGCIL (SR-II) Yet to be informed Pending
54II3 Tripping of 400kV Sriperambudur -
SVChartam and 400kV Nellore-
Sriperambudur line-1
05-04-2016 at
0011 hrs
400kV Nellore-Sriperambudur line-1 tripped on a R-
phase to earth fault 400kV Sriperambudur-
SVChatram line tripped at Sriperambudur end only
on operation of over current protection
PGCIL (SR-II) to check and revise Pole Discrepancy Relay (PDR)
time setting appropriately based on the type of AR scheme being
implemented at their 400 kV Sriperambudur SS
PGCIL (SR-II) Yet to be informed Pending
54III3 Tripping of 400 kV Kalvindapattu-Vallur
line
10-04-2016 at
1459 hrs
R-phase to earth fault had occurred in line Auto
reclose attempt is unsuccessful auto-reclose could not
be established from provided DR EL
PGCIL (SR-II) to furnish a report on the tripping event detailing the
reasons for unsuccessful AR operation at Kalvindapattu end and the
remedial action taken to restore AR to normalcy
PGCIL (SR-II) Yet to be informed Pending
55II17 Tripping of HVDC Talcher-Kolar pole-1 30-05-2016 at
0949 Hrs
Failure of main CT of AC filter (20C08A) occurred
and it in turn caused the operation of filter bank
differential protection HVDC Pole-1 got tripped on
group Differential protection operation
PGCIL (SR-II) to take up the issue of Pole-1 tripping on Group
Differential Protection (Stage-II) due to multiple commutation failures
with their OEM and furnish a report on it
PGCIL (SR-II) Yet to be informed Pending
56II8 Tripping of HVDC Talcher-Kolar Pole-1 17-06-2016 at
1635 Hrs
Talcher-Kolar HVDC Pole-1 got tripped on line fault
and Pole-2 went to ground return mode with 150MW
PGCIL (SR-II) to address amp resolve DTPC and fibre-optic link
related issues raised by KSEB at Thrissur Madakathara substations
and conduct a mock-test in coordination with KSEB to verify integrity
of signal transmission from Kolar to Thrissur Makadathara
PGCIL (SR-II) Yet to be informed Pending
64II14
PGCIL (SR-I)14-05-2017
at 1654 hrs
Tripping of 400 kV Vemagiri - Gazuwaka
line
PGCIL (SR-I) to sort out issues relating to AR functionality
operation for both Main-CB and Tie-CB at both Vemagiri and
Gajuwaka substations
For the line under consideration the following shall be carried out
by PGCIL (SR-I)
End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be
repaired replaced
Y-phase to earth fault Auto-reclose was not
successful due to persistent fault Vemagiri end had
sent a Direct Trip after un-successful Auto-reclose
AR attempt was observed in Gazuwaka end DR
after 3 phase trip
65III10
Yet to be informed PendingPole-1 got tripped due to failure of auxiliary supply
changeover 400kV Jeypore-Gazuwaka line-2 got
tripped on operation of over-voltage protection
Pole-2 east shunt reactor got failed and this in turn
resulted in tripping of HVDC pole-2 due to Pole-2 Y
block activation 400kV Jeypore-Gazuwaka line -1
also got tripped during the incident
28-Apr-17 Pole-
1 at 844 hrs
and Pole-2 at
907 hrs
Tripping of HVDC Gajuwaka Pole-1amp2
and 400 kV Jeypore-Gazuwaka line-1amp2
PGCIL (SR-I)1 PGCIL (SR-I) to provide fully automatic supply-changeover
scheme for Pole-1 auxiliaries at the earliest
2PGCIL (SR-I) to furnish a detailed report on the reasons for East
Shunt Reactor failure including remedial action taken OEM report in
this regard also shall be shared
3PGCIL (SR-I) to provide redundant AC auxiliary supply to both
Pole-1 amp Pole-2 either by making use of tertiary of ICT-1 or from
external dedicated feeder
Yet to be informed Pending
Annexure-III
Page 21 of 31
58II3 (GI) Tripping of 400 kV Sriperambudur-
SVChatram line
14-08-2016 at
1349 hrs
Line tripped at Sriperambudur end only on
operation of directional earth fault protection
(i) PGCIL (SR-II) to disable high-set of line DEFRrsquos and
(ii) PGCIL (SR-II) to block line DEFR operation when DPR is in active
condition (has picked up) at their Sriperambudur SS
PGCIL (SR-II) Yet to be informed Pending
58II5 (GI) Tripping of 400 kV Neyveli TS2-Pugalur
line and 400 kV Neyveli TS2-Neyveli TS2
EXP line
21-08-2016 at
1035 hrs
Failure of Y-Ph tension insulator of tie feeder bay at
Neyveli TS2 Neyveli-Pugalur line tripped due to over
voltage at Neyveli TS2 and direct trip was received
at Pugalur
PGCIL (SR-II) to check the operation of the DPR relays at Pugalur
end NLC TS2 - Pugalur line by trans-playing the event on another
healthy relay and take suitable action including replacement of the
relay accordingly
PGCIL (SR-II) Yet to be informed Pending
58II19 (GI) Tripping of 400 kV Madurai-Karaikudi
line
15-09-2016 at
0302hrs
Line tripped on operation of OVR Stage-I protection
at Karaikudi and Direct Trip was received at Madurai
PGCIL (SR-II) to check the operation of OVR relays at their 400 kV
Karaikudi SS and properly configure linesrsquo DRs amp ELs so that events
pertaining to OVR (Stage-I amp Stage-II) protection operation (START
amp TRIP) get explicitly recorded
PGCIL (SR-II) Yet to be informed Pending
59II20 (GI) Tripping of HVDC Talcher-Kolar pole-1 10-10-2016 at
1635 hrs
Pole-1 of HVDC Talcher-Kolar tripped due to receipt
of lsquorsquoPole block command from Talcher end due to
tripping Pole-1 DC filter at Talchar end Pole 2 went
into metallic return mode after tripping of pole-1
PGCIL (SR-II) to check the correctness of non-operation of SPS
(Talcher ndashKolar Trip Signal-1) in the instant case by comparing it
with the incident of tripping of HVDC Talcher-Kolar pole-1 on
05102016 and furnish a report on it to PCSC forum
PGCIL (SR-II) Yet to be informed Pending
59II24 (GI) Tripping of 400220kV ICT-2 at
Somanahalli SS
24-10-2016 at
354 hrs
ICT-2 tripped on operation of Buchholz relay PGCIL (SR-II) to properly configure ICT protection relay DR so that
digital signals are recorded with proper names at their 400220 kV
Somanahalli SS
PGCIL (SR-II) Yet to be informed Pending
59III4 Tripping of 400 kV Salem -Udumalpet line-2
13-10-2016 at 0306 hrs
Line tripped on R-phase to earth fault Line auto-reclosed at Udumalpet end and did not reclose at
Salem
Line tripped on R-phase to earth fault Line auto-reclosed at Udumalpet end and did not reclose at Salem
PGCIL (SR-II) Yet to be informed Pending
62II6 Tripping of 400 kV Trichy-Karaikudi line 21-01-2017 at 2145 hrs
Line tripped on operation of over voltage protection at Karaikudi end and direct trip was received at Trichy Voltage recorded in DR in antecedent
conditions were 2454 kV 2432 kV 2536 kV
respectively
1 PGCIL (SR-II) to ensure OVR settings adopted for 400 kV lines at Karaikudi SS are as per SRPC provided settings with a drop-off to pick-up ratio gt 097
2 PGCIL (SR-II) to configure OVR_START event in the corresponding Relay BCU Event Logger for all 400 kV lines emanating from their
Karaikudi SS
PGCIL (SR-II) Yet to be informed Pending
62III5 Tripping of 400 kV Tumkur ndash Bidadi line 17-02-2017
at 1044 hrs
B-E fault Line did not auto-reclose 1 PGCIL (SR-II) to properly configure AR logic operation at Bidadi
end and ensure itrsquos correct operation for a fault during reclaim time
2 PGCIL (SR-II) to ensure time-sync of protection relays with GPS at
both Tumkur and Bidadi substations
PGCIL (SR-II) Yet to be informed Pending
62III6 Tripping of 400 kV Tumkur ndash Bidadi line 18-02-2017
at 1036 hrs
B-E fault Line did not auto-reclose PGCIL (SR-II) to properly configure AR logic operation at Bidadi
end and ensure itrsquos correct operation for a fault during reclaim time
PGCIL (SR-II) Yet to be informed Pending
62V1 Tripping of 400kV Vallur-Kalivandapattu
line-2
22-02-2017 at
455 hrs
Line tripped due to failure of R phase jumper Two
faults observed from DR 2nd fault cleared in 500ms
from Kalavindapattu end
PGCIL (SR-II) to enable Trip on Reclose (TOR) at Kalavindapattu end
on all 400 kV lines emanating from it
PGCIL (SR-II) Yet to be informed Pending
57II2 Tripping of 400 kV Mywady-Salem line-1
and 400 kV Mywady-Madurai line
PGCIL (SR-II) Yet to be informed03-07-2016 at
0306 hrs
400kV Mywady- Madurai line tripped on a Y-phase
to earth fault due to agriculture fire Tie-CB LBB
relay got operated at Mywady end and resulted in
tripping of Main breakers of 400kV Mywady-
Madurai and 400kV Mywady-Salem line-1 which are
in the same diameter
PGCIL (SR-II) to furnish a report on the remedial action taken after
ascertaining the reasons for (i) non-opening of Main-CB of Mywady
ndash Madurai line at Mywady end on Tie-CB LBB operation and (ii)
delay in sending DT to the remote ends after Tie-CB LBB operation
Pending
Annexure-III
Page 22 of 31
65II2 Tripping of 400 kV Kudgi (PG) - Tumkur
line-2 and Kudgi (PG) ndash Kudgi (NTPC)
line-1
06-05-2017 Kudgi (NTPC) feeder tripped at Kudgi (PG) end on
operation of distance protection R-N Zone-1
Tumkur feeder tripped at Kudgi(PG) end on
operation of NGR buchholtz relay
1 PGCIL (SR-II) to sort out AR related issues at Kudgi (PG) end on
400 kV Kudgi (PG) ndash Kudgi (NTPC) lines and put AR into service
2 PGCIL (SR-II) investigate reasons for NGR Buccholtz trip on 400
kV Kudgi (PG) ndash Tumkur line-2 and furnish action taken report wrt
rectifying the same
PGCIL (SR-II) Yet to be informed Pending
58II16 (GI) Multiple tripping at 400 kV Kalpaka SS 06-09-2016 at
1643 Hrs
Y-Pole breaker of Bus reactor-3 got failed during its
charging This resulted in a bus fault in 400kV bus-1
resulting in tripping of 400kV elements connected to
Bus-1
PGCIL (SR-I) amp PGCIL (SR-II) to review their Reverse Zone settings of
distance relays so as to bring them in line with Ramakrishna
Committee guidelines at all their substations in the southern
region
PGCIL (SR-I) amp PGCIL
(SR-II)
Yet to be informed Pending
51II4 NTECLTripping of 400kV Alamathy-Tiruvalam
line-1 and 400kV Alamathy-Vallur line-2
NTECL Vallur to furnish a report detailing the reasons for mal-
operation of Vallur end relays for a fault on Alamathy-Tiruvalam line-
1 and remedial measures taken to PCSC forum In the report their
preparedness for implementing line differential protection on Vallur-
Alamathy lines may also be indicated
400kV Vallur-Alamathy Line-2 got tripped from
Vallur end during failure of Y-phase LA in 400kV
Alamathy-Tiruvalam line Protection at Vallur end
tried for an auto-reclose and gave a 3 phase trip
TANTRANSCO mail received on 24-03-2016
3Ф Trip at 400kV Alamathy end due to DT received from vallur end for
BФ LAS bursted in Alamathy -Thiruvalam - 1 at Alamathy end
Mail received on 27-04-2016 and 20-05-2016
3Ф Trip at 400kV Alamathy end due to DT received from vallur end for
BФ LAS bursted in Alamathy -Thiruvalam - Line-1 at Alamathy end
Pending13-12-2015 at
2242 hrs
Others
Annexure-III
Page 23 of 31
56III5 Tripping of 400 kV Neyveli TS-2-
Pugalur line
04-06-2016 at
1636 hrs
B phase to earth fault occurred in line Auto-reclose
had not operated at NLC TS-2 and DT was sent to
Pugalur end resulting in a 3 phase trip
NLC to review the necessity of providing Relay Definitive Trip and
accordingly take steps to disable it on all lines emanating from their
generating stations
NLC Direct trip triggering of DR wii be carried out at TS2 end during the next
planned shutdown of the Pugalur Ts2 feeder
Mail received on 22-02-2017
Direct trip triggering of DR carried out at TS2 end for the TS2-Pugalur
feeder on 25-01-17
Pending
56II16 Tripping of 400 kV Gajwel-Singareni
line-2
30062016 at
2343 hrs
Tripped on 3-phase Trip at Gajwel end SCCL to configure Jaipur end relay‟s EL properly so that the time-
stamp resolution is extended downwards up to milli-second level
SCCL Yet to be informed Pending
1Singareni TPS to furnish single line diagram of their switchyard
along with the Over Voltage Relay settings adopted for various
transmission lines and to ensure that they are in line with the SRPC
provided gradings
2Singareni TPS to upload various tripping files (FIRDRELTR)
pertaining to a tripping event involving their station in SRLDC web-
portal within 24-hrs of occurrence of that event in compliance of
IEGC Regulation 52(r)
Line tripped on operation of Over-Voltage
protection at Singareni and Direct Trip was received
at Gajwel DR amp EL of Singareni was not furnished
59III3
57II8 NTPC (Ramagundam)
10-07-2016 at
156 hrs
Line tripped at Ramagundam end on operation of over-
voltage protection Dichipally end tripped due to
receipt of Direct Trip signal
1NTPC-Ramagundam to ensure correctness of operation of Over
Voltage relays by taking remedial measures like maintaining
healthiness of concerned CVT‟s setting drop-off to pick-up ratio at
097 amp above etc
2NTPC-Ramagundam to ensure time sync of their station‟s DR amp
EL with GPS
3NTPC-Ramagundam to sort out analog values indication amp
overlapping issue of time-stamp in their station DR‟s
4NTPC-Ramagundam to properly configure their EL‟s so that events
are recorded with msec resolution
Line tripped on B-phase to earth fault Line auto
reclosed at Chandrapur end and did not reclose at
Ramagundam
57II4
16-07-2016 at
438 hrs
Tripping of 400 kV Ramagundam -
Chandrapur line -2
1NTPC-Ramagundam to furnish remedial measures taken wrt AR
non-operation and unwarranted DT sending to other end
2NTPC-Ramagundam to configure protection relays DR‟s such that
events get recorded for at leas
2000 msec post-triggering so as to cover complete AR operation
Tripping of 400 kV Ramagundam -
Dichipally line
NTPC-Ramagundam mail dated 09032017
1 Main-II relay replaced Over voltage relays pickup to reset ratio is 098
--- Completed
2 DR and EL are time synchronized with GPS clock
-------- Completed
3DR alalog overlaping issue is sloved ---- Completed
4 ----- Pending
Yet to be informed
Pending
54I1
Tripping of 400 kV Gajwel-Singareni line-
2
02-04-2016 at
1708 hrs 1MAPS to furnish a detailed report on the tripping of SP Koil ndash
MAPS lines 1 amp 2 at MAPS end with focus on the correctness of the
settings of Main-I amp Main-II relays (for primary amp back-up
protections) on both the lines
2MAPS to take steps to provide down-loading facility for DR amp EL
from Main-I amp Main-II relays on all 230 kV lines emanating from
MAPS
3MAPS in co-ordination with SP Koil to carry out PLCC end-to-
end testing on SP Koil ndash MAPS lines 1 amp 2 and ensure healthiness
of PLCC communication amp carrier-aided protection
4MAPS to put in service Auto-Reclosure feature on all four 230 kV
lines emanating from MAPS by June 2016
Pending
Complete outage of 230 kV SPKoil
Station of TANTRANSCO
B-phase CT failure occurred in 230 kV SPKoil -
MAPS line-1 Busbar protection got operated at
SPKoil station All elements except 230kV
Oragadam and 230kV Kalivandapattu got tripped at
230kV SPKoil station bdquoY‟ phase CT and support
insulators also got damaged
27-09-2016 at
0101 hrs
Status revided vide MAPS mail dated 06122016
1 The settings given by Ms TANTRANSCO were adopted for Main ndashI amp
Main- II relays for both the lines The same settings were verified to be
same Subsequently calibrated was done and no drift was observed
--- Complied
2 From May 2016 onwards the DR EL and trip report are being sent by
mail to SRLDC Bengaluru by MAPS
--- Complied
3 Monthly maintenance of PLCC equipments is being done by Ms
TANTRANSCO At present PLCC telephone is not working it is being
followed up
--- Complied
4 CVTs are planned to be procured from Ms TANTRANSCO by the end
of February 2017 and AR will be implemented for all the lines emanating
from MAPS by July-2017 as discussed in the current SRPC meeting on
25112016
--- Pending
PendingNPCIL (MAPS)
SCCL
NTPC-Ramagundam mail dated 09032017
1 The relay will be checked in next opportunity if required it will be
changed with new one------------- Pending
2DR time recording increased to 2 sec --------- Completed
NTPC Pending
Annexure-III
Page 24 of 31
62III2 Tripping of 400 kV Kaiga-Guttur line-1 06-02-2017
at 0501 hrs
B-phase to earth fault Line did not auto-reclose at
Kaiga end
1 KGS to properly configure all relays DR‟s time scale for a post-
triggering period of 2 sec to capture events such as complete AR
operation
2 KGS to ensure time-synchronization of all protection relays with
GPS in their 400 kV switchyard
NPCIL (KGS) Yet to be informed Pending
63III4 Tripping of 400 kV Gajwel-Singareni line-
2
07-03-2017 at
1652 hrs
Line tripped on B-phase to earth fault Line did not
auto-reclose
1 SCCL to properly configure LBB logic for all line relays
where AR has been put into service for 1-ph initiation based
on phase segregation (ie for the faulted phase) at their
Singareni TPS
SCCL Yet to be informed Pending
64II8 Tripping of 400 kV Tirunelveli-
Kudankulam line-3
23-04-2017 at
0556hrs
R-phase to earth fault had occurred in Tirunelveli -
Udumalpet line-2 During the incident Tie-CB LBB
got operated at Tirunelveli end due to sluggish
operation and tripped 400 kV Tirunelveli -
Kudankulam line-3
NPCIL (KKNPP) to configure DRrsquos amp ELrsquos of protection relays at their
station for recording DT receipt event at their Kudankulam NPP
NPCIL(KKNP) Yet to be informed Pending
Yet to be informed63III8 NPCIL (KGS)Tripping of 400kV Kaiga-Guttur line-2 Line tripped on Y-phase to earth fault Line auto-
reclosed from Guttur end and failed to re-close from
Kaiga end
1 NPCIL (KGS) to furnish an action taken report on the
reasons for AR lock-out and remedial action taken to rectify
the same
2 NPCIL (KGS) to configure DR‟s of line protection relays for
a post triggering period of 2 sec to capture complete AR
operation at their Kaiga GS
3NPCIL (KGS) to furnish FIR amp TR for tripping events as
per SRLDC provided formats
27-03-2017 at
706 hrs
Pending
Annexure-III
Page 25 of 31
34I6
01-01-2015 at
1338 hrs
42II18 400kV Raichur TPS-Raichur(PG) line-
1amp2 400kV Raichur-Mahboobnagar
Unit7 and ICT-2 at RTPS tripped
during the incident B phase to earth
fault had occurred in 400kV Raichur
TPS-Raichur line-1
1 Bus bar protection shall be provided by asset owner ( ie
KPTCL)
2 Settings for main distance protection amp Overcurrent protection
shall be examined and reviewed
3 Time synchronization of the Substation shall be ensured
As reported directional over current relay of ICTrsquos
operated due to snapping of line jumper in 220kV
Lingapur line
1 KPCL to review REF setting (DMT or IDMTL) for unit-7 by first
week of April 2015 and inform the same to PCSC forum
2 TSTRANSCO to furnish Mehaboobnagar‟s DR and EL and the
reasons for distance relay operation at their end within a week‟s time
3 PGCIL (SR-I) to rectify the issues relating to AR operation relay
reach (Z2) reverse reach (Z4) and SOTF auxiliary contacts within a
week‟s time and submit the actions taken to PCSC forum
16-07-2014400220 kV ICT-1 amp 2 at
MUNIRABAD
On account of R-phase to earth fault line tripped at
Hassan end due to operation of distance Zone-2 and
non-receipt of carrier From DR of Talaguppa end it
is observed that fault had occurred in Yphase
09-03-2015 at
0636 hrs
Tripping of 400
kV TALAGUPPA
ndash HASSAN line
40II3
Multiple tripping at Raichur TPS of
KPCL
Miscellaneous
1 PGCIL and KPTCL to ascertain the reason for the phase
discrepancy in the relay operation and take suitable remedial
measures
2 KPTCL to check the PLCC operation at Talaguppa end and submit
the report to the PCSC forum
1 Yet to be informed by KPCL ---- Pending
2 Mail received on 26-05-2015 from TSTRANSCO
It is found that the main-2 ABB make REL316 type distance relay was
defective and same was replaced with MICOM P444 by MsPGCIL on
2304-2015 After replacement of main-II DR can be extracted from this
relay For EL in to service some field winding is pending which is being
taken up in this month -- Complied with
3
PGCIL mail recieved on 27-04-2016
End to end PLCC tunning carried out
PGCIL (SR-I) RVMD 14072016
Relay settings of all the stations in SRTS-1 were derived as per
Ramakrishna Commettee recomendations and implemented - Complied
with
KPCL
TSTRANSCO
PGCIL (SR-I)
PGCIL (SR-II) KPTCL
KPTCL
PGCIL (SR-I)
Mail recieved on 28-04-2015
End to end testing of PLCC has been done and problem in the PLCC is
atttended
Mail received on 27-05-2015 (KPTCL) amp 29-07-2015
End to end testing of PLCC has been done and problem in the PLCC is
atttended Phase discrepancy in the relay operation is to be checked jointly
Mail recieved on 02-09-2015 from PGCIL (SR-II)
Problem is in identification of phases at Talguppa end To be rectified by
Ms KPTCL
Mail recieved on 28-06-2016 from KPTCL
The matter is reffered to the concerned Operation and maintance wing to
set right the mismatch of phases in 400kV Talaguppa-Nelamangala and
Talaguppa-Shantigrma lines at Talaguppa in cordination with PGCIL
Pending
(with KPTCL)
Mail recieved on 27-05-2015 (KPTCL)
1 KPTCL has taken action to provide bus bar protection to 220kV buses
2 Over current relay Settings of ICTs to be reviewed by PGCIL
Mail received on 29-07-2015 (KPTCL)
Initial Tendering stage
KPTCL Mail recieved on 23-01-2016
Detailed estimate prepared for taking up the work CEE Transmission
Zone Gulbarga will take up necessary procurement and further execution
----------------------------------------------------------------------
1 Pending from KPTCL side
2 Complied with as per PGCIL (SR-I) RVMD 14072016 which stated
that Relay settings of all the stations in SRTS-1 were derived as per
Ramakrishna Commettee recomendations and implemented
3 Pending from KPTCL side
Pending (with
KPCL)
Pending
(with KPTCL)
Annexure-III
Page 26 of 31
Tripping of Unit 1 at NCTPS 24-05-2015
at 1913 hrs
ID Fan trip
Tripping of Unit 1 at MEPL 24-05-2015
at 1913 hrs
Coal Mill tripped
Tripping of Unit 1 at
Krishnapatnam
24-05-2015
at 1917 hrs
Generator Protection operated
Tripping of Unit-8 at RTPS 24-05-2015
at 1919 hrs
Tripped on Overvoltage
47I2
1 All Tripped units viz Krishnapatinam MEPL Raichur NCTPS
to submit a detailed report on this event including the remedial
measures taken to PCSC forum
2 KPCL to check the excitation system of Unit 8 of RTPS and
submit the remedial measures taken to PCSC forum
KPCL MEPL
APGENCO TNEB
As per FIR submitted CT damage observed in
Chitoor-Main bay (404) Main breakers connected to
bus-1 (401 404 407 410) got tripped on operation of
bus bar protection Unit-1 tripped on operation of
MFT Unit-2 was not in service
Complete outage of Krishnapatnam TPS
Pending (with
KPCL)
APGENCO letter dated 18032016
1SOE and SLD are attached The DR of 405 CB is not generated during
the incident Now the problem is identified and rectified
--------- Completed
2All the 3 lines ie CHTR-2 MNBL-I amp II tripped in zone
protection The fault was in Blind zone ie P2 side of CT where it was
covered under Bus fault by the time fault moved on to P1 side when the
fault comes under STUBTEED zone after 330msec all the feeders expect
CHTR-1 tripped in Zone-II and total fault persisted for 500msec before the
405 TIE CB opens and clear the fault As a remedial the STUB protection
operation also checked and found OK-------Completed
3The Time Sync was missed on the day and found there was problem with
LAN Timer same was rectified Now found OK
-----------Completed
4Now the DR Time scale changed to 1 sec for Pre fault and 3 sec for Post
fault and STATE of events are corrected wherever found wrongor
misguiding during analysis---------Completed
5
PGCIL-SR1 RVMD 27-04-2016
Procurement of differential protection for 400kV NPS-NLR DC and
400kV RCR-RTPS-DC is under tendering
PGCIL-SR1 RVMD 14-07-2016
The proposal for procurement of Line differential Protections for 400kV
Raichur - RTPS-1 amp 2 and 400kV Nellore - NPS - 1 amp 2 lines has been
approved and tender is under technical evaluation
Pending with
PGCIL(SR-I)
08-09-2015 at
1820 hrs
44I3
1 APGENCO to furnish to PCSC forum (i) A3-size Single Line
Diagram of SDSTPS and (ii) the sequence of events with time stamp
showing the protection that opened Tie-CB (405) at SDSTPS
2 APGENCO to review STUBTEED protection in all dias at
SDSTPS and ensure that they are configured for instantaneous
operation
3 APGENCO to properly configure the STATE of the tripping events
so that they get recorded appropriately like TRIP OPERATED in
their corresponding Event Loggers
4 APGENCO to ensure time sync of all DR‟s and EL‟s at SDSTPS
5 PGCIL (SR-I) to provide line differential protection for 400 kV
NPS ndashNellore-PG lines 1 amp 2
TANGEDCO vide their mail dated 07072015 informed that as per the
discussion and recommendation of 44th meeting of PCSC held on
28052015 a time delay of 2 Sec had been introduced for the above
tripping for all the ID fans at NCTPS-II
MEPL vide their mail dated 14092015 informed that they had
implemented 2 seconds delay for under voltage tripping of all Drag Chain
Feeder Conveyors And this has been done for both the Units
APGENCO letter dated 18032016
The unit not tripped on Generator protection but tripped on Economiser
inlet flow protection consequent to tripping of TDBFP on lube oil pressure
lowBefore tripping dip in voltage was observed in the LT system which
caused tripping od lube oil pumpsAfter the incidentChangeover scheme
on under voltage of LT System was reduced from 80 with 2 sec delay to
40 with 200msec delay
APGENCO PGCIL (SR-
I)
Annexure-III
Page 27 of 31
12-11-2015 at
0020 hrs
Tripping of 400kV Gooty-Nelamangala
line
KPTCL KPCL NPCIL
(KAPS)
1 KPTCL KPCL to see the possibility of implementing Weak Infeed
logic with Echo feature enabled by Under
Voltage (27) element on Kadra-Karwar lines 1 amp2 and implement
the same if feasible
2 NPCIL to time-coordinate Kaiga‟s DEFR settings with (i) Zone-2
settings at Kaiga and (ii) primary protections of the lines emanating
from Kadra and Kodasalli
3 KPCL to ensure time-sync of EL‟s and healthiness of the Fault
Locators at Kadra
220kV Kadra-Karwar lines-1amp2 tripped
on earth fault in B-phase in zone-2
Kaiga-Kadra line tripped at Kaiga end
only on operation of directional eath
fault protection
31-07-2015 at
1144 hrs
Tripping of 220kV Kadra-Karwar lines -
1amp2 and 220kV Kaiga-Kadra line
PGCIL (SR-I) mail received on 27-04-2016
1 The firmware of REL670 is being upgraded ------- Completed
2 The recording of events in msec interval is being taken up with OEM
Henceforth for analysis purpose we will provide larm list which has msec
time stamp -------- Completed
3 End to end testing of PLCC code transmision and tuning of channels
carried out ------- Completed
4 Procurement of differential protection for 400kV NPS-NLR DC and
400kV RCR-RTPS-DC is under tendering The legends modified in
Eventalarm list Provision of diff relay for all short lines emanating from
NPS is being taken up with our corporate -------- Pending
PGCIL(SR-I) RVMD 14-07-2016
The proposal for procurement of Line differential Protections for 400kV
Raichur - RTPS-1 amp 2 and 400kV Nellore - NPS - 1 amp 2 lines has been
approved and tender is under technical evaluation
1
PGCIL RVMD 27042016
AR blocked due to failure of PLCC link The defective PLCCcards
replaced at Neelamgala end
PGCIL RVMD 14072016
AR blocked due to failure of PLCC link The defective PLCCcards
replaced at Neelamgala end End to end testing of PLCC carried out and
PLCC link is healthy ------ Pending
2 Gooty end Time syc unit is replaced with new one and commissioned ---
----- Completed
3 Yet to be informed by KPTCL --- Pending
PGCIL (SR-I) KPTCL 1 For Gooty ndashNelamangala line PGCIL (SR-I) and KPTCL to
provide 3-ph trip logic at their respective ends upon detection of
PLCC link failure during dead-time of AR operation
2 PGCIL (SR-I) to make GPS functional at Gooty SS and ensure
time-sync of various DR‟s and EL‟s with it (GPS)
3 PGCIL (SR-I) KPTCL to furnish reason for the operation of
Backup impedance protection of the line reactor at Nelamangala end
and the remedial measures taken to PCSC forum
Pending (with
KPTCL)
1PGCIL (SR-I) to furnish Action Taken Report on the findings of
OEM on relay mal-operation at NPS end on 400 kV NPS ndash NCCK
line to PCSC forum
2 PGCIL (SR-I) to appropriately configure Station Event Logger at
NPS to record events at msec interval
3 PGCIL (SR-I) to carry out PLCC end-to-end testing in coordination
with TPCIL for 400 kV NPS ndashTPCIL line
4PGCIL (SR-I) MEPL SEL TPCIL amp NCC to take steps to
provide line differential protection at their respective ends on all 400
kV lines (except Gooty line) emanating from Nellore Pooling Station
and furnish an action plan to implement the same
Pending
1
Mail recieved on 25-05-2016 from KPTCL
Availability of week end infeed with eco feature to be confirmed by
SEERTCHubli --- Pending
2
Mail recieved on 03-12-2016 from NPCIL(KGS)
The 200 ms Definite time DEFR element in both Kaiga Kadra and Kaiga
Kodasally lines were disabled IDMT DEFR is retained The 200 ms
Definite time back up oc element in both Kaiga Kadra and Kaiga
Kodasally lines were disabled IDMT is retained
------ Completed
3 Yet to be informed by KPCL
Status received vide KPCL mail dated 14062017
1 Since PT blasted (B phase) at Karwar end resistive over reach occurred
hence Backup protecion operated at Kadra end (zone-2 not sensed) ---
Pending
3Newly commissioned micom P444 relay time synchronised with GPS
------ Completed
Running units at Thermal Powertech power Station
tripped due to tripping of 400kV Nellore pooling
station (NPS)-TPCIL line and 400kV Nellore pooling
station (NPS)-ECC line
30-12-2015 at
0602hrs
R-phase to earth fault had occurred in Line Line did
not auto-reclose from both ends It was mentioned that
YampB pole breakers at Neelamangala tripped on
operation of pole discrepancy and backup impedence
protection for line reactor got operated
Complete outage of TPCIL power station 50I2
50II8
47II7
PGCIL (SR-I)
MEPL SEL TPCIL
NCC
Pending
Annexure-III
Page 28 of 31
52I8 Complete outage of 400kV NTPL station
and CEPL Stations
14-03-2016 at
0136 hrs
Running Units at NTPL and Coastal Energen power
station got tripped due to tripping of evacuating lines
NTPL and PGCIL (SR-II) to furnish compliance report of the
recommendations given by PSAG-15 Committee that held its meeting
on 12-13 April 2016 at NTPL Tuticorin
PGCIL (SR-II)
NTPL
NTPL mail received on 19052016
All General Recommendations will be done in the second week of June
2016 ---------- Complied by NTPL
Yet to be informed by PGCIL (SR-II)
Pending
[with PGCIL
(SR-II)]
56III4 Tripping of 220 kV Sedam-Tandur line 03-06-2016 at
2152 hrs
Line tripped on B-phase to earth fault Auto-reclose is
not enabled for line
KPTCL and TSTRANSCO to fast-track providing AR on 220 kV
Sedam ndash Tandur line and furnish an action plan of providing the same
by next PCSC meeting (PCSC-57)
KPTCL
TSTRANSCO
Yet to be informed Pending
KPTCL and TSTRANSCO to take steps to provide AR feature on
220 kV Sedam ndash Tandur inter-state line at their respective ends at the
earliest
KPTCL
TSTRANSCO
PGCIL mail received on 27-04-2016
Being pursued with APTRANSCO
APTRANSCO mail dated on 22-06-2016
AS maintenance being carrired out by PGCIL(SR-1) the required relay
replacement (wiringprogramming) may also be carried out by PGCIL(SR-
1)
PGCIL RVMD 14072016
1 The CB problem has been attended by POWERGRID by using OEM
Ms BHEL services amp POWERGRIDs OampM spares
------ Completed
2 Being pursued with APTRANSCO to replace the faulty Event Logger at
Vijayawada (Nunna) SS -------- Pending
APTRANSCO mail dated on 31-08-2016 amp 04032017 amp 24052017
As maintenance being carrired out by PGCIL(SR-1) the required relay
replacement (wiringprogramming) may also be carried out by PGCIL(SR-
1)
PGCIL (SR-I)
APTRANSCO
1 PGCIL (SR-I) in co-ordination with APTRANSCO to address
the problem with CB at the earliest opportune time
2 APTRANSCO to take steps to replace the faulty Event Logger at
Vijayawada (Nunna) SS
Line tripped at Mamidipally end only on Direct Trip
receipt from Ghanapur end
30-04-2016 at
1640 hrs
Line tripped due to operation of over voltage
protection at Vijayawada end and Direct Trip was
received at Sattenapalli end
25-12-2015 at
301 hrs
Tripped on 3-phase Trip at Gajwel end30062016 at
2343 hrs
19-06-2016 at
1527hrs
220kV Sedam-Humnabad-2 tripped at Sedam on
Distance protection Zone-2 Sedam-RTPS-1 amp2 lines
tripped at RTPS end only 220kV Tandoor inter-state
line was hand tripped due to incoming supply failure
54IV2 Tripping of 400kV Ghanapur-
Mamidapalli line
56II16
Tripping of 400kV Sattenapalli-
Vijayawada line
56I2
51II6
Tripping of 400 kV Gajwel-Singareni
line-2
Complete outage of 220kV Sedam
Substation of KPTCL
Pending
PendingFor the line under consideration the following shall be carried out by
TSTRANSCO and PGCL (SR-I) in co-ordination
iEnd-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
iiHealthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
PGCIL (SR-I)
TSTRANSCO
Yet to be informed
Pending
1TSTRANSCO and SCCL to check drop-off to pick-up ratio of OV
relay and ensure that it is kept at 097 amp above
2TSTRANSCO and SCCL to configure respective end bdquos DR amp EL
so that they get triggered on OVR protection and record relevant
events
3SCCL to configure Jaipur end relay‟s EL properly so that the time-
stamp resolution is extended downwards up to milli-second level
TSTRANSCO
SCCL
Yet to be informed
Yet to be informed
Pending
Annexure-III
Page 29 of 31
R-phase to earth had occurred in 400kV BTPS-JSWEL
line and protection issued a 3 phase trip
64I1 Complete outage of North Chennai TPS
STG-2
24-04-2017
at 2102hrs
Tripping of evacuating lines due to fault led to
tripping of Units
Pending
64I2 Complete outage of North Chennai TPS
STG-2
25-04-2017
at 1827hrs
Tripping of evacuating lines due to fault led to
tripping of Unit
64I3 Complete outage of North Chennai TPS STG-2
26-03-2017at 2109 hrs
Tripping of evacuating lines due to fault led to tripping of running Unit at NCTPS Stg-2
64III2 Tripping of 400 kV Ghanapur-
Mamidapalli line
04-04-2017 at
1901hrs
B-phase to earth fault Line auto-reclosed from
Mamidapalli end and tripped from Ghanapur
For the line under consideration PGCIL (SR-I) TSTRANSCO to (i)
rectify issues wrt PLCC channels (ii) restore PLCC carrier
communication and (iii) put AR into service at the earliest
PGCIL (SR-I)
TSTRANSCO
Yet to be informed Pending
APGENCO
TSTRANSCO
Direct Trip was received at VTPS and line was
holding from Suryapet end
13-06-2016 at
1655 hrs
56IV2 Tripping of 400 kV VTPS-Suryapet line
57I1 Complete outage of 220 kV Karwar
Substation of KPTCL
12-07-2017 at
1136 hrs
Triggering incident was failure of R phase PT in Bus-
1 at 220kV Karwar substation 220kV Kaiga-
Kodasalli tripped during the incident Also bus shut
down occurred at Kadra and Kodasally stations
1NPCIL (KAPS) to disable DefiniteTime OC relay and put in its
place by IDMT OC relay for backup protection on both 220 kV
Kaiga ndash Kadra line and 220 kV Kaiga ndash Kodasalli line at Kaiga end
2KPTCL to put bus bar protection in service at their 220 kV Karwar
SS at the earliest
3KPCL KPTCL to implement Weak In-feed Logic with Echo
feature enabled by Under Voltage (27) element on Kadra ndash Karwar
lines 1 amp 2
4KPTCL to furnish equipment failure report of the current incident to
PSEampTD Division of CEA with a copy marked to SRPC
KPTCL KPCL NPCIL
(KAPS)
NPCIL(KGS) mail dated on 03-12-2016
AThe 200 ms Definite time DEFR element in both Kaiga Kadra and
Kaiga Kodasally lines were disabled IDMT DEFR is retained
B The 200 ms Definite time back up oc element in both Kaiga Kadra and
Kaiga Kodasally lines were disabled IDMT is retained
------Completed
APTRANSCO mail dated on 20-12-2016
Issue was addressed to the concerned for necessary action
APTRANSCO mail dated on 24-05-2017
Meeting was conducted and the relays procurement for all the locations is
under progress
Pending57II9 Tripping of 400 kV Nellore (PG) - NPS
line-1 400 kV Krishnapatnam-Nellore
(AP) lines -1amp2 and 400kV NPS -
MEPL line
18-07-2016 at
1905 hrs
Triggering incident was snapping of Y phase
conductor in 400kV Nellore (PG) - NPS line-1
Distance relay at Krishnapatnam end over-reached in
Zone-1 and resulted in tripping of 400kV
Krishnapatnam ndash Nellore (AP) lines - 1amp2 from
Krishnapatnam end Distance relay at MEPL over-
reached and resulted in tripping of MEPL-NPS line
from MEPL end
PGCIL (SR-I) TPCIL MEPL SEL SGPL APTRANSCO
APGENCO and SDSTPS to implement line differential protection on
all 400 kV transmission lines (of length less than 50 km) emanating
from Nellore PS Nellore (PG) SS and Nellore (AP) SS [It may be
noted here that the cut-off length of 50 km has been specified with a
view to exclude only long transmission lines]
APGENCO PGCIL(SR-
I) TPCILMEPL
SELSGPL
APTRANSCO
Pending
63II9 KPCLJSWEL Yet to be informed Pending
1 TANTRANSCO and PGCIL (SR-II) to take steps to complete
insulator replacement works on the 400 kV lines owned by them in
Chennai area within 3 months
1 JSWEL to follow file naming terminology provided by SRPC
for various tripping files uploaded in SRLDCrsquos TMS portal
2JSWEL to furnish reasons for AR-BLOCK observed during
the instant tripping and remedial action taken by them to
keep AR in service
3 KPCL to configure DR amp EL properly to record OVR Stage-I
amp Stage-II protections at their BTPS station
14-03-2017 at
1911 hrs
Tripping of 400 kV YTPS-BTPS line and
400 kV BTPS-JSWEL line
Status received vide TANTRANSCO mail dated 15-06-2017
1 All the Porcelain insulators of 400kV NCTPS-II - Vallur feeders-1amp2
were replaced with Polymer insulators by 20052017
2 Existing Porcelain insulators of all other 400kV feeders are being
replaced with Polymer insulators in a phased manner
TANTRANSCO
PGCIL(SR-II)
For the line under consideration the following shall be carried out by
APGENCO in coordination with TSTRANSCO
1End-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
2Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
PendingYet to be informed
Annexure-III
Page 30 of 31
65II5 Tripping of 400 kV Ghanapur-
Mamidapalli line
08-05-2017 at
1915 hrs
Line tripped at Ghanapur end only and was holding
from Mamidapalli Ghanapur end protection had
sensed R-phase to earth fault
For the line under consideration the following shall be carried out
by TSTRANSCO in coordination with PGCIL (SR-I)
1 End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
TSTRANSCO PGCIL
(SR-I)
Yet to be informed Pending
65III12 Tripping of 400 kV Srisailam-Dindi line-2 24-05-2017
at 1502 hrs
R-phase to earth fault Auto-reclose was successful
at Dindi and Zone - 1 3-phase trip at Srisailam
Since all 400 kV lnies emanating from Srisailam LB are composite
feeders APTRANSCO TSTRANSCO can keep AR functionality disabled at respective remote end stations under their control
APTRANSCO TSTRANSCO Yet to be informed Pending
Yet to be informed PendingTriggering incident was failure of CT in 110 kV
Villianur-Kurumbapet at Villianur substation 230KV
Villianur ndash NLC2 and 230 kV Villianur - Pondy lines
got tripped from Pondy end (on operation of DEF)
and NLC end (on operation of Zone-3) respectively
resulting in loss of supply to 230 kV Villianur
substation
65I2 Complete outage of 400kV Uravakonda
and Jammalamadugu Substations
31-05-2017 at
1744 hrs
Triggering incident was tripping of 400 kV Kurnool-
PG - Narnoor line - 1 amp 2 and 400 kV Narnoor-
Jamalamadugu line-2 which led to loss of supply to
400kV Uravakonda and Jamalamadugu 400kV Gooty-
Narnoor 400kV Narnoor-Jamalamadugu-1 400kV
Srisailam-Narnoor 400kV Uruvakonda-
Mahboobnagar-1amp2 were out of service in
antecedent condition
1 For 400 kV Ghani ndashNarnoor line the following shall be carried out
by APTRANSCO
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
2 PGCIL (SR-II) to take appropriate action wrt disabling non-
directional instantaneous Igt4 protection that operates without
checking existence of stub If required the issue may be referred to
relays OEM for appropriate solution or the present relays may be
replaced with other relays with different styles that donrsquot have the
issue observed
APTRANSCO PGCIL
(SR-II)
Yet to be informed Pending
1 PED to furnish an action taken report wrt complying with the
protection audit recommendations
2 PGCIL (SR-II) to review Zone-3 and DEF protection setting at
Pondicherry end 230 kV Pondicherry ndash Villianur and 230 kV
Pondicherry ndash Bahour line and set them appropriately to achieve
required time-coordination with OC protections of ICTrsquos at Villianur
SS
3 NLCIL to keep DEF protection in blocked condition as long as
Distance Protection is active and configure it to become active only
when distance protection does not pickup to avoid time-
coordination issues
19-05-2017 at
1235 hrs
Complete outage of 230 kV Villianur
Substation of Pondicherry
65I1 PED PGCIL (SR-II)
NLCIL
For the line under consideration the following shall be carried out
by TANTRANSCO in coordination with PGCIL (SR-II)
1 End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
PGCIL (SR-II)
TANTRANSCO
Yet to be informed Pending
For the line under consideration the following shall be carried out
by NLCIL in coordination with PGCIL (SR-II)1 End-to-end communication for DT permissive amp other signals may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and software) at both ends shall be checked and faulty components
shall be repaired replaced
Y-phase to earth fault Neyveli TS2 end relay issued
a 3-phase trip 220ms after issue of Y phase trip Direct Trip was sent to Pugalur end preventing auto-reclose
07-05-2017
at 1955 hrs
Tripping of 400 kV Neyveli TS2-Pugalur
line
65III6 PGCIL (SR-II) NLCIL Yet to be informed Pending
For the line under consideration the following shall be carried out
by TSTRANSCO in coordination with NTPC-Ramagundam1 End-to-end communication for DT permissive amp other signals may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components shall be repaired replaced
Over Voltage Stage-1 had operated at Gajwel end
Ramagundam end did not trip as Direct Trip was not received from Gajwel end
29-05-2017
at 0007 hrs
Tripping of 400 kV Ramagundam -
Gajwel line
65II19 TSTRANSCO NTPC
(Ramagundam)
Yet to be informed Pending
65II16 Tripping of 400 kV Kayathar-Karaikudi
line
25-05-2017 at
1552 hrs
R-phase to earth fault had occurred in line There
was Zone-2 3 phase trip operation at Kayathar end
and Zone-1 3 phase trip at Karaikudi end
Annexure-III
Page 31 of 31
SlNo Element NameOutage
datetime
Revival
datetimeReason for Outage Sender Receiver
Remedial Measures Actions taken
1 400 kV KAIGA - GUTTUR 1 27-03-2017153800 27-03-2017164800 RELAY MALOPERATION NPCIL (KGS) KPTCL
KPTCL
At Guttur end DPR operated in Z1 R phase AR
unsucessful due to persistant fault
At Kaiga end DPR operated in Zone-1 RN
fault145km AR attempt is observed from Kaiga
end DR
Reason Transient fault Stood OK after test
charging
NPCIL (KGS)
2 400 kV KHAMMAM - KALPAKKA 1 10-04-2017125800 DISTANCE PROTECTION PGCIL (SR-I) APTRANSCO
PGCIL (SR-I)
Tripped on operation of distance protection Line
belongs to APTARSNCOTSTRANSCO
APTRANSCO TSTRANSCO Momentary fault
3 400 kV KHAMMAM - KALPAKKA 2 11-04-2017115000 11-04-2017175900 Y-N faultPGCIL (SR-I) APTRANSCO
TSTRANSCO
PGCIL (SR-I) Tripped on operation of distance
protection Line belongs to
APTRANSCOTSTRANSCO
APTRANSCO TSTRANSCO Momentary fault
4 400 Kv RAICHUR - YTPS 18-04-2017131400 18-04-2017150100 DPR ZONE 1-B-PH FAULT KPCL KPTCL To-be-discussed
5 400220 Kv ICT-3 AT NEELAMANGALA 20-04-2017162100 20-04-2017170100DUE TO HEAVY ARCING AT B-
PH ISOLATORKPTCL To-be-discussed
6 400 Kv VTPS - MALKARAM 1 23-04-2017150500 SOTF OPERATED APGENCO TSTRANSCO
TSTRANSCOTripped at both ends Tripped on R-
phase to ground Zone-1 indications AR acted and
was unsucessful at Malkaram end
APGENCO
Pending Remedial Measures Actions taken
for the Critical Tripping Incidents (as on 25072017)
Annexure-IV
Page 1 of 6
7 400 kV KHAMMAM - MAMIDIPALLY 2 08-05-2017160600 08-05-2017174900 R PHASE TO GROUND FAULT PGCIL (SR-I) TSTRANSCO
PGCIL(SR-I)
Tripped on operation of distance protection Line
belongs to APTARSNCO
TSTRANSCO
Tripped at both ends Tripped on R-phase to
ground Zone-1 indications AR acted and was
unsucessful at Mamidipally end
8 400 kV TALAGUPPA - NEELAMANGALA 09-05-2017163600 Y TO GROUND FAULT KPCL KPTCL To-be-discussed
9 400 kV MUNIRABAD - GUTTUR 20-05-2017064100 20-05-2017211000BUS BAR PROTECTION
OPERATEDPGCIL (SR-I) KPTCL
KPTCL
No abnormality found at Munirabad end and line
was in service
PGCIL (SR-I)
Tripped at Guttur end only and line was holding
from Munirabad end
10 400 kV GUTTUR - HIRIYUR 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II) PGCIL (SR-II) Due to Problem at Guttur end
11 400 kV KAIGA - GUTTUR 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDNPCIL (KGS) KPTCL To-be-discussed
12 400 kV GUTTUR - NARENDRA 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II) PGCIL (SR-II) Due to Problem at Guttur end
13 400 kV MUNIRABAD - GUTTUR 20-05-2017160000 20-05-2017170400 B-n fault PGCIL (SR-I) KPTCL
PGCIL (SR-I)
As informed by Guttur Substation line tripped at
Guttur end only without any faciaalarms Line
holding from Munirabad end Suspected mal-
operation at Guttur end
KPTCL
14 400 kV GUTTUR - HIRIYUR 1 20-05-2017204100 20-05-2017211800BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II)
PGCIL (SR-II) Due to Problem at Guttur end
KPTCL
15 400 kV BTPS-JSW TORANAGALLU 20-05-2017064100 20-05-2017210300BUS BAR PROTECTION
OPERATEDKPCL JSWEL To-be-discussed
16 400 kV KAIGA - GUTTUR 1 20-05-2017204100 20-05-2017213800BUS BAR PROTECTION
OPERATEDNPCIL (KGS) KPTCL To-be-discussed
17 400 kV GUTTUR - NARENDRA 1 20-05-2017204100 20-05-2017211200BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II)
PGCIL (SR-II) Due to Problem at Guttur end
KPTCL
Annexure-IV
Page 2 of 6
18 400220 kV ICT-1 AT HOODY 20-05-2017110700 20-05-2017180500 220KV SIDE WORKS KPTCL To-be-discussed
19 220 kV AMBEWADI - PONDA 1 22-05-2017121100 22-05-2017123000 EARTH FAULT KPTCL GED To-be-discussed
20 400 Kv VTPS - MALKARAM 1 22-05-2017145200 22-05-2017185800 B phase fault APGENCO TSTRANSCO
TSTRANSCOTrippedat both ends Tripped on B-
Phase to ground and Zone-1 indications AR acted
and was unsucessful at Malkaram end
APGENCO
21 220 kV KANIAMPET - KADAKOLA 23-05-2017143200 23-05-2017162400 BREAKER PDR RELAY ACTED KSEB KPTCL To-be-discussed
22 400 kV TALAGUPPA - HASSAN 30-05-2017014600 B PHASE TO GROUND FAULT KPTCL PGCIL (SR-II)
PGCIL(SR-II) Due to persisting fault in KPTCL
portion
KPTCL
23HVDC TALCHER - KOLAR POLE 1 AT
TALCHER01-06-2017232200 02-06-2017001100
DC DIFFERENTIAL
PROTECTION OPERATEDPGCIL (SR-II) PGCIL (ER-I)
PGCIL(SR-II) Due to DC filter Diff relay operation at
Talcher end
24 400 KV NIZAMABAD- DICHPALLY-1 05-06-2017191500 3 PHASE FAULT TSTRANSCO
TSTRANSCOTrippedat both ends Tripped on 3
Phase B-Phase to ground fault and Zone-2
indications at Dichpally end
25 400220 kV ICT-1 AT DICHPALLY 05-06-2017191500 06-06-2017003200 BUCHHOLZ RELAY OPERATED TSTRANSCO
TSTRANSCO 400kv 315MVA ICT-1 at Dichpally
tripped on OSR indications which was a mal
operation of the relay At the same time there was
3 Phase fault in 400kV Dichpally to Nizamabad line
At Nizamabad end(PGCIL) Line Isolator 3 phases
shorted in GIS Module
26400 kV RAMAGUNDAM -
DICHCHIPPALLI05-06-2017191500 05-06-2017223700 3 PHASE FAULT NTPC TSTRANSCO
TSTRANSCO Line did not trip at Dichpally end At
the same time there was 3 Phase fault in 400kV
Dichpally to Nizamabad line for which the line
tripped at Both ends Relay settings need to be
reviewed at NTPC Ramagundam end
NTPC-Ramagundam
27 400 Kv BTPS - YTPS 05-06-2017194800 05-06-2017204400 DISTANCE PROTECTION KPCL To-be-discussed
Annexure-IV
Page 3 of 6
28 400 Kv SATTENAPALLI - SRISAILAM 2 05-06-2017125500 05-06-2017144700 R-n fault APTRANSCO TSGENCO
APTRANSCO
For a momentary fault feeder tripped on R-Ph Z1
indications and AR successful at Sattenapalli end
TSGENCO
Feeder tripped on R-phase to ground Zone-2 at
Srisailam end Due to Feeder consistsing of Under
Ground cable AR was disabled at Srisailam end
29 400220 kV ICT-2 AT KOLAR 06-06-2017191000 06-06-2017223700 DUE TO HEAVY WIND PGCIL (SR-II)
PGCIL (SR-II)
Flashover between 220kV jumper dropper of B
phase and Gantry towards 220kV bus due to heavy
swing of conductor during the unprecedented
heavy winds
30 400 kV KOLAR - HOODY 2 06-06-2017200800 DUE TO HEAVY WIND PGCIL (SR-II) KPTCL
PGCIL (SR-2)
Hand Tripped due to Isolator problem at Hoody
End
KPTCL
31 400220 kV ICT-2 AT GUTTUR 13-06-2017133000 13-06-2017134500TRIPPED ON EF RELAY
OPERATIONKPTCL To-be-discussed
32400 kV PUGALUR -
KALAIVANTHAPATTU14-06-2017123700 14-06-2017184500 TRIPPED ON Y-N FAULT PGCIL(SR-II) To-be-discussed
33 220 kV KANIAMPET - KADAKOLA 22-06-2017111700 22-06-2017113400EARTH FAULT RELAY
OPERATEDKSEB KPTCL To-be-discussed
34 220 kV KANIAMPET - KADAKOLA 22-06-2017121500 22-06-2017172000EARTH FAULT RELAY
OPERATEDKSEB KPTCL To-be-discussed
35 400 kV KHAMMAM - KALPAKKA 2 03-07-2017092400 03-07-2017104700
DT RECIEVED AT KLPA END
(TRIPPED ONLY AT KLPA
END)
PGCIL (SR-I) APTRANSCO
TSTRANSCO
PGCIL (SR-I)
PLCC belongs to APTRANSCO TSTRANSCO Mal-
operation of PLCC at Kalpaka end Requested
APTRANSCO TSTRANSCO for end to end
testingtunning of PLCC
APTRANSSCO TSTRANSCO
36 400220 kV ICT-1 AT URAVAKONDA 04-07-2017020100 04-07-2017022400MASTER TRIP RELAY
OPERATEDAPTRANSCO To-be-discussed
37 400 kV KAIGA - NARENDRA 2 07-07-2017075000 07-07-2017090800 TRIPPED ON R-Y Ph FAULT NPCIL KPTCL To-be-discussed
Annexure-IV
Page 4 of 6
38 HVDC BHADRAVATHI POLE 1 07-07-2017105900 07-07-2017115400TRIPPED ON NON VALID TAP
CODEPGCIL (SR-I) PGCIL (WR-I)
PGCIL(SR-I)
Tripped due to strucking of OLTC tap during
command execution The same was now working
39 400 kV KHAMMAM - KALPAKKA 2 07-07-2017120300 07-07-2017145000 DT Received PGCIL (SR-I) APTRANSCO
PGCIL(SR-I)
Tripped due to PLCC mal-operation PLCC belongs
to TSTRANSCO APTRANSCO Requested
TSTRANSCO APTRANSCO for end to end testing
tunning of PLCC Khammam end
APTRANSCO
40 400 KV GOOTY - TUMKUR - 1 08-07-2017142200 08-07-2017152600DISTANCE PROTECTION
OPERATEDPGCIL (SR-I) PGCIL (SR-II)
PGCIL(SR-I)
Tripped due to snapping of earth wire while
stringing of OPGW Advised concerned to take
additional precautions while carrying OPGW
stringing
PGCIL(SR-II)
41 400230 Kv ICT-1 AT SVCHATRAM 14-07-2017190300TRIPPED ON RESTRICTED
EARTH FAULTTANTRANSCO
TANTRANSCO
REF protection acted in ICT-1 during Auto Reclose
(AR) attempt of 400kV SVChatram-Alamathy
feeder-2 (through fault condition) As per the relay
manufacturer (GE-T60) guidelines for the one and
half breaker scheme the REF setting will be
revised
42 400 KV GOOTY - TUMKUR - 1 15-07-2017115100 15-07-2017122300Tripped while laying opgw
cablePGCIL (SR-I) PGCIL (SR-II)
PGCIL (SR-I)
Tripped due to snapping of earth wire while
stringing of OPGW Advised concerned to take
additional precautions while carrying OPGW
stringing
PGCIL(SR-II)
43 220 kV AMBEWADI - PONDA 1 16-07-2017113800 16-07-2017120800 DISTANCE PROTECTION KPTCL GED To-be-discussed
44 220 kV AMBEWADI - PONDA 2 20-07-2017013600 LINE FAULT KPTCL GED To-be-discussed
Annexure-IV
Page 5 of 6
45 400 Kv ALM - SVCTM-I 20-07-2017112700 20-07-2017120200 C-N FAULT TANTRANSCO To-be-discussed
46 400 Kv ALM - SVCTM-II 20-07-2017112700 20-07-2017120300 A-N FAULT TANTRANSCO To-be-discussed
47 400 Kv ALM - SVCTM-II 20-07-2017144300 20-07-2017193200TO ATTEND FAULT
LOCATIONTANTRANSCO To-be-discussed
48 HVDC BHADRAVATHI POLE 1 21-07-2017224800 21-07-2017235300 INTERNAL MINOR ALARM PGCIL (SR-I) PGCIL (WR-I) To-be-discussed
49 400 kV KHAMMAM - KALPAKKA 1 21-07-2017103000 21-07-2017204200AC SUPPLY TO BREAKER
PROBLEMPGCIL (SR-I) APTRANSCO To-be-discussed
50 220 kV CHITTOR - THIRUVALEM 22-07-2017080600 22-07-2017144100RELAY MALOPERATION AT
THIRUVALAMAPTRANSCO TANTRANSCO To-be-discussed
51 400 KV GOOTY - TUMKUR - 1 22-07-2017150700 22-07-2017154500TRIPPED DURING OPGW
WORKSPGCIL (SR-I) PGCIL (SR-II) To-be-discussed
52 400 Kv GAJWEL - BHOOPALAPALLY 2 22-07-2017131300 22-07-2017133600 B PHASE FAULT TSTRANSCO TSGENCO To-be-discussed
53 400 kV GUTTUR - HIRIYUR 2 22-07-2017150300 22-07-2017155300TRIPPED DUE TO RELAY MAL
OPERATIONKPTCL PGCIL (SR-II) To-be-discussed
54 400110 kV ICT 2 AT ALAMATHY 24-07-2017091300 24-07-2017162700TRIPPED ON RESTRICTED
EARTH FAULTTANTRANSCO To-be-discussed
Annexure-IV
Page 6 of 6
G1
220kV LINE-1
ICT 220400 KV
G2
GT1 GT2
400kV LINE-1
400kV LINE-2
600MW 600MW
220kV LINE-2
400kV220kVSummary of Various Special Protection Schemes for 2 x 600 MW UPCL TPP
Adani Power Limited Ahmedabad
Adani Power Ltd Ahmedabad 1
Annexure-V
Page 1 of 12
G1
ST-2
220 kV LINE-1
ICT 220400 KV
G2
GT-1 GT-2
400kV LINE-1
400kV LINE-2
600 MW 600 MW
ST-1
220 kV LINE-2
UPCL UDUPI - NETWORK UNDER CONSIDERATION
400 kV220 kV
Adani Power Ltd Ahmedabad 2
315 MVAICT-1
315 MVAICT-2
220 kV ndash KEMMAR BUS 400 kV ndash HASSAN BUS
Annexure-V
Page 2 of 12
Adani Power Ltd Ahmedabad 3
Existing SPS
Benefits of New Proposals
If both the 400kV Lines out of serviceTripped amp Total Generation is gt 650 MW then Trip Unit-2
Existing SPS logic has been developed in Unit-2 DCS
1 Consideration of all possible contingency cases
2 Unit Backdown (AUTOMATIC) has been proposed in certain contingencies
where Unit tripping is not required After restoration of tripped outlets
Unit may ramp up to full generation
3 Comprehensive logic will be developed in Numerical Relays with adequate
security and reliable detection to avoid mal operation of sps logic
4 Monitoring of SPS logic with necessary alarms and events
Annexure-V
Page 3 of 12
Sr UPCL‐Udupi‐SUMMARY OF SPS TO HANDLE ALL POSSIBLE CONTINGENCIES Sh‐1 of 2
Contingency Cases Action Unit SelectionFor Tripping
1 Power Swing Detected in Impedance reach of Zone‐1 in 400 kV Line
Tripping of One selected unit if both Units ON Each Unit Power gt 400 MW
Unit‐2
2Tripping of one 400 kV Line while another 400 kV Line is already in OFF condition
Tripping of One selected unit if both Units ON Each Unit Power gt 400MW
Unit‐2
3 TrippingOffloading of Both 400 kV Line simultaneously (within 3 sec)
Tripping of One selected Unit if both Unit ON Each Unit Power gt 325 MW Unit‐2
4 TrippingOffloading of all four Transmission Lines Tripping of both Units Both Units
4
5
400kVlin
e Overlo
ad Stage PickupSet Point
TimeDelay Action
Stage 1 900 MW 3 Sec Alarm
Stage 2 1100 MW 2 Sec Automatic Backdown upto 450 MW in both Units
Annexure-V
Page 4 of 12
Sr UPCL‐Udupi‐SUMMARY OF SPS TO HANDLE ALL POSSIBLE CONTINGENCIES Sh‐2 of 2
Contingency Cases
Action
6 ICT
Overlo
ading from
400 kV
Line Stage Pickup
Set PointTimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units
7
220 kV
Line
Overlo
ad
Stage 1 250 MW 5 Sec Automatic Backdown upto 300 MW in both Units
5
Sr Consideration Requirements associated with SPS Implementation
1 400 kV LINE Tripping in Zone‐1 will be blocked under Power Swing DetectionOperation
2 Pole Slip Protection of Generator need to be co‐ordinated with 400 kV Line Power Swing Protection
3 Line Overload Detection will be blocked by Power Swing DetectionOperation
4 Line ZeroUnder Power Detection will be blocked by Power Swing DetectionOperation
Annexure-V
Page 5 of 12
G1
ST-2
220 kV LINE-1
ICT 220400 KV
G2
GT-1 GT-2
400kV LINE-1
400kV LINE-2
600 MW 600 MW
ST-1
220 kV LINE-2
UPCL UDUPI - NETWORK UNDER CONSIDERATION
400 kV220 kV
Adani Power Ltd Ahmedabad 6
315 MVAICT-1
315 MVAICT-2
220 kV ndash KEMMAR BUS 400 kV ndash HASSAN BUS
Annexure-V
Page 6 of 12
Contingency 1 Tripping of one 400kV line
It may lead tohellip1 Overloading of another 400 kV Line
2 Power Swing in another 400 kV Line (specially when 220 kV
Lines are not available)
3 Severe oscillations in running Units
4 Units may loose synchronism and disconnect from network
G1 G2
L1 L2L1L2
Following SPS has suggested to address this contingency
Adani Power Ltd Ahmedabad 7
400kV200kV
Contingency Cases
Action
Unit Selection
ForTripping
1
400kVline Overlo
ad
Stage PickupSet Point
TimeDelay
Stage 1 900 MW 3 Sec Alarm ‐‐‐‐‐‐‐
Stage 2 1100 MW 2 Sec Automatic Backdown upto 450 MW in both Units ‐‐‐‐‐‐‐
2 Power Swing Detected in Impedance reach of Zone‐1 in 400 kV Line
Tripping of One selected unit if both Units ON Each Unit Power gt 400 MW Unit‐2
Annexure-V
Page 7 of 12
Contingency 2 Tripping of one 400kV line while other already Tripped
It may lead tohellip
1 Oscillations in running Units
2 Units may loose synchronism and disconnect from
network
3 Overloading of ICTs and subsequent tripping
4 Overloading of 200 kV Lines and subsequent tripping
5 Station blackout
Adani Power Ltd Ahmedabad 8
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases Action Unit SelectionFor Tripping
1Tripping of one 400 kV Line while another 400 kV Line is already in OFF condition
Tripping of One selected Unit if both Unit ON Each Unit Power gt 400 MW Unit‐2
2
ICT Overlo
ading
from
400
kV Side
Stage PickupSetting
TimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units
Annexure-V
Page 8 of 12
Contingency 3 Tripping of both 400kV line simultaneously
It may lead tohellip
1 Severe oscillations in running Units
2 Units may loose synchronism and disconnect from
network
3 Overloading of ICTs and subsequent tripping
4 Overloading of 200 kV Lines and subsequent tripping
5 Station blackout
Adani Power Ltd Ahmedabad 9
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases Action Unit SelectionFor Tripping
1 TrippingOffloading of Both 400 kV Line simultaneously (within 3 sec)
Tripping of One selected Unit if both Unit ON Each Unit Power gt 325 MW Unit‐2
2
ICT Overlo
ading
from
400
kV Side
Stage PickupSetting
TimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units ‐‐‐‐‐‐‐
Annexure-V
Page 9 of 12
Contingency 4 Overloading of any 220 kV line
This contingency may arise due tohellip1 Tripping of both 400 kV Lines and associated SPS logic fails
to operate (Tripping of any One Unit if both Units running)
2 Overloading of ICTs from 400 kV Side and associated SPS
logic fails to operate
3 Tripping of any one 220 kV lines if both 220 kV lines are in
service and 400 kV outlets are not available
Adani Power Ltd Ahmedabad 10
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases
Action
Unit Selection
ForTripping
1
220kV
line
Overlo
ad StagePickupSet Point
TimeDelay
Stage 1 250 MW 5 Sec Automatic Backdown upto 300 MW in both Units ‐‐‐‐‐‐‐
If any SPS does not function Then 200 kV Line will trip by Operation of Line Over Current Function
Annexure-V
Page 10 of 12
Contingency 5 Tripping of all Lines emanating from UPCL (ZERO POWER)
It may lead to1 Over voltage conditions at UPCL Bus
2 Over speed of all the generators because of sudden
load throw
Following SPS has suggested to address these contingencies
1 Zero Power Scheme on 400 kV System and 220 kV System checking the power
flow through 400kV and 200 kV lines and trip all the units in service if there is a
under power condition on all four lines and running units
Adani Power Ltd Ahmedabad 11
G1 G2
L1 L2L1
400kV200kV
L2
Sr Contingency Cases Action Unit SelectionFor Tripping
1 TrippingOffloading of all four Transmission Lines Tripping of both Units Both Units
Annexure-V
Page 11 of 12
G1
220kV LINE-1
ICT 220400 KV
G2
GT1 GT2
400kV LINE-1
400kV LINE-2
600MW 600MW
220kV LINE-2
400kV220kV
THANKShellip
Adani Power Ltd Ahmedabad 12
Annexure-V
Page 12 of 12
65th Protection Coordination Sub-Committee
29-06-2017
Annexure-VI
Page 1 of 40
Complete outage of 230KV Villianur substation of Pondycherry at 1235 hrs on 19-05-2017
bull Triggering incident Failure of CT in 110kV Villianur-Kurumbapet at Villianur substation
bull 230110kV ICT-1amp2 at Villianur substation tripped on operation of backup Over current protection
bull 230KV Neyveli-Villianur and Pondy-Villianur Line got tripped from NLC amp Pondy ends on operation of DEF and Zone-3 respectively
bull Delayed clearance of fault observed from PMU plot ndash 560ms
bull Load loss 140 MW
DEF
ZONE-3
NLC TS-2 BAHUR TrsquoMARTHAN
PONDY
VILLIANUR
Annexure-VI
Page 2 of 40
Fault cleared in 560ms
Annexure-VI
Page 3 of 40
Complete outage of 400kV Uruvakonda and Jamalamadugu Stations at 1744 hrs on 31-05-2017
bull Triggering incident Tripping of 400kV Kurnool-Narnoor line-1 amp 2 and 400kV Kurnool-Jamalamadugu line-2
bull Loss of supply loss to 400kV Uruvakonda and Jamalamadugu
bull Lines out of service 400kV Gooty-Narnoor 400kV Narnoor-Jamalamadugu-1 400kV Srisailam-Narnoor 400kV Uruvakonda-Mahboobnagar-1amp2
Srisailam Narnoor
Kurnool
Ghani
Jrsquomadugu UVrsquokonda
Mbrsquongr
Gooty
Ghanapur
Igt4
Igt4 Z3
Z3
OV DT RCV
Annexure-VI
Page 4 of 40
Annexure-VI
Page 5 of 40
Kurnool Narnoor
DR trigger ndash 174418501 hrs
Ib=5kA
Zone-3 trip EL Stub optd
DR trigger ndash 173620637 hrs
Igt4 trip
3 phase Grp AB optd
Kurnool Narnoor
DR trigger ndash 174418503 hrs
Ib=5kA
Zone-3 trip EL Stub optd
DR trigger ndash 174306388 hrs
Igt4 trip
3 phase Grp AB optd
Kurnool Jamalamadugu
DR trigger ndash 174423979 hrs Vgt1 Trip
DR trigger ndash 174415040 hrs Z3 T1 DT Rcv not observed in DR amp EL
400kV Kurnool-Narnoor line-1
400kV Kurnool-Narnoor line-2
400kV Kurnool-Jamalamadugu line-2
Annexure-VI
Page 6 of 40
bull Points for discussion ndash Location of fault
ndash Zone-3 amp Igt4 trip of 400kV Kurnool-Narnoor line-1amp2
Annexure-VI
Page 7 of 40
Tripping of 220kV Idukki ndashUdumalpet line at 1702 hrs on 05-05-2017
bull B-N and R-N fault in line
bull Delayed clearance observed during 2nd fault
Idukki Udumalpet
DR trigger ndash 170200499 hrs ZONE 1 B-E 366Km
DR trigger ndash 165741849 hrs ZONE 1 B-E amp Zone-2 R-E
Idukki
Udumalpet Lower periyar
New Pallom Kalamassery
Annexure-VI
Page 8 of 40
Annexure-VI
Page 9 of 40
B-N FAULT
R-N FAULT
ZONE-2
Ar attempt
Udumalpet end DR Annexure-VI
Page 10 of 40
bull Points for discussion ndash Reason for 3 phase trip at idukki end
ndash Relay to give a 3 phase trip in the event of 2nd fault during dead time
Annexure-VI
Page 11 of 40
Tripping of 400kV Kudgi(PG)-Tumkur line-2 and Kudgi(PG)- Kudgi(NTPC) line-1 at 1605 hrs on 06-05-2017
bull 400kV Kudgi(PG)-Kudgi(NTPC) ndash line tripped at Kudgi PG end on R-N zone-1
bull 400kV Kudgi(PG)-Tumkur line tripped from both ends
Kudgi(NTPC)
Tumkur
Kudgi(PG) Narendra
Kohapur
Guttur
Kaiga
Annexure-VI
Page 12 of 40
Kudgi (PG) Kudgi(NTPC)
DR trigger 160547438 hrs Zone-1 optd R-N Ar lockout Ov pick up
FIR DR amp EL not furnished
Kudgi (PG) Tumkur
DR trigger 160546957 hrs NGR buchholz trip Dip in R-phase voltage
DR trigger 160512593 hrs DT Rcv Grp AB optd
400kV Kudgi(PG)-Kudgi(NTPC) line-1
400kV Kudgi(PG)-Tumkur line-2
Annexure-VI
Page 13 of 40
Annexure-VI
Page 14 of 40
Annexure-VI
Page 15 of 40
Annexure-VI
Page 16 of 40
Tripping of 220kV Edamon-Tirunelveli-1amp2 at 1809 hrs on 06-05-2017
bull 220kV Edamon-Tirunelveli-1amp2 tripped from Tirunelveli end only and was in service from Edamon end ZONE-1 R-B-E fault
bull Distance protection at Tirunelveli over-reached and tripped for fault in 220kV Edamom-Pothencode lines
Edamon
Sabarigiri
Tirunelveli Pothencode
Kundara
Edappon
Annexure-VI
Page 17 of 40
Annexure-VI
Page 18 of 40
Tripping of 400220 kV Ghani ICT-2amp3 at 1405 hrs on 07-05-2017
bull ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
bull Delayed clearance observed from PMU data
bull DR amp EL not furnished
Srisailam Narnoor
Kurnool
Ghani
Jrsquomadugu UVrsquokonda
Mbrsquongr
Gooty
Ghanapur
Annexure-VI
Page 19 of 40
Annexure-VI
Page 20 of 40
Tripping of 400kV Ghanapur-Mamidapalli line at 1915 hrs on 08-05-2017
bull Line tripped at Ghanapur end only and was holding from Mamidapalli
Ghanapur Mamidapalli
DR trigger ndash 191329917 hrs Z3 Main-2 opts Event logger Main-2 PSB optd ndash 191541751hrs
DR trigger ndash 191458457hrs R-N Start Breakers did not trip
Ghani
Malkaram
Ramagundam
Chpr
Mamidapalli
Nrsquosagar
Gajwel Ghanapur Khammam
Dindi
Annexure-VI
Page 21 of 40
Annexure-VI
Page 22 of 40
Tripping of 400220kV ICT-1 at Guttur at 2215 hrs on 09-05-2017
bull ICT-1 tripped on HV side only without any relay indications
bull No fault observed from PMU data
Annexure-VI
Page 23 of 40
Tripping of 400kV Narsapur-Shankarapalli at 0007 hrs on 10-05-2017
bull line tripped at Narsapur end only and holding from Shankarapalli
Narsapur Shankarapalli
DR trigger ndash 000720147hrs Zp T1 Igt3 Start Event logger 75A relay optd ndash 000720098 hrs
CB did not trip
Singareni
Shankarapalli Gajwel
Narsapur
Suryapet
Brsquoply
Rrsquogm
Annexure-VI
Page 24 of 40
Tripping of 400220kV Hyderabad ICT-4 and 220kV lines at Hyderabad substation at 239 hrs on 10-05-2017
bull Triggering incident Bus fault in 220 kV Ghanapur station
bull Observation from PMU data ndash dip observed in Y amp B phase fault cleared in 120ms
bull Elements tripped 220kV lines amp 400220 kV ICT-4
bull FIR not submitted by TSTRANSCO
Annexure-VI
Page 25 of 40
Tripping of 400220kV ICT-1 at BTPS 13-05-2017 at 1941 hrs
bull ICT-1 got tripped on operation of LV side earth fault protection during R-phase to earth fault in 220kV BTPS-Lingapur line
bull Lingapur line DR amp EL were furnished
BTPS Alipura Regulapadu
Lingapur
Annexure-VI
Page 26 of 40
Tripping of 765 kV Kurnool-Thiruvelam line-2 at 2003 hrs on 19-05-2017
bull Triggering incident Failure of R-phase LA at Thiruvelam end
Kurnool Thiruvelam
DR trigger time ndash 200318272 hrs
Main-1 trip Carrier aided trip
3 ph Grp-AB optd DT RCV
Ir ndash 3kA
Dip in Y-phase current observed
Event logger
REF optd - 200318340 hrs
DT send - 200318343 hrs
DR trigger time ndash 200318269 hrs
Zone-1 trip
Initially 1 ph trip and later 3 ph trip due to DT rcv
Event logger
DT rcv - 200318395 hrs
Raichur Kurnool NPS
Tiruvelam
Solapur
Annexure-VI
Page 27 of 40
Annexure-VI
Page 28 of 40
Tripping of 400220kV ICT-2 at Kalpakka at 1502 hrs on 20-05-2017
bull ICT-2 tripped due to operation of transformer buchholz relay
bull Reason for operation of Buchholz relay may be furnished to PCSC
Annexure-VI
Page 29 of 40
Tripping of 400220kV ICT-2 at KV Kota at 1021 hrs on 23-05-2017
bull ICT-2 got tripped due to mal-operation of transformer oil temperature indicator
bull Remedial actions taken may be furnished to PCSC
Annexure-VI
Page 30 of 40
Tripping of 220kV Kaniambeta-Kadakola line at 1350 hrs on 23-05-2017
bull Line tripped at Kaniambeta end
bull Kaniambeta feeder protection is provided through 220kV bus coupler breaker bay
bull EFR relay operated and B ph pole discrepancy relay operated leading to tripping of Bus coupler CB
bull Loss of infeed to Kaniambeta Ss
Annexure-VI
Page 31 of 40
Tripping of 400220kV ICT-1 at Somanahalli substation at 1724 hrs on 24-05-2017
bull ICT-1 at Somanahalli substation got tripped due to DC Earth fault
bull Findings amp Remedial actions taken may be furnished to PCSC
Annexure-VI
Page 32 of 40
Tripping of HVDC Gazuwaka Pole-1amp2 25-05-2017 at 0945 hrs
bull HVDC pole-1 got tripped due to operation of South filter inter zone protection and
bull HVDC pole-2 got tripped due to operation of differential protection
bull Findings amp remedial actions taken may be furnished to PCSC
Annexure-VI
Page 33 of 40
Tripping of 400kV Kayathar-Karaikudi line 25-05-2017 at 1552 hrs
bull Triggering Incident R-phase to earth fault
Kayathar Karaikudi
DR trigger time ndash 155236585 hrs
Zone-2 3 phase trip
Carrier unhealthy
DR trigger time ndash 155236592 hrs
zone-1 3 phase trip
Kayathar Kamudi Karaikudi
Pugalur
Trichy
Madurai
Annexure-VI
Page 34 of 40
Annexure-VI
Page 35 of 40
Tripping of 400220kV ICT-1amp3 at Hoody substation of KPTCL at 1230 hrs on 26-06-2017
bull ICT-1 tripped due to arc over of pre-close supervision contact of tip coil -2
bull ICT-3 got tripped on over-loading
Annexure-VI
Page 36 of 40
Annexure-VI
Page 37 of 40
Tripping of 400kV Simhadiri-Kalpakka line-2 at 503 hrs on 28-05-2017
bull Line tripped on mal-operation Teed Differential Protection at Simhadiri end and direct trip was received at Kalpakka
bull Y-Phase to earth fault had occurred in 400 kV Vijayawada-Vemagiri line-3
bull Findings amp remedial actions taken may be furnished to PCSC
Annexure-VI
Page 38 of 40
Tripping of 400kV Ramagundam-Gajwel at 0007 hrs on 29-05-2017
bull Over voltage stage-1 had operated at Gajwel end
bull Ramagundam end did not trip as direct trip was received from Gajwel
bull DR amp EL of Gajwel end not furnished
Annexure-VI
Page 39 of 40
Tripping of 400kV Gajwel-Ghanapur line at 0007 hrs on 29-05-2017
bull Line tripped on operation of over voltage protection at Gajwel and direct trip was received at Ghanapur
bull DR and EL of Gajwel end were not furnished
Annexure-VI
Page 40 of 40
25 Oी सयM ampकाश उपाR य= (ampचालन व अनर=ण) जएसडS T य एनजU ल तोरणगT ल बT लार- ndash 583275
Shri Surya Prakash Vice President (Operations amp Maintenance) Ms JSW Energy Ltd Toranagallu
Bellary-583275
26 Oी शाताराम प सह उपाR य= (वयत एव परयोजना) जएसडS T य एनजU ल तोरणगT ल बT लार- ndash 583275
Shri Shantharam Pai Associate Vice President (Electrical amp Projects) Ms JSW Energy Ltd Toranagallu
Bellary-583275
27 Oी आर वी भWए उपाध य= ( ampचालन) यपीसीएल ब8गलर Shri RVBhat Vice President (Operations) UPCL
Bangalore
28 सह उपाR य= ( सर=ण व मीटरग) अदानी पावर ल 8-ए सभव जज भवन क सामन बोदकदव अहमदाबाद-
380015 गजरात Associate Vice President (Protection amp Metering) Adani Power Ltd 8-A lsquoSambhavrsquo
Opp Judgersquos Bungalow Bodakdev Ahmedabad 380 015 Gujarat India
29 Oी Yबयत चZबतU (ampधान वयत एव सी आई अनर=ण) ट-पीसीआईएल [ यानपरम नल तN Fाम मतकर
मडल एसपीएसआर नT लर- 524344 Sh Bidyut Chakraborty (Head Electrical and CampI Maintenance)
TPCIL Pyanampuram Nelaturu Village Muthukur Mandal SPSR Nellore ndash 524344 (Fax No 0861 ndash 305
2304)
30 Oी आर एस कमारP वामी सलाहार(वयत) सीईपीएल मलमरडर Fाम ओ]Wपदरम ताT लक ततकडी- 628105
तमलनाड Sh RS Kumaraswamy Advisor (Electrical) CEPL Melamarudur Village Ottipidaram Taluk
Tuticorin ndash 628 105 Tamil Nadu (Fax No 0461 ndash 2614297)
31 Oी ^कशोर आकM ट वर उपाR य= (amp व अ) आईएल व एफएस ट-पीसीएल सी पदपW डाक परनगीपW भवनEगर
ताT लक कडलर िजला तमलनाड- 608502 Sh Kishore Arcot Sr Vice President (OampM) ILampFS
Tamilnadu Power Company Ltd CPudhupettai (post) Parnagipettai Bhuvanagiri Taluk Cuddalore Dist
Tamilnadu ndash 608502 (Fax No 0414-4252991)
32 Oी सS यसाची मखजU वर उपाR य= ( amp एव अ) ]हदजा एनपीसीएल पटग`यड मडल वशाखप`नम आ amp-
530031 Sh Sabyasachi Mukherjee Sr Vice President (OampM) Hinduja NPCL Pedagantyada Mandal
Visakhapatnam AP ndash 530031
33 Oी एस सदरमKतM उपाR य= ( ampचालन) लनको कaडपT ल- पावर लमटड आईडीए कaडपT ल- इbा]हमप`नम मडल
कd ण िजT ला आe ampदश- 521228 Sh S Sundaramoorthy-Vice President (operations) Lanco Kondapalli
Power Limited IDA Kondapalli Ibrahimpatnam Mandal Krishna district Andhra Pradesh-521228 (Fax
No 0866-2872801)
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 1
SOUTHERN REGIONAL POWER COMMITTEE BENGALURU
Minutes of the 65th Meeting of Protection Coordination Sub-Committee (PCSC ndash 65) of SRPC held on 29th June 2017
1 Introduction
The 65th meeting of Protection Coordination Sub-Committee (PCSC-65) of SRPC was held on 29th June 2017 at SRPC Secretariat Bengaluru The list of participants is enclosed at Annexure-I Members and Participants were welcomed to the meeting and briefed on the following protection related issues Evaluation of the bids received from various bidders in respect of SRPC project ldquoProcurement of
Web-based Management Software and Protection Setting Calculation Toolrdquo project is under progress by the Bid Evaluation Committee (BEC) of SRPC constituted for the purpose and it is expected that the award for the same would be placed in August 2017
Wrt perturbations experienced at TPCIL plant in Nellore protection audit of Nellore PS (NPS) of PGCIL (SR-I) was conducted during 19 -20 June 2017 Then a special meeting was also convened at TPCIL plant premises on 21062017 It was noted that there was nothing amiss at NPS So the cause of TPCIL perturbations was further analysed by correlating their time-stamps with that obtained from SRLDC and SLDC-APTRANSCO From them it was seen that frequent faults on 400 kV SDSTPS ndash Nellore-AP (Manubolu) DC line were the cause of observed perturbations at TPCIL plant Accordingly certain remedial measures were suggested for the parties involved APTRANSCO APGENCO and TPCIL were requested to take suitable action to comply with the recommendations given
UPCL vide their mail dated 22052017 had proposed a revised SPS at their Udupi plant in place of the existing one to take care of oscillations and power swings that would result under various contingencies All concerned members were requested to take part when the issue is taken up for discussion later in the meeting
It was also informed that in view of the frequent tripping of ICTrsquos at 400220 kV Hoody SS it was proposed to conduct PSAG-18 meeting on 03072017 to ascertain the action taken by KPTCL to attend to various measures that had been suggested by PCSC forum in their previous meetings
Wrt implementing AR on all 220 kV lines amp above it was stated that the action plan including feeder details for implemented AR are yet to be furnished by APGENCO APTRANSCO TSGENCO and TSTRANSCO KPTCL and NTPC-Ramagundam The respective Constituents were requested to furnish the sought details at the earliest and take concrete action towards implementing AR in all 220 kV amp above transmission lines
2 Confirmation of the Minutes of the 64th meeting of PCSC held on 25th May 2017
The minutes of the 64th meeting of PCSC had been circulated vide SRPC letter No SRPCSE-III PCSC-64 20173216 - 51 dated 09062017 As no comments had been received from any of the Constituents the minutes of the 64th Meeting of PCSC were confirmed
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 2
3 Details of Grid Disturbances (GDrsquos) Grid Incidents (GIrsquos) and Line Trippings due to Auto-
Reclose (AR) failure non-operation amp PLCC mal-operation
The trippings due to GDrsquos GIrsquos AR failure non-operation and PLCC mal-operation that had occurred
during May 2017 were discussed in the Meeting The deliberations and recommendations of the PCSC Forum are enclosed at AnnexurendashII for further needful action The details of the tripping events including relevant PMU plots presented by SRLDC in the meeting are also enclosed at AnnexurendashVI for kind reference
4 Status of pending PCSC Recommendations (P-REC)
The status of implementation of pending PCSC recommendations was discussed in the meeting The
Constituents were asked to take steps to comply with the same and requested to submit the status of their compliance latest by 10082017 The updated status of the same as on 25072017 is enclosed at AnnexurendashIII
5 Remedial measures Action taken for the tripping incidents of the transmission elements
under forced outage (PRM)
The tripping incidents of the transmission elements under forced outage for which the remedial action
taken had not been furnished were discussed in the meeting The Constituents were asked to kindly furnish specific remedial measures action taken covering one or the other items from the following indicative list in time so as to forward the same to Central Electricity Authority
Brief details of line patrolling carried out (with tower location)
Brief details of RoW maintenance (by proper Tree-cutting) resorted to
De-capped insulators replacement
DC earth fault removal
PLCC cards replacement
Relay settings modification
Steps taken to put AR or CB into service after they have been locked-out
Faulty equipment replacement
Reference to OEM in case of equipment failure
Brief Details of tests carried out to ascertain the healthiness of various equipment (Power Transformer Reactors Surge Arrestors Circuit Breakers CTs PTsCVTs) like Insulation Resistance (IR) test Winding Resistance test Capacitance test Tan delta test DGA test Leakage current test CRM DCRM test etc
Any other appropriate remedial measure
The updated list of PRM as on 25072017 is enclosed at Annexure-IV
6 Certificate for Healthiness of Batteries
As per the MoP CEA direction given in pursuant to recommendations of the Enquiry Committee (NEW Grid Disturbance on 30th amp 31st July 2012) RPCrsquos are required to obtain from their respective Constituents a monthly certificate for healthiness of batteries installed at 220 KV amp above voltage level Substations (for power supply to Relays RTUs and PLCC equipment) and furnish the same to CEA MoP
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 3
With reference to above the Constituents had been requested to submit the certificate on healthiness of batteries on monthly basis (ie status for a month shall be sent by the 7th day of the following month) to SRPC as per the format given below
Sl No
Station Application Battery Battery Charger Remarks
Station Name
Code Type
(PS SS)
Protection
Communication
Details Status (Healthy Unhealthy)
Details Status (Healthy Unhealthy)
1 Station-A Protection (Bank-1)
Protection (Bank-2)
Communication (Bank-1)
Communication (Bank-2)
2 Station-B hellip
hellip hellip hellip
Note 1 Code is the short name of the Station
2 PS ndash Power Station SS - Substation
The sought status for the months of May 2017 had not been received from the following SR-Constituents
TANTRANSCO NTPL amp NTECL
7 Implementation of Line Differential Protection (LDP) in Nellore and Simhadri complexes
The issue had been discussed in the 64th meeting of PCSC held on 25052017 when it was agreed that the concerned Constituents would take steps to implement LDP in both Nellore and Simhadri Complexes by December 2017
Subsequently MEPL (vide their mail dated 14062017) and SEL (vide their mail dated 27062017) informed that in view of their present financial condition they may kindly be exempted for the time being from implementing LDP on the lines belonging to them in Nellore Complex However they assured that suitable action would be taken to implement the same once their situation improves
In this regard it was clarified that PGCIL (SR-I) can go ahead procuring LDP relays without considering MEPL and SEL requirement Accordingly the following Constituents were asked to take appropriate steps to put LDP in place by December 2017
Nellore Complex Constituents responsible for LDP implementation
Timeline for LDP implementation
Line Differential Protection (LDP) to be implemented on all 400 kV lines (lt 50 km)
PGCIL (SR-I) APGENCO APTRANSCO TPCIL SGPL
December 2017
MEPL and SEL As and when their financial healthiness improves
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 4
Simhadri Complex Constituents responsible for LDP implementation
Timeline for LDP implementation
Line Differential Protection would be implemented in Simhadri Complex on all 400 kV lines inter-connecting Gajuwaka SS Kalpaka SS Simhadri STPP and Hinduja TPS
PGCIL (SR-I) NTPC APTRANSCO and HNPCL
December 2017
8 Installation of PMU by POWERGRID at 400kV NP Kunta
In PCSC-64 meeting held on 25052017 the following was noted
SRLDC stated that NP Kunta is a critical station where in addition to injection of large quantum of solar power reactive power control is also being exercised by way of the recently commissioned STATCOM Thus to better monitor the LVRT effects of Solar power station and functioning of STATCOM installed at NPKunta station it is necessary to have a PMU installed there To this PGCIL (SR-I) informed that provision for PMU at NP Kunta had not been envisaged in Part-I of URTDSM Further as per the decision taken in the 3rd Communication meeting held at SRPC Bengaluru the quantity of Phase-I of URTDSM project was freezed On this SRLDC mentioned that PGCIL need not procure an additional PMU for the purpose instead they can divert the PMU identified for Vijayawada to NP Kunta The issue was further discussed and in view of the stated significance of NP Kunta PGCIL (SR-I) was asked to divert PMU identified for Vijayawada to NP Kunta as part of Phase-I of URTDSM project
However in view of the difficulty expressed by PGCIL (SR-I) in shifting the (already commissioned) PMU and its associated cabling and communication modules from Vijayawada to NP Kunta the issue was again discussed by PCSC forum in the meeting During the meeting the necessity of having PMU at NP Kunta was once again emphasised It was also noted that a PMU had been identified for installation at GMR-Vemagiri as part of URTDSM project in Phase-I However as APTRANSCO and GMR had not agreed for the same the same was not yet carried out In view of above PCSC forum decided that PGCIL (SR-I) take steps to shift the PMU and associated cabling and communication interface modules identified for commissioning at GMR-Vemagiri to NP Kunta and install the same at the earliest
9 Revision of Special Protection Scheme (SPS) implemented at UPCLrsquos plant at Udupi
UPCL vide their mail dated 22052017 requested to review the SPS implemented at their plant in view of the changed grid conditions and furnished a proposal for consideration by SRPC SRLDC
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 5
In this regard the existing SPS and the proposed SPS by UPCL were discussed Existing SPS Both 400 kV lines unavailable amp Generation gt 650 Trip Unit-2 Both 400 kV line and one of the two 220 kV lines unavailable
amp Generation gt 300 MW Trip Both Units Proposed SPS Under this the following five contingencies have been considered 1 Tripping of one 400 kV line 2 Tripping of one 400 kV line with the other already tripped 3 Tripping of both 400 kV lies simultaneously 4 Overloading of any 220 kV line 5 Tripping of all Lines emanating from UPCL (Zero Power condition) The details of the proposed SPS by UPCL are enclosed at Annexure-V With regard to above it was noted that even though the proposed SPS may effectively take care of the oscillations power swings that may occur at UPCL during above stated contingencies the following concerns need to be properly addressed from the grid perspective Since the line breaker is not allowed to be tripped in the event of occurrence of power swing
(even when it enters Zone-1) and a definite possibility exists for it to be transmitted to the other adjacent connected stations it needs to be shown by conducting proper system studies that tripping of UPCL running Unit (s) by virtue of operation of corresponding SPS would act negatively on the sustenance of the power swing
It was felt that the Contingencies at 2 amp 3 can be combined since they essentially result in the same Further the reference power value assumed for comparing with actual generation to effect tripping of Unit-2 under Contingency-2 may be appropriately revised to 325 MW to avoid overloading of Varahi ndash Shimoga lines (in the extreme case of full generation at Varahi GS)
Study results for all Contingencies considered shall be shared Given the complexity of the proposed SPS issues pertaining to non-reliability of its operation may
also be suitably factored into Accordingly UPCL was requested to review the proposed SPS addressing above concerns and furnish the thus modified scheme to PCSC forum along with supporting study results
10 Auto-Reclosure Implementation on all 220 kV amp above Transmission Lines of
Southern Region
It was noted that APGENCO (Hydro) amp APGENCO (RTTP) are yet to furnish their action plan for implementing AR in their respective networks Similarly though TSGENCO (Thermal) amp TSGENCO (Hydro) had stated that they were coordinating with TSTRANSCO to obtain revised settings they are also yet to furnish Action Plan Time-frame for implementing AR It was also noted that in the Action Plan furnished by APTRANSCO feeder details were not mentioned Similarly in the Action Plan furnished by TSTRANSCO time-frame for implementing AR was not mentioned Action Plan for implementing AR is also yet to be furnished by NTPC-Ramagundam (for Tie-CBrsquos of 400 kV lines)
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 6
It was further noted that even though KPTCL had furnished the details of 220 kV amp 400 kV lines where AR is already in place the details of 220 kV lines where AR is not presently in service along with Action Plan for implementing same are yet to be furnished
All above Constituents were asked to kindly furnish required details by 08082017
Since the main issues in implementing AR are the adopted conservative protection philosophies lack of proper PLCC communication and breakersrsquo suitability supportability it is intimated in view of above that if there are no issues wrt carrier communication and breakersrsquo supportability concerned Constituents shall make efforts to implement AR immediately in their respective networks Where communication amp breaker related issues stand in the way of implementing AR concerned Constituents shall take steps to address them appropriately on priority basis and implement AR in their respective networks in a phased manner at the earliest
In the previously held PCSC meetings the following logics have been clarified for implementing AR
Normally high speed single-ph single-shot AR scheme (with simultaneous opening at both ends of feeder with a dead-time of 1 sec and reclaim-time of 25 sec) may be used by all Utilities (including Generators)
However those generators (Coal Gas Nuclear Hydro) who have concerns wrt closing on to un-cleared fault can make use of the following time-differentiated single-ph single-shot AR scheme
ldquoIn this after a line has been opened from both ends (generator end amp grid end) on AR operation the grid end will be auto-reclosed as usual after the elapse of its dead-time (say 1 sec) However the generator end relay will check for the line voltage after elapse of an extended dead time say 15 sec [here the additional time delay of 05 sec which has been included as a safety margin shall be so chosen that the extended dead-time is less than the adopted Pole Discrepancy time delay] If the line voltage so sensed is healthy amp normal (which implies that the fault has already been cleared) then generator end will be auto-reclosed else 3-ph trip will be given at generator end to open the other two phase polesrdquo Further wherever Trip-on-Reclose (ToR) feature is available at grid-end station it shall be configured such that it sends Direct Trip (DT) command to generator end upon its operation
It is also clarified that the above scheme can be as it is used to Line-CBrsquos of all bus configurations (including Main-CBrsquos of one-and-half breaker bus configuration) For Tie-CBrsquos in one-and-half breaker configuration employing priority scheme (which also happens to be the recommended practice) above logic is not be required since the employed priority scheme anyway checks for CLOSE_STATUS of Main-CB before closing Tie-CB However if required the above logic can be applied to Tie-CBrsquos also by adopting a suitable extended dead-time considering the remote end stationrsquos AR dead time
It is further clarified that AR functionality for a transmission line shall be preferably put into service using (i) Bay Control Unit (BCU) or (ii) separate External AR Relay Where these are not available only then should the AR functionality of Main protection relays of lines be used
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 7
Here it is assumed that both Main-relays are deriving their Voltage Input from the Line CVTrsquos (from different cores as per the recommended practice) However if this is not the case and the concerned Utility has a practice of using Line-CVT voltage input to one of the Main relays and Bus-CVT voltage input to the other Main relay it is recommended that voltage input to be used in time-differentiated AR logic shall be exclusively derived from the line-CVT for use in both the Main relays
It is also clarified that AR implementation is not required in case of radial feeders cables amp composite feeders and is optional for the lines interconnecting two generating stations
In addition to above the following logics (applicable to the Cases where AR is being proposed to be implemented from Main Protection Relays) are also intimated for the benefit of the Constituents
Since there are two Main protection relays (Main-I and Main- II) to decide upon proper way of implementing AR for achieving fool-proof AR operation it has been advised that instead of implementing AR from only one of the Main relays (in light of its low success rate) the following Alternatives be considered Alternative ndash 1 AR is implemented and kept functional from Main ndash I [Main-II] only but with feedback from Main-II [Main-I]
In this scheme AR is implemented and kept in service from Main-I [Main-II] as usual
Additionally Main-II [Main-I] relay is configured for single-pole (1-ph) tripping and the OPEN (TRIP) status of the concerned trip relay is used for triggering AR functionality in Main-I [Main-II] By this even if the fault is not sensed in the beginning by Main-I [Main-II] but sensed by Main-II [Main-I] AR operation is guaranteed However it may be noted that in cases of permanent faults this scheme may result in unsuccessful AR operation with Pole Discrepancy Relay coming to rescue if the fault is not sensed by Main-I [Main-II] but by Main-II [Main-I] at the time of auto-reclosing instant
Alternative ndash 2 AR is implemented and kept functional from both Main ndash I and Main-II
In this scheme AR is implemented and kept in service from both Main ndash I and Main-II as
usual As can be seen the scheme is reliable and is without any additional logics However to avoid the possibility of both relays racing for CLOSE-OPEN-CLOSE-OPEN operation in case of permanent faults it shall be ensured that along with other conditions ldquoAR BLOCK with 3-ph TRIPrdquo is also effected for the same phase fault as the original one that occurs during AR dead-time
Out of the above two also it has been suggested to consider Alternative-2 for implementing AR in view of its higher success rate
11 Network Configuration Changes
As per the information furnished by SR-Constituents to the OCC forum in their 132nd meeting (held on
09062017 Minutes circulated on 04072017) it is formed that the following configuration changes (additions deletions modifications of transmission elements) took place in the southern grid during
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 8
April 2017
Two STATCOMs (+- 50 MVAR Each) at NP Kunta commissioned on 16052017
Kudgi Unit I 72 Hrs trail run completed Successfully
400 kV Shankarapally-Suryapet I amp II commissioned on 05052017
22033kV SS at Hayathnagar IampII in Ranga reddy district of 50 MVA Capacity was commissioned on 03052017 by TSTRANSCO
SR II Power grid vide letter dated 10062017 had informed that consequent to the successful completion of Trial Operation the following assets under transmission system associated with ldquoSystem strengthening ndashXX in Southern Regional Gridrdquo have been put under Commercial Operation wef 0000 hrs of 10062017 in terms of clause 4 of CERC (Terms and Conditions of Tariff Regulations 2014)
1 x 500 MVA 40022033kV ICT at Trichy Substation along with associated bays and equipments
SR I Power grid vide letter dated 04062017 had informed that consequent to the successful completion of Trial Operation the following assets of ldquoTransmission System for Ultra Mega Solar Park in Anantapur Dist Andhra Pradesh- Part ndash A (Phase-I)rdquo have been put under Commercial Operation wef 0000 hrs of 04062017 in terms of clause 4 of CERC (Terms and Conditions of Tariff Regulations 2014)
+- 100 MVAR STATCOM at NP Kunta Pooling Station along with associated bays and equipment
12 Instances of SPS Operation
Based on the information furnished by SRLDC it is informed that there occurred no SPS operations in SR during the period 25052017 ndash 28062017
13 Status of Implementation of Protection Audit Recommendations (Phase-I amp Phase-II)
With reference to the petitions filed by KSEB (88MP2016) and KPTCL (135MP2016) for seeking further time-extension for completing their respective Protection Audit Recommendations (PAR) the final Order of Honrsquoble CERC disposing of petitions was issued on 15122016 In this Order the Commission apart from granting last-chance time-extensions to various SR-Constituents had also directed SRPC to monitor the status of completion of PAR regularly in PCSC meetings and submit bi-monthly report to the Commission confirming the completion of Phase-I and Phase-II of PAR of the Constituents of Southern Region
In this regard based on the information furnished various Constituents a summary table showing the
compliance status of various SR-Constituents as in July 2017 is given below
SlNo
Constituent
PAR (Phase-I) Activities
PAR (Phase-II) Activities
PAR (Ph-I amp Ph-II) Compliance ()
Remarks
Stipulated Completion
Date
Stipulated Completion
Date
1 APGENCO (Hydel)
31122017 31122017 40 ---
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 9
2 APGENCO (Thermal)
30072017 --- 75 Based on the status furnished timeline for complying with the remaining pending recommendations (3 in no) is expected by 31122017
3 APTRANSCO 31032017 --- 9571 Out of the 3 remaining pending recommendations two are expected to be completed in three months while the other is expected by 31122017
4 TSGENCO (Hydel)
31032017 31032017 8823 Based on the status furnished timeline for complying with the remaining pending recommendations (4 in no) is expected by 31122017
5 TSGENCO (Thermal)
31032017 31032017 80 Based on the status furnished timeline for complying with the remaining pending recommendations (3 in no) is expected by 31072017
6 TSTRANSCO 31032017 31032017 8523 Based on the status furnished timeline for complying with the remaining pending recommendations (13 in no) is expected by 30092017
7 KPCL --- 31112016 100 ---
8 KPTCL 31052017 31052017 2817 Based on the status furnished timeline for complying with the remaining pending recommendations (51 in no) is expected by 30092017
9 TANGEDCO 31122017 31122017 6389 ---
10 TANTRANSCO 31122017 31122017 50 ---
11 KSEB 30112016 31122017 9481 ---
12 NPCIL (MAPS) 31012017 --- 8889 Based on the status furnished timeline for complying with the remaining pending recommendation (ONE in no) is expected by 31122017
All above SR-Constituents are requested to adhere strictly to the time-lines given in the Order for
completing their respective pending PAR The IPPrsquos for whom there are pending PAR [viz Spectrum PGL GMR Barge - Kakinada Konaseema GPL APGPCL Vijjeswaram (Stage-I amp Stage-II) amp LANCO-Kondapalli PL] are also requested to complete them at the earliest
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 10
14 Nomenclature for naming various files uploaded in web-based Tripping Monitoring
System of SRLDC Portal
The nomenclature to be followed by the Constituents in naming various files (FIR DR EL TR) corresponding to a tripping incident was brought out in the SRPC letter No SRPC SE-III PCSC-45 4609 ndash 649 dated 26062015 and in the minutes of PCSC-45 issued vide SRPC letter No SRPCSE-III PCSC-45 2015 5422-455 dated 21072015 As illustrated therein the format to be followed for the user entered part-name is given below
Transmission Element File Name to be given by the user
Transmission Line SSN_DSN_line_FT
Inter-connecting Transformer SSN_ICT_FT
Generating Transformer SSN_GT_FT
Generating Unit SSN_Unit_FT
Where SSN = Source Station Name From end Station Name Sending end Station Name DSN = Destination Station Name To end Station Name Receiving end Station Name FT = File Type (FIR DR EL TR)
All SR-Constituents are requested to kindly intimate the above file naming nomenclature to all the concerned and ensure that it is strictly followed at all the stations in their respective control areas so that tripping analysis can be done systematically
15 Date amp Venue of the next PCSC Meeting
It is informed that the 66th meeting of PCSC will be held on 17th August 2017 (Thursday) from 1030 hrs onwards in the Conference Hall of SRPC Secretariat Bengaluru
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 132
Analysis of Grid Occurrences - 65
I Details of Grid Disturbances
Sl No
Details of Event Date amp Time Reason Remarks Category
1
Complete outage of 230 kV Villianur Substation of Pondicherry
19-05-2017 at 1235 hrs
Triggering incident was failure of CT in 110 kV Villianur-Kurumbapet at Villianur substation 230KV Villianur ndash NLC2 and 230 kV Villianur - Pondy lines got tripped from Pondy end (on operation of DEF) and NLC end (on operation of Zone-3) respectively resulting in loss of supply to 230 kV Villianur substation
Load Loss 140 MW
GD-1
SLD
The single line diagram of 230 kV Villianur SS as furnished by PED is attached at the end 230 kV Villianur ndash Pondy line Villianur (PED) end
As per FIR TR line was kept holding
The following was also stated in FIRTR
Remedial action Relay testing amp calibration proposed during total shutdown on 13062017
DR amp EL not furnished Pondy (PGCIL-SR2) end
As per FIRDRELTR line tripped at 123559270 hrs on B-E fault due to DPR Z3 (98 km 156 kA) operation From DR amp EL Z3 time delay was observed to be about 06 sec
230 kV Villianur ndash NLC2 line Villianur (PED) end
As per FIR TR line was kept holding
The following was also stated in FIRTR
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 232
Remedial action Relay testing amp calibration proposed during total shutdown on 13062017
DR amp EL not furnished NLC2 (NLCIL) end
As per FIRDRELTR line tripped at 123551016 hrs on B-E fault due to DEFR operation From DR amp EL DEFR time of operation was observed to be about 07 sec
Time sync of Protection relays with GPS at NLC TPS-II needed to be ensured SRPC SRLDC
It was noted that the triggering incident was failure of B-ph CT in 110 kV Villianur-Kurumbapet line at Villianur SS
It was noted that for the above fault distance protection at Villianur end on 110 kV Villianur-Kurumbapet line had not operated probably due to absence of current input (hence impedance becoming infinite)
Further since there was no busbar protection to 110 kV buses the fault continued to be fed from the remote ends (Pondy-PG and NLC-2) through 100 MVA Transformers (Txr ndash 1 amp Txr ndash 2)
So the transformersrsquo back-up protections were called into action But since OC protections provided on both HV amp LV sides had no high-set Units and since they were kept non-directional [Relay make ER TJM 10] LV (110 kV) side OC protections of both transformers had acted to give trip command Even though the 110 kV CB of Txr ndash 1 got opened that of Txr-2 had not opened due to which the fault continued to be fed from the remote ends (Pondy-PG amp NLC-2)
It was noted that the HV (230 kV) side OC protection of Txr-2 which was supposed to act under above situation had NOT acted
Due to above the remote end back-up protections were called into action
It was noted that even though Pondy-PG end CB tripped on DPR Z3 protection the time delay observed was on the lower side of about 06 sec
It was also observed that DEF protection had acted to trip its CB at NLC-2 without giving any chance for its distance protection to operate
In view of the above observed inconsistencies at Villianur SS it was decided to review various feeder amp transformer protections kept at Villanur SS during its scheduled protection audit on 10072017
Subsequently protection audit of 230 110 kV Villianur SS of PED was conducted on 10072017 during which several lacunae were noted Accordingly a comprehensive set of recommendations were given to PED for early compliance
Recommendations
PED to furnish an action taken report wrt complying with the protection audit recommendations PGCIL (SR-II) to review Zone-3 and DEF protection setting at Pondicherry end 230 kV Pondicherry ndash
Villianur and 230 kV Pondicherry ndash Bahour line and set them appropriately to achieve required
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 332
time-coordination with OC protections of ICTrsquos at Villianur SS NLCIL to keep DEF protection in blocked condition as long as Distance Protection is active and
configure it to become active only when distance protection does not pickup to avoid time-coordination issues
2
Complete outage of 400kV Uravakonda and Jammalamadugu Substations
31-05-2017 at 1744 hrs
Triggering incident was tripping of 400 kV Kurnool-PG - Narnoor line - 1 amp 2 and 400 kV Narnoor-Jamalamadugu line-2 which led to loss of supply to 400kV Uravakonda and Jamalamadugu 400kV Gooty-Narnoor 400kV Narnoor-Jamalamadugu-1 400kV Srisailam-Narnoor 400kV Uruvakonda-Mahboobnagar-1amp2 were out of service in antecedent condition
Gen Loss 500 MW
GD-1
FNN not followed by APTRANSCO FIR amp TR in prescribed formats not furnished by APTRANSCO SLD
The single line diagram 400 kV Jammalamadugu SS as furnished by APTRANSCO are attached at the end
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 432
Antecedent Conditions
The following lines were kept out of service 400kV Narnoor-Srisailam SC line 400kV Narnoor-Gooty SC line 400kV Narnoor-Hyderabad SC line 400kV Narnoor-Jamalamadugu-1 line 400kV Uravakonda-Jamalamadugu-1 line 400kV Uravakonda-Mahboobnagar line-1amp2
Above means Uravakonda SS and Jammalamadugu SS were effectively hanging on to 400 kV Jamalamadugu - Narnoor line-2 for supply
A Tripping of 400 kV Kurnool (PG) - Narnoor line-1 Kurnool-PG (PGCIL-SR1) end
As per FIRTR line tripped at 174418601 hrs due to DPR Z3 (5703 km) operation
As per DREL line tripped at 174418601 hrs due to Stub Protection operation Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 173620637 hrs due to operation of Igt4 (B-ph) protection
From EL Igt4 time delay was observed as 100 msec
Time sync of protection relays with GPS needed to be ensured B Tripping of 400 kV Kurnool (PG) - Narnoor line-2 Kurnool-PG (PGCIL-SR1) end
As per FIRTR line tripped at 174418601 hrs due to DPR Z3 (5703 km) operation
As per DREL line tripped at 174418601 hrs due to Stub Protection operation Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 174306388 hrs due to operation of Igt4 (B-ph) protection
From EL Igt4 time delay was observed to be about 100 msec
Time sync of protection relays with GPS needed to be ensured C Tripping of 400 kV Narnoor ndash Jammalamadugu line-2 Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 174423979 hrs due to OVR-I operation (From EL OVR-I Time delay was observed as 5 sec which is in line with SRPC provided gradings)
Jammalamadugu (APTRANSCO) end
As per FIR line tripped at 1744 due to DT receipt from Narnoor end
As per DR line tripped at 174415040 hrs (Type of Protection operated was not recorded)
In EL events recording started from 174424037 hrs Line was observed to have got tripped around this time due to 862 operation (Type of Protection operated was not recorded)
Time sync of Protection relays with GPS needed to be ensured SRPC SRLDC
As informed by APTRANSCO it was noted that the triggering cause for operation of Stub protection Igt4 protection was a line fault on 400 kV Ghani ndash Narnoor line-1 Even though Ghani end had tripped on DPR Z1 protection and sent carrier to Narnoor due to unhealthiness of carrier communication (PLCC related issues) Narnoor end tripped on DPR Z2 protection
The above fault was seen by relays at both ends of 400 kV Narnoor ndash Kurnool-PG lines 1 amp 2 (the relays of P444 make are owned by PGCIL-SR1 and the relay settings were also provided by PGCIL-SR1)
As in formed by PGCIL (SR-I) it was noted that there was an instantaneous non-directional Igt4 protection setting in the specific relay style (defined by relay make model and version) which operates without checking for isolator status During the above instant the flow of heavy fault
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 532
current led to its operation both ends
To this PGCIL (SR-I) was informed that by default Igt4 or stub protection is configured for instantaneous operation with corresponding isolator open position interlock So further instantaneous high-set functionality that operates without checking isolator positional status is not desirable since it can lead to unwarranted trippings as in the present case Therefore the said setting shall be kept disabled If there is no provision to effect this (by means of changing relay settings) the issue may be referred to its OEM for obtaining modified firmware suitable solution PGCIL (SR-I) can also make use of other relays with different style in place of the existing relays
Recommendations
For 400 kV Ghani ndashNarnoor line the following shall be carried out by APTRANSCO End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced PGCIL (SR-II) to take appropriate action wrt disabling non-directional instantaneous Igt4 protection
that operates without checking existence of stub If required the issue may be referred to relays OEM for appropriate solution or the present relays may be replaced with other relays with different styles that donrsquot have the issue observed
II Details of Grid Incidents
Sl No Details of Event Date amp Time Reason Category
1 Tripping of 220 kV Idukki ndashUdumalpet line
05-05-2017 at 1702 hrs
Line tripped due to B-N and R-N fault in line
GI-1
Idukki (KSEB) end
As per FIRDREL line tripped (in 3-ph) at 170200500 hrs on B-E fault due to operation of DPR Z1 (3661 km) protection
Udumalpet (TANTRANSCO) end
As per FIRDRELTR line tripped (in B-ph) at 165741907 hrs on B-E fault due to DPR Z2 (CAT AR 1025 km) operation However during AR dead-time another R-E fault was detected at 165742252 hrs in Zone-2 due to which line tripped in 3-ph after Z2 time delay of 350 msec at 165742594 hrs [It may be noted that all this happened during the AR dead-time]
Time-sync of Protection Relays with GPS needed to be ensured at 220 kV Udumalpet SS KSEB
During the instant case line did not try for AR as the external VARM AR relay was faulty and kept out of service
Remedial action Problem with VARM relay had been rectified and put into service on 10052017
SRPC SRLDC
From the DR of Udumalpet it can be seen that the relay had tried for AR even after giving three phase trip during AR dead-time due to occurrence of two different faults which is not desirable
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 632
Recommendations TANTANSCO to correctly configure AR logic at Udumalpet so that in the event of 3-ph trip being
given during AR dead-time the relay will not try for auto-reclosure TANTRANSCO to keep AR dead-time as 1 sec for all 220 kV amp above transmission lines
2
Tripping of 400 kV Kudgi (PG) - Tumkur line-2 and Kudgi (PG) ndash Kudgi (NTPC) line-1
06-05-2017 at 1605 hrs
Kudgi (NTPC) feeder tripped at Kudgi (PG) end on operation of distance protection R-N Zone-1 Tumkur feeder tripped at Kudgi(PG) end on operation of NGR buchholtz relay
GI-2
SLD
The single line diagram of 765 400 kV Kudgi-PG SS as furnished by are attached at the end 400 kV Kudgi (PG) ndash Kudgi (NTPC) line-1 Kudgi (PGCIL-SR2) end
As per FIRDRELTR line tripped (in 3-ph) at 160547499 hrs on R-E fault due to DPR Z1 (M1 79 km 013 kA M2 88 km 318 kA) operation
Kudgi (NTPC) end
FIRDRELTR not furnished 400 kV Kudgi (PG) ndash Tumkur line-2 Kudgi (PGCIL-SR2) end
As per FIRDRELTR line tripped (in 3-ph) at 160547450 hrs due to operation of NGR Buccholtz trip protection
Tumkur (PGCIL-SR2) end
As per FIRELTR line tripped (in 3-ph) at 160547596 hrs due to DT receipt from Kudgi-PG end
In DR this time was mentioned as 160512593 hrs
Time-sync of protection relays with GPS needed to be ensured PGCIL (SR-II)
With regard to tripping of 400 kV Kudgi (PG) ndash Kudgi (NTPC) line ndash 1 and AR non-operation it was informed that prior to above fault there were multiple faults on all four lines between Kudgi (PG) and Kudgi (NTPC) due to prevailing stormy weather
Remedial action Actual reasons for AR failure in the instant case were being investigated The issue was also
referred to its OEM for suitable advice
With regard to tripping 400 kV Kudgi (PG) ndash Tumkur line ndash 2 it was suspected that NGR Buchholtz relay might have mal-functioned as there was no gas collected in the bucholtz relay of NGR It may be noted that NGR buchholtz trip is present in REF relay
Remedial action Oil sample of NGR taken and sent to RTDC
Recommendations PGCIL (SR-II) to sort out AR related issues at Kudgi (PG) end on 400 kV Kudgi (PG) ndash Kudgi (NTPC)
lines and put AR into service PGCIL (SR-II) investigate the reasons for NGR Buccholtz trip on 400 kV Kudgi (PG) ndash Tumkur line-2
and furnish an action taken report wrt rectifying the same
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 732
3 Tripping of 220 kV Edamon-Tirunelveli lines - 1amp2
06-05-2017 at 1809 hrs
220kV Edamon-Tirunelveli - 1amp2 tripped from Tirunelveli end only and was in service from Edamon end
GI-1
Edamon (KSEB) end
As per FIR line was kept holding from Edamon end Tirunelveli (PGCIL-SR2) end
As per FIRDRELTR lines tripped (in 3-ph) at 180921343 hrs on R-B fault due to DPR Z1 (532 km) operation
It was stated in TR that Edamon ndash Pothencode lines 1 amp 2 had tripped around the same time and it was suspected that DPRrsquos at Tirunelveli end on 220 kV Tirunelveli ndash Edamon lines 1 amp 2 might have over-reached for the fault in 220 kV Edamon - Pothencode lines
PGCIL (SR-II)
The instant case was a typical case of overreaching of distance relays at Tirunelveli being experienced for quite a while It may be probably due to bunching of the conductors involved
Remedial action It was proposed to modify Z1 setting as 50 of line impedance with POR and would be done
within one-week time They had also proposed to measure the actual line impedance of the line and adjust Z1 settings
accordingly
06-03-2017at 0607 hrs
4 Tripping of 400220 kV Ghani ICT-2amp3
07-05-2017 at 1405 hrs
ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
GI-2
FNN not followed by APTRANSCO FIRrsquos in prescribed format not furnished by APTRANSCO SLD
The single line diagrams of 400220 kV Ghani SS as furnished by APTRANSCO is attached at the end Tripping of 500 MVA 400 220 kV ICT-2
As per FIR ICT-2 tripped at 1405 hrs due to operation of Y-ph OC amp EF protections
DR amp EL not furnished Tripping of 500 mVA 400 220 kV ICT-3
As per FIR ICT-3 tripped at 1405 hrs due to operation of Y-ph OC amp EF protections
DR amp EL not furnished SRPC SRLDC
When enquired about the reasons for operation of back-up protections of ICTrsquos ndash 2 amp 3 APTRANSCO replied that there was actually a fault on the 220 kV feeders emanating from 400 220 kV Ghani PS However since the CT Neutral connection setting had been wrongly set as ldquoTowards Bus siderdquo instead of the correct ldquoTowards Transformer siderdquo the back-up protections on 220 kV side operated for the said 220 kV line fault
APTRANSCO also informed that first ICT-2 tripped followed by ICT-3
But since it was not clear from the above explanation whether line protection on 220 kV side had operated or not and the delayed clearance of the fault observed during the incident (about 400 msec) APTRANSCO was asked to investigate the reasons for the same
APTRANSCO was also asked to check whether carrier aided protection is healthy on 220 kV lines emanating from 400 220 kV Ghani PS
07-03-2017 at 1602 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 832
Recommendations APTRANSCO to check and correct all CT Neutral Connection settings in various protection relays at
their 400 220 kV Ghani PS APTRANSCO to ensure that PLCC carrier aided protection is maintained healthy on 220 kV lines
emanating from their 400 220 kV Ghani PS APTRANSCO to take steps to complete configuration works of DRrsquos amp ELrsquos of various protection
relays at their 400 220 kV Ghani SS and furnish the same as and when required in compliance of IEGC Regulation 52 (r)
5 Tripping of 400 kV Ghanapur-Mamidapalli line
08-05-2017 at 1915 hrs
Line tripped at Ghanapur end only and was holding from Mamidapalli Ghanapur end protection had sensed R-phase to earth fault
GI-2
Mamidipalli (TSTRANSCO) end
As per FIR line was kept holding from Mamidipalli end
In DR R-E fault current (2894 kA) along with dip in R-ph voltage could be seen but if any protection relay had picked could not be verified Also EL furnished did not contain events for this time (In fact no events were found recorded after 160610859 hrs)
Ghanapur (PGCIL-SR1) end
As per FIRTR line tripped (in 3-ph) at 1915 hrs on R-E fault due to DPR Z1 (49 km 2547 kA) operation
As per DR line tripped (in 3-ph) at 191330020 hrs on R-E fault due to 3-ph Group-B Trip relay operation (Zone-3 pick-up also could be observed)
As per EL line tripped (in 3-ph) at 191541722 hrs on R-E fault due to 3-ph Group-B Protection Trip relay operation
Time-sync of protection relays with GPS needed to be ensured
When enquired about the reasons for observed discrepancies PGCIL (SR-I) informed that line tripped on operation of distance protection Since last 2-3 trippings permissive carrier was not being received at Mamidipally end
Further since PLCC at both ends belong to TSTRANSCO thorough check-up of PLCC carrier communication and tuning of PLCC link needed to be undertaken
For above one-day shut-down of line was requested to which SRLDC agreed
Recommendations For the line under consideration the following shall be carried out by TSTRANSCO in coordination
with PGCIL (SR-I) End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
08-03-2017 at 1033 hrs
6 Tripping of 400220kV ICT-1 at Guttur
09-05-2017 at 2215 hrs
ICT-1 tripped on HV side only without any relay indications GI-2
As per FIRTR ICT-1 tripped at 2215 hrs only on HV side without any relay indications KPTCL
ABB make RXMS trip relays provided in various lineICT panels were found to be mal-operating and the phenomenon observed was suspected due to raise in earth potential during any fault in Guttur substation
10-03-2017 at 1801 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 932
Remedial action Action wass being taken to provide 10kΩ resistor in series with the RXMS relay coil for all trip
relays of this type at Guttur Total 170 nos of such resistors were required Now purchase formalities were finalised and work of supply and fixing of resistors would be taken up and completed within a monthrsquos time
7 Tripping of 400 kV Narsapur-Shankarapalli line
10-05-2017 at 0007 hrs
Line tripped at Narsapur end only on B-Phase to earth fault and line did not trip from Shankarapalli
GI-2
SLD
Shankarapally (TSTRANSCO) end
As per FIR line was kept holding from Shankarapally end Narsapur (TSTRANSCO) end
As per FIRDREL line tripped in 3-ph at 000720105 hrs on B-E fault due 86 Trip relay (130 km) operation
The type of protection operated was not recorded shown in either DR or EL
TR not furnished TSTRANSCO
For the fault on 400 kV Shankarapalli-Mamidapalli line Narsapur end picked up in Z3 However due to configuration issues relating to programmable Zone Zp (this was being used as Zone-3 and its time-setting was found to be kept as zero sec) it tripped instantaneously instead of tripping after Zone3 time delay
Remedial action PSL Configuration for Zp was set right on 01-06-2017
13-03-2017 at 2347 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1032
8
Tripping of 400220 kV Hyderabad ICT-4 and 220 kV lines at Hyderabad substation
10-05-2017 at 239 hrs
Operation of busbar protection due to fault in 220 kV Bus at 220kV Hyderabad Substation
GI-1
SLD
1 2 1 2
Bus-1
Bus-2
x
xx
x
BUS BAR ACTED AT 220KV GHANAPUR SS ON 10-05-2017
CHANDRAYANAGUTTA HAYATHNAGAR
132KV BUS
160MVA-3 100MVA-1
400kV PGCIL
x x
160MVA-2ICT-1 ICT-2 ICT-3
NAGOLE
x x
ICT-4
x
MOULALI
INFOSYS
x
x
1 2
Y-Ph disc
flash over at
LocNo95
Y amp B-Ph
disc flash
over at
LocNo95
RELAY INDICATIONS ON THE FEEDER
AT GHANAPUR END AT CHANDRAYANGUTTA END
Chandrayangutta-I feeder Ghanapur-I feeder
Main-1 relayYNZ1 071kM Main-1 relayYN254kM
Main-2 relayYNZ1 09kM Main-2 relayYN
Chandrayangutta-II feeder Ghanapur-II feeder
Main-1 relayYB Z1378kM Main-1 relayRYB
Main-2 relayYBZ111kM Main-2 relayRYB
BC
14-03-2017 at 1911 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1132
Tripping of ICT-4
As per FIR ICT-4 tripped at 0240 hrs on 220 kV side only due to BBP operation on 220 kV Bus
As per DR ICT-4 tripped at 220941165 hrs apparently due to LBB operation
EL not furnished
Date amp Time-sync of DR not in order (09052017 220940682 hrs)
TR furnished did not contain any analysis or remedial action taken
It was noted that BBP for 220 kV Bus-2 had operated for a close-in line fault on 220 kV Chandrayanagutta line-2 tripping ICT-4 and other connected 220 kV feeders (It was informed that ICT-2 was not in service at the time of instant tripping)
When enquired about the reasons TSTRANSCO informed that presence sudden appearance of current in the corresponding Peripheral Unit (PU-2) of the Chandrayanagutta line-2 had led to BBP operation And the reasons for the same were being investigated
To this it was suggested to check corresponding CT neutral connection integrity of cable wiring from CT to Busbar panel as also carry out stability-check of busbar protection
Recommendations TSTRANSCO to investigate the reasons for BBP operation for 220 kV Bus-2 and furnish a report on
the remedial measures taken
9 Tripping of 400220 kV ICT-1 at BTPS
13-05-2017 at 1941 hrs
ICT-1 got tripped on operation of LV side earth fault protection during R-phase to earth fault in 220 kV BTPS-Lingapur line
GI-1
SLD
The single line diagram of 400220 kV BTPS as furnished by KPCL is attached at the end
As per FIRTR ICT-1 tripped at 1942 hrs on LV side earth fault protection due to fault in 220 kV BTPS ndash Lingapur line It was stated that the line also tripped around the same time on R-E fault due to DPR Z1 (2438 km) operation
DR amp EL pertaining to ICT-1 tripping not furnished
As per furnished DREL 220 kV BTPS ndash Lingapur line tripped from BTPS end at 194124719 hrs due to DT receipt from the remote end
KPCL
ICT-1 tripped due to non-directional sensitive earth fault protection provided on LV (220 kV) side
Remedial action The time lever for above protection was increased from 0025 to 01 in the third week of May
2017 in consultation with KPTCL KPTCL
220kV BTPS- Lingapur line tripped at both the ends with following indications At BTPS Lingapur Line tripped on DPRZone-1RN24km78kA
At Lingapur BTPS line tripped on DPRZone-2RN66km29kA
It was reported that 315MVA ICT-1 tripped on LV side earth fault protection along with Lingapur line
Remedial action Existing settings of ICT back up protection is obtained from local RT wing of KPTCL for review
Revised settings communicated to KPCL for implementation
16- 03-2017 at 0118 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1232
SRPC SRLDC
Since the ICT has been provided with normal back-up directional OC amp EF protections a separate non-directional sensitive earth fault protection is not desirable hence the need for the same may be reviewed Otherwise its time lever shall be suitably increased to a higher value (say 035) so as not to cause unwarranted trippings
Further tripping of 220 kV BTPS ndash Lingapura line from BTPS end on DT receipt was not in order
When enquired about the reasons for AR non-operation in the instant case for the above line KPCL replied that there were issues with PLCC carrier communication hence it was kept out of service
Recommendations KPCL to review the need for providing separate non-directional sensitive earth fault protection for
ICTrsquos at their BTPS station and take steps to disable the same For 220 kV BTPS ndashLingapura line KPCL to resolve issues relating to PLCC carrier communication and
put AR into service
10 Tripping of 765 kV Kurnool-Tiruvalam line-2
19-05-2017 at 2003 hrs
Failure of R-phase LA at Tiruvalam end REF operation and DT send were observed from EL of Kurnool station
GI-2
Kurnool (PGCIL-SR1) end
As per FIRTR the line tripped in 3-ph at 200318272 on R-B-E fault due to DPR Z2 (CDistance = 912) operation
As per DR line tripped in 3-ph at 200318272 hrs on R-E fault (B-E fault did not appear to be strong) due to DPR Z2 (CAT) operation and 3-ph Group - A amp B Trip relay operation (In DR DT receipt event was observed around the same time)
In EL REF protection operation of PU-P141 operation and DT_SEND to the remote end was observed at 200318340 hrs
Tiruvalam (PGCIL-SR2) end
As per FIRDRELTR the line tripped in 3 ph at 200318269 on R-E fault due to DPR Z1 operation and DT receipt from the remote end
It was stated in TR that 707 RLA (Reactor LA) had fallen down due to heavy wind and caused R-E fault
When enquired about the reasons for REF protection operation and consequent sending of DT to the other end PGCIL (SR-I) informed that the fault was detected as R-B-E fault hence three-phase trip was given However even though Main-CB got opened with its three poles opening simultaneously Tie-CB got opened in R-ph immediately while the other two phase poles took a while to open This had caused Tie-CB LB operation Since this protection was implemented in REF relay trip was extended from the same along with sending of DT to the other end
To this it was pointed out that in the instant case only R-E fault was apparent and the current in B-ph was almost at the normal value hence the sensitivity of distance relay zone elements may be checked Further Tie-CB LBB operation points to sluggishness of the CB-poles hence the opening time of tie-CB may be checked and properly set
It was also noted that in the EL of Tiruvalam DT Send event was observed after tripping of the line on R-E fault PGCIL (SR-II) was asked to look into the reasons for the same and take suitable remedial action
16-03-2017 at 1023 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1332
11 Tripping of 400220 kV ICT-2 at Kalpaka SS
20-05-2017 at 1502 hrs
ICT-2 tripped due to operation of Transformer Buchholtz relay
GI-2
As per FIR ICT-2 tripped at 15053283 hrs due to its Buccholtz relay operation It was stated in FIR that heavy rain amp gale had been reported at the time of tripping
APTRANSCO
Just prior to above tripping event station transformer supply went off When the supply came back the two oil cooling pumps which were supposed to start one after another with a time gap of 15 sec had started simultaneously due to problem in the timer module Due to this there was a sudden flow of oil which shorted the contacts of the micro-switch that gives buchholtz trip
Remedial action The faulty timer module of oil cooling pump had been replaced
On this SRPC asked for the details of AC auxiliary supply about its redundancy details of DG-set and the mode of starting (manual or auto) To this APTRANSCO informed that redundancy for AC auxiliary supply is present and the lost supply during the instant case had been restored immediately
Recommendations
APTRANSCO to furnish AC auxiliary supply details including its redundancy DG set details and its mode of starting at their 400 220 kV Kalpaka SS Further corresponding AC auxiliary supply changeover scheme drawing shall also be furnished
16-03-2017 at 1132 hrs
12 Tripping of 400220 kV ICT-2 at KV Kota SS
23-05-2017 at 1021 hrs
ICT-2 got tripped due to mal-operation of transformer oil temperature indicator
GI-2
As per FIR ICT-2 tripped at 1021 hrs on both HV and LV sides due to transformer oil temperature indicator mal-operation
As per EL ICT-2 tripped at 1019XXXXX192 hrs on due to operation of OTI protection
It was stated that DR had not been triggered for the event
Time-sync of protection relays with GPS needed to be ensured
EL was not configured to show SECONDS in time-stamp of the events (This had been brought to APTRANSCOrsquos attention in previous PCSC meetings also)
APTRANSCO
At KV Kota SS OTI got stuck While checking the same its position indicator got changed and mal-operated resulting in 3-ph trip
Remedial action Ms CGL had visited the substation and declared the relay faulty It was proposed to replace the faulty OTI on 10072017
APTRANSCO was asked to configure Event Loggers at their KV Kota SS properly so that SECONDS are also displayed in the time stamp of the events recorded
16-03-2017 at 1245 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1432
13
Tripping of 220 kV Kaniampeta - Kadakola line (Load Loss at Kaniampeta = 36 MW)
23-05-2017 at 1350 hrs
EFR relay operated and B-ph pole discrepancy relay operated leading to tripping of Bus-Coupler CB
GI-1
Kaniampeta (KSEB) end
As per FIR in Kaniyampetta 220 kV substation all transformers tripped (Load loss 36 MW) at 1339 hrs due to the tripping of 220 kV Kaniyampetta-Kadakola feeder (B phase) at Kadakola end Later 220 kV Kaniyampetta-Kadakola feeder was hand tripped at 1426 hrs from Kaniyampetta end
Kadakola (KPTCL) end
As per FIR line tripped at 1350 hrs due to EFR operation of Bus-Coupler CB and PDR operation
It was also stated that at the time of tripping Kaniampeta panel had been taken up for RampU work hence distance relay was not in service Kaniampeta CB was bypassed by keeping protection through 220 kV Bus-Coupler CB
DR amp EL not furnished KPTCL
At Kadakola during the instance protection to Kaniambetta line was provided through 220kV bus coupler breaker bay as Kadakola relay panel was taken out for M-2 retrofitting work under RampU
Bus coupler breaker tripping was suspected due to problem in the pole discrepancy relay and there was no fault in the line
Remedial action Problem with the PD relay of Bus coupler breaker was rectified on 24052017
16-03-2017 at 2026 hrs
14 Tripping of 400 220 kV ICT-1 at Somanahalli substation
24-05-2017 at 1724 hrs
ICT-1 at Somanahalli substation got tripped due to DC Earth fault
GI-2
Somanahalli (PGCIL-SR2) end
As per FIRTR ICT-1 tripped (on HV side) at 172809 hrs on momentary DC Earth fault
As per DREL ICT-1 tripped (on HV side) at 172809812 hrs due to operation of Group AB trip relays In DR manual trigger signal becoming HIGH was observed at above instant
In EL time resolution for recording events was limited to seconds (events were not shown at msec level)
PGCIL (SR-II)
At Somanahally SS 3x167 MVA single phase units had been replaced by 1x500 MVA ICT Subsequently CSD works were taken up At the time of tripping event CSD wiring works were going on During the process positive DC supply got extended to 86A trip relay inadvertently
Remedial action DC earth fault had been removed
PGCIL (SR-II) was asked to configure Event Loggers at their Somanahalli SS properly so that time resolution for recording events was set u pto msec
16-03-2017 at 118 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1532
15 Tripping of HVDC Gazuwaka Pole-1amp2
25-05-2017 at 0945 hrs
HVDC pole-1 got tripped due to operation of South filter inter zone protection and HVDC pole-2 got tripped due to operation of differential protection
GI-2
SLD
Pole-1
27-03-2017 at 1016 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1632
Pole-2
Tripping of HVDC Pole-1 (PGCIL-SR1)
As per FIRELTR Pole-1 tripped at 094513960 hrs due to operation of South Filter inter-zone protection [
It was stated that DR was not available Tripping of HVDC Pole-2 (PGCIL-SR1)
As per FIRDRELTR Pole-2 tripped at 094512906 hrs due to operation of WIN Differential protection
It was noted that no representative from Gajuwaka (HVDC amp HVAC) SS had come to attend the meeting to explain as to what caused the pole trippings
PGCIL (SR-I) representative informed that at the time of tripping RTV Coating works for switchyard equipment were going on In the process when CWC35 filterrsquos bus-side isolator was opened it feel down unexpectedly and resulted in inter-zone filter protection operation
Wrt HVDC Pole-2 tripping PGCIL (SR-I) representative informed that oscillations in voltage and current were noticed prior to tripping of HVDC Pole-2 And differential current was also observed for the extended AC bus Due to this WIN differential protection had operated resulting in tripping of HVDC Pole-2 It was also informed that the issue was referred to its OEM ABB (Sweden) for suitable advice
However since no detailed tripping report explaining the causes that led to tripping of HVDC poles and the remedial action taken had been furnished PGCIL (SR-I) was asked to submit the same
Recommendations PGCIL (SR-I) to furnish detailed report on the events that led to tripping of HVDC Poles ndash 1 amp 2
including remedial measures taken to PCSC forum Further the OEM report wrt tripping of HVDC Pole-2 shall also be furnished
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1732
16 Tripping of 400 kV Kayathar-Karaikudi line
25-05-2017 at 1552 hrs
R-phase to earth fault had occurred in line There was Zone-2 3 phase trip operation at Kayathar end and Zone-1 3 phase trip at Karaikudi end
GI-2
Kayathar (TANTRANSCO) end
As per FIRDRELTR line tripped in 3-ph at 155236989 hrs on R-E fault due to DPR Z2 operation (Z2 time delay observed was about 390 msec)
It was stated in TR that carrier channel was not healthy at the time of tripping and carrier signal was not received at this end during the fault
Remedial action Protection Coupler and OLTE were reset at both Karaikudi amp Kayathar ends and carrier channel
was made available Karaikudi (PGCIL-SR2) end
As per FIRDRELTR line tripped in 3-ph at 155236592 hrs on R-E fault due to DPR Z1 (186 km) operation
It was stated in TR that DPC had failed at the other end and resulted in Carrier Fail alarm at Karaikudi end issuing 3-ph trip
Recommendations
For the line under consideration the following shall be carried out by TANTRANSCO in coordination with PGCIL (SR-II) End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
17
Tripping of 400220 kV ICT - 1 amp 3 at Hoody substation of KPTCL (Load Loss 750 MW)
26-05-2017 at 1230 hrs
R phase limb of ICT-1 bank pre-close supervision contact of trip coil -2 had arc over ICT-3 got tripped on over-loading
GI-2
Tripping of ICT-1
As per FIR ICT-1 tripped at 1230 hrs due to arcing over of R phase limb of ICT-1 bankrsquos pre-close supervision contact of trip coil -2
As per DR the tripping took place at 114128806 hrs (Type of protection operated not recorded)
EL not furnished
Time sync of PRrsquos with GPS needed to be ensured
Remedial action The same was rectified and the circuit was changed by utilizing the spare auxiliary contact of CB
for R-ph limb by availing LC on 29052017 and charged the ICT-1 bank at 0432 hrs by getting the SRLDC code 1360
Tripping of ICT-3
As per FIR ICT-3 tripped at 1230 hrs due to operation of INV OC FWD protection amp 86A master trip relay
From the DR furnished (with trigger time = 114254202 hrs) tripping of ICT-3 and the type of protection operated were not clear
EL not furnished
Time sync of protection relays with GPS needed to be ensured at Hoody
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1832
KPTCL
At Hoody 500 MVA ICT-1 tripped without any relay indication ICT-1 and 3 were in parallel each ICT carrying about 390MW of load Due to tripping of ICT-1 ICT-3 got over loaded and hence tripped on over current protection
Remedial action After detailed inspection it was observed that pre-close supervision contact of trip coil -2 arced
over in R phase limb of the 400kV side breaker Hence it was suspected that R-pole might have opened initially and remaining poles on PD operation
The problem was rectified and attended on 29052017 by availing shut down In order to avoid tripping of another ICT operating in parallel whenever one ICT trips on fault an
SPS is being finalized by KPTCL which is to be implemented at Hoody Any time each ICT at Hoody will be catering around 400MW of load Such huge load shedding by tripping 66kV loads of Hoody station is difficult to achieve Hence 220kV radial feeders may also have to be tripped to get desired load shedding
It was noted that frequent tripping of 400 2220 kV ICTrsquos at Hoody SS had been observed in the past few months And during their discussion in various PCSC meetings the following issues have come to the for urgent action by KPTCL Implementation of Special Protection Scheme (SPS) to take care of over-loading of the other ICT
when one out of two ICTrsquos operating in parallel trips Provision of Bus-bar protection to 220 kV buses Compliance of Third Party Protection Audit Recommendations Ensuring supply reliability to Metro-services Action plan on the proposed system strengthening measures in Bengaluru area in the context
of continued use of Split-Bus operation
Thus to ascertain the action taken by KPTCL wrt above issues a Protection System Analysis Group (PSAG-18) meeting was proposed to be conducted on 03082017
Recommendations KPTCL to furnish compliance report on the recommendations given in PSAG-18 meeting to PCSC
forum
18 Tripping of 400 kV Simhadri - Kalpaka line-2
28-05-2017 at 503 hrs
Line tripped on mal-operation of Tee Differential Protection at Simhadri end and Direct Trip was received at Kalpaka
GI-2
Kalpaka (APTRANSCO) end
As per FIR line tripped at 0503 hrs due to DT receipt from the remote end
DR amp RL amp TR not furnished Simhadri STPS (NTPC) end
As per FIRTR line tripped at 050350408 hrs due to operation T-differential protection which in turn was attributed to spurious pick-up during the fault at Vemagiri end
The following was stated in TR Kalpaka Line-1amp2 Tie bays were under PTW And R-Ph CT (16CTA R-Ph) was under erection Primary connection was over secondary
connection was pending The CT secondary wires used in T-Diff protection of Kalpaka Line-2 might be touching the earth and during fault at Vemagiri some stray voltage developed across CT secondary cores might have resulted into operation of T-Diff protection Trip values are 100mA in secondary
During the operation of T-diff protection there was no change in current magnitudes of Kalpaka Line-2 and hence the tripping could be considered as spurious one
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1932
As per DR line tripped at 050350442 hrs But the type protection operated was not recorded in it
EL not furnished (In place of EL DRrsquos eventsrsquo summary was furnished)
19 Tripping of 400 kV Ramagundam - Gajwel line
29-05-2017 at 0007 hrs
Over Voltage Stage-1 had operated at Gajwel end Ramagundam end did not trip as Direct Trip was not received from Gajwel end
GI-2
Ramagundam STPS (NTPC) end
As per FIR line was kept holding from Ramagundam end Gajwel (TSTRANSCO) end
As per FIR line tripped at 0007 hrs due to OVR-I operation
DR amp EL amp TR not furnished
The tripping was not in order as per the SRPC given OVR gradings as shown below
When enquired about the reasons for OVR-I operation TSTRANSCO informed that OVR functionality implemented in REL 521 had mal-operated
Remedial action The OVR functionality had been moved to an external Over Voltage relay
Recommendations
For the line under consideration the following shall be carried out by TSTRANSCO in coordination with NTPC-Ramagundam End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
20 Tripping of 400 kV Gajwel-Ghanapur line
29-05-2017 at 0007 hrs
Line tripped on operation of over voltage protection at Gajwel and direct trip was received at Ghanapur DR and EL of Gajwel end were not furnished
GI-2
Ghanapur (PGCIL-SR1) end
As per FIRELTR line tripped at 000731885 hrs due to DT receipt from the remote end
As per DR line tripped at 000257163 hrs due to DT receipt from the remote end
Time-sync of DR amp EL with GPS needed to be ensured Gajwel (TSTRANSCO) end
As per FIR line tripped at 0007 hrs due to OVR-I operation
DR amp EL amp TR not furnished
The tripping was not in order as per the SRPC given OVR gradings as shown below
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2032
When enquired about the reasons for OVR-I operation TSTRANSCO informed that there was a loose
wiring in Y-ph CVT wiring which resulted in mal-operation of OVR-I protection
Remedial action All CVT wirings had been tightened for fool-proof operation
III Details of Trippings due to Failure or Non-operation of Auto-Reclose
Sl No Element Date amp Time Reason
Category
1 Tripping of 400 kV Hiryur-
BTPS line-1 06-05-2017 at 1401 hrs
Y-phase to earth fault had occurred in line Direct trip was sent from BTPS to Hiryur end
GI-2
Hiryur (PGCIL-SR1) end
As per FIRDRELTR line tripped (in Y-ph) at 140009730 hrs on Y-E fault due to DPR Z1 (AR 82 km 1034 kA) operation Just prior to auto-reclosing DT was received at 140010730 hrs and line tripped in 3-ph
BTPS (KPCL) end
As per FIRTR line tripped (in Y-ph) at 1400 hrs on Y-E fault due to DPR Z1 (AR 1173 km) operation AR was stated to be attempted but unsuccessful due to persistent fault
As per DREL line tripped (in Y-ph) at 125520000 hrs on Y-E fault due to DPR Z2 (CAT AR) operation and tried to auto-reclose after about 1 sec but tripped in 3-ph due to persistent (Z1) fault
Time-sync of Protection Relayrsquos with GPS needed to be ensured at BTPS
When enquired about the reasons for sending of DT to Hiriyur end KPCL informed that when the line tripped on Y-E fault and the AR operation was in progress Under-Voltage relay at BTPS end had sensed under-voltage and sent DT to Hiriyur end
It was noted that instantaneous tripping of UV relay and consequent of sending of DT to the other end are undesirable It was therefore suggested to introduce suitable delay (say 3 sec) for UVR tripping and disable sending of DT to the other end
Recommendations
KPCL to introduce suitable delay (say 3 sec) for UVR tripping and disable sending of DT to the other end on UVR operation at their BTPS station
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2132
2 Tripping of 400 kV Munirabad-Guttur line
06-05-2017 at 1702 hrs
R-phase to earth fault Auto-reclose was successful at Guttur and Breakers at Munirabad end got tripped
GI-2
Munirabad (PGCIL-SR1) end
As per FIRDRELTR line tripped (in 3-ph) at 170231624 hrs on Y-E fault due to DPR Z2 (AR CAT 1145 km) operation
Guttur (KPTCL) end
As per FIR line tripped (in R-ph) at 1702 hrs on Y-E fault due to DPR Z1 (AR 4708 km Ir=6877 kA) operation and successfully auto-reclosed
As per DREL line tripped (in R-ph) at 165933499 hrs on Y-E fault due to DPR Z1 (AR) and successfully auto-reclosed after about 1 sec
Time-sync of Protection Relays with GPS needed to be ensured at Guttur SS
When enquired about the reasons for AR non-operation at Munirabad end PGCIL (SR-I) informed that the external VARM relay through which AR had been implemented had not operated Since the relay belonged to KPTCL suitable action needed to be taken by them
On this KPTCL was asked to look into the issue and replace the relay if required PGCIL (SR-I) was also requested to coordinate with KPTCL in attending to this matter
3
Tripping of 765kV Kurnool-NPS line -2
07-05-2017 at 1405 hrs
Y phase to earth fault had occurred in line Auto-reclose was successful at Kurnool end and AR was not attempted at NPS end
GI-2
Kurnool-PG (PGIL-SR1) end
As per FIRELTR line tripped (in Y-ph) at 140543316 hrs on Y-E fault due to DPR Z1 (AR 328 km 166 kA) operation and successfully auto-reclosed after about 11 sec After about further 6 sec (ie at 140550470) line tripped in 3-ph due to receipt of DT from the remote end
It was stated in FIR that 765 kV Kurnool ndash NPS line-1 was under LVRD
As per DR line tripped (in 3-ph) at 140550470 hrs due to DT receipt from remote end
DR corresponding to successful AR operation not furnished NPS (PGIL-SR1) end
FIR amp TR furnished were that of Kurnool station
As per DREL line tripped (in 3-ph) at 140543351 hrs on Y-E fault due to AR (Z2 CAT) operation It was noted from EL that AR LOCKOUT had operated around the same time due to which line had not tried for AR
From EL it was further observed that DT was sent to the remote end at 020550419 hrs However the cause of DT send was not recorded in EL
DR pertaining to DT send was not furnished
If DT send was because of OVR-I protection operation then also tripping was not in order as it does not match with the settings provided
PGCIL (SR-I)
Non-operation of AR from NPS was due to wiring mistake made during installation of Controlled Switching Devices (CSD) for the line reactor on this line
Remedial action The wiring issues in CSD installation were rectified on 18052017
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2232
4
Tripping of 400 kV Krishnapatnam-Chittoor line-1
07-05-2017 at 1441 hrs
R-phase to earth fault Main CB Auto-reclose was successful at Chittoor end and Tie CB got tripped Breakers tripped at Krishnapatnam end and did not attempt auto-reclose
GI-2
FNN not followed by APTRANSCO and APGENCO SDSTPS (APGENCO) end
As per FIRDREL line tripped (in 3-ph) at 144113756 hrs on R-E fault due to DPR Z1 (628 km) operation It was observed from EL that the line was given 3-ph trip straight way without initiating AR
Chittoor (APTRANSCO) end
As per FIRDRELTR line tripped (in R-ph) at 144113759 hrs on R-E fault due to DPR Z1 (1147 km) operation and successfully auto-reclosed after about 1sec However it was observed that only Main-CB got auto-reclosed successfully whereas Tie-CB got tripped in 3-ph while attempting AR
Remedial action When enquired about the reasons for AR failure at SDSTPS end APGENCO representative
informed that as informed in last PCSC meeting AR configuration logic is scheduled to be reviewed by ABB in July 2017 when all issues pertaining to AR operation would be sorted out
When asked about the reasons for AR failure for Tie-CB at Chittoor end APTRANSCO informed that Tie-CB AR dead-time and PDR operational time were inadvertently kept equal As remedial action PDR operational time was increased to 25 sec
5 Tripping of 765 kV Raichur-Solapur line-2
07-05-2017 at 1918 hrs
Y-phase to earth fault Auto-reclose was successful at Solapur and breakers at Raichur end got tripped
GI-2
Solapur (PGCIL-WR1) end
As per FIRTR line tripped (in Y-ph) at 1918 hrs on Y-E fault due to DPR Z1 (AR 66 km 572 kA) operation and successfully auto-reclosed
DR amp EL not furnished Raichur (PGCIL (SR-I) end
As per FIRDRELTR line tripped (in 3-ph) at 191836810 hrs on Y-E fault due to DPR Z1 (145 km) operation It was observed from DR that AR lock-out had operated that resulted in tripping of Main-CB and Tie-CB But while Main-CB got tripped immediately Tie-CB got tripped in Y-ph only And the other two phase poles got tripped due to PDR operation after about 21 sec at 191838910 hrs
EL time-stamp resolution was limited to SECONDS instead of millisec
Tie-CB OPEN digital signals were observed to have employed NEGATIVE LOGIC PGCIL (SR-I)
The observed discrepancies at Raichur end were due to the hardware error caused by hanging of Main-CBrsquos BCU
Remedial action The problem with Main-CBrsquos BCU had been resolved by restarting it
Recommendations
PGCIL (SR-I) to configure Event Loggerrsquos time-resolution up to millisec level in all protection relays at their 765 400 kV Raichur SS
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2332
6
Tripping of 400 kV Neyveli TS2-Pugalur line
07-05-2017 at 1955 hrs
Y-phase to earth fault Neyveli TS2 end relay issued a 3-phase trip 220ms after issue of Y phase trip Direct Trip was sent to Pugalur end preventing auto-reclose
GI-2
NLC TS2 (NLCIL) end
As per FIRDRELTR line tripped in 3-ph at 195526677 hrs due to DT receipt from the other end
It was stated in TR that even though respective zones had picked up on fault DT receipt at the same time resulted in tripping of the line in 3-ph
In DR 3-ph trip was found to be issued 220 msec after Y-ph trip was issued It was also noted that DT receipt signal remained high for a duration of about 220 msec
Time sync of Protection Relays with GPS needed to be ensured at NLC-TS2
Pugalur (PGCIL-SR2) end
As per FIRDRELTR line tripped (in Y-ph) at 195534241 hrs on Y-E fault due to DPR Z1 (AR) operation However line tripped in 3-ph during AR dead-time at 195534353 hrs due to DT receipt from Neyveli end
In view of DT receipt at both ends it was suggested to carry out PLCC end-to-end testing to ensure healthiness of carrier communication
Recommendations
For the line under consideration the following shall be carried out by NLCIL in coordination with PGCIL (SR-II) End-to-end communication for DT permissive amp other signals may be ensured by testing at both
the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
7 Tripping of 400 kV NCTPS -SVChatram line-2
09-05-2017 at 1843 hrs
R-phase to earth fault Auto-reclose is not in service since Fibre optic cable link is not healthy
GI-2
NCTPS (TANGEDCO) end
As per FIRDRELTR the line tripped in 3-ph at 184223424 hrs on R-E fault due to DPR Z1 (9159 km 29 kA) operation (Given the length of this line as 95 km it may be verified whether Z1 setting is correct)
It was stated in FIR that AR was kept out of service due to defective FO communication link
Remedial action Line patrol done by lines wing and declared No Visible fault FO link cut was rectified on 13052017 and AR scheme restored
S V Chatram (TANTRANSCO) end
As per FIRDRELTR the line tripped in 3-ph at 184357616 hrs on R-E fault due to operation of DPR Z1 (32 km) operation
Time sync of protection relays with GPS needed to be ensured at both NCTPS and SV Chatram stations
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2432
8 Tripping of 400 kV Madurai-Kudankulam line
10-05-2017 at 1940hrs
B-E Fault Auto-reclose successful at Madurai and breakers tripped at Kudankulam
GI-2
Madurai (PGCIL-SR2) end
As per FIRDRELTR line tripped (in B-ph) at 194040402 hrs on B-E fault due to DPR Z1 (AR 137 km 114 kA) operation and successfully auto-reclosed after about 11 sec
Kudankulam NPP (NPCIL) end
As per FIRTR line tripped (in 3-ph) at 192936910 hrs on B-E fault due to DPR Z2 (CAT 2071 km) operation
It was informed that AR had not been kept in service as per SRPC decision Hence the tripping was in order
9 Tripping of 220 kV Idukki-Udumalpet line
14-05-2017 at 1345 hrs
Y-phase to earth fault had occurred in line Auto-reclose was successful at Idukki and breakers at Udumalpet end tripped on pole discrepancy
GI-2
Idukki (KSEB) end
As per DRTR line tripped (in Y-ph) at 134620509 hrs on Y-E fault due to DPR Z2 (CAT 83125 km) and successfully auto-reclosed after about 08 sec
EL not submitted (In its place DRrsquos events summary was furnished)
Udumalpet (TANTRANSCO) end
As per FIRTR line tripped in Y-ph at 1345 hrs on Y-N fault on DPR Z1 (2834 km) operation Subsequently tripped in 3-ph on PDR operation
As per DR line tripped in Y-ph at 134151100 hrs on Y-E fault due to DPR (AR) operation But as DRrsquos time scale was limited to 1 sec post triggering AR complete operation could not be verified
From EL line all poles dead was observed at 134152102 hrs Cause of line tripping as stated in FIRTR was not observed in EL
The following was stated in TR The fault resistance measured in the M1 relay (MicomP442) was high resulting in Z3 pickup It was
evident from the fault record that M2 relay (7SA522) had cleared the fault in Z1 by opening Y-ph pole However since AR was implemented in only M1 relay and M2 (Z1) operation had not initiated AR in M1 it resulted in opening of the other two phase poles on PDR operation
The cause of non-initiation of AR of M1 relay on external initiation was found to be logic configuration mistake in the Main 1 relay
Remedial action The AR logic configuration in the PSL of Main 1 relay had been corrected However a special relay
test would be conducted to verify AR operation during the next opportunity shutdown
Time sync of protection relays with GPS needed to be ensured at Idukki and Udumalpet
10 Tripping of 400 kV Vemagiri - Gazuwaka line
14-05-2017 at 1654 hrs
Y-phase to earth fault Auto-reclose was not successful due to persistent fault Vemagiri end had sent a Direct Trip after un-successful Auto-reclose AR attempt was observed in Gazuwaka end DR after 3 phase trip
GI-2
Vemagiri (PGCIL-SR1) end
As per FIRDRELTR line tripped in (Y-ph) at 165411968 hrs on Y-E fault due to operation of DPR Z1 (AR 1512 km) operation It tried to auto-reclose after about 11 sec but tripped in 3-ph due to persistent fault
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2532
It was noted that AR was attempted by Tie-CB only the Main-CB tripped in 3-ph at the beginning of AR initiation
Also Tie-CB AR dead-time was observed to be one second
Reasons 3-ph trip of Main-CB needed to be furnished Gazuwaka (PGCIL-SR1) end
As per FIRDRTR line tripped in Y-ph at 165330242 hrs on Y-E fault due to operation of DPR Z1 (AR 1677 km) operation But during AR dead-time it tripped in 3-ph after about 115 sec due to DT receipt from the remote end This resulted in 3-ph opening of both Main-CB and Tie-CB However after 125 sec Main-CB Y-ph limb tried for auto-reclosure and tripped due to persistent fault
As per EL line tripped in (Y-ph) at 165351597 hrs on Y-E fault due to operation of DPR Z1 (AR) operation But during AR dead-time it tripped in 3-ph at 165352620 hrs due to DT receipt from the remote end This resulted in 3-ph opening of both Main-CB and Tie-CB However at 165352687 hrs Main-CB Y-ph limb tried for auto-reclosure and tripped due to persistent fault
Reasons for AR attempt by Main-CB event after opening in 3-ph due to DT receipt needed to be explained
Time sync of DRrsquos amp ELrsquos with GPS needed to be ensured at Gajuwaka SS Recommendations
PGCIL (SR-I) to sort out issues relating to AR functionality operation for both Main-CB and Tie-CB at both Vemagiri and Gajuwaka substations
For the line under consideration the following shall be carried out by PGCIL (SR-I) End-to-end communication for DT permissive amp other signals may be ensured by testing at both
the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
11 Tripping of 400 kV VTPS-Sattenapalli line-2
21-05-2017 at 1706 hrs
B-phase to earth fault Auto-reclose successful at Sattenapalli and breakers got tripped at VTPS end
GI-2
Sattenapalli (APTRANSCO) end
As per FIRDRELTR line tripped (in Y-ph) at 170653038 hrs on B-E fault due to DPR Z1 operation and successfully auto-reclosed after about 1 sec
VTPS (APGENCO) end
As per FIRDRELTR line tripped in 3-ph at 170653133 hrs on B-E fault due to DEFR (33 kA) operation (DPR Z2 had picked up and Carrier was also received from the other end)
APGENCO
Before the LILOing of 400 kV VTPS-Srisailam DC line at Sattenapalli DEF protection had been provided from a separate REX521 relay Subsequently even though all protections at VTPS had been revised the above DEF protection implemented from the REX521 relay had been somehow left out and it only had extended 3-ph trip during the current instant
Remedial action The DEF functionality from the said REX521 had been disabled
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2632
12 Tripping of 400 kV Srisailam-Dindi line-2
24-05-2017 at 1502 hrs
R-phase to earth fault Auto-reclose was successful at Dindi and Zone - 1 3-phase trip at Srisailam
GI-2
Srisailam (TSGENCO) end
As per FIRDREL line tripped in 3-ph at 150253522 hrs on R-E fault due to DPR Z1 operation
TR contained no information Dindi (TSTRANSCO) end
As per FIRDRELTR line tripped (in R-ph) at 150253487 hrs on R-E fault due to DPR Z1 operation and successfully auto-reclosed after about 1 sec
Recommendations Since all 400 kV lines emanating from Srisailam LB are composite feeders APTRANSCO TSTRANSCO
can keep AR functionality disabled at respective remote end stations under their control
IV Details of Trippings due to PLCC mal-operation
Sl No Element Date amp Time Reason
Category
1 Tripping of 400 kV Kalpakka-Gazuwaka line-1amp2
18-05-2017 at 1108 hrs
Line tripped at Kalpakka end only on Direct Trip receive and was holding from Gazuwaka
GI-2
Tripping of 400 kV Kalpaka ndash Gajuwaka line-1
Gazuwaka (PGCIL-SR-2) end
As per FIR line was kept holding from Gazuwaka end Kalpakka (APTRANSCO) end
As per FIREL line tripped at 110625955 hrs to DT receipt from Gazuwaka end
Tripping of 400 kV Kalpaka ndash Gajuwaka line-2
Gazuwaka (PGCIL-SR2) end
As per FIR line was kept holding from Gazuwaka end Kalpakka (APTRANSCO) end
As per FIREL line tripped at 110625955 hrs to DT receipt from Gazuwaka end
Remedial action taken by APTRANSCO subsequent PCSC-65 meeting as informed vide their internal communication dated 20072017
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2732
2 Tripping of 400 kV Tumkur-Bidadi line-1 amp 2
30-05-2017 at 1139 hrs
Line tripped due to suspected PLCC mal-operation at Tumkur end and direct trip was received at Bidadi
GI-2
Tripping of 400 kV Tumkur ndash Bidadi line-1 Tumkur (PGCIL-SR2)) end
As per FIRDRELTR line tripped in 3-ph at 113515534 along with DT SEND to the remote end
PLCC mal-operation was suspected to have caused above tripping Bidadi(PGCIL-SR2) end
As per FIRTR line tripped in 3-ph at 113515 hrs due to DT receipt from Tumkur end Tripping of 400 kV Tumkur ndash Bidadi line-2 Tumkur (PGCIL-SR2)) end
As per FIRDRELTR line tripped in 3-ph at 113515534 along with DT SEND to the remote end
PLCC mal-operation was suspected to have caused above tripping Bidadi(PGCIL-SR2) end
As per FIRTR line tripped in 3-ph at 113515 hrs due to DT receipt from Tumkur end PGCIL (SR-II)
Remedial action The above trippings were due to PLCC mal-operation which in turn was due to shifting of its
coaxial cable The related circuitry was subsequently rectified
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2832
Single Line Diagram of 230 kV Villianur SS of PED [Ref I1]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2932
Single Line Diagram of 400 kV Jammalamadugu SS of APTRANSCO [Ref I2]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3032
Single Line Diagram of 400 kV Judgi-PG GIS SS of PGCIL (SR-II) [Ref II4]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3132
Single Line Diagram of 400 kV Ghani SS of APTRANSCO [Ref II4]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3232
Single Line Diagram of 400 kV BTPS of KPCL [Ref II9]
Annexure-II
Meeting No
Index
Details of Event Date amp Time Reason PCSC Recommendations Utility responsible for
Implementation
Status of Recommendations
as on 25072017
Remarks
Pending Implementation of PCSC Recommendations (up to 65th Meeting)
Complete outage of 220kV Yerraguntla
substation and tripping of running Units
at Rayalaseema TPS
52I2 (GD) PendingMail received on 27-07-2016
1The drop out relays of reducer oil pumps time setting was increased for
all millsSo there will not be any trip under transient low voltage condition--
--Complied
2The recommendation regarding 2 sec time delay will be implemented
during unit shut down and will be intimated immediately after
implementation------Pending
APGENCO 1 APGENCO to check associated logic for lube oil pump for correct
operation under transient low voltage conditions at Rayalaseema TPS
Unit-1
2 APGENCO to keep appropriate time delay fault ride through
delay (typically 2 sec) in VFD speed sensor relay at all its generating
Units including Rayalaseema TPS Units
HV B-Ph Current transformer of 100MVA Power
Transformer -1 failed resulting into a bus fault on
220KV Bus-1 Unit-1 and Unit-5 at RYTPS tripped
during the fault at Yerraguntla substation
21-02-2016 at
1039 hrs
Andhra Pradesh
APGENCO to furnish a report on the remedial action implemented
wrt overreaching of Krishnapatnam end distance relays during the
tripping of 400 kV Nellore (PG) - NPS line-1
APGENCO Yet to be informed Pending57II9 Tripping of 400 kV Nellore (PG) - NPS
line-1 400 kV Krishnapatnam-Nellore
(AP) lines -1amp2 and 400kV NPS -
MEPL line
18-07-2016 at
1905 hrs
Triggering incident was snapping of Y phase
conductor in 400kV Nellore (PG) - NPS line-1
Distance relay at Krishnapatnam end over-reached in
Zone-1 and resulted in tripping of 400kV
Krishnapatnam ndash Nellore (AP) lines - 1amp2 from
Krishnapatnam end Distance relay at MEPL over-
reached and resulted in tripping of MEPL-NPS line
from MEPL end
Yet to be informed Pending
APTRANSCO mail dated on 31-08-2016
To avoid the unwanted malopeartions due to the external LBB trip
initiation from PGCIL Vide letter Dt 04-08-2016 APTRANSCO has
requsted the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1 amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 15-11-2016
To avoid the unwanted maloperations due to the external LBB trip
initiation from PGCIL vide letter Dt 04-08-2016 ARTRANSCO has
requested the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 20-12-2016
Waiting for the PGCIL response
APTRANSCO mail dated 04032017 amp 24052017
SRPC is requested to coordinate with PGCIL in takind necessary action
Pending
Tripping of 400kV Krishnapatnam-
Nellore line-1
Line tripped on B-phase to earth fault and auto-
reclose was successful at Nellore(AP) end and un-
successful at Krishnapatnam end
APGENCO
56II13 Tripping at 220kV Gooty Substation of
APTRANSCO
24-06-2016 at
1604 hrs
LBB protection got operated for 400220kV ICT-2
breaker which had resulted in tripping of 220kV Bus-
2 at 220kV Gooty Substation
1 APGENCO SDSTPS to correct logic and ensure healthiness of ARscheme employed for transmission lines emanating from SDSTPSand furnish an action taken report to PCSC forum
2 APGENCO SDSTPS to configure DRrsquos of line protection relaysfor a post triggering period of 2 sec to capture complete ARoperation at their SDSTPS
Yet to be informed Pending63III1 28-02-2017 at
0516 hrs
1 APGENCO SDSTPS to correct logic and ensure healthiness of AR
scheme employed for transmission lines emanating from SDSTPS
and furnish an action taken report to PCSC forum
2 APGENCO SDSTPS to configure DRrsquos of line protection relays
for a post triggering period of 2 sec to capture complete AR
operation at their SDSTPS
Tripping of 400kV Krishnapatnam-Nellore line-2
R-phase to earth fault had occurred in line Auto reclose was successful at Nellore however protection at Krishnapatnam end issued a 3 phase
trip
APGENCO63III3 02-03-2017 at 455 hrs
1APTRANSCO to check the healthiness of the connecting cable
between Gooty (PGCIL) and Gooty (APTRANSCO) and replace it
if required
2APTRANSCO to ensure that the distributed architecture employed
in implementing busbar protection at their Gooty 220 kV SS does not
introduce any unwarranted delays in transmitting the triggering signals
to the Central Unit
APTRANSCO
Annexure-III
Page 1 of 31
63II2 Tripping of 400 kV KV Kota-Suryapet
line
01-03-2017 at
2005 hrs
Line tripped on operation of over-voltage protection
at KV Kota and Direct Trip was received at Suryapet
1 APTRANSCO to furnish (i) FIR amp TR for tripping events as
per SRLDC provided formats and (ii) DR amp EL within 24-hrs of
occurrence of tripping event in line with IEGC Regulation 52
(r)
2 APTRANSCO to adopt new OVR gradings for KV Kota
feeders and confirm the same
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
1 FIR furnished amp DR configured
Pending
63II16 Multiple Trippings at 220kV Vizag
Switching Station (VSS) of APTRANSCO
27-03-2017 at
1016 hrs
Bus-2 bus bar protection operated at 220kV VSS
end resulting in the tripping of all the elements
connected to bus-2
1 APTRANSCO to furnish a detailed report on the reasons for LBB
BBP operation at 220 kV VSS for a fault on 220 kV Gangavaram
feeder and remedial action taken to prevent recurrence of such
events
APTRANSCO Yet to be informed Pending
64II1 Tripping of 400220KV 315MVA ICT-
1and 230kV elements at 400kV Vemagiri
substation of APTRANSCO
09-04-2017
at 1231 hrs
Suspected mal-operation of Busbar protection had
caused tripping of 220kV Bus-1 at Vemagiri
APTRANSCO to furnish a report on the remedial action taken along
with single line diagram of 400220 kV Vemagiri SS indicating fault
location and CBs involved and protections operated
APTRANSCO Yet to be informed Pending
64II2 Tripping of 400220 kV ICTrsquos ndash 2 amp 3 at
400 kV Ghani substation of APTRANSCO
10-04-2017
at 1729 hrs
ICTrsquos ndash 2 amp 3 got tripped due to operation of 220 kV
Bus-2 busbar protection at 400220KV Ghani
substation
APTRANSCO to furnish single line diagram of 400 220 kV Ghani SS
clearly indicating (i) bus-configuration (ii) location of fault (iii)
breakers involved and type of protections operated
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
Single line diagram sent vide mail dated 27062017
Pending
64III1 Tripping of 400 kV Uravakonda-
Jammalamadugu line-1
02-04-2017 at
1758 hrs
R-phase to earth fault and line did not auto-reclose
Fault clearing time - 500ms
For the line under consideration APTRANSCO to check amp ensure
healthiness of carrier protection and make Auto-Reclosure
functional
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
Carrier aided protection scheme has been tested end to end and rectified
the problem
Pending
64III5 Tripping of 400kV Krishnapatnam-
Nellore line-2
11-04-2017 at
241 hrs
Line tripped on Y-phase earth fault Line auto-
reclosed at Krishnapatnam and did not auto-reclose
at Nellore-AP (Manubolu)
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a report
on the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64III6 Tripping of 400kV Krishnapatnam-
Nellore line-1
12-04-2017 at
251 hrs
Line tripped on Y-phase earth fault Line auto-
reclosed at Krishnapatnam and did not auto-reclose
at Nellore-AP (Manubolu)
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a report
on the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64III10 Tripping of 400kV Krishnapatnam ndash
Nellore_AP line-1
13-04-2017 at
438hrs
Y-phase to earth fault Line auto-reclosed from
Krishnapatnam end and did not auto-reclose fromNellore-AP end
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a reporton the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64IV4 Tripping of 400 kV VTPS-Malkaram line 20-04-2017 at
1624 hrs
Line tripped on Direct Trip Receive at Malkaram and
was in service from VTPS
For the line under consideration APTRANSCO to check the
healthiness of protection couplers and take suitable remedial action including replacement of the same
APTRANSCO Yet to be informed Pending
65II10 Tripping of 400220 kV ICT-2 at Kalpaka
SS
20-05-2017 at
1502 hrs
ICT-2 tripped due to operation of Transformer
Buchholtz relay
APTRANSCO to furnish details of AC auxiliary supply details
including its redundancy DG set details and its mode of
starting AC auxiliary supply changeover scheme drawing shall
also be furnished
APTRANSCO Yet to be informed Pending
1 APTRANSCO to check and correct all CT Neutral
Connection settings in various protection relays at their 400
220 kV Ghani PS
2 APTRANSCO to ensure that PLCC carrier aided protection
is maintained healthy on 220 kV lines emanating from their
400 220 kV Ghani PS
3 APTRANSCO to take steps to complete configuration works
of DR‟s amp EL‟s of various protection relays at their 400 220
kV Ghani SS and furnish the same as and when required in
compliance of IEGC Regulation 52 (r)
ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
07-05-2017Tripping of 400220 kV Ghani ICT-2amp3 65II4 APTRANSCO Yet to be informed Pending
APTRANSCO mail dated on 31-08-2016
To avoid the unwanted malopeartions due to the external LBB trip
initiation from PGCIL Vide letter Dt 04-08-2016 APTRANSCO has
requsted the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1 amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 15-11-2016
To avoid the unwanted maloperations due to the external LBB trip
initiation from PGCIL vide letter Dt 04-08-2016 ARTRANSCO has
requested the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 20-12-2016
Waiting for the PGCIL response
APTRANSCO mail dated 04032017 amp 24052017
SRPC is requested to coordinate with PGCIL in takind necessary action
Pending56II13 Tripping at 220kV Gooty Substation of
APTRANSCO
24-06-2016 at
1604 hrs
LBB protection got operated for 400220kV ICT-2
breaker which had resulted in tripping of 220kV Bus-
2 at 220kV Gooty Substation
63III2 02-03-2017 at
157 hrs
1 APTRANSCO to check and ensure correctness of AR operation
for the lines emanating from their Nellore-AP (Manubolu) SS
2 APTRANSCO to configure DR‟s of line protection relays for a
post triggering period of 2 sec to capture complete AR operation at
their Nellore-AP (Manubolu) SS
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
1The ABB make REL 670 type main-2 distance relay seen the fault as Y-
B phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
1APTRANSCO to check the healthiness of the connecting cable
between Gooty (PGCIL) and Gooty (APTRANSCO) and replace it
if required
2APTRANSCO to ensure that the distributed architecture employed
in implementing busbar protection at their Gooty 220 kV SS does not
introduce any unwarranted delays in transmitting the triggering signals
to the Central Unit
APTRANSCO
Tripping of 400kV Krishnapatnam-
Nellore line-1
Line tripped on B-phase to earth fault and line auto-
reclosed from Krishnapatnam end but did not auto-
reclose from Nellore-AP end
Annexure-III
Page 2 of 31
64II16 Tripping of 400 kV VTPS-Satenapalli line-
2
30-Apr-17 at
428 hrs
Line tripped on B-phase to earth fault FIR DR and
EL of both ends were not furnished to validate the
tripping
APGENCO and APTRANSCO to furnish a detailed report on the
events leading to tripping of the line along with remedial measures
taken to PCSC forum
APGENCO
APTRANSCO
Yet to be informed Pending
65II8 Tripping of 400220 kV Hyderabad ICT-
4 and 220 kV lines at Hyderabad
substation
10-05-2017 at
239 hrs
Operation of busbar protection due to fault in 220 kV
Bus at 220kV Hyderabad Substation
TSTRANSCO to investigate the reasons for BBP operation for 220
kV Bus-2 and furnish a report on the remedial measures taken
TSTRANSCO Yet to be informed Pending
24-12-2016 at
1052 hrs
Line tripped on B-phase to earth fault First fault was
persistent for 380 ms Auto-reclose was successful at
Khammam end during 1st fault 2nd fault occurred
during re-claim time of breaker hence Khammam end
breakers also got tripped
1 TSGENCO to implement the SRPC agreed philosophy for Power
Swing Blocking in all distance relays on the feeders emanating from
KTPS
2 For the line under consideration TSGENCO to consult relays
OEM to migrate to new versions of Firmware (from to 47201) and
Pset (to 47002)
61III5 Tripping of 400 kV Khammam - KTPS
line-2
The issue was discussed in PCSC-58 meeting held on 18102016 when
PCSC forum agreed to de-link the implementation of the Item from the
scope of Protection Audit Recommendations (PAR) and pursue it as part
of PCSC Recommendations
TSGENCO mail dated 30-05-2017
Procurement of Differential Protection relays is under process and the
work will be completed by the end of November 2017
TSGENCOProvision of line differential protection for Jurala line 1 amp 2 (line length-145 KM) feeders at 220 kV Jurala HPS [Carry-Over from Protection Audit Recommendations]58 Pending
Pendingline tripped on direct trip receive at Gajwel and was
holding from Hyderabad
Pending
06-10-2016 at
1216 hrs
For the line under consideration TSTRANSCO to carry out the
following in coordination with TSGENCO
(i) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
(ii) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(iii) Frequency bandwidth tuning of PLCC link for faithful
transmission of signals shall be carried out
62IV5 Tripping of 400 kV Gajwel-
Bhoopalapalli line-1
Telangana
TSGENCO TSGENCO mail dated 30032017
1 According to SRPC phylosphy power swing block settings are changed
to ALL ZONES BLOCK EXCEPT ZONE1
---------- Completed
2 Ms Siemens is requested to depute the service Engineer to update the
firm ware of existing SIPROTEC relays in 400KV switch yard This work
will be completed on or before 15042017 -------------- Pending
Pending
TSGENCO
TSTRANSCO
TSTRANSCO mail dated on 31-05-2017
1 Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Bhoopalpalli-1 line
59IV3
Line tripped at Bhoopalapally on DT receive and was
holding from Gajwel
TSTRANSCO mail dated on 21-12-2016
(i) Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Ghanapur line
(ii) Healthiness of PLCC system components will be checked while
conducting end to end testing
TSTRANSCO mail dated on 31-05-2017
1 Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Ghanapur line
TSTRANSCO
16-02-2017
at 1500 hrs
For the line under consideration the following shall be carried out by
TSTRANSCO in coordination with PGCIL (SR-I)
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
Tripping of 400 kV Gaiwel-Hyderabad
line
Annexure-III
Page 3 of 31
Karnataka
Annexure-III
Page 4 of 31
KPCL
38GD35 Pending13-11-2014 at
1931hrs
1 KPCL to make functional the Main2 (EPAC) relay with the
help of KPTCL at the earliest
2 KPCL to investigate the reason for DC fuse fail during
transient fault in 220kV Kadra-Kodasalli line including the testing
checking of DC supply cables breaker control cables and trip coils
3 KPCL to ensure supply for Main-1amp Main-2 protections Trip
Coils (TC1 TC2) from separate battery banks
Triggering incident was B-phase to earth fault had
occurred in 220kV Kadra-Kodasalli line Line tripped
from Kodasalli end only 220kV Kaiga-Kadra tripped
in Zone-3 from Kaiga end Tripping of evacuating
lines caused bus shut down at Kadra hydro station
16-02-2015 at
1256 hrs
GD-1 at Kadra and Kodasalli hydro
power station
GD-1 at 220kV Kadra power Station of
KPCL
41I1 Mail received on 28-05-2015
1 Main-2 relays already installed and commissioned
2 DC fuses are intact Till date no such incidence occurred
3 Possibility of DC-1 amp DC-2 arrangement and splitting of DC will be
reviewed
Mail received on 07-07-2015 21-10-2015 and 23-11-2015
1 Completed
2 Completed
3 Possibility of DC-1 amp DC-2 arrangement and splitting of DC will be
reviewed
Status received vide KPCL mail dated 14062017
1 Completed
2 Completed
3 Providing 2 separate DC sources is under process
Pending
Mail recieved on 28-05-2015
1) e-NIT floated on 28072014 for procurement of Numerical distance
relays amp GPS As there is change in scope of work and quantity of relays
by more than 25 which is not permitted as per KTPP act Hence tender
cancelled and refloated on 05052015 with revised scope of work and
revised PQR
2 However as per the recommendations of PSAG Relays were
temporarily rearranged replaced and wired up testing amp commissioning
shall be completed with the assistance of KPTCL
Mail recieved on 07-07-2015
1 Cover -1 of the bid is scheduled for open eing on 25062015
2 As per the recommendations of PSAG Relays were temporarily
rearranged testing amp commissioning completed with the assistance of
KPTCL
Mail recieved on 07-09-2015
NIT floated on 5515 through e-portal Bid evaluation completed
Obtaining of Administration approval to place PO is in progress
However as per therecommendationsof PSAG-10 Relays
weretemporarilyrearrangedTesting amp commissioning completed with the
assistanceofKPTCL
Mail recieved on 21-10-2015
NIT floated on 5515 through e-portal Bid evaluation completed LOAs
issued to Ms Schneider Electric Infrastructure Ltd on 08102015
Mail recieved on 23-11-2015
LOAs issued to Ms Schneider Electric Infrastructure Ltd on 08102015
Engineering work is in progress
Status informed during Special Meeting held on 03062016
LOA‟s issued to Ms Schneider on 08102015 Inspection of relays
completed and received at site DI issued for all balance materials except
furnitures
Status received vide KPCL mail dated 14062017
Numerical Distance Protection relays commissioned on 12042017
for all 4 lines at Kadra PH
Installation Testing and commissioning of Numerical Distance Protection
Relays for all the 4 outgoing lines is completed in all respect at Kodasalli
power house
KPCL1 The PCSC forum requested KPCL to speed up the installation of
Numerical Distance Protection relay in Kadra ndashKaiga and
Kodasalli ndashKaiga
2 The PCSC forum requested KPCL to submit the implementation
status of PSAG-10 recommendations within a week‟s time
A fault had occurred in 220 kV Kadra and Kodasalli
As A result de-energization of 220kV bus occurred at
Kadra and Kodasalli
Annexure-III
Page 5 of 31
49II15
54II4 Tripping of 400 kV Raichur TPS-
Mahboobnagar line
05-04-2016 at
1023 hrs
Line tripped on operation of Backup impedance
protection of line reactor Direct trip was received at
Mahboobnagar end
KPCL to keep the functioning of the concerned electro-mechanical
back-up impedance protection relay under observation and replace it
with a spare at the earliest
KPCL Status received vide KPCL mail dated 10072017
The electro-mechanical back-up impedance protection relay is in service
However Budgetary offer obtained for the retrofitting of Line reactor
protection with Numerical relay and is under process
Pending
54II9
Pending
PendingStatus informed during Special Meeting held on 03062016
1 Hot line washing was done previouslytender process is on for silicon
coating of insulators
Status received vide mail dated 10-07-2017
1 Off line water washing is being carried out whenever the Unit or Line is
under shutdown Silicon coating for Unit8 main amp tie breakers carried
out in Sep16 and same is under observation Till today in order and good
condition For remaining breakers since it is big order approval for the
same is under process
2 Static Electromechanical relays are existing in all 1 to 7 units Breaker
flash over protection feature will be enabled (if available) in the numerical
relays which will be retrofitted in phased manner during RampM works
KPCL1 KPCL to carry out hot-line washing of RTPS-connected lines
regularly to avoid trippings due to fog and dust
2 KPCL may see the feasibility of providing breaker flashover
protection at RTPS and implement the same if possible
Running Unit-4 5 and Unit-8 and 400kV RTPS-
Yeramaras TPS feeder got tripped due to de-
energization of both 400kV Bus-1amp2 at Raichur TPS
12-11-2015 at
0030 hrs
54I4 220 kV Nagjheri - Bidnal line tripped on B-E fault at
1228 Hrs At the same time five running generating
units (1 2 3 4 amp 6) at Nagjheri tripped on operation
of Generator Transformer‟s back-up Over Current amp
Earth Fault protection
PendingKPCL
1 KPCL to revise the settings of GT‟s back-up OC and EF
protections considering their individual contribution to solid bus fault
at 220 kV bus of Nagjheri PH
2 KPCL to upload make available various tripping files
(FIRDRELTR) for all tripping involving their stations in compliance
of IEGC Regulation 52 (r)
14-04-2016 at
1229 hrs
Tripping of Nagjheri Generators Pending
Trippings at 220kV Raichur TPS
13-04-2016 at
2112 hrs
1KPCL to undertake the following remedial measures to avoid
breaker flashovers
(i) Replacing all porcelain insulators with composite insulators
(ii) Carrying out hot-line water washing of all insulators on regular
basis
(iii) Applying Room Temperature Vulcanizing (RTV) Silicone high
voltage insulator coatings to all bus-connected ceramic insulators of
equipment like CT PT CB Isolators etc
2KPCL to take steps to provide dedicated breaker flashover
protection to all breakers at Raichur TPS at the earliest
KPCL
Tripping of 400kV Raichur TPS Bus-2
46II21
Trippings at Raichur TPS
Status received vide KPCL mail dated 10072017
1 i) Silicon coating for Unit8 main amp tie breakers carried out in Sep16
and same is under observation Till today in order and good condition For
remaining breakers since it is big order approval for the same is under
process ii) Hot line
water washing stopped and off line water washing is carried out whenever
the 400 KV Unit or line is under tripped condition Shutdown condition
2 Static Electromechanical relays are existing in all 1 to 7 units Breaker
flash over protection feature will be enabled (if available) in the numerical
relays which will be retrofitted in phased manner during RampM works
Status received vide KPCL mail dated 14062017
1 GT backup overcurrent amp earth fault settings are revised as per the
recommendations of our head office CEEDBangalore copy of letter
enclosed
2 FIRDRELTR are being uploaded in the recent incidences as all the
main-2 relays are replaced with new numerical relays
Mail received on 21-10-2015
1) Anti-pumping contactors of all the nine 220KV Lines are in circuit and
tested periodically during AOH works of lines along with other protections
2) Completed
3) Possibility to use both the 220kV buses as main bus under normal
operation is under review
Mail recieved on 23-11-2015
1) Completed
3) Two bus operation for 220kV buses In place of existing CT switching
relays High speed manual heavy duty change over switch of sufficient
current capacity will be retrofitted to all feeders at 220kV station and same
will be operated manually during changeover of feeder by one bus to the
other and this arrangement may facilitate to put both buses in service Time
required for this retrofit is around 90days However this work will be
taken up only after retrofitting of electromagnetic relays with numerical
relays for Main-2 protection of all 220kV lines for which work is in
progress
Status received vide mail dated 10-07-2017
1) Completed
2) Completed
3) Two Bus operation for 220kV bus is being carried out whenever
required However scheme for tripping of one bus during LBBfault and
maintaining the other bus intact by tripping BC breaker will be taken up in
RampM works
KPCL1 KPCL to check the operation of anti-pumping relay on 220 kV side
and keep it in healthy condition
2 KPCL to provide manual reset to the 220 kV side master trip relay
3 KPCL to use both the 220 kV buses as main buses under normal
operation and should go for single bus operation only during
emergencies
07-06-2015 at
0135 hrs
Y-ph Pole of Tie-breaker of Unit-4 at RTPS failed
Unit-4 got tripped on operation of Generator
Differential Reverse power amp LBB protection
Operation of LBB protection led to tripping of BUS-2
at RTPS
Annexure-III
Page 6 of 31
55II1
56I2 Complete outage of 220kV Sedam
Substation of KPTCL
19-06-2016 at
1527hrs
220kV Sedam-Humnabad-2 tripped at Sedam on
Distance protection Zone-2 Sedam-RTPS-1 amp2 lines
tripped at RTPS end only 220kV Tandoor inter-state
line was hand tripped due to incoming supply failure
KPCL to disable GFC protection on all lines emanating from their
generating stations
KPCL Status received vide KPCL mail dated 10072017
As per the reccomndations of KPTCL in Feb16 the settings are done with
a time delay of 2 secs
Pending
57II3 Tripping of 400220 kV ICT-2 at Raichur
TPS
07-07-2016 at
332 hrs
ICT-2 tripped on operation 400220KV ICT-2 was
tripped on operation of 220KV side Instantaneous
over current protection during B-phase to earth fault
in 220kV RTPS-Sedam-II line
KPCL to review appropriately the high-set of ICT‟s back-up OC
protection at their 220 kV RTPS so that they do not operate for a
normal through fault
KPCL Status received vide KPCL mail dated 10072017
The settings will be reviewed in co-ordination with KPTCL amp OEM
Pending
KPCL
Pending
Pending
KPCL Status received vide KPCL mail dated 14062017
1 All logics checked and found normal LBB timing checked and found
200msec as per KPTCL MRT recommendation - Completed
2 Work Under Progress
3 New GPS System commissioned along with new numerical and
synchronised with GPS system - Complied
4 Work Under Progress
Status received vide KPCL mail dated 14062017
1 DEF settings in lines are made as per recommendations of CE(RT) amp
RampD KPTCL Bangalore amp EE(RT) KPTCL Hubli
High set operation of DEF relays is disabled at Kodasalli end
2 All these guidelines are incorporated by KPTCL during the replacement
of line protection relays
3 New stand alone event logger is to be procured since spares for old
stand alone event logger are obsolete
KPCL (i) KPCL to disable high-set operation of DEF relays
(ii) KPCL to block DEF relays whenever corresponding distance
protection relays pick up at Kodasally end on Nagjheri ndash Kodasalli
lines and
(iii)KPCL to provide stand-alone Event Logger at their 220 kV
Nagjheri PH
Bus dead occurred at 220kV Nagjheri PH due to
tripping of evacuating lines
KPCL
31-08-2016 at
1247hrs
Pending
Tripping of 400kV Bellary TPS-
Yeramarus TPS line and
400kVYeramarus TPS - Raichur TPS
line
PendingYet to be informed55II19
Tripping of Units at Raichur TPS During testing of retrofitted distance protection in
400kV Raichur-2 feeder LBB protection trip DC got
extended to Bus trip This resulted in tripping of
220kV bus at RTPS and all connected 220 kV
elements Unit-4 which is connected to 400 kV Bus
got tripped due to tripping of Station Utility
Transformer that is connected 220 kV bus
58I2 (GD)
Complete outage of 220 kV Kadra power
station of KPCL
54II13
1KPCL to properly configure the distance relays at YTPS end on
both YTPS ndash BTPS line and YTPS-RTPS line with specific focus on
reaches and timings of Zone-2 Zone-3 and Zone-4 (reverse)
2KPCL to ensure the healthiness of Direct Trip circuits and relay
coils at YTPS
3KPCL to ensure time sync of DR‟s and EL‟s at YTPS with GPS
06-09-2016
at 1440 hrs
31-05-2016 at
1721 hrs
Direct Trip was sent from YTPS to RTPS and BTPS
01-05-2016 at
2144 Hrs
LBB of 220kV Kodasalli breaker at Kadra end got
operated which resulted in tripping of Bus at Kadra
and in turn led to tripping of all elements
(i) KPCL to check settings of LBB protection in all relays from which
it was implemented and ensure that their configuration logic and
timing are in order at their 220 kV Kadra PH
(ii) KPCL to furnish details regarding the existing LT auxiliary
supply arrangement at their 220 kV Kadra PH and take steps to
provide a suitable Auto-Main-Fail (AMF) panel for DG set to effect
its auto-starting in case of failure of LT supply
(iii) KPCL to ensure time-sync of all relays (DR‟s amp EL‟s) with GPS
at their 220 kV Kadra PH
(iv) KPCL to provide stand-alone Event Logger at their 220 kV
Nagjheri PH
Complete outage of 220 kV Nagjheri PH
of KPCL
Multiple tripping at 400 kV Raichur TPS
Station
15-04-2016 at
1536 hrs
Triggering incident was failure of R-phase CT of
400220kV ICT-1 400kV YTPS-RTPS line got
tripped from YTPS end 400kV RTPS-
Mehaboobnagar line tripped on a B-phase to earth
fault
In view of the availability of two buses along with healthy bus-
coupler at 220 kV RTPS KPCL is recommended to put in service the
double-bus operation at 220 kV RTPS by suitably distributing loads
within 15 days
Status received vide KPCL mail dated 10072017
Two Bus operation for 220kV bus is being carried out whenever required
However scheme for tripping of one bus during LBBfault and maintaining
the other bus intact by tripping BC breaker will be taken up in RampM
works
1KPCL to enable zero-sequence compensation feature if not already
done in all differential relays of transformers at RTPS
2KPCL to examine in detail the reasons for SOTF operation at RTPS
end for the fault on RTPS-Veltoor line and if required relay
(configuration) settings at RTPS end may be suitably got revised with
the help of their OEM
3KPCL to take steps to enable auto-reclose for the Tie-CB‟s in the
dias containing Munirabad and Veltoor (Mehboobnagar) at RTPS
KPCL Status received vide KPCL mail dated 10072017
1) Zero-sequence compensation feature is already enabled in all the
differential relays of transformers ---Completed
2) Referred to OEM for the tripping of line on SOTF protection
3) Action has been taken to retrofit the protection relays of tie bays of
Mahbubnagar and Munirabad line to enable Auto-reclosure function
58I3 (GD)
Pending
Annexure-III
Page 7 of 31
Status received vide KPCL mail dated 14062017
1 On 09092016 at STRPTwo units were running(Unit-3 amp Unit-4It is
to clarify that Station tripped due to spurious operationLBB relay in Unit-
4 and not due to operation of Unit-3 LBB as indicated in PCSC
recommendations Unit-3 which was in service tripped as a consequence of
LBB ProtectionHow ever following actions performed in both Units
a) Trip coil-1 and Trip coil-2 circuit (including cable from protection panel
to GCB Marshaling Box)of GT Breakers of Unit 03 and 04 checked found
ok
b) Integrity of Connecting cableconductor from Generating unit no3 and
also to its corresponding GT Breakers inspected and found ok
c) Regarding Spurious operation of Unit No04 LBB relay and its
timerChecked the operation of the LBB overcurrent relay with its external
Timer for repeated correct operations it was found that LBB Timer was
giving correct timing operation for 1 in 3 operations only ie for one of the
operation it was operating within 40ms compare to set value(200ms) hence
declared as faulty and the same has been replaced with new one later
operation of the new Timer checked and found okoperating for gt200mse
only With this cause for spurious operation of LBB and resulting in
complete outage of STRP has been identified and solved -----
Completed
2 In Unit -3MCR is working satisfactorilyit is to clarify that problem was
existing in Unit No4 AVR manual channel reference value of Generator
The Same has been replaced with spare one Manual channel AVR is
found to be Ok ------Completed
3 All the units AVRs Healthyness checked and found Ok -
-----
Completed
4 Presently at GPHno stand alone Event logger exists Since the subject
requirement pertains to all the Generating units and in view of
Standardization of the complete system Networking of numerical relays
carried out and events are availble in networking system
KPCL
Pending
(i) KPCL to ensure the integrity of the connecting cable conductor
from Generating Unit-3 to its corresponding GT breaker at their STR
PH
(ii) KPCL to ensure the healthiness of Manual Current Regulator
(MCR) of Unit-3‟s AVR at their STR PH
(iii) KPCL to ensure the healthiness of AVR‟s of all Units of STR
PH
(iv) KPCL to provide stand-alone Event Logger at their 220 kV STR
PH
Spurious operation of LBB protection of line feeder
had led to tripping of 220 kV bus at Sharavathy Tail
Race power house
9-09-2016 at
1119 hrs
Pending
12-09-2016 at
1447 hrs
(i) KPCL to check and correct configuration settings of LBB
protection in all relays from which it was implemented at their 220
kV Varahi PH
(ii) KPCL to provide stand-alone Event Logger at their 220 kV STR
PH
KPCLLBB protection operated and caused bus shut down at
Varahi PH
Pending
Partial disturbance occurred in central Kerala grid due
to overloading and tripping of 220 kV lines Loss of in-
feed to 220 kV Kalamassery 220 kV Brahmapuram
220 kV Ambalamugal 220 Pallom amp 220 kV Kochi
occurred Generation at Neriamangalam Panniar
Chengulam and Pallivasal also got affected during the
incident
(i) SLDC KSEB to put in place proper mechanism to ensure
adequate load-generation balance is maintained in their control area at
all times and due vigilance is exercised in operating an already
depleted transmission network
(ii) KSEB to put UFR in service at New Pallom end on 220 kV New
Pallom ndash Amabalamugal line as part of Kudankulam Regional
Islanding Scheme
KPCL
Status received vide mail dated 14062017
LBB Protection system is in Bus bar Protection PanelThe Configuration
settings are checkedThey are as follows
Minimum operating primary current is 160A
Stage IIssue of Retrip to the feeder is 100ms after the action of main
distance protection Relayinitiation of LBB
Stage IIBus bar LBB Trip -200ms
Total time of LBB trip is 300ms from the time of occurrence of Line Fault
(i) KPCL to adopt the following VT fuse-fail logic for all 220 kV
lines emanating from NPH
ldquoUnder VT fuse fail condition distance protection shall normally be
kept blocked However upon detection of a fault (sensed by negative
sequence component) blocking of distance protection shall give rise
to operation of its inherent Over-Current protection set with a definite
time delay of 500 msecrdquo
(ii) KPTCL KPCL to revise Zone-2 Zone-3 and Zone-4 (reverse)
timings of DPR of all 220 kV lines emanating from Nagjheri PH in
line with Ramakrishna Committee guidelines
Triggering event was the fault on 220 kV Nagjheri
ndashKodasalli line-2 Both buses of 220 kV Nagjeri
power station of KPCL got
de-energized
62I1 KPCL Status received vide mail dated 14062017
1 Already settings are discussed with EE(RT) Hubli and soon relays will
be tested for VT fuse fail condition
2 Timings of Zones were set as per the recommendations of CE(RT) amp
RampD KPTCL Bangalore amp EE(RT) KPTCL HubliRegarding revision
of timings will be carried out in co- ordination with EE(RT) KPTCL
Hubli
15-09-2016 at
1406 hrs
Complete outage at Varahi Hydro Power
Station
Disturbance in Kerala system Yet to be informed Pending
58I5 (GD)
58I7 (GD)
21-01-2017
at 0038 hrs
Complete outage of 220 kV Sharavathy
Tail Race PH
58I6 (GD)
Complete outage of 220 kV Nagjheri
substation of KPCL
Annexure-III
Page 8 of 31
65II9 Tripping of 400220 kV ICT-1 at BTPS 13-05-2017 at
1941 hrs
ICT-1 got tripped on operation of LV side earth fault
protection during R-phase to earth fault in 220 kV
BTPS-Lingapur line
1 KPCL to review the need for providing separate non-directional
sensitive earth fault protection for ICT‟s at their BTPS station and
take steps to disable the same
2 For 220 kV BTPS ndashLingapura line KPCL to resolve issues relating
to PLCC carrier communication and put AR into service
KPCL Yet to be informed Pending
65III2 Tripping of 400 kV Hiryur-BTPS line-1 06-05-2017
at 1401 hrs
Y-phase to earth fault had occurred in line Direct
trip was sent from BTPS to Hiryur end
KPCL to introduce suitable delay (say 3 sec) for UVR tripping and
disable sending of DT to the other end on UVR operation at their
BTPS station
KPCL Yet to be informed Pending
PendingMail received on 27-05-2015 (KPTCL) amp 29-07-2015
1Existing Back up relays will be replaced by numerical type distance
relaysProcurement is in tendering stage
2 Completed
3 Completed
KPTCL Mail recieved on 23-01-2016
1 Existing back up relays will be replaced by Main-2 protection LOI
issued Ms Alstom for taking up the works
KPTCL Mail Recieved dated 25-05-2016
Under the Scope of RampU The work will be taken up by Ms Alstom
shortly
KPTCL Mail Recieved dated 25-04-2017
1 ALSTOM make P442 type Numerical relays are supplied to the site
replacement of M-1 relays(OPTIMHO) by new relays will be taken up
shortly
KPTCL
KPCL Status received vide mail dated 10072017
1 Furnishing FIR amp TR of the tripping events as per the formats provided
by SRLDC
4 Refered to OEM for the tripping of Tie CB of Munirabad line on SOTF
protection
Pending
1 PCSC forum recommended KPTCL to replace the old static
distance protection relays with numerical relays
2 PCSC forum also requested KPTCL to provide a broken conductor
alarm indication in Control Room
3 Standing instruction needed to be given to the all substation
personnel for not changing the relay settings without approval of
RTMRT wing
Fault had occurred in 220kV
Mahalingapura-Narendra line-2 Due to the failure of
relay operation at Mahalingapura breakers at remote
end tripped which resulted in bus dead condition
1 KPCL to start furnishing FIR and TR of their tripping events as
per the formats provided by SRLDC
2 KPCL to check earth-mat resistance for 400 kV switchyard and
ensure that it is within prescribed limits
3 KPCL to set right operation of SER in CampI Control Room of Unit-
4
4 KPCL to furnish action taken wrt tripping of Tie-CB of
Munirabad line on SOTF protection OEM report in this regsrd may
be furnished
25-10-2014GD-1 at Mahalingapura Substation of
KPTCL
38GD31
63II10 Multiple trippings at 400 kV RTPS
substation of KPCL
16- 03-2017 at
0118 hrs
Bus-2 B-Ph differential bus bar protection operated
at 400 kV RTPS end tripping all the main breakers
connected to Bus-2
Annexure-III
Page 9 of 31
Pending
Suspected mal-operation of 220kV side Rphase
over current relay
Line tripped on Yphase to earth fault from both the
ends
20-12-2014
at 2220 hrs
KPTCL was requested to explore the possibility of providing AR
feature to this line and submit the remedial measures to the PCSC
forum
Pending
KPTCL1 Till the completion of RampM works for bus bar and LBB protection
KPTCL shall explore the possibility of having split bus operation at
Ambewadi and submit the details of the same to PCSC forum
2 KPTCL shall provide the details of the tripping of Supa hydro
station connected downstream from 110 kV bus
39I5
40I1
220kV Sedam-
Tandur line
Triggering incident was B-phase to earth fault in
220kV Ambewadi- Nagzari line-1 B-pole of breaker
did not open at Ambewadi end LBB protection not
available at Ambewadi end All elements tripped on
Zone-2 from remote ends
01-12-2014Tripping of 400220kV
ICT-2 at Hoody
substation of KPTCL
40IV1
Mail received on 27-05-2015 amp 29-07-2015
1 CampR panels of 500MVA ICT 1amp2 will be replaced under scheduled
RampM works
2 OampM personnel are instructed to take sufficient care in order to avoid
unwarrented trippings --- Completed
KPTCL mail received on 23-01-2016
1 New CampR panels(with numerical relays) erected for 500MVA ICT-1
amp2 under RampM work which will be commissioned shortly
KPTCL mail received on 25-05-2016
1 New CampR panels(with numerical relays) erected for 500MVA ICT-1
amp2 under RampM work which will be commissioned shortly
KPTCL mail received on 25-04-201
1 New CRPs mounted in bay KIOSK commissioned under RampM works
KPTCL1 PCSC forum recommended KPTCL to replace the relay with a
different make
2 KPTCL was also requested to train the OampM personnel
adequately before performing any maintenance works to avoid such
unwanted trippings
PendingMail recieved on 29-07-2015
Carrier protection is being restored for 220kV Sedam-Tandoor line at
Sedam end After restoring the carrier protection AR will be enabled
KPTCL mail recieved on 23-01-2016
Carrier protection is being restored for 220kV Sedam-Tandoor line at
Sedam end After restoring the carrier protection AR will be enabled
KPTCL mail recieved on 25-05-2016
SEESCADA to update the latest status
KPTCL mail recieved on 28-06-2016
Action is being taken to restore carrier protectionAR will be enabled once
carrier signal is restored
KPTCL
22-12-2014 at
2122 hrs
Mail received on 28-04-2015
1 In view of operating 220kV Ambewadi SS in split bus mode action is
being taken up by KPTCL Problem in the 220kV bus coupler breaker is
attended and isolator overhauling work is under progress Spilt bus
operation at Ambewadi will be made possible at the earliest
2 ICT Protection system at Ambewadi and trippings occured at Supa GS
during the instance is checked up and remedial measures already furnished
in this regard
---- Completed
Mail recieved on 29-07-2015
1 Action is being taken by KPTCL for operating Ambewadi in split bus
mode Problem in bus coupler breaker is attendedIsolator overhaulling
work is completedPTs are already provided to 220kV Bus-II After
commissioning of Bus-II PTs Ambewadi can be operated in split bus
mode Pending works will be completed within a months time
KPTCL mail recieved on 23-01-2016
1 Bus-II PTs yet to be commissionedPlanned to complete before end of
April-2016
KPTCL mail recieved on 25-04-2017
1 Yet to be attended
GD-1 at 220kV Ambewadi Station of
KPTCL
Annexure-III
Page 10 of 31
1 KPTCL to provide Bus Bar protection and LBB protection at
Sedam Ss and furnish the status of their implementation to PCSC
forum
2 KPTCL to implement AR feature on 220 kV Sedam-Tandur inter-
state line
Mail received on 28-04-2015
Procurement of Bus bar and LBB protection is in the final tendering stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
KPTCL mail received on 23-01-2016
1 Bus bar protection panels pocured and erected at Sedam Wiring
testing commissioning is being taken upPlanned to complete by April
2016
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
KPTCL
12-03-2015 at
751 hrs
1 KPTCL shall provide AR feature on Ambewadi ndash Ponda 220 kV
DC inter-state line
2 Till the completion of RampM works for bus bar and LBB protection
KPTCL shall explore the possibility of having split bus operation at
Ambewadi and submit the details of the
same to PCSC forum
Mail received on 27-05-2015
1 Bus Bar protection will be provded under RampU
2 AR yet to be enabled
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
Fault occurred in 220kV Sedam-Shahpur line
All connected 220kV lines and transformers were
taken on 220kV North bus as South bus was under
shut down for conversion of strung bus to rigid bus
and isolator replacement under RampM works Failure
of HV side Y phase CT of 150MVA Transformer-3
occurred at Peenya Substation which resulted in
operation of Differential and HV REF protection The
failure of CT also resulted in a 220kV bus fault in
North Bus
KPTCL to revise distance relay settings at Nelamangala end for 220
kV Nelamangala ndash Hebbal - Peenya line ndash 1 for the effective line
length of 17 km These new settings can be appropriately reviewed as
and when the tie-arrangement at Hebbal is done away with
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
Pending
PendingKPTCL
30-09-2015 at
1041 hrs
Pending
Outage of 220kV Ambewadi station in
Karnataka
Pending
PendingKPTCL mail received on 23-01-2016
Will be complied in a months time
220kV Ambewadi-Nagjheri line-2 tripped on B-phase
to earth fault This resulted in loss of supply to 220kV
Ambewadi bus 220kV Ambewadi-Ponda line-1amp2
were hand tripped after deenergization of bus at
Ambewadi
KPTCL
Complete outage of 220kV Ambewadi
substation of KPTCL
42I2 (GD)
27-09-2015 at
42317 hrs
Fault in 220kV Ambewadi-Nagjheri line-2
KPTCL
KPTCL
KPTCL mail received on 25-05-2016
Presentl 220kV Nelamangala -Hoody(ie nelamangala-Peenya-Hebbal -
Hoody line is made LIILO at Yelahanka sub station and breaker at
Peenya is kept open necessary modification in distance relay settings
adopted for new configuration
15-02-2015 at
1424 hrs
Complete outage of 220kV Peenya
Substation in Karnataka
R-Phase to ground fault occurred on 220kV Sedam-
Shahpur line Fault not cleared from Sedam end due
to stuck-breaker condition While the Sedam- Sahapur
line tripped from Shahapur end in Zone-1 the other
220 kv lines from Sedam tripped at remote ends in
Zone-2 This caused complete outage of 220kV
Sedam substation
42I1 (GD)
41I4
Complete outage of 220kV Sedam
substation of KPTCL
48I2 (GD)
48I3 (GD) KPTCL to fast-track providing AR on all 220 kV lines emanating
from Ambewadi SS to prevent Station shut-down on temporary faults
06-08-2015 at
451 hrs
220kV RTPS-Lingasugur line-2 tripped at TPS end
on operation of distance
protection zone-1 400220kV ICT-2 got tripped on
operation of earth fault
protection 220kV RTPS-Lingasugur line-1amp3 tripped
on distance protection zone-2 and zone-3
respectively Due to tripping of ICT-2 the running
units got overloaded and it was mentioned that under
frequency occurred as units are on load control The
Units got tripped on under frequency
KPTCL to activate non-directional Over Current protection with a
time delay of 600-800 msec for Fuse
failure condition at Lingasugur
KPTCL Status received vide KPCL mail dated 10072017
LV earth fault relay had an additional default Ef setting having a definite
time which resulted in tripping of ICT-2 and the same was rectified and
already complied
Pending
1 KPTCL to provide Bus bar and LBB protections for 220 kV
bus at Sedam Ss
2 KPTCL to implement AR feature on 220 kV Sedam-Tandur
inter-state line
27-01-2015 at
800 hrs
Complete outage at 220kV Sedam
Substation of KPTCL (GD-1)
Tripping of Unit-1amp2
along with 400220kV
ICT-2 at Raichur TPS
47II13
Annexure-III
Page 11 of 31
52I3 (GD) Complete outage of 220kV Shimoga
substation
22-02-2016 at
1503 hrs
220kV Bus Bar protection operated during failure of
R phase CT in DVG-2 line bay
KPTCL to operate 220 kV Shimoga on multi-bus operation under
normal conditions put it on single-bus operation only under
emergency conditions
KPTCL KPTCL Mail received dated 25-04-2017
Replacement of existing BBP by new BBP with 4 zone protection is being
taken up under RampU
Pending
56II6 Tripping of 220kV Ambewadi-Ponda
(Xeldam) line-1
10-06-2016 at
1333 hrs
Line tripped on Y-E faut due to DPR Z1 operation KPTCL to keep AR for Ambewadi ndash Ponda (Xeldam) line-1 in
service with immediate effect
KPTCL Yet to be informed Pending
59II13 Tripping of 220 kV Bidadi (PG) - Bidadi
lines - 1amp2
02-10-2016 at
1032 hrs
Line-2 tripped in DPR Zone-2 and Line-1 tripped on
operation of EF protection from Bidadi end
KPTCL to resolve PLCC carrier communication issues on 220 kV
Bidadi ndash Bidadi-PG DC lines and subsequently restore Zone-2
timing to normal values
KPTCL Yet to be informed Pending
1 KPTCL to configure all DR‟s and EL‟s at 400 kV Guttur SS so
that they will also get triggered for BBP operation
2 KPTCL to ensure time-synchronization of all DR‟s and EL‟s with
GPS at their 400 kV Guttur SS
KPTCL17-01-2016 at
1853 hrs
Pending
Pending
Yet to be informed PendingKPTCL
KPTCL
30-09-2015 at
1041 hrs
Complete outage of 220kV Ambewadi
Substation of KPTCL
Multiple tripping at 400kV Guttur sub-
station
Outage of 220kV Ambewadi station in
Karnataka
29102015 at
1434 hrs
Complete outage of 220kV Peenya
Substation of KPTCL
PendingKPTCL mail received on 23-01-2016
Will be complied in a months time
220kV Peenya-Nelamangala-3 tripped on B-E fault at
both ends At the same time 220kV Peenya-
Nelamangala-4 tripped on R-Y fault only at
Nelamangala end and was in service from Peenya
end Due to tripping of these two lines 220kV Peenya-
Nelamangala-2 tripped on overcurrent protection
KPTCL to furnish a report on the tripping of 220 kV Peenya-
Nelamangala line-4 Nelamangala detailing the remedial measures
taken including the settings adopted for Z1B (Zone extension) and
Power Swing Block
Pending220kV Nagjheri-Ambewadi line-1 tripped at 1333
hrs due to B phase to earth fault Ambewadi was
radially fed from Nagjheri power station through
220kV Nagjheri-Ambewadi line-2 Tripping of this
line caused 220kV Bus shut down at Ambewadi and
remaining lines and transformers were hand tripped
220kV Ambewadi-Nagjheri line-2 tripped on B-phase
to earth fault This resulted in loss of supply to 220kV
Ambewadi bus 220kV Ambewadi-Ponda line-1amp2
were hand tripped after deenergization of bus at
Ambewadi
KPTCL
Yet to be informedKPTCL
KPTCL Mail received dated 25-05-2016
SEE RTC Bangalore to update the status
KPTCL Mail received dated 28-06-2016
Providing numerical bus bar protection to 400kV buses and GPS time
synchronising equipment at Guttur is considered under RampU Work is
awarded to Ms Alstom execution will be taken up shortly
KPTCL Mail received dated 25-04-2017
GPS and accessories will be supplied during May 2017 expected to
complete the work within a month after supply of materials
53I1
1KPTCL to take steps to provide busbar protection at their 220 kV
Chikkodi inter-regional substation and furnish a time-line for the
same
2KPTCL to review distance protection settings for 220 kV Chikkodi
ndash Kudachi line
3KPTCL to furnish equipment failure report of the current incident to
PSEampTD Division of CEA with a copy marked to SRPC
KPTCL Mail received dated 25-05-2016
SEE RTC Bangalore to update the status
1 KPCL to provide AR on all 220 kV lines emanating from Nagjheri
PH
2 KPTCL to provide AR on all 220 kV lines emanating from
Ambewadi SS
Failure of Lightning Arrestor of Y-phase Line Reactor
of 400kV Guttur-Hiriyur line-1 and line tripped on
distance protection Zone-1 Bus-bar protection of
400kV Bus-2 at Guttur substation also got operated
during the event sensing this through fault 400220
kV ICT-1 amp 2 at Guttur 400kV Kaiga-Guttur-2
400kV
Guttur-Narendra-2 400kV Guttur-Hiriyur-2 and
400kV Guttur-Munirabad which are on 400kV Bus-2
got tripped during the incident 400kV Guttur-
Narendra-1 which was on Bus-1 also tripped at the
same time
49I13 (GD)
Triggering incident was failure of B-ph PT of 220kV
Bus-2 (western bus) at 220KV Chikkodi substation
220KV Chikodi- Belgaum-I line tripped on DEFR
(Inst) 220KV Chikkodi-Kudachi line tripped on
Distance protection and also 100MVA transformer-2
tripped on EF protection
57II1 01-07-2016 at
0303 hrs
Tripping of 220 kV Chikkodi-Mudshingi
and 220 kV Chikkodi-Talandage lines
48I3 (GD) KPTCL to fast-track providing AR on all 220 kV lines emanating
from Ambewadi SS to prevent Station shut-down on temporary faults
51II21
16-03-2016 at
1139 Hrs
Annexure-III
Page 12 of 31
62II3 Tripping of 220 kV Bus 2 and connected
elements (220kV HAL 1 and 2
400220 kV ICT- 1 2 and 22066 kV
ICT-2) at 400220 kV Hoody substation
of KPTCL (Load loss 590 MW)
09-01-2017 at
2306 hrs
Failure of R-phase CT of 220 66 kV transformer-2 at
220kV Hoody end resulted in a bus fault in 220kV
Bus-2 Fault was cleared by backup protection of
ICTs (220kV lines were being radially operated) due
to absence of busbar protection
1 KPTCL to provide Busbar protection at their 220 kV Hoody SS at
the earliest
2 KPTCL to furnish an Equipment Failure Report on CT failure to
CEA with a copy marked to SRPC
KPTCL KPTCL mail received dated 25042017
Numerical BBP is being provided under RampM works
Pending
64II9 Tripping of 400 220 kV ICT-2 and 3 at
Hoody substation of KPTCL
26-04-2017 at
1540 hrs
ICT-2 tripped on suspected mal-operation Oil surge
relay of B-phase Transformer ICT-3 tripped due to
overloading
KPTCL to put in place a suitable SPS at their 400 220 kV Hoody SS
that takes care of over-loading of the other ICT when one ICT out of
ICT‟s ndash 2 amp 3 trips at the earliest and furnish the details of
implemented SPS to PCSC forum
KPTCL Yet to be informed Pending
65II17 Tripping of 400220 kV ICT - 1 amp 3 at
Hoody substation of KPTCL
(Load Loss 750 MW)
26-05-2017 at
1230 hrs
R phase limb of ICT-1 bank pre-close supervision
contact of trip coil -2 had arc over ICT-3 got tripped
on over-loading
KPTCL to furnish compliance report on the recommendations given
in PSAG-18 meeting to PCSC forum
KPTCL Yet to be informed Pending
Complete outage of 220kV Nagjheri
power station and 220kV Ambewadi
substation of KPTCL
51I3 PendingStatus informed during Special Meeting held on 03062016
1 KPTCL informed that the matter had been taken up with concerned Line
Operation and Maintenance wing to carry out corridor clearance and
maintenance as per schedule to avoid frequent line faults in this corridor A
letter had also been addressed to Chief Engineer Bhagalkot zone to ensure
lines in amp around Kali complex are maintained in healthy condition ---
Completed
2 KPTCL assurd that the final modified SPS would be implemented at
Nagjheri PH at the earliest ------ Pending
3 KPCL informed that Nagjhari- Kodasalli Lines 1 amp 2 had been kept in
service since 23052016 0806hrs ---- Completed
KPTCL Mail received dated 28-06-2016
Modifications to be carried in Nagzari SPS logic is submitted to
SRLDCSRPC for verification and approval
Status received vide KPCL mail dated 14062017
1 Will be reviewed in consultation with EE(RT) KPTCL Hubli
2 Both the lines are in charged condition
KPCL KPTCL 1 To avoid tripping of transmission lines on transient faults KPCL
KPTCL is recommended to carry out periodic patrolling of lines and
ensure their proper maintenance by carrying out jungle bushing
clearance and trimming of tree branches within the RoW of
transmission lines as per the SRPC transmission line patrolling
guidelines (available under the menu item All Uploads Operation
Miscellaneous Transmission Line Patrolling Protocol
Guidelines for Southern Region on SRPC website)
2 KPCL KPTCL to review operation of SPS at NPH for
functionality (reduction of generation with tripping of evacuating
lines) and healthiness
3 KPCL to put 220 kV Kodasalli - Nagjheri DC lines into service if
more than 200 MW generation from Kali Complex (with Nagheri
Contribution not less than 50 MW) is ensured on sustained basis
220kV lines from Nagjheri power house started
tripping from 1100 hrs due to fault in lines The
sequence of tripping is shown in SOE list At 1233
hrs 220kV Narendra-Ambewadi lines-1amp2 got
tripped which resulted in loss of evacuation path to
Nagjheri station resulting in tripping of running Units
and complete outage at Nagjhheri power station
220kV Ambewadi station also got de-energized due
to tripping of source feeders ie 220kV Narendra-
Ambewadi-1amp2 and 220kV Nagjheri-Ambewadi-
1amp2
22-02-2016 at
1236 hrs
Pending
Pending
KPTCL
For the line under consideration the following shall be carried out by
KPTCL in coordination with
PGCIL (SR-II)
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
KPTCLLine tripped at Hiryur end due to direct trip receive
and was holding from Guttur
KPTCL mail received dated 25042017
Numerical BBP is being provided under RampM works
KPTCL to provide numerical Busbar Protection at their 220 kV
Somanahalli SS at the earliest
Tripping of 400 kV Neelamangala-
Hoody line-1
KPTCL to carry out the following for the line under consideration
(i) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
(ii) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
Tripping of 400 kV Guttur-Hiryur line-1 10-10-2016 at
315 hrs
62IV4
59IV4
62II5 Tripping of 220 kV South Bus and
connected elements (220kV HSR 220kV
Nagnathpura 220 kV Harohalli 220 kV
Subramanyapura 220 kV Tataguni 220
kV Mallur and 400220kV ICT-2 and 3)
at 400220kV Somanhalli substation of
KPTCL
(Load loss 850 MW)
20-01-2017 at
1434 hrs
Triggering incident was fault in 66 kV Somanahalli -
Bannerghatta line and fault was cleared by operation
of Back-up OCR at Somanahalli end
15-02-2017
at 1344 hrs
Line tripped at Hoody end on direct trip receive and
was holding from Neelamangala end
Yet to be informed
KPTCL
Yet to be informed Pending
Annexure-III
Page 13 of 31
56I3 Complete outage of 220kV Ambewadi
Substation of KPTCL
24-06-2016 at
2057hrs
B phase to earth fault had occurred in 220 kV
Ambewadi-Ponda line-2 Fault was cleared by
tripping of feeders from remote end
1KPCL amp KPTCL to furnish an action taken report on the
recommendations given by PSAG-16 to PCSC forum
2KPTCL to keep AR for Ambewadi ndash Ponda line-2 in non-auto
mode (ie only 3-ph trip should get extended on occurrence of a
fault) till the line is closed from Ponda end
KPCLKPTCL Yet to be informed Pending
Complete outage of 220kV Ambewadi
station of KPTCL and 220kV Nagjheri
of KPCL
Ambewadi Narendra line-2 tripped on fault and
220kV ambewadi Narendra line-1 tripped due to over-
loading Running Units at Nagjheri also tripped during
the event due to tripping of evacuating lines
KPCL KPTCL18-03-2016 at
1440 hrs
1 TANGEDCO to replace existing Check-Zone relay with a new one
possessing required performance
2 TANGEDCO to take steps to provide numerical busbar protection
at their 220 kV Tuticorin TPS TANGEDCO may also explore
providing dual CT‟s (on either side) for all BS breaakers at the time
of commissioning of numerical BBP if there were no space
constraints
3 TANGEDCO to take steps to provide for standalone Event Logger
(EL) and standalone Disturbance Recorder (DR) with automatic
downloading facility to a centralized server
Failure of Bus Section-I Y-ph CT resulted in
operation of bus-bar protection for Bus Sections -I amp
II Running Units1 4 and 5 230 kV Kayathar
230kV Kudankulam 230kV Sterlite Station
Transformer-1 2 amp 3 got tripped during the incident
Unit ndash 2 amp 3 were not in service
22-02-2017 at
0616 hrs
KPCLKPTCL
25-01-2017 at
2236 hrs
R-phase to earth fault due to de-capping of insulator
Auto-reclose attempt was unsuccessful
Tripping of ICT-3 at Raichur Substation
TANGEDCO
Pending
Tripping of running Units amp 230kV
feeders at Tuticorin TPS of TANGEDCO
(Gen Loss 640 MW)
62II7
1 KPCL to furnish a report on the reasons for Unit-6 tripping at
Nagjheri PH
2 KPCL KPTCL to modify suitably the SPS at Nagjheri Power
House such that it would also factor in the over loading of Ambewadi-
Narendra lines
3 KPCL to put 220 kV Kodasalli - Nagjheri DC lines into service if
more than 200 MW generation from Kali Complex (with Nagheri
Contribution not less than 50 MW) is ensured on sustained basis
Pending53I3 (GD)
15-03-2016 at
1228 hrs
ICT-3 tripped due to operation of back-up earth fault
protection during fault in 220kV RTPS-Raichur line-
1
KPCL KPTCL to check the ICT‟s back-up (high-set) protection
settings and ensure that they operate with a time delay of 100 msec
TANTRANSCO mail dated 12042017
1 The recommendation will be ensured AR logic will be configured in
Distance Protection relay itself instead of BCU OEM has been addressed
2 Post triggering period of 2 sec to cover AR operation in DR time scale
will be provided
TANTRANSCO mail dated 01062017 amp 15062017
1 The recommendation will be ensured AR logic will be configured in
Distance Protection relay itself instead of BCU OEM has been addressed
Main-1 amp 2 relays will be replaced for the requirement of more output
contacts for AR logic implementation
2 Post triggering period of 2 sec to cover AR operation in DR time scale
is being provided
TANGEDCO1 TANGEDCO to take properly configure AR logic at NCTPS-II in
that in case of unsuccessful auto-reclsoure three-phase trip shall be
given along with AR block
2 TANGEDCO to configure all protection relays DR‟s time scale at
NCTPS-II for a post-triggering period of 2 sec to capture events such
as complete AR operation
Tripping of 400 kV NCTPS-
SVChatram line-2
KPTCL Mail received dated 28-06-2016
Modifications to be carried in Nagzari SPS logic is submitted to
SRLDCSRPC for verification and approval
Status received vide KPCL mail dated 14062017
1 Tripped since there was evacuation problem and there were only two
lines NA-1 and NA-2
2 Will be reviewed in consultation with EE(RT) KPTCL Hubli
3 Both the lines are in charged condition
TANGEDCO mail dated 15042017
1) New Relay is tested and ready for replacementNow all 5 units are in
serviceThe relay will be replaced when lesser units are in service ---
Pending
2a)Steps are taken to renovate amp mordernization of all the control panel
into Numerical based control panels --- Pending
2b) Since 230 KV indoor switchyard has no spare space providing dual
CT`s is not fessible -- Completed
3) Procurement of EL amp DR is under progress --- Pending
TANGEDCO mail dated 26042017
1) Check zone New Relay is replaced on 17042017 -- Completed
2 Pending
3 Pending
KPTCL Mail Recieved dated 25-05-2016
SEESCADA to update the status of healthiness of carrier protection of
220kV RTPS-Raichur 1 amp2 lines
KPTCL Mail Recieved dated 28-06-2016
Details sought from KPCL for review of ICTs back up (high set) proection
settings as suggested KPCL is yet to furnish the details required to give
the revised settings
Status received vide mail dated 10-07-2017
As requested by EEE (protection) CEERT KPTCL the details were sent
to through e-mail dtd 08082016 After receipt of reply from KPTCL will
be implemented accordingly
62V3 Pending
Pending
Tamil Nadu
53II1
Annexure-III
Page 14 of 31
05-09-2015 at
1404 hrs
TANTRANSCO to take suitable measures like installing more stub-
towers along 230 kV OK Mandapam ndash Myvady line to avoid
excessive sag due to over-loading
TANTRANSCO PendingComplete outage of 230kV Palladam 230 kV
Othakalmandapam Ss 230 kV Coimbatore Ss 230
kV Thudialur and 230 kV Sadayapalayam Ss
Pending
Disturbance in 220kV Tamilnadu system48I1 (GD)
TANTRANSCO TANTRANSCO vide their mail dated 240615 informed that different
relays in Main-I amp Main-II would be ensured at the earliest
Mail recieved on 24-07-2015 19-02-2016 and 24-03-2016
Different relays in Main-I amp Main-II will be ensured
Mail received on 27-04-2016
TANTRANSCO Not feasible in the existing SAS sub stations Hence
exemption may be given for these sub stations
Mail received on 20-05-2016 16-06-201625-07-2016 amp 24-09-2016
As discussed in the 52nd PCSC meeting Swapping of Relays between two
stations is not feasible in the existing SAS sub stations Hence exemption
may be given for these sub stations
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15062017
Different make Relays will be ensured for Main-I amp II relays at Alamathy
end
TANTRANSCO Mail received on 19-02-2016 24-03-2016 and 27-04-
2016
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
Mail Received on 20-05-2016 16-06-201625-07-2016 amp 24-09-2016
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
29-03-2015 at
1529 hrs
43II5 Line-2 tripped on R-phase to earth fault
Line autoreclosed at SVChatram end and failed to
reclose at Alamathy end Bphase to earth fault in line-
1 Line tried for Ar but due to permanent fault line
did not reclose ICT tripped on operation of over flux
protection
TANTRANSCO was requested to swap the relays between two
stations so that
Main-1 and Main-2 will be of different make at each station
Tripping of 400kV
Alamathy-
SVChatram line-1amp2
and 400230kV ICT
at SVChatram
Annexure-III
Page 15 of 31
14-09-2016 at 1113Hrs
Bus Bar Protection (Zone-2) of 230 kV Bus-B got operated at Alamathy Station during fault in 230 kV
Alamathy-Korattur feeder
51I1 (GD)
12-05-2016 at
1215 hrs
Fault had occurred in 230kV Madurai-Sembatty line
Trip from distance relay was not extended to breaker
due to protection DC fail LBB protection got
operated resulting in a busbar trip at 230kV Madurai
substation All elements got tripped as there is a
single bus operation at 230kV Madurai Ss
58II17
TANTRANSCO
TANTRANSCODifferent type and Make of distance protection relays to be provided for Main-I amp Main-II protection for 230kV feeders at 400 kV Sunguvarchathiram amp 230 kV Sunguvarchathiram Substation [Carry-Over from Protection Audit Recommendations]
Mail recieved on 25-07-2016 amp 24-09-2016
TANTRANSCO Auto Transformer-2 HV side Bus isolator C-phase
support insulator of 230kV Southern Bus was replaced and Bus Bar
Protection scheme was restored on 12052016
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
CT is not available in the Bus Coupler bay for zone segregation CT latch
relay is to be provided for all bays for zone segregation
TANTRANSCO mail received on 24-03-2016
CMR relay for extending LBB protection was released and LBB extended
from Distance Protection relay directly CT is not available in the Bus
Coupler bay for zone segregation However during commissioning of third
ICT Bus section Breaker will be provided for zone segregation Numerical
BBP relay will be provided
Status received vide mails recieved on 27-04-2016 and 20-05-2016 16-
06-2016 25-07-2016 24-09-201610-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
CT is not available in the Bus Coupler bay for zone segregation However
during commissioning of third ICT Bus section Breaker will be provided
for zone segregation Numerical BBP relay will be provided
PendingComplete outage of 230kV Madurai Ss
(Chekanaurani) of TANTRANSCO
TANTRANSCO
Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
TANTRANSCOMultiple tripping at 230 kV Alamathy Station
Pending
Pending
1 TANTRANSCO to check the healthiness of BBP relay by conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
TANTRANSCO to take steps to provide double-bus operation at
their 230 kV Gummidipoondi SS
Pending
Complete outage of 230 kV
Gummidipoondi Station of
TANTRANSCO
19-01-2016 at
1156 hrs
Flashover of Auto Transformer- 2 HV
B-phase Isolator supporting insulator of 230kV
Southern Bus occurred at Gummidipoondi station At
the time of fault Bus bar protection relay was not in
service for pre-commissioning testing of Auto
Transformer-2 All feeders got tripped due to
operation of zone-2 protection from remote ends
TANTRANSCO1 TANTRANSCO to examine the feasibility of providing two main-
zone operation for bus bar protection by exploring various alternatives
like replacing existing bus-coupler CB with a hybrid bus-coupler CB
that comes with inbuilt CT replacing existing BBP relay with another
suitable relay that supports two main-zone operation and implement
the same
Busbar protection got operated for a fault in 230kV
Mywadi-Anaikadavu line
21-12-2015 at
628 hrs
Complete outage of 230kV Mywadi
station of TANTRANSCO
50I3 (GD) TANTRANSCO Mail received on 19-02-2016 and 24-03-2016
Revision of Bus Bar Protection setting was carried out The stabilizing
voltage setting was raised from 410 to 450 volts After completing the
necessary test the bus bar protection put in to service on 29122015
Mail Received on 27-04-2016 16-06-201625-07-2016 amp 24-09-2016
Revision of Bus Bar Protection setting was carried out After completing
the necessary test the bus bar protection put in to service on 29122015
Mail received on 10-11-2016 amp 20122016
Provision of Bus Coupler bay arrangement was included in the
Upgradation works proposed and the same was sanctioned by MoP
through PSDF
Numerical relay allotted and being commissioned
Mail received on 20-02-2017
Numerical BBP relay was commissioned on 02022017
Status received vide mail dated 12042017 amp 01062017 amp 15-06-
2017
Numerical BBP relay was commissioned on 02022017
Provision of Bus Coupler bay arrangement was included in the
Upgradation works proposed and the same was sanctioned by MoP
through PSDF
The issue was discussed in PCSC-58 meeting held on 18102016 when
PCSC forum agreed to de-link the implementation of the Item from the
scope of Protection Audit Recommendations (PAR) and pursue it as part
of PCSC Recommendations
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp15-06-2017
Different make Relays will be provided for Main-I amp II relays at
Sunguvarchatram end in a phased manner
Pending
1 TANTRANSCO to provide split-bus operation with bus
sectionalizer CB for their 230 kV Madurai (Chekanurani) SS
2 TANTRANSCO to provide two main-zone operation for the
numerical BBP that is being commissioned
3 TANTRANSCO to examine the feasibility of providing Re-Trip
feature for the LBB protection and accordingly take steps for
implementing the same
58
55I1 (GD)
Annexure-III
Page 16 of 31
58II17 Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
TANTRANSCOMultiple tripping at 230 kV Alamathy
Station
15-09-2016 at
2214 hrs
Bus Bar Protection (Zone1) of 230kV Bus-A got
operated at Alamathy Station during fault in 230 kV
Alamathy-OPG-1 feeder
1 TANTRANSCO to check the healthiness of BBP relay by
conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal
winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
Pending
Annexure-III
Page 17 of 31
6414 Complete outage of North Chennai TPS
STG-1
26-03-2017
at 2314hrs
Tripping of evacuating lines due to fault led to
tripping of running Unit at NCTPS Stg-1
1 TANTRANSCO to take steps to complete insulator replacement
works on the 230 kV lines owned by them in NCTPS area within 6
months
2 TANTRANSCO to take steps to implement AR on all 230 kV lines
emanating from NCTPS-I at the earliest
TANTRANSCO Yet to be informed Pending
65II1 Tripping of 220 kV Idukki ndashUdumalpet
line
05-05-2017 at
1702 hrs
Line tripped due to B-N and R-N fault in line 1 TANTANSCO to correctly configure AR logic at Udumalpet so
that in the event of 3-ph trip being given during AR dead-time the
relay will not try for auto-reclosure
2 TANTRANSCO to keep AR dead-time as 1 sec for all 220 kV amp
above transmission lines
TANTRANSCO Yet to be informed Pending
58II17
44I1 (GD)
Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
KSEB Mail received vide dated 17012017
1 110 kV bus bar protection progressing ----Pending
2 Connection of 220kV earth mat and 110 kV plate earthing system
completed---- Completed
3 Redundancy of 110V DC system in progress Complete independent
redundancy is not practical for the time being 48 V DC redundancy was
already there----Pending
4 Instead of stand alone event logger SCADA system of 110 kV feeder is
expected to be completed by the end of 2017 SCADA system of 220kV
side will be taken up after that----Pending
28-04-2015 at
1230 Hrs
Mail received on 31-07-2015
1 Reducing the sensitivity of REF protection of Unit 4 5 6 at Idukki
PH - Generation wing is planning to purchase new transformer
management relays with low impedance REF protection Purchase
procedures initiated ---------Pending
2 The replacement repair of faulty breakers are under the consideration of
Generation wing Breakers will be replaced repaired in a phased manner
Unit 3 breaker was replaced with available breaker from the 220kV
IDMD feeder The 220kV CBs of unit 2 and unit 3 will be replaced with
in two months
3 No abnormalities were noticed in the PLCC equipment at New Pallom
station It is kept under observation
Mail recieved on 30-10-2015
1 Purchase procedures is still in progress
2 Replaced
3 PLCC equipment Tested and found OK
Mail recieved on 03-03-2016
1 Even though repeated plans to have a joint inspection with MsABB
who is the OEM of the relay panel for replacing the relays with numerical
ones the same could not become successful Finally the inspection has
been fixed on 15032016 It has been planned to replace existing REF
protection with low impedance ones after retrofitting the numerical ones of
OEM
Mail recieved on 25-05-2016
1Generation wing is planning ti provide low impedance REF protection by
retrofitting numerical ABB make transformer management relay in the
existing panel ---- Pending
2Faulty breaker of Unit3 has been replaced ---- Completed
3PLCC equipments in the feeder were checked and found OK ------
Completed
TANTRANSCO
KSEB
Complete outage of Idukki Hydro Power
Station (GD-1)
Multiple tripping at 230 kV Alamathy
Station
15-09-2016 at
2214 hrs
58I1 (GD) Complete outage of 220 kV Kalamassery
Substation
23-08-2016
at 1120 hrs
Triggering incident was conductor snapping in 110
kV Kalamassery- Kaloor feeder
KSEB to take steps to provide the following at their 220 110 kV
Kalamassery SS
1 Busbar protection at 110 kV level
2 Connecting 220 kV and 110 kV sides on to a common earthmat
3 Redundant DC supply for both protection (220 V) and
communication (48 V) applications
4 Stand-alone Event Logger
Bus Bar Protection (Zone1) of 230kV Bus-A got
operated at Alamathy Station during fault in 230 kV
Alamathy-OPG-1 feeder
1 TANTRANSCO to check the healthiness of BBP relay by
conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal
winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
KSEB
Pending
220 kV breaker of unit-3 at Idukki Power
house flashed and bus differential protection
acted All Generators (6Nos) along with all
220 kV feeders tripped during the incident
1 KSEB to reduce sensitivity of REF protection appropriately at
Idukki PH
2 KSEB to replace repair the faulty breaker
3 KSEB to check the PLCC equipment at New Pallam and inform
the remedial measures taken to PCSC forum
Kerala
Pending
Pending
(Recommendat
ion No1)
Annexure-III
Page 18 of 31
08-05-2016at
457 hrs
Tripping of 400kV Hyderabad - N‟sagar
line
PGCIL (SR-I amp SR-II)
PendingLine tripped on operation of over-voltage protection at
Hyderabad end and Direct Trip was received at
N‟sagar Over-voltage Stg-2 operation was observed
in EL of Hyderabad station
55II5 1PGCIL (SR-I) to properly configure EL‟s at Hyderabad station
with time-scale resolution up to msec further DR‟s should also be
configured for showing both Analog and Digital data with properly
defined X-axis and Y-axis scales
2PGCIL (SR-I) to follow the FILE Naming Nomenclature provided
by SRPC in naming various tripping files (FIRDRELTR) being
uploaded in SRLDC‟s Tripping Monitor System (TMS) portal
PGCIL (SR-I) Yet to be informed
Annexure-III
Page 19 of 31
55II9 Tripping of HVDC Gazuwaka pole-2 19-05-2016 at
1141 hrs
Pole tripped on operation of differential current
protection of east side of Pole-2
PGCIL (SR-I) to take up the issue of differential protection operation
of converter transformer on low voltage fluctuations with their OEM
and submit a detailed report on it
PGCIL (SR-I) Yet to be informed Pending
56II11 Tripping of HVDC GazuwakaPole-2 19-06-2016 at
520 Hrs
HVDC Pole-2 got tripped on operation of Bus
differential protection
PGCIL (SR-I) to get the tripping of HVDC Pole-2 tripping on Win-
Bus differential protection thoroughly investigated for correctness of
operation and submit a report thereon
PGCIL (SR-I) Yet to be informed Pending
56III7 Tripping of 400 kV Khammam-N‟sagar
line-1
05-06-2016 at
2241 hrs
Line tripped on B-phase to earth fault Line auto-
reclosed successfully at N‟sagar and failed to auto-
reclose at Khammam
1PGCIL (SR-I) to configure DR amp EL at N‟sagar (Tallapalli) end so
that full operation of AR is captured
2PGCIL (SR-I) to investigate the reasons for non-operation of AR of
Tie-CB at N‟Sagar end and resolve them suitably
PGCIL (SR-I) Yet to be informed Pending
58II13 (GI) Tripping of 400 kV Raichur-Gooty line-1
and 400 kV Gooty-Tumkur line-2
01-09-2016 at
517 hrs
400kV Gooty-Raichur line tripped at Gooty end only
and was holding from Raichur 400kV Gooty-Tumkur
line-2 tripped on over voltage
PGCIL (SR-I) to check the operation of OVR relays at their Gooty
SS and properly configure lines‟ DRs amp ELs so that events pertaining
to OVR (Stage-I amp Stage-II) operation (START amp TRIP) get
explicitly recorded
PGCIL (SR-I) Yet to be informed Pending
58II14 (GI) Tripping of 400 kV Gooty-Tumkur line-2 02-09-2016 at
2156 hrs
Line tripped on operation of over-voltage protection at
Gooty end and Direct Trip was received at Tumkur
PGCIL (SR-I) to check the operation of OVR relays at their Gooty
SS and properly configure lines‟ DRs amp ELs so that events pertaining
to OVR (Stage-I amp Stage-II) operation (START amp TRIP) get
explicitly recorded
PGCIL (SR-I) Yet to be informed Pending
61II4 Tripping of HVDC Gazuwaka Pole-2 05-12-2016
at 1503 hrs
Pole-2 tripped due to tripping of AC filter banks
which was due to voltage disturbance in eastern bus at
Gazuwaka
PGCIL (SR-I) to refer the instant trippings to their OEM to ensure
that the settings adopted for pole trippings for low-voltage power
swing and ferro-resonance phenomena are in order and have been set
properly A copy of the OEM‟s reply in this regard shall be furnished
to PCSC forum
PGCIL (SR-I) Yet to be informed Pending
62II4 Tripping of 400 kV Gazuwaka-Vemagiri
(PG) line and 400kV Vemagiri(PG)-
Nunna line
18-01-2017 at
2203 hrs
400 kV Gazuwaka - Vemagiri (PG) line and 400 kV
Vemagiri (PG) - Nunna line got tripped due to Direct
Trip receive at Gazuwaka and Vijayawada respectively
PGCIL (SR-I) to configure triggering of DR amp EL for SF6 gas
compartment Zone trip with suitable legend
PGCIL (SR-I) Yet to be informed Pending
63II11 Tripping of 765 kV Vemagiri-Srikakulam
line-1 and 765400kV ICT-1 at Vemagiri-
PG SS
16-03-2017 at
1023 hrs
Line-1 and ICT-1 which are in the same diameter got
tripped due to operation of Tie bay gas
compartment trip
1 Since tripping of elements on Gas Compartment Trip has been
observed frequently in the past few months at 765 400 kV
Vemagiri SS PGCIL (SR-I) shall furnish a comprehensive report
detailing the remedial measures taken including OEMrsquos suggestions
to prevent their occurrence
PGCIL (SR-I) Yet to be informed Pending
PGCIL (SR-I)12-09-2016 at
1203 hrs
Line tripped on Direct Trip receipt at Ramagundam
end and line was holding from Warangal end
Pending58IV1
400 kV Gazuwaka-Vemagiri (PG) line tripped on Y-E fault However for 400 kV Gazuwaka-Vemagiri (PG) line Direct Trip was received at Gazuwaka after
250ms of occurrence of fault and fault was
persistent for 250ms Then Over-Voltage Stage-1 protection operated from Vemagiri (PG) end in 400 kV Vemagiri (PG) - Nunna line and tripped it
62II1
For the line under consideration the following shall be carried out
by PGCIL (SR-I) in coordination with NTPC-Ramagundam
I)End-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
II)Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be
repaired replaced
Yet to be informedTripping of 400 kV Ramagundam-
Warangal line
Yet to be informed05-01-2017 at 1305 hrs
Tripping of 400kV Gazuwaka - Vemagiri (PG) line and 400 kV Vemagiri (PG ) - Nunna line
1 PGCIL (SR-I) to ensure time-sync of all protections relays at their Vemagiri Gajuwaka and Vijayawada substations2 PGCIL (SR-I) to check OVR settings for correctness of operation
along with proper drop-off to pick-up ratio (gt 097) and configure
OVR_START event in the corresponding Relay BCU Event Logger for all 400 kV lines emanating from their Vemagiri (PG) SS
PGCIL (SR-I) Pending
Annexure-III
Page 20 of 31
64III16 Tripping of 76 5kV Kurnool-Nellore PS
line-2
27-04-2017 at
2222 hrs
R-phase to earth fault had occurred in line Auto-
reclose was successful at Kurnool end and breaker
at Nellore PS end tripped and did not attempt for
auto-reclose
For the line under consideration PGCIL (SR-I) to Configure Event
Logger (EL) to record events at msec level
PGCIL (SR-I) Yet to be informed Pending
65II15 Tripping of HVDC Gazuwaka Pole-1amp2 25-05-2017 at
0945 hrs
HVDC pole-1 got tripped due to operation of South
filter inter zone protection and HVDC pole-2 got
tripped due to operation of differential protection
PGCIL (SR-I) to furnish detailed report on the events that led to
tripping of HVDC Poles ndash 1 amp 2 including remedial measures taken
to PCSC forum Further the OEM report wrt tripping of HVDC
Pole-2 shall also be furnished
PGCIL (SR-I) Yet to be informed Pending
65III5 Tripping of 765 kV Raichur-Solapur line-
2
07-05-2017
at 1918 hrs
Y-phase to earth fault Auto-reclose was successful
at Solapur and breakers at Raichur end got tripped
PGCIL (SR-I) to configure Event Loggerrsquos time-resolution up to
millisec level in all protection relays at their 765 400 kV Raichur SS
PGCIL (SR-I) Yet to be informed Pending
55II7 Tripping of 400kV Kudgi PG (Narendra
New) - Narendra-PG line-2
18-05-2016 at
1625 hrs
line tripped on B-phase to earth fault and line auto-
reclosed successfully from Narendra end Line tripped
from Kudgi-PG due to operation of over-voltage stage-
1
PGCIL (SR-II) to properly configure dead-time of AR (typically 1
sec) on all lines emanating from Narendra (PG) substation
PGCIL (SR-II) Yet to be informed Pending
54II3 Tripping of 400kV Sriperambudur -
SVChartam and 400kV Nellore-
Sriperambudur line-1
05-04-2016 at
0011 hrs
400kV Nellore-Sriperambudur line-1 tripped on a R-
phase to earth fault 400kV Sriperambudur-
SVChatram line tripped at Sriperambudur end only
on operation of over current protection
PGCIL (SR-II) to check and revise Pole Discrepancy Relay (PDR)
time setting appropriately based on the type of AR scheme being
implemented at their 400 kV Sriperambudur SS
PGCIL (SR-II) Yet to be informed Pending
54III3 Tripping of 400 kV Kalvindapattu-Vallur
line
10-04-2016 at
1459 hrs
R-phase to earth fault had occurred in line Auto
reclose attempt is unsuccessful auto-reclose could not
be established from provided DR EL
PGCIL (SR-II) to furnish a report on the tripping event detailing the
reasons for unsuccessful AR operation at Kalvindapattu end and the
remedial action taken to restore AR to normalcy
PGCIL (SR-II) Yet to be informed Pending
55II17 Tripping of HVDC Talcher-Kolar pole-1 30-05-2016 at
0949 Hrs
Failure of main CT of AC filter (20C08A) occurred
and it in turn caused the operation of filter bank
differential protection HVDC Pole-1 got tripped on
group Differential protection operation
PGCIL (SR-II) to take up the issue of Pole-1 tripping on Group
Differential Protection (Stage-II) due to multiple commutation failures
with their OEM and furnish a report on it
PGCIL (SR-II) Yet to be informed Pending
56II8 Tripping of HVDC Talcher-Kolar Pole-1 17-06-2016 at
1635 Hrs
Talcher-Kolar HVDC Pole-1 got tripped on line fault
and Pole-2 went to ground return mode with 150MW
PGCIL (SR-II) to address amp resolve DTPC and fibre-optic link
related issues raised by KSEB at Thrissur Madakathara substations
and conduct a mock-test in coordination with KSEB to verify integrity
of signal transmission from Kolar to Thrissur Makadathara
PGCIL (SR-II) Yet to be informed Pending
64II14
PGCIL (SR-I)14-05-2017
at 1654 hrs
Tripping of 400 kV Vemagiri - Gazuwaka
line
PGCIL (SR-I) to sort out issues relating to AR functionality
operation for both Main-CB and Tie-CB at both Vemagiri and
Gajuwaka substations
For the line under consideration the following shall be carried out
by PGCIL (SR-I)
End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be
repaired replaced
Y-phase to earth fault Auto-reclose was not
successful due to persistent fault Vemagiri end had
sent a Direct Trip after un-successful Auto-reclose
AR attempt was observed in Gazuwaka end DR
after 3 phase trip
65III10
Yet to be informed PendingPole-1 got tripped due to failure of auxiliary supply
changeover 400kV Jeypore-Gazuwaka line-2 got
tripped on operation of over-voltage protection
Pole-2 east shunt reactor got failed and this in turn
resulted in tripping of HVDC pole-2 due to Pole-2 Y
block activation 400kV Jeypore-Gazuwaka line -1
also got tripped during the incident
28-Apr-17 Pole-
1 at 844 hrs
and Pole-2 at
907 hrs
Tripping of HVDC Gajuwaka Pole-1amp2
and 400 kV Jeypore-Gazuwaka line-1amp2
PGCIL (SR-I)1 PGCIL (SR-I) to provide fully automatic supply-changeover
scheme for Pole-1 auxiliaries at the earliest
2PGCIL (SR-I) to furnish a detailed report on the reasons for East
Shunt Reactor failure including remedial action taken OEM report in
this regard also shall be shared
3PGCIL (SR-I) to provide redundant AC auxiliary supply to both
Pole-1 amp Pole-2 either by making use of tertiary of ICT-1 or from
external dedicated feeder
Yet to be informed Pending
Annexure-III
Page 21 of 31
58II3 (GI) Tripping of 400 kV Sriperambudur-
SVChatram line
14-08-2016 at
1349 hrs
Line tripped at Sriperambudur end only on
operation of directional earth fault protection
(i) PGCIL (SR-II) to disable high-set of line DEFRrsquos and
(ii) PGCIL (SR-II) to block line DEFR operation when DPR is in active
condition (has picked up) at their Sriperambudur SS
PGCIL (SR-II) Yet to be informed Pending
58II5 (GI) Tripping of 400 kV Neyveli TS2-Pugalur
line and 400 kV Neyveli TS2-Neyveli TS2
EXP line
21-08-2016 at
1035 hrs
Failure of Y-Ph tension insulator of tie feeder bay at
Neyveli TS2 Neyveli-Pugalur line tripped due to over
voltage at Neyveli TS2 and direct trip was received
at Pugalur
PGCIL (SR-II) to check the operation of the DPR relays at Pugalur
end NLC TS2 - Pugalur line by trans-playing the event on another
healthy relay and take suitable action including replacement of the
relay accordingly
PGCIL (SR-II) Yet to be informed Pending
58II19 (GI) Tripping of 400 kV Madurai-Karaikudi
line
15-09-2016 at
0302hrs
Line tripped on operation of OVR Stage-I protection
at Karaikudi and Direct Trip was received at Madurai
PGCIL (SR-II) to check the operation of OVR relays at their 400 kV
Karaikudi SS and properly configure linesrsquo DRs amp ELs so that events
pertaining to OVR (Stage-I amp Stage-II) protection operation (START
amp TRIP) get explicitly recorded
PGCIL (SR-II) Yet to be informed Pending
59II20 (GI) Tripping of HVDC Talcher-Kolar pole-1 10-10-2016 at
1635 hrs
Pole-1 of HVDC Talcher-Kolar tripped due to receipt
of lsquorsquoPole block command from Talcher end due to
tripping Pole-1 DC filter at Talchar end Pole 2 went
into metallic return mode after tripping of pole-1
PGCIL (SR-II) to check the correctness of non-operation of SPS
(Talcher ndashKolar Trip Signal-1) in the instant case by comparing it
with the incident of tripping of HVDC Talcher-Kolar pole-1 on
05102016 and furnish a report on it to PCSC forum
PGCIL (SR-II) Yet to be informed Pending
59II24 (GI) Tripping of 400220kV ICT-2 at
Somanahalli SS
24-10-2016 at
354 hrs
ICT-2 tripped on operation of Buchholz relay PGCIL (SR-II) to properly configure ICT protection relay DR so that
digital signals are recorded with proper names at their 400220 kV
Somanahalli SS
PGCIL (SR-II) Yet to be informed Pending
59III4 Tripping of 400 kV Salem -Udumalpet line-2
13-10-2016 at 0306 hrs
Line tripped on R-phase to earth fault Line auto-reclosed at Udumalpet end and did not reclose at
Salem
Line tripped on R-phase to earth fault Line auto-reclosed at Udumalpet end and did not reclose at Salem
PGCIL (SR-II) Yet to be informed Pending
62II6 Tripping of 400 kV Trichy-Karaikudi line 21-01-2017 at 2145 hrs
Line tripped on operation of over voltage protection at Karaikudi end and direct trip was received at Trichy Voltage recorded in DR in antecedent
conditions were 2454 kV 2432 kV 2536 kV
respectively
1 PGCIL (SR-II) to ensure OVR settings adopted for 400 kV lines at Karaikudi SS are as per SRPC provided settings with a drop-off to pick-up ratio gt 097
2 PGCIL (SR-II) to configure OVR_START event in the corresponding Relay BCU Event Logger for all 400 kV lines emanating from their
Karaikudi SS
PGCIL (SR-II) Yet to be informed Pending
62III5 Tripping of 400 kV Tumkur ndash Bidadi line 17-02-2017
at 1044 hrs
B-E fault Line did not auto-reclose 1 PGCIL (SR-II) to properly configure AR logic operation at Bidadi
end and ensure itrsquos correct operation for a fault during reclaim time
2 PGCIL (SR-II) to ensure time-sync of protection relays with GPS at
both Tumkur and Bidadi substations
PGCIL (SR-II) Yet to be informed Pending
62III6 Tripping of 400 kV Tumkur ndash Bidadi line 18-02-2017
at 1036 hrs
B-E fault Line did not auto-reclose PGCIL (SR-II) to properly configure AR logic operation at Bidadi
end and ensure itrsquos correct operation for a fault during reclaim time
PGCIL (SR-II) Yet to be informed Pending
62V1 Tripping of 400kV Vallur-Kalivandapattu
line-2
22-02-2017 at
455 hrs
Line tripped due to failure of R phase jumper Two
faults observed from DR 2nd fault cleared in 500ms
from Kalavindapattu end
PGCIL (SR-II) to enable Trip on Reclose (TOR) at Kalavindapattu end
on all 400 kV lines emanating from it
PGCIL (SR-II) Yet to be informed Pending
57II2 Tripping of 400 kV Mywady-Salem line-1
and 400 kV Mywady-Madurai line
PGCIL (SR-II) Yet to be informed03-07-2016 at
0306 hrs
400kV Mywady- Madurai line tripped on a Y-phase
to earth fault due to agriculture fire Tie-CB LBB
relay got operated at Mywady end and resulted in
tripping of Main breakers of 400kV Mywady-
Madurai and 400kV Mywady-Salem line-1 which are
in the same diameter
PGCIL (SR-II) to furnish a report on the remedial action taken after
ascertaining the reasons for (i) non-opening of Main-CB of Mywady
ndash Madurai line at Mywady end on Tie-CB LBB operation and (ii)
delay in sending DT to the remote ends after Tie-CB LBB operation
Pending
Annexure-III
Page 22 of 31
65II2 Tripping of 400 kV Kudgi (PG) - Tumkur
line-2 and Kudgi (PG) ndash Kudgi (NTPC)
line-1
06-05-2017 Kudgi (NTPC) feeder tripped at Kudgi (PG) end on
operation of distance protection R-N Zone-1
Tumkur feeder tripped at Kudgi(PG) end on
operation of NGR buchholtz relay
1 PGCIL (SR-II) to sort out AR related issues at Kudgi (PG) end on
400 kV Kudgi (PG) ndash Kudgi (NTPC) lines and put AR into service
2 PGCIL (SR-II) investigate reasons for NGR Buccholtz trip on 400
kV Kudgi (PG) ndash Tumkur line-2 and furnish action taken report wrt
rectifying the same
PGCIL (SR-II) Yet to be informed Pending
58II16 (GI) Multiple tripping at 400 kV Kalpaka SS 06-09-2016 at
1643 Hrs
Y-Pole breaker of Bus reactor-3 got failed during its
charging This resulted in a bus fault in 400kV bus-1
resulting in tripping of 400kV elements connected to
Bus-1
PGCIL (SR-I) amp PGCIL (SR-II) to review their Reverse Zone settings of
distance relays so as to bring them in line with Ramakrishna
Committee guidelines at all their substations in the southern
region
PGCIL (SR-I) amp PGCIL
(SR-II)
Yet to be informed Pending
51II4 NTECLTripping of 400kV Alamathy-Tiruvalam
line-1 and 400kV Alamathy-Vallur line-2
NTECL Vallur to furnish a report detailing the reasons for mal-
operation of Vallur end relays for a fault on Alamathy-Tiruvalam line-
1 and remedial measures taken to PCSC forum In the report their
preparedness for implementing line differential protection on Vallur-
Alamathy lines may also be indicated
400kV Vallur-Alamathy Line-2 got tripped from
Vallur end during failure of Y-phase LA in 400kV
Alamathy-Tiruvalam line Protection at Vallur end
tried for an auto-reclose and gave a 3 phase trip
TANTRANSCO mail received on 24-03-2016
3Ф Trip at 400kV Alamathy end due to DT received from vallur end for
BФ LAS bursted in Alamathy -Thiruvalam - 1 at Alamathy end
Mail received on 27-04-2016 and 20-05-2016
3Ф Trip at 400kV Alamathy end due to DT received from vallur end for
BФ LAS bursted in Alamathy -Thiruvalam - Line-1 at Alamathy end
Pending13-12-2015 at
2242 hrs
Others
Annexure-III
Page 23 of 31
56III5 Tripping of 400 kV Neyveli TS-2-
Pugalur line
04-06-2016 at
1636 hrs
B phase to earth fault occurred in line Auto-reclose
had not operated at NLC TS-2 and DT was sent to
Pugalur end resulting in a 3 phase trip
NLC to review the necessity of providing Relay Definitive Trip and
accordingly take steps to disable it on all lines emanating from their
generating stations
NLC Direct trip triggering of DR wii be carried out at TS2 end during the next
planned shutdown of the Pugalur Ts2 feeder
Mail received on 22-02-2017
Direct trip triggering of DR carried out at TS2 end for the TS2-Pugalur
feeder on 25-01-17
Pending
56II16 Tripping of 400 kV Gajwel-Singareni
line-2
30062016 at
2343 hrs
Tripped on 3-phase Trip at Gajwel end SCCL to configure Jaipur end relay‟s EL properly so that the time-
stamp resolution is extended downwards up to milli-second level
SCCL Yet to be informed Pending
1Singareni TPS to furnish single line diagram of their switchyard
along with the Over Voltage Relay settings adopted for various
transmission lines and to ensure that they are in line with the SRPC
provided gradings
2Singareni TPS to upload various tripping files (FIRDRELTR)
pertaining to a tripping event involving their station in SRLDC web-
portal within 24-hrs of occurrence of that event in compliance of
IEGC Regulation 52(r)
Line tripped on operation of Over-Voltage
protection at Singareni and Direct Trip was received
at Gajwel DR amp EL of Singareni was not furnished
59III3
57II8 NTPC (Ramagundam)
10-07-2016 at
156 hrs
Line tripped at Ramagundam end on operation of over-
voltage protection Dichipally end tripped due to
receipt of Direct Trip signal
1NTPC-Ramagundam to ensure correctness of operation of Over
Voltage relays by taking remedial measures like maintaining
healthiness of concerned CVT‟s setting drop-off to pick-up ratio at
097 amp above etc
2NTPC-Ramagundam to ensure time sync of their station‟s DR amp
EL with GPS
3NTPC-Ramagundam to sort out analog values indication amp
overlapping issue of time-stamp in their station DR‟s
4NTPC-Ramagundam to properly configure their EL‟s so that events
are recorded with msec resolution
Line tripped on B-phase to earth fault Line auto
reclosed at Chandrapur end and did not reclose at
Ramagundam
57II4
16-07-2016 at
438 hrs
Tripping of 400 kV Ramagundam -
Chandrapur line -2
1NTPC-Ramagundam to furnish remedial measures taken wrt AR
non-operation and unwarranted DT sending to other end
2NTPC-Ramagundam to configure protection relays DR‟s such that
events get recorded for at leas
2000 msec post-triggering so as to cover complete AR operation
Tripping of 400 kV Ramagundam -
Dichipally line
NTPC-Ramagundam mail dated 09032017
1 Main-II relay replaced Over voltage relays pickup to reset ratio is 098
--- Completed
2 DR and EL are time synchronized with GPS clock
-------- Completed
3DR alalog overlaping issue is sloved ---- Completed
4 ----- Pending
Yet to be informed
Pending
54I1
Tripping of 400 kV Gajwel-Singareni line-
2
02-04-2016 at
1708 hrs 1MAPS to furnish a detailed report on the tripping of SP Koil ndash
MAPS lines 1 amp 2 at MAPS end with focus on the correctness of the
settings of Main-I amp Main-II relays (for primary amp back-up
protections) on both the lines
2MAPS to take steps to provide down-loading facility for DR amp EL
from Main-I amp Main-II relays on all 230 kV lines emanating from
MAPS
3MAPS in co-ordination with SP Koil to carry out PLCC end-to-
end testing on SP Koil ndash MAPS lines 1 amp 2 and ensure healthiness
of PLCC communication amp carrier-aided protection
4MAPS to put in service Auto-Reclosure feature on all four 230 kV
lines emanating from MAPS by June 2016
Pending
Complete outage of 230 kV SPKoil
Station of TANTRANSCO
B-phase CT failure occurred in 230 kV SPKoil -
MAPS line-1 Busbar protection got operated at
SPKoil station All elements except 230kV
Oragadam and 230kV Kalivandapattu got tripped at
230kV SPKoil station bdquoY‟ phase CT and support
insulators also got damaged
27-09-2016 at
0101 hrs
Status revided vide MAPS mail dated 06122016
1 The settings given by Ms TANTRANSCO were adopted for Main ndashI amp
Main- II relays for both the lines The same settings were verified to be
same Subsequently calibrated was done and no drift was observed
--- Complied
2 From May 2016 onwards the DR EL and trip report are being sent by
mail to SRLDC Bengaluru by MAPS
--- Complied
3 Monthly maintenance of PLCC equipments is being done by Ms
TANTRANSCO At present PLCC telephone is not working it is being
followed up
--- Complied
4 CVTs are planned to be procured from Ms TANTRANSCO by the end
of February 2017 and AR will be implemented for all the lines emanating
from MAPS by July-2017 as discussed in the current SRPC meeting on
25112016
--- Pending
PendingNPCIL (MAPS)
SCCL
NTPC-Ramagundam mail dated 09032017
1 The relay will be checked in next opportunity if required it will be
changed with new one------------- Pending
2DR time recording increased to 2 sec --------- Completed
NTPC Pending
Annexure-III
Page 24 of 31
62III2 Tripping of 400 kV Kaiga-Guttur line-1 06-02-2017
at 0501 hrs
B-phase to earth fault Line did not auto-reclose at
Kaiga end
1 KGS to properly configure all relays DR‟s time scale for a post-
triggering period of 2 sec to capture events such as complete AR
operation
2 KGS to ensure time-synchronization of all protection relays with
GPS in their 400 kV switchyard
NPCIL (KGS) Yet to be informed Pending
63III4 Tripping of 400 kV Gajwel-Singareni line-
2
07-03-2017 at
1652 hrs
Line tripped on B-phase to earth fault Line did not
auto-reclose
1 SCCL to properly configure LBB logic for all line relays
where AR has been put into service for 1-ph initiation based
on phase segregation (ie for the faulted phase) at their
Singareni TPS
SCCL Yet to be informed Pending
64II8 Tripping of 400 kV Tirunelveli-
Kudankulam line-3
23-04-2017 at
0556hrs
R-phase to earth fault had occurred in Tirunelveli -
Udumalpet line-2 During the incident Tie-CB LBB
got operated at Tirunelveli end due to sluggish
operation and tripped 400 kV Tirunelveli -
Kudankulam line-3
NPCIL (KKNPP) to configure DRrsquos amp ELrsquos of protection relays at their
station for recording DT receipt event at their Kudankulam NPP
NPCIL(KKNP) Yet to be informed Pending
Yet to be informed63III8 NPCIL (KGS)Tripping of 400kV Kaiga-Guttur line-2 Line tripped on Y-phase to earth fault Line auto-
reclosed from Guttur end and failed to re-close from
Kaiga end
1 NPCIL (KGS) to furnish an action taken report on the
reasons for AR lock-out and remedial action taken to rectify
the same
2 NPCIL (KGS) to configure DR‟s of line protection relays for
a post triggering period of 2 sec to capture complete AR
operation at their Kaiga GS
3NPCIL (KGS) to furnish FIR amp TR for tripping events as
per SRLDC provided formats
27-03-2017 at
706 hrs
Pending
Annexure-III
Page 25 of 31
34I6
01-01-2015 at
1338 hrs
42II18 400kV Raichur TPS-Raichur(PG) line-
1amp2 400kV Raichur-Mahboobnagar
Unit7 and ICT-2 at RTPS tripped
during the incident B phase to earth
fault had occurred in 400kV Raichur
TPS-Raichur line-1
1 Bus bar protection shall be provided by asset owner ( ie
KPTCL)
2 Settings for main distance protection amp Overcurrent protection
shall be examined and reviewed
3 Time synchronization of the Substation shall be ensured
As reported directional over current relay of ICTrsquos
operated due to snapping of line jumper in 220kV
Lingapur line
1 KPCL to review REF setting (DMT or IDMTL) for unit-7 by first
week of April 2015 and inform the same to PCSC forum
2 TSTRANSCO to furnish Mehaboobnagar‟s DR and EL and the
reasons for distance relay operation at their end within a week‟s time
3 PGCIL (SR-I) to rectify the issues relating to AR operation relay
reach (Z2) reverse reach (Z4) and SOTF auxiliary contacts within a
week‟s time and submit the actions taken to PCSC forum
16-07-2014400220 kV ICT-1 amp 2 at
MUNIRABAD
On account of R-phase to earth fault line tripped at
Hassan end due to operation of distance Zone-2 and
non-receipt of carrier From DR of Talaguppa end it
is observed that fault had occurred in Yphase
09-03-2015 at
0636 hrs
Tripping of 400
kV TALAGUPPA
ndash HASSAN line
40II3
Multiple tripping at Raichur TPS of
KPCL
Miscellaneous
1 PGCIL and KPTCL to ascertain the reason for the phase
discrepancy in the relay operation and take suitable remedial
measures
2 KPTCL to check the PLCC operation at Talaguppa end and submit
the report to the PCSC forum
1 Yet to be informed by KPCL ---- Pending
2 Mail received on 26-05-2015 from TSTRANSCO
It is found that the main-2 ABB make REL316 type distance relay was
defective and same was replaced with MICOM P444 by MsPGCIL on
2304-2015 After replacement of main-II DR can be extracted from this
relay For EL in to service some field winding is pending which is being
taken up in this month -- Complied with
3
PGCIL mail recieved on 27-04-2016
End to end PLCC tunning carried out
PGCIL (SR-I) RVMD 14072016
Relay settings of all the stations in SRTS-1 were derived as per
Ramakrishna Commettee recomendations and implemented - Complied
with
KPCL
TSTRANSCO
PGCIL (SR-I)
PGCIL (SR-II) KPTCL
KPTCL
PGCIL (SR-I)
Mail recieved on 28-04-2015
End to end testing of PLCC has been done and problem in the PLCC is
atttended
Mail received on 27-05-2015 (KPTCL) amp 29-07-2015
End to end testing of PLCC has been done and problem in the PLCC is
atttended Phase discrepancy in the relay operation is to be checked jointly
Mail recieved on 02-09-2015 from PGCIL (SR-II)
Problem is in identification of phases at Talguppa end To be rectified by
Ms KPTCL
Mail recieved on 28-06-2016 from KPTCL
The matter is reffered to the concerned Operation and maintance wing to
set right the mismatch of phases in 400kV Talaguppa-Nelamangala and
Talaguppa-Shantigrma lines at Talaguppa in cordination with PGCIL
Pending
(with KPTCL)
Mail recieved on 27-05-2015 (KPTCL)
1 KPTCL has taken action to provide bus bar protection to 220kV buses
2 Over current relay Settings of ICTs to be reviewed by PGCIL
Mail received on 29-07-2015 (KPTCL)
Initial Tendering stage
KPTCL Mail recieved on 23-01-2016
Detailed estimate prepared for taking up the work CEE Transmission
Zone Gulbarga will take up necessary procurement and further execution
----------------------------------------------------------------------
1 Pending from KPTCL side
2 Complied with as per PGCIL (SR-I) RVMD 14072016 which stated
that Relay settings of all the stations in SRTS-1 were derived as per
Ramakrishna Commettee recomendations and implemented
3 Pending from KPTCL side
Pending (with
KPCL)
Pending
(with KPTCL)
Annexure-III
Page 26 of 31
Tripping of Unit 1 at NCTPS 24-05-2015
at 1913 hrs
ID Fan trip
Tripping of Unit 1 at MEPL 24-05-2015
at 1913 hrs
Coal Mill tripped
Tripping of Unit 1 at
Krishnapatnam
24-05-2015
at 1917 hrs
Generator Protection operated
Tripping of Unit-8 at RTPS 24-05-2015
at 1919 hrs
Tripped on Overvoltage
47I2
1 All Tripped units viz Krishnapatinam MEPL Raichur NCTPS
to submit a detailed report on this event including the remedial
measures taken to PCSC forum
2 KPCL to check the excitation system of Unit 8 of RTPS and
submit the remedial measures taken to PCSC forum
KPCL MEPL
APGENCO TNEB
As per FIR submitted CT damage observed in
Chitoor-Main bay (404) Main breakers connected to
bus-1 (401 404 407 410) got tripped on operation of
bus bar protection Unit-1 tripped on operation of
MFT Unit-2 was not in service
Complete outage of Krishnapatnam TPS
Pending (with
KPCL)
APGENCO letter dated 18032016
1SOE and SLD are attached The DR of 405 CB is not generated during
the incident Now the problem is identified and rectified
--------- Completed
2All the 3 lines ie CHTR-2 MNBL-I amp II tripped in zone
protection The fault was in Blind zone ie P2 side of CT where it was
covered under Bus fault by the time fault moved on to P1 side when the
fault comes under STUBTEED zone after 330msec all the feeders expect
CHTR-1 tripped in Zone-II and total fault persisted for 500msec before the
405 TIE CB opens and clear the fault As a remedial the STUB protection
operation also checked and found OK-------Completed
3The Time Sync was missed on the day and found there was problem with
LAN Timer same was rectified Now found OK
-----------Completed
4Now the DR Time scale changed to 1 sec for Pre fault and 3 sec for Post
fault and STATE of events are corrected wherever found wrongor
misguiding during analysis---------Completed
5
PGCIL-SR1 RVMD 27-04-2016
Procurement of differential protection for 400kV NPS-NLR DC and
400kV RCR-RTPS-DC is under tendering
PGCIL-SR1 RVMD 14-07-2016
The proposal for procurement of Line differential Protections for 400kV
Raichur - RTPS-1 amp 2 and 400kV Nellore - NPS - 1 amp 2 lines has been
approved and tender is under technical evaluation
Pending with
PGCIL(SR-I)
08-09-2015 at
1820 hrs
44I3
1 APGENCO to furnish to PCSC forum (i) A3-size Single Line
Diagram of SDSTPS and (ii) the sequence of events with time stamp
showing the protection that opened Tie-CB (405) at SDSTPS
2 APGENCO to review STUBTEED protection in all dias at
SDSTPS and ensure that they are configured for instantaneous
operation
3 APGENCO to properly configure the STATE of the tripping events
so that they get recorded appropriately like TRIP OPERATED in
their corresponding Event Loggers
4 APGENCO to ensure time sync of all DR‟s and EL‟s at SDSTPS
5 PGCIL (SR-I) to provide line differential protection for 400 kV
NPS ndashNellore-PG lines 1 amp 2
TANGEDCO vide their mail dated 07072015 informed that as per the
discussion and recommendation of 44th meeting of PCSC held on
28052015 a time delay of 2 Sec had been introduced for the above
tripping for all the ID fans at NCTPS-II
MEPL vide their mail dated 14092015 informed that they had
implemented 2 seconds delay for under voltage tripping of all Drag Chain
Feeder Conveyors And this has been done for both the Units
APGENCO letter dated 18032016
The unit not tripped on Generator protection but tripped on Economiser
inlet flow protection consequent to tripping of TDBFP on lube oil pressure
lowBefore tripping dip in voltage was observed in the LT system which
caused tripping od lube oil pumpsAfter the incidentChangeover scheme
on under voltage of LT System was reduced from 80 with 2 sec delay to
40 with 200msec delay
APGENCO PGCIL (SR-
I)
Annexure-III
Page 27 of 31
12-11-2015 at
0020 hrs
Tripping of 400kV Gooty-Nelamangala
line
KPTCL KPCL NPCIL
(KAPS)
1 KPTCL KPCL to see the possibility of implementing Weak Infeed
logic with Echo feature enabled by Under
Voltage (27) element on Kadra-Karwar lines 1 amp2 and implement
the same if feasible
2 NPCIL to time-coordinate Kaiga‟s DEFR settings with (i) Zone-2
settings at Kaiga and (ii) primary protections of the lines emanating
from Kadra and Kodasalli
3 KPCL to ensure time-sync of EL‟s and healthiness of the Fault
Locators at Kadra
220kV Kadra-Karwar lines-1amp2 tripped
on earth fault in B-phase in zone-2
Kaiga-Kadra line tripped at Kaiga end
only on operation of directional eath
fault protection
31-07-2015 at
1144 hrs
Tripping of 220kV Kadra-Karwar lines -
1amp2 and 220kV Kaiga-Kadra line
PGCIL (SR-I) mail received on 27-04-2016
1 The firmware of REL670 is being upgraded ------- Completed
2 The recording of events in msec interval is being taken up with OEM
Henceforth for analysis purpose we will provide larm list which has msec
time stamp -------- Completed
3 End to end testing of PLCC code transmision and tuning of channels
carried out ------- Completed
4 Procurement of differential protection for 400kV NPS-NLR DC and
400kV RCR-RTPS-DC is under tendering The legends modified in
Eventalarm list Provision of diff relay for all short lines emanating from
NPS is being taken up with our corporate -------- Pending
PGCIL(SR-I) RVMD 14-07-2016
The proposal for procurement of Line differential Protections for 400kV
Raichur - RTPS-1 amp 2 and 400kV Nellore - NPS - 1 amp 2 lines has been
approved and tender is under technical evaluation
1
PGCIL RVMD 27042016
AR blocked due to failure of PLCC link The defective PLCCcards
replaced at Neelamgala end
PGCIL RVMD 14072016
AR blocked due to failure of PLCC link The defective PLCCcards
replaced at Neelamgala end End to end testing of PLCC carried out and
PLCC link is healthy ------ Pending
2 Gooty end Time syc unit is replaced with new one and commissioned ---
----- Completed
3 Yet to be informed by KPTCL --- Pending
PGCIL (SR-I) KPTCL 1 For Gooty ndashNelamangala line PGCIL (SR-I) and KPTCL to
provide 3-ph trip logic at their respective ends upon detection of
PLCC link failure during dead-time of AR operation
2 PGCIL (SR-I) to make GPS functional at Gooty SS and ensure
time-sync of various DR‟s and EL‟s with it (GPS)
3 PGCIL (SR-I) KPTCL to furnish reason for the operation of
Backup impedance protection of the line reactor at Nelamangala end
and the remedial measures taken to PCSC forum
Pending (with
KPTCL)
1PGCIL (SR-I) to furnish Action Taken Report on the findings of
OEM on relay mal-operation at NPS end on 400 kV NPS ndash NCCK
line to PCSC forum
2 PGCIL (SR-I) to appropriately configure Station Event Logger at
NPS to record events at msec interval
3 PGCIL (SR-I) to carry out PLCC end-to-end testing in coordination
with TPCIL for 400 kV NPS ndashTPCIL line
4PGCIL (SR-I) MEPL SEL TPCIL amp NCC to take steps to
provide line differential protection at their respective ends on all 400
kV lines (except Gooty line) emanating from Nellore Pooling Station
and furnish an action plan to implement the same
Pending
1
Mail recieved on 25-05-2016 from KPTCL
Availability of week end infeed with eco feature to be confirmed by
SEERTCHubli --- Pending
2
Mail recieved on 03-12-2016 from NPCIL(KGS)
The 200 ms Definite time DEFR element in both Kaiga Kadra and Kaiga
Kodasally lines were disabled IDMT DEFR is retained The 200 ms
Definite time back up oc element in both Kaiga Kadra and Kaiga
Kodasally lines were disabled IDMT is retained
------ Completed
3 Yet to be informed by KPCL
Status received vide KPCL mail dated 14062017
1 Since PT blasted (B phase) at Karwar end resistive over reach occurred
hence Backup protecion operated at Kadra end (zone-2 not sensed) ---
Pending
3Newly commissioned micom P444 relay time synchronised with GPS
------ Completed
Running units at Thermal Powertech power Station
tripped due to tripping of 400kV Nellore pooling
station (NPS)-TPCIL line and 400kV Nellore pooling
station (NPS)-ECC line
30-12-2015 at
0602hrs
R-phase to earth fault had occurred in Line Line did
not auto-reclose from both ends It was mentioned that
YampB pole breakers at Neelamangala tripped on
operation of pole discrepancy and backup impedence
protection for line reactor got operated
Complete outage of TPCIL power station 50I2
50II8
47II7
PGCIL (SR-I)
MEPL SEL TPCIL
NCC
Pending
Annexure-III
Page 28 of 31
52I8 Complete outage of 400kV NTPL station
and CEPL Stations
14-03-2016 at
0136 hrs
Running Units at NTPL and Coastal Energen power
station got tripped due to tripping of evacuating lines
NTPL and PGCIL (SR-II) to furnish compliance report of the
recommendations given by PSAG-15 Committee that held its meeting
on 12-13 April 2016 at NTPL Tuticorin
PGCIL (SR-II)
NTPL
NTPL mail received on 19052016
All General Recommendations will be done in the second week of June
2016 ---------- Complied by NTPL
Yet to be informed by PGCIL (SR-II)
Pending
[with PGCIL
(SR-II)]
56III4 Tripping of 220 kV Sedam-Tandur line 03-06-2016 at
2152 hrs
Line tripped on B-phase to earth fault Auto-reclose is
not enabled for line
KPTCL and TSTRANSCO to fast-track providing AR on 220 kV
Sedam ndash Tandur line and furnish an action plan of providing the same
by next PCSC meeting (PCSC-57)
KPTCL
TSTRANSCO
Yet to be informed Pending
KPTCL and TSTRANSCO to take steps to provide AR feature on
220 kV Sedam ndash Tandur inter-state line at their respective ends at the
earliest
KPTCL
TSTRANSCO
PGCIL mail received on 27-04-2016
Being pursued with APTRANSCO
APTRANSCO mail dated on 22-06-2016
AS maintenance being carrired out by PGCIL(SR-1) the required relay
replacement (wiringprogramming) may also be carried out by PGCIL(SR-
1)
PGCIL RVMD 14072016
1 The CB problem has been attended by POWERGRID by using OEM
Ms BHEL services amp POWERGRIDs OampM spares
------ Completed
2 Being pursued with APTRANSCO to replace the faulty Event Logger at
Vijayawada (Nunna) SS -------- Pending
APTRANSCO mail dated on 31-08-2016 amp 04032017 amp 24052017
As maintenance being carrired out by PGCIL(SR-1) the required relay
replacement (wiringprogramming) may also be carried out by PGCIL(SR-
1)
PGCIL (SR-I)
APTRANSCO
1 PGCIL (SR-I) in co-ordination with APTRANSCO to address
the problem with CB at the earliest opportune time
2 APTRANSCO to take steps to replace the faulty Event Logger at
Vijayawada (Nunna) SS
Line tripped at Mamidipally end only on Direct Trip
receipt from Ghanapur end
30-04-2016 at
1640 hrs
Line tripped due to operation of over voltage
protection at Vijayawada end and Direct Trip was
received at Sattenapalli end
25-12-2015 at
301 hrs
Tripped on 3-phase Trip at Gajwel end30062016 at
2343 hrs
19-06-2016 at
1527hrs
220kV Sedam-Humnabad-2 tripped at Sedam on
Distance protection Zone-2 Sedam-RTPS-1 amp2 lines
tripped at RTPS end only 220kV Tandoor inter-state
line was hand tripped due to incoming supply failure
54IV2 Tripping of 400kV Ghanapur-
Mamidapalli line
56II16
Tripping of 400kV Sattenapalli-
Vijayawada line
56I2
51II6
Tripping of 400 kV Gajwel-Singareni
line-2
Complete outage of 220kV Sedam
Substation of KPTCL
Pending
PendingFor the line under consideration the following shall be carried out by
TSTRANSCO and PGCL (SR-I) in co-ordination
iEnd-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
iiHealthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
PGCIL (SR-I)
TSTRANSCO
Yet to be informed
Pending
1TSTRANSCO and SCCL to check drop-off to pick-up ratio of OV
relay and ensure that it is kept at 097 amp above
2TSTRANSCO and SCCL to configure respective end bdquos DR amp EL
so that they get triggered on OVR protection and record relevant
events
3SCCL to configure Jaipur end relay‟s EL properly so that the time-
stamp resolution is extended downwards up to milli-second level
TSTRANSCO
SCCL
Yet to be informed
Yet to be informed
Pending
Annexure-III
Page 29 of 31
R-phase to earth had occurred in 400kV BTPS-JSWEL
line and protection issued a 3 phase trip
64I1 Complete outage of North Chennai TPS
STG-2
24-04-2017
at 2102hrs
Tripping of evacuating lines due to fault led to
tripping of Units
Pending
64I2 Complete outage of North Chennai TPS
STG-2
25-04-2017
at 1827hrs
Tripping of evacuating lines due to fault led to
tripping of Unit
64I3 Complete outage of North Chennai TPS STG-2
26-03-2017at 2109 hrs
Tripping of evacuating lines due to fault led to tripping of running Unit at NCTPS Stg-2
64III2 Tripping of 400 kV Ghanapur-
Mamidapalli line
04-04-2017 at
1901hrs
B-phase to earth fault Line auto-reclosed from
Mamidapalli end and tripped from Ghanapur
For the line under consideration PGCIL (SR-I) TSTRANSCO to (i)
rectify issues wrt PLCC channels (ii) restore PLCC carrier
communication and (iii) put AR into service at the earliest
PGCIL (SR-I)
TSTRANSCO
Yet to be informed Pending
APGENCO
TSTRANSCO
Direct Trip was received at VTPS and line was
holding from Suryapet end
13-06-2016 at
1655 hrs
56IV2 Tripping of 400 kV VTPS-Suryapet line
57I1 Complete outage of 220 kV Karwar
Substation of KPTCL
12-07-2017 at
1136 hrs
Triggering incident was failure of R phase PT in Bus-
1 at 220kV Karwar substation 220kV Kaiga-
Kodasalli tripped during the incident Also bus shut
down occurred at Kadra and Kodasally stations
1NPCIL (KAPS) to disable DefiniteTime OC relay and put in its
place by IDMT OC relay for backup protection on both 220 kV
Kaiga ndash Kadra line and 220 kV Kaiga ndash Kodasalli line at Kaiga end
2KPTCL to put bus bar protection in service at their 220 kV Karwar
SS at the earliest
3KPCL KPTCL to implement Weak In-feed Logic with Echo
feature enabled by Under Voltage (27) element on Kadra ndash Karwar
lines 1 amp 2
4KPTCL to furnish equipment failure report of the current incident to
PSEampTD Division of CEA with a copy marked to SRPC
KPTCL KPCL NPCIL
(KAPS)
NPCIL(KGS) mail dated on 03-12-2016
AThe 200 ms Definite time DEFR element in both Kaiga Kadra and
Kaiga Kodasally lines were disabled IDMT DEFR is retained
B The 200 ms Definite time back up oc element in both Kaiga Kadra and
Kaiga Kodasally lines were disabled IDMT is retained
------Completed
APTRANSCO mail dated on 20-12-2016
Issue was addressed to the concerned for necessary action
APTRANSCO mail dated on 24-05-2017
Meeting was conducted and the relays procurement for all the locations is
under progress
Pending57II9 Tripping of 400 kV Nellore (PG) - NPS
line-1 400 kV Krishnapatnam-Nellore
(AP) lines -1amp2 and 400kV NPS -
MEPL line
18-07-2016 at
1905 hrs
Triggering incident was snapping of Y phase
conductor in 400kV Nellore (PG) - NPS line-1
Distance relay at Krishnapatnam end over-reached in
Zone-1 and resulted in tripping of 400kV
Krishnapatnam ndash Nellore (AP) lines - 1amp2 from
Krishnapatnam end Distance relay at MEPL over-
reached and resulted in tripping of MEPL-NPS line
from MEPL end
PGCIL (SR-I) TPCIL MEPL SEL SGPL APTRANSCO
APGENCO and SDSTPS to implement line differential protection on
all 400 kV transmission lines (of length less than 50 km) emanating
from Nellore PS Nellore (PG) SS and Nellore (AP) SS [It may be
noted here that the cut-off length of 50 km has been specified with a
view to exclude only long transmission lines]
APGENCO PGCIL(SR-
I) TPCILMEPL
SELSGPL
APTRANSCO
Pending
63II9 KPCLJSWEL Yet to be informed Pending
1 TANTRANSCO and PGCIL (SR-II) to take steps to complete
insulator replacement works on the 400 kV lines owned by them in
Chennai area within 3 months
1 JSWEL to follow file naming terminology provided by SRPC
for various tripping files uploaded in SRLDCrsquos TMS portal
2JSWEL to furnish reasons for AR-BLOCK observed during
the instant tripping and remedial action taken by them to
keep AR in service
3 KPCL to configure DR amp EL properly to record OVR Stage-I
amp Stage-II protections at their BTPS station
14-03-2017 at
1911 hrs
Tripping of 400 kV YTPS-BTPS line and
400 kV BTPS-JSWEL line
Status received vide TANTRANSCO mail dated 15-06-2017
1 All the Porcelain insulators of 400kV NCTPS-II - Vallur feeders-1amp2
were replaced with Polymer insulators by 20052017
2 Existing Porcelain insulators of all other 400kV feeders are being
replaced with Polymer insulators in a phased manner
TANTRANSCO
PGCIL(SR-II)
For the line under consideration the following shall be carried out by
APGENCO in coordination with TSTRANSCO
1End-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
2Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
PendingYet to be informed
Annexure-III
Page 30 of 31
65II5 Tripping of 400 kV Ghanapur-
Mamidapalli line
08-05-2017 at
1915 hrs
Line tripped at Ghanapur end only and was holding
from Mamidapalli Ghanapur end protection had
sensed R-phase to earth fault
For the line under consideration the following shall be carried out
by TSTRANSCO in coordination with PGCIL (SR-I)
1 End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
TSTRANSCO PGCIL
(SR-I)
Yet to be informed Pending
65III12 Tripping of 400 kV Srisailam-Dindi line-2 24-05-2017
at 1502 hrs
R-phase to earth fault Auto-reclose was successful
at Dindi and Zone - 1 3-phase trip at Srisailam
Since all 400 kV lnies emanating from Srisailam LB are composite
feeders APTRANSCO TSTRANSCO can keep AR functionality disabled at respective remote end stations under their control
APTRANSCO TSTRANSCO Yet to be informed Pending
Yet to be informed PendingTriggering incident was failure of CT in 110 kV
Villianur-Kurumbapet at Villianur substation 230KV
Villianur ndash NLC2 and 230 kV Villianur - Pondy lines
got tripped from Pondy end (on operation of DEF)
and NLC end (on operation of Zone-3) respectively
resulting in loss of supply to 230 kV Villianur
substation
65I2 Complete outage of 400kV Uravakonda
and Jammalamadugu Substations
31-05-2017 at
1744 hrs
Triggering incident was tripping of 400 kV Kurnool-
PG - Narnoor line - 1 amp 2 and 400 kV Narnoor-
Jamalamadugu line-2 which led to loss of supply to
400kV Uravakonda and Jamalamadugu 400kV Gooty-
Narnoor 400kV Narnoor-Jamalamadugu-1 400kV
Srisailam-Narnoor 400kV Uruvakonda-
Mahboobnagar-1amp2 were out of service in
antecedent condition
1 For 400 kV Ghani ndashNarnoor line the following shall be carried out
by APTRANSCO
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
2 PGCIL (SR-II) to take appropriate action wrt disabling non-
directional instantaneous Igt4 protection that operates without
checking existence of stub If required the issue may be referred to
relays OEM for appropriate solution or the present relays may be
replaced with other relays with different styles that donrsquot have the
issue observed
APTRANSCO PGCIL
(SR-II)
Yet to be informed Pending
1 PED to furnish an action taken report wrt complying with the
protection audit recommendations
2 PGCIL (SR-II) to review Zone-3 and DEF protection setting at
Pondicherry end 230 kV Pondicherry ndash Villianur and 230 kV
Pondicherry ndash Bahour line and set them appropriately to achieve
required time-coordination with OC protections of ICTrsquos at Villianur
SS
3 NLCIL to keep DEF protection in blocked condition as long as
Distance Protection is active and configure it to become active only
when distance protection does not pickup to avoid time-
coordination issues
19-05-2017 at
1235 hrs
Complete outage of 230 kV Villianur
Substation of Pondicherry
65I1 PED PGCIL (SR-II)
NLCIL
For the line under consideration the following shall be carried out
by TANTRANSCO in coordination with PGCIL (SR-II)
1 End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
PGCIL (SR-II)
TANTRANSCO
Yet to be informed Pending
For the line under consideration the following shall be carried out
by NLCIL in coordination with PGCIL (SR-II)1 End-to-end communication for DT permissive amp other signals may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and software) at both ends shall be checked and faulty components
shall be repaired replaced
Y-phase to earth fault Neyveli TS2 end relay issued
a 3-phase trip 220ms after issue of Y phase trip Direct Trip was sent to Pugalur end preventing auto-reclose
07-05-2017
at 1955 hrs
Tripping of 400 kV Neyveli TS2-Pugalur
line
65III6 PGCIL (SR-II) NLCIL Yet to be informed Pending
For the line under consideration the following shall be carried out
by TSTRANSCO in coordination with NTPC-Ramagundam1 End-to-end communication for DT permissive amp other signals may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components shall be repaired replaced
Over Voltage Stage-1 had operated at Gajwel end
Ramagundam end did not trip as Direct Trip was not received from Gajwel end
29-05-2017
at 0007 hrs
Tripping of 400 kV Ramagundam -
Gajwel line
65II19 TSTRANSCO NTPC
(Ramagundam)
Yet to be informed Pending
65II16 Tripping of 400 kV Kayathar-Karaikudi
line
25-05-2017 at
1552 hrs
R-phase to earth fault had occurred in line There
was Zone-2 3 phase trip operation at Kayathar end
and Zone-1 3 phase trip at Karaikudi end
Annexure-III
Page 31 of 31
SlNo Element NameOutage
datetime
Revival
datetimeReason for Outage Sender Receiver
Remedial Measures Actions taken
1 400 kV KAIGA - GUTTUR 1 27-03-2017153800 27-03-2017164800 RELAY MALOPERATION NPCIL (KGS) KPTCL
KPTCL
At Guttur end DPR operated in Z1 R phase AR
unsucessful due to persistant fault
At Kaiga end DPR operated in Zone-1 RN
fault145km AR attempt is observed from Kaiga
end DR
Reason Transient fault Stood OK after test
charging
NPCIL (KGS)
2 400 kV KHAMMAM - KALPAKKA 1 10-04-2017125800 DISTANCE PROTECTION PGCIL (SR-I) APTRANSCO
PGCIL (SR-I)
Tripped on operation of distance protection Line
belongs to APTARSNCOTSTRANSCO
APTRANSCO TSTRANSCO Momentary fault
3 400 kV KHAMMAM - KALPAKKA 2 11-04-2017115000 11-04-2017175900 Y-N faultPGCIL (SR-I) APTRANSCO
TSTRANSCO
PGCIL (SR-I) Tripped on operation of distance
protection Line belongs to
APTRANSCOTSTRANSCO
APTRANSCO TSTRANSCO Momentary fault
4 400 Kv RAICHUR - YTPS 18-04-2017131400 18-04-2017150100 DPR ZONE 1-B-PH FAULT KPCL KPTCL To-be-discussed
5 400220 Kv ICT-3 AT NEELAMANGALA 20-04-2017162100 20-04-2017170100DUE TO HEAVY ARCING AT B-
PH ISOLATORKPTCL To-be-discussed
6 400 Kv VTPS - MALKARAM 1 23-04-2017150500 SOTF OPERATED APGENCO TSTRANSCO
TSTRANSCOTripped at both ends Tripped on R-
phase to ground Zone-1 indications AR acted and
was unsucessful at Malkaram end
APGENCO
Pending Remedial Measures Actions taken
for the Critical Tripping Incidents (as on 25072017)
Annexure-IV
Page 1 of 6
7 400 kV KHAMMAM - MAMIDIPALLY 2 08-05-2017160600 08-05-2017174900 R PHASE TO GROUND FAULT PGCIL (SR-I) TSTRANSCO
PGCIL(SR-I)
Tripped on operation of distance protection Line
belongs to APTARSNCO
TSTRANSCO
Tripped at both ends Tripped on R-phase to
ground Zone-1 indications AR acted and was
unsucessful at Mamidipally end
8 400 kV TALAGUPPA - NEELAMANGALA 09-05-2017163600 Y TO GROUND FAULT KPCL KPTCL To-be-discussed
9 400 kV MUNIRABAD - GUTTUR 20-05-2017064100 20-05-2017211000BUS BAR PROTECTION
OPERATEDPGCIL (SR-I) KPTCL
KPTCL
No abnormality found at Munirabad end and line
was in service
PGCIL (SR-I)
Tripped at Guttur end only and line was holding
from Munirabad end
10 400 kV GUTTUR - HIRIYUR 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II) PGCIL (SR-II) Due to Problem at Guttur end
11 400 kV KAIGA - GUTTUR 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDNPCIL (KGS) KPTCL To-be-discussed
12 400 kV GUTTUR - NARENDRA 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II) PGCIL (SR-II) Due to Problem at Guttur end
13 400 kV MUNIRABAD - GUTTUR 20-05-2017160000 20-05-2017170400 B-n fault PGCIL (SR-I) KPTCL
PGCIL (SR-I)
As informed by Guttur Substation line tripped at
Guttur end only without any faciaalarms Line
holding from Munirabad end Suspected mal-
operation at Guttur end
KPTCL
14 400 kV GUTTUR - HIRIYUR 1 20-05-2017204100 20-05-2017211800BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II)
PGCIL (SR-II) Due to Problem at Guttur end
KPTCL
15 400 kV BTPS-JSW TORANAGALLU 20-05-2017064100 20-05-2017210300BUS BAR PROTECTION
OPERATEDKPCL JSWEL To-be-discussed
16 400 kV KAIGA - GUTTUR 1 20-05-2017204100 20-05-2017213800BUS BAR PROTECTION
OPERATEDNPCIL (KGS) KPTCL To-be-discussed
17 400 kV GUTTUR - NARENDRA 1 20-05-2017204100 20-05-2017211200BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II)
PGCIL (SR-II) Due to Problem at Guttur end
KPTCL
Annexure-IV
Page 2 of 6
18 400220 kV ICT-1 AT HOODY 20-05-2017110700 20-05-2017180500 220KV SIDE WORKS KPTCL To-be-discussed
19 220 kV AMBEWADI - PONDA 1 22-05-2017121100 22-05-2017123000 EARTH FAULT KPTCL GED To-be-discussed
20 400 Kv VTPS - MALKARAM 1 22-05-2017145200 22-05-2017185800 B phase fault APGENCO TSTRANSCO
TSTRANSCOTrippedat both ends Tripped on B-
Phase to ground and Zone-1 indications AR acted
and was unsucessful at Malkaram end
APGENCO
21 220 kV KANIAMPET - KADAKOLA 23-05-2017143200 23-05-2017162400 BREAKER PDR RELAY ACTED KSEB KPTCL To-be-discussed
22 400 kV TALAGUPPA - HASSAN 30-05-2017014600 B PHASE TO GROUND FAULT KPTCL PGCIL (SR-II)
PGCIL(SR-II) Due to persisting fault in KPTCL
portion
KPTCL
23HVDC TALCHER - KOLAR POLE 1 AT
TALCHER01-06-2017232200 02-06-2017001100
DC DIFFERENTIAL
PROTECTION OPERATEDPGCIL (SR-II) PGCIL (ER-I)
PGCIL(SR-II) Due to DC filter Diff relay operation at
Talcher end
24 400 KV NIZAMABAD- DICHPALLY-1 05-06-2017191500 3 PHASE FAULT TSTRANSCO
TSTRANSCOTrippedat both ends Tripped on 3
Phase B-Phase to ground fault and Zone-2
indications at Dichpally end
25 400220 kV ICT-1 AT DICHPALLY 05-06-2017191500 06-06-2017003200 BUCHHOLZ RELAY OPERATED TSTRANSCO
TSTRANSCO 400kv 315MVA ICT-1 at Dichpally
tripped on OSR indications which was a mal
operation of the relay At the same time there was
3 Phase fault in 400kV Dichpally to Nizamabad line
At Nizamabad end(PGCIL) Line Isolator 3 phases
shorted in GIS Module
26400 kV RAMAGUNDAM -
DICHCHIPPALLI05-06-2017191500 05-06-2017223700 3 PHASE FAULT NTPC TSTRANSCO
TSTRANSCO Line did not trip at Dichpally end At
the same time there was 3 Phase fault in 400kV
Dichpally to Nizamabad line for which the line
tripped at Both ends Relay settings need to be
reviewed at NTPC Ramagundam end
NTPC-Ramagundam
27 400 Kv BTPS - YTPS 05-06-2017194800 05-06-2017204400 DISTANCE PROTECTION KPCL To-be-discussed
Annexure-IV
Page 3 of 6
28 400 Kv SATTENAPALLI - SRISAILAM 2 05-06-2017125500 05-06-2017144700 R-n fault APTRANSCO TSGENCO
APTRANSCO
For a momentary fault feeder tripped on R-Ph Z1
indications and AR successful at Sattenapalli end
TSGENCO
Feeder tripped on R-phase to ground Zone-2 at
Srisailam end Due to Feeder consistsing of Under
Ground cable AR was disabled at Srisailam end
29 400220 kV ICT-2 AT KOLAR 06-06-2017191000 06-06-2017223700 DUE TO HEAVY WIND PGCIL (SR-II)
PGCIL (SR-II)
Flashover between 220kV jumper dropper of B
phase and Gantry towards 220kV bus due to heavy
swing of conductor during the unprecedented
heavy winds
30 400 kV KOLAR - HOODY 2 06-06-2017200800 DUE TO HEAVY WIND PGCIL (SR-II) KPTCL
PGCIL (SR-2)
Hand Tripped due to Isolator problem at Hoody
End
KPTCL
31 400220 kV ICT-2 AT GUTTUR 13-06-2017133000 13-06-2017134500TRIPPED ON EF RELAY
OPERATIONKPTCL To-be-discussed
32400 kV PUGALUR -
KALAIVANTHAPATTU14-06-2017123700 14-06-2017184500 TRIPPED ON Y-N FAULT PGCIL(SR-II) To-be-discussed
33 220 kV KANIAMPET - KADAKOLA 22-06-2017111700 22-06-2017113400EARTH FAULT RELAY
OPERATEDKSEB KPTCL To-be-discussed
34 220 kV KANIAMPET - KADAKOLA 22-06-2017121500 22-06-2017172000EARTH FAULT RELAY
OPERATEDKSEB KPTCL To-be-discussed
35 400 kV KHAMMAM - KALPAKKA 2 03-07-2017092400 03-07-2017104700
DT RECIEVED AT KLPA END
(TRIPPED ONLY AT KLPA
END)
PGCIL (SR-I) APTRANSCO
TSTRANSCO
PGCIL (SR-I)
PLCC belongs to APTRANSCO TSTRANSCO Mal-
operation of PLCC at Kalpaka end Requested
APTRANSCO TSTRANSCO for end to end
testingtunning of PLCC
APTRANSSCO TSTRANSCO
36 400220 kV ICT-1 AT URAVAKONDA 04-07-2017020100 04-07-2017022400MASTER TRIP RELAY
OPERATEDAPTRANSCO To-be-discussed
37 400 kV KAIGA - NARENDRA 2 07-07-2017075000 07-07-2017090800 TRIPPED ON R-Y Ph FAULT NPCIL KPTCL To-be-discussed
Annexure-IV
Page 4 of 6
38 HVDC BHADRAVATHI POLE 1 07-07-2017105900 07-07-2017115400TRIPPED ON NON VALID TAP
CODEPGCIL (SR-I) PGCIL (WR-I)
PGCIL(SR-I)
Tripped due to strucking of OLTC tap during
command execution The same was now working
39 400 kV KHAMMAM - KALPAKKA 2 07-07-2017120300 07-07-2017145000 DT Received PGCIL (SR-I) APTRANSCO
PGCIL(SR-I)
Tripped due to PLCC mal-operation PLCC belongs
to TSTRANSCO APTRANSCO Requested
TSTRANSCO APTRANSCO for end to end testing
tunning of PLCC Khammam end
APTRANSCO
40 400 KV GOOTY - TUMKUR - 1 08-07-2017142200 08-07-2017152600DISTANCE PROTECTION
OPERATEDPGCIL (SR-I) PGCIL (SR-II)
PGCIL(SR-I)
Tripped due to snapping of earth wire while
stringing of OPGW Advised concerned to take
additional precautions while carrying OPGW
stringing
PGCIL(SR-II)
41 400230 Kv ICT-1 AT SVCHATRAM 14-07-2017190300TRIPPED ON RESTRICTED
EARTH FAULTTANTRANSCO
TANTRANSCO
REF protection acted in ICT-1 during Auto Reclose
(AR) attempt of 400kV SVChatram-Alamathy
feeder-2 (through fault condition) As per the relay
manufacturer (GE-T60) guidelines for the one and
half breaker scheme the REF setting will be
revised
42 400 KV GOOTY - TUMKUR - 1 15-07-2017115100 15-07-2017122300Tripped while laying opgw
cablePGCIL (SR-I) PGCIL (SR-II)
PGCIL (SR-I)
Tripped due to snapping of earth wire while
stringing of OPGW Advised concerned to take
additional precautions while carrying OPGW
stringing
PGCIL(SR-II)
43 220 kV AMBEWADI - PONDA 1 16-07-2017113800 16-07-2017120800 DISTANCE PROTECTION KPTCL GED To-be-discussed
44 220 kV AMBEWADI - PONDA 2 20-07-2017013600 LINE FAULT KPTCL GED To-be-discussed
Annexure-IV
Page 5 of 6
45 400 Kv ALM - SVCTM-I 20-07-2017112700 20-07-2017120200 C-N FAULT TANTRANSCO To-be-discussed
46 400 Kv ALM - SVCTM-II 20-07-2017112700 20-07-2017120300 A-N FAULT TANTRANSCO To-be-discussed
47 400 Kv ALM - SVCTM-II 20-07-2017144300 20-07-2017193200TO ATTEND FAULT
LOCATIONTANTRANSCO To-be-discussed
48 HVDC BHADRAVATHI POLE 1 21-07-2017224800 21-07-2017235300 INTERNAL MINOR ALARM PGCIL (SR-I) PGCIL (WR-I) To-be-discussed
49 400 kV KHAMMAM - KALPAKKA 1 21-07-2017103000 21-07-2017204200AC SUPPLY TO BREAKER
PROBLEMPGCIL (SR-I) APTRANSCO To-be-discussed
50 220 kV CHITTOR - THIRUVALEM 22-07-2017080600 22-07-2017144100RELAY MALOPERATION AT
THIRUVALAMAPTRANSCO TANTRANSCO To-be-discussed
51 400 KV GOOTY - TUMKUR - 1 22-07-2017150700 22-07-2017154500TRIPPED DURING OPGW
WORKSPGCIL (SR-I) PGCIL (SR-II) To-be-discussed
52 400 Kv GAJWEL - BHOOPALAPALLY 2 22-07-2017131300 22-07-2017133600 B PHASE FAULT TSTRANSCO TSGENCO To-be-discussed
53 400 kV GUTTUR - HIRIYUR 2 22-07-2017150300 22-07-2017155300TRIPPED DUE TO RELAY MAL
OPERATIONKPTCL PGCIL (SR-II) To-be-discussed
54 400110 kV ICT 2 AT ALAMATHY 24-07-2017091300 24-07-2017162700TRIPPED ON RESTRICTED
EARTH FAULTTANTRANSCO To-be-discussed
Annexure-IV
Page 6 of 6
G1
220kV LINE-1
ICT 220400 KV
G2
GT1 GT2
400kV LINE-1
400kV LINE-2
600MW 600MW
220kV LINE-2
400kV220kVSummary of Various Special Protection Schemes for 2 x 600 MW UPCL TPP
Adani Power Limited Ahmedabad
Adani Power Ltd Ahmedabad 1
Annexure-V
Page 1 of 12
G1
ST-2
220 kV LINE-1
ICT 220400 KV
G2
GT-1 GT-2
400kV LINE-1
400kV LINE-2
600 MW 600 MW
ST-1
220 kV LINE-2
UPCL UDUPI - NETWORK UNDER CONSIDERATION
400 kV220 kV
Adani Power Ltd Ahmedabad 2
315 MVAICT-1
315 MVAICT-2
220 kV ndash KEMMAR BUS 400 kV ndash HASSAN BUS
Annexure-V
Page 2 of 12
Adani Power Ltd Ahmedabad 3
Existing SPS
Benefits of New Proposals
If both the 400kV Lines out of serviceTripped amp Total Generation is gt 650 MW then Trip Unit-2
Existing SPS logic has been developed in Unit-2 DCS
1 Consideration of all possible contingency cases
2 Unit Backdown (AUTOMATIC) has been proposed in certain contingencies
where Unit tripping is not required After restoration of tripped outlets
Unit may ramp up to full generation
3 Comprehensive logic will be developed in Numerical Relays with adequate
security and reliable detection to avoid mal operation of sps logic
4 Monitoring of SPS logic with necessary alarms and events
Annexure-V
Page 3 of 12
Sr UPCL‐Udupi‐SUMMARY OF SPS TO HANDLE ALL POSSIBLE CONTINGENCIES Sh‐1 of 2
Contingency Cases Action Unit SelectionFor Tripping
1 Power Swing Detected in Impedance reach of Zone‐1 in 400 kV Line
Tripping of One selected unit if both Units ON Each Unit Power gt 400 MW
Unit‐2
2Tripping of one 400 kV Line while another 400 kV Line is already in OFF condition
Tripping of One selected unit if both Units ON Each Unit Power gt 400MW
Unit‐2
3 TrippingOffloading of Both 400 kV Line simultaneously (within 3 sec)
Tripping of One selected Unit if both Unit ON Each Unit Power gt 325 MW Unit‐2
4 TrippingOffloading of all four Transmission Lines Tripping of both Units Both Units
4
5
400kVlin
e Overlo
ad Stage PickupSet Point
TimeDelay Action
Stage 1 900 MW 3 Sec Alarm
Stage 2 1100 MW 2 Sec Automatic Backdown upto 450 MW in both Units
Annexure-V
Page 4 of 12
Sr UPCL‐Udupi‐SUMMARY OF SPS TO HANDLE ALL POSSIBLE CONTINGENCIES Sh‐2 of 2
Contingency Cases
Action
6 ICT
Overlo
ading from
400 kV
Line Stage Pickup
Set PointTimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units
7
220 kV
Line
Overlo
ad
Stage 1 250 MW 5 Sec Automatic Backdown upto 300 MW in both Units
5
Sr Consideration Requirements associated with SPS Implementation
1 400 kV LINE Tripping in Zone‐1 will be blocked under Power Swing DetectionOperation
2 Pole Slip Protection of Generator need to be co‐ordinated with 400 kV Line Power Swing Protection
3 Line Overload Detection will be blocked by Power Swing DetectionOperation
4 Line ZeroUnder Power Detection will be blocked by Power Swing DetectionOperation
Annexure-V
Page 5 of 12
G1
ST-2
220 kV LINE-1
ICT 220400 KV
G2
GT-1 GT-2
400kV LINE-1
400kV LINE-2
600 MW 600 MW
ST-1
220 kV LINE-2
UPCL UDUPI - NETWORK UNDER CONSIDERATION
400 kV220 kV
Adani Power Ltd Ahmedabad 6
315 MVAICT-1
315 MVAICT-2
220 kV ndash KEMMAR BUS 400 kV ndash HASSAN BUS
Annexure-V
Page 6 of 12
Contingency 1 Tripping of one 400kV line
It may lead tohellip1 Overloading of another 400 kV Line
2 Power Swing in another 400 kV Line (specially when 220 kV
Lines are not available)
3 Severe oscillations in running Units
4 Units may loose synchronism and disconnect from network
G1 G2
L1 L2L1L2
Following SPS has suggested to address this contingency
Adani Power Ltd Ahmedabad 7
400kV200kV
Contingency Cases
Action
Unit Selection
ForTripping
1
400kVline Overlo
ad
Stage PickupSet Point
TimeDelay
Stage 1 900 MW 3 Sec Alarm ‐‐‐‐‐‐‐
Stage 2 1100 MW 2 Sec Automatic Backdown upto 450 MW in both Units ‐‐‐‐‐‐‐
2 Power Swing Detected in Impedance reach of Zone‐1 in 400 kV Line
Tripping of One selected unit if both Units ON Each Unit Power gt 400 MW Unit‐2
Annexure-V
Page 7 of 12
Contingency 2 Tripping of one 400kV line while other already Tripped
It may lead tohellip
1 Oscillations in running Units
2 Units may loose synchronism and disconnect from
network
3 Overloading of ICTs and subsequent tripping
4 Overloading of 200 kV Lines and subsequent tripping
5 Station blackout
Adani Power Ltd Ahmedabad 8
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases Action Unit SelectionFor Tripping
1Tripping of one 400 kV Line while another 400 kV Line is already in OFF condition
Tripping of One selected Unit if both Unit ON Each Unit Power gt 400 MW Unit‐2
2
ICT Overlo
ading
from
400
kV Side
Stage PickupSetting
TimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units
Annexure-V
Page 8 of 12
Contingency 3 Tripping of both 400kV line simultaneously
It may lead tohellip
1 Severe oscillations in running Units
2 Units may loose synchronism and disconnect from
network
3 Overloading of ICTs and subsequent tripping
4 Overloading of 200 kV Lines and subsequent tripping
5 Station blackout
Adani Power Ltd Ahmedabad 9
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases Action Unit SelectionFor Tripping
1 TrippingOffloading of Both 400 kV Line simultaneously (within 3 sec)
Tripping of One selected Unit if both Unit ON Each Unit Power gt 325 MW Unit‐2
2
ICT Overlo
ading
from
400
kV Side
Stage PickupSetting
TimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units ‐‐‐‐‐‐‐
Annexure-V
Page 9 of 12
Contingency 4 Overloading of any 220 kV line
This contingency may arise due tohellip1 Tripping of both 400 kV Lines and associated SPS logic fails
to operate (Tripping of any One Unit if both Units running)
2 Overloading of ICTs from 400 kV Side and associated SPS
logic fails to operate
3 Tripping of any one 220 kV lines if both 220 kV lines are in
service and 400 kV outlets are not available
Adani Power Ltd Ahmedabad 10
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases
Action
Unit Selection
ForTripping
1
220kV
line
Overlo
ad StagePickupSet Point
TimeDelay
Stage 1 250 MW 5 Sec Automatic Backdown upto 300 MW in both Units ‐‐‐‐‐‐‐
If any SPS does not function Then 200 kV Line will trip by Operation of Line Over Current Function
Annexure-V
Page 10 of 12
Contingency 5 Tripping of all Lines emanating from UPCL (ZERO POWER)
It may lead to1 Over voltage conditions at UPCL Bus
2 Over speed of all the generators because of sudden
load throw
Following SPS has suggested to address these contingencies
1 Zero Power Scheme on 400 kV System and 220 kV System checking the power
flow through 400kV and 200 kV lines and trip all the units in service if there is a
under power condition on all four lines and running units
Adani Power Ltd Ahmedabad 11
G1 G2
L1 L2L1
400kV200kV
L2
Sr Contingency Cases Action Unit SelectionFor Tripping
1 TrippingOffloading of all four Transmission Lines Tripping of both Units Both Units
Annexure-V
Page 11 of 12
G1
220kV LINE-1
ICT 220400 KV
G2
GT1 GT2
400kV LINE-1
400kV LINE-2
600MW 600MW
220kV LINE-2
400kV220kV
THANKShellip
Adani Power Ltd Ahmedabad 12
Annexure-V
Page 12 of 12
65th Protection Coordination Sub-Committee
29-06-2017
Annexure-VI
Page 1 of 40
Complete outage of 230KV Villianur substation of Pondycherry at 1235 hrs on 19-05-2017
bull Triggering incident Failure of CT in 110kV Villianur-Kurumbapet at Villianur substation
bull 230110kV ICT-1amp2 at Villianur substation tripped on operation of backup Over current protection
bull 230KV Neyveli-Villianur and Pondy-Villianur Line got tripped from NLC amp Pondy ends on operation of DEF and Zone-3 respectively
bull Delayed clearance of fault observed from PMU plot ndash 560ms
bull Load loss 140 MW
DEF
ZONE-3
NLC TS-2 BAHUR TrsquoMARTHAN
PONDY
VILLIANUR
Annexure-VI
Page 2 of 40
Fault cleared in 560ms
Annexure-VI
Page 3 of 40
Complete outage of 400kV Uruvakonda and Jamalamadugu Stations at 1744 hrs on 31-05-2017
bull Triggering incident Tripping of 400kV Kurnool-Narnoor line-1 amp 2 and 400kV Kurnool-Jamalamadugu line-2
bull Loss of supply loss to 400kV Uruvakonda and Jamalamadugu
bull Lines out of service 400kV Gooty-Narnoor 400kV Narnoor-Jamalamadugu-1 400kV Srisailam-Narnoor 400kV Uruvakonda-Mahboobnagar-1amp2
Srisailam Narnoor
Kurnool
Ghani
Jrsquomadugu UVrsquokonda
Mbrsquongr
Gooty
Ghanapur
Igt4
Igt4 Z3
Z3
OV DT RCV
Annexure-VI
Page 4 of 40
Annexure-VI
Page 5 of 40
Kurnool Narnoor
DR trigger ndash 174418501 hrs
Ib=5kA
Zone-3 trip EL Stub optd
DR trigger ndash 173620637 hrs
Igt4 trip
3 phase Grp AB optd
Kurnool Narnoor
DR trigger ndash 174418503 hrs
Ib=5kA
Zone-3 trip EL Stub optd
DR trigger ndash 174306388 hrs
Igt4 trip
3 phase Grp AB optd
Kurnool Jamalamadugu
DR trigger ndash 174423979 hrs Vgt1 Trip
DR trigger ndash 174415040 hrs Z3 T1 DT Rcv not observed in DR amp EL
400kV Kurnool-Narnoor line-1
400kV Kurnool-Narnoor line-2
400kV Kurnool-Jamalamadugu line-2
Annexure-VI
Page 6 of 40
bull Points for discussion ndash Location of fault
ndash Zone-3 amp Igt4 trip of 400kV Kurnool-Narnoor line-1amp2
Annexure-VI
Page 7 of 40
Tripping of 220kV Idukki ndashUdumalpet line at 1702 hrs on 05-05-2017
bull B-N and R-N fault in line
bull Delayed clearance observed during 2nd fault
Idukki Udumalpet
DR trigger ndash 170200499 hrs ZONE 1 B-E 366Km
DR trigger ndash 165741849 hrs ZONE 1 B-E amp Zone-2 R-E
Idukki
Udumalpet Lower periyar
New Pallom Kalamassery
Annexure-VI
Page 8 of 40
Annexure-VI
Page 9 of 40
B-N FAULT
R-N FAULT
ZONE-2
Ar attempt
Udumalpet end DR Annexure-VI
Page 10 of 40
bull Points for discussion ndash Reason for 3 phase trip at idukki end
ndash Relay to give a 3 phase trip in the event of 2nd fault during dead time
Annexure-VI
Page 11 of 40
Tripping of 400kV Kudgi(PG)-Tumkur line-2 and Kudgi(PG)- Kudgi(NTPC) line-1 at 1605 hrs on 06-05-2017
bull 400kV Kudgi(PG)-Kudgi(NTPC) ndash line tripped at Kudgi PG end on R-N zone-1
bull 400kV Kudgi(PG)-Tumkur line tripped from both ends
Kudgi(NTPC)
Tumkur
Kudgi(PG) Narendra
Kohapur
Guttur
Kaiga
Annexure-VI
Page 12 of 40
Kudgi (PG) Kudgi(NTPC)
DR trigger 160547438 hrs Zone-1 optd R-N Ar lockout Ov pick up
FIR DR amp EL not furnished
Kudgi (PG) Tumkur
DR trigger 160546957 hrs NGR buchholz trip Dip in R-phase voltage
DR trigger 160512593 hrs DT Rcv Grp AB optd
400kV Kudgi(PG)-Kudgi(NTPC) line-1
400kV Kudgi(PG)-Tumkur line-2
Annexure-VI
Page 13 of 40
Annexure-VI
Page 14 of 40
Annexure-VI
Page 15 of 40
Annexure-VI
Page 16 of 40
Tripping of 220kV Edamon-Tirunelveli-1amp2 at 1809 hrs on 06-05-2017
bull 220kV Edamon-Tirunelveli-1amp2 tripped from Tirunelveli end only and was in service from Edamon end ZONE-1 R-B-E fault
bull Distance protection at Tirunelveli over-reached and tripped for fault in 220kV Edamom-Pothencode lines
Edamon
Sabarigiri
Tirunelveli Pothencode
Kundara
Edappon
Annexure-VI
Page 17 of 40
Annexure-VI
Page 18 of 40
Tripping of 400220 kV Ghani ICT-2amp3 at 1405 hrs on 07-05-2017
bull ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
bull Delayed clearance observed from PMU data
bull DR amp EL not furnished
Srisailam Narnoor
Kurnool
Ghani
Jrsquomadugu UVrsquokonda
Mbrsquongr
Gooty
Ghanapur
Annexure-VI
Page 19 of 40
Annexure-VI
Page 20 of 40
Tripping of 400kV Ghanapur-Mamidapalli line at 1915 hrs on 08-05-2017
bull Line tripped at Ghanapur end only and was holding from Mamidapalli
Ghanapur Mamidapalli
DR trigger ndash 191329917 hrs Z3 Main-2 opts Event logger Main-2 PSB optd ndash 191541751hrs
DR trigger ndash 191458457hrs R-N Start Breakers did not trip
Ghani
Malkaram
Ramagundam
Chpr
Mamidapalli
Nrsquosagar
Gajwel Ghanapur Khammam
Dindi
Annexure-VI
Page 21 of 40
Annexure-VI
Page 22 of 40
Tripping of 400220kV ICT-1 at Guttur at 2215 hrs on 09-05-2017
bull ICT-1 tripped on HV side only without any relay indications
bull No fault observed from PMU data
Annexure-VI
Page 23 of 40
Tripping of 400kV Narsapur-Shankarapalli at 0007 hrs on 10-05-2017
bull line tripped at Narsapur end only and holding from Shankarapalli
Narsapur Shankarapalli
DR trigger ndash 000720147hrs Zp T1 Igt3 Start Event logger 75A relay optd ndash 000720098 hrs
CB did not trip
Singareni
Shankarapalli Gajwel
Narsapur
Suryapet
Brsquoply
Rrsquogm
Annexure-VI
Page 24 of 40
Tripping of 400220kV Hyderabad ICT-4 and 220kV lines at Hyderabad substation at 239 hrs on 10-05-2017
bull Triggering incident Bus fault in 220 kV Ghanapur station
bull Observation from PMU data ndash dip observed in Y amp B phase fault cleared in 120ms
bull Elements tripped 220kV lines amp 400220 kV ICT-4
bull FIR not submitted by TSTRANSCO
Annexure-VI
Page 25 of 40
Tripping of 400220kV ICT-1 at BTPS 13-05-2017 at 1941 hrs
bull ICT-1 got tripped on operation of LV side earth fault protection during R-phase to earth fault in 220kV BTPS-Lingapur line
bull Lingapur line DR amp EL were furnished
BTPS Alipura Regulapadu
Lingapur
Annexure-VI
Page 26 of 40
Tripping of 765 kV Kurnool-Thiruvelam line-2 at 2003 hrs on 19-05-2017
bull Triggering incident Failure of R-phase LA at Thiruvelam end
Kurnool Thiruvelam
DR trigger time ndash 200318272 hrs
Main-1 trip Carrier aided trip
3 ph Grp-AB optd DT RCV
Ir ndash 3kA
Dip in Y-phase current observed
Event logger
REF optd - 200318340 hrs
DT send - 200318343 hrs
DR trigger time ndash 200318269 hrs
Zone-1 trip
Initially 1 ph trip and later 3 ph trip due to DT rcv
Event logger
DT rcv - 200318395 hrs
Raichur Kurnool NPS
Tiruvelam
Solapur
Annexure-VI
Page 27 of 40
Annexure-VI
Page 28 of 40
Tripping of 400220kV ICT-2 at Kalpakka at 1502 hrs on 20-05-2017
bull ICT-2 tripped due to operation of transformer buchholz relay
bull Reason for operation of Buchholz relay may be furnished to PCSC
Annexure-VI
Page 29 of 40
Tripping of 400220kV ICT-2 at KV Kota at 1021 hrs on 23-05-2017
bull ICT-2 got tripped due to mal-operation of transformer oil temperature indicator
bull Remedial actions taken may be furnished to PCSC
Annexure-VI
Page 30 of 40
Tripping of 220kV Kaniambeta-Kadakola line at 1350 hrs on 23-05-2017
bull Line tripped at Kaniambeta end
bull Kaniambeta feeder protection is provided through 220kV bus coupler breaker bay
bull EFR relay operated and B ph pole discrepancy relay operated leading to tripping of Bus coupler CB
bull Loss of infeed to Kaniambeta Ss
Annexure-VI
Page 31 of 40
Tripping of 400220kV ICT-1 at Somanahalli substation at 1724 hrs on 24-05-2017
bull ICT-1 at Somanahalli substation got tripped due to DC Earth fault
bull Findings amp Remedial actions taken may be furnished to PCSC
Annexure-VI
Page 32 of 40
Tripping of HVDC Gazuwaka Pole-1amp2 25-05-2017 at 0945 hrs
bull HVDC pole-1 got tripped due to operation of South filter inter zone protection and
bull HVDC pole-2 got tripped due to operation of differential protection
bull Findings amp remedial actions taken may be furnished to PCSC
Annexure-VI
Page 33 of 40
Tripping of 400kV Kayathar-Karaikudi line 25-05-2017 at 1552 hrs
bull Triggering Incident R-phase to earth fault
Kayathar Karaikudi
DR trigger time ndash 155236585 hrs
Zone-2 3 phase trip
Carrier unhealthy
DR trigger time ndash 155236592 hrs
zone-1 3 phase trip
Kayathar Kamudi Karaikudi
Pugalur
Trichy
Madurai
Annexure-VI
Page 34 of 40
Annexure-VI
Page 35 of 40
Tripping of 400220kV ICT-1amp3 at Hoody substation of KPTCL at 1230 hrs on 26-06-2017
bull ICT-1 tripped due to arc over of pre-close supervision contact of tip coil -2
bull ICT-3 got tripped on over-loading
Annexure-VI
Page 36 of 40
Annexure-VI
Page 37 of 40
Tripping of 400kV Simhadiri-Kalpakka line-2 at 503 hrs on 28-05-2017
bull Line tripped on mal-operation Teed Differential Protection at Simhadiri end and direct trip was received at Kalpakka
bull Y-Phase to earth fault had occurred in 400 kV Vijayawada-Vemagiri line-3
bull Findings amp remedial actions taken may be furnished to PCSC
Annexure-VI
Page 38 of 40
Tripping of 400kV Ramagundam-Gajwel at 0007 hrs on 29-05-2017
bull Over voltage stage-1 had operated at Gajwel end
bull Ramagundam end did not trip as direct trip was received from Gajwel
bull DR amp EL of Gajwel end not furnished
Annexure-VI
Page 39 of 40
Tripping of 400kV Gajwel-Ghanapur line at 0007 hrs on 29-05-2017
bull Line tripped on operation of over voltage protection at Gajwel and direct trip was received at Ghanapur
bull DR and EL of Gajwel end were not furnished
Annexure-VI
Page 40 of 40
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 1
SOUTHERN REGIONAL POWER COMMITTEE BENGALURU
Minutes of the 65th Meeting of Protection Coordination Sub-Committee (PCSC ndash 65) of SRPC held on 29th June 2017
1 Introduction
The 65th meeting of Protection Coordination Sub-Committee (PCSC-65) of SRPC was held on 29th June 2017 at SRPC Secretariat Bengaluru The list of participants is enclosed at Annexure-I Members and Participants were welcomed to the meeting and briefed on the following protection related issues Evaluation of the bids received from various bidders in respect of SRPC project ldquoProcurement of
Web-based Management Software and Protection Setting Calculation Toolrdquo project is under progress by the Bid Evaluation Committee (BEC) of SRPC constituted for the purpose and it is expected that the award for the same would be placed in August 2017
Wrt perturbations experienced at TPCIL plant in Nellore protection audit of Nellore PS (NPS) of PGCIL (SR-I) was conducted during 19 -20 June 2017 Then a special meeting was also convened at TPCIL plant premises on 21062017 It was noted that there was nothing amiss at NPS So the cause of TPCIL perturbations was further analysed by correlating their time-stamps with that obtained from SRLDC and SLDC-APTRANSCO From them it was seen that frequent faults on 400 kV SDSTPS ndash Nellore-AP (Manubolu) DC line were the cause of observed perturbations at TPCIL plant Accordingly certain remedial measures were suggested for the parties involved APTRANSCO APGENCO and TPCIL were requested to take suitable action to comply with the recommendations given
UPCL vide their mail dated 22052017 had proposed a revised SPS at their Udupi plant in place of the existing one to take care of oscillations and power swings that would result under various contingencies All concerned members were requested to take part when the issue is taken up for discussion later in the meeting
It was also informed that in view of the frequent tripping of ICTrsquos at 400220 kV Hoody SS it was proposed to conduct PSAG-18 meeting on 03072017 to ascertain the action taken by KPTCL to attend to various measures that had been suggested by PCSC forum in their previous meetings
Wrt implementing AR on all 220 kV lines amp above it was stated that the action plan including feeder details for implemented AR are yet to be furnished by APGENCO APTRANSCO TSGENCO and TSTRANSCO KPTCL and NTPC-Ramagundam The respective Constituents were requested to furnish the sought details at the earliest and take concrete action towards implementing AR in all 220 kV amp above transmission lines
2 Confirmation of the Minutes of the 64th meeting of PCSC held on 25th May 2017
The minutes of the 64th meeting of PCSC had been circulated vide SRPC letter No SRPCSE-III PCSC-64 20173216 - 51 dated 09062017 As no comments had been received from any of the Constituents the minutes of the 64th Meeting of PCSC were confirmed
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 2
3 Details of Grid Disturbances (GDrsquos) Grid Incidents (GIrsquos) and Line Trippings due to Auto-
Reclose (AR) failure non-operation amp PLCC mal-operation
The trippings due to GDrsquos GIrsquos AR failure non-operation and PLCC mal-operation that had occurred
during May 2017 were discussed in the Meeting The deliberations and recommendations of the PCSC Forum are enclosed at AnnexurendashII for further needful action The details of the tripping events including relevant PMU plots presented by SRLDC in the meeting are also enclosed at AnnexurendashVI for kind reference
4 Status of pending PCSC Recommendations (P-REC)
The status of implementation of pending PCSC recommendations was discussed in the meeting The
Constituents were asked to take steps to comply with the same and requested to submit the status of their compliance latest by 10082017 The updated status of the same as on 25072017 is enclosed at AnnexurendashIII
5 Remedial measures Action taken for the tripping incidents of the transmission elements
under forced outage (PRM)
The tripping incidents of the transmission elements under forced outage for which the remedial action
taken had not been furnished were discussed in the meeting The Constituents were asked to kindly furnish specific remedial measures action taken covering one or the other items from the following indicative list in time so as to forward the same to Central Electricity Authority
Brief details of line patrolling carried out (with tower location)
Brief details of RoW maintenance (by proper Tree-cutting) resorted to
De-capped insulators replacement
DC earth fault removal
PLCC cards replacement
Relay settings modification
Steps taken to put AR or CB into service after they have been locked-out
Faulty equipment replacement
Reference to OEM in case of equipment failure
Brief Details of tests carried out to ascertain the healthiness of various equipment (Power Transformer Reactors Surge Arrestors Circuit Breakers CTs PTsCVTs) like Insulation Resistance (IR) test Winding Resistance test Capacitance test Tan delta test DGA test Leakage current test CRM DCRM test etc
Any other appropriate remedial measure
The updated list of PRM as on 25072017 is enclosed at Annexure-IV
6 Certificate for Healthiness of Batteries
As per the MoP CEA direction given in pursuant to recommendations of the Enquiry Committee (NEW Grid Disturbance on 30th amp 31st July 2012) RPCrsquos are required to obtain from their respective Constituents a monthly certificate for healthiness of batteries installed at 220 KV amp above voltage level Substations (for power supply to Relays RTUs and PLCC equipment) and furnish the same to CEA MoP
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 3
With reference to above the Constituents had been requested to submit the certificate on healthiness of batteries on monthly basis (ie status for a month shall be sent by the 7th day of the following month) to SRPC as per the format given below
Sl No
Station Application Battery Battery Charger Remarks
Station Name
Code Type
(PS SS)
Protection
Communication
Details Status (Healthy Unhealthy)
Details Status (Healthy Unhealthy)
1 Station-A Protection (Bank-1)
Protection (Bank-2)
Communication (Bank-1)
Communication (Bank-2)
2 Station-B hellip
hellip hellip hellip
Note 1 Code is the short name of the Station
2 PS ndash Power Station SS - Substation
The sought status for the months of May 2017 had not been received from the following SR-Constituents
TANTRANSCO NTPL amp NTECL
7 Implementation of Line Differential Protection (LDP) in Nellore and Simhadri complexes
The issue had been discussed in the 64th meeting of PCSC held on 25052017 when it was agreed that the concerned Constituents would take steps to implement LDP in both Nellore and Simhadri Complexes by December 2017
Subsequently MEPL (vide their mail dated 14062017) and SEL (vide their mail dated 27062017) informed that in view of their present financial condition they may kindly be exempted for the time being from implementing LDP on the lines belonging to them in Nellore Complex However they assured that suitable action would be taken to implement the same once their situation improves
In this regard it was clarified that PGCIL (SR-I) can go ahead procuring LDP relays without considering MEPL and SEL requirement Accordingly the following Constituents were asked to take appropriate steps to put LDP in place by December 2017
Nellore Complex Constituents responsible for LDP implementation
Timeline for LDP implementation
Line Differential Protection (LDP) to be implemented on all 400 kV lines (lt 50 km)
PGCIL (SR-I) APGENCO APTRANSCO TPCIL SGPL
December 2017
MEPL and SEL As and when their financial healthiness improves
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 4
Simhadri Complex Constituents responsible for LDP implementation
Timeline for LDP implementation
Line Differential Protection would be implemented in Simhadri Complex on all 400 kV lines inter-connecting Gajuwaka SS Kalpaka SS Simhadri STPP and Hinduja TPS
PGCIL (SR-I) NTPC APTRANSCO and HNPCL
December 2017
8 Installation of PMU by POWERGRID at 400kV NP Kunta
In PCSC-64 meeting held on 25052017 the following was noted
SRLDC stated that NP Kunta is a critical station where in addition to injection of large quantum of solar power reactive power control is also being exercised by way of the recently commissioned STATCOM Thus to better monitor the LVRT effects of Solar power station and functioning of STATCOM installed at NPKunta station it is necessary to have a PMU installed there To this PGCIL (SR-I) informed that provision for PMU at NP Kunta had not been envisaged in Part-I of URTDSM Further as per the decision taken in the 3rd Communication meeting held at SRPC Bengaluru the quantity of Phase-I of URTDSM project was freezed On this SRLDC mentioned that PGCIL need not procure an additional PMU for the purpose instead they can divert the PMU identified for Vijayawada to NP Kunta The issue was further discussed and in view of the stated significance of NP Kunta PGCIL (SR-I) was asked to divert PMU identified for Vijayawada to NP Kunta as part of Phase-I of URTDSM project
However in view of the difficulty expressed by PGCIL (SR-I) in shifting the (already commissioned) PMU and its associated cabling and communication modules from Vijayawada to NP Kunta the issue was again discussed by PCSC forum in the meeting During the meeting the necessity of having PMU at NP Kunta was once again emphasised It was also noted that a PMU had been identified for installation at GMR-Vemagiri as part of URTDSM project in Phase-I However as APTRANSCO and GMR had not agreed for the same the same was not yet carried out In view of above PCSC forum decided that PGCIL (SR-I) take steps to shift the PMU and associated cabling and communication interface modules identified for commissioning at GMR-Vemagiri to NP Kunta and install the same at the earliest
9 Revision of Special Protection Scheme (SPS) implemented at UPCLrsquos plant at Udupi
UPCL vide their mail dated 22052017 requested to review the SPS implemented at their plant in view of the changed grid conditions and furnished a proposal for consideration by SRPC SRLDC
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 5
In this regard the existing SPS and the proposed SPS by UPCL were discussed Existing SPS Both 400 kV lines unavailable amp Generation gt 650 Trip Unit-2 Both 400 kV line and one of the two 220 kV lines unavailable
amp Generation gt 300 MW Trip Both Units Proposed SPS Under this the following five contingencies have been considered 1 Tripping of one 400 kV line 2 Tripping of one 400 kV line with the other already tripped 3 Tripping of both 400 kV lies simultaneously 4 Overloading of any 220 kV line 5 Tripping of all Lines emanating from UPCL (Zero Power condition) The details of the proposed SPS by UPCL are enclosed at Annexure-V With regard to above it was noted that even though the proposed SPS may effectively take care of the oscillations power swings that may occur at UPCL during above stated contingencies the following concerns need to be properly addressed from the grid perspective Since the line breaker is not allowed to be tripped in the event of occurrence of power swing
(even when it enters Zone-1) and a definite possibility exists for it to be transmitted to the other adjacent connected stations it needs to be shown by conducting proper system studies that tripping of UPCL running Unit (s) by virtue of operation of corresponding SPS would act negatively on the sustenance of the power swing
It was felt that the Contingencies at 2 amp 3 can be combined since they essentially result in the same Further the reference power value assumed for comparing with actual generation to effect tripping of Unit-2 under Contingency-2 may be appropriately revised to 325 MW to avoid overloading of Varahi ndash Shimoga lines (in the extreme case of full generation at Varahi GS)
Study results for all Contingencies considered shall be shared Given the complexity of the proposed SPS issues pertaining to non-reliability of its operation may
also be suitably factored into Accordingly UPCL was requested to review the proposed SPS addressing above concerns and furnish the thus modified scheme to PCSC forum along with supporting study results
10 Auto-Reclosure Implementation on all 220 kV amp above Transmission Lines of
Southern Region
It was noted that APGENCO (Hydro) amp APGENCO (RTTP) are yet to furnish their action plan for implementing AR in their respective networks Similarly though TSGENCO (Thermal) amp TSGENCO (Hydro) had stated that they were coordinating with TSTRANSCO to obtain revised settings they are also yet to furnish Action Plan Time-frame for implementing AR It was also noted that in the Action Plan furnished by APTRANSCO feeder details were not mentioned Similarly in the Action Plan furnished by TSTRANSCO time-frame for implementing AR was not mentioned Action Plan for implementing AR is also yet to be furnished by NTPC-Ramagundam (for Tie-CBrsquos of 400 kV lines)
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 6
It was further noted that even though KPTCL had furnished the details of 220 kV amp 400 kV lines where AR is already in place the details of 220 kV lines where AR is not presently in service along with Action Plan for implementing same are yet to be furnished
All above Constituents were asked to kindly furnish required details by 08082017
Since the main issues in implementing AR are the adopted conservative protection philosophies lack of proper PLCC communication and breakersrsquo suitability supportability it is intimated in view of above that if there are no issues wrt carrier communication and breakersrsquo supportability concerned Constituents shall make efforts to implement AR immediately in their respective networks Where communication amp breaker related issues stand in the way of implementing AR concerned Constituents shall take steps to address them appropriately on priority basis and implement AR in their respective networks in a phased manner at the earliest
In the previously held PCSC meetings the following logics have been clarified for implementing AR
Normally high speed single-ph single-shot AR scheme (with simultaneous opening at both ends of feeder with a dead-time of 1 sec and reclaim-time of 25 sec) may be used by all Utilities (including Generators)
However those generators (Coal Gas Nuclear Hydro) who have concerns wrt closing on to un-cleared fault can make use of the following time-differentiated single-ph single-shot AR scheme
ldquoIn this after a line has been opened from both ends (generator end amp grid end) on AR operation the grid end will be auto-reclosed as usual after the elapse of its dead-time (say 1 sec) However the generator end relay will check for the line voltage after elapse of an extended dead time say 15 sec [here the additional time delay of 05 sec which has been included as a safety margin shall be so chosen that the extended dead-time is less than the adopted Pole Discrepancy time delay] If the line voltage so sensed is healthy amp normal (which implies that the fault has already been cleared) then generator end will be auto-reclosed else 3-ph trip will be given at generator end to open the other two phase polesrdquo Further wherever Trip-on-Reclose (ToR) feature is available at grid-end station it shall be configured such that it sends Direct Trip (DT) command to generator end upon its operation
It is also clarified that the above scheme can be as it is used to Line-CBrsquos of all bus configurations (including Main-CBrsquos of one-and-half breaker bus configuration) For Tie-CBrsquos in one-and-half breaker configuration employing priority scheme (which also happens to be the recommended practice) above logic is not be required since the employed priority scheme anyway checks for CLOSE_STATUS of Main-CB before closing Tie-CB However if required the above logic can be applied to Tie-CBrsquos also by adopting a suitable extended dead-time considering the remote end stationrsquos AR dead time
It is further clarified that AR functionality for a transmission line shall be preferably put into service using (i) Bay Control Unit (BCU) or (ii) separate External AR Relay Where these are not available only then should the AR functionality of Main protection relays of lines be used
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 7
Here it is assumed that both Main-relays are deriving their Voltage Input from the Line CVTrsquos (from different cores as per the recommended practice) However if this is not the case and the concerned Utility has a practice of using Line-CVT voltage input to one of the Main relays and Bus-CVT voltage input to the other Main relay it is recommended that voltage input to be used in time-differentiated AR logic shall be exclusively derived from the line-CVT for use in both the Main relays
It is also clarified that AR implementation is not required in case of radial feeders cables amp composite feeders and is optional for the lines interconnecting two generating stations
In addition to above the following logics (applicable to the Cases where AR is being proposed to be implemented from Main Protection Relays) are also intimated for the benefit of the Constituents
Since there are two Main protection relays (Main-I and Main- II) to decide upon proper way of implementing AR for achieving fool-proof AR operation it has been advised that instead of implementing AR from only one of the Main relays (in light of its low success rate) the following Alternatives be considered Alternative ndash 1 AR is implemented and kept functional from Main ndash I [Main-II] only but with feedback from Main-II [Main-I]
In this scheme AR is implemented and kept in service from Main-I [Main-II] as usual
Additionally Main-II [Main-I] relay is configured for single-pole (1-ph) tripping and the OPEN (TRIP) status of the concerned trip relay is used for triggering AR functionality in Main-I [Main-II] By this even if the fault is not sensed in the beginning by Main-I [Main-II] but sensed by Main-II [Main-I] AR operation is guaranteed However it may be noted that in cases of permanent faults this scheme may result in unsuccessful AR operation with Pole Discrepancy Relay coming to rescue if the fault is not sensed by Main-I [Main-II] but by Main-II [Main-I] at the time of auto-reclosing instant
Alternative ndash 2 AR is implemented and kept functional from both Main ndash I and Main-II
In this scheme AR is implemented and kept in service from both Main ndash I and Main-II as
usual As can be seen the scheme is reliable and is without any additional logics However to avoid the possibility of both relays racing for CLOSE-OPEN-CLOSE-OPEN operation in case of permanent faults it shall be ensured that along with other conditions ldquoAR BLOCK with 3-ph TRIPrdquo is also effected for the same phase fault as the original one that occurs during AR dead-time
Out of the above two also it has been suggested to consider Alternative-2 for implementing AR in view of its higher success rate
11 Network Configuration Changes
As per the information furnished by SR-Constituents to the OCC forum in their 132nd meeting (held on
09062017 Minutes circulated on 04072017) it is formed that the following configuration changes (additions deletions modifications of transmission elements) took place in the southern grid during
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 8
April 2017
Two STATCOMs (+- 50 MVAR Each) at NP Kunta commissioned on 16052017
Kudgi Unit I 72 Hrs trail run completed Successfully
400 kV Shankarapally-Suryapet I amp II commissioned on 05052017
22033kV SS at Hayathnagar IampII in Ranga reddy district of 50 MVA Capacity was commissioned on 03052017 by TSTRANSCO
SR II Power grid vide letter dated 10062017 had informed that consequent to the successful completion of Trial Operation the following assets under transmission system associated with ldquoSystem strengthening ndashXX in Southern Regional Gridrdquo have been put under Commercial Operation wef 0000 hrs of 10062017 in terms of clause 4 of CERC (Terms and Conditions of Tariff Regulations 2014)
1 x 500 MVA 40022033kV ICT at Trichy Substation along with associated bays and equipments
SR I Power grid vide letter dated 04062017 had informed that consequent to the successful completion of Trial Operation the following assets of ldquoTransmission System for Ultra Mega Solar Park in Anantapur Dist Andhra Pradesh- Part ndash A (Phase-I)rdquo have been put under Commercial Operation wef 0000 hrs of 04062017 in terms of clause 4 of CERC (Terms and Conditions of Tariff Regulations 2014)
+- 100 MVAR STATCOM at NP Kunta Pooling Station along with associated bays and equipment
12 Instances of SPS Operation
Based on the information furnished by SRLDC it is informed that there occurred no SPS operations in SR during the period 25052017 ndash 28062017
13 Status of Implementation of Protection Audit Recommendations (Phase-I amp Phase-II)
With reference to the petitions filed by KSEB (88MP2016) and KPTCL (135MP2016) for seeking further time-extension for completing their respective Protection Audit Recommendations (PAR) the final Order of Honrsquoble CERC disposing of petitions was issued on 15122016 In this Order the Commission apart from granting last-chance time-extensions to various SR-Constituents had also directed SRPC to monitor the status of completion of PAR regularly in PCSC meetings and submit bi-monthly report to the Commission confirming the completion of Phase-I and Phase-II of PAR of the Constituents of Southern Region
In this regard based on the information furnished various Constituents a summary table showing the
compliance status of various SR-Constituents as in July 2017 is given below
SlNo
Constituent
PAR (Phase-I) Activities
PAR (Phase-II) Activities
PAR (Ph-I amp Ph-II) Compliance ()
Remarks
Stipulated Completion
Date
Stipulated Completion
Date
1 APGENCO (Hydel)
31122017 31122017 40 ---
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 9
2 APGENCO (Thermal)
30072017 --- 75 Based on the status furnished timeline for complying with the remaining pending recommendations (3 in no) is expected by 31122017
3 APTRANSCO 31032017 --- 9571 Out of the 3 remaining pending recommendations two are expected to be completed in three months while the other is expected by 31122017
4 TSGENCO (Hydel)
31032017 31032017 8823 Based on the status furnished timeline for complying with the remaining pending recommendations (4 in no) is expected by 31122017
5 TSGENCO (Thermal)
31032017 31032017 80 Based on the status furnished timeline for complying with the remaining pending recommendations (3 in no) is expected by 31072017
6 TSTRANSCO 31032017 31032017 8523 Based on the status furnished timeline for complying with the remaining pending recommendations (13 in no) is expected by 30092017
7 KPCL --- 31112016 100 ---
8 KPTCL 31052017 31052017 2817 Based on the status furnished timeline for complying with the remaining pending recommendations (51 in no) is expected by 30092017
9 TANGEDCO 31122017 31122017 6389 ---
10 TANTRANSCO 31122017 31122017 50 ---
11 KSEB 30112016 31122017 9481 ---
12 NPCIL (MAPS) 31012017 --- 8889 Based on the status furnished timeline for complying with the remaining pending recommendation (ONE in no) is expected by 31122017
All above SR-Constituents are requested to adhere strictly to the time-lines given in the Order for
completing their respective pending PAR The IPPrsquos for whom there are pending PAR [viz Spectrum PGL GMR Barge - Kakinada Konaseema GPL APGPCL Vijjeswaram (Stage-I amp Stage-II) amp LANCO-Kondapalli PL] are also requested to complete them at the earliest
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 10
14 Nomenclature for naming various files uploaded in web-based Tripping Monitoring
System of SRLDC Portal
The nomenclature to be followed by the Constituents in naming various files (FIR DR EL TR) corresponding to a tripping incident was brought out in the SRPC letter No SRPC SE-III PCSC-45 4609 ndash 649 dated 26062015 and in the minutes of PCSC-45 issued vide SRPC letter No SRPCSE-III PCSC-45 2015 5422-455 dated 21072015 As illustrated therein the format to be followed for the user entered part-name is given below
Transmission Element File Name to be given by the user
Transmission Line SSN_DSN_line_FT
Inter-connecting Transformer SSN_ICT_FT
Generating Transformer SSN_GT_FT
Generating Unit SSN_Unit_FT
Where SSN = Source Station Name From end Station Name Sending end Station Name DSN = Destination Station Name To end Station Name Receiving end Station Name FT = File Type (FIR DR EL TR)
All SR-Constituents are requested to kindly intimate the above file naming nomenclature to all the concerned and ensure that it is strictly followed at all the stations in their respective control areas so that tripping analysis can be done systematically
15 Date amp Venue of the next PCSC Meeting
It is informed that the 66th meeting of PCSC will be held on 17th August 2017 (Thursday) from 1030 hrs onwards in the Conference Hall of SRPC Secretariat Bengaluru
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 132
Analysis of Grid Occurrences - 65
I Details of Grid Disturbances
Sl No
Details of Event Date amp Time Reason Remarks Category
1
Complete outage of 230 kV Villianur Substation of Pondicherry
19-05-2017 at 1235 hrs
Triggering incident was failure of CT in 110 kV Villianur-Kurumbapet at Villianur substation 230KV Villianur ndash NLC2 and 230 kV Villianur - Pondy lines got tripped from Pondy end (on operation of DEF) and NLC end (on operation of Zone-3) respectively resulting in loss of supply to 230 kV Villianur substation
Load Loss 140 MW
GD-1
SLD
The single line diagram of 230 kV Villianur SS as furnished by PED is attached at the end 230 kV Villianur ndash Pondy line Villianur (PED) end
As per FIR TR line was kept holding
The following was also stated in FIRTR
Remedial action Relay testing amp calibration proposed during total shutdown on 13062017
DR amp EL not furnished Pondy (PGCIL-SR2) end
As per FIRDRELTR line tripped at 123559270 hrs on B-E fault due to DPR Z3 (98 km 156 kA) operation From DR amp EL Z3 time delay was observed to be about 06 sec
230 kV Villianur ndash NLC2 line Villianur (PED) end
As per FIR TR line was kept holding
The following was also stated in FIRTR
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 232
Remedial action Relay testing amp calibration proposed during total shutdown on 13062017
DR amp EL not furnished NLC2 (NLCIL) end
As per FIRDRELTR line tripped at 123551016 hrs on B-E fault due to DEFR operation From DR amp EL DEFR time of operation was observed to be about 07 sec
Time sync of Protection relays with GPS at NLC TPS-II needed to be ensured SRPC SRLDC
It was noted that the triggering incident was failure of B-ph CT in 110 kV Villianur-Kurumbapet line at Villianur SS
It was noted that for the above fault distance protection at Villianur end on 110 kV Villianur-Kurumbapet line had not operated probably due to absence of current input (hence impedance becoming infinite)
Further since there was no busbar protection to 110 kV buses the fault continued to be fed from the remote ends (Pondy-PG and NLC-2) through 100 MVA Transformers (Txr ndash 1 amp Txr ndash 2)
So the transformersrsquo back-up protections were called into action But since OC protections provided on both HV amp LV sides had no high-set Units and since they were kept non-directional [Relay make ER TJM 10] LV (110 kV) side OC protections of both transformers had acted to give trip command Even though the 110 kV CB of Txr ndash 1 got opened that of Txr-2 had not opened due to which the fault continued to be fed from the remote ends (Pondy-PG amp NLC-2)
It was noted that the HV (230 kV) side OC protection of Txr-2 which was supposed to act under above situation had NOT acted
Due to above the remote end back-up protections were called into action
It was noted that even though Pondy-PG end CB tripped on DPR Z3 protection the time delay observed was on the lower side of about 06 sec
It was also observed that DEF protection had acted to trip its CB at NLC-2 without giving any chance for its distance protection to operate
In view of the above observed inconsistencies at Villianur SS it was decided to review various feeder amp transformer protections kept at Villanur SS during its scheduled protection audit on 10072017
Subsequently protection audit of 230 110 kV Villianur SS of PED was conducted on 10072017 during which several lacunae were noted Accordingly a comprehensive set of recommendations were given to PED for early compliance
Recommendations
PED to furnish an action taken report wrt complying with the protection audit recommendations PGCIL (SR-II) to review Zone-3 and DEF protection setting at Pondicherry end 230 kV Pondicherry ndash
Villianur and 230 kV Pondicherry ndash Bahour line and set them appropriately to achieve required
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 332
time-coordination with OC protections of ICTrsquos at Villianur SS NLCIL to keep DEF protection in blocked condition as long as Distance Protection is active and
configure it to become active only when distance protection does not pickup to avoid time-coordination issues
2
Complete outage of 400kV Uravakonda and Jammalamadugu Substations
31-05-2017 at 1744 hrs
Triggering incident was tripping of 400 kV Kurnool-PG - Narnoor line - 1 amp 2 and 400 kV Narnoor-Jamalamadugu line-2 which led to loss of supply to 400kV Uravakonda and Jamalamadugu 400kV Gooty-Narnoor 400kV Narnoor-Jamalamadugu-1 400kV Srisailam-Narnoor 400kV Uruvakonda-Mahboobnagar-1amp2 were out of service in antecedent condition
Gen Loss 500 MW
GD-1
FNN not followed by APTRANSCO FIR amp TR in prescribed formats not furnished by APTRANSCO SLD
The single line diagram 400 kV Jammalamadugu SS as furnished by APTRANSCO are attached at the end
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 432
Antecedent Conditions
The following lines were kept out of service 400kV Narnoor-Srisailam SC line 400kV Narnoor-Gooty SC line 400kV Narnoor-Hyderabad SC line 400kV Narnoor-Jamalamadugu-1 line 400kV Uravakonda-Jamalamadugu-1 line 400kV Uravakonda-Mahboobnagar line-1amp2
Above means Uravakonda SS and Jammalamadugu SS were effectively hanging on to 400 kV Jamalamadugu - Narnoor line-2 for supply
A Tripping of 400 kV Kurnool (PG) - Narnoor line-1 Kurnool-PG (PGCIL-SR1) end
As per FIRTR line tripped at 174418601 hrs due to DPR Z3 (5703 km) operation
As per DREL line tripped at 174418601 hrs due to Stub Protection operation Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 173620637 hrs due to operation of Igt4 (B-ph) protection
From EL Igt4 time delay was observed as 100 msec
Time sync of protection relays with GPS needed to be ensured B Tripping of 400 kV Kurnool (PG) - Narnoor line-2 Kurnool-PG (PGCIL-SR1) end
As per FIRTR line tripped at 174418601 hrs due to DPR Z3 (5703 km) operation
As per DREL line tripped at 174418601 hrs due to Stub Protection operation Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 174306388 hrs due to operation of Igt4 (B-ph) protection
From EL Igt4 time delay was observed to be about 100 msec
Time sync of protection relays with GPS needed to be ensured C Tripping of 400 kV Narnoor ndash Jammalamadugu line-2 Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 174423979 hrs due to OVR-I operation (From EL OVR-I Time delay was observed as 5 sec which is in line with SRPC provided gradings)
Jammalamadugu (APTRANSCO) end
As per FIR line tripped at 1744 due to DT receipt from Narnoor end
As per DR line tripped at 174415040 hrs (Type of Protection operated was not recorded)
In EL events recording started from 174424037 hrs Line was observed to have got tripped around this time due to 862 operation (Type of Protection operated was not recorded)
Time sync of Protection relays with GPS needed to be ensured SRPC SRLDC
As informed by APTRANSCO it was noted that the triggering cause for operation of Stub protection Igt4 protection was a line fault on 400 kV Ghani ndash Narnoor line-1 Even though Ghani end had tripped on DPR Z1 protection and sent carrier to Narnoor due to unhealthiness of carrier communication (PLCC related issues) Narnoor end tripped on DPR Z2 protection
The above fault was seen by relays at both ends of 400 kV Narnoor ndash Kurnool-PG lines 1 amp 2 (the relays of P444 make are owned by PGCIL-SR1 and the relay settings were also provided by PGCIL-SR1)
As in formed by PGCIL (SR-I) it was noted that there was an instantaneous non-directional Igt4 protection setting in the specific relay style (defined by relay make model and version) which operates without checking for isolator status During the above instant the flow of heavy fault
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 532
current led to its operation both ends
To this PGCIL (SR-I) was informed that by default Igt4 or stub protection is configured for instantaneous operation with corresponding isolator open position interlock So further instantaneous high-set functionality that operates without checking isolator positional status is not desirable since it can lead to unwarranted trippings as in the present case Therefore the said setting shall be kept disabled If there is no provision to effect this (by means of changing relay settings) the issue may be referred to its OEM for obtaining modified firmware suitable solution PGCIL (SR-I) can also make use of other relays with different style in place of the existing relays
Recommendations
For 400 kV Ghani ndashNarnoor line the following shall be carried out by APTRANSCO End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced PGCIL (SR-II) to take appropriate action wrt disabling non-directional instantaneous Igt4 protection
that operates without checking existence of stub If required the issue may be referred to relays OEM for appropriate solution or the present relays may be replaced with other relays with different styles that donrsquot have the issue observed
II Details of Grid Incidents
Sl No Details of Event Date amp Time Reason Category
1 Tripping of 220 kV Idukki ndashUdumalpet line
05-05-2017 at 1702 hrs
Line tripped due to B-N and R-N fault in line
GI-1
Idukki (KSEB) end
As per FIRDREL line tripped (in 3-ph) at 170200500 hrs on B-E fault due to operation of DPR Z1 (3661 km) protection
Udumalpet (TANTRANSCO) end
As per FIRDRELTR line tripped (in B-ph) at 165741907 hrs on B-E fault due to DPR Z2 (CAT AR 1025 km) operation However during AR dead-time another R-E fault was detected at 165742252 hrs in Zone-2 due to which line tripped in 3-ph after Z2 time delay of 350 msec at 165742594 hrs [It may be noted that all this happened during the AR dead-time]
Time-sync of Protection Relays with GPS needed to be ensured at 220 kV Udumalpet SS KSEB
During the instant case line did not try for AR as the external VARM AR relay was faulty and kept out of service
Remedial action Problem with VARM relay had been rectified and put into service on 10052017
SRPC SRLDC
From the DR of Udumalpet it can be seen that the relay had tried for AR even after giving three phase trip during AR dead-time due to occurrence of two different faults which is not desirable
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 632
Recommendations TANTANSCO to correctly configure AR logic at Udumalpet so that in the event of 3-ph trip being
given during AR dead-time the relay will not try for auto-reclosure TANTRANSCO to keep AR dead-time as 1 sec for all 220 kV amp above transmission lines
2
Tripping of 400 kV Kudgi (PG) - Tumkur line-2 and Kudgi (PG) ndash Kudgi (NTPC) line-1
06-05-2017 at 1605 hrs
Kudgi (NTPC) feeder tripped at Kudgi (PG) end on operation of distance protection R-N Zone-1 Tumkur feeder tripped at Kudgi(PG) end on operation of NGR buchholtz relay
GI-2
SLD
The single line diagram of 765 400 kV Kudgi-PG SS as furnished by are attached at the end 400 kV Kudgi (PG) ndash Kudgi (NTPC) line-1 Kudgi (PGCIL-SR2) end
As per FIRDRELTR line tripped (in 3-ph) at 160547499 hrs on R-E fault due to DPR Z1 (M1 79 km 013 kA M2 88 km 318 kA) operation
Kudgi (NTPC) end
FIRDRELTR not furnished 400 kV Kudgi (PG) ndash Tumkur line-2 Kudgi (PGCIL-SR2) end
As per FIRDRELTR line tripped (in 3-ph) at 160547450 hrs due to operation of NGR Buccholtz trip protection
Tumkur (PGCIL-SR2) end
As per FIRELTR line tripped (in 3-ph) at 160547596 hrs due to DT receipt from Kudgi-PG end
In DR this time was mentioned as 160512593 hrs
Time-sync of protection relays with GPS needed to be ensured PGCIL (SR-II)
With regard to tripping of 400 kV Kudgi (PG) ndash Kudgi (NTPC) line ndash 1 and AR non-operation it was informed that prior to above fault there were multiple faults on all four lines between Kudgi (PG) and Kudgi (NTPC) due to prevailing stormy weather
Remedial action Actual reasons for AR failure in the instant case were being investigated The issue was also
referred to its OEM for suitable advice
With regard to tripping 400 kV Kudgi (PG) ndash Tumkur line ndash 2 it was suspected that NGR Buchholtz relay might have mal-functioned as there was no gas collected in the bucholtz relay of NGR It may be noted that NGR buchholtz trip is present in REF relay
Remedial action Oil sample of NGR taken and sent to RTDC
Recommendations PGCIL (SR-II) to sort out AR related issues at Kudgi (PG) end on 400 kV Kudgi (PG) ndash Kudgi (NTPC)
lines and put AR into service PGCIL (SR-II) investigate the reasons for NGR Buccholtz trip on 400 kV Kudgi (PG) ndash Tumkur line-2
and furnish an action taken report wrt rectifying the same
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 732
3 Tripping of 220 kV Edamon-Tirunelveli lines - 1amp2
06-05-2017 at 1809 hrs
220kV Edamon-Tirunelveli - 1amp2 tripped from Tirunelveli end only and was in service from Edamon end
GI-1
Edamon (KSEB) end
As per FIR line was kept holding from Edamon end Tirunelveli (PGCIL-SR2) end
As per FIRDRELTR lines tripped (in 3-ph) at 180921343 hrs on R-B fault due to DPR Z1 (532 km) operation
It was stated in TR that Edamon ndash Pothencode lines 1 amp 2 had tripped around the same time and it was suspected that DPRrsquos at Tirunelveli end on 220 kV Tirunelveli ndash Edamon lines 1 amp 2 might have over-reached for the fault in 220 kV Edamon - Pothencode lines
PGCIL (SR-II)
The instant case was a typical case of overreaching of distance relays at Tirunelveli being experienced for quite a while It may be probably due to bunching of the conductors involved
Remedial action It was proposed to modify Z1 setting as 50 of line impedance with POR and would be done
within one-week time They had also proposed to measure the actual line impedance of the line and adjust Z1 settings
accordingly
06-03-2017at 0607 hrs
4 Tripping of 400220 kV Ghani ICT-2amp3
07-05-2017 at 1405 hrs
ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
GI-2
FNN not followed by APTRANSCO FIRrsquos in prescribed format not furnished by APTRANSCO SLD
The single line diagrams of 400220 kV Ghani SS as furnished by APTRANSCO is attached at the end Tripping of 500 MVA 400 220 kV ICT-2
As per FIR ICT-2 tripped at 1405 hrs due to operation of Y-ph OC amp EF protections
DR amp EL not furnished Tripping of 500 mVA 400 220 kV ICT-3
As per FIR ICT-3 tripped at 1405 hrs due to operation of Y-ph OC amp EF protections
DR amp EL not furnished SRPC SRLDC
When enquired about the reasons for operation of back-up protections of ICTrsquos ndash 2 amp 3 APTRANSCO replied that there was actually a fault on the 220 kV feeders emanating from 400 220 kV Ghani PS However since the CT Neutral connection setting had been wrongly set as ldquoTowards Bus siderdquo instead of the correct ldquoTowards Transformer siderdquo the back-up protections on 220 kV side operated for the said 220 kV line fault
APTRANSCO also informed that first ICT-2 tripped followed by ICT-3
But since it was not clear from the above explanation whether line protection on 220 kV side had operated or not and the delayed clearance of the fault observed during the incident (about 400 msec) APTRANSCO was asked to investigate the reasons for the same
APTRANSCO was also asked to check whether carrier aided protection is healthy on 220 kV lines emanating from 400 220 kV Ghani PS
07-03-2017 at 1602 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 832
Recommendations APTRANSCO to check and correct all CT Neutral Connection settings in various protection relays at
their 400 220 kV Ghani PS APTRANSCO to ensure that PLCC carrier aided protection is maintained healthy on 220 kV lines
emanating from their 400 220 kV Ghani PS APTRANSCO to take steps to complete configuration works of DRrsquos amp ELrsquos of various protection
relays at their 400 220 kV Ghani SS and furnish the same as and when required in compliance of IEGC Regulation 52 (r)
5 Tripping of 400 kV Ghanapur-Mamidapalli line
08-05-2017 at 1915 hrs
Line tripped at Ghanapur end only and was holding from Mamidapalli Ghanapur end protection had sensed R-phase to earth fault
GI-2
Mamidipalli (TSTRANSCO) end
As per FIR line was kept holding from Mamidipalli end
In DR R-E fault current (2894 kA) along with dip in R-ph voltage could be seen but if any protection relay had picked could not be verified Also EL furnished did not contain events for this time (In fact no events were found recorded after 160610859 hrs)
Ghanapur (PGCIL-SR1) end
As per FIRTR line tripped (in 3-ph) at 1915 hrs on R-E fault due to DPR Z1 (49 km 2547 kA) operation
As per DR line tripped (in 3-ph) at 191330020 hrs on R-E fault due to 3-ph Group-B Trip relay operation (Zone-3 pick-up also could be observed)
As per EL line tripped (in 3-ph) at 191541722 hrs on R-E fault due to 3-ph Group-B Protection Trip relay operation
Time-sync of protection relays with GPS needed to be ensured
When enquired about the reasons for observed discrepancies PGCIL (SR-I) informed that line tripped on operation of distance protection Since last 2-3 trippings permissive carrier was not being received at Mamidipally end
Further since PLCC at both ends belong to TSTRANSCO thorough check-up of PLCC carrier communication and tuning of PLCC link needed to be undertaken
For above one-day shut-down of line was requested to which SRLDC agreed
Recommendations For the line under consideration the following shall be carried out by TSTRANSCO in coordination
with PGCIL (SR-I) End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
08-03-2017 at 1033 hrs
6 Tripping of 400220kV ICT-1 at Guttur
09-05-2017 at 2215 hrs
ICT-1 tripped on HV side only without any relay indications GI-2
As per FIRTR ICT-1 tripped at 2215 hrs only on HV side without any relay indications KPTCL
ABB make RXMS trip relays provided in various lineICT panels were found to be mal-operating and the phenomenon observed was suspected due to raise in earth potential during any fault in Guttur substation
10-03-2017 at 1801 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 932
Remedial action Action wass being taken to provide 10kΩ resistor in series with the RXMS relay coil for all trip
relays of this type at Guttur Total 170 nos of such resistors were required Now purchase formalities were finalised and work of supply and fixing of resistors would be taken up and completed within a monthrsquos time
7 Tripping of 400 kV Narsapur-Shankarapalli line
10-05-2017 at 0007 hrs
Line tripped at Narsapur end only on B-Phase to earth fault and line did not trip from Shankarapalli
GI-2
SLD
Shankarapally (TSTRANSCO) end
As per FIR line was kept holding from Shankarapally end Narsapur (TSTRANSCO) end
As per FIRDREL line tripped in 3-ph at 000720105 hrs on B-E fault due 86 Trip relay (130 km) operation
The type of protection operated was not recorded shown in either DR or EL
TR not furnished TSTRANSCO
For the fault on 400 kV Shankarapalli-Mamidapalli line Narsapur end picked up in Z3 However due to configuration issues relating to programmable Zone Zp (this was being used as Zone-3 and its time-setting was found to be kept as zero sec) it tripped instantaneously instead of tripping after Zone3 time delay
Remedial action PSL Configuration for Zp was set right on 01-06-2017
13-03-2017 at 2347 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1032
8
Tripping of 400220 kV Hyderabad ICT-4 and 220 kV lines at Hyderabad substation
10-05-2017 at 239 hrs
Operation of busbar protection due to fault in 220 kV Bus at 220kV Hyderabad Substation
GI-1
SLD
1 2 1 2
Bus-1
Bus-2
x
xx
x
BUS BAR ACTED AT 220KV GHANAPUR SS ON 10-05-2017
CHANDRAYANAGUTTA HAYATHNAGAR
132KV BUS
160MVA-3 100MVA-1
400kV PGCIL
x x
160MVA-2ICT-1 ICT-2 ICT-3
NAGOLE
x x
ICT-4
x
MOULALI
INFOSYS
x
x
1 2
Y-Ph disc
flash over at
LocNo95
Y amp B-Ph
disc flash
over at
LocNo95
RELAY INDICATIONS ON THE FEEDER
AT GHANAPUR END AT CHANDRAYANGUTTA END
Chandrayangutta-I feeder Ghanapur-I feeder
Main-1 relayYNZ1 071kM Main-1 relayYN254kM
Main-2 relayYNZ1 09kM Main-2 relayYN
Chandrayangutta-II feeder Ghanapur-II feeder
Main-1 relayYB Z1378kM Main-1 relayRYB
Main-2 relayYBZ111kM Main-2 relayRYB
BC
14-03-2017 at 1911 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1132
Tripping of ICT-4
As per FIR ICT-4 tripped at 0240 hrs on 220 kV side only due to BBP operation on 220 kV Bus
As per DR ICT-4 tripped at 220941165 hrs apparently due to LBB operation
EL not furnished
Date amp Time-sync of DR not in order (09052017 220940682 hrs)
TR furnished did not contain any analysis or remedial action taken
It was noted that BBP for 220 kV Bus-2 had operated for a close-in line fault on 220 kV Chandrayanagutta line-2 tripping ICT-4 and other connected 220 kV feeders (It was informed that ICT-2 was not in service at the time of instant tripping)
When enquired about the reasons TSTRANSCO informed that presence sudden appearance of current in the corresponding Peripheral Unit (PU-2) of the Chandrayanagutta line-2 had led to BBP operation And the reasons for the same were being investigated
To this it was suggested to check corresponding CT neutral connection integrity of cable wiring from CT to Busbar panel as also carry out stability-check of busbar protection
Recommendations TSTRANSCO to investigate the reasons for BBP operation for 220 kV Bus-2 and furnish a report on
the remedial measures taken
9 Tripping of 400220 kV ICT-1 at BTPS
13-05-2017 at 1941 hrs
ICT-1 got tripped on operation of LV side earth fault protection during R-phase to earth fault in 220 kV BTPS-Lingapur line
GI-1
SLD
The single line diagram of 400220 kV BTPS as furnished by KPCL is attached at the end
As per FIRTR ICT-1 tripped at 1942 hrs on LV side earth fault protection due to fault in 220 kV BTPS ndash Lingapur line It was stated that the line also tripped around the same time on R-E fault due to DPR Z1 (2438 km) operation
DR amp EL pertaining to ICT-1 tripping not furnished
As per furnished DREL 220 kV BTPS ndash Lingapur line tripped from BTPS end at 194124719 hrs due to DT receipt from the remote end
KPCL
ICT-1 tripped due to non-directional sensitive earth fault protection provided on LV (220 kV) side
Remedial action The time lever for above protection was increased from 0025 to 01 in the third week of May
2017 in consultation with KPTCL KPTCL
220kV BTPS- Lingapur line tripped at both the ends with following indications At BTPS Lingapur Line tripped on DPRZone-1RN24km78kA
At Lingapur BTPS line tripped on DPRZone-2RN66km29kA
It was reported that 315MVA ICT-1 tripped on LV side earth fault protection along with Lingapur line
Remedial action Existing settings of ICT back up protection is obtained from local RT wing of KPTCL for review
Revised settings communicated to KPCL for implementation
16- 03-2017 at 0118 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1232
SRPC SRLDC
Since the ICT has been provided with normal back-up directional OC amp EF protections a separate non-directional sensitive earth fault protection is not desirable hence the need for the same may be reviewed Otherwise its time lever shall be suitably increased to a higher value (say 035) so as not to cause unwarranted trippings
Further tripping of 220 kV BTPS ndash Lingapura line from BTPS end on DT receipt was not in order
When enquired about the reasons for AR non-operation in the instant case for the above line KPCL replied that there were issues with PLCC carrier communication hence it was kept out of service
Recommendations KPCL to review the need for providing separate non-directional sensitive earth fault protection for
ICTrsquos at their BTPS station and take steps to disable the same For 220 kV BTPS ndashLingapura line KPCL to resolve issues relating to PLCC carrier communication and
put AR into service
10 Tripping of 765 kV Kurnool-Tiruvalam line-2
19-05-2017 at 2003 hrs
Failure of R-phase LA at Tiruvalam end REF operation and DT send were observed from EL of Kurnool station
GI-2
Kurnool (PGCIL-SR1) end
As per FIRTR the line tripped in 3-ph at 200318272 on R-B-E fault due to DPR Z2 (CDistance = 912) operation
As per DR line tripped in 3-ph at 200318272 hrs on R-E fault (B-E fault did not appear to be strong) due to DPR Z2 (CAT) operation and 3-ph Group - A amp B Trip relay operation (In DR DT receipt event was observed around the same time)
In EL REF protection operation of PU-P141 operation and DT_SEND to the remote end was observed at 200318340 hrs
Tiruvalam (PGCIL-SR2) end
As per FIRDRELTR the line tripped in 3 ph at 200318269 on R-E fault due to DPR Z1 operation and DT receipt from the remote end
It was stated in TR that 707 RLA (Reactor LA) had fallen down due to heavy wind and caused R-E fault
When enquired about the reasons for REF protection operation and consequent sending of DT to the other end PGCIL (SR-I) informed that the fault was detected as R-B-E fault hence three-phase trip was given However even though Main-CB got opened with its three poles opening simultaneously Tie-CB got opened in R-ph immediately while the other two phase poles took a while to open This had caused Tie-CB LB operation Since this protection was implemented in REF relay trip was extended from the same along with sending of DT to the other end
To this it was pointed out that in the instant case only R-E fault was apparent and the current in B-ph was almost at the normal value hence the sensitivity of distance relay zone elements may be checked Further Tie-CB LBB operation points to sluggishness of the CB-poles hence the opening time of tie-CB may be checked and properly set
It was also noted that in the EL of Tiruvalam DT Send event was observed after tripping of the line on R-E fault PGCIL (SR-II) was asked to look into the reasons for the same and take suitable remedial action
16-03-2017 at 1023 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1332
11 Tripping of 400220 kV ICT-2 at Kalpaka SS
20-05-2017 at 1502 hrs
ICT-2 tripped due to operation of Transformer Buchholtz relay
GI-2
As per FIR ICT-2 tripped at 15053283 hrs due to its Buccholtz relay operation It was stated in FIR that heavy rain amp gale had been reported at the time of tripping
APTRANSCO
Just prior to above tripping event station transformer supply went off When the supply came back the two oil cooling pumps which were supposed to start one after another with a time gap of 15 sec had started simultaneously due to problem in the timer module Due to this there was a sudden flow of oil which shorted the contacts of the micro-switch that gives buchholtz trip
Remedial action The faulty timer module of oil cooling pump had been replaced
On this SRPC asked for the details of AC auxiliary supply about its redundancy details of DG-set and the mode of starting (manual or auto) To this APTRANSCO informed that redundancy for AC auxiliary supply is present and the lost supply during the instant case had been restored immediately
Recommendations
APTRANSCO to furnish AC auxiliary supply details including its redundancy DG set details and its mode of starting at their 400 220 kV Kalpaka SS Further corresponding AC auxiliary supply changeover scheme drawing shall also be furnished
16-03-2017 at 1132 hrs
12 Tripping of 400220 kV ICT-2 at KV Kota SS
23-05-2017 at 1021 hrs
ICT-2 got tripped due to mal-operation of transformer oil temperature indicator
GI-2
As per FIR ICT-2 tripped at 1021 hrs on both HV and LV sides due to transformer oil temperature indicator mal-operation
As per EL ICT-2 tripped at 1019XXXXX192 hrs on due to operation of OTI protection
It was stated that DR had not been triggered for the event
Time-sync of protection relays with GPS needed to be ensured
EL was not configured to show SECONDS in time-stamp of the events (This had been brought to APTRANSCOrsquos attention in previous PCSC meetings also)
APTRANSCO
At KV Kota SS OTI got stuck While checking the same its position indicator got changed and mal-operated resulting in 3-ph trip
Remedial action Ms CGL had visited the substation and declared the relay faulty It was proposed to replace the faulty OTI on 10072017
APTRANSCO was asked to configure Event Loggers at their KV Kota SS properly so that SECONDS are also displayed in the time stamp of the events recorded
16-03-2017 at 1245 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1432
13
Tripping of 220 kV Kaniampeta - Kadakola line (Load Loss at Kaniampeta = 36 MW)
23-05-2017 at 1350 hrs
EFR relay operated and B-ph pole discrepancy relay operated leading to tripping of Bus-Coupler CB
GI-1
Kaniampeta (KSEB) end
As per FIR in Kaniyampetta 220 kV substation all transformers tripped (Load loss 36 MW) at 1339 hrs due to the tripping of 220 kV Kaniyampetta-Kadakola feeder (B phase) at Kadakola end Later 220 kV Kaniyampetta-Kadakola feeder was hand tripped at 1426 hrs from Kaniyampetta end
Kadakola (KPTCL) end
As per FIR line tripped at 1350 hrs due to EFR operation of Bus-Coupler CB and PDR operation
It was also stated that at the time of tripping Kaniampeta panel had been taken up for RampU work hence distance relay was not in service Kaniampeta CB was bypassed by keeping protection through 220 kV Bus-Coupler CB
DR amp EL not furnished KPTCL
At Kadakola during the instance protection to Kaniambetta line was provided through 220kV bus coupler breaker bay as Kadakola relay panel was taken out for M-2 retrofitting work under RampU
Bus coupler breaker tripping was suspected due to problem in the pole discrepancy relay and there was no fault in the line
Remedial action Problem with the PD relay of Bus coupler breaker was rectified on 24052017
16-03-2017 at 2026 hrs
14 Tripping of 400 220 kV ICT-1 at Somanahalli substation
24-05-2017 at 1724 hrs
ICT-1 at Somanahalli substation got tripped due to DC Earth fault
GI-2
Somanahalli (PGCIL-SR2) end
As per FIRTR ICT-1 tripped (on HV side) at 172809 hrs on momentary DC Earth fault
As per DREL ICT-1 tripped (on HV side) at 172809812 hrs due to operation of Group AB trip relays In DR manual trigger signal becoming HIGH was observed at above instant
In EL time resolution for recording events was limited to seconds (events were not shown at msec level)
PGCIL (SR-II)
At Somanahally SS 3x167 MVA single phase units had been replaced by 1x500 MVA ICT Subsequently CSD works were taken up At the time of tripping event CSD wiring works were going on During the process positive DC supply got extended to 86A trip relay inadvertently
Remedial action DC earth fault had been removed
PGCIL (SR-II) was asked to configure Event Loggers at their Somanahalli SS properly so that time resolution for recording events was set u pto msec
16-03-2017 at 118 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1532
15 Tripping of HVDC Gazuwaka Pole-1amp2
25-05-2017 at 0945 hrs
HVDC pole-1 got tripped due to operation of South filter inter zone protection and HVDC pole-2 got tripped due to operation of differential protection
GI-2
SLD
Pole-1
27-03-2017 at 1016 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1632
Pole-2
Tripping of HVDC Pole-1 (PGCIL-SR1)
As per FIRELTR Pole-1 tripped at 094513960 hrs due to operation of South Filter inter-zone protection [
It was stated that DR was not available Tripping of HVDC Pole-2 (PGCIL-SR1)
As per FIRDRELTR Pole-2 tripped at 094512906 hrs due to operation of WIN Differential protection
It was noted that no representative from Gajuwaka (HVDC amp HVAC) SS had come to attend the meeting to explain as to what caused the pole trippings
PGCIL (SR-I) representative informed that at the time of tripping RTV Coating works for switchyard equipment were going on In the process when CWC35 filterrsquos bus-side isolator was opened it feel down unexpectedly and resulted in inter-zone filter protection operation
Wrt HVDC Pole-2 tripping PGCIL (SR-I) representative informed that oscillations in voltage and current were noticed prior to tripping of HVDC Pole-2 And differential current was also observed for the extended AC bus Due to this WIN differential protection had operated resulting in tripping of HVDC Pole-2 It was also informed that the issue was referred to its OEM ABB (Sweden) for suitable advice
However since no detailed tripping report explaining the causes that led to tripping of HVDC poles and the remedial action taken had been furnished PGCIL (SR-I) was asked to submit the same
Recommendations PGCIL (SR-I) to furnish detailed report on the events that led to tripping of HVDC Poles ndash 1 amp 2
including remedial measures taken to PCSC forum Further the OEM report wrt tripping of HVDC Pole-2 shall also be furnished
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1732
16 Tripping of 400 kV Kayathar-Karaikudi line
25-05-2017 at 1552 hrs
R-phase to earth fault had occurred in line There was Zone-2 3 phase trip operation at Kayathar end and Zone-1 3 phase trip at Karaikudi end
GI-2
Kayathar (TANTRANSCO) end
As per FIRDRELTR line tripped in 3-ph at 155236989 hrs on R-E fault due to DPR Z2 operation (Z2 time delay observed was about 390 msec)
It was stated in TR that carrier channel was not healthy at the time of tripping and carrier signal was not received at this end during the fault
Remedial action Protection Coupler and OLTE were reset at both Karaikudi amp Kayathar ends and carrier channel
was made available Karaikudi (PGCIL-SR2) end
As per FIRDRELTR line tripped in 3-ph at 155236592 hrs on R-E fault due to DPR Z1 (186 km) operation
It was stated in TR that DPC had failed at the other end and resulted in Carrier Fail alarm at Karaikudi end issuing 3-ph trip
Recommendations
For the line under consideration the following shall be carried out by TANTRANSCO in coordination with PGCIL (SR-II) End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
17
Tripping of 400220 kV ICT - 1 amp 3 at Hoody substation of KPTCL (Load Loss 750 MW)
26-05-2017 at 1230 hrs
R phase limb of ICT-1 bank pre-close supervision contact of trip coil -2 had arc over ICT-3 got tripped on over-loading
GI-2
Tripping of ICT-1
As per FIR ICT-1 tripped at 1230 hrs due to arcing over of R phase limb of ICT-1 bankrsquos pre-close supervision contact of trip coil -2
As per DR the tripping took place at 114128806 hrs (Type of protection operated not recorded)
EL not furnished
Time sync of PRrsquos with GPS needed to be ensured
Remedial action The same was rectified and the circuit was changed by utilizing the spare auxiliary contact of CB
for R-ph limb by availing LC on 29052017 and charged the ICT-1 bank at 0432 hrs by getting the SRLDC code 1360
Tripping of ICT-3
As per FIR ICT-3 tripped at 1230 hrs due to operation of INV OC FWD protection amp 86A master trip relay
From the DR furnished (with trigger time = 114254202 hrs) tripping of ICT-3 and the type of protection operated were not clear
EL not furnished
Time sync of protection relays with GPS needed to be ensured at Hoody
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1832
KPTCL
At Hoody 500 MVA ICT-1 tripped without any relay indication ICT-1 and 3 were in parallel each ICT carrying about 390MW of load Due to tripping of ICT-1 ICT-3 got over loaded and hence tripped on over current protection
Remedial action After detailed inspection it was observed that pre-close supervision contact of trip coil -2 arced
over in R phase limb of the 400kV side breaker Hence it was suspected that R-pole might have opened initially and remaining poles on PD operation
The problem was rectified and attended on 29052017 by availing shut down In order to avoid tripping of another ICT operating in parallel whenever one ICT trips on fault an
SPS is being finalized by KPTCL which is to be implemented at Hoody Any time each ICT at Hoody will be catering around 400MW of load Such huge load shedding by tripping 66kV loads of Hoody station is difficult to achieve Hence 220kV radial feeders may also have to be tripped to get desired load shedding
It was noted that frequent tripping of 400 2220 kV ICTrsquos at Hoody SS had been observed in the past few months And during their discussion in various PCSC meetings the following issues have come to the for urgent action by KPTCL Implementation of Special Protection Scheme (SPS) to take care of over-loading of the other ICT
when one out of two ICTrsquos operating in parallel trips Provision of Bus-bar protection to 220 kV buses Compliance of Third Party Protection Audit Recommendations Ensuring supply reliability to Metro-services Action plan on the proposed system strengthening measures in Bengaluru area in the context
of continued use of Split-Bus operation
Thus to ascertain the action taken by KPTCL wrt above issues a Protection System Analysis Group (PSAG-18) meeting was proposed to be conducted on 03082017
Recommendations KPTCL to furnish compliance report on the recommendations given in PSAG-18 meeting to PCSC
forum
18 Tripping of 400 kV Simhadri - Kalpaka line-2
28-05-2017 at 503 hrs
Line tripped on mal-operation of Tee Differential Protection at Simhadri end and Direct Trip was received at Kalpaka
GI-2
Kalpaka (APTRANSCO) end
As per FIR line tripped at 0503 hrs due to DT receipt from the remote end
DR amp RL amp TR not furnished Simhadri STPS (NTPC) end
As per FIRTR line tripped at 050350408 hrs due to operation T-differential protection which in turn was attributed to spurious pick-up during the fault at Vemagiri end
The following was stated in TR Kalpaka Line-1amp2 Tie bays were under PTW And R-Ph CT (16CTA R-Ph) was under erection Primary connection was over secondary
connection was pending The CT secondary wires used in T-Diff protection of Kalpaka Line-2 might be touching the earth and during fault at Vemagiri some stray voltage developed across CT secondary cores might have resulted into operation of T-Diff protection Trip values are 100mA in secondary
During the operation of T-diff protection there was no change in current magnitudes of Kalpaka Line-2 and hence the tripping could be considered as spurious one
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1932
As per DR line tripped at 050350442 hrs But the type protection operated was not recorded in it
EL not furnished (In place of EL DRrsquos eventsrsquo summary was furnished)
19 Tripping of 400 kV Ramagundam - Gajwel line
29-05-2017 at 0007 hrs
Over Voltage Stage-1 had operated at Gajwel end Ramagundam end did not trip as Direct Trip was not received from Gajwel end
GI-2
Ramagundam STPS (NTPC) end
As per FIR line was kept holding from Ramagundam end Gajwel (TSTRANSCO) end
As per FIR line tripped at 0007 hrs due to OVR-I operation
DR amp EL amp TR not furnished
The tripping was not in order as per the SRPC given OVR gradings as shown below
When enquired about the reasons for OVR-I operation TSTRANSCO informed that OVR functionality implemented in REL 521 had mal-operated
Remedial action The OVR functionality had been moved to an external Over Voltage relay
Recommendations
For the line under consideration the following shall be carried out by TSTRANSCO in coordination with NTPC-Ramagundam End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
20 Tripping of 400 kV Gajwel-Ghanapur line
29-05-2017 at 0007 hrs
Line tripped on operation of over voltage protection at Gajwel and direct trip was received at Ghanapur DR and EL of Gajwel end were not furnished
GI-2
Ghanapur (PGCIL-SR1) end
As per FIRELTR line tripped at 000731885 hrs due to DT receipt from the remote end
As per DR line tripped at 000257163 hrs due to DT receipt from the remote end
Time-sync of DR amp EL with GPS needed to be ensured Gajwel (TSTRANSCO) end
As per FIR line tripped at 0007 hrs due to OVR-I operation
DR amp EL amp TR not furnished
The tripping was not in order as per the SRPC given OVR gradings as shown below
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2032
When enquired about the reasons for OVR-I operation TSTRANSCO informed that there was a loose
wiring in Y-ph CVT wiring which resulted in mal-operation of OVR-I protection
Remedial action All CVT wirings had been tightened for fool-proof operation
III Details of Trippings due to Failure or Non-operation of Auto-Reclose
Sl No Element Date amp Time Reason
Category
1 Tripping of 400 kV Hiryur-
BTPS line-1 06-05-2017 at 1401 hrs
Y-phase to earth fault had occurred in line Direct trip was sent from BTPS to Hiryur end
GI-2
Hiryur (PGCIL-SR1) end
As per FIRDRELTR line tripped (in Y-ph) at 140009730 hrs on Y-E fault due to DPR Z1 (AR 82 km 1034 kA) operation Just prior to auto-reclosing DT was received at 140010730 hrs and line tripped in 3-ph
BTPS (KPCL) end
As per FIRTR line tripped (in Y-ph) at 1400 hrs on Y-E fault due to DPR Z1 (AR 1173 km) operation AR was stated to be attempted but unsuccessful due to persistent fault
As per DREL line tripped (in Y-ph) at 125520000 hrs on Y-E fault due to DPR Z2 (CAT AR) operation and tried to auto-reclose after about 1 sec but tripped in 3-ph due to persistent (Z1) fault
Time-sync of Protection Relayrsquos with GPS needed to be ensured at BTPS
When enquired about the reasons for sending of DT to Hiriyur end KPCL informed that when the line tripped on Y-E fault and the AR operation was in progress Under-Voltage relay at BTPS end had sensed under-voltage and sent DT to Hiriyur end
It was noted that instantaneous tripping of UV relay and consequent of sending of DT to the other end are undesirable It was therefore suggested to introduce suitable delay (say 3 sec) for UVR tripping and disable sending of DT to the other end
Recommendations
KPCL to introduce suitable delay (say 3 sec) for UVR tripping and disable sending of DT to the other end on UVR operation at their BTPS station
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2132
2 Tripping of 400 kV Munirabad-Guttur line
06-05-2017 at 1702 hrs
R-phase to earth fault Auto-reclose was successful at Guttur and Breakers at Munirabad end got tripped
GI-2
Munirabad (PGCIL-SR1) end
As per FIRDRELTR line tripped (in 3-ph) at 170231624 hrs on Y-E fault due to DPR Z2 (AR CAT 1145 km) operation
Guttur (KPTCL) end
As per FIR line tripped (in R-ph) at 1702 hrs on Y-E fault due to DPR Z1 (AR 4708 km Ir=6877 kA) operation and successfully auto-reclosed
As per DREL line tripped (in R-ph) at 165933499 hrs on Y-E fault due to DPR Z1 (AR) and successfully auto-reclosed after about 1 sec
Time-sync of Protection Relays with GPS needed to be ensured at Guttur SS
When enquired about the reasons for AR non-operation at Munirabad end PGCIL (SR-I) informed that the external VARM relay through which AR had been implemented had not operated Since the relay belonged to KPTCL suitable action needed to be taken by them
On this KPTCL was asked to look into the issue and replace the relay if required PGCIL (SR-I) was also requested to coordinate with KPTCL in attending to this matter
3
Tripping of 765kV Kurnool-NPS line -2
07-05-2017 at 1405 hrs
Y phase to earth fault had occurred in line Auto-reclose was successful at Kurnool end and AR was not attempted at NPS end
GI-2
Kurnool-PG (PGIL-SR1) end
As per FIRELTR line tripped (in Y-ph) at 140543316 hrs on Y-E fault due to DPR Z1 (AR 328 km 166 kA) operation and successfully auto-reclosed after about 11 sec After about further 6 sec (ie at 140550470) line tripped in 3-ph due to receipt of DT from the remote end
It was stated in FIR that 765 kV Kurnool ndash NPS line-1 was under LVRD
As per DR line tripped (in 3-ph) at 140550470 hrs due to DT receipt from remote end
DR corresponding to successful AR operation not furnished NPS (PGIL-SR1) end
FIR amp TR furnished were that of Kurnool station
As per DREL line tripped (in 3-ph) at 140543351 hrs on Y-E fault due to AR (Z2 CAT) operation It was noted from EL that AR LOCKOUT had operated around the same time due to which line had not tried for AR
From EL it was further observed that DT was sent to the remote end at 020550419 hrs However the cause of DT send was not recorded in EL
DR pertaining to DT send was not furnished
If DT send was because of OVR-I protection operation then also tripping was not in order as it does not match with the settings provided
PGCIL (SR-I)
Non-operation of AR from NPS was due to wiring mistake made during installation of Controlled Switching Devices (CSD) for the line reactor on this line
Remedial action The wiring issues in CSD installation were rectified on 18052017
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2232
4
Tripping of 400 kV Krishnapatnam-Chittoor line-1
07-05-2017 at 1441 hrs
R-phase to earth fault Main CB Auto-reclose was successful at Chittoor end and Tie CB got tripped Breakers tripped at Krishnapatnam end and did not attempt auto-reclose
GI-2
FNN not followed by APTRANSCO and APGENCO SDSTPS (APGENCO) end
As per FIRDREL line tripped (in 3-ph) at 144113756 hrs on R-E fault due to DPR Z1 (628 km) operation It was observed from EL that the line was given 3-ph trip straight way without initiating AR
Chittoor (APTRANSCO) end
As per FIRDRELTR line tripped (in R-ph) at 144113759 hrs on R-E fault due to DPR Z1 (1147 km) operation and successfully auto-reclosed after about 1sec However it was observed that only Main-CB got auto-reclosed successfully whereas Tie-CB got tripped in 3-ph while attempting AR
Remedial action When enquired about the reasons for AR failure at SDSTPS end APGENCO representative
informed that as informed in last PCSC meeting AR configuration logic is scheduled to be reviewed by ABB in July 2017 when all issues pertaining to AR operation would be sorted out
When asked about the reasons for AR failure for Tie-CB at Chittoor end APTRANSCO informed that Tie-CB AR dead-time and PDR operational time were inadvertently kept equal As remedial action PDR operational time was increased to 25 sec
5 Tripping of 765 kV Raichur-Solapur line-2
07-05-2017 at 1918 hrs
Y-phase to earth fault Auto-reclose was successful at Solapur and breakers at Raichur end got tripped
GI-2
Solapur (PGCIL-WR1) end
As per FIRTR line tripped (in Y-ph) at 1918 hrs on Y-E fault due to DPR Z1 (AR 66 km 572 kA) operation and successfully auto-reclosed
DR amp EL not furnished Raichur (PGCIL (SR-I) end
As per FIRDRELTR line tripped (in 3-ph) at 191836810 hrs on Y-E fault due to DPR Z1 (145 km) operation It was observed from DR that AR lock-out had operated that resulted in tripping of Main-CB and Tie-CB But while Main-CB got tripped immediately Tie-CB got tripped in Y-ph only And the other two phase poles got tripped due to PDR operation after about 21 sec at 191838910 hrs
EL time-stamp resolution was limited to SECONDS instead of millisec
Tie-CB OPEN digital signals were observed to have employed NEGATIVE LOGIC PGCIL (SR-I)
The observed discrepancies at Raichur end were due to the hardware error caused by hanging of Main-CBrsquos BCU
Remedial action The problem with Main-CBrsquos BCU had been resolved by restarting it
Recommendations
PGCIL (SR-I) to configure Event Loggerrsquos time-resolution up to millisec level in all protection relays at their 765 400 kV Raichur SS
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2332
6
Tripping of 400 kV Neyveli TS2-Pugalur line
07-05-2017 at 1955 hrs
Y-phase to earth fault Neyveli TS2 end relay issued a 3-phase trip 220ms after issue of Y phase trip Direct Trip was sent to Pugalur end preventing auto-reclose
GI-2
NLC TS2 (NLCIL) end
As per FIRDRELTR line tripped in 3-ph at 195526677 hrs due to DT receipt from the other end
It was stated in TR that even though respective zones had picked up on fault DT receipt at the same time resulted in tripping of the line in 3-ph
In DR 3-ph trip was found to be issued 220 msec after Y-ph trip was issued It was also noted that DT receipt signal remained high for a duration of about 220 msec
Time sync of Protection Relays with GPS needed to be ensured at NLC-TS2
Pugalur (PGCIL-SR2) end
As per FIRDRELTR line tripped (in Y-ph) at 195534241 hrs on Y-E fault due to DPR Z1 (AR) operation However line tripped in 3-ph during AR dead-time at 195534353 hrs due to DT receipt from Neyveli end
In view of DT receipt at both ends it was suggested to carry out PLCC end-to-end testing to ensure healthiness of carrier communication
Recommendations
For the line under consideration the following shall be carried out by NLCIL in coordination with PGCIL (SR-II) End-to-end communication for DT permissive amp other signals may be ensured by testing at both
the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
7 Tripping of 400 kV NCTPS -SVChatram line-2
09-05-2017 at 1843 hrs
R-phase to earth fault Auto-reclose is not in service since Fibre optic cable link is not healthy
GI-2
NCTPS (TANGEDCO) end
As per FIRDRELTR the line tripped in 3-ph at 184223424 hrs on R-E fault due to DPR Z1 (9159 km 29 kA) operation (Given the length of this line as 95 km it may be verified whether Z1 setting is correct)
It was stated in FIR that AR was kept out of service due to defective FO communication link
Remedial action Line patrol done by lines wing and declared No Visible fault FO link cut was rectified on 13052017 and AR scheme restored
S V Chatram (TANTRANSCO) end
As per FIRDRELTR the line tripped in 3-ph at 184357616 hrs on R-E fault due to operation of DPR Z1 (32 km) operation
Time sync of protection relays with GPS needed to be ensured at both NCTPS and SV Chatram stations
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2432
8 Tripping of 400 kV Madurai-Kudankulam line
10-05-2017 at 1940hrs
B-E Fault Auto-reclose successful at Madurai and breakers tripped at Kudankulam
GI-2
Madurai (PGCIL-SR2) end
As per FIRDRELTR line tripped (in B-ph) at 194040402 hrs on B-E fault due to DPR Z1 (AR 137 km 114 kA) operation and successfully auto-reclosed after about 11 sec
Kudankulam NPP (NPCIL) end
As per FIRTR line tripped (in 3-ph) at 192936910 hrs on B-E fault due to DPR Z2 (CAT 2071 km) operation
It was informed that AR had not been kept in service as per SRPC decision Hence the tripping was in order
9 Tripping of 220 kV Idukki-Udumalpet line
14-05-2017 at 1345 hrs
Y-phase to earth fault had occurred in line Auto-reclose was successful at Idukki and breakers at Udumalpet end tripped on pole discrepancy
GI-2
Idukki (KSEB) end
As per DRTR line tripped (in Y-ph) at 134620509 hrs on Y-E fault due to DPR Z2 (CAT 83125 km) and successfully auto-reclosed after about 08 sec
EL not submitted (In its place DRrsquos events summary was furnished)
Udumalpet (TANTRANSCO) end
As per FIRTR line tripped in Y-ph at 1345 hrs on Y-N fault on DPR Z1 (2834 km) operation Subsequently tripped in 3-ph on PDR operation
As per DR line tripped in Y-ph at 134151100 hrs on Y-E fault due to DPR (AR) operation But as DRrsquos time scale was limited to 1 sec post triggering AR complete operation could not be verified
From EL line all poles dead was observed at 134152102 hrs Cause of line tripping as stated in FIRTR was not observed in EL
The following was stated in TR The fault resistance measured in the M1 relay (MicomP442) was high resulting in Z3 pickup It was
evident from the fault record that M2 relay (7SA522) had cleared the fault in Z1 by opening Y-ph pole However since AR was implemented in only M1 relay and M2 (Z1) operation had not initiated AR in M1 it resulted in opening of the other two phase poles on PDR operation
The cause of non-initiation of AR of M1 relay on external initiation was found to be logic configuration mistake in the Main 1 relay
Remedial action The AR logic configuration in the PSL of Main 1 relay had been corrected However a special relay
test would be conducted to verify AR operation during the next opportunity shutdown
Time sync of protection relays with GPS needed to be ensured at Idukki and Udumalpet
10 Tripping of 400 kV Vemagiri - Gazuwaka line
14-05-2017 at 1654 hrs
Y-phase to earth fault Auto-reclose was not successful due to persistent fault Vemagiri end had sent a Direct Trip after un-successful Auto-reclose AR attempt was observed in Gazuwaka end DR after 3 phase trip
GI-2
Vemagiri (PGCIL-SR1) end
As per FIRDRELTR line tripped in (Y-ph) at 165411968 hrs on Y-E fault due to operation of DPR Z1 (AR 1512 km) operation It tried to auto-reclose after about 11 sec but tripped in 3-ph due to persistent fault
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2532
It was noted that AR was attempted by Tie-CB only the Main-CB tripped in 3-ph at the beginning of AR initiation
Also Tie-CB AR dead-time was observed to be one second
Reasons 3-ph trip of Main-CB needed to be furnished Gazuwaka (PGCIL-SR1) end
As per FIRDRTR line tripped in Y-ph at 165330242 hrs on Y-E fault due to operation of DPR Z1 (AR 1677 km) operation But during AR dead-time it tripped in 3-ph after about 115 sec due to DT receipt from the remote end This resulted in 3-ph opening of both Main-CB and Tie-CB However after 125 sec Main-CB Y-ph limb tried for auto-reclosure and tripped due to persistent fault
As per EL line tripped in (Y-ph) at 165351597 hrs on Y-E fault due to operation of DPR Z1 (AR) operation But during AR dead-time it tripped in 3-ph at 165352620 hrs due to DT receipt from the remote end This resulted in 3-ph opening of both Main-CB and Tie-CB However at 165352687 hrs Main-CB Y-ph limb tried for auto-reclosure and tripped due to persistent fault
Reasons for AR attempt by Main-CB event after opening in 3-ph due to DT receipt needed to be explained
Time sync of DRrsquos amp ELrsquos with GPS needed to be ensured at Gajuwaka SS Recommendations
PGCIL (SR-I) to sort out issues relating to AR functionality operation for both Main-CB and Tie-CB at both Vemagiri and Gajuwaka substations
For the line under consideration the following shall be carried out by PGCIL (SR-I) End-to-end communication for DT permissive amp other signals may be ensured by testing at both
the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
11 Tripping of 400 kV VTPS-Sattenapalli line-2
21-05-2017 at 1706 hrs
B-phase to earth fault Auto-reclose successful at Sattenapalli and breakers got tripped at VTPS end
GI-2
Sattenapalli (APTRANSCO) end
As per FIRDRELTR line tripped (in Y-ph) at 170653038 hrs on B-E fault due to DPR Z1 operation and successfully auto-reclosed after about 1 sec
VTPS (APGENCO) end
As per FIRDRELTR line tripped in 3-ph at 170653133 hrs on B-E fault due to DEFR (33 kA) operation (DPR Z2 had picked up and Carrier was also received from the other end)
APGENCO
Before the LILOing of 400 kV VTPS-Srisailam DC line at Sattenapalli DEF protection had been provided from a separate REX521 relay Subsequently even though all protections at VTPS had been revised the above DEF protection implemented from the REX521 relay had been somehow left out and it only had extended 3-ph trip during the current instant
Remedial action The DEF functionality from the said REX521 had been disabled
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2632
12 Tripping of 400 kV Srisailam-Dindi line-2
24-05-2017 at 1502 hrs
R-phase to earth fault Auto-reclose was successful at Dindi and Zone - 1 3-phase trip at Srisailam
GI-2
Srisailam (TSGENCO) end
As per FIRDREL line tripped in 3-ph at 150253522 hrs on R-E fault due to DPR Z1 operation
TR contained no information Dindi (TSTRANSCO) end
As per FIRDRELTR line tripped (in R-ph) at 150253487 hrs on R-E fault due to DPR Z1 operation and successfully auto-reclosed after about 1 sec
Recommendations Since all 400 kV lines emanating from Srisailam LB are composite feeders APTRANSCO TSTRANSCO
can keep AR functionality disabled at respective remote end stations under their control
IV Details of Trippings due to PLCC mal-operation
Sl No Element Date amp Time Reason
Category
1 Tripping of 400 kV Kalpakka-Gazuwaka line-1amp2
18-05-2017 at 1108 hrs
Line tripped at Kalpakka end only on Direct Trip receive and was holding from Gazuwaka
GI-2
Tripping of 400 kV Kalpaka ndash Gajuwaka line-1
Gazuwaka (PGCIL-SR-2) end
As per FIR line was kept holding from Gazuwaka end Kalpakka (APTRANSCO) end
As per FIREL line tripped at 110625955 hrs to DT receipt from Gazuwaka end
Tripping of 400 kV Kalpaka ndash Gajuwaka line-2
Gazuwaka (PGCIL-SR2) end
As per FIR line was kept holding from Gazuwaka end Kalpakka (APTRANSCO) end
As per FIREL line tripped at 110625955 hrs to DT receipt from Gazuwaka end
Remedial action taken by APTRANSCO subsequent PCSC-65 meeting as informed vide their internal communication dated 20072017
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2732
2 Tripping of 400 kV Tumkur-Bidadi line-1 amp 2
30-05-2017 at 1139 hrs
Line tripped due to suspected PLCC mal-operation at Tumkur end and direct trip was received at Bidadi
GI-2
Tripping of 400 kV Tumkur ndash Bidadi line-1 Tumkur (PGCIL-SR2)) end
As per FIRDRELTR line tripped in 3-ph at 113515534 along with DT SEND to the remote end
PLCC mal-operation was suspected to have caused above tripping Bidadi(PGCIL-SR2) end
As per FIRTR line tripped in 3-ph at 113515 hrs due to DT receipt from Tumkur end Tripping of 400 kV Tumkur ndash Bidadi line-2 Tumkur (PGCIL-SR2)) end
As per FIRDRELTR line tripped in 3-ph at 113515534 along with DT SEND to the remote end
PLCC mal-operation was suspected to have caused above tripping Bidadi(PGCIL-SR2) end
As per FIRTR line tripped in 3-ph at 113515 hrs due to DT receipt from Tumkur end PGCIL (SR-II)
Remedial action The above trippings were due to PLCC mal-operation which in turn was due to shifting of its
coaxial cable The related circuitry was subsequently rectified
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2832
Single Line Diagram of 230 kV Villianur SS of PED [Ref I1]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2932
Single Line Diagram of 400 kV Jammalamadugu SS of APTRANSCO [Ref I2]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3032
Single Line Diagram of 400 kV Judgi-PG GIS SS of PGCIL (SR-II) [Ref II4]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3132
Single Line Diagram of 400 kV Ghani SS of APTRANSCO [Ref II4]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3232
Single Line Diagram of 400 kV BTPS of KPCL [Ref II9]
Annexure-II
Meeting No
Index
Details of Event Date amp Time Reason PCSC Recommendations Utility responsible for
Implementation
Status of Recommendations
as on 25072017
Remarks
Pending Implementation of PCSC Recommendations (up to 65th Meeting)
Complete outage of 220kV Yerraguntla
substation and tripping of running Units
at Rayalaseema TPS
52I2 (GD) PendingMail received on 27-07-2016
1The drop out relays of reducer oil pumps time setting was increased for
all millsSo there will not be any trip under transient low voltage condition--
--Complied
2The recommendation regarding 2 sec time delay will be implemented
during unit shut down and will be intimated immediately after
implementation------Pending
APGENCO 1 APGENCO to check associated logic for lube oil pump for correct
operation under transient low voltage conditions at Rayalaseema TPS
Unit-1
2 APGENCO to keep appropriate time delay fault ride through
delay (typically 2 sec) in VFD speed sensor relay at all its generating
Units including Rayalaseema TPS Units
HV B-Ph Current transformer of 100MVA Power
Transformer -1 failed resulting into a bus fault on
220KV Bus-1 Unit-1 and Unit-5 at RYTPS tripped
during the fault at Yerraguntla substation
21-02-2016 at
1039 hrs
Andhra Pradesh
APGENCO to furnish a report on the remedial action implemented
wrt overreaching of Krishnapatnam end distance relays during the
tripping of 400 kV Nellore (PG) - NPS line-1
APGENCO Yet to be informed Pending57II9 Tripping of 400 kV Nellore (PG) - NPS
line-1 400 kV Krishnapatnam-Nellore
(AP) lines -1amp2 and 400kV NPS -
MEPL line
18-07-2016 at
1905 hrs
Triggering incident was snapping of Y phase
conductor in 400kV Nellore (PG) - NPS line-1
Distance relay at Krishnapatnam end over-reached in
Zone-1 and resulted in tripping of 400kV
Krishnapatnam ndash Nellore (AP) lines - 1amp2 from
Krishnapatnam end Distance relay at MEPL over-
reached and resulted in tripping of MEPL-NPS line
from MEPL end
Yet to be informed Pending
APTRANSCO mail dated on 31-08-2016
To avoid the unwanted malopeartions due to the external LBB trip
initiation from PGCIL Vide letter Dt 04-08-2016 APTRANSCO has
requsted the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1 amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 15-11-2016
To avoid the unwanted maloperations due to the external LBB trip
initiation from PGCIL vide letter Dt 04-08-2016 ARTRANSCO has
requested the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 20-12-2016
Waiting for the PGCIL response
APTRANSCO mail dated 04032017 amp 24052017
SRPC is requested to coordinate with PGCIL in takind necessary action
Pending
Tripping of 400kV Krishnapatnam-
Nellore line-1
Line tripped on B-phase to earth fault and auto-
reclose was successful at Nellore(AP) end and un-
successful at Krishnapatnam end
APGENCO
56II13 Tripping at 220kV Gooty Substation of
APTRANSCO
24-06-2016 at
1604 hrs
LBB protection got operated for 400220kV ICT-2
breaker which had resulted in tripping of 220kV Bus-
2 at 220kV Gooty Substation
1 APGENCO SDSTPS to correct logic and ensure healthiness of ARscheme employed for transmission lines emanating from SDSTPSand furnish an action taken report to PCSC forum
2 APGENCO SDSTPS to configure DRrsquos of line protection relaysfor a post triggering period of 2 sec to capture complete ARoperation at their SDSTPS
Yet to be informed Pending63III1 28-02-2017 at
0516 hrs
1 APGENCO SDSTPS to correct logic and ensure healthiness of AR
scheme employed for transmission lines emanating from SDSTPS
and furnish an action taken report to PCSC forum
2 APGENCO SDSTPS to configure DRrsquos of line protection relays
for a post triggering period of 2 sec to capture complete AR
operation at their SDSTPS
Tripping of 400kV Krishnapatnam-Nellore line-2
R-phase to earth fault had occurred in line Auto reclose was successful at Nellore however protection at Krishnapatnam end issued a 3 phase
trip
APGENCO63III3 02-03-2017 at 455 hrs
1APTRANSCO to check the healthiness of the connecting cable
between Gooty (PGCIL) and Gooty (APTRANSCO) and replace it
if required
2APTRANSCO to ensure that the distributed architecture employed
in implementing busbar protection at their Gooty 220 kV SS does not
introduce any unwarranted delays in transmitting the triggering signals
to the Central Unit
APTRANSCO
Annexure-III
Page 1 of 31
63II2 Tripping of 400 kV KV Kota-Suryapet
line
01-03-2017 at
2005 hrs
Line tripped on operation of over-voltage protection
at KV Kota and Direct Trip was received at Suryapet
1 APTRANSCO to furnish (i) FIR amp TR for tripping events as
per SRLDC provided formats and (ii) DR amp EL within 24-hrs of
occurrence of tripping event in line with IEGC Regulation 52
(r)
2 APTRANSCO to adopt new OVR gradings for KV Kota
feeders and confirm the same
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
1 FIR furnished amp DR configured
Pending
63II16 Multiple Trippings at 220kV Vizag
Switching Station (VSS) of APTRANSCO
27-03-2017 at
1016 hrs
Bus-2 bus bar protection operated at 220kV VSS
end resulting in the tripping of all the elements
connected to bus-2
1 APTRANSCO to furnish a detailed report on the reasons for LBB
BBP operation at 220 kV VSS for a fault on 220 kV Gangavaram
feeder and remedial action taken to prevent recurrence of such
events
APTRANSCO Yet to be informed Pending
64II1 Tripping of 400220KV 315MVA ICT-
1and 230kV elements at 400kV Vemagiri
substation of APTRANSCO
09-04-2017
at 1231 hrs
Suspected mal-operation of Busbar protection had
caused tripping of 220kV Bus-1 at Vemagiri
APTRANSCO to furnish a report on the remedial action taken along
with single line diagram of 400220 kV Vemagiri SS indicating fault
location and CBs involved and protections operated
APTRANSCO Yet to be informed Pending
64II2 Tripping of 400220 kV ICTrsquos ndash 2 amp 3 at
400 kV Ghani substation of APTRANSCO
10-04-2017
at 1729 hrs
ICTrsquos ndash 2 amp 3 got tripped due to operation of 220 kV
Bus-2 busbar protection at 400220KV Ghani
substation
APTRANSCO to furnish single line diagram of 400 220 kV Ghani SS
clearly indicating (i) bus-configuration (ii) location of fault (iii)
breakers involved and type of protections operated
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
Single line diagram sent vide mail dated 27062017
Pending
64III1 Tripping of 400 kV Uravakonda-
Jammalamadugu line-1
02-04-2017 at
1758 hrs
R-phase to earth fault and line did not auto-reclose
Fault clearing time - 500ms
For the line under consideration APTRANSCO to check amp ensure
healthiness of carrier protection and make Auto-Reclosure
functional
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
Carrier aided protection scheme has been tested end to end and rectified
the problem
Pending
64III5 Tripping of 400kV Krishnapatnam-
Nellore line-2
11-04-2017 at
241 hrs
Line tripped on Y-phase earth fault Line auto-
reclosed at Krishnapatnam and did not auto-reclose
at Nellore-AP (Manubolu)
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a report
on the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64III6 Tripping of 400kV Krishnapatnam-
Nellore line-1
12-04-2017 at
251 hrs
Line tripped on Y-phase earth fault Line auto-
reclosed at Krishnapatnam and did not auto-reclose
at Nellore-AP (Manubolu)
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a report
on the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64III10 Tripping of 400kV Krishnapatnam ndash
Nellore_AP line-1
13-04-2017 at
438hrs
Y-phase to earth fault Line auto-reclosed from
Krishnapatnam end and did not auto-reclose fromNellore-AP end
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a reporton the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64IV4 Tripping of 400 kV VTPS-Malkaram line 20-04-2017 at
1624 hrs
Line tripped on Direct Trip Receive at Malkaram and
was in service from VTPS
For the line under consideration APTRANSCO to check the
healthiness of protection couplers and take suitable remedial action including replacement of the same
APTRANSCO Yet to be informed Pending
65II10 Tripping of 400220 kV ICT-2 at Kalpaka
SS
20-05-2017 at
1502 hrs
ICT-2 tripped due to operation of Transformer
Buchholtz relay
APTRANSCO to furnish details of AC auxiliary supply details
including its redundancy DG set details and its mode of
starting AC auxiliary supply changeover scheme drawing shall
also be furnished
APTRANSCO Yet to be informed Pending
1 APTRANSCO to check and correct all CT Neutral
Connection settings in various protection relays at their 400
220 kV Ghani PS
2 APTRANSCO to ensure that PLCC carrier aided protection
is maintained healthy on 220 kV lines emanating from their
400 220 kV Ghani PS
3 APTRANSCO to take steps to complete configuration works
of DR‟s amp EL‟s of various protection relays at their 400 220
kV Ghani SS and furnish the same as and when required in
compliance of IEGC Regulation 52 (r)
ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
07-05-2017Tripping of 400220 kV Ghani ICT-2amp3 65II4 APTRANSCO Yet to be informed Pending
APTRANSCO mail dated on 31-08-2016
To avoid the unwanted malopeartions due to the external LBB trip
initiation from PGCIL Vide letter Dt 04-08-2016 APTRANSCO has
requsted the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1 amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 15-11-2016
To avoid the unwanted maloperations due to the external LBB trip
initiation from PGCIL vide letter Dt 04-08-2016 ARTRANSCO has
requested the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 20-12-2016
Waiting for the PGCIL response
APTRANSCO mail dated 04032017 amp 24052017
SRPC is requested to coordinate with PGCIL in takind necessary action
Pending56II13 Tripping at 220kV Gooty Substation of
APTRANSCO
24-06-2016 at
1604 hrs
LBB protection got operated for 400220kV ICT-2
breaker which had resulted in tripping of 220kV Bus-
2 at 220kV Gooty Substation
63III2 02-03-2017 at
157 hrs
1 APTRANSCO to check and ensure correctness of AR operation
for the lines emanating from their Nellore-AP (Manubolu) SS
2 APTRANSCO to configure DR‟s of line protection relays for a
post triggering period of 2 sec to capture complete AR operation at
their Nellore-AP (Manubolu) SS
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
1The ABB make REL 670 type main-2 distance relay seen the fault as Y-
B phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
1APTRANSCO to check the healthiness of the connecting cable
between Gooty (PGCIL) and Gooty (APTRANSCO) and replace it
if required
2APTRANSCO to ensure that the distributed architecture employed
in implementing busbar protection at their Gooty 220 kV SS does not
introduce any unwarranted delays in transmitting the triggering signals
to the Central Unit
APTRANSCO
Tripping of 400kV Krishnapatnam-
Nellore line-1
Line tripped on B-phase to earth fault and line auto-
reclosed from Krishnapatnam end but did not auto-
reclose from Nellore-AP end
Annexure-III
Page 2 of 31
64II16 Tripping of 400 kV VTPS-Satenapalli line-
2
30-Apr-17 at
428 hrs
Line tripped on B-phase to earth fault FIR DR and
EL of both ends were not furnished to validate the
tripping
APGENCO and APTRANSCO to furnish a detailed report on the
events leading to tripping of the line along with remedial measures
taken to PCSC forum
APGENCO
APTRANSCO
Yet to be informed Pending
65II8 Tripping of 400220 kV Hyderabad ICT-
4 and 220 kV lines at Hyderabad
substation
10-05-2017 at
239 hrs
Operation of busbar protection due to fault in 220 kV
Bus at 220kV Hyderabad Substation
TSTRANSCO to investigate the reasons for BBP operation for 220
kV Bus-2 and furnish a report on the remedial measures taken
TSTRANSCO Yet to be informed Pending
24-12-2016 at
1052 hrs
Line tripped on B-phase to earth fault First fault was
persistent for 380 ms Auto-reclose was successful at
Khammam end during 1st fault 2nd fault occurred
during re-claim time of breaker hence Khammam end
breakers also got tripped
1 TSGENCO to implement the SRPC agreed philosophy for Power
Swing Blocking in all distance relays on the feeders emanating from
KTPS
2 For the line under consideration TSGENCO to consult relays
OEM to migrate to new versions of Firmware (from to 47201) and
Pset (to 47002)
61III5 Tripping of 400 kV Khammam - KTPS
line-2
The issue was discussed in PCSC-58 meeting held on 18102016 when
PCSC forum agreed to de-link the implementation of the Item from the
scope of Protection Audit Recommendations (PAR) and pursue it as part
of PCSC Recommendations
TSGENCO mail dated 30-05-2017
Procurement of Differential Protection relays is under process and the
work will be completed by the end of November 2017
TSGENCOProvision of line differential protection for Jurala line 1 amp 2 (line length-145 KM) feeders at 220 kV Jurala HPS [Carry-Over from Protection Audit Recommendations]58 Pending
Pendingline tripped on direct trip receive at Gajwel and was
holding from Hyderabad
Pending
06-10-2016 at
1216 hrs
For the line under consideration TSTRANSCO to carry out the
following in coordination with TSGENCO
(i) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
(ii) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(iii) Frequency bandwidth tuning of PLCC link for faithful
transmission of signals shall be carried out
62IV5 Tripping of 400 kV Gajwel-
Bhoopalapalli line-1
Telangana
TSGENCO TSGENCO mail dated 30032017
1 According to SRPC phylosphy power swing block settings are changed
to ALL ZONES BLOCK EXCEPT ZONE1
---------- Completed
2 Ms Siemens is requested to depute the service Engineer to update the
firm ware of existing SIPROTEC relays in 400KV switch yard This work
will be completed on or before 15042017 -------------- Pending
Pending
TSGENCO
TSTRANSCO
TSTRANSCO mail dated on 31-05-2017
1 Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Bhoopalpalli-1 line
59IV3
Line tripped at Bhoopalapally on DT receive and was
holding from Gajwel
TSTRANSCO mail dated on 21-12-2016
(i) Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Ghanapur line
(ii) Healthiness of PLCC system components will be checked while
conducting end to end testing
TSTRANSCO mail dated on 31-05-2017
1 Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Ghanapur line
TSTRANSCO
16-02-2017
at 1500 hrs
For the line under consideration the following shall be carried out by
TSTRANSCO in coordination with PGCIL (SR-I)
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
Tripping of 400 kV Gaiwel-Hyderabad
line
Annexure-III
Page 3 of 31
Karnataka
Annexure-III
Page 4 of 31
KPCL
38GD35 Pending13-11-2014 at
1931hrs
1 KPCL to make functional the Main2 (EPAC) relay with the
help of KPTCL at the earliest
2 KPCL to investigate the reason for DC fuse fail during
transient fault in 220kV Kadra-Kodasalli line including the testing
checking of DC supply cables breaker control cables and trip coils
3 KPCL to ensure supply for Main-1amp Main-2 protections Trip
Coils (TC1 TC2) from separate battery banks
Triggering incident was B-phase to earth fault had
occurred in 220kV Kadra-Kodasalli line Line tripped
from Kodasalli end only 220kV Kaiga-Kadra tripped
in Zone-3 from Kaiga end Tripping of evacuating
lines caused bus shut down at Kadra hydro station
16-02-2015 at
1256 hrs
GD-1 at Kadra and Kodasalli hydro
power station
GD-1 at 220kV Kadra power Station of
KPCL
41I1 Mail received on 28-05-2015
1 Main-2 relays already installed and commissioned
2 DC fuses are intact Till date no such incidence occurred
3 Possibility of DC-1 amp DC-2 arrangement and splitting of DC will be
reviewed
Mail received on 07-07-2015 21-10-2015 and 23-11-2015
1 Completed
2 Completed
3 Possibility of DC-1 amp DC-2 arrangement and splitting of DC will be
reviewed
Status received vide KPCL mail dated 14062017
1 Completed
2 Completed
3 Providing 2 separate DC sources is under process
Pending
Mail recieved on 28-05-2015
1) e-NIT floated on 28072014 for procurement of Numerical distance
relays amp GPS As there is change in scope of work and quantity of relays
by more than 25 which is not permitted as per KTPP act Hence tender
cancelled and refloated on 05052015 with revised scope of work and
revised PQR
2 However as per the recommendations of PSAG Relays were
temporarily rearranged replaced and wired up testing amp commissioning
shall be completed with the assistance of KPTCL
Mail recieved on 07-07-2015
1 Cover -1 of the bid is scheduled for open eing on 25062015
2 As per the recommendations of PSAG Relays were temporarily
rearranged testing amp commissioning completed with the assistance of
KPTCL
Mail recieved on 07-09-2015
NIT floated on 5515 through e-portal Bid evaluation completed
Obtaining of Administration approval to place PO is in progress
However as per therecommendationsof PSAG-10 Relays
weretemporarilyrearrangedTesting amp commissioning completed with the
assistanceofKPTCL
Mail recieved on 21-10-2015
NIT floated on 5515 through e-portal Bid evaluation completed LOAs
issued to Ms Schneider Electric Infrastructure Ltd on 08102015
Mail recieved on 23-11-2015
LOAs issued to Ms Schneider Electric Infrastructure Ltd on 08102015
Engineering work is in progress
Status informed during Special Meeting held on 03062016
LOA‟s issued to Ms Schneider on 08102015 Inspection of relays
completed and received at site DI issued for all balance materials except
furnitures
Status received vide KPCL mail dated 14062017
Numerical Distance Protection relays commissioned on 12042017
for all 4 lines at Kadra PH
Installation Testing and commissioning of Numerical Distance Protection
Relays for all the 4 outgoing lines is completed in all respect at Kodasalli
power house
KPCL1 The PCSC forum requested KPCL to speed up the installation of
Numerical Distance Protection relay in Kadra ndashKaiga and
Kodasalli ndashKaiga
2 The PCSC forum requested KPCL to submit the implementation
status of PSAG-10 recommendations within a week‟s time
A fault had occurred in 220 kV Kadra and Kodasalli
As A result de-energization of 220kV bus occurred at
Kadra and Kodasalli
Annexure-III
Page 5 of 31
49II15
54II4 Tripping of 400 kV Raichur TPS-
Mahboobnagar line
05-04-2016 at
1023 hrs
Line tripped on operation of Backup impedance
protection of line reactor Direct trip was received at
Mahboobnagar end
KPCL to keep the functioning of the concerned electro-mechanical
back-up impedance protection relay under observation and replace it
with a spare at the earliest
KPCL Status received vide KPCL mail dated 10072017
The electro-mechanical back-up impedance protection relay is in service
However Budgetary offer obtained for the retrofitting of Line reactor
protection with Numerical relay and is under process
Pending
54II9
Pending
PendingStatus informed during Special Meeting held on 03062016
1 Hot line washing was done previouslytender process is on for silicon
coating of insulators
Status received vide mail dated 10-07-2017
1 Off line water washing is being carried out whenever the Unit or Line is
under shutdown Silicon coating for Unit8 main amp tie breakers carried
out in Sep16 and same is under observation Till today in order and good
condition For remaining breakers since it is big order approval for the
same is under process
2 Static Electromechanical relays are existing in all 1 to 7 units Breaker
flash over protection feature will be enabled (if available) in the numerical
relays which will be retrofitted in phased manner during RampM works
KPCL1 KPCL to carry out hot-line washing of RTPS-connected lines
regularly to avoid trippings due to fog and dust
2 KPCL may see the feasibility of providing breaker flashover
protection at RTPS and implement the same if possible
Running Unit-4 5 and Unit-8 and 400kV RTPS-
Yeramaras TPS feeder got tripped due to de-
energization of both 400kV Bus-1amp2 at Raichur TPS
12-11-2015 at
0030 hrs
54I4 220 kV Nagjheri - Bidnal line tripped on B-E fault at
1228 Hrs At the same time five running generating
units (1 2 3 4 amp 6) at Nagjheri tripped on operation
of Generator Transformer‟s back-up Over Current amp
Earth Fault protection
PendingKPCL
1 KPCL to revise the settings of GT‟s back-up OC and EF
protections considering their individual contribution to solid bus fault
at 220 kV bus of Nagjheri PH
2 KPCL to upload make available various tripping files
(FIRDRELTR) for all tripping involving their stations in compliance
of IEGC Regulation 52 (r)
14-04-2016 at
1229 hrs
Tripping of Nagjheri Generators Pending
Trippings at 220kV Raichur TPS
13-04-2016 at
2112 hrs
1KPCL to undertake the following remedial measures to avoid
breaker flashovers
(i) Replacing all porcelain insulators with composite insulators
(ii) Carrying out hot-line water washing of all insulators on regular
basis
(iii) Applying Room Temperature Vulcanizing (RTV) Silicone high
voltage insulator coatings to all bus-connected ceramic insulators of
equipment like CT PT CB Isolators etc
2KPCL to take steps to provide dedicated breaker flashover
protection to all breakers at Raichur TPS at the earliest
KPCL
Tripping of 400kV Raichur TPS Bus-2
46II21
Trippings at Raichur TPS
Status received vide KPCL mail dated 10072017
1 i) Silicon coating for Unit8 main amp tie breakers carried out in Sep16
and same is under observation Till today in order and good condition For
remaining breakers since it is big order approval for the same is under
process ii) Hot line
water washing stopped and off line water washing is carried out whenever
the 400 KV Unit or line is under tripped condition Shutdown condition
2 Static Electromechanical relays are existing in all 1 to 7 units Breaker
flash over protection feature will be enabled (if available) in the numerical
relays which will be retrofitted in phased manner during RampM works
Status received vide KPCL mail dated 14062017
1 GT backup overcurrent amp earth fault settings are revised as per the
recommendations of our head office CEEDBangalore copy of letter
enclosed
2 FIRDRELTR are being uploaded in the recent incidences as all the
main-2 relays are replaced with new numerical relays
Mail received on 21-10-2015
1) Anti-pumping contactors of all the nine 220KV Lines are in circuit and
tested periodically during AOH works of lines along with other protections
2) Completed
3) Possibility to use both the 220kV buses as main bus under normal
operation is under review
Mail recieved on 23-11-2015
1) Completed
3) Two bus operation for 220kV buses In place of existing CT switching
relays High speed manual heavy duty change over switch of sufficient
current capacity will be retrofitted to all feeders at 220kV station and same
will be operated manually during changeover of feeder by one bus to the
other and this arrangement may facilitate to put both buses in service Time
required for this retrofit is around 90days However this work will be
taken up only after retrofitting of electromagnetic relays with numerical
relays for Main-2 protection of all 220kV lines for which work is in
progress
Status received vide mail dated 10-07-2017
1) Completed
2) Completed
3) Two Bus operation for 220kV bus is being carried out whenever
required However scheme for tripping of one bus during LBBfault and
maintaining the other bus intact by tripping BC breaker will be taken up in
RampM works
KPCL1 KPCL to check the operation of anti-pumping relay on 220 kV side
and keep it in healthy condition
2 KPCL to provide manual reset to the 220 kV side master trip relay
3 KPCL to use both the 220 kV buses as main buses under normal
operation and should go for single bus operation only during
emergencies
07-06-2015 at
0135 hrs
Y-ph Pole of Tie-breaker of Unit-4 at RTPS failed
Unit-4 got tripped on operation of Generator
Differential Reverse power amp LBB protection
Operation of LBB protection led to tripping of BUS-2
at RTPS
Annexure-III
Page 6 of 31
55II1
56I2 Complete outage of 220kV Sedam
Substation of KPTCL
19-06-2016 at
1527hrs
220kV Sedam-Humnabad-2 tripped at Sedam on
Distance protection Zone-2 Sedam-RTPS-1 amp2 lines
tripped at RTPS end only 220kV Tandoor inter-state
line was hand tripped due to incoming supply failure
KPCL to disable GFC protection on all lines emanating from their
generating stations
KPCL Status received vide KPCL mail dated 10072017
As per the reccomndations of KPTCL in Feb16 the settings are done with
a time delay of 2 secs
Pending
57II3 Tripping of 400220 kV ICT-2 at Raichur
TPS
07-07-2016 at
332 hrs
ICT-2 tripped on operation 400220KV ICT-2 was
tripped on operation of 220KV side Instantaneous
over current protection during B-phase to earth fault
in 220kV RTPS-Sedam-II line
KPCL to review appropriately the high-set of ICT‟s back-up OC
protection at their 220 kV RTPS so that they do not operate for a
normal through fault
KPCL Status received vide KPCL mail dated 10072017
The settings will be reviewed in co-ordination with KPTCL amp OEM
Pending
KPCL
Pending
Pending
KPCL Status received vide KPCL mail dated 14062017
1 All logics checked and found normal LBB timing checked and found
200msec as per KPTCL MRT recommendation - Completed
2 Work Under Progress
3 New GPS System commissioned along with new numerical and
synchronised with GPS system - Complied
4 Work Under Progress
Status received vide KPCL mail dated 14062017
1 DEF settings in lines are made as per recommendations of CE(RT) amp
RampD KPTCL Bangalore amp EE(RT) KPTCL Hubli
High set operation of DEF relays is disabled at Kodasalli end
2 All these guidelines are incorporated by KPTCL during the replacement
of line protection relays
3 New stand alone event logger is to be procured since spares for old
stand alone event logger are obsolete
KPCL (i) KPCL to disable high-set operation of DEF relays
(ii) KPCL to block DEF relays whenever corresponding distance
protection relays pick up at Kodasally end on Nagjheri ndash Kodasalli
lines and
(iii)KPCL to provide stand-alone Event Logger at their 220 kV
Nagjheri PH
Bus dead occurred at 220kV Nagjheri PH due to
tripping of evacuating lines
KPCL
31-08-2016 at
1247hrs
Pending
Tripping of 400kV Bellary TPS-
Yeramarus TPS line and
400kVYeramarus TPS - Raichur TPS
line
PendingYet to be informed55II19
Tripping of Units at Raichur TPS During testing of retrofitted distance protection in
400kV Raichur-2 feeder LBB protection trip DC got
extended to Bus trip This resulted in tripping of
220kV bus at RTPS and all connected 220 kV
elements Unit-4 which is connected to 400 kV Bus
got tripped due to tripping of Station Utility
Transformer that is connected 220 kV bus
58I2 (GD)
Complete outage of 220 kV Kadra power
station of KPCL
54II13
1KPCL to properly configure the distance relays at YTPS end on
both YTPS ndash BTPS line and YTPS-RTPS line with specific focus on
reaches and timings of Zone-2 Zone-3 and Zone-4 (reverse)
2KPCL to ensure the healthiness of Direct Trip circuits and relay
coils at YTPS
3KPCL to ensure time sync of DR‟s and EL‟s at YTPS with GPS
06-09-2016
at 1440 hrs
31-05-2016 at
1721 hrs
Direct Trip was sent from YTPS to RTPS and BTPS
01-05-2016 at
2144 Hrs
LBB of 220kV Kodasalli breaker at Kadra end got
operated which resulted in tripping of Bus at Kadra
and in turn led to tripping of all elements
(i) KPCL to check settings of LBB protection in all relays from which
it was implemented and ensure that their configuration logic and
timing are in order at their 220 kV Kadra PH
(ii) KPCL to furnish details regarding the existing LT auxiliary
supply arrangement at their 220 kV Kadra PH and take steps to
provide a suitable Auto-Main-Fail (AMF) panel for DG set to effect
its auto-starting in case of failure of LT supply
(iii) KPCL to ensure time-sync of all relays (DR‟s amp EL‟s) with GPS
at their 220 kV Kadra PH
(iv) KPCL to provide stand-alone Event Logger at their 220 kV
Nagjheri PH
Complete outage of 220 kV Nagjheri PH
of KPCL
Multiple tripping at 400 kV Raichur TPS
Station
15-04-2016 at
1536 hrs
Triggering incident was failure of R-phase CT of
400220kV ICT-1 400kV YTPS-RTPS line got
tripped from YTPS end 400kV RTPS-
Mehaboobnagar line tripped on a B-phase to earth
fault
In view of the availability of two buses along with healthy bus-
coupler at 220 kV RTPS KPCL is recommended to put in service the
double-bus operation at 220 kV RTPS by suitably distributing loads
within 15 days
Status received vide KPCL mail dated 10072017
Two Bus operation for 220kV bus is being carried out whenever required
However scheme for tripping of one bus during LBBfault and maintaining
the other bus intact by tripping BC breaker will be taken up in RampM
works
1KPCL to enable zero-sequence compensation feature if not already
done in all differential relays of transformers at RTPS
2KPCL to examine in detail the reasons for SOTF operation at RTPS
end for the fault on RTPS-Veltoor line and if required relay
(configuration) settings at RTPS end may be suitably got revised with
the help of their OEM
3KPCL to take steps to enable auto-reclose for the Tie-CB‟s in the
dias containing Munirabad and Veltoor (Mehboobnagar) at RTPS
KPCL Status received vide KPCL mail dated 10072017
1) Zero-sequence compensation feature is already enabled in all the
differential relays of transformers ---Completed
2) Referred to OEM for the tripping of line on SOTF protection
3) Action has been taken to retrofit the protection relays of tie bays of
Mahbubnagar and Munirabad line to enable Auto-reclosure function
58I3 (GD)
Pending
Annexure-III
Page 7 of 31
Status received vide KPCL mail dated 14062017
1 On 09092016 at STRPTwo units were running(Unit-3 amp Unit-4It is
to clarify that Station tripped due to spurious operationLBB relay in Unit-
4 and not due to operation of Unit-3 LBB as indicated in PCSC
recommendations Unit-3 which was in service tripped as a consequence of
LBB ProtectionHow ever following actions performed in both Units
a) Trip coil-1 and Trip coil-2 circuit (including cable from protection panel
to GCB Marshaling Box)of GT Breakers of Unit 03 and 04 checked found
ok
b) Integrity of Connecting cableconductor from Generating unit no3 and
also to its corresponding GT Breakers inspected and found ok
c) Regarding Spurious operation of Unit No04 LBB relay and its
timerChecked the operation of the LBB overcurrent relay with its external
Timer for repeated correct operations it was found that LBB Timer was
giving correct timing operation for 1 in 3 operations only ie for one of the
operation it was operating within 40ms compare to set value(200ms) hence
declared as faulty and the same has been replaced with new one later
operation of the new Timer checked and found okoperating for gt200mse
only With this cause for spurious operation of LBB and resulting in
complete outage of STRP has been identified and solved -----
Completed
2 In Unit -3MCR is working satisfactorilyit is to clarify that problem was
existing in Unit No4 AVR manual channel reference value of Generator
The Same has been replaced with spare one Manual channel AVR is
found to be Ok ------Completed
3 All the units AVRs Healthyness checked and found Ok -
-----
Completed
4 Presently at GPHno stand alone Event logger exists Since the subject
requirement pertains to all the Generating units and in view of
Standardization of the complete system Networking of numerical relays
carried out and events are availble in networking system
KPCL
Pending
(i) KPCL to ensure the integrity of the connecting cable conductor
from Generating Unit-3 to its corresponding GT breaker at their STR
PH
(ii) KPCL to ensure the healthiness of Manual Current Regulator
(MCR) of Unit-3‟s AVR at their STR PH
(iii) KPCL to ensure the healthiness of AVR‟s of all Units of STR
PH
(iv) KPCL to provide stand-alone Event Logger at their 220 kV STR
PH
Spurious operation of LBB protection of line feeder
had led to tripping of 220 kV bus at Sharavathy Tail
Race power house
9-09-2016 at
1119 hrs
Pending
12-09-2016 at
1447 hrs
(i) KPCL to check and correct configuration settings of LBB
protection in all relays from which it was implemented at their 220
kV Varahi PH
(ii) KPCL to provide stand-alone Event Logger at their 220 kV STR
PH
KPCLLBB protection operated and caused bus shut down at
Varahi PH
Pending
Partial disturbance occurred in central Kerala grid due
to overloading and tripping of 220 kV lines Loss of in-
feed to 220 kV Kalamassery 220 kV Brahmapuram
220 kV Ambalamugal 220 Pallom amp 220 kV Kochi
occurred Generation at Neriamangalam Panniar
Chengulam and Pallivasal also got affected during the
incident
(i) SLDC KSEB to put in place proper mechanism to ensure
adequate load-generation balance is maintained in their control area at
all times and due vigilance is exercised in operating an already
depleted transmission network
(ii) KSEB to put UFR in service at New Pallom end on 220 kV New
Pallom ndash Amabalamugal line as part of Kudankulam Regional
Islanding Scheme
KPCL
Status received vide mail dated 14062017
LBB Protection system is in Bus bar Protection PanelThe Configuration
settings are checkedThey are as follows
Minimum operating primary current is 160A
Stage IIssue of Retrip to the feeder is 100ms after the action of main
distance protection Relayinitiation of LBB
Stage IIBus bar LBB Trip -200ms
Total time of LBB trip is 300ms from the time of occurrence of Line Fault
(i) KPCL to adopt the following VT fuse-fail logic for all 220 kV
lines emanating from NPH
ldquoUnder VT fuse fail condition distance protection shall normally be
kept blocked However upon detection of a fault (sensed by negative
sequence component) blocking of distance protection shall give rise
to operation of its inherent Over-Current protection set with a definite
time delay of 500 msecrdquo
(ii) KPTCL KPCL to revise Zone-2 Zone-3 and Zone-4 (reverse)
timings of DPR of all 220 kV lines emanating from Nagjheri PH in
line with Ramakrishna Committee guidelines
Triggering event was the fault on 220 kV Nagjheri
ndashKodasalli line-2 Both buses of 220 kV Nagjeri
power station of KPCL got
de-energized
62I1 KPCL Status received vide mail dated 14062017
1 Already settings are discussed with EE(RT) Hubli and soon relays will
be tested for VT fuse fail condition
2 Timings of Zones were set as per the recommendations of CE(RT) amp
RampD KPTCL Bangalore amp EE(RT) KPTCL HubliRegarding revision
of timings will be carried out in co- ordination with EE(RT) KPTCL
Hubli
15-09-2016 at
1406 hrs
Complete outage at Varahi Hydro Power
Station
Disturbance in Kerala system Yet to be informed Pending
58I5 (GD)
58I7 (GD)
21-01-2017
at 0038 hrs
Complete outage of 220 kV Sharavathy
Tail Race PH
58I6 (GD)
Complete outage of 220 kV Nagjheri
substation of KPCL
Annexure-III
Page 8 of 31
65II9 Tripping of 400220 kV ICT-1 at BTPS 13-05-2017 at
1941 hrs
ICT-1 got tripped on operation of LV side earth fault
protection during R-phase to earth fault in 220 kV
BTPS-Lingapur line
1 KPCL to review the need for providing separate non-directional
sensitive earth fault protection for ICT‟s at their BTPS station and
take steps to disable the same
2 For 220 kV BTPS ndashLingapura line KPCL to resolve issues relating
to PLCC carrier communication and put AR into service
KPCL Yet to be informed Pending
65III2 Tripping of 400 kV Hiryur-BTPS line-1 06-05-2017
at 1401 hrs
Y-phase to earth fault had occurred in line Direct
trip was sent from BTPS to Hiryur end
KPCL to introduce suitable delay (say 3 sec) for UVR tripping and
disable sending of DT to the other end on UVR operation at their
BTPS station
KPCL Yet to be informed Pending
PendingMail received on 27-05-2015 (KPTCL) amp 29-07-2015
1Existing Back up relays will be replaced by numerical type distance
relaysProcurement is in tendering stage
2 Completed
3 Completed
KPTCL Mail recieved on 23-01-2016
1 Existing back up relays will be replaced by Main-2 protection LOI
issued Ms Alstom for taking up the works
KPTCL Mail Recieved dated 25-05-2016
Under the Scope of RampU The work will be taken up by Ms Alstom
shortly
KPTCL Mail Recieved dated 25-04-2017
1 ALSTOM make P442 type Numerical relays are supplied to the site
replacement of M-1 relays(OPTIMHO) by new relays will be taken up
shortly
KPTCL
KPCL Status received vide mail dated 10072017
1 Furnishing FIR amp TR of the tripping events as per the formats provided
by SRLDC
4 Refered to OEM for the tripping of Tie CB of Munirabad line on SOTF
protection
Pending
1 PCSC forum recommended KPTCL to replace the old static
distance protection relays with numerical relays
2 PCSC forum also requested KPTCL to provide a broken conductor
alarm indication in Control Room
3 Standing instruction needed to be given to the all substation
personnel for not changing the relay settings without approval of
RTMRT wing
Fault had occurred in 220kV
Mahalingapura-Narendra line-2 Due to the failure of
relay operation at Mahalingapura breakers at remote
end tripped which resulted in bus dead condition
1 KPCL to start furnishing FIR and TR of their tripping events as
per the formats provided by SRLDC
2 KPCL to check earth-mat resistance for 400 kV switchyard and
ensure that it is within prescribed limits
3 KPCL to set right operation of SER in CampI Control Room of Unit-
4
4 KPCL to furnish action taken wrt tripping of Tie-CB of
Munirabad line on SOTF protection OEM report in this regsrd may
be furnished
25-10-2014GD-1 at Mahalingapura Substation of
KPTCL
38GD31
63II10 Multiple trippings at 400 kV RTPS
substation of KPCL
16- 03-2017 at
0118 hrs
Bus-2 B-Ph differential bus bar protection operated
at 400 kV RTPS end tripping all the main breakers
connected to Bus-2
Annexure-III
Page 9 of 31
Pending
Suspected mal-operation of 220kV side Rphase
over current relay
Line tripped on Yphase to earth fault from both the
ends
20-12-2014
at 2220 hrs
KPTCL was requested to explore the possibility of providing AR
feature to this line and submit the remedial measures to the PCSC
forum
Pending
KPTCL1 Till the completion of RampM works for bus bar and LBB protection
KPTCL shall explore the possibility of having split bus operation at
Ambewadi and submit the details of the same to PCSC forum
2 KPTCL shall provide the details of the tripping of Supa hydro
station connected downstream from 110 kV bus
39I5
40I1
220kV Sedam-
Tandur line
Triggering incident was B-phase to earth fault in
220kV Ambewadi- Nagzari line-1 B-pole of breaker
did not open at Ambewadi end LBB protection not
available at Ambewadi end All elements tripped on
Zone-2 from remote ends
01-12-2014Tripping of 400220kV
ICT-2 at Hoody
substation of KPTCL
40IV1
Mail received on 27-05-2015 amp 29-07-2015
1 CampR panels of 500MVA ICT 1amp2 will be replaced under scheduled
RampM works
2 OampM personnel are instructed to take sufficient care in order to avoid
unwarrented trippings --- Completed
KPTCL mail received on 23-01-2016
1 New CampR panels(with numerical relays) erected for 500MVA ICT-1
amp2 under RampM work which will be commissioned shortly
KPTCL mail received on 25-05-2016
1 New CampR panels(with numerical relays) erected for 500MVA ICT-1
amp2 under RampM work which will be commissioned shortly
KPTCL mail received on 25-04-201
1 New CRPs mounted in bay KIOSK commissioned under RampM works
KPTCL1 PCSC forum recommended KPTCL to replace the relay with a
different make
2 KPTCL was also requested to train the OampM personnel
adequately before performing any maintenance works to avoid such
unwanted trippings
PendingMail recieved on 29-07-2015
Carrier protection is being restored for 220kV Sedam-Tandoor line at
Sedam end After restoring the carrier protection AR will be enabled
KPTCL mail recieved on 23-01-2016
Carrier protection is being restored for 220kV Sedam-Tandoor line at
Sedam end After restoring the carrier protection AR will be enabled
KPTCL mail recieved on 25-05-2016
SEESCADA to update the latest status
KPTCL mail recieved on 28-06-2016
Action is being taken to restore carrier protectionAR will be enabled once
carrier signal is restored
KPTCL
22-12-2014 at
2122 hrs
Mail received on 28-04-2015
1 In view of operating 220kV Ambewadi SS in split bus mode action is
being taken up by KPTCL Problem in the 220kV bus coupler breaker is
attended and isolator overhauling work is under progress Spilt bus
operation at Ambewadi will be made possible at the earliest
2 ICT Protection system at Ambewadi and trippings occured at Supa GS
during the instance is checked up and remedial measures already furnished
in this regard
---- Completed
Mail recieved on 29-07-2015
1 Action is being taken by KPTCL for operating Ambewadi in split bus
mode Problem in bus coupler breaker is attendedIsolator overhaulling
work is completedPTs are already provided to 220kV Bus-II After
commissioning of Bus-II PTs Ambewadi can be operated in split bus
mode Pending works will be completed within a months time
KPTCL mail recieved on 23-01-2016
1 Bus-II PTs yet to be commissionedPlanned to complete before end of
April-2016
KPTCL mail recieved on 25-04-2017
1 Yet to be attended
GD-1 at 220kV Ambewadi Station of
KPTCL
Annexure-III
Page 10 of 31
1 KPTCL to provide Bus Bar protection and LBB protection at
Sedam Ss and furnish the status of their implementation to PCSC
forum
2 KPTCL to implement AR feature on 220 kV Sedam-Tandur inter-
state line
Mail received on 28-04-2015
Procurement of Bus bar and LBB protection is in the final tendering stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
KPTCL mail received on 23-01-2016
1 Bus bar protection panels pocured and erected at Sedam Wiring
testing commissioning is being taken upPlanned to complete by April
2016
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
KPTCL
12-03-2015 at
751 hrs
1 KPTCL shall provide AR feature on Ambewadi ndash Ponda 220 kV
DC inter-state line
2 Till the completion of RampM works for bus bar and LBB protection
KPTCL shall explore the possibility of having split bus operation at
Ambewadi and submit the details of the
same to PCSC forum
Mail received on 27-05-2015
1 Bus Bar protection will be provded under RampU
2 AR yet to be enabled
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
Fault occurred in 220kV Sedam-Shahpur line
All connected 220kV lines and transformers were
taken on 220kV North bus as South bus was under
shut down for conversion of strung bus to rigid bus
and isolator replacement under RampM works Failure
of HV side Y phase CT of 150MVA Transformer-3
occurred at Peenya Substation which resulted in
operation of Differential and HV REF protection The
failure of CT also resulted in a 220kV bus fault in
North Bus
KPTCL to revise distance relay settings at Nelamangala end for 220
kV Nelamangala ndash Hebbal - Peenya line ndash 1 for the effective line
length of 17 km These new settings can be appropriately reviewed as
and when the tie-arrangement at Hebbal is done away with
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
Pending
PendingKPTCL
30-09-2015 at
1041 hrs
Pending
Outage of 220kV Ambewadi station in
Karnataka
Pending
PendingKPTCL mail received on 23-01-2016
Will be complied in a months time
220kV Ambewadi-Nagjheri line-2 tripped on B-phase
to earth fault This resulted in loss of supply to 220kV
Ambewadi bus 220kV Ambewadi-Ponda line-1amp2
were hand tripped after deenergization of bus at
Ambewadi
KPTCL
Complete outage of 220kV Ambewadi
substation of KPTCL
42I2 (GD)
27-09-2015 at
42317 hrs
Fault in 220kV Ambewadi-Nagjheri line-2
KPTCL
KPTCL
KPTCL mail received on 25-05-2016
Presentl 220kV Nelamangala -Hoody(ie nelamangala-Peenya-Hebbal -
Hoody line is made LIILO at Yelahanka sub station and breaker at
Peenya is kept open necessary modification in distance relay settings
adopted for new configuration
15-02-2015 at
1424 hrs
Complete outage of 220kV Peenya
Substation in Karnataka
R-Phase to ground fault occurred on 220kV Sedam-
Shahpur line Fault not cleared from Sedam end due
to stuck-breaker condition While the Sedam- Sahapur
line tripped from Shahapur end in Zone-1 the other
220 kv lines from Sedam tripped at remote ends in
Zone-2 This caused complete outage of 220kV
Sedam substation
42I1 (GD)
41I4
Complete outage of 220kV Sedam
substation of KPTCL
48I2 (GD)
48I3 (GD) KPTCL to fast-track providing AR on all 220 kV lines emanating
from Ambewadi SS to prevent Station shut-down on temporary faults
06-08-2015 at
451 hrs
220kV RTPS-Lingasugur line-2 tripped at TPS end
on operation of distance
protection zone-1 400220kV ICT-2 got tripped on
operation of earth fault
protection 220kV RTPS-Lingasugur line-1amp3 tripped
on distance protection zone-2 and zone-3
respectively Due to tripping of ICT-2 the running
units got overloaded and it was mentioned that under
frequency occurred as units are on load control The
Units got tripped on under frequency
KPTCL to activate non-directional Over Current protection with a
time delay of 600-800 msec for Fuse
failure condition at Lingasugur
KPTCL Status received vide KPCL mail dated 10072017
LV earth fault relay had an additional default Ef setting having a definite
time which resulted in tripping of ICT-2 and the same was rectified and
already complied
Pending
1 KPTCL to provide Bus bar and LBB protections for 220 kV
bus at Sedam Ss
2 KPTCL to implement AR feature on 220 kV Sedam-Tandur
inter-state line
27-01-2015 at
800 hrs
Complete outage at 220kV Sedam
Substation of KPTCL (GD-1)
Tripping of Unit-1amp2
along with 400220kV
ICT-2 at Raichur TPS
47II13
Annexure-III
Page 11 of 31
52I3 (GD) Complete outage of 220kV Shimoga
substation
22-02-2016 at
1503 hrs
220kV Bus Bar protection operated during failure of
R phase CT in DVG-2 line bay
KPTCL to operate 220 kV Shimoga on multi-bus operation under
normal conditions put it on single-bus operation only under
emergency conditions
KPTCL KPTCL Mail received dated 25-04-2017
Replacement of existing BBP by new BBP with 4 zone protection is being
taken up under RampU
Pending
56II6 Tripping of 220kV Ambewadi-Ponda
(Xeldam) line-1
10-06-2016 at
1333 hrs
Line tripped on Y-E faut due to DPR Z1 operation KPTCL to keep AR for Ambewadi ndash Ponda (Xeldam) line-1 in
service with immediate effect
KPTCL Yet to be informed Pending
59II13 Tripping of 220 kV Bidadi (PG) - Bidadi
lines - 1amp2
02-10-2016 at
1032 hrs
Line-2 tripped in DPR Zone-2 and Line-1 tripped on
operation of EF protection from Bidadi end
KPTCL to resolve PLCC carrier communication issues on 220 kV
Bidadi ndash Bidadi-PG DC lines and subsequently restore Zone-2
timing to normal values
KPTCL Yet to be informed Pending
1 KPTCL to configure all DR‟s and EL‟s at 400 kV Guttur SS so
that they will also get triggered for BBP operation
2 KPTCL to ensure time-synchronization of all DR‟s and EL‟s with
GPS at their 400 kV Guttur SS
KPTCL17-01-2016 at
1853 hrs
Pending
Pending
Yet to be informed PendingKPTCL
KPTCL
30-09-2015 at
1041 hrs
Complete outage of 220kV Ambewadi
Substation of KPTCL
Multiple tripping at 400kV Guttur sub-
station
Outage of 220kV Ambewadi station in
Karnataka
29102015 at
1434 hrs
Complete outage of 220kV Peenya
Substation of KPTCL
PendingKPTCL mail received on 23-01-2016
Will be complied in a months time
220kV Peenya-Nelamangala-3 tripped on B-E fault at
both ends At the same time 220kV Peenya-
Nelamangala-4 tripped on R-Y fault only at
Nelamangala end and was in service from Peenya
end Due to tripping of these two lines 220kV Peenya-
Nelamangala-2 tripped on overcurrent protection
KPTCL to furnish a report on the tripping of 220 kV Peenya-
Nelamangala line-4 Nelamangala detailing the remedial measures
taken including the settings adopted for Z1B (Zone extension) and
Power Swing Block
Pending220kV Nagjheri-Ambewadi line-1 tripped at 1333
hrs due to B phase to earth fault Ambewadi was
radially fed from Nagjheri power station through
220kV Nagjheri-Ambewadi line-2 Tripping of this
line caused 220kV Bus shut down at Ambewadi and
remaining lines and transformers were hand tripped
220kV Ambewadi-Nagjheri line-2 tripped on B-phase
to earth fault This resulted in loss of supply to 220kV
Ambewadi bus 220kV Ambewadi-Ponda line-1amp2
were hand tripped after deenergization of bus at
Ambewadi
KPTCL
Yet to be informedKPTCL
KPTCL Mail received dated 25-05-2016
SEE RTC Bangalore to update the status
KPTCL Mail received dated 28-06-2016
Providing numerical bus bar protection to 400kV buses and GPS time
synchronising equipment at Guttur is considered under RampU Work is
awarded to Ms Alstom execution will be taken up shortly
KPTCL Mail received dated 25-04-2017
GPS and accessories will be supplied during May 2017 expected to
complete the work within a month after supply of materials
53I1
1KPTCL to take steps to provide busbar protection at their 220 kV
Chikkodi inter-regional substation and furnish a time-line for the
same
2KPTCL to review distance protection settings for 220 kV Chikkodi
ndash Kudachi line
3KPTCL to furnish equipment failure report of the current incident to
PSEampTD Division of CEA with a copy marked to SRPC
KPTCL Mail received dated 25-05-2016
SEE RTC Bangalore to update the status
1 KPCL to provide AR on all 220 kV lines emanating from Nagjheri
PH
2 KPTCL to provide AR on all 220 kV lines emanating from
Ambewadi SS
Failure of Lightning Arrestor of Y-phase Line Reactor
of 400kV Guttur-Hiriyur line-1 and line tripped on
distance protection Zone-1 Bus-bar protection of
400kV Bus-2 at Guttur substation also got operated
during the event sensing this through fault 400220
kV ICT-1 amp 2 at Guttur 400kV Kaiga-Guttur-2
400kV
Guttur-Narendra-2 400kV Guttur-Hiriyur-2 and
400kV Guttur-Munirabad which are on 400kV Bus-2
got tripped during the incident 400kV Guttur-
Narendra-1 which was on Bus-1 also tripped at the
same time
49I13 (GD)
Triggering incident was failure of B-ph PT of 220kV
Bus-2 (western bus) at 220KV Chikkodi substation
220KV Chikodi- Belgaum-I line tripped on DEFR
(Inst) 220KV Chikkodi-Kudachi line tripped on
Distance protection and also 100MVA transformer-2
tripped on EF protection
57II1 01-07-2016 at
0303 hrs
Tripping of 220 kV Chikkodi-Mudshingi
and 220 kV Chikkodi-Talandage lines
48I3 (GD) KPTCL to fast-track providing AR on all 220 kV lines emanating
from Ambewadi SS to prevent Station shut-down on temporary faults
51II21
16-03-2016 at
1139 Hrs
Annexure-III
Page 12 of 31
62II3 Tripping of 220 kV Bus 2 and connected
elements (220kV HAL 1 and 2
400220 kV ICT- 1 2 and 22066 kV
ICT-2) at 400220 kV Hoody substation
of KPTCL (Load loss 590 MW)
09-01-2017 at
2306 hrs
Failure of R-phase CT of 220 66 kV transformer-2 at
220kV Hoody end resulted in a bus fault in 220kV
Bus-2 Fault was cleared by backup protection of
ICTs (220kV lines were being radially operated) due
to absence of busbar protection
1 KPTCL to provide Busbar protection at their 220 kV Hoody SS at
the earliest
2 KPTCL to furnish an Equipment Failure Report on CT failure to
CEA with a copy marked to SRPC
KPTCL KPTCL mail received dated 25042017
Numerical BBP is being provided under RampM works
Pending
64II9 Tripping of 400 220 kV ICT-2 and 3 at
Hoody substation of KPTCL
26-04-2017 at
1540 hrs
ICT-2 tripped on suspected mal-operation Oil surge
relay of B-phase Transformer ICT-3 tripped due to
overloading
KPTCL to put in place a suitable SPS at their 400 220 kV Hoody SS
that takes care of over-loading of the other ICT when one ICT out of
ICT‟s ndash 2 amp 3 trips at the earliest and furnish the details of
implemented SPS to PCSC forum
KPTCL Yet to be informed Pending
65II17 Tripping of 400220 kV ICT - 1 amp 3 at
Hoody substation of KPTCL
(Load Loss 750 MW)
26-05-2017 at
1230 hrs
R phase limb of ICT-1 bank pre-close supervision
contact of trip coil -2 had arc over ICT-3 got tripped
on over-loading
KPTCL to furnish compliance report on the recommendations given
in PSAG-18 meeting to PCSC forum
KPTCL Yet to be informed Pending
Complete outage of 220kV Nagjheri
power station and 220kV Ambewadi
substation of KPTCL
51I3 PendingStatus informed during Special Meeting held on 03062016
1 KPTCL informed that the matter had been taken up with concerned Line
Operation and Maintenance wing to carry out corridor clearance and
maintenance as per schedule to avoid frequent line faults in this corridor A
letter had also been addressed to Chief Engineer Bhagalkot zone to ensure
lines in amp around Kali complex are maintained in healthy condition ---
Completed
2 KPTCL assurd that the final modified SPS would be implemented at
Nagjheri PH at the earliest ------ Pending
3 KPCL informed that Nagjhari- Kodasalli Lines 1 amp 2 had been kept in
service since 23052016 0806hrs ---- Completed
KPTCL Mail received dated 28-06-2016
Modifications to be carried in Nagzari SPS logic is submitted to
SRLDCSRPC for verification and approval
Status received vide KPCL mail dated 14062017
1 Will be reviewed in consultation with EE(RT) KPTCL Hubli
2 Both the lines are in charged condition
KPCL KPTCL 1 To avoid tripping of transmission lines on transient faults KPCL
KPTCL is recommended to carry out periodic patrolling of lines and
ensure their proper maintenance by carrying out jungle bushing
clearance and trimming of tree branches within the RoW of
transmission lines as per the SRPC transmission line patrolling
guidelines (available under the menu item All Uploads Operation
Miscellaneous Transmission Line Patrolling Protocol
Guidelines for Southern Region on SRPC website)
2 KPCL KPTCL to review operation of SPS at NPH for
functionality (reduction of generation with tripping of evacuating
lines) and healthiness
3 KPCL to put 220 kV Kodasalli - Nagjheri DC lines into service if
more than 200 MW generation from Kali Complex (with Nagheri
Contribution not less than 50 MW) is ensured on sustained basis
220kV lines from Nagjheri power house started
tripping from 1100 hrs due to fault in lines The
sequence of tripping is shown in SOE list At 1233
hrs 220kV Narendra-Ambewadi lines-1amp2 got
tripped which resulted in loss of evacuation path to
Nagjheri station resulting in tripping of running Units
and complete outage at Nagjhheri power station
220kV Ambewadi station also got de-energized due
to tripping of source feeders ie 220kV Narendra-
Ambewadi-1amp2 and 220kV Nagjheri-Ambewadi-
1amp2
22-02-2016 at
1236 hrs
Pending
Pending
KPTCL
For the line under consideration the following shall be carried out by
KPTCL in coordination with
PGCIL (SR-II)
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
KPTCLLine tripped at Hiryur end due to direct trip receive
and was holding from Guttur
KPTCL mail received dated 25042017
Numerical BBP is being provided under RampM works
KPTCL to provide numerical Busbar Protection at their 220 kV
Somanahalli SS at the earliest
Tripping of 400 kV Neelamangala-
Hoody line-1
KPTCL to carry out the following for the line under consideration
(i) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
(ii) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
Tripping of 400 kV Guttur-Hiryur line-1 10-10-2016 at
315 hrs
62IV4
59IV4
62II5 Tripping of 220 kV South Bus and
connected elements (220kV HSR 220kV
Nagnathpura 220 kV Harohalli 220 kV
Subramanyapura 220 kV Tataguni 220
kV Mallur and 400220kV ICT-2 and 3)
at 400220kV Somanhalli substation of
KPTCL
(Load loss 850 MW)
20-01-2017 at
1434 hrs
Triggering incident was fault in 66 kV Somanahalli -
Bannerghatta line and fault was cleared by operation
of Back-up OCR at Somanahalli end
15-02-2017
at 1344 hrs
Line tripped at Hoody end on direct trip receive and
was holding from Neelamangala end
Yet to be informed
KPTCL
Yet to be informed Pending
Annexure-III
Page 13 of 31
56I3 Complete outage of 220kV Ambewadi
Substation of KPTCL
24-06-2016 at
2057hrs
B phase to earth fault had occurred in 220 kV
Ambewadi-Ponda line-2 Fault was cleared by
tripping of feeders from remote end
1KPCL amp KPTCL to furnish an action taken report on the
recommendations given by PSAG-16 to PCSC forum
2KPTCL to keep AR for Ambewadi ndash Ponda line-2 in non-auto
mode (ie only 3-ph trip should get extended on occurrence of a
fault) till the line is closed from Ponda end
KPCLKPTCL Yet to be informed Pending
Complete outage of 220kV Ambewadi
station of KPTCL and 220kV Nagjheri
of KPCL
Ambewadi Narendra line-2 tripped on fault and
220kV ambewadi Narendra line-1 tripped due to over-
loading Running Units at Nagjheri also tripped during
the event due to tripping of evacuating lines
KPCL KPTCL18-03-2016 at
1440 hrs
1 TANGEDCO to replace existing Check-Zone relay with a new one
possessing required performance
2 TANGEDCO to take steps to provide numerical busbar protection
at their 220 kV Tuticorin TPS TANGEDCO may also explore
providing dual CT‟s (on either side) for all BS breaakers at the time
of commissioning of numerical BBP if there were no space
constraints
3 TANGEDCO to take steps to provide for standalone Event Logger
(EL) and standalone Disturbance Recorder (DR) with automatic
downloading facility to a centralized server
Failure of Bus Section-I Y-ph CT resulted in
operation of bus-bar protection for Bus Sections -I amp
II Running Units1 4 and 5 230 kV Kayathar
230kV Kudankulam 230kV Sterlite Station
Transformer-1 2 amp 3 got tripped during the incident
Unit ndash 2 amp 3 were not in service
22-02-2017 at
0616 hrs
KPCLKPTCL
25-01-2017 at
2236 hrs
R-phase to earth fault due to de-capping of insulator
Auto-reclose attempt was unsuccessful
Tripping of ICT-3 at Raichur Substation
TANGEDCO
Pending
Tripping of running Units amp 230kV
feeders at Tuticorin TPS of TANGEDCO
(Gen Loss 640 MW)
62II7
1 KPCL to furnish a report on the reasons for Unit-6 tripping at
Nagjheri PH
2 KPCL KPTCL to modify suitably the SPS at Nagjheri Power
House such that it would also factor in the over loading of Ambewadi-
Narendra lines
3 KPCL to put 220 kV Kodasalli - Nagjheri DC lines into service if
more than 200 MW generation from Kali Complex (with Nagheri
Contribution not less than 50 MW) is ensured on sustained basis
Pending53I3 (GD)
15-03-2016 at
1228 hrs
ICT-3 tripped due to operation of back-up earth fault
protection during fault in 220kV RTPS-Raichur line-
1
KPCL KPTCL to check the ICT‟s back-up (high-set) protection
settings and ensure that they operate with a time delay of 100 msec
TANTRANSCO mail dated 12042017
1 The recommendation will be ensured AR logic will be configured in
Distance Protection relay itself instead of BCU OEM has been addressed
2 Post triggering period of 2 sec to cover AR operation in DR time scale
will be provided
TANTRANSCO mail dated 01062017 amp 15062017
1 The recommendation will be ensured AR logic will be configured in
Distance Protection relay itself instead of BCU OEM has been addressed
Main-1 amp 2 relays will be replaced for the requirement of more output
contacts for AR logic implementation
2 Post triggering period of 2 sec to cover AR operation in DR time scale
is being provided
TANGEDCO1 TANGEDCO to take properly configure AR logic at NCTPS-II in
that in case of unsuccessful auto-reclsoure three-phase trip shall be
given along with AR block
2 TANGEDCO to configure all protection relays DR‟s time scale at
NCTPS-II for a post-triggering period of 2 sec to capture events such
as complete AR operation
Tripping of 400 kV NCTPS-
SVChatram line-2
KPTCL Mail received dated 28-06-2016
Modifications to be carried in Nagzari SPS logic is submitted to
SRLDCSRPC for verification and approval
Status received vide KPCL mail dated 14062017
1 Tripped since there was evacuation problem and there were only two
lines NA-1 and NA-2
2 Will be reviewed in consultation with EE(RT) KPTCL Hubli
3 Both the lines are in charged condition
TANGEDCO mail dated 15042017
1) New Relay is tested and ready for replacementNow all 5 units are in
serviceThe relay will be replaced when lesser units are in service ---
Pending
2a)Steps are taken to renovate amp mordernization of all the control panel
into Numerical based control panels --- Pending
2b) Since 230 KV indoor switchyard has no spare space providing dual
CT`s is not fessible -- Completed
3) Procurement of EL amp DR is under progress --- Pending
TANGEDCO mail dated 26042017
1) Check zone New Relay is replaced on 17042017 -- Completed
2 Pending
3 Pending
KPTCL Mail Recieved dated 25-05-2016
SEESCADA to update the status of healthiness of carrier protection of
220kV RTPS-Raichur 1 amp2 lines
KPTCL Mail Recieved dated 28-06-2016
Details sought from KPCL for review of ICTs back up (high set) proection
settings as suggested KPCL is yet to furnish the details required to give
the revised settings
Status received vide mail dated 10-07-2017
As requested by EEE (protection) CEERT KPTCL the details were sent
to through e-mail dtd 08082016 After receipt of reply from KPTCL will
be implemented accordingly
62V3 Pending
Pending
Tamil Nadu
53II1
Annexure-III
Page 14 of 31
05-09-2015 at
1404 hrs
TANTRANSCO to take suitable measures like installing more stub-
towers along 230 kV OK Mandapam ndash Myvady line to avoid
excessive sag due to over-loading
TANTRANSCO PendingComplete outage of 230kV Palladam 230 kV
Othakalmandapam Ss 230 kV Coimbatore Ss 230
kV Thudialur and 230 kV Sadayapalayam Ss
Pending
Disturbance in 220kV Tamilnadu system48I1 (GD)
TANTRANSCO TANTRANSCO vide their mail dated 240615 informed that different
relays in Main-I amp Main-II would be ensured at the earliest
Mail recieved on 24-07-2015 19-02-2016 and 24-03-2016
Different relays in Main-I amp Main-II will be ensured
Mail received on 27-04-2016
TANTRANSCO Not feasible in the existing SAS sub stations Hence
exemption may be given for these sub stations
Mail received on 20-05-2016 16-06-201625-07-2016 amp 24-09-2016
As discussed in the 52nd PCSC meeting Swapping of Relays between two
stations is not feasible in the existing SAS sub stations Hence exemption
may be given for these sub stations
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15062017
Different make Relays will be ensured for Main-I amp II relays at Alamathy
end
TANTRANSCO Mail received on 19-02-2016 24-03-2016 and 27-04-
2016
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
Mail Received on 20-05-2016 16-06-201625-07-2016 amp 24-09-2016
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
29-03-2015 at
1529 hrs
43II5 Line-2 tripped on R-phase to earth fault
Line autoreclosed at SVChatram end and failed to
reclose at Alamathy end Bphase to earth fault in line-
1 Line tried for Ar but due to permanent fault line
did not reclose ICT tripped on operation of over flux
protection
TANTRANSCO was requested to swap the relays between two
stations so that
Main-1 and Main-2 will be of different make at each station
Tripping of 400kV
Alamathy-
SVChatram line-1amp2
and 400230kV ICT
at SVChatram
Annexure-III
Page 15 of 31
14-09-2016 at 1113Hrs
Bus Bar Protection (Zone-2) of 230 kV Bus-B got operated at Alamathy Station during fault in 230 kV
Alamathy-Korattur feeder
51I1 (GD)
12-05-2016 at
1215 hrs
Fault had occurred in 230kV Madurai-Sembatty line
Trip from distance relay was not extended to breaker
due to protection DC fail LBB protection got
operated resulting in a busbar trip at 230kV Madurai
substation All elements got tripped as there is a
single bus operation at 230kV Madurai Ss
58II17
TANTRANSCO
TANTRANSCODifferent type and Make of distance protection relays to be provided for Main-I amp Main-II protection for 230kV feeders at 400 kV Sunguvarchathiram amp 230 kV Sunguvarchathiram Substation [Carry-Over from Protection Audit Recommendations]
Mail recieved on 25-07-2016 amp 24-09-2016
TANTRANSCO Auto Transformer-2 HV side Bus isolator C-phase
support insulator of 230kV Southern Bus was replaced and Bus Bar
Protection scheme was restored on 12052016
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
CT is not available in the Bus Coupler bay for zone segregation CT latch
relay is to be provided for all bays for zone segregation
TANTRANSCO mail received on 24-03-2016
CMR relay for extending LBB protection was released and LBB extended
from Distance Protection relay directly CT is not available in the Bus
Coupler bay for zone segregation However during commissioning of third
ICT Bus section Breaker will be provided for zone segregation Numerical
BBP relay will be provided
Status received vide mails recieved on 27-04-2016 and 20-05-2016 16-
06-2016 25-07-2016 24-09-201610-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
CT is not available in the Bus Coupler bay for zone segregation However
during commissioning of third ICT Bus section Breaker will be provided
for zone segregation Numerical BBP relay will be provided
PendingComplete outage of 230kV Madurai Ss
(Chekanaurani) of TANTRANSCO
TANTRANSCO
Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
TANTRANSCOMultiple tripping at 230 kV Alamathy Station
Pending
Pending
1 TANTRANSCO to check the healthiness of BBP relay by conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
TANTRANSCO to take steps to provide double-bus operation at
their 230 kV Gummidipoondi SS
Pending
Complete outage of 230 kV
Gummidipoondi Station of
TANTRANSCO
19-01-2016 at
1156 hrs
Flashover of Auto Transformer- 2 HV
B-phase Isolator supporting insulator of 230kV
Southern Bus occurred at Gummidipoondi station At
the time of fault Bus bar protection relay was not in
service for pre-commissioning testing of Auto
Transformer-2 All feeders got tripped due to
operation of zone-2 protection from remote ends
TANTRANSCO1 TANTRANSCO to examine the feasibility of providing two main-
zone operation for bus bar protection by exploring various alternatives
like replacing existing bus-coupler CB with a hybrid bus-coupler CB
that comes with inbuilt CT replacing existing BBP relay with another
suitable relay that supports two main-zone operation and implement
the same
Busbar protection got operated for a fault in 230kV
Mywadi-Anaikadavu line
21-12-2015 at
628 hrs
Complete outage of 230kV Mywadi
station of TANTRANSCO
50I3 (GD) TANTRANSCO Mail received on 19-02-2016 and 24-03-2016
Revision of Bus Bar Protection setting was carried out The stabilizing
voltage setting was raised from 410 to 450 volts After completing the
necessary test the bus bar protection put in to service on 29122015
Mail Received on 27-04-2016 16-06-201625-07-2016 amp 24-09-2016
Revision of Bus Bar Protection setting was carried out After completing
the necessary test the bus bar protection put in to service on 29122015
Mail received on 10-11-2016 amp 20122016
Provision of Bus Coupler bay arrangement was included in the
Upgradation works proposed and the same was sanctioned by MoP
through PSDF
Numerical relay allotted and being commissioned
Mail received on 20-02-2017
Numerical BBP relay was commissioned on 02022017
Status received vide mail dated 12042017 amp 01062017 amp 15-06-
2017
Numerical BBP relay was commissioned on 02022017
Provision of Bus Coupler bay arrangement was included in the
Upgradation works proposed and the same was sanctioned by MoP
through PSDF
The issue was discussed in PCSC-58 meeting held on 18102016 when
PCSC forum agreed to de-link the implementation of the Item from the
scope of Protection Audit Recommendations (PAR) and pursue it as part
of PCSC Recommendations
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp15-06-2017
Different make Relays will be provided for Main-I amp II relays at
Sunguvarchatram end in a phased manner
Pending
1 TANTRANSCO to provide split-bus operation with bus
sectionalizer CB for their 230 kV Madurai (Chekanurani) SS
2 TANTRANSCO to provide two main-zone operation for the
numerical BBP that is being commissioned
3 TANTRANSCO to examine the feasibility of providing Re-Trip
feature for the LBB protection and accordingly take steps for
implementing the same
58
55I1 (GD)
Annexure-III
Page 16 of 31
58II17 Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
TANTRANSCOMultiple tripping at 230 kV Alamathy
Station
15-09-2016 at
2214 hrs
Bus Bar Protection (Zone1) of 230kV Bus-A got
operated at Alamathy Station during fault in 230 kV
Alamathy-OPG-1 feeder
1 TANTRANSCO to check the healthiness of BBP relay by
conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal
winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
Pending
Annexure-III
Page 17 of 31
6414 Complete outage of North Chennai TPS
STG-1
26-03-2017
at 2314hrs
Tripping of evacuating lines due to fault led to
tripping of running Unit at NCTPS Stg-1
1 TANTRANSCO to take steps to complete insulator replacement
works on the 230 kV lines owned by them in NCTPS area within 6
months
2 TANTRANSCO to take steps to implement AR on all 230 kV lines
emanating from NCTPS-I at the earliest
TANTRANSCO Yet to be informed Pending
65II1 Tripping of 220 kV Idukki ndashUdumalpet
line
05-05-2017 at
1702 hrs
Line tripped due to B-N and R-N fault in line 1 TANTANSCO to correctly configure AR logic at Udumalpet so
that in the event of 3-ph trip being given during AR dead-time the
relay will not try for auto-reclosure
2 TANTRANSCO to keep AR dead-time as 1 sec for all 220 kV amp
above transmission lines
TANTRANSCO Yet to be informed Pending
58II17
44I1 (GD)
Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
KSEB Mail received vide dated 17012017
1 110 kV bus bar protection progressing ----Pending
2 Connection of 220kV earth mat and 110 kV plate earthing system
completed---- Completed
3 Redundancy of 110V DC system in progress Complete independent
redundancy is not practical for the time being 48 V DC redundancy was
already there----Pending
4 Instead of stand alone event logger SCADA system of 110 kV feeder is
expected to be completed by the end of 2017 SCADA system of 220kV
side will be taken up after that----Pending
28-04-2015 at
1230 Hrs
Mail received on 31-07-2015
1 Reducing the sensitivity of REF protection of Unit 4 5 6 at Idukki
PH - Generation wing is planning to purchase new transformer
management relays with low impedance REF protection Purchase
procedures initiated ---------Pending
2 The replacement repair of faulty breakers are under the consideration of
Generation wing Breakers will be replaced repaired in a phased manner
Unit 3 breaker was replaced with available breaker from the 220kV
IDMD feeder The 220kV CBs of unit 2 and unit 3 will be replaced with
in two months
3 No abnormalities were noticed in the PLCC equipment at New Pallom
station It is kept under observation
Mail recieved on 30-10-2015
1 Purchase procedures is still in progress
2 Replaced
3 PLCC equipment Tested and found OK
Mail recieved on 03-03-2016
1 Even though repeated plans to have a joint inspection with MsABB
who is the OEM of the relay panel for replacing the relays with numerical
ones the same could not become successful Finally the inspection has
been fixed on 15032016 It has been planned to replace existing REF
protection with low impedance ones after retrofitting the numerical ones of
OEM
Mail recieved on 25-05-2016
1Generation wing is planning ti provide low impedance REF protection by
retrofitting numerical ABB make transformer management relay in the
existing panel ---- Pending
2Faulty breaker of Unit3 has been replaced ---- Completed
3PLCC equipments in the feeder were checked and found OK ------
Completed
TANTRANSCO
KSEB
Complete outage of Idukki Hydro Power
Station (GD-1)
Multiple tripping at 230 kV Alamathy
Station
15-09-2016 at
2214 hrs
58I1 (GD) Complete outage of 220 kV Kalamassery
Substation
23-08-2016
at 1120 hrs
Triggering incident was conductor snapping in 110
kV Kalamassery- Kaloor feeder
KSEB to take steps to provide the following at their 220 110 kV
Kalamassery SS
1 Busbar protection at 110 kV level
2 Connecting 220 kV and 110 kV sides on to a common earthmat
3 Redundant DC supply for both protection (220 V) and
communication (48 V) applications
4 Stand-alone Event Logger
Bus Bar Protection (Zone1) of 230kV Bus-A got
operated at Alamathy Station during fault in 230 kV
Alamathy-OPG-1 feeder
1 TANTRANSCO to check the healthiness of BBP relay by
conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal
winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
KSEB
Pending
220 kV breaker of unit-3 at Idukki Power
house flashed and bus differential protection
acted All Generators (6Nos) along with all
220 kV feeders tripped during the incident
1 KSEB to reduce sensitivity of REF protection appropriately at
Idukki PH
2 KSEB to replace repair the faulty breaker
3 KSEB to check the PLCC equipment at New Pallam and inform
the remedial measures taken to PCSC forum
Kerala
Pending
Pending
(Recommendat
ion No1)
Annexure-III
Page 18 of 31
08-05-2016at
457 hrs
Tripping of 400kV Hyderabad - N‟sagar
line
PGCIL (SR-I amp SR-II)
PendingLine tripped on operation of over-voltage protection at
Hyderabad end and Direct Trip was received at
N‟sagar Over-voltage Stg-2 operation was observed
in EL of Hyderabad station
55II5 1PGCIL (SR-I) to properly configure EL‟s at Hyderabad station
with time-scale resolution up to msec further DR‟s should also be
configured for showing both Analog and Digital data with properly
defined X-axis and Y-axis scales
2PGCIL (SR-I) to follow the FILE Naming Nomenclature provided
by SRPC in naming various tripping files (FIRDRELTR) being
uploaded in SRLDC‟s Tripping Monitor System (TMS) portal
PGCIL (SR-I) Yet to be informed
Annexure-III
Page 19 of 31
55II9 Tripping of HVDC Gazuwaka pole-2 19-05-2016 at
1141 hrs
Pole tripped on operation of differential current
protection of east side of Pole-2
PGCIL (SR-I) to take up the issue of differential protection operation
of converter transformer on low voltage fluctuations with their OEM
and submit a detailed report on it
PGCIL (SR-I) Yet to be informed Pending
56II11 Tripping of HVDC GazuwakaPole-2 19-06-2016 at
520 Hrs
HVDC Pole-2 got tripped on operation of Bus
differential protection
PGCIL (SR-I) to get the tripping of HVDC Pole-2 tripping on Win-
Bus differential protection thoroughly investigated for correctness of
operation and submit a report thereon
PGCIL (SR-I) Yet to be informed Pending
56III7 Tripping of 400 kV Khammam-N‟sagar
line-1
05-06-2016 at
2241 hrs
Line tripped on B-phase to earth fault Line auto-
reclosed successfully at N‟sagar and failed to auto-
reclose at Khammam
1PGCIL (SR-I) to configure DR amp EL at N‟sagar (Tallapalli) end so
that full operation of AR is captured
2PGCIL (SR-I) to investigate the reasons for non-operation of AR of
Tie-CB at N‟Sagar end and resolve them suitably
PGCIL (SR-I) Yet to be informed Pending
58II13 (GI) Tripping of 400 kV Raichur-Gooty line-1
and 400 kV Gooty-Tumkur line-2
01-09-2016 at
517 hrs
400kV Gooty-Raichur line tripped at Gooty end only
and was holding from Raichur 400kV Gooty-Tumkur
line-2 tripped on over voltage
PGCIL (SR-I) to check the operation of OVR relays at their Gooty
SS and properly configure lines‟ DRs amp ELs so that events pertaining
to OVR (Stage-I amp Stage-II) operation (START amp TRIP) get
explicitly recorded
PGCIL (SR-I) Yet to be informed Pending
58II14 (GI) Tripping of 400 kV Gooty-Tumkur line-2 02-09-2016 at
2156 hrs
Line tripped on operation of over-voltage protection at
Gooty end and Direct Trip was received at Tumkur
PGCIL (SR-I) to check the operation of OVR relays at their Gooty
SS and properly configure lines‟ DRs amp ELs so that events pertaining
to OVR (Stage-I amp Stage-II) operation (START amp TRIP) get
explicitly recorded
PGCIL (SR-I) Yet to be informed Pending
61II4 Tripping of HVDC Gazuwaka Pole-2 05-12-2016
at 1503 hrs
Pole-2 tripped due to tripping of AC filter banks
which was due to voltage disturbance in eastern bus at
Gazuwaka
PGCIL (SR-I) to refer the instant trippings to their OEM to ensure
that the settings adopted for pole trippings for low-voltage power
swing and ferro-resonance phenomena are in order and have been set
properly A copy of the OEM‟s reply in this regard shall be furnished
to PCSC forum
PGCIL (SR-I) Yet to be informed Pending
62II4 Tripping of 400 kV Gazuwaka-Vemagiri
(PG) line and 400kV Vemagiri(PG)-
Nunna line
18-01-2017 at
2203 hrs
400 kV Gazuwaka - Vemagiri (PG) line and 400 kV
Vemagiri (PG) - Nunna line got tripped due to Direct
Trip receive at Gazuwaka and Vijayawada respectively
PGCIL (SR-I) to configure triggering of DR amp EL for SF6 gas
compartment Zone trip with suitable legend
PGCIL (SR-I) Yet to be informed Pending
63II11 Tripping of 765 kV Vemagiri-Srikakulam
line-1 and 765400kV ICT-1 at Vemagiri-
PG SS
16-03-2017 at
1023 hrs
Line-1 and ICT-1 which are in the same diameter got
tripped due to operation of Tie bay gas
compartment trip
1 Since tripping of elements on Gas Compartment Trip has been
observed frequently in the past few months at 765 400 kV
Vemagiri SS PGCIL (SR-I) shall furnish a comprehensive report
detailing the remedial measures taken including OEMrsquos suggestions
to prevent their occurrence
PGCIL (SR-I) Yet to be informed Pending
PGCIL (SR-I)12-09-2016 at
1203 hrs
Line tripped on Direct Trip receipt at Ramagundam
end and line was holding from Warangal end
Pending58IV1
400 kV Gazuwaka-Vemagiri (PG) line tripped on Y-E fault However for 400 kV Gazuwaka-Vemagiri (PG) line Direct Trip was received at Gazuwaka after
250ms of occurrence of fault and fault was
persistent for 250ms Then Over-Voltage Stage-1 protection operated from Vemagiri (PG) end in 400 kV Vemagiri (PG) - Nunna line and tripped it
62II1
For the line under consideration the following shall be carried out
by PGCIL (SR-I) in coordination with NTPC-Ramagundam
I)End-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
II)Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be
repaired replaced
Yet to be informedTripping of 400 kV Ramagundam-
Warangal line
Yet to be informed05-01-2017 at 1305 hrs
Tripping of 400kV Gazuwaka - Vemagiri (PG) line and 400 kV Vemagiri (PG ) - Nunna line
1 PGCIL (SR-I) to ensure time-sync of all protections relays at their Vemagiri Gajuwaka and Vijayawada substations2 PGCIL (SR-I) to check OVR settings for correctness of operation
along with proper drop-off to pick-up ratio (gt 097) and configure
OVR_START event in the corresponding Relay BCU Event Logger for all 400 kV lines emanating from their Vemagiri (PG) SS
PGCIL (SR-I) Pending
Annexure-III
Page 20 of 31
64III16 Tripping of 76 5kV Kurnool-Nellore PS
line-2
27-04-2017 at
2222 hrs
R-phase to earth fault had occurred in line Auto-
reclose was successful at Kurnool end and breaker
at Nellore PS end tripped and did not attempt for
auto-reclose
For the line under consideration PGCIL (SR-I) to Configure Event
Logger (EL) to record events at msec level
PGCIL (SR-I) Yet to be informed Pending
65II15 Tripping of HVDC Gazuwaka Pole-1amp2 25-05-2017 at
0945 hrs
HVDC pole-1 got tripped due to operation of South
filter inter zone protection and HVDC pole-2 got
tripped due to operation of differential protection
PGCIL (SR-I) to furnish detailed report on the events that led to
tripping of HVDC Poles ndash 1 amp 2 including remedial measures taken
to PCSC forum Further the OEM report wrt tripping of HVDC
Pole-2 shall also be furnished
PGCIL (SR-I) Yet to be informed Pending
65III5 Tripping of 765 kV Raichur-Solapur line-
2
07-05-2017
at 1918 hrs
Y-phase to earth fault Auto-reclose was successful
at Solapur and breakers at Raichur end got tripped
PGCIL (SR-I) to configure Event Loggerrsquos time-resolution up to
millisec level in all protection relays at their 765 400 kV Raichur SS
PGCIL (SR-I) Yet to be informed Pending
55II7 Tripping of 400kV Kudgi PG (Narendra
New) - Narendra-PG line-2
18-05-2016 at
1625 hrs
line tripped on B-phase to earth fault and line auto-
reclosed successfully from Narendra end Line tripped
from Kudgi-PG due to operation of over-voltage stage-
1
PGCIL (SR-II) to properly configure dead-time of AR (typically 1
sec) on all lines emanating from Narendra (PG) substation
PGCIL (SR-II) Yet to be informed Pending
54II3 Tripping of 400kV Sriperambudur -
SVChartam and 400kV Nellore-
Sriperambudur line-1
05-04-2016 at
0011 hrs
400kV Nellore-Sriperambudur line-1 tripped on a R-
phase to earth fault 400kV Sriperambudur-
SVChatram line tripped at Sriperambudur end only
on operation of over current protection
PGCIL (SR-II) to check and revise Pole Discrepancy Relay (PDR)
time setting appropriately based on the type of AR scheme being
implemented at their 400 kV Sriperambudur SS
PGCIL (SR-II) Yet to be informed Pending
54III3 Tripping of 400 kV Kalvindapattu-Vallur
line
10-04-2016 at
1459 hrs
R-phase to earth fault had occurred in line Auto
reclose attempt is unsuccessful auto-reclose could not
be established from provided DR EL
PGCIL (SR-II) to furnish a report on the tripping event detailing the
reasons for unsuccessful AR operation at Kalvindapattu end and the
remedial action taken to restore AR to normalcy
PGCIL (SR-II) Yet to be informed Pending
55II17 Tripping of HVDC Talcher-Kolar pole-1 30-05-2016 at
0949 Hrs
Failure of main CT of AC filter (20C08A) occurred
and it in turn caused the operation of filter bank
differential protection HVDC Pole-1 got tripped on
group Differential protection operation
PGCIL (SR-II) to take up the issue of Pole-1 tripping on Group
Differential Protection (Stage-II) due to multiple commutation failures
with their OEM and furnish a report on it
PGCIL (SR-II) Yet to be informed Pending
56II8 Tripping of HVDC Talcher-Kolar Pole-1 17-06-2016 at
1635 Hrs
Talcher-Kolar HVDC Pole-1 got tripped on line fault
and Pole-2 went to ground return mode with 150MW
PGCIL (SR-II) to address amp resolve DTPC and fibre-optic link
related issues raised by KSEB at Thrissur Madakathara substations
and conduct a mock-test in coordination with KSEB to verify integrity
of signal transmission from Kolar to Thrissur Makadathara
PGCIL (SR-II) Yet to be informed Pending
64II14
PGCIL (SR-I)14-05-2017
at 1654 hrs
Tripping of 400 kV Vemagiri - Gazuwaka
line
PGCIL (SR-I) to sort out issues relating to AR functionality
operation for both Main-CB and Tie-CB at both Vemagiri and
Gajuwaka substations
For the line under consideration the following shall be carried out
by PGCIL (SR-I)
End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be
repaired replaced
Y-phase to earth fault Auto-reclose was not
successful due to persistent fault Vemagiri end had
sent a Direct Trip after un-successful Auto-reclose
AR attempt was observed in Gazuwaka end DR
after 3 phase trip
65III10
Yet to be informed PendingPole-1 got tripped due to failure of auxiliary supply
changeover 400kV Jeypore-Gazuwaka line-2 got
tripped on operation of over-voltage protection
Pole-2 east shunt reactor got failed and this in turn
resulted in tripping of HVDC pole-2 due to Pole-2 Y
block activation 400kV Jeypore-Gazuwaka line -1
also got tripped during the incident
28-Apr-17 Pole-
1 at 844 hrs
and Pole-2 at
907 hrs
Tripping of HVDC Gajuwaka Pole-1amp2
and 400 kV Jeypore-Gazuwaka line-1amp2
PGCIL (SR-I)1 PGCIL (SR-I) to provide fully automatic supply-changeover
scheme for Pole-1 auxiliaries at the earliest
2PGCIL (SR-I) to furnish a detailed report on the reasons for East
Shunt Reactor failure including remedial action taken OEM report in
this regard also shall be shared
3PGCIL (SR-I) to provide redundant AC auxiliary supply to both
Pole-1 amp Pole-2 either by making use of tertiary of ICT-1 or from
external dedicated feeder
Yet to be informed Pending
Annexure-III
Page 21 of 31
58II3 (GI) Tripping of 400 kV Sriperambudur-
SVChatram line
14-08-2016 at
1349 hrs
Line tripped at Sriperambudur end only on
operation of directional earth fault protection
(i) PGCIL (SR-II) to disable high-set of line DEFRrsquos and
(ii) PGCIL (SR-II) to block line DEFR operation when DPR is in active
condition (has picked up) at their Sriperambudur SS
PGCIL (SR-II) Yet to be informed Pending
58II5 (GI) Tripping of 400 kV Neyveli TS2-Pugalur
line and 400 kV Neyveli TS2-Neyveli TS2
EXP line
21-08-2016 at
1035 hrs
Failure of Y-Ph tension insulator of tie feeder bay at
Neyveli TS2 Neyveli-Pugalur line tripped due to over
voltage at Neyveli TS2 and direct trip was received
at Pugalur
PGCIL (SR-II) to check the operation of the DPR relays at Pugalur
end NLC TS2 - Pugalur line by trans-playing the event on another
healthy relay and take suitable action including replacement of the
relay accordingly
PGCIL (SR-II) Yet to be informed Pending
58II19 (GI) Tripping of 400 kV Madurai-Karaikudi
line
15-09-2016 at
0302hrs
Line tripped on operation of OVR Stage-I protection
at Karaikudi and Direct Trip was received at Madurai
PGCIL (SR-II) to check the operation of OVR relays at their 400 kV
Karaikudi SS and properly configure linesrsquo DRs amp ELs so that events
pertaining to OVR (Stage-I amp Stage-II) protection operation (START
amp TRIP) get explicitly recorded
PGCIL (SR-II) Yet to be informed Pending
59II20 (GI) Tripping of HVDC Talcher-Kolar pole-1 10-10-2016 at
1635 hrs
Pole-1 of HVDC Talcher-Kolar tripped due to receipt
of lsquorsquoPole block command from Talcher end due to
tripping Pole-1 DC filter at Talchar end Pole 2 went
into metallic return mode after tripping of pole-1
PGCIL (SR-II) to check the correctness of non-operation of SPS
(Talcher ndashKolar Trip Signal-1) in the instant case by comparing it
with the incident of tripping of HVDC Talcher-Kolar pole-1 on
05102016 and furnish a report on it to PCSC forum
PGCIL (SR-II) Yet to be informed Pending
59II24 (GI) Tripping of 400220kV ICT-2 at
Somanahalli SS
24-10-2016 at
354 hrs
ICT-2 tripped on operation of Buchholz relay PGCIL (SR-II) to properly configure ICT protection relay DR so that
digital signals are recorded with proper names at their 400220 kV
Somanahalli SS
PGCIL (SR-II) Yet to be informed Pending
59III4 Tripping of 400 kV Salem -Udumalpet line-2
13-10-2016 at 0306 hrs
Line tripped on R-phase to earth fault Line auto-reclosed at Udumalpet end and did not reclose at
Salem
Line tripped on R-phase to earth fault Line auto-reclosed at Udumalpet end and did not reclose at Salem
PGCIL (SR-II) Yet to be informed Pending
62II6 Tripping of 400 kV Trichy-Karaikudi line 21-01-2017 at 2145 hrs
Line tripped on operation of over voltage protection at Karaikudi end and direct trip was received at Trichy Voltage recorded in DR in antecedent
conditions were 2454 kV 2432 kV 2536 kV
respectively
1 PGCIL (SR-II) to ensure OVR settings adopted for 400 kV lines at Karaikudi SS are as per SRPC provided settings with a drop-off to pick-up ratio gt 097
2 PGCIL (SR-II) to configure OVR_START event in the corresponding Relay BCU Event Logger for all 400 kV lines emanating from their
Karaikudi SS
PGCIL (SR-II) Yet to be informed Pending
62III5 Tripping of 400 kV Tumkur ndash Bidadi line 17-02-2017
at 1044 hrs
B-E fault Line did not auto-reclose 1 PGCIL (SR-II) to properly configure AR logic operation at Bidadi
end and ensure itrsquos correct operation for a fault during reclaim time
2 PGCIL (SR-II) to ensure time-sync of protection relays with GPS at
both Tumkur and Bidadi substations
PGCIL (SR-II) Yet to be informed Pending
62III6 Tripping of 400 kV Tumkur ndash Bidadi line 18-02-2017
at 1036 hrs
B-E fault Line did not auto-reclose PGCIL (SR-II) to properly configure AR logic operation at Bidadi
end and ensure itrsquos correct operation for a fault during reclaim time
PGCIL (SR-II) Yet to be informed Pending
62V1 Tripping of 400kV Vallur-Kalivandapattu
line-2
22-02-2017 at
455 hrs
Line tripped due to failure of R phase jumper Two
faults observed from DR 2nd fault cleared in 500ms
from Kalavindapattu end
PGCIL (SR-II) to enable Trip on Reclose (TOR) at Kalavindapattu end
on all 400 kV lines emanating from it
PGCIL (SR-II) Yet to be informed Pending
57II2 Tripping of 400 kV Mywady-Salem line-1
and 400 kV Mywady-Madurai line
PGCIL (SR-II) Yet to be informed03-07-2016 at
0306 hrs
400kV Mywady- Madurai line tripped on a Y-phase
to earth fault due to agriculture fire Tie-CB LBB
relay got operated at Mywady end and resulted in
tripping of Main breakers of 400kV Mywady-
Madurai and 400kV Mywady-Salem line-1 which are
in the same diameter
PGCIL (SR-II) to furnish a report on the remedial action taken after
ascertaining the reasons for (i) non-opening of Main-CB of Mywady
ndash Madurai line at Mywady end on Tie-CB LBB operation and (ii)
delay in sending DT to the remote ends after Tie-CB LBB operation
Pending
Annexure-III
Page 22 of 31
65II2 Tripping of 400 kV Kudgi (PG) - Tumkur
line-2 and Kudgi (PG) ndash Kudgi (NTPC)
line-1
06-05-2017 Kudgi (NTPC) feeder tripped at Kudgi (PG) end on
operation of distance protection R-N Zone-1
Tumkur feeder tripped at Kudgi(PG) end on
operation of NGR buchholtz relay
1 PGCIL (SR-II) to sort out AR related issues at Kudgi (PG) end on
400 kV Kudgi (PG) ndash Kudgi (NTPC) lines and put AR into service
2 PGCIL (SR-II) investigate reasons for NGR Buccholtz trip on 400
kV Kudgi (PG) ndash Tumkur line-2 and furnish action taken report wrt
rectifying the same
PGCIL (SR-II) Yet to be informed Pending
58II16 (GI) Multiple tripping at 400 kV Kalpaka SS 06-09-2016 at
1643 Hrs
Y-Pole breaker of Bus reactor-3 got failed during its
charging This resulted in a bus fault in 400kV bus-1
resulting in tripping of 400kV elements connected to
Bus-1
PGCIL (SR-I) amp PGCIL (SR-II) to review their Reverse Zone settings of
distance relays so as to bring them in line with Ramakrishna
Committee guidelines at all their substations in the southern
region
PGCIL (SR-I) amp PGCIL
(SR-II)
Yet to be informed Pending
51II4 NTECLTripping of 400kV Alamathy-Tiruvalam
line-1 and 400kV Alamathy-Vallur line-2
NTECL Vallur to furnish a report detailing the reasons for mal-
operation of Vallur end relays for a fault on Alamathy-Tiruvalam line-
1 and remedial measures taken to PCSC forum In the report their
preparedness for implementing line differential protection on Vallur-
Alamathy lines may also be indicated
400kV Vallur-Alamathy Line-2 got tripped from
Vallur end during failure of Y-phase LA in 400kV
Alamathy-Tiruvalam line Protection at Vallur end
tried for an auto-reclose and gave a 3 phase trip
TANTRANSCO mail received on 24-03-2016
3Ф Trip at 400kV Alamathy end due to DT received from vallur end for
BФ LAS bursted in Alamathy -Thiruvalam - 1 at Alamathy end
Mail received on 27-04-2016 and 20-05-2016
3Ф Trip at 400kV Alamathy end due to DT received from vallur end for
BФ LAS bursted in Alamathy -Thiruvalam - Line-1 at Alamathy end
Pending13-12-2015 at
2242 hrs
Others
Annexure-III
Page 23 of 31
56III5 Tripping of 400 kV Neyveli TS-2-
Pugalur line
04-06-2016 at
1636 hrs
B phase to earth fault occurred in line Auto-reclose
had not operated at NLC TS-2 and DT was sent to
Pugalur end resulting in a 3 phase trip
NLC to review the necessity of providing Relay Definitive Trip and
accordingly take steps to disable it on all lines emanating from their
generating stations
NLC Direct trip triggering of DR wii be carried out at TS2 end during the next
planned shutdown of the Pugalur Ts2 feeder
Mail received on 22-02-2017
Direct trip triggering of DR carried out at TS2 end for the TS2-Pugalur
feeder on 25-01-17
Pending
56II16 Tripping of 400 kV Gajwel-Singareni
line-2
30062016 at
2343 hrs
Tripped on 3-phase Trip at Gajwel end SCCL to configure Jaipur end relay‟s EL properly so that the time-
stamp resolution is extended downwards up to milli-second level
SCCL Yet to be informed Pending
1Singareni TPS to furnish single line diagram of their switchyard
along with the Over Voltage Relay settings adopted for various
transmission lines and to ensure that they are in line with the SRPC
provided gradings
2Singareni TPS to upload various tripping files (FIRDRELTR)
pertaining to a tripping event involving their station in SRLDC web-
portal within 24-hrs of occurrence of that event in compliance of
IEGC Regulation 52(r)
Line tripped on operation of Over-Voltage
protection at Singareni and Direct Trip was received
at Gajwel DR amp EL of Singareni was not furnished
59III3
57II8 NTPC (Ramagundam)
10-07-2016 at
156 hrs
Line tripped at Ramagundam end on operation of over-
voltage protection Dichipally end tripped due to
receipt of Direct Trip signal
1NTPC-Ramagundam to ensure correctness of operation of Over
Voltage relays by taking remedial measures like maintaining
healthiness of concerned CVT‟s setting drop-off to pick-up ratio at
097 amp above etc
2NTPC-Ramagundam to ensure time sync of their station‟s DR amp
EL with GPS
3NTPC-Ramagundam to sort out analog values indication amp
overlapping issue of time-stamp in their station DR‟s
4NTPC-Ramagundam to properly configure their EL‟s so that events
are recorded with msec resolution
Line tripped on B-phase to earth fault Line auto
reclosed at Chandrapur end and did not reclose at
Ramagundam
57II4
16-07-2016 at
438 hrs
Tripping of 400 kV Ramagundam -
Chandrapur line -2
1NTPC-Ramagundam to furnish remedial measures taken wrt AR
non-operation and unwarranted DT sending to other end
2NTPC-Ramagundam to configure protection relays DR‟s such that
events get recorded for at leas
2000 msec post-triggering so as to cover complete AR operation
Tripping of 400 kV Ramagundam -
Dichipally line
NTPC-Ramagundam mail dated 09032017
1 Main-II relay replaced Over voltage relays pickup to reset ratio is 098
--- Completed
2 DR and EL are time synchronized with GPS clock
-------- Completed
3DR alalog overlaping issue is sloved ---- Completed
4 ----- Pending
Yet to be informed
Pending
54I1
Tripping of 400 kV Gajwel-Singareni line-
2
02-04-2016 at
1708 hrs 1MAPS to furnish a detailed report on the tripping of SP Koil ndash
MAPS lines 1 amp 2 at MAPS end with focus on the correctness of the
settings of Main-I amp Main-II relays (for primary amp back-up
protections) on both the lines
2MAPS to take steps to provide down-loading facility for DR amp EL
from Main-I amp Main-II relays on all 230 kV lines emanating from
MAPS
3MAPS in co-ordination with SP Koil to carry out PLCC end-to-
end testing on SP Koil ndash MAPS lines 1 amp 2 and ensure healthiness
of PLCC communication amp carrier-aided protection
4MAPS to put in service Auto-Reclosure feature on all four 230 kV
lines emanating from MAPS by June 2016
Pending
Complete outage of 230 kV SPKoil
Station of TANTRANSCO
B-phase CT failure occurred in 230 kV SPKoil -
MAPS line-1 Busbar protection got operated at
SPKoil station All elements except 230kV
Oragadam and 230kV Kalivandapattu got tripped at
230kV SPKoil station bdquoY‟ phase CT and support
insulators also got damaged
27-09-2016 at
0101 hrs
Status revided vide MAPS mail dated 06122016
1 The settings given by Ms TANTRANSCO were adopted for Main ndashI amp
Main- II relays for both the lines The same settings were verified to be
same Subsequently calibrated was done and no drift was observed
--- Complied
2 From May 2016 onwards the DR EL and trip report are being sent by
mail to SRLDC Bengaluru by MAPS
--- Complied
3 Monthly maintenance of PLCC equipments is being done by Ms
TANTRANSCO At present PLCC telephone is not working it is being
followed up
--- Complied
4 CVTs are planned to be procured from Ms TANTRANSCO by the end
of February 2017 and AR will be implemented for all the lines emanating
from MAPS by July-2017 as discussed in the current SRPC meeting on
25112016
--- Pending
PendingNPCIL (MAPS)
SCCL
NTPC-Ramagundam mail dated 09032017
1 The relay will be checked in next opportunity if required it will be
changed with new one------------- Pending
2DR time recording increased to 2 sec --------- Completed
NTPC Pending
Annexure-III
Page 24 of 31
62III2 Tripping of 400 kV Kaiga-Guttur line-1 06-02-2017
at 0501 hrs
B-phase to earth fault Line did not auto-reclose at
Kaiga end
1 KGS to properly configure all relays DR‟s time scale for a post-
triggering period of 2 sec to capture events such as complete AR
operation
2 KGS to ensure time-synchronization of all protection relays with
GPS in their 400 kV switchyard
NPCIL (KGS) Yet to be informed Pending
63III4 Tripping of 400 kV Gajwel-Singareni line-
2
07-03-2017 at
1652 hrs
Line tripped on B-phase to earth fault Line did not
auto-reclose
1 SCCL to properly configure LBB logic for all line relays
where AR has been put into service for 1-ph initiation based
on phase segregation (ie for the faulted phase) at their
Singareni TPS
SCCL Yet to be informed Pending
64II8 Tripping of 400 kV Tirunelveli-
Kudankulam line-3
23-04-2017 at
0556hrs
R-phase to earth fault had occurred in Tirunelveli -
Udumalpet line-2 During the incident Tie-CB LBB
got operated at Tirunelveli end due to sluggish
operation and tripped 400 kV Tirunelveli -
Kudankulam line-3
NPCIL (KKNPP) to configure DRrsquos amp ELrsquos of protection relays at their
station for recording DT receipt event at their Kudankulam NPP
NPCIL(KKNP) Yet to be informed Pending
Yet to be informed63III8 NPCIL (KGS)Tripping of 400kV Kaiga-Guttur line-2 Line tripped on Y-phase to earth fault Line auto-
reclosed from Guttur end and failed to re-close from
Kaiga end
1 NPCIL (KGS) to furnish an action taken report on the
reasons for AR lock-out and remedial action taken to rectify
the same
2 NPCIL (KGS) to configure DR‟s of line protection relays for
a post triggering period of 2 sec to capture complete AR
operation at their Kaiga GS
3NPCIL (KGS) to furnish FIR amp TR for tripping events as
per SRLDC provided formats
27-03-2017 at
706 hrs
Pending
Annexure-III
Page 25 of 31
34I6
01-01-2015 at
1338 hrs
42II18 400kV Raichur TPS-Raichur(PG) line-
1amp2 400kV Raichur-Mahboobnagar
Unit7 and ICT-2 at RTPS tripped
during the incident B phase to earth
fault had occurred in 400kV Raichur
TPS-Raichur line-1
1 Bus bar protection shall be provided by asset owner ( ie
KPTCL)
2 Settings for main distance protection amp Overcurrent protection
shall be examined and reviewed
3 Time synchronization of the Substation shall be ensured
As reported directional over current relay of ICTrsquos
operated due to snapping of line jumper in 220kV
Lingapur line
1 KPCL to review REF setting (DMT or IDMTL) for unit-7 by first
week of April 2015 and inform the same to PCSC forum
2 TSTRANSCO to furnish Mehaboobnagar‟s DR and EL and the
reasons for distance relay operation at their end within a week‟s time
3 PGCIL (SR-I) to rectify the issues relating to AR operation relay
reach (Z2) reverse reach (Z4) and SOTF auxiliary contacts within a
week‟s time and submit the actions taken to PCSC forum
16-07-2014400220 kV ICT-1 amp 2 at
MUNIRABAD
On account of R-phase to earth fault line tripped at
Hassan end due to operation of distance Zone-2 and
non-receipt of carrier From DR of Talaguppa end it
is observed that fault had occurred in Yphase
09-03-2015 at
0636 hrs
Tripping of 400
kV TALAGUPPA
ndash HASSAN line
40II3
Multiple tripping at Raichur TPS of
KPCL
Miscellaneous
1 PGCIL and KPTCL to ascertain the reason for the phase
discrepancy in the relay operation and take suitable remedial
measures
2 KPTCL to check the PLCC operation at Talaguppa end and submit
the report to the PCSC forum
1 Yet to be informed by KPCL ---- Pending
2 Mail received on 26-05-2015 from TSTRANSCO
It is found that the main-2 ABB make REL316 type distance relay was
defective and same was replaced with MICOM P444 by MsPGCIL on
2304-2015 After replacement of main-II DR can be extracted from this
relay For EL in to service some field winding is pending which is being
taken up in this month -- Complied with
3
PGCIL mail recieved on 27-04-2016
End to end PLCC tunning carried out
PGCIL (SR-I) RVMD 14072016
Relay settings of all the stations in SRTS-1 were derived as per
Ramakrishna Commettee recomendations and implemented - Complied
with
KPCL
TSTRANSCO
PGCIL (SR-I)
PGCIL (SR-II) KPTCL
KPTCL
PGCIL (SR-I)
Mail recieved on 28-04-2015
End to end testing of PLCC has been done and problem in the PLCC is
atttended
Mail received on 27-05-2015 (KPTCL) amp 29-07-2015
End to end testing of PLCC has been done and problem in the PLCC is
atttended Phase discrepancy in the relay operation is to be checked jointly
Mail recieved on 02-09-2015 from PGCIL (SR-II)
Problem is in identification of phases at Talguppa end To be rectified by
Ms KPTCL
Mail recieved on 28-06-2016 from KPTCL
The matter is reffered to the concerned Operation and maintance wing to
set right the mismatch of phases in 400kV Talaguppa-Nelamangala and
Talaguppa-Shantigrma lines at Talaguppa in cordination with PGCIL
Pending
(with KPTCL)
Mail recieved on 27-05-2015 (KPTCL)
1 KPTCL has taken action to provide bus bar protection to 220kV buses
2 Over current relay Settings of ICTs to be reviewed by PGCIL
Mail received on 29-07-2015 (KPTCL)
Initial Tendering stage
KPTCL Mail recieved on 23-01-2016
Detailed estimate prepared for taking up the work CEE Transmission
Zone Gulbarga will take up necessary procurement and further execution
----------------------------------------------------------------------
1 Pending from KPTCL side
2 Complied with as per PGCIL (SR-I) RVMD 14072016 which stated
that Relay settings of all the stations in SRTS-1 were derived as per
Ramakrishna Commettee recomendations and implemented
3 Pending from KPTCL side
Pending (with
KPCL)
Pending
(with KPTCL)
Annexure-III
Page 26 of 31
Tripping of Unit 1 at NCTPS 24-05-2015
at 1913 hrs
ID Fan trip
Tripping of Unit 1 at MEPL 24-05-2015
at 1913 hrs
Coal Mill tripped
Tripping of Unit 1 at
Krishnapatnam
24-05-2015
at 1917 hrs
Generator Protection operated
Tripping of Unit-8 at RTPS 24-05-2015
at 1919 hrs
Tripped on Overvoltage
47I2
1 All Tripped units viz Krishnapatinam MEPL Raichur NCTPS
to submit a detailed report on this event including the remedial
measures taken to PCSC forum
2 KPCL to check the excitation system of Unit 8 of RTPS and
submit the remedial measures taken to PCSC forum
KPCL MEPL
APGENCO TNEB
As per FIR submitted CT damage observed in
Chitoor-Main bay (404) Main breakers connected to
bus-1 (401 404 407 410) got tripped on operation of
bus bar protection Unit-1 tripped on operation of
MFT Unit-2 was not in service
Complete outage of Krishnapatnam TPS
Pending (with
KPCL)
APGENCO letter dated 18032016
1SOE and SLD are attached The DR of 405 CB is not generated during
the incident Now the problem is identified and rectified
--------- Completed
2All the 3 lines ie CHTR-2 MNBL-I amp II tripped in zone
protection The fault was in Blind zone ie P2 side of CT where it was
covered under Bus fault by the time fault moved on to P1 side when the
fault comes under STUBTEED zone after 330msec all the feeders expect
CHTR-1 tripped in Zone-II and total fault persisted for 500msec before the
405 TIE CB opens and clear the fault As a remedial the STUB protection
operation also checked and found OK-------Completed
3The Time Sync was missed on the day and found there was problem with
LAN Timer same was rectified Now found OK
-----------Completed
4Now the DR Time scale changed to 1 sec for Pre fault and 3 sec for Post
fault and STATE of events are corrected wherever found wrongor
misguiding during analysis---------Completed
5
PGCIL-SR1 RVMD 27-04-2016
Procurement of differential protection for 400kV NPS-NLR DC and
400kV RCR-RTPS-DC is under tendering
PGCIL-SR1 RVMD 14-07-2016
The proposal for procurement of Line differential Protections for 400kV
Raichur - RTPS-1 amp 2 and 400kV Nellore - NPS - 1 amp 2 lines has been
approved and tender is under technical evaluation
Pending with
PGCIL(SR-I)
08-09-2015 at
1820 hrs
44I3
1 APGENCO to furnish to PCSC forum (i) A3-size Single Line
Diagram of SDSTPS and (ii) the sequence of events with time stamp
showing the protection that opened Tie-CB (405) at SDSTPS
2 APGENCO to review STUBTEED protection in all dias at
SDSTPS and ensure that they are configured for instantaneous
operation
3 APGENCO to properly configure the STATE of the tripping events
so that they get recorded appropriately like TRIP OPERATED in
their corresponding Event Loggers
4 APGENCO to ensure time sync of all DR‟s and EL‟s at SDSTPS
5 PGCIL (SR-I) to provide line differential protection for 400 kV
NPS ndashNellore-PG lines 1 amp 2
TANGEDCO vide their mail dated 07072015 informed that as per the
discussion and recommendation of 44th meeting of PCSC held on
28052015 a time delay of 2 Sec had been introduced for the above
tripping for all the ID fans at NCTPS-II
MEPL vide their mail dated 14092015 informed that they had
implemented 2 seconds delay for under voltage tripping of all Drag Chain
Feeder Conveyors And this has been done for both the Units
APGENCO letter dated 18032016
The unit not tripped on Generator protection but tripped on Economiser
inlet flow protection consequent to tripping of TDBFP on lube oil pressure
lowBefore tripping dip in voltage was observed in the LT system which
caused tripping od lube oil pumpsAfter the incidentChangeover scheme
on under voltage of LT System was reduced from 80 with 2 sec delay to
40 with 200msec delay
APGENCO PGCIL (SR-
I)
Annexure-III
Page 27 of 31
12-11-2015 at
0020 hrs
Tripping of 400kV Gooty-Nelamangala
line
KPTCL KPCL NPCIL
(KAPS)
1 KPTCL KPCL to see the possibility of implementing Weak Infeed
logic with Echo feature enabled by Under
Voltage (27) element on Kadra-Karwar lines 1 amp2 and implement
the same if feasible
2 NPCIL to time-coordinate Kaiga‟s DEFR settings with (i) Zone-2
settings at Kaiga and (ii) primary protections of the lines emanating
from Kadra and Kodasalli
3 KPCL to ensure time-sync of EL‟s and healthiness of the Fault
Locators at Kadra
220kV Kadra-Karwar lines-1amp2 tripped
on earth fault in B-phase in zone-2
Kaiga-Kadra line tripped at Kaiga end
only on operation of directional eath
fault protection
31-07-2015 at
1144 hrs
Tripping of 220kV Kadra-Karwar lines -
1amp2 and 220kV Kaiga-Kadra line
PGCIL (SR-I) mail received on 27-04-2016
1 The firmware of REL670 is being upgraded ------- Completed
2 The recording of events in msec interval is being taken up with OEM
Henceforth for analysis purpose we will provide larm list which has msec
time stamp -------- Completed
3 End to end testing of PLCC code transmision and tuning of channels
carried out ------- Completed
4 Procurement of differential protection for 400kV NPS-NLR DC and
400kV RCR-RTPS-DC is under tendering The legends modified in
Eventalarm list Provision of diff relay for all short lines emanating from
NPS is being taken up with our corporate -------- Pending
PGCIL(SR-I) RVMD 14-07-2016
The proposal for procurement of Line differential Protections for 400kV
Raichur - RTPS-1 amp 2 and 400kV Nellore - NPS - 1 amp 2 lines has been
approved and tender is under technical evaluation
1
PGCIL RVMD 27042016
AR blocked due to failure of PLCC link The defective PLCCcards
replaced at Neelamgala end
PGCIL RVMD 14072016
AR blocked due to failure of PLCC link The defective PLCCcards
replaced at Neelamgala end End to end testing of PLCC carried out and
PLCC link is healthy ------ Pending
2 Gooty end Time syc unit is replaced with new one and commissioned ---
----- Completed
3 Yet to be informed by KPTCL --- Pending
PGCIL (SR-I) KPTCL 1 For Gooty ndashNelamangala line PGCIL (SR-I) and KPTCL to
provide 3-ph trip logic at their respective ends upon detection of
PLCC link failure during dead-time of AR operation
2 PGCIL (SR-I) to make GPS functional at Gooty SS and ensure
time-sync of various DR‟s and EL‟s with it (GPS)
3 PGCIL (SR-I) KPTCL to furnish reason for the operation of
Backup impedance protection of the line reactor at Nelamangala end
and the remedial measures taken to PCSC forum
Pending (with
KPTCL)
1PGCIL (SR-I) to furnish Action Taken Report on the findings of
OEM on relay mal-operation at NPS end on 400 kV NPS ndash NCCK
line to PCSC forum
2 PGCIL (SR-I) to appropriately configure Station Event Logger at
NPS to record events at msec interval
3 PGCIL (SR-I) to carry out PLCC end-to-end testing in coordination
with TPCIL for 400 kV NPS ndashTPCIL line
4PGCIL (SR-I) MEPL SEL TPCIL amp NCC to take steps to
provide line differential protection at their respective ends on all 400
kV lines (except Gooty line) emanating from Nellore Pooling Station
and furnish an action plan to implement the same
Pending
1
Mail recieved on 25-05-2016 from KPTCL
Availability of week end infeed with eco feature to be confirmed by
SEERTCHubli --- Pending
2
Mail recieved on 03-12-2016 from NPCIL(KGS)
The 200 ms Definite time DEFR element in both Kaiga Kadra and Kaiga
Kodasally lines were disabled IDMT DEFR is retained The 200 ms
Definite time back up oc element in both Kaiga Kadra and Kaiga
Kodasally lines were disabled IDMT is retained
------ Completed
3 Yet to be informed by KPCL
Status received vide KPCL mail dated 14062017
1 Since PT blasted (B phase) at Karwar end resistive over reach occurred
hence Backup protecion operated at Kadra end (zone-2 not sensed) ---
Pending
3Newly commissioned micom P444 relay time synchronised with GPS
------ Completed
Running units at Thermal Powertech power Station
tripped due to tripping of 400kV Nellore pooling
station (NPS)-TPCIL line and 400kV Nellore pooling
station (NPS)-ECC line
30-12-2015 at
0602hrs
R-phase to earth fault had occurred in Line Line did
not auto-reclose from both ends It was mentioned that
YampB pole breakers at Neelamangala tripped on
operation of pole discrepancy and backup impedence
protection for line reactor got operated
Complete outage of TPCIL power station 50I2
50II8
47II7
PGCIL (SR-I)
MEPL SEL TPCIL
NCC
Pending
Annexure-III
Page 28 of 31
52I8 Complete outage of 400kV NTPL station
and CEPL Stations
14-03-2016 at
0136 hrs
Running Units at NTPL and Coastal Energen power
station got tripped due to tripping of evacuating lines
NTPL and PGCIL (SR-II) to furnish compliance report of the
recommendations given by PSAG-15 Committee that held its meeting
on 12-13 April 2016 at NTPL Tuticorin
PGCIL (SR-II)
NTPL
NTPL mail received on 19052016
All General Recommendations will be done in the second week of June
2016 ---------- Complied by NTPL
Yet to be informed by PGCIL (SR-II)
Pending
[with PGCIL
(SR-II)]
56III4 Tripping of 220 kV Sedam-Tandur line 03-06-2016 at
2152 hrs
Line tripped on B-phase to earth fault Auto-reclose is
not enabled for line
KPTCL and TSTRANSCO to fast-track providing AR on 220 kV
Sedam ndash Tandur line and furnish an action plan of providing the same
by next PCSC meeting (PCSC-57)
KPTCL
TSTRANSCO
Yet to be informed Pending
KPTCL and TSTRANSCO to take steps to provide AR feature on
220 kV Sedam ndash Tandur inter-state line at their respective ends at the
earliest
KPTCL
TSTRANSCO
PGCIL mail received on 27-04-2016
Being pursued with APTRANSCO
APTRANSCO mail dated on 22-06-2016
AS maintenance being carrired out by PGCIL(SR-1) the required relay
replacement (wiringprogramming) may also be carried out by PGCIL(SR-
1)
PGCIL RVMD 14072016
1 The CB problem has been attended by POWERGRID by using OEM
Ms BHEL services amp POWERGRIDs OampM spares
------ Completed
2 Being pursued with APTRANSCO to replace the faulty Event Logger at
Vijayawada (Nunna) SS -------- Pending
APTRANSCO mail dated on 31-08-2016 amp 04032017 amp 24052017
As maintenance being carrired out by PGCIL(SR-1) the required relay
replacement (wiringprogramming) may also be carried out by PGCIL(SR-
1)
PGCIL (SR-I)
APTRANSCO
1 PGCIL (SR-I) in co-ordination with APTRANSCO to address
the problem with CB at the earliest opportune time
2 APTRANSCO to take steps to replace the faulty Event Logger at
Vijayawada (Nunna) SS
Line tripped at Mamidipally end only on Direct Trip
receipt from Ghanapur end
30-04-2016 at
1640 hrs
Line tripped due to operation of over voltage
protection at Vijayawada end and Direct Trip was
received at Sattenapalli end
25-12-2015 at
301 hrs
Tripped on 3-phase Trip at Gajwel end30062016 at
2343 hrs
19-06-2016 at
1527hrs
220kV Sedam-Humnabad-2 tripped at Sedam on
Distance protection Zone-2 Sedam-RTPS-1 amp2 lines
tripped at RTPS end only 220kV Tandoor inter-state
line was hand tripped due to incoming supply failure
54IV2 Tripping of 400kV Ghanapur-
Mamidapalli line
56II16
Tripping of 400kV Sattenapalli-
Vijayawada line
56I2
51II6
Tripping of 400 kV Gajwel-Singareni
line-2
Complete outage of 220kV Sedam
Substation of KPTCL
Pending
PendingFor the line under consideration the following shall be carried out by
TSTRANSCO and PGCL (SR-I) in co-ordination
iEnd-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
iiHealthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
PGCIL (SR-I)
TSTRANSCO
Yet to be informed
Pending
1TSTRANSCO and SCCL to check drop-off to pick-up ratio of OV
relay and ensure that it is kept at 097 amp above
2TSTRANSCO and SCCL to configure respective end bdquos DR amp EL
so that they get triggered on OVR protection and record relevant
events
3SCCL to configure Jaipur end relay‟s EL properly so that the time-
stamp resolution is extended downwards up to milli-second level
TSTRANSCO
SCCL
Yet to be informed
Yet to be informed
Pending
Annexure-III
Page 29 of 31
R-phase to earth had occurred in 400kV BTPS-JSWEL
line and protection issued a 3 phase trip
64I1 Complete outage of North Chennai TPS
STG-2
24-04-2017
at 2102hrs
Tripping of evacuating lines due to fault led to
tripping of Units
Pending
64I2 Complete outage of North Chennai TPS
STG-2
25-04-2017
at 1827hrs
Tripping of evacuating lines due to fault led to
tripping of Unit
64I3 Complete outage of North Chennai TPS STG-2
26-03-2017at 2109 hrs
Tripping of evacuating lines due to fault led to tripping of running Unit at NCTPS Stg-2
64III2 Tripping of 400 kV Ghanapur-
Mamidapalli line
04-04-2017 at
1901hrs
B-phase to earth fault Line auto-reclosed from
Mamidapalli end and tripped from Ghanapur
For the line under consideration PGCIL (SR-I) TSTRANSCO to (i)
rectify issues wrt PLCC channels (ii) restore PLCC carrier
communication and (iii) put AR into service at the earliest
PGCIL (SR-I)
TSTRANSCO
Yet to be informed Pending
APGENCO
TSTRANSCO
Direct Trip was received at VTPS and line was
holding from Suryapet end
13-06-2016 at
1655 hrs
56IV2 Tripping of 400 kV VTPS-Suryapet line
57I1 Complete outage of 220 kV Karwar
Substation of KPTCL
12-07-2017 at
1136 hrs
Triggering incident was failure of R phase PT in Bus-
1 at 220kV Karwar substation 220kV Kaiga-
Kodasalli tripped during the incident Also bus shut
down occurred at Kadra and Kodasally stations
1NPCIL (KAPS) to disable DefiniteTime OC relay and put in its
place by IDMT OC relay for backup protection on both 220 kV
Kaiga ndash Kadra line and 220 kV Kaiga ndash Kodasalli line at Kaiga end
2KPTCL to put bus bar protection in service at their 220 kV Karwar
SS at the earliest
3KPCL KPTCL to implement Weak In-feed Logic with Echo
feature enabled by Under Voltage (27) element on Kadra ndash Karwar
lines 1 amp 2
4KPTCL to furnish equipment failure report of the current incident to
PSEampTD Division of CEA with a copy marked to SRPC
KPTCL KPCL NPCIL
(KAPS)
NPCIL(KGS) mail dated on 03-12-2016
AThe 200 ms Definite time DEFR element in both Kaiga Kadra and
Kaiga Kodasally lines were disabled IDMT DEFR is retained
B The 200 ms Definite time back up oc element in both Kaiga Kadra and
Kaiga Kodasally lines were disabled IDMT is retained
------Completed
APTRANSCO mail dated on 20-12-2016
Issue was addressed to the concerned for necessary action
APTRANSCO mail dated on 24-05-2017
Meeting was conducted and the relays procurement for all the locations is
under progress
Pending57II9 Tripping of 400 kV Nellore (PG) - NPS
line-1 400 kV Krishnapatnam-Nellore
(AP) lines -1amp2 and 400kV NPS -
MEPL line
18-07-2016 at
1905 hrs
Triggering incident was snapping of Y phase
conductor in 400kV Nellore (PG) - NPS line-1
Distance relay at Krishnapatnam end over-reached in
Zone-1 and resulted in tripping of 400kV
Krishnapatnam ndash Nellore (AP) lines - 1amp2 from
Krishnapatnam end Distance relay at MEPL over-
reached and resulted in tripping of MEPL-NPS line
from MEPL end
PGCIL (SR-I) TPCIL MEPL SEL SGPL APTRANSCO
APGENCO and SDSTPS to implement line differential protection on
all 400 kV transmission lines (of length less than 50 km) emanating
from Nellore PS Nellore (PG) SS and Nellore (AP) SS [It may be
noted here that the cut-off length of 50 km has been specified with a
view to exclude only long transmission lines]
APGENCO PGCIL(SR-
I) TPCILMEPL
SELSGPL
APTRANSCO
Pending
63II9 KPCLJSWEL Yet to be informed Pending
1 TANTRANSCO and PGCIL (SR-II) to take steps to complete
insulator replacement works on the 400 kV lines owned by them in
Chennai area within 3 months
1 JSWEL to follow file naming terminology provided by SRPC
for various tripping files uploaded in SRLDCrsquos TMS portal
2JSWEL to furnish reasons for AR-BLOCK observed during
the instant tripping and remedial action taken by them to
keep AR in service
3 KPCL to configure DR amp EL properly to record OVR Stage-I
amp Stage-II protections at their BTPS station
14-03-2017 at
1911 hrs
Tripping of 400 kV YTPS-BTPS line and
400 kV BTPS-JSWEL line
Status received vide TANTRANSCO mail dated 15-06-2017
1 All the Porcelain insulators of 400kV NCTPS-II - Vallur feeders-1amp2
were replaced with Polymer insulators by 20052017
2 Existing Porcelain insulators of all other 400kV feeders are being
replaced with Polymer insulators in a phased manner
TANTRANSCO
PGCIL(SR-II)
For the line under consideration the following shall be carried out by
APGENCO in coordination with TSTRANSCO
1End-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
2Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
PendingYet to be informed
Annexure-III
Page 30 of 31
65II5 Tripping of 400 kV Ghanapur-
Mamidapalli line
08-05-2017 at
1915 hrs
Line tripped at Ghanapur end only and was holding
from Mamidapalli Ghanapur end protection had
sensed R-phase to earth fault
For the line under consideration the following shall be carried out
by TSTRANSCO in coordination with PGCIL (SR-I)
1 End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
TSTRANSCO PGCIL
(SR-I)
Yet to be informed Pending
65III12 Tripping of 400 kV Srisailam-Dindi line-2 24-05-2017
at 1502 hrs
R-phase to earth fault Auto-reclose was successful
at Dindi and Zone - 1 3-phase trip at Srisailam
Since all 400 kV lnies emanating from Srisailam LB are composite
feeders APTRANSCO TSTRANSCO can keep AR functionality disabled at respective remote end stations under their control
APTRANSCO TSTRANSCO Yet to be informed Pending
Yet to be informed PendingTriggering incident was failure of CT in 110 kV
Villianur-Kurumbapet at Villianur substation 230KV
Villianur ndash NLC2 and 230 kV Villianur - Pondy lines
got tripped from Pondy end (on operation of DEF)
and NLC end (on operation of Zone-3) respectively
resulting in loss of supply to 230 kV Villianur
substation
65I2 Complete outage of 400kV Uravakonda
and Jammalamadugu Substations
31-05-2017 at
1744 hrs
Triggering incident was tripping of 400 kV Kurnool-
PG - Narnoor line - 1 amp 2 and 400 kV Narnoor-
Jamalamadugu line-2 which led to loss of supply to
400kV Uravakonda and Jamalamadugu 400kV Gooty-
Narnoor 400kV Narnoor-Jamalamadugu-1 400kV
Srisailam-Narnoor 400kV Uruvakonda-
Mahboobnagar-1amp2 were out of service in
antecedent condition
1 For 400 kV Ghani ndashNarnoor line the following shall be carried out
by APTRANSCO
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
2 PGCIL (SR-II) to take appropriate action wrt disabling non-
directional instantaneous Igt4 protection that operates without
checking existence of stub If required the issue may be referred to
relays OEM for appropriate solution or the present relays may be
replaced with other relays with different styles that donrsquot have the
issue observed
APTRANSCO PGCIL
(SR-II)
Yet to be informed Pending
1 PED to furnish an action taken report wrt complying with the
protection audit recommendations
2 PGCIL (SR-II) to review Zone-3 and DEF protection setting at
Pondicherry end 230 kV Pondicherry ndash Villianur and 230 kV
Pondicherry ndash Bahour line and set them appropriately to achieve
required time-coordination with OC protections of ICTrsquos at Villianur
SS
3 NLCIL to keep DEF protection in blocked condition as long as
Distance Protection is active and configure it to become active only
when distance protection does not pickup to avoid time-
coordination issues
19-05-2017 at
1235 hrs
Complete outage of 230 kV Villianur
Substation of Pondicherry
65I1 PED PGCIL (SR-II)
NLCIL
For the line under consideration the following shall be carried out
by TANTRANSCO in coordination with PGCIL (SR-II)
1 End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
PGCIL (SR-II)
TANTRANSCO
Yet to be informed Pending
For the line under consideration the following shall be carried out
by NLCIL in coordination with PGCIL (SR-II)1 End-to-end communication for DT permissive amp other signals may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and software) at both ends shall be checked and faulty components
shall be repaired replaced
Y-phase to earth fault Neyveli TS2 end relay issued
a 3-phase trip 220ms after issue of Y phase trip Direct Trip was sent to Pugalur end preventing auto-reclose
07-05-2017
at 1955 hrs
Tripping of 400 kV Neyveli TS2-Pugalur
line
65III6 PGCIL (SR-II) NLCIL Yet to be informed Pending
For the line under consideration the following shall be carried out
by TSTRANSCO in coordination with NTPC-Ramagundam1 End-to-end communication for DT permissive amp other signals may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components shall be repaired replaced
Over Voltage Stage-1 had operated at Gajwel end
Ramagundam end did not trip as Direct Trip was not received from Gajwel end
29-05-2017
at 0007 hrs
Tripping of 400 kV Ramagundam -
Gajwel line
65II19 TSTRANSCO NTPC
(Ramagundam)
Yet to be informed Pending
65II16 Tripping of 400 kV Kayathar-Karaikudi
line
25-05-2017 at
1552 hrs
R-phase to earth fault had occurred in line There
was Zone-2 3 phase trip operation at Kayathar end
and Zone-1 3 phase trip at Karaikudi end
Annexure-III
Page 31 of 31
SlNo Element NameOutage
datetime
Revival
datetimeReason for Outage Sender Receiver
Remedial Measures Actions taken
1 400 kV KAIGA - GUTTUR 1 27-03-2017153800 27-03-2017164800 RELAY MALOPERATION NPCIL (KGS) KPTCL
KPTCL
At Guttur end DPR operated in Z1 R phase AR
unsucessful due to persistant fault
At Kaiga end DPR operated in Zone-1 RN
fault145km AR attempt is observed from Kaiga
end DR
Reason Transient fault Stood OK after test
charging
NPCIL (KGS)
2 400 kV KHAMMAM - KALPAKKA 1 10-04-2017125800 DISTANCE PROTECTION PGCIL (SR-I) APTRANSCO
PGCIL (SR-I)
Tripped on operation of distance protection Line
belongs to APTARSNCOTSTRANSCO
APTRANSCO TSTRANSCO Momentary fault
3 400 kV KHAMMAM - KALPAKKA 2 11-04-2017115000 11-04-2017175900 Y-N faultPGCIL (SR-I) APTRANSCO
TSTRANSCO
PGCIL (SR-I) Tripped on operation of distance
protection Line belongs to
APTRANSCOTSTRANSCO
APTRANSCO TSTRANSCO Momentary fault
4 400 Kv RAICHUR - YTPS 18-04-2017131400 18-04-2017150100 DPR ZONE 1-B-PH FAULT KPCL KPTCL To-be-discussed
5 400220 Kv ICT-3 AT NEELAMANGALA 20-04-2017162100 20-04-2017170100DUE TO HEAVY ARCING AT B-
PH ISOLATORKPTCL To-be-discussed
6 400 Kv VTPS - MALKARAM 1 23-04-2017150500 SOTF OPERATED APGENCO TSTRANSCO
TSTRANSCOTripped at both ends Tripped on R-
phase to ground Zone-1 indications AR acted and
was unsucessful at Malkaram end
APGENCO
Pending Remedial Measures Actions taken
for the Critical Tripping Incidents (as on 25072017)
Annexure-IV
Page 1 of 6
7 400 kV KHAMMAM - MAMIDIPALLY 2 08-05-2017160600 08-05-2017174900 R PHASE TO GROUND FAULT PGCIL (SR-I) TSTRANSCO
PGCIL(SR-I)
Tripped on operation of distance protection Line
belongs to APTARSNCO
TSTRANSCO
Tripped at both ends Tripped on R-phase to
ground Zone-1 indications AR acted and was
unsucessful at Mamidipally end
8 400 kV TALAGUPPA - NEELAMANGALA 09-05-2017163600 Y TO GROUND FAULT KPCL KPTCL To-be-discussed
9 400 kV MUNIRABAD - GUTTUR 20-05-2017064100 20-05-2017211000BUS BAR PROTECTION
OPERATEDPGCIL (SR-I) KPTCL
KPTCL
No abnormality found at Munirabad end and line
was in service
PGCIL (SR-I)
Tripped at Guttur end only and line was holding
from Munirabad end
10 400 kV GUTTUR - HIRIYUR 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II) PGCIL (SR-II) Due to Problem at Guttur end
11 400 kV KAIGA - GUTTUR 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDNPCIL (KGS) KPTCL To-be-discussed
12 400 kV GUTTUR - NARENDRA 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II) PGCIL (SR-II) Due to Problem at Guttur end
13 400 kV MUNIRABAD - GUTTUR 20-05-2017160000 20-05-2017170400 B-n fault PGCIL (SR-I) KPTCL
PGCIL (SR-I)
As informed by Guttur Substation line tripped at
Guttur end only without any faciaalarms Line
holding from Munirabad end Suspected mal-
operation at Guttur end
KPTCL
14 400 kV GUTTUR - HIRIYUR 1 20-05-2017204100 20-05-2017211800BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II)
PGCIL (SR-II) Due to Problem at Guttur end
KPTCL
15 400 kV BTPS-JSW TORANAGALLU 20-05-2017064100 20-05-2017210300BUS BAR PROTECTION
OPERATEDKPCL JSWEL To-be-discussed
16 400 kV KAIGA - GUTTUR 1 20-05-2017204100 20-05-2017213800BUS BAR PROTECTION
OPERATEDNPCIL (KGS) KPTCL To-be-discussed
17 400 kV GUTTUR - NARENDRA 1 20-05-2017204100 20-05-2017211200BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II)
PGCIL (SR-II) Due to Problem at Guttur end
KPTCL
Annexure-IV
Page 2 of 6
18 400220 kV ICT-1 AT HOODY 20-05-2017110700 20-05-2017180500 220KV SIDE WORKS KPTCL To-be-discussed
19 220 kV AMBEWADI - PONDA 1 22-05-2017121100 22-05-2017123000 EARTH FAULT KPTCL GED To-be-discussed
20 400 Kv VTPS - MALKARAM 1 22-05-2017145200 22-05-2017185800 B phase fault APGENCO TSTRANSCO
TSTRANSCOTrippedat both ends Tripped on B-
Phase to ground and Zone-1 indications AR acted
and was unsucessful at Malkaram end
APGENCO
21 220 kV KANIAMPET - KADAKOLA 23-05-2017143200 23-05-2017162400 BREAKER PDR RELAY ACTED KSEB KPTCL To-be-discussed
22 400 kV TALAGUPPA - HASSAN 30-05-2017014600 B PHASE TO GROUND FAULT KPTCL PGCIL (SR-II)
PGCIL(SR-II) Due to persisting fault in KPTCL
portion
KPTCL
23HVDC TALCHER - KOLAR POLE 1 AT
TALCHER01-06-2017232200 02-06-2017001100
DC DIFFERENTIAL
PROTECTION OPERATEDPGCIL (SR-II) PGCIL (ER-I)
PGCIL(SR-II) Due to DC filter Diff relay operation at
Talcher end
24 400 KV NIZAMABAD- DICHPALLY-1 05-06-2017191500 3 PHASE FAULT TSTRANSCO
TSTRANSCOTrippedat both ends Tripped on 3
Phase B-Phase to ground fault and Zone-2
indications at Dichpally end
25 400220 kV ICT-1 AT DICHPALLY 05-06-2017191500 06-06-2017003200 BUCHHOLZ RELAY OPERATED TSTRANSCO
TSTRANSCO 400kv 315MVA ICT-1 at Dichpally
tripped on OSR indications which was a mal
operation of the relay At the same time there was
3 Phase fault in 400kV Dichpally to Nizamabad line
At Nizamabad end(PGCIL) Line Isolator 3 phases
shorted in GIS Module
26400 kV RAMAGUNDAM -
DICHCHIPPALLI05-06-2017191500 05-06-2017223700 3 PHASE FAULT NTPC TSTRANSCO
TSTRANSCO Line did not trip at Dichpally end At
the same time there was 3 Phase fault in 400kV
Dichpally to Nizamabad line for which the line
tripped at Both ends Relay settings need to be
reviewed at NTPC Ramagundam end
NTPC-Ramagundam
27 400 Kv BTPS - YTPS 05-06-2017194800 05-06-2017204400 DISTANCE PROTECTION KPCL To-be-discussed
Annexure-IV
Page 3 of 6
28 400 Kv SATTENAPALLI - SRISAILAM 2 05-06-2017125500 05-06-2017144700 R-n fault APTRANSCO TSGENCO
APTRANSCO
For a momentary fault feeder tripped on R-Ph Z1
indications and AR successful at Sattenapalli end
TSGENCO
Feeder tripped on R-phase to ground Zone-2 at
Srisailam end Due to Feeder consistsing of Under
Ground cable AR was disabled at Srisailam end
29 400220 kV ICT-2 AT KOLAR 06-06-2017191000 06-06-2017223700 DUE TO HEAVY WIND PGCIL (SR-II)
PGCIL (SR-II)
Flashover between 220kV jumper dropper of B
phase and Gantry towards 220kV bus due to heavy
swing of conductor during the unprecedented
heavy winds
30 400 kV KOLAR - HOODY 2 06-06-2017200800 DUE TO HEAVY WIND PGCIL (SR-II) KPTCL
PGCIL (SR-2)
Hand Tripped due to Isolator problem at Hoody
End
KPTCL
31 400220 kV ICT-2 AT GUTTUR 13-06-2017133000 13-06-2017134500TRIPPED ON EF RELAY
OPERATIONKPTCL To-be-discussed
32400 kV PUGALUR -
KALAIVANTHAPATTU14-06-2017123700 14-06-2017184500 TRIPPED ON Y-N FAULT PGCIL(SR-II) To-be-discussed
33 220 kV KANIAMPET - KADAKOLA 22-06-2017111700 22-06-2017113400EARTH FAULT RELAY
OPERATEDKSEB KPTCL To-be-discussed
34 220 kV KANIAMPET - KADAKOLA 22-06-2017121500 22-06-2017172000EARTH FAULT RELAY
OPERATEDKSEB KPTCL To-be-discussed
35 400 kV KHAMMAM - KALPAKKA 2 03-07-2017092400 03-07-2017104700
DT RECIEVED AT KLPA END
(TRIPPED ONLY AT KLPA
END)
PGCIL (SR-I) APTRANSCO
TSTRANSCO
PGCIL (SR-I)
PLCC belongs to APTRANSCO TSTRANSCO Mal-
operation of PLCC at Kalpaka end Requested
APTRANSCO TSTRANSCO for end to end
testingtunning of PLCC
APTRANSSCO TSTRANSCO
36 400220 kV ICT-1 AT URAVAKONDA 04-07-2017020100 04-07-2017022400MASTER TRIP RELAY
OPERATEDAPTRANSCO To-be-discussed
37 400 kV KAIGA - NARENDRA 2 07-07-2017075000 07-07-2017090800 TRIPPED ON R-Y Ph FAULT NPCIL KPTCL To-be-discussed
Annexure-IV
Page 4 of 6
38 HVDC BHADRAVATHI POLE 1 07-07-2017105900 07-07-2017115400TRIPPED ON NON VALID TAP
CODEPGCIL (SR-I) PGCIL (WR-I)
PGCIL(SR-I)
Tripped due to strucking of OLTC tap during
command execution The same was now working
39 400 kV KHAMMAM - KALPAKKA 2 07-07-2017120300 07-07-2017145000 DT Received PGCIL (SR-I) APTRANSCO
PGCIL(SR-I)
Tripped due to PLCC mal-operation PLCC belongs
to TSTRANSCO APTRANSCO Requested
TSTRANSCO APTRANSCO for end to end testing
tunning of PLCC Khammam end
APTRANSCO
40 400 KV GOOTY - TUMKUR - 1 08-07-2017142200 08-07-2017152600DISTANCE PROTECTION
OPERATEDPGCIL (SR-I) PGCIL (SR-II)
PGCIL(SR-I)
Tripped due to snapping of earth wire while
stringing of OPGW Advised concerned to take
additional precautions while carrying OPGW
stringing
PGCIL(SR-II)
41 400230 Kv ICT-1 AT SVCHATRAM 14-07-2017190300TRIPPED ON RESTRICTED
EARTH FAULTTANTRANSCO
TANTRANSCO
REF protection acted in ICT-1 during Auto Reclose
(AR) attempt of 400kV SVChatram-Alamathy
feeder-2 (through fault condition) As per the relay
manufacturer (GE-T60) guidelines for the one and
half breaker scheme the REF setting will be
revised
42 400 KV GOOTY - TUMKUR - 1 15-07-2017115100 15-07-2017122300Tripped while laying opgw
cablePGCIL (SR-I) PGCIL (SR-II)
PGCIL (SR-I)
Tripped due to snapping of earth wire while
stringing of OPGW Advised concerned to take
additional precautions while carrying OPGW
stringing
PGCIL(SR-II)
43 220 kV AMBEWADI - PONDA 1 16-07-2017113800 16-07-2017120800 DISTANCE PROTECTION KPTCL GED To-be-discussed
44 220 kV AMBEWADI - PONDA 2 20-07-2017013600 LINE FAULT KPTCL GED To-be-discussed
Annexure-IV
Page 5 of 6
45 400 Kv ALM - SVCTM-I 20-07-2017112700 20-07-2017120200 C-N FAULT TANTRANSCO To-be-discussed
46 400 Kv ALM - SVCTM-II 20-07-2017112700 20-07-2017120300 A-N FAULT TANTRANSCO To-be-discussed
47 400 Kv ALM - SVCTM-II 20-07-2017144300 20-07-2017193200TO ATTEND FAULT
LOCATIONTANTRANSCO To-be-discussed
48 HVDC BHADRAVATHI POLE 1 21-07-2017224800 21-07-2017235300 INTERNAL MINOR ALARM PGCIL (SR-I) PGCIL (WR-I) To-be-discussed
49 400 kV KHAMMAM - KALPAKKA 1 21-07-2017103000 21-07-2017204200AC SUPPLY TO BREAKER
PROBLEMPGCIL (SR-I) APTRANSCO To-be-discussed
50 220 kV CHITTOR - THIRUVALEM 22-07-2017080600 22-07-2017144100RELAY MALOPERATION AT
THIRUVALAMAPTRANSCO TANTRANSCO To-be-discussed
51 400 KV GOOTY - TUMKUR - 1 22-07-2017150700 22-07-2017154500TRIPPED DURING OPGW
WORKSPGCIL (SR-I) PGCIL (SR-II) To-be-discussed
52 400 Kv GAJWEL - BHOOPALAPALLY 2 22-07-2017131300 22-07-2017133600 B PHASE FAULT TSTRANSCO TSGENCO To-be-discussed
53 400 kV GUTTUR - HIRIYUR 2 22-07-2017150300 22-07-2017155300TRIPPED DUE TO RELAY MAL
OPERATIONKPTCL PGCIL (SR-II) To-be-discussed
54 400110 kV ICT 2 AT ALAMATHY 24-07-2017091300 24-07-2017162700TRIPPED ON RESTRICTED
EARTH FAULTTANTRANSCO To-be-discussed
Annexure-IV
Page 6 of 6
G1
220kV LINE-1
ICT 220400 KV
G2
GT1 GT2
400kV LINE-1
400kV LINE-2
600MW 600MW
220kV LINE-2
400kV220kVSummary of Various Special Protection Schemes for 2 x 600 MW UPCL TPP
Adani Power Limited Ahmedabad
Adani Power Ltd Ahmedabad 1
Annexure-V
Page 1 of 12
G1
ST-2
220 kV LINE-1
ICT 220400 KV
G2
GT-1 GT-2
400kV LINE-1
400kV LINE-2
600 MW 600 MW
ST-1
220 kV LINE-2
UPCL UDUPI - NETWORK UNDER CONSIDERATION
400 kV220 kV
Adani Power Ltd Ahmedabad 2
315 MVAICT-1
315 MVAICT-2
220 kV ndash KEMMAR BUS 400 kV ndash HASSAN BUS
Annexure-V
Page 2 of 12
Adani Power Ltd Ahmedabad 3
Existing SPS
Benefits of New Proposals
If both the 400kV Lines out of serviceTripped amp Total Generation is gt 650 MW then Trip Unit-2
Existing SPS logic has been developed in Unit-2 DCS
1 Consideration of all possible contingency cases
2 Unit Backdown (AUTOMATIC) has been proposed in certain contingencies
where Unit tripping is not required After restoration of tripped outlets
Unit may ramp up to full generation
3 Comprehensive logic will be developed in Numerical Relays with adequate
security and reliable detection to avoid mal operation of sps logic
4 Monitoring of SPS logic with necessary alarms and events
Annexure-V
Page 3 of 12
Sr UPCL‐Udupi‐SUMMARY OF SPS TO HANDLE ALL POSSIBLE CONTINGENCIES Sh‐1 of 2
Contingency Cases Action Unit SelectionFor Tripping
1 Power Swing Detected in Impedance reach of Zone‐1 in 400 kV Line
Tripping of One selected unit if both Units ON Each Unit Power gt 400 MW
Unit‐2
2Tripping of one 400 kV Line while another 400 kV Line is already in OFF condition
Tripping of One selected unit if both Units ON Each Unit Power gt 400MW
Unit‐2
3 TrippingOffloading of Both 400 kV Line simultaneously (within 3 sec)
Tripping of One selected Unit if both Unit ON Each Unit Power gt 325 MW Unit‐2
4 TrippingOffloading of all four Transmission Lines Tripping of both Units Both Units
4
5
400kVlin
e Overlo
ad Stage PickupSet Point
TimeDelay Action
Stage 1 900 MW 3 Sec Alarm
Stage 2 1100 MW 2 Sec Automatic Backdown upto 450 MW in both Units
Annexure-V
Page 4 of 12
Sr UPCL‐Udupi‐SUMMARY OF SPS TO HANDLE ALL POSSIBLE CONTINGENCIES Sh‐2 of 2
Contingency Cases
Action
6 ICT
Overlo
ading from
400 kV
Line Stage Pickup
Set PointTimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units
7
220 kV
Line
Overlo
ad
Stage 1 250 MW 5 Sec Automatic Backdown upto 300 MW in both Units
5
Sr Consideration Requirements associated with SPS Implementation
1 400 kV LINE Tripping in Zone‐1 will be blocked under Power Swing DetectionOperation
2 Pole Slip Protection of Generator need to be co‐ordinated with 400 kV Line Power Swing Protection
3 Line Overload Detection will be blocked by Power Swing DetectionOperation
4 Line ZeroUnder Power Detection will be blocked by Power Swing DetectionOperation
Annexure-V
Page 5 of 12
G1
ST-2
220 kV LINE-1
ICT 220400 KV
G2
GT-1 GT-2
400kV LINE-1
400kV LINE-2
600 MW 600 MW
ST-1
220 kV LINE-2
UPCL UDUPI - NETWORK UNDER CONSIDERATION
400 kV220 kV
Adani Power Ltd Ahmedabad 6
315 MVAICT-1
315 MVAICT-2
220 kV ndash KEMMAR BUS 400 kV ndash HASSAN BUS
Annexure-V
Page 6 of 12
Contingency 1 Tripping of one 400kV line
It may lead tohellip1 Overloading of another 400 kV Line
2 Power Swing in another 400 kV Line (specially when 220 kV
Lines are not available)
3 Severe oscillations in running Units
4 Units may loose synchronism and disconnect from network
G1 G2
L1 L2L1L2
Following SPS has suggested to address this contingency
Adani Power Ltd Ahmedabad 7
400kV200kV
Contingency Cases
Action
Unit Selection
ForTripping
1
400kVline Overlo
ad
Stage PickupSet Point
TimeDelay
Stage 1 900 MW 3 Sec Alarm ‐‐‐‐‐‐‐
Stage 2 1100 MW 2 Sec Automatic Backdown upto 450 MW in both Units ‐‐‐‐‐‐‐
2 Power Swing Detected in Impedance reach of Zone‐1 in 400 kV Line
Tripping of One selected unit if both Units ON Each Unit Power gt 400 MW Unit‐2
Annexure-V
Page 7 of 12
Contingency 2 Tripping of one 400kV line while other already Tripped
It may lead tohellip
1 Oscillations in running Units
2 Units may loose synchronism and disconnect from
network
3 Overloading of ICTs and subsequent tripping
4 Overloading of 200 kV Lines and subsequent tripping
5 Station blackout
Adani Power Ltd Ahmedabad 8
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases Action Unit SelectionFor Tripping
1Tripping of one 400 kV Line while another 400 kV Line is already in OFF condition
Tripping of One selected Unit if both Unit ON Each Unit Power gt 400 MW Unit‐2
2
ICT Overlo
ading
from
400
kV Side
Stage PickupSetting
TimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units
Annexure-V
Page 8 of 12
Contingency 3 Tripping of both 400kV line simultaneously
It may lead tohellip
1 Severe oscillations in running Units
2 Units may loose synchronism and disconnect from
network
3 Overloading of ICTs and subsequent tripping
4 Overloading of 200 kV Lines and subsequent tripping
5 Station blackout
Adani Power Ltd Ahmedabad 9
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases Action Unit SelectionFor Tripping
1 TrippingOffloading of Both 400 kV Line simultaneously (within 3 sec)
Tripping of One selected Unit if both Unit ON Each Unit Power gt 325 MW Unit‐2
2
ICT Overlo
ading
from
400
kV Side
Stage PickupSetting
TimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units ‐‐‐‐‐‐‐
Annexure-V
Page 9 of 12
Contingency 4 Overloading of any 220 kV line
This contingency may arise due tohellip1 Tripping of both 400 kV Lines and associated SPS logic fails
to operate (Tripping of any One Unit if both Units running)
2 Overloading of ICTs from 400 kV Side and associated SPS
logic fails to operate
3 Tripping of any one 220 kV lines if both 220 kV lines are in
service and 400 kV outlets are not available
Adani Power Ltd Ahmedabad 10
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases
Action
Unit Selection
ForTripping
1
220kV
line
Overlo
ad StagePickupSet Point
TimeDelay
Stage 1 250 MW 5 Sec Automatic Backdown upto 300 MW in both Units ‐‐‐‐‐‐‐
If any SPS does not function Then 200 kV Line will trip by Operation of Line Over Current Function
Annexure-V
Page 10 of 12
Contingency 5 Tripping of all Lines emanating from UPCL (ZERO POWER)
It may lead to1 Over voltage conditions at UPCL Bus
2 Over speed of all the generators because of sudden
load throw
Following SPS has suggested to address these contingencies
1 Zero Power Scheme on 400 kV System and 220 kV System checking the power
flow through 400kV and 200 kV lines and trip all the units in service if there is a
under power condition on all four lines and running units
Adani Power Ltd Ahmedabad 11
G1 G2
L1 L2L1
400kV200kV
L2
Sr Contingency Cases Action Unit SelectionFor Tripping
1 TrippingOffloading of all four Transmission Lines Tripping of both Units Both Units
Annexure-V
Page 11 of 12
G1
220kV LINE-1
ICT 220400 KV
G2
GT1 GT2
400kV LINE-1
400kV LINE-2
600MW 600MW
220kV LINE-2
400kV220kV
THANKShellip
Adani Power Ltd Ahmedabad 12
Annexure-V
Page 12 of 12
65th Protection Coordination Sub-Committee
29-06-2017
Annexure-VI
Page 1 of 40
Complete outage of 230KV Villianur substation of Pondycherry at 1235 hrs on 19-05-2017
bull Triggering incident Failure of CT in 110kV Villianur-Kurumbapet at Villianur substation
bull 230110kV ICT-1amp2 at Villianur substation tripped on operation of backup Over current protection
bull 230KV Neyveli-Villianur and Pondy-Villianur Line got tripped from NLC amp Pondy ends on operation of DEF and Zone-3 respectively
bull Delayed clearance of fault observed from PMU plot ndash 560ms
bull Load loss 140 MW
DEF
ZONE-3
NLC TS-2 BAHUR TrsquoMARTHAN
PONDY
VILLIANUR
Annexure-VI
Page 2 of 40
Fault cleared in 560ms
Annexure-VI
Page 3 of 40
Complete outage of 400kV Uruvakonda and Jamalamadugu Stations at 1744 hrs on 31-05-2017
bull Triggering incident Tripping of 400kV Kurnool-Narnoor line-1 amp 2 and 400kV Kurnool-Jamalamadugu line-2
bull Loss of supply loss to 400kV Uruvakonda and Jamalamadugu
bull Lines out of service 400kV Gooty-Narnoor 400kV Narnoor-Jamalamadugu-1 400kV Srisailam-Narnoor 400kV Uruvakonda-Mahboobnagar-1amp2
Srisailam Narnoor
Kurnool
Ghani
Jrsquomadugu UVrsquokonda
Mbrsquongr
Gooty
Ghanapur
Igt4
Igt4 Z3
Z3
OV DT RCV
Annexure-VI
Page 4 of 40
Annexure-VI
Page 5 of 40
Kurnool Narnoor
DR trigger ndash 174418501 hrs
Ib=5kA
Zone-3 trip EL Stub optd
DR trigger ndash 173620637 hrs
Igt4 trip
3 phase Grp AB optd
Kurnool Narnoor
DR trigger ndash 174418503 hrs
Ib=5kA
Zone-3 trip EL Stub optd
DR trigger ndash 174306388 hrs
Igt4 trip
3 phase Grp AB optd
Kurnool Jamalamadugu
DR trigger ndash 174423979 hrs Vgt1 Trip
DR trigger ndash 174415040 hrs Z3 T1 DT Rcv not observed in DR amp EL
400kV Kurnool-Narnoor line-1
400kV Kurnool-Narnoor line-2
400kV Kurnool-Jamalamadugu line-2
Annexure-VI
Page 6 of 40
bull Points for discussion ndash Location of fault
ndash Zone-3 amp Igt4 trip of 400kV Kurnool-Narnoor line-1amp2
Annexure-VI
Page 7 of 40
Tripping of 220kV Idukki ndashUdumalpet line at 1702 hrs on 05-05-2017
bull B-N and R-N fault in line
bull Delayed clearance observed during 2nd fault
Idukki Udumalpet
DR trigger ndash 170200499 hrs ZONE 1 B-E 366Km
DR trigger ndash 165741849 hrs ZONE 1 B-E amp Zone-2 R-E
Idukki
Udumalpet Lower periyar
New Pallom Kalamassery
Annexure-VI
Page 8 of 40
Annexure-VI
Page 9 of 40
B-N FAULT
R-N FAULT
ZONE-2
Ar attempt
Udumalpet end DR Annexure-VI
Page 10 of 40
bull Points for discussion ndash Reason for 3 phase trip at idukki end
ndash Relay to give a 3 phase trip in the event of 2nd fault during dead time
Annexure-VI
Page 11 of 40
Tripping of 400kV Kudgi(PG)-Tumkur line-2 and Kudgi(PG)- Kudgi(NTPC) line-1 at 1605 hrs on 06-05-2017
bull 400kV Kudgi(PG)-Kudgi(NTPC) ndash line tripped at Kudgi PG end on R-N zone-1
bull 400kV Kudgi(PG)-Tumkur line tripped from both ends
Kudgi(NTPC)
Tumkur
Kudgi(PG) Narendra
Kohapur
Guttur
Kaiga
Annexure-VI
Page 12 of 40
Kudgi (PG) Kudgi(NTPC)
DR trigger 160547438 hrs Zone-1 optd R-N Ar lockout Ov pick up
FIR DR amp EL not furnished
Kudgi (PG) Tumkur
DR trigger 160546957 hrs NGR buchholz trip Dip in R-phase voltage
DR trigger 160512593 hrs DT Rcv Grp AB optd
400kV Kudgi(PG)-Kudgi(NTPC) line-1
400kV Kudgi(PG)-Tumkur line-2
Annexure-VI
Page 13 of 40
Annexure-VI
Page 14 of 40
Annexure-VI
Page 15 of 40
Annexure-VI
Page 16 of 40
Tripping of 220kV Edamon-Tirunelveli-1amp2 at 1809 hrs on 06-05-2017
bull 220kV Edamon-Tirunelveli-1amp2 tripped from Tirunelveli end only and was in service from Edamon end ZONE-1 R-B-E fault
bull Distance protection at Tirunelveli over-reached and tripped for fault in 220kV Edamom-Pothencode lines
Edamon
Sabarigiri
Tirunelveli Pothencode
Kundara
Edappon
Annexure-VI
Page 17 of 40
Annexure-VI
Page 18 of 40
Tripping of 400220 kV Ghani ICT-2amp3 at 1405 hrs on 07-05-2017
bull ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
bull Delayed clearance observed from PMU data
bull DR amp EL not furnished
Srisailam Narnoor
Kurnool
Ghani
Jrsquomadugu UVrsquokonda
Mbrsquongr
Gooty
Ghanapur
Annexure-VI
Page 19 of 40
Annexure-VI
Page 20 of 40
Tripping of 400kV Ghanapur-Mamidapalli line at 1915 hrs on 08-05-2017
bull Line tripped at Ghanapur end only and was holding from Mamidapalli
Ghanapur Mamidapalli
DR trigger ndash 191329917 hrs Z3 Main-2 opts Event logger Main-2 PSB optd ndash 191541751hrs
DR trigger ndash 191458457hrs R-N Start Breakers did not trip
Ghani
Malkaram
Ramagundam
Chpr
Mamidapalli
Nrsquosagar
Gajwel Ghanapur Khammam
Dindi
Annexure-VI
Page 21 of 40
Annexure-VI
Page 22 of 40
Tripping of 400220kV ICT-1 at Guttur at 2215 hrs on 09-05-2017
bull ICT-1 tripped on HV side only without any relay indications
bull No fault observed from PMU data
Annexure-VI
Page 23 of 40
Tripping of 400kV Narsapur-Shankarapalli at 0007 hrs on 10-05-2017
bull line tripped at Narsapur end only and holding from Shankarapalli
Narsapur Shankarapalli
DR trigger ndash 000720147hrs Zp T1 Igt3 Start Event logger 75A relay optd ndash 000720098 hrs
CB did not trip
Singareni
Shankarapalli Gajwel
Narsapur
Suryapet
Brsquoply
Rrsquogm
Annexure-VI
Page 24 of 40
Tripping of 400220kV Hyderabad ICT-4 and 220kV lines at Hyderabad substation at 239 hrs on 10-05-2017
bull Triggering incident Bus fault in 220 kV Ghanapur station
bull Observation from PMU data ndash dip observed in Y amp B phase fault cleared in 120ms
bull Elements tripped 220kV lines amp 400220 kV ICT-4
bull FIR not submitted by TSTRANSCO
Annexure-VI
Page 25 of 40
Tripping of 400220kV ICT-1 at BTPS 13-05-2017 at 1941 hrs
bull ICT-1 got tripped on operation of LV side earth fault protection during R-phase to earth fault in 220kV BTPS-Lingapur line
bull Lingapur line DR amp EL were furnished
BTPS Alipura Regulapadu
Lingapur
Annexure-VI
Page 26 of 40
Tripping of 765 kV Kurnool-Thiruvelam line-2 at 2003 hrs on 19-05-2017
bull Triggering incident Failure of R-phase LA at Thiruvelam end
Kurnool Thiruvelam
DR trigger time ndash 200318272 hrs
Main-1 trip Carrier aided trip
3 ph Grp-AB optd DT RCV
Ir ndash 3kA
Dip in Y-phase current observed
Event logger
REF optd - 200318340 hrs
DT send - 200318343 hrs
DR trigger time ndash 200318269 hrs
Zone-1 trip
Initially 1 ph trip and later 3 ph trip due to DT rcv
Event logger
DT rcv - 200318395 hrs
Raichur Kurnool NPS
Tiruvelam
Solapur
Annexure-VI
Page 27 of 40
Annexure-VI
Page 28 of 40
Tripping of 400220kV ICT-2 at Kalpakka at 1502 hrs on 20-05-2017
bull ICT-2 tripped due to operation of transformer buchholz relay
bull Reason for operation of Buchholz relay may be furnished to PCSC
Annexure-VI
Page 29 of 40
Tripping of 400220kV ICT-2 at KV Kota at 1021 hrs on 23-05-2017
bull ICT-2 got tripped due to mal-operation of transformer oil temperature indicator
bull Remedial actions taken may be furnished to PCSC
Annexure-VI
Page 30 of 40
Tripping of 220kV Kaniambeta-Kadakola line at 1350 hrs on 23-05-2017
bull Line tripped at Kaniambeta end
bull Kaniambeta feeder protection is provided through 220kV bus coupler breaker bay
bull EFR relay operated and B ph pole discrepancy relay operated leading to tripping of Bus coupler CB
bull Loss of infeed to Kaniambeta Ss
Annexure-VI
Page 31 of 40
Tripping of 400220kV ICT-1 at Somanahalli substation at 1724 hrs on 24-05-2017
bull ICT-1 at Somanahalli substation got tripped due to DC Earth fault
bull Findings amp Remedial actions taken may be furnished to PCSC
Annexure-VI
Page 32 of 40
Tripping of HVDC Gazuwaka Pole-1amp2 25-05-2017 at 0945 hrs
bull HVDC pole-1 got tripped due to operation of South filter inter zone protection and
bull HVDC pole-2 got tripped due to operation of differential protection
bull Findings amp remedial actions taken may be furnished to PCSC
Annexure-VI
Page 33 of 40
Tripping of 400kV Kayathar-Karaikudi line 25-05-2017 at 1552 hrs
bull Triggering Incident R-phase to earth fault
Kayathar Karaikudi
DR trigger time ndash 155236585 hrs
Zone-2 3 phase trip
Carrier unhealthy
DR trigger time ndash 155236592 hrs
zone-1 3 phase trip
Kayathar Kamudi Karaikudi
Pugalur
Trichy
Madurai
Annexure-VI
Page 34 of 40
Annexure-VI
Page 35 of 40
Tripping of 400220kV ICT-1amp3 at Hoody substation of KPTCL at 1230 hrs on 26-06-2017
bull ICT-1 tripped due to arc over of pre-close supervision contact of tip coil -2
bull ICT-3 got tripped on over-loading
Annexure-VI
Page 36 of 40
Annexure-VI
Page 37 of 40
Tripping of 400kV Simhadiri-Kalpakka line-2 at 503 hrs on 28-05-2017
bull Line tripped on mal-operation Teed Differential Protection at Simhadiri end and direct trip was received at Kalpakka
bull Y-Phase to earth fault had occurred in 400 kV Vijayawada-Vemagiri line-3
bull Findings amp remedial actions taken may be furnished to PCSC
Annexure-VI
Page 38 of 40
Tripping of 400kV Ramagundam-Gajwel at 0007 hrs on 29-05-2017
bull Over voltage stage-1 had operated at Gajwel end
bull Ramagundam end did not trip as direct trip was received from Gajwel
bull DR amp EL of Gajwel end not furnished
Annexure-VI
Page 39 of 40
Tripping of 400kV Gajwel-Ghanapur line at 0007 hrs on 29-05-2017
bull Line tripped on operation of over voltage protection at Gajwel and direct trip was received at Ghanapur
bull DR and EL of Gajwel end were not furnished
Annexure-VI
Page 40 of 40
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 2
3 Details of Grid Disturbances (GDrsquos) Grid Incidents (GIrsquos) and Line Trippings due to Auto-
Reclose (AR) failure non-operation amp PLCC mal-operation
The trippings due to GDrsquos GIrsquos AR failure non-operation and PLCC mal-operation that had occurred
during May 2017 were discussed in the Meeting The deliberations and recommendations of the PCSC Forum are enclosed at AnnexurendashII for further needful action The details of the tripping events including relevant PMU plots presented by SRLDC in the meeting are also enclosed at AnnexurendashVI for kind reference
4 Status of pending PCSC Recommendations (P-REC)
The status of implementation of pending PCSC recommendations was discussed in the meeting The
Constituents were asked to take steps to comply with the same and requested to submit the status of their compliance latest by 10082017 The updated status of the same as on 25072017 is enclosed at AnnexurendashIII
5 Remedial measures Action taken for the tripping incidents of the transmission elements
under forced outage (PRM)
The tripping incidents of the transmission elements under forced outage for which the remedial action
taken had not been furnished were discussed in the meeting The Constituents were asked to kindly furnish specific remedial measures action taken covering one or the other items from the following indicative list in time so as to forward the same to Central Electricity Authority
Brief details of line patrolling carried out (with tower location)
Brief details of RoW maintenance (by proper Tree-cutting) resorted to
De-capped insulators replacement
DC earth fault removal
PLCC cards replacement
Relay settings modification
Steps taken to put AR or CB into service after they have been locked-out
Faulty equipment replacement
Reference to OEM in case of equipment failure
Brief Details of tests carried out to ascertain the healthiness of various equipment (Power Transformer Reactors Surge Arrestors Circuit Breakers CTs PTsCVTs) like Insulation Resistance (IR) test Winding Resistance test Capacitance test Tan delta test DGA test Leakage current test CRM DCRM test etc
Any other appropriate remedial measure
The updated list of PRM as on 25072017 is enclosed at Annexure-IV
6 Certificate for Healthiness of Batteries
As per the MoP CEA direction given in pursuant to recommendations of the Enquiry Committee (NEW Grid Disturbance on 30th amp 31st July 2012) RPCrsquos are required to obtain from their respective Constituents a monthly certificate for healthiness of batteries installed at 220 KV amp above voltage level Substations (for power supply to Relays RTUs and PLCC equipment) and furnish the same to CEA MoP
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 3
With reference to above the Constituents had been requested to submit the certificate on healthiness of batteries on monthly basis (ie status for a month shall be sent by the 7th day of the following month) to SRPC as per the format given below
Sl No
Station Application Battery Battery Charger Remarks
Station Name
Code Type
(PS SS)
Protection
Communication
Details Status (Healthy Unhealthy)
Details Status (Healthy Unhealthy)
1 Station-A Protection (Bank-1)
Protection (Bank-2)
Communication (Bank-1)
Communication (Bank-2)
2 Station-B hellip
hellip hellip hellip
Note 1 Code is the short name of the Station
2 PS ndash Power Station SS - Substation
The sought status for the months of May 2017 had not been received from the following SR-Constituents
TANTRANSCO NTPL amp NTECL
7 Implementation of Line Differential Protection (LDP) in Nellore and Simhadri complexes
The issue had been discussed in the 64th meeting of PCSC held on 25052017 when it was agreed that the concerned Constituents would take steps to implement LDP in both Nellore and Simhadri Complexes by December 2017
Subsequently MEPL (vide their mail dated 14062017) and SEL (vide their mail dated 27062017) informed that in view of their present financial condition they may kindly be exempted for the time being from implementing LDP on the lines belonging to them in Nellore Complex However they assured that suitable action would be taken to implement the same once their situation improves
In this regard it was clarified that PGCIL (SR-I) can go ahead procuring LDP relays without considering MEPL and SEL requirement Accordingly the following Constituents were asked to take appropriate steps to put LDP in place by December 2017
Nellore Complex Constituents responsible for LDP implementation
Timeline for LDP implementation
Line Differential Protection (LDP) to be implemented on all 400 kV lines (lt 50 km)
PGCIL (SR-I) APGENCO APTRANSCO TPCIL SGPL
December 2017
MEPL and SEL As and when their financial healthiness improves
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 4
Simhadri Complex Constituents responsible for LDP implementation
Timeline for LDP implementation
Line Differential Protection would be implemented in Simhadri Complex on all 400 kV lines inter-connecting Gajuwaka SS Kalpaka SS Simhadri STPP and Hinduja TPS
PGCIL (SR-I) NTPC APTRANSCO and HNPCL
December 2017
8 Installation of PMU by POWERGRID at 400kV NP Kunta
In PCSC-64 meeting held on 25052017 the following was noted
SRLDC stated that NP Kunta is a critical station where in addition to injection of large quantum of solar power reactive power control is also being exercised by way of the recently commissioned STATCOM Thus to better monitor the LVRT effects of Solar power station and functioning of STATCOM installed at NPKunta station it is necessary to have a PMU installed there To this PGCIL (SR-I) informed that provision for PMU at NP Kunta had not been envisaged in Part-I of URTDSM Further as per the decision taken in the 3rd Communication meeting held at SRPC Bengaluru the quantity of Phase-I of URTDSM project was freezed On this SRLDC mentioned that PGCIL need not procure an additional PMU for the purpose instead they can divert the PMU identified for Vijayawada to NP Kunta The issue was further discussed and in view of the stated significance of NP Kunta PGCIL (SR-I) was asked to divert PMU identified for Vijayawada to NP Kunta as part of Phase-I of URTDSM project
However in view of the difficulty expressed by PGCIL (SR-I) in shifting the (already commissioned) PMU and its associated cabling and communication modules from Vijayawada to NP Kunta the issue was again discussed by PCSC forum in the meeting During the meeting the necessity of having PMU at NP Kunta was once again emphasised It was also noted that a PMU had been identified for installation at GMR-Vemagiri as part of URTDSM project in Phase-I However as APTRANSCO and GMR had not agreed for the same the same was not yet carried out In view of above PCSC forum decided that PGCIL (SR-I) take steps to shift the PMU and associated cabling and communication interface modules identified for commissioning at GMR-Vemagiri to NP Kunta and install the same at the earliest
9 Revision of Special Protection Scheme (SPS) implemented at UPCLrsquos plant at Udupi
UPCL vide their mail dated 22052017 requested to review the SPS implemented at their plant in view of the changed grid conditions and furnished a proposal for consideration by SRPC SRLDC
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 5
In this regard the existing SPS and the proposed SPS by UPCL were discussed Existing SPS Both 400 kV lines unavailable amp Generation gt 650 Trip Unit-2 Both 400 kV line and one of the two 220 kV lines unavailable
amp Generation gt 300 MW Trip Both Units Proposed SPS Under this the following five contingencies have been considered 1 Tripping of one 400 kV line 2 Tripping of one 400 kV line with the other already tripped 3 Tripping of both 400 kV lies simultaneously 4 Overloading of any 220 kV line 5 Tripping of all Lines emanating from UPCL (Zero Power condition) The details of the proposed SPS by UPCL are enclosed at Annexure-V With regard to above it was noted that even though the proposed SPS may effectively take care of the oscillations power swings that may occur at UPCL during above stated contingencies the following concerns need to be properly addressed from the grid perspective Since the line breaker is not allowed to be tripped in the event of occurrence of power swing
(even when it enters Zone-1) and a definite possibility exists for it to be transmitted to the other adjacent connected stations it needs to be shown by conducting proper system studies that tripping of UPCL running Unit (s) by virtue of operation of corresponding SPS would act negatively on the sustenance of the power swing
It was felt that the Contingencies at 2 amp 3 can be combined since they essentially result in the same Further the reference power value assumed for comparing with actual generation to effect tripping of Unit-2 under Contingency-2 may be appropriately revised to 325 MW to avoid overloading of Varahi ndash Shimoga lines (in the extreme case of full generation at Varahi GS)
Study results for all Contingencies considered shall be shared Given the complexity of the proposed SPS issues pertaining to non-reliability of its operation may
also be suitably factored into Accordingly UPCL was requested to review the proposed SPS addressing above concerns and furnish the thus modified scheme to PCSC forum along with supporting study results
10 Auto-Reclosure Implementation on all 220 kV amp above Transmission Lines of
Southern Region
It was noted that APGENCO (Hydro) amp APGENCO (RTTP) are yet to furnish their action plan for implementing AR in their respective networks Similarly though TSGENCO (Thermal) amp TSGENCO (Hydro) had stated that they were coordinating with TSTRANSCO to obtain revised settings they are also yet to furnish Action Plan Time-frame for implementing AR It was also noted that in the Action Plan furnished by APTRANSCO feeder details were not mentioned Similarly in the Action Plan furnished by TSTRANSCO time-frame for implementing AR was not mentioned Action Plan for implementing AR is also yet to be furnished by NTPC-Ramagundam (for Tie-CBrsquos of 400 kV lines)
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 6
It was further noted that even though KPTCL had furnished the details of 220 kV amp 400 kV lines where AR is already in place the details of 220 kV lines where AR is not presently in service along with Action Plan for implementing same are yet to be furnished
All above Constituents were asked to kindly furnish required details by 08082017
Since the main issues in implementing AR are the adopted conservative protection philosophies lack of proper PLCC communication and breakersrsquo suitability supportability it is intimated in view of above that if there are no issues wrt carrier communication and breakersrsquo supportability concerned Constituents shall make efforts to implement AR immediately in their respective networks Where communication amp breaker related issues stand in the way of implementing AR concerned Constituents shall take steps to address them appropriately on priority basis and implement AR in their respective networks in a phased manner at the earliest
In the previously held PCSC meetings the following logics have been clarified for implementing AR
Normally high speed single-ph single-shot AR scheme (with simultaneous opening at both ends of feeder with a dead-time of 1 sec and reclaim-time of 25 sec) may be used by all Utilities (including Generators)
However those generators (Coal Gas Nuclear Hydro) who have concerns wrt closing on to un-cleared fault can make use of the following time-differentiated single-ph single-shot AR scheme
ldquoIn this after a line has been opened from both ends (generator end amp grid end) on AR operation the grid end will be auto-reclosed as usual after the elapse of its dead-time (say 1 sec) However the generator end relay will check for the line voltage after elapse of an extended dead time say 15 sec [here the additional time delay of 05 sec which has been included as a safety margin shall be so chosen that the extended dead-time is less than the adopted Pole Discrepancy time delay] If the line voltage so sensed is healthy amp normal (which implies that the fault has already been cleared) then generator end will be auto-reclosed else 3-ph trip will be given at generator end to open the other two phase polesrdquo Further wherever Trip-on-Reclose (ToR) feature is available at grid-end station it shall be configured such that it sends Direct Trip (DT) command to generator end upon its operation
It is also clarified that the above scheme can be as it is used to Line-CBrsquos of all bus configurations (including Main-CBrsquos of one-and-half breaker bus configuration) For Tie-CBrsquos in one-and-half breaker configuration employing priority scheme (which also happens to be the recommended practice) above logic is not be required since the employed priority scheme anyway checks for CLOSE_STATUS of Main-CB before closing Tie-CB However if required the above logic can be applied to Tie-CBrsquos also by adopting a suitable extended dead-time considering the remote end stationrsquos AR dead time
It is further clarified that AR functionality for a transmission line shall be preferably put into service using (i) Bay Control Unit (BCU) or (ii) separate External AR Relay Where these are not available only then should the AR functionality of Main protection relays of lines be used
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 7
Here it is assumed that both Main-relays are deriving their Voltage Input from the Line CVTrsquos (from different cores as per the recommended practice) However if this is not the case and the concerned Utility has a practice of using Line-CVT voltage input to one of the Main relays and Bus-CVT voltage input to the other Main relay it is recommended that voltage input to be used in time-differentiated AR logic shall be exclusively derived from the line-CVT for use in both the Main relays
It is also clarified that AR implementation is not required in case of radial feeders cables amp composite feeders and is optional for the lines interconnecting two generating stations
In addition to above the following logics (applicable to the Cases where AR is being proposed to be implemented from Main Protection Relays) are also intimated for the benefit of the Constituents
Since there are two Main protection relays (Main-I and Main- II) to decide upon proper way of implementing AR for achieving fool-proof AR operation it has been advised that instead of implementing AR from only one of the Main relays (in light of its low success rate) the following Alternatives be considered Alternative ndash 1 AR is implemented and kept functional from Main ndash I [Main-II] only but with feedback from Main-II [Main-I]
In this scheme AR is implemented and kept in service from Main-I [Main-II] as usual
Additionally Main-II [Main-I] relay is configured for single-pole (1-ph) tripping and the OPEN (TRIP) status of the concerned trip relay is used for triggering AR functionality in Main-I [Main-II] By this even if the fault is not sensed in the beginning by Main-I [Main-II] but sensed by Main-II [Main-I] AR operation is guaranteed However it may be noted that in cases of permanent faults this scheme may result in unsuccessful AR operation with Pole Discrepancy Relay coming to rescue if the fault is not sensed by Main-I [Main-II] but by Main-II [Main-I] at the time of auto-reclosing instant
Alternative ndash 2 AR is implemented and kept functional from both Main ndash I and Main-II
In this scheme AR is implemented and kept in service from both Main ndash I and Main-II as
usual As can be seen the scheme is reliable and is without any additional logics However to avoid the possibility of both relays racing for CLOSE-OPEN-CLOSE-OPEN operation in case of permanent faults it shall be ensured that along with other conditions ldquoAR BLOCK with 3-ph TRIPrdquo is also effected for the same phase fault as the original one that occurs during AR dead-time
Out of the above two also it has been suggested to consider Alternative-2 for implementing AR in view of its higher success rate
11 Network Configuration Changes
As per the information furnished by SR-Constituents to the OCC forum in their 132nd meeting (held on
09062017 Minutes circulated on 04072017) it is formed that the following configuration changes (additions deletions modifications of transmission elements) took place in the southern grid during
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 8
April 2017
Two STATCOMs (+- 50 MVAR Each) at NP Kunta commissioned on 16052017
Kudgi Unit I 72 Hrs trail run completed Successfully
400 kV Shankarapally-Suryapet I amp II commissioned on 05052017
22033kV SS at Hayathnagar IampII in Ranga reddy district of 50 MVA Capacity was commissioned on 03052017 by TSTRANSCO
SR II Power grid vide letter dated 10062017 had informed that consequent to the successful completion of Trial Operation the following assets under transmission system associated with ldquoSystem strengthening ndashXX in Southern Regional Gridrdquo have been put under Commercial Operation wef 0000 hrs of 10062017 in terms of clause 4 of CERC (Terms and Conditions of Tariff Regulations 2014)
1 x 500 MVA 40022033kV ICT at Trichy Substation along with associated bays and equipments
SR I Power grid vide letter dated 04062017 had informed that consequent to the successful completion of Trial Operation the following assets of ldquoTransmission System for Ultra Mega Solar Park in Anantapur Dist Andhra Pradesh- Part ndash A (Phase-I)rdquo have been put under Commercial Operation wef 0000 hrs of 04062017 in terms of clause 4 of CERC (Terms and Conditions of Tariff Regulations 2014)
+- 100 MVAR STATCOM at NP Kunta Pooling Station along with associated bays and equipment
12 Instances of SPS Operation
Based on the information furnished by SRLDC it is informed that there occurred no SPS operations in SR during the period 25052017 ndash 28062017
13 Status of Implementation of Protection Audit Recommendations (Phase-I amp Phase-II)
With reference to the petitions filed by KSEB (88MP2016) and KPTCL (135MP2016) for seeking further time-extension for completing their respective Protection Audit Recommendations (PAR) the final Order of Honrsquoble CERC disposing of petitions was issued on 15122016 In this Order the Commission apart from granting last-chance time-extensions to various SR-Constituents had also directed SRPC to monitor the status of completion of PAR regularly in PCSC meetings and submit bi-monthly report to the Commission confirming the completion of Phase-I and Phase-II of PAR of the Constituents of Southern Region
In this regard based on the information furnished various Constituents a summary table showing the
compliance status of various SR-Constituents as in July 2017 is given below
SlNo
Constituent
PAR (Phase-I) Activities
PAR (Phase-II) Activities
PAR (Ph-I amp Ph-II) Compliance ()
Remarks
Stipulated Completion
Date
Stipulated Completion
Date
1 APGENCO (Hydel)
31122017 31122017 40 ---
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 9
2 APGENCO (Thermal)
30072017 --- 75 Based on the status furnished timeline for complying with the remaining pending recommendations (3 in no) is expected by 31122017
3 APTRANSCO 31032017 --- 9571 Out of the 3 remaining pending recommendations two are expected to be completed in three months while the other is expected by 31122017
4 TSGENCO (Hydel)
31032017 31032017 8823 Based on the status furnished timeline for complying with the remaining pending recommendations (4 in no) is expected by 31122017
5 TSGENCO (Thermal)
31032017 31032017 80 Based on the status furnished timeline for complying with the remaining pending recommendations (3 in no) is expected by 31072017
6 TSTRANSCO 31032017 31032017 8523 Based on the status furnished timeline for complying with the remaining pending recommendations (13 in no) is expected by 30092017
7 KPCL --- 31112016 100 ---
8 KPTCL 31052017 31052017 2817 Based on the status furnished timeline for complying with the remaining pending recommendations (51 in no) is expected by 30092017
9 TANGEDCO 31122017 31122017 6389 ---
10 TANTRANSCO 31122017 31122017 50 ---
11 KSEB 30112016 31122017 9481 ---
12 NPCIL (MAPS) 31012017 --- 8889 Based on the status furnished timeline for complying with the remaining pending recommendation (ONE in no) is expected by 31122017
All above SR-Constituents are requested to adhere strictly to the time-lines given in the Order for
completing their respective pending PAR The IPPrsquos for whom there are pending PAR [viz Spectrum PGL GMR Barge - Kakinada Konaseema GPL APGPCL Vijjeswaram (Stage-I amp Stage-II) amp LANCO-Kondapalli PL] are also requested to complete them at the earliest
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 10
14 Nomenclature for naming various files uploaded in web-based Tripping Monitoring
System of SRLDC Portal
The nomenclature to be followed by the Constituents in naming various files (FIR DR EL TR) corresponding to a tripping incident was brought out in the SRPC letter No SRPC SE-III PCSC-45 4609 ndash 649 dated 26062015 and in the minutes of PCSC-45 issued vide SRPC letter No SRPCSE-III PCSC-45 2015 5422-455 dated 21072015 As illustrated therein the format to be followed for the user entered part-name is given below
Transmission Element File Name to be given by the user
Transmission Line SSN_DSN_line_FT
Inter-connecting Transformer SSN_ICT_FT
Generating Transformer SSN_GT_FT
Generating Unit SSN_Unit_FT
Where SSN = Source Station Name From end Station Name Sending end Station Name DSN = Destination Station Name To end Station Name Receiving end Station Name FT = File Type (FIR DR EL TR)
All SR-Constituents are requested to kindly intimate the above file naming nomenclature to all the concerned and ensure that it is strictly followed at all the stations in their respective control areas so that tripping analysis can be done systematically
15 Date amp Venue of the next PCSC Meeting
It is informed that the 66th meeting of PCSC will be held on 17th August 2017 (Thursday) from 1030 hrs onwards in the Conference Hall of SRPC Secretariat Bengaluru
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 132
Analysis of Grid Occurrences - 65
I Details of Grid Disturbances
Sl No
Details of Event Date amp Time Reason Remarks Category
1
Complete outage of 230 kV Villianur Substation of Pondicherry
19-05-2017 at 1235 hrs
Triggering incident was failure of CT in 110 kV Villianur-Kurumbapet at Villianur substation 230KV Villianur ndash NLC2 and 230 kV Villianur - Pondy lines got tripped from Pondy end (on operation of DEF) and NLC end (on operation of Zone-3) respectively resulting in loss of supply to 230 kV Villianur substation
Load Loss 140 MW
GD-1
SLD
The single line diagram of 230 kV Villianur SS as furnished by PED is attached at the end 230 kV Villianur ndash Pondy line Villianur (PED) end
As per FIR TR line was kept holding
The following was also stated in FIRTR
Remedial action Relay testing amp calibration proposed during total shutdown on 13062017
DR amp EL not furnished Pondy (PGCIL-SR2) end
As per FIRDRELTR line tripped at 123559270 hrs on B-E fault due to DPR Z3 (98 km 156 kA) operation From DR amp EL Z3 time delay was observed to be about 06 sec
230 kV Villianur ndash NLC2 line Villianur (PED) end
As per FIR TR line was kept holding
The following was also stated in FIRTR
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 232
Remedial action Relay testing amp calibration proposed during total shutdown on 13062017
DR amp EL not furnished NLC2 (NLCIL) end
As per FIRDRELTR line tripped at 123551016 hrs on B-E fault due to DEFR operation From DR amp EL DEFR time of operation was observed to be about 07 sec
Time sync of Protection relays with GPS at NLC TPS-II needed to be ensured SRPC SRLDC
It was noted that the triggering incident was failure of B-ph CT in 110 kV Villianur-Kurumbapet line at Villianur SS
It was noted that for the above fault distance protection at Villianur end on 110 kV Villianur-Kurumbapet line had not operated probably due to absence of current input (hence impedance becoming infinite)
Further since there was no busbar protection to 110 kV buses the fault continued to be fed from the remote ends (Pondy-PG and NLC-2) through 100 MVA Transformers (Txr ndash 1 amp Txr ndash 2)
So the transformersrsquo back-up protections were called into action But since OC protections provided on both HV amp LV sides had no high-set Units and since they were kept non-directional [Relay make ER TJM 10] LV (110 kV) side OC protections of both transformers had acted to give trip command Even though the 110 kV CB of Txr ndash 1 got opened that of Txr-2 had not opened due to which the fault continued to be fed from the remote ends (Pondy-PG amp NLC-2)
It was noted that the HV (230 kV) side OC protection of Txr-2 which was supposed to act under above situation had NOT acted
Due to above the remote end back-up protections were called into action
It was noted that even though Pondy-PG end CB tripped on DPR Z3 protection the time delay observed was on the lower side of about 06 sec
It was also observed that DEF protection had acted to trip its CB at NLC-2 without giving any chance for its distance protection to operate
In view of the above observed inconsistencies at Villianur SS it was decided to review various feeder amp transformer protections kept at Villanur SS during its scheduled protection audit on 10072017
Subsequently protection audit of 230 110 kV Villianur SS of PED was conducted on 10072017 during which several lacunae were noted Accordingly a comprehensive set of recommendations were given to PED for early compliance
Recommendations
PED to furnish an action taken report wrt complying with the protection audit recommendations PGCIL (SR-II) to review Zone-3 and DEF protection setting at Pondicherry end 230 kV Pondicherry ndash
Villianur and 230 kV Pondicherry ndash Bahour line and set them appropriately to achieve required
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 332
time-coordination with OC protections of ICTrsquos at Villianur SS NLCIL to keep DEF protection in blocked condition as long as Distance Protection is active and
configure it to become active only when distance protection does not pickup to avoid time-coordination issues
2
Complete outage of 400kV Uravakonda and Jammalamadugu Substations
31-05-2017 at 1744 hrs
Triggering incident was tripping of 400 kV Kurnool-PG - Narnoor line - 1 amp 2 and 400 kV Narnoor-Jamalamadugu line-2 which led to loss of supply to 400kV Uravakonda and Jamalamadugu 400kV Gooty-Narnoor 400kV Narnoor-Jamalamadugu-1 400kV Srisailam-Narnoor 400kV Uruvakonda-Mahboobnagar-1amp2 were out of service in antecedent condition
Gen Loss 500 MW
GD-1
FNN not followed by APTRANSCO FIR amp TR in prescribed formats not furnished by APTRANSCO SLD
The single line diagram 400 kV Jammalamadugu SS as furnished by APTRANSCO are attached at the end
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 432
Antecedent Conditions
The following lines were kept out of service 400kV Narnoor-Srisailam SC line 400kV Narnoor-Gooty SC line 400kV Narnoor-Hyderabad SC line 400kV Narnoor-Jamalamadugu-1 line 400kV Uravakonda-Jamalamadugu-1 line 400kV Uravakonda-Mahboobnagar line-1amp2
Above means Uravakonda SS and Jammalamadugu SS were effectively hanging on to 400 kV Jamalamadugu - Narnoor line-2 for supply
A Tripping of 400 kV Kurnool (PG) - Narnoor line-1 Kurnool-PG (PGCIL-SR1) end
As per FIRTR line tripped at 174418601 hrs due to DPR Z3 (5703 km) operation
As per DREL line tripped at 174418601 hrs due to Stub Protection operation Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 173620637 hrs due to operation of Igt4 (B-ph) protection
From EL Igt4 time delay was observed as 100 msec
Time sync of protection relays with GPS needed to be ensured B Tripping of 400 kV Kurnool (PG) - Narnoor line-2 Kurnool-PG (PGCIL-SR1) end
As per FIRTR line tripped at 174418601 hrs due to DPR Z3 (5703 km) operation
As per DREL line tripped at 174418601 hrs due to Stub Protection operation Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 174306388 hrs due to operation of Igt4 (B-ph) protection
From EL Igt4 time delay was observed to be about 100 msec
Time sync of protection relays with GPS needed to be ensured C Tripping of 400 kV Narnoor ndash Jammalamadugu line-2 Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 174423979 hrs due to OVR-I operation (From EL OVR-I Time delay was observed as 5 sec which is in line with SRPC provided gradings)
Jammalamadugu (APTRANSCO) end
As per FIR line tripped at 1744 due to DT receipt from Narnoor end
As per DR line tripped at 174415040 hrs (Type of Protection operated was not recorded)
In EL events recording started from 174424037 hrs Line was observed to have got tripped around this time due to 862 operation (Type of Protection operated was not recorded)
Time sync of Protection relays with GPS needed to be ensured SRPC SRLDC
As informed by APTRANSCO it was noted that the triggering cause for operation of Stub protection Igt4 protection was a line fault on 400 kV Ghani ndash Narnoor line-1 Even though Ghani end had tripped on DPR Z1 protection and sent carrier to Narnoor due to unhealthiness of carrier communication (PLCC related issues) Narnoor end tripped on DPR Z2 protection
The above fault was seen by relays at both ends of 400 kV Narnoor ndash Kurnool-PG lines 1 amp 2 (the relays of P444 make are owned by PGCIL-SR1 and the relay settings were also provided by PGCIL-SR1)
As in formed by PGCIL (SR-I) it was noted that there was an instantaneous non-directional Igt4 protection setting in the specific relay style (defined by relay make model and version) which operates without checking for isolator status During the above instant the flow of heavy fault
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 532
current led to its operation both ends
To this PGCIL (SR-I) was informed that by default Igt4 or stub protection is configured for instantaneous operation with corresponding isolator open position interlock So further instantaneous high-set functionality that operates without checking isolator positional status is not desirable since it can lead to unwarranted trippings as in the present case Therefore the said setting shall be kept disabled If there is no provision to effect this (by means of changing relay settings) the issue may be referred to its OEM for obtaining modified firmware suitable solution PGCIL (SR-I) can also make use of other relays with different style in place of the existing relays
Recommendations
For 400 kV Ghani ndashNarnoor line the following shall be carried out by APTRANSCO End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced PGCIL (SR-II) to take appropriate action wrt disabling non-directional instantaneous Igt4 protection
that operates without checking existence of stub If required the issue may be referred to relays OEM for appropriate solution or the present relays may be replaced with other relays with different styles that donrsquot have the issue observed
II Details of Grid Incidents
Sl No Details of Event Date amp Time Reason Category
1 Tripping of 220 kV Idukki ndashUdumalpet line
05-05-2017 at 1702 hrs
Line tripped due to B-N and R-N fault in line
GI-1
Idukki (KSEB) end
As per FIRDREL line tripped (in 3-ph) at 170200500 hrs on B-E fault due to operation of DPR Z1 (3661 km) protection
Udumalpet (TANTRANSCO) end
As per FIRDRELTR line tripped (in B-ph) at 165741907 hrs on B-E fault due to DPR Z2 (CAT AR 1025 km) operation However during AR dead-time another R-E fault was detected at 165742252 hrs in Zone-2 due to which line tripped in 3-ph after Z2 time delay of 350 msec at 165742594 hrs [It may be noted that all this happened during the AR dead-time]
Time-sync of Protection Relays with GPS needed to be ensured at 220 kV Udumalpet SS KSEB
During the instant case line did not try for AR as the external VARM AR relay was faulty and kept out of service
Remedial action Problem with VARM relay had been rectified and put into service on 10052017
SRPC SRLDC
From the DR of Udumalpet it can be seen that the relay had tried for AR even after giving three phase trip during AR dead-time due to occurrence of two different faults which is not desirable
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 632
Recommendations TANTANSCO to correctly configure AR logic at Udumalpet so that in the event of 3-ph trip being
given during AR dead-time the relay will not try for auto-reclosure TANTRANSCO to keep AR dead-time as 1 sec for all 220 kV amp above transmission lines
2
Tripping of 400 kV Kudgi (PG) - Tumkur line-2 and Kudgi (PG) ndash Kudgi (NTPC) line-1
06-05-2017 at 1605 hrs
Kudgi (NTPC) feeder tripped at Kudgi (PG) end on operation of distance protection R-N Zone-1 Tumkur feeder tripped at Kudgi(PG) end on operation of NGR buchholtz relay
GI-2
SLD
The single line diagram of 765 400 kV Kudgi-PG SS as furnished by are attached at the end 400 kV Kudgi (PG) ndash Kudgi (NTPC) line-1 Kudgi (PGCIL-SR2) end
As per FIRDRELTR line tripped (in 3-ph) at 160547499 hrs on R-E fault due to DPR Z1 (M1 79 km 013 kA M2 88 km 318 kA) operation
Kudgi (NTPC) end
FIRDRELTR not furnished 400 kV Kudgi (PG) ndash Tumkur line-2 Kudgi (PGCIL-SR2) end
As per FIRDRELTR line tripped (in 3-ph) at 160547450 hrs due to operation of NGR Buccholtz trip protection
Tumkur (PGCIL-SR2) end
As per FIRELTR line tripped (in 3-ph) at 160547596 hrs due to DT receipt from Kudgi-PG end
In DR this time was mentioned as 160512593 hrs
Time-sync of protection relays with GPS needed to be ensured PGCIL (SR-II)
With regard to tripping of 400 kV Kudgi (PG) ndash Kudgi (NTPC) line ndash 1 and AR non-operation it was informed that prior to above fault there were multiple faults on all four lines between Kudgi (PG) and Kudgi (NTPC) due to prevailing stormy weather
Remedial action Actual reasons for AR failure in the instant case were being investigated The issue was also
referred to its OEM for suitable advice
With regard to tripping 400 kV Kudgi (PG) ndash Tumkur line ndash 2 it was suspected that NGR Buchholtz relay might have mal-functioned as there was no gas collected in the bucholtz relay of NGR It may be noted that NGR buchholtz trip is present in REF relay
Remedial action Oil sample of NGR taken and sent to RTDC
Recommendations PGCIL (SR-II) to sort out AR related issues at Kudgi (PG) end on 400 kV Kudgi (PG) ndash Kudgi (NTPC)
lines and put AR into service PGCIL (SR-II) investigate the reasons for NGR Buccholtz trip on 400 kV Kudgi (PG) ndash Tumkur line-2
and furnish an action taken report wrt rectifying the same
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 732
3 Tripping of 220 kV Edamon-Tirunelveli lines - 1amp2
06-05-2017 at 1809 hrs
220kV Edamon-Tirunelveli - 1amp2 tripped from Tirunelveli end only and was in service from Edamon end
GI-1
Edamon (KSEB) end
As per FIR line was kept holding from Edamon end Tirunelveli (PGCIL-SR2) end
As per FIRDRELTR lines tripped (in 3-ph) at 180921343 hrs on R-B fault due to DPR Z1 (532 km) operation
It was stated in TR that Edamon ndash Pothencode lines 1 amp 2 had tripped around the same time and it was suspected that DPRrsquos at Tirunelveli end on 220 kV Tirunelveli ndash Edamon lines 1 amp 2 might have over-reached for the fault in 220 kV Edamon - Pothencode lines
PGCIL (SR-II)
The instant case was a typical case of overreaching of distance relays at Tirunelveli being experienced for quite a while It may be probably due to bunching of the conductors involved
Remedial action It was proposed to modify Z1 setting as 50 of line impedance with POR and would be done
within one-week time They had also proposed to measure the actual line impedance of the line and adjust Z1 settings
accordingly
06-03-2017at 0607 hrs
4 Tripping of 400220 kV Ghani ICT-2amp3
07-05-2017 at 1405 hrs
ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
GI-2
FNN not followed by APTRANSCO FIRrsquos in prescribed format not furnished by APTRANSCO SLD
The single line diagrams of 400220 kV Ghani SS as furnished by APTRANSCO is attached at the end Tripping of 500 MVA 400 220 kV ICT-2
As per FIR ICT-2 tripped at 1405 hrs due to operation of Y-ph OC amp EF protections
DR amp EL not furnished Tripping of 500 mVA 400 220 kV ICT-3
As per FIR ICT-3 tripped at 1405 hrs due to operation of Y-ph OC amp EF protections
DR amp EL not furnished SRPC SRLDC
When enquired about the reasons for operation of back-up protections of ICTrsquos ndash 2 amp 3 APTRANSCO replied that there was actually a fault on the 220 kV feeders emanating from 400 220 kV Ghani PS However since the CT Neutral connection setting had been wrongly set as ldquoTowards Bus siderdquo instead of the correct ldquoTowards Transformer siderdquo the back-up protections on 220 kV side operated for the said 220 kV line fault
APTRANSCO also informed that first ICT-2 tripped followed by ICT-3
But since it was not clear from the above explanation whether line protection on 220 kV side had operated or not and the delayed clearance of the fault observed during the incident (about 400 msec) APTRANSCO was asked to investigate the reasons for the same
APTRANSCO was also asked to check whether carrier aided protection is healthy on 220 kV lines emanating from 400 220 kV Ghani PS
07-03-2017 at 1602 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 832
Recommendations APTRANSCO to check and correct all CT Neutral Connection settings in various protection relays at
their 400 220 kV Ghani PS APTRANSCO to ensure that PLCC carrier aided protection is maintained healthy on 220 kV lines
emanating from their 400 220 kV Ghani PS APTRANSCO to take steps to complete configuration works of DRrsquos amp ELrsquos of various protection
relays at their 400 220 kV Ghani SS and furnish the same as and when required in compliance of IEGC Regulation 52 (r)
5 Tripping of 400 kV Ghanapur-Mamidapalli line
08-05-2017 at 1915 hrs
Line tripped at Ghanapur end only and was holding from Mamidapalli Ghanapur end protection had sensed R-phase to earth fault
GI-2
Mamidipalli (TSTRANSCO) end
As per FIR line was kept holding from Mamidipalli end
In DR R-E fault current (2894 kA) along with dip in R-ph voltage could be seen but if any protection relay had picked could not be verified Also EL furnished did not contain events for this time (In fact no events were found recorded after 160610859 hrs)
Ghanapur (PGCIL-SR1) end
As per FIRTR line tripped (in 3-ph) at 1915 hrs on R-E fault due to DPR Z1 (49 km 2547 kA) operation
As per DR line tripped (in 3-ph) at 191330020 hrs on R-E fault due to 3-ph Group-B Trip relay operation (Zone-3 pick-up also could be observed)
As per EL line tripped (in 3-ph) at 191541722 hrs on R-E fault due to 3-ph Group-B Protection Trip relay operation
Time-sync of protection relays with GPS needed to be ensured
When enquired about the reasons for observed discrepancies PGCIL (SR-I) informed that line tripped on operation of distance protection Since last 2-3 trippings permissive carrier was not being received at Mamidipally end
Further since PLCC at both ends belong to TSTRANSCO thorough check-up of PLCC carrier communication and tuning of PLCC link needed to be undertaken
For above one-day shut-down of line was requested to which SRLDC agreed
Recommendations For the line under consideration the following shall be carried out by TSTRANSCO in coordination
with PGCIL (SR-I) End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
08-03-2017 at 1033 hrs
6 Tripping of 400220kV ICT-1 at Guttur
09-05-2017 at 2215 hrs
ICT-1 tripped on HV side only without any relay indications GI-2
As per FIRTR ICT-1 tripped at 2215 hrs only on HV side without any relay indications KPTCL
ABB make RXMS trip relays provided in various lineICT panels were found to be mal-operating and the phenomenon observed was suspected due to raise in earth potential during any fault in Guttur substation
10-03-2017 at 1801 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 932
Remedial action Action wass being taken to provide 10kΩ resistor in series with the RXMS relay coil for all trip
relays of this type at Guttur Total 170 nos of such resistors were required Now purchase formalities were finalised and work of supply and fixing of resistors would be taken up and completed within a monthrsquos time
7 Tripping of 400 kV Narsapur-Shankarapalli line
10-05-2017 at 0007 hrs
Line tripped at Narsapur end only on B-Phase to earth fault and line did not trip from Shankarapalli
GI-2
SLD
Shankarapally (TSTRANSCO) end
As per FIR line was kept holding from Shankarapally end Narsapur (TSTRANSCO) end
As per FIRDREL line tripped in 3-ph at 000720105 hrs on B-E fault due 86 Trip relay (130 km) operation
The type of protection operated was not recorded shown in either DR or EL
TR not furnished TSTRANSCO
For the fault on 400 kV Shankarapalli-Mamidapalli line Narsapur end picked up in Z3 However due to configuration issues relating to programmable Zone Zp (this was being used as Zone-3 and its time-setting was found to be kept as zero sec) it tripped instantaneously instead of tripping after Zone3 time delay
Remedial action PSL Configuration for Zp was set right on 01-06-2017
13-03-2017 at 2347 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1032
8
Tripping of 400220 kV Hyderabad ICT-4 and 220 kV lines at Hyderabad substation
10-05-2017 at 239 hrs
Operation of busbar protection due to fault in 220 kV Bus at 220kV Hyderabad Substation
GI-1
SLD
1 2 1 2
Bus-1
Bus-2
x
xx
x
BUS BAR ACTED AT 220KV GHANAPUR SS ON 10-05-2017
CHANDRAYANAGUTTA HAYATHNAGAR
132KV BUS
160MVA-3 100MVA-1
400kV PGCIL
x x
160MVA-2ICT-1 ICT-2 ICT-3
NAGOLE
x x
ICT-4
x
MOULALI
INFOSYS
x
x
1 2
Y-Ph disc
flash over at
LocNo95
Y amp B-Ph
disc flash
over at
LocNo95
RELAY INDICATIONS ON THE FEEDER
AT GHANAPUR END AT CHANDRAYANGUTTA END
Chandrayangutta-I feeder Ghanapur-I feeder
Main-1 relayYNZ1 071kM Main-1 relayYN254kM
Main-2 relayYNZ1 09kM Main-2 relayYN
Chandrayangutta-II feeder Ghanapur-II feeder
Main-1 relayYB Z1378kM Main-1 relayRYB
Main-2 relayYBZ111kM Main-2 relayRYB
BC
14-03-2017 at 1911 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1132
Tripping of ICT-4
As per FIR ICT-4 tripped at 0240 hrs on 220 kV side only due to BBP operation on 220 kV Bus
As per DR ICT-4 tripped at 220941165 hrs apparently due to LBB operation
EL not furnished
Date amp Time-sync of DR not in order (09052017 220940682 hrs)
TR furnished did not contain any analysis or remedial action taken
It was noted that BBP for 220 kV Bus-2 had operated for a close-in line fault on 220 kV Chandrayanagutta line-2 tripping ICT-4 and other connected 220 kV feeders (It was informed that ICT-2 was not in service at the time of instant tripping)
When enquired about the reasons TSTRANSCO informed that presence sudden appearance of current in the corresponding Peripheral Unit (PU-2) of the Chandrayanagutta line-2 had led to BBP operation And the reasons for the same were being investigated
To this it was suggested to check corresponding CT neutral connection integrity of cable wiring from CT to Busbar panel as also carry out stability-check of busbar protection
Recommendations TSTRANSCO to investigate the reasons for BBP operation for 220 kV Bus-2 and furnish a report on
the remedial measures taken
9 Tripping of 400220 kV ICT-1 at BTPS
13-05-2017 at 1941 hrs
ICT-1 got tripped on operation of LV side earth fault protection during R-phase to earth fault in 220 kV BTPS-Lingapur line
GI-1
SLD
The single line diagram of 400220 kV BTPS as furnished by KPCL is attached at the end
As per FIRTR ICT-1 tripped at 1942 hrs on LV side earth fault protection due to fault in 220 kV BTPS ndash Lingapur line It was stated that the line also tripped around the same time on R-E fault due to DPR Z1 (2438 km) operation
DR amp EL pertaining to ICT-1 tripping not furnished
As per furnished DREL 220 kV BTPS ndash Lingapur line tripped from BTPS end at 194124719 hrs due to DT receipt from the remote end
KPCL
ICT-1 tripped due to non-directional sensitive earth fault protection provided on LV (220 kV) side
Remedial action The time lever for above protection was increased from 0025 to 01 in the third week of May
2017 in consultation with KPTCL KPTCL
220kV BTPS- Lingapur line tripped at both the ends with following indications At BTPS Lingapur Line tripped on DPRZone-1RN24km78kA
At Lingapur BTPS line tripped on DPRZone-2RN66km29kA
It was reported that 315MVA ICT-1 tripped on LV side earth fault protection along with Lingapur line
Remedial action Existing settings of ICT back up protection is obtained from local RT wing of KPTCL for review
Revised settings communicated to KPCL for implementation
16- 03-2017 at 0118 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1232
SRPC SRLDC
Since the ICT has been provided with normal back-up directional OC amp EF protections a separate non-directional sensitive earth fault protection is not desirable hence the need for the same may be reviewed Otherwise its time lever shall be suitably increased to a higher value (say 035) so as not to cause unwarranted trippings
Further tripping of 220 kV BTPS ndash Lingapura line from BTPS end on DT receipt was not in order
When enquired about the reasons for AR non-operation in the instant case for the above line KPCL replied that there were issues with PLCC carrier communication hence it was kept out of service
Recommendations KPCL to review the need for providing separate non-directional sensitive earth fault protection for
ICTrsquos at their BTPS station and take steps to disable the same For 220 kV BTPS ndashLingapura line KPCL to resolve issues relating to PLCC carrier communication and
put AR into service
10 Tripping of 765 kV Kurnool-Tiruvalam line-2
19-05-2017 at 2003 hrs
Failure of R-phase LA at Tiruvalam end REF operation and DT send were observed from EL of Kurnool station
GI-2
Kurnool (PGCIL-SR1) end
As per FIRTR the line tripped in 3-ph at 200318272 on R-B-E fault due to DPR Z2 (CDistance = 912) operation
As per DR line tripped in 3-ph at 200318272 hrs on R-E fault (B-E fault did not appear to be strong) due to DPR Z2 (CAT) operation and 3-ph Group - A amp B Trip relay operation (In DR DT receipt event was observed around the same time)
In EL REF protection operation of PU-P141 operation and DT_SEND to the remote end was observed at 200318340 hrs
Tiruvalam (PGCIL-SR2) end
As per FIRDRELTR the line tripped in 3 ph at 200318269 on R-E fault due to DPR Z1 operation and DT receipt from the remote end
It was stated in TR that 707 RLA (Reactor LA) had fallen down due to heavy wind and caused R-E fault
When enquired about the reasons for REF protection operation and consequent sending of DT to the other end PGCIL (SR-I) informed that the fault was detected as R-B-E fault hence three-phase trip was given However even though Main-CB got opened with its three poles opening simultaneously Tie-CB got opened in R-ph immediately while the other two phase poles took a while to open This had caused Tie-CB LB operation Since this protection was implemented in REF relay trip was extended from the same along with sending of DT to the other end
To this it was pointed out that in the instant case only R-E fault was apparent and the current in B-ph was almost at the normal value hence the sensitivity of distance relay zone elements may be checked Further Tie-CB LBB operation points to sluggishness of the CB-poles hence the opening time of tie-CB may be checked and properly set
It was also noted that in the EL of Tiruvalam DT Send event was observed after tripping of the line on R-E fault PGCIL (SR-II) was asked to look into the reasons for the same and take suitable remedial action
16-03-2017 at 1023 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1332
11 Tripping of 400220 kV ICT-2 at Kalpaka SS
20-05-2017 at 1502 hrs
ICT-2 tripped due to operation of Transformer Buchholtz relay
GI-2
As per FIR ICT-2 tripped at 15053283 hrs due to its Buccholtz relay operation It was stated in FIR that heavy rain amp gale had been reported at the time of tripping
APTRANSCO
Just prior to above tripping event station transformer supply went off When the supply came back the two oil cooling pumps which were supposed to start one after another with a time gap of 15 sec had started simultaneously due to problem in the timer module Due to this there was a sudden flow of oil which shorted the contacts of the micro-switch that gives buchholtz trip
Remedial action The faulty timer module of oil cooling pump had been replaced
On this SRPC asked for the details of AC auxiliary supply about its redundancy details of DG-set and the mode of starting (manual or auto) To this APTRANSCO informed that redundancy for AC auxiliary supply is present and the lost supply during the instant case had been restored immediately
Recommendations
APTRANSCO to furnish AC auxiliary supply details including its redundancy DG set details and its mode of starting at their 400 220 kV Kalpaka SS Further corresponding AC auxiliary supply changeover scheme drawing shall also be furnished
16-03-2017 at 1132 hrs
12 Tripping of 400220 kV ICT-2 at KV Kota SS
23-05-2017 at 1021 hrs
ICT-2 got tripped due to mal-operation of transformer oil temperature indicator
GI-2
As per FIR ICT-2 tripped at 1021 hrs on both HV and LV sides due to transformer oil temperature indicator mal-operation
As per EL ICT-2 tripped at 1019XXXXX192 hrs on due to operation of OTI protection
It was stated that DR had not been triggered for the event
Time-sync of protection relays with GPS needed to be ensured
EL was not configured to show SECONDS in time-stamp of the events (This had been brought to APTRANSCOrsquos attention in previous PCSC meetings also)
APTRANSCO
At KV Kota SS OTI got stuck While checking the same its position indicator got changed and mal-operated resulting in 3-ph trip
Remedial action Ms CGL had visited the substation and declared the relay faulty It was proposed to replace the faulty OTI on 10072017
APTRANSCO was asked to configure Event Loggers at their KV Kota SS properly so that SECONDS are also displayed in the time stamp of the events recorded
16-03-2017 at 1245 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1432
13
Tripping of 220 kV Kaniampeta - Kadakola line (Load Loss at Kaniampeta = 36 MW)
23-05-2017 at 1350 hrs
EFR relay operated and B-ph pole discrepancy relay operated leading to tripping of Bus-Coupler CB
GI-1
Kaniampeta (KSEB) end
As per FIR in Kaniyampetta 220 kV substation all transformers tripped (Load loss 36 MW) at 1339 hrs due to the tripping of 220 kV Kaniyampetta-Kadakola feeder (B phase) at Kadakola end Later 220 kV Kaniyampetta-Kadakola feeder was hand tripped at 1426 hrs from Kaniyampetta end
Kadakola (KPTCL) end
As per FIR line tripped at 1350 hrs due to EFR operation of Bus-Coupler CB and PDR operation
It was also stated that at the time of tripping Kaniampeta panel had been taken up for RampU work hence distance relay was not in service Kaniampeta CB was bypassed by keeping protection through 220 kV Bus-Coupler CB
DR amp EL not furnished KPTCL
At Kadakola during the instance protection to Kaniambetta line was provided through 220kV bus coupler breaker bay as Kadakola relay panel was taken out for M-2 retrofitting work under RampU
Bus coupler breaker tripping was suspected due to problem in the pole discrepancy relay and there was no fault in the line
Remedial action Problem with the PD relay of Bus coupler breaker was rectified on 24052017
16-03-2017 at 2026 hrs
14 Tripping of 400 220 kV ICT-1 at Somanahalli substation
24-05-2017 at 1724 hrs
ICT-1 at Somanahalli substation got tripped due to DC Earth fault
GI-2
Somanahalli (PGCIL-SR2) end
As per FIRTR ICT-1 tripped (on HV side) at 172809 hrs on momentary DC Earth fault
As per DREL ICT-1 tripped (on HV side) at 172809812 hrs due to operation of Group AB trip relays In DR manual trigger signal becoming HIGH was observed at above instant
In EL time resolution for recording events was limited to seconds (events were not shown at msec level)
PGCIL (SR-II)
At Somanahally SS 3x167 MVA single phase units had been replaced by 1x500 MVA ICT Subsequently CSD works were taken up At the time of tripping event CSD wiring works were going on During the process positive DC supply got extended to 86A trip relay inadvertently
Remedial action DC earth fault had been removed
PGCIL (SR-II) was asked to configure Event Loggers at their Somanahalli SS properly so that time resolution for recording events was set u pto msec
16-03-2017 at 118 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1532
15 Tripping of HVDC Gazuwaka Pole-1amp2
25-05-2017 at 0945 hrs
HVDC pole-1 got tripped due to operation of South filter inter zone protection and HVDC pole-2 got tripped due to operation of differential protection
GI-2
SLD
Pole-1
27-03-2017 at 1016 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1632
Pole-2
Tripping of HVDC Pole-1 (PGCIL-SR1)
As per FIRELTR Pole-1 tripped at 094513960 hrs due to operation of South Filter inter-zone protection [
It was stated that DR was not available Tripping of HVDC Pole-2 (PGCIL-SR1)
As per FIRDRELTR Pole-2 tripped at 094512906 hrs due to operation of WIN Differential protection
It was noted that no representative from Gajuwaka (HVDC amp HVAC) SS had come to attend the meeting to explain as to what caused the pole trippings
PGCIL (SR-I) representative informed that at the time of tripping RTV Coating works for switchyard equipment were going on In the process when CWC35 filterrsquos bus-side isolator was opened it feel down unexpectedly and resulted in inter-zone filter protection operation
Wrt HVDC Pole-2 tripping PGCIL (SR-I) representative informed that oscillations in voltage and current were noticed prior to tripping of HVDC Pole-2 And differential current was also observed for the extended AC bus Due to this WIN differential protection had operated resulting in tripping of HVDC Pole-2 It was also informed that the issue was referred to its OEM ABB (Sweden) for suitable advice
However since no detailed tripping report explaining the causes that led to tripping of HVDC poles and the remedial action taken had been furnished PGCIL (SR-I) was asked to submit the same
Recommendations PGCIL (SR-I) to furnish detailed report on the events that led to tripping of HVDC Poles ndash 1 amp 2
including remedial measures taken to PCSC forum Further the OEM report wrt tripping of HVDC Pole-2 shall also be furnished
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1732
16 Tripping of 400 kV Kayathar-Karaikudi line
25-05-2017 at 1552 hrs
R-phase to earth fault had occurred in line There was Zone-2 3 phase trip operation at Kayathar end and Zone-1 3 phase trip at Karaikudi end
GI-2
Kayathar (TANTRANSCO) end
As per FIRDRELTR line tripped in 3-ph at 155236989 hrs on R-E fault due to DPR Z2 operation (Z2 time delay observed was about 390 msec)
It was stated in TR that carrier channel was not healthy at the time of tripping and carrier signal was not received at this end during the fault
Remedial action Protection Coupler and OLTE were reset at both Karaikudi amp Kayathar ends and carrier channel
was made available Karaikudi (PGCIL-SR2) end
As per FIRDRELTR line tripped in 3-ph at 155236592 hrs on R-E fault due to DPR Z1 (186 km) operation
It was stated in TR that DPC had failed at the other end and resulted in Carrier Fail alarm at Karaikudi end issuing 3-ph trip
Recommendations
For the line under consideration the following shall be carried out by TANTRANSCO in coordination with PGCIL (SR-II) End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
17
Tripping of 400220 kV ICT - 1 amp 3 at Hoody substation of KPTCL (Load Loss 750 MW)
26-05-2017 at 1230 hrs
R phase limb of ICT-1 bank pre-close supervision contact of trip coil -2 had arc over ICT-3 got tripped on over-loading
GI-2
Tripping of ICT-1
As per FIR ICT-1 tripped at 1230 hrs due to arcing over of R phase limb of ICT-1 bankrsquos pre-close supervision contact of trip coil -2
As per DR the tripping took place at 114128806 hrs (Type of protection operated not recorded)
EL not furnished
Time sync of PRrsquos with GPS needed to be ensured
Remedial action The same was rectified and the circuit was changed by utilizing the spare auxiliary contact of CB
for R-ph limb by availing LC on 29052017 and charged the ICT-1 bank at 0432 hrs by getting the SRLDC code 1360
Tripping of ICT-3
As per FIR ICT-3 tripped at 1230 hrs due to operation of INV OC FWD protection amp 86A master trip relay
From the DR furnished (with trigger time = 114254202 hrs) tripping of ICT-3 and the type of protection operated were not clear
EL not furnished
Time sync of protection relays with GPS needed to be ensured at Hoody
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1832
KPTCL
At Hoody 500 MVA ICT-1 tripped without any relay indication ICT-1 and 3 were in parallel each ICT carrying about 390MW of load Due to tripping of ICT-1 ICT-3 got over loaded and hence tripped on over current protection
Remedial action After detailed inspection it was observed that pre-close supervision contact of trip coil -2 arced
over in R phase limb of the 400kV side breaker Hence it was suspected that R-pole might have opened initially and remaining poles on PD operation
The problem was rectified and attended on 29052017 by availing shut down In order to avoid tripping of another ICT operating in parallel whenever one ICT trips on fault an
SPS is being finalized by KPTCL which is to be implemented at Hoody Any time each ICT at Hoody will be catering around 400MW of load Such huge load shedding by tripping 66kV loads of Hoody station is difficult to achieve Hence 220kV radial feeders may also have to be tripped to get desired load shedding
It was noted that frequent tripping of 400 2220 kV ICTrsquos at Hoody SS had been observed in the past few months And during their discussion in various PCSC meetings the following issues have come to the for urgent action by KPTCL Implementation of Special Protection Scheme (SPS) to take care of over-loading of the other ICT
when one out of two ICTrsquos operating in parallel trips Provision of Bus-bar protection to 220 kV buses Compliance of Third Party Protection Audit Recommendations Ensuring supply reliability to Metro-services Action plan on the proposed system strengthening measures in Bengaluru area in the context
of continued use of Split-Bus operation
Thus to ascertain the action taken by KPTCL wrt above issues a Protection System Analysis Group (PSAG-18) meeting was proposed to be conducted on 03082017
Recommendations KPTCL to furnish compliance report on the recommendations given in PSAG-18 meeting to PCSC
forum
18 Tripping of 400 kV Simhadri - Kalpaka line-2
28-05-2017 at 503 hrs
Line tripped on mal-operation of Tee Differential Protection at Simhadri end and Direct Trip was received at Kalpaka
GI-2
Kalpaka (APTRANSCO) end
As per FIR line tripped at 0503 hrs due to DT receipt from the remote end
DR amp RL amp TR not furnished Simhadri STPS (NTPC) end
As per FIRTR line tripped at 050350408 hrs due to operation T-differential protection which in turn was attributed to spurious pick-up during the fault at Vemagiri end
The following was stated in TR Kalpaka Line-1amp2 Tie bays were under PTW And R-Ph CT (16CTA R-Ph) was under erection Primary connection was over secondary
connection was pending The CT secondary wires used in T-Diff protection of Kalpaka Line-2 might be touching the earth and during fault at Vemagiri some stray voltage developed across CT secondary cores might have resulted into operation of T-Diff protection Trip values are 100mA in secondary
During the operation of T-diff protection there was no change in current magnitudes of Kalpaka Line-2 and hence the tripping could be considered as spurious one
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1932
As per DR line tripped at 050350442 hrs But the type protection operated was not recorded in it
EL not furnished (In place of EL DRrsquos eventsrsquo summary was furnished)
19 Tripping of 400 kV Ramagundam - Gajwel line
29-05-2017 at 0007 hrs
Over Voltage Stage-1 had operated at Gajwel end Ramagundam end did not trip as Direct Trip was not received from Gajwel end
GI-2
Ramagundam STPS (NTPC) end
As per FIR line was kept holding from Ramagundam end Gajwel (TSTRANSCO) end
As per FIR line tripped at 0007 hrs due to OVR-I operation
DR amp EL amp TR not furnished
The tripping was not in order as per the SRPC given OVR gradings as shown below
When enquired about the reasons for OVR-I operation TSTRANSCO informed that OVR functionality implemented in REL 521 had mal-operated
Remedial action The OVR functionality had been moved to an external Over Voltage relay
Recommendations
For the line under consideration the following shall be carried out by TSTRANSCO in coordination with NTPC-Ramagundam End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
20 Tripping of 400 kV Gajwel-Ghanapur line
29-05-2017 at 0007 hrs
Line tripped on operation of over voltage protection at Gajwel and direct trip was received at Ghanapur DR and EL of Gajwel end were not furnished
GI-2
Ghanapur (PGCIL-SR1) end
As per FIRELTR line tripped at 000731885 hrs due to DT receipt from the remote end
As per DR line tripped at 000257163 hrs due to DT receipt from the remote end
Time-sync of DR amp EL with GPS needed to be ensured Gajwel (TSTRANSCO) end
As per FIR line tripped at 0007 hrs due to OVR-I operation
DR amp EL amp TR not furnished
The tripping was not in order as per the SRPC given OVR gradings as shown below
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2032
When enquired about the reasons for OVR-I operation TSTRANSCO informed that there was a loose
wiring in Y-ph CVT wiring which resulted in mal-operation of OVR-I protection
Remedial action All CVT wirings had been tightened for fool-proof operation
III Details of Trippings due to Failure or Non-operation of Auto-Reclose
Sl No Element Date amp Time Reason
Category
1 Tripping of 400 kV Hiryur-
BTPS line-1 06-05-2017 at 1401 hrs
Y-phase to earth fault had occurred in line Direct trip was sent from BTPS to Hiryur end
GI-2
Hiryur (PGCIL-SR1) end
As per FIRDRELTR line tripped (in Y-ph) at 140009730 hrs on Y-E fault due to DPR Z1 (AR 82 km 1034 kA) operation Just prior to auto-reclosing DT was received at 140010730 hrs and line tripped in 3-ph
BTPS (KPCL) end
As per FIRTR line tripped (in Y-ph) at 1400 hrs on Y-E fault due to DPR Z1 (AR 1173 km) operation AR was stated to be attempted but unsuccessful due to persistent fault
As per DREL line tripped (in Y-ph) at 125520000 hrs on Y-E fault due to DPR Z2 (CAT AR) operation and tried to auto-reclose after about 1 sec but tripped in 3-ph due to persistent (Z1) fault
Time-sync of Protection Relayrsquos with GPS needed to be ensured at BTPS
When enquired about the reasons for sending of DT to Hiriyur end KPCL informed that when the line tripped on Y-E fault and the AR operation was in progress Under-Voltage relay at BTPS end had sensed under-voltage and sent DT to Hiriyur end
It was noted that instantaneous tripping of UV relay and consequent of sending of DT to the other end are undesirable It was therefore suggested to introduce suitable delay (say 3 sec) for UVR tripping and disable sending of DT to the other end
Recommendations
KPCL to introduce suitable delay (say 3 sec) for UVR tripping and disable sending of DT to the other end on UVR operation at their BTPS station
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2132
2 Tripping of 400 kV Munirabad-Guttur line
06-05-2017 at 1702 hrs
R-phase to earth fault Auto-reclose was successful at Guttur and Breakers at Munirabad end got tripped
GI-2
Munirabad (PGCIL-SR1) end
As per FIRDRELTR line tripped (in 3-ph) at 170231624 hrs on Y-E fault due to DPR Z2 (AR CAT 1145 km) operation
Guttur (KPTCL) end
As per FIR line tripped (in R-ph) at 1702 hrs on Y-E fault due to DPR Z1 (AR 4708 km Ir=6877 kA) operation and successfully auto-reclosed
As per DREL line tripped (in R-ph) at 165933499 hrs on Y-E fault due to DPR Z1 (AR) and successfully auto-reclosed after about 1 sec
Time-sync of Protection Relays with GPS needed to be ensured at Guttur SS
When enquired about the reasons for AR non-operation at Munirabad end PGCIL (SR-I) informed that the external VARM relay through which AR had been implemented had not operated Since the relay belonged to KPTCL suitable action needed to be taken by them
On this KPTCL was asked to look into the issue and replace the relay if required PGCIL (SR-I) was also requested to coordinate with KPTCL in attending to this matter
3
Tripping of 765kV Kurnool-NPS line -2
07-05-2017 at 1405 hrs
Y phase to earth fault had occurred in line Auto-reclose was successful at Kurnool end and AR was not attempted at NPS end
GI-2
Kurnool-PG (PGIL-SR1) end
As per FIRELTR line tripped (in Y-ph) at 140543316 hrs on Y-E fault due to DPR Z1 (AR 328 km 166 kA) operation and successfully auto-reclosed after about 11 sec After about further 6 sec (ie at 140550470) line tripped in 3-ph due to receipt of DT from the remote end
It was stated in FIR that 765 kV Kurnool ndash NPS line-1 was under LVRD
As per DR line tripped (in 3-ph) at 140550470 hrs due to DT receipt from remote end
DR corresponding to successful AR operation not furnished NPS (PGIL-SR1) end
FIR amp TR furnished were that of Kurnool station
As per DREL line tripped (in 3-ph) at 140543351 hrs on Y-E fault due to AR (Z2 CAT) operation It was noted from EL that AR LOCKOUT had operated around the same time due to which line had not tried for AR
From EL it was further observed that DT was sent to the remote end at 020550419 hrs However the cause of DT send was not recorded in EL
DR pertaining to DT send was not furnished
If DT send was because of OVR-I protection operation then also tripping was not in order as it does not match with the settings provided
PGCIL (SR-I)
Non-operation of AR from NPS was due to wiring mistake made during installation of Controlled Switching Devices (CSD) for the line reactor on this line
Remedial action The wiring issues in CSD installation were rectified on 18052017
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2232
4
Tripping of 400 kV Krishnapatnam-Chittoor line-1
07-05-2017 at 1441 hrs
R-phase to earth fault Main CB Auto-reclose was successful at Chittoor end and Tie CB got tripped Breakers tripped at Krishnapatnam end and did not attempt auto-reclose
GI-2
FNN not followed by APTRANSCO and APGENCO SDSTPS (APGENCO) end
As per FIRDREL line tripped (in 3-ph) at 144113756 hrs on R-E fault due to DPR Z1 (628 km) operation It was observed from EL that the line was given 3-ph trip straight way without initiating AR
Chittoor (APTRANSCO) end
As per FIRDRELTR line tripped (in R-ph) at 144113759 hrs on R-E fault due to DPR Z1 (1147 km) operation and successfully auto-reclosed after about 1sec However it was observed that only Main-CB got auto-reclosed successfully whereas Tie-CB got tripped in 3-ph while attempting AR
Remedial action When enquired about the reasons for AR failure at SDSTPS end APGENCO representative
informed that as informed in last PCSC meeting AR configuration logic is scheduled to be reviewed by ABB in July 2017 when all issues pertaining to AR operation would be sorted out
When asked about the reasons for AR failure for Tie-CB at Chittoor end APTRANSCO informed that Tie-CB AR dead-time and PDR operational time were inadvertently kept equal As remedial action PDR operational time was increased to 25 sec
5 Tripping of 765 kV Raichur-Solapur line-2
07-05-2017 at 1918 hrs
Y-phase to earth fault Auto-reclose was successful at Solapur and breakers at Raichur end got tripped
GI-2
Solapur (PGCIL-WR1) end
As per FIRTR line tripped (in Y-ph) at 1918 hrs on Y-E fault due to DPR Z1 (AR 66 km 572 kA) operation and successfully auto-reclosed
DR amp EL not furnished Raichur (PGCIL (SR-I) end
As per FIRDRELTR line tripped (in 3-ph) at 191836810 hrs on Y-E fault due to DPR Z1 (145 km) operation It was observed from DR that AR lock-out had operated that resulted in tripping of Main-CB and Tie-CB But while Main-CB got tripped immediately Tie-CB got tripped in Y-ph only And the other two phase poles got tripped due to PDR operation after about 21 sec at 191838910 hrs
EL time-stamp resolution was limited to SECONDS instead of millisec
Tie-CB OPEN digital signals were observed to have employed NEGATIVE LOGIC PGCIL (SR-I)
The observed discrepancies at Raichur end were due to the hardware error caused by hanging of Main-CBrsquos BCU
Remedial action The problem with Main-CBrsquos BCU had been resolved by restarting it
Recommendations
PGCIL (SR-I) to configure Event Loggerrsquos time-resolution up to millisec level in all protection relays at their 765 400 kV Raichur SS
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2332
6
Tripping of 400 kV Neyveli TS2-Pugalur line
07-05-2017 at 1955 hrs
Y-phase to earth fault Neyveli TS2 end relay issued a 3-phase trip 220ms after issue of Y phase trip Direct Trip was sent to Pugalur end preventing auto-reclose
GI-2
NLC TS2 (NLCIL) end
As per FIRDRELTR line tripped in 3-ph at 195526677 hrs due to DT receipt from the other end
It was stated in TR that even though respective zones had picked up on fault DT receipt at the same time resulted in tripping of the line in 3-ph
In DR 3-ph trip was found to be issued 220 msec after Y-ph trip was issued It was also noted that DT receipt signal remained high for a duration of about 220 msec
Time sync of Protection Relays with GPS needed to be ensured at NLC-TS2
Pugalur (PGCIL-SR2) end
As per FIRDRELTR line tripped (in Y-ph) at 195534241 hrs on Y-E fault due to DPR Z1 (AR) operation However line tripped in 3-ph during AR dead-time at 195534353 hrs due to DT receipt from Neyveli end
In view of DT receipt at both ends it was suggested to carry out PLCC end-to-end testing to ensure healthiness of carrier communication
Recommendations
For the line under consideration the following shall be carried out by NLCIL in coordination with PGCIL (SR-II) End-to-end communication for DT permissive amp other signals may be ensured by testing at both
the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
7 Tripping of 400 kV NCTPS -SVChatram line-2
09-05-2017 at 1843 hrs
R-phase to earth fault Auto-reclose is not in service since Fibre optic cable link is not healthy
GI-2
NCTPS (TANGEDCO) end
As per FIRDRELTR the line tripped in 3-ph at 184223424 hrs on R-E fault due to DPR Z1 (9159 km 29 kA) operation (Given the length of this line as 95 km it may be verified whether Z1 setting is correct)
It was stated in FIR that AR was kept out of service due to defective FO communication link
Remedial action Line patrol done by lines wing and declared No Visible fault FO link cut was rectified on 13052017 and AR scheme restored
S V Chatram (TANTRANSCO) end
As per FIRDRELTR the line tripped in 3-ph at 184357616 hrs on R-E fault due to operation of DPR Z1 (32 km) operation
Time sync of protection relays with GPS needed to be ensured at both NCTPS and SV Chatram stations
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2432
8 Tripping of 400 kV Madurai-Kudankulam line
10-05-2017 at 1940hrs
B-E Fault Auto-reclose successful at Madurai and breakers tripped at Kudankulam
GI-2
Madurai (PGCIL-SR2) end
As per FIRDRELTR line tripped (in B-ph) at 194040402 hrs on B-E fault due to DPR Z1 (AR 137 km 114 kA) operation and successfully auto-reclosed after about 11 sec
Kudankulam NPP (NPCIL) end
As per FIRTR line tripped (in 3-ph) at 192936910 hrs on B-E fault due to DPR Z2 (CAT 2071 km) operation
It was informed that AR had not been kept in service as per SRPC decision Hence the tripping was in order
9 Tripping of 220 kV Idukki-Udumalpet line
14-05-2017 at 1345 hrs
Y-phase to earth fault had occurred in line Auto-reclose was successful at Idukki and breakers at Udumalpet end tripped on pole discrepancy
GI-2
Idukki (KSEB) end
As per DRTR line tripped (in Y-ph) at 134620509 hrs on Y-E fault due to DPR Z2 (CAT 83125 km) and successfully auto-reclosed after about 08 sec
EL not submitted (In its place DRrsquos events summary was furnished)
Udumalpet (TANTRANSCO) end
As per FIRTR line tripped in Y-ph at 1345 hrs on Y-N fault on DPR Z1 (2834 km) operation Subsequently tripped in 3-ph on PDR operation
As per DR line tripped in Y-ph at 134151100 hrs on Y-E fault due to DPR (AR) operation But as DRrsquos time scale was limited to 1 sec post triggering AR complete operation could not be verified
From EL line all poles dead was observed at 134152102 hrs Cause of line tripping as stated in FIRTR was not observed in EL
The following was stated in TR The fault resistance measured in the M1 relay (MicomP442) was high resulting in Z3 pickup It was
evident from the fault record that M2 relay (7SA522) had cleared the fault in Z1 by opening Y-ph pole However since AR was implemented in only M1 relay and M2 (Z1) operation had not initiated AR in M1 it resulted in opening of the other two phase poles on PDR operation
The cause of non-initiation of AR of M1 relay on external initiation was found to be logic configuration mistake in the Main 1 relay
Remedial action The AR logic configuration in the PSL of Main 1 relay had been corrected However a special relay
test would be conducted to verify AR operation during the next opportunity shutdown
Time sync of protection relays with GPS needed to be ensured at Idukki and Udumalpet
10 Tripping of 400 kV Vemagiri - Gazuwaka line
14-05-2017 at 1654 hrs
Y-phase to earth fault Auto-reclose was not successful due to persistent fault Vemagiri end had sent a Direct Trip after un-successful Auto-reclose AR attempt was observed in Gazuwaka end DR after 3 phase trip
GI-2
Vemagiri (PGCIL-SR1) end
As per FIRDRELTR line tripped in (Y-ph) at 165411968 hrs on Y-E fault due to operation of DPR Z1 (AR 1512 km) operation It tried to auto-reclose after about 11 sec but tripped in 3-ph due to persistent fault
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2532
It was noted that AR was attempted by Tie-CB only the Main-CB tripped in 3-ph at the beginning of AR initiation
Also Tie-CB AR dead-time was observed to be one second
Reasons 3-ph trip of Main-CB needed to be furnished Gazuwaka (PGCIL-SR1) end
As per FIRDRTR line tripped in Y-ph at 165330242 hrs on Y-E fault due to operation of DPR Z1 (AR 1677 km) operation But during AR dead-time it tripped in 3-ph after about 115 sec due to DT receipt from the remote end This resulted in 3-ph opening of both Main-CB and Tie-CB However after 125 sec Main-CB Y-ph limb tried for auto-reclosure and tripped due to persistent fault
As per EL line tripped in (Y-ph) at 165351597 hrs on Y-E fault due to operation of DPR Z1 (AR) operation But during AR dead-time it tripped in 3-ph at 165352620 hrs due to DT receipt from the remote end This resulted in 3-ph opening of both Main-CB and Tie-CB However at 165352687 hrs Main-CB Y-ph limb tried for auto-reclosure and tripped due to persistent fault
Reasons for AR attempt by Main-CB event after opening in 3-ph due to DT receipt needed to be explained
Time sync of DRrsquos amp ELrsquos with GPS needed to be ensured at Gajuwaka SS Recommendations
PGCIL (SR-I) to sort out issues relating to AR functionality operation for both Main-CB and Tie-CB at both Vemagiri and Gajuwaka substations
For the line under consideration the following shall be carried out by PGCIL (SR-I) End-to-end communication for DT permissive amp other signals may be ensured by testing at both
the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
11 Tripping of 400 kV VTPS-Sattenapalli line-2
21-05-2017 at 1706 hrs
B-phase to earth fault Auto-reclose successful at Sattenapalli and breakers got tripped at VTPS end
GI-2
Sattenapalli (APTRANSCO) end
As per FIRDRELTR line tripped (in Y-ph) at 170653038 hrs on B-E fault due to DPR Z1 operation and successfully auto-reclosed after about 1 sec
VTPS (APGENCO) end
As per FIRDRELTR line tripped in 3-ph at 170653133 hrs on B-E fault due to DEFR (33 kA) operation (DPR Z2 had picked up and Carrier was also received from the other end)
APGENCO
Before the LILOing of 400 kV VTPS-Srisailam DC line at Sattenapalli DEF protection had been provided from a separate REX521 relay Subsequently even though all protections at VTPS had been revised the above DEF protection implemented from the REX521 relay had been somehow left out and it only had extended 3-ph trip during the current instant
Remedial action The DEF functionality from the said REX521 had been disabled
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2632
12 Tripping of 400 kV Srisailam-Dindi line-2
24-05-2017 at 1502 hrs
R-phase to earth fault Auto-reclose was successful at Dindi and Zone - 1 3-phase trip at Srisailam
GI-2
Srisailam (TSGENCO) end
As per FIRDREL line tripped in 3-ph at 150253522 hrs on R-E fault due to DPR Z1 operation
TR contained no information Dindi (TSTRANSCO) end
As per FIRDRELTR line tripped (in R-ph) at 150253487 hrs on R-E fault due to DPR Z1 operation and successfully auto-reclosed after about 1 sec
Recommendations Since all 400 kV lines emanating from Srisailam LB are composite feeders APTRANSCO TSTRANSCO
can keep AR functionality disabled at respective remote end stations under their control
IV Details of Trippings due to PLCC mal-operation
Sl No Element Date amp Time Reason
Category
1 Tripping of 400 kV Kalpakka-Gazuwaka line-1amp2
18-05-2017 at 1108 hrs
Line tripped at Kalpakka end only on Direct Trip receive and was holding from Gazuwaka
GI-2
Tripping of 400 kV Kalpaka ndash Gajuwaka line-1
Gazuwaka (PGCIL-SR-2) end
As per FIR line was kept holding from Gazuwaka end Kalpakka (APTRANSCO) end
As per FIREL line tripped at 110625955 hrs to DT receipt from Gazuwaka end
Tripping of 400 kV Kalpaka ndash Gajuwaka line-2
Gazuwaka (PGCIL-SR2) end
As per FIR line was kept holding from Gazuwaka end Kalpakka (APTRANSCO) end
As per FIREL line tripped at 110625955 hrs to DT receipt from Gazuwaka end
Remedial action taken by APTRANSCO subsequent PCSC-65 meeting as informed vide their internal communication dated 20072017
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2732
2 Tripping of 400 kV Tumkur-Bidadi line-1 amp 2
30-05-2017 at 1139 hrs
Line tripped due to suspected PLCC mal-operation at Tumkur end and direct trip was received at Bidadi
GI-2
Tripping of 400 kV Tumkur ndash Bidadi line-1 Tumkur (PGCIL-SR2)) end
As per FIRDRELTR line tripped in 3-ph at 113515534 along with DT SEND to the remote end
PLCC mal-operation was suspected to have caused above tripping Bidadi(PGCIL-SR2) end
As per FIRTR line tripped in 3-ph at 113515 hrs due to DT receipt from Tumkur end Tripping of 400 kV Tumkur ndash Bidadi line-2 Tumkur (PGCIL-SR2)) end
As per FIRDRELTR line tripped in 3-ph at 113515534 along with DT SEND to the remote end
PLCC mal-operation was suspected to have caused above tripping Bidadi(PGCIL-SR2) end
As per FIRTR line tripped in 3-ph at 113515 hrs due to DT receipt from Tumkur end PGCIL (SR-II)
Remedial action The above trippings were due to PLCC mal-operation which in turn was due to shifting of its
coaxial cable The related circuitry was subsequently rectified
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2832
Single Line Diagram of 230 kV Villianur SS of PED [Ref I1]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2932
Single Line Diagram of 400 kV Jammalamadugu SS of APTRANSCO [Ref I2]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3032
Single Line Diagram of 400 kV Judgi-PG GIS SS of PGCIL (SR-II) [Ref II4]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3132
Single Line Diagram of 400 kV Ghani SS of APTRANSCO [Ref II4]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3232
Single Line Diagram of 400 kV BTPS of KPCL [Ref II9]
Annexure-II
Meeting No
Index
Details of Event Date amp Time Reason PCSC Recommendations Utility responsible for
Implementation
Status of Recommendations
as on 25072017
Remarks
Pending Implementation of PCSC Recommendations (up to 65th Meeting)
Complete outage of 220kV Yerraguntla
substation and tripping of running Units
at Rayalaseema TPS
52I2 (GD) PendingMail received on 27-07-2016
1The drop out relays of reducer oil pumps time setting was increased for
all millsSo there will not be any trip under transient low voltage condition--
--Complied
2The recommendation regarding 2 sec time delay will be implemented
during unit shut down and will be intimated immediately after
implementation------Pending
APGENCO 1 APGENCO to check associated logic for lube oil pump for correct
operation under transient low voltage conditions at Rayalaseema TPS
Unit-1
2 APGENCO to keep appropriate time delay fault ride through
delay (typically 2 sec) in VFD speed sensor relay at all its generating
Units including Rayalaseema TPS Units
HV B-Ph Current transformer of 100MVA Power
Transformer -1 failed resulting into a bus fault on
220KV Bus-1 Unit-1 and Unit-5 at RYTPS tripped
during the fault at Yerraguntla substation
21-02-2016 at
1039 hrs
Andhra Pradesh
APGENCO to furnish a report on the remedial action implemented
wrt overreaching of Krishnapatnam end distance relays during the
tripping of 400 kV Nellore (PG) - NPS line-1
APGENCO Yet to be informed Pending57II9 Tripping of 400 kV Nellore (PG) - NPS
line-1 400 kV Krishnapatnam-Nellore
(AP) lines -1amp2 and 400kV NPS -
MEPL line
18-07-2016 at
1905 hrs
Triggering incident was snapping of Y phase
conductor in 400kV Nellore (PG) - NPS line-1
Distance relay at Krishnapatnam end over-reached in
Zone-1 and resulted in tripping of 400kV
Krishnapatnam ndash Nellore (AP) lines - 1amp2 from
Krishnapatnam end Distance relay at MEPL over-
reached and resulted in tripping of MEPL-NPS line
from MEPL end
Yet to be informed Pending
APTRANSCO mail dated on 31-08-2016
To avoid the unwanted malopeartions due to the external LBB trip
initiation from PGCIL Vide letter Dt 04-08-2016 APTRANSCO has
requsted the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1 amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 15-11-2016
To avoid the unwanted maloperations due to the external LBB trip
initiation from PGCIL vide letter Dt 04-08-2016 ARTRANSCO has
requested the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 20-12-2016
Waiting for the PGCIL response
APTRANSCO mail dated 04032017 amp 24052017
SRPC is requested to coordinate with PGCIL in takind necessary action
Pending
Tripping of 400kV Krishnapatnam-
Nellore line-1
Line tripped on B-phase to earth fault and auto-
reclose was successful at Nellore(AP) end and un-
successful at Krishnapatnam end
APGENCO
56II13 Tripping at 220kV Gooty Substation of
APTRANSCO
24-06-2016 at
1604 hrs
LBB protection got operated for 400220kV ICT-2
breaker which had resulted in tripping of 220kV Bus-
2 at 220kV Gooty Substation
1 APGENCO SDSTPS to correct logic and ensure healthiness of ARscheme employed for transmission lines emanating from SDSTPSand furnish an action taken report to PCSC forum
2 APGENCO SDSTPS to configure DRrsquos of line protection relaysfor a post triggering period of 2 sec to capture complete ARoperation at their SDSTPS
Yet to be informed Pending63III1 28-02-2017 at
0516 hrs
1 APGENCO SDSTPS to correct logic and ensure healthiness of AR
scheme employed for transmission lines emanating from SDSTPS
and furnish an action taken report to PCSC forum
2 APGENCO SDSTPS to configure DRrsquos of line protection relays
for a post triggering period of 2 sec to capture complete AR
operation at their SDSTPS
Tripping of 400kV Krishnapatnam-Nellore line-2
R-phase to earth fault had occurred in line Auto reclose was successful at Nellore however protection at Krishnapatnam end issued a 3 phase
trip
APGENCO63III3 02-03-2017 at 455 hrs
1APTRANSCO to check the healthiness of the connecting cable
between Gooty (PGCIL) and Gooty (APTRANSCO) and replace it
if required
2APTRANSCO to ensure that the distributed architecture employed
in implementing busbar protection at their Gooty 220 kV SS does not
introduce any unwarranted delays in transmitting the triggering signals
to the Central Unit
APTRANSCO
Annexure-III
Page 1 of 31
63II2 Tripping of 400 kV KV Kota-Suryapet
line
01-03-2017 at
2005 hrs
Line tripped on operation of over-voltage protection
at KV Kota and Direct Trip was received at Suryapet
1 APTRANSCO to furnish (i) FIR amp TR for tripping events as
per SRLDC provided formats and (ii) DR amp EL within 24-hrs of
occurrence of tripping event in line with IEGC Regulation 52
(r)
2 APTRANSCO to adopt new OVR gradings for KV Kota
feeders and confirm the same
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
1 FIR furnished amp DR configured
Pending
63II16 Multiple Trippings at 220kV Vizag
Switching Station (VSS) of APTRANSCO
27-03-2017 at
1016 hrs
Bus-2 bus bar protection operated at 220kV VSS
end resulting in the tripping of all the elements
connected to bus-2
1 APTRANSCO to furnish a detailed report on the reasons for LBB
BBP operation at 220 kV VSS for a fault on 220 kV Gangavaram
feeder and remedial action taken to prevent recurrence of such
events
APTRANSCO Yet to be informed Pending
64II1 Tripping of 400220KV 315MVA ICT-
1and 230kV elements at 400kV Vemagiri
substation of APTRANSCO
09-04-2017
at 1231 hrs
Suspected mal-operation of Busbar protection had
caused tripping of 220kV Bus-1 at Vemagiri
APTRANSCO to furnish a report on the remedial action taken along
with single line diagram of 400220 kV Vemagiri SS indicating fault
location and CBs involved and protections operated
APTRANSCO Yet to be informed Pending
64II2 Tripping of 400220 kV ICTrsquos ndash 2 amp 3 at
400 kV Ghani substation of APTRANSCO
10-04-2017
at 1729 hrs
ICTrsquos ndash 2 amp 3 got tripped due to operation of 220 kV
Bus-2 busbar protection at 400220KV Ghani
substation
APTRANSCO to furnish single line diagram of 400 220 kV Ghani SS
clearly indicating (i) bus-configuration (ii) location of fault (iii)
breakers involved and type of protections operated
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
Single line diagram sent vide mail dated 27062017
Pending
64III1 Tripping of 400 kV Uravakonda-
Jammalamadugu line-1
02-04-2017 at
1758 hrs
R-phase to earth fault and line did not auto-reclose
Fault clearing time - 500ms
For the line under consideration APTRANSCO to check amp ensure
healthiness of carrier protection and make Auto-Reclosure
functional
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
Carrier aided protection scheme has been tested end to end and rectified
the problem
Pending
64III5 Tripping of 400kV Krishnapatnam-
Nellore line-2
11-04-2017 at
241 hrs
Line tripped on Y-phase earth fault Line auto-
reclosed at Krishnapatnam and did not auto-reclose
at Nellore-AP (Manubolu)
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a report
on the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64III6 Tripping of 400kV Krishnapatnam-
Nellore line-1
12-04-2017 at
251 hrs
Line tripped on Y-phase earth fault Line auto-
reclosed at Krishnapatnam and did not auto-reclose
at Nellore-AP (Manubolu)
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a report
on the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64III10 Tripping of 400kV Krishnapatnam ndash
Nellore_AP line-1
13-04-2017 at
438hrs
Y-phase to earth fault Line auto-reclosed from
Krishnapatnam end and did not auto-reclose fromNellore-AP end
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a reporton the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64IV4 Tripping of 400 kV VTPS-Malkaram line 20-04-2017 at
1624 hrs
Line tripped on Direct Trip Receive at Malkaram and
was in service from VTPS
For the line under consideration APTRANSCO to check the
healthiness of protection couplers and take suitable remedial action including replacement of the same
APTRANSCO Yet to be informed Pending
65II10 Tripping of 400220 kV ICT-2 at Kalpaka
SS
20-05-2017 at
1502 hrs
ICT-2 tripped due to operation of Transformer
Buchholtz relay
APTRANSCO to furnish details of AC auxiliary supply details
including its redundancy DG set details and its mode of
starting AC auxiliary supply changeover scheme drawing shall
also be furnished
APTRANSCO Yet to be informed Pending
1 APTRANSCO to check and correct all CT Neutral
Connection settings in various protection relays at their 400
220 kV Ghani PS
2 APTRANSCO to ensure that PLCC carrier aided protection
is maintained healthy on 220 kV lines emanating from their
400 220 kV Ghani PS
3 APTRANSCO to take steps to complete configuration works
of DR‟s amp EL‟s of various protection relays at their 400 220
kV Ghani SS and furnish the same as and when required in
compliance of IEGC Regulation 52 (r)
ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
07-05-2017Tripping of 400220 kV Ghani ICT-2amp3 65II4 APTRANSCO Yet to be informed Pending
APTRANSCO mail dated on 31-08-2016
To avoid the unwanted malopeartions due to the external LBB trip
initiation from PGCIL Vide letter Dt 04-08-2016 APTRANSCO has
requsted the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1 amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 15-11-2016
To avoid the unwanted maloperations due to the external LBB trip
initiation from PGCIL vide letter Dt 04-08-2016 ARTRANSCO has
requested the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 20-12-2016
Waiting for the PGCIL response
APTRANSCO mail dated 04032017 amp 24052017
SRPC is requested to coordinate with PGCIL in takind necessary action
Pending56II13 Tripping at 220kV Gooty Substation of
APTRANSCO
24-06-2016 at
1604 hrs
LBB protection got operated for 400220kV ICT-2
breaker which had resulted in tripping of 220kV Bus-
2 at 220kV Gooty Substation
63III2 02-03-2017 at
157 hrs
1 APTRANSCO to check and ensure correctness of AR operation
for the lines emanating from their Nellore-AP (Manubolu) SS
2 APTRANSCO to configure DR‟s of line protection relays for a
post triggering period of 2 sec to capture complete AR operation at
their Nellore-AP (Manubolu) SS
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
1The ABB make REL 670 type main-2 distance relay seen the fault as Y-
B phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
1APTRANSCO to check the healthiness of the connecting cable
between Gooty (PGCIL) and Gooty (APTRANSCO) and replace it
if required
2APTRANSCO to ensure that the distributed architecture employed
in implementing busbar protection at their Gooty 220 kV SS does not
introduce any unwarranted delays in transmitting the triggering signals
to the Central Unit
APTRANSCO
Tripping of 400kV Krishnapatnam-
Nellore line-1
Line tripped on B-phase to earth fault and line auto-
reclosed from Krishnapatnam end but did not auto-
reclose from Nellore-AP end
Annexure-III
Page 2 of 31
64II16 Tripping of 400 kV VTPS-Satenapalli line-
2
30-Apr-17 at
428 hrs
Line tripped on B-phase to earth fault FIR DR and
EL of both ends were not furnished to validate the
tripping
APGENCO and APTRANSCO to furnish a detailed report on the
events leading to tripping of the line along with remedial measures
taken to PCSC forum
APGENCO
APTRANSCO
Yet to be informed Pending
65II8 Tripping of 400220 kV Hyderabad ICT-
4 and 220 kV lines at Hyderabad
substation
10-05-2017 at
239 hrs
Operation of busbar protection due to fault in 220 kV
Bus at 220kV Hyderabad Substation
TSTRANSCO to investigate the reasons for BBP operation for 220
kV Bus-2 and furnish a report on the remedial measures taken
TSTRANSCO Yet to be informed Pending
24-12-2016 at
1052 hrs
Line tripped on B-phase to earth fault First fault was
persistent for 380 ms Auto-reclose was successful at
Khammam end during 1st fault 2nd fault occurred
during re-claim time of breaker hence Khammam end
breakers also got tripped
1 TSGENCO to implement the SRPC agreed philosophy for Power
Swing Blocking in all distance relays on the feeders emanating from
KTPS
2 For the line under consideration TSGENCO to consult relays
OEM to migrate to new versions of Firmware (from to 47201) and
Pset (to 47002)
61III5 Tripping of 400 kV Khammam - KTPS
line-2
The issue was discussed in PCSC-58 meeting held on 18102016 when
PCSC forum agreed to de-link the implementation of the Item from the
scope of Protection Audit Recommendations (PAR) and pursue it as part
of PCSC Recommendations
TSGENCO mail dated 30-05-2017
Procurement of Differential Protection relays is under process and the
work will be completed by the end of November 2017
TSGENCOProvision of line differential protection for Jurala line 1 amp 2 (line length-145 KM) feeders at 220 kV Jurala HPS [Carry-Over from Protection Audit Recommendations]58 Pending
Pendingline tripped on direct trip receive at Gajwel and was
holding from Hyderabad
Pending
06-10-2016 at
1216 hrs
For the line under consideration TSTRANSCO to carry out the
following in coordination with TSGENCO
(i) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
(ii) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(iii) Frequency bandwidth tuning of PLCC link for faithful
transmission of signals shall be carried out
62IV5 Tripping of 400 kV Gajwel-
Bhoopalapalli line-1
Telangana
TSGENCO TSGENCO mail dated 30032017
1 According to SRPC phylosphy power swing block settings are changed
to ALL ZONES BLOCK EXCEPT ZONE1
---------- Completed
2 Ms Siemens is requested to depute the service Engineer to update the
firm ware of existing SIPROTEC relays in 400KV switch yard This work
will be completed on or before 15042017 -------------- Pending
Pending
TSGENCO
TSTRANSCO
TSTRANSCO mail dated on 31-05-2017
1 Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Bhoopalpalli-1 line
59IV3
Line tripped at Bhoopalapally on DT receive and was
holding from Gajwel
TSTRANSCO mail dated on 21-12-2016
(i) Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Ghanapur line
(ii) Healthiness of PLCC system components will be checked while
conducting end to end testing
TSTRANSCO mail dated on 31-05-2017
1 Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Ghanapur line
TSTRANSCO
16-02-2017
at 1500 hrs
For the line under consideration the following shall be carried out by
TSTRANSCO in coordination with PGCIL (SR-I)
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
Tripping of 400 kV Gaiwel-Hyderabad
line
Annexure-III
Page 3 of 31
Karnataka
Annexure-III
Page 4 of 31
KPCL
38GD35 Pending13-11-2014 at
1931hrs
1 KPCL to make functional the Main2 (EPAC) relay with the
help of KPTCL at the earliest
2 KPCL to investigate the reason for DC fuse fail during
transient fault in 220kV Kadra-Kodasalli line including the testing
checking of DC supply cables breaker control cables and trip coils
3 KPCL to ensure supply for Main-1amp Main-2 protections Trip
Coils (TC1 TC2) from separate battery banks
Triggering incident was B-phase to earth fault had
occurred in 220kV Kadra-Kodasalli line Line tripped
from Kodasalli end only 220kV Kaiga-Kadra tripped
in Zone-3 from Kaiga end Tripping of evacuating
lines caused bus shut down at Kadra hydro station
16-02-2015 at
1256 hrs
GD-1 at Kadra and Kodasalli hydro
power station
GD-1 at 220kV Kadra power Station of
KPCL
41I1 Mail received on 28-05-2015
1 Main-2 relays already installed and commissioned
2 DC fuses are intact Till date no such incidence occurred
3 Possibility of DC-1 amp DC-2 arrangement and splitting of DC will be
reviewed
Mail received on 07-07-2015 21-10-2015 and 23-11-2015
1 Completed
2 Completed
3 Possibility of DC-1 amp DC-2 arrangement and splitting of DC will be
reviewed
Status received vide KPCL mail dated 14062017
1 Completed
2 Completed
3 Providing 2 separate DC sources is under process
Pending
Mail recieved on 28-05-2015
1) e-NIT floated on 28072014 for procurement of Numerical distance
relays amp GPS As there is change in scope of work and quantity of relays
by more than 25 which is not permitted as per KTPP act Hence tender
cancelled and refloated on 05052015 with revised scope of work and
revised PQR
2 However as per the recommendations of PSAG Relays were
temporarily rearranged replaced and wired up testing amp commissioning
shall be completed with the assistance of KPTCL
Mail recieved on 07-07-2015
1 Cover -1 of the bid is scheduled for open eing on 25062015
2 As per the recommendations of PSAG Relays were temporarily
rearranged testing amp commissioning completed with the assistance of
KPTCL
Mail recieved on 07-09-2015
NIT floated on 5515 through e-portal Bid evaluation completed
Obtaining of Administration approval to place PO is in progress
However as per therecommendationsof PSAG-10 Relays
weretemporarilyrearrangedTesting amp commissioning completed with the
assistanceofKPTCL
Mail recieved on 21-10-2015
NIT floated on 5515 through e-portal Bid evaluation completed LOAs
issued to Ms Schneider Electric Infrastructure Ltd on 08102015
Mail recieved on 23-11-2015
LOAs issued to Ms Schneider Electric Infrastructure Ltd on 08102015
Engineering work is in progress
Status informed during Special Meeting held on 03062016
LOA‟s issued to Ms Schneider on 08102015 Inspection of relays
completed and received at site DI issued for all balance materials except
furnitures
Status received vide KPCL mail dated 14062017
Numerical Distance Protection relays commissioned on 12042017
for all 4 lines at Kadra PH
Installation Testing and commissioning of Numerical Distance Protection
Relays for all the 4 outgoing lines is completed in all respect at Kodasalli
power house
KPCL1 The PCSC forum requested KPCL to speed up the installation of
Numerical Distance Protection relay in Kadra ndashKaiga and
Kodasalli ndashKaiga
2 The PCSC forum requested KPCL to submit the implementation
status of PSAG-10 recommendations within a week‟s time
A fault had occurred in 220 kV Kadra and Kodasalli
As A result de-energization of 220kV bus occurred at
Kadra and Kodasalli
Annexure-III
Page 5 of 31
49II15
54II4 Tripping of 400 kV Raichur TPS-
Mahboobnagar line
05-04-2016 at
1023 hrs
Line tripped on operation of Backup impedance
protection of line reactor Direct trip was received at
Mahboobnagar end
KPCL to keep the functioning of the concerned electro-mechanical
back-up impedance protection relay under observation and replace it
with a spare at the earliest
KPCL Status received vide KPCL mail dated 10072017
The electro-mechanical back-up impedance protection relay is in service
However Budgetary offer obtained for the retrofitting of Line reactor
protection with Numerical relay and is under process
Pending
54II9
Pending
PendingStatus informed during Special Meeting held on 03062016
1 Hot line washing was done previouslytender process is on for silicon
coating of insulators
Status received vide mail dated 10-07-2017
1 Off line water washing is being carried out whenever the Unit or Line is
under shutdown Silicon coating for Unit8 main amp tie breakers carried
out in Sep16 and same is under observation Till today in order and good
condition For remaining breakers since it is big order approval for the
same is under process
2 Static Electromechanical relays are existing in all 1 to 7 units Breaker
flash over protection feature will be enabled (if available) in the numerical
relays which will be retrofitted in phased manner during RampM works
KPCL1 KPCL to carry out hot-line washing of RTPS-connected lines
regularly to avoid trippings due to fog and dust
2 KPCL may see the feasibility of providing breaker flashover
protection at RTPS and implement the same if possible
Running Unit-4 5 and Unit-8 and 400kV RTPS-
Yeramaras TPS feeder got tripped due to de-
energization of both 400kV Bus-1amp2 at Raichur TPS
12-11-2015 at
0030 hrs
54I4 220 kV Nagjheri - Bidnal line tripped on B-E fault at
1228 Hrs At the same time five running generating
units (1 2 3 4 amp 6) at Nagjheri tripped on operation
of Generator Transformer‟s back-up Over Current amp
Earth Fault protection
PendingKPCL
1 KPCL to revise the settings of GT‟s back-up OC and EF
protections considering their individual contribution to solid bus fault
at 220 kV bus of Nagjheri PH
2 KPCL to upload make available various tripping files
(FIRDRELTR) for all tripping involving their stations in compliance
of IEGC Regulation 52 (r)
14-04-2016 at
1229 hrs
Tripping of Nagjheri Generators Pending
Trippings at 220kV Raichur TPS
13-04-2016 at
2112 hrs
1KPCL to undertake the following remedial measures to avoid
breaker flashovers
(i) Replacing all porcelain insulators with composite insulators
(ii) Carrying out hot-line water washing of all insulators on regular
basis
(iii) Applying Room Temperature Vulcanizing (RTV) Silicone high
voltage insulator coatings to all bus-connected ceramic insulators of
equipment like CT PT CB Isolators etc
2KPCL to take steps to provide dedicated breaker flashover
protection to all breakers at Raichur TPS at the earliest
KPCL
Tripping of 400kV Raichur TPS Bus-2
46II21
Trippings at Raichur TPS
Status received vide KPCL mail dated 10072017
1 i) Silicon coating for Unit8 main amp tie breakers carried out in Sep16
and same is under observation Till today in order and good condition For
remaining breakers since it is big order approval for the same is under
process ii) Hot line
water washing stopped and off line water washing is carried out whenever
the 400 KV Unit or line is under tripped condition Shutdown condition
2 Static Electromechanical relays are existing in all 1 to 7 units Breaker
flash over protection feature will be enabled (if available) in the numerical
relays which will be retrofitted in phased manner during RampM works
Status received vide KPCL mail dated 14062017
1 GT backup overcurrent amp earth fault settings are revised as per the
recommendations of our head office CEEDBangalore copy of letter
enclosed
2 FIRDRELTR are being uploaded in the recent incidences as all the
main-2 relays are replaced with new numerical relays
Mail received on 21-10-2015
1) Anti-pumping contactors of all the nine 220KV Lines are in circuit and
tested periodically during AOH works of lines along with other protections
2) Completed
3) Possibility to use both the 220kV buses as main bus under normal
operation is under review
Mail recieved on 23-11-2015
1) Completed
3) Two bus operation for 220kV buses In place of existing CT switching
relays High speed manual heavy duty change over switch of sufficient
current capacity will be retrofitted to all feeders at 220kV station and same
will be operated manually during changeover of feeder by one bus to the
other and this arrangement may facilitate to put both buses in service Time
required for this retrofit is around 90days However this work will be
taken up only after retrofitting of electromagnetic relays with numerical
relays for Main-2 protection of all 220kV lines for which work is in
progress
Status received vide mail dated 10-07-2017
1) Completed
2) Completed
3) Two Bus operation for 220kV bus is being carried out whenever
required However scheme for tripping of one bus during LBBfault and
maintaining the other bus intact by tripping BC breaker will be taken up in
RampM works
KPCL1 KPCL to check the operation of anti-pumping relay on 220 kV side
and keep it in healthy condition
2 KPCL to provide manual reset to the 220 kV side master trip relay
3 KPCL to use both the 220 kV buses as main buses under normal
operation and should go for single bus operation only during
emergencies
07-06-2015 at
0135 hrs
Y-ph Pole of Tie-breaker of Unit-4 at RTPS failed
Unit-4 got tripped on operation of Generator
Differential Reverse power amp LBB protection
Operation of LBB protection led to tripping of BUS-2
at RTPS
Annexure-III
Page 6 of 31
55II1
56I2 Complete outage of 220kV Sedam
Substation of KPTCL
19-06-2016 at
1527hrs
220kV Sedam-Humnabad-2 tripped at Sedam on
Distance protection Zone-2 Sedam-RTPS-1 amp2 lines
tripped at RTPS end only 220kV Tandoor inter-state
line was hand tripped due to incoming supply failure
KPCL to disable GFC protection on all lines emanating from their
generating stations
KPCL Status received vide KPCL mail dated 10072017
As per the reccomndations of KPTCL in Feb16 the settings are done with
a time delay of 2 secs
Pending
57II3 Tripping of 400220 kV ICT-2 at Raichur
TPS
07-07-2016 at
332 hrs
ICT-2 tripped on operation 400220KV ICT-2 was
tripped on operation of 220KV side Instantaneous
over current protection during B-phase to earth fault
in 220kV RTPS-Sedam-II line
KPCL to review appropriately the high-set of ICT‟s back-up OC
protection at their 220 kV RTPS so that they do not operate for a
normal through fault
KPCL Status received vide KPCL mail dated 10072017
The settings will be reviewed in co-ordination with KPTCL amp OEM
Pending
KPCL
Pending
Pending
KPCL Status received vide KPCL mail dated 14062017
1 All logics checked and found normal LBB timing checked and found
200msec as per KPTCL MRT recommendation - Completed
2 Work Under Progress
3 New GPS System commissioned along with new numerical and
synchronised with GPS system - Complied
4 Work Under Progress
Status received vide KPCL mail dated 14062017
1 DEF settings in lines are made as per recommendations of CE(RT) amp
RampD KPTCL Bangalore amp EE(RT) KPTCL Hubli
High set operation of DEF relays is disabled at Kodasalli end
2 All these guidelines are incorporated by KPTCL during the replacement
of line protection relays
3 New stand alone event logger is to be procured since spares for old
stand alone event logger are obsolete
KPCL (i) KPCL to disable high-set operation of DEF relays
(ii) KPCL to block DEF relays whenever corresponding distance
protection relays pick up at Kodasally end on Nagjheri ndash Kodasalli
lines and
(iii)KPCL to provide stand-alone Event Logger at their 220 kV
Nagjheri PH
Bus dead occurred at 220kV Nagjheri PH due to
tripping of evacuating lines
KPCL
31-08-2016 at
1247hrs
Pending
Tripping of 400kV Bellary TPS-
Yeramarus TPS line and
400kVYeramarus TPS - Raichur TPS
line
PendingYet to be informed55II19
Tripping of Units at Raichur TPS During testing of retrofitted distance protection in
400kV Raichur-2 feeder LBB protection trip DC got
extended to Bus trip This resulted in tripping of
220kV bus at RTPS and all connected 220 kV
elements Unit-4 which is connected to 400 kV Bus
got tripped due to tripping of Station Utility
Transformer that is connected 220 kV bus
58I2 (GD)
Complete outage of 220 kV Kadra power
station of KPCL
54II13
1KPCL to properly configure the distance relays at YTPS end on
both YTPS ndash BTPS line and YTPS-RTPS line with specific focus on
reaches and timings of Zone-2 Zone-3 and Zone-4 (reverse)
2KPCL to ensure the healthiness of Direct Trip circuits and relay
coils at YTPS
3KPCL to ensure time sync of DR‟s and EL‟s at YTPS with GPS
06-09-2016
at 1440 hrs
31-05-2016 at
1721 hrs
Direct Trip was sent from YTPS to RTPS and BTPS
01-05-2016 at
2144 Hrs
LBB of 220kV Kodasalli breaker at Kadra end got
operated which resulted in tripping of Bus at Kadra
and in turn led to tripping of all elements
(i) KPCL to check settings of LBB protection in all relays from which
it was implemented and ensure that their configuration logic and
timing are in order at their 220 kV Kadra PH
(ii) KPCL to furnish details regarding the existing LT auxiliary
supply arrangement at their 220 kV Kadra PH and take steps to
provide a suitable Auto-Main-Fail (AMF) panel for DG set to effect
its auto-starting in case of failure of LT supply
(iii) KPCL to ensure time-sync of all relays (DR‟s amp EL‟s) with GPS
at their 220 kV Kadra PH
(iv) KPCL to provide stand-alone Event Logger at their 220 kV
Nagjheri PH
Complete outage of 220 kV Nagjheri PH
of KPCL
Multiple tripping at 400 kV Raichur TPS
Station
15-04-2016 at
1536 hrs
Triggering incident was failure of R-phase CT of
400220kV ICT-1 400kV YTPS-RTPS line got
tripped from YTPS end 400kV RTPS-
Mehaboobnagar line tripped on a B-phase to earth
fault
In view of the availability of two buses along with healthy bus-
coupler at 220 kV RTPS KPCL is recommended to put in service the
double-bus operation at 220 kV RTPS by suitably distributing loads
within 15 days
Status received vide KPCL mail dated 10072017
Two Bus operation for 220kV bus is being carried out whenever required
However scheme for tripping of one bus during LBBfault and maintaining
the other bus intact by tripping BC breaker will be taken up in RampM
works
1KPCL to enable zero-sequence compensation feature if not already
done in all differential relays of transformers at RTPS
2KPCL to examine in detail the reasons for SOTF operation at RTPS
end for the fault on RTPS-Veltoor line and if required relay
(configuration) settings at RTPS end may be suitably got revised with
the help of their OEM
3KPCL to take steps to enable auto-reclose for the Tie-CB‟s in the
dias containing Munirabad and Veltoor (Mehboobnagar) at RTPS
KPCL Status received vide KPCL mail dated 10072017
1) Zero-sequence compensation feature is already enabled in all the
differential relays of transformers ---Completed
2) Referred to OEM for the tripping of line on SOTF protection
3) Action has been taken to retrofit the protection relays of tie bays of
Mahbubnagar and Munirabad line to enable Auto-reclosure function
58I3 (GD)
Pending
Annexure-III
Page 7 of 31
Status received vide KPCL mail dated 14062017
1 On 09092016 at STRPTwo units were running(Unit-3 amp Unit-4It is
to clarify that Station tripped due to spurious operationLBB relay in Unit-
4 and not due to operation of Unit-3 LBB as indicated in PCSC
recommendations Unit-3 which was in service tripped as a consequence of
LBB ProtectionHow ever following actions performed in both Units
a) Trip coil-1 and Trip coil-2 circuit (including cable from protection panel
to GCB Marshaling Box)of GT Breakers of Unit 03 and 04 checked found
ok
b) Integrity of Connecting cableconductor from Generating unit no3 and
also to its corresponding GT Breakers inspected and found ok
c) Regarding Spurious operation of Unit No04 LBB relay and its
timerChecked the operation of the LBB overcurrent relay with its external
Timer for repeated correct operations it was found that LBB Timer was
giving correct timing operation for 1 in 3 operations only ie for one of the
operation it was operating within 40ms compare to set value(200ms) hence
declared as faulty and the same has been replaced with new one later
operation of the new Timer checked and found okoperating for gt200mse
only With this cause for spurious operation of LBB and resulting in
complete outage of STRP has been identified and solved -----
Completed
2 In Unit -3MCR is working satisfactorilyit is to clarify that problem was
existing in Unit No4 AVR manual channel reference value of Generator
The Same has been replaced with spare one Manual channel AVR is
found to be Ok ------Completed
3 All the units AVRs Healthyness checked and found Ok -
-----
Completed
4 Presently at GPHno stand alone Event logger exists Since the subject
requirement pertains to all the Generating units and in view of
Standardization of the complete system Networking of numerical relays
carried out and events are availble in networking system
KPCL
Pending
(i) KPCL to ensure the integrity of the connecting cable conductor
from Generating Unit-3 to its corresponding GT breaker at their STR
PH
(ii) KPCL to ensure the healthiness of Manual Current Regulator
(MCR) of Unit-3‟s AVR at their STR PH
(iii) KPCL to ensure the healthiness of AVR‟s of all Units of STR
PH
(iv) KPCL to provide stand-alone Event Logger at their 220 kV STR
PH
Spurious operation of LBB protection of line feeder
had led to tripping of 220 kV bus at Sharavathy Tail
Race power house
9-09-2016 at
1119 hrs
Pending
12-09-2016 at
1447 hrs
(i) KPCL to check and correct configuration settings of LBB
protection in all relays from which it was implemented at their 220
kV Varahi PH
(ii) KPCL to provide stand-alone Event Logger at their 220 kV STR
PH
KPCLLBB protection operated and caused bus shut down at
Varahi PH
Pending
Partial disturbance occurred in central Kerala grid due
to overloading and tripping of 220 kV lines Loss of in-
feed to 220 kV Kalamassery 220 kV Brahmapuram
220 kV Ambalamugal 220 Pallom amp 220 kV Kochi
occurred Generation at Neriamangalam Panniar
Chengulam and Pallivasal also got affected during the
incident
(i) SLDC KSEB to put in place proper mechanism to ensure
adequate load-generation balance is maintained in their control area at
all times and due vigilance is exercised in operating an already
depleted transmission network
(ii) KSEB to put UFR in service at New Pallom end on 220 kV New
Pallom ndash Amabalamugal line as part of Kudankulam Regional
Islanding Scheme
KPCL
Status received vide mail dated 14062017
LBB Protection system is in Bus bar Protection PanelThe Configuration
settings are checkedThey are as follows
Minimum operating primary current is 160A
Stage IIssue of Retrip to the feeder is 100ms after the action of main
distance protection Relayinitiation of LBB
Stage IIBus bar LBB Trip -200ms
Total time of LBB trip is 300ms from the time of occurrence of Line Fault
(i) KPCL to adopt the following VT fuse-fail logic for all 220 kV
lines emanating from NPH
ldquoUnder VT fuse fail condition distance protection shall normally be
kept blocked However upon detection of a fault (sensed by negative
sequence component) blocking of distance protection shall give rise
to operation of its inherent Over-Current protection set with a definite
time delay of 500 msecrdquo
(ii) KPTCL KPCL to revise Zone-2 Zone-3 and Zone-4 (reverse)
timings of DPR of all 220 kV lines emanating from Nagjheri PH in
line with Ramakrishna Committee guidelines
Triggering event was the fault on 220 kV Nagjheri
ndashKodasalli line-2 Both buses of 220 kV Nagjeri
power station of KPCL got
de-energized
62I1 KPCL Status received vide mail dated 14062017
1 Already settings are discussed with EE(RT) Hubli and soon relays will
be tested for VT fuse fail condition
2 Timings of Zones were set as per the recommendations of CE(RT) amp
RampD KPTCL Bangalore amp EE(RT) KPTCL HubliRegarding revision
of timings will be carried out in co- ordination with EE(RT) KPTCL
Hubli
15-09-2016 at
1406 hrs
Complete outage at Varahi Hydro Power
Station
Disturbance in Kerala system Yet to be informed Pending
58I5 (GD)
58I7 (GD)
21-01-2017
at 0038 hrs
Complete outage of 220 kV Sharavathy
Tail Race PH
58I6 (GD)
Complete outage of 220 kV Nagjheri
substation of KPCL
Annexure-III
Page 8 of 31
65II9 Tripping of 400220 kV ICT-1 at BTPS 13-05-2017 at
1941 hrs
ICT-1 got tripped on operation of LV side earth fault
protection during R-phase to earth fault in 220 kV
BTPS-Lingapur line
1 KPCL to review the need for providing separate non-directional
sensitive earth fault protection for ICT‟s at their BTPS station and
take steps to disable the same
2 For 220 kV BTPS ndashLingapura line KPCL to resolve issues relating
to PLCC carrier communication and put AR into service
KPCL Yet to be informed Pending
65III2 Tripping of 400 kV Hiryur-BTPS line-1 06-05-2017
at 1401 hrs
Y-phase to earth fault had occurred in line Direct
trip was sent from BTPS to Hiryur end
KPCL to introduce suitable delay (say 3 sec) for UVR tripping and
disable sending of DT to the other end on UVR operation at their
BTPS station
KPCL Yet to be informed Pending
PendingMail received on 27-05-2015 (KPTCL) amp 29-07-2015
1Existing Back up relays will be replaced by numerical type distance
relaysProcurement is in tendering stage
2 Completed
3 Completed
KPTCL Mail recieved on 23-01-2016
1 Existing back up relays will be replaced by Main-2 protection LOI
issued Ms Alstom for taking up the works
KPTCL Mail Recieved dated 25-05-2016
Under the Scope of RampU The work will be taken up by Ms Alstom
shortly
KPTCL Mail Recieved dated 25-04-2017
1 ALSTOM make P442 type Numerical relays are supplied to the site
replacement of M-1 relays(OPTIMHO) by new relays will be taken up
shortly
KPTCL
KPCL Status received vide mail dated 10072017
1 Furnishing FIR amp TR of the tripping events as per the formats provided
by SRLDC
4 Refered to OEM for the tripping of Tie CB of Munirabad line on SOTF
protection
Pending
1 PCSC forum recommended KPTCL to replace the old static
distance protection relays with numerical relays
2 PCSC forum also requested KPTCL to provide a broken conductor
alarm indication in Control Room
3 Standing instruction needed to be given to the all substation
personnel for not changing the relay settings without approval of
RTMRT wing
Fault had occurred in 220kV
Mahalingapura-Narendra line-2 Due to the failure of
relay operation at Mahalingapura breakers at remote
end tripped which resulted in bus dead condition
1 KPCL to start furnishing FIR and TR of their tripping events as
per the formats provided by SRLDC
2 KPCL to check earth-mat resistance for 400 kV switchyard and
ensure that it is within prescribed limits
3 KPCL to set right operation of SER in CampI Control Room of Unit-
4
4 KPCL to furnish action taken wrt tripping of Tie-CB of
Munirabad line on SOTF protection OEM report in this regsrd may
be furnished
25-10-2014GD-1 at Mahalingapura Substation of
KPTCL
38GD31
63II10 Multiple trippings at 400 kV RTPS
substation of KPCL
16- 03-2017 at
0118 hrs
Bus-2 B-Ph differential bus bar protection operated
at 400 kV RTPS end tripping all the main breakers
connected to Bus-2
Annexure-III
Page 9 of 31
Pending
Suspected mal-operation of 220kV side Rphase
over current relay
Line tripped on Yphase to earth fault from both the
ends
20-12-2014
at 2220 hrs
KPTCL was requested to explore the possibility of providing AR
feature to this line and submit the remedial measures to the PCSC
forum
Pending
KPTCL1 Till the completion of RampM works for bus bar and LBB protection
KPTCL shall explore the possibility of having split bus operation at
Ambewadi and submit the details of the same to PCSC forum
2 KPTCL shall provide the details of the tripping of Supa hydro
station connected downstream from 110 kV bus
39I5
40I1
220kV Sedam-
Tandur line
Triggering incident was B-phase to earth fault in
220kV Ambewadi- Nagzari line-1 B-pole of breaker
did not open at Ambewadi end LBB protection not
available at Ambewadi end All elements tripped on
Zone-2 from remote ends
01-12-2014Tripping of 400220kV
ICT-2 at Hoody
substation of KPTCL
40IV1
Mail received on 27-05-2015 amp 29-07-2015
1 CampR panels of 500MVA ICT 1amp2 will be replaced under scheduled
RampM works
2 OampM personnel are instructed to take sufficient care in order to avoid
unwarrented trippings --- Completed
KPTCL mail received on 23-01-2016
1 New CampR panels(with numerical relays) erected for 500MVA ICT-1
amp2 under RampM work which will be commissioned shortly
KPTCL mail received on 25-05-2016
1 New CampR panels(with numerical relays) erected for 500MVA ICT-1
amp2 under RampM work which will be commissioned shortly
KPTCL mail received on 25-04-201
1 New CRPs mounted in bay KIOSK commissioned under RampM works
KPTCL1 PCSC forum recommended KPTCL to replace the relay with a
different make
2 KPTCL was also requested to train the OampM personnel
adequately before performing any maintenance works to avoid such
unwanted trippings
PendingMail recieved on 29-07-2015
Carrier protection is being restored for 220kV Sedam-Tandoor line at
Sedam end After restoring the carrier protection AR will be enabled
KPTCL mail recieved on 23-01-2016
Carrier protection is being restored for 220kV Sedam-Tandoor line at
Sedam end After restoring the carrier protection AR will be enabled
KPTCL mail recieved on 25-05-2016
SEESCADA to update the latest status
KPTCL mail recieved on 28-06-2016
Action is being taken to restore carrier protectionAR will be enabled once
carrier signal is restored
KPTCL
22-12-2014 at
2122 hrs
Mail received on 28-04-2015
1 In view of operating 220kV Ambewadi SS in split bus mode action is
being taken up by KPTCL Problem in the 220kV bus coupler breaker is
attended and isolator overhauling work is under progress Spilt bus
operation at Ambewadi will be made possible at the earliest
2 ICT Protection system at Ambewadi and trippings occured at Supa GS
during the instance is checked up and remedial measures already furnished
in this regard
---- Completed
Mail recieved on 29-07-2015
1 Action is being taken by KPTCL for operating Ambewadi in split bus
mode Problem in bus coupler breaker is attendedIsolator overhaulling
work is completedPTs are already provided to 220kV Bus-II After
commissioning of Bus-II PTs Ambewadi can be operated in split bus
mode Pending works will be completed within a months time
KPTCL mail recieved on 23-01-2016
1 Bus-II PTs yet to be commissionedPlanned to complete before end of
April-2016
KPTCL mail recieved on 25-04-2017
1 Yet to be attended
GD-1 at 220kV Ambewadi Station of
KPTCL
Annexure-III
Page 10 of 31
1 KPTCL to provide Bus Bar protection and LBB protection at
Sedam Ss and furnish the status of their implementation to PCSC
forum
2 KPTCL to implement AR feature on 220 kV Sedam-Tandur inter-
state line
Mail received on 28-04-2015
Procurement of Bus bar and LBB protection is in the final tendering stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
KPTCL mail received on 23-01-2016
1 Bus bar protection panels pocured and erected at Sedam Wiring
testing commissioning is being taken upPlanned to complete by April
2016
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
KPTCL
12-03-2015 at
751 hrs
1 KPTCL shall provide AR feature on Ambewadi ndash Ponda 220 kV
DC inter-state line
2 Till the completion of RampM works for bus bar and LBB protection
KPTCL shall explore the possibility of having split bus operation at
Ambewadi and submit the details of the
same to PCSC forum
Mail received on 27-05-2015
1 Bus Bar protection will be provded under RampU
2 AR yet to be enabled
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
Fault occurred in 220kV Sedam-Shahpur line
All connected 220kV lines and transformers were
taken on 220kV North bus as South bus was under
shut down for conversion of strung bus to rigid bus
and isolator replacement under RampM works Failure
of HV side Y phase CT of 150MVA Transformer-3
occurred at Peenya Substation which resulted in
operation of Differential and HV REF protection The
failure of CT also resulted in a 220kV bus fault in
North Bus
KPTCL to revise distance relay settings at Nelamangala end for 220
kV Nelamangala ndash Hebbal - Peenya line ndash 1 for the effective line
length of 17 km These new settings can be appropriately reviewed as
and when the tie-arrangement at Hebbal is done away with
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
Pending
PendingKPTCL
30-09-2015 at
1041 hrs
Pending
Outage of 220kV Ambewadi station in
Karnataka
Pending
PendingKPTCL mail received on 23-01-2016
Will be complied in a months time
220kV Ambewadi-Nagjheri line-2 tripped on B-phase
to earth fault This resulted in loss of supply to 220kV
Ambewadi bus 220kV Ambewadi-Ponda line-1amp2
were hand tripped after deenergization of bus at
Ambewadi
KPTCL
Complete outage of 220kV Ambewadi
substation of KPTCL
42I2 (GD)
27-09-2015 at
42317 hrs
Fault in 220kV Ambewadi-Nagjheri line-2
KPTCL
KPTCL
KPTCL mail received on 25-05-2016
Presentl 220kV Nelamangala -Hoody(ie nelamangala-Peenya-Hebbal -
Hoody line is made LIILO at Yelahanka sub station and breaker at
Peenya is kept open necessary modification in distance relay settings
adopted for new configuration
15-02-2015 at
1424 hrs
Complete outage of 220kV Peenya
Substation in Karnataka
R-Phase to ground fault occurred on 220kV Sedam-
Shahpur line Fault not cleared from Sedam end due
to stuck-breaker condition While the Sedam- Sahapur
line tripped from Shahapur end in Zone-1 the other
220 kv lines from Sedam tripped at remote ends in
Zone-2 This caused complete outage of 220kV
Sedam substation
42I1 (GD)
41I4
Complete outage of 220kV Sedam
substation of KPTCL
48I2 (GD)
48I3 (GD) KPTCL to fast-track providing AR on all 220 kV lines emanating
from Ambewadi SS to prevent Station shut-down on temporary faults
06-08-2015 at
451 hrs
220kV RTPS-Lingasugur line-2 tripped at TPS end
on operation of distance
protection zone-1 400220kV ICT-2 got tripped on
operation of earth fault
protection 220kV RTPS-Lingasugur line-1amp3 tripped
on distance protection zone-2 and zone-3
respectively Due to tripping of ICT-2 the running
units got overloaded and it was mentioned that under
frequency occurred as units are on load control The
Units got tripped on under frequency
KPTCL to activate non-directional Over Current protection with a
time delay of 600-800 msec for Fuse
failure condition at Lingasugur
KPTCL Status received vide KPCL mail dated 10072017
LV earth fault relay had an additional default Ef setting having a definite
time which resulted in tripping of ICT-2 and the same was rectified and
already complied
Pending
1 KPTCL to provide Bus bar and LBB protections for 220 kV
bus at Sedam Ss
2 KPTCL to implement AR feature on 220 kV Sedam-Tandur
inter-state line
27-01-2015 at
800 hrs
Complete outage at 220kV Sedam
Substation of KPTCL (GD-1)
Tripping of Unit-1amp2
along with 400220kV
ICT-2 at Raichur TPS
47II13
Annexure-III
Page 11 of 31
52I3 (GD) Complete outage of 220kV Shimoga
substation
22-02-2016 at
1503 hrs
220kV Bus Bar protection operated during failure of
R phase CT in DVG-2 line bay
KPTCL to operate 220 kV Shimoga on multi-bus operation under
normal conditions put it on single-bus operation only under
emergency conditions
KPTCL KPTCL Mail received dated 25-04-2017
Replacement of existing BBP by new BBP with 4 zone protection is being
taken up under RampU
Pending
56II6 Tripping of 220kV Ambewadi-Ponda
(Xeldam) line-1
10-06-2016 at
1333 hrs
Line tripped on Y-E faut due to DPR Z1 operation KPTCL to keep AR for Ambewadi ndash Ponda (Xeldam) line-1 in
service with immediate effect
KPTCL Yet to be informed Pending
59II13 Tripping of 220 kV Bidadi (PG) - Bidadi
lines - 1amp2
02-10-2016 at
1032 hrs
Line-2 tripped in DPR Zone-2 and Line-1 tripped on
operation of EF protection from Bidadi end
KPTCL to resolve PLCC carrier communication issues on 220 kV
Bidadi ndash Bidadi-PG DC lines and subsequently restore Zone-2
timing to normal values
KPTCL Yet to be informed Pending
1 KPTCL to configure all DR‟s and EL‟s at 400 kV Guttur SS so
that they will also get triggered for BBP operation
2 KPTCL to ensure time-synchronization of all DR‟s and EL‟s with
GPS at their 400 kV Guttur SS
KPTCL17-01-2016 at
1853 hrs
Pending
Pending
Yet to be informed PendingKPTCL
KPTCL
30-09-2015 at
1041 hrs
Complete outage of 220kV Ambewadi
Substation of KPTCL
Multiple tripping at 400kV Guttur sub-
station
Outage of 220kV Ambewadi station in
Karnataka
29102015 at
1434 hrs
Complete outage of 220kV Peenya
Substation of KPTCL
PendingKPTCL mail received on 23-01-2016
Will be complied in a months time
220kV Peenya-Nelamangala-3 tripped on B-E fault at
both ends At the same time 220kV Peenya-
Nelamangala-4 tripped on R-Y fault only at
Nelamangala end and was in service from Peenya
end Due to tripping of these two lines 220kV Peenya-
Nelamangala-2 tripped on overcurrent protection
KPTCL to furnish a report on the tripping of 220 kV Peenya-
Nelamangala line-4 Nelamangala detailing the remedial measures
taken including the settings adopted for Z1B (Zone extension) and
Power Swing Block
Pending220kV Nagjheri-Ambewadi line-1 tripped at 1333
hrs due to B phase to earth fault Ambewadi was
radially fed from Nagjheri power station through
220kV Nagjheri-Ambewadi line-2 Tripping of this
line caused 220kV Bus shut down at Ambewadi and
remaining lines and transformers were hand tripped
220kV Ambewadi-Nagjheri line-2 tripped on B-phase
to earth fault This resulted in loss of supply to 220kV
Ambewadi bus 220kV Ambewadi-Ponda line-1amp2
were hand tripped after deenergization of bus at
Ambewadi
KPTCL
Yet to be informedKPTCL
KPTCL Mail received dated 25-05-2016
SEE RTC Bangalore to update the status
KPTCL Mail received dated 28-06-2016
Providing numerical bus bar protection to 400kV buses and GPS time
synchronising equipment at Guttur is considered under RampU Work is
awarded to Ms Alstom execution will be taken up shortly
KPTCL Mail received dated 25-04-2017
GPS and accessories will be supplied during May 2017 expected to
complete the work within a month after supply of materials
53I1
1KPTCL to take steps to provide busbar protection at their 220 kV
Chikkodi inter-regional substation and furnish a time-line for the
same
2KPTCL to review distance protection settings for 220 kV Chikkodi
ndash Kudachi line
3KPTCL to furnish equipment failure report of the current incident to
PSEampTD Division of CEA with a copy marked to SRPC
KPTCL Mail received dated 25-05-2016
SEE RTC Bangalore to update the status
1 KPCL to provide AR on all 220 kV lines emanating from Nagjheri
PH
2 KPTCL to provide AR on all 220 kV lines emanating from
Ambewadi SS
Failure of Lightning Arrestor of Y-phase Line Reactor
of 400kV Guttur-Hiriyur line-1 and line tripped on
distance protection Zone-1 Bus-bar protection of
400kV Bus-2 at Guttur substation also got operated
during the event sensing this through fault 400220
kV ICT-1 amp 2 at Guttur 400kV Kaiga-Guttur-2
400kV
Guttur-Narendra-2 400kV Guttur-Hiriyur-2 and
400kV Guttur-Munirabad which are on 400kV Bus-2
got tripped during the incident 400kV Guttur-
Narendra-1 which was on Bus-1 also tripped at the
same time
49I13 (GD)
Triggering incident was failure of B-ph PT of 220kV
Bus-2 (western bus) at 220KV Chikkodi substation
220KV Chikodi- Belgaum-I line tripped on DEFR
(Inst) 220KV Chikkodi-Kudachi line tripped on
Distance protection and also 100MVA transformer-2
tripped on EF protection
57II1 01-07-2016 at
0303 hrs
Tripping of 220 kV Chikkodi-Mudshingi
and 220 kV Chikkodi-Talandage lines
48I3 (GD) KPTCL to fast-track providing AR on all 220 kV lines emanating
from Ambewadi SS to prevent Station shut-down on temporary faults
51II21
16-03-2016 at
1139 Hrs
Annexure-III
Page 12 of 31
62II3 Tripping of 220 kV Bus 2 and connected
elements (220kV HAL 1 and 2
400220 kV ICT- 1 2 and 22066 kV
ICT-2) at 400220 kV Hoody substation
of KPTCL (Load loss 590 MW)
09-01-2017 at
2306 hrs
Failure of R-phase CT of 220 66 kV transformer-2 at
220kV Hoody end resulted in a bus fault in 220kV
Bus-2 Fault was cleared by backup protection of
ICTs (220kV lines were being radially operated) due
to absence of busbar protection
1 KPTCL to provide Busbar protection at their 220 kV Hoody SS at
the earliest
2 KPTCL to furnish an Equipment Failure Report on CT failure to
CEA with a copy marked to SRPC
KPTCL KPTCL mail received dated 25042017
Numerical BBP is being provided under RampM works
Pending
64II9 Tripping of 400 220 kV ICT-2 and 3 at
Hoody substation of KPTCL
26-04-2017 at
1540 hrs
ICT-2 tripped on suspected mal-operation Oil surge
relay of B-phase Transformer ICT-3 tripped due to
overloading
KPTCL to put in place a suitable SPS at their 400 220 kV Hoody SS
that takes care of over-loading of the other ICT when one ICT out of
ICT‟s ndash 2 amp 3 trips at the earliest and furnish the details of
implemented SPS to PCSC forum
KPTCL Yet to be informed Pending
65II17 Tripping of 400220 kV ICT - 1 amp 3 at
Hoody substation of KPTCL
(Load Loss 750 MW)
26-05-2017 at
1230 hrs
R phase limb of ICT-1 bank pre-close supervision
contact of trip coil -2 had arc over ICT-3 got tripped
on over-loading
KPTCL to furnish compliance report on the recommendations given
in PSAG-18 meeting to PCSC forum
KPTCL Yet to be informed Pending
Complete outage of 220kV Nagjheri
power station and 220kV Ambewadi
substation of KPTCL
51I3 PendingStatus informed during Special Meeting held on 03062016
1 KPTCL informed that the matter had been taken up with concerned Line
Operation and Maintenance wing to carry out corridor clearance and
maintenance as per schedule to avoid frequent line faults in this corridor A
letter had also been addressed to Chief Engineer Bhagalkot zone to ensure
lines in amp around Kali complex are maintained in healthy condition ---
Completed
2 KPTCL assurd that the final modified SPS would be implemented at
Nagjheri PH at the earliest ------ Pending
3 KPCL informed that Nagjhari- Kodasalli Lines 1 amp 2 had been kept in
service since 23052016 0806hrs ---- Completed
KPTCL Mail received dated 28-06-2016
Modifications to be carried in Nagzari SPS logic is submitted to
SRLDCSRPC for verification and approval
Status received vide KPCL mail dated 14062017
1 Will be reviewed in consultation with EE(RT) KPTCL Hubli
2 Both the lines are in charged condition
KPCL KPTCL 1 To avoid tripping of transmission lines on transient faults KPCL
KPTCL is recommended to carry out periodic patrolling of lines and
ensure their proper maintenance by carrying out jungle bushing
clearance and trimming of tree branches within the RoW of
transmission lines as per the SRPC transmission line patrolling
guidelines (available under the menu item All Uploads Operation
Miscellaneous Transmission Line Patrolling Protocol
Guidelines for Southern Region on SRPC website)
2 KPCL KPTCL to review operation of SPS at NPH for
functionality (reduction of generation with tripping of evacuating
lines) and healthiness
3 KPCL to put 220 kV Kodasalli - Nagjheri DC lines into service if
more than 200 MW generation from Kali Complex (with Nagheri
Contribution not less than 50 MW) is ensured on sustained basis
220kV lines from Nagjheri power house started
tripping from 1100 hrs due to fault in lines The
sequence of tripping is shown in SOE list At 1233
hrs 220kV Narendra-Ambewadi lines-1amp2 got
tripped which resulted in loss of evacuation path to
Nagjheri station resulting in tripping of running Units
and complete outage at Nagjhheri power station
220kV Ambewadi station also got de-energized due
to tripping of source feeders ie 220kV Narendra-
Ambewadi-1amp2 and 220kV Nagjheri-Ambewadi-
1amp2
22-02-2016 at
1236 hrs
Pending
Pending
KPTCL
For the line under consideration the following shall be carried out by
KPTCL in coordination with
PGCIL (SR-II)
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
KPTCLLine tripped at Hiryur end due to direct trip receive
and was holding from Guttur
KPTCL mail received dated 25042017
Numerical BBP is being provided under RampM works
KPTCL to provide numerical Busbar Protection at their 220 kV
Somanahalli SS at the earliest
Tripping of 400 kV Neelamangala-
Hoody line-1
KPTCL to carry out the following for the line under consideration
(i) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
(ii) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
Tripping of 400 kV Guttur-Hiryur line-1 10-10-2016 at
315 hrs
62IV4
59IV4
62II5 Tripping of 220 kV South Bus and
connected elements (220kV HSR 220kV
Nagnathpura 220 kV Harohalli 220 kV
Subramanyapura 220 kV Tataguni 220
kV Mallur and 400220kV ICT-2 and 3)
at 400220kV Somanhalli substation of
KPTCL
(Load loss 850 MW)
20-01-2017 at
1434 hrs
Triggering incident was fault in 66 kV Somanahalli -
Bannerghatta line and fault was cleared by operation
of Back-up OCR at Somanahalli end
15-02-2017
at 1344 hrs
Line tripped at Hoody end on direct trip receive and
was holding from Neelamangala end
Yet to be informed
KPTCL
Yet to be informed Pending
Annexure-III
Page 13 of 31
56I3 Complete outage of 220kV Ambewadi
Substation of KPTCL
24-06-2016 at
2057hrs
B phase to earth fault had occurred in 220 kV
Ambewadi-Ponda line-2 Fault was cleared by
tripping of feeders from remote end
1KPCL amp KPTCL to furnish an action taken report on the
recommendations given by PSAG-16 to PCSC forum
2KPTCL to keep AR for Ambewadi ndash Ponda line-2 in non-auto
mode (ie only 3-ph trip should get extended on occurrence of a
fault) till the line is closed from Ponda end
KPCLKPTCL Yet to be informed Pending
Complete outage of 220kV Ambewadi
station of KPTCL and 220kV Nagjheri
of KPCL
Ambewadi Narendra line-2 tripped on fault and
220kV ambewadi Narendra line-1 tripped due to over-
loading Running Units at Nagjheri also tripped during
the event due to tripping of evacuating lines
KPCL KPTCL18-03-2016 at
1440 hrs
1 TANGEDCO to replace existing Check-Zone relay with a new one
possessing required performance
2 TANGEDCO to take steps to provide numerical busbar protection
at their 220 kV Tuticorin TPS TANGEDCO may also explore
providing dual CT‟s (on either side) for all BS breaakers at the time
of commissioning of numerical BBP if there were no space
constraints
3 TANGEDCO to take steps to provide for standalone Event Logger
(EL) and standalone Disturbance Recorder (DR) with automatic
downloading facility to a centralized server
Failure of Bus Section-I Y-ph CT resulted in
operation of bus-bar protection for Bus Sections -I amp
II Running Units1 4 and 5 230 kV Kayathar
230kV Kudankulam 230kV Sterlite Station
Transformer-1 2 amp 3 got tripped during the incident
Unit ndash 2 amp 3 were not in service
22-02-2017 at
0616 hrs
KPCLKPTCL
25-01-2017 at
2236 hrs
R-phase to earth fault due to de-capping of insulator
Auto-reclose attempt was unsuccessful
Tripping of ICT-3 at Raichur Substation
TANGEDCO
Pending
Tripping of running Units amp 230kV
feeders at Tuticorin TPS of TANGEDCO
(Gen Loss 640 MW)
62II7
1 KPCL to furnish a report on the reasons for Unit-6 tripping at
Nagjheri PH
2 KPCL KPTCL to modify suitably the SPS at Nagjheri Power
House such that it would also factor in the over loading of Ambewadi-
Narendra lines
3 KPCL to put 220 kV Kodasalli - Nagjheri DC lines into service if
more than 200 MW generation from Kali Complex (with Nagheri
Contribution not less than 50 MW) is ensured on sustained basis
Pending53I3 (GD)
15-03-2016 at
1228 hrs
ICT-3 tripped due to operation of back-up earth fault
protection during fault in 220kV RTPS-Raichur line-
1
KPCL KPTCL to check the ICT‟s back-up (high-set) protection
settings and ensure that they operate with a time delay of 100 msec
TANTRANSCO mail dated 12042017
1 The recommendation will be ensured AR logic will be configured in
Distance Protection relay itself instead of BCU OEM has been addressed
2 Post triggering period of 2 sec to cover AR operation in DR time scale
will be provided
TANTRANSCO mail dated 01062017 amp 15062017
1 The recommendation will be ensured AR logic will be configured in
Distance Protection relay itself instead of BCU OEM has been addressed
Main-1 amp 2 relays will be replaced for the requirement of more output
contacts for AR logic implementation
2 Post triggering period of 2 sec to cover AR operation in DR time scale
is being provided
TANGEDCO1 TANGEDCO to take properly configure AR logic at NCTPS-II in
that in case of unsuccessful auto-reclsoure three-phase trip shall be
given along with AR block
2 TANGEDCO to configure all protection relays DR‟s time scale at
NCTPS-II for a post-triggering period of 2 sec to capture events such
as complete AR operation
Tripping of 400 kV NCTPS-
SVChatram line-2
KPTCL Mail received dated 28-06-2016
Modifications to be carried in Nagzari SPS logic is submitted to
SRLDCSRPC for verification and approval
Status received vide KPCL mail dated 14062017
1 Tripped since there was evacuation problem and there were only two
lines NA-1 and NA-2
2 Will be reviewed in consultation with EE(RT) KPTCL Hubli
3 Both the lines are in charged condition
TANGEDCO mail dated 15042017
1) New Relay is tested and ready for replacementNow all 5 units are in
serviceThe relay will be replaced when lesser units are in service ---
Pending
2a)Steps are taken to renovate amp mordernization of all the control panel
into Numerical based control panels --- Pending
2b) Since 230 KV indoor switchyard has no spare space providing dual
CT`s is not fessible -- Completed
3) Procurement of EL amp DR is under progress --- Pending
TANGEDCO mail dated 26042017
1) Check zone New Relay is replaced on 17042017 -- Completed
2 Pending
3 Pending
KPTCL Mail Recieved dated 25-05-2016
SEESCADA to update the status of healthiness of carrier protection of
220kV RTPS-Raichur 1 amp2 lines
KPTCL Mail Recieved dated 28-06-2016
Details sought from KPCL for review of ICTs back up (high set) proection
settings as suggested KPCL is yet to furnish the details required to give
the revised settings
Status received vide mail dated 10-07-2017
As requested by EEE (protection) CEERT KPTCL the details were sent
to through e-mail dtd 08082016 After receipt of reply from KPTCL will
be implemented accordingly
62V3 Pending
Pending
Tamil Nadu
53II1
Annexure-III
Page 14 of 31
05-09-2015 at
1404 hrs
TANTRANSCO to take suitable measures like installing more stub-
towers along 230 kV OK Mandapam ndash Myvady line to avoid
excessive sag due to over-loading
TANTRANSCO PendingComplete outage of 230kV Palladam 230 kV
Othakalmandapam Ss 230 kV Coimbatore Ss 230
kV Thudialur and 230 kV Sadayapalayam Ss
Pending
Disturbance in 220kV Tamilnadu system48I1 (GD)
TANTRANSCO TANTRANSCO vide their mail dated 240615 informed that different
relays in Main-I amp Main-II would be ensured at the earliest
Mail recieved on 24-07-2015 19-02-2016 and 24-03-2016
Different relays in Main-I amp Main-II will be ensured
Mail received on 27-04-2016
TANTRANSCO Not feasible in the existing SAS sub stations Hence
exemption may be given for these sub stations
Mail received on 20-05-2016 16-06-201625-07-2016 amp 24-09-2016
As discussed in the 52nd PCSC meeting Swapping of Relays between two
stations is not feasible in the existing SAS sub stations Hence exemption
may be given for these sub stations
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15062017
Different make Relays will be ensured for Main-I amp II relays at Alamathy
end
TANTRANSCO Mail received on 19-02-2016 24-03-2016 and 27-04-
2016
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
Mail Received on 20-05-2016 16-06-201625-07-2016 amp 24-09-2016
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
29-03-2015 at
1529 hrs
43II5 Line-2 tripped on R-phase to earth fault
Line autoreclosed at SVChatram end and failed to
reclose at Alamathy end Bphase to earth fault in line-
1 Line tried for Ar but due to permanent fault line
did not reclose ICT tripped on operation of over flux
protection
TANTRANSCO was requested to swap the relays between two
stations so that
Main-1 and Main-2 will be of different make at each station
Tripping of 400kV
Alamathy-
SVChatram line-1amp2
and 400230kV ICT
at SVChatram
Annexure-III
Page 15 of 31
14-09-2016 at 1113Hrs
Bus Bar Protection (Zone-2) of 230 kV Bus-B got operated at Alamathy Station during fault in 230 kV
Alamathy-Korattur feeder
51I1 (GD)
12-05-2016 at
1215 hrs
Fault had occurred in 230kV Madurai-Sembatty line
Trip from distance relay was not extended to breaker
due to protection DC fail LBB protection got
operated resulting in a busbar trip at 230kV Madurai
substation All elements got tripped as there is a
single bus operation at 230kV Madurai Ss
58II17
TANTRANSCO
TANTRANSCODifferent type and Make of distance protection relays to be provided for Main-I amp Main-II protection for 230kV feeders at 400 kV Sunguvarchathiram amp 230 kV Sunguvarchathiram Substation [Carry-Over from Protection Audit Recommendations]
Mail recieved on 25-07-2016 amp 24-09-2016
TANTRANSCO Auto Transformer-2 HV side Bus isolator C-phase
support insulator of 230kV Southern Bus was replaced and Bus Bar
Protection scheme was restored on 12052016
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
CT is not available in the Bus Coupler bay for zone segregation CT latch
relay is to be provided for all bays for zone segregation
TANTRANSCO mail received on 24-03-2016
CMR relay for extending LBB protection was released and LBB extended
from Distance Protection relay directly CT is not available in the Bus
Coupler bay for zone segregation However during commissioning of third
ICT Bus section Breaker will be provided for zone segregation Numerical
BBP relay will be provided
Status received vide mails recieved on 27-04-2016 and 20-05-2016 16-
06-2016 25-07-2016 24-09-201610-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
CT is not available in the Bus Coupler bay for zone segregation However
during commissioning of third ICT Bus section Breaker will be provided
for zone segregation Numerical BBP relay will be provided
PendingComplete outage of 230kV Madurai Ss
(Chekanaurani) of TANTRANSCO
TANTRANSCO
Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
TANTRANSCOMultiple tripping at 230 kV Alamathy Station
Pending
Pending
1 TANTRANSCO to check the healthiness of BBP relay by conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
TANTRANSCO to take steps to provide double-bus operation at
their 230 kV Gummidipoondi SS
Pending
Complete outage of 230 kV
Gummidipoondi Station of
TANTRANSCO
19-01-2016 at
1156 hrs
Flashover of Auto Transformer- 2 HV
B-phase Isolator supporting insulator of 230kV
Southern Bus occurred at Gummidipoondi station At
the time of fault Bus bar protection relay was not in
service for pre-commissioning testing of Auto
Transformer-2 All feeders got tripped due to
operation of zone-2 protection from remote ends
TANTRANSCO1 TANTRANSCO to examine the feasibility of providing two main-
zone operation for bus bar protection by exploring various alternatives
like replacing existing bus-coupler CB with a hybrid bus-coupler CB
that comes with inbuilt CT replacing existing BBP relay with another
suitable relay that supports two main-zone operation and implement
the same
Busbar protection got operated for a fault in 230kV
Mywadi-Anaikadavu line
21-12-2015 at
628 hrs
Complete outage of 230kV Mywadi
station of TANTRANSCO
50I3 (GD) TANTRANSCO Mail received on 19-02-2016 and 24-03-2016
Revision of Bus Bar Protection setting was carried out The stabilizing
voltage setting was raised from 410 to 450 volts After completing the
necessary test the bus bar protection put in to service on 29122015
Mail Received on 27-04-2016 16-06-201625-07-2016 amp 24-09-2016
Revision of Bus Bar Protection setting was carried out After completing
the necessary test the bus bar protection put in to service on 29122015
Mail received on 10-11-2016 amp 20122016
Provision of Bus Coupler bay arrangement was included in the
Upgradation works proposed and the same was sanctioned by MoP
through PSDF
Numerical relay allotted and being commissioned
Mail received on 20-02-2017
Numerical BBP relay was commissioned on 02022017
Status received vide mail dated 12042017 amp 01062017 amp 15-06-
2017
Numerical BBP relay was commissioned on 02022017
Provision of Bus Coupler bay arrangement was included in the
Upgradation works proposed and the same was sanctioned by MoP
through PSDF
The issue was discussed in PCSC-58 meeting held on 18102016 when
PCSC forum agreed to de-link the implementation of the Item from the
scope of Protection Audit Recommendations (PAR) and pursue it as part
of PCSC Recommendations
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp15-06-2017
Different make Relays will be provided for Main-I amp II relays at
Sunguvarchatram end in a phased manner
Pending
1 TANTRANSCO to provide split-bus operation with bus
sectionalizer CB for their 230 kV Madurai (Chekanurani) SS
2 TANTRANSCO to provide two main-zone operation for the
numerical BBP that is being commissioned
3 TANTRANSCO to examine the feasibility of providing Re-Trip
feature for the LBB protection and accordingly take steps for
implementing the same
58
55I1 (GD)
Annexure-III
Page 16 of 31
58II17 Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
TANTRANSCOMultiple tripping at 230 kV Alamathy
Station
15-09-2016 at
2214 hrs
Bus Bar Protection (Zone1) of 230kV Bus-A got
operated at Alamathy Station during fault in 230 kV
Alamathy-OPG-1 feeder
1 TANTRANSCO to check the healthiness of BBP relay by
conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal
winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
Pending
Annexure-III
Page 17 of 31
6414 Complete outage of North Chennai TPS
STG-1
26-03-2017
at 2314hrs
Tripping of evacuating lines due to fault led to
tripping of running Unit at NCTPS Stg-1
1 TANTRANSCO to take steps to complete insulator replacement
works on the 230 kV lines owned by them in NCTPS area within 6
months
2 TANTRANSCO to take steps to implement AR on all 230 kV lines
emanating from NCTPS-I at the earliest
TANTRANSCO Yet to be informed Pending
65II1 Tripping of 220 kV Idukki ndashUdumalpet
line
05-05-2017 at
1702 hrs
Line tripped due to B-N and R-N fault in line 1 TANTANSCO to correctly configure AR logic at Udumalpet so
that in the event of 3-ph trip being given during AR dead-time the
relay will not try for auto-reclosure
2 TANTRANSCO to keep AR dead-time as 1 sec for all 220 kV amp
above transmission lines
TANTRANSCO Yet to be informed Pending
58II17
44I1 (GD)
Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
KSEB Mail received vide dated 17012017
1 110 kV bus bar protection progressing ----Pending
2 Connection of 220kV earth mat and 110 kV plate earthing system
completed---- Completed
3 Redundancy of 110V DC system in progress Complete independent
redundancy is not practical for the time being 48 V DC redundancy was
already there----Pending
4 Instead of stand alone event logger SCADA system of 110 kV feeder is
expected to be completed by the end of 2017 SCADA system of 220kV
side will be taken up after that----Pending
28-04-2015 at
1230 Hrs
Mail received on 31-07-2015
1 Reducing the sensitivity of REF protection of Unit 4 5 6 at Idukki
PH - Generation wing is planning to purchase new transformer
management relays with low impedance REF protection Purchase
procedures initiated ---------Pending
2 The replacement repair of faulty breakers are under the consideration of
Generation wing Breakers will be replaced repaired in a phased manner
Unit 3 breaker was replaced with available breaker from the 220kV
IDMD feeder The 220kV CBs of unit 2 and unit 3 will be replaced with
in two months
3 No abnormalities were noticed in the PLCC equipment at New Pallom
station It is kept under observation
Mail recieved on 30-10-2015
1 Purchase procedures is still in progress
2 Replaced
3 PLCC equipment Tested and found OK
Mail recieved on 03-03-2016
1 Even though repeated plans to have a joint inspection with MsABB
who is the OEM of the relay panel for replacing the relays with numerical
ones the same could not become successful Finally the inspection has
been fixed on 15032016 It has been planned to replace existing REF
protection with low impedance ones after retrofitting the numerical ones of
OEM
Mail recieved on 25-05-2016
1Generation wing is planning ti provide low impedance REF protection by
retrofitting numerical ABB make transformer management relay in the
existing panel ---- Pending
2Faulty breaker of Unit3 has been replaced ---- Completed
3PLCC equipments in the feeder were checked and found OK ------
Completed
TANTRANSCO
KSEB
Complete outage of Idukki Hydro Power
Station (GD-1)
Multiple tripping at 230 kV Alamathy
Station
15-09-2016 at
2214 hrs
58I1 (GD) Complete outage of 220 kV Kalamassery
Substation
23-08-2016
at 1120 hrs
Triggering incident was conductor snapping in 110
kV Kalamassery- Kaloor feeder
KSEB to take steps to provide the following at their 220 110 kV
Kalamassery SS
1 Busbar protection at 110 kV level
2 Connecting 220 kV and 110 kV sides on to a common earthmat
3 Redundant DC supply for both protection (220 V) and
communication (48 V) applications
4 Stand-alone Event Logger
Bus Bar Protection (Zone1) of 230kV Bus-A got
operated at Alamathy Station during fault in 230 kV
Alamathy-OPG-1 feeder
1 TANTRANSCO to check the healthiness of BBP relay by
conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal
winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
KSEB
Pending
220 kV breaker of unit-3 at Idukki Power
house flashed and bus differential protection
acted All Generators (6Nos) along with all
220 kV feeders tripped during the incident
1 KSEB to reduce sensitivity of REF protection appropriately at
Idukki PH
2 KSEB to replace repair the faulty breaker
3 KSEB to check the PLCC equipment at New Pallam and inform
the remedial measures taken to PCSC forum
Kerala
Pending
Pending
(Recommendat
ion No1)
Annexure-III
Page 18 of 31
08-05-2016at
457 hrs
Tripping of 400kV Hyderabad - N‟sagar
line
PGCIL (SR-I amp SR-II)
PendingLine tripped on operation of over-voltage protection at
Hyderabad end and Direct Trip was received at
N‟sagar Over-voltage Stg-2 operation was observed
in EL of Hyderabad station
55II5 1PGCIL (SR-I) to properly configure EL‟s at Hyderabad station
with time-scale resolution up to msec further DR‟s should also be
configured for showing both Analog and Digital data with properly
defined X-axis and Y-axis scales
2PGCIL (SR-I) to follow the FILE Naming Nomenclature provided
by SRPC in naming various tripping files (FIRDRELTR) being
uploaded in SRLDC‟s Tripping Monitor System (TMS) portal
PGCIL (SR-I) Yet to be informed
Annexure-III
Page 19 of 31
55II9 Tripping of HVDC Gazuwaka pole-2 19-05-2016 at
1141 hrs
Pole tripped on operation of differential current
protection of east side of Pole-2
PGCIL (SR-I) to take up the issue of differential protection operation
of converter transformer on low voltage fluctuations with their OEM
and submit a detailed report on it
PGCIL (SR-I) Yet to be informed Pending
56II11 Tripping of HVDC GazuwakaPole-2 19-06-2016 at
520 Hrs
HVDC Pole-2 got tripped on operation of Bus
differential protection
PGCIL (SR-I) to get the tripping of HVDC Pole-2 tripping on Win-
Bus differential protection thoroughly investigated for correctness of
operation and submit a report thereon
PGCIL (SR-I) Yet to be informed Pending
56III7 Tripping of 400 kV Khammam-N‟sagar
line-1
05-06-2016 at
2241 hrs
Line tripped on B-phase to earth fault Line auto-
reclosed successfully at N‟sagar and failed to auto-
reclose at Khammam
1PGCIL (SR-I) to configure DR amp EL at N‟sagar (Tallapalli) end so
that full operation of AR is captured
2PGCIL (SR-I) to investigate the reasons for non-operation of AR of
Tie-CB at N‟Sagar end and resolve them suitably
PGCIL (SR-I) Yet to be informed Pending
58II13 (GI) Tripping of 400 kV Raichur-Gooty line-1
and 400 kV Gooty-Tumkur line-2
01-09-2016 at
517 hrs
400kV Gooty-Raichur line tripped at Gooty end only
and was holding from Raichur 400kV Gooty-Tumkur
line-2 tripped on over voltage
PGCIL (SR-I) to check the operation of OVR relays at their Gooty
SS and properly configure lines‟ DRs amp ELs so that events pertaining
to OVR (Stage-I amp Stage-II) operation (START amp TRIP) get
explicitly recorded
PGCIL (SR-I) Yet to be informed Pending
58II14 (GI) Tripping of 400 kV Gooty-Tumkur line-2 02-09-2016 at
2156 hrs
Line tripped on operation of over-voltage protection at
Gooty end and Direct Trip was received at Tumkur
PGCIL (SR-I) to check the operation of OVR relays at their Gooty
SS and properly configure lines‟ DRs amp ELs so that events pertaining
to OVR (Stage-I amp Stage-II) operation (START amp TRIP) get
explicitly recorded
PGCIL (SR-I) Yet to be informed Pending
61II4 Tripping of HVDC Gazuwaka Pole-2 05-12-2016
at 1503 hrs
Pole-2 tripped due to tripping of AC filter banks
which was due to voltage disturbance in eastern bus at
Gazuwaka
PGCIL (SR-I) to refer the instant trippings to their OEM to ensure
that the settings adopted for pole trippings for low-voltage power
swing and ferro-resonance phenomena are in order and have been set
properly A copy of the OEM‟s reply in this regard shall be furnished
to PCSC forum
PGCIL (SR-I) Yet to be informed Pending
62II4 Tripping of 400 kV Gazuwaka-Vemagiri
(PG) line and 400kV Vemagiri(PG)-
Nunna line
18-01-2017 at
2203 hrs
400 kV Gazuwaka - Vemagiri (PG) line and 400 kV
Vemagiri (PG) - Nunna line got tripped due to Direct
Trip receive at Gazuwaka and Vijayawada respectively
PGCIL (SR-I) to configure triggering of DR amp EL for SF6 gas
compartment Zone trip with suitable legend
PGCIL (SR-I) Yet to be informed Pending
63II11 Tripping of 765 kV Vemagiri-Srikakulam
line-1 and 765400kV ICT-1 at Vemagiri-
PG SS
16-03-2017 at
1023 hrs
Line-1 and ICT-1 which are in the same diameter got
tripped due to operation of Tie bay gas
compartment trip
1 Since tripping of elements on Gas Compartment Trip has been
observed frequently in the past few months at 765 400 kV
Vemagiri SS PGCIL (SR-I) shall furnish a comprehensive report
detailing the remedial measures taken including OEMrsquos suggestions
to prevent their occurrence
PGCIL (SR-I) Yet to be informed Pending
PGCIL (SR-I)12-09-2016 at
1203 hrs
Line tripped on Direct Trip receipt at Ramagundam
end and line was holding from Warangal end
Pending58IV1
400 kV Gazuwaka-Vemagiri (PG) line tripped on Y-E fault However for 400 kV Gazuwaka-Vemagiri (PG) line Direct Trip was received at Gazuwaka after
250ms of occurrence of fault and fault was
persistent for 250ms Then Over-Voltage Stage-1 protection operated from Vemagiri (PG) end in 400 kV Vemagiri (PG) - Nunna line and tripped it
62II1
For the line under consideration the following shall be carried out
by PGCIL (SR-I) in coordination with NTPC-Ramagundam
I)End-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
II)Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be
repaired replaced
Yet to be informedTripping of 400 kV Ramagundam-
Warangal line
Yet to be informed05-01-2017 at 1305 hrs
Tripping of 400kV Gazuwaka - Vemagiri (PG) line and 400 kV Vemagiri (PG ) - Nunna line
1 PGCIL (SR-I) to ensure time-sync of all protections relays at their Vemagiri Gajuwaka and Vijayawada substations2 PGCIL (SR-I) to check OVR settings for correctness of operation
along with proper drop-off to pick-up ratio (gt 097) and configure
OVR_START event in the corresponding Relay BCU Event Logger for all 400 kV lines emanating from their Vemagiri (PG) SS
PGCIL (SR-I) Pending
Annexure-III
Page 20 of 31
64III16 Tripping of 76 5kV Kurnool-Nellore PS
line-2
27-04-2017 at
2222 hrs
R-phase to earth fault had occurred in line Auto-
reclose was successful at Kurnool end and breaker
at Nellore PS end tripped and did not attempt for
auto-reclose
For the line under consideration PGCIL (SR-I) to Configure Event
Logger (EL) to record events at msec level
PGCIL (SR-I) Yet to be informed Pending
65II15 Tripping of HVDC Gazuwaka Pole-1amp2 25-05-2017 at
0945 hrs
HVDC pole-1 got tripped due to operation of South
filter inter zone protection and HVDC pole-2 got
tripped due to operation of differential protection
PGCIL (SR-I) to furnish detailed report on the events that led to
tripping of HVDC Poles ndash 1 amp 2 including remedial measures taken
to PCSC forum Further the OEM report wrt tripping of HVDC
Pole-2 shall also be furnished
PGCIL (SR-I) Yet to be informed Pending
65III5 Tripping of 765 kV Raichur-Solapur line-
2
07-05-2017
at 1918 hrs
Y-phase to earth fault Auto-reclose was successful
at Solapur and breakers at Raichur end got tripped
PGCIL (SR-I) to configure Event Loggerrsquos time-resolution up to
millisec level in all protection relays at their 765 400 kV Raichur SS
PGCIL (SR-I) Yet to be informed Pending
55II7 Tripping of 400kV Kudgi PG (Narendra
New) - Narendra-PG line-2
18-05-2016 at
1625 hrs
line tripped on B-phase to earth fault and line auto-
reclosed successfully from Narendra end Line tripped
from Kudgi-PG due to operation of over-voltage stage-
1
PGCIL (SR-II) to properly configure dead-time of AR (typically 1
sec) on all lines emanating from Narendra (PG) substation
PGCIL (SR-II) Yet to be informed Pending
54II3 Tripping of 400kV Sriperambudur -
SVChartam and 400kV Nellore-
Sriperambudur line-1
05-04-2016 at
0011 hrs
400kV Nellore-Sriperambudur line-1 tripped on a R-
phase to earth fault 400kV Sriperambudur-
SVChatram line tripped at Sriperambudur end only
on operation of over current protection
PGCIL (SR-II) to check and revise Pole Discrepancy Relay (PDR)
time setting appropriately based on the type of AR scheme being
implemented at their 400 kV Sriperambudur SS
PGCIL (SR-II) Yet to be informed Pending
54III3 Tripping of 400 kV Kalvindapattu-Vallur
line
10-04-2016 at
1459 hrs
R-phase to earth fault had occurred in line Auto
reclose attempt is unsuccessful auto-reclose could not
be established from provided DR EL
PGCIL (SR-II) to furnish a report on the tripping event detailing the
reasons for unsuccessful AR operation at Kalvindapattu end and the
remedial action taken to restore AR to normalcy
PGCIL (SR-II) Yet to be informed Pending
55II17 Tripping of HVDC Talcher-Kolar pole-1 30-05-2016 at
0949 Hrs
Failure of main CT of AC filter (20C08A) occurred
and it in turn caused the operation of filter bank
differential protection HVDC Pole-1 got tripped on
group Differential protection operation
PGCIL (SR-II) to take up the issue of Pole-1 tripping on Group
Differential Protection (Stage-II) due to multiple commutation failures
with their OEM and furnish a report on it
PGCIL (SR-II) Yet to be informed Pending
56II8 Tripping of HVDC Talcher-Kolar Pole-1 17-06-2016 at
1635 Hrs
Talcher-Kolar HVDC Pole-1 got tripped on line fault
and Pole-2 went to ground return mode with 150MW
PGCIL (SR-II) to address amp resolve DTPC and fibre-optic link
related issues raised by KSEB at Thrissur Madakathara substations
and conduct a mock-test in coordination with KSEB to verify integrity
of signal transmission from Kolar to Thrissur Makadathara
PGCIL (SR-II) Yet to be informed Pending
64II14
PGCIL (SR-I)14-05-2017
at 1654 hrs
Tripping of 400 kV Vemagiri - Gazuwaka
line
PGCIL (SR-I) to sort out issues relating to AR functionality
operation for both Main-CB and Tie-CB at both Vemagiri and
Gajuwaka substations
For the line under consideration the following shall be carried out
by PGCIL (SR-I)
End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be
repaired replaced
Y-phase to earth fault Auto-reclose was not
successful due to persistent fault Vemagiri end had
sent a Direct Trip after un-successful Auto-reclose
AR attempt was observed in Gazuwaka end DR
after 3 phase trip
65III10
Yet to be informed PendingPole-1 got tripped due to failure of auxiliary supply
changeover 400kV Jeypore-Gazuwaka line-2 got
tripped on operation of over-voltage protection
Pole-2 east shunt reactor got failed and this in turn
resulted in tripping of HVDC pole-2 due to Pole-2 Y
block activation 400kV Jeypore-Gazuwaka line -1
also got tripped during the incident
28-Apr-17 Pole-
1 at 844 hrs
and Pole-2 at
907 hrs
Tripping of HVDC Gajuwaka Pole-1amp2
and 400 kV Jeypore-Gazuwaka line-1amp2
PGCIL (SR-I)1 PGCIL (SR-I) to provide fully automatic supply-changeover
scheme for Pole-1 auxiliaries at the earliest
2PGCIL (SR-I) to furnish a detailed report on the reasons for East
Shunt Reactor failure including remedial action taken OEM report in
this regard also shall be shared
3PGCIL (SR-I) to provide redundant AC auxiliary supply to both
Pole-1 amp Pole-2 either by making use of tertiary of ICT-1 or from
external dedicated feeder
Yet to be informed Pending
Annexure-III
Page 21 of 31
58II3 (GI) Tripping of 400 kV Sriperambudur-
SVChatram line
14-08-2016 at
1349 hrs
Line tripped at Sriperambudur end only on
operation of directional earth fault protection
(i) PGCIL (SR-II) to disable high-set of line DEFRrsquos and
(ii) PGCIL (SR-II) to block line DEFR operation when DPR is in active
condition (has picked up) at their Sriperambudur SS
PGCIL (SR-II) Yet to be informed Pending
58II5 (GI) Tripping of 400 kV Neyveli TS2-Pugalur
line and 400 kV Neyveli TS2-Neyveli TS2
EXP line
21-08-2016 at
1035 hrs
Failure of Y-Ph tension insulator of tie feeder bay at
Neyveli TS2 Neyveli-Pugalur line tripped due to over
voltage at Neyveli TS2 and direct trip was received
at Pugalur
PGCIL (SR-II) to check the operation of the DPR relays at Pugalur
end NLC TS2 - Pugalur line by trans-playing the event on another
healthy relay and take suitable action including replacement of the
relay accordingly
PGCIL (SR-II) Yet to be informed Pending
58II19 (GI) Tripping of 400 kV Madurai-Karaikudi
line
15-09-2016 at
0302hrs
Line tripped on operation of OVR Stage-I protection
at Karaikudi and Direct Trip was received at Madurai
PGCIL (SR-II) to check the operation of OVR relays at their 400 kV
Karaikudi SS and properly configure linesrsquo DRs amp ELs so that events
pertaining to OVR (Stage-I amp Stage-II) protection operation (START
amp TRIP) get explicitly recorded
PGCIL (SR-II) Yet to be informed Pending
59II20 (GI) Tripping of HVDC Talcher-Kolar pole-1 10-10-2016 at
1635 hrs
Pole-1 of HVDC Talcher-Kolar tripped due to receipt
of lsquorsquoPole block command from Talcher end due to
tripping Pole-1 DC filter at Talchar end Pole 2 went
into metallic return mode after tripping of pole-1
PGCIL (SR-II) to check the correctness of non-operation of SPS
(Talcher ndashKolar Trip Signal-1) in the instant case by comparing it
with the incident of tripping of HVDC Talcher-Kolar pole-1 on
05102016 and furnish a report on it to PCSC forum
PGCIL (SR-II) Yet to be informed Pending
59II24 (GI) Tripping of 400220kV ICT-2 at
Somanahalli SS
24-10-2016 at
354 hrs
ICT-2 tripped on operation of Buchholz relay PGCIL (SR-II) to properly configure ICT protection relay DR so that
digital signals are recorded with proper names at their 400220 kV
Somanahalli SS
PGCIL (SR-II) Yet to be informed Pending
59III4 Tripping of 400 kV Salem -Udumalpet line-2
13-10-2016 at 0306 hrs
Line tripped on R-phase to earth fault Line auto-reclosed at Udumalpet end and did not reclose at
Salem
Line tripped on R-phase to earth fault Line auto-reclosed at Udumalpet end and did not reclose at Salem
PGCIL (SR-II) Yet to be informed Pending
62II6 Tripping of 400 kV Trichy-Karaikudi line 21-01-2017 at 2145 hrs
Line tripped on operation of over voltage protection at Karaikudi end and direct trip was received at Trichy Voltage recorded in DR in antecedent
conditions were 2454 kV 2432 kV 2536 kV
respectively
1 PGCIL (SR-II) to ensure OVR settings adopted for 400 kV lines at Karaikudi SS are as per SRPC provided settings with a drop-off to pick-up ratio gt 097
2 PGCIL (SR-II) to configure OVR_START event in the corresponding Relay BCU Event Logger for all 400 kV lines emanating from their
Karaikudi SS
PGCIL (SR-II) Yet to be informed Pending
62III5 Tripping of 400 kV Tumkur ndash Bidadi line 17-02-2017
at 1044 hrs
B-E fault Line did not auto-reclose 1 PGCIL (SR-II) to properly configure AR logic operation at Bidadi
end and ensure itrsquos correct operation for a fault during reclaim time
2 PGCIL (SR-II) to ensure time-sync of protection relays with GPS at
both Tumkur and Bidadi substations
PGCIL (SR-II) Yet to be informed Pending
62III6 Tripping of 400 kV Tumkur ndash Bidadi line 18-02-2017
at 1036 hrs
B-E fault Line did not auto-reclose PGCIL (SR-II) to properly configure AR logic operation at Bidadi
end and ensure itrsquos correct operation for a fault during reclaim time
PGCIL (SR-II) Yet to be informed Pending
62V1 Tripping of 400kV Vallur-Kalivandapattu
line-2
22-02-2017 at
455 hrs
Line tripped due to failure of R phase jumper Two
faults observed from DR 2nd fault cleared in 500ms
from Kalavindapattu end
PGCIL (SR-II) to enable Trip on Reclose (TOR) at Kalavindapattu end
on all 400 kV lines emanating from it
PGCIL (SR-II) Yet to be informed Pending
57II2 Tripping of 400 kV Mywady-Salem line-1
and 400 kV Mywady-Madurai line
PGCIL (SR-II) Yet to be informed03-07-2016 at
0306 hrs
400kV Mywady- Madurai line tripped on a Y-phase
to earth fault due to agriculture fire Tie-CB LBB
relay got operated at Mywady end and resulted in
tripping of Main breakers of 400kV Mywady-
Madurai and 400kV Mywady-Salem line-1 which are
in the same diameter
PGCIL (SR-II) to furnish a report on the remedial action taken after
ascertaining the reasons for (i) non-opening of Main-CB of Mywady
ndash Madurai line at Mywady end on Tie-CB LBB operation and (ii)
delay in sending DT to the remote ends after Tie-CB LBB operation
Pending
Annexure-III
Page 22 of 31
65II2 Tripping of 400 kV Kudgi (PG) - Tumkur
line-2 and Kudgi (PG) ndash Kudgi (NTPC)
line-1
06-05-2017 Kudgi (NTPC) feeder tripped at Kudgi (PG) end on
operation of distance protection R-N Zone-1
Tumkur feeder tripped at Kudgi(PG) end on
operation of NGR buchholtz relay
1 PGCIL (SR-II) to sort out AR related issues at Kudgi (PG) end on
400 kV Kudgi (PG) ndash Kudgi (NTPC) lines and put AR into service
2 PGCIL (SR-II) investigate reasons for NGR Buccholtz trip on 400
kV Kudgi (PG) ndash Tumkur line-2 and furnish action taken report wrt
rectifying the same
PGCIL (SR-II) Yet to be informed Pending
58II16 (GI) Multiple tripping at 400 kV Kalpaka SS 06-09-2016 at
1643 Hrs
Y-Pole breaker of Bus reactor-3 got failed during its
charging This resulted in a bus fault in 400kV bus-1
resulting in tripping of 400kV elements connected to
Bus-1
PGCIL (SR-I) amp PGCIL (SR-II) to review their Reverse Zone settings of
distance relays so as to bring them in line with Ramakrishna
Committee guidelines at all their substations in the southern
region
PGCIL (SR-I) amp PGCIL
(SR-II)
Yet to be informed Pending
51II4 NTECLTripping of 400kV Alamathy-Tiruvalam
line-1 and 400kV Alamathy-Vallur line-2
NTECL Vallur to furnish a report detailing the reasons for mal-
operation of Vallur end relays for a fault on Alamathy-Tiruvalam line-
1 and remedial measures taken to PCSC forum In the report their
preparedness for implementing line differential protection on Vallur-
Alamathy lines may also be indicated
400kV Vallur-Alamathy Line-2 got tripped from
Vallur end during failure of Y-phase LA in 400kV
Alamathy-Tiruvalam line Protection at Vallur end
tried for an auto-reclose and gave a 3 phase trip
TANTRANSCO mail received on 24-03-2016
3Ф Trip at 400kV Alamathy end due to DT received from vallur end for
BФ LAS bursted in Alamathy -Thiruvalam - 1 at Alamathy end
Mail received on 27-04-2016 and 20-05-2016
3Ф Trip at 400kV Alamathy end due to DT received from vallur end for
BФ LAS bursted in Alamathy -Thiruvalam - Line-1 at Alamathy end
Pending13-12-2015 at
2242 hrs
Others
Annexure-III
Page 23 of 31
56III5 Tripping of 400 kV Neyveli TS-2-
Pugalur line
04-06-2016 at
1636 hrs
B phase to earth fault occurred in line Auto-reclose
had not operated at NLC TS-2 and DT was sent to
Pugalur end resulting in a 3 phase trip
NLC to review the necessity of providing Relay Definitive Trip and
accordingly take steps to disable it on all lines emanating from their
generating stations
NLC Direct trip triggering of DR wii be carried out at TS2 end during the next
planned shutdown of the Pugalur Ts2 feeder
Mail received on 22-02-2017
Direct trip triggering of DR carried out at TS2 end for the TS2-Pugalur
feeder on 25-01-17
Pending
56II16 Tripping of 400 kV Gajwel-Singareni
line-2
30062016 at
2343 hrs
Tripped on 3-phase Trip at Gajwel end SCCL to configure Jaipur end relay‟s EL properly so that the time-
stamp resolution is extended downwards up to milli-second level
SCCL Yet to be informed Pending
1Singareni TPS to furnish single line diagram of their switchyard
along with the Over Voltage Relay settings adopted for various
transmission lines and to ensure that they are in line with the SRPC
provided gradings
2Singareni TPS to upload various tripping files (FIRDRELTR)
pertaining to a tripping event involving their station in SRLDC web-
portal within 24-hrs of occurrence of that event in compliance of
IEGC Regulation 52(r)
Line tripped on operation of Over-Voltage
protection at Singareni and Direct Trip was received
at Gajwel DR amp EL of Singareni was not furnished
59III3
57II8 NTPC (Ramagundam)
10-07-2016 at
156 hrs
Line tripped at Ramagundam end on operation of over-
voltage protection Dichipally end tripped due to
receipt of Direct Trip signal
1NTPC-Ramagundam to ensure correctness of operation of Over
Voltage relays by taking remedial measures like maintaining
healthiness of concerned CVT‟s setting drop-off to pick-up ratio at
097 amp above etc
2NTPC-Ramagundam to ensure time sync of their station‟s DR amp
EL with GPS
3NTPC-Ramagundam to sort out analog values indication amp
overlapping issue of time-stamp in their station DR‟s
4NTPC-Ramagundam to properly configure their EL‟s so that events
are recorded with msec resolution
Line tripped on B-phase to earth fault Line auto
reclosed at Chandrapur end and did not reclose at
Ramagundam
57II4
16-07-2016 at
438 hrs
Tripping of 400 kV Ramagundam -
Chandrapur line -2
1NTPC-Ramagundam to furnish remedial measures taken wrt AR
non-operation and unwarranted DT sending to other end
2NTPC-Ramagundam to configure protection relays DR‟s such that
events get recorded for at leas
2000 msec post-triggering so as to cover complete AR operation
Tripping of 400 kV Ramagundam -
Dichipally line
NTPC-Ramagundam mail dated 09032017
1 Main-II relay replaced Over voltage relays pickup to reset ratio is 098
--- Completed
2 DR and EL are time synchronized with GPS clock
-------- Completed
3DR alalog overlaping issue is sloved ---- Completed
4 ----- Pending
Yet to be informed
Pending
54I1
Tripping of 400 kV Gajwel-Singareni line-
2
02-04-2016 at
1708 hrs 1MAPS to furnish a detailed report on the tripping of SP Koil ndash
MAPS lines 1 amp 2 at MAPS end with focus on the correctness of the
settings of Main-I amp Main-II relays (for primary amp back-up
protections) on both the lines
2MAPS to take steps to provide down-loading facility for DR amp EL
from Main-I amp Main-II relays on all 230 kV lines emanating from
MAPS
3MAPS in co-ordination with SP Koil to carry out PLCC end-to-
end testing on SP Koil ndash MAPS lines 1 amp 2 and ensure healthiness
of PLCC communication amp carrier-aided protection
4MAPS to put in service Auto-Reclosure feature on all four 230 kV
lines emanating from MAPS by June 2016
Pending
Complete outage of 230 kV SPKoil
Station of TANTRANSCO
B-phase CT failure occurred in 230 kV SPKoil -
MAPS line-1 Busbar protection got operated at
SPKoil station All elements except 230kV
Oragadam and 230kV Kalivandapattu got tripped at
230kV SPKoil station bdquoY‟ phase CT and support
insulators also got damaged
27-09-2016 at
0101 hrs
Status revided vide MAPS mail dated 06122016
1 The settings given by Ms TANTRANSCO were adopted for Main ndashI amp
Main- II relays for both the lines The same settings were verified to be
same Subsequently calibrated was done and no drift was observed
--- Complied
2 From May 2016 onwards the DR EL and trip report are being sent by
mail to SRLDC Bengaluru by MAPS
--- Complied
3 Monthly maintenance of PLCC equipments is being done by Ms
TANTRANSCO At present PLCC telephone is not working it is being
followed up
--- Complied
4 CVTs are planned to be procured from Ms TANTRANSCO by the end
of February 2017 and AR will be implemented for all the lines emanating
from MAPS by July-2017 as discussed in the current SRPC meeting on
25112016
--- Pending
PendingNPCIL (MAPS)
SCCL
NTPC-Ramagundam mail dated 09032017
1 The relay will be checked in next opportunity if required it will be
changed with new one------------- Pending
2DR time recording increased to 2 sec --------- Completed
NTPC Pending
Annexure-III
Page 24 of 31
62III2 Tripping of 400 kV Kaiga-Guttur line-1 06-02-2017
at 0501 hrs
B-phase to earth fault Line did not auto-reclose at
Kaiga end
1 KGS to properly configure all relays DR‟s time scale for a post-
triggering period of 2 sec to capture events such as complete AR
operation
2 KGS to ensure time-synchronization of all protection relays with
GPS in their 400 kV switchyard
NPCIL (KGS) Yet to be informed Pending
63III4 Tripping of 400 kV Gajwel-Singareni line-
2
07-03-2017 at
1652 hrs
Line tripped on B-phase to earth fault Line did not
auto-reclose
1 SCCL to properly configure LBB logic for all line relays
where AR has been put into service for 1-ph initiation based
on phase segregation (ie for the faulted phase) at their
Singareni TPS
SCCL Yet to be informed Pending
64II8 Tripping of 400 kV Tirunelveli-
Kudankulam line-3
23-04-2017 at
0556hrs
R-phase to earth fault had occurred in Tirunelveli -
Udumalpet line-2 During the incident Tie-CB LBB
got operated at Tirunelveli end due to sluggish
operation and tripped 400 kV Tirunelveli -
Kudankulam line-3
NPCIL (KKNPP) to configure DRrsquos amp ELrsquos of protection relays at their
station for recording DT receipt event at their Kudankulam NPP
NPCIL(KKNP) Yet to be informed Pending
Yet to be informed63III8 NPCIL (KGS)Tripping of 400kV Kaiga-Guttur line-2 Line tripped on Y-phase to earth fault Line auto-
reclosed from Guttur end and failed to re-close from
Kaiga end
1 NPCIL (KGS) to furnish an action taken report on the
reasons for AR lock-out and remedial action taken to rectify
the same
2 NPCIL (KGS) to configure DR‟s of line protection relays for
a post triggering period of 2 sec to capture complete AR
operation at their Kaiga GS
3NPCIL (KGS) to furnish FIR amp TR for tripping events as
per SRLDC provided formats
27-03-2017 at
706 hrs
Pending
Annexure-III
Page 25 of 31
34I6
01-01-2015 at
1338 hrs
42II18 400kV Raichur TPS-Raichur(PG) line-
1amp2 400kV Raichur-Mahboobnagar
Unit7 and ICT-2 at RTPS tripped
during the incident B phase to earth
fault had occurred in 400kV Raichur
TPS-Raichur line-1
1 Bus bar protection shall be provided by asset owner ( ie
KPTCL)
2 Settings for main distance protection amp Overcurrent protection
shall be examined and reviewed
3 Time synchronization of the Substation shall be ensured
As reported directional over current relay of ICTrsquos
operated due to snapping of line jumper in 220kV
Lingapur line
1 KPCL to review REF setting (DMT or IDMTL) for unit-7 by first
week of April 2015 and inform the same to PCSC forum
2 TSTRANSCO to furnish Mehaboobnagar‟s DR and EL and the
reasons for distance relay operation at their end within a week‟s time
3 PGCIL (SR-I) to rectify the issues relating to AR operation relay
reach (Z2) reverse reach (Z4) and SOTF auxiliary contacts within a
week‟s time and submit the actions taken to PCSC forum
16-07-2014400220 kV ICT-1 amp 2 at
MUNIRABAD
On account of R-phase to earth fault line tripped at
Hassan end due to operation of distance Zone-2 and
non-receipt of carrier From DR of Talaguppa end it
is observed that fault had occurred in Yphase
09-03-2015 at
0636 hrs
Tripping of 400
kV TALAGUPPA
ndash HASSAN line
40II3
Multiple tripping at Raichur TPS of
KPCL
Miscellaneous
1 PGCIL and KPTCL to ascertain the reason for the phase
discrepancy in the relay operation and take suitable remedial
measures
2 KPTCL to check the PLCC operation at Talaguppa end and submit
the report to the PCSC forum
1 Yet to be informed by KPCL ---- Pending
2 Mail received on 26-05-2015 from TSTRANSCO
It is found that the main-2 ABB make REL316 type distance relay was
defective and same was replaced with MICOM P444 by MsPGCIL on
2304-2015 After replacement of main-II DR can be extracted from this
relay For EL in to service some field winding is pending which is being
taken up in this month -- Complied with
3
PGCIL mail recieved on 27-04-2016
End to end PLCC tunning carried out
PGCIL (SR-I) RVMD 14072016
Relay settings of all the stations in SRTS-1 were derived as per
Ramakrishna Commettee recomendations and implemented - Complied
with
KPCL
TSTRANSCO
PGCIL (SR-I)
PGCIL (SR-II) KPTCL
KPTCL
PGCIL (SR-I)
Mail recieved on 28-04-2015
End to end testing of PLCC has been done and problem in the PLCC is
atttended
Mail received on 27-05-2015 (KPTCL) amp 29-07-2015
End to end testing of PLCC has been done and problem in the PLCC is
atttended Phase discrepancy in the relay operation is to be checked jointly
Mail recieved on 02-09-2015 from PGCIL (SR-II)
Problem is in identification of phases at Talguppa end To be rectified by
Ms KPTCL
Mail recieved on 28-06-2016 from KPTCL
The matter is reffered to the concerned Operation and maintance wing to
set right the mismatch of phases in 400kV Talaguppa-Nelamangala and
Talaguppa-Shantigrma lines at Talaguppa in cordination with PGCIL
Pending
(with KPTCL)
Mail recieved on 27-05-2015 (KPTCL)
1 KPTCL has taken action to provide bus bar protection to 220kV buses
2 Over current relay Settings of ICTs to be reviewed by PGCIL
Mail received on 29-07-2015 (KPTCL)
Initial Tendering stage
KPTCL Mail recieved on 23-01-2016
Detailed estimate prepared for taking up the work CEE Transmission
Zone Gulbarga will take up necessary procurement and further execution
----------------------------------------------------------------------
1 Pending from KPTCL side
2 Complied with as per PGCIL (SR-I) RVMD 14072016 which stated
that Relay settings of all the stations in SRTS-1 were derived as per
Ramakrishna Commettee recomendations and implemented
3 Pending from KPTCL side
Pending (with
KPCL)
Pending
(with KPTCL)
Annexure-III
Page 26 of 31
Tripping of Unit 1 at NCTPS 24-05-2015
at 1913 hrs
ID Fan trip
Tripping of Unit 1 at MEPL 24-05-2015
at 1913 hrs
Coal Mill tripped
Tripping of Unit 1 at
Krishnapatnam
24-05-2015
at 1917 hrs
Generator Protection operated
Tripping of Unit-8 at RTPS 24-05-2015
at 1919 hrs
Tripped on Overvoltage
47I2
1 All Tripped units viz Krishnapatinam MEPL Raichur NCTPS
to submit a detailed report on this event including the remedial
measures taken to PCSC forum
2 KPCL to check the excitation system of Unit 8 of RTPS and
submit the remedial measures taken to PCSC forum
KPCL MEPL
APGENCO TNEB
As per FIR submitted CT damage observed in
Chitoor-Main bay (404) Main breakers connected to
bus-1 (401 404 407 410) got tripped on operation of
bus bar protection Unit-1 tripped on operation of
MFT Unit-2 was not in service
Complete outage of Krishnapatnam TPS
Pending (with
KPCL)
APGENCO letter dated 18032016
1SOE and SLD are attached The DR of 405 CB is not generated during
the incident Now the problem is identified and rectified
--------- Completed
2All the 3 lines ie CHTR-2 MNBL-I amp II tripped in zone
protection The fault was in Blind zone ie P2 side of CT where it was
covered under Bus fault by the time fault moved on to P1 side when the
fault comes under STUBTEED zone after 330msec all the feeders expect
CHTR-1 tripped in Zone-II and total fault persisted for 500msec before the
405 TIE CB opens and clear the fault As a remedial the STUB protection
operation also checked and found OK-------Completed
3The Time Sync was missed on the day and found there was problem with
LAN Timer same was rectified Now found OK
-----------Completed
4Now the DR Time scale changed to 1 sec for Pre fault and 3 sec for Post
fault and STATE of events are corrected wherever found wrongor
misguiding during analysis---------Completed
5
PGCIL-SR1 RVMD 27-04-2016
Procurement of differential protection for 400kV NPS-NLR DC and
400kV RCR-RTPS-DC is under tendering
PGCIL-SR1 RVMD 14-07-2016
The proposal for procurement of Line differential Protections for 400kV
Raichur - RTPS-1 amp 2 and 400kV Nellore - NPS - 1 amp 2 lines has been
approved and tender is under technical evaluation
Pending with
PGCIL(SR-I)
08-09-2015 at
1820 hrs
44I3
1 APGENCO to furnish to PCSC forum (i) A3-size Single Line
Diagram of SDSTPS and (ii) the sequence of events with time stamp
showing the protection that opened Tie-CB (405) at SDSTPS
2 APGENCO to review STUBTEED protection in all dias at
SDSTPS and ensure that they are configured for instantaneous
operation
3 APGENCO to properly configure the STATE of the tripping events
so that they get recorded appropriately like TRIP OPERATED in
their corresponding Event Loggers
4 APGENCO to ensure time sync of all DR‟s and EL‟s at SDSTPS
5 PGCIL (SR-I) to provide line differential protection for 400 kV
NPS ndashNellore-PG lines 1 amp 2
TANGEDCO vide their mail dated 07072015 informed that as per the
discussion and recommendation of 44th meeting of PCSC held on
28052015 a time delay of 2 Sec had been introduced for the above
tripping for all the ID fans at NCTPS-II
MEPL vide their mail dated 14092015 informed that they had
implemented 2 seconds delay for under voltage tripping of all Drag Chain
Feeder Conveyors And this has been done for both the Units
APGENCO letter dated 18032016
The unit not tripped on Generator protection but tripped on Economiser
inlet flow protection consequent to tripping of TDBFP on lube oil pressure
lowBefore tripping dip in voltage was observed in the LT system which
caused tripping od lube oil pumpsAfter the incidentChangeover scheme
on under voltage of LT System was reduced from 80 with 2 sec delay to
40 with 200msec delay
APGENCO PGCIL (SR-
I)
Annexure-III
Page 27 of 31
12-11-2015 at
0020 hrs
Tripping of 400kV Gooty-Nelamangala
line
KPTCL KPCL NPCIL
(KAPS)
1 KPTCL KPCL to see the possibility of implementing Weak Infeed
logic with Echo feature enabled by Under
Voltage (27) element on Kadra-Karwar lines 1 amp2 and implement
the same if feasible
2 NPCIL to time-coordinate Kaiga‟s DEFR settings with (i) Zone-2
settings at Kaiga and (ii) primary protections of the lines emanating
from Kadra and Kodasalli
3 KPCL to ensure time-sync of EL‟s and healthiness of the Fault
Locators at Kadra
220kV Kadra-Karwar lines-1amp2 tripped
on earth fault in B-phase in zone-2
Kaiga-Kadra line tripped at Kaiga end
only on operation of directional eath
fault protection
31-07-2015 at
1144 hrs
Tripping of 220kV Kadra-Karwar lines -
1amp2 and 220kV Kaiga-Kadra line
PGCIL (SR-I) mail received on 27-04-2016
1 The firmware of REL670 is being upgraded ------- Completed
2 The recording of events in msec interval is being taken up with OEM
Henceforth for analysis purpose we will provide larm list which has msec
time stamp -------- Completed
3 End to end testing of PLCC code transmision and tuning of channels
carried out ------- Completed
4 Procurement of differential protection for 400kV NPS-NLR DC and
400kV RCR-RTPS-DC is under tendering The legends modified in
Eventalarm list Provision of diff relay for all short lines emanating from
NPS is being taken up with our corporate -------- Pending
PGCIL(SR-I) RVMD 14-07-2016
The proposal for procurement of Line differential Protections for 400kV
Raichur - RTPS-1 amp 2 and 400kV Nellore - NPS - 1 amp 2 lines has been
approved and tender is under technical evaluation
1
PGCIL RVMD 27042016
AR blocked due to failure of PLCC link The defective PLCCcards
replaced at Neelamgala end
PGCIL RVMD 14072016
AR blocked due to failure of PLCC link The defective PLCCcards
replaced at Neelamgala end End to end testing of PLCC carried out and
PLCC link is healthy ------ Pending
2 Gooty end Time syc unit is replaced with new one and commissioned ---
----- Completed
3 Yet to be informed by KPTCL --- Pending
PGCIL (SR-I) KPTCL 1 For Gooty ndashNelamangala line PGCIL (SR-I) and KPTCL to
provide 3-ph trip logic at their respective ends upon detection of
PLCC link failure during dead-time of AR operation
2 PGCIL (SR-I) to make GPS functional at Gooty SS and ensure
time-sync of various DR‟s and EL‟s with it (GPS)
3 PGCIL (SR-I) KPTCL to furnish reason for the operation of
Backup impedance protection of the line reactor at Nelamangala end
and the remedial measures taken to PCSC forum
Pending (with
KPTCL)
1PGCIL (SR-I) to furnish Action Taken Report on the findings of
OEM on relay mal-operation at NPS end on 400 kV NPS ndash NCCK
line to PCSC forum
2 PGCIL (SR-I) to appropriately configure Station Event Logger at
NPS to record events at msec interval
3 PGCIL (SR-I) to carry out PLCC end-to-end testing in coordination
with TPCIL for 400 kV NPS ndashTPCIL line
4PGCIL (SR-I) MEPL SEL TPCIL amp NCC to take steps to
provide line differential protection at their respective ends on all 400
kV lines (except Gooty line) emanating from Nellore Pooling Station
and furnish an action plan to implement the same
Pending
1
Mail recieved on 25-05-2016 from KPTCL
Availability of week end infeed with eco feature to be confirmed by
SEERTCHubli --- Pending
2
Mail recieved on 03-12-2016 from NPCIL(KGS)
The 200 ms Definite time DEFR element in both Kaiga Kadra and Kaiga
Kodasally lines were disabled IDMT DEFR is retained The 200 ms
Definite time back up oc element in both Kaiga Kadra and Kaiga
Kodasally lines were disabled IDMT is retained
------ Completed
3 Yet to be informed by KPCL
Status received vide KPCL mail dated 14062017
1 Since PT blasted (B phase) at Karwar end resistive over reach occurred
hence Backup protecion operated at Kadra end (zone-2 not sensed) ---
Pending
3Newly commissioned micom P444 relay time synchronised with GPS
------ Completed
Running units at Thermal Powertech power Station
tripped due to tripping of 400kV Nellore pooling
station (NPS)-TPCIL line and 400kV Nellore pooling
station (NPS)-ECC line
30-12-2015 at
0602hrs
R-phase to earth fault had occurred in Line Line did
not auto-reclose from both ends It was mentioned that
YampB pole breakers at Neelamangala tripped on
operation of pole discrepancy and backup impedence
protection for line reactor got operated
Complete outage of TPCIL power station 50I2
50II8
47II7
PGCIL (SR-I)
MEPL SEL TPCIL
NCC
Pending
Annexure-III
Page 28 of 31
52I8 Complete outage of 400kV NTPL station
and CEPL Stations
14-03-2016 at
0136 hrs
Running Units at NTPL and Coastal Energen power
station got tripped due to tripping of evacuating lines
NTPL and PGCIL (SR-II) to furnish compliance report of the
recommendations given by PSAG-15 Committee that held its meeting
on 12-13 April 2016 at NTPL Tuticorin
PGCIL (SR-II)
NTPL
NTPL mail received on 19052016
All General Recommendations will be done in the second week of June
2016 ---------- Complied by NTPL
Yet to be informed by PGCIL (SR-II)
Pending
[with PGCIL
(SR-II)]
56III4 Tripping of 220 kV Sedam-Tandur line 03-06-2016 at
2152 hrs
Line tripped on B-phase to earth fault Auto-reclose is
not enabled for line
KPTCL and TSTRANSCO to fast-track providing AR on 220 kV
Sedam ndash Tandur line and furnish an action plan of providing the same
by next PCSC meeting (PCSC-57)
KPTCL
TSTRANSCO
Yet to be informed Pending
KPTCL and TSTRANSCO to take steps to provide AR feature on
220 kV Sedam ndash Tandur inter-state line at their respective ends at the
earliest
KPTCL
TSTRANSCO
PGCIL mail received on 27-04-2016
Being pursued with APTRANSCO
APTRANSCO mail dated on 22-06-2016
AS maintenance being carrired out by PGCIL(SR-1) the required relay
replacement (wiringprogramming) may also be carried out by PGCIL(SR-
1)
PGCIL RVMD 14072016
1 The CB problem has been attended by POWERGRID by using OEM
Ms BHEL services amp POWERGRIDs OampM spares
------ Completed
2 Being pursued with APTRANSCO to replace the faulty Event Logger at
Vijayawada (Nunna) SS -------- Pending
APTRANSCO mail dated on 31-08-2016 amp 04032017 amp 24052017
As maintenance being carrired out by PGCIL(SR-1) the required relay
replacement (wiringprogramming) may also be carried out by PGCIL(SR-
1)
PGCIL (SR-I)
APTRANSCO
1 PGCIL (SR-I) in co-ordination with APTRANSCO to address
the problem with CB at the earliest opportune time
2 APTRANSCO to take steps to replace the faulty Event Logger at
Vijayawada (Nunna) SS
Line tripped at Mamidipally end only on Direct Trip
receipt from Ghanapur end
30-04-2016 at
1640 hrs
Line tripped due to operation of over voltage
protection at Vijayawada end and Direct Trip was
received at Sattenapalli end
25-12-2015 at
301 hrs
Tripped on 3-phase Trip at Gajwel end30062016 at
2343 hrs
19-06-2016 at
1527hrs
220kV Sedam-Humnabad-2 tripped at Sedam on
Distance protection Zone-2 Sedam-RTPS-1 amp2 lines
tripped at RTPS end only 220kV Tandoor inter-state
line was hand tripped due to incoming supply failure
54IV2 Tripping of 400kV Ghanapur-
Mamidapalli line
56II16
Tripping of 400kV Sattenapalli-
Vijayawada line
56I2
51II6
Tripping of 400 kV Gajwel-Singareni
line-2
Complete outage of 220kV Sedam
Substation of KPTCL
Pending
PendingFor the line under consideration the following shall be carried out by
TSTRANSCO and PGCL (SR-I) in co-ordination
iEnd-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
iiHealthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
PGCIL (SR-I)
TSTRANSCO
Yet to be informed
Pending
1TSTRANSCO and SCCL to check drop-off to pick-up ratio of OV
relay and ensure that it is kept at 097 amp above
2TSTRANSCO and SCCL to configure respective end bdquos DR amp EL
so that they get triggered on OVR protection and record relevant
events
3SCCL to configure Jaipur end relay‟s EL properly so that the time-
stamp resolution is extended downwards up to milli-second level
TSTRANSCO
SCCL
Yet to be informed
Yet to be informed
Pending
Annexure-III
Page 29 of 31
R-phase to earth had occurred in 400kV BTPS-JSWEL
line and protection issued a 3 phase trip
64I1 Complete outage of North Chennai TPS
STG-2
24-04-2017
at 2102hrs
Tripping of evacuating lines due to fault led to
tripping of Units
Pending
64I2 Complete outage of North Chennai TPS
STG-2
25-04-2017
at 1827hrs
Tripping of evacuating lines due to fault led to
tripping of Unit
64I3 Complete outage of North Chennai TPS STG-2
26-03-2017at 2109 hrs
Tripping of evacuating lines due to fault led to tripping of running Unit at NCTPS Stg-2
64III2 Tripping of 400 kV Ghanapur-
Mamidapalli line
04-04-2017 at
1901hrs
B-phase to earth fault Line auto-reclosed from
Mamidapalli end and tripped from Ghanapur
For the line under consideration PGCIL (SR-I) TSTRANSCO to (i)
rectify issues wrt PLCC channels (ii) restore PLCC carrier
communication and (iii) put AR into service at the earliest
PGCIL (SR-I)
TSTRANSCO
Yet to be informed Pending
APGENCO
TSTRANSCO
Direct Trip was received at VTPS and line was
holding from Suryapet end
13-06-2016 at
1655 hrs
56IV2 Tripping of 400 kV VTPS-Suryapet line
57I1 Complete outage of 220 kV Karwar
Substation of KPTCL
12-07-2017 at
1136 hrs
Triggering incident was failure of R phase PT in Bus-
1 at 220kV Karwar substation 220kV Kaiga-
Kodasalli tripped during the incident Also bus shut
down occurred at Kadra and Kodasally stations
1NPCIL (KAPS) to disable DefiniteTime OC relay and put in its
place by IDMT OC relay for backup protection on both 220 kV
Kaiga ndash Kadra line and 220 kV Kaiga ndash Kodasalli line at Kaiga end
2KPTCL to put bus bar protection in service at their 220 kV Karwar
SS at the earliest
3KPCL KPTCL to implement Weak In-feed Logic with Echo
feature enabled by Under Voltage (27) element on Kadra ndash Karwar
lines 1 amp 2
4KPTCL to furnish equipment failure report of the current incident to
PSEampTD Division of CEA with a copy marked to SRPC
KPTCL KPCL NPCIL
(KAPS)
NPCIL(KGS) mail dated on 03-12-2016
AThe 200 ms Definite time DEFR element in both Kaiga Kadra and
Kaiga Kodasally lines were disabled IDMT DEFR is retained
B The 200 ms Definite time back up oc element in both Kaiga Kadra and
Kaiga Kodasally lines were disabled IDMT is retained
------Completed
APTRANSCO mail dated on 20-12-2016
Issue was addressed to the concerned for necessary action
APTRANSCO mail dated on 24-05-2017
Meeting was conducted and the relays procurement for all the locations is
under progress
Pending57II9 Tripping of 400 kV Nellore (PG) - NPS
line-1 400 kV Krishnapatnam-Nellore
(AP) lines -1amp2 and 400kV NPS -
MEPL line
18-07-2016 at
1905 hrs
Triggering incident was snapping of Y phase
conductor in 400kV Nellore (PG) - NPS line-1
Distance relay at Krishnapatnam end over-reached in
Zone-1 and resulted in tripping of 400kV
Krishnapatnam ndash Nellore (AP) lines - 1amp2 from
Krishnapatnam end Distance relay at MEPL over-
reached and resulted in tripping of MEPL-NPS line
from MEPL end
PGCIL (SR-I) TPCIL MEPL SEL SGPL APTRANSCO
APGENCO and SDSTPS to implement line differential protection on
all 400 kV transmission lines (of length less than 50 km) emanating
from Nellore PS Nellore (PG) SS and Nellore (AP) SS [It may be
noted here that the cut-off length of 50 km has been specified with a
view to exclude only long transmission lines]
APGENCO PGCIL(SR-
I) TPCILMEPL
SELSGPL
APTRANSCO
Pending
63II9 KPCLJSWEL Yet to be informed Pending
1 TANTRANSCO and PGCIL (SR-II) to take steps to complete
insulator replacement works on the 400 kV lines owned by them in
Chennai area within 3 months
1 JSWEL to follow file naming terminology provided by SRPC
for various tripping files uploaded in SRLDCrsquos TMS portal
2JSWEL to furnish reasons for AR-BLOCK observed during
the instant tripping and remedial action taken by them to
keep AR in service
3 KPCL to configure DR amp EL properly to record OVR Stage-I
amp Stage-II protections at their BTPS station
14-03-2017 at
1911 hrs
Tripping of 400 kV YTPS-BTPS line and
400 kV BTPS-JSWEL line
Status received vide TANTRANSCO mail dated 15-06-2017
1 All the Porcelain insulators of 400kV NCTPS-II - Vallur feeders-1amp2
were replaced with Polymer insulators by 20052017
2 Existing Porcelain insulators of all other 400kV feeders are being
replaced with Polymer insulators in a phased manner
TANTRANSCO
PGCIL(SR-II)
For the line under consideration the following shall be carried out by
APGENCO in coordination with TSTRANSCO
1End-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
2Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
PendingYet to be informed
Annexure-III
Page 30 of 31
65II5 Tripping of 400 kV Ghanapur-
Mamidapalli line
08-05-2017 at
1915 hrs
Line tripped at Ghanapur end only and was holding
from Mamidapalli Ghanapur end protection had
sensed R-phase to earth fault
For the line under consideration the following shall be carried out
by TSTRANSCO in coordination with PGCIL (SR-I)
1 End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
TSTRANSCO PGCIL
(SR-I)
Yet to be informed Pending
65III12 Tripping of 400 kV Srisailam-Dindi line-2 24-05-2017
at 1502 hrs
R-phase to earth fault Auto-reclose was successful
at Dindi and Zone - 1 3-phase trip at Srisailam
Since all 400 kV lnies emanating from Srisailam LB are composite
feeders APTRANSCO TSTRANSCO can keep AR functionality disabled at respective remote end stations under their control
APTRANSCO TSTRANSCO Yet to be informed Pending
Yet to be informed PendingTriggering incident was failure of CT in 110 kV
Villianur-Kurumbapet at Villianur substation 230KV
Villianur ndash NLC2 and 230 kV Villianur - Pondy lines
got tripped from Pondy end (on operation of DEF)
and NLC end (on operation of Zone-3) respectively
resulting in loss of supply to 230 kV Villianur
substation
65I2 Complete outage of 400kV Uravakonda
and Jammalamadugu Substations
31-05-2017 at
1744 hrs
Triggering incident was tripping of 400 kV Kurnool-
PG - Narnoor line - 1 amp 2 and 400 kV Narnoor-
Jamalamadugu line-2 which led to loss of supply to
400kV Uravakonda and Jamalamadugu 400kV Gooty-
Narnoor 400kV Narnoor-Jamalamadugu-1 400kV
Srisailam-Narnoor 400kV Uruvakonda-
Mahboobnagar-1amp2 were out of service in
antecedent condition
1 For 400 kV Ghani ndashNarnoor line the following shall be carried out
by APTRANSCO
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
2 PGCIL (SR-II) to take appropriate action wrt disabling non-
directional instantaneous Igt4 protection that operates without
checking existence of stub If required the issue may be referred to
relays OEM for appropriate solution or the present relays may be
replaced with other relays with different styles that donrsquot have the
issue observed
APTRANSCO PGCIL
(SR-II)
Yet to be informed Pending
1 PED to furnish an action taken report wrt complying with the
protection audit recommendations
2 PGCIL (SR-II) to review Zone-3 and DEF protection setting at
Pondicherry end 230 kV Pondicherry ndash Villianur and 230 kV
Pondicherry ndash Bahour line and set them appropriately to achieve
required time-coordination with OC protections of ICTrsquos at Villianur
SS
3 NLCIL to keep DEF protection in blocked condition as long as
Distance Protection is active and configure it to become active only
when distance protection does not pickup to avoid time-
coordination issues
19-05-2017 at
1235 hrs
Complete outage of 230 kV Villianur
Substation of Pondicherry
65I1 PED PGCIL (SR-II)
NLCIL
For the line under consideration the following shall be carried out
by TANTRANSCO in coordination with PGCIL (SR-II)
1 End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
PGCIL (SR-II)
TANTRANSCO
Yet to be informed Pending
For the line under consideration the following shall be carried out
by NLCIL in coordination with PGCIL (SR-II)1 End-to-end communication for DT permissive amp other signals may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and software) at both ends shall be checked and faulty components
shall be repaired replaced
Y-phase to earth fault Neyveli TS2 end relay issued
a 3-phase trip 220ms after issue of Y phase trip Direct Trip was sent to Pugalur end preventing auto-reclose
07-05-2017
at 1955 hrs
Tripping of 400 kV Neyveli TS2-Pugalur
line
65III6 PGCIL (SR-II) NLCIL Yet to be informed Pending
For the line under consideration the following shall be carried out
by TSTRANSCO in coordination with NTPC-Ramagundam1 End-to-end communication for DT permissive amp other signals may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components shall be repaired replaced
Over Voltage Stage-1 had operated at Gajwel end
Ramagundam end did not trip as Direct Trip was not received from Gajwel end
29-05-2017
at 0007 hrs
Tripping of 400 kV Ramagundam -
Gajwel line
65II19 TSTRANSCO NTPC
(Ramagundam)
Yet to be informed Pending
65II16 Tripping of 400 kV Kayathar-Karaikudi
line
25-05-2017 at
1552 hrs
R-phase to earth fault had occurred in line There
was Zone-2 3 phase trip operation at Kayathar end
and Zone-1 3 phase trip at Karaikudi end
Annexure-III
Page 31 of 31
SlNo Element NameOutage
datetime
Revival
datetimeReason for Outage Sender Receiver
Remedial Measures Actions taken
1 400 kV KAIGA - GUTTUR 1 27-03-2017153800 27-03-2017164800 RELAY MALOPERATION NPCIL (KGS) KPTCL
KPTCL
At Guttur end DPR operated in Z1 R phase AR
unsucessful due to persistant fault
At Kaiga end DPR operated in Zone-1 RN
fault145km AR attempt is observed from Kaiga
end DR
Reason Transient fault Stood OK after test
charging
NPCIL (KGS)
2 400 kV KHAMMAM - KALPAKKA 1 10-04-2017125800 DISTANCE PROTECTION PGCIL (SR-I) APTRANSCO
PGCIL (SR-I)
Tripped on operation of distance protection Line
belongs to APTARSNCOTSTRANSCO
APTRANSCO TSTRANSCO Momentary fault
3 400 kV KHAMMAM - KALPAKKA 2 11-04-2017115000 11-04-2017175900 Y-N faultPGCIL (SR-I) APTRANSCO
TSTRANSCO
PGCIL (SR-I) Tripped on operation of distance
protection Line belongs to
APTRANSCOTSTRANSCO
APTRANSCO TSTRANSCO Momentary fault
4 400 Kv RAICHUR - YTPS 18-04-2017131400 18-04-2017150100 DPR ZONE 1-B-PH FAULT KPCL KPTCL To-be-discussed
5 400220 Kv ICT-3 AT NEELAMANGALA 20-04-2017162100 20-04-2017170100DUE TO HEAVY ARCING AT B-
PH ISOLATORKPTCL To-be-discussed
6 400 Kv VTPS - MALKARAM 1 23-04-2017150500 SOTF OPERATED APGENCO TSTRANSCO
TSTRANSCOTripped at both ends Tripped on R-
phase to ground Zone-1 indications AR acted and
was unsucessful at Malkaram end
APGENCO
Pending Remedial Measures Actions taken
for the Critical Tripping Incidents (as on 25072017)
Annexure-IV
Page 1 of 6
7 400 kV KHAMMAM - MAMIDIPALLY 2 08-05-2017160600 08-05-2017174900 R PHASE TO GROUND FAULT PGCIL (SR-I) TSTRANSCO
PGCIL(SR-I)
Tripped on operation of distance protection Line
belongs to APTARSNCO
TSTRANSCO
Tripped at both ends Tripped on R-phase to
ground Zone-1 indications AR acted and was
unsucessful at Mamidipally end
8 400 kV TALAGUPPA - NEELAMANGALA 09-05-2017163600 Y TO GROUND FAULT KPCL KPTCL To-be-discussed
9 400 kV MUNIRABAD - GUTTUR 20-05-2017064100 20-05-2017211000BUS BAR PROTECTION
OPERATEDPGCIL (SR-I) KPTCL
KPTCL
No abnormality found at Munirabad end and line
was in service
PGCIL (SR-I)
Tripped at Guttur end only and line was holding
from Munirabad end
10 400 kV GUTTUR - HIRIYUR 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II) PGCIL (SR-II) Due to Problem at Guttur end
11 400 kV KAIGA - GUTTUR 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDNPCIL (KGS) KPTCL To-be-discussed
12 400 kV GUTTUR - NARENDRA 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II) PGCIL (SR-II) Due to Problem at Guttur end
13 400 kV MUNIRABAD - GUTTUR 20-05-2017160000 20-05-2017170400 B-n fault PGCIL (SR-I) KPTCL
PGCIL (SR-I)
As informed by Guttur Substation line tripped at
Guttur end only without any faciaalarms Line
holding from Munirabad end Suspected mal-
operation at Guttur end
KPTCL
14 400 kV GUTTUR - HIRIYUR 1 20-05-2017204100 20-05-2017211800BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II)
PGCIL (SR-II) Due to Problem at Guttur end
KPTCL
15 400 kV BTPS-JSW TORANAGALLU 20-05-2017064100 20-05-2017210300BUS BAR PROTECTION
OPERATEDKPCL JSWEL To-be-discussed
16 400 kV KAIGA - GUTTUR 1 20-05-2017204100 20-05-2017213800BUS BAR PROTECTION
OPERATEDNPCIL (KGS) KPTCL To-be-discussed
17 400 kV GUTTUR - NARENDRA 1 20-05-2017204100 20-05-2017211200BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II)
PGCIL (SR-II) Due to Problem at Guttur end
KPTCL
Annexure-IV
Page 2 of 6
18 400220 kV ICT-1 AT HOODY 20-05-2017110700 20-05-2017180500 220KV SIDE WORKS KPTCL To-be-discussed
19 220 kV AMBEWADI - PONDA 1 22-05-2017121100 22-05-2017123000 EARTH FAULT KPTCL GED To-be-discussed
20 400 Kv VTPS - MALKARAM 1 22-05-2017145200 22-05-2017185800 B phase fault APGENCO TSTRANSCO
TSTRANSCOTrippedat both ends Tripped on B-
Phase to ground and Zone-1 indications AR acted
and was unsucessful at Malkaram end
APGENCO
21 220 kV KANIAMPET - KADAKOLA 23-05-2017143200 23-05-2017162400 BREAKER PDR RELAY ACTED KSEB KPTCL To-be-discussed
22 400 kV TALAGUPPA - HASSAN 30-05-2017014600 B PHASE TO GROUND FAULT KPTCL PGCIL (SR-II)
PGCIL(SR-II) Due to persisting fault in KPTCL
portion
KPTCL
23HVDC TALCHER - KOLAR POLE 1 AT
TALCHER01-06-2017232200 02-06-2017001100
DC DIFFERENTIAL
PROTECTION OPERATEDPGCIL (SR-II) PGCIL (ER-I)
PGCIL(SR-II) Due to DC filter Diff relay operation at
Talcher end
24 400 KV NIZAMABAD- DICHPALLY-1 05-06-2017191500 3 PHASE FAULT TSTRANSCO
TSTRANSCOTrippedat both ends Tripped on 3
Phase B-Phase to ground fault and Zone-2
indications at Dichpally end
25 400220 kV ICT-1 AT DICHPALLY 05-06-2017191500 06-06-2017003200 BUCHHOLZ RELAY OPERATED TSTRANSCO
TSTRANSCO 400kv 315MVA ICT-1 at Dichpally
tripped on OSR indications which was a mal
operation of the relay At the same time there was
3 Phase fault in 400kV Dichpally to Nizamabad line
At Nizamabad end(PGCIL) Line Isolator 3 phases
shorted in GIS Module
26400 kV RAMAGUNDAM -
DICHCHIPPALLI05-06-2017191500 05-06-2017223700 3 PHASE FAULT NTPC TSTRANSCO
TSTRANSCO Line did not trip at Dichpally end At
the same time there was 3 Phase fault in 400kV
Dichpally to Nizamabad line for which the line
tripped at Both ends Relay settings need to be
reviewed at NTPC Ramagundam end
NTPC-Ramagundam
27 400 Kv BTPS - YTPS 05-06-2017194800 05-06-2017204400 DISTANCE PROTECTION KPCL To-be-discussed
Annexure-IV
Page 3 of 6
28 400 Kv SATTENAPALLI - SRISAILAM 2 05-06-2017125500 05-06-2017144700 R-n fault APTRANSCO TSGENCO
APTRANSCO
For a momentary fault feeder tripped on R-Ph Z1
indications and AR successful at Sattenapalli end
TSGENCO
Feeder tripped on R-phase to ground Zone-2 at
Srisailam end Due to Feeder consistsing of Under
Ground cable AR was disabled at Srisailam end
29 400220 kV ICT-2 AT KOLAR 06-06-2017191000 06-06-2017223700 DUE TO HEAVY WIND PGCIL (SR-II)
PGCIL (SR-II)
Flashover between 220kV jumper dropper of B
phase and Gantry towards 220kV bus due to heavy
swing of conductor during the unprecedented
heavy winds
30 400 kV KOLAR - HOODY 2 06-06-2017200800 DUE TO HEAVY WIND PGCIL (SR-II) KPTCL
PGCIL (SR-2)
Hand Tripped due to Isolator problem at Hoody
End
KPTCL
31 400220 kV ICT-2 AT GUTTUR 13-06-2017133000 13-06-2017134500TRIPPED ON EF RELAY
OPERATIONKPTCL To-be-discussed
32400 kV PUGALUR -
KALAIVANTHAPATTU14-06-2017123700 14-06-2017184500 TRIPPED ON Y-N FAULT PGCIL(SR-II) To-be-discussed
33 220 kV KANIAMPET - KADAKOLA 22-06-2017111700 22-06-2017113400EARTH FAULT RELAY
OPERATEDKSEB KPTCL To-be-discussed
34 220 kV KANIAMPET - KADAKOLA 22-06-2017121500 22-06-2017172000EARTH FAULT RELAY
OPERATEDKSEB KPTCL To-be-discussed
35 400 kV KHAMMAM - KALPAKKA 2 03-07-2017092400 03-07-2017104700
DT RECIEVED AT KLPA END
(TRIPPED ONLY AT KLPA
END)
PGCIL (SR-I) APTRANSCO
TSTRANSCO
PGCIL (SR-I)
PLCC belongs to APTRANSCO TSTRANSCO Mal-
operation of PLCC at Kalpaka end Requested
APTRANSCO TSTRANSCO for end to end
testingtunning of PLCC
APTRANSSCO TSTRANSCO
36 400220 kV ICT-1 AT URAVAKONDA 04-07-2017020100 04-07-2017022400MASTER TRIP RELAY
OPERATEDAPTRANSCO To-be-discussed
37 400 kV KAIGA - NARENDRA 2 07-07-2017075000 07-07-2017090800 TRIPPED ON R-Y Ph FAULT NPCIL KPTCL To-be-discussed
Annexure-IV
Page 4 of 6
38 HVDC BHADRAVATHI POLE 1 07-07-2017105900 07-07-2017115400TRIPPED ON NON VALID TAP
CODEPGCIL (SR-I) PGCIL (WR-I)
PGCIL(SR-I)
Tripped due to strucking of OLTC tap during
command execution The same was now working
39 400 kV KHAMMAM - KALPAKKA 2 07-07-2017120300 07-07-2017145000 DT Received PGCIL (SR-I) APTRANSCO
PGCIL(SR-I)
Tripped due to PLCC mal-operation PLCC belongs
to TSTRANSCO APTRANSCO Requested
TSTRANSCO APTRANSCO for end to end testing
tunning of PLCC Khammam end
APTRANSCO
40 400 KV GOOTY - TUMKUR - 1 08-07-2017142200 08-07-2017152600DISTANCE PROTECTION
OPERATEDPGCIL (SR-I) PGCIL (SR-II)
PGCIL(SR-I)
Tripped due to snapping of earth wire while
stringing of OPGW Advised concerned to take
additional precautions while carrying OPGW
stringing
PGCIL(SR-II)
41 400230 Kv ICT-1 AT SVCHATRAM 14-07-2017190300TRIPPED ON RESTRICTED
EARTH FAULTTANTRANSCO
TANTRANSCO
REF protection acted in ICT-1 during Auto Reclose
(AR) attempt of 400kV SVChatram-Alamathy
feeder-2 (through fault condition) As per the relay
manufacturer (GE-T60) guidelines for the one and
half breaker scheme the REF setting will be
revised
42 400 KV GOOTY - TUMKUR - 1 15-07-2017115100 15-07-2017122300Tripped while laying opgw
cablePGCIL (SR-I) PGCIL (SR-II)
PGCIL (SR-I)
Tripped due to snapping of earth wire while
stringing of OPGW Advised concerned to take
additional precautions while carrying OPGW
stringing
PGCIL(SR-II)
43 220 kV AMBEWADI - PONDA 1 16-07-2017113800 16-07-2017120800 DISTANCE PROTECTION KPTCL GED To-be-discussed
44 220 kV AMBEWADI - PONDA 2 20-07-2017013600 LINE FAULT KPTCL GED To-be-discussed
Annexure-IV
Page 5 of 6
45 400 Kv ALM - SVCTM-I 20-07-2017112700 20-07-2017120200 C-N FAULT TANTRANSCO To-be-discussed
46 400 Kv ALM - SVCTM-II 20-07-2017112700 20-07-2017120300 A-N FAULT TANTRANSCO To-be-discussed
47 400 Kv ALM - SVCTM-II 20-07-2017144300 20-07-2017193200TO ATTEND FAULT
LOCATIONTANTRANSCO To-be-discussed
48 HVDC BHADRAVATHI POLE 1 21-07-2017224800 21-07-2017235300 INTERNAL MINOR ALARM PGCIL (SR-I) PGCIL (WR-I) To-be-discussed
49 400 kV KHAMMAM - KALPAKKA 1 21-07-2017103000 21-07-2017204200AC SUPPLY TO BREAKER
PROBLEMPGCIL (SR-I) APTRANSCO To-be-discussed
50 220 kV CHITTOR - THIRUVALEM 22-07-2017080600 22-07-2017144100RELAY MALOPERATION AT
THIRUVALAMAPTRANSCO TANTRANSCO To-be-discussed
51 400 KV GOOTY - TUMKUR - 1 22-07-2017150700 22-07-2017154500TRIPPED DURING OPGW
WORKSPGCIL (SR-I) PGCIL (SR-II) To-be-discussed
52 400 Kv GAJWEL - BHOOPALAPALLY 2 22-07-2017131300 22-07-2017133600 B PHASE FAULT TSTRANSCO TSGENCO To-be-discussed
53 400 kV GUTTUR - HIRIYUR 2 22-07-2017150300 22-07-2017155300TRIPPED DUE TO RELAY MAL
OPERATIONKPTCL PGCIL (SR-II) To-be-discussed
54 400110 kV ICT 2 AT ALAMATHY 24-07-2017091300 24-07-2017162700TRIPPED ON RESTRICTED
EARTH FAULTTANTRANSCO To-be-discussed
Annexure-IV
Page 6 of 6
G1
220kV LINE-1
ICT 220400 KV
G2
GT1 GT2
400kV LINE-1
400kV LINE-2
600MW 600MW
220kV LINE-2
400kV220kVSummary of Various Special Protection Schemes for 2 x 600 MW UPCL TPP
Adani Power Limited Ahmedabad
Adani Power Ltd Ahmedabad 1
Annexure-V
Page 1 of 12
G1
ST-2
220 kV LINE-1
ICT 220400 KV
G2
GT-1 GT-2
400kV LINE-1
400kV LINE-2
600 MW 600 MW
ST-1
220 kV LINE-2
UPCL UDUPI - NETWORK UNDER CONSIDERATION
400 kV220 kV
Adani Power Ltd Ahmedabad 2
315 MVAICT-1
315 MVAICT-2
220 kV ndash KEMMAR BUS 400 kV ndash HASSAN BUS
Annexure-V
Page 2 of 12
Adani Power Ltd Ahmedabad 3
Existing SPS
Benefits of New Proposals
If both the 400kV Lines out of serviceTripped amp Total Generation is gt 650 MW then Trip Unit-2
Existing SPS logic has been developed in Unit-2 DCS
1 Consideration of all possible contingency cases
2 Unit Backdown (AUTOMATIC) has been proposed in certain contingencies
where Unit tripping is not required After restoration of tripped outlets
Unit may ramp up to full generation
3 Comprehensive logic will be developed in Numerical Relays with adequate
security and reliable detection to avoid mal operation of sps logic
4 Monitoring of SPS logic with necessary alarms and events
Annexure-V
Page 3 of 12
Sr UPCL‐Udupi‐SUMMARY OF SPS TO HANDLE ALL POSSIBLE CONTINGENCIES Sh‐1 of 2
Contingency Cases Action Unit SelectionFor Tripping
1 Power Swing Detected in Impedance reach of Zone‐1 in 400 kV Line
Tripping of One selected unit if both Units ON Each Unit Power gt 400 MW
Unit‐2
2Tripping of one 400 kV Line while another 400 kV Line is already in OFF condition
Tripping of One selected unit if both Units ON Each Unit Power gt 400MW
Unit‐2
3 TrippingOffloading of Both 400 kV Line simultaneously (within 3 sec)
Tripping of One selected Unit if both Unit ON Each Unit Power gt 325 MW Unit‐2
4 TrippingOffloading of all four Transmission Lines Tripping of both Units Both Units
4
5
400kVlin
e Overlo
ad Stage PickupSet Point
TimeDelay Action
Stage 1 900 MW 3 Sec Alarm
Stage 2 1100 MW 2 Sec Automatic Backdown upto 450 MW in both Units
Annexure-V
Page 4 of 12
Sr UPCL‐Udupi‐SUMMARY OF SPS TO HANDLE ALL POSSIBLE CONTINGENCIES Sh‐2 of 2
Contingency Cases
Action
6 ICT
Overlo
ading from
400 kV
Line Stage Pickup
Set PointTimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units
7
220 kV
Line
Overlo
ad
Stage 1 250 MW 5 Sec Automatic Backdown upto 300 MW in both Units
5
Sr Consideration Requirements associated with SPS Implementation
1 400 kV LINE Tripping in Zone‐1 will be blocked under Power Swing DetectionOperation
2 Pole Slip Protection of Generator need to be co‐ordinated with 400 kV Line Power Swing Protection
3 Line Overload Detection will be blocked by Power Swing DetectionOperation
4 Line ZeroUnder Power Detection will be blocked by Power Swing DetectionOperation
Annexure-V
Page 5 of 12
G1
ST-2
220 kV LINE-1
ICT 220400 KV
G2
GT-1 GT-2
400kV LINE-1
400kV LINE-2
600 MW 600 MW
ST-1
220 kV LINE-2
UPCL UDUPI - NETWORK UNDER CONSIDERATION
400 kV220 kV
Adani Power Ltd Ahmedabad 6
315 MVAICT-1
315 MVAICT-2
220 kV ndash KEMMAR BUS 400 kV ndash HASSAN BUS
Annexure-V
Page 6 of 12
Contingency 1 Tripping of one 400kV line
It may lead tohellip1 Overloading of another 400 kV Line
2 Power Swing in another 400 kV Line (specially when 220 kV
Lines are not available)
3 Severe oscillations in running Units
4 Units may loose synchronism and disconnect from network
G1 G2
L1 L2L1L2
Following SPS has suggested to address this contingency
Adani Power Ltd Ahmedabad 7
400kV200kV
Contingency Cases
Action
Unit Selection
ForTripping
1
400kVline Overlo
ad
Stage PickupSet Point
TimeDelay
Stage 1 900 MW 3 Sec Alarm ‐‐‐‐‐‐‐
Stage 2 1100 MW 2 Sec Automatic Backdown upto 450 MW in both Units ‐‐‐‐‐‐‐
2 Power Swing Detected in Impedance reach of Zone‐1 in 400 kV Line
Tripping of One selected unit if both Units ON Each Unit Power gt 400 MW Unit‐2
Annexure-V
Page 7 of 12
Contingency 2 Tripping of one 400kV line while other already Tripped
It may lead tohellip
1 Oscillations in running Units
2 Units may loose synchronism and disconnect from
network
3 Overloading of ICTs and subsequent tripping
4 Overloading of 200 kV Lines and subsequent tripping
5 Station blackout
Adani Power Ltd Ahmedabad 8
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases Action Unit SelectionFor Tripping
1Tripping of one 400 kV Line while another 400 kV Line is already in OFF condition
Tripping of One selected Unit if both Unit ON Each Unit Power gt 400 MW Unit‐2
2
ICT Overlo
ading
from
400
kV Side
Stage PickupSetting
TimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units
Annexure-V
Page 8 of 12
Contingency 3 Tripping of both 400kV line simultaneously
It may lead tohellip
1 Severe oscillations in running Units
2 Units may loose synchronism and disconnect from
network
3 Overloading of ICTs and subsequent tripping
4 Overloading of 200 kV Lines and subsequent tripping
5 Station blackout
Adani Power Ltd Ahmedabad 9
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases Action Unit SelectionFor Tripping
1 TrippingOffloading of Both 400 kV Line simultaneously (within 3 sec)
Tripping of One selected Unit if both Unit ON Each Unit Power gt 325 MW Unit‐2
2
ICT Overlo
ading
from
400
kV Side
Stage PickupSetting
TimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units ‐‐‐‐‐‐‐
Annexure-V
Page 9 of 12
Contingency 4 Overloading of any 220 kV line
This contingency may arise due tohellip1 Tripping of both 400 kV Lines and associated SPS logic fails
to operate (Tripping of any One Unit if both Units running)
2 Overloading of ICTs from 400 kV Side and associated SPS
logic fails to operate
3 Tripping of any one 220 kV lines if both 220 kV lines are in
service and 400 kV outlets are not available
Adani Power Ltd Ahmedabad 10
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases
Action
Unit Selection
ForTripping
1
220kV
line
Overlo
ad StagePickupSet Point
TimeDelay
Stage 1 250 MW 5 Sec Automatic Backdown upto 300 MW in both Units ‐‐‐‐‐‐‐
If any SPS does not function Then 200 kV Line will trip by Operation of Line Over Current Function
Annexure-V
Page 10 of 12
Contingency 5 Tripping of all Lines emanating from UPCL (ZERO POWER)
It may lead to1 Over voltage conditions at UPCL Bus
2 Over speed of all the generators because of sudden
load throw
Following SPS has suggested to address these contingencies
1 Zero Power Scheme on 400 kV System and 220 kV System checking the power
flow through 400kV and 200 kV lines and trip all the units in service if there is a
under power condition on all four lines and running units
Adani Power Ltd Ahmedabad 11
G1 G2
L1 L2L1
400kV200kV
L2
Sr Contingency Cases Action Unit SelectionFor Tripping
1 TrippingOffloading of all four Transmission Lines Tripping of both Units Both Units
Annexure-V
Page 11 of 12
G1
220kV LINE-1
ICT 220400 KV
G2
GT1 GT2
400kV LINE-1
400kV LINE-2
600MW 600MW
220kV LINE-2
400kV220kV
THANKShellip
Adani Power Ltd Ahmedabad 12
Annexure-V
Page 12 of 12
65th Protection Coordination Sub-Committee
29-06-2017
Annexure-VI
Page 1 of 40
Complete outage of 230KV Villianur substation of Pondycherry at 1235 hrs on 19-05-2017
bull Triggering incident Failure of CT in 110kV Villianur-Kurumbapet at Villianur substation
bull 230110kV ICT-1amp2 at Villianur substation tripped on operation of backup Over current protection
bull 230KV Neyveli-Villianur and Pondy-Villianur Line got tripped from NLC amp Pondy ends on operation of DEF and Zone-3 respectively
bull Delayed clearance of fault observed from PMU plot ndash 560ms
bull Load loss 140 MW
DEF
ZONE-3
NLC TS-2 BAHUR TrsquoMARTHAN
PONDY
VILLIANUR
Annexure-VI
Page 2 of 40
Fault cleared in 560ms
Annexure-VI
Page 3 of 40
Complete outage of 400kV Uruvakonda and Jamalamadugu Stations at 1744 hrs on 31-05-2017
bull Triggering incident Tripping of 400kV Kurnool-Narnoor line-1 amp 2 and 400kV Kurnool-Jamalamadugu line-2
bull Loss of supply loss to 400kV Uruvakonda and Jamalamadugu
bull Lines out of service 400kV Gooty-Narnoor 400kV Narnoor-Jamalamadugu-1 400kV Srisailam-Narnoor 400kV Uruvakonda-Mahboobnagar-1amp2
Srisailam Narnoor
Kurnool
Ghani
Jrsquomadugu UVrsquokonda
Mbrsquongr
Gooty
Ghanapur
Igt4
Igt4 Z3
Z3
OV DT RCV
Annexure-VI
Page 4 of 40
Annexure-VI
Page 5 of 40
Kurnool Narnoor
DR trigger ndash 174418501 hrs
Ib=5kA
Zone-3 trip EL Stub optd
DR trigger ndash 173620637 hrs
Igt4 trip
3 phase Grp AB optd
Kurnool Narnoor
DR trigger ndash 174418503 hrs
Ib=5kA
Zone-3 trip EL Stub optd
DR trigger ndash 174306388 hrs
Igt4 trip
3 phase Grp AB optd
Kurnool Jamalamadugu
DR trigger ndash 174423979 hrs Vgt1 Trip
DR trigger ndash 174415040 hrs Z3 T1 DT Rcv not observed in DR amp EL
400kV Kurnool-Narnoor line-1
400kV Kurnool-Narnoor line-2
400kV Kurnool-Jamalamadugu line-2
Annexure-VI
Page 6 of 40
bull Points for discussion ndash Location of fault
ndash Zone-3 amp Igt4 trip of 400kV Kurnool-Narnoor line-1amp2
Annexure-VI
Page 7 of 40
Tripping of 220kV Idukki ndashUdumalpet line at 1702 hrs on 05-05-2017
bull B-N and R-N fault in line
bull Delayed clearance observed during 2nd fault
Idukki Udumalpet
DR trigger ndash 170200499 hrs ZONE 1 B-E 366Km
DR trigger ndash 165741849 hrs ZONE 1 B-E amp Zone-2 R-E
Idukki
Udumalpet Lower periyar
New Pallom Kalamassery
Annexure-VI
Page 8 of 40
Annexure-VI
Page 9 of 40
B-N FAULT
R-N FAULT
ZONE-2
Ar attempt
Udumalpet end DR Annexure-VI
Page 10 of 40
bull Points for discussion ndash Reason for 3 phase trip at idukki end
ndash Relay to give a 3 phase trip in the event of 2nd fault during dead time
Annexure-VI
Page 11 of 40
Tripping of 400kV Kudgi(PG)-Tumkur line-2 and Kudgi(PG)- Kudgi(NTPC) line-1 at 1605 hrs on 06-05-2017
bull 400kV Kudgi(PG)-Kudgi(NTPC) ndash line tripped at Kudgi PG end on R-N zone-1
bull 400kV Kudgi(PG)-Tumkur line tripped from both ends
Kudgi(NTPC)
Tumkur
Kudgi(PG) Narendra
Kohapur
Guttur
Kaiga
Annexure-VI
Page 12 of 40
Kudgi (PG) Kudgi(NTPC)
DR trigger 160547438 hrs Zone-1 optd R-N Ar lockout Ov pick up
FIR DR amp EL not furnished
Kudgi (PG) Tumkur
DR trigger 160546957 hrs NGR buchholz trip Dip in R-phase voltage
DR trigger 160512593 hrs DT Rcv Grp AB optd
400kV Kudgi(PG)-Kudgi(NTPC) line-1
400kV Kudgi(PG)-Tumkur line-2
Annexure-VI
Page 13 of 40
Annexure-VI
Page 14 of 40
Annexure-VI
Page 15 of 40
Annexure-VI
Page 16 of 40
Tripping of 220kV Edamon-Tirunelveli-1amp2 at 1809 hrs on 06-05-2017
bull 220kV Edamon-Tirunelveli-1amp2 tripped from Tirunelveli end only and was in service from Edamon end ZONE-1 R-B-E fault
bull Distance protection at Tirunelveli over-reached and tripped for fault in 220kV Edamom-Pothencode lines
Edamon
Sabarigiri
Tirunelveli Pothencode
Kundara
Edappon
Annexure-VI
Page 17 of 40
Annexure-VI
Page 18 of 40
Tripping of 400220 kV Ghani ICT-2amp3 at 1405 hrs on 07-05-2017
bull ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
bull Delayed clearance observed from PMU data
bull DR amp EL not furnished
Srisailam Narnoor
Kurnool
Ghani
Jrsquomadugu UVrsquokonda
Mbrsquongr
Gooty
Ghanapur
Annexure-VI
Page 19 of 40
Annexure-VI
Page 20 of 40
Tripping of 400kV Ghanapur-Mamidapalli line at 1915 hrs on 08-05-2017
bull Line tripped at Ghanapur end only and was holding from Mamidapalli
Ghanapur Mamidapalli
DR trigger ndash 191329917 hrs Z3 Main-2 opts Event logger Main-2 PSB optd ndash 191541751hrs
DR trigger ndash 191458457hrs R-N Start Breakers did not trip
Ghani
Malkaram
Ramagundam
Chpr
Mamidapalli
Nrsquosagar
Gajwel Ghanapur Khammam
Dindi
Annexure-VI
Page 21 of 40
Annexure-VI
Page 22 of 40
Tripping of 400220kV ICT-1 at Guttur at 2215 hrs on 09-05-2017
bull ICT-1 tripped on HV side only without any relay indications
bull No fault observed from PMU data
Annexure-VI
Page 23 of 40
Tripping of 400kV Narsapur-Shankarapalli at 0007 hrs on 10-05-2017
bull line tripped at Narsapur end only and holding from Shankarapalli
Narsapur Shankarapalli
DR trigger ndash 000720147hrs Zp T1 Igt3 Start Event logger 75A relay optd ndash 000720098 hrs
CB did not trip
Singareni
Shankarapalli Gajwel
Narsapur
Suryapet
Brsquoply
Rrsquogm
Annexure-VI
Page 24 of 40
Tripping of 400220kV Hyderabad ICT-4 and 220kV lines at Hyderabad substation at 239 hrs on 10-05-2017
bull Triggering incident Bus fault in 220 kV Ghanapur station
bull Observation from PMU data ndash dip observed in Y amp B phase fault cleared in 120ms
bull Elements tripped 220kV lines amp 400220 kV ICT-4
bull FIR not submitted by TSTRANSCO
Annexure-VI
Page 25 of 40
Tripping of 400220kV ICT-1 at BTPS 13-05-2017 at 1941 hrs
bull ICT-1 got tripped on operation of LV side earth fault protection during R-phase to earth fault in 220kV BTPS-Lingapur line
bull Lingapur line DR amp EL were furnished
BTPS Alipura Regulapadu
Lingapur
Annexure-VI
Page 26 of 40
Tripping of 765 kV Kurnool-Thiruvelam line-2 at 2003 hrs on 19-05-2017
bull Triggering incident Failure of R-phase LA at Thiruvelam end
Kurnool Thiruvelam
DR trigger time ndash 200318272 hrs
Main-1 trip Carrier aided trip
3 ph Grp-AB optd DT RCV
Ir ndash 3kA
Dip in Y-phase current observed
Event logger
REF optd - 200318340 hrs
DT send - 200318343 hrs
DR trigger time ndash 200318269 hrs
Zone-1 trip
Initially 1 ph trip and later 3 ph trip due to DT rcv
Event logger
DT rcv - 200318395 hrs
Raichur Kurnool NPS
Tiruvelam
Solapur
Annexure-VI
Page 27 of 40
Annexure-VI
Page 28 of 40
Tripping of 400220kV ICT-2 at Kalpakka at 1502 hrs on 20-05-2017
bull ICT-2 tripped due to operation of transformer buchholz relay
bull Reason for operation of Buchholz relay may be furnished to PCSC
Annexure-VI
Page 29 of 40
Tripping of 400220kV ICT-2 at KV Kota at 1021 hrs on 23-05-2017
bull ICT-2 got tripped due to mal-operation of transformer oil temperature indicator
bull Remedial actions taken may be furnished to PCSC
Annexure-VI
Page 30 of 40
Tripping of 220kV Kaniambeta-Kadakola line at 1350 hrs on 23-05-2017
bull Line tripped at Kaniambeta end
bull Kaniambeta feeder protection is provided through 220kV bus coupler breaker bay
bull EFR relay operated and B ph pole discrepancy relay operated leading to tripping of Bus coupler CB
bull Loss of infeed to Kaniambeta Ss
Annexure-VI
Page 31 of 40
Tripping of 400220kV ICT-1 at Somanahalli substation at 1724 hrs on 24-05-2017
bull ICT-1 at Somanahalli substation got tripped due to DC Earth fault
bull Findings amp Remedial actions taken may be furnished to PCSC
Annexure-VI
Page 32 of 40
Tripping of HVDC Gazuwaka Pole-1amp2 25-05-2017 at 0945 hrs
bull HVDC pole-1 got tripped due to operation of South filter inter zone protection and
bull HVDC pole-2 got tripped due to operation of differential protection
bull Findings amp remedial actions taken may be furnished to PCSC
Annexure-VI
Page 33 of 40
Tripping of 400kV Kayathar-Karaikudi line 25-05-2017 at 1552 hrs
bull Triggering Incident R-phase to earth fault
Kayathar Karaikudi
DR trigger time ndash 155236585 hrs
Zone-2 3 phase trip
Carrier unhealthy
DR trigger time ndash 155236592 hrs
zone-1 3 phase trip
Kayathar Kamudi Karaikudi
Pugalur
Trichy
Madurai
Annexure-VI
Page 34 of 40
Annexure-VI
Page 35 of 40
Tripping of 400220kV ICT-1amp3 at Hoody substation of KPTCL at 1230 hrs on 26-06-2017
bull ICT-1 tripped due to arc over of pre-close supervision contact of tip coil -2
bull ICT-3 got tripped on over-loading
Annexure-VI
Page 36 of 40
Annexure-VI
Page 37 of 40
Tripping of 400kV Simhadiri-Kalpakka line-2 at 503 hrs on 28-05-2017
bull Line tripped on mal-operation Teed Differential Protection at Simhadiri end and direct trip was received at Kalpakka
bull Y-Phase to earth fault had occurred in 400 kV Vijayawada-Vemagiri line-3
bull Findings amp remedial actions taken may be furnished to PCSC
Annexure-VI
Page 38 of 40
Tripping of 400kV Ramagundam-Gajwel at 0007 hrs on 29-05-2017
bull Over voltage stage-1 had operated at Gajwel end
bull Ramagundam end did not trip as direct trip was received from Gajwel
bull DR amp EL of Gajwel end not furnished
Annexure-VI
Page 39 of 40
Tripping of 400kV Gajwel-Ghanapur line at 0007 hrs on 29-05-2017
bull Line tripped on operation of over voltage protection at Gajwel and direct trip was received at Ghanapur
bull DR and EL of Gajwel end were not furnished
Annexure-VI
Page 40 of 40
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 3
With reference to above the Constituents had been requested to submit the certificate on healthiness of batteries on monthly basis (ie status for a month shall be sent by the 7th day of the following month) to SRPC as per the format given below
Sl No
Station Application Battery Battery Charger Remarks
Station Name
Code Type
(PS SS)
Protection
Communication
Details Status (Healthy Unhealthy)
Details Status (Healthy Unhealthy)
1 Station-A Protection (Bank-1)
Protection (Bank-2)
Communication (Bank-1)
Communication (Bank-2)
2 Station-B hellip
hellip hellip hellip
Note 1 Code is the short name of the Station
2 PS ndash Power Station SS - Substation
The sought status for the months of May 2017 had not been received from the following SR-Constituents
TANTRANSCO NTPL amp NTECL
7 Implementation of Line Differential Protection (LDP) in Nellore and Simhadri complexes
The issue had been discussed in the 64th meeting of PCSC held on 25052017 when it was agreed that the concerned Constituents would take steps to implement LDP in both Nellore and Simhadri Complexes by December 2017
Subsequently MEPL (vide their mail dated 14062017) and SEL (vide their mail dated 27062017) informed that in view of their present financial condition they may kindly be exempted for the time being from implementing LDP on the lines belonging to them in Nellore Complex However they assured that suitable action would be taken to implement the same once their situation improves
In this regard it was clarified that PGCIL (SR-I) can go ahead procuring LDP relays without considering MEPL and SEL requirement Accordingly the following Constituents were asked to take appropriate steps to put LDP in place by December 2017
Nellore Complex Constituents responsible for LDP implementation
Timeline for LDP implementation
Line Differential Protection (LDP) to be implemented on all 400 kV lines (lt 50 km)
PGCIL (SR-I) APGENCO APTRANSCO TPCIL SGPL
December 2017
MEPL and SEL As and when their financial healthiness improves
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 4
Simhadri Complex Constituents responsible for LDP implementation
Timeline for LDP implementation
Line Differential Protection would be implemented in Simhadri Complex on all 400 kV lines inter-connecting Gajuwaka SS Kalpaka SS Simhadri STPP and Hinduja TPS
PGCIL (SR-I) NTPC APTRANSCO and HNPCL
December 2017
8 Installation of PMU by POWERGRID at 400kV NP Kunta
In PCSC-64 meeting held on 25052017 the following was noted
SRLDC stated that NP Kunta is a critical station where in addition to injection of large quantum of solar power reactive power control is also being exercised by way of the recently commissioned STATCOM Thus to better monitor the LVRT effects of Solar power station and functioning of STATCOM installed at NPKunta station it is necessary to have a PMU installed there To this PGCIL (SR-I) informed that provision for PMU at NP Kunta had not been envisaged in Part-I of URTDSM Further as per the decision taken in the 3rd Communication meeting held at SRPC Bengaluru the quantity of Phase-I of URTDSM project was freezed On this SRLDC mentioned that PGCIL need not procure an additional PMU for the purpose instead they can divert the PMU identified for Vijayawada to NP Kunta The issue was further discussed and in view of the stated significance of NP Kunta PGCIL (SR-I) was asked to divert PMU identified for Vijayawada to NP Kunta as part of Phase-I of URTDSM project
However in view of the difficulty expressed by PGCIL (SR-I) in shifting the (already commissioned) PMU and its associated cabling and communication modules from Vijayawada to NP Kunta the issue was again discussed by PCSC forum in the meeting During the meeting the necessity of having PMU at NP Kunta was once again emphasised It was also noted that a PMU had been identified for installation at GMR-Vemagiri as part of URTDSM project in Phase-I However as APTRANSCO and GMR had not agreed for the same the same was not yet carried out In view of above PCSC forum decided that PGCIL (SR-I) take steps to shift the PMU and associated cabling and communication interface modules identified for commissioning at GMR-Vemagiri to NP Kunta and install the same at the earliest
9 Revision of Special Protection Scheme (SPS) implemented at UPCLrsquos plant at Udupi
UPCL vide their mail dated 22052017 requested to review the SPS implemented at their plant in view of the changed grid conditions and furnished a proposal for consideration by SRPC SRLDC
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 5
In this regard the existing SPS and the proposed SPS by UPCL were discussed Existing SPS Both 400 kV lines unavailable amp Generation gt 650 Trip Unit-2 Both 400 kV line and one of the two 220 kV lines unavailable
amp Generation gt 300 MW Trip Both Units Proposed SPS Under this the following five contingencies have been considered 1 Tripping of one 400 kV line 2 Tripping of one 400 kV line with the other already tripped 3 Tripping of both 400 kV lies simultaneously 4 Overloading of any 220 kV line 5 Tripping of all Lines emanating from UPCL (Zero Power condition) The details of the proposed SPS by UPCL are enclosed at Annexure-V With regard to above it was noted that even though the proposed SPS may effectively take care of the oscillations power swings that may occur at UPCL during above stated contingencies the following concerns need to be properly addressed from the grid perspective Since the line breaker is not allowed to be tripped in the event of occurrence of power swing
(even when it enters Zone-1) and a definite possibility exists for it to be transmitted to the other adjacent connected stations it needs to be shown by conducting proper system studies that tripping of UPCL running Unit (s) by virtue of operation of corresponding SPS would act negatively on the sustenance of the power swing
It was felt that the Contingencies at 2 amp 3 can be combined since they essentially result in the same Further the reference power value assumed for comparing with actual generation to effect tripping of Unit-2 under Contingency-2 may be appropriately revised to 325 MW to avoid overloading of Varahi ndash Shimoga lines (in the extreme case of full generation at Varahi GS)
Study results for all Contingencies considered shall be shared Given the complexity of the proposed SPS issues pertaining to non-reliability of its operation may
also be suitably factored into Accordingly UPCL was requested to review the proposed SPS addressing above concerns and furnish the thus modified scheme to PCSC forum along with supporting study results
10 Auto-Reclosure Implementation on all 220 kV amp above Transmission Lines of
Southern Region
It was noted that APGENCO (Hydro) amp APGENCO (RTTP) are yet to furnish their action plan for implementing AR in their respective networks Similarly though TSGENCO (Thermal) amp TSGENCO (Hydro) had stated that they were coordinating with TSTRANSCO to obtain revised settings they are also yet to furnish Action Plan Time-frame for implementing AR It was also noted that in the Action Plan furnished by APTRANSCO feeder details were not mentioned Similarly in the Action Plan furnished by TSTRANSCO time-frame for implementing AR was not mentioned Action Plan for implementing AR is also yet to be furnished by NTPC-Ramagundam (for Tie-CBrsquos of 400 kV lines)
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 6
It was further noted that even though KPTCL had furnished the details of 220 kV amp 400 kV lines where AR is already in place the details of 220 kV lines where AR is not presently in service along with Action Plan for implementing same are yet to be furnished
All above Constituents were asked to kindly furnish required details by 08082017
Since the main issues in implementing AR are the adopted conservative protection philosophies lack of proper PLCC communication and breakersrsquo suitability supportability it is intimated in view of above that if there are no issues wrt carrier communication and breakersrsquo supportability concerned Constituents shall make efforts to implement AR immediately in their respective networks Where communication amp breaker related issues stand in the way of implementing AR concerned Constituents shall take steps to address them appropriately on priority basis and implement AR in their respective networks in a phased manner at the earliest
In the previously held PCSC meetings the following logics have been clarified for implementing AR
Normally high speed single-ph single-shot AR scheme (with simultaneous opening at both ends of feeder with a dead-time of 1 sec and reclaim-time of 25 sec) may be used by all Utilities (including Generators)
However those generators (Coal Gas Nuclear Hydro) who have concerns wrt closing on to un-cleared fault can make use of the following time-differentiated single-ph single-shot AR scheme
ldquoIn this after a line has been opened from both ends (generator end amp grid end) on AR operation the grid end will be auto-reclosed as usual after the elapse of its dead-time (say 1 sec) However the generator end relay will check for the line voltage after elapse of an extended dead time say 15 sec [here the additional time delay of 05 sec which has been included as a safety margin shall be so chosen that the extended dead-time is less than the adopted Pole Discrepancy time delay] If the line voltage so sensed is healthy amp normal (which implies that the fault has already been cleared) then generator end will be auto-reclosed else 3-ph trip will be given at generator end to open the other two phase polesrdquo Further wherever Trip-on-Reclose (ToR) feature is available at grid-end station it shall be configured such that it sends Direct Trip (DT) command to generator end upon its operation
It is also clarified that the above scheme can be as it is used to Line-CBrsquos of all bus configurations (including Main-CBrsquos of one-and-half breaker bus configuration) For Tie-CBrsquos in one-and-half breaker configuration employing priority scheme (which also happens to be the recommended practice) above logic is not be required since the employed priority scheme anyway checks for CLOSE_STATUS of Main-CB before closing Tie-CB However if required the above logic can be applied to Tie-CBrsquos also by adopting a suitable extended dead-time considering the remote end stationrsquos AR dead time
It is further clarified that AR functionality for a transmission line shall be preferably put into service using (i) Bay Control Unit (BCU) or (ii) separate External AR Relay Where these are not available only then should the AR functionality of Main protection relays of lines be used
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 7
Here it is assumed that both Main-relays are deriving their Voltage Input from the Line CVTrsquos (from different cores as per the recommended practice) However if this is not the case and the concerned Utility has a practice of using Line-CVT voltage input to one of the Main relays and Bus-CVT voltage input to the other Main relay it is recommended that voltage input to be used in time-differentiated AR logic shall be exclusively derived from the line-CVT for use in both the Main relays
It is also clarified that AR implementation is not required in case of radial feeders cables amp composite feeders and is optional for the lines interconnecting two generating stations
In addition to above the following logics (applicable to the Cases where AR is being proposed to be implemented from Main Protection Relays) are also intimated for the benefit of the Constituents
Since there are two Main protection relays (Main-I and Main- II) to decide upon proper way of implementing AR for achieving fool-proof AR operation it has been advised that instead of implementing AR from only one of the Main relays (in light of its low success rate) the following Alternatives be considered Alternative ndash 1 AR is implemented and kept functional from Main ndash I [Main-II] only but with feedback from Main-II [Main-I]
In this scheme AR is implemented and kept in service from Main-I [Main-II] as usual
Additionally Main-II [Main-I] relay is configured for single-pole (1-ph) tripping and the OPEN (TRIP) status of the concerned trip relay is used for triggering AR functionality in Main-I [Main-II] By this even if the fault is not sensed in the beginning by Main-I [Main-II] but sensed by Main-II [Main-I] AR operation is guaranteed However it may be noted that in cases of permanent faults this scheme may result in unsuccessful AR operation with Pole Discrepancy Relay coming to rescue if the fault is not sensed by Main-I [Main-II] but by Main-II [Main-I] at the time of auto-reclosing instant
Alternative ndash 2 AR is implemented and kept functional from both Main ndash I and Main-II
In this scheme AR is implemented and kept in service from both Main ndash I and Main-II as
usual As can be seen the scheme is reliable and is without any additional logics However to avoid the possibility of both relays racing for CLOSE-OPEN-CLOSE-OPEN operation in case of permanent faults it shall be ensured that along with other conditions ldquoAR BLOCK with 3-ph TRIPrdquo is also effected for the same phase fault as the original one that occurs during AR dead-time
Out of the above two also it has been suggested to consider Alternative-2 for implementing AR in view of its higher success rate
11 Network Configuration Changes
As per the information furnished by SR-Constituents to the OCC forum in their 132nd meeting (held on
09062017 Minutes circulated on 04072017) it is formed that the following configuration changes (additions deletions modifications of transmission elements) took place in the southern grid during
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 8
April 2017
Two STATCOMs (+- 50 MVAR Each) at NP Kunta commissioned on 16052017
Kudgi Unit I 72 Hrs trail run completed Successfully
400 kV Shankarapally-Suryapet I amp II commissioned on 05052017
22033kV SS at Hayathnagar IampII in Ranga reddy district of 50 MVA Capacity was commissioned on 03052017 by TSTRANSCO
SR II Power grid vide letter dated 10062017 had informed that consequent to the successful completion of Trial Operation the following assets under transmission system associated with ldquoSystem strengthening ndashXX in Southern Regional Gridrdquo have been put under Commercial Operation wef 0000 hrs of 10062017 in terms of clause 4 of CERC (Terms and Conditions of Tariff Regulations 2014)
1 x 500 MVA 40022033kV ICT at Trichy Substation along with associated bays and equipments
SR I Power grid vide letter dated 04062017 had informed that consequent to the successful completion of Trial Operation the following assets of ldquoTransmission System for Ultra Mega Solar Park in Anantapur Dist Andhra Pradesh- Part ndash A (Phase-I)rdquo have been put under Commercial Operation wef 0000 hrs of 04062017 in terms of clause 4 of CERC (Terms and Conditions of Tariff Regulations 2014)
+- 100 MVAR STATCOM at NP Kunta Pooling Station along with associated bays and equipment
12 Instances of SPS Operation
Based on the information furnished by SRLDC it is informed that there occurred no SPS operations in SR during the period 25052017 ndash 28062017
13 Status of Implementation of Protection Audit Recommendations (Phase-I amp Phase-II)
With reference to the petitions filed by KSEB (88MP2016) and KPTCL (135MP2016) for seeking further time-extension for completing their respective Protection Audit Recommendations (PAR) the final Order of Honrsquoble CERC disposing of petitions was issued on 15122016 In this Order the Commission apart from granting last-chance time-extensions to various SR-Constituents had also directed SRPC to monitor the status of completion of PAR regularly in PCSC meetings and submit bi-monthly report to the Commission confirming the completion of Phase-I and Phase-II of PAR of the Constituents of Southern Region
In this regard based on the information furnished various Constituents a summary table showing the
compliance status of various SR-Constituents as in July 2017 is given below
SlNo
Constituent
PAR (Phase-I) Activities
PAR (Phase-II) Activities
PAR (Ph-I amp Ph-II) Compliance ()
Remarks
Stipulated Completion
Date
Stipulated Completion
Date
1 APGENCO (Hydel)
31122017 31122017 40 ---
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 9
2 APGENCO (Thermal)
30072017 --- 75 Based on the status furnished timeline for complying with the remaining pending recommendations (3 in no) is expected by 31122017
3 APTRANSCO 31032017 --- 9571 Out of the 3 remaining pending recommendations two are expected to be completed in three months while the other is expected by 31122017
4 TSGENCO (Hydel)
31032017 31032017 8823 Based on the status furnished timeline for complying with the remaining pending recommendations (4 in no) is expected by 31122017
5 TSGENCO (Thermal)
31032017 31032017 80 Based on the status furnished timeline for complying with the remaining pending recommendations (3 in no) is expected by 31072017
6 TSTRANSCO 31032017 31032017 8523 Based on the status furnished timeline for complying with the remaining pending recommendations (13 in no) is expected by 30092017
7 KPCL --- 31112016 100 ---
8 KPTCL 31052017 31052017 2817 Based on the status furnished timeline for complying with the remaining pending recommendations (51 in no) is expected by 30092017
9 TANGEDCO 31122017 31122017 6389 ---
10 TANTRANSCO 31122017 31122017 50 ---
11 KSEB 30112016 31122017 9481 ---
12 NPCIL (MAPS) 31012017 --- 8889 Based on the status furnished timeline for complying with the remaining pending recommendation (ONE in no) is expected by 31122017
All above SR-Constituents are requested to adhere strictly to the time-lines given in the Order for
completing their respective pending PAR The IPPrsquos for whom there are pending PAR [viz Spectrum PGL GMR Barge - Kakinada Konaseema GPL APGPCL Vijjeswaram (Stage-I amp Stage-II) amp LANCO-Kondapalli PL] are also requested to complete them at the earliest
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 10
14 Nomenclature for naming various files uploaded in web-based Tripping Monitoring
System of SRLDC Portal
The nomenclature to be followed by the Constituents in naming various files (FIR DR EL TR) corresponding to a tripping incident was brought out in the SRPC letter No SRPC SE-III PCSC-45 4609 ndash 649 dated 26062015 and in the minutes of PCSC-45 issued vide SRPC letter No SRPCSE-III PCSC-45 2015 5422-455 dated 21072015 As illustrated therein the format to be followed for the user entered part-name is given below
Transmission Element File Name to be given by the user
Transmission Line SSN_DSN_line_FT
Inter-connecting Transformer SSN_ICT_FT
Generating Transformer SSN_GT_FT
Generating Unit SSN_Unit_FT
Where SSN = Source Station Name From end Station Name Sending end Station Name DSN = Destination Station Name To end Station Name Receiving end Station Name FT = File Type (FIR DR EL TR)
All SR-Constituents are requested to kindly intimate the above file naming nomenclature to all the concerned and ensure that it is strictly followed at all the stations in their respective control areas so that tripping analysis can be done systematically
15 Date amp Venue of the next PCSC Meeting
It is informed that the 66th meeting of PCSC will be held on 17th August 2017 (Thursday) from 1030 hrs onwards in the Conference Hall of SRPC Secretariat Bengaluru
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 132
Analysis of Grid Occurrences - 65
I Details of Grid Disturbances
Sl No
Details of Event Date amp Time Reason Remarks Category
1
Complete outage of 230 kV Villianur Substation of Pondicherry
19-05-2017 at 1235 hrs
Triggering incident was failure of CT in 110 kV Villianur-Kurumbapet at Villianur substation 230KV Villianur ndash NLC2 and 230 kV Villianur - Pondy lines got tripped from Pondy end (on operation of DEF) and NLC end (on operation of Zone-3) respectively resulting in loss of supply to 230 kV Villianur substation
Load Loss 140 MW
GD-1
SLD
The single line diagram of 230 kV Villianur SS as furnished by PED is attached at the end 230 kV Villianur ndash Pondy line Villianur (PED) end
As per FIR TR line was kept holding
The following was also stated in FIRTR
Remedial action Relay testing amp calibration proposed during total shutdown on 13062017
DR amp EL not furnished Pondy (PGCIL-SR2) end
As per FIRDRELTR line tripped at 123559270 hrs on B-E fault due to DPR Z3 (98 km 156 kA) operation From DR amp EL Z3 time delay was observed to be about 06 sec
230 kV Villianur ndash NLC2 line Villianur (PED) end
As per FIR TR line was kept holding
The following was also stated in FIRTR
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 232
Remedial action Relay testing amp calibration proposed during total shutdown on 13062017
DR amp EL not furnished NLC2 (NLCIL) end
As per FIRDRELTR line tripped at 123551016 hrs on B-E fault due to DEFR operation From DR amp EL DEFR time of operation was observed to be about 07 sec
Time sync of Protection relays with GPS at NLC TPS-II needed to be ensured SRPC SRLDC
It was noted that the triggering incident was failure of B-ph CT in 110 kV Villianur-Kurumbapet line at Villianur SS
It was noted that for the above fault distance protection at Villianur end on 110 kV Villianur-Kurumbapet line had not operated probably due to absence of current input (hence impedance becoming infinite)
Further since there was no busbar protection to 110 kV buses the fault continued to be fed from the remote ends (Pondy-PG and NLC-2) through 100 MVA Transformers (Txr ndash 1 amp Txr ndash 2)
So the transformersrsquo back-up protections were called into action But since OC protections provided on both HV amp LV sides had no high-set Units and since they were kept non-directional [Relay make ER TJM 10] LV (110 kV) side OC protections of both transformers had acted to give trip command Even though the 110 kV CB of Txr ndash 1 got opened that of Txr-2 had not opened due to which the fault continued to be fed from the remote ends (Pondy-PG amp NLC-2)
It was noted that the HV (230 kV) side OC protection of Txr-2 which was supposed to act under above situation had NOT acted
Due to above the remote end back-up protections were called into action
It was noted that even though Pondy-PG end CB tripped on DPR Z3 protection the time delay observed was on the lower side of about 06 sec
It was also observed that DEF protection had acted to trip its CB at NLC-2 without giving any chance for its distance protection to operate
In view of the above observed inconsistencies at Villianur SS it was decided to review various feeder amp transformer protections kept at Villanur SS during its scheduled protection audit on 10072017
Subsequently protection audit of 230 110 kV Villianur SS of PED was conducted on 10072017 during which several lacunae were noted Accordingly a comprehensive set of recommendations were given to PED for early compliance
Recommendations
PED to furnish an action taken report wrt complying with the protection audit recommendations PGCIL (SR-II) to review Zone-3 and DEF protection setting at Pondicherry end 230 kV Pondicherry ndash
Villianur and 230 kV Pondicherry ndash Bahour line and set them appropriately to achieve required
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 332
time-coordination with OC protections of ICTrsquos at Villianur SS NLCIL to keep DEF protection in blocked condition as long as Distance Protection is active and
configure it to become active only when distance protection does not pickup to avoid time-coordination issues
2
Complete outage of 400kV Uravakonda and Jammalamadugu Substations
31-05-2017 at 1744 hrs
Triggering incident was tripping of 400 kV Kurnool-PG - Narnoor line - 1 amp 2 and 400 kV Narnoor-Jamalamadugu line-2 which led to loss of supply to 400kV Uravakonda and Jamalamadugu 400kV Gooty-Narnoor 400kV Narnoor-Jamalamadugu-1 400kV Srisailam-Narnoor 400kV Uruvakonda-Mahboobnagar-1amp2 were out of service in antecedent condition
Gen Loss 500 MW
GD-1
FNN not followed by APTRANSCO FIR amp TR in prescribed formats not furnished by APTRANSCO SLD
The single line diagram 400 kV Jammalamadugu SS as furnished by APTRANSCO are attached at the end
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 432
Antecedent Conditions
The following lines were kept out of service 400kV Narnoor-Srisailam SC line 400kV Narnoor-Gooty SC line 400kV Narnoor-Hyderabad SC line 400kV Narnoor-Jamalamadugu-1 line 400kV Uravakonda-Jamalamadugu-1 line 400kV Uravakonda-Mahboobnagar line-1amp2
Above means Uravakonda SS and Jammalamadugu SS were effectively hanging on to 400 kV Jamalamadugu - Narnoor line-2 for supply
A Tripping of 400 kV Kurnool (PG) - Narnoor line-1 Kurnool-PG (PGCIL-SR1) end
As per FIRTR line tripped at 174418601 hrs due to DPR Z3 (5703 km) operation
As per DREL line tripped at 174418601 hrs due to Stub Protection operation Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 173620637 hrs due to operation of Igt4 (B-ph) protection
From EL Igt4 time delay was observed as 100 msec
Time sync of protection relays with GPS needed to be ensured B Tripping of 400 kV Kurnool (PG) - Narnoor line-2 Kurnool-PG (PGCIL-SR1) end
As per FIRTR line tripped at 174418601 hrs due to DPR Z3 (5703 km) operation
As per DREL line tripped at 174418601 hrs due to Stub Protection operation Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 174306388 hrs due to operation of Igt4 (B-ph) protection
From EL Igt4 time delay was observed to be about 100 msec
Time sync of protection relays with GPS needed to be ensured C Tripping of 400 kV Narnoor ndash Jammalamadugu line-2 Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 174423979 hrs due to OVR-I operation (From EL OVR-I Time delay was observed as 5 sec which is in line with SRPC provided gradings)
Jammalamadugu (APTRANSCO) end
As per FIR line tripped at 1744 due to DT receipt from Narnoor end
As per DR line tripped at 174415040 hrs (Type of Protection operated was not recorded)
In EL events recording started from 174424037 hrs Line was observed to have got tripped around this time due to 862 operation (Type of Protection operated was not recorded)
Time sync of Protection relays with GPS needed to be ensured SRPC SRLDC
As informed by APTRANSCO it was noted that the triggering cause for operation of Stub protection Igt4 protection was a line fault on 400 kV Ghani ndash Narnoor line-1 Even though Ghani end had tripped on DPR Z1 protection and sent carrier to Narnoor due to unhealthiness of carrier communication (PLCC related issues) Narnoor end tripped on DPR Z2 protection
The above fault was seen by relays at both ends of 400 kV Narnoor ndash Kurnool-PG lines 1 amp 2 (the relays of P444 make are owned by PGCIL-SR1 and the relay settings were also provided by PGCIL-SR1)
As in formed by PGCIL (SR-I) it was noted that there was an instantaneous non-directional Igt4 protection setting in the specific relay style (defined by relay make model and version) which operates without checking for isolator status During the above instant the flow of heavy fault
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 532
current led to its operation both ends
To this PGCIL (SR-I) was informed that by default Igt4 or stub protection is configured for instantaneous operation with corresponding isolator open position interlock So further instantaneous high-set functionality that operates without checking isolator positional status is not desirable since it can lead to unwarranted trippings as in the present case Therefore the said setting shall be kept disabled If there is no provision to effect this (by means of changing relay settings) the issue may be referred to its OEM for obtaining modified firmware suitable solution PGCIL (SR-I) can also make use of other relays with different style in place of the existing relays
Recommendations
For 400 kV Ghani ndashNarnoor line the following shall be carried out by APTRANSCO End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced PGCIL (SR-II) to take appropriate action wrt disabling non-directional instantaneous Igt4 protection
that operates without checking existence of stub If required the issue may be referred to relays OEM for appropriate solution or the present relays may be replaced with other relays with different styles that donrsquot have the issue observed
II Details of Grid Incidents
Sl No Details of Event Date amp Time Reason Category
1 Tripping of 220 kV Idukki ndashUdumalpet line
05-05-2017 at 1702 hrs
Line tripped due to B-N and R-N fault in line
GI-1
Idukki (KSEB) end
As per FIRDREL line tripped (in 3-ph) at 170200500 hrs on B-E fault due to operation of DPR Z1 (3661 km) protection
Udumalpet (TANTRANSCO) end
As per FIRDRELTR line tripped (in B-ph) at 165741907 hrs on B-E fault due to DPR Z2 (CAT AR 1025 km) operation However during AR dead-time another R-E fault was detected at 165742252 hrs in Zone-2 due to which line tripped in 3-ph after Z2 time delay of 350 msec at 165742594 hrs [It may be noted that all this happened during the AR dead-time]
Time-sync of Protection Relays with GPS needed to be ensured at 220 kV Udumalpet SS KSEB
During the instant case line did not try for AR as the external VARM AR relay was faulty and kept out of service
Remedial action Problem with VARM relay had been rectified and put into service on 10052017
SRPC SRLDC
From the DR of Udumalpet it can be seen that the relay had tried for AR even after giving three phase trip during AR dead-time due to occurrence of two different faults which is not desirable
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 632
Recommendations TANTANSCO to correctly configure AR logic at Udumalpet so that in the event of 3-ph trip being
given during AR dead-time the relay will not try for auto-reclosure TANTRANSCO to keep AR dead-time as 1 sec for all 220 kV amp above transmission lines
2
Tripping of 400 kV Kudgi (PG) - Tumkur line-2 and Kudgi (PG) ndash Kudgi (NTPC) line-1
06-05-2017 at 1605 hrs
Kudgi (NTPC) feeder tripped at Kudgi (PG) end on operation of distance protection R-N Zone-1 Tumkur feeder tripped at Kudgi(PG) end on operation of NGR buchholtz relay
GI-2
SLD
The single line diagram of 765 400 kV Kudgi-PG SS as furnished by are attached at the end 400 kV Kudgi (PG) ndash Kudgi (NTPC) line-1 Kudgi (PGCIL-SR2) end
As per FIRDRELTR line tripped (in 3-ph) at 160547499 hrs on R-E fault due to DPR Z1 (M1 79 km 013 kA M2 88 km 318 kA) operation
Kudgi (NTPC) end
FIRDRELTR not furnished 400 kV Kudgi (PG) ndash Tumkur line-2 Kudgi (PGCIL-SR2) end
As per FIRDRELTR line tripped (in 3-ph) at 160547450 hrs due to operation of NGR Buccholtz trip protection
Tumkur (PGCIL-SR2) end
As per FIRELTR line tripped (in 3-ph) at 160547596 hrs due to DT receipt from Kudgi-PG end
In DR this time was mentioned as 160512593 hrs
Time-sync of protection relays with GPS needed to be ensured PGCIL (SR-II)
With regard to tripping of 400 kV Kudgi (PG) ndash Kudgi (NTPC) line ndash 1 and AR non-operation it was informed that prior to above fault there were multiple faults on all four lines between Kudgi (PG) and Kudgi (NTPC) due to prevailing stormy weather
Remedial action Actual reasons for AR failure in the instant case were being investigated The issue was also
referred to its OEM for suitable advice
With regard to tripping 400 kV Kudgi (PG) ndash Tumkur line ndash 2 it was suspected that NGR Buchholtz relay might have mal-functioned as there was no gas collected in the bucholtz relay of NGR It may be noted that NGR buchholtz trip is present in REF relay
Remedial action Oil sample of NGR taken and sent to RTDC
Recommendations PGCIL (SR-II) to sort out AR related issues at Kudgi (PG) end on 400 kV Kudgi (PG) ndash Kudgi (NTPC)
lines and put AR into service PGCIL (SR-II) investigate the reasons for NGR Buccholtz trip on 400 kV Kudgi (PG) ndash Tumkur line-2
and furnish an action taken report wrt rectifying the same
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 732
3 Tripping of 220 kV Edamon-Tirunelveli lines - 1amp2
06-05-2017 at 1809 hrs
220kV Edamon-Tirunelveli - 1amp2 tripped from Tirunelveli end only and was in service from Edamon end
GI-1
Edamon (KSEB) end
As per FIR line was kept holding from Edamon end Tirunelveli (PGCIL-SR2) end
As per FIRDRELTR lines tripped (in 3-ph) at 180921343 hrs on R-B fault due to DPR Z1 (532 km) operation
It was stated in TR that Edamon ndash Pothencode lines 1 amp 2 had tripped around the same time and it was suspected that DPRrsquos at Tirunelveli end on 220 kV Tirunelveli ndash Edamon lines 1 amp 2 might have over-reached for the fault in 220 kV Edamon - Pothencode lines
PGCIL (SR-II)
The instant case was a typical case of overreaching of distance relays at Tirunelveli being experienced for quite a while It may be probably due to bunching of the conductors involved
Remedial action It was proposed to modify Z1 setting as 50 of line impedance with POR and would be done
within one-week time They had also proposed to measure the actual line impedance of the line and adjust Z1 settings
accordingly
06-03-2017at 0607 hrs
4 Tripping of 400220 kV Ghani ICT-2amp3
07-05-2017 at 1405 hrs
ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
GI-2
FNN not followed by APTRANSCO FIRrsquos in prescribed format not furnished by APTRANSCO SLD
The single line diagrams of 400220 kV Ghani SS as furnished by APTRANSCO is attached at the end Tripping of 500 MVA 400 220 kV ICT-2
As per FIR ICT-2 tripped at 1405 hrs due to operation of Y-ph OC amp EF protections
DR amp EL not furnished Tripping of 500 mVA 400 220 kV ICT-3
As per FIR ICT-3 tripped at 1405 hrs due to operation of Y-ph OC amp EF protections
DR amp EL not furnished SRPC SRLDC
When enquired about the reasons for operation of back-up protections of ICTrsquos ndash 2 amp 3 APTRANSCO replied that there was actually a fault on the 220 kV feeders emanating from 400 220 kV Ghani PS However since the CT Neutral connection setting had been wrongly set as ldquoTowards Bus siderdquo instead of the correct ldquoTowards Transformer siderdquo the back-up protections on 220 kV side operated for the said 220 kV line fault
APTRANSCO also informed that first ICT-2 tripped followed by ICT-3
But since it was not clear from the above explanation whether line protection on 220 kV side had operated or not and the delayed clearance of the fault observed during the incident (about 400 msec) APTRANSCO was asked to investigate the reasons for the same
APTRANSCO was also asked to check whether carrier aided protection is healthy on 220 kV lines emanating from 400 220 kV Ghani PS
07-03-2017 at 1602 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 832
Recommendations APTRANSCO to check and correct all CT Neutral Connection settings in various protection relays at
their 400 220 kV Ghani PS APTRANSCO to ensure that PLCC carrier aided protection is maintained healthy on 220 kV lines
emanating from their 400 220 kV Ghani PS APTRANSCO to take steps to complete configuration works of DRrsquos amp ELrsquos of various protection
relays at their 400 220 kV Ghani SS and furnish the same as and when required in compliance of IEGC Regulation 52 (r)
5 Tripping of 400 kV Ghanapur-Mamidapalli line
08-05-2017 at 1915 hrs
Line tripped at Ghanapur end only and was holding from Mamidapalli Ghanapur end protection had sensed R-phase to earth fault
GI-2
Mamidipalli (TSTRANSCO) end
As per FIR line was kept holding from Mamidipalli end
In DR R-E fault current (2894 kA) along with dip in R-ph voltage could be seen but if any protection relay had picked could not be verified Also EL furnished did not contain events for this time (In fact no events were found recorded after 160610859 hrs)
Ghanapur (PGCIL-SR1) end
As per FIRTR line tripped (in 3-ph) at 1915 hrs on R-E fault due to DPR Z1 (49 km 2547 kA) operation
As per DR line tripped (in 3-ph) at 191330020 hrs on R-E fault due to 3-ph Group-B Trip relay operation (Zone-3 pick-up also could be observed)
As per EL line tripped (in 3-ph) at 191541722 hrs on R-E fault due to 3-ph Group-B Protection Trip relay operation
Time-sync of protection relays with GPS needed to be ensured
When enquired about the reasons for observed discrepancies PGCIL (SR-I) informed that line tripped on operation of distance protection Since last 2-3 trippings permissive carrier was not being received at Mamidipally end
Further since PLCC at both ends belong to TSTRANSCO thorough check-up of PLCC carrier communication and tuning of PLCC link needed to be undertaken
For above one-day shut-down of line was requested to which SRLDC agreed
Recommendations For the line under consideration the following shall be carried out by TSTRANSCO in coordination
with PGCIL (SR-I) End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
08-03-2017 at 1033 hrs
6 Tripping of 400220kV ICT-1 at Guttur
09-05-2017 at 2215 hrs
ICT-1 tripped on HV side only without any relay indications GI-2
As per FIRTR ICT-1 tripped at 2215 hrs only on HV side without any relay indications KPTCL
ABB make RXMS trip relays provided in various lineICT panels were found to be mal-operating and the phenomenon observed was suspected due to raise in earth potential during any fault in Guttur substation
10-03-2017 at 1801 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 932
Remedial action Action wass being taken to provide 10kΩ resistor in series with the RXMS relay coil for all trip
relays of this type at Guttur Total 170 nos of such resistors were required Now purchase formalities were finalised and work of supply and fixing of resistors would be taken up and completed within a monthrsquos time
7 Tripping of 400 kV Narsapur-Shankarapalli line
10-05-2017 at 0007 hrs
Line tripped at Narsapur end only on B-Phase to earth fault and line did not trip from Shankarapalli
GI-2
SLD
Shankarapally (TSTRANSCO) end
As per FIR line was kept holding from Shankarapally end Narsapur (TSTRANSCO) end
As per FIRDREL line tripped in 3-ph at 000720105 hrs on B-E fault due 86 Trip relay (130 km) operation
The type of protection operated was not recorded shown in either DR or EL
TR not furnished TSTRANSCO
For the fault on 400 kV Shankarapalli-Mamidapalli line Narsapur end picked up in Z3 However due to configuration issues relating to programmable Zone Zp (this was being used as Zone-3 and its time-setting was found to be kept as zero sec) it tripped instantaneously instead of tripping after Zone3 time delay
Remedial action PSL Configuration for Zp was set right on 01-06-2017
13-03-2017 at 2347 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1032
8
Tripping of 400220 kV Hyderabad ICT-4 and 220 kV lines at Hyderabad substation
10-05-2017 at 239 hrs
Operation of busbar protection due to fault in 220 kV Bus at 220kV Hyderabad Substation
GI-1
SLD
1 2 1 2
Bus-1
Bus-2
x
xx
x
BUS BAR ACTED AT 220KV GHANAPUR SS ON 10-05-2017
CHANDRAYANAGUTTA HAYATHNAGAR
132KV BUS
160MVA-3 100MVA-1
400kV PGCIL
x x
160MVA-2ICT-1 ICT-2 ICT-3
NAGOLE
x x
ICT-4
x
MOULALI
INFOSYS
x
x
1 2
Y-Ph disc
flash over at
LocNo95
Y amp B-Ph
disc flash
over at
LocNo95
RELAY INDICATIONS ON THE FEEDER
AT GHANAPUR END AT CHANDRAYANGUTTA END
Chandrayangutta-I feeder Ghanapur-I feeder
Main-1 relayYNZ1 071kM Main-1 relayYN254kM
Main-2 relayYNZ1 09kM Main-2 relayYN
Chandrayangutta-II feeder Ghanapur-II feeder
Main-1 relayYB Z1378kM Main-1 relayRYB
Main-2 relayYBZ111kM Main-2 relayRYB
BC
14-03-2017 at 1911 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1132
Tripping of ICT-4
As per FIR ICT-4 tripped at 0240 hrs on 220 kV side only due to BBP operation on 220 kV Bus
As per DR ICT-4 tripped at 220941165 hrs apparently due to LBB operation
EL not furnished
Date amp Time-sync of DR not in order (09052017 220940682 hrs)
TR furnished did not contain any analysis or remedial action taken
It was noted that BBP for 220 kV Bus-2 had operated for a close-in line fault on 220 kV Chandrayanagutta line-2 tripping ICT-4 and other connected 220 kV feeders (It was informed that ICT-2 was not in service at the time of instant tripping)
When enquired about the reasons TSTRANSCO informed that presence sudden appearance of current in the corresponding Peripheral Unit (PU-2) of the Chandrayanagutta line-2 had led to BBP operation And the reasons for the same were being investigated
To this it was suggested to check corresponding CT neutral connection integrity of cable wiring from CT to Busbar panel as also carry out stability-check of busbar protection
Recommendations TSTRANSCO to investigate the reasons for BBP operation for 220 kV Bus-2 and furnish a report on
the remedial measures taken
9 Tripping of 400220 kV ICT-1 at BTPS
13-05-2017 at 1941 hrs
ICT-1 got tripped on operation of LV side earth fault protection during R-phase to earth fault in 220 kV BTPS-Lingapur line
GI-1
SLD
The single line diagram of 400220 kV BTPS as furnished by KPCL is attached at the end
As per FIRTR ICT-1 tripped at 1942 hrs on LV side earth fault protection due to fault in 220 kV BTPS ndash Lingapur line It was stated that the line also tripped around the same time on R-E fault due to DPR Z1 (2438 km) operation
DR amp EL pertaining to ICT-1 tripping not furnished
As per furnished DREL 220 kV BTPS ndash Lingapur line tripped from BTPS end at 194124719 hrs due to DT receipt from the remote end
KPCL
ICT-1 tripped due to non-directional sensitive earth fault protection provided on LV (220 kV) side
Remedial action The time lever for above protection was increased from 0025 to 01 in the third week of May
2017 in consultation with KPTCL KPTCL
220kV BTPS- Lingapur line tripped at both the ends with following indications At BTPS Lingapur Line tripped on DPRZone-1RN24km78kA
At Lingapur BTPS line tripped on DPRZone-2RN66km29kA
It was reported that 315MVA ICT-1 tripped on LV side earth fault protection along with Lingapur line
Remedial action Existing settings of ICT back up protection is obtained from local RT wing of KPTCL for review
Revised settings communicated to KPCL for implementation
16- 03-2017 at 0118 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1232
SRPC SRLDC
Since the ICT has been provided with normal back-up directional OC amp EF protections a separate non-directional sensitive earth fault protection is not desirable hence the need for the same may be reviewed Otherwise its time lever shall be suitably increased to a higher value (say 035) so as not to cause unwarranted trippings
Further tripping of 220 kV BTPS ndash Lingapura line from BTPS end on DT receipt was not in order
When enquired about the reasons for AR non-operation in the instant case for the above line KPCL replied that there were issues with PLCC carrier communication hence it was kept out of service
Recommendations KPCL to review the need for providing separate non-directional sensitive earth fault protection for
ICTrsquos at their BTPS station and take steps to disable the same For 220 kV BTPS ndashLingapura line KPCL to resolve issues relating to PLCC carrier communication and
put AR into service
10 Tripping of 765 kV Kurnool-Tiruvalam line-2
19-05-2017 at 2003 hrs
Failure of R-phase LA at Tiruvalam end REF operation and DT send were observed from EL of Kurnool station
GI-2
Kurnool (PGCIL-SR1) end
As per FIRTR the line tripped in 3-ph at 200318272 on R-B-E fault due to DPR Z2 (CDistance = 912) operation
As per DR line tripped in 3-ph at 200318272 hrs on R-E fault (B-E fault did not appear to be strong) due to DPR Z2 (CAT) operation and 3-ph Group - A amp B Trip relay operation (In DR DT receipt event was observed around the same time)
In EL REF protection operation of PU-P141 operation and DT_SEND to the remote end was observed at 200318340 hrs
Tiruvalam (PGCIL-SR2) end
As per FIRDRELTR the line tripped in 3 ph at 200318269 on R-E fault due to DPR Z1 operation and DT receipt from the remote end
It was stated in TR that 707 RLA (Reactor LA) had fallen down due to heavy wind and caused R-E fault
When enquired about the reasons for REF protection operation and consequent sending of DT to the other end PGCIL (SR-I) informed that the fault was detected as R-B-E fault hence three-phase trip was given However even though Main-CB got opened with its three poles opening simultaneously Tie-CB got opened in R-ph immediately while the other two phase poles took a while to open This had caused Tie-CB LB operation Since this protection was implemented in REF relay trip was extended from the same along with sending of DT to the other end
To this it was pointed out that in the instant case only R-E fault was apparent and the current in B-ph was almost at the normal value hence the sensitivity of distance relay zone elements may be checked Further Tie-CB LBB operation points to sluggishness of the CB-poles hence the opening time of tie-CB may be checked and properly set
It was also noted that in the EL of Tiruvalam DT Send event was observed after tripping of the line on R-E fault PGCIL (SR-II) was asked to look into the reasons for the same and take suitable remedial action
16-03-2017 at 1023 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1332
11 Tripping of 400220 kV ICT-2 at Kalpaka SS
20-05-2017 at 1502 hrs
ICT-2 tripped due to operation of Transformer Buchholtz relay
GI-2
As per FIR ICT-2 tripped at 15053283 hrs due to its Buccholtz relay operation It was stated in FIR that heavy rain amp gale had been reported at the time of tripping
APTRANSCO
Just prior to above tripping event station transformer supply went off When the supply came back the two oil cooling pumps which were supposed to start one after another with a time gap of 15 sec had started simultaneously due to problem in the timer module Due to this there was a sudden flow of oil which shorted the contacts of the micro-switch that gives buchholtz trip
Remedial action The faulty timer module of oil cooling pump had been replaced
On this SRPC asked for the details of AC auxiliary supply about its redundancy details of DG-set and the mode of starting (manual or auto) To this APTRANSCO informed that redundancy for AC auxiliary supply is present and the lost supply during the instant case had been restored immediately
Recommendations
APTRANSCO to furnish AC auxiliary supply details including its redundancy DG set details and its mode of starting at their 400 220 kV Kalpaka SS Further corresponding AC auxiliary supply changeover scheme drawing shall also be furnished
16-03-2017 at 1132 hrs
12 Tripping of 400220 kV ICT-2 at KV Kota SS
23-05-2017 at 1021 hrs
ICT-2 got tripped due to mal-operation of transformer oil temperature indicator
GI-2
As per FIR ICT-2 tripped at 1021 hrs on both HV and LV sides due to transformer oil temperature indicator mal-operation
As per EL ICT-2 tripped at 1019XXXXX192 hrs on due to operation of OTI protection
It was stated that DR had not been triggered for the event
Time-sync of protection relays with GPS needed to be ensured
EL was not configured to show SECONDS in time-stamp of the events (This had been brought to APTRANSCOrsquos attention in previous PCSC meetings also)
APTRANSCO
At KV Kota SS OTI got stuck While checking the same its position indicator got changed and mal-operated resulting in 3-ph trip
Remedial action Ms CGL had visited the substation and declared the relay faulty It was proposed to replace the faulty OTI on 10072017
APTRANSCO was asked to configure Event Loggers at their KV Kota SS properly so that SECONDS are also displayed in the time stamp of the events recorded
16-03-2017 at 1245 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1432
13
Tripping of 220 kV Kaniampeta - Kadakola line (Load Loss at Kaniampeta = 36 MW)
23-05-2017 at 1350 hrs
EFR relay operated and B-ph pole discrepancy relay operated leading to tripping of Bus-Coupler CB
GI-1
Kaniampeta (KSEB) end
As per FIR in Kaniyampetta 220 kV substation all transformers tripped (Load loss 36 MW) at 1339 hrs due to the tripping of 220 kV Kaniyampetta-Kadakola feeder (B phase) at Kadakola end Later 220 kV Kaniyampetta-Kadakola feeder was hand tripped at 1426 hrs from Kaniyampetta end
Kadakola (KPTCL) end
As per FIR line tripped at 1350 hrs due to EFR operation of Bus-Coupler CB and PDR operation
It was also stated that at the time of tripping Kaniampeta panel had been taken up for RampU work hence distance relay was not in service Kaniampeta CB was bypassed by keeping protection through 220 kV Bus-Coupler CB
DR amp EL not furnished KPTCL
At Kadakola during the instance protection to Kaniambetta line was provided through 220kV bus coupler breaker bay as Kadakola relay panel was taken out for M-2 retrofitting work under RampU
Bus coupler breaker tripping was suspected due to problem in the pole discrepancy relay and there was no fault in the line
Remedial action Problem with the PD relay of Bus coupler breaker was rectified on 24052017
16-03-2017 at 2026 hrs
14 Tripping of 400 220 kV ICT-1 at Somanahalli substation
24-05-2017 at 1724 hrs
ICT-1 at Somanahalli substation got tripped due to DC Earth fault
GI-2
Somanahalli (PGCIL-SR2) end
As per FIRTR ICT-1 tripped (on HV side) at 172809 hrs on momentary DC Earth fault
As per DREL ICT-1 tripped (on HV side) at 172809812 hrs due to operation of Group AB trip relays In DR manual trigger signal becoming HIGH was observed at above instant
In EL time resolution for recording events was limited to seconds (events were not shown at msec level)
PGCIL (SR-II)
At Somanahally SS 3x167 MVA single phase units had been replaced by 1x500 MVA ICT Subsequently CSD works were taken up At the time of tripping event CSD wiring works were going on During the process positive DC supply got extended to 86A trip relay inadvertently
Remedial action DC earth fault had been removed
PGCIL (SR-II) was asked to configure Event Loggers at their Somanahalli SS properly so that time resolution for recording events was set u pto msec
16-03-2017 at 118 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1532
15 Tripping of HVDC Gazuwaka Pole-1amp2
25-05-2017 at 0945 hrs
HVDC pole-1 got tripped due to operation of South filter inter zone protection and HVDC pole-2 got tripped due to operation of differential protection
GI-2
SLD
Pole-1
27-03-2017 at 1016 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1632
Pole-2
Tripping of HVDC Pole-1 (PGCIL-SR1)
As per FIRELTR Pole-1 tripped at 094513960 hrs due to operation of South Filter inter-zone protection [
It was stated that DR was not available Tripping of HVDC Pole-2 (PGCIL-SR1)
As per FIRDRELTR Pole-2 tripped at 094512906 hrs due to operation of WIN Differential protection
It was noted that no representative from Gajuwaka (HVDC amp HVAC) SS had come to attend the meeting to explain as to what caused the pole trippings
PGCIL (SR-I) representative informed that at the time of tripping RTV Coating works for switchyard equipment were going on In the process when CWC35 filterrsquos bus-side isolator was opened it feel down unexpectedly and resulted in inter-zone filter protection operation
Wrt HVDC Pole-2 tripping PGCIL (SR-I) representative informed that oscillations in voltage and current were noticed prior to tripping of HVDC Pole-2 And differential current was also observed for the extended AC bus Due to this WIN differential protection had operated resulting in tripping of HVDC Pole-2 It was also informed that the issue was referred to its OEM ABB (Sweden) for suitable advice
However since no detailed tripping report explaining the causes that led to tripping of HVDC poles and the remedial action taken had been furnished PGCIL (SR-I) was asked to submit the same
Recommendations PGCIL (SR-I) to furnish detailed report on the events that led to tripping of HVDC Poles ndash 1 amp 2
including remedial measures taken to PCSC forum Further the OEM report wrt tripping of HVDC Pole-2 shall also be furnished
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1732
16 Tripping of 400 kV Kayathar-Karaikudi line
25-05-2017 at 1552 hrs
R-phase to earth fault had occurred in line There was Zone-2 3 phase trip operation at Kayathar end and Zone-1 3 phase trip at Karaikudi end
GI-2
Kayathar (TANTRANSCO) end
As per FIRDRELTR line tripped in 3-ph at 155236989 hrs on R-E fault due to DPR Z2 operation (Z2 time delay observed was about 390 msec)
It was stated in TR that carrier channel was not healthy at the time of tripping and carrier signal was not received at this end during the fault
Remedial action Protection Coupler and OLTE were reset at both Karaikudi amp Kayathar ends and carrier channel
was made available Karaikudi (PGCIL-SR2) end
As per FIRDRELTR line tripped in 3-ph at 155236592 hrs on R-E fault due to DPR Z1 (186 km) operation
It was stated in TR that DPC had failed at the other end and resulted in Carrier Fail alarm at Karaikudi end issuing 3-ph trip
Recommendations
For the line under consideration the following shall be carried out by TANTRANSCO in coordination with PGCIL (SR-II) End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
17
Tripping of 400220 kV ICT - 1 amp 3 at Hoody substation of KPTCL (Load Loss 750 MW)
26-05-2017 at 1230 hrs
R phase limb of ICT-1 bank pre-close supervision contact of trip coil -2 had arc over ICT-3 got tripped on over-loading
GI-2
Tripping of ICT-1
As per FIR ICT-1 tripped at 1230 hrs due to arcing over of R phase limb of ICT-1 bankrsquos pre-close supervision contact of trip coil -2
As per DR the tripping took place at 114128806 hrs (Type of protection operated not recorded)
EL not furnished
Time sync of PRrsquos with GPS needed to be ensured
Remedial action The same was rectified and the circuit was changed by utilizing the spare auxiliary contact of CB
for R-ph limb by availing LC on 29052017 and charged the ICT-1 bank at 0432 hrs by getting the SRLDC code 1360
Tripping of ICT-3
As per FIR ICT-3 tripped at 1230 hrs due to operation of INV OC FWD protection amp 86A master trip relay
From the DR furnished (with trigger time = 114254202 hrs) tripping of ICT-3 and the type of protection operated were not clear
EL not furnished
Time sync of protection relays with GPS needed to be ensured at Hoody
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1832
KPTCL
At Hoody 500 MVA ICT-1 tripped without any relay indication ICT-1 and 3 were in parallel each ICT carrying about 390MW of load Due to tripping of ICT-1 ICT-3 got over loaded and hence tripped on over current protection
Remedial action After detailed inspection it was observed that pre-close supervision contact of trip coil -2 arced
over in R phase limb of the 400kV side breaker Hence it was suspected that R-pole might have opened initially and remaining poles on PD operation
The problem was rectified and attended on 29052017 by availing shut down In order to avoid tripping of another ICT operating in parallel whenever one ICT trips on fault an
SPS is being finalized by KPTCL which is to be implemented at Hoody Any time each ICT at Hoody will be catering around 400MW of load Such huge load shedding by tripping 66kV loads of Hoody station is difficult to achieve Hence 220kV radial feeders may also have to be tripped to get desired load shedding
It was noted that frequent tripping of 400 2220 kV ICTrsquos at Hoody SS had been observed in the past few months And during their discussion in various PCSC meetings the following issues have come to the for urgent action by KPTCL Implementation of Special Protection Scheme (SPS) to take care of over-loading of the other ICT
when one out of two ICTrsquos operating in parallel trips Provision of Bus-bar protection to 220 kV buses Compliance of Third Party Protection Audit Recommendations Ensuring supply reliability to Metro-services Action plan on the proposed system strengthening measures in Bengaluru area in the context
of continued use of Split-Bus operation
Thus to ascertain the action taken by KPTCL wrt above issues a Protection System Analysis Group (PSAG-18) meeting was proposed to be conducted on 03082017
Recommendations KPTCL to furnish compliance report on the recommendations given in PSAG-18 meeting to PCSC
forum
18 Tripping of 400 kV Simhadri - Kalpaka line-2
28-05-2017 at 503 hrs
Line tripped on mal-operation of Tee Differential Protection at Simhadri end and Direct Trip was received at Kalpaka
GI-2
Kalpaka (APTRANSCO) end
As per FIR line tripped at 0503 hrs due to DT receipt from the remote end
DR amp RL amp TR not furnished Simhadri STPS (NTPC) end
As per FIRTR line tripped at 050350408 hrs due to operation T-differential protection which in turn was attributed to spurious pick-up during the fault at Vemagiri end
The following was stated in TR Kalpaka Line-1amp2 Tie bays were under PTW And R-Ph CT (16CTA R-Ph) was under erection Primary connection was over secondary
connection was pending The CT secondary wires used in T-Diff protection of Kalpaka Line-2 might be touching the earth and during fault at Vemagiri some stray voltage developed across CT secondary cores might have resulted into operation of T-Diff protection Trip values are 100mA in secondary
During the operation of T-diff protection there was no change in current magnitudes of Kalpaka Line-2 and hence the tripping could be considered as spurious one
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1932
As per DR line tripped at 050350442 hrs But the type protection operated was not recorded in it
EL not furnished (In place of EL DRrsquos eventsrsquo summary was furnished)
19 Tripping of 400 kV Ramagundam - Gajwel line
29-05-2017 at 0007 hrs
Over Voltage Stage-1 had operated at Gajwel end Ramagundam end did not trip as Direct Trip was not received from Gajwel end
GI-2
Ramagundam STPS (NTPC) end
As per FIR line was kept holding from Ramagundam end Gajwel (TSTRANSCO) end
As per FIR line tripped at 0007 hrs due to OVR-I operation
DR amp EL amp TR not furnished
The tripping was not in order as per the SRPC given OVR gradings as shown below
When enquired about the reasons for OVR-I operation TSTRANSCO informed that OVR functionality implemented in REL 521 had mal-operated
Remedial action The OVR functionality had been moved to an external Over Voltage relay
Recommendations
For the line under consideration the following shall be carried out by TSTRANSCO in coordination with NTPC-Ramagundam End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
20 Tripping of 400 kV Gajwel-Ghanapur line
29-05-2017 at 0007 hrs
Line tripped on operation of over voltage protection at Gajwel and direct trip was received at Ghanapur DR and EL of Gajwel end were not furnished
GI-2
Ghanapur (PGCIL-SR1) end
As per FIRELTR line tripped at 000731885 hrs due to DT receipt from the remote end
As per DR line tripped at 000257163 hrs due to DT receipt from the remote end
Time-sync of DR amp EL with GPS needed to be ensured Gajwel (TSTRANSCO) end
As per FIR line tripped at 0007 hrs due to OVR-I operation
DR amp EL amp TR not furnished
The tripping was not in order as per the SRPC given OVR gradings as shown below
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2032
When enquired about the reasons for OVR-I operation TSTRANSCO informed that there was a loose
wiring in Y-ph CVT wiring which resulted in mal-operation of OVR-I protection
Remedial action All CVT wirings had been tightened for fool-proof operation
III Details of Trippings due to Failure or Non-operation of Auto-Reclose
Sl No Element Date amp Time Reason
Category
1 Tripping of 400 kV Hiryur-
BTPS line-1 06-05-2017 at 1401 hrs
Y-phase to earth fault had occurred in line Direct trip was sent from BTPS to Hiryur end
GI-2
Hiryur (PGCIL-SR1) end
As per FIRDRELTR line tripped (in Y-ph) at 140009730 hrs on Y-E fault due to DPR Z1 (AR 82 km 1034 kA) operation Just prior to auto-reclosing DT was received at 140010730 hrs and line tripped in 3-ph
BTPS (KPCL) end
As per FIRTR line tripped (in Y-ph) at 1400 hrs on Y-E fault due to DPR Z1 (AR 1173 km) operation AR was stated to be attempted but unsuccessful due to persistent fault
As per DREL line tripped (in Y-ph) at 125520000 hrs on Y-E fault due to DPR Z2 (CAT AR) operation and tried to auto-reclose after about 1 sec but tripped in 3-ph due to persistent (Z1) fault
Time-sync of Protection Relayrsquos with GPS needed to be ensured at BTPS
When enquired about the reasons for sending of DT to Hiriyur end KPCL informed that when the line tripped on Y-E fault and the AR operation was in progress Under-Voltage relay at BTPS end had sensed under-voltage and sent DT to Hiriyur end
It was noted that instantaneous tripping of UV relay and consequent of sending of DT to the other end are undesirable It was therefore suggested to introduce suitable delay (say 3 sec) for UVR tripping and disable sending of DT to the other end
Recommendations
KPCL to introduce suitable delay (say 3 sec) for UVR tripping and disable sending of DT to the other end on UVR operation at their BTPS station
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2132
2 Tripping of 400 kV Munirabad-Guttur line
06-05-2017 at 1702 hrs
R-phase to earth fault Auto-reclose was successful at Guttur and Breakers at Munirabad end got tripped
GI-2
Munirabad (PGCIL-SR1) end
As per FIRDRELTR line tripped (in 3-ph) at 170231624 hrs on Y-E fault due to DPR Z2 (AR CAT 1145 km) operation
Guttur (KPTCL) end
As per FIR line tripped (in R-ph) at 1702 hrs on Y-E fault due to DPR Z1 (AR 4708 km Ir=6877 kA) operation and successfully auto-reclosed
As per DREL line tripped (in R-ph) at 165933499 hrs on Y-E fault due to DPR Z1 (AR) and successfully auto-reclosed after about 1 sec
Time-sync of Protection Relays with GPS needed to be ensured at Guttur SS
When enquired about the reasons for AR non-operation at Munirabad end PGCIL (SR-I) informed that the external VARM relay through which AR had been implemented had not operated Since the relay belonged to KPTCL suitable action needed to be taken by them
On this KPTCL was asked to look into the issue and replace the relay if required PGCIL (SR-I) was also requested to coordinate with KPTCL in attending to this matter
3
Tripping of 765kV Kurnool-NPS line -2
07-05-2017 at 1405 hrs
Y phase to earth fault had occurred in line Auto-reclose was successful at Kurnool end and AR was not attempted at NPS end
GI-2
Kurnool-PG (PGIL-SR1) end
As per FIRELTR line tripped (in Y-ph) at 140543316 hrs on Y-E fault due to DPR Z1 (AR 328 km 166 kA) operation and successfully auto-reclosed after about 11 sec After about further 6 sec (ie at 140550470) line tripped in 3-ph due to receipt of DT from the remote end
It was stated in FIR that 765 kV Kurnool ndash NPS line-1 was under LVRD
As per DR line tripped (in 3-ph) at 140550470 hrs due to DT receipt from remote end
DR corresponding to successful AR operation not furnished NPS (PGIL-SR1) end
FIR amp TR furnished were that of Kurnool station
As per DREL line tripped (in 3-ph) at 140543351 hrs on Y-E fault due to AR (Z2 CAT) operation It was noted from EL that AR LOCKOUT had operated around the same time due to which line had not tried for AR
From EL it was further observed that DT was sent to the remote end at 020550419 hrs However the cause of DT send was not recorded in EL
DR pertaining to DT send was not furnished
If DT send was because of OVR-I protection operation then also tripping was not in order as it does not match with the settings provided
PGCIL (SR-I)
Non-operation of AR from NPS was due to wiring mistake made during installation of Controlled Switching Devices (CSD) for the line reactor on this line
Remedial action The wiring issues in CSD installation were rectified on 18052017
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2232
4
Tripping of 400 kV Krishnapatnam-Chittoor line-1
07-05-2017 at 1441 hrs
R-phase to earth fault Main CB Auto-reclose was successful at Chittoor end and Tie CB got tripped Breakers tripped at Krishnapatnam end and did not attempt auto-reclose
GI-2
FNN not followed by APTRANSCO and APGENCO SDSTPS (APGENCO) end
As per FIRDREL line tripped (in 3-ph) at 144113756 hrs on R-E fault due to DPR Z1 (628 km) operation It was observed from EL that the line was given 3-ph trip straight way without initiating AR
Chittoor (APTRANSCO) end
As per FIRDRELTR line tripped (in R-ph) at 144113759 hrs on R-E fault due to DPR Z1 (1147 km) operation and successfully auto-reclosed after about 1sec However it was observed that only Main-CB got auto-reclosed successfully whereas Tie-CB got tripped in 3-ph while attempting AR
Remedial action When enquired about the reasons for AR failure at SDSTPS end APGENCO representative
informed that as informed in last PCSC meeting AR configuration logic is scheduled to be reviewed by ABB in July 2017 when all issues pertaining to AR operation would be sorted out
When asked about the reasons for AR failure for Tie-CB at Chittoor end APTRANSCO informed that Tie-CB AR dead-time and PDR operational time were inadvertently kept equal As remedial action PDR operational time was increased to 25 sec
5 Tripping of 765 kV Raichur-Solapur line-2
07-05-2017 at 1918 hrs
Y-phase to earth fault Auto-reclose was successful at Solapur and breakers at Raichur end got tripped
GI-2
Solapur (PGCIL-WR1) end
As per FIRTR line tripped (in Y-ph) at 1918 hrs on Y-E fault due to DPR Z1 (AR 66 km 572 kA) operation and successfully auto-reclosed
DR amp EL not furnished Raichur (PGCIL (SR-I) end
As per FIRDRELTR line tripped (in 3-ph) at 191836810 hrs on Y-E fault due to DPR Z1 (145 km) operation It was observed from DR that AR lock-out had operated that resulted in tripping of Main-CB and Tie-CB But while Main-CB got tripped immediately Tie-CB got tripped in Y-ph only And the other two phase poles got tripped due to PDR operation after about 21 sec at 191838910 hrs
EL time-stamp resolution was limited to SECONDS instead of millisec
Tie-CB OPEN digital signals were observed to have employed NEGATIVE LOGIC PGCIL (SR-I)
The observed discrepancies at Raichur end were due to the hardware error caused by hanging of Main-CBrsquos BCU
Remedial action The problem with Main-CBrsquos BCU had been resolved by restarting it
Recommendations
PGCIL (SR-I) to configure Event Loggerrsquos time-resolution up to millisec level in all protection relays at their 765 400 kV Raichur SS
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2332
6
Tripping of 400 kV Neyveli TS2-Pugalur line
07-05-2017 at 1955 hrs
Y-phase to earth fault Neyveli TS2 end relay issued a 3-phase trip 220ms after issue of Y phase trip Direct Trip was sent to Pugalur end preventing auto-reclose
GI-2
NLC TS2 (NLCIL) end
As per FIRDRELTR line tripped in 3-ph at 195526677 hrs due to DT receipt from the other end
It was stated in TR that even though respective zones had picked up on fault DT receipt at the same time resulted in tripping of the line in 3-ph
In DR 3-ph trip was found to be issued 220 msec after Y-ph trip was issued It was also noted that DT receipt signal remained high for a duration of about 220 msec
Time sync of Protection Relays with GPS needed to be ensured at NLC-TS2
Pugalur (PGCIL-SR2) end
As per FIRDRELTR line tripped (in Y-ph) at 195534241 hrs on Y-E fault due to DPR Z1 (AR) operation However line tripped in 3-ph during AR dead-time at 195534353 hrs due to DT receipt from Neyveli end
In view of DT receipt at both ends it was suggested to carry out PLCC end-to-end testing to ensure healthiness of carrier communication
Recommendations
For the line under consideration the following shall be carried out by NLCIL in coordination with PGCIL (SR-II) End-to-end communication for DT permissive amp other signals may be ensured by testing at both
the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
7 Tripping of 400 kV NCTPS -SVChatram line-2
09-05-2017 at 1843 hrs
R-phase to earth fault Auto-reclose is not in service since Fibre optic cable link is not healthy
GI-2
NCTPS (TANGEDCO) end
As per FIRDRELTR the line tripped in 3-ph at 184223424 hrs on R-E fault due to DPR Z1 (9159 km 29 kA) operation (Given the length of this line as 95 km it may be verified whether Z1 setting is correct)
It was stated in FIR that AR was kept out of service due to defective FO communication link
Remedial action Line patrol done by lines wing and declared No Visible fault FO link cut was rectified on 13052017 and AR scheme restored
S V Chatram (TANTRANSCO) end
As per FIRDRELTR the line tripped in 3-ph at 184357616 hrs on R-E fault due to operation of DPR Z1 (32 km) operation
Time sync of protection relays with GPS needed to be ensured at both NCTPS and SV Chatram stations
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2432
8 Tripping of 400 kV Madurai-Kudankulam line
10-05-2017 at 1940hrs
B-E Fault Auto-reclose successful at Madurai and breakers tripped at Kudankulam
GI-2
Madurai (PGCIL-SR2) end
As per FIRDRELTR line tripped (in B-ph) at 194040402 hrs on B-E fault due to DPR Z1 (AR 137 km 114 kA) operation and successfully auto-reclosed after about 11 sec
Kudankulam NPP (NPCIL) end
As per FIRTR line tripped (in 3-ph) at 192936910 hrs on B-E fault due to DPR Z2 (CAT 2071 km) operation
It was informed that AR had not been kept in service as per SRPC decision Hence the tripping was in order
9 Tripping of 220 kV Idukki-Udumalpet line
14-05-2017 at 1345 hrs
Y-phase to earth fault had occurred in line Auto-reclose was successful at Idukki and breakers at Udumalpet end tripped on pole discrepancy
GI-2
Idukki (KSEB) end
As per DRTR line tripped (in Y-ph) at 134620509 hrs on Y-E fault due to DPR Z2 (CAT 83125 km) and successfully auto-reclosed after about 08 sec
EL not submitted (In its place DRrsquos events summary was furnished)
Udumalpet (TANTRANSCO) end
As per FIRTR line tripped in Y-ph at 1345 hrs on Y-N fault on DPR Z1 (2834 km) operation Subsequently tripped in 3-ph on PDR operation
As per DR line tripped in Y-ph at 134151100 hrs on Y-E fault due to DPR (AR) operation But as DRrsquos time scale was limited to 1 sec post triggering AR complete operation could not be verified
From EL line all poles dead was observed at 134152102 hrs Cause of line tripping as stated in FIRTR was not observed in EL
The following was stated in TR The fault resistance measured in the M1 relay (MicomP442) was high resulting in Z3 pickup It was
evident from the fault record that M2 relay (7SA522) had cleared the fault in Z1 by opening Y-ph pole However since AR was implemented in only M1 relay and M2 (Z1) operation had not initiated AR in M1 it resulted in opening of the other two phase poles on PDR operation
The cause of non-initiation of AR of M1 relay on external initiation was found to be logic configuration mistake in the Main 1 relay
Remedial action The AR logic configuration in the PSL of Main 1 relay had been corrected However a special relay
test would be conducted to verify AR operation during the next opportunity shutdown
Time sync of protection relays with GPS needed to be ensured at Idukki and Udumalpet
10 Tripping of 400 kV Vemagiri - Gazuwaka line
14-05-2017 at 1654 hrs
Y-phase to earth fault Auto-reclose was not successful due to persistent fault Vemagiri end had sent a Direct Trip after un-successful Auto-reclose AR attempt was observed in Gazuwaka end DR after 3 phase trip
GI-2
Vemagiri (PGCIL-SR1) end
As per FIRDRELTR line tripped in (Y-ph) at 165411968 hrs on Y-E fault due to operation of DPR Z1 (AR 1512 km) operation It tried to auto-reclose after about 11 sec but tripped in 3-ph due to persistent fault
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2532
It was noted that AR was attempted by Tie-CB only the Main-CB tripped in 3-ph at the beginning of AR initiation
Also Tie-CB AR dead-time was observed to be one second
Reasons 3-ph trip of Main-CB needed to be furnished Gazuwaka (PGCIL-SR1) end
As per FIRDRTR line tripped in Y-ph at 165330242 hrs on Y-E fault due to operation of DPR Z1 (AR 1677 km) operation But during AR dead-time it tripped in 3-ph after about 115 sec due to DT receipt from the remote end This resulted in 3-ph opening of both Main-CB and Tie-CB However after 125 sec Main-CB Y-ph limb tried for auto-reclosure and tripped due to persistent fault
As per EL line tripped in (Y-ph) at 165351597 hrs on Y-E fault due to operation of DPR Z1 (AR) operation But during AR dead-time it tripped in 3-ph at 165352620 hrs due to DT receipt from the remote end This resulted in 3-ph opening of both Main-CB and Tie-CB However at 165352687 hrs Main-CB Y-ph limb tried for auto-reclosure and tripped due to persistent fault
Reasons for AR attempt by Main-CB event after opening in 3-ph due to DT receipt needed to be explained
Time sync of DRrsquos amp ELrsquos with GPS needed to be ensured at Gajuwaka SS Recommendations
PGCIL (SR-I) to sort out issues relating to AR functionality operation for both Main-CB and Tie-CB at both Vemagiri and Gajuwaka substations
For the line under consideration the following shall be carried out by PGCIL (SR-I) End-to-end communication for DT permissive amp other signals may be ensured by testing at both
the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
11 Tripping of 400 kV VTPS-Sattenapalli line-2
21-05-2017 at 1706 hrs
B-phase to earth fault Auto-reclose successful at Sattenapalli and breakers got tripped at VTPS end
GI-2
Sattenapalli (APTRANSCO) end
As per FIRDRELTR line tripped (in Y-ph) at 170653038 hrs on B-E fault due to DPR Z1 operation and successfully auto-reclosed after about 1 sec
VTPS (APGENCO) end
As per FIRDRELTR line tripped in 3-ph at 170653133 hrs on B-E fault due to DEFR (33 kA) operation (DPR Z2 had picked up and Carrier was also received from the other end)
APGENCO
Before the LILOing of 400 kV VTPS-Srisailam DC line at Sattenapalli DEF protection had been provided from a separate REX521 relay Subsequently even though all protections at VTPS had been revised the above DEF protection implemented from the REX521 relay had been somehow left out and it only had extended 3-ph trip during the current instant
Remedial action The DEF functionality from the said REX521 had been disabled
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2632
12 Tripping of 400 kV Srisailam-Dindi line-2
24-05-2017 at 1502 hrs
R-phase to earth fault Auto-reclose was successful at Dindi and Zone - 1 3-phase trip at Srisailam
GI-2
Srisailam (TSGENCO) end
As per FIRDREL line tripped in 3-ph at 150253522 hrs on R-E fault due to DPR Z1 operation
TR contained no information Dindi (TSTRANSCO) end
As per FIRDRELTR line tripped (in R-ph) at 150253487 hrs on R-E fault due to DPR Z1 operation and successfully auto-reclosed after about 1 sec
Recommendations Since all 400 kV lines emanating from Srisailam LB are composite feeders APTRANSCO TSTRANSCO
can keep AR functionality disabled at respective remote end stations under their control
IV Details of Trippings due to PLCC mal-operation
Sl No Element Date amp Time Reason
Category
1 Tripping of 400 kV Kalpakka-Gazuwaka line-1amp2
18-05-2017 at 1108 hrs
Line tripped at Kalpakka end only on Direct Trip receive and was holding from Gazuwaka
GI-2
Tripping of 400 kV Kalpaka ndash Gajuwaka line-1
Gazuwaka (PGCIL-SR-2) end
As per FIR line was kept holding from Gazuwaka end Kalpakka (APTRANSCO) end
As per FIREL line tripped at 110625955 hrs to DT receipt from Gazuwaka end
Tripping of 400 kV Kalpaka ndash Gajuwaka line-2
Gazuwaka (PGCIL-SR2) end
As per FIR line was kept holding from Gazuwaka end Kalpakka (APTRANSCO) end
As per FIREL line tripped at 110625955 hrs to DT receipt from Gazuwaka end
Remedial action taken by APTRANSCO subsequent PCSC-65 meeting as informed vide their internal communication dated 20072017
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2732
2 Tripping of 400 kV Tumkur-Bidadi line-1 amp 2
30-05-2017 at 1139 hrs
Line tripped due to suspected PLCC mal-operation at Tumkur end and direct trip was received at Bidadi
GI-2
Tripping of 400 kV Tumkur ndash Bidadi line-1 Tumkur (PGCIL-SR2)) end
As per FIRDRELTR line tripped in 3-ph at 113515534 along with DT SEND to the remote end
PLCC mal-operation was suspected to have caused above tripping Bidadi(PGCIL-SR2) end
As per FIRTR line tripped in 3-ph at 113515 hrs due to DT receipt from Tumkur end Tripping of 400 kV Tumkur ndash Bidadi line-2 Tumkur (PGCIL-SR2)) end
As per FIRDRELTR line tripped in 3-ph at 113515534 along with DT SEND to the remote end
PLCC mal-operation was suspected to have caused above tripping Bidadi(PGCIL-SR2) end
As per FIRTR line tripped in 3-ph at 113515 hrs due to DT receipt from Tumkur end PGCIL (SR-II)
Remedial action The above trippings were due to PLCC mal-operation which in turn was due to shifting of its
coaxial cable The related circuitry was subsequently rectified
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2832
Single Line Diagram of 230 kV Villianur SS of PED [Ref I1]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2932
Single Line Diagram of 400 kV Jammalamadugu SS of APTRANSCO [Ref I2]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3032
Single Line Diagram of 400 kV Judgi-PG GIS SS of PGCIL (SR-II) [Ref II4]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3132
Single Line Diagram of 400 kV Ghani SS of APTRANSCO [Ref II4]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3232
Single Line Diagram of 400 kV BTPS of KPCL [Ref II9]
Annexure-II
Meeting No
Index
Details of Event Date amp Time Reason PCSC Recommendations Utility responsible for
Implementation
Status of Recommendations
as on 25072017
Remarks
Pending Implementation of PCSC Recommendations (up to 65th Meeting)
Complete outage of 220kV Yerraguntla
substation and tripping of running Units
at Rayalaseema TPS
52I2 (GD) PendingMail received on 27-07-2016
1The drop out relays of reducer oil pumps time setting was increased for
all millsSo there will not be any trip under transient low voltage condition--
--Complied
2The recommendation regarding 2 sec time delay will be implemented
during unit shut down and will be intimated immediately after
implementation------Pending
APGENCO 1 APGENCO to check associated logic for lube oil pump for correct
operation under transient low voltage conditions at Rayalaseema TPS
Unit-1
2 APGENCO to keep appropriate time delay fault ride through
delay (typically 2 sec) in VFD speed sensor relay at all its generating
Units including Rayalaseema TPS Units
HV B-Ph Current transformer of 100MVA Power
Transformer -1 failed resulting into a bus fault on
220KV Bus-1 Unit-1 and Unit-5 at RYTPS tripped
during the fault at Yerraguntla substation
21-02-2016 at
1039 hrs
Andhra Pradesh
APGENCO to furnish a report on the remedial action implemented
wrt overreaching of Krishnapatnam end distance relays during the
tripping of 400 kV Nellore (PG) - NPS line-1
APGENCO Yet to be informed Pending57II9 Tripping of 400 kV Nellore (PG) - NPS
line-1 400 kV Krishnapatnam-Nellore
(AP) lines -1amp2 and 400kV NPS -
MEPL line
18-07-2016 at
1905 hrs
Triggering incident was snapping of Y phase
conductor in 400kV Nellore (PG) - NPS line-1
Distance relay at Krishnapatnam end over-reached in
Zone-1 and resulted in tripping of 400kV
Krishnapatnam ndash Nellore (AP) lines - 1amp2 from
Krishnapatnam end Distance relay at MEPL over-
reached and resulted in tripping of MEPL-NPS line
from MEPL end
Yet to be informed Pending
APTRANSCO mail dated on 31-08-2016
To avoid the unwanted malopeartions due to the external LBB trip
initiation from PGCIL Vide letter Dt 04-08-2016 APTRANSCO has
requsted the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1 amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 15-11-2016
To avoid the unwanted maloperations due to the external LBB trip
initiation from PGCIL vide letter Dt 04-08-2016 ARTRANSCO has
requested the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 20-12-2016
Waiting for the PGCIL response
APTRANSCO mail dated 04032017 amp 24052017
SRPC is requested to coordinate with PGCIL in takind necessary action
Pending
Tripping of 400kV Krishnapatnam-
Nellore line-1
Line tripped on B-phase to earth fault and auto-
reclose was successful at Nellore(AP) end and un-
successful at Krishnapatnam end
APGENCO
56II13 Tripping at 220kV Gooty Substation of
APTRANSCO
24-06-2016 at
1604 hrs
LBB protection got operated for 400220kV ICT-2
breaker which had resulted in tripping of 220kV Bus-
2 at 220kV Gooty Substation
1 APGENCO SDSTPS to correct logic and ensure healthiness of ARscheme employed for transmission lines emanating from SDSTPSand furnish an action taken report to PCSC forum
2 APGENCO SDSTPS to configure DRrsquos of line protection relaysfor a post triggering period of 2 sec to capture complete ARoperation at their SDSTPS
Yet to be informed Pending63III1 28-02-2017 at
0516 hrs
1 APGENCO SDSTPS to correct logic and ensure healthiness of AR
scheme employed for transmission lines emanating from SDSTPS
and furnish an action taken report to PCSC forum
2 APGENCO SDSTPS to configure DRrsquos of line protection relays
for a post triggering period of 2 sec to capture complete AR
operation at their SDSTPS
Tripping of 400kV Krishnapatnam-Nellore line-2
R-phase to earth fault had occurred in line Auto reclose was successful at Nellore however protection at Krishnapatnam end issued a 3 phase
trip
APGENCO63III3 02-03-2017 at 455 hrs
1APTRANSCO to check the healthiness of the connecting cable
between Gooty (PGCIL) and Gooty (APTRANSCO) and replace it
if required
2APTRANSCO to ensure that the distributed architecture employed
in implementing busbar protection at their Gooty 220 kV SS does not
introduce any unwarranted delays in transmitting the triggering signals
to the Central Unit
APTRANSCO
Annexure-III
Page 1 of 31
63II2 Tripping of 400 kV KV Kota-Suryapet
line
01-03-2017 at
2005 hrs
Line tripped on operation of over-voltage protection
at KV Kota and Direct Trip was received at Suryapet
1 APTRANSCO to furnish (i) FIR amp TR for tripping events as
per SRLDC provided formats and (ii) DR amp EL within 24-hrs of
occurrence of tripping event in line with IEGC Regulation 52
(r)
2 APTRANSCO to adopt new OVR gradings for KV Kota
feeders and confirm the same
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
1 FIR furnished amp DR configured
Pending
63II16 Multiple Trippings at 220kV Vizag
Switching Station (VSS) of APTRANSCO
27-03-2017 at
1016 hrs
Bus-2 bus bar protection operated at 220kV VSS
end resulting in the tripping of all the elements
connected to bus-2
1 APTRANSCO to furnish a detailed report on the reasons for LBB
BBP operation at 220 kV VSS for a fault on 220 kV Gangavaram
feeder and remedial action taken to prevent recurrence of such
events
APTRANSCO Yet to be informed Pending
64II1 Tripping of 400220KV 315MVA ICT-
1and 230kV elements at 400kV Vemagiri
substation of APTRANSCO
09-04-2017
at 1231 hrs
Suspected mal-operation of Busbar protection had
caused tripping of 220kV Bus-1 at Vemagiri
APTRANSCO to furnish a report on the remedial action taken along
with single line diagram of 400220 kV Vemagiri SS indicating fault
location and CBs involved and protections operated
APTRANSCO Yet to be informed Pending
64II2 Tripping of 400220 kV ICTrsquos ndash 2 amp 3 at
400 kV Ghani substation of APTRANSCO
10-04-2017
at 1729 hrs
ICTrsquos ndash 2 amp 3 got tripped due to operation of 220 kV
Bus-2 busbar protection at 400220KV Ghani
substation
APTRANSCO to furnish single line diagram of 400 220 kV Ghani SS
clearly indicating (i) bus-configuration (ii) location of fault (iii)
breakers involved and type of protections operated
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
Single line diagram sent vide mail dated 27062017
Pending
64III1 Tripping of 400 kV Uravakonda-
Jammalamadugu line-1
02-04-2017 at
1758 hrs
R-phase to earth fault and line did not auto-reclose
Fault clearing time - 500ms
For the line under consideration APTRANSCO to check amp ensure
healthiness of carrier protection and make Auto-Reclosure
functional
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
Carrier aided protection scheme has been tested end to end and rectified
the problem
Pending
64III5 Tripping of 400kV Krishnapatnam-
Nellore line-2
11-04-2017 at
241 hrs
Line tripped on Y-phase earth fault Line auto-
reclosed at Krishnapatnam and did not auto-reclose
at Nellore-AP (Manubolu)
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a report
on the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64III6 Tripping of 400kV Krishnapatnam-
Nellore line-1
12-04-2017 at
251 hrs
Line tripped on Y-phase earth fault Line auto-
reclosed at Krishnapatnam and did not auto-reclose
at Nellore-AP (Manubolu)
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a report
on the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64III10 Tripping of 400kV Krishnapatnam ndash
Nellore_AP line-1
13-04-2017 at
438hrs
Y-phase to earth fault Line auto-reclosed from
Krishnapatnam end and did not auto-reclose fromNellore-AP end
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a reporton the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64IV4 Tripping of 400 kV VTPS-Malkaram line 20-04-2017 at
1624 hrs
Line tripped on Direct Trip Receive at Malkaram and
was in service from VTPS
For the line under consideration APTRANSCO to check the
healthiness of protection couplers and take suitable remedial action including replacement of the same
APTRANSCO Yet to be informed Pending
65II10 Tripping of 400220 kV ICT-2 at Kalpaka
SS
20-05-2017 at
1502 hrs
ICT-2 tripped due to operation of Transformer
Buchholtz relay
APTRANSCO to furnish details of AC auxiliary supply details
including its redundancy DG set details and its mode of
starting AC auxiliary supply changeover scheme drawing shall
also be furnished
APTRANSCO Yet to be informed Pending
1 APTRANSCO to check and correct all CT Neutral
Connection settings in various protection relays at their 400
220 kV Ghani PS
2 APTRANSCO to ensure that PLCC carrier aided protection
is maintained healthy on 220 kV lines emanating from their
400 220 kV Ghani PS
3 APTRANSCO to take steps to complete configuration works
of DR‟s amp EL‟s of various protection relays at their 400 220
kV Ghani SS and furnish the same as and when required in
compliance of IEGC Regulation 52 (r)
ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
07-05-2017Tripping of 400220 kV Ghani ICT-2amp3 65II4 APTRANSCO Yet to be informed Pending
APTRANSCO mail dated on 31-08-2016
To avoid the unwanted malopeartions due to the external LBB trip
initiation from PGCIL Vide letter Dt 04-08-2016 APTRANSCO has
requsted the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1 amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 15-11-2016
To avoid the unwanted maloperations due to the external LBB trip
initiation from PGCIL vide letter Dt 04-08-2016 ARTRANSCO has
requested the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 20-12-2016
Waiting for the PGCIL response
APTRANSCO mail dated 04032017 amp 24052017
SRPC is requested to coordinate with PGCIL in takind necessary action
Pending56II13 Tripping at 220kV Gooty Substation of
APTRANSCO
24-06-2016 at
1604 hrs
LBB protection got operated for 400220kV ICT-2
breaker which had resulted in tripping of 220kV Bus-
2 at 220kV Gooty Substation
63III2 02-03-2017 at
157 hrs
1 APTRANSCO to check and ensure correctness of AR operation
for the lines emanating from their Nellore-AP (Manubolu) SS
2 APTRANSCO to configure DR‟s of line protection relays for a
post triggering period of 2 sec to capture complete AR operation at
their Nellore-AP (Manubolu) SS
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
1The ABB make REL 670 type main-2 distance relay seen the fault as Y-
B phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
1APTRANSCO to check the healthiness of the connecting cable
between Gooty (PGCIL) and Gooty (APTRANSCO) and replace it
if required
2APTRANSCO to ensure that the distributed architecture employed
in implementing busbar protection at their Gooty 220 kV SS does not
introduce any unwarranted delays in transmitting the triggering signals
to the Central Unit
APTRANSCO
Tripping of 400kV Krishnapatnam-
Nellore line-1
Line tripped on B-phase to earth fault and line auto-
reclosed from Krishnapatnam end but did not auto-
reclose from Nellore-AP end
Annexure-III
Page 2 of 31
64II16 Tripping of 400 kV VTPS-Satenapalli line-
2
30-Apr-17 at
428 hrs
Line tripped on B-phase to earth fault FIR DR and
EL of both ends were not furnished to validate the
tripping
APGENCO and APTRANSCO to furnish a detailed report on the
events leading to tripping of the line along with remedial measures
taken to PCSC forum
APGENCO
APTRANSCO
Yet to be informed Pending
65II8 Tripping of 400220 kV Hyderabad ICT-
4 and 220 kV lines at Hyderabad
substation
10-05-2017 at
239 hrs
Operation of busbar protection due to fault in 220 kV
Bus at 220kV Hyderabad Substation
TSTRANSCO to investigate the reasons for BBP operation for 220
kV Bus-2 and furnish a report on the remedial measures taken
TSTRANSCO Yet to be informed Pending
24-12-2016 at
1052 hrs
Line tripped on B-phase to earth fault First fault was
persistent for 380 ms Auto-reclose was successful at
Khammam end during 1st fault 2nd fault occurred
during re-claim time of breaker hence Khammam end
breakers also got tripped
1 TSGENCO to implement the SRPC agreed philosophy for Power
Swing Blocking in all distance relays on the feeders emanating from
KTPS
2 For the line under consideration TSGENCO to consult relays
OEM to migrate to new versions of Firmware (from to 47201) and
Pset (to 47002)
61III5 Tripping of 400 kV Khammam - KTPS
line-2
The issue was discussed in PCSC-58 meeting held on 18102016 when
PCSC forum agreed to de-link the implementation of the Item from the
scope of Protection Audit Recommendations (PAR) and pursue it as part
of PCSC Recommendations
TSGENCO mail dated 30-05-2017
Procurement of Differential Protection relays is under process and the
work will be completed by the end of November 2017
TSGENCOProvision of line differential protection for Jurala line 1 amp 2 (line length-145 KM) feeders at 220 kV Jurala HPS [Carry-Over from Protection Audit Recommendations]58 Pending
Pendingline tripped on direct trip receive at Gajwel and was
holding from Hyderabad
Pending
06-10-2016 at
1216 hrs
For the line under consideration TSTRANSCO to carry out the
following in coordination with TSGENCO
(i) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
(ii) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(iii) Frequency bandwidth tuning of PLCC link for faithful
transmission of signals shall be carried out
62IV5 Tripping of 400 kV Gajwel-
Bhoopalapalli line-1
Telangana
TSGENCO TSGENCO mail dated 30032017
1 According to SRPC phylosphy power swing block settings are changed
to ALL ZONES BLOCK EXCEPT ZONE1
---------- Completed
2 Ms Siemens is requested to depute the service Engineer to update the
firm ware of existing SIPROTEC relays in 400KV switch yard This work
will be completed on or before 15042017 -------------- Pending
Pending
TSGENCO
TSTRANSCO
TSTRANSCO mail dated on 31-05-2017
1 Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Bhoopalpalli-1 line
59IV3
Line tripped at Bhoopalapally on DT receive and was
holding from Gajwel
TSTRANSCO mail dated on 21-12-2016
(i) Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Ghanapur line
(ii) Healthiness of PLCC system components will be checked while
conducting end to end testing
TSTRANSCO mail dated on 31-05-2017
1 Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Ghanapur line
TSTRANSCO
16-02-2017
at 1500 hrs
For the line under consideration the following shall be carried out by
TSTRANSCO in coordination with PGCIL (SR-I)
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
Tripping of 400 kV Gaiwel-Hyderabad
line
Annexure-III
Page 3 of 31
Karnataka
Annexure-III
Page 4 of 31
KPCL
38GD35 Pending13-11-2014 at
1931hrs
1 KPCL to make functional the Main2 (EPAC) relay with the
help of KPTCL at the earliest
2 KPCL to investigate the reason for DC fuse fail during
transient fault in 220kV Kadra-Kodasalli line including the testing
checking of DC supply cables breaker control cables and trip coils
3 KPCL to ensure supply for Main-1amp Main-2 protections Trip
Coils (TC1 TC2) from separate battery banks
Triggering incident was B-phase to earth fault had
occurred in 220kV Kadra-Kodasalli line Line tripped
from Kodasalli end only 220kV Kaiga-Kadra tripped
in Zone-3 from Kaiga end Tripping of evacuating
lines caused bus shut down at Kadra hydro station
16-02-2015 at
1256 hrs
GD-1 at Kadra and Kodasalli hydro
power station
GD-1 at 220kV Kadra power Station of
KPCL
41I1 Mail received on 28-05-2015
1 Main-2 relays already installed and commissioned
2 DC fuses are intact Till date no such incidence occurred
3 Possibility of DC-1 amp DC-2 arrangement and splitting of DC will be
reviewed
Mail received on 07-07-2015 21-10-2015 and 23-11-2015
1 Completed
2 Completed
3 Possibility of DC-1 amp DC-2 arrangement and splitting of DC will be
reviewed
Status received vide KPCL mail dated 14062017
1 Completed
2 Completed
3 Providing 2 separate DC sources is under process
Pending
Mail recieved on 28-05-2015
1) e-NIT floated on 28072014 for procurement of Numerical distance
relays amp GPS As there is change in scope of work and quantity of relays
by more than 25 which is not permitted as per KTPP act Hence tender
cancelled and refloated on 05052015 with revised scope of work and
revised PQR
2 However as per the recommendations of PSAG Relays were
temporarily rearranged replaced and wired up testing amp commissioning
shall be completed with the assistance of KPTCL
Mail recieved on 07-07-2015
1 Cover -1 of the bid is scheduled for open eing on 25062015
2 As per the recommendations of PSAG Relays were temporarily
rearranged testing amp commissioning completed with the assistance of
KPTCL
Mail recieved on 07-09-2015
NIT floated on 5515 through e-portal Bid evaluation completed
Obtaining of Administration approval to place PO is in progress
However as per therecommendationsof PSAG-10 Relays
weretemporarilyrearrangedTesting amp commissioning completed with the
assistanceofKPTCL
Mail recieved on 21-10-2015
NIT floated on 5515 through e-portal Bid evaluation completed LOAs
issued to Ms Schneider Electric Infrastructure Ltd on 08102015
Mail recieved on 23-11-2015
LOAs issued to Ms Schneider Electric Infrastructure Ltd on 08102015
Engineering work is in progress
Status informed during Special Meeting held on 03062016
LOA‟s issued to Ms Schneider on 08102015 Inspection of relays
completed and received at site DI issued for all balance materials except
furnitures
Status received vide KPCL mail dated 14062017
Numerical Distance Protection relays commissioned on 12042017
for all 4 lines at Kadra PH
Installation Testing and commissioning of Numerical Distance Protection
Relays for all the 4 outgoing lines is completed in all respect at Kodasalli
power house
KPCL1 The PCSC forum requested KPCL to speed up the installation of
Numerical Distance Protection relay in Kadra ndashKaiga and
Kodasalli ndashKaiga
2 The PCSC forum requested KPCL to submit the implementation
status of PSAG-10 recommendations within a week‟s time
A fault had occurred in 220 kV Kadra and Kodasalli
As A result de-energization of 220kV bus occurred at
Kadra and Kodasalli
Annexure-III
Page 5 of 31
49II15
54II4 Tripping of 400 kV Raichur TPS-
Mahboobnagar line
05-04-2016 at
1023 hrs
Line tripped on operation of Backup impedance
protection of line reactor Direct trip was received at
Mahboobnagar end
KPCL to keep the functioning of the concerned electro-mechanical
back-up impedance protection relay under observation and replace it
with a spare at the earliest
KPCL Status received vide KPCL mail dated 10072017
The electro-mechanical back-up impedance protection relay is in service
However Budgetary offer obtained for the retrofitting of Line reactor
protection with Numerical relay and is under process
Pending
54II9
Pending
PendingStatus informed during Special Meeting held on 03062016
1 Hot line washing was done previouslytender process is on for silicon
coating of insulators
Status received vide mail dated 10-07-2017
1 Off line water washing is being carried out whenever the Unit or Line is
under shutdown Silicon coating for Unit8 main amp tie breakers carried
out in Sep16 and same is under observation Till today in order and good
condition For remaining breakers since it is big order approval for the
same is under process
2 Static Electromechanical relays are existing in all 1 to 7 units Breaker
flash over protection feature will be enabled (if available) in the numerical
relays which will be retrofitted in phased manner during RampM works
KPCL1 KPCL to carry out hot-line washing of RTPS-connected lines
regularly to avoid trippings due to fog and dust
2 KPCL may see the feasibility of providing breaker flashover
protection at RTPS and implement the same if possible
Running Unit-4 5 and Unit-8 and 400kV RTPS-
Yeramaras TPS feeder got tripped due to de-
energization of both 400kV Bus-1amp2 at Raichur TPS
12-11-2015 at
0030 hrs
54I4 220 kV Nagjheri - Bidnal line tripped on B-E fault at
1228 Hrs At the same time five running generating
units (1 2 3 4 amp 6) at Nagjheri tripped on operation
of Generator Transformer‟s back-up Over Current amp
Earth Fault protection
PendingKPCL
1 KPCL to revise the settings of GT‟s back-up OC and EF
protections considering their individual contribution to solid bus fault
at 220 kV bus of Nagjheri PH
2 KPCL to upload make available various tripping files
(FIRDRELTR) for all tripping involving their stations in compliance
of IEGC Regulation 52 (r)
14-04-2016 at
1229 hrs
Tripping of Nagjheri Generators Pending
Trippings at 220kV Raichur TPS
13-04-2016 at
2112 hrs
1KPCL to undertake the following remedial measures to avoid
breaker flashovers
(i) Replacing all porcelain insulators with composite insulators
(ii) Carrying out hot-line water washing of all insulators on regular
basis
(iii) Applying Room Temperature Vulcanizing (RTV) Silicone high
voltage insulator coatings to all bus-connected ceramic insulators of
equipment like CT PT CB Isolators etc
2KPCL to take steps to provide dedicated breaker flashover
protection to all breakers at Raichur TPS at the earliest
KPCL
Tripping of 400kV Raichur TPS Bus-2
46II21
Trippings at Raichur TPS
Status received vide KPCL mail dated 10072017
1 i) Silicon coating for Unit8 main amp tie breakers carried out in Sep16
and same is under observation Till today in order and good condition For
remaining breakers since it is big order approval for the same is under
process ii) Hot line
water washing stopped and off line water washing is carried out whenever
the 400 KV Unit or line is under tripped condition Shutdown condition
2 Static Electromechanical relays are existing in all 1 to 7 units Breaker
flash over protection feature will be enabled (if available) in the numerical
relays which will be retrofitted in phased manner during RampM works
Status received vide KPCL mail dated 14062017
1 GT backup overcurrent amp earth fault settings are revised as per the
recommendations of our head office CEEDBangalore copy of letter
enclosed
2 FIRDRELTR are being uploaded in the recent incidences as all the
main-2 relays are replaced with new numerical relays
Mail received on 21-10-2015
1) Anti-pumping contactors of all the nine 220KV Lines are in circuit and
tested periodically during AOH works of lines along with other protections
2) Completed
3) Possibility to use both the 220kV buses as main bus under normal
operation is under review
Mail recieved on 23-11-2015
1) Completed
3) Two bus operation for 220kV buses In place of existing CT switching
relays High speed manual heavy duty change over switch of sufficient
current capacity will be retrofitted to all feeders at 220kV station and same
will be operated manually during changeover of feeder by one bus to the
other and this arrangement may facilitate to put both buses in service Time
required for this retrofit is around 90days However this work will be
taken up only after retrofitting of electromagnetic relays with numerical
relays for Main-2 protection of all 220kV lines for which work is in
progress
Status received vide mail dated 10-07-2017
1) Completed
2) Completed
3) Two Bus operation for 220kV bus is being carried out whenever
required However scheme for tripping of one bus during LBBfault and
maintaining the other bus intact by tripping BC breaker will be taken up in
RampM works
KPCL1 KPCL to check the operation of anti-pumping relay on 220 kV side
and keep it in healthy condition
2 KPCL to provide manual reset to the 220 kV side master trip relay
3 KPCL to use both the 220 kV buses as main buses under normal
operation and should go for single bus operation only during
emergencies
07-06-2015 at
0135 hrs
Y-ph Pole of Tie-breaker of Unit-4 at RTPS failed
Unit-4 got tripped on operation of Generator
Differential Reverse power amp LBB protection
Operation of LBB protection led to tripping of BUS-2
at RTPS
Annexure-III
Page 6 of 31
55II1
56I2 Complete outage of 220kV Sedam
Substation of KPTCL
19-06-2016 at
1527hrs
220kV Sedam-Humnabad-2 tripped at Sedam on
Distance protection Zone-2 Sedam-RTPS-1 amp2 lines
tripped at RTPS end only 220kV Tandoor inter-state
line was hand tripped due to incoming supply failure
KPCL to disable GFC protection on all lines emanating from their
generating stations
KPCL Status received vide KPCL mail dated 10072017
As per the reccomndations of KPTCL in Feb16 the settings are done with
a time delay of 2 secs
Pending
57II3 Tripping of 400220 kV ICT-2 at Raichur
TPS
07-07-2016 at
332 hrs
ICT-2 tripped on operation 400220KV ICT-2 was
tripped on operation of 220KV side Instantaneous
over current protection during B-phase to earth fault
in 220kV RTPS-Sedam-II line
KPCL to review appropriately the high-set of ICT‟s back-up OC
protection at their 220 kV RTPS so that they do not operate for a
normal through fault
KPCL Status received vide KPCL mail dated 10072017
The settings will be reviewed in co-ordination with KPTCL amp OEM
Pending
KPCL
Pending
Pending
KPCL Status received vide KPCL mail dated 14062017
1 All logics checked and found normal LBB timing checked and found
200msec as per KPTCL MRT recommendation - Completed
2 Work Under Progress
3 New GPS System commissioned along with new numerical and
synchronised with GPS system - Complied
4 Work Under Progress
Status received vide KPCL mail dated 14062017
1 DEF settings in lines are made as per recommendations of CE(RT) amp
RampD KPTCL Bangalore amp EE(RT) KPTCL Hubli
High set operation of DEF relays is disabled at Kodasalli end
2 All these guidelines are incorporated by KPTCL during the replacement
of line protection relays
3 New stand alone event logger is to be procured since spares for old
stand alone event logger are obsolete
KPCL (i) KPCL to disable high-set operation of DEF relays
(ii) KPCL to block DEF relays whenever corresponding distance
protection relays pick up at Kodasally end on Nagjheri ndash Kodasalli
lines and
(iii)KPCL to provide stand-alone Event Logger at their 220 kV
Nagjheri PH
Bus dead occurred at 220kV Nagjheri PH due to
tripping of evacuating lines
KPCL
31-08-2016 at
1247hrs
Pending
Tripping of 400kV Bellary TPS-
Yeramarus TPS line and
400kVYeramarus TPS - Raichur TPS
line
PendingYet to be informed55II19
Tripping of Units at Raichur TPS During testing of retrofitted distance protection in
400kV Raichur-2 feeder LBB protection trip DC got
extended to Bus trip This resulted in tripping of
220kV bus at RTPS and all connected 220 kV
elements Unit-4 which is connected to 400 kV Bus
got tripped due to tripping of Station Utility
Transformer that is connected 220 kV bus
58I2 (GD)
Complete outage of 220 kV Kadra power
station of KPCL
54II13
1KPCL to properly configure the distance relays at YTPS end on
both YTPS ndash BTPS line and YTPS-RTPS line with specific focus on
reaches and timings of Zone-2 Zone-3 and Zone-4 (reverse)
2KPCL to ensure the healthiness of Direct Trip circuits and relay
coils at YTPS
3KPCL to ensure time sync of DR‟s and EL‟s at YTPS with GPS
06-09-2016
at 1440 hrs
31-05-2016 at
1721 hrs
Direct Trip was sent from YTPS to RTPS and BTPS
01-05-2016 at
2144 Hrs
LBB of 220kV Kodasalli breaker at Kadra end got
operated which resulted in tripping of Bus at Kadra
and in turn led to tripping of all elements
(i) KPCL to check settings of LBB protection in all relays from which
it was implemented and ensure that their configuration logic and
timing are in order at their 220 kV Kadra PH
(ii) KPCL to furnish details regarding the existing LT auxiliary
supply arrangement at their 220 kV Kadra PH and take steps to
provide a suitable Auto-Main-Fail (AMF) panel for DG set to effect
its auto-starting in case of failure of LT supply
(iii) KPCL to ensure time-sync of all relays (DR‟s amp EL‟s) with GPS
at their 220 kV Kadra PH
(iv) KPCL to provide stand-alone Event Logger at their 220 kV
Nagjheri PH
Complete outage of 220 kV Nagjheri PH
of KPCL
Multiple tripping at 400 kV Raichur TPS
Station
15-04-2016 at
1536 hrs
Triggering incident was failure of R-phase CT of
400220kV ICT-1 400kV YTPS-RTPS line got
tripped from YTPS end 400kV RTPS-
Mehaboobnagar line tripped on a B-phase to earth
fault
In view of the availability of two buses along with healthy bus-
coupler at 220 kV RTPS KPCL is recommended to put in service the
double-bus operation at 220 kV RTPS by suitably distributing loads
within 15 days
Status received vide KPCL mail dated 10072017
Two Bus operation for 220kV bus is being carried out whenever required
However scheme for tripping of one bus during LBBfault and maintaining
the other bus intact by tripping BC breaker will be taken up in RampM
works
1KPCL to enable zero-sequence compensation feature if not already
done in all differential relays of transformers at RTPS
2KPCL to examine in detail the reasons for SOTF operation at RTPS
end for the fault on RTPS-Veltoor line and if required relay
(configuration) settings at RTPS end may be suitably got revised with
the help of their OEM
3KPCL to take steps to enable auto-reclose for the Tie-CB‟s in the
dias containing Munirabad and Veltoor (Mehboobnagar) at RTPS
KPCL Status received vide KPCL mail dated 10072017
1) Zero-sequence compensation feature is already enabled in all the
differential relays of transformers ---Completed
2) Referred to OEM for the tripping of line on SOTF protection
3) Action has been taken to retrofit the protection relays of tie bays of
Mahbubnagar and Munirabad line to enable Auto-reclosure function
58I3 (GD)
Pending
Annexure-III
Page 7 of 31
Status received vide KPCL mail dated 14062017
1 On 09092016 at STRPTwo units were running(Unit-3 amp Unit-4It is
to clarify that Station tripped due to spurious operationLBB relay in Unit-
4 and not due to operation of Unit-3 LBB as indicated in PCSC
recommendations Unit-3 which was in service tripped as a consequence of
LBB ProtectionHow ever following actions performed in both Units
a) Trip coil-1 and Trip coil-2 circuit (including cable from protection panel
to GCB Marshaling Box)of GT Breakers of Unit 03 and 04 checked found
ok
b) Integrity of Connecting cableconductor from Generating unit no3 and
also to its corresponding GT Breakers inspected and found ok
c) Regarding Spurious operation of Unit No04 LBB relay and its
timerChecked the operation of the LBB overcurrent relay with its external
Timer for repeated correct operations it was found that LBB Timer was
giving correct timing operation for 1 in 3 operations only ie for one of the
operation it was operating within 40ms compare to set value(200ms) hence
declared as faulty and the same has been replaced with new one later
operation of the new Timer checked and found okoperating for gt200mse
only With this cause for spurious operation of LBB and resulting in
complete outage of STRP has been identified and solved -----
Completed
2 In Unit -3MCR is working satisfactorilyit is to clarify that problem was
existing in Unit No4 AVR manual channel reference value of Generator
The Same has been replaced with spare one Manual channel AVR is
found to be Ok ------Completed
3 All the units AVRs Healthyness checked and found Ok -
-----
Completed
4 Presently at GPHno stand alone Event logger exists Since the subject
requirement pertains to all the Generating units and in view of
Standardization of the complete system Networking of numerical relays
carried out and events are availble in networking system
KPCL
Pending
(i) KPCL to ensure the integrity of the connecting cable conductor
from Generating Unit-3 to its corresponding GT breaker at their STR
PH
(ii) KPCL to ensure the healthiness of Manual Current Regulator
(MCR) of Unit-3‟s AVR at their STR PH
(iii) KPCL to ensure the healthiness of AVR‟s of all Units of STR
PH
(iv) KPCL to provide stand-alone Event Logger at their 220 kV STR
PH
Spurious operation of LBB protection of line feeder
had led to tripping of 220 kV bus at Sharavathy Tail
Race power house
9-09-2016 at
1119 hrs
Pending
12-09-2016 at
1447 hrs
(i) KPCL to check and correct configuration settings of LBB
protection in all relays from which it was implemented at their 220
kV Varahi PH
(ii) KPCL to provide stand-alone Event Logger at their 220 kV STR
PH
KPCLLBB protection operated and caused bus shut down at
Varahi PH
Pending
Partial disturbance occurred in central Kerala grid due
to overloading and tripping of 220 kV lines Loss of in-
feed to 220 kV Kalamassery 220 kV Brahmapuram
220 kV Ambalamugal 220 Pallom amp 220 kV Kochi
occurred Generation at Neriamangalam Panniar
Chengulam and Pallivasal also got affected during the
incident
(i) SLDC KSEB to put in place proper mechanism to ensure
adequate load-generation balance is maintained in their control area at
all times and due vigilance is exercised in operating an already
depleted transmission network
(ii) KSEB to put UFR in service at New Pallom end on 220 kV New
Pallom ndash Amabalamugal line as part of Kudankulam Regional
Islanding Scheme
KPCL
Status received vide mail dated 14062017
LBB Protection system is in Bus bar Protection PanelThe Configuration
settings are checkedThey are as follows
Minimum operating primary current is 160A
Stage IIssue of Retrip to the feeder is 100ms after the action of main
distance protection Relayinitiation of LBB
Stage IIBus bar LBB Trip -200ms
Total time of LBB trip is 300ms from the time of occurrence of Line Fault
(i) KPCL to adopt the following VT fuse-fail logic for all 220 kV
lines emanating from NPH
ldquoUnder VT fuse fail condition distance protection shall normally be
kept blocked However upon detection of a fault (sensed by negative
sequence component) blocking of distance protection shall give rise
to operation of its inherent Over-Current protection set with a definite
time delay of 500 msecrdquo
(ii) KPTCL KPCL to revise Zone-2 Zone-3 and Zone-4 (reverse)
timings of DPR of all 220 kV lines emanating from Nagjheri PH in
line with Ramakrishna Committee guidelines
Triggering event was the fault on 220 kV Nagjheri
ndashKodasalli line-2 Both buses of 220 kV Nagjeri
power station of KPCL got
de-energized
62I1 KPCL Status received vide mail dated 14062017
1 Already settings are discussed with EE(RT) Hubli and soon relays will
be tested for VT fuse fail condition
2 Timings of Zones were set as per the recommendations of CE(RT) amp
RampD KPTCL Bangalore amp EE(RT) KPTCL HubliRegarding revision
of timings will be carried out in co- ordination with EE(RT) KPTCL
Hubli
15-09-2016 at
1406 hrs
Complete outage at Varahi Hydro Power
Station
Disturbance in Kerala system Yet to be informed Pending
58I5 (GD)
58I7 (GD)
21-01-2017
at 0038 hrs
Complete outage of 220 kV Sharavathy
Tail Race PH
58I6 (GD)
Complete outage of 220 kV Nagjheri
substation of KPCL
Annexure-III
Page 8 of 31
65II9 Tripping of 400220 kV ICT-1 at BTPS 13-05-2017 at
1941 hrs
ICT-1 got tripped on operation of LV side earth fault
protection during R-phase to earth fault in 220 kV
BTPS-Lingapur line
1 KPCL to review the need for providing separate non-directional
sensitive earth fault protection for ICT‟s at their BTPS station and
take steps to disable the same
2 For 220 kV BTPS ndashLingapura line KPCL to resolve issues relating
to PLCC carrier communication and put AR into service
KPCL Yet to be informed Pending
65III2 Tripping of 400 kV Hiryur-BTPS line-1 06-05-2017
at 1401 hrs
Y-phase to earth fault had occurred in line Direct
trip was sent from BTPS to Hiryur end
KPCL to introduce suitable delay (say 3 sec) for UVR tripping and
disable sending of DT to the other end on UVR operation at their
BTPS station
KPCL Yet to be informed Pending
PendingMail received on 27-05-2015 (KPTCL) amp 29-07-2015
1Existing Back up relays will be replaced by numerical type distance
relaysProcurement is in tendering stage
2 Completed
3 Completed
KPTCL Mail recieved on 23-01-2016
1 Existing back up relays will be replaced by Main-2 protection LOI
issued Ms Alstom for taking up the works
KPTCL Mail Recieved dated 25-05-2016
Under the Scope of RampU The work will be taken up by Ms Alstom
shortly
KPTCL Mail Recieved dated 25-04-2017
1 ALSTOM make P442 type Numerical relays are supplied to the site
replacement of M-1 relays(OPTIMHO) by new relays will be taken up
shortly
KPTCL
KPCL Status received vide mail dated 10072017
1 Furnishing FIR amp TR of the tripping events as per the formats provided
by SRLDC
4 Refered to OEM for the tripping of Tie CB of Munirabad line on SOTF
protection
Pending
1 PCSC forum recommended KPTCL to replace the old static
distance protection relays with numerical relays
2 PCSC forum also requested KPTCL to provide a broken conductor
alarm indication in Control Room
3 Standing instruction needed to be given to the all substation
personnel for not changing the relay settings without approval of
RTMRT wing
Fault had occurred in 220kV
Mahalingapura-Narendra line-2 Due to the failure of
relay operation at Mahalingapura breakers at remote
end tripped which resulted in bus dead condition
1 KPCL to start furnishing FIR and TR of their tripping events as
per the formats provided by SRLDC
2 KPCL to check earth-mat resistance for 400 kV switchyard and
ensure that it is within prescribed limits
3 KPCL to set right operation of SER in CampI Control Room of Unit-
4
4 KPCL to furnish action taken wrt tripping of Tie-CB of
Munirabad line on SOTF protection OEM report in this regsrd may
be furnished
25-10-2014GD-1 at Mahalingapura Substation of
KPTCL
38GD31
63II10 Multiple trippings at 400 kV RTPS
substation of KPCL
16- 03-2017 at
0118 hrs
Bus-2 B-Ph differential bus bar protection operated
at 400 kV RTPS end tripping all the main breakers
connected to Bus-2
Annexure-III
Page 9 of 31
Pending
Suspected mal-operation of 220kV side Rphase
over current relay
Line tripped on Yphase to earth fault from both the
ends
20-12-2014
at 2220 hrs
KPTCL was requested to explore the possibility of providing AR
feature to this line and submit the remedial measures to the PCSC
forum
Pending
KPTCL1 Till the completion of RampM works for bus bar and LBB protection
KPTCL shall explore the possibility of having split bus operation at
Ambewadi and submit the details of the same to PCSC forum
2 KPTCL shall provide the details of the tripping of Supa hydro
station connected downstream from 110 kV bus
39I5
40I1
220kV Sedam-
Tandur line
Triggering incident was B-phase to earth fault in
220kV Ambewadi- Nagzari line-1 B-pole of breaker
did not open at Ambewadi end LBB protection not
available at Ambewadi end All elements tripped on
Zone-2 from remote ends
01-12-2014Tripping of 400220kV
ICT-2 at Hoody
substation of KPTCL
40IV1
Mail received on 27-05-2015 amp 29-07-2015
1 CampR panels of 500MVA ICT 1amp2 will be replaced under scheduled
RampM works
2 OampM personnel are instructed to take sufficient care in order to avoid
unwarrented trippings --- Completed
KPTCL mail received on 23-01-2016
1 New CampR panels(with numerical relays) erected for 500MVA ICT-1
amp2 under RampM work which will be commissioned shortly
KPTCL mail received on 25-05-2016
1 New CampR panels(with numerical relays) erected for 500MVA ICT-1
amp2 under RampM work which will be commissioned shortly
KPTCL mail received on 25-04-201
1 New CRPs mounted in bay KIOSK commissioned under RampM works
KPTCL1 PCSC forum recommended KPTCL to replace the relay with a
different make
2 KPTCL was also requested to train the OampM personnel
adequately before performing any maintenance works to avoid such
unwanted trippings
PendingMail recieved on 29-07-2015
Carrier protection is being restored for 220kV Sedam-Tandoor line at
Sedam end After restoring the carrier protection AR will be enabled
KPTCL mail recieved on 23-01-2016
Carrier protection is being restored for 220kV Sedam-Tandoor line at
Sedam end After restoring the carrier protection AR will be enabled
KPTCL mail recieved on 25-05-2016
SEESCADA to update the latest status
KPTCL mail recieved on 28-06-2016
Action is being taken to restore carrier protectionAR will be enabled once
carrier signal is restored
KPTCL
22-12-2014 at
2122 hrs
Mail received on 28-04-2015
1 In view of operating 220kV Ambewadi SS in split bus mode action is
being taken up by KPTCL Problem in the 220kV bus coupler breaker is
attended and isolator overhauling work is under progress Spilt bus
operation at Ambewadi will be made possible at the earliest
2 ICT Protection system at Ambewadi and trippings occured at Supa GS
during the instance is checked up and remedial measures already furnished
in this regard
---- Completed
Mail recieved on 29-07-2015
1 Action is being taken by KPTCL for operating Ambewadi in split bus
mode Problem in bus coupler breaker is attendedIsolator overhaulling
work is completedPTs are already provided to 220kV Bus-II After
commissioning of Bus-II PTs Ambewadi can be operated in split bus
mode Pending works will be completed within a months time
KPTCL mail recieved on 23-01-2016
1 Bus-II PTs yet to be commissionedPlanned to complete before end of
April-2016
KPTCL mail recieved on 25-04-2017
1 Yet to be attended
GD-1 at 220kV Ambewadi Station of
KPTCL
Annexure-III
Page 10 of 31
1 KPTCL to provide Bus Bar protection and LBB protection at
Sedam Ss and furnish the status of their implementation to PCSC
forum
2 KPTCL to implement AR feature on 220 kV Sedam-Tandur inter-
state line
Mail received on 28-04-2015
Procurement of Bus bar and LBB protection is in the final tendering stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
KPTCL mail received on 23-01-2016
1 Bus bar protection panels pocured and erected at Sedam Wiring
testing commissioning is being taken upPlanned to complete by April
2016
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
KPTCL
12-03-2015 at
751 hrs
1 KPTCL shall provide AR feature on Ambewadi ndash Ponda 220 kV
DC inter-state line
2 Till the completion of RampM works for bus bar and LBB protection
KPTCL shall explore the possibility of having split bus operation at
Ambewadi and submit the details of the
same to PCSC forum
Mail received on 27-05-2015
1 Bus Bar protection will be provded under RampU
2 AR yet to be enabled
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
Fault occurred in 220kV Sedam-Shahpur line
All connected 220kV lines and transformers were
taken on 220kV North bus as South bus was under
shut down for conversion of strung bus to rigid bus
and isolator replacement under RampM works Failure
of HV side Y phase CT of 150MVA Transformer-3
occurred at Peenya Substation which resulted in
operation of Differential and HV REF protection The
failure of CT also resulted in a 220kV bus fault in
North Bus
KPTCL to revise distance relay settings at Nelamangala end for 220
kV Nelamangala ndash Hebbal - Peenya line ndash 1 for the effective line
length of 17 km These new settings can be appropriately reviewed as
and when the tie-arrangement at Hebbal is done away with
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
Pending
PendingKPTCL
30-09-2015 at
1041 hrs
Pending
Outage of 220kV Ambewadi station in
Karnataka
Pending
PendingKPTCL mail received on 23-01-2016
Will be complied in a months time
220kV Ambewadi-Nagjheri line-2 tripped on B-phase
to earth fault This resulted in loss of supply to 220kV
Ambewadi bus 220kV Ambewadi-Ponda line-1amp2
were hand tripped after deenergization of bus at
Ambewadi
KPTCL
Complete outage of 220kV Ambewadi
substation of KPTCL
42I2 (GD)
27-09-2015 at
42317 hrs
Fault in 220kV Ambewadi-Nagjheri line-2
KPTCL
KPTCL
KPTCL mail received on 25-05-2016
Presentl 220kV Nelamangala -Hoody(ie nelamangala-Peenya-Hebbal -
Hoody line is made LIILO at Yelahanka sub station and breaker at
Peenya is kept open necessary modification in distance relay settings
adopted for new configuration
15-02-2015 at
1424 hrs
Complete outage of 220kV Peenya
Substation in Karnataka
R-Phase to ground fault occurred on 220kV Sedam-
Shahpur line Fault not cleared from Sedam end due
to stuck-breaker condition While the Sedam- Sahapur
line tripped from Shahapur end in Zone-1 the other
220 kv lines from Sedam tripped at remote ends in
Zone-2 This caused complete outage of 220kV
Sedam substation
42I1 (GD)
41I4
Complete outage of 220kV Sedam
substation of KPTCL
48I2 (GD)
48I3 (GD) KPTCL to fast-track providing AR on all 220 kV lines emanating
from Ambewadi SS to prevent Station shut-down on temporary faults
06-08-2015 at
451 hrs
220kV RTPS-Lingasugur line-2 tripped at TPS end
on operation of distance
protection zone-1 400220kV ICT-2 got tripped on
operation of earth fault
protection 220kV RTPS-Lingasugur line-1amp3 tripped
on distance protection zone-2 and zone-3
respectively Due to tripping of ICT-2 the running
units got overloaded and it was mentioned that under
frequency occurred as units are on load control The
Units got tripped on under frequency
KPTCL to activate non-directional Over Current protection with a
time delay of 600-800 msec for Fuse
failure condition at Lingasugur
KPTCL Status received vide KPCL mail dated 10072017
LV earth fault relay had an additional default Ef setting having a definite
time which resulted in tripping of ICT-2 and the same was rectified and
already complied
Pending
1 KPTCL to provide Bus bar and LBB protections for 220 kV
bus at Sedam Ss
2 KPTCL to implement AR feature on 220 kV Sedam-Tandur
inter-state line
27-01-2015 at
800 hrs
Complete outage at 220kV Sedam
Substation of KPTCL (GD-1)
Tripping of Unit-1amp2
along with 400220kV
ICT-2 at Raichur TPS
47II13
Annexure-III
Page 11 of 31
52I3 (GD) Complete outage of 220kV Shimoga
substation
22-02-2016 at
1503 hrs
220kV Bus Bar protection operated during failure of
R phase CT in DVG-2 line bay
KPTCL to operate 220 kV Shimoga on multi-bus operation under
normal conditions put it on single-bus operation only under
emergency conditions
KPTCL KPTCL Mail received dated 25-04-2017
Replacement of existing BBP by new BBP with 4 zone protection is being
taken up under RampU
Pending
56II6 Tripping of 220kV Ambewadi-Ponda
(Xeldam) line-1
10-06-2016 at
1333 hrs
Line tripped on Y-E faut due to DPR Z1 operation KPTCL to keep AR for Ambewadi ndash Ponda (Xeldam) line-1 in
service with immediate effect
KPTCL Yet to be informed Pending
59II13 Tripping of 220 kV Bidadi (PG) - Bidadi
lines - 1amp2
02-10-2016 at
1032 hrs
Line-2 tripped in DPR Zone-2 and Line-1 tripped on
operation of EF protection from Bidadi end
KPTCL to resolve PLCC carrier communication issues on 220 kV
Bidadi ndash Bidadi-PG DC lines and subsequently restore Zone-2
timing to normal values
KPTCL Yet to be informed Pending
1 KPTCL to configure all DR‟s and EL‟s at 400 kV Guttur SS so
that they will also get triggered for BBP operation
2 KPTCL to ensure time-synchronization of all DR‟s and EL‟s with
GPS at their 400 kV Guttur SS
KPTCL17-01-2016 at
1853 hrs
Pending
Pending
Yet to be informed PendingKPTCL
KPTCL
30-09-2015 at
1041 hrs
Complete outage of 220kV Ambewadi
Substation of KPTCL
Multiple tripping at 400kV Guttur sub-
station
Outage of 220kV Ambewadi station in
Karnataka
29102015 at
1434 hrs
Complete outage of 220kV Peenya
Substation of KPTCL
PendingKPTCL mail received on 23-01-2016
Will be complied in a months time
220kV Peenya-Nelamangala-3 tripped on B-E fault at
both ends At the same time 220kV Peenya-
Nelamangala-4 tripped on R-Y fault only at
Nelamangala end and was in service from Peenya
end Due to tripping of these two lines 220kV Peenya-
Nelamangala-2 tripped on overcurrent protection
KPTCL to furnish a report on the tripping of 220 kV Peenya-
Nelamangala line-4 Nelamangala detailing the remedial measures
taken including the settings adopted for Z1B (Zone extension) and
Power Swing Block
Pending220kV Nagjheri-Ambewadi line-1 tripped at 1333
hrs due to B phase to earth fault Ambewadi was
radially fed from Nagjheri power station through
220kV Nagjheri-Ambewadi line-2 Tripping of this
line caused 220kV Bus shut down at Ambewadi and
remaining lines and transformers were hand tripped
220kV Ambewadi-Nagjheri line-2 tripped on B-phase
to earth fault This resulted in loss of supply to 220kV
Ambewadi bus 220kV Ambewadi-Ponda line-1amp2
were hand tripped after deenergization of bus at
Ambewadi
KPTCL
Yet to be informedKPTCL
KPTCL Mail received dated 25-05-2016
SEE RTC Bangalore to update the status
KPTCL Mail received dated 28-06-2016
Providing numerical bus bar protection to 400kV buses and GPS time
synchronising equipment at Guttur is considered under RampU Work is
awarded to Ms Alstom execution will be taken up shortly
KPTCL Mail received dated 25-04-2017
GPS and accessories will be supplied during May 2017 expected to
complete the work within a month after supply of materials
53I1
1KPTCL to take steps to provide busbar protection at their 220 kV
Chikkodi inter-regional substation and furnish a time-line for the
same
2KPTCL to review distance protection settings for 220 kV Chikkodi
ndash Kudachi line
3KPTCL to furnish equipment failure report of the current incident to
PSEampTD Division of CEA with a copy marked to SRPC
KPTCL Mail received dated 25-05-2016
SEE RTC Bangalore to update the status
1 KPCL to provide AR on all 220 kV lines emanating from Nagjheri
PH
2 KPTCL to provide AR on all 220 kV lines emanating from
Ambewadi SS
Failure of Lightning Arrestor of Y-phase Line Reactor
of 400kV Guttur-Hiriyur line-1 and line tripped on
distance protection Zone-1 Bus-bar protection of
400kV Bus-2 at Guttur substation also got operated
during the event sensing this through fault 400220
kV ICT-1 amp 2 at Guttur 400kV Kaiga-Guttur-2
400kV
Guttur-Narendra-2 400kV Guttur-Hiriyur-2 and
400kV Guttur-Munirabad which are on 400kV Bus-2
got tripped during the incident 400kV Guttur-
Narendra-1 which was on Bus-1 also tripped at the
same time
49I13 (GD)
Triggering incident was failure of B-ph PT of 220kV
Bus-2 (western bus) at 220KV Chikkodi substation
220KV Chikodi- Belgaum-I line tripped on DEFR
(Inst) 220KV Chikkodi-Kudachi line tripped on
Distance protection and also 100MVA transformer-2
tripped on EF protection
57II1 01-07-2016 at
0303 hrs
Tripping of 220 kV Chikkodi-Mudshingi
and 220 kV Chikkodi-Talandage lines
48I3 (GD) KPTCL to fast-track providing AR on all 220 kV lines emanating
from Ambewadi SS to prevent Station shut-down on temporary faults
51II21
16-03-2016 at
1139 Hrs
Annexure-III
Page 12 of 31
62II3 Tripping of 220 kV Bus 2 and connected
elements (220kV HAL 1 and 2
400220 kV ICT- 1 2 and 22066 kV
ICT-2) at 400220 kV Hoody substation
of KPTCL (Load loss 590 MW)
09-01-2017 at
2306 hrs
Failure of R-phase CT of 220 66 kV transformer-2 at
220kV Hoody end resulted in a bus fault in 220kV
Bus-2 Fault was cleared by backup protection of
ICTs (220kV lines were being radially operated) due
to absence of busbar protection
1 KPTCL to provide Busbar protection at their 220 kV Hoody SS at
the earliest
2 KPTCL to furnish an Equipment Failure Report on CT failure to
CEA with a copy marked to SRPC
KPTCL KPTCL mail received dated 25042017
Numerical BBP is being provided under RampM works
Pending
64II9 Tripping of 400 220 kV ICT-2 and 3 at
Hoody substation of KPTCL
26-04-2017 at
1540 hrs
ICT-2 tripped on suspected mal-operation Oil surge
relay of B-phase Transformer ICT-3 tripped due to
overloading
KPTCL to put in place a suitable SPS at their 400 220 kV Hoody SS
that takes care of over-loading of the other ICT when one ICT out of
ICT‟s ndash 2 amp 3 trips at the earliest and furnish the details of
implemented SPS to PCSC forum
KPTCL Yet to be informed Pending
65II17 Tripping of 400220 kV ICT - 1 amp 3 at
Hoody substation of KPTCL
(Load Loss 750 MW)
26-05-2017 at
1230 hrs
R phase limb of ICT-1 bank pre-close supervision
contact of trip coil -2 had arc over ICT-3 got tripped
on over-loading
KPTCL to furnish compliance report on the recommendations given
in PSAG-18 meeting to PCSC forum
KPTCL Yet to be informed Pending
Complete outage of 220kV Nagjheri
power station and 220kV Ambewadi
substation of KPTCL
51I3 PendingStatus informed during Special Meeting held on 03062016
1 KPTCL informed that the matter had been taken up with concerned Line
Operation and Maintenance wing to carry out corridor clearance and
maintenance as per schedule to avoid frequent line faults in this corridor A
letter had also been addressed to Chief Engineer Bhagalkot zone to ensure
lines in amp around Kali complex are maintained in healthy condition ---
Completed
2 KPTCL assurd that the final modified SPS would be implemented at
Nagjheri PH at the earliest ------ Pending
3 KPCL informed that Nagjhari- Kodasalli Lines 1 amp 2 had been kept in
service since 23052016 0806hrs ---- Completed
KPTCL Mail received dated 28-06-2016
Modifications to be carried in Nagzari SPS logic is submitted to
SRLDCSRPC for verification and approval
Status received vide KPCL mail dated 14062017
1 Will be reviewed in consultation with EE(RT) KPTCL Hubli
2 Both the lines are in charged condition
KPCL KPTCL 1 To avoid tripping of transmission lines on transient faults KPCL
KPTCL is recommended to carry out periodic patrolling of lines and
ensure their proper maintenance by carrying out jungle bushing
clearance and trimming of tree branches within the RoW of
transmission lines as per the SRPC transmission line patrolling
guidelines (available under the menu item All Uploads Operation
Miscellaneous Transmission Line Patrolling Protocol
Guidelines for Southern Region on SRPC website)
2 KPCL KPTCL to review operation of SPS at NPH for
functionality (reduction of generation with tripping of evacuating
lines) and healthiness
3 KPCL to put 220 kV Kodasalli - Nagjheri DC lines into service if
more than 200 MW generation from Kali Complex (with Nagheri
Contribution not less than 50 MW) is ensured on sustained basis
220kV lines from Nagjheri power house started
tripping from 1100 hrs due to fault in lines The
sequence of tripping is shown in SOE list At 1233
hrs 220kV Narendra-Ambewadi lines-1amp2 got
tripped which resulted in loss of evacuation path to
Nagjheri station resulting in tripping of running Units
and complete outage at Nagjhheri power station
220kV Ambewadi station also got de-energized due
to tripping of source feeders ie 220kV Narendra-
Ambewadi-1amp2 and 220kV Nagjheri-Ambewadi-
1amp2
22-02-2016 at
1236 hrs
Pending
Pending
KPTCL
For the line under consideration the following shall be carried out by
KPTCL in coordination with
PGCIL (SR-II)
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
KPTCLLine tripped at Hiryur end due to direct trip receive
and was holding from Guttur
KPTCL mail received dated 25042017
Numerical BBP is being provided under RampM works
KPTCL to provide numerical Busbar Protection at their 220 kV
Somanahalli SS at the earliest
Tripping of 400 kV Neelamangala-
Hoody line-1
KPTCL to carry out the following for the line under consideration
(i) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
(ii) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
Tripping of 400 kV Guttur-Hiryur line-1 10-10-2016 at
315 hrs
62IV4
59IV4
62II5 Tripping of 220 kV South Bus and
connected elements (220kV HSR 220kV
Nagnathpura 220 kV Harohalli 220 kV
Subramanyapura 220 kV Tataguni 220
kV Mallur and 400220kV ICT-2 and 3)
at 400220kV Somanhalli substation of
KPTCL
(Load loss 850 MW)
20-01-2017 at
1434 hrs
Triggering incident was fault in 66 kV Somanahalli -
Bannerghatta line and fault was cleared by operation
of Back-up OCR at Somanahalli end
15-02-2017
at 1344 hrs
Line tripped at Hoody end on direct trip receive and
was holding from Neelamangala end
Yet to be informed
KPTCL
Yet to be informed Pending
Annexure-III
Page 13 of 31
56I3 Complete outage of 220kV Ambewadi
Substation of KPTCL
24-06-2016 at
2057hrs
B phase to earth fault had occurred in 220 kV
Ambewadi-Ponda line-2 Fault was cleared by
tripping of feeders from remote end
1KPCL amp KPTCL to furnish an action taken report on the
recommendations given by PSAG-16 to PCSC forum
2KPTCL to keep AR for Ambewadi ndash Ponda line-2 in non-auto
mode (ie only 3-ph trip should get extended on occurrence of a
fault) till the line is closed from Ponda end
KPCLKPTCL Yet to be informed Pending
Complete outage of 220kV Ambewadi
station of KPTCL and 220kV Nagjheri
of KPCL
Ambewadi Narendra line-2 tripped on fault and
220kV ambewadi Narendra line-1 tripped due to over-
loading Running Units at Nagjheri also tripped during
the event due to tripping of evacuating lines
KPCL KPTCL18-03-2016 at
1440 hrs
1 TANGEDCO to replace existing Check-Zone relay with a new one
possessing required performance
2 TANGEDCO to take steps to provide numerical busbar protection
at their 220 kV Tuticorin TPS TANGEDCO may also explore
providing dual CT‟s (on either side) for all BS breaakers at the time
of commissioning of numerical BBP if there were no space
constraints
3 TANGEDCO to take steps to provide for standalone Event Logger
(EL) and standalone Disturbance Recorder (DR) with automatic
downloading facility to a centralized server
Failure of Bus Section-I Y-ph CT resulted in
operation of bus-bar protection for Bus Sections -I amp
II Running Units1 4 and 5 230 kV Kayathar
230kV Kudankulam 230kV Sterlite Station
Transformer-1 2 amp 3 got tripped during the incident
Unit ndash 2 amp 3 were not in service
22-02-2017 at
0616 hrs
KPCLKPTCL
25-01-2017 at
2236 hrs
R-phase to earth fault due to de-capping of insulator
Auto-reclose attempt was unsuccessful
Tripping of ICT-3 at Raichur Substation
TANGEDCO
Pending
Tripping of running Units amp 230kV
feeders at Tuticorin TPS of TANGEDCO
(Gen Loss 640 MW)
62II7
1 KPCL to furnish a report on the reasons for Unit-6 tripping at
Nagjheri PH
2 KPCL KPTCL to modify suitably the SPS at Nagjheri Power
House such that it would also factor in the over loading of Ambewadi-
Narendra lines
3 KPCL to put 220 kV Kodasalli - Nagjheri DC lines into service if
more than 200 MW generation from Kali Complex (with Nagheri
Contribution not less than 50 MW) is ensured on sustained basis
Pending53I3 (GD)
15-03-2016 at
1228 hrs
ICT-3 tripped due to operation of back-up earth fault
protection during fault in 220kV RTPS-Raichur line-
1
KPCL KPTCL to check the ICT‟s back-up (high-set) protection
settings and ensure that they operate with a time delay of 100 msec
TANTRANSCO mail dated 12042017
1 The recommendation will be ensured AR logic will be configured in
Distance Protection relay itself instead of BCU OEM has been addressed
2 Post triggering period of 2 sec to cover AR operation in DR time scale
will be provided
TANTRANSCO mail dated 01062017 amp 15062017
1 The recommendation will be ensured AR logic will be configured in
Distance Protection relay itself instead of BCU OEM has been addressed
Main-1 amp 2 relays will be replaced for the requirement of more output
contacts for AR logic implementation
2 Post triggering period of 2 sec to cover AR operation in DR time scale
is being provided
TANGEDCO1 TANGEDCO to take properly configure AR logic at NCTPS-II in
that in case of unsuccessful auto-reclsoure three-phase trip shall be
given along with AR block
2 TANGEDCO to configure all protection relays DR‟s time scale at
NCTPS-II for a post-triggering period of 2 sec to capture events such
as complete AR operation
Tripping of 400 kV NCTPS-
SVChatram line-2
KPTCL Mail received dated 28-06-2016
Modifications to be carried in Nagzari SPS logic is submitted to
SRLDCSRPC for verification and approval
Status received vide KPCL mail dated 14062017
1 Tripped since there was evacuation problem and there were only two
lines NA-1 and NA-2
2 Will be reviewed in consultation with EE(RT) KPTCL Hubli
3 Both the lines are in charged condition
TANGEDCO mail dated 15042017
1) New Relay is tested and ready for replacementNow all 5 units are in
serviceThe relay will be replaced when lesser units are in service ---
Pending
2a)Steps are taken to renovate amp mordernization of all the control panel
into Numerical based control panels --- Pending
2b) Since 230 KV indoor switchyard has no spare space providing dual
CT`s is not fessible -- Completed
3) Procurement of EL amp DR is under progress --- Pending
TANGEDCO mail dated 26042017
1) Check zone New Relay is replaced on 17042017 -- Completed
2 Pending
3 Pending
KPTCL Mail Recieved dated 25-05-2016
SEESCADA to update the status of healthiness of carrier protection of
220kV RTPS-Raichur 1 amp2 lines
KPTCL Mail Recieved dated 28-06-2016
Details sought from KPCL for review of ICTs back up (high set) proection
settings as suggested KPCL is yet to furnish the details required to give
the revised settings
Status received vide mail dated 10-07-2017
As requested by EEE (protection) CEERT KPTCL the details were sent
to through e-mail dtd 08082016 After receipt of reply from KPTCL will
be implemented accordingly
62V3 Pending
Pending
Tamil Nadu
53II1
Annexure-III
Page 14 of 31
05-09-2015 at
1404 hrs
TANTRANSCO to take suitable measures like installing more stub-
towers along 230 kV OK Mandapam ndash Myvady line to avoid
excessive sag due to over-loading
TANTRANSCO PendingComplete outage of 230kV Palladam 230 kV
Othakalmandapam Ss 230 kV Coimbatore Ss 230
kV Thudialur and 230 kV Sadayapalayam Ss
Pending
Disturbance in 220kV Tamilnadu system48I1 (GD)
TANTRANSCO TANTRANSCO vide their mail dated 240615 informed that different
relays in Main-I amp Main-II would be ensured at the earliest
Mail recieved on 24-07-2015 19-02-2016 and 24-03-2016
Different relays in Main-I amp Main-II will be ensured
Mail received on 27-04-2016
TANTRANSCO Not feasible in the existing SAS sub stations Hence
exemption may be given for these sub stations
Mail received on 20-05-2016 16-06-201625-07-2016 amp 24-09-2016
As discussed in the 52nd PCSC meeting Swapping of Relays between two
stations is not feasible in the existing SAS sub stations Hence exemption
may be given for these sub stations
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15062017
Different make Relays will be ensured for Main-I amp II relays at Alamathy
end
TANTRANSCO Mail received on 19-02-2016 24-03-2016 and 27-04-
2016
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
Mail Received on 20-05-2016 16-06-201625-07-2016 amp 24-09-2016
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
29-03-2015 at
1529 hrs
43II5 Line-2 tripped on R-phase to earth fault
Line autoreclosed at SVChatram end and failed to
reclose at Alamathy end Bphase to earth fault in line-
1 Line tried for Ar but due to permanent fault line
did not reclose ICT tripped on operation of over flux
protection
TANTRANSCO was requested to swap the relays between two
stations so that
Main-1 and Main-2 will be of different make at each station
Tripping of 400kV
Alamathy-
SVChatram line-1amp2
and 400230kV ICT
at SVChatram
Annexure-III
Page 15 of 31
14-09-2016 at 1113Hrs
Bus Bar Protection (Zone-2) of 230 kV Bus-B got operated at Alamathy Station during fault in 230 kV
Alamathy-Korattur feeder
51I1 (GD)
12-05-2016 at
1215 hrs
Fault had occurred in 230kV Madurai-Sembatty line
Trip from distance relay was not extended to breaker
due to protection DC fail LBB protection got
operated resulting in a busbar trip at 230kV Madurai
substation All elements got tripped as there is a
single bus operation at 230kV Madurai Ss
58II17
TANTRANSCO
TANTRANSCODifferent type and Make of distance protection relays to be provided for Main-I amp Main-II protection for 230kV feeders at 400 kV Sunguvarchathiram amp 230 kV Sunguvarchathiram Substation [Carry-Over from Protection Audit Recommendations]
Mail recieved on 25-07-2016 amp 24-09-2016
TANTRANSCO Auto Transformer-2 HV side Bus isolator C-phase
support insulator of 230kV Southern Bus was replaced and Bus Bar
Protection scheme was restored on 12052016
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
CT is not available in the Bus Coupler bay for zone segregation CT latch
relay is to be provided for all bays for zone segregation
TANTRANSCO mail received on 24-03-2016
CMR relay for extending LBB protection was released and LBB extended
from Distance Protection relay directly CT is not available in the Bus
Coupler bay for zone segregation However during commissioning of third
ICT Bus section Breaker will be provided for zone segregation Numerical
BBP relay will be provided
Status received vide mails recieved on 27-04-2016 and 20-05-2016 16-
06-2016 25-07-2016 24-09-201610-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
CT is not available in the Bus Coupler bay for zone segregation However
during commissioning of third ICT Bus section Breaker will be provided
for zone segregation Numerical BBP relay will be provided
PendingComplete outage of 230kV Madurai Ss
(Chekanaurani) of TANTRANSCO
TANTRANSCO
Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
TANTRANSCOMultiple tripping at 230 kV Alamathy Station
Pending
Pending
1 TANTRANSCO to check the healthiness of BBP relay by conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
TANTRANSCO to take steps to provide double-bus operation at
their 230 kV Gummidipoondi SS
Pending
Complete outage of 230 kV
Gummidipoondi Station of
TANTRANSCO
19-01-2016 at
1156 hrs
Flashover of Auto Transformer- 2 HV
B-phase Isolator supporting insulator of 230kV
Southern Bus occurred at Gummidipoondi station At
the time of fault Bus bar protection relay was not in
service for pre-commissioning testing of Auto
Transformer-2 All feeders got tripped due to
operation of zone-2 protection from remote ends
TANTRANSCO1 TANTRANSCO to examine the feasibility of providing two main-
zone operation for bus bar protection by exploring various alternatives
like replacing existing bus-coupler CB with a hybrid bus-coupler CB
that comes with inbuilt CT replacing existing BBP relay with another
suitable relay that supports two main-zone operation and implement
the same
Busbar protection got operated for a fault in 230kV
Mywadi-Anaikadavu line
21-12-2015 at
628 hrs
Complete outage of 230kV Mywadi
station of TANTRANSCO
50I3 (GD) TANTRANSCO Mail received on 19-02-2016 and 24-03-2016
Revision of Bus Bar Protection setting was carried out The stabilizing
voltage setting was raised from 410 to 450 volts After completing the
necessary test the bus bar protection put in to service on 29122015
Mail Received on 27-04-2016 16-06-201625-07-2016 amp 24-09-2016
Revision of Bus Bar Protection setting was carried out After completing
the necessary test the bus bar protection put in to service on 29122015
Mail received on 10-11-2016 amp 20122016
Provision of Bus Coupler bay arrangement was included in the
Upgradation works proposed and the same was sanctioned by MoP
through PSDF
Numerical relay allotted and being commissioned
Mail received on 20-02-2017
Numerical BBP relay was commissioned on 02022017
Status received vide mail dated 12042017 amp 01062017 amp 15-06-
2017
Numerical BBP relay was commissioned on 02022017
Provision of Bus Coupler bay arrangement was included in the
Upgradation works proposed and the same was sanctioned by MoP
through PSDF
The issue was discussed in PCSC-58 meeting held on 18102016 when
PCSC forum agreed to de-link the implementation of the Item from the
scope of Protection Audit Recommendations (PAR) and pursue it as part
of PCSC Recommendations
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp15-06-2017
Different make Relays will be provided for Main-I amp II relays at
Sunguvarchatram end in a phased manner
Pending
1 TANTRANSCO to provide split-bus operation with bus
sectionalizer CB for their 230 kV Madurai (Chekanurani) SS
2 TANTRANSCO to provide two main-zone operation for the
numerical BBP that is being commissioned
3 TANTRANSCO to examine the feasibility of providing Re-Trip
feature for the LBB protection and accordingly take steps for
implementing the same
58
55I1 (GD)
Annexure-III
Page 16 of 31
58II17 Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
TANTRANSCOMultiple tripping at 230 kV Alamathy
Station
15-09-2016 at
2214 hrs
Bus Bar Protection (Zone1) of 230kV Bus-A got
operated at Alamathy Station during fault in 230 kV
Alamathy-OPG-1 feeder
1 TANTRANSCO to check the healthiness of BBP relay by
conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal
winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
Pending
Annexure-III
Page 17 of 31
6414 Complete outage of North Chennai TPS
STG-1
26-03-2017
at 2314hrs
Tripping of evacuating lines due to fault led to
tripping of running Unit at NCTPS Stg-1
1 TANTRANSCO to take steps to complete insulator replacement
works on the 230 kV lines owned by them in NCTPS area within 6
months
2 TANTRANSCO to take steps to implement AR on all 230 kV lines
emanating from NCTPS-I at the earliest
TANTRANSCO Yet to be informed Pending
65II1 Tripping of 220 kV Idukki ndashUdumalpet
line
05-05-2017 at
1702 hrs
Line tripped due to B-N and R-N fault in line 1 TANTANSCO to correctly configure AR logic at Udumalpet so
that in the event of 3-ph trip being given during AR dead-time the
relay will not try for auto-reclosure
2 TANTRANSCO to keep AR dead-time as 1 sec for all 220 kV amp
above transmission lines
TANTRANSCO Yet to be informed Pending
58II17
44I1 (GD)
Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
KSEB Mail received vide dated 17012017
1 110 kV bus bar protection progressing ----Pending
2 Connection of 220kV earth mat and 110 kV plate earthing system
completed---- Completed
3 Redundancy of 110V DC system in progress Complete independent
redundancy is not practical for the time being 48 V DC redundancy was
already there----Pending
4 Instead of stand alone event logger SCADA system of 110 kV feeder is
expected to be completed by the end of 2017 SCADA system of 220kV
side will be taken up after that----Pending
28-04-2015 at
1230 Hrs
Mail received on 31-07-2015
1 Reducing the sensitivity of REF protection of Unit 4 5 6 at Idukki
PH - Generation wing is planning to purchase new transformer
management relays with low impedance REF protection Purchase
procedures initiated ---------Pending
2 The replacement repair of faulty breakers are under the consideration of
Generation wing Breakers will be replaced repaired in a phased manner
Unit 3 breaker was replaced with available breaker from the 220kV
IDMD feeder The 220kV CBs of unit 2 and unit 3 will be replaced with
in two months
3 No abnormalities were noticed in the PLCC equipment at New Pallom
station It is kept under observation
Mail recieved on 30-10-2015
1 Purchase procedures is still in progress
2 Replaced
3 PLCC equipment Tested and found OK
Mail recieved on 03-03-2016
1 Even though repeated plans to have a joint inspection with MsABB
who is the OEM of the relay panel for replacing the relays with numerical
ones the same could not become successful Finally the inspection has
been fixed on 15032016 It has been planned to replace existing REF
protection with low impedance ones after retrofitting the numerical ones of
OEM
Mail recieved on 25-05-2016
1Generation wing is planning ti provide low impedance REF protection by
retrofitting numerical ABB make transformer management relay in the
existing panel ---- Pending
2Faulty breaker of Unit3 has been replaced ---- Completed
3PLCC equipments in the feeder were checked and found OK ------
Completed
TANTRANSCO
KSEB
Complete outage of Idukki Hydro Power
Station (GD-1)
Multiple tripping at 230 kV Alamathy
Station
15-09-2016 at
2214 hrs
58I1 (GD) Complete outage of 220 kV Kalamassery
Substation
23-08-2016
at 1120 hrs
Triggering incident was conductor snapping in 110
kV Kalamassery- Kaloor feeder
KSEB to take steps to provide the following at their 220 110 kV
Kalamassery SS
1 Busbar protection at 110 kV level
2 Connecting 220 kV and 110 kV sides on to a common earthmat
3 Redundant DC supply for both protection (220 V) and
communication (48 V) applications
4 Stand-alone Event Logger
Bus Bar Protection (Zone1) of 230kV Bus-A got
operated at Alamathy Station during fault in 230 kV
Alamathy-OPG-1 feeder
1 TANTRANSCO to check the healthiness of BBP relay by
conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal
winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
KSEB
Pending
220 kV breaker of unit-3 at Idukki Power
house flashed and bus differential protection
acted All Generators (6Nos) along with all
220 kV feeders tripped during the incident
1 KSEB to reduce sensitivity of REF protection appropriately at
Idukki PH
2 KSEB to replace repair the faulty breaker
3 KSEB to check the PLCC equipment at New Pallam and inform
the remedial measures taken to PCSC forum
Kerala
Pending
Pending
(Recommendat
ion No1)
Annexure-III
Page 18 of 31
08-05-2016at
457 hrs
Tripping of 400kV Hyderabad - N‟sagar
line
PGCIL (SR-I amp SR-II)
PendingLine tripped on operation of over-voltage protection at
Hyderabad end and Direct Trip was received at
N‟sagar Over-voltage Stg-2 operation was observed
in EL of Hyderabad station
55II5 1PGCIL (SR-I) to properly configure EL‟s at Hyderabad station
with time-scale resolution up to msec further DR‟s should also be
configured for showing both Analog and Digital data with properly
defined X-axis and Y-axis scales
2PGCIL (SR-I) to follow the FILE Naming Nomenclature provided
by SRPC in naming various tripping files (FIRDRELTR) being
uploaded in SRLDC‟s Tripping Monitor System (TMS) portal
PGCIL (SR-I) Yet to be informed
Annexure-III
Page 19 of 31
55II9 Tripping of HVDC Gazuwaka pole-2 19-05-2016 at
1141 hrs
Pole tripped on operation of differential current
protection of east side of Pole-2
PGCIL (SR-I) to take up the issue of differential protection operation
of converter transformer on low voltage fluctuations with their OEM
and submit a detailed report on it
PGCIL (SR-I) Yet to be informed Pending
56II11 Tripping of HVDC GazuwakaPole-2 19-06-2016 at
520 Hrs
HVDC Pole-2 got tripped on operation of Bus
differential protection
PGCIL (SR-I) to get the tripping of HVDC Pole-2 tripping on Win-
Bus differential protection thoroughly investigated for correctness of
operation and submit a report thereon
PGCIL (SR-I) Yet to be informed Pending
56III7 Tripping of 400 kV Khammam-N‟sagar
line-1
05-06-2016 at
2241 hrs
Line tripped on B-phase to earth fault Line auto-
reclosed successfully at N‟sagar and failed to auto-
reclose at Khammam
1PGCIL (SR-I) to configure DR amp EL at N‟sagar (Tallapalli) end so
that full operation of AR is captured
2PGCIL (SR-I) to investigate the reasons for non-operation of AR of
Tie-CB at N‟Sagar end and resolve them suitably
PGCIL (SR-I) Yet to be informed Pending
58II13 (GI) Tripping of 400 kV Raichur-Gooty line-1
and 400 kV Gooty-Tumkur line-2
01-09-2016 at
517 hrs
400kV Gooty-Raichur line tripped at Gooty end only
and was holding from Raichur 400kV Gooty-Tumkur
line-2 tripped on over voltage
PGCIL (SR-I) to check the operation of OVR relays at their Gooty
SS and properly configure lines‟ DRs amp ELs so that events pertaining
to OVR (Stage-I amp Stage-II) operation (START amp TRIP) get
explicitly recorded
PGCIL (SR-I) Yet to be informed Pending
58II14 (GI) Tripping of 400 kV Gooty-Tumkur line-2 02-09-2016 at
2156 hrs
Line tripped on operation of over-voltage protection at
Gooty end and Direct Trip was received at Tumkur
PGCIL (SR-I) to check the operation of OVR relays at their Gooty
SS and properly configure lines‟ DRs amp ELs so that events pertaining
to OVR (Stage-I amp Stage-II) operation (START amp TRIP) get
explicitly recorded
PGCIL (SR-I) Yet to be informed Pending
61II4 Tripping of HVDC Gazuwaka Pole-2 05-12-2016
at 1503 hrs
Pole-2 tripped due to tripping of AC filter banks
which was due to voltage disturbance in eastern bus at
Gazuwaka
PGCIL (SR-I) to refer the instant trippings to their OEM to ensure
that the settings adopted for pole trippings for low-voltage power
swing and ferro-resonance phenomena are in order and have been set
properly A copy of the OEM‟s reply in this regard shall be furnished
to PCSC forum
PGCIL (SR-I) Yet to be informed Pending
62II4 Tripping of 400 kV Gazuwaka-Vemagiri
(PG) line and 400kV Vemagiri(PG)-
Nunna line
18-01-2017 at
2203 hrs
400 kV Gazuwaka - Vemagiri (PG) line and 400 kV
Vemagiri (PG) - Nunna line got tripped due to Direct
Trip receive at Gazuwaka and Vijayawada respectively
PGCIL (SR-I) to configure triggering of DR amp EL for SF6 gas
compartment Zone trip with suitable legend
PGCIL (SR-I) Yet to be informed Pending
63II11 Tripping of 765 kV Vemagiri-Srikakulam
line-1 and 765400kV ICT-1 at Vemagiri-
PG SS
16-03-2017 at
1023 hrs
Line-1 and ICT-1 which are in the same diameter got
tripped due to operation of Tie bay gas
compartment trip
1 Since tripping of elements on Gas Compartment Trip has been
observed frequently in the past few months at 765 400 kV
Vemagiri SS PGCIL (SR-I) shall furnish a comprehensive report
detailing the remedial measures taken including OEMrsquos suggestions
to prevent their occurrence
PGCIL (SR-I) Yet to be informed Pending
PGCIL (SR-I)12-09-2016 at
1203 hrs
Line tripped on Direct Trip receipt at Ramagundam
end and line was holding from Warangal end
Pending58IV1
400 kV Gazuwaka-Vemagiri (PG) line tripped on Y-E fault However for 400 kV Gazuwaka-Vemagiri (PG) line Direct Trip was received at Gazuwaka after
250ms of occurrence of fault and fault was
persistent for 250ms Then Over-Voltage Stage-1 protection operated from Vemagiri (PG) end in 400 kV Vemagiri (PG) - Nunna line and tripped it
62II1
For the line under consideration the following shall be carried out
by PGCIL (SR-I) in coordination with NTPC-Ramagundam
I)End-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
II)Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be
repaired replaced
Yet to be informedTripping of 400 kV Ramagundam-
Warangal line
Yet to be informed05-01-2017 at 1305 hrs
Tripping of 400kV Gazuwaka - Vemagiri (PG) line and 400 kV Vemagiri (PG ) - Nunna line
1 PGCIL (SR-I) to ensure time-sync of all protections relays at their Vemagiri Gajuwaka and Vijayawada substations2 PGCIL (SR-I) to check OVR settings for correctness of operation
along with proper drop-off to pick-up ratio (gt 097) and configure
OVR_START event in the corresponding Relay BCU Event Logger for all 400 kV lines emanating from their Vemagiri (PG) SS
PGCIL (SR-I) Pending
Annexure-III
Page 20 of 31
64III16 Tripping of 76 5kV Kurnool-Nellore PS
line-2
27-04-2017 at
2222 hrs
R-phase to earth fault had occurred in line Auto-
reclose was successful at Kurnool end and breaker
at Nellore PS end tripped and did not attempt for
auto-reclose
For the line under consideration PGCIL (SR-I) to Configure Event
Logger (EL) to record events at msec level
PGCIL (SR-I) Yet to be informed Pending
65II15 Tripping of HVDC Gazuwaka Pole-1amp2 25-05-2017 at
0945 hrs
HVDC pole-1 got tripped due to operation of South
filter inter zone protection and HVDC pole-2 got
tripped due to operation of differential protection
PGCIL (SR-I) to furnish detailed report on the events that led to
tripping of HVDC Poles ndash 1 amp 2 including remedial measures taken
to PCSC forum Further the OEM report wrt tripping of HVDC
Pole-2 shall also be furnished
PGCIL (SR-I) Yet to be informed Pending
65III5 Tripping of 765 kV Raichur-Solapur line-
2
07-05-2017
at 1918 hrs
Y-phase to earth fault Auto-reclose was successful
at Solapur and breakers at Raichur end got tripped
PGCIL (SR-I) to configure Event Loggerrsquos time-resolution up to
millisec level in all protection relays at their 765 400 kV Raichur SS
PGCIL (SR-I) Yet to be informed Pending
55II7 Tripping of 400kV Kudgi PG (Narendra
New) - Narendra-PG line-2
18-05-2016 at
1625 hrs
line tripped on B-phase to earth fault and line auto-
reclosed successfully from Narendra end Line tripped
from Kudgi-PG due to operation of over-voltage stage-
1
PGCIL (SR-II) to properly configure dead-time of AR (typically 1
sec) on all lines emanating from Narendra (PG) substation
PGCIL (SR-II) Yet to be informed Pending
54II3 Tripping of 400kV Sriperambudur -
SVChartam and 400kV Nellore-
Sriperambudur line-1
05-04-2016 at
0011 hrs
400kV Nellore-Sriperambudur line-1 tripped on a R-
phase to earth fault 400kV Sriperambudur-
SVChatram line tripped at Sriperambudur end only
on operation of over current protection
PGCIL (SR-II) to check and revise Pole Discrepancy Relay (PDR)
time setting appropriately based on the type of AR scheme being
implemented at their 400 kV Sriperambudur SS
PGCIL (SR-II) Yet to be informed Pending
54III3 Tripping of 400 kV Kalvindapattu-Vallur
line
10-04-2016 at
1459 hrs
R-phase to earth fault had occurred in line Auto
reclose attempt is unsuccessful auto-reclose could not
be established from provided DR EL
PGCIL (SR-II) to furnish a report on the tripping event detailing the
reasons for unsuccessful AR operation at Kalvindapattu end and the
remedial action taken to restore AR to normalcy
PGCIL (SR-II) Yet to be informed Pending
55II17 Tripping of HVDC Talcher-Kolar pole-1 30-05-2016 at
0949 Hrs
Failure of main CT of AC filter (20C08A) occurred
and it in turn caused the operation of filter bank
differential protection HVDC Pole-1 got tripped on
group Differential protection operation
PGCIL (SR-II) to take up the issue of Pole-1 tripping on Group
Differential Protection (Stage-II) due to multiple commutation failures
with their OEM and furnish a report on it
PGCIL (SR-II) Yet to be informed Pending
56II8 Tripping of HVDC Talcher-Kolar Pole-1 17-06-2016 at
1635 Hrs
Talcher-Kolar HVDC Pole-1 got tripped on line fault
and Pole-2 went to ground return mode with 150MW
PGCIL (SR-II) to address amp resolve DTPC and fibre-optic link
related issues raised by KSEB at Thrissur Madakathara substations
and conduct a mock-test in coordination with KSEB to verify integrity
of signal transmission from Kolar to Thrissur Makadathara
PGCIL (SR-II) Yet to be informed Pending
64II14
PGCIL (SR-I)14-05-2017
at 1654 hrs
Tripping of 400 kV Vemagiri - Gazuwaka
line
PGCIL (SR-I) to sort out issues relating to AR functionality
operation for both Main-CB and Tie-CB at both Vemagiri and
Gajuwaka substations
For the line under consideration the following shall be carried out
by PGCIL (SR-I)
End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be
repaired replaced
Y-phase to earth fault Auto-reclose was not
successful due to persistent fault Vemagiri end had
sent a Direct Trip after un-successful Auto-reclose
AR attempt was observed in Gazuwaka end DR
after 3 phase trip
65III10
Yet to be informed PendingPole-1 got tripped due to failure of auxiliary supply
changeover 400kV Jeypore-Gazuwaka line-2 got
tripped on operation of over-voltage protection
Pole-2 east shunt reactor got failed and this in turn
resulted in tripping of HVDC pole-2 due to Pole-2 Y
block activation 400kV Jeypore-Gazuwaka line -1
also got tripped during the incident
28-Apr-17 Pole-
1 at 844 hrs
and Pole-2 at
907 hrs
Tripping of HVDC Gajuwaka Pole-1amp2
and 400 kV Jeypore-Gazuwaka line-1amp2
PGCIL (SR-I)1 PGCIL (SR-I) to provide fully automatic supply-changeover
scheme for Pole-1 auxiliaries at the earliest
2PGCIL (SR-I) to furnish a detailed report on the reasons for East
Shunt Reactor failure including remedial action taken OEM report in
this regard also shall be shared
3PGCIL (SR-I) to provide redundant AC auxiliary supply to both
Pole-1 amp Pole-2 either by making use of tertiary of ICT-1 or from
external dedicated feeder
Yet to be informed Pending
Annexure-III
Page 21 of 31
58II3 (GI) Tripping of 400 kV Sriperambudur-
SVChatram line
14-08-2016 at
1349 hrs
Line tripped at Sriperambudur end only on
operation of directional earth fault protection
(i) PGCIL (SR-II) to disable high-set of line DEFRrsquos and
(ii) PGCIL (SR-II) to block line DEFR operation when DPR is in active
condition (has picked up) at their Sriperambudur SS
PGCIL (SR-II) Yet to be informed Pending
58II5 (GI) Tripping of 400 kV Neyveli TS2-Pugalur
line and 400 kV Neyveli TS2-Neyveli TS2
EXP line
21-08-2016 at
1035 hrs
Failure of Y-Ph tension insulator of tie feeder bay at
Neyveli TS2 Neyveli-Pugalur line tripped due to over
voltage at Neyveli TS2 and direct trip was received
at Pugalur
PGCIL (SR-II) to check the operation of the DPR relays at Pugalur
end NLC TS2 - Pugalur line by trans-playing the event on another
healthy relay and take suitable action including replacement of the
relay accordingly
PGCIL (SR-II) Yet to be informed Pending
58II19 (GI) Tripping of 400 kV Madurai-Karaikudi
line
15-09-2016 at
0302hrs
Line tripped on operation of OVR Stage-I protection
at Karaikudi and Direct Trip was received at Madurai
PGCIL (SR-II) to check the operation of OVR relays at their 400 kV
Karaikudi SS and properly configure linesrsquo DRs amp ELs so that events
pertaining to OVR (Stage-I amp Stage-II) protection operation (START
amp TRIP) get explicitly recorded
PGCIL (SR-II) Yet to be informed Pending
59II20 (GI) Tripping of HVDC Talcher-Kolar pole-1 10-10-2016 at
1635 hrs
Pole-1 of HVDC Talcher-Kolar tripped due to receipt
of lsquorsquoPole block command from Talcher end due to
tripping Pole-1 DC filter at Talchar end Pole 2 went
into metallic return mode after tripping of pole-1
PGCIL (SR-II) to check the correctness of non-operation of SPS
(Talcher ndashKolar Trip Signal-1) in the instant case by comparing it
with the incident of tripping of HVDC Talcher-Kolar pole-1 on
05102016 and furnish a report on it to PCSC forum
PGCIL (SR-II) Yet to be informed Pending
59II24 (GI) Tripping of 400220kV ICT-2 at
Somanahalli SS
24-10-2016 at
354 hrs
ICT-2 tripped on operation of Buchholz relay PGCIL (SR-II) to properly configure ICT protection relay DR so that
digital signals are recorded with proper names at their 400220 kV
Somanahalli SS
PGCIL (SR-II) Yet to be informed Pending
59III4 Tripping of 400 kV Salem -Udumalpet line-2
13-10-2016 at 0306 hrs
Line tripped on R-phase to earth fault Line auto-reclosed at Udumalpet end and did not reclose at
Salem
Line tripped on R-phase to earth fault Line auto-reclosed at Udumalpet end and did not reclose at Salem
PGCIL (SR-II) Yet to be informed Pending
62II6 Tripping of 400 kV Trichy-Karaikudi line 21-01-2017 at 2145 hrs
Line tripped on operation of over voltage protection at Karaikudi end and direct trip was received at Trichy Voltage recorded in DR in antecedent
conditions were 2454 kV 2432 kV 2536 kV
respectively
1 PGCIL (SR-II) to ensure OVR settings adopted for 400 kV lines at Karaikudi SS are as per SRPC provided settings with a drop-off to pick-up ratio gt 097
2 PGCIL (SR-II) to configure OVR_START event in the corresponding Relay BCU Event Logger for all 400 kV lines emanating from their
Karaikudi SS
PGCIL (SR-II) Yet to be informed Pending
62III5 Tripping of 400 kV Tumkur ndash Bidadi line 17-02-2017
at 1044 hrs
B-E fault Line did not auto-reclose 1 PGCIL (SR-II) to properly configure AR logic operation at Bidadi
end and ensure itrsquos correct operation for a fault during reclaim time
2 PGCIL (SR-II) to ensure time-sync of protection relays with GPS at
both Tumkur and Bidadi substations
PGCIL (SR-II) Yet to be informed Pending
62III6 Tripping of 400 kV Tumkur ndash Bidadi line 18-02-2017
at 1036 hrs
B-E fault Line did not auto-reclose PGCIL (SR-II) to properly configure AR logic operation at Bidadi
end and ensure itrsquos correct operation for a fault during reclaim time
PGCIL (SR-II) Yet to be informed Pending
62V1 Tripping of 400kV Vallur-Kalivandapattu
line-2
22-02-2017 at
455 hrs
Line tripped due to failure of R phase jumper Two
faults observed from DR 2nd fault cleared in 500ms
from Kalavindapattu end
PGCIL (SR-II) to enable Trip on Reclose (TOR) at Kalavindapattu end
on all 400 kV lines emanating from it
PGCIL (SR-II) Yet to be informed Pending
57II2 Tripping of 400 kV Mywady-Salem line-1
and 400 kV Mywady-Madurai line
PGCIL (SR-II) Yet to be informed03-07-2016 at
0306 hrs
400kV Mywady- Madurai line tripped on a Y-phase
to earth fault due to agriculture fire Tie-CB LBB
relay got operated at Mywady end and resulted in
tripping of Main breakers of 400kV Mywady-
Madurai and 400kV Mywady-Salem line-1 which are
in the same diameter
PGCIL (SR-II) to furnish a report on the remedial action taken after
ascertaining the reasons for (i) non-opening of Main-CB of Mywady
ndash Madurai line at Mywady end on Tie-CB LBB operation and (ii)
delay in sending DT to the remote ends after Tie-CB LBB operation
Pending
Annexure-III
Page 22 of 31
65II2 Tripping of 400 kV Kudgi (PG) - Tumkur
line-2 and Kudgi (PG) ndash Kudgi (NTPC)
line-1
06-05-2017 Kudgi (NTPC) feeder tripped at Kudgi (PG) end on
operation of distance protection R-N Zone-1
Tumkur feeder tripped at Kudgi(PG) end on
operation of NGR buchholtz relay
1 PGCIL (SR-II) to sort out AR related issues at Kudgi (PG) end on
400 kV Kudgi (PG) ndash Kudgi (NTPC) lines and put AR into service
2 PGCIL (SR-II) investigate reasons for NGR Buccholtz trip on 400
kV Kudgi (PG) ndash Tumkur line-2 and furnish action taken report wrt
rectifying the same
PGCIL (SR-II) Yet to be informed Pending
58II16 (GI) Multiple tripping at 400 kV Kalpaka SS 06-09-2016 at
1643 Hrs
Y-Pole breaker of Bus reactor-3 got failed during its
charging This resulted in a bus fault in 400kV bus-1
resulting in tripping of 400kV elements connected to
Bus-1
PGCIL (SR-I) amp PGCIL (SR-II) to review their Reverse Zone settings of
distance relays so as to bring them in line with Ramakrishna
Committee guidelines at all their substations in the southern
region
PGCIL (SR-I) amp PGCIL
(SR-II)
Yet to be informed Pending
51II4 NTECLTripping of 400kV Alamathy-Tiruvalam
line-1 and 400kV Alamathy-Vallur line-2
NTECL Vallur to furnish a report detailing the reasons for mal-
operation of Vallur end relays for a fault on Alamathy-Tiruvalam line-
1 and remedial measures taken to PCSC forum In the report their
preparedness for implementing line differential protection on Vallur-
Alamathy lines may also be indicated
400kV Vallur-Alamathy Line-2 got tripped from
Vallur end during failure of Y-phase LA in 400kV
Alamathy-Tiruvalam line Protection at Vallur end
tried for an auto-reclose and gave a 3 phase trip
TANTRANSCO mail received on 24-03-2016
3Ф Trip at 400kV Alamathy end due to DT received from vallur end for
BФ LAS bursted in Alamathy -Thiruvalam - 1 at Alamathy end
Mail received on 27-04-2016 and 20-05-2016
3Ф Trip at 400kV Alamathy end due to DT received from vallur end for
BФ LAS bursted in Alamathy -Thiruvalam - Line-1 at Alamathy end
Pending13-12-2015 at
2242 hrs
Others
Annexure-III
Page 23 of 31
56III5 Tripping of 400 kV Neyveli TS-2-
Pugalur line
04-06-2016 at
1636 hrs
B phase to earth fault occurred in line Auto-reclose
had not operated at NLC TS-2 and DT was sent to
Pugalur end resulting in a 3 phase trip
NLC to review the necessity of providing Relay Definitive Trip and
accordingly take steps to disable it on all lines emanating from their
generating stations
NLC Direct trip triggering of DR wii be carried out at TS2 end during the next
planned shutdown of the Pugalur Ts2 feeder
Mail received on 22-02-2017
Direct trip triggering of DR carried out at TS2 end for the TS2-Pugalur
feeder on 25-01-17
Pending
56II16 Tripping of 400 kV Gajwel-Singareni
line-2
30062016 at
2343 hrs
Tripped on 3-phase Trip at Gajwel end SCCL to configure Jaipur end relay‟s EL properly so that the time-
stamp resolution is extended downwards up to milli-second level
SCCL Yet to be informed Pending
1Singareni TPS to furnish single line diagram of their switchyard
along with the Over Voltage Relay settings adopted for various
transmission lines and to ensure that they are in line with the SRPC
provided gradings
2Singareni TPS to upload various tripping files (FIRDRELTR)
pertaining to a tripping event involving their station in SRLDC web-
portal within 24-hrs of occurrence of that event in compliance of
IEGC Regulation 52(r)
Line tripped on operation of Over-Voltage
protection at Singareni and Direct Trip was received
at Gajwel DR amp EL of Singareni was not furnished
59III3
57II8 NTPC (Ramagundam)
10-07-2016 at
156 hrs
Line tripped at Ramagundam end on operation of over-
voltage protection Dichipally end tripped due to
receipt of Direct Trip signal
1NTPC-Ramagundam to ensure correctness of operation of Over
Voltage relays by taking remedial measures like maintaining
healthiness of concerned CVT‟s setting drop-off to pick-up ratio at
097 amp above etc
2NTPC-Ramagundam to ensure time sync of their station‟s DR amp
EL with GPS
3NTPC-Ramagundam to sort out analog values indication amp
overlapping issue of time-stamp in their station DR‟s
4NTPC-Ramagundam to properly configure their EL‟s so that events
are recorded with msec resolution
Line tripped on B-phase to earth fault Line auto
reclosed at Chandrapur end and did not reclose at
Ramagundam
57II4
16-07-2016 at
438 hrs
Tripping of 400 kV Ramagundam -
Chandrapur line -2
1NTPC-Ramagundam to furnish remedial measures taken wrt AR
non-operation and unwarranted DT sending to other end
2NTPC-Ramagundam to configure protection relays DR‟s such that
events get recorded for at leas
2000 msec post-triggering so as to cover complete AR operation
Tripping of 400 kV Ramagundam -
Dichipally line
NTPC-Ramagundam mail dated 09032017
1 Main-II relay replaced Over voltage relays pickup to reset ratio is 098
--- Completed
2 DR and EL are time synchronized with GPS clock
-------- Completed
3DR alalog overlaping issue is sloved ---- Completed
4 ----- Pending
Yet to be informed
Pending
54I1
Tripping of 400 kV Gajwel-Singareni line-
2
02-04-2016 at
1708 hrs 1MAPS to furnish a detailed report on the tripping of SP Koil ndash
MAPS lines 1 amp 2 at MAPS end with focus on the correctness of the
settings of Main-I amp Main-II relays (for primary amp back-up
protections) on both the lines
2MAPS to take steps to provide down-loading facility for DR amp EL
from Main-I amp Main-II relays on all 230 kV lines emanating from
MAPS
3MAPS in co-ordination with SP Koil to carry out PLCC end-to-
end testing on SP Koil ndash MAPS lines 1 amp 2 and ensure healthiness
of PLCC communication amp carrier-aided protection
4MAPS to put in service Auto-Reclosure feature on all four 230 kV
lines emanating from MAPS by June 2016
Pending
Complete outage of 230 kV SPKoil
Station of TANTRANSCO
B-phase CT failure occurred in 230 kV SPKoil -
MAPS line-1 Busbar protection got operated at
SPKoil station All elements except 230kV
Oragadam and 230kV Kalivandapattu got tripped at
230kV SPKoil station bdquoY‟ phase CT and support
insulators also got damaged
27-09-2016 at
0101 hrs
Status revided vide MAPS mail dated 06122016
1 The settings given by Ms TANTRANSCO were adopted for Main ndashI amp
Main- II relays for both the lines The same settings were verified to be
same Subsequently calibrated was done and no drift was observed
--- Complied
2 From May 2016 onwards the DR EL and trip report are being sent by
mail to SRLDC Bengaluru by MAPS
--- Complied
3 Monthly maintenance of PLCC equipments is being done by Ms
TANTRANSCO At present PLCC telephone is not working it is being
followed up
--- Complied
4 CVTs are planned to be procured from Ms TANTRANSCO by the end
of February 2017 and AR will be implemented for all the lines emanating
from MAPS by July-2017 as discussed in the current SRPC meeting on
25112016
--- Pending
PendingNPCIL (MAPS)
SCCL
NTPC-Ramagundam mail dated 09032017
1 The relay will be checked in next opportunity if required it will be
changed with new one------------- Pending
2DR time recording increased to 2 sec --------- Completed
NTPC Pending
Annexure-III
Page 24 of 31
62III2 Tripping of 400 kV Kaiga-Guttur line-1 06-02-2017
at 0501 hrs
B-phase to earth fault Line did not auto-reclose at
Kaiga end
1 KGS to properly configure all relays DR‟s time scale for a post-
triggering period of 2 sec to capture events such as complete AR
operation
2 KGS to ensure time-synchronization of all protection relays with
GPS in their 400 kV switchyard
NPCIL (KGS) Yet to be informed Pending
63III4 Tripping of 400 kV Gajwel-Singareni line-
2
07-03-2017 at
1652 hrs
Line tripped on B-phase to earth fault Line did not
auto-reclose
1 SCCL to properly configure LBB logic for all line relays
where AR has been put into service for 1-ph initiation based
on phase segregation (ie for the faulted phase) at their
Singareni TPS
SCCL Yet to be informed Pending
64II8 Tripping of 400 kV Tirunelveli-
Kudankulam line-3
23-04-2017 at
0556hrs
R-phase to earth fault had occurred in Tirunelveli -
Udumalpet line-2 During the incident Tie-CB LBB
got operated at Tirunelveli end due to sluggish
operation and tripped 400 kV Tirunelveli -
Kudankulam line-3
NPCIL (KKNPP) to configure DRrsquos amp ELrsquos of protection relays at their
station for recording DT receipt event at their Kudankulam NPP
NPCIL(KKNP) Yet to be informed Pending
Yet to be informed63III8 NPCIL (KGS)Tripping of 400kV Kaiga-Guttur line-2 Line tripped on Y-phase to earth fault Line auto-
reclosed from Guttur end and failed to re-close from
Kaiga end
1 NPCIL (KGS) to furnish an action taken report on the
reasons for AR lock-out and remedial action taken to rectify
the same
2 NPCIL (KGS) to configure DR‟s of line protection relays for
a post triggering period of 2 sec to capture complete AR
operation at their Kaiga GS
3NPCIL (KGS) to furnish FIR amp TR for tripping events as
per SRLDC provided formats
27-03-2017 at
706 hrs
Pending
Annexure-III
Page 25 of 31
34I6
01-01-2015 at
1338 hrs
42II18 400kV Raichur TPS-Raichur(PG) line-
1amp2 400kV Raichur-Mahboobnagar
Unit7 and ICT-2 at RTPS tripped
during the incident B phase to earth
fault had occurred in 400kV Raichur
TPS-Raichur line-1
1 Bus bar protection shall be provided by asset owner ( ie
KPTCL)
2 Settings for main distance protection amp Overcurrent protection
shall be examined and reviewed
3 Time synchronization of the Substation shall be ensured
As reported directional over current relay of ICTrsquos
operated due to snapping of line jumper in 220kV
Lingapur line
1 KPCL to review REF setting (DMT or IDMTL) for unit-7 by first
week of April 2015 and inform the same to PCSC forum
2 TSTRANSCO to furnish Mehaboobnagar‟s DR and EL and the
reasons for distance relay operation at their end within a week‟s time
3 PGCIL (SR-I) to rectify the issues relating to AR operation relay
reach (Z2) reverse reach (Z4) and SOTF auxiliary contacts within a
week‟s time and submit the actions taken to PCSC forum
16-07-2014400220 kV ICT-1 amp 2 at
MUNIRABAD
On account of R-phase to earth fault line tripped at
Hassan end due to operation of distance Zone-2 and
non-receipt of carrier From DR of Talaguppa end it
is observed that fault had occurred in Yphase
09-03-2015 at
0636 hrs
Tripping of 400
kV TALAGUPPA
ndash HASSAN line
40II3
Multiple tripping at Raichur TPS of
KPCL
Miscellaneous
1 PGCIL and KPTCL to ascertain the reason for the phase
discrepancy in the relay operation and take suitable remedial
measures
2 KPTCL to check the PLCC operation at Talaguppa end and submit
the report to the PCSC forum
1 Yet to be informed by KPCL ---- Pending
2 Mail received on 26-05-2015 from TSTRANSCO
It is found that the main-2 ABB make REL316 type distance relay was
defective and same was replaced with MICOM P444 by MsPGCIL on
2304-2015 After replacement of main-II DR can be extracted from this
relay For EL in to service some field winding is pending which is being
taken up in this month -- Complied with
3
PGCIL mail recieved on 27-04-2016
End to end PLCC tunning carried out
PGCIL (SR-I) RVMD 14072016
Relay settings of all the stations in SRTS-1 were derived as per
Ramakrishna Commettee recomendations and implemented - Complied
with
KPCL
TSTRANSCO
PGCIL (SR-I)
PGCIL (SR-II) KPTCL
KPTCL
PGCIL (SR-I)
Mail recieved on 28-04-2015
End to end testing of PLCC has been done and problem in the PLCC is
atttended
Mail received on 27-05-2015 (KPTCL) amp 29-07-2015
End to end testing of PLCC has been done and problem in the PLCC is
atttended Phase discrepancy in the relay operation is to be checked jointly
Mail recieved on 02-09-2015 from PGCIL (SR-II)
Problem is in identification of phases at Talguppa end To be rectified by
Ms KPTCL
Mail recieved on 28-06-2016 from KPTCL
The matter is reffered to the concerned Operation and maintance wing to
set right the mismatch of phases in 400kV Talaguppa-Nelamangala and
Talaguppa-Shantigrma lines at Talaguppa in cordination with PGCIL
Pending
(with KPTCL)
Mail recieved on 27-05-2015 (KPTCL)
1 KPTCL has taken action to provide bus bar protection to 220kV buses
2 Over current relay Settings of ICTs to be reviewed by PGCIL
Mail received on 29-07-2015 (KPTCL)
Initial Tendering stage
KPTCL Mail recieved on 23-01-2016
Detailed estimate prepared for taking up the work CEE Transmission
Zone Gulbarga will take up necessary procurement and further execution
----------------------------------------------------------------------
1 Pending from KPTCL side
2 Complied with as per PGCIL (SR-I) RVMD 14072016 which stated
that Relay settings of all the stations in SRTS-1 were derived as per
Ramakrishna Commettee recomendations and implemented
3 Pending from KPTCL side
Pending (with
KPCL)
Pending
(with KPTCL)
Annexure-III
Page 26 of 31
Tripping of Unit 1 at NCTPS 24-05-2015
at 1913 hrs
ID Fan trip
Tripping of Unit 1 at MEPL 24-05-2015
at 1913 hrs
Coal Mill tripped
Tripping of Unit 1 at
Krishnapatnam
24-05-2015
at 1917 hrs
Generator Protection operated
Tripping of Unit-8 at RTPS 24-05-2015
at 1919 hrs
Tripped on Overvoltage
47I2
1 All Tripped units viz Krishnapatinam MEPL Raichur NCTPS
to submit a detailed report on this event including the remedial
measures taken to PCSC forum
2 KPCL to check the excitation system of Unit 8 of RTPS and
submit the remedial measures taken to PCSC forum
KPCL MEPL
APGENCO TNEB
As per FIR submitted CT damage observed in
Chitoor-Main bay (404) Main breakers connected to
bus-1 (401 404 407 410) got tripped on operation of
bus bar protection Unit-1 tripped on operation of
MFT Unit-2 was not in service
Complete outage of Krishnapatnam TPS
Pending (with
KPCL)
APGENCO letter dated 18032016
1SOE and SLD are attached The DR of 405 CB is not generated during
the incident Now the problem is identified and rectified
--------- Completed
2All the 3 lines ie CHTR-2 MNBL-I amp II tripped in zone
protection The fault was in Blind zone ie P2 side of CT where it was
covered under Bus fault by the time fault moved on to P1 side when the
fault comes under STUBTEED zone after 330msec all the feeders expect
CHTR-1 tripped in Zone-II and total fault persisted for 500msec before the
405 TIE CB opens and clear the fault As a remedial the STUB protection
operation also checked and found OK-------Completed
3The Time Sync was missed on the day and found there was problem with
LAN Timer same was rectified Now found OK
-----------Completed
4Now the DR Time scale changed to 1 sec for Pre fault and 3 sec for Post
fault and STATE of events are corrected wherever found wrongor
misguiding during analysis---------Completed
5
PGCIL-SR1 RVMD 27-04-2016
Procurement of differential protection for 400kV NPS-NLR DC and
400kV RCR-RTPS-DC is under tendering
PGCIL-SR1 RVMD 14-07-2016
The proposal for procurement of Line differential Protections for 400kV
Raichur - RTPS-1 amp 2 and 400kV Nellore - NPS - 1 amp 2 lines has been
approved and tender is under technical evaluation
Pending with
PGCIL(SR-I)
08-09-2015 at
1820 hrs
44I3
1 APGENCO to furnish to PCSC forum (i) A3-size Single Line
Diagram of SDSTPS and (ii) the sequence of events with time stamp
showing the protection that opened Tie-CB (405) at SDSTPS
2 APGENCO to review STUBTEED protection in all dias at
SDSTPS and ensure that they are configured for instantaneous
operation
3 APGENCO to properly configure the STATE of the tripping events
so that they get recorded appropriately like TRIP OPERATED in
their corresponding Event Loggers
4 APGENCO to ensure time sync of all DR‟s and EL‟s at SDSTPS
5 PGCIL (SR-I) to provide line differential protection for 400 kV
NPS ndashNellore-PG lines 1 amp 2
TANGEDCO vide their mail dated 07072015 informed that as per the
discussion and recommendation of 44th meeting of PCSC held on
28052015 a time delay of 2 Sec had been introduced for the above
tripping for all the ID fans at NCTPS-II
MEPL vide their mail dated 14092015 informed that they had
implemented 2 seconds delay for under voltage tripping of all Drag Chain
Feeder Conveyors And this has been done for both the Units
APGENCO letter dated 18032016
The unit not tripped on Generator protection but tripped on Economiser
inlet flow protection consequent to tripping of TDBFP on lube oil pressure
lowBefore tripping dip in voltage was observed in the LT system which
caused tripping od lube oil pumpsAfter the incidentChangeover scheme
on under voltage of LT System was reduced from 80 with 2 sec delay to
40 with 200msec delay
APGENCO PGCIL (SR-
I)
Annexure-III
Page 27 of 31
12-11-2015 at
0020 hrs
Tripping of 400kV Gooty-Nelamangala
line
KPTCL KPCL NPCIL
(KAPS)
1 KPTCL KPCL to see the possibility of implementing Weak Infeed
logic with Echo feature enabled by Under
Voltage (27) element on Kadra-Karwar lines 1 amp2 and implement
the same if feasible
2 NPCIL to time-coordinate Kaiga‟s DEFR settings with (i) Zone-2
settings at Kaiga and (ii) primary protections of the lines emanating
from Kadra and Kodasalli
3 KPCL to ensure time-sync of EL‟s and healthiness of the Fault
Locators at Kadra
220kV Kadra-Karwar lines-1amp2 tripped
on earth fault in B-phase in zone-2
Kaiga-Kadra line tripped at Kaiga end
only on operation of directional eath
fault protection
31-07-2015 at
1144 hrs
Tripping of 220kV Kadra-Karwar lines -
1amp2 and 220kV Kaiga-Kadra line
PGCIL (SR-I) mail received on 27-04-2016
1 The firmware of REL670 is being upgraded ------- Completed
2 The recording of events in msec interval is being taken up with OEM
Henceforth for analysis purpose we will provide larm list which has msec
time stamp -------- Completed
3 End to end testing of PLCC code transmision and tuning of channels
carried out ------- Completed
4 Procurement of differential protection for 400kV NPS-NLR DC and
400kV RCR-RTPS-DC is under tendering The legends modified in
Eventalarm list Provision of diff relay for all short lines emanating from
NPS is being taken up with our corporate -------- Pending
PGCIL(SR-I) RVMD 14-07-2016
The proposal for procurement of Line differential Protections for 400kV
Raichur - RTPS-1 amp 2 and 400kV Nellore - NPS - 1 amp 2 lines has been
approved and tender is under technical evaluation
1
PGCIL RVMD 27042016
AR blocked due to failure of PLCC link The defective PLCCcards
replaced at Neelamgala end
PGCIL RVMD 14072016
AR blocked due to failure of PLCC link The defective PLCCcards
replaced at Neelamgala end End to end testing of PLCC carried out and
PLCC link is healthy ------ Pending
2 Gooty end Time syc unit is replaced with new one and commissioned ---
----- Completed
3 Yet to be informed by KPTCL --- Pending
PGCIL (SR-I) KPTCL 1 For Gooty ndashNelamangala line PGCIL (SR-I) and KPTCL to
provide 3-ph trip logic at their respective ends upon detection of
PLCC link failure during dead-time of AR operation
2 PGCIL (SR-I) to make GPS functional at Gooty SS and ensure
time-sync of various DR‟s and EL‟s with it (GPS)
3 PGCIL (SR-I) KPTCL to furnish reason for the operation of
Backup impedance protection of the line reactor at Nelamangala end
and the remedial measures taken to PCSC forum
Pending (with
KPTCL)
1PGCIL (SR-I) to furnish Action Taken Report on the findings of
OEM on relay mal-operation at NPS end on 400 kV NPS ndash NCCK
line to PCSC forum
2 PGCIL (SR-I) to appropriately configure Station Event Logger at
NPS to record events at msec interval
3 PGCIL (SR-I) to carry out PLCC end-to-end testing in coordination
with TPCIL for 400 kV NPS ndashTPCIL line
4PGCIL (SR-I) MEPL SEL TPCIL amp NCC to take steps to
provide line differential protection at their respective ends on all 400
kV lines (except Gooty line) emanating from Nellore Pooling Station
and furnish an action plan to implement the same
Pending
1
Mail recieved on 25-05-2016 from KPTCL
Availability of week end infeed with eco feature to be confirmed by
SEERTCHubli --- Pending
2
Mail recieved on 03-12-2016 from NPCIL(KGS)
The 200 ms Definite time DEFR element in both Kaiga Kadra and Kaiga
Kodasally lines were disabled IDMT DEFR is retained The 200 ms
Definite time back up oc element in both Kaiga Kadra and Kaiga
Kodasally lines were disabled IDMT is retained
------ Completed
3 Yet to be informed by KPCL
Status received vide KPCL mail dated 14062017
1 Since PT blasted (B phase) at Karwar end resistive over reach occurred
hence Backup protecion operated at Kadra end (zone-2 not sensed) ---
Pending
3Newly commissioned micom P444 relay time synchronised with GPS
------ Completed
Running units at Thermal Powertech power Station
tripped due to tripping of 400kV Nellore pooling
station (NPS)-TPCIL line and 400kV Nellore pooling
station (NPS)-ECC line
30-12-2015 at
0602hrs
R-phase to earth fault had occurred in Line Line did
not auto-reclose from both ends It was mentioned that
YampB pole breakers at Neelamangala tripped on
operation of pole discrepancy and backup impedence
protection for line reactor got operated
Complete outage of TPCIL power station 50I2
50II8
47II7
PGCIL (SR-I)
MEPL SEL TPCIL
NCC
Pending
Annexure-III
Page 28 of 31
52I8 Complete outage of 400kV NTPL station
and CEPL Stations
14-03-2016 at
0136 hrs
Running Units at NTPL and Coastal Energen power
station got tripped due to tripping of evacuating lines
NTPL and PGCIL (SR-II) to furnish compliance report of the
recommendations given by PSAG-15 Committee that held its meeting
on 12-13 April 2016 at NTPL Tuticorin
PGCIL (SR-II)
NTPL
NTPL mail received on 19052016
All General Recommendations will be done in the second week of June
2016 ---------- Complied by NTPL
Yet to be informed by PGCIL (SR-II)
Pending
[with PGCIL
(SR-II)]
56III4 Tripping of 220 kV Sedam-Tandur line 03-06-2016 at
2152 hrs
Line tripped on B-phase to earth fault Auto-reclose is
not enabled for line
KPTCL and TSTRANSCO to fast-track providing AR on 220 kV
Sedam ndash Tandur line and furnish an action plan of providing the same
by next PCSC meeting (PCSC-57)
KPTCL
TSTRANSCO
Yet to be informed Pending
KPTCL and TSTRANSCO to take steps to provide AR feature on
220 kV Sedam ndash Tandur inter-state line at their respective ends at the
earliest
KPTCL
TSTRANSCO
PGCIL mail received on 27-04-2016
Being pursued with APTRANSCO
APTRANSCO mail dated on 22-06-2016
AS maintenance being carrired out by PGCIL(SR-1) the required relay
replacement (wiringprogramming) may also be carried out by PGCIL(SR-
1)
PGCIL RVMD 14072016
1 The CB problem has been attended by POWERGRID by using OEM
Ms BHEL services amp POWERGRIDs OampM spares
------ Completed
2 Being pursued with APTRANSCO to replace the faulty Event Logger at
Vijayawada (Nunna) SS -------- Pending
APTRANSCO mail dated on 31-08-2016 amp 04032017 amp 24052017
As maintenance being carrired out by PGCIL(SR-1) the required relay
replacement (wiringprogramming) may also be carried out by PGCIL(SR-
1)
PGCIL (SR-I)
APTRANSCO
1 PGCIL (SR-I) in co-ordination with APTRANSCO to address
the problem with CB at the earliest opportune time
2 APTRANSCO to take steps to replace the faulty Event Logger at
Vijayawada (Nunna) SS
Line tripped at Mamidipally end only on Direct Trip
receipt from Ghanapur end
30-04-2016 at
1640 hrs
Line tripped due to operation of over voltage
protection at Vijayawada end and Direct Trip was
received at Sattenapalli end
25-12-2015 at
301 hrs
Tripped on 3-phase Trip at Gajwel end30062016 at
2343 hrs
19-06-2016 at
1527hrs
220kV Sedam-Humnabad-2 tripped at Sedam on
Distance protection Zone-2 Sedam-RTPS-1 amp2 lines
tripped at RTPS end only 220kV Tandoor inter-state
line was hand tripped due to incoming supply failure
54IV2 Tripping of 400kV Ghanapur-
Mamidapalli line
56II16
Tripping of 400kV Sattenapalli-
Vijayawada line
56I2
51II6
Tripping of 400 kV Gajwel-Singareni
line-2
Complete outage of 220kV Sedam
Substation of KPTCL
Pending
PendingFor the line under consideration the following shall be carried out by
TSTRANSCO and PGCL (SR-I) in co-ordination
iEnd-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
iiHealthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
PGCIL (SR-I)
TSTRANSCO
Yet to be informed
Pending
1TSTRANSCO and SCCL to check drop-off to pick-up ratio of OV
relay and ensure that it is kept at 097 amp above
2TSTRANSCO and SCCL to configure respective end bdquos DR amp EL
so that they get triggered on OVR protection and record relevant
events
3SCCL to configure Jaipur end relay‟s EL properly so that the time-
stamp resolution is extended downwards up to milli-second level
TSTRANSCO
SCCL
Yet to be informed
Yet to be informed
Pending
Annexure-III
Page 29 of 31
R-phase to earth had occurred in 400kV BTPS-JSWEL
line and protection issued a 3 phase trip
64I1 Complete outage of North Chennai TPS
STG-2
24-04-2017
at 2102hrs
Tripping of evacuating lines due to fault led to
tripping of Units
Pending
64I2 Complete outage of North Chennai TPS
STG-2
25-04-2017
at 1827hrs
Tripping of evacuating lines due to fault led to
tripping of Unit
64I3 Complete outage of North Chennai TPS STG-2
26-03-2017at 2109 hrs
Tripping of evacuating lines due to fault led to tripping of running Unit at NCTPS Stg-2
64III2 Tripping of 400 kV Ghanapur-
Mamidapalli line
04-04-2017 at
1901hrs
B-phase to earth fault Line auto-reclosed from
Mamidapalli end and tripped from Ghanapur
For the line under consideration PGCIL (SR-I) TSTRANSCO to (i)
rectify issues wrt PLCC channels (ii) restore PLCC carrier
communication and (iii) put AR into service at the earliest
PGCIL (SR-I)
TSTRANSCO
Yet to be informed Pending
APGENCO
TSTRANSCO
Direct Trip was received at VTPS and line was
holding from Suryapet end
13-06-2016 at
1655 hrs
56IV2 Tripping of 400 kV VTPS-Suryapet line
57I1 Complete outage of 220 kV Karwar
Substation of KPTCL
12-07-2017 at
1136 hrs
Triggering incident was failure of R phase PT in Bus-
1 at 220kV Karwar substation 220kV Kaiga-
Kodasalli tripped during the incident Also bus shut
down occurred at Kadra and Kodasally stations
1NPCIL (KAPS) to disable DefiniteTime OC relay and put in its
place by IDMT OC relay for backup protection on both 220 kV
Kaiga ndash Kadra line and 220 kV Kaiga ndash Kodasalli line at Kaiga end
2KPTCL to put bus bar protection in service at their 220 kV Karwar
SS at the earliest
3KPCL KPTCL to implement Weak In-feed Logic with Echo
feature enabled by Under Voltage (27) element on Kadra ndash Karwar
lines 1 amp 2
4KPTCL to furnish equipment failure report of the current incident to
PSEampTD Division of CEA with a copy marked to SRPC
KPTCL KPCL NPCIL
(KAPS)
NPCIL(KGS) mail dated on 03-12-2016
AThe 200 ms Definite time DEFR element in both Kaiga Kadra and
Kaiga Kodasally lines were disabled IDMT DEFR is retained
B The 200 ms Definite time back up oc element in both Kaiga Kadra and
Kaiga Kodasally lines were disabled IDMT is retained
------Completed
APTRANSCO mail dated on 20-12-2016
Issue was addressed to the concerned for necessary action
APTRANSCO mail dated on 24-05-2017
Meeting was conducted and the relays procurement for all the locations is
under progress
Pending57II9 Tripping of 400 kV Nellore (PG) - NPS
line-1 400 kV Krishnapatnam-Nellore
(AP) lines -1amp2 and 400kV NPS -
MEPL line
18-07-2016 at
1905 hrs
Triggering incident was snapping of Y phase
conductor in 400kV Nellore (PG) - NPS line-1
Distance relay at Krishnapatnam end over-reached in
Zone-1 and resulted in tripping of 400kV
Krishnapatnam ndash Nellore (AP) lines - 1amp2 from
Krishnapatnam end Distance relay at MEPL over-
reached and resulted in tripping of MEPL-NPS line
from MEPL end
PGCIL (SR-I) TPCIL MEPL SEL SGPL APTRANSCO
APGENCO and SDSTPS to implement line differential protection on
all 400 kV transmission lines (of length less than 50 km) emanating
from Nellore PS Nellore (PG) SS and Nellore (AP) SS [It may be
noted here that the cut-off length of 50 km has been specified with a
view to exclude only long transmission lines]
APGENCO PGCIL(SR-
I) TPCILMEPL
SELSGPL
APTRANSCO
Pending
63II9 KPCLJSWEL Yet to be informed Pending
1 TANTRANSCO and PGCIL (SR-II) to take steps to complete
insulator replacement works on the 400 kV lines owned by them in
Chennai area within 3 months
1 JSWEL to follow file naming terminology provided by SRPC
for various tripping files uploaded in SRLDCrsquos TMS portal
2JSWEL to furnish reasons for AR-BLOCK observed during
the instant tripping and remedial action taken by them to
keep AR in service
3 KPCL to configure DR amp EL properly to record OVR Stage-I
amp Stage-II protections at their BTPS station
14-03-2017 at
1911 hrs
Tripping of 400 kV YTPS-BTPS line and
400 kV BTPS-JSWEL line
Status received vide TANTRANSCO mail dated 15-06-2017
1 All the Porcelain insulators of 400kV NCTPS-II - Vallur feeders-1amp2
were replaced with Polymer insulators by 20052017
2 Existing Porcelain insulators of all other 400kV feeders are being
replaced with Polymer insulators in a phased manner
TANTRANSCO
PGCIL(SR-II)
For the line under consideration the following shall be carried out by
APGENCO in coordination with TSTRANSCO
1End-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
2Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
PendingYet to be informed
Annexure-III
Page 30 of 31
65II5 Tripping of 400 kV Ghanapur-
Mamidapalli line
08-05-2017 at
1915 hrs
Line tripped at Ghanapur end only and was holding
from Mamidapalli Ghanapur end protection had
sensed R-phase to earth fault
For the line under consideration the following shall be carried out
by TSTRANSCO in coordination with PGCIL (SR-I)
1 End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
TSTRANSCO PGCIL
(SR-I)
Yet to be informed Pending
65III12 Tripping of 400 kV Srisailam-Dindi line-2 24-05-2017
at 1502 hrs
R-phase to earth fault Auto-reclose was successful
at Dindi and Zone - 1 3-phase trip at Srisailam
Since all 400 kV lnies emanating from Srisailam LB are composite
feeders APTRANSCO TSTRANSCO can keep AR functionality disabled at respective remote end stations under their control
APTRANSCO TSTRANSCO Yet to be informed Pending
Yet to be informed PendingTriggering incident was failure of CT in 110 kV
Villianur-Kurumbapet at Villianur substation 230KV
Villianur ndash NLC2 and 230 kV Villianur - Pondy lines
got tripped from Pondy end (on operation of DEF)
and NLC end (on operation of Zone-3) respectively
resulting in loss of supply to 230 kV Villianur
substation
65I2 Complete outage of 400kV Uravakonda
and Jammalamadugu Substations
31-05-2017 at
1744 hrs
Triggering incident was tripping of 400 kV Kurnool-
PG - Narnoor line - 1 amp 2 and 400 kV Narnoor-
Jamalamadugu line-2 which led to loss of supply to
400kV Uravakonda and Jamalamadugu 400kV Gooty-
Narnoor 400kV Narnoor-Jamalamadugu-1 400kV
Srisailam-Narnoor 400kV Uruvakonda-
Mahboobnagar-1amp2 were out of service in
antecedent condition
1 For 400 kV Ghani ndashNarnoor line the following shall be carried out
by APTRANSCO
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
2 PGCIL (SR-II) to take appropriate action wrt disabling non-
directional instantaneous Igt4 protection that operates without
checking existence of stub If required the issue may be referred to
relays OEM for appropriate solution or the present relays may be
replaced with other relays with different styles that donrsquot have the
issue observed
APTRANSCO PGCIL
(SR-II)
Yet to be informed Pending
1 PED to furnish an action taken report wrt complying with the
protection audit recommendations
2 PGCIL (SR-II) to review Zone-3 and DEF protection setting at
Pondicherry end 230 kV Pondicherry ndash Villianur and 230 kV
Pondicherry ndash Bahour line and set them appropriately to achieve
required time-coordination with OC protections of ICTrsquos at Villianur
SS
3 NLCIL to keep DEF protection in blocked condition as long as
Distance Protection is active and configure it to become active only
when distance protection does not pickup to avoid time-
coordination issues
19-05-2017 at
1235 hrs
Complete outage of 230 kV Villianur
Substation of Pondicherry
65I1 PED PGCIL (SR-II)
NLCIL
For the line under consideration the following shall be carried out
by TANTRANSCO in coordination with PGCIL (SR-II)
1 End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
PGCIL (SR-II)
TANTRANSCO
Yet to be informed Pending
For the line under consideration the following shall be carried out
by NLCIL in coordination with PGCIL (SR-II)1 End-to-end communication for DT permissive amp other signals may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and software) at both ends shall be checked and faulty components
shall be repaired replaced
Y-phase to earth fault Neyveli TS2 end relay issued
a 3-phase trip 220ms after issue of Y phase trip Direct Trip was sent to Pugalur end preventing auto-reclose
07-05-2017
at 1955 hrs
Tripping of 400 kV Neyveli TS2-Pugalur
line
65III6 PGCIL (SR-II) NLCIL Yet to be informed Pending
For the line under consideration the following shall be carried out
by TSTRANSCO in coordination with NTPC-Ramagundam1 End-to-end communication for DT permissive amp other signals may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components shall be repaired replaced
Over Voltage Stage-1 had operated at Gajwel end
Ramagundam end did not trip as Direct Trip was not received from Gajwel end
29-05-2017
at 0007 hrs
Tripping of 400 kV Ramagundam -
Gajwel line
65II19 TSTRANSCO NTPC
(Ramagundam)
Yet to be informed Pending
65II16 Tripping of 400 kV Kayathar-Karaikudi
line
25-05-2017 at
1552 hrs
R-phase to earth fault had occurred in line There
was Zone-2 3 phase trip operation at Kayathar end
and Zone-1 3 phase trip at Karaikudi end
Annexure-III
Page 31 of 31
SlNo Element NameOutage
datetime
Revival
datetimeReason for Outage Sender Receiver
Remedial Measures Actions taken
1 400 kV KAIGA - GUTTUR 1 27-03-2017153800 27-03-2017164800 RELAY MALOPERATION NPCIL (KGS) KPTCL
KPTCL
At Guttur end DPR operated in Z1 R phase AR
unsucessful due to persistant fault
At Kaiga end DPR operated in Zone-1 RN
fault145km AR attempt is observed from Kaiga
end DR
Reason Transient fault Stood OK after test
charging
NPCIL (KGS)
2 400 kV KHAMMAM - KALPAKKA 1 10-04-2017125800 DISTANCE PROTECTION PGCIL (SR-I) APTRANSCO
PGCIL (SR-I)
Tripped on operation of distance protection Line
belongs to APTARSNCOTSTRANSCO
APTRANSCO TSTRANSCO Momentary fault
3 400 kV KHAMMAM - KALPAKKA 2 11-04-2017115000 11-04-2017175900 Y-N faultPGCIL (SR-I) APTRANSCO
TSTRANSCO
PGCIL (SR-I) Tripped on operation of distance
protection Line belongs to
APTRANSCOTSTRANSCO
APTRANSCO TSTRANSCO Momentary fault
4 400 Kv RAICHUR - YTPS 18-04-2017131400 18-04-2017150100 DPR ZONE 1-B-PH FAULT KPCL KPTCL To-be-discussed
5 400220 Kv ICT-3 AT NEELAMANGALA 20-04-2017162100 20-04-2017170100DUE TO HEAVY ARCING AT B-
PH ISOLATORKPTCL To-be-discussed
6 400 Kv VTPS - MALKARAM 1 23-04-2017150500 SOTF OPERATED APGENCO TSTRANSCO
TSTRANSCOTripped at both ends Tripped on R-
phase to ground Zone-1 indications AR acted and
was unsucessful at Malkaram end
APGENCO
Pending Remedial Measures Actions taken
for the Critical Tripping Incidents (as on 25072017)
Annexure-IV
Page 1 of 6
7 400 kV KHAMMAM - MAMIDIPALLY 2 08-05-2017160600 08-05-2017174900 R PHASE TO GROUND FAULT PGCIL (SR-I) TSTRANSCO
PGCIL(SR-I)
Tripped on operation of distance protection Line
belongs to APTARSNCO
TSTRANSCO
Tripped at both ends Tripped on R-phase to
ground Zone-1 indications AR acted and was
unsucessful at Mamidipally end
8 400 kV TALAGUPPA - NEELAMANGALA 09-05-2017163600 Y TO GROUND FAULT KPCL KPTCL To-be-discussed
9 400 kV MUNIRABAD - GUTTUR 20-05-2017064100 20-05-2017211000BUS BAR PROTECTION
OPERATEDPGCIL (SR-I) KPTCL
KPTCL
No abnormality found at Munirabad end and line
was in service
PGCIL (SR-I)
Tripped at Guttur end only and line was holding
from Munirabad end
10 400 kV GUTTUR - HIRIYUR 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II) PGCIL (SR-II) Due to Problem at Guttur end
11 400 kV KAIGA - GUTTUR 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDNPCIL (KGS) KPTCL To-be-discussed
12 400 kV GUTTUR - NARENDRA 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II) PGCIL (SR-II) Due to Problem at Guttur end
13 400 kV MUNIRABAD - GUTTUR 20-05-2017160000 20-05-2017170400 B-n fault PGCIL (SR-I) KPTCL
PGCIL (SR-I)
As informed by Guttur Substation line tripped at
Guttur end only without any faciaalarms Line
holding from Munirabad end Suspected mal-
operation at Guttur end
KPTCL
14 400 kV GUTTUR - HIRIYUR 1 20-05-2017204100 20-05-2017211800BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II)
PGCIL (SR-II) Due to Problem at Guttur end
KPTCL
15 400 kV BTPS-JSW TORANAGALLU 20-05-2017064100 20-05-2017210300BUS BAR PROTECTION
OPERATEDKPCL JSWEL To-be-discussed
16 400 kV KAIGA - GUTTUR 1 20-05-2017204100 20-05-2017213800BUS BAR PROTECTION
OPERATEDNPCIL (KGS) KPTCL To-be-discussed
17 400 kV GUTTUR - NARENDRA 1 20-05-2017204100 20-05-2017211200BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II)
PGCIL (SR-II) Due to Problem at Guttur end
KPTCL
Annexure-IV
Page 2 of 6
18 400220 kV ICT-1 AT HOODY 20-05-2017110700 20-05-2017180500 220KV SIDE WORKS KPTCL To-be-discussed
19 220 kV AMBEWADI - PONDA 1 22-05-2017121100 22-05-2017123000 EARTH FAULT KPTCL GED To-be-discussed
20 400 Kv VTPS - MALKARAM 1 22-05-2017145200 22-05-2017185800 B phase fault APGENCO TSTRANSCO
TSTRANSCOTrippedat both ends Tripped on B-
Phase to ground and Zone-1 indications AR acted
and was unsucessful at Malkaram end
APGENCO
21 220 kV KANIAMPET - KADAKOLA 23-05-2017143200 23-05-2017162400 BREAKER PDR RELAY ACTED KSEB KPTCL To-be-discussed
22 400 kV TALAGUPPA - HASSAN 30-05-2017014600 B PHASE TO GROUND FAULT KPTCL PGCIL (SR-II)
PGCIL(SR-II) Due to persisting fault in KPTCL
portion
KPTCL
23HVDC TALCHER - KOLAR POLE 1 AT
TALCHER01-06-2017232200 02-06-2017001100
DC DIFFERENTIAL
PROTECTION OPERATEDPGCIL (SR-II) PGCIL (ER-I)
PGCIL(SR-II) Due to DC filter Diff relay operation at
Talcher end
24 400 KV NIZAMABAD- DICHPALLY-1 05-06-2017191500 3 PHASE FAULT TSTRANSCO
TSTRANSCOTrippedat both ends Tripped on 3
Phase B-Phase to ground fault and Zone-2
indications at Dichpally end
25 400220 kV ICT-1 AT DICHPALLY 05-06-2017191500 06-06-2017003200 BUCHHOLZ RELAY OPERATED TSTRANSCO
TSTRANSCO 400kv 315MVA ICT-1 at Dichpally
tripped on OSR indications which was a mal
operation of the relay At the same time there was
3 Phase fault in 400kV Dichpally to Nizamabad line
At Nizamabad end(PGCIL) Line Isolator 3 phases
shorted in GIS Module
26400 kV RAMAGUNDAM -
DICHCHIPPALLI05-06-2017191500 05-06-2017223700 3 PHASE FAULT NTPC TSTRANSCO
TSTRANSCO Line did not trip at Dichpally end At
the same time there was 3 Phase fault in 400kV
Dichpally to Nizamabad line for which the line
tripped at Both ends Relay settings need to be
reviewed at NTPC Ramagundam end
NTPC-Ramagundam
27 400 Kv BTPS - YTPS 05-06-2017194800 05-06-2017204400 DISTANCE PROTECTION KPCL To-be-discussed
Annexure-IV
Page 3 of 6
28 400 Kv SATTENAPALLI - SRISAILAM 2 05-06-2017125500 05-06-2017144700 R-n fault APTRANSCO TSGENCO
APTRANSCO
For a momentary fault feeder tripped on R-Ph Z1
indications and AR successful at Sattenapalli end
TSGENCO
Feeder tripped on R-phase to ground Zone-2 at
Srisailam end Due to Feeder consistsing of Under
Ground cable AR was disabled at Srisailam end
29 400220 kV ICT-2 AT KOLAR 06-06-2017191000 06-06-2017223700 DUE TO HEAVY WIND PGCIL (SR-II)
PGCIL (SR-II)
Flashover between 220kV jumper dropper of B
phase and Gantry towards 220kV bus due to heavy
swing of conductor during the unprecedented
heavy winds
30 400 kV KOLAR - HOODY 2 06-06-2017200800 DUE TO HEAVY WIND PGCIL (SR-II) KPTCL
PGCIL (SR-2)
Hand Tripped due to Isolator problem at Hoody
End
KPTCL
31 400220 kV ICT-2 AT GUTTUR 13-06-2017133000 13-06-2017134500TRIPPED ON EF RELAY
OPERATIONKPTCL To-be-discussed
32400 kV PUGALUR -
KALAIVANTHAPATTU14-06-2017123700 14-06-2017184500 TRIPPED ON Y-N FAULT PGCIL(SR-II) To-be-discussed
33 220 kV KANIAMPET - KADAKOLA 22-06-2017111700 22-06-2017113400EARTH FAULT RELAY
OPERATEDKSEB KPTCL To-be-discussed
34 220 kV KANIAMPET - KADAKOLA 22-06-2017121500 22-06-2017172000EARTH FAULT RELAY
OPERATEDKSEB KPTCL To-be-discussed
35 400 kV KHAMMAM - KALPAKKA 2 03-07-2017092400 03-07-2017104700
DT RECIEVED AT KLPA END
(TRIPPED ONLY AT KLPA
END)
PGCIL (SR-I) APTRANSCO
TSTRANSCO
PGCIL (SR-I)
PLCC belongs to APTRANSCO TSTRANSCO Mal-
operation of PLCC at Kalpaka end Requested
APTRANSCO TSTRANSCO for end to end
testingtunning of PLCC
APTRANSSCO TSTRANSCO
36 400220 kV ICT-1 AT URAVAKONDA 04-07-2017020100 04-07-2017022400MASTER TRIP RELAY
OPERATEDAPTRANSCO To-be-discussed
37 400 kV KAIGA - NARENDRA 2 07-07-2017075000 07-07-2017090800 TRIPPED ON R-Y Ph FAULT NPCIL KPTCL To-be-discussed
Annexure-IV
Page 4 of 6
38 HVDC BHADRAVATHI POLE 1 07-07-2017105900 07-07-2017115400TRIPPED ON NON VALID TAP
CODEPGCIL (SR-I) PGCIL (WR-I)
PGCIL(SR-I)
Tripped due to strucking of OLTC tap during
command execution The same was now working
39 400 kV KHAMMAM - KALPAKKA 2 07-07-2017120300 07-07-2017145000 DT Received PGCIL (SR-I) APTRANSCO
PGCIL(SR-I)
Tripped due to PLCC mal-operation PLCC belongs
to TSTRANSCO APTRANSCO Requested
TSTRANSCO APTRANSCO for end to end testing
tunning of PLCC Khammam end
APTRANSCO
40 400 KV GOOTY - TUMKUR - 1 08-07-2017142200 08-07-2017152600DISTANCE PROTECTION
OPERATEDPGCIL (SR-I) PGCIL (SR-II)
PGCIL(SR-I)
Tripped due to snapping of earth wire while
stringing of OPGW Advised concerned to take
additional precautions while carrying OPGW
stringing
PGCIL(SR-II)
41 400230 Kv ICT-1 AT SVCHATRAM 14-07-2017190300TRIPPED ON RESTRICTED
EARTH FAULTTANTRANSCO
TANTRANSCO
REF protection acted in ICT-1 during Auto Reclose
(AR) attempt of 400kV SVChatram-Alamathy
feeder-2 (through fault condition) As per the relay
manufacturer (GE-T60) guidelines for the one and
half breaker scheme the REF setting will be
revised
42 400 KV GOOTY - TUMKUR - 1 15-07-2017115100 15-07-2017122300Tripped while laying opgw
cablePGCIL (SR-I) PGCIL (SR-II)
PGCIL (SR-I)
Tripped due to snapping of earth wire while
stringing of OPGW Advised concerned to take
additional precautions while carrying OPGW
stringing
PGCIL(SR-II)
43 220 kV AMBEWADI - PONDA 1 16-07-2017113800 16-07-2017120800 DISTANCE PROTECTION KPTCL GED To-be-discussed
44 220 kV AMBEWADI - PONDA 2 20-07-2017013600 LINE FAULT KPTCL GED To-be-discussed
Annexure-IV
Page 5 of 6
45 400 Kv ALM - SVCTM-I 20-07-2017112700 20-07-2017120200 C-N FAULT TANTRANSCO To-be-discussed
46 400 Kv ALM - SVCTM-II 20-07-2017112700 20-07-2017120300 A-N FAULT TANTRANSCO To-be-discussed
47 400 Kv ALM - SVCTM-II 20-07-2017144300 20-07-2017193200TO ATTEND FAULT
LOCATIONTANTRANSCO To-be-discussed
48 HVDC BHADRAVATHI POLE 1 21-07-2017224800 21-07-2017235300 INTERNAL MINOR ALARM PGCIL (SR-I) PGCIL (WR-I) To-be-discussed
49 400 kV KHAMMAM - KALPAKKA 1 21-07-2017103000 21-07-2017204200AC SUPPLY TO BREAKER
PROBLEMPGCIL (SR-I) APTRANSCO To-be-discussed
50 220 kV CHITTOR - THIRUVALEM 22-07-2017080600 22-07-2017144100RELAY MALOPERATION AT
THIRUVALAMAPTRANSCO TANTRANSCO To-be-discussed
51 400 KV GOOTY - TUMKUR - 1 22-07-2017150700 22-07-2017154500TRIPPED DURING OPGW
WORKSPGCIL (SR-I) PGCIL (SR-II) To-be-discussed
52 400 Kv GAJWEL - BHOOPALAPALLY 2 22-07-2017131300 22-07-2017133600 B PHASE FAULT TSTRANSCO TSGENCO To-be-discussed
53 400 kV GUTTUR - HIRIYUR 2 22-07-2017150300 22-07-2017155300TRIPPED DUE TO RELAY MAL
OPERATIONKPTCL PGCIL (SR-II) To-be-discussed
54 400110 kV ICT 2 AT ALAMATHY 24-07-2017091300 24-07-2017162700TRIPPED ON RESTRICTED
EARTH FAULTTANTRANSCO To-be-discussed
Annexure-IV
Page 6 of 6
G1
220kV LINE-1
ICT 220400 KV
G2
GT1 GT2
400kV LINE-1
400kV LINE-2
600MW 600MW
220kV LINE-2
400kV220kVSummary of Various Special Protection Schemes for 2 x 600 MW UPCL TPP
Adani Power Limited Ahmedabad
Adani Power Ltd Ahmedabad 1
Annexure-V
Page 1 of 12
G1
ST-2
220 kV LINE-1
ICT 220400 KV
G2
GT-1 GT-2
400kV LINE-1
400kV LINE-2
600 MW 600 MW
ST-1
220 kV LINE-2
UPCL UDUPI - NETWORK UNDER CONSIDERATION
400 kV220 kV
Adani Power Ltd Ahmedabad 2
315 MVAICT-1
315 MVAICT-2
220 kV ndash KEMMAR BUS 400 kV ndash HASSAN BUS
Annexure-V
Page 2 of 12
Adani Power Ltd Ahmedabad 3
Existing SPS
Benefits of New Proposals
If both the 400kV Lines out of serviceTripped amp Total Generation is gt 650 MW then Trip Unit-2
Existing SPS logic has been developed in Unit-2 DCS
1 Consideration of all possible contingency cases
2 Unit Backdown (AUTOMATIC) has been proposed in certain contingencies
where Unit tripping is not required After restoration of tripped outlets
Unit may ramp up to full generation
3 Comprehensive logic will be developed in Numerical Relays with adequate
security and reliable detection to avoid mal operation of sps logic
4 Monitoring of SPS logic with necessary alarms and events
Annexure-V
Page 3 of 12
Sr UPCL‐Udupi‐SUMMARY OF SPS TO HANDLE ALL POSSIBLE CONTINGENCIES Sh‐1 of 2
Contingency Cases Action Unit SelectionFor Tripping
1 Power Swing Detected in Impedance reach of Zone‐1 in 400 kV Line
Tripping of One selected unit if both Units ON Each Unit Power gt 400 MW
Unit‐2
2Tripping of one 400 kV Line while another 400 kV Line is already in OFF condition
Tripping of One selected unit if both Units ON Each Unit Power gt 400MW
Unit‐2
3 TrippingOffloading of Both 400 kV Line simultaneously (within 3 sec)
Tripping of One selected Unit if both Unit ON Each Unit Power gt 325 MW Unit‐2
4 TrippingOffloading of all four Transmission Lines Tripping of both Units Both Units
4
5
400kVlin
e Overlo
ad Stage PickupSet Point
TimeDelay Action
Stage 1 900 MW 3 Sec Alarm
Stage 2 1100 MW 2 Sec Automatic Backdown upto 450 MW in both Units
Annexure-V
Page 4 of 12
Sr UPCL‐Udupi‐SUMMARY OF SPS TO HANDLE ALL POSSIBLE CONTINGENCIES Sh‐2 of 2
Contingency Cases
Action
6 ICT
Overlo
ading from
400 kV
Line Stage Pickup
Set PointTimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units
7
220 kV
Line
Overlo
ad
Stage 1 250 MW 5 Sec Automatic Backdown upto 300 MW in both Units
5
Sr Consideration Requirements associated with SPS Implementation
1 400 kV LINE Tripping in Zone‐1 will be blocked under Power Swing DetectionOperation
2 Pole Slip Protection of Generator need to be co‐ordinated with 400 kV Line Power Swing Protection
3 Line Overload Detection will be blocked by Power Swing DetectionOperation
4 Line ZeroUnder Power Detection will be blocked by Power Swing DetectionOperation
Annexure-V
Page 5 of 12
G1
ST-2
220 kV LINE-1
ICT 220400 KV
G2
GT-1 GT-2
400kV LINE-1
400kV LINE-2
600 MW 600 MW
ST-1
220 kV LINE-2
UPCL UDUPI - NETWORK UNDER CONSIDERATION
400 kV220 kV
Adani Power Ltd Ahmedabad 6
315 MVAICT-1
315 MVAICT-2
220 kV ndash KEMMAR BUS 400 kV ndash HASSAN BUS
Annexure-V
Page 6 of 12
Contingency 1 Tripping of one 400kV line
It may lead tohellip1 Overloading of another 400 kV Line
2 Power Swing in another 400 kV Line (specially when 220 kV
Lines are not available)
3 Severe oscillations in running Units
4 Units may loose synchronism and disconnect from network
G1 G2
L1 L2L1L2
Following SPS has suggested to address this contingency
Adani Power Ltd Ahmedabad 7
400kV200kV
Contingency Cases
Action
Unit Selection
ForTripping
1
400kVline Overlo
ad
Stage PickupSet Point
TimeDelay
Stage 1 900 MW 3 Sec Alarm ‐‐‐‐‐‐‐
Stage 2 1100 MW 2 Sec Automatic Backdown upto 450 MW in both Units ‐‐‐‐‐‐‐
2 Power Swing Detected in Impedance reach of Zone‐1 in 400 kV Line
Tripping of One selected unit if both Units ON Each Unit Power gt 400 MW Unit‐2
Annexure-V
Page 7 of 12
Contingency 2 Tripping of one 400kV line while other already Tripped
It may lead tohellip
1 Oscillations in running Units
2 Units may loose synchronism and disconnect from
network
3 Overloading of ICTs and subsequent tripping
4 Overloading of 200 kV Lines and subsequent tripping
5 Station blackout
Adani Power Ltd Ahmedabad 8
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases Action Unit SelectionFor Tripping
1Tripping of one 400 kV Line while another 400 kV Line is already in OFF condition
Tripping of One selected Unit if both Unit ON Each Unit Power gt 400 MW Unit‐2
2
ICT Overlo
ading
from
400
kV Side
Stage PickupSetting
TimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units
Annexure-V
Page 8 of 12
Contingency 3 Tripping of both 400kV line simultaneously
It may lead tohellip
1 Severe oscillations in running Units
2 Units may loose synchronism and disconnect from
network
3 Overloading of ICTs and subsequent tripping
4 Overloading of 200 kV Lines and subsequent tripping
5 Station blackout
Adani Power Ltd Ahmedabad 9
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases Action Unit SelectionFor Tripping
1 TrippingOffloading of Both 400 kV Line simultaneously (within 3 sec)
Tripping of One selected Unit if both Unit ON Each Unit Power gt 325 MW Unit‐2
2
ICT Overlo
ading
from
400
kV Side
Stage PickupSetting
TimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units ‐‐‐‐‐‐‐
Annexure-V
Page 9 of 12
Contingency 4 Overloading of any 220 kV line
This contingency may arise due tohellip1 Tripping of both 400 kV Lines and associated SPS logic fails
to operate (Tripping of any One Unit if both Units running)
2 Overloading of ICTs from 400 kV Side and associated SPS
logic fails to operate
3 Tripping of any one 220 kV lines if both 220 kV lines are in
service and 400 kV outlets are not available
Adani Power Ltd Ahmedabad 10
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases
Action
Unit Selection
ForTripping
1
220kV
line
Overlo
ad StagePickupSet Point
TimeDelay
Stage 1 250 MW 5 Sec Automatic Backdown upto 300 MW in both Units ‐‐‐‐‐‐‐
If any SPS does not function Then 200 kV Line will trip by Operation of Line Over Current Function
Annexure-V
Page 10 of 12
Contingency 5 Tripping of all Lines emanating from UPCL (ZERO POWER)
It may lead to1 Over voltage conditions at UPCL Bus
2 Over speed of all the generators because of sudden
load throw
Following SPS has suggested to address these contingencies
1 Zero Power Scheme on 400 kV System and 220 kV System checking the power
flow through 400kV and 200 kV lines and trip all the units in service if there is a
under power condition on all four lines and running units
Adani Power Ltd Ahmedabad 11
G1 G2
L1 L2L1
400kV200kV
L2
Sr Contingency Cases Action Unit SelectionFor Tripping
1 TrippingOffloading of all four Transmission Lines Tripping of both Units Both Units
Annexure-V
Page 11 of 12
G1
220kV LINE-1
ICT 220400 KV
G2
GT1 GT2
400kV LINE-1
400kV LINE-2
600MW 600MW
220kV LINE-2
400kV220kV
THANKShellip
Adani Power Ltd Ahmedabad 12
Annexure-V
Page 12 of 12
65th Protection Coordination Sub-Committee
29-06-2017
Annexure-VI
Page 1 of 40
Complete outage of 230KV Villianur substation of Pondycherry at 1235 hrs on 19-05-2017
bull Triggering incident Failure of CT in 110kV Villianur-Kurumbapet at Villianur substation
bull 230110kV ICT-1amp2 at Villianur substation tripped on operation of backup Over current protection
bull 230KV Neyveli-Villianur and Pondy-Villianur Line got tripped from NLC amp Pondy ends on operation of DEF and Zone-3 respectively
bull Delayed clearance of fault observed from PMU plot ndash 560ms
bull Load loss 140 MW
DEF
ZONE-3
NLC TS-2 BAHUR TrsquoMARTHAN
PONDY
VILLIANUR
Annexure-VI
Page 2 of 40
Fault cleared in 560ms
Annexure-VI
Page 3 of 40
Complete outage of 400kV Uruvakonda and Jamalamadugu Stations at 1744 hrs on 31-05-2017
bull Triggering incident Tripping of 400kV Kurnool-Narnoor line-1 amp 2 and 400kV Kurnool-Jamalamadugu line-2
bull Loss of supply loss to 400kV Uruvakonda and Jamalamadugu
bull Lines out of service 400kV Gooty-Narnoor 400kV Narnoor-Jamalamadugu-1 400kV Srisailam-Narnoor 400kV Uruvakonda-Mahboobnagar-1amp2
Srisailam Narnoor
Kurnool
Ghani
Jrsquomadugu UVrsquokonda
Mbrsquongr
Gooty
Ghanapur
Igt4
Igt4 Z3
Z3
OV DT RCV
Annexure-VI
Page 4 of 40
Annexure-VI
Page 5 of 40
Kurnool Narnoor
DR trigger ndash 174418501 hrs
Ib=5kA
Zone-3 trip EL Stub optd
DR trigger ndash 173620637 hrs
Igt4 trip
3 phase Grp AB optd
Kurnool Narnoor
DR trigger ndash 174418503 hrs
Ib=5kA
Zone-3 trip EL Stub optd
DR trigger ndash 174306388 hrs
Igt4 trip
3 phase Grp AB optd
Kurnool Jamalamadugu
DR trigger ndash 174423979 hrs Vgt1 Trip
DR trigger ndash 174415040 hrs Z3 T1 DT Rcv not observed in DR amp EL
400kV Kurnool-Narnoor line-1
400kV Kurnool-Narnoor line-2
400kV Kurnool-Jamalamadugu line-2
Annexure-VI
Page 6 of 40
bull Points for discussion ndash Location of fault
ndash Zone-3 amp Igt4 trip of 400kV Kurnool-Narnoor line-1amp2
Annexure-VI
Page 7 of 40
Tripping of 220kV Idukki ndashUdumalpet line at 1702 hrs on 05-05-2017
bull B-N and R-N fault in line
bull Delayed clearance observed during 2nd fault
Idukki Udumalpet
DR trigger ndash 170200499 hrs ZONE 1 B-E 366Km
DR trigger ndash 165741849 hrs ZONE 1 B-E amp Zone-2 R-E
Idukki
Udumalpet Lower periyar
New Pallom Kalamassery
Annexure-VI
Page 8 of 40
Annexure-VI
Page 9 of 40
B-N FAULT
R-N FAULT
ZONE-2
Ar attempt
Udumalpet end DR Annexure-VI
Page 10 of 40
bull Points for discussion ndash Reason for 3 phase trip at idukki end
ndash Relay to give a 3 phase trip in the event of 2nd fault during dead time
Annexure-VI
Page 11 of 40
Tripping of 400kV Kudgi(PG)-Tumkur line-2 and Kudgi(PG)- Kudgi(NTPC) line-1 at 1605 hrs on 06-05-2017
bull 400kV Kudgi(PG)-Kudgi(NTPC) ndash line tripped at Kudgi PG end on R-N zone-1
bull 400kV Kudgi(PG)-Tumkur line tripped from both ends
Kudgi(NTPC)
Tumkur
Kudgi(PG) Narendra
Kohapur
Guttur
Kaiga
Annexure-VI
Page 12 of 40
Kudgi (PG) Kudgi(NTPC)
DR trigger 160547438 hrs Zone-1 optd R-N Ar lockout Ov pick up
FIR DR amp EL not furnished
Kudgi (PG) Tumkur
DR trigger 160546957 hrs NGR buchholz trip Dip in R-phase voltage
DR trigger 160512593 hrs DT Rcv Grp AB optd
400kV Kudgi(PG)-Kudgi(NTPC) line-1
400kV Kudgi(PG)-Tumkur line-2
Annexure-VI
Page 13 of 40
Annexure-VI
Page 14 of 40
Annexure-VI
Page 15 of 40
Annexure-VI
Page 16 of 40
Tripping of 220kV Edamon-Tirunelveli-1amp2 at 1809 hrs on 06-05-2017
bull 220kV Edamon-Tirunelveli-1amp2 tripped from Tirunelveli end only and was in service from Edamon end ZONE-1 R-B-E fault
bull Distance protection at Tirunelveli over-reached and tripped for fault in 220kV Edamom-Pothencode lines
Edamon
Sabarigiri
Tirunelveli Pothencode
Kundara
Edappon
Annexure-VI
Page 17 of 40
Annexure-VI
Page 18 of 40
Tripping of 400220 kV Ghani ICT-2amp3 at 1405 hrs on 07-05-2017
bull ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
bull Delayed clearance observed from PMU data
bull DR amp EL not furnished
Srisailam Narnoor
Kurnool
Ghani
Jrsquomadugu UVrsquokonda
Mbrsquongr
Gooty
Ghanapur
Annexure-VI
Page 19 of 40
Annexure-VI
Page 20 of 40
Tripping of 400kV Ghanapur-Mamidapalli line at 1915 hrs on 08-05-2017
bull Line tripped at Ghanapur end only and was holding from Mamidapalli
Ghanapur Mamidapalli
DR trigger ndash 191329917 hrs Z3 Main-2 opts Event logger Main-2 PSB optd ndash 191541751hrs
DR trigger ndash 191458457hrs R-N Start Breakers did not trip
Ghani
Malkaram
Ramagundam
Chpr
Mamidapalli
Nrsquosagar
Gajwel Ghanapur Khammam
Dindi
Annexure-VI
Page 21 of 40
Annexure-VI
Page 22 of 40
Tripping of 400220kV ICT-1 at Guttur at 2215 hrs on 09-05-2017
bull ICT-1 tripped on HV side only without any relay indications
bull No fault observed from PMU data
Annexure-VI
Page 23 of 40
Tripping of 400kV Narsapur-Shankarapalli at 0007 hrs on 10-05-2017
bull line tripped at Narsapur end only and holding from Shankarapalli
Narsapur Shankarapalli
DR trigger ndash 000720147hrs Zp T1 Igt3 Start Event logger 75A relay optd ndash 000720098 hrs
CB did not trip
Singareni
Shankarapalli Gajwel
Narsapur
Suryapet
Brsquoply
Rrsquogm
Annexure-VI
Page 24 of 40
Tripping of 400220kV Hyderabad ICT-4 and 220kV lines at Hyderabad substation at 239 hrs on 10-05-2017
bull Triggering incident Bus fault in 220 kV Ghanapur station
bull Observation from PMU data ndash dip observed in Y amp B phase fault cleared in 120ms
bull Elements tripped 220kV lines amp 400220 kV ICT-4
bull FIR not submitted by TSTRANSCO
Annexure-VI
Page 25 of 40
Tripping of 400220kV ICT-1 at BTPS 13-05-2017 at 1941 hrs
bull ICT-1 got tripped on operation of LV side earth fault protection during R-phase to earth fault in 220kV BTPS-Lingapur line
bull Lingapur line DR amp EL were furnished
BTPS Alipura Regulapadu
Lingapur
Annexure-VI
Page 26 of 40
Tripping of 765 kV Kurnool-Thiruvelam line-2 at 2003 hrs on 19-05-2017
bull Triggering incident Failure of R-phase LA at Thiruvelam end
Kurnool Thiruvelam
DR trigger time ndash 200318272 hrs
Main-1 trip Carrier aided trip
3 ph Grp-AB optd DT RCV
Ir ndash 3kA
Dip in Y-phase current observed
Event logger
REF optd - 200318340 hrs
DT send - 200318343 hrs
DR trigger time ndash 200318269 hrs
Zone-1 trip
Initially 1 ph trip and later 3 ph trip due to DT rcv
Event logger
DT rcv - 200318395 hrs
Raichur Kurnool NPS
Tiruvelam
Solapur
Annexure-VI
Page 27 of 40
Annexure-VI
Page 28 of 40
Tripping of 400220kV ICT-2 at Kalpakka at 1502 hrs on 20-05-2017
bull ICT-2 tripped due to operation of transformer buchholz relay
bull Reason for operation of Buchholz relay may be furnished to PCSC
Annexure-VI
Page 29 of 40
Tripping of 400220kV ICT-2 at KV Kota at 1021 hrs on 23-05-2017
bull ICT-2 got tripped due to mal-operation of transformer oil temperature indicator
bull Remedial actions taken may be furnished to PCSC
Annexure-VI
Page 30 of 40
Tripping of 220kV Kaniambeta-Kadakola line at 1350 hrs on 23-05-2017
bull Line tripped at Kaniambeta end
bull Kaniambeta feeder protection is provided through 220kV bus coupler breaker bay
bull EFR relay operated and B ph pole discrepancy relay operated leading to tripping of Bus coupler CB
bull Loss of infeed to Kaniambeta Ss
Annexure-VI
Page 31 of 40
Tripping of 400220kV ICT-1 at Somanahalli substation at 1724 hrs on 24-05-2017
bull ICT-1 at Somanahalli substation got tripped due to DC Earth fault
bull Findings amp Remedial actions taken may be furnished to PCSC
Annexure-VI
Page 32 of 40
Tripping of HVDC Gazuwaka Pole-1amp2 25-05-2017 at 0945 hrs
bull HVDC pole-1 got tripped due to operation of South filter inter zone protection and
bull HVDC pole-2 got tripped due to operation of differential protection
bull Findings amp remedial actions taken may be furnished to PCSC
Annexure-VI
Page 33 of 40
Tripping of 400kV Kayathar-Karaikudi line 25-05-2017 at 1552 hrs
bull Triggering Incident R-phase to earth fault
Kayathar Karaikudi
DR trigger time ndash 155236585 hrs
Zone-2 3 phase trip
Carrier unhealthy
DR trigger time ndash 155236592 hrs
zone-1 3 phase trip
Kayathar Kamudi Karaikudi
Pugalur
Trichy
Madurai
Annexure-VI
Page 34 of 40
Annexure-VI
Page 35 of 40
Tripping of 400220kV ICT-1amp3 at Hoody substation of KPTCL at 1230 hrs on 26-06-2017
bull ICT-1 tripped due to arc over of pre-close supervision contact of tip coil -2
bull ICT-3 got tripped on over-loading
Annexure-VI
Page 36 of 40
Annexure-VI
Page 37 of 40
Tripping of 400kV Simhadiri-Kalpakka line-2 at 503 hrs on 28-05-2017
bull Line tripped on mal-operation Teed Differential Protection at Simhadiri end and direct trip was received at Kalpakka
bull Y-Phase to earth fault had occurred in 400 kV Vijayawada-Vemagiri line-3
bull Findings amp remedial actions taken may be furnished to PCSC
Annexure-VI
Page 38 of 40
Tripping of 400kV Ramagundam-Gajwel at 0007 hrs on 29-05-2017
bull Over voltage stage-1 had operated at Gajwel end
bull Ramagundam end did not trip as direct trip was received from Gajwel
bull DR amp EL of Gajwel end not furnished
Annexure-VI
Page 39 of 40
Tripping of 400kV Gajwel-Ghanapur line at 0007 hrs on 29-05-2017
bull Line tripped on operation of over voltage protection at Gajwel and direct trip was received at Ghanapur
bull DR and EL of Gajwel end were not furnished
Annexure-VI
Page 40 of 40
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 4
Simhadri Complex Constituents responsible for LDP implementation
Timeline for LDP implementation
Line Differential Protection would be implemented in Simhadri Complex on all 400 kV lines inter-connecting Gajuwaka SS Kalpaka SS Simhadri STPP and Hinduja TPS
PGCIL (SR-I) NTPC APTRANSCO and HNPCL
December 2017
8 Installation of PMU by POWERGRID at 400kV NP Kunta
In PCSC-64 meeting held on 25052017 the following was noted
SRLDC stated that NP Kunta is a critical station where in addition to injection of large quantum of solar power reactive power control is also being exercised by way of the recently commissioned STATCOM Thus to better monitor the LVRT effects of Solar power station and functioning of STATCOM installed at NPKunta station it is necessary to have a PMU installed there To this PGCIL (SR-I) informed that provision for PMU at NP Kunta had not been envisaged in Part-I of URTDSM Further as per the decision taken in the 3rd Communication meeting held at SRPC Bengaluru the quantity of Phase-I of URTDSM project was freezed On this SRLDC mentioned that PGCIL need not procure an additional PMU for the purpose instead they can divert the PMU identified for Vijayawada to NP Kunta The issue was further discussed and in view of the stated significance of NP Kunta PGCIL (SR-I) was asked to divert PMU identified for Vijayawada to NP Kunta as part of Phase-I of URTDSM project
However in view of the difficulty expressed by PGCIL (SR-I) in shifting the (already commissioned) PMU and its associated cabling and communication modules from Vijayawada to NP Kunta the issue was again discussed by PCSC forum in the meeting During the meeting the necessity of having PMU at NP Kunta was once again emphasised It was also noted that a PMU had been identified for installation at GMR-Vemagiri as part of URTDSM project in Phase-I However as APTRANSCO and GMR had not agreed for the same the same was not yet carried out In view of above PCSC forum decided that PGCIL (SR-I) take steps to shift the PMU and associated cabling and communication interface modules identified for commissioning at GMR-Vemagiri to NP Kunta and install the same at the earliest
9 Revision of Special Protection Scheme (SPS) implemented at UPCLrsquos plant at Udupi
UPCL vide their mail dated 22052017 requested to review the SPS implemented at their plant in view of the changed grid conditions and furnished a proposal for consideration by SRPC SRLDC
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 5
In this regard the existing SPS and the proposed SPS by UPCL were discussed Existing SPS Both 400 kV lines unavailable amp Generation gt 650 Trip Unit-2 Both 400 kV line and one of the two 220 kV lines unavailable
amp Generation gt 300 MW Trip Both Units Proposed SPS Under this the following five contingencies have been considered 1 Tripping of one 400 kV line 2 Tripping of one 400 kV line with the other already tripped 3 Tripping of both 400 kV lies simultaneously 4 Overloading of any 220 kV line 5 Tripping of all Lines emanating from UPCL (Zero Power condition) The details of the proposed SPS by UPCL are enclosed at Annexure-V With regard to above it was noted that even though the proposed SPS may effectively take care of the oscillations power swings that may occur at UPCL during above stated contingencies the following concerns need to be properly addressed from the grid perspective Since the line breaker is not allowed to be tripped in the event of occurrence of power swing
(even when it enters Zone-1) and a definite possibility exists for it to be transmitted to the other adjacent connected stations it needs to be shown by conducting proper system studies that tripping of UPCL running Unit (s) by virtue of operation of corresponding SPS would act negatively on the sustenance of the power swing
It was felt that the Contingencies at 2 amp 3 can be combined since they essentially result in the same Further the reference power value assumed for comparing with actual generation to effect tripping of Unit-2 under Contingency-2 may be appropriately revised to 325 MW to avoid overloading of Varahi ndash Shimoga lines (in the extreme case of full generation at Varahi GS)
Study results for all Contingencies considered shall be shared Given the complexity of the proposed SPS issues pertaining to non-reliability of its operation may
also be suitably factored into Accordingly UPCL was requested to review the proposed SPS addressing above concerns and furnish the thus modified scheme to PCSC forum along with supporting study results
10 Auto-Reclosure Implementation on all 220 kV amp above Transmission Lines of
Southern Region
It was noted that APGENCO (Hydro) amp APGENCO (RTTP) are yet to furnish their action plan for implementing AR in their respective networks Similarly though TSGENCO (Thermal) amp TSGENCO (Hydro) had stated that they were coordinating with TSTRANSCO to obtain revised settings they are also yet to furnish Action Plan Time-frame for implementing AR It was also noted that in the Action Plan furnished by APTRANSCO feeder details were not mentioned Similarly in the Action Plan furnished by TSTRANSCO time-frame for implementing AR was not mentioned Action Plan for implementing AR is also yet to be furnished by NTPC-Ramagundam (for Tie-CBrsquos of 400 kV lines)
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 6
It was further noted that even though KPTCL had furnished the details of 220 kV amp 400 kV lines where AR is already in place the details of 220 kV lines where AR is not presently in service along with Action Plan for implementing same are yet to be furnished
All above Constituents were asked to kindly furnish required details by 08082017
Since the main issues in implementing AR are the adopted conservative protection philosophies lack of proper PLCC communication and breakersrsquo suitability supportability it is intimated in view of above that if there are no issues wrt carrier communication and breakersrsquo supportability concerned Constituents shall make efforts to implement AR immediately in their respective networks Where communication amp breaker related issues stand in the way of implementing AR concerned Constituents shall take steps to address them appropriately on priority basis and implement AR in their respective networks in a phased manner at the earliest
In the previously held PCSC meetings the following logics have been clarified for implementing AR
Normally high speed single-ph single-shot AR scheme (with simultaneous opening at both ends of feeder with a dead-time of 1 sec and reclaim-time of 25 sec) may be used by all Utilities (including Generators)
However those generators (Coal Gas Nuclear Hydro) who have concerns wrt closing on to un-cleared fault can make use of the following time-differentiated single-ph single-shot AR scheme
ldquoIn this after a line has been opened from both ends (generator end amp grid end) on AR operation the grid end will be auto-reclosed as usual after the elapse of its dead-time (say 1 sec) However the generator end relay will check for the line voltage after elapse of an extended dead time say 15 sec [here the additional time delay of 05 sec which has been included as a safety margin shall be so chosen that the extended dead-time is less than the adopted Pole Discrepancy time delay] If the line voltage so sensed is healthy amp normal (which implies that the fault has already been cleared) then generator end will be auto-reclosed else 3-ph trip will be given at generator end to open the other two phase polesrdquo Further wherever Trip-on-Reclose (ToR) feature is available at grid-end station it shall be configured such that it sends Direct Trip (DT) command to generator end upon its operation
It is also clarified that the above scheme can be as it is used to Line-CBrsquos of all bus configurations (including Main-CBrsquos of one-and-half breaker bus configuration) For Tie-CBrsquos in one-and-half breaker configuration employing priority scheme (which also happens to be the recommended practice) above logic is not be required since the employed priority scheme anyway checks for CLOSE_STATUS of Main-CB before closing Tie-CB However if required the above logic can be applied to Tie-CBrsquos also by adopting a suitable extended dead-time considering the remote end stationrsquos AR dead time
It is further clarified that AR functionality for a transmission line shall be preferably put into service using (i) Bay Control Unit (BCU) or (ii) separate External AR Relay Where these are not available only then should the AR functionality of Main protection relays of lines be used
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 7
Here it is assumed that both Main-relays are deriving their Voltage Input from the Line CVTrsquos (from different cores as per the recommended practice) However if this is not the case and the concerned Utility has a practice of using Line-CVT voltage input to one of the Main relays and Bus-CVT voltage input to the other Main relay it is recommended that voltage input to be used in time-differentiated AR logic shall be exclusively derived from the line-CVT for use in both the Main relays
It is also clarified that AR implementation is not required in case of radial feeders cables amp composite feeders and is optional for the lines interconnecting two generating stations
In addition to above the following logics (applicable to the Cases where AR is being proposed to be implemented from Main Protection Relays) are also intimated for the benefit of the Constituents
Since there are two Main protection relays (Main-I and Main- II) to decide upon proper way of implementing AR for achieving fool-proof AR operation it has been advised that instead of implementing AR from only one of the Main relays (in light of its low success rate) the following Alternatives be considered Alternative ndash 1 AR is implemented and kept functional from Main ndash I [Main-II] only but with feedback from Main-II [Main-I]
In this scheme AR is implemented and kept in service from Main-I [Main-II] as usual
Additionally Main-II [Main-I] relay is configured for single-pole (1-ph) tripping and the OPEN (TRIP) status of the concerned trip relay is used for triggering AR functionality in Main-I [Main-II] By this even if the fault is not sensed in the beginning by Main-I [Main-II] but sensed by Main-II [Main-I] AR operation is guaranteed However it may be noted that in cases of permanent faults this scheme may result in unsuccessful AR operation with Pole Discrepancy Relay coming to rescue if the fault is not sensed by Main-I [Main-II] but by Main-II [Main-I] at the time of auto-reclosing instant
Alternative ndash 2 AR is implemented and kept functional from both Main ndash I and Main-II
In this scheme AR is implemented and kept in service from both Main ndash I and Main-II as
usual As can be seen the scheme is reliable and is without any additional logics However to avoid the possibility of both relays racing for CLOSE-OPEN-CLOSE-OPEN operation in case of permanent faults it shall be ensured that along with other conditions ldquoAR BLOCK with 3-ph TRIPrdquo is also effected for the same phase fault as the original one that occurs during AR dead-time
Out of the above two also it has been suggested to consider Alternative-2 for implementing AR in view of its higher success rate
11 Network Configuration Changes
As per the information furnished by SR-Constituents to the OCC forum in their 132nd meeting (held on
09062017 Minutes circulated on 04072017) it is formed that the following configuration changes (additions deletions modifications of transmission elements) took place in the southern grid during
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 8
April 2017
Two STATCOMs (+- 50 MVAR Each) at NP Kunta commissioned on 16052017
Kudgi Unit I 72 Hrs trail run completed Successfully
400 kV Shankarapally-Suryapet I amp II commissioned on 05052017
22033kV SS at Hayathnagar IampII in Ranga reddy district of 50 MVA Capacity was commissioned on 03052017 by TSTRANSCO
SR II Power grid vide letter dated 10062017 had informed that consequent to the successful completion of Trial Operation the following assets under transmission system associated with ldquoSystem strengthening ndashXX in Southern Regional Gridrdquo have been put under Commercial Operation wef 0000 hrs of 10062017 in terms of clause 4 of CERC (Terms and Conditions of Tariff Regulations 2014)
1 x 500 MVA 40022033kV ICT at Trichy Substation along with associated bays and equipments
SR I Power grid vide letter dated 04062017 had informed that consequent to the successful completion of Trial Operation the following assets of ldquoTransmission System for Ultra Mega Solar Park in Anantapur Dist Andhra Pradesh- Part ndash A (Phase-I)rdquo have been put under Commercial Operation wef 0000 hrs of 04062017 in terms of clause 4 of CERC (Terms and Conditions of Tariff Regulations 2014)
+- 100 MVAR STATCOM at NP Kunta Pooling Station along with associated bays and equipment
12 Instances of SPS Operation
Based on the information furnished by SRLDC it is informed that there occurred no SPS operations in SR during the period 25052017 ndash 28062017
13 Status of Implementation of Protection Audit Recommendations (Phase-I amp Phase-II)
With reference to the petitions filed by KSEB (88MP2016) and KPTCL (135MP2016) for seeking further time-extension for completing their respective Protection Audit Recommendations (PAR) the final Order of Honrsquoble CERC disposing of petitions was issued on 15122016 In this Order the Commission apart from granting last-chance time-extensions to various SR-Constituents had also directed SRPC to monitor the status of completion of PAR regularly in PCSC meetings and submit bi-monthly report to the Commission confirming the completion of Phase-I and Phase-II of PAR of the Constituents of Southern Region
In this regard based on the information furnished various Constituents a summary table showing the
compliance status of various SR-Constituents as in July 2017 is given below
SlNo
Constituent
PAR (Phase-I) Activities
PAR (Phase-II) Activities
PAR (Ph-I amp Ph-II) Compliance ()
Remarks
Stipulated Completion
Date
Stipulated Completion
Date
1 APGENCO (Hydel)
31122017 31122017 40 ---
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 9
2 APGENCO (Thermal)
30072017 --- 75 Based on the status furnished timeline for complying with the remaining pending recommendations (3 in no) is expected by 31122017
3 APTRANSCO 31032017 --- 9571 Out of the 3 remaining pending recommendations two are expected to be completed in three months while the other is expected by 31122017
4 TSGENCO (Hydel)
31032017 31032017 8823 Based on the status furnished timeline for complying with the remaining pending recommendations (4 in no) is expected by 31122017
5 TSGENCO (Thermal)
31032017 31032017 80 Based on the status furnished timeline for complying with the remaining pending recommendations (3 in no) is expected by 31072017
6 TSTRANSCO 31032017 31032017 8523 Based on the status furnished timeline for complying with the remaining pending recommendations (13 in no) is expected by 30092017
7 KPCL --- 31112016 100 ---
8 KPTCL 31052017 31052017 2817 Based on the status furnished timeline for complying with the remaining pending recommendations (51 in no) is expected by 30092017
9 TANGEDCO 31122017 31122017 6389 ---
10 TANTRANSCO 31122017 31122017 50 ---
11 KSEB 30112016 31122017 9481 ---
12 NPCIL (MAPS) 31012017 --- 8889 Based on the status furnished timeline for complying with the remaining pending recommendation (ONE in no) is expected by 31122017
All above SR-Constituents are requested to adhere strictly to the time-lines given in the Order for
completing their respective pending PAR The IPPrsquos for whom there are pending PAR [viz Spectrum PGL GMR Barge - Kakinada Konaseema GPL APGPCL Vijjeswaram (Stage-I amp Stage-II) amp LANCO-Kondapalli PL] are also requested to complete them at the earliest
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 10
14 Nomenclature for naming various files uploaded in web-based Tripping Monitoring
System of SRLDC Portal
The nomenclature to be followed by the Constituents in naming various files (FIR DR EL TR) corresponding to a tripping incident was brought out in the SRPC letter No SRPC SE-III PCSC-45 4609 ndash 649 dated 26062015 and in the minutes of PCSC-45 issued vide SRPC letter No SRPCSE-III PCSC-45 2015 5422-455 dated 21072015 As illustrated therein the format to be followed for the user entered part-name is given below
Transmission Element File Name to be given by the user
Transmission Line SSN_DSN_line_FT
Inter-connecting Transformer SSN_ICT_FT
Generating Transformer SSN_GT_FT
Generating Unit SSN_Unit_FT
Where SSN = Source Station Name From end Station Name Sending end Station Name DSN = Destination Station Name To end Station Name Receiving end Station Name FT = File Type (FIR DR EL TR)
All SR-Constituents are requested to kindly intimate the above file naming nomenclature to all the concerned and ensure that it is strictly followed at all the stations in their respective control areas so that tripping analysis can be done systematically
15 Date amp Venue of the next PCSC Meeting
It is informed that the 66th meeting of PCSC will be held on 17th August 2017 (Thursday) from 1030 hrs onwards in the Conference Hall of SRPC Secretariat Bengaluru
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 132
Analysis of Grid Occurrences - 65
I Details of Grid Disturbances
Sl No
Details of Event Date amp Time Reason Remarks Category
1
Complete outage of 230 kV Villianur Substation of Pondicherry
19-05-2017 at 1235 hrs
Triggering incident was failure of CT in 110 kV Villianur-Kurumbapet at Villianur substation 230KV Villianur ndash NLC2 and 230 kV Villianur - Pondy lines got tripped from Pondy end (on operation of DEF) and NLC end (on operation of Zone-3) respectively resulting in loss of supply to 230 kV Villianur substation
Load Loss 140 MW
GD-1
SLD
The single line diagram of 230 kV Villianur SS as furnished by PED is attached at the end 230 kV Villianur ndash Pondy line Villianur (PED) end
As per FIR TR line was kept holding
The following was also stated in FIRTR
Remedial action Relay testing amp calibration proposed during total shutdown on 13062017
DR amp EL not furnished Pondy (PGCIL-SR2) end
As per FIRDRELTR line tripped at 123559270 hrs on B-E fault due to DPR Z3 (98 km 156 kA) operation From DR amp EL Z3 time delay was observed to be about 06 sec
230 kV Villianur ndash NLC2 line Villianur (PED) end
As per FIR TR line was kept holding
The following was also stated in FIRTR
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 232
Remedial action Relay testing amp calibration proposed during total shutdown on 13062017
DR amp EL not furnished NLC2 (NLCIL) end
As per FIRDRELTR line tripped at 123551016 hrs on B-E fault due to DEFR operation From DR amp EL DEFR time of operation was observed to be about 07 sec
Time sync of Protection relays with GPS at NLC TPS-II needed to be ensured SRPC SRLDC
It was noted that the triggering incident was failure of B-ph CT in 110 kV Villianur-Kurumbapet line at Villianur SS
It was noted that for the above fault distance protection at Villianur end on 110 kV Villianur-Kurumbapet line had not operated probably due to absence of current input (hence impedance becoming infinite)
Further since there was no busbar protection to 110 kV buses the fault continued to be fed from the remote ends (Pondy-PG and NLC-2) through 100 MVA Transformers (Txr ndash 1 amp Txr ndash 2)
So the transformersrsquo back-up protections were called into action But since OC protections provided on both HV amp LV sides had no high-set Units and since they were kept non-directional [Relay make ER TJM 10] LV (110 kV) side OC protections of both transformers had acted to give trip command Even though the 110 kV CB of Txr ndash 1 got opened that of Txr-2 had not opened due to which the fault continued to be fed from the remote ends (Pondy-PG amp NLC-2)
It was noted that the HV (230 kV) side OC protection of Txr-2 which was supposed to act under above situation had NOT acted
Due to above the remote end back-up protections were called into action
It was noted that even though Pondy-PG end CB tripped on DPR Z3 protection the time delay observed was on the lower side of about 06 sec
It was also observed that DEF protection had acted to trip its CB at NLC-2 without giving any chance for its distance protection to operate
In view of the above observed inconsistencies at Villianur SS it was decided to review various feeder amp transformer protections kept at Villanur SS during its scheduled protection audit on 10072017
Subsequently protection audit of 230 110 kV Villianur SS of PED was conducted on 10072017 during which several lacunae were noted Accordingly a comprehensive set of recommendations were given to PED for early compliance
Recommendations
PED to furnish an action taken report wrt complying with the protection audit recommendations PGCIL (SR-II) to review Zone-3 and DEF protection setting at Pondicherry end 230 kV Pondicherry ndash
Villianur and 230 kV Pondicherry ndash Bahour line and set them appropriately to achieve required
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 332
time-coordination with OC protections of ICTrsquos at Villianur SS NLCIL to keep DEF protection in blocked condition as long as Distance Protection is active and
configure it to become active only when distance protection does not pickup to avoid time-coordination issues
2
Complete outage of 400kV Uravakonda and Jammalamadugu Substations
31-05-2017 at 1744 hrs
Triggering incident was tripping of 400 kV Kurnool-PG - Narnoor line - 1 amp 2 and 400 kV Narnoor-Jamalamadugu line-2 which led to loss of supply to 400kV Uravakonda and Jamalamadugu 400kV Gooty-Narnoor 400kV Narnoor-Jamalamadugu-1 400kV Srisailam-Narnoor 400kV Uruvakonda-Mahboobnagar-1amp2 were out of service in antecedent condition
Gen Loss 500 MW
GD-1
FNN not followed by APTRANSCO FIR amp TR in prescribed formats not furnished by APTRANSCO SLD
The single line diagram 400 kV Jammalamadugu SS as furnished by APTRANSCO are attached at the end
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 432
Antecedent Conditions
The following lines were kept out of service 400kV Narnoor-Srisailam SC line 400kV Narnoor-Gooty SC line 400kV Narnoor-Hyderabad SC line 400kV Narnoor-Jamalamadugu-1 line 400kV Uravakonda-Jamalamadugu-1 line 400kV Uravakonda-Mahboobnagar line-1amp2
Above means Uravakonda SS and Jammalamadugu SS were effectively hanging on to 400 kV Jamalamadugu - Narnoor line-2 for supply
A Tripping of 400 kV Kurnool (PG) - Narnoor line-1 Kurnool-PG (PGCIL-SR1) end
As per FIRTR line tripped at 174418601 hrs due to DPR Z3 (5703 km) operation
As per DREL line tripped at 174418601 hrs due to Stub Protection operation Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 173620637 hrs due to operation of Igt4 (B-ph) protection
From EL Igt4 time delay was observed as 100 msec
Time sync of protection relays with GPS needed to be ensured B Tripping of 400 kV Kurnool (PG) - Narnoor line-2 Kurnool-PG (PGCIL-SR1) end
As per FIRTR line tripped at 174418601 hrs due to DPR Z3 (5703 km) operation
As per DREL line tripped at 174418601 hrs due to Stub Protection operation Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 174306388 hrs due to operation of Igt4 (B-ph) protection
From EL Igt4 time delay was observed to be about 100 msec
Time sync of protection relays with GPS needed to be ensured C Tripping of 400 kV Narnoor ndash Jammalamadugu line-2 Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 174423979 hrs due to OVR-I operation (From EL OVR-I Time delay was observed as 5 sec which is in line with SRPC provided gradings)
Jammalamadugu (APTRANSCO) end
As per FIR line tripped at 1744 due to DT receipt from Narnoor end
As per DR line tripped at 174415040 hrs (Type of Protection operated was not recorded)
In EL events recording started from 174424037 hrs Line was observed to have got tripped around this time due to 862 operation (Type of Protection operated was not recorded)
Time sync of Protection relays with GPS needed to be ensured SRPC SRLDC
As informed by APTRANSCO it was noted that the triggering cause for operation of Stub protection Igt4 protection was a line fault on 400 kV Ghani ndash Narnoor line-1 Even though Ghani end had tripped on DPR Z1 protection and sent carrier to Narnoor due to unhealthiness of carrier communication (PLCC related issues) Narnoor end tripped on DPR Z2 protection
The above fault was seen by relays at both ends of 400 kV Narnoor ndash Kurnool-PG lines 1 amp 2 (the relays of P444 make are owned by PGCIL-SR1 and the relay settings were also provided by PGCIL-SR1)
As in formed by PGCIL (SR-I) it was noted that there was an instantaneous non-directional Igt4 protection setting in the specific relay style (defined by relay make model and version) which operates without checking for isolator status During the above instant the flow of heavy fault
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 532
current led to its operation both ends
To this PGCIL (SR-I) was informed that by default Igt4 or stub protection is configured for instantaneous operation with corresponding isolator open position interlock So further instantaneous high-set functionality that operates without checking isolator positional status is not desirable since it can lead to unwarranted trippings as in the present case Therefore the said setting shall be kept disabled If there is no provision to effect this (by means of changing relay settings) the issue may be referred to its OEM for obtaining modified firmware suitable solution PGCIL (SR-I) can also make use of other relays with different style in place of the existing relays
Recommendations
For 400 kV Ghani ndashNarnoor line the following shall be carried out by APTRANSCO End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced PGCIL (SR-II) to take appropriate action wrt disabling non-directional instantaneous Igt4 protection
that operates without checking existence of stub If required the issue may be referred to relays OEM for appropriate solution or the present relays may be replaced with other relays with different styles that donrsquot have the issue observed
II Details of Grid Incidents
Sl No Details of Event Date amp Time Reason Category
1 Tripping of 220 kV Idukki ndashUdumalpet line
05-05-2017 at 1702 hrs
Line tripped due to B-N and R-N fault in line
GI-1
Idukki (KSEB) end
As per FIRDREL line tripped (in 3-ph) at 170200500 hrs on B-E fault due to operation of DPR Z1 (3661 km) protection
Udumalpet (TANTRANSCO) end
As per FIRDRELTR line tripped (in B-ph) at 165741907 hrs on B-E fault due to DPR Z2 (CAT AR 1025 km) operation However during AR dead-time another R-E fault was detected at 165742252 hrs in Zone-2 due to which line tripped in 3-ph after Z2 time delay of 350 msec at 165742594 hrs [It may be noted that all this happened during the AR dead-time]
Time-sync of Protection Relays with GPS needed to be ensured at 220 kV Udumalpet SS KSEB
During the instant case line did not try for AR as the external VARM AR relay was faulty and kept out of service
Remedial action Problem with VARM relay had been rectified and put into service on 10052017
SRPC SRLDC
From the DR of Udumalpet it can be seen that the relay had tried for AR even after giving three phase trip during AR dead-time due to occurrence of two different faults which is not desirable
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 632
Recommendations TANTANSCO to correctly configure AR logic at Udumalpet so that in the event of 3-ph trip being
given during AR dead-time the relay will not try for auto-reclosure TANTRANSCO to keep AR dead-time as 1 sec for all 220 kV amp above transmission lines
2
Tripping of 400 kV Kudgi (PG) - Tumkur line-2 and Kudgi (PG) ndash Kudgi (NTPC) line-1
06-05-2017 at 1605 hrs
Kudgi (NTPC) feeder tripped at Kudgi (PG) end on operation of distance protection R-N Zone-1 Tumkur feeder tripped at Kudgi(PG) end on operation of NGR buchholtz relay
GI-2
SLD
The single line diagram of 765 400 kV Kudgi-PG SS as furnished by are attached at the end 400 kV Kudgi (PG) ndash Kudgi (NTPC) line-1 Kudgi (PGCIL-SR2) end
As per FIRDRELTR line tripped (in 3-ph) at 160547499 hrs on R-E fault due to DPR Z1 (M1 79 km 013 kA M2 88 km 318 kA) operation
Kudgi (NTPC) end
FIRDRELTR not furnished 400 kV Kudgi (PG) ndash Tumkur line-2 Kudgi (PGCIL-SR2) end
As per FIRDRELTR line tripped (in 3-ph) at 160547450 hrs due to operation of NGR Buccholtz trip protection
Tumkur (PGCIL-SR2) end
As per FIRELTR line tripped (in 3-ph) at 160547596 hrs due to DT receipt from Kudgi-PG end
In DR this time was mentioned as 160512593 hrs
Time-sync of protection relays with GPS needed to be ensured PGCIL (SR-II)
With regard to tripping of 400 kV Kudgi (PG) ndash Kudgi (NTPC) line ndash 1 and AR non-operation it was informed that prior to above fault there were multiple faults on all four lines between Kudgi (PG) and Kudgi (NTPC) due to prevailing stormy weather
Remedial action Actual reasons for AR failure in the instant case were being investigated The issue was also
referred to its OEM for suitable advice
With regard to tripping 400 kV Kudgi (PG) ndash Tumkur line ndash 2 it was suspected that NGR Buchholtz relay might have mal-functioned as there was no gas collected in the bucholtz relay of NGR It may be noted that NGR buchholtz trip is present in REF relay
Remedial action Oil sample of NGR taken and sent to RTDC
Recommendations PGCIL (SR-II) to sort out AR related issues at Kudgi (PG) end on 400 kV Kudgi (PG) ndash Kudgi (NTPC)
lines and put AR into service PGCIL (SR-II) investigate the reasons for NGR Buccholtz trip on 400 kV Kudgi (PG) ndash Tumkur line-2
and furnish an action taken report wrt rectifying the same
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 732
3 Tripping of 220 kV Edamon-Tirunelveli lines - 1amp2
06-05-2017 at 1809 hrs
220kV Edamon-Tirunelveli - 1amp2 tripped from Tirunelveli end only and was in service from Edamon end
GI-1
Edamon (KSEB) end
As per FIR line was kept holding from Edamon end Tirunelveli (PGCIL-SR2) end
As per FIRDRELTR lines tripped (in 3-ph) at 180921343 hrs on R-B fault due to DPR Z1 (532 km) operation
It was stated in TR that Edamon ndash Pothencode lines 1 amp 2 had tripped around the same time and it was suspected that DPRrsquos at Tirunelveli end on 220 kV Tirunelveli ndash Edamon lines 1 amp 2 might have over-reached for the fault in 220 kV Edamon - Pothencode lines
PGCIL (SR-II)
The instant case was a typical case of overreaching of distance relays at Tirunelveli being experienced for quite a while It may be probably due to bunching of the conductors involved
Remedial action It was proposed to modify Z1 setting as 50 of line impedance with POR and would be done
within one-week time They had also proposed to measure the actual line impedance of the line and adjust Z1 settings
accordingly
06-03-2017at 0607 hrs
4 Tripping of 400220 kV Ghani ICT-2amp3
07-05-2017 at 1405 hrs
ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
GI-2
FNN not followed by APTRANSCO FIRrsquos in prescribed format not furnished by APTRANSCO SLD
The single line diagrams of 400220 kV Ghani SS as furnished by APTRANSCO is attached at the end Tripping of 500 MVA 400 220 kV ICT-2
As per FIR ICT-2 tripped at 1405 hrs due to operation of Y-ph OC amp EF protections
DR amp EL not furnished Tripping of 500 mVA 400 220 kV ICT-3
As per FIR ICT-3 tripped at 1405 hrs due to operation of Y-ph OC amp EF protections
DR amp EL not furnished SRPC SRLDC
When enquired about the reasons for operation of back-up protections of ICTrsquos ndash 2 amp 3 APTRANSCO replied that there was actually a fault on the 220 kV feeders emanating from 400 220 kV Ghani PS However since the CT Neutral connection setting had been wrongly set as ldquoTowards Bus siderdquo instead of the correct ldquoTowards Transformer siderdquo the back-up protections on 220 kV side operated for the said 220 kV line fault
APTRANSCO also informed that first ICT-2 tripped followed by ICT-3
But since it was not clear from the above explanation whether line protection on 220 kV side had operated or not and the delayed clearance of the fault observed during the incident (about 400 msec) APTRANSCO was asked to investigate the reasons for the same
APTRANSCO was also asked to check whether carrier aided protection is healthy on 220 kV lines emanating from 400 220 kV Ghani PS
07-03-2017 at 1602 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 832
Recommendations APTRANSCO to check and correct all CT Neutral Connection settings in various protection relays at
their 400 220 kV Ghani PS APTRANSCO to ensure that PLCC carrier aided protection is maintained healthy on 220 kV lines
emanating from their 400 220 kV Ghani PS APTRANSCO to take steps to complete configuration works of DRrsquos amp ELrsquos of various protection
relays at their 400 220 kV Ghani SS and furnish the same as and when required in compliance of IEGC Regulation 52 (r)
5 Tripping of 400 kV Ghanapur-Mamidapalli line
08-05-2017 at 1915 hrs
Line tripped at Ghanapur end only and was holding from Mamidapalli Ghanapur end protection had sensed R-phase to earth fault
GI-2
Mamidipalli (TSTRANSCO) end
As per FIR line was kept holding from Mamidipalli end
In DR R-E fault current (2894 kA) along with dip in R-ph voltage could be seen but if any protection relay had picked could not be verified Also EL furnished did not contain events for this time (In fact no events were found recorded after 160610859 hrs)
Ghanapur (PGCIL-SR1) end
As per FIRTR line tripped (in 3-ph) at 1915 hrs on R-E fault due to DPR Z1 (49 km 2547 kA) operation
As per DR line tripped (in 3-ph) at 191330020 hrs on R-E fault due to 3-ph Group-B Trip relay operation (Zone-3 pick-up also could be observed)
As per EL line tripped (in 3-ph) at 191541722 hrs on R-E fault due to 3-ph Group-B Protection Trip relay operation
Time-sync of protection relays with GPS needed to be ensured
When enquired about the reasons for observed discrepancies PGCIL (SR-I) informed that line tripped on operation of distance protection Since last 2-3 trippings permissive carrier was not being received at Mamidipally end
Further since PLCC at both ends belong to TSTRANSCO thorough check-up of PLCC carrier communication and tuning of PLCC link needed to be undertaken
For above one-day shut-down of line was requested to which SRLDC agreed
Recommendations For the line under consideration the following shall be carried out by TSTRANSCO in coordination
with PGCIL (SR-I) End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
08-03-2017 at 1033 hrs
6 Tripping of 400220kV ICT-1 at Guttur
09-05-2017 at 2215 hrs
ICT-1 tripped on HV side only without any relay indications GI-2
As per FIRTR ICT-1 tripped at 2215 hrs only on HV side without any relay indications KPTCL
ABB make RXMS trip relays provided in various lineICT panels were found to be mal-operating and the phenomenon observed was suspected due to raise in earth potential during any fault in Guttur substation
10-03-2017 at 1801 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 932
Remedial action Action wass being taken to provide 10kΩ resistor in series with the RXMS relay coil for all trip
relays of this type at Guttur Total 170 nos of such resistors were required Now purchase formalities were finalised and work of supply and fixing of resistors would be taken up and completed within a monthrsquos time
7 Tripping of 400 kV Narsapur-Shankarapalli line
10-05-2017 at 0007 hrs
Line tripped at Narsapur end only on B-Phase to earth fault and line did not trip from Shankarapalli
GI-2
SLD
Shankarapally (TSTRANSCO) end
As per FIR line was kept holding from Shankarapally end Narsapur (TSTRANSCO) end
As per FIRDREL line tripped in 3-ph at 000720105 hrs on B-E fault due 86 Trip relay (130 km) operation
The type of protection operated was not recorded shown in either DR or EL
TR not furnished TSTRANSCO
For the fault on 400 kV Shankarapalli-Mamidapalli line Narsapur end picked up in Z3 However due to configuration issues relating to programmable Zone Zp (this was being used as Zone-3 and its time-setting was found to be kept as zero sec) it tripped instantaneously instead of tripping after Zone3 time delay
Remedial action PSL Configuration for Zp was set right on 01-06-2017
13-03-2017 at 2347 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1032
8
Tripping of 400220 kV Hyderabad ICT-4 and 220 kV lines at Hyderabad substation
10-05-2017 at 239 hrs
Operation of busbar protection due to fault in 220 kV Bus at 220kV Hyderabad Substation
GI-1
SLD
1 2 1 2
Bus-1
Bus-2
x
xx
x
BUS BAR ACTED AT 220KV GHANAPUR SS ON 10-05-2017
CHANDRAYANAGUTTA HAYATHNAGAR
132KV BUS
160MVA-3 100MVA-1
400kV PGCIL
x x
160MVA-2ICT-1 ICT-2 ICT-3
NAGOLE
x x
ICT-4
x
MOULALI
INFOSYS
x
x
1 2
Y-Ph disc
flash over at
LocNo95
Y amp B-Ph
disc flash
over at
LocNo95
RELAY INDICATIONS ON THE FEEDER
AT GHANAPUR END AT CHANDRAYANGUTTA END
Chandrayangutta-I feeder Ghanapur-I feeder
Main-1 relayYNZ1 071kM Main-1 relayYN254kM
Main-2 relayYNZ1 09kM Main-2 relayYN
Chandrayangutta-II feeder Ghanapur-II feeder
Main-1 relayYB Z1378kM Main-1 relayRYB
Main-2 relayYBZ111kM Main-2 relayRYB
BC
14-03-2017 at 1911 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1132
Tripping of ICT-4
As per FIR ICT-4 tripped at 0240 hrs on 220 kV side only due to BBP operation on 220 kV Bus
As per DR ICT-4 tripped at 220941165 hrs apparently due to LBB operation
EL not furnished
Date amp Time-sync of DR not in order (09052017 220940682 hrs)
TR furnished did not contain any analysis or remedial action taken
It was noted that BBP for 220 kV Bus-2 had operated for a close-in line fault on 220 kV Chandrayanagutta line-2 tripping ICT-4 and other connected 220 kV feeders (It was informed that ICT-2 was not in service at the time of instant tripping)
When enquired about the reasons TSTRANSCO informed that presence sudden appearance of current in the corresponding Peripheral Unit (PU-2) of the Chandrayanagutta line-2 had led to BBP operation And the reasons for the same were being investigated
To this it was suggested to check corresponding CT neutral connection integrity of cable wiring from CT to Busbar panel as also carry out stability-check of busbar protection
Recommendations TSTRANSCO to investigate the reasons for BBP operation for 220 kV Bus-2 and furnish a report on
the remedial measures taken
9 Tripping of 400220 kV ICT-1 at BTPS
13-05-2017 at 1941 hrs
ICT-1 got tripped on operation of LV side earth fault protection during R-phase to earth fault in 220 kV BTPS-Lingapur line
GI-1
SLD
The single line diagram of 400220 kV BTPS as furnished by KPCL is attached at the end
As per FIRTR ICT-1 tripped at 1942 hrs on LV side earth fault protection due to fault in 220 kV BTPS ndash Lingapur line It was stated that the line also tripped around the same time on R-E fault due to DPR Z1 (2438 km) operation
DR amp EL pertaining to ICT-1 tripping not furnished
As per furnished DREL 220 kV BTPS ndash Lingapur line tripped from BTPS end at 194124719 hrs due to DT receipt from the remote end
KPCL
ICT-1 tripped due to non-directional sensitive earth fault protection provided on LV (220 kV) side
Remedial action The time lever for above protection was increased from 0025 to 01 in the third week of May
2017 in consultation with KPTCL KPTCL
220kV BTPS- Lingapur line tripped at both the ends with following indications At BTPS Lingapur Line tripped on DPRZone-1RN24km78kA
At Lingapur BTPS line tripped on DPRZone-2RN66km29kA
It was reported that 315MVA ICT-1 tripped on LV side earth fault protection along with Lingapur line
Remedial action Existing settings of ICT back up protection is obtained from local RT wing of KPTCL for review
Revised settings communicated to KPCL for implementation
16- 03-2017 at 0118 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1232
SRPC SRLDC
Since the ICT has been provided with normal back-up directional OC amp EF protections a separate non-directional sensitive earth fault protection is not desirable hence the need for the same may be reviewed Otherwise its time lever shall be suitably increased to a higher value (say 035) so as not to cause unwarranted trippings
Further tripping of 220 kV BTPS ndash Lingapura line from BTPS end on DT receipt was not in order
When enquired about the reasons for AR non-operation in the instant case for the above line KPCL replied that there were issues with PLCC carrier communication hence it was kept out of service
Recommendations KPCL to review the need for providing separate non-directional sensitive earth fault protection for
ICTrsquos at their BTPS station and take steps to disable the same For 220 kV BTPS ndashLingapura line KPCL to resolve issues relating to PLCC carrier communication and
put AR into service
10 Tripping of 765 kV Kurnool-Tiruvalam line-2
19-05-2017 at 2003 hrs
Failure of R-phase LA at Tiruvalam end REF operation and DT send were observed from EL of Kurnool station
GI-2
Kurnool (PGCIL-SR1) end
As per FIRTR the line tripped in 3-ph at 200318272 on R-B-E fault due to DPR Z2 (CDistance = 912) operation
As per DR line tripped in 3-ph at 200318272 hrs on R-E fault (B-E fault did not appear to be strong) due to DPR Z2 (CAT) operation and 3-ph Group - A amp B Trip relay operation (In DR DT receipt event was observed around the same time)
In EL REF protection operation of PU-P141 operation and DT_SEND to the remote end was observed at 200318340 hrs
Tiruvalam (PGCIL-SR2) end
As per FIRDRELTR the line tripped in 3 ph at 200318269 on R-E fault due to DPR Z1 operation and DT receipt from the remote end
It was stated in TR that 707 RLA (Reactor LA) had fallen down due to heavy wind and caused R-E fault
When enquired about the reasons for REF protection operation and consequent sending of DT to the other end PGCIL (SR-I) informed that the fault was detected as R-B-E fault hence three-phase trip was given However even though Main-CB got opened with its three poles opening simultaneously Tie-CB got opened in R-ph immediately while the other two phase poles took a while to open This had caused Tie-CB LB operation Since this protection was implemented in REF relay trip was extended from the same along with sending of DT to the other end
To this it was pointed out that in the instant case only R-E fault was apparent and the current in B-ph was almost at the normal value hence the sensitivity of distance relay zone elements may be checked Further Tie-CB LBB operation points to sluggishness of the CB-poles hence the opening time of tie-CB may be checked and properly set
It was also noted that in the EL of Tiruvalam DT Send event was observed after tripping of the line on R-E fault PGCIL (SR-II) was asked to look into the reasons for the same and take suitable remedial action
16-03-2017 at 1023 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1332
11 Tripping of 400220 kV ICT-2 at Kalpaka SS
20-05-2017 at 1502 hrs
ICT-2 tripped due to operation of Transformer Buchholtz relay
GI-2
As per FIR ICT-2 tripped at 15053283 hrs due to its Buccholtz relay operation It was stated in FIR that heavy rain amp gale had been reported at the time of tripping
APTRANSCO
Just prior to above tripping event station transformer supply went off When the supply came back the two oil cooling pumps which were supposed to start one after another with a time gap of 15 sec had started simultaneously due to problem in the timer module Due to this there was a sudden flow of oil which shorted the contacts of the micro-switch that gives buchholtz trip
Remedial action The faulty timer module of oil cooling pump had been replaced
On this SRPC asked for the details of AC auxiliary supply about its redundancy details of DG-set and the mode of starting (manual or auto) To this APTRANSCO informed that redundancy for AC auxiliary supply is present and the lost supply during the instant case had been restored immediately
Recommendations
APTRANSCO to furnish AC auxiliary supply details including its redundancy DG set details and its mode of starting at their 400 220 kV Kalpaka SS Further corresponding AC auxiliary supply changeover scheme drawing shall also be furnished
16-03-2017 at 1132 hrs
12 Tripping of 400220 kV ICT-2 at KV Kota SS
23-05-2017 at 1021 hrs
ICT-2 got tripped due to mal-operation of transformer oil temperature indicator
GI-2
As per FIR ICT-2 tripped at 1021 hrs on both HV and LV sides due to transformer oil temperature indicator mal-operation
As per EL ICT-2 tripped at 1019XXXXX192 hrs on due to operation of OTI protection
It was stated that DR had not been triggered for the event
Time-sync of protection relays with GPS needed to be ensured
EL was not configured to show SECONDS in time-stamp of the events (This had been brought to APTRANSCOrsquos attention in previous PCSC meetings also)
APTRANSCO
At KV Kota SS OTI got stuck While checking the same its position indicator got changed and mal-operated resulting in 3-ph trip
Remedial action Ms CGL had visited the substation and declared the relay faulty It was proposed to replace the faulty OTI on 10072017
APTRANSCO was asked to configure Event Loggers at their KV Kota SS properly so that SECONDS are also displayed in the time stamp of the events recorded
16-03-2017 at 1245 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1432
13
Tripping of 220 kV Kaniampeta - Kadakola line (Load Loss at Kaniampeta = 36 MW)
23-05-2017 at 1350 hrs
EFR relay operated and B-ph pole discrepancy relay operated leading to tripping of Bus-Coupler CB
GI-1
Kaniampeta (KSEB) end
As per FIR in Kaniyampetta 220 kV substation all transformers tripped (Load loss 36 MW) at 1339 hrs due to the tripping of 220 kV Kaniyampetta-Kadakola feeder (B phase) at Kadakola end Later 220 kV Kaniyampetta-Kadakola feeder was hand tripped at 1426 hrs from Kaniyampetta end
Kadakola (KPTCL) end
As per FIR line tripped at 1350 hrs due to EFR operation of Bus-Coupler CB and PDR operation
It was also stated that at the time of tripping Kaniampeta panel had been taken up for RampU work hence distance relay was not in service Kaniampeta CB was bypassed by keeping protection through 220 kV Bus-Coupler CB
DR amp EL not furnished KPTCL
At Kadakola during the instance protection to Kaniambetta line was provided through 220kV bus coupler breaker bay as Kadakola relay panel was taken out for M-2 retrofitting work under RampU
Bus coupler breaker tripping was suspected due to problem in the pole discrepancy relay and there was no fault in the line
Remedial action Problem with the PD relay of Bus coupler breaker was rectified on 24052017
16-03-2017 at 2026 hrs
14 Tripping of 400 220 kV ICT-1 at Somanahalli substation
24-05-2017 at 1724 hrs
ICT-1 at Somanahalli substation got tripped due to DC Earth fault
GI-2
Somanahalli (PGCIL-SR2) end
As per FIRTR ICT-1 tripped (on HV side) at 172809 hrs on momentary DC Earth fault
As per DREL ICT-1 tripped (on HV side) at 172809812 hrs due to operation of Group AB trip relays In DR manual trigger signal becoming HIGH was observed at above instant
In EL time resolution for recording events was limited to seconds (events were not shown at msec level)
PGCIL (SR-II)
At Somanahally SS 3x167 MVA single phase units had been replaced by 1x500 MVA ICT Subsequently CSD works were taken up At the time of tripping event CSD wiring works were going on During the process positive DC supply got extended to 86A trip relay inadvertently
Remedial action DC earth fault had been removed
PGCIL (SR-II) was asked to configure Event Loggers at their Somanahalli SS properly so that time resolution for recording events was set u pto msec
16-03-2017 at 118 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1532
15 Tripping of HVDC Gazuwaka Pole-1amp2
25-05-2017 at 0945 hrs
HVDC pole-1 got tripped due to operation of South filter inter zone protection and HVDC pole-2 got tripped due to operation of differential protection
GI-2
SLD
Pole-1
27-03-2017 at 1016 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1632
Pole-2
Tripping of HVDC Pole-1 (PGCIL-SR1)
As per FIRELTR Pole-1 tripped at 094513960 hrs due to operation of South Filter inter-zone protection [
It was stated that DR was not available Tripping of HVDC Pole-2 (PGCIL-SR1)
As per FIRDRELTR Pole-2 tripped at 094512906 hrs due to operation of WIN Differential protection
It was noted that no representative from Gajuwaka (HVDC amp HVAC) SS had come to attend the meeting to explain as to what caused the pole trippings
PGCIL (SR-I) representative informed that at the time of tripping RTV Coating works for switchyard equipment were going on In the process when CWC35 filterrsquos bus-side isolator was opened it feel down unexpectedly and resulted in inter-zone filter protection operation
Wrt HVDC Pole-2 tripping PGCIL (SR-I) representative informed that oscillations in voltage and current were noticed prior to tripping of HVDC Pole-2 And differential current was also observed for the extended AC bus Due to this WIN differential protection had operated resulting in tripping of HVDC Pole-2 It was also informed that the issue was referred to its OEM ABB (Sweden) for suitable advice
However since no detailed tripping report explaining the causes that led to tripping of HVDC poles and the remedial action taken had been furnished PGCIL (SR-I) was asked to submit the same
Recommendations PGCIL (SR-I) to furnish detailed report on the events that led to tripping of HVDC Poles ndash 1 amp 2
including remedial measures taken to PCSC forum Further the OEM report wrt tripping of HVDC Pole-2 shall also be furnished
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1732
16 Tripping of 400 kV Kayathar-Karaikudi line
25-05-2017 at 1552 hrs
R-phase to earth fault had occurred in line There was Zone-2 3 phase trip operation at Kayathar end and Zone-1 3 phase trip at Karaikudi end
GI-2
Kayathar (TANTRANSCO) end
As per FIRDRELTR line tripped in 3-ph at 155236989 hrs on R-E fault due to DPR Z2 operation (Z2 time delay observed was about 390 msec)
It was stated in TR that carrier channel was not healthy at the time of tripping and carrier signal was not received at this end during the fault
Remedial action Protection Coupler and OLTE were reset at both Karaikudi amp Kayathar ends and carrier channel
was made available Karaikudi (PGCIL-SR2) end
As per FIRDRELTR line tripped in 3-ph at 155236592 hrs on R-E fault due to DPR Z1 (186 km) operation
It was stated in TR that DPC had failed at the other end and resulted in Carrier Fail alarm at Karaikudi end issuing 3-ph trip
Recommendations
For the line under consideration the following shall be carried out by TANTRANSCO in coordination with PGCIL (SR-II) End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
17
Tripping of 400220 kV ICT - 1 amp 3 at Hoody substation of KPTCL (Load Loss 750 MW)
26-05-2017 at 1230 hrs
R phase limb of ICT-1 bank pre-close supervision contact of trip coil -2 had arc over ICT-3 got tripped on over-loading
GI-2
Tripping of ICT-1
As per FIR ICT-1 tripped at 1230 hrs due to arcing over of R phase limb of ICT-1 bankrsquos pre-close supervision contact of trip coil -2
As per DR the tripping took place at 114128806 hrs (Type of protection operated not recorded)
EL not furnished
Time sync of PRrsquos with GPS needed to be ensured
Remedial action The same was rectified and the circuit was changed by utilizing the spare auxiliary contact of CB
for R-ph limb by availing LC on 29052017 and charged the ICT-1 bank at 0432 hrs by getting the SRLDC code 1360
Tripping of ICT-3
As per FIR ICT-3 tripped at 1230 hrs due to operation of INV OC FWD protection amp 86A master trip relay
From the DR furnished (with trigger time = 114254202 hrs) tripping of ICT-3 and the type of protection operated were not clear
EL not furnished
Time sync of protection relays with GPS needed to be ensured at Hoody
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1832
KPTCL
At Hoody 500 MVA ICT-1 tripped without any relay indication ICT-1 and 3 were in parallel each ICT carrying about 390MW of load Due to tripping of ICT-1 ICT-3 got over loaded and hence tripped on over current protection
Remedial action After detailed inspection it was observed that pre-close supervision contact of trip coil -2 arced
over in R phase limb of the 400kV side breaker Hence it was suspected that R-pole might have opened initially and remaining poles on PD operation
The problem was rectified and attended on 29052017 by availing shut down In order to avoid tripping of another ICT operating in parallel whenever one ICT trips on fault an
SPS is being finalized by KPTCL which is to be implemented at Hoody Any time each ICT at Hoody will be catering around 400MW of load Such huge load shedding by tripping 66kV loads of Hoody station is difficult to achieve Hence 220kV radial feeders may also have to be tripped to get desired load shedding
It was noted that frequent tripping of 400 2220 kV ICTrsquos at Hoody SS had been observed in the past few months And during their discussion in various PCSC meetings the following issues have come to the for urgent action by KPTCL Implementation of Special Protection Scheme (SPS) to take care of over-loading of the other ICT
when one out of two ICTrsquos operating in parallel trips Provision of Bus-bar protection to 220 kV buses Compliance of Third Party Protection Audit Recommendations Ensuring supply reliability to Metro-services Action plan on the proposed system strengthening measures in Bengaluru area in the context
of continued use of Split-Bus operation
Thus to ascertain the action taken by KPTCL wrt above issues a Protection System Analysis Group (PSAG-18) meeting was proposed to be conducted on 03082017
Recommendations KPTCL to furnish compliance report on the recommendations given in PSAG-18 meeting to PCSC
forum
18 Tripping of 400 kV Simhadri - Kalpaka line-2
28-05-2017 at 503 hrs
Line tripped on mal-operation of Tee Differential Protection at Simhadri end and Direct Trip was received at Kalpaka
GI-2
Kalpaka (APTRANSCO) end
As per FIR line tripped at 0503 hrs due to DT receipt from the remote end
DR amp RL amp TR not furnished Simhadri STPS (NTPC) end
As per FIRTR line tripped at 050350408 hrs due to operation T-differential protection which in turn was attributed to spurious pick-up during the fault at Vemagiri end
The following was stated in TR Kalpaka Line-1amp2 Tie bays were under PTW And R-Ph CT (16CTA R-Ph) was under erection Primary connection was over secondary
connection was pending The CT secondary wires used in T-Diff protection of Kalpaka Line-2 might be touching the earth and during fault at Vemagiri some stray voltage developed across CT secondary cores might have resulted into operation of T-Diff protection Trip values are 100mA in secondary
During the operation of T-diff protection there was no change in current magnitudes of Kalpaka Line-2 and hence the tripping could be considered as spurious one
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1932
As per DR line tripped at 050350442 hrs But the type protection operated was not recorded in it
EL not furnished (In place of EL DRrsquos eventsrsquo summary was furnished)
19 Tripping of 400 kV Ramagundam - Gajwel line
29-05-2017 at 0007 hrs
Over Voltage Stage-1 had operated at Gajwel end Ramagundam end did not trip as Direct Trip was not received from Gajwel end
GI-2
Ramagundam STPS (NTPC) end
As per FIR line was kept holding from Ramagundam end Gajwel (TSTRANSCO) end
As per FIR line tripped at 0007 hrs due to OVR-I operation
DR amp EL amp TR not furnished
The tripping was not in order as per the SRPC given OVR gradings as shown below
When enquired about the reasons for OVR-I operation TSTRANSCO informed that OVR functionality implemented in REL 521 had mal-operated
Remedial action The OVR functionality had been moved to an external Over Voltage relay
Recommendations
For the line under consideration the following shall be carried out by TSTRANSCO in coordination with NTPC-Ramagundam End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
20 Tripping of 400 kV Gajwel-Ghanapur line
29-05-2017 at 0007 hrs
Line tripped on operation of over voltage protection at Gajwel and direct trip was received at Ghanapur DR and EL of Gajwel end were not furnished
GI-2
Ghanapur (PGCIL-SR1) end
As per FIRELTR line tripped at 000731885 hrs due to DT receipt from the remote end
As per DR line tripped at 000257163 hrs due to DT receipt from the remote end
Time-sync of DR amp EL with GPS needed to be ensured Gajwel (TSTRANSCO) end
As per FIR line tripped at 0007 hrs due to OVR-I operation
DR amp EL amp TR not furnished
The tripping was not in order as per the SRPC given OVR gradings as shown below
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2032
When enquired about the reasons for OVR-I operation TSTRANSCO informed that there was a loose
wiring in Y-ph CVT wiring which resulted in mal-operation of OVR-I protection
Remedial action All CVT wirings had been tightened for fool-proof operation
III Details of Trippings due to Failure or Non-operation of Auto-Reclose
Sl No Element Date amp Time Reason
Category
1 Tripping of 400 kV Hiryur-
BTPS line-1 06-05-2017 at 1401 hrs
Y-phase to earth fault had occurred in line Direct trip was sent from BTPS to Hiryur end
GI-2
Hiryur (PGCIL-SR1) end
As per FIRDRELTR line tripped (in Y-ph) at 140009730 hrs on Y-E fault due to DPR Z1 (AR 82 km 1034 kA) operation Just prior to auto-reclosing DT was received at 140010730 hrs and line tripped in 3-ph
BTPS (KPCL) end
As per FIRTR line tripped (in Y-ph) at 1400 hrs on Y-E fault due to DPR Z1 (AR 1173 km) operation AR was stated to be attempted but unsuccessful due to persistent fault
As per DREL line tripped (in Y-ph) at 125520000 hrs on Y-E fault due to DPR Z2 (CAT AR) operation and tried to auto-reclose after about 1 sec but tripped in 3-ph due to persistent (Z1) fault
Time-sync of Protection Relayrsquos with GPS needed to be ensured at BTPS
When enquired about the reasons for sending of DT to Hiriyur end KPCL informed that when the line tripped on Y-E fault and the AR operation was in progress Under-Voltage relay at BTPS end had sensed under-voltage and sent DT to Hiriyur end
It was noted that instantaneous tripping of UV relay and consequent of sending of DT to the other end are undesirable It was therefore suggested to introduce suitable delay (say 3 sec) for UVR tripping and disable sending of DT to the other end
Recommendations
KPCL to introduce suitable delay (say 3 sec) for UVR tripping and disable sending of DT to the other end on UVR operation at their BTPS station
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2132
2 Tripping of 400 kV Munirabad-Guttur line
06-05-2017 at 1702 hrs
R-phase to earth fault Auto-reclose was successful at Guttur and Breakers at Munirabad end got tripped
GI-2
Munirabad (PGCIL-SR1) end
As per FIRDRELTR line tripped (in 3-ph) at 170231624 hrs on Y-E fault due to DPR Z2 (AR CAT 1145 km) operation
Guttur (KPTCL) end
As per FIR line tripped (in R-ph) at 1702 hrs on Y-E fault due to DPR Z1 (AR 4708 km Ir=6877 kA) operation and successfully auto-reclosed
As per DREL line tripped (in R-ph) at 165933499 hrs on Y-E fault due to DPR Z1 (AR) and successfully auto-reclosed after about 1 sec
Time-sync of Protection Relays with GPS needed to be ensured at Guttur SS
When enquired about the reasons for AR non-operation at Munirabad end PGCIL (SR-I) informed that the external VARM relay through which AR had been implemented had not operated Since the relay belonged to KPTCL suitable action needed to be taken by them
On this KPTCL was asked to look into the issue and replace the relay if required PGCIL (SR-I) was also requested to coordinate with KPTCL in attending to this matter
3
Tripping of 765kV Kurnool-NPS line -2
07-05-2017 at 1405 hrs
Y phase to earth fault had occurred in line Auto-reclose was successful at Kurnool end and AR was not attempted at NPS end
GI-2
Kurnool-PG (PGIL-SR1) end
As per FIRELTR line tripped (in Y-ph) at 140543316 hrs on Y-E fault due to DPR Z1 (AR 328 km 166 kA) operation and successfully auto-reclosed after about 11 sec After about further 6 sec (ie at 140550470) line tripped in 3-ph due to receipt of DT from the remote end
It was stated in FIR that 765 kV Kurnool ndash NPS line-1 was under LVRD
As per DR line tripped (in 3-ph) at 140550470 hrs due to DT receipt from remote end
DR corresponding to successful AR operation not furnished NPS (PGIL-SR1) end
FIR amp TR furnished were that of Kurnool station
As per DREL line tripped (in 3-ph) at 140543351 hrs on Y-E fault due to AR (Z2 CAT) operation It was noted from EL that AR LOCKOUT had operated around the same time due to which line had not tried for AR
From EL it was further observed that DT was sent to the remote end at 020550419 hrs However the cause of DT send was not recorded in EL
DR pertaining to DT send was not furnished
If DT send was because of OVR-I protection operation then also tripping was not in order as it does not match with the settings provided
PGCIL (SR-I)
Non-operation of AR from NPS was due to wiring mistake made during installation of Controlled Switching Devices (CSD) for the line reactor on this line
Remedial action The wiring issues in CSD installation were rectified on 18052017
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2232
4
Tripping of 400 kV Krishnapatnam-Chittoor line-1
07-05-2017 at 1441 hrs
R-phase to earth fault Main CB Auto-reclose was successful at Chittoor end and Tie CB got tripped Breakers tripped at Krishnapatnam end and did not attempt auto-reclose
GI-2
FNN not followed by APTRANSCO and APGENCO SDSTPS (APGENCO) end
As per FIRDREL line tripped (in 3-ph) at 144113756 hrs on R-E fault due to DPR Z1 (628 km) operation It was observed from EL that the line was given 3-ph trip straight way without initiating AR
Chittoor (APTRANSCO) end
As per FIRDRELTR line tripped (in R-ph) at 144113759 hrs on R-E fault due to DPR Z1 (1147 km) operation and successfully auto-reclosed after about 1sec However it was observed that only Main-CB got auto-reclosed successfully whereas Tie-CB got tripped in 3-ph while attempting AR
Remedial action When enquired about the reasons for AR failure at SDSTPS end APGENCO representative
informed that as informed in last PCSC meeting AR configuration logic is scheduled to be reviewed by ABB in July 2017 when all issues pertaining to AR operation would be sorted out
When asked about the reasons for AR failure for Tie-CB at Chittoor end APTRANSCO informed that Tie-CB AR dead-time and PDR operational time were inadvertently kept equal As remedial action PDR operational time was increased to 25 sec
5 Tripping of 765 kV Raichur-Solapur line-2
07-05-2017 at 1918 hrs
Y-phase to earth fault Auto-reclose was successful at Solapur and breakers at Raichur end got tripped
GI-2
Solapur (PGCIL-WR1) end
As per FIRTR line tripped (in Y-ph) at 1918 hrs on Y-E fault due to DPR Z1 (AR 66 km 572 kA) operation and successfully auto-reclosed
DR amp EL not furnished Raichur (PGCIL (SR-I) end
As per FIRDRELTR line tripped (in 3-ph) at 191836810 hrs on Y-E fault due to DPR Z1 (145 km) operation It was observed from DR that AR lock-out had operated that resulted in tripping of Main-CB and Tie-CB But while Main-CB got tripped immediately Tie-CB got tripped in Y-ph only And the other two phase poles got tripped due to PDR operation after about 21 sec at 191838910 hrs
EL time-stamp resolution was limited to SECONDS instead of millisec
Tie-CB OPEN digital signals were observed to have employed NEGATIVE LOGIC PGCIL (SR-I)
The observed discrepancies at Raichur end were due to the hardware error caused by hanging of Main-CBrsquos BCU
Remedial action The problem with Main-CBrsquos BCU had been resolved by restarting it
Recommendations
PGCIL (SR-I) to configure Event Loggerrsquos time-resolution up to millisec level in all protection relays at their 765 400 kV Raichur SS
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2332
6
Tripping of 400 kV Neyveli TS2-Pugalur line
07-05-2017 at 1955 hrs
Y-phase to earth fault Neyveli TS2 end relay issued a 3-phase trip 220ms after issue of Y phase trip Direct Trip was sent to Pugalur end preventing auto-reclose
GI-2
NLC TS2 (NLCIL) end
As per FIRDRELTR line tripped in 3-ph at 195526677 hrs due to DT receipt from the other end
It was stated in TR that even though respective zones had picked up on fault DT receipt at the same time resulted in tripping of the line in 3-ph
In DR 3-ph trip was found to be issued 220 msec after Y-ph trip was issued It was also noted that DT receipt signal remained high for a duration of about 220 msec
Time sync of Protection Relays with GPS needed to be ensured at NLC-TS2
Pugalur (PGCIL-SR2) end
As per FIRDRELTR line tripped (in Y-ph) at 195534241 hrs on Y-E fault due to DPR Z1 (AR) operation However line tripped in 3-ph during AR dead-time at 195534353 hrs due to DT receipt from Neyveli end
In view of DT receipt at both ends it was suggested to carry out PLCC end-to-end testing to ensure healthiness of carrier communication
Recommendations
For the line under consideration the following shall be carried out by NLCIL in coordination with PGCIL (SR-II) End-to-end communication for DT permissive amp other signals may be ensured by testing at both
the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
7 Tripping of 400 kV NCTPS -SVChatram line-2
09-05-2017 at 1843 hrs
R-phase to earth fault Auto-reclose is not in service since Fibre optic cable link is not healthy
GI-2
NCTPS (TANGEDCO) end
As per FIRDRELTR the line tripped in 3-ph at 184223424 hrs on R-E fault due to DPR Z1 (9159 km 29 kA) operation (Given the length of this line as 95 km it may be verified whether Z1 setting is correct)
It was stated in FIR that AR was kept out of service due to defective FO communication link
Remedial action Line patrol done by lines wing and declared No Visible fault FO link cut was rectified on 13052017 and AR scheme restored
S V Chatram (TANTRANSCO) end
As per FIRDRELTR the line tripped in 3-ph at 184357616 hrs on R-E fault due to operation of DPR Z1 (32 km) operation
Time sync of protection relays with GPS needed to be ensured at both NCTPS and SV Chatram stations
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2432
8 Tripping of 400 kV Madurai-Kudankulam line
10-05-2017 at 1940hrs
B-E Fault Auto-reclose successful at Madurai and breakers tripped at Kudankulam
GI-2
Madurai (PGCIL-SR2) end
As per FIRDRELTR line tripped (in B-ph) at 194040402 hrs on B-E fault due to DPR Z1 (AR 137 km 114 kA) operation and successfully auto-reclosed after about 11 sec
Kudankulam NPP (NPCIL) end
As per FIRTR line tripped (in 3-ph) at 192936910 hrs on B-E fault due to DPR Z2 (CAT 2071 km) operation
It was informed that AR had not been kept in service as per SRPC decision Hence the tripping was in order
9 Tripping of 220 kV Idukki-Udumalpet line
14-05-2017 at 1345 hrs
Y-phase to earth fault had occurred in line Auto-reclose was successful at Idukki and breakers at Udumalpet end tripped on pole discrepancy
GI-2
Idukki (KSEB) end
As per DRTR line tripped (in Y-ph) at 134620509 hrs on Y-E fault due to DPR Z2 (CAT 83125 km) and successfully auto-reclosed after about 08 sec
EL not submitted (In its place DRrsquos events summary was furnished)
Udumalpet (TANTRANSCO) end
As per FIRTR line tripped in Y-ph at 1345 hrs on Y-N fault on DPR Z1 (2834 km) operation Subsequently tripped in 3-ph on PDR operation
As per DR line tripped in Y-ph at 134151100 hrs on Y-E fault due to DPR (AR) operation But as DRrsquos time scale was limited to 1 sec post triggering AR complete operation could not be verified
From EL line all poles dead was observed at 134152102 hrs Cause of line tripping as stated in FIRTR was not observed in EL
The following was stated in TR The fault resistance measured in the M1 relay (MicomP442) was high resulting in Z3 pickup It was
evident from the fault record that M2 relay (7SA522) had cleared the fault in Z1 by opening Y-ph pole However since AR was implemented in only M1 relay and M2 (Z1) operation had not initiated AR in M1 it resulted in opening of the other two phase poles on PDR operation
The cause of non-initiation of AR of M1 relay on external initiation was found to be logic configuration mistake in the Main 1 relay
Remedial action The AR logic configuration in the PSL of Main 1 relay had been corrected However a special relay
test would be conducted to verify AR operation during the next opportunity shutdown
Time sync of protection relays with GPS needed to be ensured at Idukki and Udumalpet
10 Tripping of 400 kV Vemagiri - Gazuwaka line
14-05-2017 at 1654 hrs
Y-phase to earth fault Auto-reclose was not successful due to persistent fault Vemagiri end had sent a Direct Trip after un-successful Auto-reclose AR attempt was observed in Gazuwaka end DR after 3 phase trip
GI-2
Vemagiri (PGCIL-SR1) end
As per FIRDRELTR line tripped in (Y-ph) at 165411968 hrs on Y-E fault due to operation of DPR Z1 (AR 1512 km) operation It tried to auto-reclose after about 11 sec but tripped in 3-ph due to persistent fault
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2532
It was noted that AR was attempted by Tie-CB only the Main-CB tripped in 3-ph at the beginning of AR initiation
Also Tie-CB AR dead-time was observed to be one second
Reasons 3-ph trip of Main-CB needed to be furnished Gazuwaka (PGCIL-SR1) end
As per FIRDRTR line tripped in Y-ph at 165330242 hrs on Y-E fault due to operation of DPR Z1 (AR 1677 km) operation But during AR dead-time it tripped in 3-ph after about 115 sec due to DT receipt from the remote end This resulted in 3-ph opening of both Main-CB and Tie-CB However after 125 sec Main-CB Y-ph limb tried for auto-reclosure and tripped due to persistent fault
As per EL line tripped in (Y-ph) at 165351597 hrs on Y-E fault due to operation of DPR Z1 (AR) operation But during AR dead-time it tripped in 3-ph at 165352620 hrs due to DT receipt from the remote end This resulted in 3-ph opening of both Main-CB and Tie-CB However at 165352687 hrs Main-CB Y-ph limb tried for auto-reclosure and tripped due to persistent fault
Reasons for AR attempt by Main-CB event after opening in 3-ph due to DT receipt needed to be explained
Time sync of DRrsquos amp ELrsquos with GPS needed to be ensured at Gajuwaka SS Recommendations
PGCIL (SR-I) to sort out issues relating to AR functionality operation for both Main-CB and Tie-CB at both Vemagiri and Gajuwaka substations
For the line under consideration the following shall be carried out by PGCIL (SR-I) End-to-end communication for DT permissive amp other signals may be ensured by testing at both
the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
11 Tripping of 400 kV VTPS-Sattenapalli line-2
21-05-2017 at 1706 hrs
B-phase to earth fault Auto-reclose successful at Sattenapalli and breakers got tripped at VTPS end
GI-2
Sattenapalli (APTRANSCO) end
As per FIRDRELTR line tripped (in Y-ph) at 170653038 hrs on B-E fault due to DPR Z1 operation and successfully auto-reclosed after about 1 sec
VTPS (APGENCO) end
As per FIRDRELTR line tripped in 3-ph at 170653133 hrs on B-E fault due to DEFR (33 kA) operation (DPR Z2 had picked up and Carrier was also received from the other end)
APGENCO
Before the LILOing of 400 kV VTPS-Srisailam DC line at Sattenapalli DEF protection had been provided from a separate REX521 relay Subsequently even though all protections at VTPS had been revised the above DEF protection implemented from the REX521 relay had been somehow left out and it only had extended 3-ph trip during the current instant
Remedial action The DEF functionality from the said REX521 had been disabled
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2632
12 Tripping of 400 kV Srisailam-Dindi line-2
24-05-2017 at 1502 hrs
R-phase to earth fault Auto-reclose was successful at Dindi and Zone - 1 3-phase trip at Srisailam
GI-2
Srisailam (TSGENCO) end
As per FIRDREL line tripped in 3-ph at 150253522 hrs on R-E fault due to DPR Z1 operation
TR contained no information Dindi (TSTRANSCO) end
As per FIRDRELTR line tripped (in R-ph) at 150253487 hrs on R-E fault due to DPR Z1 operation and successfully auto-reclosed after about 1 sec
Recommendations Since all 400 kV lines emanating from Srisailam LB are composite feeders APTRANSCO TSTRANSCO
can keep AR functionality disabled at respective remote end stations under their control
IV Details of Trippings due to PLCC mal-operation
Sl No Element Date amp Time Reason
Category
1 Tripping of 400 kV Kalpakka-Gazuwaka line-1amp2
18-05-2017 at 1108 hrs
Line tripped at Kalpakka end only on Direct Trip receive and was holding from Gazuwaka
GI-2
Tripping of 400 kV Kalpaka ndash Gajuwaka line-1
Gazuwaka (PGCIL-SR-2) end
As per FIR line was kept holding from Gazuwaka end Kalpakka (APTRANSCO) end
As per FIREL line tripped at 110625955 hrs to DT receipt from Gazuwaka end
Tripping of 400 kV Kalpaka ndash Gajuwaka line-2
Gazuwaka (PGCIL-SR2) end
As per FIR line was kept holding from Gazuwaka end Kalpakka (APTRANSCO) end
As per FIREL line tripped at 110625955 hrs to DT receipt from Gazuwaka end
Remedial action taken by APTRANSCO subsequent PCSC-65 meeting as informed vide their internal communication dated 20072017
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2732
2 Tripping of 400 kV Tumkur-Bidadi line-1 amp 2
30-05-2017 at 1139 hrs
Line tripped due to suspected PLCC mal-operation at Tumkur end and direct trip was received at Bidadi
GI-2
Tripping of 400 kV Tumkur ndash Bidadi line-1 Tumkur (PGCIL-SR2)) end
As per FIRDRELTR line tripped in 3-ph at 113515534 along with DT SEND to the remote end
PLCC mal-operation was suspected to have caused above tripping Bidadi(PGCIL-SR2) end
As per FIRTR line tripped in 3-ph at 113515 hrs due to DT receipt from Tumkur end Tripping of 400 kV Tumkur ndash Bidadi line-2 Tumkur (PGCIL-SR2)) end
As per FIRDRELTR line tripped in 3-ph at 113515534 along with DT SEND to the remote end
PLCC mal-operation was suspected to have caused above tripping Bidadi(PGCIL-SR2) end
As per FIRTR line tripped in 3-ph at 113515 hrs due to DT receipt from Tumkur end PGCIL (SR-II)
Remedial action The above trippings were due to PLCC mal-operation which in turn was due to shifting of its
coaxial cable The related circuitry was subsequently rectified
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2832
Single Line Diagram of 230 kV Villianur SS of PED [Ref I1]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2932
Single Line Diagram of 400 kV Jammalamadugu SS of APTRANSCO [Ref I2]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3032
Single Line Diagram of 400 kV Judgi-PG GIS SS of PGCIL (SR-II) [Ref II4]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3132
Single Line Diagram of 400 kV Ghani SS of APTRANSCO [Ref II4]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3232
Single Line Diagram of 400 kV BTPS of KPCL [Ref II9]
Annexure-II
Meeting No
Index
Details of Event Date amp Time Reason PCSC Recommendations Utility responsible for
Implementation
Status of Recommendations
as on 25072017
Remarks
Pending Implementation of PCSC Recommendations (up to 65th Meeting)
Complete outage of 220kV Yerraguntla
substation and tripping of running Units
at Rayalaseema TPS
52I2 (GD) PendingMail received on 27-07-2016
1The drop out relays of reducer oil pumps time setting was increased for
all millsSo there will not be any trip under transient low voltage condition--
--Complied
2The recommendation regarding 2 sec time delay will be implemented
during unit shut down and will be intimated immediately after
implementation------Pending
APGENCO 1 APGENCO to check associated logic for lube oil pump for correct
operation under transient low voltage conditions at Rayalaseema TPS
Unit-1
2 APGENCO to keep appropriate time delay fault ride through
delay (typically 2 sec) in VFD speed sensor relay at all its generating
Units including Rayalaseema TPS Units
HV B-Ph Current transformer of 100MVA Power
Transformer -1 failed resulting into a bus fault on
220KV Bus-1 Unit-1 and Unit-5 at RYTPS tripped
during the fault at Yerraguntla substation
21-02-2016 at
1039 hrs
Andhra Pradesh
APGENCO to furnish a report on the remedial action implemented
wrt overreaching of Krishnapatnam end distance relays during the
tripping of 400 kV Nellore (PG) - NPS line-1
APGENCO Yet to be informed Pending57II9 Tripping of 400 kV Nellore (PG) - NPS
line-1 400 kV Krishnapatnam-Nellore
(AP) lines -1amp2 and 400kV NPS -
MEPL line
18-07-2016 at
1905 hrs
Triggering incident was snapping of Y phase
conductor in 400kV Nellore (PG) - NPS line-1
Distance relay at Krishnapatnam end over-reached in
Zone-1 and resulted in tripping of 400kV
Krishnapatnam ndash Nellore (AP) lines - 1amp2 from
Krishnapatnam end Distance relay at MEPL over-
reached and resulted in tripping of MEPL-NPS line
from MEPL end
Yet to be informed Pending
APTRANSCO mail dated on 31-08-2016
To avoid the unwanted malopeartions due to the external LBB trip
initiation from PGCIL Vide letter Dt 04-08-2016 APTRANSCO has
requsted the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1 amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 15-11-2016
To avoid the unwanted maloperations due to the external LBB trip
initiation from PGCIL vide letter Dt 04-08-2016 ARTRANSCO has
requested the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 20-12-2016
Waiting for the PGCIL response
APTRANSCO mail dated 04032017 amp 24052017
SRPC is requested to coordinate with PGCIL in takind necessary action
Pending
Tripping of 400kV Krishnapatnam-
Nellore line-1
Line tripped on B-phase to earth fault and auto-
reclose was successful at Nellore(AP) end and un-
successful at Krishnapatnam end
APGENCO
56II13 Tripping at 220kV Gooty Substation of
APTRANSCO
24-06-2016 at
1604 hrs
LBB protection got operated for 400220kV ICT-2
breaker which had resulted in tripping of 220kV Bus-
2 at 220kV Gooty Substation
1 APGENCO SDSTPS to correct logic and ensure healthiness of ARscheme employed for transmission lines emanating from SDSTPSand furnish an action taken report to PCSC forum
2 APGENCO SDSTPS to configure DRrsquos of line protection relaysfor a post triggering period of 2 sec to capture complete ARoperation at their SDSTPS
Yet to be informed Pending63III1 28-02-2017 at
0516 hrs
1 APGENCO SDSTPS to correct logic and ensure healthiness of AR
scheme employed for transmission lines emanating from SDSTPS
and furnish an action taken report to PCSC forum
2 APGENCO SDSTPS to configure DRrsquos of line protection relays
for a post triggering period of 2 sec to capture complete AR
operation at their SDSTPS
Tripping of 400kV Krishnapatnam-Nellore line-2
R-phase to earth fault had occurred in line Auto reclose was successful at Nellore however protection at Krishnapatnam end issued a 3 phase
trip
APGENCO63III3 02-03-2017 at 455 hrs
1APTRANSCO to check the healthiness of the connecting cable
between Gooty (PGCIL) and Gooty (APTRANSCO) and replace it
if required
2APTRANSCO to ensure that the distributed architecture employed
in implementing busbar protection at their Gooty 220 kV SS does not
introduce any unwarranted delays in transmitting the triggering signals
to the Central Unit
APTRANSCO
Annexure-III
Page 1 of 31
63II2 Tripping of 400 kV KV Kota-Suryapet
line
01-03-2017 at
2005 hrs
Line tripped on operation of over-voltage protection
at KV Kota and Direct Trip was received at Suryapet
1 APTRANSCO to furnish (i) FIR amp TR for tripping events as
per SRLDC provided formats and (ii) DR amp EL within 24-hrs of
occurrence of tripping event in line with IEGC Regulation 52
(r)
2 APTRANSCO to adopt new OVR gradings for KV Kota
feeders and confirm the same
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
1 FIR furnished amp DR configured
Pending
63II16 Multiple Trippings at 220kV Vizag
Switching Station (VSS) of APTRANSCO
27-03-2017 at
1016 hrs
Bus-2 bus bar protection operated at 220kV VSS
end resulting in the tripping of all the elements
connected to bus-2
1 APTRANSCO to furnish a detailed report on the reasons for LBB
BBP operation at 220 kV VSS for a fault on 220 kV Gangavaram
feeder and remedial action taken to prevent recurrence of such
events
APTRANSCO Yet to be informed Pending
64II1 Tripping of 400220KV 315MVA ICT-
1and 230kV elements at 400kV Vemagiri
substation of APTRANSCO
09-04-2017
at 1231 hrs
Suspected mal-operation of Busbar protection had
caused tripping of 220kV Bus-1 at Vemagiri
APTRANSCO to furnish a report on the remedial action taken along
with single line diagram of 400220 kV Vemagiri SS indicating fault
location and CBs involved and protections operated
APTRANSCO Yet to be informed Pending
64II2 Tripping of 400220 kV ICTrsquos ndash 2 amp 3 at
400 kV Ghani substation of APTRANSCO
10-04-2017
at 1729 hrs
ICTrsquos ndash 2 amp 3 got tripped due to operation of 220 kV
Bus-2 busbar protection at 400220KV Ghani
substation
APTRANSCO to furnish single line diagram of 400 220 kV Ghani SS
clearly indicating (i) bus-configuration (ii) location of fault (iii)
breakers involved and type of protections operated
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
Single line diagram sent vide mail dated 27062017
Pending
64III1 Tripping of 400 kV Uravakonda-
Jammalamadugu line-1
02-04-2017 at
1758 hrs
R-phase to earth fault and line did not auto-reclose
Fault clearing time - 500ms
For the line under consideration APTRANSCO to check amp ensure
healthiness of carrier protection and make Auto-Reclosure
functional
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
Carrier aided protection scheme has been tested end to end and rectified
the problem
Pending
64III5 Tripping of 400kV Krishnapatnam-
Nellore line-2
11-04-2017 at
241 hrs
Line tripped on Y-phase earth fault Line auto-
reclosed at Krishnapatnam and did not auto-reclose
at Nellore-AP (Manubolu)
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a report
on the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64III6 Tripping of 400kV Krishnapatnam-
Nellore line-1
12-04-2017 at
251 hrs
Line tripped on Y-phase earth fault Line auto-
reclosed at Krishnapatnam and did not auto-reclose
at Nellore-AP (Manubolu)
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a report
on the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64III10 Tripping of 400kV Krishnapatnam ndash
Nellore_AP line-1
13-04-2017 at
438hrs
Y-phase to earth fault Line auto-reclosed from
Krishnapatnam end and did not auto-reclose fromNellore-AP end
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a reporton the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64IV4 Tripping of 400 kV VTPS-Malkaram line 20-04-2017 at
1624 hrs
Line tripped on Direct Trip Receive at Malkaram and
was in service from VTPS
For the line under consideration APTRANSCO to check the
healthiness of protection couplers and take suitable remedial action including replacement of the same
APTRANSCO Yet to be informed Pending
65II10 Tripping of 400220 kV ICT-2 at Kalpaka
SS
20-05-2017 at
1502 hrs
ICT-2 tripped due to operation of Transformer
Buchholtz relay
APTRANSCO to furnish details of AC auxiliary supply details
including its redundancy DG set details and its mode of
starting AC auxiliary supply changeover scheme drawing shall
also be furnished
APTRANSCO Yet to be informed Pending
1 APTRANSCO to check and correct all CT Neutral
Connection settings in various protection relays at their 400
220 kV Ghani PS
2 APTRANSCO to ensure that PLCC carrier aided protection
is maintained healthy on 220 kV lines emanating from their
400 220 kV Ghani PS
3 APTRANSCO to take steps to complete configuration works
of DR‟s amp EL‟s of various protection relays at their 400 220
kV Ghani SS and furnish the same as and when required in
compliance of IEGC Regulation 52 (r)
ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
07-05-2017Tripping of 400220 kV Ghani ICT-2amp3 65II4 APTRANSCO Yet to be informed Pending
APTRANSCO mail dated on 31-08-2016
To avoid the unwanted malopeartions due to the external LBB trip
initiation from PGCIL Vide letter Dt 04-08-2016 APTRANSCO has
requsted the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1 amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 15-11-2016
To avoid the unwanted maloperations due to the external LBB trip
initiation from PGCIL vide letter Dt 04-08-2016 ARTRANSCO has
requested the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 20-12-2016
Waiting for the PGCIL response
APTRANSCO mail dated 04032017 amp 24052017
SRPC is requested to coordinate with PGCIL in takind necessary action
Pending56II13 Tripping at 220kV Gooty Substation of
APTRANSCO
24-06-2016 at
1604 hrs
LBB protection got operated for 400220kV ICT-2
breaker which had resulted in tripping of 220kV Bus-
2 at 220kV Gooty Substation
63III2 02-03-2017 at
157 hrs
1 APTRANSCO to check and ensure correctness of AR operation
for the lines emanating from their Nellore-AP (Manubolu) SS
2 APTRANSCO to configure DR‟s of line protection relays for a
post triggering period of 2 sec to capture complete AR operation at
their Nellore-AP (Manubolu) SS
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
1The ABB make REL 670 type main-2 distance relay seen the fault as Y-
B phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
1APTRANSCO to check the healthiness of the connecting cable
between Gooty (PGCIL) and Gooty (APTRANSCO) and replace it
if required
2APTRANSCO to ensure that the distributed architecture employed
in implementing busbar protection at their Gooty 220 kV SS does not
introduce any unwarranted delays in transmitting the triggering signals
to the Central Unit
APTRANSCO
Tripping of 400kV Krishnapatnam-
Nellore line-1
Line tripped on B-phase to earth fault and line auto-
reclosed from Krishnapatnam end but did not auto-
reclose from Nellore-AP end
Annexure-III
Page 2 of 31
64II16 Tripping of 400 kV VTPS-Satenapalli line-
2
30-Apr-17 at
428 hrs
Line tripped on B-phase to earth fault FIR DR and
EL of both ends were not furnished to validate the
tripping
APGENCO and APTRANSCO to furnish a detailed report on the
events leading to tripping of the line along with remedial measures
taken to PCSC forum
APGENCO
APTRANSCO
Yet to be informed Pending
65II8 Tripping of 400220 kV Hyderabad ICT-
4 and 220 kV lines at Hyderabad
substation
10-05-2017 at
239 hrs
Operation of busbar protection due to fault in 220 kV
Bus at 220kV Hyderabad Substation
TSTRANSCO to investigate the reasons for BBP operation for 220
kV Bus-2 and furnish a report on the remedial measures taken
TSTRANSCO Yet to be informed Pending
24-12-2016 at
1052 hrs
Line tripped on B-phase to earth fault First fault was
persistent for 380 ms Auto-reclose was successful at
Khammam end during 1st fault 2nd fault occurred
during re-claim time of breaker hence Khammam end
breakers also got tripped
1 TSGENCO to implement the SRPC agreed philosophy for Power
Swing Blocking in all distance relays on the feeders emanating from
KTPS
2 For the line under consideration TSGENCO to consult relays
OEM to migrate to new versions of Firmware (from to 47201) and
Pset (to 47002)
61III5 Tripping of 400 kV Khammam - KTPS
line-2
The issue was discussed in PCSC-58 meeting held on 18102016 when
PCSC forum agreed to de-link the implementation of the Item from the
scope of Protection Audit Recommendations (PAR) and pursue it as part
of PCSC Recommendations
TSGENCO mail dated 30-05-2017
Procurement of Differential Protection relays is under process and the
work will be completed by the end of November 2017
TSGENCOProvision of line differential protection for Jurala line 1 amp 2 (line length-145 KM) feeders at 220 kV Jurala HPS [Carry-Over from Protection Audit Recommendations]58 Pending
Pendingline tripped on direct trip receive at Gajwel and was
holding from Hyderabad
Pending
06-10-2016 at
1216 hrs
For the line under consideration TSTRANSCO to carry out the
following in coordination with TSGENCO
(i) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
(ii) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(iii) Frequency bandwidth tuning of PLCC link for faithful
transmission of signals shall be carried out
62IV5 Tripping of 400 kV Gajwel-
Bhoopalapalli line-1
Telangana
TSGENCO TSGENCO mail dated 30032017
1 According to SRPC phylosphy power swing block settings are changed
to ALL ZONES BLOCK EXCEPT ZONE1
---------- Completed
2 Ms Siemens is requested to depute the service Engineer to update the
firm ware of existing SIPROTEC relays in 400KV switch yard This work
will be completed on or before 15042017 -------------- Pending
Pending
TSGENCO
TSTRANSCO
TSTRANSCO mail dated on 31-05-2017
1 Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Bhoopalpalli-1 line
59IV3
Line tripped at Bhoopalapally on DT receive and was
holding from Gajwel
TSTRANSCO mail dated on 21-12-2016
(i) Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Ghanapur line
(ii) Healthiness of PLCC system components will be checked while
conducting end to end testing
TSTRANSCO mail dated on 31-05-2017
1 Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Ghanapur line
TSTRANSCO
16-02-2017
at 1500 hrs
For the line under consideration the following shall be carried out by
TSTRANSCO in coordination with PGCIL (SR-I)
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
Tripping of 400 kV Gaiwel-Hyderabad
line
Annexure-III
Page 3 of 31
Karnataka
Annexure-III
Page 4 of 31
KPCL
38GD35 Pending13-11-2014 at
1931hrs
1 KPCL to make functional the Main2 (EPAC) relay with the
help of KPTCL at the earliest
2 KPCL to investigate the reason for DC fuse fail during
transient fault in 220kV Kadra-Kodasalli line including the testing
checking of DC supply cables breaker control cables and trip coils
3 KPCL to ensure supply for Main-1amp Main-2 protections Trip
Coils (TC1 TC2) from separate battery banks
Triggering incident was B-phase to earth fault had
occurred in 220kV Kadra-Kodasalli line Line tripped
from Kodasalli end only 220kV Kaiga-Kadra tripped
in Zone-3 from Kaiga end Tripping of evacuating
lines caused bus shut down at Kadra hydro station
16-02-2015 at
1256 hrs
GD-1 at Kadra and Kodasalli hydro
power station
GD-1 at 220kV Kadra power Station of
KPCL
41I1 Mail received on 28-05-2015
1 Main-2 relays already installed and commissioned
2 DC fuses are intact Till date no such incidence occurred
3 Possibility of DC-1 amp DC-2 arrangement and splitting of DC will be
reviewed
Mail received on 07-07-2015 21-10-2015 and 23-11-2015
1 Completed
2 Completed
3 Possibility of DC-1 amp DC-2 arrangement and splitting of DC will be
reviewed
Status received vide KPCL mail dated 14062017
1 Completed
2 Completed
3 Providing 2 separate DC sources is under process
Pending
Mail recieved on 28-05-2015
1) e-NIT floated on 28072014 for procurement of Numerical distance
relays amp GPS As there is change in scope of work and quantity of relays
by more than 25 which is not permitted as per KTPP act Hence tender
cancelled and refloated on 05052015 with revised scope of work and
revised PQR
2 However as per the recommendations of PSAG Relays were
temporarily rearranged replaced and wired up testing amp commissioning
shall be completed with the assistance of KPTCL
Mail recieved on 07-07-2015
1 Cover -1 of the bid is scheduled for open eing on 25062015
2 As per the recommendations of PSAG Relays were temporarily
rearranged testing amp commissioning completed with the assistance of
KPTCL
Mail recieved on 07-09-2015
NIT floated on 5515 through e-portal Bid evaluation completed
Obtaining of Administration approval to place PO is in progress
However as per therecommendationsof PSAG-10 Relays
weretemporarilyrearrangedTesting amp commissioning completed with the
assistanceofKPTCL
Mail recieved on 21-10-2015
NIT floated on 5515 through e-portal Bid evaluation completed LOAs
issued to Ms Schneider Electric Infrastructure Ltd on 08102015
Mail recieved on 23-11-2015
LOAs issued to Ms Schneider Electric Infrastructure Ltd on 08102015
Engineering work is in progress
Status informed during Special Meeting held on 03062016
LOA‟s issued to Ms Schneider on 08102015 Inspection of relays
completed and received at site DI issued for all balance materials except
furnitures
Status received vide KPCL mail dated 14062017
Numerical Distance Protection relays commissioned on 12042017
for all 4 lines at Kadra PH
Installation Testing and commissioning of Numerical Distance Protection
Relays for all the 4 outgoing lines is completed in all respect at Kodasalli
power house
KPCL1 The PCSC forum requested KPCL to speed up the installation of
Numerical Distance Protection relay in Kadra ndashKaiga and
Kodasalli ndashKaiga
2 The PCSC forum requested KPCL to submit the implementation
status of PSAG-10 recommendations within a week‟s time
A fault had occurred in 220 kV Kadra and Kodasalli
As A result de-energization of 220kV bus occurred at
Kadra and Kodasalli
Annexure-III
Page 5 of 31
49II15
54II4 Tripping of 400 kV Raichur TPS-
Mahboobnagar line
05-04-2016 at
1023 hrs
Line tripped on operation of Backup impedance
protection of line reactor Direct trip was received at
Mahboobnagar end
KPCL to keep the functioning of the concerned electro-mechanical
back-up impedance protection relay under observation and replace it
with a spare at the earliest
KPCL Status received vide KPCL mail dated 10072017
The electro-mechanical back-up impedance protection relay is in service
However Budgetary offer obtained for the retrofitting of Line reactor
protection with Numerical relay and is under process
Pending
54II9
Pending
PendingStatus informed during Special Meeting held on 03062016
1 Hot line washing was done previouslytender process is on for silicon
coating of insulators
Status received vide mail dated 10-07-2017
1 Off line water washing is being carried out whenever the Unit or Line is
under shutdown Silicon coating for Unit8 main amp tie breakers carried
out in Sep16 and same is under observation Till today in order and good
condition For remaining breakers since it is big order approval for the
same is under process
2 Static Electromechanical relays are existing in all 1 to 7 units Breaker
flash over protection feature will be enabled (if available) in the numerical
relays which will be retrofitted in phased manner during RampM works
KPCL1 KPCL to carry out hot-line washing of RTPS-connected lines
regularly to avoid trippings due to fog and dust
2 KPCL may see the feasibility of providing breaker flashover
protection at RTPS and implement the same if possible
Running Unit-4 5 and Unit-8 and 400kV RTPS-
Yeramaras TPS feeder got tripped due to de-
energization of both 400kV Bus-1amp2 at Raichur TPS
12-11-2015 at
0030 hrs
54I4 220 kV Nagjheri - Bidnal line tripped on B-E fault at
1228 Hrs At the same time five running generating
units (1 2 3 4 amp 6) at Nagjheri tripped on operation
of Generator Transformer‟s back-up Over Current amp
Earth Fault protection
PendingKPCL
1 KPCL to revise the settings of GT‟s back-up OC and EF
protections considering their individual contribution to solid bus fault
at 220 kV bus of Nagjheri PH
2 KPCL to upload make available various tripping files
(FIRDRELTR) for all tripping involving their stations in compliance
of IEGC Regulation 52 (r)
14-04-2016 at
1229 hrs
Tripping of Nagjheri Generators Pending
Trippings at 220kV Raichur TPS
13-04-2016 at
2112 hrs
1KPCL to undertake the following remedial measures to avoid
breaker flashovers
(i) Replacing all porcelain insulators with composite insulators
(ii) Carrying out hot-line water washing of all insulators on regular
basis
(iii) Applying Room Temperature Vulcanizing (RTV) Silicone high
voltage insulator coatings to all bus-connected ceramic insulators of
equipment like CT PT CB Isolators etc
2KPCL to take steps to provide dedicated breaker flashover
protection to all breakers at Raichur TPS at the earliest
KPCL
Tripping of 400kV Raichur TPS Bus-2
46II21
Trippings at Raichur TPS
Status received vide KPCL mail dated 10072017
1 i) Silicon coating for Unit8 main amp tie breakers carried out in Sep16
and same is under observation Till today in order and good condition For
remaining breakers since it is big order approval for the same is under
process ii) Hot line
water washing stopped and off line water washing is carried out whenever
the 400 KV Unit or line is under tripped condition Shutdown condition
2 Static Electromechanical relays are existing in all 1 to 7 units Breaker
flash over protection feature will be enabled (if available) in the numerical
relays which will be retrofitted in phased manner during RampM works
Status received vide KPCL mail dated 14062017
1 GT backup overcurrent amp earth fault settings are revised as per the
recommendations of our head office CEEDBangalore copy of letter
enclosed
2 FIRDRELTR are being uploaded in the recent incidences as all the
main-2 relays are replaced with new numerical relays
Mail received on 21-10-2015
1) Anti-pumping contactors of all the nine 220KV Lines are in circuit and
tested periodically during AOH works of lines along with other protections
2) Completed
3) Possibility to use both the 220kV buses as main bus under normal
operation is under review
Mail recieved on 23-11-2015
1) Completed
3) Two bus operation for 220kV buses In place of existing CT switching
relays High speed manual heavy duty change over switch of sufficient
current capacity will be retrofitted to all feeders at 220kV station and same
will be operated manually during changeover of feeder by one bus to the
other and this arrangement may facilitate to put both buses in service Time
required for this retrofit is around 90days However this work will be
taken up only after retrofitting of electromagnetic relays with numerical
relays for Main-2 protection of all 220kV lines for which work is in
progress
Status received vide mail dated 10-07-2017
1) Completed
2) Completed
3) Two Bus operation for 220kV bus is being carried out whenever
required However scheme for tripping of one bus during LBBfault and
maintaining the other bus intact by tripping BC breaker will be taken up in
RampM works
KPCL1 KPCL to check the operation of anti-pumping relay on 220 kV side
and keep it in healthy condition
2 KPCL to provide manual reset to the 220 kV side master trip relay
3 KPCL to use both the 220 kV buses as main buses under normal
operation and should go for single bus operation only during
emergencies
07-06-2015 at
0135 hrs
Y-ph Pole of Tie-breaker of Unit-4 at RTPS failed
Unit-4 got tripped on operation of Generator
Differential Reverse power amp LBB protection
Operation of LBB protection led to tripping of BUS-2
at RTPS
Annexure-III
Page 6 of 31
55II1
56I2 Complete outage of 220kV Sedam
Substation of KPTCL
19-06-2016 at
1527hrs
220kV Sedam-Humnabad-2 tripped at Sedam on
Distance protection Zone-2 Sedam-RTPS-1 amp2 lines
tripped at RTPS end only 220kV Tandoor inter-state
line was hand tripped due to incoming supply failure
KPCL to disable GFC protection on all lines emanating from their
generating stations
KPCL Status received vide KPCL mail dated 10072017
As per the reccomndations of KPTCL in Feb16 the settings are done with
a time delay of 2 secs
Pending
57II3 Tripping of 400220 kV ICT-2 at Raichur
TPS
07-07-2016 at
332 hrs
ICT-2 tripped on operation 400220KV ICT-2 was
tripped on operation of 220KV side Instantaneous
over current protection during B-phase to earth fault
in 220kV RTPS-Sedam-II line
KPCL to review appropriately the high-set of ICT‟s back-up OC
protection at their 220 kV RTPS so that they do not operate for a
normal through fault
KPCL Status received vide KPCL mail dated 10072017
The settings will be reviewed in co-ordination with KPTCL amp OEM
Pending
KPCL
Pending
Pending
KPCL Status received vide KPCL mail dated 14062017
1 All logics checked and found normal LBB timing checked and found
200msec as per KPTCL MRT recommendation - Completed
2 Work Under Progress
3 New GPS System commissioned along with new numerical and
synchronised with GPS system - Complied
4 Work Under Progress
Status received vide KPCL mail dated 14062017
1 DEF settings in lines are made as per recommendations of CE(RT) amp
RampD KPTCL Bangalore amp EE(RT) KPTCL Hubli
High set operation of DEF relays is disabled at Kodasalli end
2 All these guidelines are incorporated by KPTCL during the replacement
of line protection relays
3 New stand alone event logger is to be procured since spares for old
stand alone event logger are obsolete
KPCL (i) KPCL to disable high-set operation of DEF relays
(ii) KPCL to block DEF relays whenever corresponding distance
protection relays pick up at Kodasally end on Nagjheri ndash Kodasalli
lines and
(iii)KPCL to provide stand-alone Event Logger at their 220 kV
Nagjheri PH
Bus dead occurred at 220kV Nagjheri PH due to
tripping of evacuating lines
KPCL
31-08-2016 at
1247hrs
Pending
Tripping of 400kV Bellary TPS-
Yeramarus TPS line and
400kVYeramarus TPS - Raichur TPS
line
PendingYet to be informed55II19
Tripping of Units at Raichur TPS During testing of retrofitted distance protection in
400kV Raichur-2 feeder LBB protection trip DC got
extended to Bus trip This resulted in tripping of
220kV bus at RTPS and all connected 220 kV
elements Unit-4 which is connected to 400 kV Bus
got tripped due to tripping of Station Utility
Transformer that is connected 220 kV bus
58I2 (GD)
Complete outage of 220 kV Kadra power
station of KPCL
54II13
1KPCL to properly configure the distance relays at YTPS end on
both YTPS ndash BTPS line and YTPS-RTPS line with specific focus on
reaches and timings of Zone-2 Zone-3 and Zone-4 (reverse)
2KPCL to ensure the healthiness of Direct Trip circuits and relay
coils at YTPS
3KPCL to ensure time sync of DR‟s and EL‟s at YTPS with GPS
06-09-2016
at 1440 hrs
31-05-2016 at
1721 hrs
Direct Trip was sent from YTPS to RTPS and BTPS
01-05-2016 at
2144 Hrs
LBB of 220kV Kodasalli breaker at Kadra end got
operated which resulted in tripping of Bus at Kadra
and in turn led to tripping of all elements
(i) KPCL to check settings of LBB protection in all relays from which
it was implemented and ensure that their configuration logic and
timing are in order at their 220 kV Kadra PH
(ii) KPCL to furnish details regarding the existing LT auxiliary
supply arrangement at their 220 kV Kadra PH and take steps to
provide a suitable Auto-Main-Fail (AMF) panel for DG set to effect
its auto-starting in case of failure of LT supply
(iii) KPCL to ensure time-sync of all relays (DR‟s amp EL‟s) with GPS
at their 220 kV Kadra PH
(iv) KPCL to provide stand-alone Event Logger at their 220 kV
Nagjheri PH
Complete outage of 220 kV Nagjheri PH
of KPCL
Multiple tripping at 400 kV Raichur TPS
Station
15-04-2016 at
1536 hrs
Triggering incident was failure of R-phase CT of
400220kV ICT-1 400kV YTPS-RTPS line got
tripped from YTPS end 400kV RTPS-
Mehaboobnagar line tripped on a B-phase to earth
fault
In view of the availability of two buses along with healthy bus-
coupler at 220 kV RTPS KPCL is recommended to put in service the
double-bus operation at 220 kV RTPS by suitably distributing loads
within 15 days
Status received vide KPCL mail dated 10072017
Two Bus operation for 220kV bus is being carried out whenever required
However scheme for tripping of one bus during LBBfault and maintaining
the other bus intact by tripping BC breaker will be taken up in RampM
works
1KPCL to enable zero-sequence compensation feature if not already
done in all differential relays of transformers at RTPS
2KPCL to examine in detail the reasons for SOTF operation at RTPS
end for the fault on RTPS-Veltoor line and if required relay
(configuration) settings at RTPS end may be suitably got revised with
the help of their OEM
3KPCL to take steps to enable auto-reclose for the Tie-CB‟s in the
dias containing Munirabad and Veltoor (Mehboobnagar) at RTPS
KPCL Status received vide KPCL mail dated 10072017
1) Zero-sequence compensation feature is already enabled in all the
differential relays of transformers ---Completed
2) Referred to OEM for the tripping of line on SOTF protection
3) Action has been taken to retrofit the protection relays of tie bays of
Mahbubnagar and Munirabad line to enable Auto-reclosure function
58I3 (GD)
Pending
Annexure-III
Page 7 of 31
Status received vide KPCL mail dated 14062017
1 On 09092016 at STRPTwo units were running(Unit-3 amp Unit-4It is
to clarify that Station tripped due to spurious operationLBB relay in Unit-
4 and not due to operation of Unit-3 LBB as indicated in PCSC
recommendations Unit-3 which was in service tripped as a consequence of
LBB ProtectionHow ever following actions performed in both Units
a) Trip coil-1 and Trip coil-2 circuit (including cable from protection panel
to GCB Marshaling Box)of GT Breakers of Unit 03 and 04 checked found
ok
b) Integrity of Connecting cableconductor from Generating unit no3 and
also to its corresponding GT Breakers inspected and found ok
c) Regarding Spurious operation of Unit No04 LBB relay and its
timerChecked the operation of the LBB overcurrent relay with its external
Timer for repeated correct operations it was found that LBB Timer was
giving correct timing operation for 1 in 3 operations only ie for one of the
operation it was operating within 40ms compare to set value(200ms) hence
declared as faulty and the same has been replaced with new one later
operation of the new Timer checked and found okoperating for gt200mse
only With this cause for spurious operation of LBB and resulting in
complete outage of STRP has been identified and solved -----
Completed
2 In Unit -3MCR is working satisfactorilyit is to clarify that problem was
existing in Unit No4 AVR manual channel reference value of Generator
The Same has been replaced with spare one Manual channel AVR is
found to be Ok ------Completed
3 All the units AVRs Healthyness checked and found Ok -
-----
Completed
4 Presently at GPHno stand alone Event logger exists Since the subject
requirement pertains to all the Generating units and in view of
Standardization of the complete system Networking of numerical relays
carried out and events are availble in networking system
KPCL
Pending
(i) KPCL to ensure the integrity of the connecting cable conductor
from Generating Unit-3 to its corresponding GT breaker at their STR
PH
(ii) KPCL to ensure the healthiness of Manual Current Regulator
(MCR) of Unit-3‟s AVR at their STR PH
(iii) KPCL to ensure the healthiness of AVR‟s of all Units of STR
PH
(iv) KPCL to provide stand-alone Event Logger at their 220 kV STR
PH
Spurious operation of LBB protection of line feeder
had led to tripping of 220 kV bus at Sharavathy Tail
Race power house
9-09-2016 at
1119 hrs
Pending
12-09-2016 at
1447 hrs
(i) KPCL to check and correct configuration settings of LBB
protection in all relays from which it was implemented at their 220
kV Varahi PH
(ii) KPCL to provide stand-alone Event Logger at their 220 kV STR
PH
KPCLLBB protection operated and caused bus shut down at
Varahi PH
Pending
Partial disturbance occurred in central Kerala grid due
to overloading and tripping of 220 kV lines Loss of in-
feed to 220 kV Kalamassery 220 kV Brahmapuram
220 kV Ambalamugal 220 Pallom amp 220 kV Kochi
occurred Generation at Neriamangalam Panniar
Chengulam and Pallivasal also got affected during the
incident
(i) SLDC KSEB to put in place proper mechanism to ensure
adequate load-generation balance is maintained in their control area at
all times and due vigilance is exercised in operating an already
depleted transmission network
(ii) KSEB to put UFR in service at New Pallom end on 220 kV New
Pallom ndash Amabalamugal line as part of Kudankulam Regional
Islanding Scheme
KPCL
Status received vide mail dated 14062017
LBB Protection system is in Bus bar Protection PanelThe Configuration
settings are checkedThey are as follows
Minimum operating primary current is 160A
Stage IIssue of Retrip to the feeder is 100ms after the action of main
distance protection Relayinitiation of LBB
Stage IIBus bar LBB Trip -200ms
Total time of LBB trip is 300ms from the time of occurrence of Line Fault
(i) KPCL to adopt the following VT fuse-fail logic for all 220 kV
lines emanating from NPH
ldquoUnder VT fuse fail condition distance protection shall normally be
kept blocked However upon detection of a fault (sensed by negative
sequence component) blocking of distance protection shall give rise
to operation of its inherent Over-Current protection set with a definite
time delay of 500 msecrdquo
(ii) KPTCL KPCL to revise Zone-2 Zone-3 and Zone-4 (reverse)
timings of DPR of all 220 kV lines emanating from Nagjheri PH in
line with Ramakrishna Committee guidelines
Triggering event was the fault on 220 kV Nagjheri
ndashKodasalli line-2 Both buses of 220 kV Nagjeri
power station of KPCL got
de-energized
62I1 KPCL Status received vide mail dated 14062017
1 Already settings are discussed with EE(RT) Hubli and soon relays will
be tested for VT fuse fail condition
2 Timings of Zones were set as per the recommendations of CE(RT) amp
RampD KPTCL Bangalore amp EE(RT) KPTCL HubliRegarding revision
of timings will be carried out in co- ordination with EE(RT) KPTCL
Hubli
15-09-2016 at
1406 hrs
Complete outage at Varahi Hydro Power
Station
Disturbance in Kerala system Yet to be informed Pending
58I5 (GD)
58I7 (GD)
21-01-2017
at 0038 hrs
Complete outage of 220 kV Sharavathy
Tail Race PH
58I6 (GD)
Complete outage of 220 kV Nagjheri
substation of KPCL
Annexure-III
Page 8 of 31
65II9 Tripping of 400220 kV ICT-1 at BTPS 13-05-2017 at
1941 hrs
ICT-1 got tripped on operation of LV side earth fault
protection during R-phase to earth fault in 220 kV
BTPS-Lingapur line
1 KPCL to review the need for providing separate non-directional
sensitive earth fault protection for ICT‟s at their BTPS station and
take steps to disable the same
2 For 220 kV BTPS ndashLingapura line KPCL to resolve issues relating
to PLCC carrier communication and put AR into service
KPCL Yet to be informed Pending
65III2 Tripping of 400 kV Hiryur-BTPS line-1 06-05-2017
at 1401 hrs
Y-phase to earth fault had occurred in line Direct
trip was sent from BTPS to Hiryur end
KPCL to introduce suitable delay (say 3 sec) for UVR tripping and
disable sending of DT to the other end on UVR operation at their
BTPS station
KPCL Yet to be informed Pending
PendingMail received on 27-05-2015 (KPTCL) amp 29-07-2015
1Existing Back up relays will be replaced by numerical type distance
relaysProcurement is in tendering stage
2 Completed
3 Completed
KPTCL Mail recieved on 23-01-2016
1 Existing back up relays will be replaced by Main-2 protection LOI
issued Ms Alstom for taking up the works
KPTCL Mail Recieved dated 25-05-2016
Under the Scope of RampU The work will be taken up by Ms Alstom
shortly
KPTCL Mail Recieved dated 25-04-2017
1 ALSTOM make P442 type Numerical relays are supplied to the site
replacement of M-1 relays(OPTIMHO) by new relays will be taken up
shortly
KPTCL
KPCL Status received vide mail dated 10072017
1 Furnishing FIR amp TR of the tripping events as per the formats provided
by SRLDC
4 Refered to OEM for the tripping of Tie CB of Munirabad line on SOTF
protection
Pending
1 PCSC forum recommended KPTCL to replace the old static
distance protection relays with numerical relays
2 PCSC forum also requested KPTCL to provide a broken conductor
alarm indication in Control Room
3 Standing instruction needed to be given to the all substation
personnel for not changing the relay settings without approval of
RTMRT wing
Fault had occurred in 220kV
Mahalingapura-Narendra line-2 Due to the failure of
relay operation at Mahalingapura breakers at remote
end tripped which resulted in bus dead condition
1 KPCL to start furnishing FIR and TR of their tripping events as
per the formats provided by SRLDC
2 KPCL to check earth-mat resistance for 400 kV switchyard and
ensure that it is within prescribed limits
3 KPCL to set right operation of SER in CampI Control Room of Unit-
4
4 KPCL to furnish action taken wrt tripping of Tie-CB of
Munirabad line on SOTF protection OEM report in this regsrd may
be furnished
25-10-2014GD-1 at Mahalingapura Substation of
KPTCL
38GD31
63II10 Multiple trippings at 400 kV RTPS
substation of KPCL
16- 03-2017 at
0118 hrs
Bus-2 B-Ph differential bus bar protection operated
at 400 kV RTPS end tripping all the main breakers
connected to Bus-2
Annexure-III
Page 9 of 31
Pending
Suspected mal-operation of 220kV side Rphase
over current relay
Line tripped on Yphase to earth fault from both the
ends
20-12-2014
at 2220 hrs
KPTCL was requested to explore the possibility of providing AR
feature to this line and submit the remedial measures to the PCSC
forum
Pending
KPTCL1 Till the completion of RampM works for bus bar and LBB protection
KPTCL shall explore the possibility of having split bus operation at
Ambewadi and submit the details of the same to PCSC forum
2 KPTCL shall provide the details of the tripping of Supa hydro
station connected downstream from 110 kV bus
39I5
40I1
220kV Sedam-
Tandur line
Triggering incident was B-phase to earth fault in
220kV Ambewadi- Nagzari line-1 B-pole of breaker
did not open at Ambewadi end LBB protection not
available at Ambewadi end All elements tripped on
Zone-2 from remote ends
01-12-2014Tripping of 400220kV
ICT-2 at Hoody
substation of KPTCL
40IV1
Mail received on 27-05-2015 amp 29-07-2015
1 CampR panels of 500MVA ICT 1amp2 will be replaced under scheduled
RampM works
2 OampM personnel are instructed to take sufficient care in order to avoid
unwarrented trippings --- Completed
KPTCL mail received on 23-01-2016
1 New CampR panels(with numerical relays) erected for 500MVA ICT-1
amp2 under RampM work which will be commissioned shortly
KPTCL mail received on 25-05-2016
1 New CampR panels(with numerical relays) erected for 500MVA ICT-1
amp2 under RampM work which will be commissioned shortly
KPTCL mail received on 25-04-201
1 New CRPs mounted in bay KIOSK commissioned under RampM works
KPTCL1 PCSC forum recommended KPTCL to replace the relay with a
different make
2 KPTCL was also requested to train the OampM personnel
adequately before performing any maintenance works to avoid such
unwanted trippings
PendingMail recieved on 29-07-2015
Carrier protection is being restored for 220kV Sedam-Tandoor line at
Sedam end After restoring the carrier protection AR will be enabled
KPTCL mail recieved on 23-01-2016
Carrier protection is being restored for 220kV Sedam-Tandoor line at
Sedam end After restoring the carrier protection AR will be enabled
KPTCL mail recieved on 25-05-2016
SEESCADA to update the latest status
KPTCL mail recieved on 28-06-2016
Action is being taken to restore carrier protectionAR will be enabled once
carrier signal is restored
KPTCL
22-12-2014 at
2122 hrs
Mail received on 28-04-2015
1 In view of operating 220kV Ambewadi SS in split bus mode action is
being taken up by KPTCL Problem in the 220kV bus coupler breaker is
attended and isolator overhauling work is under progress Spilt bus
operation at Ambewadi will be made possible at the earliest
2 ICT Protection system at Ambewadi and trippings occured at Supa GS
during the instance is checked up and remedial measures already furnished
in this regard
---- Completed
Mail recieved on 29-07-2015
1 Action is being taken by KPTCL for operating Ambewadi in split bus
mode Problem in bus coupler breaker is attendedIsolator overhaulling
work is completedPTs are already provided to 220kV Bus-II After
commissioning of Bus-II PTs Ambewadi can be operated in split bus
mode Pending works will be completed within a months time
KPTCL mail recieved on 23-01-2016
1 Bus-II PTs yet to be commissionedPlanned to complete before end of
April-2016
KPTCL mail recieved on 25-04-2017
1 Yet to be attended
GD-1 at 220kV Ambewadi Station of
KPTCL
Annexure-III
Page 10 of 31
1 KPTCL to provide Bus Bar protection and LBB protection at
Sedam Ss and furnish the status of their implementation to PCSC
forum
2 KPTCL to implement AR feature on 220 kV Sedam-Tandur inter-
state line
Mail received on 28-04-2015
Procurement of Bus bar and LBB protection is in the final tendering stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
KPTCL mail received on 23-01-2016
1 Bus bar protection panels pocured and erected at Sedam Wiring
testing commissioning is being taken upPlanned to complete by April
2016
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
KPTCL
12-03-2015 at
751 hrs
1 KPTCL shall provide AR feature on Ambewadi ndash Ponda 220 kV
DC inter-state line
2 Till the completion of RampM works for bus bar and LBB protection
KPTCL shall explore the possibility of having split bus operation at
Ambewadi and submit the details of the
same to PCSC forum
Mail received on 27-05-2015
1 Bus Bar protection will be provded under RampU
2 AR yet to be enabled
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
Fault occurred in 220kV Sedam-Shahpur line
All connected 220kV lines and transformers were
taken on 220kV North bus as South bus was under
shut down for conversion of strung bus to rigid bus
and isolator replacement under RampM works Failure
of HV side Y phase CT of 150MVA Transformer-3
occurred at Peenya Substation which resulted in
operation of Differential and HV REF protection The
failure of CT also resulted in a 220kV bus fault in
North Bus
KPTCL to revise distance relay settings at Nelamangala end for 220
kV Nelamangala ndash Hebbal - Peenya line ndash 1 for the effective line
length of 17 km These new settings can be appropriately reviewed as
and when the tie-arrangement at Hebbal is done away with
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
Pending
PendingKPTCL
30-09-2015 at
1041 hrs
Pending
Outage of 220kV Ambewadi station in
Karnataka
Pending
PendingKPTCL mail received on 23-01-2016
Will be complied in a months time
220kV Ambewadi-Nagjheri line-2 tripped on B-phase
to earth fault This resulted in loss of supply to 220kV
Ambewadi bus 220kV Ambewadi-Ponda line-1amp2
were hand tripped after deenergization of bus at
Ambewadi
KPTCL
Complete outage of 220kV Ambewadi
substation of KPTCL
42I2 (GD)
27-09-2015 at
42317 hrs
Fault in 220kV Ambewadi-Nagjheri line-2
KPTCL
KPTCL
KPTCL mail received on 25-05-2016
Presentl 220kV Nelamangala -Hoody(ie nelamangala-Peenya-Hebbal -
Hoody line is made LIILO at Yelahanka sub station and breaker at
Peenya is kept open necessary modification in distance relay settings
adopted for new configuration
15-02-2015 at
1424 hrs
Complete outage of 220kV Peenya
Substation in Karnataka
R-Phase to ground fault occurred on 220kV Sedam-
Shahpur line Fault not cleared from Sedam end due
to stuck-breaker condition While the Sedam- Sahapur
line tripped from Shahapur end in Zone-1 the other
220 kv lines from Sedam tripped at remote ends in
Zone-2 This caused complete outage of 220kV
Sedam substation
42I1 (GD)
41I4
Complete outage of 220kV Sedam
substation of KPTCL
48I2 (GD)
48I3 (GD) KPTCL to fast-track providing AR on all 220 kV lines emanating
from Ambewadi SS to prevent Station shut-down on temporary faults
06-08-2015 at
451 hrs
220kV RTPS-Lingasugur line-2 tripped at TPS end
on operation of distance
protection zone-1 400220kV ICT-2 got tripped on
operation of earth fault
protection 220kV RTPS-Lingasugur line-1amp3 tripped
on distance protection zone-2 and zone-3
respectively Due to tripping of ICT-2 the running
units got overloaded and it was mentioned that under
frequency occurred as units are on load control The
Units got tripped on under frequency
KPTCL to activate non-directional Over Current protection with a
time delay of 600-800 msec for Fuse
failure condition at Lingasugur
KPTCL Status received vide KPCL mail dated 10072017
LV earth fault relay had an additional default Ef setting having a definite
time which resulted in tripping of ICT-2 and the same was rectified and
already complied
Pending
1 KPTCL to provide Bus bar and LBB protections for 220 kV
bus at Sedam Ss
2 KPTCL to implement AR feature on 220 kV Sedam-Tandur
inter-state line
27-01-2015 at
800 hrs
Complete outage at 220kV Sedam
Substation of KPTCL (GD-1)
Tripping of Unit-1amp2
along with 400220kV
ICT-2 at Raichur TPS
47II13
Annexure-III
Page 11 of 31
52I3 (GD) Complete outage of 220kV Shimoga
substation
22-02-2016 at
1503 hrs
220kV Bus Bar protection operated during failure of
R phase CT in DVG-2 line bay
KPTCL to operate 220 kV Shimoga on multi-bus operation under
normal conditions put it on single-bus operation only under
emergency conditions
KPTCL KPTCL Mail received dated 25-04-2017
Replacement of existing BBP by new BBP with 4 zone protection is being
taken up under RampU
Pending
56II6 Tripping of 220kV Ambewadi-Ponda
(Xeldam) line-1
10-06-2016 at
1333 hrs
Line tripped on Y-E faut due to DPR Z1 operation KPTCL to keep AR for Ambewadi ndash Ponda (Xeldam) line-1 in
service with immediate effect
KPTCL Yet to be informed Pending
59II13 Tripping of 220 kV Bidadi (PG) - Bidadi
lines - 1amp2
02-10-2016 at
1032 hrs
Line-2 tripped in DPR Zone-2 and Line-1 tripped on
operation of EF protection from Bidadi end
KPTCL to resolve PLCC carrier communication issues on 220 kV
Bidadi ndash Bidadi-PG DC lines and subsequently restore Zone-2
timing to normal values
KPTCL Yet to be informed Pending
1 KPTCL to configure all DR‟s and EL‟s at 400 kV Guttur SS so
that they will also get triggered for BBP operation
2 KPTCL to ensure time-synchronization of all DR‟s and EL‟s with
GPS at their 400 kV Guttur SS
KPTCL17-01-2016 at
1853 hrs
Pending
Pending
Yet to be informed PendingKPTCL
KPTCL
30-09-2015 at
1041 hrs
Complete outage of 220kV Ambewadi
Substation of KPTCL
Multiple tripping at 400kV Guttur sub-
station
Outage of 220kV Ambewadi station in
Karnataka
29102015 at
1434 hrs
Complete outage of 220kV Peenya
Substation of KPTCL
PendingKPTCL mail received on 23-01-2016
Will be complied in a months time
220kV Peenya-Nelamangala-3 tripped on B-E fault at
both ends At the same time 220kV Peenya-
Nelamangala-4 tripped on R-Y fault only at
Nelamangala end and was in service from Peenya
end Due to tripping of these two lines 220kV Peenya-
Nelamangala-2 tripped on overcurrent protection
KPTCL to furnish a report on the tripping of 220 kV Peenya-
Nelamangala line-4 Nelamangala detailing the remedial measures
taken including the settings adopted for Z1B (Zone extension) and
Power Swing Block
Pending220kV Nagjheri-Ambewadi line-1 tripped at 1333
hrs due to B phase to earth fault Ambewadi was
radially fed from Nagjheri power station through
220kV Nagjheri-Ambewadi line-2 Tripping of this
line caused 220kV Bus shut down at Ambewadi and
remaining lines and transformers were hand tripped
220kV Ambewadi-Nagjheri line-2 tripped on B-phase
to earth fault This resulted in loss of supply to 220kV
Ambewadi bus 220kV Ambewadi-Ponda line-1amp2
were hand tripped after deenergization of bus at
Ambewadi
KPTCL
Yet to be informedKPTCL
KPTCL Mail received dated 25-05-2016
SEE RTC Bangalore to update the status
KPTCL Mail received dated 28-06-2016
Providing numerical bus bar protection to 400kV buses and GPS time
synchronising equipment at Guttur is considered under RampU Work is
awarded to Ms Alstom execution will be taken up shortly
KPTCL Mail received dated 25-04-2017
GPS and accessories will be supplied during May 2017 expected to
complete the work within a month after supply of materials
53I1
1KPTCL to take steps to provide busbar protection at their 220 kV
Chikkodi inter-regional substation and furnish a time-line for the
same
2KPTCL to review distance protection settings for 220 kV Chikkodi
ndash Kudachi line
3KPTCL to furnish equipment failure report of the current incident to
PSEampTD Division of CEA with a copy marked to SRPC
KPTCL Mail received dated 25-05-2016
SEE RTC Bangalore to update the status
1 KPCL to provide AR on all 220 kV lines emanating from Nagjheri
PH
2 KPTCL to provide AR on all 220 kV lines emanating from
Ambewadi SS
Failure of Lightning Arrestor of Y-phase Line Reactor
of 400kV Guttur-Hiriyur line-1 and line tripped on
distance protection Zone-1 Bus-bar protection of
400kV Bus-2 at Guttur substation also got operated
during the event sensing this through fault 400220
kV ICT-1 amp 2 at Guttur 400kV Kaiga-Guttur-2
400kV
Guttur-Narendra-2 400kV Guttur-Hiriyur-2 and
400kV Guttur-Munirabad which are on 400kV Bus-2
got tripped during the incident 400kV Guttur-
Narendra-1 which was on Bus-1 also tripped at the
same time
49I13 (GD)
Triggering incident was failure of B-ph PT of 220kV
Bus-2 (western bus) at 220KV Chikkodi substation
220KV Chikodi- Belgaum-I line tripped on DEFR
(Inst) 220KV Chikkodi-Kudachi line tripped on
Distance protection and also 100MVA transformer-2
tripped on EF protection
57II1 01-07-2016 at
0303 hrs
Tripping of 220 kV Chikkodi-Mudshingi
and 220 kV Chikkodi-Talandage lines
48I3 (GD) KPTCL to fast-track providing AR on all 220 kV lines emanating
from Ambewadi SS to prevent Station shut-down on temporary faults
51II21
16-03-2016 at
1139 Hrs
Annexure-III
Page 12 of 31
62II3 Tripping of 220 kV Bus 2 and connected
elements (220kV HAL 1 and 2
400220 kV ICT- 1 2 and 22066 kV
ICT-2) at 400220 kV Hoody substation
of KPTCL (Load loss 590 MW)
09-01-2017 at
2306 hrs
Failure of R-phase CT of 220 66 kV transformer-2 at
220kV Hoody end resulted in a bus fault in 220kV
Bus-2 Fault was cleared by backup protection of
ICTs (220kV lines were being radially operated) due
to absence of busbar protection
1 KPTCL to provide Busbar protection at their 220 kV Hoody SS at
the earliest
2 KPTCL to furnish an Equipment Failure Report on CT failure to
CEA with a copy marked to SRPC
KPTCL KPTCL mail received dated 25042017
Numerical BBP is being provided under RampM works
Pending
64II9 Tripping of 400 220 kV ICT-2 and 3 at
Hoody substation of KPTCL
26-04-2017 at
1540 hrs
ICT-2 tripped on suspected mal-operation Oil surge
relay of B-phase Transformer ICT-3 tripped due to
overloading
KPTCL to put in place a suitable SPS at their 400 220 kV Hoody SS
that takes care of over-loading of the other ICT when one ICT out of
ICT‟s ndash 2 amp 3 trips at the earliest and furnish the details of
implemented SPS to PCSC forum
KPTCL Yet to be informed Pending
65II17 Tripping of 400220 kV ICT - 1 amp 3 at
Hoody substation of KPTCL
(Load Loss 750 MW)
26-05-2017 at
1230 hrs
R phase limb of ICT-1 bank pre-close supervision
contact of trip coil -2 had arc over ICT-3 got tripped
on over-loading
KPTCL to furnish compliance report on the recommendations given
in PSAG-18 meeting to PCSC forum
KPTCL Yet to be informed Pending
Complete outage of 220kV Nagjheri
power station and 220kV Ambewadi
substation of KPTCL
51I3 PendingStatus informed during Special Meeting held on 03062016
1 KPTCL informed that the matter had been taken up with concerned Line
Operation and Maintenance wing to carry out corridor clearance and
maintenance as per schedule to avoid frequent line faults in this corridor A
letter had also been addressed to Chief Engineer Bhagalkot zone to ensure
lines in amp around Kali complex are maintained in healthy condition ---
Completed
2 KPTCL assurd that the final modified SPS would be implemented at
Nagjheri PH at the earliest ------ Pending
3 KPCL informed that Nagjhari- Kodasalli Lines 1 amp 2 had been kept in
service since 23052016 0806hrs ---- Completed
KPTCL Mail received dated 28-06-2016
Modifications to be carried in Nagzari SPS logic is submitted to
SRLDCSRPC for verification and approval
Status received vide KPCL mail dated 14062017
1 Will be reviewed in consultation with EE(RT) KPTCL Hubli
2 Both the lines are in charged condition
KPCL KPTCL 1 To avoid tripping of transmission lines on transient faults KPCL
KPTCL is recommended to carry out periodic patrolling of lines and
ensure their proper maintenance by carrying out jungle bushing
clearance and trimming of tree branches within the RoW of
transmission lines as per the SRPC transmission line patrolling
guidelines (available under the menu item All Uploads Operation
Miscellaneous Transmission Line Patrolling Protocol
Guidelines for Southern Region on SRPC website)
2 KPCL KPTCL to review operation of SPS at NPH for
functionality (reduction of generation with tripping of evacuating
lines) and healthiness
3 KPCL to put 220 kV Kodasalli - Nagjheri DC lines into service if
more than 200 MW generation from Kali Complex (with Nagheri
Contribution not less than 50 MW) is ensured on sustained basis
220kV lines from Nagjheri power house started
tripping from 1100 hrs due to fault in lines The
sequence of tripping is shown in SOE list At 1233
hrs 220kV Narendra-Ambewadi lines-1amp2 got
tripped which resulted in loss of evacuation path to
Nagjheri station resulting in tripping of running Units
and complete outage at Nagjhheri power station
220kV Ambewadi station also got de-energized due
to tripping of source feeders ie 220kV Narendra-
Ambewadi-1amp2 and 220kV Nagjheri-Ambewadi-
1amp2
22-02-2016 at
1236 hrs
Pending
Pending
KPTCL
For the line under consideration the following shall be carried out by
KPTCL in coordination with
PGCIL (SR-II)
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
KPTCLLine tripped at Hiryur end due to direct trip receive
and was holding from Guttur
KPTCL mail received dated 25042017
Numerical BBP is being provided under RampM works
KPTCL to provide numerical Busbar Protection at their 220 kV
Somanahalli SS at the earliest
Tripping of 400 kV Neelamangala-
Hoody line-1
KPTCL to carry out the following for the line under consideration
(i) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
(ii) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
Tripping of 400 kV Guttur-Hiryur line-1 10-10-2016 at
315 hrs
62IV4
59IV4
62II5 Tripping of 220 kV South Bus and
connected elements (220kV HSR 220kV
Nagnathpura 220 kV Harohalli 220 kV
Subramanyapura 220 kV Tataguni 220
kV Mallur and 400220kV ICT-2 and 3)
at 400220kV Somanhalli substation of
KPTCL
(Load loss 850 MW)
20-01-2017 at
1434 hrs
Triggering incident was fault in 66 kV Somanahalli -
Bannerghatta line and fault was cleared by operation
of Back-up OCR at Somanahalli end
15-02-2017
at 1344 hrs
Line tripped at Hoody end on direct trip receive and
was holding from Neelamangala end
Yet to be informed
KPTCL
Yet to be informed Pending
Annexure-III
Page 13 of 31
56I3 Complete outage of 220kV Ambewadi
Substation of KPTCL
24-06-2016 at
2057hrs
B phase to earth fault had occurred in 220 kV
Ambewadi-Ponda line-2 Fault was cleared by
tripping of feeders from remote end
1KPCL amp KPTCL to furnish an action taken report on the
recommendations given by PSAG-16 to PCSC forum
2KPTCL to keep AR for Ambewadi ndash Ponda line-2 in non-auto
mode (ie only 3-ph trip should get extended on occurrence of a
fault) till the line is closed from Ponda end
KPCLKPTCL Yet to be informed Pending
Complete outage of 220kV Ambewadi
station of KPTCL and 220kV Nagjheri
of KPCL
Ambewadi Narendra line-2 tripped on fault and
220kV ambewadi Narendra line-1 tripped due to over-
loading Running Units at Nagjheri also tripped during
the event due to tripping of evacuating lines
KPCL KPTCL18-03-2016 at
1440 hrs
1 TANGEDCO to replace existing Check-Zone relay with a new one
possessing required performance
2 TANGEDCO to take steps to provide numerical busbar protection
at their 220 kV Tuticorin TPS TANGEDCO may also explore
providing dual CT‟s (on either side) for all BS breaakers at the time
of commissioning of numerical BBP if there were no space
constraints
3 TANGEDCO to take steps to provide for standalone Event Logger
(EL) and standalone Disturbance Recorder (DR) with automatic
downloading facility to a centralized server
Failure of Bus Section-I Y-ph CT resulted in
operation of bus-bar protection for Bus Sections -I amp
II Running Units1 4 and 5 230 kV Kayathar
230kV Kudankulam 230kV Sterlite Station
Transformer-1 2 amp 3 got tripped during the incident
Unit ndash 2 amp 3 were not in service
22-02-2017 at
0616 hrs
KPCLKPTCL
25-01-2017 at
2236 hrs
R-phase to earth fault due to de-capping of insulator
Auto-reclose attempt was unsuccessful
Tripping of ICT-3 at Raichur Substation
TANGEDCO
Pending
Tripping of running Units amp 230kV
feeders at Tuticorin TPS of TANGEDCO
(Gen Loss 640 MW)
62II7
1 KPCL to furnish a report on the reasons for Unit-6 tripping at
Nagjheri PH
2 KPCL KPTCL to modify suitably the SPS at Nagjheri Power
House such that it would also factor in the over loading of Ambewadi-
Narendra lines
3 KPCL to put 220 kV Kodasalli - Nagjheri DC lines into service if
more than 200 MW generation from Kali Complex (with Nagheri
Contribution not less than 50 MW) is ensured on sustained basis
Pending53I3 (GD)
15-03-2016 at
1228 hrs
ICT-3 tripped due to operation of back-up earth fault
protection during fault in 220kV RTPS-Raichur line-
1
KPCL KPTCL to check the ICT‟s back-up (high-set) protection
settings and ensure that they operate with a time delay of 100 msec
TANTRANSCO mail dated 12042017
1 The recommendation will be ensured AR logic will be configured in
Distance Protection relay itself instead of BCU OEM has been addressed
2 Post triggering period of 2 sec to cover AR operation in DR time scale
will be provided
TANTRANSCO mail dated 01062017 amp 15062017
1 The recommendation will be ensured AR logic will be configured in
Distance Protection relay itself instead of BCU OEM has been addressed
Main-1 amp 2 relays will be replaced for the requirement of more output
contacts for AR logic implementation
2 Post triggering period of 2 sec to cover AR operation in DR time scale
is being provided
TANGEDCO1 TANGEDCO to take properly configure AR logic at NCTPS-II in
that in case of unsuccessful auto-reclsoure three-phase trip shall be
given along with AR block
2 TANGEDCO to configure all protection relays DR‟s time scale at
NCTPS-II for a post-triggering period of 2 sec to capture events such
as complete AR operation
Tripping of 400 kV NCTPS-
SVChatram line-2
KPTCL Mail received dated 28-06-2016
Modifications to be carried in Nagzari SPS logic is submitted to
SRLDCSRPC for verification and approval
Status received vide KPCL mail dated 14062017
1 Tripped since there was evacuation problem and there were only two
lines NA-1 and NA-2
2 Will be reviewed in consultation with EE(RT) KPTCL Hubli
3 Both the lines are in charged condition
TANGEDCO mail dated 15042017
1) New Relay is tested and ready for replacementNow all 5 units are in
serviceThe relay will be replaced when lesser units are in service ---
Pending
2a)Steps are taken to renovate amp mordernization of all the control panel
into Numerical based control panels --- Pending
2b) Since 230 KV indoor switchyard has no spare space providing dual
CT`s is not fessible -- Completed
3) Procurement of EL amp DR is under progress --- Pending
TANGEDCO mail dated 26042017
1) Check zone New Relay is replaced on 17042017 -- Completed
2 Pending
3 Pending
KPTCL Mail Recieved dated 25-05-2016
SEESCADA to update the status of healthiness of carrier protection of
220kV RTPS-Raichur 1 amp2 lines
KPTCL Mail Recieved dated 28-06-2016
Details sought from KPCL for review of ICTs back up (high set) proection
settings as suggested KPCL is yet to furnish the details required to give
the revised settings
Status received vide mail dated 10-07-2017
As requested by EEE (protection) CEERT KPTCL the details were sent
to through e-mail dtd 08082016 After receipt of reply from KPTCL will
be implemented accordingly
62V3 Pending
Pending
Tamil Nadu
53II1
Annexure-III
Page 14 of 31
05-09-2015 at
1404 hrs
TANTRANSCO to take suitable measures like installing more stub-
towers along 230 kV OK Mandapam ndash Myvady line to avoid
excessive sag due to over-loading
TANTRANSCO PendingComplete outage of 230kV Palladam 230 kV
Othakalmandapam Ss 230 kV Coimbatore Ss 230
kV Thudialur and 230 kV Sadayapalayam Ss
Pending
Disturbance in 220kV Tamilnadu system48I1 (GD)
TANTRANSCO TANTRANSCO vide their mail dated 240615 informed that different
relays in Main-I amp Main-II would be ensured at the earliest
Mail recieved on 24-07-2015 19-02-2016 and 24-03-2016
Different relays in Main-I amp Main-II will be ensured
Mail received on 27-04-2016
TANTRANSCO Not feasible in the existing SAS sub stations Hence
exemption may be given for these sub stations
Mail received on 20-05-2016 16-06-201625-07-2016 amp 24-09-2016
As discussed in the 52nd PCSC meeting Swapping of Relays between two
stations is not feasible in the existing SAS sub stations Hence exemption
may be given for these sub stations
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15062017
Different make Relays will be ensured for Main-I amp II relays at Alamathy
end
TANTRANSCO Mail received on 19-02-2016 24-03-2016 and 27-04-
2016
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
Mail Received on 20-05-2016 16-06-201625-07-2016 amp 24-09-2016
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
29-03-2015 at
1529 hrs
43II5 Line-2 tripped on R-phase to earth fault
Line autoreclosed at SVChatram end and failed to
reclose at Alamathy end Bphase to earth fault in line-
1 Line tried for Ar but due to permanent fault line
did not reclose ICT tripped on operation of over flux
protection
TANTRANSCO was requested to swap the relays between two
stations so that
Main-1 and Main-2 will be of different make at each station
Tripping of 400kV
Alamathy-
SVChatram line-1amp2
and 400230kV ICT
at SVChatram
Annexure-III
Page 15 of 31
14-09-2016 at 1113Hrs
Bus Bar Protection (Zone-2) of 230 kV Bus-B got operated at Alamathy Station during fault in 230 kV
Alamathy-Korattur feeder
51I1 (GD)
12-05-2016 at
1215 hrs
Fault had occurred in 230kV Madurai-Sembatty line
Trip from distance relay was not extended to breaker
due to protection DC fail LBB protection got
operated resulting in a busbar trip at 230kV Madurai
substation All elements got tripped as there is a
single bus operation at 230kV Madurai Ss
58II17
TANTRANSCO
TANTRANSCODifferent type and Make of distance protection relays to be provided for Main-I amp Main-II protection for 230kV feeders at 400 kV Sunguvarchathiram amp 230 kV Sunguvarchathiram Substation [Carry-Over from Protection Audit Recommendations]
Mail recieved on 25-07-2016 amp 24-09-2016
TANTRANSCO Auto Transformer-2 HV side Bus isolator C-phase
support insulator of 230kV Southern Bus was replaced and Bus Bar
Protection scheme was restored on 12052016
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
CT is not available in the Bus Coupler bay for zone segregation CT latch
relay is to be provided for all bays for zone segregation
TANTRANSCO mail received on 24-03-2016
CMR relay for extending LBB protection was released and LBB extended
from Distance Protection relay directly CT is not available in the Bus
Coupler bay for zone segregation However during commissioning of third
ICT Bus section Breaker will be provided for zone segregation Numerical
BBP relay will be provided
Status received vide mails recieved on 27-04-2016 and 20-05-2016 16-
06-2016 25-07-2016 24-09-201610-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
CT is not available in the Bus Coupler bay for zone segregation However
during commissioning of third ICT Bus section Breaker will be provided
for zone segregation Numerical BBP relay will be provided
PendingComplete outage of 230kV Madurai Ss
(Chekanaurani) of TANTRANSCO
TANTRANSCO
Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
TANTRANSCOMultiple tripping at 230 kV Alamathy Station
Pending
Pending
1 TANTRANSCO to check the healthiness of BBP relay by conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
TANTRANSCO to take steps to provide double-bus operation at
their 230 kV Gummidipoondi SS
Pending
Complete outage of 230 kV
Gummidipoondi Station of
TANTRANSCO
19-01-2016 at
1156 hrs
Flashover of Auto Transformer- 2 HV
B-phase Isolator supporting insulator of 230kV
Southern Bus occurred at Gummidipoondi station At
the time of fault Bus bar protection relay was not in
service for pre-commissioning testing of Auto
Transformer-2 All feeders got tripped due to
operation of zone-2 protection from remote ends
TANTRANSCO1 TANTRANSCO to examine the feasibility of providing two main-
zone operation for bus bar protection by exploring various alternatives
like replacing existing bus-coupler CB with a hybrid bus-coupler CB
that comes with inbuilt CT replacing existing BBP relay with another
suitable relay that supports two main-zone operation and implement
the same
Busbar protection got operated for a fault in 230kV
Mywadi-Anaikadavu line
21-12-2015 at
628 hrs
Complete outage of 230kV Mywadi
station of TANTRANSCO
50I3 (GD) TANTRANSCO Mail received on 19-02-2016 and 24-03-2016
Revision of Bus Bar Protection setting was carried out The stabilizing
voltage setting was raised from 410 to 450 volts After completing the
necessary test the bus bar protection put in to service on 29122015
Mail Received on 27-04-2016 16-06-201625-07-2016 amp 24-09-2016
Revision of Bus Bar Protection setting was carried out After completing
the necessary test the bus bar protection put in to service on 29122015
Mail received on 10-11-2016 amp 20122016
Provision of Bus Coupler bay arrangement was included in the
Upgradation works proposed and the same was sanctioned by MoP
through PSDF
Numerical relay allotted and being commissioned
Mail received on 20-02-2017
Numerical BBP relay was commissioned on 02022017
Status received vide mail dated 12042017 amp 01062017 amp 15-06-
2017
Numerical BBP relay was commissioned on 02022017
Provision of Bus Coupler bay arrangement was included in the
Upgradation works proposed and the same was sanctioned by MoP
through PSDF
The issue was discussed in PCSC-58 meeting held on 18102016 when
PCSC forum agreed to de-link the implementation of the Item from the
scope of Protection Audit Recommendations (PAR) and pursue it as part
of PCSC Recommendations
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp15-06-2017
Different make Relays will be provided for Main-I amp II relays at
Sunguvarchatram end in a phased manner
Pending
1 TANTRANSCO to provide split-bus operation with bus
sectionalizer CB for their 230 kV Madurai (Chekanurani) SS
2 TANTRANSCO to provide two main-zone operation for the
numerical BBP that is being commissioned
3 TANTRANSCO to examine the feasibility of providing Re-Trip
feature for the LBB protection and accordingly take steps for
implementing the same
58
55I1 (GD)
Annexure-III
Page 16 of 31
58II17 Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
TANTRANSCOMultiple tripping at 230 kV Alamathy
Station
15-09-2016 at
2214 hrs
Bus Bar Protection (Zone1) of 230kV Bus-A got
operated at Alamathy Station during fault in 230 kV
Alamathy-OPG-1 feeder
1 TANTRANSCO to check the healthiness of BBP relay by
conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal
winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
Pending
Annexure-III
Page 17 of 31
6414 Complete outage of North Chennai TPS
STG-1
26-03-2017
at 2314hrs
Tripping of evacuating lines due to fault led to
tripping of running Unit at NCTPS Stg-1
1 TANTRANSCO to take steps to complete insulator replacement
works on the 230 kV lines owned by them in NCTPS area within 6
months
2 TANTRANSCO to take steps to implement AR on all 230 kV lines
emanating from NCTPS-I at the earliest
TANTRANSCO Yet to be informed Pending
65II1 Tripping of 220 kV Idukki ndashUdumalpet
line
05-05-2017 at
1702 hrs
Line tripped due to B-N and R-N fault in line 1 TANTANSCO to correctly configure AR logic at Udumalpet so
that in the event of 3-ph trip being given during AR dead-time the
relay will not try for auto-reclosure
2 TANTRANSCO to keep AR dead-time as 1 sec for all 220 kV amp
above transmission lines
TANTRANSCO Yet to be informed Pending
58II17
44I1 (GD)
Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
KSEB Mail received vide dated 17012017
1 110 kV bus bar protection progressing ----Pending
2 Connection of 220kV earth mat and 110 kV plate earthing system
completed---- Completed
3 Redundancy of 110V DC system in progress Complete independent
redundancy is not practical for the time being 48 V DC redundancy was
already there----Pending
4 Instead of stand alone event logger SCADA system of 110 kV feeder is
expected to be completed by the end of 2017 SCADA system of 220kV
side will be taken up after that----Pending
28-04-2015 at
1230 Hrs
Mail received on 31-07-2015
1 Reducing the sensitivity of REF protection of Unit 4 5 6 at Idukki
PH - Generation wing is planning to purchase new transformer
management relays with low impedance REF protection Purchase
procedures initiated ---------Pending
2 The replacement repair of faulty breakers are under the consideration of
Generation wing Breakers will be replaced repaired in a phased manner
Unit 3 breaker was replaced with available breaker from the 220kV
IDMD feeder The 220kV CBs of unit 2 and unit 3 will be replaced with
in two months
3 No abnormalities were noticed in the PLCC equipment at New Pallom
station It is kept under observation
Mail recieved on 30-10-2015
1 Purchase procedures is still in progress
2 Replaced
3 PLCC equipment Tested and found OK
Mail recieved on 03-03-2016
1 Even though repeated plans to have a joint inspection with MsABB
who is the OEM of the relay panel for replacing the relays with numerical
ones the same could not become successful Finally the inspection has
been fixed on 15032016 It has been planned to replace existing REF
protection with low impedance ones after retrofitting the numerical ones of
OEM
Mail recieved on 25-05-2016
1Generation wing is planning ti provide low impedance REF protection by
retrofitting numerical ABB make transformer management relay in the
existing panel ---- Pending
2Faulty breaker of Unit3 has been replaced ---- Completed
3PLCC equipments in the feeder were checked and found OK ------
Completed
TANTRANSCO
KSEB
Complete outage of Idukki Hydro Power
Station (GD-1)
Multiple tripping at 230 kV Alamathy
Station
15-09-2016 at
2214 hrs
58I1 (GD) Complete outage of 220 kV Kalamassery
Substation
23-08-2016
at 1120 hrs
Triggering incident was conductor snapping in 110
kV Kalamassery- Kaloor feeder
KSEB to take steps to provide the following at their 220 110 kV
Kalamassery SS
1 Busbar protection at 110 kV level
2 Connecting 220 kV and 110 kV sides on to a common earthmat
3 Redundant DC supply for both protection (220 V) and
communication (48 V) applications
4 Stand-alone Event Logger
Bus Bar Protection (Zone1) of 230kV Bus-A got
operated at Alamathy Station during fault in 230 kV
Alamathy-OPG-1 feeder
1 TANTRANSCO to check the healthiness of BBP relay by
conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal
winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
KSEB
Pending
220 kV breaker of unit-3 at Idukki Power
house flashed and bus differential protection
acted All Generators (6Nos) along with all
220 kV feeders tripped during the incident
1 KSEB to reduce sensitivity of REF protection appropriately at
Idukki PH
2 KSEB to replace repair the faulty breaker
3 KSEB to check the PLCC equipment at New Pallam and inform
the remedial measures taken to PCSC forum
Kerala
Pending
Pending
(Recommendat
ion No1)
Annexure-III
Page 18 of 31
08-05-2016at
457 hrs
Tripping of 400kV Hyderabad - N‟sagar
line
PGCIL (SR-I amp SR-II)
PendingLine tripped on operation of over-voltage protection at
Hyderabad end and Direct Trip was received at
N‟sagar Over-voltage Stg-2 operation was observed
in EL of Hyderabad station
55II5 1PGCIL (SR-I) to properly configure EL‟s at Hyderabad station
with time-scale resolution up to msec further DR‟s should also be
configured for showing both Analog and Digital data with properly
defined X-axis and Y-axis scales
2PGCIL (SR-I) to follow the FILE Naming Nomenclature provided
by SRPC in naming various tripping files (FIRDRELTR) being
uploaded in SRLDC‟s Tripping Monitor System (TMS) portal
PGCIL (SR-I) Yet to be informed
Annexure-III
Page 19 of 31
55II9 Tripping of HVDC Gazuwaka pole-2 19-05-2016 at
1141 hrs
Pole tripped on operation of differential current
protection of east side of Pole-2
PGCIL (SR-I) to take up the issue of differential protection operation
of converter transformer on low voltage fluctuations with their OEM
and submit a detailed report on it
PGCIL (SR-I) Yet to be informed Pending
56II11 Tripping of HVDC GazuwakaPole-2 19-06-2016 at
520 Hrs
HVDC Pole-2 got tripped on operation of Bus
differential protection
PGCIL (SR-I) to get the tripping of HVDC Pole-2 tripping on Win-
Bus differential protection thoroughly investigated for correctness of
operation and submit a report thereon
PGCIL (SR-I) Yet to be informed Pending
56III7 Tripping of 400 kV Khammam-N‟sagar
line-1
05-06-2016 at
2241 hrs
Line tripped on B-phase to earth fault Line auto-
reclosed successfully at N‟sagar and failed to auto-
reclose at Khammam
1PGCIL (SR-I) to configure DR amp EL at N‟sagar (Tallapalli) end so
that full operation of AR is captured
2PGCIL (SR-I) to investigate the reasons for non-operation of AR of
Tie-CB at N‟Sagar end and resolve them suitably
PGCIL (SR-I) Yet to be informed Pending
58II13 (GI) Tripping of 400 kV Raichur-Gooty line-1
and 400 kV Gooty-Tumkur line-2
01-09-2016 at
517 hrs
400kV Gooty-Raichur line tripped at Gooty end only
and was holding from Raichur 400kV Gooty-Tumkur
line-2 tripped on over voltage
PGCIL (SR-I) to check the operation of OVR relays at their Gooty
SS and properly configure lines‟ DRs amp ELs so that events pertaining
to OVR (Stage-I amp Stage-II) operation (START amp TRIP) get
explicitly recorded
PGCIL (SR-I) Yet to be informed Pending
58II14 (GI) Tripping of 400 kV Gooty-Tumkur line-2 02-09-2016 at
2156 hrs
Line tripped on operation of over-voltage protection at
Gooty end and Direct Trip was received at Tumkur
PGCIL (SR-I) to check the operation of OVR relays at their Gooty
SS and properly configure lines‟ DRs amp ELs so that events pertaining
to OVR (Stage-I amp Stage-II) operation (START amp TRIP) get
explicitly recorded
PGCIL (SR-I) Yet to be informed Pending
61II4 Tripping of HVDC Gazuwaka Pole-2 05-12-2016
at 1503 hrs
Pole-2 tripped due to tripping of AC filter banks
which was due to voltage disturbance in eastern bus at
Gazuwaka
PGCIL (SR-I) to refer the instant trippings to their OEM to ensure
that the settings adopted for pole trippings for low-voltage power
swing and ferro-resonance phenomena are in order and have been set
properly A copy of the OEM‟s reply in this regard shall be furnished
to PCSC forum
PGCIL (SR-I) Yet to be informed Pending
62II4 Tripping of 400 kV Gazuwaka-Vemagiri
(PG) line and 400kV Vemagiri(PG)-
Nunna line
18-01-2017 at
2203 hrs
400 kV Gazuwaka - Vemagiri (PG) line and 400 kV
Vemagiri (PG) - Nunna line got tripped due to Direct
Trip receive at Gazuwaka and Vijayawada respectively
PGCIL (SR-I) to configure triggering of DR amp EL for SF6 gas
compartment Zone trip with suitable legend
PGCIL (SR-I) Yet to be informed Pending
63II11 Tripping of 765 kV Vemagiri-Srikakulam
line-1 and 765400kV ICT-1 at Vemagiri-
PG SS
16-03-2017 at
1023 hrs
Line-1 and ICT-1 which are in the same diameter got
tripped due to operation of Tie bay gas
compartment trip
1 Since tripping of elements on Gas Compartment Trip has been
observed frequently in the past few months at 765 400 kV
Vemagiri SS PGCIL (SR-I) shall furnish a comprehensive report
detailing the remedial measures taken including OEMrsquos suggestions
to prevent their occurrence
PGCIL (SR-I) Yet to be informed Pending
PGCIL (SR-I)12-09-2016 at
1203 hrs
Line tripped on Direct Trip receipt at Ramagundam
end and line was holding from Warangal end
Pending58IV1
400 kV Gazuwaka-Vemagiri (PG) line tripped on Y-E fault However for 400 kV Gazuwaka-Vemagiri (PG) line Direct Trip was received at Gazuwaka after
250ms of occurrence of fault and fault was
persistent for 250ms Then Over-Voltage Stage-1 protection operated from Vemagiri (PG) end in 400 kV Vemagiri (PG) - Nunna line and tripped it
62II1
For the line under consideration the following shall be carried out
by PGCIL (SR-I) in coordination with NTPC-Ramagundam
I)End-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
II)Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be
repaired replaced
Yet to be informedTripping of 400 kV Ramagundam-
Warangal line
Yet to be informed05-01-2017 at 1305 hrs
Tripping of 400kV Gazuwaka - Vemagiri (PG) line and 400 kV Vemagiri (PG ) - Nunna line
1 PGCIL (SR-I) to ensure time-sync of all protections relays at their Vemagiri Gajuwaka and Vijayawada substations2 PGCIL (SR-I) to check OVR settings for correctness of operation
along with proper drop-off to pick-up ratio (gt 097) and configure
OVR_START event in the corresponding Relay BCU Event Logger for all 400 kV lines emanating from their Vemagiri (PG) SS
PGCIL (SR-I) Pending
Annexure-III
Page 20 of 31
64III16 Tripping of 76 5kV Kurnool-Nellore PS
line-2
27-04-2017 at
2222 hrs
R-phase to earth fault had occurred in line Auto-
reclose was successful at Kurnool end and breaker
at Nellore PS end tripped and did not attempt for
auto-reclose
For the line under consideration PGCIL (SR-I) to Configure Event
Logger (EL) to record events at msec level
PGCIL (SR-I) Yet to be informed Pending
65II15 Tripping of HVDC Gazuwaka Pole-1amp2 25-05-2017 at
0945 hrs
HVDC pole-1 got tripped due to operation of South
filter inter zone protection and HVDC pole-2 got
tripped due to operation of differential protection
PGCIL (SR-I) to furnish detailed report on the events that led to
tripping of HVDC Poles ndash 1 amp 2 including remedial measures taken
to PCSC forum Further the OEM report wrt tripping of HVDC
Pole-2 shall also be furnished
PGCIL (SR-I) Yet to be informed Pending
65III5 Tripping of 765 kV Raichur-Solapur line-
2
07-05-2017
at 1918 hrs
Y-phase to earth fault Auto-reclose was successful
at Solapur and breakers at Raichur end got tripped
PGCIL (SR-I) to configure Event Loggerrsquos time-resolution up to
millisec level in all protection relays at their 765 400 kV Raichur SS
PGCIL (SR-I) Yet to be informed Pending
55II7 Tripping of 400kV Kudgi PG (Narendra
New) - Narendra-PG line-2
18-05-2016 at
1625 hrs
line tripped on B-phase to earth fault and line auto-
reclosed successfully from Narendra end Line tripped
from Kudgi-PG due to operation of over-voltage stage-
1
PGCIL (SR-II) to properly configure dead-time of AR (typically 1
sec) on all lines emanating from Narendra (PG) substation
PGCIL (SR-II) Yet to be informed Pending
54II3 Tripping of 400kV Sriperambudur -
SVChartam and 400kV Nellore-
Sriperambudur line-1
05-04-2016 at
0011 hrs
400kV Nellore-Sriperambudur line-1 tripped on a R-
phase to earth fault 400kV Sriperambudur-
SVChatram line tripped at Sriperambudur end only
on operation of over current protection
PGCIL (SR-II) to check and revise Pole Discrepancy Relay (PDR)
time setting appropriately based on the type of AR scheme being
implemented at their 400 kV Sriperambudur SS
PGCIL (SR-II) Yet to be informed Pending
54III3 Tripping of 400 kV Kalvindapattu-Vallur
line
10-04-2016 at
1459 hrs
R-phase to earth fault had occurred in line Auto
reclose attempt is unsuccessful auto-reclose could not
be established from provided DR EL
PGCIL (SR-II) to furnish a report on the tripping event detailing the
reasons for unsuccessful AR operation at Kalvindapattu end and the
remedial action taken to restore AR to normalcy
PGCIL (SR-II) Yet to be informed Pending
55II17 Tripping of HVDC Talcher-Kolar pole-1 30-05-2016 at
0949 Hrs
Failure of main CT of AC filter (20C08A) occurred
and it in turn caused the operation of filter bank
differential protection HVDC Pole-1 got tripped on
group Differential protection operation
PGCIL (SR-II) to take up the issue of Pole-1 tripping on Group
Differential Protection (Stage-II) due to multiple commutation failures
with their OEM and furnish a report on it
PGCIL (SR-II) Yet to be informed Pending
56II8 Tripping of HVDC Talcher-Kolar Pole-1 17-06-2016 at
1635 Hrs
Talcher-Kolar HVDC Pole-1 got tripped on line fault
and Pole-2 went to ground return mode with 150MW
PGCIL (SR-II) to address amp resolve DTPC and fibre-optic link
related issues raised by KSEB at Thrissur Madakathara substations
and conduct a mock-test in coordination with KSEB to verify integrity
of signal transmission from Kolar to Thrissur Makadathara
PGCIL (SR-II) Yet to be informed Pending
64II14
PGCIL (SR-I)14-05-2017
at 1654 hrs
Tripping of 400 kV Vemagiri - Gazuwaka
line
PGCIL (SR-I) to sort out issues relating to AR functionality
operation for both Main-CB and Tie-CB at both Vemagiri and
Gajuwaka substations
For the line under consideration the following shall be carried out
by PGCIL (SR-I)
End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be
repaired replaced
Y-phase to earth fault Auto-reclose was not
successful due to persistent fault Vemagiri end had
sent a Direct Trip after un-successful Auto-reclose
AR attempt was observed in Gazuwaka end DR
after 3 phase trip
65III10
Yet to be informed PendingPole-1 got tripped due to failure of auxiliary supply
changeover 400kV Jeypore-Gazuwaka line-2 got
tripped on operation of over-voltage protection
Pole-2 east shunt reactor got failed and this in turn
resulted in tripping of HVDC pole-2 due to Pole-2 Y
block activation 400kV Jeypore-Gazuwaka line -1
also got tripped during the incident
28-Apr-17 Pole-
1 at 844 hrs
and Pole-2 at
907 hrs
Tripping of HVDC Gajuwaka Pole-1amp2
and 400 kV Jeypore-Gazuwaka line-1amp2
PGCIL (SR-I)1 PGCIL (SR-I) to provide fully automatic supply-changeover
scheme for Pole-1 auxiliaries at the earliest
2PGCIL (SR-I) to furnish a detailed report on the reasons for East
Shunt Reactor failure including remedial action taken OEM report in
this regard also shall be shared
3PGCIL (SR-I) to provide redundant AC auxiliary supply to both
Pole-1 amp Pole-2 either by making use of tertiary of ICT-1 or from
external dedicated feeder
Yet to be informed Pending
Annexure-III
Page 21 of 31
58II3 (GI) Tripping of 400 kV Sriperambudur-
SVChatram line
14-08-2016 at
1349 hrs
Line tripped at Sriperambudur end only on
operation of directional earth fault protection
(i) PGCIL (SR-II) to disable high-set of line DEFRrsquos and
(ii) PGCIL (SR-II) to block line DEFR operation when DPR is in active
condition (has picked up) at their Sriperambudur SS
PGCIL (SR-II) Yet to be informed Pending
58II5 (GI) Tripping of 400 kV Neyveli TS2-Pugalur
line and 400 kV Neyveli TS2-Neyveli TS2
EXP line
21-08-2016 at
1035 hrs
Failure of Y-Ph tension insulator of tie feeder bay at
Neyveli TS2 Neyveli-Pugalur line tripped due to over
voltage at Neyveli TS2 and direct trip was received
at Pugalur
PGCIL (SR-II) to check the operation of the DPR relays at Pugalur
end NLC TS2 - Pugalur line by trans-playing the event on another
healthy relay and take suitable action including replacement of the
relay accordingly
PGCIL (SR-II) Yet to be informed Pending
58II19 (GI) Tripping of 400 kV Madurai-Karaikudi
line
15-09-2016 at
0302hrs
Line tripped on operation of OVR Stage-I protection
at Karaikudi and Direct Trip was received at Madurai
PGCIL (SR-II) to check the operation of OVR relays at their 400 kV
Karaikudi SS and properly configure linesrsquo DRs amp ELs so that events
pertaining to OVR (Stage-I amp Stage-II) protection operation (START
amp TRIP) get explicitly recorded
PGCIL (SR-II) Yet to be informed Pending
59II20 (GI) Tripping of HVDC Talcher-Kolar pole-1 10-10-2016 at
1635 hrs
Pole-1 of HVDC Talcher-Kolar tripped due to receipt
of lsquorsquoPole block command from Talcher end due to
tripping Pole-1 DC filter at Talchar end Pole 2 went
into metallic return mode after tripping of pole-1
PGCIL (SR-II) to check the correctness of non-operation of SPS
(Talcher ndashKolar Trip Signal-1) in the instant case by comparing it
with the incident of tripping of HVDC Talcher-Kolar pole-1 on
05102016 and furnish a report on it to PCSC forum
PGCIL (SR-II) Yet to be informed Pending
59II24 (GI) Tripping of 400220kV ICT-2 at
Somanahalli SS
24-10-2016 at
354 hrs
ICT-2 tripped on operation of Buchholz relay PGCIL (SR-II) to properly configure ICT protection relay DR so that
digital signals are recorded with proper names at their 400220 kV
Somanahalli SS
PGCIL (SR-II) Yet to be informed Pending
59III4 Tripping of 400 kV Salem -Udumalpet line-2
13-10-2016 at 0306 hrs
Line tripped on R-phase to earth fault Line auto-reclosed at Udumalpet end and did not reclose at
Salem
Line tripped on R-phase to earth fault Line auto-reclosed at Udumalpet end and did not reclose at Salem
PGCIL (SR-II) Yet to be informed Pending
62II6 Tripping of 400 kV Trichy-Karaikudi line 21-01-2017 at 2145 hrs
Line tripped on operation of over voltage protection at Karaikudi end and direct trip was received at Trichy Voltage recorded in DR in antecedent
conditions were 2454 kV 2432 kV 2536 kV
respectively
1 PGCIL (SR-II) to ensure OVR settings adopted for 400 kV lines at Karaikudi SS are as per SRPC provided settings with a drop-off to pick-up ratio gt 097
2 PGCIL (SR-II) to configure OVR_START event in the corresponding Relay BCU Event Logger for all 400 kV lines emanating from their
Karaikudi SS
PGCIL (SR-II) Yet to be informed Pending
62III5 Tripping of 400 kV Tumkur ndash Bidadi line 17-02-2017
at 1044 hrs
B-E fault Line did not auto-reclose 1 PGCIL (SR-II) to properly configure AR logic operation at Bidadi
end and ensure itrsquos correct operation for a fault during reclaim time
2 PGCIL (SR-II) to ensure time-sync of protection relays with GPS at
both Tumkur and Bidadi substations
PGCIL (SR-II) Yet to be informed Pending
62III6 Tripping of 400 kV Tumkur ndash Bidadi line 18-02-2017
at 1036 hrs
B-E fault Line did not auto-reclose PGCIL (SR-II) to properly configure AR logic operation at Bidadi
end and ensure itrsquos correct operation for a fault during reclaim time
PGCIL (SR-II) Yet to be informed Pending
62V1 Tripping of 400kV Vallur-Kalivandapattu
line-2
22-02-2017 at
455 hrs
Line tripped due to failure of R phase jumper Two
faults observed from DR 2nd fault cleared in 500ms
from Kalavindapattu end
PGCIL (SR-II) to enable Trip on Reclose (TOR) at Kalavindapattu end
on all 400 kV lines emanating from it
PGCIL (SR-II) Yet to be informed Pending
57II2 Tripping of 400 kV Mywady-Salem line-1
and 400 kV Mywady-Madurai line
PGCIL (SR-II) Yet to be informed03-07-2016 at
0306 hrs
400kV Mywady- Madurai line tripped on a Y-phase
to earth fault due to agriculture fire Tie-CB LBB
relay got operated at Mywady end and resulted in
tripping of Main breakers of 400kV Mywady-
Madurai and 400kV Mywady-Salem line-1 which are
in the same diameter
PGCIL (SR-II) to furnish a report on the remedial action taken after
ascertaining the reasons for (i) non-opening of Main-CB of Mywady
ndash Madurai line at Mywady end on Tie-CB LBB operation and (ii)
delay in sending DT to the remote ends after Tie-CB LBB operation
Pending
Annexure-III
Page 22 of 31
65II2 Tripping of 400 kV Kudgi (PG) - Tumkur
line-2 and Kudgi (PG) ndash Kudgi (NTPC)
line-1
06-05-2017 Kudgi (NTPC) feeder tripped at Kudgi (PG) end on
operation of distance protection R-N Zone-1
Tumkur feeder tripped at Kudgi(PG) end on
operation of NGR buchholtz relay
1 PGCIL (SR-II) to sort out AR related issues at Kudgi (PG) end on
400 kV Kudgi (PG) ndash Kudgi (NTPC) lines and put AR into service
2 PGCIL (SR-II) investigate reasons for NGR Buccholtz trip on 400
kV Kudgi (PG) ndash Tumkur line-2 and furnish action taken report wrt
rectifying the same
PGCIL (SR-II) Yet to be informed Pending
58II16 (GI) Multiple tripping at 400 kV Kalpaka SS 06-09-2016 at
1643 Hrs
Y-Pole breaker of Bus reactor-3 got failed during its
charging This resulted in a bus fault in 400kV bus-1
resulting in tripping of 400kV elements connected to
Bus-1
PGCIL (SR-I) amp PGCIL (SR-II) to review their Reverse Zone settings of
distance relays so as to bring them in line with Ramakrishna
Committee guidelines at all their substations in the southern
region
PGCIL (SR-I) amp PGCIL
(SR-II)
Yet to be informed Pending
51II4 NTECLTripping of 400kV Alamathy-Tiruvalam
line-1 and 400kV Alamathy-Vallur line-2
NTECL Vallur to furnish a report detailing the reasons for mal-
operation of Vallur end relays for a fault on Alamathy-Tiruvalam line-
1 and remedial measures taken to PCSC forum In the report their
preparedness for implementing line differential protection on Vallur-
Alamathy lines may also be indicated
400kV Vallur-Alamathy Line-2 got tripped from
Vallur end during failure of Y-phase LA in 400kV
Alamathy-Tiruvalam line Protection at Vallur end
tried for an auto-reclose and gave a 3 phase trip
TANTRANSCO mail received on 24-03-2016
3Ф Trip at 400kV Alamathy end due to DT received from vallur end for
BФ LAS bursted in Alamathy -Thiruvalam - 1 at Alamathy end
Mail received on 27-04-2016 and 20-05-2016
3Ф Trip at 400kV Alamathy end due to DT received from vallur end for
BФ LAS bursted in Alamathy -Thiruvalam - Line-1 at Alamathy end
Pending13-12-2015 at
2242 hrs
Others
Annexure-III
Page 23 of 31
56III5 Tripping of 400 kV Neyveli TS-2-
Pugalur line
04-06-2016 at
1636 hrs
B phase to earth fault occurred in line Auto-reclose
had not operated at NLC TS-2 and DT was sent to
Pugalur end resulting in a 3 phase trip
NLC to review the necessity of providing Relay Definitive Trip and
accordingly take steps to disable it on all lines emanating from their
generating stations
NLC Direct trip triggering of DR wii be carried out at TS2 end during the next
planned shutdown of the Pugalur Ts2 feeder
Mail received on 22-02-2017
Direct trip triggering of DR carried out at TS2 end for the TS2-Pugalur
feeder on 25-01-17
Pending
56II16 Tripping of 400 kV Gajwel-Singareni
line-2
30062016 at
2343 hrs
Tripped on 3-phase Trip at Gajwel end SCCL to configure Jaipur end relay‟s EL properly so that the time-
stamp resolution is extended downwards up to milli-second level
SCCL Yet to be informed Pending
1Singareni TPS to furnish single line diagram of their switchyard
along with the Over Voltage Relay settings adopted for various
transmission lines and to ensure that they are in line with the SRPC
provided gradings
2Singareni TPS to upload various tripping files (FIRDRELTR)
pertaining to a tripping event involving their station in SRLDC web-
portal within 24-hrs of occurrence of that event in compliance of
IEGC Regulation 52(r)
Line tripped on operation of Over-Voltage
protection at Singareni and Direct Trip was received
at Gajwel DR amp EL of Singareni was not furnished
59III3
57II8 NTPC (Ramagundam)
10-07-2016 at
156 hrs
Line tripped at Ramagundam end on operation of over-
voltage protection Dichipally end tripped due to
receipt of Direct Trip signal
1NTPC-Ramagundam to ensure correctness of operation of Over
Voltage relays by taking remedial measures like maintaining
healthiness of concerned CVT‟s setting drop-off to pick-up ratio at
097 amp above etc
2NTPC-Ramagundam to ensure time sync of their station‟s DR amp
EL with GPS
3NTPC-Ramagundam to sort out analog values indication amp
overlapping issue of time-stamp in their station DR‟s
4NTPC-Ramagundam to properly configure their EL‟s so that events
are recorded with msec resolution
Line tripped on B-phase to earth fault Line auto
reclosed at Chandrapur end and did not reclose at
Ramagundam
57II4
16-07-2016 at
438 hrs
Tripping of 400 kV Ramagundam -
Chandrapur line -2
1NTPC-Ramagundam to furnish remedial measures taken wrt AR
non-operation and unwarranted DT sending to other end
2NTPC-Ramagundam to configure protection relays DR‟s such that
events get recorded for at leas
2000 msec post-triggering so as to cover complete AR operation
Tripping of 400 kV Ramagundam -
Dichipally line
NTPC-Ramagundam mail dated 09032017
1 Main-II relay replaced Over voltage relays pickup to reset ratio is 098
--- Completed
2 DR and EL are time synchronized with GPS clock
-------- Completed
3DR alalog overlaping issue is sloved ---- Completed
4 ----- Pending
Yet to be informed
Pending
54I1
Tripping of 400 kV Gajwel-Singareni line-
2
02-04-2016 at
1708 hrs 1MAPS to furnish a detailed report on the tripping of SP Koil ndash
MAPS lines 1 amp 2 at MAPS end with focus on the correctness of the
settings of Main-I amp Main-II relays (for primary amp back-up
protections) on both the lines
2MAPS to take steps to provide down-loading facility for DR amp EL
from Main-I amp Main-II relays on all 230 kV lines emanating from
MAPS
3MAPS in co-ordination with SP Koil to carry out PLCC end-to-
end testing on SP Koil ndash MAPS lines 1 amp 2 and ensure healthiness
of PLCC communication amp carrier-aided protection
4MAPS to put in service Auto-Reclosure feature on all four 230 kV
lines emanating from MAPS by June 2016
Pending
Complete outage of 230 kV SPKoil
Station of TANTRANSCO
B-phase CT failure occurred in 230 kV SPKoil -
MAPS line-1 Busbar protection got operated at
SPKoil station All elements except 230kV
Oragadam and 230kV Kalivandapattu got tripped at
230kV SPKoil station bdquoY‟ phase CT and support
insulators also got damaged
27-09-2016 at
0101 hrs
Status revided vide MAPS mail dated 06122016
1 The settings given by Ms TANTRANSCO were adopted for Main ndashI amp
Main- II relays for both the lines The same settings were verified to be
same Subsequently calibrated was done and no drift was observed
--- Complied
2 From May 2016 onwards the DR EL and trip report are being sent by
mail to SRLDC Bengaluru by MAPS
--- Complied
3 Monthly maintenance of PLCC equipments is being done by Ms
TANTRANSCO At present PLCC telephone is not working it is being
followed up
--- Complied
4 CVTs are planned to be procured from Ms TANTRANSCO by the end
of February 2017 and AR will be implemented for all the lines emanating
from MAPS by July-2017 as discussed in the current SRPC meeting on
25112016
--- Pending
PendingNPCIL (MAPS)
SCCL
NTPC-Ramagundam mail dated 09032017
1 The relay will be checked in next opportunity if required it will be
changed with new one------------- Pending
2DR time recording increased to 2 sec --------- Completed
NTPC Pending
Annexure-III
Page 24 of 31
62III2 Tripping of 400 kV Kaiga-Guttur line-1 06-02-2017
at 0501 hrs
B-phase to earth fault Line did not auto-reclose at
Kaiga end
1 KGS to properly configure all relays DR‟s time scale for a post-
triggering period of 2 sec to capture events such as complete AR
operation
2 KGS to ensure time-synchronization of all protection relays with
GPS in their 400 kV switchyard
NPCIL (KGS) Yet to be informed Pending
63III4 Tripping of 400 kV Gajwel-Singareni line-
2
07-03-2017 at
1652 hrs
Line tripped on B-phase to earth fault Line did not
auto-reclose
1 SCCL to properly configure LBB logic for all line relays
where AR has been put into service for 1-ph initiation based
on phase segregation (ie for the faulted phase) at their
Singareni TPS
SCCL Yet to be informed Pending
64II8 Tripping of 400 kV Tirunelveli-
Kudankulam line-3
23-04-2017 at
0556hrs
R-phase to earth fault had occurred in Tirunelveli -
Udumalpet line-2 During the incident Tie-CB LBB
got operated at Tirunelveli end due to sluggish
operation and tripped 400 kV Tirunelveli -
Kudankulam line-3
NPCIL (KKNPP) to configure DRrsquos amp ELrsquos of protection relays at their
station for recording DT receipt event at their Kudankulam NPP
NPCIL(KKNP) Yet to be informed Pending
Yet to be informed63III8 NPCIL (KGS)Tripping of 400kV Kaiga-Guttur line-2 Line tripped on Y-phase to earth fault Line auto-
reclosed from Guttur end and failed to re-close from
Kaiga end
1 NPCIL (KGS) to furnish an action taken report on the
reasons for AR lock-out and remedial action taken to rectify
the same
2 NPCIL (KGS) to configure DR‟s of line protection relays for
a post triggering period of 2 sec to capture complete AR
operation at their Kaiga GS
3NPCIL (KGS) to furnish FIR amp TR for tripping events as
per SRLDC provided formats
27-03-2017 at
706 hrs
Pending
Annexure-III
Page 25 of 31
34I6
01-01-2015 at
1338 hrs
42II18 400kV Raichur TPS-Raichur(PG) line-
1amp2 400kV Raichur-Mahboobnagar
Unit7 and ICT-2 at RTPS tripped
during the incident B phase to earth
fault had occurred in 400kV Raichur
TPS-Raichur line-1
1 Bus bar protection shall be provided by asset owner ( ie
KPTCL)
2 Settings for main distance protection amp Overcurrent protection
shall be examined and reviewed
3 Time synchronization of the Substation shall be ensured
As reported directional over current relay of ICTrsquos
operated due to snapping of line jumper in 220kV
Lingapur line
1 KPCL to review REF setting (DMT or IDMTL) for unit-7 by first
week of April 2015 and inform the same to PCSC forum
2 TSTRANSCO to furnish Mehaboobnagar‟s DR and EL and the
reasons for distance relay operation at their end within a week‟s time
3 PGCIL (SR-I) to rectify the issues relating to AR operation relay
reach (Z2) reverse reach (Z4) and SOTF auxiliary contacts within a
week‟s time and submit the actions taken to PCSC forum
16-07-2014400220 kV ICT-1 amp 2 at
MUNIRABAD
On account of R-phase to earth fault line tripped at
Hassan end due to operation of distance Zone-2 and
non-receipt of carrier From DR of Talaguppa end it
is observed that fault had occurred in Yphase
09-03-2015 at
0636 hrs
Tripping of 400
kV TALAGUPPA
ndash HASSAN line
40II3
Multiple tripping at Raichur TPS of
KPCL
Miscellaneous
1 PGCIL and KPTCL to ascertain the reason for the phase
discrepancy in the relay operation and take suitable remedial
measures
2 KPTCL to check the PLCC operation at Talaguppa end and submit
the report to the PCSC forum
1 Yet to be informed by KPCL ---- Pending
2 Mail received on 26-05-2015 from TSTRANSCO
It is found that the main-2 ABB make REL316 type distance relay was
defective and same was replaced with MICOM P444 by MsPGCIL on
2304-2015 After replacement of main-II DR can be extracted from this
relay For EL in to service some field winding is pending which is being
taken up in this month -- Complied with
3
PGCIL mail recieved on 27-04-2016
End to end PLCC tunning carried out
PGCIL (SR-I) RVMD 14072016
Relay settings of all the stations in SRTS-1 were derived as per
Ramakrishna Commettee recomendations and implemented - Complied
with
KPCL
TSTRANSCO
PGCIL (SR-I)
PGCIL (SR-II) KPTCL
KPTCL
PGCIL (SR-I)
Mail recieved on 28-04-2015
End to end testing of PLCC has been done and problem in the PLCC is
atttended
Mail received on 27-05-2015 (KPTCL) amp 29-07-2015
End to end testing of PLCC has been done and problem in the PLCC is
atttended Phase discrepancy in the relay operation is to be checked jointly
Mail recieved on 02-09-2015 from PGCIL (SR-II)
Problem is in identification of phases at Talguppa end To be rectified by
Ms KPTCL
Mail recieved on 28-06-2016 from KPTCL
The matter is reffered to the concerned Operation and maintance wing to
set right the mismatch of phases in 400kV Talaguppa-Nelamangala and
Talaguppa-Shantigrma lines at Talaguppa in cordination with PGCIL
Pending
(with KPTCL)
Mail recieved on 27-05-2015 (KPTCL)
1 KPTCL has taken action to provide bus bar protection to 220kV buses
2 Over current relay Settings of ICTs to be reviewed by PGCIL
Mail received on 29-07-2015 (KPTCL)
Initial Tendering stage
KPTCL Mail recieved on 23-01-2016
Detailed estimate prepared for taking up the work CEE Transmission
Zone Gulbarga will take up necessary procurement and further execution
----------------------------------------------------------------------
1 Pending from KPTCL side
2 Complied with as per PGCIL (SR-I) RVMD 14072016 which stated
that Relay settings of all the stations in SRTS-1 were derived as per
Ramakrishna Commettee recomendations and implemented
3 Pending from KPTCL side
Pending (with
KPCL)
Pending
(with KPTCL)
Annexure-III
Page 26 of 31
Tripping of Unit 1 at NCTPS 24-05-2015
at 1913 hrs
ID Fan trip
Tripping of Unit 1 at MEPL 24-05-2015
at 1913 hrs
Coal Mill tripped
Tripping of Unit 1 at
Krishnapatnam
24-05-2015
at 1917 hrs
Generator Protection operated
Tripping of Unit-8 at RTPS 24-05-2015
at 1919 hrs
Tripped on Overvoltage
47I2
1 All Tripped units viz Krishnapatinam MEPL Raichur NCTPS
to submit a detailed report on this event including the remedial
measures taken to PCSC forum
2 KPCL to check the excitation system of Unit 8 of RTPS and
submit the remedial measures taken to PCSC forum
KPCL MEPL
APGENCO TNEB
As per FIR submitted CT damage observed in
Chitoor-Main bay (404) Main breakers connected to
bus-1 (401 404 407 410) got tripped on operation of
bus bar protection Unit-1 tripped on operation of
MFT Unit-2 was not in service
Complete outage of Krishnapatnam TPS
Pending (with
KPCL)
APGENCO letter dated 18032016
1SOE and SLD are attached The DR of 405 CB is not generated during
the incident Now the problem is identified and rectified
--------- Completed
2All the 3 lines ie CHTR-2 MNBL-I amp II tripped in zone
protection The fault was in Blind zone ie P2 side of CT where it was
covered under Bus fault by the time fault moved on to P1 side when the
fault comes under STUBTEED zone after 330msec all the feeders expect
CHTR-1 tripped in Zone-II and total fault persisted for 500msec before the
405 TIE CB opens and clear the fault As a remedial the STUB protection
operation also checked and found OK-------Completed
3The Time Sync was missed on the day and found there was problem with
LAN Timer same was rectified Now found OK
-----------Completed
4Now the DR Time scale changed to 1 sec for Pre fault and 3 sec for Post
fault and STATE of events are corrected wherever found wrongor
misguiding during analysis---------Completed
5
PGCIL-SR1 RVMD 27-04-2016
Procurement of differential protection for 400kV NPS-NLR DC and
400kV RCR-RTPS-DC is under tendering
PGCIL-SR1 RVMD 14-07-2016
The proposal for procurement of Line differential Protections for 400kV
Raichur - RTPS-1 amp 2 and 400kV Nellore - NPS - 1 amp 2 lines has been
approved and tender is under technical evaluation
Pending with
PGCIL(SR-I)
08-09-2015 at
1820 hrs
44I3
1 APGENCO to furnish to PCSC forum (i) A3-size Single Line
Diagram of SDSTPS and (ii) the sequence of events with time stamp
showing the protection that opened Tie-CB (405) at SDSTPS
2 APGENCO to review STUBTEED protection in all dias at
SDSTPS and ensure that they are configured for instantaneous
operation
3 APGENCO to properly configure the STATE of the tripping events
so that they get recorded appropriately like TRIP OPERATED in
their corresponding Event Loggers
4 APGENCO to ensure time sync of all DR‟s and EL‟s at SDSTPS
5 PGCIL (SR-I) to provide line differential protection for 400 kV
NPS ndashNellore-PG lines 1 amp 2
TANGEDCO vide their mail dated 07072015 informed that as per the
discussion and recommendation of 44th meeting of PCSC held on
28052015 a time delay of 2 Sec had been introduced for the above
tripping for all the ID fans at NCTPS-II
MEPL vide their mail dated 14092015 informed that they had
implemented 2 seconds delay for under voltage tripping of all Drag Chain
Feeder Conveyors And this has been done for both the Units
APGENCO letter dated 18032016
The unit not tripped on Generator protection but tripped on Economiser
inlet flow protection consequent to tripping of TDBFP on lube oil pressure
lowBefore tripping dip in voltage was observed in the LT system which
caused tripping od lube oil pumpsAfter the incidentChangeover scheme
on under voltage of LT System was reduced from 80 with 2 sec delay to
40 with 200msec delay
APGENCO PGCIL (SR-
I)
Annexure-III
Page 27 of 31
12-11-2015 at
0020 hrs
Tripping of 400kV Gooty-Nelamangala
line
KPTCL KPCL NPCIL
(KAPS)
1 KPTCL KPCL to see the possibility of implementing Weak Infeed
logic with Echo feature enabled by Under
Voltage (27) element on Kadra-Karwar lines 1 amp2 and implement
the same if feasible
2 NPCIL to time-coordinate Kaiga‟s DEFR settings with (i) Zone-2
settings at Kaiga and (ii) primary protections of the lines emanating
from Kadra and Kodasalli
3 KPCL to ensure time-sync of EL‟s and healthiness of the Fault
Locators at Kadra
220kV Kadra-Karwar lines-1amp2 tripped
on earth fault in B-phase in zone-2
Kaiga-Kadra line tripped at Kaiga end
only on operation of directional eath
fault protection
31-07-2015 at
1144 hrs
Tripping of 220kV Kadra-Karwar lines -
1amp2 and 220kV Kaiga-Kadra line
PGCIL (SR-I) mail received on 27-04-2016
1 The firmware of REL670 is being upgraded ------- Completed
2 The recording of events in msec interval is being taken up with OEM
Henceforth for analysis purpose we will provide larm list which has msec
time stamp -------- Completed
3 End to end testing of PLCC code transmision and tuning of channels
carried out ------- Completed
4 Procurement of differential protection for 400kV NPS-NLR DC and
400kV RCR-RTPS-DC is under tendering The legends modified in
Eventalarm list Provision of diff relay for all short lines emanating from
NPS is being taken up with our corporate -------- Pending
PGCIL(SR-I) RVMD 14-07-2016
The proposal for procurement of Line differential Protections for 400kV
Raichur - RTPS-1 amp 2 and 400kV Nellore - NPS - 1 amp 2 lines has been
approved and tender is under technical evaluation
1
PGCIL RVMD 27042016
AR blocked due to failure of PLCC link The defective PLCCcards
replaced at Neelamgala end
PGCIL RVMD 14072016
AR blocked due to failure of PLCC link The defective PLCCcards
replaced at Neelamgala end End to end testing of PLCC carried out and
PLCC link is healthy ------ Pending
2 Gooty end Time syc unit is replaced with new one and commissioned ---
----- Completed
3 Yet to be informed by KPTCL --- Pending
PGCIL (SR-I) KPTCL 1 For Gooty ndashNelamangala line PGCIL (SR-I) and KPTCL to
provide 3-ph trip logic at their respective ends upon detection of
PLCC link failure during dead-time of AR operation
2 PGCIL (SR-I) to make GPS functional at Gooty SS and ensure
time-sync of various DR‟s and EL‟s with it (GPS)
3 PGCIL (SR-I) KPTCL to furnish reason for the operation of
Backup impedance protection of the line reactor at Nelamangala end
and the remedial measures taken to PCSC forum
Pending (with
KPTCL)
1PGCIL (SR-I) to furnish Action Taken Report on the findings of
OEM on relay mal-operation at NPS end on 400 kV NPS ndash NCCK
line to PCSC forum
2 PGCIL (SR-I) to appropriately configure Station Event Logger at
NPS to record events at msec interval
3 PGCIL (SR-I) to carry out PLCC end-to-end testing in coordination
with TPCIL for 400 kV NPS ndashTPCIL line
4PGCIL (SR-I) MEPL SEL TPCIL amp NCC to take steps to
provide line differential protection at their respective ends on all 400
kV lines (except Gooty line) emanating from Nellore Pooling Station
and furnish an action plan to implement the same
Pending
1
Mail recieved on 25-05-2016 from KPTCL
Availability of week end infeed with eco feature to be confirmed by
SEERTCHubli --- Pending
2
Mail recieved on 03-12-2016 from NPCIL(KGS)
The 200 ms Definite time DEFR element in both Kaiga Kadra and Kaiga
Kodasally lines were disabled IDMT DEFR is retained The 200 ms
Definite time back up oc element in both Kaiga Kadra and Kaiga
Kodasally lines were disabled IDMT is retained
------ Completed
3 Yet to be informed by KPCL
Status received vide KPCL mail dated 14062017
1 Since PT blasted (B phase) at Karwar end resistive over reach occurred
hence Backup protecion operated at Kadra end (zone-2 not sensed) ---
Pending
3Newly commissioned micom P444 relay time synchronised with GPS
------ Completed
Running units at Thermal Powertech power Station
tripped due to tripping of 400kV Nellore pooling
station (NPS)-TPCIL line and 400kV Nellore pooling
station (NPS)-ECC line
30-12-2015 at
0602hrs
R-phase to earth fault had occurred in Line Line did
not auto-reclose from both ends It was mentioned that
YampB pole breakers at Neelamangala tripped on
operation of pole discrepancy and backup impedence
protection for line reactor got operated
Complete outage of TPCIL power station 50I2
50II8
47II7
PGCIL (SR-I)
MEPL SEL TPCIL
NCC
Pending
Annexure-III
Page 28 of 31
52I8 Complete outage of 400kV NTPL station
and CEPL Stations
14-03-2016 at
0136 hrs
Running Units at NTPL and Coastal Energen power
station got tripped due to tripping of evacuating lines
NTPL and PGCIL (SR-II) to furnish compliance report of the
recommendations given by PSAG-15 Committee that held its meeting
on 12-13 April 2016 at NTPL Tuticorin
PGCIL (SR-II)
NTPL
NTPL mail received on 19052016
All General Recommendations will be done in the second week of June
2016 ---------- Complied by NTPL
Yet to be informed by PGCIL (SR-II)
Pending
[with PGCIL
(SR-II)]
56III4 Tripping of 220 kV Sedam-Tandur line 03-06-2016 at
2152 hrs
Line tripped on B-phase to earth fault Auto-reclose is
not enabled for line
KPTCL and TSTRANSCO to fast-track providing AR on 220 kV
Sedam ndash Tandur line and furnish an action plan of providing the same
by next PCSC meeting (PCSC-57)
KPTCL
TSTRANSCO
Yet to be informed Pending
KPTCL and TSTRANSCO to take steps to provide AR feature on
220 kV Sedam ndash Tandur inter-state line at their respective ends at the
earliest
KPTCL
TSTRANSCO
PGCIL mail received on 27-04-2016
Being pursued with APTRANSCO
APTRANSCO mail dated on 22-06-2016
AS maintenance being carrired out by PGCIL(SR-1) the required relay
replacement (wiringprogramming) may also be carried out by PGCIL(SR-
1)
PGCIL RVMD 14072016
1 The CB problem has been attended by POWERGRID by using OEM
Ms BHEL services amp POWERGRIDs OampM spares
------ Completed
2 Being pursued with APTRANSCO to replace the faulty Event Logger at
Vijayawada (Nunna) SS -------- Pending
APTRANSCO mail dated on 31-08-2016 amp 04032017 amp 24052017
As maintenance being carrired out by PGCIL(SR-1) the required relay
replacement (wiringprogramming) may also be carried out by PGCIL(SR-
1)
PGCIL (SR-I)
APTRANSCO
1 PGCIL (SR-I) in co-ordination with APTRANSCO to address
the problem with CB at the earliest opportune time
2 APTRANSCO to take steps to replace the faulty Event Logger at
Vijayawada (Nunna) SS
Line tripped at Mamidipally end only on Direct Trip
receipt from Ghanapur end
30-04-2016 at
1640 hrs
Line tripped due to operation of over voltage
protection at Vijayawada end and Direct Trip was
received at Sattenapalli end
25-12-2015 at
301 hrs
Tripped on 3-phase Trip at Gajwel end30062016 at
2343 hrs
19-06-2016 at
1527hrs
220kV Sedam-Humnabad-2 tripped at Sedam on
Distance protection Zone-2 Sedam-RTPS-1 amp2 lines
tripped at RTPS end only 220kV Tandoor inter-state
line was hand tripped due to incoming supply failure
54IV2 Tripping of 400kV Ghanapur-
Mamidapalli line
56II16
Tripping of 400kV Sattenapalli-
Vijayawada line
56I2
51II6
Tripping of 400 kV Gajwel-Singareni
line-2
Complete outage of 220kV Sedam
Substation of KPTCL
Pending
PendingFor the line under consideration the following shall be carried out by
TSTRANSCO and PGCL (SR-I) in co-ordination
iEnd-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
iiHealthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
PGCIL (SR-I)
TSTRANSCO
Yet to be informed
Pending
1TSTRANSCO and SCCL to check drop-off to pick-up ratio of OV
relay and ensure that it is kept at 097 amp above
2TSTRANSCO and SCCL to configure respective end bdquos DR amp EL
so that they get triggered on OVR protection and record relevant
events
3SCCL to configure Jaipur end relay‟s EL properly so that the time-
stamp resolution is extended downwards up to milli-second level
TSTRANSCO
SCCL
Yet to be informed
Yet to be informed
Pending
Annexure-III
Page 29 of 31
R-phase to earth had occurred in 400kV BTPS-JSWEL
line and protection issued a 3 phase trip
64I1 Complete outage of North Chennai TPS
STG-2
24-04-2017
at 2102hrs
Tripping of evacuating lines due to fault led to
tripping of Units
Pending
64I2 Complete outage of North Chennai TPS
STG-2
25-04-2017
at 1827hrs
Tripping of evacuating lines due to fault led to
tripping of Unit
64I3 Complete outage of North Chennai TPS STG-2
26-03-2017at 2109 hrs
Tripping of evacuating lines due to fault led to tripping of running Unit at NCTPS Stg-2
64III2 Tripping of 400 kV Ghanapur-
Mamidapalli line
04-04-2017 at
1901hrs
B-phase to earth fault Line auto-reclosed from
Mamidapalli end and tripped from Ghanapur
For the line under consideration PGCIL (SR-I) TSTRANSCO to (i)
rectify issues wrt PLCC channels (ii) restore PLCC carrier
communication and (iii) put AR into service at the earliest
PGCIL (SR-I)
TSTRANSCO
Yet to be informed Pending
APGENCO
TSTRANSCO
Direct Trip was received at VTPS and line was
holding from Suryapet end
13-06-2016 at
1655 hrs
56IV2 Tripping of 400 kV VTPS-Suryapet line
57I1 Complete outage of 220 kV Karwar
Substation of KPTCL
12-07-2017 at
1136 hrs
Triggering incident was failure of R phase PT in Bus-
1 at 220kV Karwar substation 220kV Kaiga-
Kodasalli tripped during the incident Also bus shut
down occurred at Kadra and Kodasally stations
1NPCIL (KAPS) to disable DefiniteTime OC relay and put in its
place by IDMT OC relay for backup protection on both 220 kV
Kaiga ndash Kadra line and 220 kV Kaiga ndash Kodasalli line at Kaiga end
2KPTCL to put bus bar protection in service at their 220 kV Karwar
SS at the earliest
3KPCL KPTCL to implement Weak In-feed Logic with Echo
feature enabled by Under Voltage (27) element on Kadra ndash Karwar
lines 1 amp 2
4KPTCL to furnish equipment failure report of the current incident to
PSEampTD Division of CEA with a copy marked to SRPC
KPTCL KPCL NPCIL
(KAPS)
NPCIL(KGS) mail dated on 03-12-2016
AThe 200 ms Definite time DEFR element in both Kaiga Kadra and
Kaiga Kodasally lines were disabled IDMT DEFR is retained
B The 200 ms Definite time back up oc element in both Kaiga Kadra and
Kaiga Kodasally lines were disabled IDMT is retained
------Completed
APTRANSCO mail dated on 20-12-2016
Issue was addressed to the concerned for necessary action
APTRANSCO mail dated on 24-05-2017
Meeting was conducted and the relays procurement for all the locations is
under progress
Pending57II9 Tripping of 400 kV Nellore (PG) - NPS
line-1 400 kV Krishnapatnam-Nellore
(AP) lines -1amp2 and 400kV NPS -
MEPL line
18-07-2016 at
1905 hrs
Triggering incident was snapping of Y phase
conductor in 400kV Nellore (PG) - NPS line-1
Distance relay at Krishnapatnam end over-reached in
Zone-1 and resulted in tripping of 400kV
Krishnapatnam ndash Nellore (AP) lines - 1amp2 from
Krishnapatnam end Distance relay at MEPL over-
reached and resulted in tripping of MEPL-NPS line
from MEPL end
PGCIL (SR-I) TPCIL MEPL SEL SGPL APTRANSCO
APGENCO and SDSTPS to implement line differential protection on
all 400 kV transmission lines (of length less than 50 km) emanating
from Nellore PS Nellore (PG) SS and Nellore (AP) SS [It may be
noted here that the cut-off length of 50 km has been specified with a
view to exclude only long transmission lines]
APGENCO PGCIL(SR-
I) TPCILMEPL
SELSGPL
APTRANSCO
Pending
63II9 KPCLJSWEL Yet to be informed Pending
1 TANTRANSCO and PGCIL (SR-II) to take steps to complete
insulator replacement works on the 400 kV lines owned by them in
Chennai area within 3 months
1 JSWEL to follow file naming terminology provided by SRPC
for various tripping files uploaded in SRLDCrsquos TMS portal
2JSWEL to furnish reasons for AR-BLOCK observed during
the instant tripping and remedial action taken by them to
keep AR in service
3 KPCL to configure DR amp EL properly to record OVR Stage-I
amp Stage-II protections at their BTPS station
14-03-2017 at
1911 hrs
Tripping of 400 kV YTPS-BTPS line and
400 kV BTPS-JSWEL line
Status received vide TANTRANSCO mail dated 15-06-2017
1 All the Porcelain insulators of 400kV NCTPS-II - Vallur feeders-1amp2
were replaced with Polymer insulators by 20052017
2 Existing Porcelain insulators of all other 400kV feeders are being
replaced with Polymer insulators in a phased manner
TANTRANSCO
PGCIL(SR-II)
For the line under consideration the following shall be carried out by
APGENCO in coordination with TSTRANSCO
1End-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
2Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
PendingYet to be informed
Annexure-III
Page 30 of 31
65II5 Tripping of 400 kV Ghanapur-
Mamidapalli line
08-05-2017 at
1915 hrs
Line tripped at Ghanapur end only and was holding
from Mamidapalli Ghanapur end protection had
sensed R-phase to earth fault
For the line under consideration the following shall be carried out
by TSTRANSCO in coordination with PGCIL (SR-I)
1 End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
TSTRANSCO PGCIL
(SR-I)
Yet to be informed Pending
65III12 Tripping of 400 kV Srisailam-Dindi line-2 24-05-2017
at 1502 hrs
R-phase to earth fault Auto-reclose was successful
at Dindi and Zone - 1 3-phase trip at Srisailam
Since all 400 kV lnies emanating from Srisailam LB are composite
feeders APTRANSCO TSTRANSCO can keep AR functionality disabled at respective remote end stations under their control
APTRANSCO TSTRANSCO Yet to be informed Pending
Yet to be informed PendingTriggering incident was failure of CT in 110 kV
Villianur-Kurumbapet at Villianur substation 230KV
Villianur ndash NLC2 and 230 kV Villianur - Pondy lines
got tripped from Pondy end (on operation of DEF)
and NLC end (on operation of Zone-3) respectively
resulting in loss of supply to 230 kV Villianur
substation
65I2 Complete outage of 400kV Uravakonda
and Jammalamadugu Substations
31-05-2017 at
1744 hrs
Triggering incident was tripping of 400 kV Kurnool-
PG - Narnoor line - 1 amp 2 and 400 kV Narnoor-
Jamalamadugu line-2 which led to loss of supply to
400kV Uravakonda and Jamalamadugu 400kV Gooty-
Narnoor 400kV Narnoor-Jamalamadugu-1 400kV
Srisailam-Narnoor 400kV Uruvakonda-
Mahboobnagar-1amp2 were out of service in
antecedent condition
1 For 400 kV Ghani ndashNarnoor line the following shall be carried out
by APTRANSCO
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
2 PGCIL (SR-II) to take appropriate action wrt disabling non-
directional instantaneous Igt4 protection that operates without
checking existence of stub If required the issue may be referred to
relays OEM for appropriate solution or the present relays may be
replaced with other relays with different styles that donrsquot have the
issue observed
APTRANSCO PGCIL
(SR-II)
Yet to be informed Pending
1 PED to furnish an action taken report wrt complying with the
protection audit recommendations
2 PGCIL (SR-II) to review Zone-3 and DEF protection setting at
Pondicherry end 230 kV Pondicherry ndash Villianur and 230 kV
Pondicherry ndash Bahour line and set them appropriately to achieve
required time-coordination with OC protections of ICTrsquos at Villianur
SS
3 NLCIL to keep DEF protection in blocked condition as long as
Distance Protection is active and configure it to become active only
when distance protection does not pickup to avoid time-
coordination issues
19-05-2017 at
1235 hrs
Complete outage of 230 kV Villianur
Substation of Pondicherry
65I1 PED PGCIL (SR-II)
NLCIL
For the line under consideration the following shall be carried out
by TANTRANSCO in coordination with PGCIL (SR-II)
1 End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
PGCIL (SR-II)
TANTRANSCO
Yet to be informed Pending
For the line under consideration the following shall be carried out
by NLCIL in coordination with PGCIL (SR-II)1 End-to-end communication for DT permissive amp other signals may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and software) at both ends shall be checked and faulty components
shall be repaired replaced
Y-phase to earth fault Neyveli TS2 end relay issued
a 3-phase trip 220ms after issue of Y phase trip Direct Trip was sent to Pugalur end preventing auto-reclose
07-05-2017
at 1955 hrs
Tripping of 400 kV Neyveli TS2-Pugalur
line
65III6 PGCIL (SR-II) NLCIL Yet to be informed Pending
For the line under consideration the following shall be carried out
by TSTRANSCO in coordination with NTPC-Ramagundam1 End-to-end communication for DT permissive amp other signals may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components shall be repaired replaced
Over Voltage Stage-1 had operated at Gajwel end
Ramagundam end did not trip as Direct Trip was not received from Gajwel end
29-05-2017
at 0007 hrs
Tripping of 400 kV Ramagundam -
Gajwel line
65II19 TSTRANSCO NTPC
(Ramagundam)
Yet to be informed Pending
65II16 Tripping of 400 kV Kayathar-Karaikudi
line
25-05-2017 at
1552 hrs
R-phase to earth fault had occurred in line There
was Zone-2 3 phase trip operation at Kayathar end
and Zone-1 3 phase trip at Karaikudi end
Annexure-III
Page 31 of 31
SlNo Element NameOutage
datetime
Revival
datetimeReason for Outage Sender Receiver
Remedial Measures Actions taken
1 400 kV KAIGA - GUTTUR 1 27-03-2017153800 27-03-2017164800 RELAY MALOPERATION NPCIL (KGS) KPTCL
KPTCL
At Guttur end DPR operated in Z1 R phase AR
unsucessful due to persistant fault
At Kaiga end DPR operated in Zone-1 RN
fault145km AR attempt is observed from Kaiga
end DR
Reason Transient fault Stood OK after test
charging
NPCIL (KGS)
2 400 kV KHAMMAM - KALPAKKA 1 10-04-2017125800 DISTANCE PROTECTION PGCIL (SR-I) APTRANSCO
PGCIL (SR-I)
Tripped on operation of distance protection Line
belongs to APTARSNCOTSTRANSCO
APTRANSCO TSTRANSCO Momentary fault
3 400 kV KHAMMAM - KALPAKKA 2 11-04-2017115000 11-04-2017175900 Y-N faultPGCIL (SR-I) APTRANSCO
TSTRANSCO
PGCIL (SR-I) Tripped on operation of distance
protection Line belongs to
APTRANSCOTSTRANSCO
APTRANSCO TSTRANSCO Momentary fault
4 400 Kv RAICHUR - YTPS 18-04-2017131400 18-04-2017150100 DPR ZONE 1-B-PH FAULT KPCL KPTCL To-be-discussed
5 400220 Kv ICT-3 AT NEELAMANGALA 20-04-2017162100 20-04-2017170100DUE TO HEAVY ARCING AT B-
PH ISOLATORKPTCL To-be-discussed
6 400 Kv VTPS - MALKARAM 1 23-04-2017150500 SOTF OPERATED APGENCO TSTRANSCO
TSTRANSCOTripped at both ends Tripped on R-
phase to ground Zone-1 indications AR acted and
was unsucessful at Malkaram end
APGENCO
Pending Remedial Measures Actions taken
for the Critical Tripping Incidents (as on 25072017)
Annexure-IV
Page 1 of 6
7 400 kV KHAMMAM - MAMIDIPALLY 2 08-05-2017160600 08-05-2017174900 R PHASE TO GROUND FAULT PGCIL (SR-I) TSTRANSCO
PGCIL(SR-I)
Tripped on operation of distance protection Line
belongs to APTARSNCO
TSTRANSCO
Tripped at both ends Tripped on R-phase to
ground Zone-1 indications AR acted and was
unsucessful at Mamidipally end
8 400 kV TALAGUPPA - NEELAMANGALA 09-05-2017163600 Y TO GROUND FAULT KPCL KPTCL To-be-discussed
9 400 kV MUNIRABAD - GUTTUR 20-05-2017064100 20-05-2017211000BUS BAR PROTECTION
OPERATEDPGCIL (SR-I) KPTCL
KPTCL
No abnormality found at Munirabad end and line
was in service
PGCIL (SR-I)
Tripped at Guttur end only and line was holding
from Munirabad end
10 400 kV GUTTUR - HIRIYUR 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II) PGCIL (SR-II) Due to Problem at Guttur end
11 400 kV KAIGA - GUTTUR 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDNPCIL (KGS) KPTCL To-be-discussed
12 400 kV GUTTUR - NARENDRA 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II) PGCIL (SR-II) Due to Problem at Guttur end
13 400 kV MUNIRABAD - GUTTUR 20-05-2017160000 20-05-2017170400 B-n fault PGCIL (SR-I) KPTCL
PGCIL (SR-I)
As informed by Guttur Substation line tripped at
Guttur end only without any faciaalarms Line
holding from Munirabad end Suspected mal-
operation at Guttur end
KPTCL
14 400 kV GUTTUR - HIRIYUR 1 20-05-2017204100 20-05-2017211800BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II)
PGCIL (SR-II) Due to Problem at Guttur end
KPTCL
15 400 kV BTPS-JSW TORANAGALLU 20-05-2017064100 20-05-2017210300BUS BAR PROTECTION
OPERATEDKPCL JSWEL To-be-discussed
16 400 kV KAIGA - GUTTUR 1 20-05-2017204100 20-05-2017213800BUS BAR PROTECTION
OPERATEDNPCIL (KGS) KPTCL To-be-discussed
17 400 kV GUTTUR - NARENDRA 1 20-05-2017204100 20-05-2017211200BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II)
PGCIL (SR-II) Due to Problem at Guttur end
KPTCL
Annexure-IV
Page 2 of 6
18 400220 kV ICT-1 AT HOODY 20-05-2017110700 20-05-2017180500 220KV SIDE WORKS KPTCL To-be-discussed
19 220 kV AMBEWADI - PONDA 1 22-05-2017121100 22-05-2017123000 EARTH FAULT KPTCL GED To-be-discussed
20 400 Kv VTPS - MALKARAM 1 22-05-2017145200 22-05-2017185800 B phase fault APGENCO TSTRANSCO
TSTRANSCOTrippedat both ends Tripped on B-
Phase to ground and Zone-1 indications AR acted
and was unsucessful at Malkaram end
APGENCO
21 220 kV KANIAMPET - KADAKOLA 23-05-2017143200 23-05-2017162400 BREAKER PDR RELAY ACTED KSEB KPTCL To-be-discussed
22 400 kV TALAGUPPA - HASSAN 30-05-2017014600 B PHASE TO GROUND FAULT KPTCL PGCIL (SR-II)
PGCIL(SR-II) Due to persisting fault in KPTCL
portion
KPTCL
23HVDC TALCHER - KOLAR POLE 1 AT
TALCHER01-06-2017232200 02-06-2017001100
DC DIFFERENTIAL
PROTECTION OPERATEDPGCIL (SR-II) PGCIL (ER-I)
PGCIL(SR-II) Due to DC filter Diff relay operation at
Talcher end
24 400 KV NIZAMABAD- DICHPALLY-1 05-06-2017191500 3 PHASE FAULT TSTRANSCO
TSTRANSCOTrippedat both ends Tripped on 3
Phase B-Phase to ground fault and Zone-2
indications at Dichpally end
25 400220 kV ICT-1 AT DICHPALLY 05-06-2017191500 06-06-2017003200 BUCHHOLZ RELAY OPERATED TSTRANSCO
TSTRANSCO 400kv 315MVA ICT-1 at Dichpally
tripped on OSR indications which was a mal
operation of the relay At the same time there was
3 Phase fault in 400kV Dichpally to Nizamabad line
At Nizamabad end(PGCIL) Line Isolator 3 phases
shorted in GIS Module
26400 kV RAMAGUNDAM -
DICHCHIPPALLI05-06-2017191500 05-06-2017223700 3 PHASE FAULT NTPC TSTRANSCO
TSTRANSCO Line did not trip at Dichpally end At
the same time there was 3 Phase fault in 400kV
Dichpally to Nizamabad line for which the line
tripped at Both ends Relay settings need to be
reviewed at NTPC Ramagundam end
NTPC-Ramagundam
27 400 Kv BTPS - YTPS 05-06-2017194800 05-06-2017204400 DISTANCE PROTECTION KPCL To-be-discussed
Annexure-IV
Page 3 of 6
28 400 Kv SATTENAPALLI - SRISAILAM 2 05-06-2017125500 05-06-2017144700 R-n fault APTRANSCO TSGENCO
APTRANSCO
For a momentary fault feeder tripped on R-Ph Z1
indications and AR successful at Sattenapalli end
TSGENCO
Feeder tripped on R-phase to ground Zone-2 at
Srisailam end Due to Feeder consistsing of Under
Ground cable AR was disabled at Srisailam end
29 400220 kV ICT-2 AT KOLAR 06-06-2017191000 06-06-2017223700 DUE TO HEAVY WIND PGCIL (SR-II)
PGCIL (SR-II)
Flashover between 220kV jumper dropper of B
phase and Gantry towards 220kV bus due to heavy
swing of conductor during the unprecedented
heavy winds
30 400 kV KOLAR - HOODY 2 06-06-2017200800 DUE TO HEAVY WIND PGCIL (SR-II) KPTCL
PGCIL (SR-2)
Hand Tripped due to Isolator problem at Hoody
End
KPTCL
31 400220 kV ICT-2 AT GUTTUR 13-06-2017133000 13-06-2017134500TRIPPED ON EF RELAY
OPERATIONKPTCL To-be-discussed
32400 kV PUGALUR -
KALAIVANTHAPATTU14-06-2017123700 14-06-2017184500 TRIPPED ON Y-N FAULT PGCIL(SR-II) To-be-discussed
33 220 kV KANIAMPET - KADAKOLA 22-06-2017111700 22-06-2017113400EARTH FAULT RELAY
OPERATEDKSEB KPTCL To-be-discussed
34 220 kV KANIAMPET - KADAKOLA 22-06-2017121500 22-06-2017172000EARTH FAULT RELAY
OPERATEDKSEB KPTCL To-be-discussed
35 400 kV KHAMMAM - KALPAKKA 2 03-07-2017092400 03-07-2017104700
DT RECIEVED AT KLPA END
(TRIPPED ONLY AT KLPA
END)
PGCIL (SR-I) APTRANSCO
TSTRANSCO
PGCIL (SR-I)
PLCC belongs to APTRANSCO TSTRANSCO Mal-
operation of PLCC at Kalpaka end Requested
APTRANSCO TSTRANSCO for end to end
testingtunning of PLCC
APTRANSSCO TSTRANSCO
36 400220 kV ICT-1 AT URAVAKONDA 04-07-2017020100 04-07-2017022400MASTER TRIP RELAY
OPERATEDAPTRANSCO To-be-discussed
37 400 kV KAIGA - NARENDRA 2 07-07-2017075000 07-07-2017090800 TRIPPED ON R-Y Ph FAULT NPCIL KPTCL To-be-discussed
Annexure-IV
Page 4 of 6
38 HVDC BHADRAVATHI POLE 1 07-07-2017105900 07-07-2017115400TRIPPED ON NON VALID TAP
CODEPGCIL (SR-I) PGCIL (WR-I)
PGCIL(SR-I)
Tripped due to strucking of OLTC tap during
command execution The same was now working
39 400 kV KHAMMAM - KALPAKKA 2 07-07-2017120300 07-07-2017145000 DT Received PGCIL (SR-I) APTRANSCO
PGCIL(SR-I)
Tripped due to PLCC mal-operation PLCC belongs
to TSTRANSCO APTRANSCO Requested
TSTRANSCO APTRANSCO for end to end testing
tunning of PLCC Khammam end
APTRANSCO
40 400 KV GOOTY - TUMKUR - 1 08-07-2017142200 08-07-2017152600DISTANCE PROTECTION
OPERATEDPGCIL (SR-I) PGCIL (SR-II)
PGCIL(SR-I)
Tripped due to snapping of earth wire while
stringing of OPGW Advised concerned to take
additional precautions while carrying OPGW
stringing
PGCIL(SR-II)
41 400230 Kv ICT-1 AT SVCHATRAM 14-07-2017190300TRIPPED ON RESTRICTED
EARTH FAULTTANTRANSCO
TANTRANSCO
REF protection acted in ICT-1 during Auto Reclose
(AR) attempt of 400kV SVChatram-Alamathy
feeder-2 (through fault condition) As per the relay
manufacturer (GE-T60) guidelines for the one and
half breaker scheme the REF setting will be
revised
42 400 KV GOOTY - TUMKUR - 1 15-07-2017115100 15-07-2017122300Tripped while laying opgw
cablePGCIL (SR-I) PGCIL (SR-II)
PGCIL (SR-I)
Tripped due to snapping of earth wire while
stringing of OPGW Advised concerned to take
additional precautions while carrying OPGW
stringing
PGCIL(SR-II)
43 220 kV AMBEWADI - PONDA 1 16-07-2017113800 16-07-2017120800 DISTANCE PROTECTION KPTCL GED To-be-discussed
44 220 kV AMBEWADI - PONDA 2 20-07-2017013600 LINE FAULT KPTCL GED To-be-discussed
Annexure-IV
Page 5 of 6
45 400 Kv ALM - SVCTM-I 20-07-2017112700 20-07-2017120200 C-N FAULT TANTRANSCO To-be-discussed
46 400 Kv ALM - SVCTM-II 20-07-2017112700 20-07-2017120300 A-N FAULT TANTRANSCO To-be-discussed
47 400 Kv ALM - SVCTM-II 20-07-2017144300 20-07-2017193200TO ATTEND FAULT
LOCATIONTANTRANSCO To-be-discussed
48 HVDC BHADRAVATHI POLE 1 21-07-2017224800 21-07-2017235300 INTERNAL MINOR ALARM PGCIL (SR-I) PGCIL (WR-I) To-be-discussed
49 400 kV KHAMMAM - KALPAKKA 1 21-07-2017103000 21-07-2017204200AC SUPPLY TO BREAKER
PROBLEMPGCIL (SR-I) APTRANSCO To-be-discussed
50 220 kV CHITTOR - THIRUVALEM 22-07-2017080600 22-07-2017144100RELAY MALOPERATION AT
THIRUVALAMAPTRANSCO TANTRANSCO To-be-discussed
51 400 KV GOOTY - TUMKUR - 1 22-07-2017150700 22-07-2017154500TRIPPED DURING OPGW
WORKSPGCIL (SR-I) PGCIL (SR-II) To-be-discussed
52 400 Kv GAJWEL - BHOOPALAPALLY 2 22-07-2017131300 22-07-2017133600 B PHASE FAULT TSTRANSCO TSGENCO To-be-discussed
53 400 kV GUTTUR - HIRIYUR 2 22-07-2017150300 22-07-2017155300TRIPPED DUE TO RELAY MAL
OPERATIONKPTCL PGCIL (SR-II) To-be-discussed
54 400110 kV ICT 2 AT ALAMATHY 24-07-2017091300 24-07-2017162700TRIPPED ON RESTRICTED
EARTH FAULTTANTRANSCO To-be-discussed
Annexure-IV
Page 6 of 6
G1
220kV LINE-1
ICT 220400 KV
G2
GT1 GT2
400kV LINE-1
400kV LINE-2
600MW 600MW
220kV LINE-2
400kV220kVSummary of Various Special Protection Schemes for 2 x 600 MW UPCL TPP
Adani Power Limited Ahmedabad
Adani Power Ltd Ahmedabad 1
Annexure-V
Page 1 of 12
G1
ST-2
220 kV LINE-1
ICT 220400 KV
G2
GT-1 GT-2
400kV LINE-1
400kV LINE-2
600 MW 600 MW
ST-1
220 kV LINE-2
UPCL UDUPI - NETWORK UNDER CONSIDERATION
400 kV220 kV
Adani Power Ltd Ahmedabad 2
315 MVAICT-1
315 MVAICT-2
220 kV ndash KEMMAR BUS 400 kV ndash HASSAN BUS
Annexure-V
Page 2 of 12
Adani Power Ltd Ahmedabad 3
Existing SPS
Benefits of New Proposals
If both the 400kV Lines out of serviceTripped amp Total Generation is gt 650 MW then Trip Unit-2
Existing SPS logic has been developed in Unit-2 DCS
1 Consideration of all possible contingency cases
2 Unit Backdown (AUTOMATIC) has been proposed in certain contingencies
where Unit tripping is not required After restoration of tripped outlets
Unit may ramp up to full generation
3 Comprehensive logic will be developed in Numerical Relays with adequate
security and reliable detection to avoid mal operation of sps logic
4 Monitoring of SPS logic with necessary alarms and events
Annexure-V
Page 3 of 12
Sr UPCL‐Udupi‐SUMMARY OF SPS TO HANDLE ALL POSSIBLE CONTINGENCIES Sh‐1 of 2
Contingency Cases Action Unit SelectionFor Tripping
1 Power Swing Detected in Impedance reach of Zone‐1 in 400 kV Line
Tripping of One selected unit if both Units ON Each Unit Power gt 400 MW
Unit‐2
2Tripping of one 400 kV Line while another 400 kV Line is already in OFF condition
Tripping of One selected unit if both Units ON Each Unit Power gt 400MW
Unit‐2
3 TrippingOffloading of Both 400 kV Line simultaneously (within 3 sec)
Tripping of One selected Unit if both Unit ON Each Unit Power gt 325 MW Unit‐2
4 TrippingOffloading of all four Transmission Lines Tripping of both Units Both Units
4
5
400kVlin
e Overlo
ad Stage PickupSet Point
TimeDelay Action
Stage 1 900 MW 3 Sec Alarm
Stage 2 1100 MW 2 Sec Automatic Backdown upto 450 MW in both Units
Annexure-V
Page 4 of 12
Sr UPCL‐Udupi‐SUMMARY OF SPS TO HANDLE ALL POSSIBLE CONTINGENCIES Sh‐2 of 2
Contingency Cases
Action
6 ICT
Overlo
ading from
400 kV
Line Stage Pickup
Set PointTimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units
7
220 kV
Line
Overlo
ad
Stage 1 250 MW 5 Sec Automatic Backdown upto 300 MW in both Units
5
Sr Consideration Requirements associated with SPS Implementation
1 400 kV LINE Tripping in Zone‐1 will be blocked under Power Swing DetectionOperation
2 Pole Slip Protection of Generator need to be co‐ordinated with 400 kV Line Power Swing Protection
3 Line Overload Detection will be blocked by Power Swing DetectionOperation
4 Line ZeroUnder Power Detection will be blocked by Power Swing DetectionOperation
Annexure-V
Page 5 of 12
G1
ST-2
220 kV LINE-1
ICT 220400 KV
G2
GT-1 GT-2
400kV LINE-1
400kV LINE-2
600 MW 600 MW
ST-1
220 kV LINE-2
UPCL UDUPI - NETWORK UNDER CONSIDERATION
400 kV220 kV
Adani Power Ltd Ahmedabad 6
315 MVAICT-1
315 MVAICT-2
220 kV ndash KEMMAR BUS 400 kV ndash HASSAN BUS
Annexure-V
Page 6 of 12
Contingency 1 Tripping of one 400kV line
It may lead tohellip1 Overloading of another 400 kV Line
2 Power Swing in another 400 kV Line (specially when 220 kV
Lines are not available)
3 Severe oscillations in running Units
4 Units may loose synchronism and disconnect from network
G1 G2
L1 L2L1L2
Following SPS has suggested to address this contingency
Adani Power Ltd Ahmedabad 7
400kV200kV
Contingency Cases
Action
Unit Selection
ForTripping
1
400kVline Overlo
ad
Stage PickupSet Point
TimeDelay
Stage 1 900 MW 3 Sec Alarm ‐‐‐‐‐‐‐
Stage 2 1100 MW 2 Sec Automatic Backdown upto 450 MW in both Units ‐‐‐‐‐‐‐
2 Power Swing Detected in Impedance reach of Zone‐1 in 400 kV Line
Tripping of One selected unit if both Units ON Each Unit Power gt 400 MW Unit‐2
Annexure-V
Page 7 of 12
Contingency 2 Tripping of one 400kV line while other already Tripped
It may lead tohellip
1 Oscillations in running Units
2 Units may loose synchronism and disconnect from
network
3 Overloading of ICTs and subsequent tripping
4 Overloading of 200 kV Lines and subsequent tripping
5 Station blackout
Adani Power Ltd Ahmedabad 8
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases Action Unit SelectionFor Tripping
1Tripping of one 400 kV Line while another 400 kV Line is already in OFF condition
Tripping of One selected Unit if both Unit ON Each Unit Power gt 400 MW Unit‐2
2
ICT Overlo
ading
from
400
kV Side
Stage PickupSetting
TimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units
Annexure-V
Page 8 of 12
Contingency 3 Tripping of both 400kV line simultaneously
It may lead tohellip
1 Severe oscillations in running Units
2 Units may loose synchronism and disconnect from
network
3 Overloading of ICTs and subsequent tripping
4 Overloading of 200 kV Lines and subsequent tripping
5 Station blackout
Adani Power Ltd Ahmedabad 9
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases Action Unit SelectionFor Tripping
1 TrippingOffloading of Both 400 kV Line simultaneously (within 3 sec)
Tripping of One selected Unit if both Unit ON Each Unit Power gt 325 MW Unit‐2
2
ICT Overlo
ading
from
400
kV Side
Stage PickupSetting
TimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units ‐‐‐‐‐‐‐
Annexure-V
Page 9 of 12
Contingency 4 Overloading of any 220 kV line
This contingency may arise due tohellip1 Tripping of both 400 kV Lines and associated SPS logic fails
to operate (Tripping of any One Unit if both Units running)
2 Overloading of ICTs from 400 kV Side and associated SPS
logic fails to operate
3 Tripping of any one 220 kV lines if both 220 kV lines are in
service and 400 kV outlets are not available
Adani Power Ltd Ahmedabad 10
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases
Action
Unit Selection
ForTripping
1
220kV
line
Overlo
ad StagePickupSet Point
TimeDelay
Stage 1 250 MW 5 Sec Automatic Backdown upto 300 MW in both Units ‐‐‐‐‐‐‐
If any SPS does not function Then 200 kV Line will trip by Operation of Line Over Current Function
Annexure-V
Page 10 of 12
Contingency 5 Tripping of all Lines emanating from UPCL (ZERO POWER)
It may lead to1 Over voltage conditions at UPCL Bus
2 Over speed of all the generators because of sudden
load throw
Following SPS has suggested to address these contingencies
1 Zero Power Scheme on 400 kV System and 220 kV System checking the power
flow through 400kV and 200 kV lines and trip all the units in service if there is a
under power condition on all four lines and running units
Adani Power Ltd Ahmedabad 11
G1 G2
L1 L2L1
400kV200kV
L2
Sr Contingency Cases Action Unit SelectionFor Tripping
1 TrippingOffloading of all four Transmission Lines Tripping of both Units Both Units
Annexure-V
Page 11 of 12
G1
220kV LINE-1
ICT 220400 KV
G2
GT1 GT2
400kV LINE-1
400kV LINE-2
600MW 600MW
220kV LINE-2
400kV220kV
THANKShellip
Adani Power Ltd Ahmedabad 12
Annexure-V
Page 12 of 12
65th Protection Coordination Sub-Committee
29-06-2017
Annexure-VI
Page 1 of 40
Complete outage of 230KV Villianur substation of Pondycherry at 1235 hrs on 19-05-2017
bull Triggering incident Failure of CT in 110kV Villianur-Kurumbapet at Villianur substation
bull 230110kV ICT-1amp2 at Villianur substation tripped on operation of backup Over current protection
bull 230KV Neyveli-Villianur and Pondy-Villianur Line got tripped from NLC amp Pondy ends on operation of DEF and Zone-3 respectively
bull Delayed clearance of fault observed from PMU plot ndash 560ms
bull Load loss 140 MW
DEF
ZONE-3
NLC TS-2 BAHUR TrsquoMARTHAN
PONDY
VILLIANUR
Annexure-VI
Page 2 of 40
Fault cleared in 560ms
Annexure-VI
Page 3 of 40
Complete outage of 400kV Uruvakonda and Jamalamadugu Stations at 1744 hrs on 31-05-2017
bull Triggering incident Tripping of 400kV Kurnool-Narnoor line-1 amp 2 and 400kV Kurnool-Jamalamadugu line-2
bull Loss of supply loss to 400kV Uruvakonda and Jamalamadugu
bull Lines out of service 400kV Gooty-Narnoor 400kV Narnoor-Jamalamadugu-1 400kV Srisailam-Narnoor 400kV Uruvakonda-Mahboobnagar-1amp2
Srisailam Narnoor
Kurnool
Ghani
Jrsquomadugu UVrsquokonda
Mbrsquongr
Gooty
Ghanapur
Igt4
Igt4 Z3
Z3
OV DT RCV
Annexure-VI
Page 4 of 40
Annexure-VI
Page 5 of 40
Kurnool Narnoor
DR trigger ndash 174418501 hrs
Ib=5kA
Zone-3 trip EL Stub optd
DR trigger ndash 173620637 hrs
Igt4 trip
3 phase Grp AB optd
Kurnool Narnoor
DR trigger ndash 174418503 hrs
Ib=5kA
Zone-3 trip EL Stub optd
DR trigger ndash 174306388 hrs
Igt4 trip
3 phase Grp AB optd
Kurnool Jamalamadugu
DR trigger ndash 174423979 hrs Vgt1 Trip
DR trigger ndash 174415040 hrs Z3 T1 DT Rcv not observed in DR amp EL
400kV Kurnool-Narnoor line-1
400kV Kurnool-Narnoor line-2
400kV Kurnool-Jamalamadugu line-2
Annexure-VI
Page 6 of 40
bull Points for discussion ndash Location of fault
ndash Zone-3 amp Igt4 trip of 400kV Kurnool-Narnoor line-1amp2
Annexure-VI
Page 7 of 40
Tripping of 220kV Idukki ndashUdumalpet line at 1702 hrs on 05-05-2017
bull B-N and R-N fault in line
bull Delayed clearance observed during 2nd fault
Idukki Udumalpet
DR trigger ndash 170200499 hrs ZONE 1 B-E 366Km
DR trigger ndash 165741849 hrs ZONE 1 B-E amp Zone-2 R-E
Idukki
Udumalpet Lower periyar
New Pallom Kalamassery
Annexure-VI
Page 8 of 40
Annexure-VI
Page 9 of 40
B-N FAULT
R-N FAULT
ZONE-2
Ar attempt
Udumalpet end DR Annexure-VI
Page 10 of 40
bull Points for discussion ndash Reason for 3 phase trip at idukki end
ndash Relay to give a 3 phase trip in the event of 2nd fault during dead time
Annexure-VI
Page 11 of 40
Tripping of 400kV Kudgi(PG)-Tumkur line-2 and Kudgi(PG)- Kudgi(NTPC) line-1 at 1605 hrs on 06-05-2017
bull 400kV Kudgi(PG)-Kudgi(NTPC) ndash line tripped at Kudgi PG end on R-N zone-1
bull 400kV Kudgi(PG)-Tumkur line tripped from both ends
Kudgi(NTPC)
Tumkur
Kudgi(PG) Narendra
Kohapur
Guttur
Kaiga
Annexure-VI
Page 12 of 40
Kudgi (PG) Kudgi(NTPC)
DR trigger 160547438 hrs Zone-1 optd R-N Ar lockout Ov pick up
FIR DR amp EL not furnished
Kudgi (PG) Tumkur
DR trigger 160546957 hrs NGR buchholz trip Dip in R-phase voltage
DR trigger 160512593 hrs DT Rcv Grp AB optd
400kV Kudgi(PG)-Kudgi(NTPC) line-1
400kV Kudgi(PG)-Tumkur line-2
Annexure-VI
Page 13 of 40
Annexure-VI
Page 14 of 40
Annexure-VI
Page 15 of 40
Annexure-VI
Page 16 of 40
Tripping of 220kV Edamon-Tirunelveli-1amp2 at 1809 hrs on 06-05-2017
bull 220kV Edamon-Tirunelveli-1amp2 tripped from Tirunelveli end only and was in service from Edamon end ZONE-1 R-B-E fault
bull Distance protection at Tirunelveli over-reached and tripped for fault in 220kV Edamom-Pothencode lines
Edamon
Sabarigiri
Tirunelveli Pothencode
Kundara
Edappon
Annexure-VI
Page 17 of 40
Annexure-VI
Page 18 of 40
Tripping of 400220 kV Ghani ICT-2amp3 at 1405 hrs on 07-05-2017
bull ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
bull Delayed clearance observed from PMU data
bull DR amp EL not furnished
Srisailam Narnoor
Kurnool
Ghani
Jrsquomadugu UVrsquokonda
Mbrsquongr
Gooty
Ghanapur
Annexure-VI
Page 19 of 40
Annexure-VI
Page 20 of 40
Tripping of 400kV Ghanapur-Mamidapalli line at 1915 hrs on 08-05-2017
bull Line tripped at Ghanapur end only and was holding from Mamidapalli
Ghanapur Mamidapalli
DR trigger ndash 191329917 hrs Z3 Main-2 opts Event logger Main-2 PSB optd ndash 191541751hrs
DR trigger ndash 191458457hrs R-N Start Breakers did not trip
Ghani
Malkaram
Ramagundam
Chpr
Mamidapalli
Nrsquosagar
Gajwel Ghanapur Khammam
Dindi
Annexure-VI
Page 21 of 40
Annexure-VI
Page 22 of 40
Tripping of 400220kV ICT-1 at Guttur at 2215 hrs on 09-05-2017
bull ICT-1 tripped on HV side only without any relay indications
bull No fault observed from PMU data
Annexure-VI
Page 23 of 40
Tripping of 400kV Narsapur-Shankarapalli at 0007 hrs on 10-05-2017
bull line tripped at Narsapur end only and holding from Shankarapalli
Narsapur Shankarapalli
DR trigger ndash 000720147hrs Zp T1 Igt3 Start Event logger 75A relay optd ndash 000720098 hrs
CB did not trip
Singareni
Shankarapalli Gajwel
Narsapur
Suryapet
Brsquoply
Rrsquogm
Annexure-VI
Page 24 of 40
Tripping of 400220kV Hyderabad ICT-4 and 220kV lines at Hyderabad substation at 239 hrs on 10-05-2017
bull Triggering incident Bus fault in 220 kV Ghanapur station
bull Observation from PMU data ndash dip observed in Y amp B phase fault cleared in 120ms
bull Elements tripped 220kV lines amp 400220 kV ICT-4
bull FIR not submitted by TSTRANSCO
Annexure-VI
Page 25 of 40
Tripping of 400220kV ICT-1 at BTPS 13-05-2017 at 1941 hrs
bull ICT-1 got tripped on operation of LV side earth fault protection during R-phase to earth fault in 220kV BTPS-Lingapur line
bull Lingapur line DR amp EL were furnished
BTPS Alipura Regulapadu
Lingapur
Annexure-VI
Page 26 of 40
Tripping of 765 kV Kurnool-Thiruvelam line-2 at 2003 hrs on 19-05-2017
bull Triggering incident Failure of R-phase LA at Thiruvelam end
Kurnool Thiruvelam
DR trigger time ndash 200318272 hrs
Main-1 trip Carrier aided trip
3 ph Grp-AB optd DT RCV
Ir ndash 3kA
Dip in Y-phase current observed
Event logger
REF optd - 200318340 hrs
DT send - 200318343 hrs
DR trigger time ndash 200318269 hrs
Zone-1 trip
Initially 1 ph trip and later 3 ph trip due to DT rcv
Event logger
DT rcv - 200318395 hrs
Raichur Kurnool NPS
Tiruvelam
Solapur
Annexure-VI
Page 27 of 40
Annexure-VI
Page 28 of 40
Tripping of 400220kV ICT-2 at Kalpakka at 1502 hrs on 20-05-2017
bull ICT-2 tripped due to operation of transformer buchholz relay
bull Reason for operation of Buchholz relay may be furnished to PCSC
Annexure-VI
Page 29 of 40
Tripping of 400220kV ICT-2 at KV Kota at 1021 hrs on 23-05-2017
bull ICT-2 got tripped due to mal-operation of transformer oil temperature indicator
bull Remedial actions taken may be furnished to PCSC
Annexure-VI
Page 30 of 40
Tripping of 220kV Kaniambeta-Kadakola line at 1350 hrs on 23-05-2017
bull Line tripped at Kaniambeta end
bull Kaniambeta feeder protection is provided through 220kV bus coupler breaker bay
bull EFR relay operated and B ph pole discrepancy relay operated leading to tripping of Bus coupler CB
bull Loss of infeed to Kaniambeta Ss
Annexure-VI
Page 31 of 40
Tripping of 400220kV ICT-1 at Somanahalli substation at 1724 hrs on 24-05-2017
bull ICT-1 at Somanahalli substation got tripped due to DC Earth fault
bull Findings amp Remedial actions taken may be furnished to PCSC
Annexure-VI
Page 32 of 40
Tripping of HVDC Gazuwaka Pole-1amp2 25-05-2017 at 0945 hrs
bull HVDC pole-1 got tripped due to operation of South filter inter zone protection and
bull HVDC pole-2 got tripped due to operation of differential protection
bull Findings amp remedial actions taken may be furnished to PCSC
Annexure-VI
Page 33 of 40
Tripping of 400kV Kayathar-Karaikudi line 25-05-2017 at 1552 hrs
bull Triggering Incident R-phase to earth fault
Kayathar Karaikudi
DR trigger time ndash 155236585 hrs
Zone-2 3 phase trip
Carrier unhealthy
DR trigger time ndash 155236592 hrs
zone-1 3 phase trip
Kayathar Kamudi Karaikudi
Pugalur
Trichy
Madurai
Annexure-VI
Page 34 of 40
Annexure-VI
Page 35 of 40
Tripping of 400220kV ICT-1amp3 at Hoody substation of KPTCL at 1230 hrs on 26-06-2017
bull ICT-1 tripped due to arc over of pre-close supervision contact of tip coil -2
bull ICT-3 got tripped on over-loading
Annexure-VI
Page 36 of 40
Annexure-VI
Page 37 of 40
Tripping of 400kV Simhadiri-Kalpakka line-2 at 503 hrs on 28-05-2017
bull Line tripped on mal-operation Teed Differential Protection at Simhadiri end and direct trip was received at Kalpakka
bull Y-Phase to earth fault had occurred in 400 kV Vijayawada-Vemagiri line-3
bull Findings amp remedial actions taken may be furnished to PCSC
Annexure-VI
Page 38 of 40
Tripping of 400kV Ramagundam-Gajwel at 0007 hrs on 29-05-2017
bull Over voltage stage-1 had operated at Gajwel end
bull Ramagundam end did not trip as direct trip was received from Gajwel
bull DR amp EL of Gajwel end not furnished
Annexure-VI
Page 39 of 40
Tripping of 400kV Gajwel-Ghanapur line at 0007 hrs on 29-05-2017
bull Line tripped on operation of over voltage protection at Gajwel and direct trip was received at Ghanapur
bull DR and EL of Gajwel end were not furnished
Annexure-VI
Page 40 of 40
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 5
In this regard the existing SPS and the proposed SPS by UPCL were discussed Existing SPS Both 400 kV lines unavailable amp Generation gt 650 Trip Unit-2 Both 400 kV line and one of the two 220 kV lines unavailable
amp Generation gt 300 MW Trip Both Units Proposed SPS Under this the following five contingencies have been considered 1 Tripping of one 400 kV line 2 Tripping of one 400 kV line with the other already tripped 3 Tripping of both 400 kV lies simultaneously 4 Overloading of any 220 kV line 5 Tripping of all Lines emanating from UPCL (Zero Power condition) The details of the proposed SPS by UPCL are enclosed at Annexure-V With regard to above it was noted that even though the proposed SPS may effectively take care of the oscillations power swings that may occur at UPCL during above stated contingencies the following concerns need to be properly addressed from the grid perspective Since the line breaker is not allowed to be tripped in the event of occurrence of power swing
(even when it enters Zone-1) and a definite possibility exists for it to be transmitted to the other adjacent connected stations it needs to be shown by conducting proper system studies that tripping of UPCL running Unit (s) by virtue of operation of corresponding SPS would act negatively on the sustenance of the power swing
It was felt that the Contingencies at 2 amp 3 can be combined since they essentially result in the same Further the reference power value assumed for comparing with actual generation to effect tripping of Unit-2 under Contingency-2 may be appropriately revised to 325 MW to avoid overloading of Varahi ndash Shimoga lines (in the extreme case of full generation at Varahi GS)
Study results for all Contingencies considered shall be shared Given the complexity of the proposed SPS issues pertaining to non-reliability of its operation may
also be suitably factored into Accordingly UPCL was requested to review the proposed SPS addressing above concerns and furnish the thus modified scheme to PCSC forum along with supporting study results
10 Auto-Reclosure Implementation on all 220 kV amp above Transmission Lines of
Southern Region
It was noted that APGENCO (Hydro) amp APGENCO (RTTP) are yet to furnish their action plan for implementing AR in their respective networks Similarly though TSGENCO (Thermal) amp TSGENCO (Hydro) had stated that they were coordinating with TSTRANSCO to obtain revised settings they are also yet to furnish Action Plan Time-frame for implementing AR It was also noted that in the Action Plan furnished by APTRANSCO feeder details were not mentioned Similarly in the Action Plan furnished by TSTRANSCO time-frame for implementing AR was not mentioned Action Plan for implementing AR is also yet to be furnished by NTPC-Ramagundam (for Tie-CBrsquos of 400 kV lines)
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 6
It was further noted that even though KPTCL had furnished the details of 220 kV amp 400 kV lines where AR is already in place the details of 220 kV lines where AR is not presently in service along with Action Plan for implementing same are yet to be furnished
All above Constituents were asked to kindly furnish required details by 08082017
Since the main issues in implementing AR are the adopted conservative protection philosophies lack of proper PLCC communication and breakersrsquo suitability supportability it is intimated in view of above that if there are no issues wrt carrier communication and breakersrsquo supportability concerned Constituents shall make efforts to implement AR immediately in their respective networks Where communication amp breaker related issues stand in the way of implementing AR concerned Constituents shall take steps to address them appropriately on priority basis and implement AR in their respective networks in a phased manner at the earliest
In the previously held PCSC meetings the following logics have been clarified for implementing AR
Normally high speed single-ph single-shot AR scheme (with simultaneous opening at both ends of feeder with a dead-time of 1 sec and reclaim-time of 25 sec) may be used by all Utilities (including Generators)
However those generators (Coal Gas Nuclear Hydro) who have concerns wrt closing on to un-cleared fault can make use of the following time-differentiated single-ph single-shot AR scheme
ldquoIn this after a line has been opened from both ends (generator end amp grid end) on AR operation the grid end will be auto-reclosed as usual after the elapse of its dead-time (say 1 sec) However the generator end relay will check for the line voltage after elapse of an extended dead time say 15 sec [here the additional time delay of 05 sec which has been included as a safety margin shall be so chosen that the extended dead-time is less than the adopted Pole Discrepancy time delay] If the line voltage so sensed is healthy amp normal (which implies that the fault has already been cleared) then generator end will be auto-reclosed else 3-ph trip will be given at generator end to open the other two phase polesrdquo Further wherever Trip-on-Reclose (ToR) feature is available at grid-end station it shall be configured such that it sends Direct Trip (DT) command to generator end upon its operation
It is also clarified that the above scheme can be as it is used to Line-CBrsquos of all bus configurations (including Main-CBrsquos of one-and-half breaker bus configuration) For Tie-CBrsquos in one-and-half breaker configuration employing priority scheme (which also happens to be the recommended practice) above logic is not be required since the employed priority scheme anyway checks for CLOSE_STATUS of Main-CB before closing Tie-CB However if required the above logic can be applied to Tie-CBrsquos also by adopting a suitable extended dead-time considering the remote end stationrsquos AR dead time
It is further clarified that AR functionality for a transmission line shall be preferably put into service using (i) Bay Control Unit (BCU) or (ii) separate External AR Relay Where these are not available only then should the AR functionality of Main protection relays of lines be used
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 7
Here it is assumed that both Main-relays are deriving their Voltage Input from the Line CVTrsquos (from different cores as per the recommended practice) However if this is not the case and the concerned Utility has a practice of using Line-CVT voltage input to one of the Main relays and Bus-CVT voltage input to the other Main relay it is recommended that voltage input to be used in time-differentiated AR logic shall be exclusively derived from the line-CVT for use in both the Main relays
It is also clarified that AR implementation is not required in case of radial feeders cables amp composite feeders and is optional for the lines interconnecting two generating stations
In addition to above the following logics (applicable to the Cases where AR is being proposed to be implemented from Main Protection Relays) are also intimated for the benefit of the Constituents
Since there are two Main protection relays (Main-I and Main- II) to decide upon proper way of implementing AR for achieving fool-proof AR operation it has been advised that instead of implementing AR from only one of the Main relays (in light of its low success rate) the following Alternatives be considered Alternative ndash 1 AR is implemented and kept functional from Main ndash I [Main-II] only but with feedback from Main-II [Main-I]
In this scheme AR is implemented and kept in service from Main-I [Main-II] as usual
Additionally Main-II [Main-I] relay is configured for single-pole (1-ph) tripping and the OPEN (TRIP) status of the concerned trip relay is used for triggering AR functionality in Main-I [Main-II] By this even if the fault is not sensed in the beginning by Main-I [Main-II] but sensed by Main-II [Main-I] AR operation is guaranteed However it may be noted that in cases of permanent faults this scheme may result in unsuccessful AR operation with Pole Discrepancy Relay coming to rescue if the fault is not sensed by Main-I [Main-II] but by Main-II [Main-I] at the time of auto-reclosing instant
Alternative ndash 2 AR is implemented and kept functional from both Main ndash I and Main-II
In this scheme AR is implemented and kept in service from both Main ndash I and Main-II as
usual As can be seen the scheme is reliable and is without any additional logics However to avoid the possibility of both relays racing for CLOSE-OPEN-CLOSE-OPEN operation in case of permanent faults it shall be ensured that along with other conditions ldquoAR BLOCK with 3-ph TRIPrdquo is also effected for the same phase fault as the original one that occurs during AR dead-time
Out of the above two also it has been suggested to consider Alternative-2 for implementing AR in view of its higher success rate
11 Network Configuration Changes
As per the information furnished by SR-Constituents to the OCC forum in their 132nd meeting (held on
09062017 Minutes circulated on 04072017) it is formed that the following configuration changes (additions deletions modifications of transmission elements) took place in the southern grid during
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 8
April 2017
Two STATCOMs (+- 50 MVAR Each) at NP Kunta commissioned on 16052017
Kudgi Unit I 72 Hrs trail run completed Successfully
400 kV Shankarapally-Suryapet I amp II commissioned on 05052017
22033kV SS at Hayathnagar IampII in Ranga reddy district of 50 MVA Capacity was commissioned on 03052017 by TSTRANSCO
SR II Power grid vide letter dated 10062017 had informed that consequent to the successful completion of Trial Operation the following assets under transmission system associated with ldquoSystem strengthening ndashXX in Southern Regional Gridrdquo have been put under Commercial Operation wef 0000 hrs of 10062017 in terms of clause 4 of CERC (Terms and Conditions of Tariff Regulations 2014)
1 x 500 MVA 40022033kV ICT at Trichy Substation along with associated bays and equipments
SR I Power grid vide letter dated 04062017 had informed that consequent to the successful completion of Trial Operation the following assets of ldquoTransmission System for Ultra Mega Solar Park in Anantapur Dist Andhra Pradesh- Part ndash A (Phase-I)rdquo have been put under Commercial Operation wef 0000 hrs of 04062017 in terms of clause 4 of CERC (Terms and Conditions of Tariff Regulations 2014)
+- 100 MVAR STATCOM at NP Kunta Pooling Station along with associated bays and equipment
12 Instances of SPS Operation
Based on the information furnished by SRLDC it is informed that there occurred no SPS operations in SR during the period 25052017 ndash 28062017
13 Status of Implementation of Protection Audit Recommendations (Phase-I amp Phase-II)
With reference to the petitions filed by KSEB (88MP2016) and KPTCL (135MP2016) for seeking further time-extension for completing their respective Protection Audit Recommendations (PAR) the final Order of Honrsquoble CERC disposing of petitions was issued on 15122016 In this Order the Commission apart from granting last-chance time-extensions to various SR-Constituents had also directed SRPC to monitor the status of completion of PAR regularly in PCSC meetings and submit bi-monthly report to the Commission confirming the completion of Phase-I and Phase-II of PAR of the Constituents of Southern Region
In this regard based on the information furnished various Constituents a summary table showing the
compliance status of various SR-Constituents as in July 2017 is given below
SlNo
Constituent
PAR (Phase-I) Activities
PAR (Phase-II) Activities
PAR (Ph-I amp Ph-II) Compliance ()
Remarks
Stipulated Completion
Date
Stipulated Completion
Date
1 APGENCO (Hydel)
31122017 31122017 40 ---
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 9
2 APGENCO (Thermal)
30072017 --- 75 Based on the status furnished timeline for complying with the remaining pending recommendations (3 in no) is expected by 31122017
3 APTRANSCO 31032017 --- 9571 Out of the 3 remaining pending recommendations two are expected to be completed in three months while the other is expected by 31122017
4 TSGENCO (Hydel)
31032017 31032017 8823 Based on the status furnished timeline for complying with the remaining pending recommendations (4 in no) is expected by 31122017
5 TSGENCO (Thermal)
31032017 31032017 80 Based on the status furnished timeline for complying with the remaining pending recommendations (3 in no) is expected by 31072017
6 TSTRANSCO 31032017 31032017 8523 Based on the status furnished timeline for complying with the remaining pending recommendations (13 in no) is expected by 30092017
7 KPCL --- 31112016 100 ---
8 KPTCL 31052017 31052017 2817 Based on the status furnished timeline for complying with the remaining pending recommendations (51 in no) is expected by 30092017
9 TANGEDCO 31122017 31122017 6389 ---
10 TANTRANSCO 31122017 31122017 50 ---
11 KSEB 30112016 31122017 9481 ---
12 NPCIL (MAPS) 31012017 --- 8889 Based on the status furnished timeline for complying with the remaining pending recommendation (ONE in no) is expected by 31122017
All above SR-Constituents are requested to adhere strictly to the time-lines given in the Order for
completing their respective pending PAR The IPPrsquos for whom there are pending PAR [viz Spectrum PGL GMR Barge - Kakinada Konaseema GPL APGPCL Vijjeswaram (Stage-I amp Stage-II) amp LANCO-Kondapalli PL] are also requested to complete them at the earliest
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 10
14 Nomenclature for naming various files uploaded in web-based Tripping Monitoring
System of SRLDC Portal
The nomenclature to be followed by the Constituents in naming various files (FIR DR EL TR) corresponding to a tripping incident was brought out in the SRPC letter No SRPC SE-III PCSC-45 4609 ndash 649 dated 26062015 and in the minutes of PCSC-45 issued vide SRPC letter No SRPCSE-III PCSC-45 2015 5422-455 dated 21072015 As illustrated therein the format to be followed for the user entered part-name is given below
Transmission Element File Name to be given by the user
Transmission Line SSN_DSN_line_FT
Inter-connecting Transformer SSN_ICT_FT
Generating Transformer SSN_GT_FT
Generating Unit SSN_Unit_FT
Where SSN = Source Station Name From end Station Name Sending end Station Name DSN = Destination Station Name To end Station Name Receiving end Station Name FT = File Type (FIR DR EL TR)
All SR-Constituents are requested to kindly intimate the above file naming nomenclature to all the concerned and ensure that it is strictly followed at all the stations in their respective control areas so that tripping analysis can be done systematically
15 Date amp Venue of the next PCSC Meeting
It is informed that the 66th meeting of PCSC will be held on 17th August 2017 (Thursday) from 1030 hrs onwards in the Conference Hall of SRPC Secretariat Bengaluru
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 132
Analysis of Grid Occurrences - 65
I Details of Grid Disturbances
Sl No
Details of Event Date amp Time Reason Remarks Category
1
Complete outage of 230 kV Villianur Substation of Pondicherry
19-05-2017 at 1235 hrs
Triggering incident was failure of CT in 110 kV Villianur-Kurumbapet at Villianur substation 230KV Villianur ndash NLC2 and 230 kV Villianur - Pondy lines got tripped from Pondy end (on operation of DEF) and NLC end (on operation of Zone-3) respectively resulting in loss of supply to 230 kV Villianur substation
Load Loss 140 MW
GD-1
SLD
The single line diagram of 230 kV Villianur SS as furnished by PED is attached at the end 230 kV Villianur ndash Pondy line Villianur (PED) end
As per FIR TR line was kept holding
The following was also stated in FIRTR
Remedial action Relay testing amp calibration proposed during total shutdown on 13062017
DR amp EL not furnished Pondy (PGCIL-SR2) end
As per FIRDRELTR line tripped at 123559270 hrs on B-E fault due to DPR Z3 (98 km 156 kA) operation From DR amp EL Z3 time delay was observed to be about 06 sec
230 kV Villianur ndash NLC2 line Villianur (PED) end
As per FIR TR line was kept holding
The following was also stated in FIRTR
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 232
Remedial action Relay testing amp calibration proposed during total shutdown on 13062017
DR amp EL not furnished NLC2 (NLCIL) end
As per FIRDRELTR line tripped at 123551016 hrs on B-E fault due to DEFR operation From DR amp EL DEFR time of operation was observed to be about 07 sec
Time sync of Protection relays with GPS at NLC TPS-II needed to be ensured SRPC SRLDC
It was noted that the triggering incident was failure of B-ph CT in 110 kV Villianur-Kurumbapet line at Villianur SS
It was noted that for the above fault distance protection at Villianur end on 110 kV Villianur-Kurumbapet line had not operated probably due to absence of current input (hence impedance becoming infinite)
Further since there was no busbar protection to 110 kV buses the fault continued to be fed from the remote ends (Pondy-PG and NLC-2) through 100 MVA Transformers (Txr ndash 1 amp Txr ndash 2)
So the transformersrsquo back-up protections were called into action But since OC protections provided on both HV amp LV sides had no high-set Units and since they were kept non-directional [Relay make ER TJM 10] LV (110 kV) side OC protections of both transformers had acted to give trip command Even though the 110 kV CB of Txr ndash 1 got opened that of Txr-2 had not opened due to which the fault continued to be fed from the remote ends (Pondy-PG amp NLC-2)
It was noted that the HV (230 kV) side OC protection of Txr-2 which was supposed to act under above situation had NOT acted
Due to above the remote end back-up protections were called into action
It was noted that even though Pondy-PG end CB tripped on DPR Z3 protection the time delay observed was on the lower side of about 06 sec
It was also observed that DEF protection had acted to trip its CB at NLC-2 without giving any chance for its distance protection to operate
In view of the above observed inconsistencies at Villianur SS it was decided to review various feeder amp transformer protections kept at Villanur SS during its scheduled protection audit on 10072017
Subsequently protection audit of 230 110 kV Villianur SS of PED was conducted on 10072017 during which several lacunae were noted Accordingly a comprehensive set of recommendations were given to PED for early compliance
Recommendations
PED to furnish an action taken report wrt complying with the protection audit recommendations PGCIL (SR-II) to review Zone-3 and DEF protection setting at Pondicherry end 230 kV Pondicherry ndash
Villianur and 230 kV Pondicherry ndash Bahour line and set them appropriately to achieve required
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 332
time-coordination with OC protections of ICTrsquos at Villianur SS NLCIL to keep DEF protection in blocked condition as long as Distance Protection is active and
configure it to become active only when distance protection does not pickup to avoid time-coordination issues
2
Complete outage of 400kV Uravakonda and Jammalamadugu Substations
31-05-2017 at 1744 hrs
Triggering incident was tripping of 400 kV Kurnool-PG - Narnoor line - 1 amp 2 and 400 kV Narnoor-Jamalamadugu line-2 which led to loss of supply to 400kV Uravakonda and Jamalamadugu 400kV Gooty-Narnoor 400kV Narnoor-Jamalamadugu-1 400kV Srisailam-Narnoor 400kV Uruvakonda-Mahboobnagar-1amp2 were out of service in antecedent condition
Gen Loss 500 MW
GD-1
FNN not followed by APTRANSCO FIR amp TR in prescribed formats not furnished by APTRANSCO SLD
The single line diagram 400 kV Jammalamadugu SS as furnished by APTRANSCO are attached at the end
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 432
Antecedent Conditions
The following lines were kept out of service 400kV Narnoor-Srisailam SC line 400kV Narnoor-Gooty SC line 400kV Narnoor-Hyderabad SC line 400kV Narnoor-Jamalamadugu-1 line 400kV Uravakonda-Jamalamadugu-1 line 400kV Uravakonda-Mahboobnagar line-1amp2
Above means Uravakonda SS and Jammalamadugu SS were effectively hanging on to 400 kV Jamalamadugu - Narnoor line-2 for supply
A Tripping of 400 kV Kurnool (PG) - Narnoor line-1 Kurnool-PG (PGCIL-SR1) end
As per FIRTR line tripped at 174418601 hrs due to DPR Z3 (5703 km) operation
As per DREL line tripped at 174418601 hrs due to Stub Protection operation Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 173620637 hrs due to operation of Igt4 (B-ph) protection
From EL Igt4 time delay was observed as 100 msec
Time sync of protection relays with GPS needed to be ensured B Tripping of 400 kV Kurnool (PG) - Narnoor line-2 Kurnool-PG (PGCIL-SR1) end
As per FIRTR line tripped at 174418601 hrs due to DPR Z3 (5703 km) operation
As per DREL line tripped at 174418601 hrs due to Stub Protection operation Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 174306388 hrs due to operation of Igt4 (B-ph) protection
From EL Igt4 time delay was observed to be about 100 msec
Time sync of protection relays with GPS needed to be ensured C Tripping of 400 kV Narnoor ndash Jammalamadugu line-2 Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 174423979 hrs due to OVR-I operation (From EL OVR-I Time delay was observed as 5 sec which is in line with SRPC provided gradings)
Jammalamadugu (APTRANSCO) end
As per FIR line tripped at 1744 due to DT receipt from Narnoor end
As per DR line tripped at 174415040 hrs (Type of Protection operated was not recorded)
In EL events recording started from 174424037 hrs Line was observed to have got tripped around this time due to 862 operation (Type of Protection operated was not recorded)
Time sync of Protection relays with GPS needed to be ensured SRPC SRLDC
As informed by APTRANSCO it was noted that the triggering cause for operation of Stub protection Igt4 protection was a line fault on 400 kV Ghani ndash Narnoor line-1 Even though Ghani end had tripped on DPR Z1 protection and sent carrier to Narnoor due to unhealthiness of carrier communication (PLCC related issues) Narnoor end tripped on DPR Z2 protection
The above fault was seen by relays at both ends of 400 kV Narnoor ndash Kurnool-PG lines 1 amp 2 (the relays of P444 make are owned by PGCIL-SR1 and the relay settings were also provided by PGCIL-SR1)
As in formed by PGCIL (SR-I) it was noted that there was an instantaneous non-directional Igt4 protection setting in the specific relay style (defined by relay make model and version) which operates without checking for isolator status During the above instant the flow of heavy fault
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 532
current led to its operation both ends
To this PGCIL (SR-I) was informed that by default Igt4 or stub protection is configured for instantaneous operation with corresponding isolator open position interlock So further instantaneous high-set functionality that operates without checking isolator positional status is not desirable since it can lead to unwarranted trippings as in the present case Therefore the said setting shall be kept disabled If there is no provision to effect this (by means of changing relay settings) the issue may be referred to its OEM for obtaining modified firmware suitable solution PGCIL (SR-I) can also make use of other relays with different style in place of the existing relays
Recommendations
For 400 kV Ghani ndashNarnoor line the following shall be carried out by APTRANSCO End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced PGCIL (SR-II) to take appropriate action wrt disabling non-directional instantaneous Igt4 protection
that operates without checking existence of stub If required the issue may be referred to relays OEM for appropriate solution or the present relays may be replaced with other relays with different styles that donrsquot have the issue observed
II Details of Grid Incidents
Sl No Details of Event Date amp Time Reason Category
1 Tripping of 220 kV Idukki ndashUdumalpet line
05-05-2017 at 1702 hrs
Line tripped due to B-N and R-N fault in line
GI-1
Idukki (KSEB) end
As per FIRDREL line tripped (in 3-ph) at 170200500 hrs on B-E fault due to operation of DPR Z1 (3661 km) protection
Udumalpet (TANTRANSCO) end
As per FIRDRELTR line tripped (in B-ph) at 165741907 hrs on B-E fault due to DPR Z2 (CAT AR 1025 km) operation However during AR dead-time another R-E fault was detected at 165742252 hrs in Zone-2 due to which line tripped in 3-ph after Z2 time delay of 350 msec at 165742594 hrs [It may be noted that all this happened during the AR dead-time]
Time-sync of Protection Relays with GPS needed to be ensured at 220 kV Udumalpet SS KSEB
During the instant case line did not try for AR as the external VARM AR relay was faulty and kept out of service
Remedial action Problem with VARM relay had been rectified and put into service on 10052017
SRPC SRLDC
From the DR of Udumalpet it can be seen that the relay had tried for AR even after giving three phase trip during AR dead-time due to occurrence of two different faults which is not desirable
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 632
Recommendations TANTANSCO to correctly configure AR logic at Udumalpet so that in the event of 3-ph trip being
given during AR dead-time the relay will not try for auto-reclosure TANTRANSCO to keep AR dead-time as 1 sec for all 220 kV amp above transmission lines
2
Tripping of 400 kV Kudgi (PG) - Tumkur line-2 and Kudgi (PG) ndash Kudgi (NTPC) line-1
06-05-2017 at 1605 hrs
Kudgi (NTPC) feeder tripped at Kudgi (PG) end on operation of distance protection R-N Zone-1 Tumkur feeder tripped at Kudgi(PG) end on operation of NGR buchholtz relay
GI-2
SLD
The single line diagram of 765 400 kV Kudgi-PG SS as furnished by are attached at the end 400 kV Kudgi (PG) ndash Kudgi (NTPC) line-1 Kudgi (PGCIL-SR2) end
As per FIRDRELTR line tripped (in 3-ph) at 160547499 hrs on R-E fault due to DPR Z1 (M1 79 km 013 kA M2 88 km 318 kA) operation
Kudgi (NTPC) end
FIRDRELTR not furnished 400 kV Kudgi (PG) ndash Tumkur line-2 Kudgi (PGCIL-SR2) end
As per FIRDRELTR line tripped (in 3-ph) at 160547450 hrs due to operation of NGR Buccholtz trip protection
Tumkur (PGCIL-SR2) end
As per FIRELTR line tripped (in 3-ph) at 160547596 hrs due to DT receipt from Kudgi-PG end
In DR this time was mentioned as 160512593 hrs
Time-sync of protection relays with GPS needed to be ensured PGCIL (SR-II)
With regard to tripping of 400 kV Kudgi (PG) ndash Kudgi (NTPC) line ndash 1 and AR non-operation it was informed that prior to above fault there were multiple faults on all four lines between Kudgi (PG) and Kudgi (NTPC) due to prevailing stormy weather
Remedial action Actual reasons for AR failure in the instant case were being investigated The issue was also
referred to its OEM for suitable advice
With regard to tripping 400 kV Kudgi (PG) ndash Tumkur line ndash 2 it was suspected that NGR Buchholtz relay might have mal-functioned as there was no gas collected in the bucholtz relay of NGR It may be noted that NGR buchholtz trip is present in REF relay
Remedial action Oil sample of NGR taken and sent to RTDC
Recommendations PGCIL (SR-II) to sort out AR related issues at Kudgi (PG) end on 400 kV Kudgi (PG) ndash Kudgi (NTPC)
lines and put AR into service PGCIL (SR-II) investigate the reasons for NGR Buccholtz trip on 400 kV Kudgi (PG) ndash Tumkur line-2
and furnish an action taken report wrt rectifying the same
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 732
3 Tripping of 220 kV Edamon-Tirunelveli lines - 1amp2
06-05-2017 at 1809 hrs
220kV Edamon-Tirunelveli - 1amp2 tripped from Tirunelveli end only and was in service from Edamon end
GI-1
Edamon (KSEB) end
As per FIR line was kept holding from Edamon end Tirunelveli (PGCIL-SR2) end
As per FIRDRELTR lines tripped (in 3-ph) at 180921343 hrs on R-B fault due to DPR Z1 (532 km) operation
It was stated in TR that Edamon ndash Pothencode lines 1 amp 2 had tripped around the same time and it was suspected that DPRrsquos at Tirunelveli end on 220 kV Tirunelveli ndash Edamon lines 1 amp 2 might have over-reached for the fault in 220 kV Edamon - Pothencode lines
PGCIL (SR-II)
The instant case was a typical case of overreaching of distance relays at Tirunelveli being experienced for quite a while It may be probably due to bunching of the conductors involved
Remedial action It was proposed to modify Z1 setting as 50 of line impedance with POR and would be done
within one-week time They had also proposed to measure the actual line impedance of the line and adjust Z1 settings
accordingly
06-03-2017at 0607 hrs
4 Tripping of 400220 kV Ghani ICT-2amp3
07-05-2017 at 1405 hrs
ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
GI-2
FNN not followed by APTRANSCO FIRrsquos in prescribed format not furnished by APTRANSCO SLD
The single line diagrams of 400220 kV Ghani SS as furnished by APTRANSCO is attached at the end Tripping of 500 MVA 400 220 kV ICT-2
As per FIR ICT-2 tripped at 1405 hrs due to operation of Y-ph OC amp EF protections
DR amp EL not furnished Tripping of 500 mVA 400 220 kV ICT-3
As per FIR ICT-3 tripped at 1405 hrs due to operation of Y-ph OC amp EF protections
DR amp EL not furnished SRPC SRLDC
When enquired about the reasons for operation of back-up protections of ICTrsquos ndash 2 amp 3 APTRANSCO replied that there was actually a fault on the 220 kV feeders emanating from 400 220 kV Ghani PS However since the CT Neutral connection setting had been wrongly set as ldquoTowards Bus siderdquo instead of the correct ldquoTowards Transformer siderdquo the back-up protections on 220 kV side operated for the said 220 kV line fault
APTRANSCO also informed that first ICT-2 tripped followed by ICT-3
But since it was not clear from the above explanation whether line protection on 220 kV side had operated or not and the delayed clearance of the fault observed during the incident (about 400 msec) APTRANSCO was asked to investigate the reasons for the same
APTRANSCO was also asked to check whether carrier aided protection is healthy on 220 kV lines emanating from 400 220 kV Ghani PS
07-03-2017 at 1602 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 832
Recommendations APTRANSCO to check and correct all CT Neutral Connection settings in various protection relays at
their 400 220 kV Ghani PS APTRANSCO to ensure that PLCC carrier aided protection is maintained healthy on 220 kV lines
emanating from their 400 220 kV Ghani PS APTRANSCO to take steps to complete configuration works of DRrsquos amp ELrsquos of various protection
relays at their 400 220 kV Ghani SS and furnish the same as and when required in compliance of IEGC Regulation 52 (r)
5 Tripping of 400 kV Ghanapur-Mamidapalli line
08-05-2017 at 1915 hrs
Line tripped at Ghanapur end only and was holding from Mamidapalli Ghanapur end protection had sensed R-phase to earth fault
GI-2
Mamidipalli (TSTRANSCO) end
As per FIR line was kept holding from Mamidipalli end
In DR R-E fault current (2894 kA) along with dip in R-ph voltage could be seen but if any protection relay had picked could not be verified Also EL furnished did not contain events for this time (In fact no events were found recorded after 160610859 hrs)
Ghanapur (PGCIL-SR1) end
As per FIRTR line tripped (in 3-ph) at 1915 hrs on R-E fault due to DPR Z1 (49 km 2547 kA) operation
As per DR line tripped (in 3-ph) at 191330020 hrs on R-E fault due to 3-ph Group-B Trip relay operation (Zone-3 pick-up also could be observed)
As per EL line tripped (in 3-ph) at 191541722 hrs on R-E fault due to 3-ph Group-B Protection Trip relay operation
Time-sync of protection relays with GPS needed to be ensured
When enquired about the reasons for observed discrepancies PGCIL (SR-I) informed that line tripped on operation of distance protection Since last 2-3 trippings permissive carrier was not being received at Mamidipally end
Further since PLCC at both ends belong to TSTRANSCO thorough check-up of PLCC carrier communication and tuning of PLCC link needed to be undertaken
For above one-day shut-down of line was requested to which SRLDC agreed
Recommendations For the line under consideration the following shall be carried out by TSTRANSCO in coordination
with PGCIL (SR-I) End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
08-03-2017 at 1033 hrs
6 Tripping of 400220kV ICT-1 at Guttur
09-05-2017 at 2215 hrs
ICT-1 tripped on HV side only without any relay indications GI-2
As per FIRTR ICT-1 tripped at 2215 hrs only on HV side without any relay indications KPTCL
ABB make RXMS trip relays provided in various lineICT panels were found to be mal-operating and the phenomenon observed was suspected due to raise in earth potential during any fault in Guttur substation
10-03-2017 at 1801 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 932
Remedial action Action wass being taken to provide 10kΩ resistor in series with the RXMS relay coil for all trip
relays of this type at Guttur Total 170 nos of such resistors were required Now purchase formalities were finalised and work of supply and fixing of resistors would be taken up and completed within a monthrsquos time
7 Tripping of 400 kV Narsapur-Shankarapalli line
10-05-2017 at 0007 hrs
Line tripped at Narsapur end only on B-Phase to earth fault and line did not trip from Shankarapalli
GI-2
SLD
Shankarapally (TSTRANSCO) end
As per FIR line was kept holding from Shankarapally end Narsapur (TSTRANSCO) end
As per FIRDREL line tripped in 3-ph at 000720105 hrs on B-E fault due 86 Trip relay (130 km) operation
The type of protection operated was not recorded shown in either DR or EL
TR not furnished TSTRANSCO
For the fault on 400 kV Shankarapalli-Mamidapalli line Narsapur end picked up in Z3 However due to configuration issues relating to programmable Zone Zp (this was being used as Zone-3 and its time-setting was found to be kept as zero sec) it tripped instantaneously instead of tripping after Zone3 time delay
Remedial action PSL Configuration for Zp was set right on 01-06-2017
13-03-2017 at 2347 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1032
8
Tripping of 400220 kV Hyderabad ICT-4 and 220 kV lines at Hyderabad substation
10-05-2017 at 239 hrs
Operation of busbar protection due to fault in 220 kV Bus at 220kV Hyderabad Substation
GI-1
SLD
1 2 1 2
Bus-1
Bus-2
x
xx
x
BUS BAR ACTED AT 220KV GHANAPUR SS ON 10-05-2017
CHANDRAYANAGUTTA HAYATHNAGAR
132KV BUS
160MVA-3 100MVA-1
400kV PGCIL
x x
160MVA-2ICT-1 ICT-2 ICT-3
NAGOLE
x x
ICT-4
x
MOULALI
INFOSYS
x
x
1 2
Y-Ph disc
flash over at
LocNo95
Y amp B-Ph
disc flash
over at
LocNo95
RELAY INDICATIONS ON THE FEEDER
AT GHANAPUR END AT CHANDRAYANGUTTA END
Chandrayangutta-I feeder Ghanapur-I feeder
Main-1 relayYNZ1 071kM Main-1 relayYN254kM
Main-2 relayYNZ1 09kM Main-2 relayYN
Chandrayangutta-II feeder Ghanapur-II feeder
Main-1 relayYB Z1378kM Main-1 relayRYB
Main-2 relayYBZ111kM Main-2 relayRYB
BC
14-03-2017 at 1911 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1132
Tripping of ICT-4
As per FIR ICT-4 tripped at 0240 hrs on 220 kV side only due to BBP operation on 220 kV Bus
As per DR ICT-4 tripped at 220941165 hrs apparently due to LBB operation
EL not furnished
Date amp Time-sync of DR not in order (09052017 220940682 hrs)
TR furnished did not contain any analysis or remedial action taken
It was noted that BBP for 220 kV Bus-2 had operated for a close-in line fault on 220 kV Chandrayanagutta line-2 tripping ICT-4 and other connected 220 kV feeders (It was informed that ICT-2 was not in service at the time of instant tripping)
When enquired about the reasons TSTRANSCO informed that presence sudden appearance of current in the corresponding Peripheral Unit (PU-2) of the Chandrayanagutta line-2 had led to BBP operation And the reasons for the same were being investigated
To this it was suggested to check corresponding CT neutral connection integrity of cable wiring from CT to Busbar panel as also carry out stability-check of busbar protection
Recommendations TSTRANSCO to investigate the reasons for BBP operation for 220 kV Bus-2 and furnish a report on
the remedial measures taken
9 Tripping of 400220 kV ICT-1 at BTPS
13-05-2017 at 1941 hrs
ICT-1 got tripped on operation of LV side earth fault protection during R-phase to earth fault in 220 kV BTPS-Lingapur line
GI-1
SLD
The single line diagram of 400220 kV BTPS as furnished by KPCL is attached at the end
As per FIRTR ICT-1 tripped at 1942 hrs on LV side earth fault protection due to fault in 220 kV BTPS ndash Lingapur line It was stated that the line also tripped around the same time on R-E fault due to DPR Z1 (2438 km) operation
DR amp EL pertaining to ICT-1 tripping not furnished
As per furnished DREL 220 kV BTPS ndash Lingapur line tripped from BTPS end at 194124719 hrs due to DT receipt from the remote end
KPCL
ICT-1 tripped due to non-directional sensitive earth fault protection provided on LV (220 kV) side
Remedial action The time lever for above protection was increased from 0025 to 01 in the third week of May
2017 in consultation with KPTCL KPTCL
220kV BTPS- Lingapur line tripped at both the ends with following indications At BTPS Lingapur Line tripped on DPRZone-1RN24km78kA
At Lingapur BTPS line tripped on DPRZone-2RN66km29kA
It was reported that 315MVA ICT-1 tripped on LV side earth fault protection along with Lingapur line
Remedial action Existing settings of ICT back up protection is obtained from local RT wing of KPTCL for review
Revised settings communicated to KPCL for implementation
16- 03-2017 at 0118 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1232
SRPC SRLDC
Since the ICT has been provided with normal back-up directional OC amp EF protections a separate non-directional sensitive earth fault protection is not desirable hence the need for the same may be reviewed Otherwise its time lever shall be suitably increased to a higher value (say 035) so as not to cause unwarranted trippings
Further tripping of 220 kV BTPS ndash Lingapura line from BTPS end on DT receipt was not in order
When enquired about the reasons for AR non-operation in the instant case for the above line KPCL replied that there were issues with PLCC carrier communication hence it was kept out of service
Recommendations KPCL to review the need for providing separate non-directional sensitive earth fault protection for
ICTrsquos at their BTPS station and take steps to disable the same For 220 kV BTPS ndashLingapura line KPCL to resolve issues relating to PLCC carrier communication and
put AR into service
10 Tripping of 765 kV Kurnool-Tiruvalam line-2
19-05-2017 at 2003 hrs
Failure of R-phase LA at Tiruvalam end REF operation and DT send were observed from EL of Kurnool station
GI-2
Kurnool (PGCIL-SR1) end
As per FIRTR the line tripped in 3-ph at 200318272 on R-B-E fault due to DPR Z2 (CDistance = 912) operation
As per DR line tripped in 3-ph at 200318272 hrs on R-E fault (B-E fault did not appear to be strong) due to DPR Z2 (CAT) operation and 3-ph Group - A amp B Trip relay operation (In DR DT receipt event was observed around the same time)
In EL REF protection operation of PU-P141 operation and DT_SEND to the remote end was observed at 200318340 hrs
Tiruvalam (PGCIL-SR2) end
As per FIRDRELTR the line tripped in 3 ph at 200318269 on R-E fault due to DPR Z1 operation and DT receipt from the remote end
It was stated in TR that 707 RLA (Reactor LA) had fallen down due to heavy wind and caused R-E fault
When enquired about the reasons for REF protection operation and consequent sending of DT to the other end PGCIL (SR-I) informed that the fault was detected as R-B-E fault hence three-phase trip was given However even though Main-CB got opened with its three poles opening simultaneously Tie-CB got opened in R-ph immediately while the other two phase poles took a while to open This had caused Tie-CB LB operation Since this protection was implemented in REF relay trip was extended from the same along with sending of DT to the other end
To this it was pointed out that in the instant case only R-E fault was apparent and the current in B-ph was almost at the normal value hence the sensitivity of distance relay zone elements may be checked Further Tie-CB LBB operation points to sluggishness of the CB-poles hence the opening time of tie-CB may be checked and properly set
It was also noted that in the EL of Tiruvalam DT Send event was observed after tripping of the line on R-E fault PGCIL (SR-II) was asked to look into the reasons for the same and take suitable remedial action
16-03-2017 at 1023 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1332
11 Tripping of 400220 kV ICT-2 at Kalpaka SS
20-05-2017 at 1502 hrs
ICT-2 tripped due to operation of Transformer Buchholtz relay
GI-2
As per FIR ICT-2 tripped at 15053283 hrs due to its Buccholtz relay operation It was stated in FIR that heavy rain amp gale had been reported at the time of tripping
APTRANSCO
Just prior to above tripping event station transformer supply went off When the supply came back the two oil cooling pumps which were supposed to start one after another with a time gap of 15 sec had started simultaneously due to problem in the timer module Due to this there was a sudden flow of oil which shorted the contacts of the micro-switch that gives buchholtz trip
Remedial action The faulty timer module of oil cooling pump had been replaced
On this SRPC asked for the details of AC auxiliary supply about its redundancy details of DG-set and the mode of starting (manual or auto) To this APTRANSCO informed that redundancy for AC auxiliary supply is present and the lost supply during the instant case had been restored immediately
Recommendations
APTRANSCO to furnish AC auxiliary supply details including its redundancy DG set details and its mode of starting at their 400 220 kV Kalpaka SS Further corresponding AC auxiliary supply changeover scheme drawing shall also be furnished
16-03-2017 at 1132 hrs
12 Tripping of 400220 kV ICT-2 at KV Kota SS
23-05-2017 at 1021 hrs
ICT-2 got tripped due to mal-operation of transformer oil temperature indicator
GI-2
As per FIR ICT-2 tripped at 1021 hrs on both HV and LV sides due to transformer oil temperature indicator mal-operation
As per EL ICT-2 tripped at 1019XXXXX192 hrs on due to operation of OTI protection
It was stated that DR had not been triggered for the event
Time-sync of protection relays with GPS needed to be ensured
EL was not configured to show SECONDS in time-stamp of the events (This had been brought to APTRANSCOrsquos attention in previous PCSC meetings also)
APTRANSCO
At KV Kota SS OTI got stuck While checking the same its position indicator got changed and mal-operated resulting in 3-ph trip
Remedial action Ms CGL had visited the substation and declared the relay faulty It was proposed to replace the faulty OTI on 10072017
APTRANSCO was asked to configure Event Loggers at their KV Kota SS properly so that SECONDS are also displayed in the time stamp of the events recorded
16-03-2017 at 1245 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1432
13
Tripping of 220 kV Kaniampeta - Kadakola line (Load Loss at Kaniampeta = 36 MW)
23-05-2017 at 1350 hrs
EFR relay operated and B-ph pole discrepancy relay operated leading to tripping of Bus-Coupler CB
GI-1
Kaniampeta (KSEB) end
As per FIR in Kaniyampetta 220 kV substation all transformers tripped (Load loss 36 MW) at 1339 hrs due to the tripping of 220 kV Kaniyampetta-Kadakola feeder (B phase) at Kadakola end Later 220 kV Kaniyampetta-Kadakola feeder was hand tripped at 1426 hrs from Kaniyampetta end
Kadakola (KPTCL) end
As per FIR line tripped at 1350 hrs due to EFR operation of Bus-Coupler CB and PDR operation
It was also stated that at the time of tripping Kaniampeta panel had been taken up for RampU work hence distance relay was not in service Kaniampeta CB was bypassed by keeping protection through 220 kV Bus-Coupler CB
DR amp EL not furnished KPTCL
At Kadakola during the instance protection to Kaniambetta line was provided through 220kV bus coupler breaker bay as Kadakola relay panel was taken out for M-2 retrofitting work under RampU
Bus coupler breaker tripping was suspected due to problem in the pole discrepancy relay and there was no fault in the line
Remedial action Problem with the PD relay of Bus coupler breaker was rectified on 24052017
16-03-2017 at 2026 hrs
14 Tripping of 400 220 kV ICT-1 at Somanahalli substation
24-05-2017 at 1724 hrs
ICT-1 at Somanahalli substation got tripped due to DC Earth fault
GI-2
Somanahalli (PGCIL-SR2) end
As per FIRTR ICT-1 tripped (on HV side) at 172809 hrs on momentary DC Earth fault
As per DREL ICT-1 tripped (on HV side) at 172809812 hrs due to operation of Group AB trip relays In DR manual trigger signal becoming HIGH was observed at above instant
In EL time resolution for recording events was limited to seconds (events were not shown at msec level)
PGCIL (SR-II)
At Somanahally SS 3x167 MVA single phase units had been replaced by 1x500 MVA ICT Subsequently CSD works were taken up At the time of tripping event CSD wiring works were going on During the process positive DC supply got extended to 86A trip relay inadvertently
Remedial action DC earth fault had been removed
PGCIL (SR-II) was asked to configure Event Loggers at their Somanahalli SS properly so that time resolution for recording events was set u pto msec
16-03-2017 at 118 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1532
15 Tripping of HVDC Gazuwaka Pole-1amp2
25-05-2017 at 0945 hrs
HVDC pole-1 got tripped due to operation of South filter inter zone protection and HVDC pole-2 got tripped due to operation of differential protection
GI-2
SLD
Pole-1
27-03-2017 at 1016 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1632
Pole-2
Tripping of HVDC Pole-1 (PGCIL-SR1)
As per FIRELTR Pole-1 tripped at 094513960 hrs due to operation of South Filter inter-zone protection [
It was stated that DR was not available Tripping of HVDC Pole-2 (PGCIL-SR1)
As per FIRDRELTR Pole-2 tripped at 094512906 hrs due to operation of WIN Differential protection
It was noted that no representative from Gajuwaka (HVDC amp HVAC) SS had come to attend the meeting to explain as to what caused the pole trippings
PGCIL (SR-I) representative informed that at the time of tripping RTV Coating works for switchyard equipment were going on In the process when CWC35 filterrsquos bus-side isolator was opened it feel down unexpectedly and resulted in inter-zone filter protection operation
Wrt HVDC Pole-2 tripping PGCIL (SR-I) representative informed that oscillations in voltage and current were noticed prior to tripping of HVDC Pole-2 And differential current was also observed for the extended AC bus Due to this WIN differential protection had operated resulting in tripping of HVDC Pole-2 It was also informed that the issue was referred to its OEM ABB (Sweden) for suitable advice
However since no detailed tripping report explaining the causes that led to tripping of HVDC poles and the remedial action taken had been furnished PGCIL (SR-I) was asked to submit the same
Recommendations PGCIL (SR-I) to furnish detailed report on the events that led to tripping of HVDC Poles ndash 1 amp 2
including remedial measures taken to PCSC forum Further the OEM report wrt tripping of HVDC Pole-2 shall also be furnished
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1732
16 Tripping of 400 kV Kayathar-Karaikudi line
25-05-2017 at 1552 hrs
R-phase to earth fault had occurred in line There was Zone-2 3 phase trip operation at Kayathar end and Zone-1 3 phase trip at Karaikudi end
GI-2
Kayathar (TANTRANSCO) end
As per FIRDRELTR line tripped in 3-ph at 155236989 hrs on R-E fault due to DPR Z2 operation (Z2 time delay observed was about 390 msec)
It was stated in TR that carrier channel was not healthy at the time of tripping and carrier signal was not received at this end during the fault
Remedial action Protection Coupler and OLTE were reset at both Karaikudi amp Kayathar ends and carrier channel
was made available Karaikudi (PGCIL-SR2) end
As per FIRDRELTR line tripped in 3-ph at 155236592 hrs on R-E fault due to DPR Z1 (186 km) operation
It was stated in TR that DPC had failed at the other end and resulted in Carrier Fail alarm at Karaikudi end issuing 3-ph trip
Recommendations
For the line under consideration the following shall be carried out by TANTRANSCO in coordination with PGCIL (SR-II) End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
17
Tripping of 400220 kV ICT - 1 amp 3 at Hoody substation of KPTCL (Load Loss 750 MW)
26-05-2017 at 1230 hrs
R phase limb of ICT-1 bank pre-close supervision contact of trip coil -2 had arc over ICT-3 got tripped on over-loading
GI-2
Tripping of ICT-1
As per FIR ICT-1 tripped at 1230 hrs due to arcing over of R phase limb of ICT-1 bankrsquos pre-close supervision contact of trip coil -2
As per DR the tripping took place at 114128806 hrs (Type of protection operated not recorded)
EL not furnished
Time sync of PRrsquos with GPS needed to be ensured
Remedial action The same was rectified and the circuit was changed by utilizing the spare auxiliary contact of CB
for R-ph limb by availing LC on 29052017 and charged the ICT-1 bank at 0432 hrs by getting the SRLDC code 1360
Tripping of ICT-3
As per FIR ICT-3 tripped at 1230 hrs due to operation of INV OC FWD protection amp 86A master trip relay
From the DR furnished (with trigger time = 114254202 hrs) tripping of ICT-3 and the type of protection operated were not clear
EL not furnished
Time sync of protection relays with GPS needed to be ensured at Hoody
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1832
KPTCL
At Hoody 500 MVA ICT-1 tripped without any relay indication ICT-1 and 3 were in parallel each ICT carrying about 390MW of load Due to tripping of ICT-1 ICT-3 got over loaded and hence tripped on over current protection
Remedial action After detailed inspection it was observed that pre-close supervision contact of trip coil -2 arced
over in R phase limb of the 400kV side breaker Hence it was suspected that R-pole might have opened initially and remaining poles on PD operation
The problem was rectified and attended on 29052017 by availing shut down In order to avoid tripping of another ICT operating in parallel whenever one ICT trips on fault an
SPS is being finalized by KPTCL which is to be implemented at Hoody Any time each ICT at Hoody will be catering around 400MW of load Such huge load shedding by tripping 66kV loads of Hoody station is difficult to achieve Hence 220kV radial feeders may also have to be tripped to get desired load shedding
It was noted that frequent tripping of 400 2220 kV ICTrsquos at Hoody SS had been observed in the past few months And during their discussion in various PCSC meetings the following issues have come to the for urgent action by KPTCL Implementation of Special Protection Scheme (SPS) to take care of over-loading of the other ICT
when one out of two ICTrsquos operating in parallel trips Provision of Bus-bar protection to 220 kV buses Compliance of Third Party Protection Audit Recommendations Ensuring supply reliability to Metro-services Action plan on the proposed system strengthening measures in Bengaluru area in the context
of continued use of Split-Bus operation
Thus to ascertain the action taken by KPTCL wrt above issues a Protection System Analysis Group (PSAG-18) meeting was proposed to be conducted on 03082017
Recommendations KPTCL to furnish compliance report on the recommendations given in PSAG-18 meeting to PCSC
forum
18 Tripping of 400 kV Simhadri - Kalpaka line-2
28-05-2017 at 503 hrs
Line tripped on mal-operation of Tee Differential Protection at Simhadri end and Direct Trip was received at Kalpaka
GI-2
Kalpaka (APTRANSCO) end
As per FIR line tripped at 0503 hrs due to DT receipt from the remote end
DR amp RL amp TR not furnished Simhadri STPS (NTPC) end
As per FIRTR line tripped at 050350408 hrs due to operation T-differential protection which in turn was attributed to spurious pick-up during the fault at Vemagiri end
The following was stated in TR Kalpaka Line-1amp2 Tie bays were under PTW And R-Ph CT (16CTA R-Ph) was under erection Primary connection was over secondary
connection was pending The CT secondary wires used in T-Diff protection of Kalpaka Line-2 might be touching the earth and during fault at Vemagiri some stray voltage developed across CT secondary cores might have resulted into operation of T-Diff protection Trip values are 100mA in secondary
During the operation of T-diff protection there was no change in current magnitudes of Kalpaka Line-2 and hence the tripping could be considered as spurious one
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1932
As per DR line tripped at 050350442 hrs But the type protection operated was not recorded in it
EL not furnished (In place of EL DRrsquos eventsrsquo summary was furnished)
19 Tripping of 400 kV Ramagundam - Gajwel line
29-05-2017 at 0007 hrs
Over Voltage Stage-1 had operated at Gajwel end Ramagundam end did not trip as Direct Trip was not received from Gajwel end
GI-2
Ramagundam STPS (NTPC) end
As per FIR line was kept holding from Ramagundam end Gajwel (TSTRANSCO) end
As per FIR line tripped at 0007 hrs due to OVR-I operation
DR amp EL amp TR not furnished
The tripping was not in order as per the SRPC given OVR gradings as shown below
When enquired about the reasons for OVR-I operation TSTRANSCO informed that OVR functionality implemented in REL 521 had mal-operated
Remedial action The OVR functionality had been moved to an external Over Voltage relay
Recommendations
For the line under consideration the following shall be carried out by TSTRANSCO in coordination with NTPC-Ramagundam End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
20 Tripping of 400 kV Gajwel-Ghanapur line
29-05-2017 at 0007 hrs
Line tripped on operation of over voltage protection at Gajwel and direct trip was received at Ghanapur DR and EL of Gajwel end were not furnished
GI-2
Ghanapur (PGCIL-SR1) end
As per FIRELTR line tripped at 000731885 hrs due to DT receipt from the remote end
As per DR line tripped at 000257163 hrs due to DT receipt from the remote end
Time-sync of DR amp EL with GPS needed to be ensured Gajwel (TSTRANSCO) end
As per FIR line tripped at 0007 hrs due to OVR-I operation
DR amp EL amp TR not furnished
The tripping was not in order as per the SRPC given OVR gradings as shown below
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2032
When enquired about the reasons for OVR-I operation TSTRANSCO informed that there was a loose
wiring in Y-ph CVT wiring which resulted in mal-operation of OVR-I protection
Remedial action All CVT wirings had been tightened for fool-proof operation
III Details of Trippings due to Failure or Non-operation of Auto-Reclose
Sl No Element Date amp Time Reason
Category
1 Tripping of 400 kV Hiryur-
BTPS line-1 06-05-2017 at 1401 hrs
Y-phase to earth fault had occurred in line Direct trip was sent from BTPS to Hiryur end
GI-2
Hiryur (PGCIL-SR1) end
As per FIRDRELTR line tripped (in Y-ph) at 140009730 hrs on Y-E fault due to DPR Z1 (AR 82 km 1034 kA) operation Just prior to auto-reclosing DT was received at 140010730 hrs and line tripped in 3-ph
BTPS (KPCL) end
As per FIRTR line tripped (in Y-ph) at 1400 hrs on Y-E fault due to DPR Z1 (AR 1173 km) operation AR was stated to be attempted but unsuccessful due to persistent fault
As per DREL line tripped (in Y-ph) at 125520000 hrs on Y-E fault due to DPR Z2 (CAT AR) operation and tried to auto-reclose after about 1 sec but tripped in 3-ph due to persistent (Z1) fault
Time-sync of Protection Relayrsquos with GPS needed to be ensured at BTPS
When enquired about the reasons for sending of DT to Hiriyur end KPCL informed that when the line tripped on Y-E fault and the AR operation was in progress Under-Voltage relay at BTPS end had sensed under-voltage and sent DT to Hiriyur end
It was noted that instantaneous tripping of UV relay and consequent of sending of DT to the other end are undesirable It was therefore suggested to introduce suitable delay (say 3 sec) for UVR tripping and disable sending of DT to the other end
Recommendations
KPCL to introduce suitable delay (say 3 sec) for UVR tripping and disable sending of DT to the other end on UVR operation at their BTPS station
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2132
2 Tripping of 400 kV Munirabad-Guttur line
06-05-2017 at 1702 hrs
R-phase to earth fault Auto-reclose was successful at Guttur and Breakers at Munirabad end got tripped
GI-2
Munirabad (PGCIL-SR1) end
As per FIRDRELTR line tripped (in 3-ph) at 170231624 hrs on Y-E fault due to DPR Z2 (AR CAT 1145 km) operation
Guttur (KPTCL) end
As per FIR line tripped (in R-ph) at 1702 hrs on Y-E fault due to DPR Z1 (AR 4708 km Ir=6877 kA) operation and successfully auto-reclosed
As per DREL line tripped (in R-ph) at 165933499 hrs on Y-E fault due to DPR Z1 (AR) and successfully auto-reclosed after about 1 sec
Time-sync of Protection Relays with GPS needed to be ensured at Guttur SS
When enquired about the reasons for AR non-operation at Munirabad end PGCIL (SR-I) informed that the external VARM relay through which AR had been implemented had not operated Since the relay belonged to KPTCL suitable action needed to be taken by them
On this KPTCL was asked to look into the issue and replace the relay if required PGCIL (SR-I) was also requested to coordinate with KPTCL in attending to this matter
3
Tripping of 765kV Kurnool-NPS line -2
07-05-2017 at 1405 hrs
Y phase to earth fault had occurred in line Auto-reclose was successful at Kurnool end and AR was not attempted at NPS end
GI-2
Kurnool-PG (PGIL-SR1) end
As per FIRELTR line tripped (in Y-ph) at 140543316 hrs on Y-E fault due to DPR Z1 (AR 328 km 166 kA) operation and successfully auto-reclosed after about 11 sec After about further 6 sec (ie at 140550470) line tripped in 3-ph due to receipt of DT from the remote end
It was stated in FIR that 765 kV Kurnool ndash NPS line-1 was under LVRD
As per DR line tripped (in 3-ph) at 140550470 hrs due to DT receipt from remote end
DR corresponding to successful AR operation not furnished NPS (PGIL-SR1) end
FIR amp TR furnished were that of Kurnool station
As per DREL line tripped (in 3-ph) at 140543351 hrs on Y-E fault due to AR (Z2 CAT) operation It was noted from EL that AR LOCKOUT had operated around the same time due to which line had not tried for AR
From EL it was further observed that DT was sent to the remote end at 020550419 hrs However the cause of DT send was not recorded in EL
DR pertaining to DT send was not furnished
If DT send was because of OVR-I protection operation then also tripping was not in order as it does not match with the settings provided
PGCIL (SR-I)
Non-operation of AR from NPS was due to wiring mistake made during installation of Controlled Switching Devices (CSD) for the line reactor on this line
Remedial action The wiring issues in CSD installation were rectified on 18052017
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2232
4
Tripping of 400 kV Krishnapatnam-Chittoor line-1
07-05-2017 at 1441 hrs
R-phase to earth fault Main CB Auto-reclose was successful at Chittoor end and Tie CB got tripped Breakers tripped at Krishnapatnam end and did not attempt auto-reclose
GI-2
FNN not followed by APTRANSCO and APGENCO SDSTPS (APGENCO) end
As per FIRDREL line tripped (in 3-ph) at 144113756 hrs on R-E fault due to DPR Z1 (628 km) operation It was observed from EL that the line was given 3-ph trip straight way without initiating AR
Chittoor (APTRANSCO) end
As per FIRDRELTR line tripped (in R-ph) at 144113759 hrs on R-E fault due to DPR Z1 (1147 km) operation and successfully auto-reclosed after about 1sec However it was observed that only Main-CB got auto-reclosed successfully whereas Tie-CB got tripped in 3-ph while attempting AR
Remedial action When enquired about the reasons for AR failure at SDSTPS end APGENCO representative
informed that as informed in last PCSC meeting AR configuration logic is scheduled to be reviewed by ABB in July 2017 when all issues pertaining to AR operation would be sorted out
When asked about the reasons for AR failure for Tie-CB at Chittoor end APTRANSCO informed that Tie-CB AR dead-time and PDR operational time were inadvertently kept equal As remedial action PDR operational time was increased to 25 sec
5 Tripping of 765 kV Raichur-Solapur line-2
07-05-2017 at 1918 hrs
Y-phase to earth fault Auto-reclose was successful at Solapur and breakers at Raichur end got tripped
GI-2
Solapur (PGCIL-WR1) end
As per FIRTR line tripped (in Y-ph) at 1918 hrs on Y-E fault due to DPR Z1 (AR 66 km 572 kA) operation and successfully auto-reclosed
DR amp EL not furnished Raichur (PGCIL (SR-I) end
As per FIRDRELTR line tripped (in 3-ph) at 191836810 hrs on Y-E fault due to DPR Z1 (145 km) operation It was observed from DR that AR lock-out had operated that resulted in tripping of Main-CB and Tie-CB But while Main-CB got tripped immediately Tie-CB got tripped in Y-ph only And the other two phase poles got tripped due to PDR operation after about 21 sec at 191838910 hrs
EL time-stamp resolution was limited to SECONDS instead of millisec
Tie-CB OPEN digital signals were observed to have employed NEGATIVE LOGIC PGCIL (SR-I)
The observed discrepancies at Raichur end were due to the hardware error caused by hanging of Main-CBrsquos BCU
Remedial action The problem with Main-CBrsquos BCU had been resolved by restarting it
Recommendations
PGCIL (SR-I) to configure Event Loggerrsquos time-resolution up to millisec level in all protection relays at their 765 400 kV Raichur SS
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2332
6
Tripping of 400 kV Neyveli TS2-Pugalur line
07-05-2017 at 1955 hrs
Y-phase to earth fault Neyveli TS2 end relay issued a 3-phase trip 220ms after issue of Y phase trip Direct Trip was sent to Pugalur end preventing auto-reclose
GI-2
NLC TS2 (NLCIL) end
As per FIRDRELTR line tripped in 3-ph at 195526677 hrs due to DT receipt from the other end
It was stated in TR that even though respective zones had picked up on fault DT receipt at the same time resulted in tripping of the line in 3-ph
In DR 3-ph trip was found to be issued 220 msec after Y-ph trip was issued It was also noted that DT receipt signal remained high for a duration of about 220 msec
Time sync of Protection Relays with GPS needed to be ensured at NLC-TS2
Pugalur (PGCIL-SR2) end
As per FIRDRELTR line tripped (in Y-ph) at 195534241 hrs on Y-E fault due to DPR Z1 (AR) operation However line tripped in 3-ph during AR dead-time at 195534353 hrs due to DT receipt from Neyveli end
In view of DT receipt at both ends it was suggested to carry out PLCC end-to-end testing to ensure healthiness of carrier communication
Recommendations
For the line under consideration the following shall be carried out by NLCIL in coordination with PGCIL (SR-II) End-to-end communication for DT permissive amp other signals may be ensured by testing at both
the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
7 Tripping of 400 kV NCTPS -SVChatram line-2
09-05-2017 at 1843 hrs
R-phase to earth fault Auto-reclose is not in service since Fibre optic cable link is not healthy
GI-2
NCTPS (TANGEDCO) end
As per FIRDRELTR the line tripped in 3-ph at 184223424 hrs on R-E fault due to DPR Z1 (9159 km 29 kA) operation (Given the length of this line as 95 km it may be verified whether Z1 setting is correct)
It was stated in FIR that AR was kept out of service due to defective FO communication link
Remedial action Line patrol done by lines wing and declared No Visible fault FO link cut was rectified on 13052017 and AR scheme restored
S V Chatram (TANTRANSCO) end
As per FIRDRELTR the line tripped in 3-ph at 184357616 hrs on R-E fault due to operation of DPR Z1 (32 km) operation
Time sync of protection relays with GPS needed to be ensured at both NCTPS and SV Chatram stations
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2432
8 Tripping of 400 kV Madurai-Kudankulam line
10-05-2017 at 1940hrs
B-E Fault Auto-reclose successful at Madurai and breakers tripped at Kudankulam
GI-2
Madurai (PGCIL-SR2) end
As per FIRDRELTR line tripped (in B-ph) at 194040402 hrs on B-E fault due to DPR Z1 (AR 137 km 114 kA) operation and successfully auto-reclosed after about 11 sec
Kudankulam NPP (NPCIL) end
As per FIRTR line tripped (in 3-ph) at 192936910 hrs on B-E fault due to DPR Z2 (CAT 2071 km) operation
It was informed that AR had not been kept in service as per SRPC decision Hence the tripping was in order
9 Tripping of 220 kV Idukki-Udumalpet line
14-05-2017 at 1345 hrs
Y-phase to earth fault had occurred in line Auto-reclose was successful at Idukki and breakers at Udumalpet end tripped on pole discrepancy
GI-2
Idukki (KSEB) end
As per DRTR line tripped (in Y-ph) at 134620509 hrs on Y-E fault due to DPR Z2 (CAT 83125 km) and successfully auto-reclosed after about 08 sec
EL not submitted (In its place DRrsquos events summary was furnished)
Udumalpet (TANTRANSCO) end
As per FIRTR line tripped in Y-ph at 1345 hrs on Y-N fault on DPR Z1 (2834 km) operation Subsequently tripped in 3-ph on PDR operation
As per DR line tripped in Y-ph at 134151100 hrs on Y-E fault due to DPR (AR) operation But as DRrsquos time scale was limited to 1 sec post triggering AR complete operation could not be verified
From EL line all poles dead was observed at 134152102 hrs Cause of line tripping as stated in FIRTR was not observed in EL
The following was stated in TR The fault resistance measured in the M1 relay (MicomP442) was high resulting in Z3 pickup It was
evident from the fault record that M2 relay (7SA522) had cleared the fault in Z1 by opening Y-ph pole However since AR was implemented in only M1 relay and M2 (Z1) operation had not initiated AR in M1 it resulted in opening of the other two phase poles on PDR operation
The cause of non-initiation of AR of M1 relay on external initiation was found to be logic configuration mistake in the Main 1 relay
Remedial action The AR logic configuration in the PSL of Main 1 relay had been corrected However a special relay
test would be conducted to verify AR operation during the next opportunity shutdown
Time sync of protection relays with GPS needed to be ensured at Idukki and Udumalpet
10 Tripping of 400 kV Vemagiri - Gazuwaka line
14-05-2017 at 1654 hrs
Y-phase to earth fault Auto-reclose was not successful due to persistent fault Vemagiri end had sent a Direct Trip after un-successful Auto-reclose AR attempt was observed in Gazuwaka end DR after 3 phase trip
GI-2
Vemagiri (PGCIL-SR1) end
As per FIRDRELTR line tripped in (Y-ph) at 165411968 hrs on Y-E fault due to operation of DPR Z1 (AR 1512 km) operation It tried to auto-reclose after about 11 sec but tripped in 3-ph due to persistent fault
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2532
It was noted that AR was attempted by Tie-CB only the Main-CB tripped in 3-ph at the beginning of AR initiation
Also Tie-CB AR dead-time was observed to be one second
Reasons 3-ph trip of Main-CB needed to be furnished Gazuwaka (PGCIL-SR1) end
As per FIRDRTR line tripped in Y-ph at 165330242 hrs on Y-E fault due to operation of DPR Z1 (AR 1677 km) operation But during AR dead-time it tripped in 3-ph after about 115 sec due to DT receipt from the remote end This resulted in 3-ph opening of both Main-CB and Tie-CB However after 125 sec Main-CB Y-ph limb tried for auto-reclosure and tripped due to persistent fault
As per EL line tripped in (Y-ph) at 165351597 hrs on Y-E fault due to operation of DPR Z1 (AR) operation But during AR dead-time it tripped in 3-ph at 165352620 hrs due to DT receipt from the remote end This resulted in 3-ph opening of both Main-CB and Tie-CB However at 165352687 hrs Main-CB Y-ph limb tried for auto-reclosure and tripped due to persistent fault
Reasons for AR attempt by Main-CB event after opening in 3-ph due to DT receipt needed to be explained
Time sync of DRrsquos amp ELrsquos with GPS needed to be ensured at Gajuwaka SS Recommendations
PGCIL (SR-I) to sort out issues relating to AR functionality operation for both Main-CB and Tie-CB at both Vemagiri and Gajuwaka substations
For the line under consideration the following shall be carried out by PGCIL (SR-I) End-to-end communication for DT permissive amp other signals may be ensured by testing at both
the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
11 Tripping of 400 kV VTPS-Sattenapalli line-2
21-05-2017 at 1706 hrs
B-phase to earth fault Auto-reclose successful at Sattenapalli and breakers got tripped at VTPS end
GI-2
Sattenapalli (APTRANSCO) end
As per FIRDRELTR line tripped (in Y-ph) at 170653038 hrs on B-E fault due to DPR Z1 operation and successfully auto-reclosed after about 1 sec
VTPS (APGENCO) end
As per FIRDRELTR line tripped in 3-ph at 170653133 hrs on B-E fault due to DEFR (33 kA) operation (DPR Z2 had picked up and Carrier was also received from the other end)
APGENCO
Before the LILOing of 400 kV VTPS-Srisailam DC line at Sattenapalli DEF protection had been provided from a separate REX521 relay Subsequently even though all protections at VTPS had been revised the above DEF protection implemented from the REX521 relay had been somehow left out and it only had extended 3-ph trip during the current instant
Remedial action The DEF functionality from the said REX521 had been disabled
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2632
12 Tripping of 400 kV Srisailam-Dindi line-2
24-05-2017 at 1502 hrs
R-phase to earth fault Auto-reclose was successful at Dindi and Zone - 1 3-phase trip at Srisailam
GI-2
Srisailam (TSGENCO) end
As per FIRDREL line tripped in 3-ph at 150253522 hrs on R-E fault due to DPR Z1 operation
TR contained no information Dindi (TSTRANSCO) end
As per FIRDRELTR line tripped (in R-ph) at 150253487 hrs on R-E fault due to DPR Z1 operation and successfully auto-reclosed after about 1 sec
Recommendations Since all 400 kV lines emanating from Srisailam LB are composite feeders APTRANSCO TSTRANSCO
can keep AR functionality disabled at respective remote end stations under their control
IV Details of Trippings due to PLCC mal-operation
Sl No Element Date amp Time Reason
Category
1 Tripping of 400 kV Kalpakka-Gazuwaka line-1amp2
18-05-2017 at 1108 hrs
Line tripped at Kalpakka end only on Direct Trip receive and was holding from Gazuwaka
GI-2
Tripping of 400 kV Kalpaka ndash Gajuwaka line-1
Gazuwaka (PGCIL-SR-2) end
As per FIR line was kept holding from Gazuwaka end Kalpakka (APTRANSCO) end
As per FIREL line tripped at 110625955 hrs to DT receipt from Gazuwaka end
Tripping of 400 kV Kalpaka ndash Gajuwaka line-2
Gazuwaka (PGCIL-SR2) end
As per FIR line was kept holding from Gazuwaka end Kalpakka (APTRANSCO) end
As per FIREL line tripped at 110625955 hrs to DT receipt from Gazuwaka end
Remedial action taken by APTRANSCO subsequent PCSC-65 meeting as informed vide their internal communication dated 20072017
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2732
2 Tripping of 400 kV Tumkur-Bidadi line-1 amp 2
30-05-2017 at 1139 hrs
Line tripped due to suspected PLCC mal-operation at Tumkur end and direct trip was received at Bidadi
GI-2
Tripping of 400 kV Tumkur ndash Bidadi line-1 Tumkur (PGCIL-SR2)) end
As per FIRDRELTR line tripped in 3-ph at 113515534 along with DT SEND to the remote end
PLCC mal-operation was suspected to have caused above tripping Bidadi(PGCIL-SR2) end
As per FIRTR line tripped in 3-ph at 113515 hrs due to DT receipt from Tumkur end Tripping of 400 kV Tumkur ndash Bidadi line-2 Tumkur (PGCIL-SR2)) end
As per FIRDRELTR line tripped in 3-ph at 113515534 along with DT SEND to the remote end
PLCC mal-operation was suspected to have caused above tripping Bidadi(PGCIL-SR2) end
As per FIRTR line tripped in 3-ph at 113515 hrs due to DT receipt from Tumkur end PGCIL (SR-II)
Remedial action The above trippings were due to PLCC mal-operation which in turn was due to shifting of its
coaxial cable The related circuitry was subsequently rectified
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2832
Single Line Diagram of 230 kV Villianur SS of PED [Ref I1]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2932
Single Line Diagram of 400 kV Jammalamadugu SS of APTRANSCO [Ref I2]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3032
Single Line Diagram of 400 kV Judgi-PG GIS SS of PGCIL (SR-II) [Ref II4]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3132
Single Line Diagram of 400 kV Ghani SS of APTRANSCO [Ref II4]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3232
Single Line Diagram of 400 kV BTPS of KPCL [Ref II9]
Annexure-II
Meeting No
Index
Details of Event Date amp Time Reason PCSC Recommendations Utility responsible for
Implementation
Status of Recommendations
as on 25072017
Remarks
Pending Implementation of PCSC Recommendations (up to 65th Meeting)
Complete outage of 220kV Yerraguntla
substation and tripping of running Units
at Rayalaseema TPS
52I2 (GD) PendingMail received on 27-07-2016
1The drop out relays of reducer oil pumps time setting was increased for
all millsSo there will not be any trip under transient low voltage condition--
--Complied
2The recommendation regarding 2 sec time delay will be implemented
during unit shut down and will be intimated immediately after
implementation------Pending
APGENCO 1 APGENCO to check associated logic for lube oil pump for correct
operation under transient low voltage conditions at Rayalaseema TPS
Unit-1
2 APGENCO to keep appropriate time delay fault ride through
delay (typically 2 sec) in VFD speed sensor relay at all its generating
Units including Rayalaseema TPS Units
HV B-Ph Current transformer of 100MVA Power
Transformer -1 failed resulting into a bus fault on
220KV Bus-1 Unit-1 and Unit-5 at RYTPS tripped
during the fault at Yerraguntla substation
21-02-2016 at
1039 hrs
Andhra Pradesh
APGENCO to furnish a report on the remedial action implemented
wrt overreaching of Krishnapatnam end distance relays during the
tripping of 400 kV Nellore (PG) - NPS line-1
APGENCO Yet to be informed Pending57II9 Tripping of 400 kV Nellore (PG) - NPS
line-1 400 kV Krishnapatnam-Nellore
(AP) lines -1amp2 and 400kV NPS -
MEPL line
18-07-2016 at
1905 hrs
Triggering incident was snapping of Y phase
conductor in 400kV Nellore (PG) - NPS line-1
Distance relay at Krishnapatnam end over-reached in
Zone-1 and resulted in tripping of 400kV
Krishnapatnam ndash Nellore (AP) lines - 1amp2 from
Krishnapatnam end Distance relay at MEPL over-
reached and resulted in tripping of MEPL-NPS line
from MEPL end
Yet to be informed Pending
APTRANSCO mail dated on 31-08-2016
To avoid the unwanted malopeartions due to the external LBB trip
initiation from PGCIL Vide letter Dt 04-08-2016 APTRANSCO has
requsted the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1 amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 15-11-2016
To avoid the unwanted maloperations due to the external LBB trip
initiation from PGCIL vide letter Dt 04-08-2016 ARTRANSCO has
requested the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 20-12-2016
Waiting for the PGCIL response
APTRANSCO mail dated 04032017 amp 24052017
SRPC is requested to coordinate with PGCIL in takind necessary action
Pending
Tripping of 400kV Krishnapatnam-
Nellore line-1
Line tripped on B-phase to earth fault and auto-
reclose was successful at Nellore(AP) end and un-
successful at Krishnapatnam end
APGENCO
56II13 Tripping at 220kV Gooty Substation of
APTRANSCO
24-06-2016 at
1604 hrs
LBB protection got operated for 400220kV ICT-2
breaker which had resulted in tripping of 220kV Bus-
2 at 220kV Gooty Substation
1 APGENCO SDSTPS to correct logic and ensure healthiness of ARscheme employed for transmission lines emanating from SDSTPSand furnish an action taken report to PCSC forum
2 APGENCO SDSTPS to configure DRrsquos of line protection relaysfor a post triggering period of 2 sec to capture complete ARoperation at their SDSTPS
Yet to be informed Pending63III1 28-02-2017 at
0516 hrs
1 APGENCO SDSTPS to correct logic and ensure healthiness of AR
scheme employed for transmission lines emanating from SDSTPS
and furnish an action taken report to PCSC forum
2 APGENCO SDSTPS to configure DRrsquos of line protection relays
for a post triggering period of 2 sec to capture complete AR
operation at their SDSTPS
Tripping of 400kV Krishnapatnam-Nellore line-2
R-phase to earth fault had occurred in line Auto reclose was successful at Nellore however protection at Krishnapatnam end issued a 3 phase
trip
APGENCO63III3 02-03-2017 at 455 hrs
1APTRANSCO to check the healthiness of the connecting cable
between Gooty (PGCIL) and Gooty (APTRANSCO) and replace it
if required
2APTRANSCO to ensure that the distributed architecture employed
in implementing busbar protection at their Gooty 220 kV SS does not
introduce any unwarranted delays in transmitting the triggering signals
to the Central Unit
APTRANSCO
Annexure-III
Page 1 of 31
63II2 Tripping of 400 kV KV Kota-Suryapet
line
01-03-2017 at
2005 hrs
Line tripped on operation of over-voltage protection
at KV Kota and Direct Trip was received at Suryapet
1 APTRANSCO to furnish (i) FIR amp TR for tripping events as
per SRLDC provided formats and (ii) DR amp EL within 24-hrs of
occurrence of tripping event in line with IEGC Regulation 52
(r)
2 APTRANSCO to adopt new OVR gradings for KV Kota
feeders and confirm the same
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
1 FIR furnished amp DR configured
Pending
63II16 Multiple Trippings at 220kV Vizag
Switching Station (VSS) of APTRANSCO
27-03-2017 at
1016 hrs
Bus-2 bus bar protection operated at 220kV VSS
end resulting in the tripping of all the elements
connected to bus-2
1 APTRANSCO to furnish a detailed report on the reasons for LBB
BBP operation at 220 kV VSS for a fault on 220 kV Gangavaram
feeder and remedial action taken to prevent recurrence of such
events
APTRANSCO Yet to be informed Pending
64II1 Tripping of 400220KV 315MVA ICT-
1and 230kV elements at 400kV Vemagiri
substation of APTRANSCO
09-04-2017
at 1231 hrs
Suspected mal-operation of Busbar protection had
caused tripping of 220kV Bus-1 at Vemagiri
APTRANSCO to furnish a report on the remedial action taken along
with single line diagram of 400220 kV Vemagiri SS indicating fault
location and CBs involved and protections operated
APTRANSCO Yet to be informed Pending
64II2 Tripping of 400220 kV ICTrsquos ndash 2 amp 3 at
400 kV Ghani substation of APTRANSCO
10-04-2017
at 1729 hrs
ICTrsquos ndash 2 amp 3 got tripped due to operation of 220 kV
Bus-2 busbar protection at 400220KV Ghani
substation
APTRANSCO to furnish single line diagram of 400 220 kV Ghani SS
clearly indicating (i) bus-configuration (ii) location of fault (iii)
breakers involved and type of protections operated
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
Single line diagram sent vide mail dated 27062017
Pending
64III1 Tripping of 400 kV Uravakonda-
Jammalamadugu line-1
02-04-2017 at
1758 hrs
R-phase to earth fault and line did not auto-reclose
Fault clearing time - 500ms
For the line under consideration APTRANSCO to check amp ensure
healthiness of carrier protection and make Auto-Reclosure
functional
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
Carrier aided protection scheme has been tested end to end and rectified
the problem
Pending
64III5 Tripping of 400kV Krishnapatnam-
Nellore line-2
11-04-2017 at
241 hrs
Line tripped on Y-phase earth fault Line auto-
reclosed at Krishnapatnam and did not auto-reclose
at Nellore-AP (Manubolu)
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a report
on the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64III6 Tripping of 400kV Krishnapatnam-
Nellore line-1
12-04-2017 at
251 hrs
Line tripped on Y-phase earth fault Line auto-
reclosed at Krishnapatnam and did not auto-reclose
at Nellore-AP (Manubolu)
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a report
on the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64III10 Tripping of 400kV Krishnapatnam ndash
Nellore_AP line-1
13-04-2017 at
438hrs
Y-phase to earth fault Line auto-reclosed from
Krishnapatnam end and did not auto-reclose fromNellore-AP end
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a reporton the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64IV4 Tripping of 400 kV VTPS-Malkaram line 20-04-2017 at
1624 hrs
Line tripped on Direct Trip Receive at Malkaram and
was in service from VTPS
For the line under consideration APTRANSCO to check the
healthiness of protection couplers and take suitable remedial action including replacement of the same
APTRANSCO Yet to be informed Pending
65II10 Tripping of 400220 kV ICT-2 at Kalpaka
SS
20-05-2017 at
1502 hrs
ICT-2 tripped due to operation of Transformer
Buchholtz relay
APTRANSCO to furnish details of AC auxiliary supply details
including its redundancy DG set details and its mode of
starting AC auxiliary supply changeover scheme drawing shall
also be furnished
APTRANSCO Yet to be informed Pending
1 APTRANSCO to check and correct all CT Neutral
Connection settings in various protection relays at their 400
220 kV Ghani PS
2 APTRANSCO to ensure that PLCC carrier aided protection
is maintained healthy on 220 kV lines emanating from their
400 220 kV Ghani PS
3 APTRANSCO to take steps to complete configuration works
of DR‟s amp EL‟s of various protection relays at their 400 220
kV Ghani SS and furnish the same as and when required in
compliance of IEGC Regulation 52 (r)
ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
07-05-2017Tripping of 400220 kV Ghani ICT-2amp3 65II4 APTRANSCO Yet to be informed Pending
APTRANSCO mail dated on 31-08-2016
To avoid the unwanted malopeartions due to the external LBB trip
initiation from PGCIL Vide letter Dt 04-08-2016 APTRANSCO has
requsted the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1 amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 15-11-2016
To avoid the unwanted maloperations due to the external LBB trip
initiation from PGCIL vide letter Dt 04-08-2016 ARTRANSCO has
requested the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 20-12-2016
Waiting for the PGCIL response
APTRANSCO mail dated 04032017 amp 24052017
SRPC is requested to coordinate with PGCIL in takind necessary action
Pending56II13 Tripping at 220kV Gooty Substation of
APTRANSCO
24-06-2016 at
1604 hrs
LBB protection got operated for 400220kV ICT-2
breaker which had resulted in tripping of 220kV Bus-
2 at 220kV Gooty Substation
63III2 02-03-2017 at
157 hrs
1 APTRANSCO to check and ensure correctness of AR operation
for the lines emanating from their Nellore-AP (Manubolu) SS
2 APTRANSCO to configure DR‟s of line protection relays for a
post triggering period of 2 sec to capture complete AR operation at
their Nellore-AP (Manubolu) SS
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
1The ABB make REL 670 type main-2 distance relay seen the fault as Y-
B phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
1APTRANSCO to check the healthiness of the connecting cable
between Gooty (PGCIL) and Gooty (APTRANSCO) and replace it
if required
2APTRANSCO to ensure that the distributed architecture employed
in implementing busbar protection at their Gooty 220 kV SS does not
introduce any unwarranted delays in transmitting the triggering signals
to the Central Unit
APTRANSCO
Tripping of 400kV Krishnapatnam-
Nellore line-1
Line tripped on B-phase to earth fault and line auto-
reclosed from Krishnapatnam end but did not auto-
reclose from Nellore-AP end
Annexure-III
Page 2 of 31
64II16 Tripping of 400 kV VTPS-Satenapalli line-
2
30-Apr-17 at
428 hrs
Line tripped on B-phase to earth fault FIR DR and
EL of both ends were not furnished to validate the
tripping
APGENCO and APTRANSCO to furnish a detailed report on the
events leading to tripping of the line along with remedial measures
taken to PCSC forum
APGENCO
APTRANSCO
Yet to be informed Pending
65II8 Tripping of 400220 kV Hyderabad ICT-
4 and 220 kV lines at Hyderabad
substation
10-05-2017 at
239 hrs
Operation of busbar protection due to fault in 220 kV
Bus at 220kV Hyderabad Substation
TSTRANSCO to investigate the reasons for BBP operation for 220
kV Bus-2 and furnish a report on the remedial measures taken
TSTRANSCO Yet to be informed Pending
24-12-2016 at
1052 hrs
Line tripped on B-phase to earth fault First fault was
persistent for 380 ms Auto-reclose was successful at
Khammam end during 1st fault 2nd fault occurred
during re-claim time of breaker hence Khammam end
breakers also got tripped
1 TSGENCO to implement the SRPC agreed philosophy for Power
Swing Blocking in all distance relays on the feeders emanating from
KTPS
2 For the line under consideration TSGENCO to consult relays
OEM to migrate to new versions of Firmware (from to 47201) and
Pset (to 47002)
61III5 Tripping of 400 kV Khammam - KTPS
line-2
The issue was discussed in PCSC-58 meeting held on 18102016 when
PCSC forum agreed to de-link the implementation of the Item from the
scope of Protection Audit Recommendations (PAR) and pursue it as part
of PCSC Recommendations
TSGENCO mail dated 30-05-2017
Procurement of Differential Protection relays is under process and the
work will be completed by the end of November 2017
TSGENCOProvision of line differential protection for Jurala line 1 amp 2 (line length-145 KM) feeders at 220 kV Jurala HPS [Carry-Over from Protection Audit Recommendations]58 Pending
Pendingline tripped on direct trip receive at Gajwel and was
holding from Hyderabad
Pending
06-10-2016 at
1216 hrs
For the line under consideration TSTRANSCO to carry out the
following in coordination with TSGENCO
(i) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
(ii) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(iii) Frequency bandwidth tuning of PLCC link for faithful
transmission of signals shall be carried out
62IV5 Tripping of 400 kV Gajwel-
Bhoopalapalli line-1
Telangana
TSGENCO TSGENCO mail dated 30032017
1 According to SRPC phylosphy power swing block settings are changed
to ALL ZONES BLOCK EXCEPT ZONE1
---------- Completed
2 Ms Siemens is requested to depute the service Engineer to update the
firm ware of existing SIPROTEC relays in 400KV switch yard This work
will be completed on or before 15042017 -------------- Pending
Pending
TSGENCO
TSTRANSCO
TSTRANSCO mail dated on 31-05-2017
1 Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Bhoopalpalli-1 line
59IV3
Line tripped at Bhoopalapally on DT receive and was
holding from Gajwel
TSTRANSCO mail dated on 21-12-2016
(i) Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Ghanapur line
(ii) Healthiness of PLCC system components will be checked while
conducting end to end testing
TSTRANSCO mail dated on 31-05-2017
1 Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Ghanapur line
TSTRANSCO
16-02-2017
at 1500 hrs
For the line under consideration the following shall be carried out by
TSTRANSCO in coordination with PGCIL (SR-I)
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
Tripping of 400 kV Gaiwel-Hyderabad
line
Annexure-III
Page 3 of 31
Karnataka
Annexure-III
Page 4 of 31
KPCL
38GD35 Pending13-11-2014 at
1931hrs
1 KPCL to make functional the Main2 (EPAC) relay with the
help of KPTCL at the earliest
2 KPCL to investigate the reason for DC fuse fail during
transient fault in 220kV Kadra-Kodasalli line including the testing
checking of DC supply cables breaker control cables and trip coils
3 KPCL to ensure supply for Main-1amp Main-2 protections Trip
Coils (TC1 TC2) from separate battery banks
Triggering incident was B-phase to earth fault had
occurred in 220kV Kadra-Kodasalli line Line tripped
from Kodasalli end only 220kV Kaiga-Kadra tripped
in Zone-3 from Kaiga end Tripping of evacuating
lines caused bus shut down at Kadra hydro station
16-02-2015 at
1256 hrs
GD-1 at Kadra and Kodasalli hydro
power station
GD-1 at 220kV Kadra power Station of
KPCL
41I1 Mail received on 28-05-2015
1 Main-2 relays already installed and commissioned
2 DC fuses are intact Till date no such incidence occurred
3 Possibility of DC-1 amp DC-2 arrangement and splitting of DC will be
reviewed
Mail received on 07-07-2015 21-10-2015 and 23-11-2015
1 Completed
2 Completed
3 Possibility of DC-1 amp DC-2 arrangement and splitting of DC will be
reviewed
Status received vide KPCL mail dated 14062017
1 Completed
2 Completed
3 Providing 2 separate DC sources is under process
Pending
Mail recieved on 28-05-2015
1) e-NIT floated on 28072014 for procurement of Numerical distance
relays amp GPS As there is change in scope of work and quantity of relays
by more than 25 which is not permitted as per KTPP act Hence tender
cancelled and refloated on 05052015 with revised scope of work and
revised PQR
2 However as per the recommendations of PSAG Relays were
temporarily rearranged replaced and wired up testing amp commissioning
shall be completed with the assistance of KPTCL
Mail recieved on 07-07-2015
1 Cover -1 of the bid is scheduled for open eing on 25062015
2 As per the recommendations of PSAG Relays were temporarily
rearranged testing amp commissioning completed with the assistance of
KPTCL
Mail recieved on 07-09-2015
NIT floated on 5515 through e-portal Bid evaluation completed
Obtaining of Administration approval to place PO is in progress
However as per therecommendationsof PSAG-10 Relays
weretemporarilyrearrangedTesting amp commissioning completed with the
assistanceofKPTCL
Mail recieved on 21-10-2015
NIT floated on 5515 through e-portal Bid evaluation completed LOAs
issued to Ms Schneider Electric Infrastructure Ltd on 08102015
Mail recieved on 23-11-2015
LOAs issued to Ms Schneider Electric Infrastructure Ltd on 08102015
Engineering work is in progress
Status informed during Special Meeting held on 03062016
LOA‟s issued to Ms Schneider on 08102015 Inspection of relays
completed and received at site DI issued for all balance materials except
furnitures
Status received vide KPCL mail dated 14062017
Numerical Distance Protection relays commissioned on 12042017
for all 4 lines at Kadra PH
Installation Testing and commissioning of Numerical Distance Protection
Relays for all the 4 outgoing lines is completed in all respect at Kodasalli
power house
KPCL1 The PCSC forum requested KPCL to speed up the installation of
Numerical Distance Protection relay in Kadra ndashKaiga and
Kodasalli ndashKaiga
2 The PCSC forum requested KPCL to submit the implementation
status of PSAG-10 recommendations within a week‟s time
A fault had occurred in 220 kV Kadra and Kodasalli
As A result de-energization of 220kV bus occurred at
Kadra and Kodasalli
Annexure-III
Page 5 of 31
49II15
54II4 Tripping of 400 kV Raichur TPS-
Mahboobnagar line
05-04-2016 at
1023 hrs
Line tripped on operation of Backup impedance
protection of line reactor Direct trip was received at
Mahboobnagar end
KPCL to keep the functioning of the concerned electro-mechanical
back-up impedance protection relay under observation and replace it
with a spare at the earliest
KPCL Status received vide KPCL mail dated 10072017
The electro-mechanical back-up impedance protection relay is in service
However Budgetary offer obtained for the retrofitting of Line reactor
protection with Numerical relay and is under process
Pending
54II9
Pending
PendingStatus informed during Special Meeting held on 03062016
1 Hot line washing was done previouslytender process is on for silicon
coating of insulators
Status received vide mail dated 10-07-2017
1 Off line water washing is being carried out whenever the Unit or Line is
under shutdown Silicon coating for Unit8 main amp tie breakers carried
out in Sep16 and same is under observation Till today in order and good
condition For remaining breakers since it is big order approval for the
same is under process
2 Static Electromechanical relays are existing in all 1 to 7 units Breaker
flash over protection feature will be enabled (if available) in the numerical
relays which will be retrofitted in phased manner during RampM works
KPCL1 KPCL to carry out hot-line washing of RTPS-connected lines
regularly to avoid trippings due to fog and dust
2 KPCL may see the feasibility of providing breaker flashover
protection at RTPS and implement the same if possible
Running Unit-4 5 and Unit-8 and 400kV RTPS-
Yeramaras TPS feeder got tripped due to de-
energization of both 400kV Bus-1amp2 at Raichur TPS
12-11-2015 at
0030 hrs
54I4 220 kV Nagjheri - Bidnal line tripped on B-E fault at
1228 Hrs At the same time five running generating
units (1 2 3 4 amp 6) at Nagjheri tripped on operation
of Generator Transformer‟s back-up Over Current amp
Earth Fault protection
PendingKPCL
1 KPCL to revise the settings of GT‟s back-up OC and EF
protections considering their individual contribution to solid bus fault
at 220 kV bus of Nagjheri PH
2 KPCL to upload make available various tripping files
(FIRDRELTR) for all tripping involving their stations in compliance
of IEGC Regulation 52 (r)
14-04-2016 at
1229 hrs
Tripping of Nagjheri Generators Pending
Trippings at 220kV Raichur TPS
13-04-2016 at
2112 hrs
1KPCL to undertake the following remedial measures to avoid
breaker flashovers
(i) Replacing all porcelain insulators with composite insulators
(ii) Carrying out hot-line water washing of all insulators on regular
basis
(iii) Applying Room Temperature Vulcanizing (RTV) Silicone high
voltage insulator coatings to all bus-connected ceramic insulators of
equipment like CT PT CB Isolators etc
2KPCL to take steps to provide dedicated breaker flashover
protection to all breakers at Raichur TPS at the earliest
KPCL
Tripping of 400kV Raichur TPS Bus-2
46II21
Trippings at Raichur TPS
Status received vide KPCL mail dated 10072017
1 i) Silicon coating for Unit8 main amp tie breakers carried out in Sep16
and same is under observation Till today in order and good condition For
remaining breakers since it is big order approval for the same is under
process ii) Hot line
water washing stopped and off line water washing is carried out whenever
the 400 KV Unit or line is under tripped condition Shutdown condition
2 Static Electromechanical relays are existing in all 1 to 7 units Breaker
flash over protection feature will be enabled (if available) in the numerical
relays which will be retrofitted in phased manner during RampM works
Status received vide KPCL mail dated 14062017
1 GT backup overcurrent amp earth fault settings are revised as per the
recommendations of our head office CEEDBangalore copy of letter
enclosed
2 FIRDRELTR are being uploaded in the recent incidences as all the
main-2 relays are replaced with new numerical relays
Mail received on 21-10-2015
1) Anti-pumping contactors of all the nine 220KV Lines are in circuit and
tested periodically during AOH works of lines along with other protections
2) Completed
3) Possibility to use both the 220kV buses as main bus under normal
operation is under review
Mail recieved on 23-11-2015
1) Completed
3) Two bus operation for 220kV buses In place of existing CT switching
relays High speed manual heavy duty change over switch of sufficient
current capacity will be retrofitted to all feeders at 220kV station and same
will be operated manually during changeover of feeder by one bus to the
other and this arrangement may facilitate to put both buses in service Time
required for this retrofit is around 90days However this work will be
taken up only after retrofitting of electromagnetic relays with numerical
relays for Main-2 protection of all 220kV lines for which work is in
progress
Status received vide mail dated 10-07-2017
1) Completed
2) Completed
3) Two Bus operation for 220kV bus is being carried out whenever
required However scheme for tripping of one bus during LBBfault and
maintaining the other bus intact by tripping BC breaker will be taken up in
RampM works
KPCL1 KPCL to check the operation of anti-pumping relay on 220 kV side
and keep it in healthy condition
2 KPCL to provide manual reset to the 220 kV side master trip relay
3 KPCL to use both the 220 kV buses as main buses under normal
operation and should go for single bus operation only during
emergencies
07-06-2015 at
0135 hrs
Y-ph Pole of Tie-breaker of Unit-4 at RTPS failed
Unit-4 got tripped on operation of Generator
Differential Reverse power amp LBB protection
Operation of LBB protection led to tripping of BUS-2
at RTPS
Annexure-III
Page 6 of 31
55II1
56I2 Complete outage of 220kV Sedam
Substation of KPTCL
19-06-2016 at
1527hrs
220kV Sedam-Humnabad-2 tripped at Sedam on
Distance protection Zone-2 Sedam-RTPS-1 amp2 lines
tripped at RTPS end only 220kV Tandoor inter-state
line was hand tripped due to incoming supply failure
KPCL to disable GFC protection on all lines emanating from their
generating stations
KPCL Status received vide KPCL mail dated 10072017
As per the reccomndations of KPTCL in Feb16 the settings are done with
a time delay of 2 secs
Pending
57II3 Tripping of 400220 kV ICT-2 at Raichur
TPS
07-07-2016 at
332 hrs
ICT-2 tripped on operation 400220KV ICT-2 was
tripped on operation of 220KV side Instantaneous
over current protection during B-phase to earth fault
in 220kV RTPS-Sedam-II line
KPCL to review appropriately the high-set of ICT‟s back-up OC
protection at their 220 kV RTPS so that they do not operate for a
normal through fault
KPCL Status received vide KPCL mail dated 10072017
The settings will be reviewed in co-ordination with KPTCL amp OEM
Pending
KPCL
Pending
Pending
KPCL Status received vide KPCL mail dated 14062017
1 All logics checked and found normal LBB timing checked and found
200msec as per KPTCL MRT recommendation - Completed
2 Work Under Progress
3 New GPS System commissioned along with new numerical and
synchronised with GPS system - Complied
4 Work Under Progress
Status received vide KPCL mail dated 14062017
1 DEF settings in lines are made as per recommendations of CE(RT) amp
RampD KPTCL Bangalore amp EE(RT) KPTCL Hubli
High set operation of DEF relays is disabled at Kodasalli end
2 All these guidelines are incorporated by KPTCL during the replacement
of line protection relays
3 New stand alone event logger is to be procured since spares for old
stand alone event logger are obsolete
KPCL (i) KPCL to disable high-set operation of DEF relays
(ii) KPCL to block DEF relays whenever corresponding distance
protection relays pick up at Kodasally end on Nagjheri ndash Kodasalli
lines and
(iii)KPCL to provide stand-alone Event Logger at their 220 kV
Nagjheri PH
Bus dead occurred at 220kV Nagjheri PH due to
tripping of evacuating lines
KPCL
31-08-2016 at
1247hrs
Pending
Tripping of 400kV Bellary TPS-
Yeramarus TPS line and
400kVYeramarus TPS - Raichur TPS
line
PendingYet to be informed55II19
Tripping of Units at Raichur TPS During testing of retrofitted distance protection in
400kV Raichur-2 feeder LBB protection trip DC got
extended to Bus trip This resulted in tripping of
220kV bus at RTPS and all connected 220 kV
elements Unit-4 which is connected to 400 kV Bus
got tripped due to tripping of Station Utility
Transformer that is connected 220 kV bus
58I2 (GD)
Complete outage of 220 kV Kadra power
station of KPCL
54II13
1KPCL to properly configure the distance relays at YTPS end on
both YTPS ndash BTPS line and YTPS-RTPS line with specific focus on
reaches and timings of Zone-2 Zone-3 and Zone-4 (reverse)
2KPCL to ensure the healthiness of Direct Trip circuits and relay
coils at YTPS
3KPCL to ensure time sync of DR‟s and EL‟s at YTPS with GPS
06-09-2016
at 1440 hrs
31-05-2016 at
1721 hrs
Direct Trip was sent from YTPS to RTPS and BTPS
01-05-2016 at
2144 Hrs
LBB of 220kV Kodasalli breaker at Kadra end got
operated which resulted in tripping of Bus at Kadra
and in turn led to tripping of all elements
(i) KPCL to check settings of LBB protection in all relays from which
it was implemented and ensure that their configuration logic and
timing are in order at their 220 kV Kadra PH
(ii) KPCL to furnish details regarding the existing LT auxiliary
supply arrangement at their 220 kV Kadra PH and take steps to
provide a suitable Auto-Main-Fail (AMF) panel for DG set to effect
its auto-starting in case of failure of LT supply
(iii) KPCL to ensure time-sync of all relays (DR‟s amp EL‟s) with GPS
at their 220 kV Kadra PH
(iv) KPCL to provide stand-alone Event Logger at their 220 kV
Nagjheri PH
Complete outage of 220 kV Nagjheri PH
of KPCL
Multiple tripping at 400 kV Raichur TPS
Station
15-04-2016 at
1536 hrs
Triggering incident was failure of R-phase CT of
400220kV ICT-1 400kV YTPS-RTPS line got
tripped from YTPS end 400kV RTPS-
Mehaboobnagar line tripped on a B-phase to earth
fault
In view of the availability of two buses along with healthy bus-
coupler at 220 kV RTPS KPCL is recommended to put in service the
double-bus operation at 220 kV RTPS by suitably distributing loads
within 15 days
Status received vide KPCL mail dated 10072017
Two Bus operation for 220kV bus is being carried out whenever required
However scheme for tripping of one bus during LBBfault and maintaining
the other bus intact by tripping BC breaker will be taken up in RampM
works
1KPCL to enable zero-sequence compensation feature if not already
done in all differential relays of transformers at RTPS
2KPCL to examine in detail the reasons for SOTF operation at RTPS
end for the fault on RTPS-Veltoor line and if required relay
(configuration) settings at RTPS end may be suitably got revised with
the help of their OEM
3KPCL to take steps to enable auto-reclose for the Tie-CB‟s in the
dias containing Munirabad and Veltoor (Mehboobnagar) at RTPS
KPCL Status received vide KPCL mail dated 10072017
1) Zero-sequence compensation feature is already enabled in all the
differential relays of transformers ---Completed
2) Referred to OEM for the tripping of line on SOTF protection
3) Action has been taken to retrofit the protection relays of tie bays of
Mahbubnagar and Munirabad line to enable Auto-reclosure function
58I3 (GD)
Pending
Annexure-III
Page 7 of 31
Status received vide KPCL mail dated 14062017
1 On 09092016 at STRPTwo units were running(Unit-3 amp Unit-4It is
to clarify that Station tripped due to spurious operationLBB relay in Unit-
4 and not due to operation of Unit-3 LBB as indicated in PCSC
recommendations Unit-3 which was in service tripped as a consequence of
LBB ProtectionHow ever following actions performed in both Units
a) Trip coil-1 and Trip coil-2 circuit (including cable from protection panel
to GCB Marshaling Box)of GT Breakers of Unit 03 and 04 checked found
ok
b) Integrity of Connecting cableconductor from Generating unit no3 and
also to its corresponding GT Breakers inspected and found ok
c) Regarding Spurious operation of Unit No04 LBB relay and its
timerChecked the operation of the LBB overcurrent relay with its external
Timer for repeated correct operations it was found that LBB Timer was
giving correct timing operation for 1 in 3 operations only ie for one of the
operation it was operating within 40ms compare to set value(200ms) hence
declared as faulty and the same has been replaced with new one later
operation of the new Timer checked and found okoperating for gt200mse
only With this cause for spurious operation of LBB and resulting in
complete outage of STRP has been identified and solved -----
Completed
2 In Unit -3MCR is working satisfactorilyit is to clarify that problem was
existing in Unit No4 AVR manual channel reference value of Generator
The Same has been replaced with spare one Manual channel AVR is
found to be Ok ------Completed
3 All the units AVRs Healthyness checked and found Ok -
-----
Completed
4 Presently at GPHno stand alone Event logger exists Since the subject
requirement pertains to all the Generating units and in view of
Standardization of the complete system Networking of numerical relays
carried out and events are availble in networking system
KPCL
Pending
(i) KPCL to ensure the integrity of the connecting cable conductor
from Generating Unit-3 to its corresponding GT breaker at their STR
PH
(ii) KPCL to ensure the healthiness of Manual Current Regulator
(MCR) of Unit-3‟s AVR at their STR PH
(iii) KPCL to ensure the healthiness of AVR‟s of all Units of STR
PH
(iv) KPCL to provide stand-alone Event Logger at their 220 kV STR
PH
Spurious operation of LBB protection of line feeder
had led to tripping of 220 kV bus at Sharavathy Tail
Race power house
9-09-2016 at
1119 hrs
Pending
12-09-2016 at
1447 hrs
(i) KPCL to check and correct configuration settings of LBB
protection in all relays from which it was implemented at their 220
kV Varahi PH
(ii) KPCL to provide stand-alone Event Logger at their 220 kV STR
PH
KPCLLBB protection operated and caused bus shut down at
Varahi PH
Pending
Partial disturbance occurred in central Kerala grid due
to overloading and tripping of 220 kV lines Loss of in-
feed to 220 kV Kalamassery 220 kV Brahmapuram
220 kV Ambalamugal 220 Pallom amp 220 kV Kochi
occurred Generation at Neriamangalam Panniar
Chengulam and Pallivasal also got affected during the
incident
(i) SLDC KSEB to put in place proper mechanism to ensure
adequate load-generation balance is maintained in their control area at
all times and due vigilance is exercised in operating an already
depleted transmission network
(ii) KSEB to put UFR in service at New Pallom end on 220 kV New
Pallom ndash Amabalamugal line as part of Kudankulam Regional
Islanding Scheme
KPCL
Status received vide mail dated 14062017
LBB Protection system is in Bus bar Protection PanelThe Configuration
settings are checkedThey are as follows
Minimum operating primary current is 160A
Stage IIssue of Retrip to the feeder is 100ms after the action of main
distance protection Relayinitiation of LBB
Stage IIBus bar LBB Trip -200ms
Total time of LBB trip is 300ms from the time of occurrence of Line Fault
(i) KPCL to adopt the following VT fuse-fail logic for all 220 kV
lines emanating from NPH
ldquoUnder VT fuse fail condition distance protection shall normally be
kept blocked However upon detection of a fault (sensed by negative
sequence component) blocking of distance protection shall give rise
to operation of its inherent Over-Current protection set with a definite
time delay of 500 msecrdquo
(ii) KPTCL KPCL to revise Zone-2 Zone-3 and Zone-4 (reverse)
timings of DPR of all 220 kV lines emanating from Nagjheri PH in
line with Ramakrishna Committee guidelines
Triggering event was the fault on 220 kV Nagjheri
ndashKodasalli line-2 Both buses of 220 kV Nagjeri
power station of KPCL got
de-energized
62I1 KPCL Status received vide mail dated 14062017
1 Already settings are discussed with EE(RT) Hubli and soon relays will
be tested for VT fuse fail condition
2 Timings of Zones were set as per the recommendations of CE(RT) amp
RampD KPTCL Bangalore amp EE(RT) KPTCL HubliRegarding revision
of timings will be carried out in co- ordination with EE(RT) KPTCL
Hubli
15-09-2016 at
1406 hrs
Complete outage at Varahi Hydro Power
Station
Disturbance in Kerala system Yet to be informed Pending
58I5 (GD)
58I7 (GD)
21-01-2017
at 0038 hrs
Complete outage of 220 kV Sharavathy
Tail Race PH
58I6 (GD)
Complete outage of 220 kV Nagjheri
substation of KPCL
Annexure-III
Page 8 of 31
65II9 Tripping of 400220 kV ICT-1 at BTPS 13-05-2017 at
1941 hrs
ICT-1 got tripped on operation of LV side earth fault
protection during R-phase to earth fault in 220 kV
BTPS-Lingapur line
1 KPCL to review the need for providing separate non-directional
sensitive earth fault protection for ICT‟s at their BTPS station and
take steps to disable the same
2 For 220 kV BTPS ndashLingapura line KPCL to resolve issues relating
to PLCC carrier communication and put AR into service
KPCL Yet to be informed Pending
65III2 Tripping of 400 kV Hiryur-BTPS line-1 06-05-2017
at 1401 hrs
Y-phase to earth fault had occurred in line Direct
trip was sent from BTPS to Hiryur end
KPCL to introduce suitable delay (say 3 sec) for UVR tripping and
disable sending of DT to the other end on UVR operation at their
BTPS station
KPCL Yet to be informed Pending
PendingMail received on 27-05-2015 (KPTCL) amp 29-07-2015
1Existing Back up relays will be replaced by numerical type distance
relaysProcurement is in tendering stage
2 Completed
3 Completed
KPTCL Mail recieved on 23-01-2016
1 Existing back up relays will be replaced by Main-2 protection LOI
issued Ms Alstom for taking up the works
KPTCL Mail Recieved dated 25-05-2016
Under the Scope of RampU The work will be taken up by Ms Alstom
shortly
KPTCL Mail Recieved dated 25-04-2017
1 ALSTOM make P442 type Numerical relays are supplied to the site
replacement of M-1 relays(OPTIMHO) by new relays will be taken up
shortly
KPTCL
KPCL Status received vide mail dated 10072017
1 Furnishing FIR amp TR of the tripping events as per the formats provided
by SRLDC
4 Refered to OEM for the tripping of Tie CB of Munirabad line on SOTF
protection
Pending
1 PCSC forum recommended KPTCL to replace the old static
distance protection relays with numerical relays
2 PCSC forum also requested KPTCL to provide a broken conductor
alarm indication in Control Room
3 Standing instruction needed to be given to the all substation
personnel for not changing the relay settings without approval of
RTMRT wing
Fault had occurred in 220kV
Mahalingapura-Narendra line-2 Due to the failure of
relay operation at Mahalingapura breakers at remote
end tripped which resulted in bus dead condition
1 KPCL to start furnishing FIR and TR of their tripping events as
per the formats provided by SRLDC
2 KPCL to check earth-mat resistance for 400 kV switchyard and
ensure that it is within prescribed limits
3 KPCL to set right operation of SER in CampI Control Room of Unit-
4
4 KPCL to furnish action taken wrt tripping of Tie-CB of
Munirabad line on SOTF protection OEM report in this regsrd may
be furnished
25-10-2014GD-1 at Mahalingapura Substation of
KPTCL
38GD31
63II10 Multiple trippings at 400 kV RTPS
substation of KPCL
16- 03-2017 at
0118 hrs
Bus-2 B-Ph differential bus bar protection operated
at 400 kV RTPS end tripping all the main breakers
connected to Bus-2
Annexure-III
Page 9 of 31
Pending
Suspected mal-operation of 220kV side Rphase
over current relay
Line tripped on Yphase to earth fault from both the
ends
20-12-2014
at 2220 hrs
KPTCL was requested to explore the possibility of providing AR
feature to this line and submit the remedial measures to the PCSC
forum
Pending
KPTCL1 Till the completion of RampM works for bus bar and LBB protection
KPTCL shall explore the possibility of having split bus operation at
Ambewadi and submit the details of the same to PCSC forum
2 KPTCL shall provide the details of the tripping of Supa hydro
station connected downstream from 110 kV bus
39I5
40I1
220kV Sedam-
Tandur line
Triggering incident was B-phase to earth fault in
220kV Ambewadi- Nagzari line-1 B-pole of breaker
did not open at Ambewadi end LBB protection not
available at Ambewadi end All elements tripped on
Zone-2 from remote ends
01-12-2014Tripping of 400220kV
ICT-2 at Hoody
substation of KPTCL
40IV1
Mail received on 27-05-2015 amp 29-07-2015
1 CampR panels of 500MVA ICT 1amp2 will be replaced under scheduled
RampM works
2 OampM personnel are instructed to take sufficient care in order to avoid
unwarrented trippings --- Completed
KPTCL mail received on 23-01-2016
1 New CampR panels(with numerical relays) erected for 500MVA ICT-1
amp2 under RampM work which will be commissioned shortly
KPTCL mail received on 25-05-2016
1 New CampR panels(with numerical relays) erected for 500MVA ICT-1
amp2 under RampM work which will be commissioned shortly
KPTCL mail received on 25-04-201
1 New CRPs mounted in bay KIOSK commissioned under RampM works
KPTCL1 PCSC forum recommended KPTCL to replace the relay with a
different make
2 KPTCL was also requested to train the OampM personnel
adequately before performing any maintenance works to avoid such
unwanted trippings
PendingMail recieved on 29-07-2015
Carrier protection is being restored for 220kV Sedam-Tandoor line at
Sedam end After restoring the carrier protection AR will be enabled
KPTCL mail recieved on 23-01-2016
Carrier protection is being restored for 220kV Sedam-Tandoor line at
Sedam end After restoring the carrier protection AR will be enabled
KPTCL mail recieved on 25-05-2016
SEESCADA to update the latest status
KPTCL mail recieved on 28-06-2016
Action is being taken to restore carrier protectionAR will be enabled once
carrier signal is restored
KPTCL
22-12-2014 at
2122 hrs
Mail received on 28-04-2015
1 In view of operating 220kV Ambewadi SS in split bus mode action is
being taken up by KPTCL Problem in the 220kV bus coupler breaker is
attended and isolator overhauling work is under progress Spilt bus
operation at Ambewadi will be made possible at the earliest
2 ICT Protection system at Ambewadi and trippings occured at Supa GS
during the instance is checked up and remedial measures already furnished
in this regard
---- Completed
Mail recieved on 29-07-2015
1 Action is being taken by KPTCL for operating Ambewadi in split bus
mode Problem in bus coupler breaker is attendedIsolator overhaulling
work is completedPTs are already provided to 220kV Bus-II After
commissioning of Bus-II PTs Ambewadi can be operated in split bus
mode Pending works will be completed within a months time
KPTCL mail recieved on 23-01-2016
1 Bus-II PTs yet to be commissionedPlanned to complete before end of
April-2016
KPTCL mail recieved on 25-04-2017
1 Yet to be attended
GD-1 at 220kV Ambewadi Station of
KPTCL
Annexure-III
Page 10 of 31
1 KPTCL to provide Bus Bar protection and LBB protection at
Sedam Ss and furnish the status of their implementation to PCSC
forum
2 KPTCL to implement AR feature on 220 kV Sedam-Tandur inter-
state line
Mail received on 28-04-2015
Procurement of Bus bar and LBB protection is in the final tendering stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
KPTCL mail received on 23-01-2016
1 Bus bar protection panels pocured and erected at Sedam Wiring
testing commissioning is being taken upPlanned to complete by April
2016
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
KPTCL
12-03-2015 at
751 hrs
1 KPTCL shall provide AR feature on Ambewadi ndash Ponda 220 kV
DC inter-state line
2 Till the completion of RampM works for bus bar and LBB protection
KPTCL shall explore the possibility of having split bus operation at
Ambewadi and submit the details of the
same to PCSC forum
Mail received on 27-05-2015
1 Bus Bar protection will be provded under RampU
2 AR yet to be enabled
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
Fault occurred in 220kV Sedam-Shahpur line
All connected 220kV lines and transformers were
taken on 220kV North bus as South bus was under
shut down for conversion of strung bus to rigid bus
and isolator replacement under RampM works Failure
of HV side Y phase CT of 150MVA Transformer-3
occurred at Peenya Substation which resulted in
operation of Differential and HV REF protection The
failure of CT also resulted in a 220kV bus fault in
North Bus
KPTCL to revise distance relay settings at Nelamangala end for 220
kV Nelamangala ndash Hebbal - Peenya line ndash 1 for the effective line
length of 17 km These new settings can be appropriately reviewed as
and when the tie-arrangement at Hebbal is done away with
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
Pending
PendingKPTCL
30-09-2015 at
1041 hrs
Pending
Outage of 220kV Ambewadi station in
Karnataka
Pending
PendingKPTCL mail received on 23-01-2016
Will be complied in a months time
220kV Ambewadi-Nagjheri line-2 tripped on B-phase
to earth fault This resulted in loss of supply to 220kV
Ambewadi bus 220kV Ambewadi-Ponda line-1amp2
were hand tripped after deenergization of bus at
Ambewadi
KPTCL
Complete outage of 220kV Ambewadi
substation of KPTCL
42I2 (GD)
27-09-2015 at
42317 hrs
Fault in 220kV Ambewadi-Nagjheri line-2
KPTCL
KPTCL
KPTCL mail received on 25-05-2016
Presentl 220kV Nelamangala -Hoody(ie nelamangala-Peenya-Hebbal -
Hoody line is made LIILO at Yelahanka sub station and breaker at
Peenya is kept open necessary modification in distance relay settings
adopted for new configuration
15-02-2015 at
1424 hrs
Complete outage of 220kV Peenya
Substation in Karnataka
R-Phase to ground fault occurred on 220kV Sedam-
Shahpur line Fault not cleared from Sedam end due
to stuck-breaker condition While the Sedam- Sahapur
line tripped from Shahapur end in Zone-1 the other
220 kv lines from Sedam tripped at remote ends in
Zone-2 This caused complete outage of 220kV
Sedam substation
42I1 (GD)
41I4
Complete outage of 220kV Sedam
substation of KPTCL
48I2 (GD)
48I3 (GD) KPTCL to fast-track providing AR on all 220 kV lines emanating
from Ambewadi SS to prevent Station shut-down on temporary faults
06-08-2015 at
451 hrs
220kV RTPS-Lingasugur line-2 tripped at TPS end
on operation of distance
protection zone-1 400220kV ICT-2 got tripped on
operation of earth fault
protection 220kV RTPS-Lingasugur line-1amp3 tripped
on distance protection zone-2 and zone-3
respectively Due to tripping of ICT-2 the running
units got overloaded and it was mentioned that under
frequency occurred as units are on load control The
Units got tripped on under frequency
KPTCL to activate non-directional Over Current protection with a
time delay of 600-800 msec for Fuse
failure condition at Lingasugur
KPTCL Status received vide KPCL mail dated 10072017
LV earth fault relay had an additional default Ef setting having a definite
time which resulted in tripping of ICT-2 and the same was rectified and
already complied
Pending
1 KPTCL to provide Bus bar and LBB protections for 220 kV
bus at Sedam Ss
2 KPTCL to implement AR feature on 220 kV Sedam-Tandur
inter-state line
27-01-2015 at
800 hrs
Complete outage at 220kV Sedam
Substation of KPTCL (GD-1)
Tripping of Unit-1amp2
along with 400220kV
ICT-2 at Raichur TPS
47II13
Annexure-III
Page 11 of 31
52I3 (GD) Complete outage of 220kV Shimoga
substation
22-02-2016 at
1503 hrs
220kV Bus Bar protection operated during failure of
R phase CT in DVG-2 line bay
KPTCL to operate 220 kV Shimoga on multi-bus operation under
normal conditions put it on single-bus operation only under
emergency conditions
KPTCL KPTCL Mail received dated 25-04-2017
Replacement of existing BBP by new BBP with 4 zone protection is being
taken up under RampU
Pending
56II6 Tripping of 220kV Ambewadi-Ponda
(Xeldam) line-1
10-06-2016 at
1333 hrs
Line tripped on Y-E faut due to DPR Z1 operation KPTCL to keep AR for Ambewadi ndash Ponda (Xeldam) line-1 in
service with immediate effect
KPTCL Yet to be informed Pending
59II13 Tripping of 220 kV Bidadi (PG) - Bidadi
lines - 1amp2
02-10-2016 at
1032 hrs
Line-2 tripped in DPR Zone-2 and Line-1 tripped on
operation of EF protection from Bidadi end
KPTCL to resolve PLCC carrier communication issues on 220 kV
Bidadi ndash Bidadi-PG DC lines and subsequently restore Zone-2
timing to normal values
KPTCL Yet to be informed Pending
1 KPTCL to configure all DR‟s and EL‟s at 400 kV Guttur SS so
that they will also get triggered for BBP operation
2 KPTCL to ensure time-synchronization of all DR‟s and EL‟s with
GPS at their 400 kV Guttur SS
KPTCL17-01-2016 at
1853 hrs
Pending
Pending
Yet to be informed PendingKPTCL
KPTCL
30-09-2015 at
1041 hrs
Complete outage of 220kV Ambewadi
Substation of KPTCL
Multiple tripping at 400kV Guttur sub-
station
Outage of 220kV Ambewadi station in
Karnataka
29102015 at
1434 hrs
Complete outage of 220kV Peenya
Substation of KPTCL
PendingKPTCL mail received on 23-01-2016
Will be complied in a months time
220kV Peenya-Nelamangala-3 tripped on B-E fault at
both ends At the same time 220kV Peenya-
Nelamangala-4 tripped on R-Y fault only at
Nelamangala end and was in service from Peenya
end Due to tripping of these two lines 220kV Peenya-
Nelamangala-2 tripped on overcurrent protection
KPTCL to furnish a report on the tripping of 220 kV Peenya-
Nelamangala line-4 Nelamangala detailing the remedial measures
taken including the settings adopted for Z1B (Zone extension) and
Power Swing Block
Pending220kV Nagjheri-Ambewadi line-1 tripped at 1333
hrs due to B phase to earth fault Ambewadi was
radially fed from Nagjheri power station through
220kV Nagjheri-Ambewadi line-2 Tripping of this
line caused 220kV Bus shut down at Ambewadi and
remaining lines and transformers were hand tripped
220kV Ambewadi-Nagjheri line-2 tripped on B-phase
to earth fault This resulted in loss of supply to 220kV
Ambewadi bus 220kV Ambewadi-Ponda line-1amp2
were hand tripped after deenergization of bus at
Ambewadi
KPTCL
Yet to be informedKPTCL
KPTCL Mail received dated 25-05-2016
SEE RTC Bangalore to update the status
KPTCL Mail received dated 28-06-2016
Providing numerical bus bar protection to 400kV buses and GPS time
synchronising equipment at Guttur is considered under RampU Work is
awarded to Ms Alstom execution will be taken up shortly
KPTCL Mail received dated 25-04-2017
GPS and accessories will be supplied during May 2017 expected to
complete the work within a month after supply of materials
53I1
1KPTCL to take steps to provide busbar protection at their 220 kV
Chikkodi inter-regional substation and furnish a time-line for the
same
2KPTCL to review distance protection settings for 220 kV Chikkodi
ndash Kudachi line
3KPTCL to furnish equipment failure report of the current incident to
PSEampTD Division of CEA with a copy marked to SRPC
KPTCL Mail received dated 25-05-2016
SEE RTC Bangalore to update the status
1 KPCL to provide AR on all 220 kV lines emanating from Nagjheri
PH
2 KPTCL to provide AR on all 220 kV lines emanating from
Ambewadi SS
Failure of Lightning Arrestor of Y-phase Line Reactor
of 400kV Guttur-Hiriyur line-1 and line tripped on
distance protection Zone-1 Bus-bar protection of
400kV Bus-2 at Guttur substation also got operated
during the event sensing this through fault 400220
kV ICT-1 amp 2 at Guttur 400kV Kaiga-Guttur-2
400kV
Guttur-Narendra-2 400kV Guttur-Hiriyur-2 and
400kV Guttur-Munirabad which are on 400kV Bus-2
got tripped during the incident 400kV Guttur-
Narendra-1 which was on Bus-1 also tripped at the
same time
49I13 (GD)
Triggering incident was failure of B-ph PT of 220kV
Bus-2 (western bus) at 220KV Chikkodi substation
220KV Chikodi- Belgaum-I line tripped on DEFR
(Inst) 220KV Chikkodi-Kudachi line tripped on
Distance protection and also 100MVA transformer-2
tripped on EF protection
57II1 01-07-2016 at
0303 hrs
Tripping of 220 kV Chikkodi-Mudshingi
and 220 kV Chikkodi-Talandage lines
48I3 (GD) KPTCL to fast-track providing AR on all 220 kV lines emanating
from Ambewadi SS to prevent Station shut-down on temporary faults
51II21
16-03-2016 at
1139 Hrs
Annexure-III
Page 12 of 31
62II3 Tripping of 220 kV Bus 2 and connected
elements (220kV HAL 1 and 2
400220 kV ICT- 1 2 and 22066 kV
ICT-2) at 400220 kV Hoody substation
of KPTCL (Load loss 590 MW)
09-01-2017 at
2306 hrs
Failure of R-phase CT of 220 66 kV transformer-2 at
220kV Hoody end resulted in a bus fault in 220kV
Bus-2 Fault was cleared by backup protection of
ICTs (220kV lines were being radially operated) due
to absence of busbar protection
1 KPTCL to provide Busbar protection at their 220 kV Hoody SS at
the earliest
2 KPTCL to furnish an Equipment Failure Report on CT failure to
CEA with a copy marked to SRPC
KPTCL KPTCL mail received dated 25042017
Numerical BBP is being provided under RampM works
Pending
64II9 Tripping of 400 220 kV ICT-2 and 3 at
Hoody substation of KPTCL
26-04-2017 at
1540 hrs
ICT-2 tripped on suspected mal-operation Oil surge
relay of B-phase Transformer ICT-3 tripped due to
overloading
KPTCL to put in place a suitable SPS at their 400 220 kV Hoody SS
that takes care of over-loading of the other ICT when one ICT out of
ICT‟s ndash 2 amp 3 trips at the earliest and furnish the details of
implemented SPS to PCSC forum
KPTCL Yet to be informed Pending
65II17 Tripping of 400220 kV ICT - 1 amp 3 at
Hoody substation of KPTCL
(Load Loss 750 MW)
26-05-2017 at
1230 hrs
R phase limb of ICT-1 bank pre-close supervision
contact of trip coil -2 had arc over ICT-3 got tripped
on over-loading
KPTCL to furnish compliance report on the recommendations given
in PSAG-18 meeting to PCSC forum
KPTCL Yet to be informed Pending
Complete outage of 220kV Nagjheri
power station and 220kV Ambewadi
substation of KPTCL
51I3 PendingStatus informed during Special Meeting held on 03062016
1 KPTCL informed that the matter had been taken up with concerned Line
Operation and Maintenance wing to carry out corridor clearance and
maintenance as per schedule to avoid frequent line faults in this corridor A
letter had also been addressed to Chief Engineer Bhagalkot zone to ensure
lines in amp around Kali complex are maintained in healthy condition ---
Completed
2 KPTCL assurd that the final modified SPS would be implemented at
Nagjheri PH at the earliest ------ Pending
3 KPCL informed that Nagjhari- Kodasalli Lines 1 amp 2 had been kept in
service since 23052016 0806hrs ---- Completed
KPTCL Mail received dated 28-06-2016
Modifications to be carried in Nagzari SPS logic is submitted to
SRLDCSRPC for verification and approval
Status received vide KPCL mail dated 14062017
1 Will be reviewed in consultation with EE(RT) KPTCL Hubli
2 Both the lines are in charged condition
KPCL KPTCL 1 To avoid tripping of transmission lines on transient faults KPCL
KPTCL is recommended to carry out periodic patrolling of lines and
ensure their proper maintenance by carrying out jungle bushing
clearance and trimming of tree branches within the RoW of
transmission lines as per the SRPC transmission line patrolling
guidelines (available under the menu item All Uploads Operation
Miscellaneous Transmission Line Patrolling Protocol
Guidelines for Southern Region on SRPC website)
2 KPCL KPTCL to review operation of SPS at NPH for
functionality (reduction of generation with tripping of evacuating
lines) and healthiness
3 KPCL to put 220 kV Kodasalli - Nagjheri DC lines into service if
more than 200 MW generation from Kali Complex (with Nagheri
Contribution not less than 50 MW) is ensured on sustained basis
220kV lines from Nagjheri power house started
tripping from 1100 hrs due to fault in lines The
sequence of tripping is shown in SOE list At 1233
hrs 220kV Narendra-Ambewadi lines-1amp2 got
tripped which resulted in loss of evacuation path to
Nagjheri station resulting in tripping of running Units
and complete outage at Nagjhheri power station
220kV Ambewadi station also got de-energized due
to tripping of source feeders ie 220kV Narendra-
Ambewadi-1amp2 and 220kV Nagjheri-Ambewadi-
1amp2
22-02-2016 at
1236 hrs
Pending
Pending
KPTCL
For the line under consideration the following shall be carried out by
KPTCL in coordination with
PGCIL (SR-II)
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
KPTCLLine tripped at Hiryur end due to direct trip receive
and was holding from Guttur
KPTCL mail received dated 25042017
Numerical BBP is being provided under RampM works
KPTCL to provide numerical Busbar Protection at their 220 kV
Somanahalli SS at the earliest
Tripping of 400 kV Neelamangala-
Hoody line-1
KPTCL to carry out the following for the line under consideration
(i) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
(ii) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
Tripping of 400 kV Guttur-Hiryur line-1 10-10-2016 at
315 hrs
62IV4
59IV4
62II5 Tripping of 220 kV South Bus and
connected elements (220kV HSR 220kV
Nagnathpura 220 kV Harohalli 220 kV
Subramanyapura 220 kV Tataguni 220
kV Mallur and 400220kV ICT-2 and 3)
at 400220kV Somanhalli substation of
KPTCL
(Load loss 850 MW)
20-01-2017 at
1434 hrs
Triggering incident was fault in 66 kV Somanahalli -
Bannerghatta line and fault was cleared by operation
of Back-up OCR at Somanahalli end
15-02-2017
at 1344 hrs
Line tripped at Hoody end on direct trip receive and
was holding from Neelamangala end
Yet to be informed
KPTCL
Yet to be informed Pending
Annexure-III
Page 13 of 31
56I3 Complete outage of 220kV Ambewadi
Substation of KPTCL
24-06-2016 at
2057hrs
B phase to earth fault had occurred in 220 kV
Ambewadi-Ponda line-2 Fault was cleared by
tripping of feeders from remote end
1KPCL amp KPTCL to furnish an action taken report on the
recommendations given by PSAG-16 to PCSC forum
2KPTCL to keep AR for Ambewadi ndash Ponda line-2 in non-auto
mode (ie only 3-ph trip should get extended on occurrence of a
fault) till the line is closed from Ponda end
KPCLKPTCL Yet to be informed Pending
Complete outage of 220kV Ambewadi
station of KPTCL and 220kV Nagjheri
of KPCL
Ambewadi Narendra line-2 tripped on fault and
220kV ambewadi Narendra line-1 tripped due to over-
loading Running Units at Nagjheri also tripped during
the event due to tripping of evacuating lines
KPCL KPTCL18-03-2016 at
1440 hrs
1 TANGEDCO to replace existing Check-Zone relay with a new one
possessing required performance
2 TANGEDCO to take steps to provide numerical busbar protection
at their 220 kV Tuticorin TPS TANGEDCO may also explore
providing dual CT‟s (on either side) for all BS breaakers at the time
of commissioning of numerical BBP if there were no space
constraints
3 TANGEDCO to take steps to provide for standalone Event Logger
(EL) and standalone Disturbance Recorder (DR) with automatic
downloading facility to a centralized server
Failure of Bus Section-I Y-ph CT resulted in
operation of bus-bar protection for Bus Sections -I amp
II Running Units1 4 and 5 230 kV Kayathar
230kV Kudankulam 230kV Sterlite Station
Transformer-1 2 amp 3 got tripped during the incident
Unit ndash 2 amp 3 were not in service
22-02-2017 at
0616 hrs
KPCLKPTCL
25-01-2017 at
2236 hrs
R-phase to earth fault due to de-capping of insulator
Auto-reclose attempt was unsuccessful
Tripping of ICT-3 at Raichur Substation
TANGEDCO
Pending
Tripping of running Units amp 230kV
feeders at Tuticorin TPS of TANGEDCO
(Gen Loss 640 MW)
62II7
1 KPCL to furnish a report on the reasons for Unit-6 tripping at
Nagjheri PH
2 KPCL KPTCL to modify suitably the SPS at Nagjheri Power
House such that it would also factor in the over loading of Ambewadi-
Narendra lines
3 KPCL to put 220 kV Kodasalli - Nagjheri DC lines into service if
more than 200 MW generation from Kali Complex (with Nagheri
Contribution not less than 50 MW) is ensured on sustained basis
Pending53I3 (GD)
15-03-2016 at
1228 hrs
ICT-3 tripped due to operation of back-up earth fault
protection during fault in 220kV RTPS-Raichur line-
1
KPCL KPTCL to check the ICT‟s back-up (high-set) protection
settings and ensure that they operate with a time delay of 100 msec
TANTRANSCO mail dated 12042017
1 The recommendation will be ensured AR logic will be configured in
Distance Protection relay itself instead of BCU OEM has been addressed
2 Post triggering period of 2 sec to cover AR operation in DR time scale
will be provided
TANTRANSCO mail dated 01062017 amp 15062017
1 The recommendation will be ensured AR logic will be configured in
Distance Protection relay itself instead of BCU OEM has been addressed
Main-1 amp 2 relays will be replaced for the requirement of more output
contacts for AR logic implementation
2 Post triggering period of 2 sec to cover AR operation in DR time scale
is being provided
TANGEDCO1 TANGEDCO to take properly configure AR logic at NCTPS-II in
that in case of unsuccessful auto-reclsoure three-phase trip shall be
given along with AR block
2 TANGEDCO to configure all protection relays DR‟s time scale at
NCTPS-II for a post-triggering period of 2 sec to capture events such
as complete AR operation
Tripping of 400 kV NCTPS-
SVChatram line-2
KPTCL Mail received dated 28-06-2016
Modifications to be carried in Nagzari SPS logic is submitted to
SRLDCSRPC for verification and approval
Status received vide KPCL mail dated 14062017
1 Tripped since there was evacuation problem and there were only two
lines NA-1 and NA-2
2 Will be reviewed in consultation with EE(RT) KPTCL Hubli
3 Both the lines are in charged condition
TANGEDCO mail dated 15042017
1) New Relay is tested and ready for replacementNow all 5 units are in
serviceThe relay will be replaced when lesser units are in service ---
Pending
2a)Steps are taken to renovate amp mordernization of all the control panel
into Numerical based control panels --- Pending
2b) Since 230 KV indoor switchyard has no spare space providing dual
CT`s is not fessible -- Completed
3) Procurement of EL amp DR is under progress --- Pending
TANGEDCO mail dated 26042017
1) Check zone New Relay is replaced on 17042017 -- Completed
2 Pending
3 Pending
KPTCL Mail Recieved dated 25-05-2016
SEESCADA to update the status of healthiness of carrier protection of
220kV RTPS-Raichur 1 amp2 lines
KPTCL Mail Recieved dated 28-06-2016
Details sought from KPCL for review of ICTs back up (high set) proection
settings as suggested KPCL is yet to furnish the details required to give
the revised settings
Status received vide mail dated 10-07-2017
As requested by EEE (protection) CEERT KPTCL the details were sent
to through e-mail dtd 08082016 After receipt of reply from KPTCL will
be implemented accordingly
62V3 Pending
Pending
Tamil Nadu
53II1
Annexure-III
Page 14 of 31
05-09-2015 at
1404 hrs
TANTRANSCO to take suitable measures like installing more stub-
towers along 230 kV OK Mandapam ndash Myvady line to avoid
excessive sag due to over-loading
TANTRANSCO PendingComplete outage of 230kV Palladam 230 kV
Othakalmandapam Ss 230 kV Coimbatore Ss 230
kV Thudialur and 230 kV Sadayapalayam Ss
Pending
Disturbance in 220kV Tamilnadu system48I1 (GD)
TANTRANSCO TANTRANSCO vide their mail dated 240615 informed that different
relays in Main-I amp Main-II would be ensured at the earliest
Mail recieved on 24-07-2015 19-02-2016 and 24-03-2016
Different relays in Main-I amp Main-II will be ensured
Mail received on 27-04-2016
TANTRANSCO Not feasible in the existing SAS sub stations Hence
exemption may be given for these sub stations
Mail received on 20-05-2016 16-06-201625-07-2016 amp 24-09-2016
As discussed in the 52nd PCSC meeting Swapping of Relays between two
stations is not feasible in the existing SAS sub stations Hence exemption
may be given for these sub stations
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15062017
Different make Relays will be ensured for Main-I amp II relays at Alamathy
end
TANTRANSCO Mail received on 19-02-2016 24-03-2016 and 27-04-
2016
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
Mail Received on 20-05-2016 16-06-201625-07-2016 amp 24-09-2016
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
29-03-2015 at
1529 hrs
43II5 Line-2 tripped on R-phase to earth fault
Line autoreclosed at SVChatram end and failed to
reclose at Alamathy end Bphase to earth fault in line-
1 Line tried for Ar but due to permanent fault line
did not reclose ICT tripped on operation of over flux
protection
TANTRANSCO was requested to swap the relays between two
stations so that
Main-1 and Main-2 will be of different make at each station
Tripping of 400kV
Alamathy-
SVChatram line-1amp2
and 400230kV ICT
at SVChatram
Annexure-III
Page 15 of 31
14-09-2016 at 1113Hrs
Bus Bar Protection (Zone-2) of 230 kV Bus-B got operated at Alamathy Station during fault in 230 kV
Alamathy-Korattur feeder
51I1 (GD)
12-05-2016 at
1215 hrs
Fault had occurred in 230kV Madurai-Sembatty line
Trip from distance relay was not extended to breaker
due to protection DC fail LBB protection got
operated resulting in a busbar trip at 230kV Madurai
substation All elements got tripped as there is a
single bus operation at 230kV Madurai Ss
58II17
TANTRANSCO
TANTRANSCODifferent type and Make of distance protection relays to be provided for Main-I amp Main-II protection for 230kV feeders at 400 kV Sunguvarchathiram amp 230 kV Sunguvarchathiram Substation [Carry-Over from Protection Audit Recommendations]
Mail recieved on 25-07-2016 amp 24-09-2016
TANTRANSCO Auto Transformer-2 HV side Bus isolator C-phase
support insulator of 230kV Southern Bus was replaced and Bus Bar
Protection scheme was restored on 12052016
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
CT is not available in the Bus Coupler bay for zone segregation CT latch
relay is to be provided for all bays for zone segregation
TANTRANSCO mail received on 24-03-2016
CMR relay for extending LBB protection was released and LBB extended
from Distance Protection relay directly CT is not available in the Bus
Coupler bay for zone segregation However during commissioning of third
ICT Bus section Breaker will be provided for zone segregation Numerical
BBP relay will be provided
Status received vide mails recieved on 27-04-2016 and 20-05-2016 16-
06-2016 25-07-2016 24-09-201610-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
CT is not available in the Bus Coupler bay for zone segregation However
during commissioning of third ICT Bus section Breaker will be provided
for zone segregation Numerical BBP relay will be provided
PendingComplete outage of 230kV Madurai Ss
(Chekanaurani) of TANTRANSCO
TANTRANSCO
Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
TANTRANSCOMultiple tripping at 230 kV Alamathy Station
Pending
Pending
1 TANTRANSCO to check the healthiness of BBP relay by conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
TANTRANSCO to take steps to provide double-bus operation at
their 230 kV Gummidipoondi SS
Pending
Complete outage of 230 kV
Gummidipoondi Station of
TANTRANSCO
19-01-2016 at
1156 hrs
Flashover of Auto Transformer- 2 HV
B-phase Isolator supporting insulator of 230kV
Southern Bus occurred at Gummidipoondi station At
the time of fault Bus bar protection relay was not in
service for pre-commissioning testing of Auto
Transformer-2 All feeders got tripped due to
operation of zone-2 protection from remote ends
TANTRANSCO1 TANTRANSCO to examine the feasibility of providing two main-
zone operation for bus bar protection by exploring various alternatives
like replacing existing bus-coupler CB with a hybrid bus-coupler CB
that comes with inbuilt CT replacing existing BBP relay with another
suitable relay that supports two main-zone operation and implement
the same
Busbar protection got operated for a fault in 230kV
Mywadi-Anaikadavu line
21-12-2015 at
628 hrs
Complete outage of 230kV Mywadi
station of TANTRANSCO
50I3 (GD) TANTRANSCO Mail received on 19-02-2016 and 24-03-2016
Revision of Bus Bar Protection setting was carried out The stabilizing
voltage setting was raised from 410 to 450 volts After completing the
necessary test the bus bar protection put in to service on 29122015
Mail Received on 27-04-2016 16-06-201625-07-2016 amp 24-09-2016
Revision of Bus Bar Protection setting was carried out After completing
the necessary test the bus bar protection put in to service on 29122015
Mail received on 10-11-2016 amp 20122016
Provision of Bus Coupler bay arrangement was included in the
Upgradation works proposed and the same was sanctioned by MoP
through PSDF
Numerical relay allotted and being commissioned
Mail received on 20-02-2017
Numerical BBP relay was commissioned on 02022017
Status received vide mail dated 12042017 amp 01062017 amp 15-06-
2017
Numerical BBP relay was commissioned on 02022017
Provision of Bus Coupler bay arrangement was included in the
Upgradation works proposed and the same was sanctioned by MoP
through PSDF
The issue was discussed in PCSC-58 meeting held on 18102016 when
PCSC forum agreed to de-link the implementation of the Item from the
scope of Protection Audit Recommendations (PAR) and pursue it as part
of PCSC Recommendations
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp15-06-2017
Different make Relays will be provided for Main-I amp II relays at
Sunguvarchatram end in a phased manner
Pending
1 TANTRANSCO to provide split-bus operation with bus
sectionalizer CB for their 230 kV Madurai (Chekanurani) SS
2 TANTRANSCO to provide two main-zone operation for the
numerical BBP that is being commissioned
3 TANTRANSCO to examine the feasibility of providing Re-Trip
feature for the LBB protection and accordingly take steps for
implementing the same
58
55I1 (GD)
Annexure-III
Page 16 of 31
58II17 Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
TANTRANSCOMultiple tripping at 230 kV Alamathy
Station
15-09-2016 at
2214 hrs
Bus Bar Protection (Zone1) of 230kV Bus-A got
operated at Alamathy Station during fault in 230 kV
Alamathy-OPG-1 feeder
1 TANTRANSCO to check the healthiness of BBP relay by
conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal
winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
Pending
Annexure-III
Page 17 of 31
6414 Complete outage of North Chennai TPS
STG-1
26-03-2017
at 2314hrs
Tripping of evacuating lines due to fault led to
tripping of running Unit at NCTPS Stg-1
1 TANTRANSCO to take steps to complete insulator replacement
works on the 230 kV lines owned by them in NCTPS area within 6
months
2 TANTRANSCO to take steps to implement AR on all 230 kV lines
emanating from NCTPS-I at the earliest
TANTRANSCO Yet to be informed Pending
65II1 Tripping of 220 kV Idukki ndashUdumalpet
line
05-05-2017 at
1702 hrs
Line tripped due to B-N and R-N fault in line 1 TANTANSCO to correctly configure AR logic at Udumalpet so
that in the event of 3-ph trip being given during AR dead-time the
relay will not try for auto-reclosure
2 TANTRANSCO to keep AR dead-time as 1 sec for all 220 kV amp
above transmission lines
TANTRANSCO Yet to be informed Pending
58II17
44I1 (GD)
Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
KSEB Mail received vide dated 17012017
1 110 kV bus bar protection progressing ----Pending
2 Connection of 220kV earth mat and 110 kV plate earthing system
completed---- Completed
3 Redundancy of 110V DC system in progress Complete independent
redundancy is not practical for the time being 48 V DC redundancy was
already there----Pending
4 Instead of stand alone event logger SCADA system of 110 kV feeder is
expected to be completed by the end of 2017 SCADA system of 220kV
side will be taken up after that----Pending
28-04-2015 at
1230 Hrs
Mail received on 31-07-2015
1 Reducing the sensitivity of REF protection of Unit 4 5 6 at Idukki
PH - Generation wing is planning to purchase new transformer
management relays with low impedance REF protection Purchase
procedures initiated ---------Pending
2 The replacement repair of faulty breakers are under the consideration of
Generation wing Breakers will be replaced repaired in a phased manner
Unit 3 breaker was replaced with available breaker from the 220kV
IDMD feeder The 220kV CBs of unit 2 and unit 3 will be replaced with
in two months
3 No abnormalities were noticed in the PLCC equipment at New Pallom
station It is kept under observation
Mail recieved on 30-10-2015
1 Purchase procedures is still in progress
2 Replaced
3 PLCC equipment Tested and found OK
Mail recieved on 03-03-2016
1 Even though repeated plans to have a joint inspection with MsABB
who is the OEM of the relay panel for replacing the relays with numerical
ones the same could not become successful Finally the inspection has
been fixed on 15032016 It has been planned to replace existing REF
protection with low impedance ones after retrofitting the numerical ones of
OEM
Mail recieved on 25-05-2016
1Generation wing is planning ti provide low impedance REF protection by
retrofitting numerical ABB make transformer management relay in the
existing panel ---- Pending
2Faulty breaker of Unit3 has been replaced ---- Completed
3PLCC equipments in the feeder were checked and found OK ------
Completed
TANTRANSCO
KSEB
Complete outage of Idukki Hydro Power
Station (GD-1)
Multiple tripping at 230 kV Alamathy
Station
15-09-2016 at
2214 hrs
58I1 (GD) Complete outage of 220 kV Kalamassery
Substation
23-08-2016
at 1120 hrs
Triggering incident was conductor snapping in 110
kV Kalamassery- Kaloor feeder
KSEB to take steps to provide the following at their 220 110 kV
Kalamassery SS
1 Busbar protection at 110 kV level
2 Connecting 220 kV and 110 kV sides on to a common earthmat
3 Redundant DC supply for both protection (220 V) and
communication (48 V) applications
4 Stand-alone Event Logger
Bus Bar Protection (Zone1) of 230kV Bus-A got
operated at Alamathy Station during fault in 230 kV
Alamathy-OPG-1 feeder
1 TANTRANSCO to check the healthiness of BBP relay by
conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal
winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
KSEB
Pending
220 kV breaker of unit-3 at Idukki Power
house flashed and bus differential protection
acted All Generators (6Nos) along with all
220 kV feeders tripped during the incident
1 KSEB to reduce sensitivity of REF protection appropriately at
Idukki PH
2 KSEB to replace repair the faulty breaker
3 KSEB to check the PLCC equipment at New Pallam and inform
the remedial measures taken to PCSC forum
Kerala
Pending
Pending
(Recommendat
ion No1)
Annexure-III
Page 18 of 31
08-05-2016at
457 hrs
Tripping of 400kV Hyderabad - N‟sagar
line
PGCIL (SR-I amp SR-II)
PendingLine tripped on operation of over-voltage protection at
Hyderabad end and Direct Trip was received at
N‟sagar Over-voltage Stg-2 operation was observed
in EL of Hyderabad station
55II5 1PGCIL (SR-I) to properly configure EL‟s at Hyderabad station
with time-scale resolution up to msec further DR‟s should also be
configured for showing both Analog and Digital data with properly
defined X-axis and Y-axis scales
2PGCIL (SR-I) to follow the FILE Naming Nomenclature provided
by SRPC in naming various tripping files (FIRDRELTR) being
uploaded in SRLDC‟s Tripping Monitor System (TMS) portal
PGCIL (SR-I) Yet to be informed
Annexure-III
Page 19 of 31
55II9 Tripping of HVDC Gazuwaka pole-2 19-05-2016 at
1141 hrs
Pole tripped on operation of differential current
protection of east side of Pole-2
PGCIL (SR-I) to take up the issue of differential protection operation
of converter transformer on low voltage fluctuations with their OEM
and submit a detailed report on it
PGCIL (SR-I) Yet to be informed Pending
56II11 Tripping of HVDC GazuwakaPole-2 19-06-2016 at
520 Hrs
HVDC Pole-2 got tripped on operation of Bus
differential protection
PGCIL (SR-I) to get the tripping of HVDC Pole-2 tripping on Win-
Bus differential protection thoroughly investigated for correctness of
operation and submit a report thereon
PGCIL (SR-I) Yet to be informed Pending
56III7 Tripping of 400 kV Khammam-N‟sagar
line-1
05-06-2016 at
2241 hrs
Line tripped on B-phase to earth fault Line auto-
reclosed successfully at N‟sagar and failed to auto-
reclose at Khammam
1PGCIL (SR-I) to configure DR amp EL at N‟sagar (Tallapalli) end so
that full operation of AR is captured
2PGCIL (SR-I) to investigate the reasons for non-operation of AR of
Tie-CB at N‟Sagar end and resolve them suitably
PGCIL (SR-I) Yet to be informed Pending
58II13 (GI) Tripping of 400 kV Raichur-Gooty line-1
and 400 kV Gooty-Tumkur line-2
01-09-2016 at
517 hrs
400kV Gooty-Raichur line tripped at Gooty end only
and was holding from Raichur 400kV Gooty-Tumkur
line-2 tripped on over voltage
PGCIL (SR-I) to check the operation of OVR relays at their Gooty
SS and properly configure lines‟ DRs amp ELs so that events pertaining
to OVR (Stage-I amp Stage-II) operation (START amp TRIP) get
explicitly recorded
PGCIL (SR-I) Yet to be informed Pending
58II14 (GI) Tripping of 400 kV Gooty-Tumkur line-2 02-09-2016 at
2156 hrs
Line tripped on operation of over-voltage protection at
Gooty end and Direct Trip was received at Tumkur
PGCIL (SR-I) to check the operation of OVR relays at their Gooty
SS and properly configure lines‟ DRs amp ELs so that events pertaining
to OVR (Stage-I amp Stage-II) operation (START amp TRIP) get
explicitly recorded
PGCIL (SR-I) Yet to be informed Pending
61II4 Tripping of HVDC Gazuwaka Pole-2 05-12-2016
at 1503 hrs
Pole-2 tripped due to tripping of AC filter banks
which was due to voltage disturbance in eastern bus at
Gazuwaka
PGCIL (SR-I) to refer the instant trippings to their OEM to ensure
that the settings adopted for pole trippings for low-voltage power
swing and ferro-resonance phenomena are in order and have been set
properly A copy of the OEM‟s reply in this regard shall be furnished
to PCSC forum
PGCIL (SR-I) Yet to be informed Pending
62II4 Tripping of 400 kV Gazuwaka-Vemagiri
(PG) line and 400kV Vemagiri(PG)-
Nunna line
18-01-2017 at
2203 hrs
400 kV Gazuwaka - Vemagiri (PG) line and 400 kV
Vemagiri (PG) - Nunna line got tripped due to Direct
Trip receive at Gazuwaka and Vijayawada respectively
PGCIL (SR-I) to configure triggering of DR amp EL for SF6 gas
compartment Zone trip with suitable legend
PGCIL (SR-I) Yet to be informed Pending
63II11 Tripping of 765 kV Vemagiri-Srikakulam
line-1 and 765400kV ICT-1 at Vemagiri-
PG SS
16-03-2017 at
1023 hrs
Line-1 and ICT-1 which are in the same diameter got
tripped due to operation of Tie bay gas
compartment trip
1 Since tripping of elements on Gas Compartment Trip has been
observed frequently in the past few months at 765 400 kV
Vemagiri SS PGCIL (SR-I) shall furnish a comprehensive report
detailing the remedial measures taken including OEMrsquos suggestions
to prevent their occurrence
PGCIL (SR-I) Yet to be informed Pending
PGCIL (SR-I)12-09-2016 at
1203 hrs
Line tripped on Direct Trip receipt at Ramagundam
end and line was holding from Warangal end
Pending58IV1
400 kV Gazuwaka-Vemagiri (PG) line tripped on Y-E fault However for 400 kV Gazuwaka-Vemagiri (PG) line Direct Trip was received at Gazuwaka after
250ms of occurrence of fault and fault was
persistent for 250ms Then Over-Voltage Stage-1 protection operated from Vemagiri (PG) end in 400 kV Vemagiri (PG) - Nunna line and tripped it
62II1
For the line under consideration the following shall be carried out
by PGCIL (SR-I) in coordination with NTPC-Ramagundam
I)End-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
II)Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be
repaired replaced
Yet to be informedTripping of 400 kV Ramagundam-
Warangal line
Yet to be informed05-01-2017 at 1305 hrs
Tripping of 400kV Gazuwaka - Vemagiri (PG) line and 400 kV Vemagiri (PG ) - Nunna line
1 PGCIL (SR-I) to ensure time-sync of all protections relays at their Vemagiri Gajuwaka and Vijayawada substations2 PGCIL (SR-I) to check OVR settings for correctness of operation
along with proper drop-off to pick-up ratio (gt 097) and configure
OVR_START event in the corresponding Relay BCU Event Logger for all 400 kV lines emanating from their Vemagiri (PG) SS
PGCIL (SR-I) Pending
Annexure-III
Page 20 of 31
64III16 Tripping of 76 5kV Kurnool-Nellore PS
line-2
27-04-2017 at
2222 hrs
R-phase to earth fault had occurred in line Auto-
reclose was successful at Kurnool end and breaker
at Nellore PS end tripped and did not attempt for
auto-reclose
For the line under consideration PGCIL (SR-I) to Configure Event
Logger (EL) to record events at msec level
PGCIL (SR-I) Yet to be informed Pending
65II15 Tripping of HVDC Gazuwaka Pole-1amp2 25-05-2017 at
0945 hrs
HVDC pole-1 got tripped due to operation of South
filter inter zone protection and HVDC pole-2 got
tripped due to operation of differential protection
PGCIL (SR-I) to furnish detailed report on the events that led to
tripping of HVDC Poles ndash 1 amp 2 including remedial measures taken
to PCSC forum Further the OEM report wrt tripping of HVDC
Pole-2 shall also be furnished
PGCIL (SR-I) Yet to be informed Pending
65III5 Tripping of 765 kV Raichur-Solapur line-
2
07-05-2017
at 1918 hrs
Y-phase to earth fault Auto-reclose was successful
at Solapur and breakers at Raichur end got tripped
PGCIL (SR-I) to configure Event Loggerrsquos time-resolution up to
millisec level in all protection relays at their 765 400 kV Raichur SS
PGCIL (SR-I) Yet to be informed Pending
55II7 Tripping of 400kV Kudgi PG (Narendra
New) - Narendra-PG line-2
18-05-2016 at
1625 hrs
line tripped on B-phase to earth fault and line auto-
reclosed successfully from Narendra end Line tripped
from Kudgi-PG due to operation of over-voltage stage-
1
PGCIL (SR-II) to properly configure dead-time of AR (typically 1
sec) on all lines emanating from Narendra (PG) substation
PGCIL (SR-II) Yet to be informed Pending
54II3 Tripping of 400kV Sriperambudur -
SVChartam and 400kV Nellore-
Sriperambudur line-1
05-04-2016 at
0011 hrs
400kV Nellore-Sriperambudur line-1 tripped on a R-
phase to earth fault 400kV Sriperambudur-
SVChatram line tripped at Sriperambudur end only
on operation of over current protection
PGCIL (SR-II) to check and revise Pole Discrepancy Relay (PDR)
time setting appropriately based on the type of AR scheme being
implemented at their 400 kV Sriperambudur SS
PGCIL (SR-II) Yet to be informed Pending
54III3 Tripping of 400 kV Kalvindapattu-Vallur
line
10-04-2016 at
1459 hrs
R-phase to earth fault had occurred in line Auto
reclose attempt is unsuccessful auto-reclose could not
be established from provided DR EL
PGCIL (SR-II) to furnish a report on the tripping event detailing the
reasons for unsuccessful AR operation at Kalvindapattu end and the
remedial action taken to restore AR to normalcy
PGCIL (SR-II) Yet to be informed Pending
55II17 Tripping of HVDC Talcher-Kolar pole-1 30-05-2016 at
0949 Hrs
Failure of main CT of AC filter (20C08A) occurred
and it in turn caused the operation of filter bank
differential protection HVDC Pole-1 got tripped on
group Differential protection operation
PGCIL (SR-II) to take up the issue of Pole-1 tripping on Group
Differential Protection (Stage-II) due to multiple commutation failures
with their OEM and furnish a report on it
PGCIL (SR-II) Yet to be informed Pending
56II8 Tripping of HVDC Talcher-Kolar Pole-1 17-06-2016 at
1635 Hrs
Talcher-Kolar HVDC Pole-1 got tripped on line fault
and Pole-2 went to ground return mode with 150MW
PGCIL (SR-II) to address amp resolve DTPC and fibre-optic link
related issues raised by KSEB at Thrissur Madakathara substations
and conduct a mock-test in coordination with KSEB to verify integrity
of signal transmission from Kolar to Thrissur Makadathara
PGCIL (SR-II) Yet to be informed Pending
64II14
PGCIL (SR-I)14-05-2017
at 1654 hrs
Tripping of 400 kV Vemagiri - Gazuwaka
line
PGCIL (SR-I) to sort out issues relating to AR functionality
operation for both Main-CB and Tie-CB at both Vemagiri and
Gajuwaka substations
For the line under consideration the following shall be carried out
by PGCIL (SR-I)
End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be
repaired replaced
Y-phase to earth fault Auto-reclose was not
successful due to persistent fault Vemagiri end had
sent a Direct Trip after un-successful Auto-reclose
AR attempt was observed in Gazuwaka end DR
after 3 phase trip
65III10
Yet to be informed PendingPole-1 got tripped due to failure of auxiliary supply
changeover 400kV Jeypore-Gazuwaka line-2 got
tripped on operation of over-voltage protection
Pole-2 east shunt reactor got failed and this in turn
resulted in tripping of HVDC pole-2 due to Pole-2 Y
block activation 400kV Jeypore-Gazuwaka line -1
also got tripped during the incident
28-Apr-17 Pole-
1 at 844 hrs
and Pole-2 at
907 hrs
Tripping of HVDC Gajuwaka Pole-1amp2
and 400 kV Jeypore-Gazuwaka line-1amp2
PGCIL (SR-I)1 PGCIL (SR-I) to provide fully automatic supply-changeover
scheme for Pole-1 auxiliaries at the earliest
2PGCIL (SR-I) to furnish a detailed report on the reasons for East
Shunt Reactor failure including remedial action taken OEM report in
this regard also shall be shared
3PGCIL (SR-I) to provide redundant AC auxiliary supply to both
Pole-1 amp Pole-2 either by making use of tertiary of ICT-1 or from
external dedicated feeder
Yet to be informed Pending
Annexure-III
Page 21 of 31
58II3 (GI) Tripping of 400 kV Sriperambudur-
SVChatram line
14-08-2016 at
1349 hrs
Line tripped at Sriperambudur end only on
operation of directional earth fault protection
(i) PGCIL (SR-II) to disable high-set of line DEFRrsquos and
(ii) PGCIL (SR-II) to block line DEFR operation when DPR is in active
condition (has picked up) at their Sriperambudur SS
PGCIL (SR-II) Yet to be informed Pending
58II5 (GI) Tripping of 400 kV Neyveli TS2-Pugalur
line and 400 kV Neyveli TS2-Neyveli TS2
EXP line
21-08-2016 at
1035 hrs
Failure of Y-Ph tension insulator of tie feeder bay at
Neyveli TS2 Neyveli-Pugalur line tripped due to over
voltage at Neyveli TS2 and direct trip was received
at Pugalur
PGCIL (SR-II) to check the operation of the DPR relays at Pugalur
end NLC TS2 - Pugalur line by trans-playing the event on another
healthy relay and take suitable action including replacement of the
relay accordingly
PGCIL (SR-II) Yet to be informed Pending
58II19 (GI) Tripping of 400 kV Madurai-Karaikudi
line
15-09-2016 at
0302hrs
Line tripped on operation of OVR Stage-I protection
at Karaikudi and Direct Trip was received at Madurai
PGCIL (SR-II) to check the operation of OVR relays at their 400 kV
Karaikudi SS and properly configure linesrsquo DRs amp ELs so that events
pertaining to OVR (Stage-I amp Stage-II) protection operation (START
amp TRIP) get explicitly recorded
PGCIL (SR-II) Yet to be informed Pending
59II20 (GI) Tripping of HVDC Talcher-Kolar pole-1 10-10-2016 at
1635 hrs
Pole-1 of HVDC Talcher-Kolar tripped due to receipt
of lsquorsquoPole block command from Talcher end due to
tripping Pole-1 DC filter at Talchar end Pole 2 went
into metallic return mode after tripping of pole-1
PGCIL (SR-II) to check the correctness of non-operation of SPS
(Talcher ndashKolar Trip Signal-1) in the instant case by comparing it
with the incident of tripping of HVDC Talcher-Kolar pole-1 on
05102016 and furnish a report on it to PCSC forum
PGCIL (SR-II) Yet to be informed Pending
59II24 (GI) Tripping of 400220kV ICT-2 at
Somanahalli SS
24-10-2016 at
354 hrs
ICT-2 tripped on operation of Buchholz relay PGCIL (SR-II) to properly configure ICT protection relay DR so that
digital signals are recorded with proper names at their 400220 kV
Somanahalli SS
PGCIL (SR-II) Yet to be informed Pending
59III4 Tripping of 400 kV Salem -Udumalpet line-2
13-10-2016 at 0306 hrs
Line tripped on R-phase to earth fault Line auto-reclosed at Udumalpet end and did not reclose at
Salem
Line tripped on R-phase to earth fault Line auto-reclosed at Udumalpet end and did not reclose at Salem
PGCIL (SR-II) Yet to be informed Pending
62II6 Tripping of 400 kV Trichy-Karaikudi line 21-01-2017 at 2145 hrs
Line tripped on operation of over voltage protection at Karaikudi end and direct trip was received at Trichy Voltage recorded in DR in antecedent
conditions were 2454 kV 2432 kV 2536 kV
respectively
1 PGCIL (SR-II) to ensure OVR settings adopted for 400 kV lines at Karaikudi SS are as per SRPC provided settings with a drop-off to pick-up ratio gt 097
2 PGCIL (SR-II) to configure OVR_START event in the corresponding Relay BCU Event Logger for all 400 kV lines emanating from their
Karaikudi SS
PGCIL (SR-II) Yet to be informed Pending
62III5 Tripping of 400 kV Tumkur ndash Bidadi line 17-02-2017
at 1044 hrs
B-E fault Line did not auto-reclose 1 PGCIL (SR-II) to properly configure AR logic operation at Bidadi
end and ensure itrsquos correct operation for a fault during reclaim time
2 PGCIL (SR-II) to ensure time-sync of protection relays with GPS at
both Tumkur and Bidadi substations
PGCIL (SR-II) Yet to be informed Pending
62III6 Tripping of 400 kV Tumkur ndash Bidadi line 18-02-2017
at 1036 hrs
B-E fault Line did not auto-reclose PGCIL (SR-II) to properly configure AR logic operation at Bidadi
end and ensure itrsquos correct operation for a fault during reclaim time
PGCIL (SR-II) Yet to be informed Pending
62V1 Tripping of 400kV Vallur-Kalivandapattu
line-2
22-02-2017 at
455 hrs
Line tripped due to failure of R phase jumper Two
faults observed from DR 2nd fault cleared in 500ms
from Kalavindapattu end
PGCIL (SR-II) to enable Trip on Reclose (TOR) at Kalavindapattu end
on all 400 kV lines emanating from it
PGCIL (SR-II) Yet to be informed Pending
57II2 Tripping of 400 kV Mywady-Salem line-1
and 400 kV Mywady-Madurai line
PGCIL (SR-II) Yet to be informed03-07-2016 at
0306 hrs
400kV Mywady- Madurai line tripped on a Y-phase
to earth fault due to agriculture fire Tie-CB LBB
relay got operated at Mywady end and resulted in
tripping of Main breakers of 400kV Mywady-
Madurai and 400kV Mywady-Salem line-1 which are
in the same diameter
PGCIL (SR-II) to furnish a report on the remedial action taken after
ascertaining the reasons for (i) non-opening of Main-CB of Mywady
ndash Madurai line at Mywady end on Tie-CB LBB operation and (ii)
delay in sending DT to the remote ends after Tie-CB LBB operation
Pending
Annexure-III
Page 22 of 31
65II2 Tripping of 400 kV Kudgi (PG) - Tumkur
line-2 and Kudgi (PG) ndash Kudgi (NTPC)
line-1
06-05-2017 Kudgi (NTPC) feeder tripped at Kudgi (PG) end on
operation of distance protection R-N Zone-1
Tumkur feeder tripped at Kudgi(PG) end on
operation of NGR buchholtz relay
1 PGCIL (SR-II) to sort out AR related issues at Kudgi (PG) end on
400 kV Kudgi (PG) ndash Kudgi (NTPC) lines and put AR into service
2 PGCIL (SR-II) investigate reasons for NGR Buccholtz trip on 400
kV Kudgi (PG) ndash Tumkur line-2 and furnish action taken report wrt
rectifying the same
PGCIL (SR-II) Yet to be informed Pending
58II16 (GI) Multiple tripping at 400 kV Kalpaka SS 06-09-2016 at
1643 Hrs
Y-Pole breaker of Bus reactor-3 got failed during its
charging This resulted in a bus fault in 400kV bus-1
resulting in tripping of 400kV elements connected to
Bus-1
PGCIL (SR-I) amp PGCIL (SR-II) to review their Reverse Zone settings of
distance relays so as to bring them in line with Ramakrishna
Committee guidelines at all their substations in the southern
region
PGCIL (SR-I) amp PGCIL
(SR-II)
Yet to be informed Pending
51II4 NTECLTripping of 400kV Alamathy-Tiruvalam
line-1 and 400kV Alamathy-Vallur line-2
NTECL Vallur to furnish a report detailing the reasons for mal-
operation of Vallur end relays for a fault on Alamathy-Tiruvalam line-
1 and remedial measures taken to PCSC forum In the report their
preparedness for implementing line differential protection on Vallur-
Alamathy lines may also be indicated
400kV Vallur-Alamathy Line-2 got tripped from
Vallur end during failure of Y-phase LA in 400kV
Alamathy-Tiruvalam line Protection at Vallur end
tried for an auto-reclose and gave a 3 phase trip
TANTRANSCO mail received on 24-03-2016
3Ф Trip at 400kV Alamathy end due to DT received from vallur end for
BФ LAS bursted in Alamathy -Thiruvalam - 1 at Alamathy end
Mail received on 27-04-2016 and 20-05-2016
3Ф Trip at 400kV Alamathy end due to DT received from vallur end for
BФ LAS bursted in Alamathy -Thiruvalam - Line-1 at Alamathy end
Pending13-12-2015 at
2242 hrs
Others
Annexure-III
Page 23 of 31
56III5 Tripping of 400 kV Neyveli TS-2-
Pugalur line
04-06-2016 at
1636 hrs
B phase to earth fault occurred in line Auto-reclose
had not operated at NLC TS-2 and DT was sent to
Pugalur end resulting in a 3 phase trip
NLC to review the necessity of providing Relay Definitive Trip and
accordingly take steps to disable it on all lines emanating from their
generating stations
NLC Direct trip triggering of DR wii be carried out at TS2 end during the next
planned shutdown of the Pugalur Ts2 feeder
Mail received on 22-02-2017
Direct trip triggering of DR carried out at TS2 end for the TS2-Pugalur
feeder on 25-01-17
Pending
56II16 Tripping of 400 kV Gajwel-Singareni
line-2
30062016 at
2343 hrs
Tripped on 3-phase Trip at Gajwel end SCCL to configure Jaipur end relay‟s EL properly so that the time-
stamp resolution is extended downwards up to milli-second level
SCCL Yet to be informed Pending
1Singareni TPS to furnish single line diagram of their switchyard
along with the Over Voltage Relay settings adopted for various
transmission lines and to ensure that they are in line with the SRPC
provided gradings
2Singareni TPS to upload various tripping files (FIRDRELTR)
pertaining to a tripping event involving their station in SRLDC web-
portal within 24-hrs of occurrence of that event in compliance of
IEGC Regulation 52(r)
Line tripped on operation of Over-Voltage
protection at Singareni and Direct Trip was received
at Gajwel DR amp EL of Singareni was not furnished
59III3
57II8 NTPC (Ramagundam)
10-07-2016 at
156 hrs
Line tripped at Ramagundam end on operation of over-
voltage protection Dichipally end tripped due to
receipt of Direct Trip signal
1NTPC-Ramagundam to ensure correctness of operation of Over
Voltage relays by taking remedial measures like maintaining
healthiness of concerned CVT‟s setting drop-off to pick-up ratio at
097 amp above etc
2NTPC-Ramagundam to ensure time sync of their station‟s DR amp
EL with GPS
3NTPC-Ramagundam to sort out analog values indication amp
overlapping issue of time-stamp in their station DR‟s
4NTPC-Ramagundam to properly configure their EL‟s so that events
are recorded with msec resolution
Line tripped on B-phase to earth fault Line auto
reclosed at Chandrapur end and did not reclose at
Ramagundam
57II4
16-07-2016 at
438 hrs
Tripping of 400 kV Ramagundam -
Chandrapur line -2
1NTPC-Ramagundam to furnish remedial measures taken wrt AR
non-operation and unwarranted DT sending to other end
2NTPC-Ramagundam to configure protection relays DR‟s such that
events get recorded for at leas
2000 msec post-triggering so as to cover complete AR operation
Tripping of 400 kV Ramagundam -
Dichipally line
NTPC-Ramagundam mail dated 09032017
1 Main-II relay replaced Over voltage relays pickup to reset ratio is 098
--- Completed
2 DR and EL are time synchronized with GPS clock
-------- Completed
3DR alalog overlaping issue is sloved ---- Completed
4 ----- Pending
Yet to be informed
Pending
54I1
Tripping of 400 kV Gajwel-Singareni line-
2
02-04-2016 at
1708 hrs 1MAPS to furnish a detailed report on the tripping of SP Koil ndash
MAPS lines 1 amp 2 at MAPS end with focus on the correctness of the
settings of Main-I amp Main-II relays (for primary amp back-up
protections) on both the lines
2MAPS to take steps to provide down-loading facility for DR amp EL
from Main-I amp Main-II relays on all 230 kV lines emanating from
MAPS
3MAPS in co-ordination with SP Koil to carry out PLCC end-to-
end testing on SP Koil ndash MAPS lines 1 amp 2 and ensure healthiness
of PLCC communication amp carrier-aided protection
4MAPS to put in service Auto-Reclosure feature on all four 230 kV
lines emanating from MAPS by June 2016
Pending
Complete outage of 230 kV SPKoil
Station of TANTRANSCO
B-phase CT failure occurred in 230 kV SPKoil -
MAPS line-1 Busbar protection got operated at
SPKoil station All elements except 230kV
Oragadam and 230kV Kalivandapattu got tripped at
230kV SPKoil station bdquoY‟ phase CT and support
insulators also got damaged
27-09-2016 at
0101 hrs
Status revided vide MAPS mail dated 06122016
1 The settings given by Ms TANTRANSCO were adopted for Main ndashI amp
Main- II relays for both the lines The same settings were verified to be
same Subsequently calibrated was done and no drift was observed
--- Complied
2 From May 2016 onwards the DR EL and trip report are being sent by
mail to SRLDC Bengaluru by MAPS
--- Complied
3 Monthly maintenance of PLCC equipments is being done by Ms
TANTRANSCO At present PLCC telephone is not working it is being
followed up
--- Complied
4 CVTs are planned to be procured from Ms TANTRANSCO by the end
of February 2017 and AR will be implemented for all the lines emanating
from MAPS by July-2017 as discussed in the current SRPC meeting on
25112016
--- Pending
PendingNPCIL (MAPS)
SCCL
NTPC-Ramagundam mail dated 09032017
1 The relay will be checked in next opportunity if required it will be
changed with new one------------- Pending
2DR time recording increased to 2 sec --------- Completed
NTPC Pending
Annexure-III
Page 24 of 31
62III2 Tripping of 400 kV Kaiga-Guttur line-1 06-02-2017
at 0501 hrs
B-phase to earth fault Line did not auto-reclose at
Kaiga end
1 KGS to properly configure all relays DR‟s time scale for a post-
triggering period of 2 sec to capture events such as complete AR
operation
2 KGS to ensure time-synchronization of all protection relays with
GPS in their 400 kV switchyard
NPCIL (KGS) Yet to be informed Pending
63III4 Tripping of 400 kV Gajwel-Singareni line-
2
07-03-2017 at
1652 hrs
Line tripped on B-phase to earth fault Line did not
auto-reclose
1 SCCL to properly configure LBB logic for all line relays
where AR has been put into service for 1-ph initiation based
on phase segregation (ie for the faulted phase) at their
Singareni TPS
SCCL Yet to be informed Pending
64II8 Tripping of 400 kV Tirunelveli-
Kudankulam line-3
23-04-2017 at
0556hrs
R-phase to earth fault had occurred in Tirunelveli -
Udumalpet line-2 During the incident Tie-CB LBB
got operated at Tirunelveli end due to sluggish
operation and tripped 400 kV Tirunelveli -
Kudankulam line-3
NPCIL (KKNPP) to configure DRrsquos amp ELrsquos of protection relays at their
station for recording DT receipt event at their Kudankulam NPP
NPCIL(KKNP) Yet to be informed Pending
Yet to be informed63III8 NPCIL (KGS)Tripping of 400kV Kaiga-Guttur line-2 Line tripped on Y-phase to earth fault Line auto-
reclosed from Guttur end and failed to re-close from
Kaiga end
1 NPCIL (KGS) to furnish an action taken report on the
reasons for AR lock-out and remedial action taken to rectify
the same
2 NPCIL (KGS) to configure DR‟s of line protection relays for
a post triggering period of 2 sec to capture complete AR
operation at their Kaiga GS
3NPCIL (KGS) to furnish FIR amp TR for tripping events as
per SRLDC provided formats
27-03-2017 at
706 hrs
Pending
Annexure-III
Page 25 of 31
34I6
01-01-2015 at
1338 hrs
42II18 400kV Raichur TPS-Raichur(PG) line-
1amp2 400kV Raichur-Mahboobnagar
Unit7 and ICT-2 at RTPS tripped
during the incident B phase to earth
fault had occurred in 400kV Raichur
TPS-Raichur line-1
1 Bus bar protection shall be provided by asset owner ( ie
KPTCL)
2 Settings for main distance protection amp Overcurrent protection
shall be examined and reviewed
3 Time synchronization of the Substation shall be ensured
As reported directional over current relay of ICTrsquos
operated due to snapping of line jumper in 220kV
Lingapur line
1 KPCL to review REF setting (DMT or IDMTL) for unit-7 by first
week of April 2015 and inform the same to PCSC forum
2 TSTRANSCO to furnish Mehaboobnagar‟s DR and EL and the
reasons for distance relay operation at their end within a week‟s time
3 PGCIL (SR-I) to rectify the issues relating to AR operation relay
reach (Z2) reverse reach (Z4) and SOTF auxiliary contacts within a
week‟s time and submit the actions taken to PCSC forum
16-07-2014400220 kV ICT-1 amp 2 at
MUNIRABAD
On account of R-phase to earth fault line tripped at
Hassan end due to operation of distance Zone-2 and
non-receipt of carrier From DR of Talaguppa end it
is observed that fault had occurred in Yphase
09-03-2015 at
0636 hrs
Tripping of 400
kV TALAGUPPA
ndash HASSAN line
40II3
Multiple tripping at Raichur TPS of
KPCL
Miscellaneous
1 PGCIL and KPTCL to ascertain the reason for the phase
discrepancy in the relay operation and take suitable remedial
measures
2 KPTCL to check the PLCC operation at Talaguppa end and submit
the report to the PCSC forum
1 Yet to be informed by KPCL ---- Pending
2 Mail received on 26-05-2015 from TSTRANSCO
It is found that the main-2 ABB make REL316 type distance relay was
defective and same was replaced with MICOM P444 by MsPGCIL on
2304-2015 After replacement of main-II DR can be extracted from this
relay For EL in to service some field winding is pending which is being
taken up in this month -- Complied with
3
PGCIL mail recieved on 27-04-2016
End to end PLCC tunning carried out
PGCIL (SR-I) RVMD 14072016
Relay settings of all the stations in SRTS-1 were derived as per
Ramakrishna Commettee recomendations and implemented - Complied
with
KPCL
TSTRANSCO
PGCIL (SR-I)
PGCIL (SR-II) KPTCL
KPTCL
PGCIL (SR-I)
Mail recieved on 28-04-2015
End to end testing of PLCC has been done and problem in the PLCC is
atttended
Mail received on 27-05-2015 (KPTCL) amp 29-07-2015
End to end testing of PLCC has been done and problem in the PLCC is
atttended Phase discrepancy in the relay operation is to be checked jointly
Mail recieved on 02-09-2015 from PGCIL (SR-II)
Problem is in identification of phases at Talguppa end To be rectified by
Ms KPTCL
Mail recieved on 28-06-2016 from KPTCL
The matter is reffered to the concerned Operation and maintance wing to
set right the mismatch of phases in 400kV Talaguppa-Nelamangala and
Talaguppa-Shantigrma lines at Talaguppa in cordination with PGCIL
Pending
(with KPTCL)
Mail recieved on 27-05-2015 (KPTCL)
1 KPTCL has taken action to provide bus bar protection to 220kV buses
2 Over current relay Settings of ICTs to be reviewed by PGCIL
Mail received on 29-07-2015 (KPTCL)
Initial Tendering stage
KPTCL Mail recieved on 23-01-2016
Detailed estimate prepared for taking up the work CEE Transmission
Zone Gulbarga will take up necessary procurement and further execution
----------------------------------------------------------------------
1 Pending from KPTCL side
2 Complied with as per PGCIL (SR-I) RVMD 14072016 which stated
that Relay settings of all the stations in SRTS-1 were derived as per
Ramakrishna Commettee recomendations and implemented
3 Pending from KPTCL side
Pending (with
KPCL)
Pending
(with KPTCL)
Annexure-III
Page 26 of 31
Tripping of Unit 1 at NCTPS 24-05-2015
at 1913 hrs
ID Fan trip
Tripping of Unit 1 at MEPL 24-05-2015
at 1913 hrs
Coal Mill tripped
Tripping of Unit 1 at
Krishnapatnam
24-05-2015
at 1917 hrs
Generator Protection operated
Tripping of Unit-8 at RTPS 24-05-2015
at 1919 hrs
Tripped on Overvoltage
47I2
1 All Tripped units viz Krishnapatinam MEPL Raichur NCTPS
to submit a detailed report on this event including the remedial
measures taken to PCSC forum
2 KPCL to check the excitation system of Unit 8 of RTPS and
submit the remedial measures taken to PCSC forum
KPCL MEPL
APGENCO TNEB
As per FIR submitted CT damage observed in
Chitoor-Main bay (404) Main breakers connected to
bus-1 (401 404 407 410) got tripped on operation of
bus bar protection Unit-1 tripped on operation of
MFT Unit-2 was not in service
Complete outage of Krishnapatnam TPS
Pending (with
KPCL)
APGENCO letter dated 18032016
1SOE and SLD are attached The DR of 405 CB is not generated during
the incident Now the problem is identified and rectified
--------- Completed
2All the 3 lines ie CHTR-2 MNBL-I amp II tripped in zone
protection The fault was in Blind zone ie P2 side of CT where it was
covered under Bus fault by the time fault moved on to P1 side when the
fault comes under STUBTEED zone after 330msec all the feeders expect
CHTR-1 tripped in Zone-II and total fault persisted for 500msec before the
405 TIE CB opens and clear the fault As a remedial the STUB protection
operation also checked and found OK-------Completed
3The Time Sync was missed on the day and found there was problem with
LAN Timer same was rectified Now found OK
-----------Completed
4Now the DR Time scale changed to 1 sec for Pre fault and 3 sec for Post
fault and STATE of events are corrected wherever found wrongor
misguiding during analysis---------Completed
5
PGCIL-SR1 RVMD 27-04-2016
Procurement of differential protection for 400kV NPS-NLR DC and
400kV RCR-RTPS-DC is under tendering
PGCIL-SR1 RVMD 14-07-2016
The proposal for procurement of Line differential Protections for 400kV
Raichur - RTPS-1 amp 2 and 400kV Nellore - NPS - 1 amp 2 lines has been
approved and tender is under technical evaluation
Pending with
PGCIL(SR-I)
08-09-2015 at
1820 hrs
44I3
1 APGENCO to furnish to PCSC forum (i) A3-size Single Line
Diagram of SDSTPS and (ii) the sequence of events with time stamp
showing the protection that opened Tie-CB (405) at SDSTPS
2 APGENCO to review STUBTEED protection in all dias at
SDSTPS and ensure that they are configured for instantaneous
operation
3 APGENCO to properly configure the STATE of the tripping events
so that they get recorded appropriately like TRIP OPERATED in
their corresponding Event Loggers
4 APGENCO to ensure time sync of all DR‟s and EL‟s at SDSTPS
5 PGCIL (SR-I) to provide line differential protection for 400 kV
NPS ndashNellore-PG lines 1 amp 2
TANGEDCO vide their mail dated 07072015 informed that as per the
discussion and recommendation of 44th meeting of PCSC held on
28052015 a time delay of 2 Sec had been introduced for the above
tripping for all the ID fans at NCTPS-II
MEPL vide their mail dated 14092015 informed that they had
implemented 2 seconds delay for under voltage tripping of all Drag Chain
Feeder Conveyors And this has been done for both the Units
APGENCO letter dated 18032016
The unit not tripped on Generator protection but tripped on Economiser
inlet flow protection consequent to tripping of TDBFP on lube oil pressure
lowBefore tripping dip in voltage was observed in the LT system which
caused tripping od lube oil pumpsAfter the incidentChangeover scheme
on under voltage of LT System was reduced from 80 with 2 sec delay to
40 with 200msec delay
APGENCO PGCIL (SR-
I)
Annexure-III
Page 27 of 31
12-11-2015 at
0020 hrs
Tripping of 400kV Gooty-Nelamangala
line
KPTCL KPCL NPCIL
(KAPS)
1 KPTCL KPCL to see the possibility of implementing Weak Infeed
logic with Echo feature enabled by Under
Voltage (27) element on Kadra-Karwar lines 1 amp2 and implement
the same if feasible
2 NPCIL to time-coordinate Kaiga‟s DEFR settings with (i) Zone-2
settings at Kaiga and (ii) primary protections of the lines emanating
from Kadra and Kodasalli
3 KPCL to ensure time-sync of EL‟s and healthiness of the Fault
Locators at Kadra
220kV Kadra-Karwar lines-1amp2 tripped
on earth fault in B-phase in zone-2
Kaiga-Kadra line tripped at Kaiga end
only on operation of directional eath
fault protection
31-07-2015 at
1144 hrs
Tripping of 220kV Kadra-Karwar lines -
1amp2 and 220kV Kaiga-Kadra line
PGCIL (SR-I) mail received on 27-04-2016
1 The firmware of REL670 is being upgraded ------- Completed
2 The recording of events in msec interval is being taken up with OEM
Henceforth for analysis purpose we will provide larm list which has msec
time stamp -------- Completed
3 End to end testing of PLCC code transmision and tuning of channels
carried out ------- Completed
4 Procurement of differential protection for 400kV NPS-NLR DC and
400kV RCR-RTPS-DC is under tendering The legends modified in
Eventalarm list Provision of diff relay for all short lines emanating from
NPS is being taken up with our corporate -------- Pending
PGCIL(SR-I) RVMD 14-07-2016
The proposal for procurement of Line differential Protections for 400kV
Raichur - RTPS-1 amp 2 and 400kV Nellore - NPS - 1 amp 2 lines has been
approved and tender is under technical evaluation
1
PGCIL RVMD 27042016
AR blocked due to failure of PLCC link The defective PLCCcards
replaced at Neelamgala end
PGCIL RVMD 14072016
AR blocked due to failure of PLCC link The defective PLCCcards
replaced at Neelamgala end End to end testing of PLCC carried out and
PLCC link is healthy ------ Pending
2 Gooty end Time syc unit is replaced with new one and commissioned ---
----- Completed
3 Yet to be informed by KPTCL --- Pending
PGCIL (SR-I) KPTCL 1 For Gooty ndashNelamangala line PGCIL (SR-I) and KPTCL to
provide 3-ph trip logic at their respective ends upon detection of
PLCC link failure during dead-time of AR operation
2 PGCIL (SR-I) to make GPS functional at Gooty SS and ensure
time-sync of various DR‟s and EL‟s with it (GPS)
3 PGCIL (SR-I) KPTCL to furnish reason for the operation of
Backup impedance protection of the line reactor at Nelamangala end
and the remedial measures taken to PCSC forum
Pending (with
KPTCL)
1PGCIL (SR-I) to furnish Action Taken Report on the findings of
OEM on relay mal-operation at NPS end on 400 kV NPS ndash NCCK
line to PCSC forum
2 PGCIL (SR-I) to appropriately configure Station Event Logger at
NPS to record events at msec interval
3 PGCIL (SR-I) to carry out PLCC end-to-end testing in coordination
with TPCIL for 400 kV NPS ndashTPCIL line
4PGCIL (SR-I) MEPL SEL TPCIL amp NCC to take steps to
provide line differential protection at their respective ends on all 400
kV lines (except Gooty line) emanating from Nellore Pooling Station
and furnish an action plan to implement the same
Pending
1
Mail recieved on 25-05-2016 from KPTCL
Availability of week end infeed with eco feature to be confirmed by
SEERTCHubli --- Pending
2
Mail recieved on 03-12-2016 from NPCIL(KGS)
The 200 ms Definite time DEFR element in both Kaiga Kadra and Kaiga
Kodasally lines were disabled IDMT DEFR is retained The 200 ms
Definite time back up oc element in both Kaiga Kadra and Kaiga
Kodasally lines were disabled IDMT is retained
------ Completed
3 Yet to be informed by KPCL
Status received vide KPCL mail dated 14062017
1 Since PT blasted (B phase) at Karwar end resistive over reach occurred
hence Backup protecion operated at Kadra end (zone-2 not sensed) ---
Pending
3Newly commissioned micom P444 relay time synchronised with GPS
------ Completed
Running units at Thermal Powertech power Station
tripped due to tripping of 400kV Nellore pooling
station (NPS)-TPCIL line and 400kV Nellore pooling
station (NPS)-ECC line
30-12-2015 at
0602hrs
R-phase to earth fault had occurred in Line Line did
not auto-reclose from both ends It was mentioned that
YampB pole breakers at Neelamangala tripped on
operation of pole discrepancy and backup impedence
protection for line reactor got operated
Complete outage of TPCIL power station 50I2
50II8
47II7
PGCIL (SR-I)
MEPL SEL TPCIL
NCC
Pending
Annexure-III
Page 28 of 31
52I8 Complete outage of 400kV NTPL station
and CEPL Stations
14-03-2016 at
0136 hrs
Running Units at NTPL and Coastal Energen power
station got tripped due to tripping of evacuating lines
NTPL and PGCIL (SR-II) to furnish compliance report of the
recommendations given by PSAG-15 Committee that held its meeting
on 12-13 April 2016 at NTPL Tuticorin
PGCIL (SR-II)
NTPL
NTPL mail received on 19052016
All General Recommendations will be done in the second week of June
2016 ---------- Complied by NTPL
Yet to be informed by PGCIL (SR-II)
Pending
[with PGCIL
(SR-II)]
56III4 Tripping of 220 kV Sedam-Tandur line 03-06-2016 at
2152 hrs
Line tripped on B-phase to earth fault Auto-reclose is
not enabled for line
KPTCL and TSTRANSCO to fast-track providing AR on 220 kV
Sedam ndash Tandur line and furnish an action plan of providing the same
by next PCSC meeting (PCSC-57)
KPTCL
TSTRANSCO
Yet to be informed Pending
KPTCL and TSTRANSCO to take steps to provide AR feature on
220 kV Sedam ndash Tandur inter-state line at their respective ends at the
earliest
KPTCL
TSTRANSCO
PGCIL mail received on 27-04-2016
Being pursued with APTRANSCO
APTRANSCO mail dated on 22-06-2016
AS maintenance being carrired out by PGCIL(SR-1) the required relay
replacement (wiringprogramming) may also be carried out by PGCIL(SR-
1)
PGCIL RVMD 14072016
1 The CB problem has been attended by POWERGRID by using OEM
Ms BHEL services amp POWERGRIDs OampM spares
------ Completed
2 Being pursued with APTRANSCO to replace the faulty Event Logger at
Vijayawada (Nunna) SS -------- Pending
APTRANSCO mail dated on 31-08-2016 amp 04032017 amp 24052017
As maintenance being carrired out by PGCIL(SR-1) the required relay
replacement (wiringprogramming) may also be carried out by PGCIL(SR-
1)
PGCIL (SR-I)
APTRANSCO
1 PGCIL (SR-I) in co-ordination with APTRANSCO to address
the problem with CB at the earliest opportune time
2 APTRANSCO to take steps to replace the faulty Event Logger at
Vijayawada (Nunna) SS
Line tripped at Mamidipally end only on Direct Trip
receipt from Ghanapur end
30-04-2016 at
1640 hrs
Line tripped due to operation of over voltage
protection at Vijayawada end and Direct Trip was
received at Sattenapalli end
25-12-2015 at
301 hrs
Tripped on 3-phase Trip at Gajwel end30062016 at
2343 hrs
19-06-2016 at
1527hrs
220kV Sedam-Humnabad-2 tripped at Sedam on
Distance protection Zone-2 Sedam-RTPS-1 amp2 lines
tripped at RTPS end only 220kV Tandoor inter-state
line was hand tripped due to incoming supply failure
54IV2 Tripping of 400kV Ghanapur-
Mamidapalli line
56II16
Tripping of 400kV Sattenapalli-
Vijayawada line
56I2
51II6
Tripping of 400 kV Gajwel-Singareni
line-2
Complete outage of 220kV Sedam
Substation of KPTCL
Pending
PendingFor the line under consideration the following shall be carried out by
TSTRANSCO and PGCL (SR-I) in co-ordination
iEnd-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
iiHealthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
PGCIL (SR-I)
TSTRANSCO
Yet to be informed
Pending
1TSTRANSCO and SCCL to check drop-off to pick-up ratio of OV
relay and ensure that it is kept at 097 amp above
2TSTRANSCO and SCCL to configure respective end bdquos DR amp EL
so that they get triggered on OVR protection and record relevant
events
3SCCL to configure Jaipur end relay‟s EL properly so that the time-
stamp resolution is extended downwards up to milli-second level
TSTRANSCO
SCCL
Yet to be informed
Yet to be informed
Pending
Annexure-III
Page 29 of 31
R-phase to earth had occurred in 400kV BTPS-JSWEL
line and protection issued a 3 phase trip
64I1 Complete outage of North Chennai TPS
STG-2
24-04-2017
at 2102hrs
Tripping of evacuating lines due to fault led to
tripping of Units
Pending
64I2 Complete outage of North Chennai TPS
STG-2
25-04-2017
at 1827hrs
Tripping of evacuating lines due to fault led to
tripping of Unit
64I3 Complete outage of North Chennai TPS STG-2
26-03-2017at 2109 hrs
Tripping of evacuating lines due to fault led to tripping of running Unit at NCTPS Stg-2
64III2 Tripping of 400 kV Ghanapur-
Mamidapalli line
04-04-2017 at
1901hrs
B-phase to earth fault Line auto-reclosed from
Mamidapalli end and tripped from Ghanapur
For the line under consideration PGCIL (SR-I) TSTRANSCO to (i)
rectify issues wrt PLCC channels (ii) restore PLCC carrier
communication and (iii) put AR into service at the earliest
PGCIL (SR-I)
TSTRANSCO
Yet to be informed Pending
APGENCO
TSTRANSCO
Direct Trip was received at VTPS and line was
holding from Suryapet end
13-06-2016 at
1655 hrs
56IV2 Tripping of 400 kV VTPS-Suryapet line
57I1 Complete outage of 220 kV Karwar
Substation of KPTCL
12-07-2017 at
1136 hrs
Triggering incident was failure of R phase PT in Bus-
1 at 220kV Karwar substation 220kV Kaiga-
Kodasalli tripped during the incident Also bus shut
down occurred at Kadra and Kodasally stations
1NPCIL (KAPS) to disable DefiniteTime OC relay and put in its
place by IDMT OC relay for backup protection on both 220 kV
Kaiga ndash Kadra line and 220 kV Kaiga ndash Kodasalli line at Kaiga end
2KPTCL to put bus bar protection in service at their 220 kV Karwar
SS at the earliest
3KPCL KPTCL to implement Weak In-feed Logic with Echo
feature enabled by Under Voltage (27) element on Kadra ndash Karwar
lines 1 amp 2
4KPTCL to furnish equipment failure report of the current incident to
PSEampTD Division of CEA with a copy marked to SRPC
KPTCL KPCL NPCIL
(KAPS)
NPCIL(KGS) mail dated on 03-12-2016
AThe 200 ms Definite time DEFR element in both Kaiga Kadra and
Kaiga Kodasally lines were disabled IDMT DEFR is retained
B The 200 ms Definite time back up oc element in both Kaiga Kadra and
Kaiga Kodasally lines were disabled IDMT is retained
------Completed
APTRANSCO mail dated on 20-12-2016
Issue was addressed to the concerned for necessary action
APTRANSCO mail dated on 24-05-2017
Meeting was conducted and the relays procurement for all the locations is
under progress
Pending57II9 Tripping of 400 kV Nellore (PG) - NPS
line-1 400 kV Krishnapatnam-Nellore
(AP) lines -1amp2 and 400kV NPS -
MEPL line
18-07-2016 at
1905 hrs
Triggering incident was snapping of Y phase
conductor in 400kV Nellore (PG) - NPS line-1
Distance relay at Krishnapatnam end over-reached in
Zone-1 and resulted in tripping of 400kV
Krishnapatnam ndash Nellore (AP) lines - 1amp2 from
Krishnapatnam end Distance relay at MEPL over-
reached and resulted in tripping of MEPL-NPS line
from MEPL end
PGCIL (SR-I) TPCIL MEPL SEL SGPL APTRANSCO
APGENCO and SDSTPS to implement line differential protection on
all 400 kV transmission lines (of length less than 50 km) emanating
from Nellore PS Nellore (PG) SS and Nellore (AP) SS [It may be
noted here that the cut-off length of 50 km has been specified with a
view to exclude only long transmission lines]
APGENCO PGCIL(SR-
I) TPCILMEPL
SELSGPL
APTRANSCO
Pending
63II9 KPCLJSWEL Yet to be informed Pending
1 TANTRANSCO and PGCIL (SR-II) to take steps to complete
insulator replacement works on the 400 kV lines owned by them in
Chennai area within 3 months
1 JSWEL to follow file naming terminology provided by SRPC
for various tripping files uploaded in SRLDCrsquos TMS portal
2JSWEL to furnish reasons for AR-BLOCK observed during
the instant tripping and remedial action taken by them to
keep AR in service
3 KPCL to configure DR amp EL properly to record OVR Stage-I
amp Stage-II protections at their BTPS station
14-03-2017 at
1911 hrs
Tripping of 400 kV YTPS-BTPS line and
400 kV BTPS-JSWEL line
Status received vide TANTRANSCO mail dated 15-06-2017
1 All the Porcelain insulators of 400kV NCTPS-II - Vallur feeders-1amp2
were replaced with Polymer insulators by 20052017
2 Existing Porcelain insulators of all other 400kV feeders are being
replaced with Polymer insulators in a phased manner
TANTRANSCO
PGCIL(SR-II)
For the line under consideration the following shall be carried out by
APGENCO in coordination with TSTRANSCO
1End-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
2Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
PendingYet to be informed
Annexure-III
Page 30 of 31
65II5 Tripping of 400 kV Ghanapur-
Mamidapalli line
08-05-2017 at
1915 hrs
Line tripped at Ghanapur end only and was holding
from Mamidapalli Ghanapur end protection had
sensed R-phase to earth fault
For the line under consideration the following shall be carried out
by TSTRANSCO in coordination with PGCIL (SR-I)
1 End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
TSTRANSCO PGCIL
(SR-I)
Yet to be informed Pending
65III12 Tripping of 400 kV Srisailam-Dindi line-2 24-05-2017
at 1502 hrs
R-phase to earth fault Auto-reclose was successful
at Dindi and Zone - 1 3-phase trip at Srisailam
Since all 400 kV lnies emanating from Srisailam LB are composite
feeders APTRANSCO TSTRANSCO can keep AR functionality disabled at respective remote end stations under their control
APTRANSCO TSTRANSCO Yet to be informed Pending
Yet to be informed PendingTriggering incident was failure of CT in 110 kV
Villianur-Kurumbapet at Villianur substation 230KV
Villianur ndash NLC2 and 230 kV Villianur - Pondy lines
got tripped from Pondy end (on operation of DEF)
and NLC end (on operation of Zone-3) respectively
resulting in loss of supply to 230 kV Villianur
substation
65I2 Complete outage of 400kV Uravakonda
and Jammalamadugu Substations
31-05-2017 at
1744 hrs
Triggering incident was tripping of 400 kV Kurnool-
PG - Narnoor line - 1 amp 2 and 400 kV Narnoor-
Jamalamadugu line-2 which led to loss of supply to
400kV Uravakonda and Jamalamadugu 400kV Gooty-
Narnoor 400kV Narnoor-Jamalamadugu-1 400kV
Srisailam-Narnoor 400kV Uruvakonda-
Mahboobnagar-1amp2 were out of service in
antecedent condition
1 For 400 kV Ghani ndashNarnoor line the following shall be carried out
by APTRANSCO
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
2 PGCIL (SR-II) to take appropriate action wrt disabling non-
directional instantaneous Igt4 protection that operates without
checking existence of stub If required the issue may be referred to
relays OEM for appropriate solution or the present relays may be
replaced with other relays with different styles that donrsquot have the
issue observed
APTRANSCO PGCIL
(SR-II)
Yet to be informed Pending
1 PED to furnish an action taken report wrt complying with the
protection audit recommendations
2 PGCIL (SR-II) to review Zone-3 and DEF protection setting at
Pondicherry end 230 kV Pondicherry ndash Villianur and 230 kV
Pondicherry ndash Bahour line and set them appropriately to achieve
required time-coordination with OC protections of ICTrsquos at Villianur
SS
3 NLCIL to keep DEF protection in blocked condition as long as
Distance Protection is active and configure it to become active only
when distance protection does not pickup to avoid time-
coordination issues
19-05-2017 at
1235 hrs
Complete outage of 230 kV Villianur
Substation of Pondicherry
65I1 PED PGCIL (SR-II)
NLCIL
For the line under consideration the following shall be carried out
by TANTRANSCO in coordination with PGCIL (SR-II)
1 End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
PGCIL (SR-II)
TANTRANSCO
Yet to be informed Pending
For the line under consideration the following shall be carried out
by NLCIL in coordination with PGCIL (SR-II)1 End-to-end communication for DT permissive amp other signals may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and software) at both ends shall be checked and faulty components
shall be repaired replaced
Y-phase to earth fault Neyveli TS2 end relay issued
a 3-phase trip 220ms after issue of Y phase trip Direct Trip was sent to Pugalur end preventing auto-reclose
07-05-2017
at 1955 hrs
Tripping of 400 kV Neyveli TS2-Pugalur
line
65III6 PGCIL (SR-II) NLCIL Yet to be informed Pending
For the line under consideration the following shall be carried out
by TSTRANSCO in coordination with NTPC-Ramagundam1 End-to-end communication for DT permissive amp other signals may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components shall be repaired replaced
Over Voltage Stage-1 had operated at Gajwel end
Ramagundam end did not trip as Direct Trip was not received from Gajwel end
29-05-2017
at 0007 hrs
Tripping of 400 kV Ramagundam -
Gajwel line
65II19 TSTRANSCO NTPC
(Ramagundam)
Yet to be informed Pending
65II16 Tripping of 400 kV Kayathar-Karaikudi
line
25-05-2017 at
1552 hrs
R-phase to earth fault had occurred in line There
was Zone-2 3 phase trip operation at Kayathar end
and Zone-1 3 phase trip at Karaikudi end
Annexure-III
Page 31 of 31
SlNo Element NameOutage
datetime
Revival
datetimeReason for Outage Sender Receiver
Remedial Measures Actions taken
1 400 kV KAIGA - GUTTUR 1 27-03-2017153800 27-03-2017164800 RELAY MALOPERATION NPCIL (KGS) KPTCL
KPTCL
At Guttur end DPR operated in Z1 R phase AR
unsucessful due to persistant fault
At Kaiga end DPR operated in Zone-1 RN
fault145km AR attempt is observed from Kaiga
end DR
Reason Transient fault Stood OK after test
charging
NPCIL (KGS)
2 400 kV KHAMMAM - KALPAKKA 1 10-04-2017125800 DISTANCE PROTECTION PGCIL (SR-I) APTRANSCO
PGCIL (SR-I)
Tripped on operation of distance protection Line
belongs to APTARSNCOTSTRANSCO
APTRANSCO TSTRANSCO Momentary fault
3 400 kV KHAMMAM - KALPAKKA 2 11-04-2017115000 11-04-2017175900 Y-N faultPGCIL (SR-I) APTRANSCO
TSTRANSCO
PGCIL (SR-I) Tripped on operation of distance
protection Line belongs to
APTRANSCOTSTRANSCO
APTRANSCO TSTRANSCO Momentary fault
4 400 Kv RAICHUR - YTPS 18-04-2017131400 18-04-2017150100 DPR ZONE 1-B-PH FAULT KPCL KPTCL To-be-discussed
5 400220 Kv ICT-3 AT NEELAMANGALA 20-04-2017162100 20-04-2017170100DUE TO HEAVY ARCING AT B-
PH ISOLATORKPTCL To-be-discussed
6 400 Kv VTPS - MALKARAM 1 23-04-2017150500 SOTF OPERATED APGENCO TSTRANSCO
TSTRANSCOTripped at both ends Tripped on R-
phase to ground Zone-1 indications AR acted and
was unsucessful at Malkaram end
APGENCO
Pending Remedial Measures Actions taken
for the Critical Tripping Incidents (as on 25072017)
Annexure-IV
Page 1 of 6
7 400 kV KHAMMAM - MAMIDIPALLY 2 08-05-2017160600 08-05-2017174900 R PHASE TO GROUND FAULT PGCIL (SR-I) TSTRANSCO
PGCIL(SR-I)
Tripped on operation of distance protection Line
belongs to APTARSNCO
TSTRANSCO
Tripped at both ends Tripped on R-phase to
ground Zone-1 indications AR acted and was
unsucessful at Mamidipally end
8 400 kV TALAGUPPA - NEELAMANGALA 09-05-2017163600 Y TO GROUND FAULT KPCL KPTCL To-be-discussed
9 400 kV MUNIRABAD - GUTTUR 20-05-2017064100 20-05-2017211000BUS BAR PROTECTION
OPERATEDPGCIL (SR-I) KPTCL
KPTCL
No abnormality found at Munirabad end and line
was in service
PGCIL (SR-I)
Tripped at Guttur end only and line was holding
from Munirabad end
10 400 kV GUTTUR - HIRIYUR 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II) PGCIL (SR-II) Due to Problem at Guttur end
11 400 kV KAIGA - GUTTUR 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDNPCIL (KGS) KPTCL To-be-discussed
12 400 kV GUTTUR - NARENDRA 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II) PGCIL (SR-II) Due to Problem at Guttur end
13 400 kV MUNIRABAD - GUTTUR 20-05-2017160000 20-05-2017170400 B-n fault PGCIL (SR-I) KPTCL
PGCIL (SR-I)
As informed by Guttur Substation line tripped at
Guttur end only without any faciaalarms Line
holding from Munirabad end Suspected mal-
operation at Guttur end
KPTCL
14 400 kV GUTTUR - HIRIYUR 1 20-05-2017204100 20-05-2017211800BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II)
PGCIL (SR-II) Due to Problem at Guttur end
KPTCL
15 400 kV BTPS-JSW TORANAGALLU 20-05-2017064100 20-05-2017210300BUS BAR PROTECTION
OPERATEDKPCL JSWEL To-be-discussed
16 400 kV KAIGA - GUTTUR 1 20-05-2017204100 20-05-2017213800BUS BAR PROTECTION
OPERATEDNPCIL (KGS) KPTCL To-be-discussed
17 400 kV GUTTUR - NARENDRA 1 20-05-2017204100 20-05-2017211200BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II)
PGCIL (SR-II) Due to Problem at Guttur end
KPTCL
Annexure-IV
Page 2 of 6
18 400220 kV ICT-1 AT HOODY 20-05-2017110700 20-05-2017180500 220KV SIDE WORKS KPTCL To-be-discussed
19 220 kV AMBEWADI - PONDA 1 22-05-2017121100 22-05-2017123000 EARTH FAULT KPTCL GED To-be-discussed
20 400 Kv VTPS - MALKARAM 1 22-05-2017145200 22-05-2017185800 B phase fault APGENCO TSTRANSCO
TSTRANSCOTrippedat both ends Tripped on B-
Phase to ground and Zone-1 indications AR acted
and was unsucessful at Malkaram end
APGENCO
21 220 kV KANIAMPET - KADAKOLA 23-05-2017143200 23-05-2017162400 BREAKER PDR RELAY ACTED KSEB KPTCL To-be-discussed
22 400 kV TALAGUPPA - HASSAN 30-05-2017014600 B PHASE TO GROUND FAULT KPTCL PGCIL (SR-II)
PGCIL(SR-II) Due to persisting fault in KPTCL
portion
KPTCL
23HVDC TALCHER - KOLAR POLE 1 AT
TALCHER01-06-2017232200 02-06-2017001100
DC DIFFERENTIAL
PROTECTION OPERATEDPGCIL (SR-II) PGCIL (ER-I)
PGCIL(SR-II) Due to DC filter Diff relay operation at
Talcher end
24 400 KV NIZAMABAD- DICHPALLY-1 05-06-2017191500 3 PHASE FAULT TSTRANSCO
TSTRANSCOTrippedat both ends Tripped on 3
Phase B-Phase to ground fault and Zone-2
indications at Dichpally end
25 400220 kV ICT-1 AT DICHPALLY 05-06-2017191500 06-06-2017003200 BUCHHOLZ RELAY OPERATED TSTRANSCO
TSTRANSCO 400kv 315MVA ICT-1 at Dichpally
tripped on OSR indications which was a mal
operation of the relay At the same time there was
3 Phase fault in 400kV Dichpally to Nizamabad line
At Nizamabad end(PGCIL) Line Isolator 3 phases
shorted in GIS Module
26400 kV RAMAGUNDAM -
DICHCHIPPALLI05-06-2017191500 05-06-2017223700 3 PHASE FAULT NTPC TSTRANSCO
TSTRANSCO Line did not trip at Dichpally end At
the same time there was 3 Phase fault in 400kV
Dichpally to Nizamabad line for which the line
tripped at Both ends Relay settings need to be
reviewed at NTPC Ramagundam end
NTPC-Ramagundam
27 400 Kv BTPS - YTPS 05-06-2017194800 05-06-2017204400 DISTANCE PROTECTION KPCL To-be-discussed
Annexure-IV
Page 3 of 6
28 400 Kv SATTENAPALLI - SRISAILAM 2 05-06-2017125500 05-06-2017144700 R-n fault APTRANSCO TSGENCO
APTRANSCO
For a momentary fault feeder tripped on R-Ph Z1
indications and AR successful at Sattenapalli end
TSGENCO
Feeder tripped on R-phase to ground Zone-2 at
Srisailam end Due to Feeder consistsing of Under
Ground cable AR was disabled at Srisailam end
29 400220 kV ICT-2 AT KOLAR 06-06-2017191000 06-06-2017223700 DUE TO HEAVY WIND PGCIL (SR-II)
PGCIL (SR-II)
Flashover between 220kV jumper dropper of B
phase and Gantry towards 220kV bus due to heavy
swing of conductor during the unprecedented
heavy winds
30 400 kV KOLAR - HOODY 2 06-06-2017200800 DUE TO HEAVY WIND PGCIL (SR-II) KPTCL
PGCIL (SR-2)
Hand Tripped due to Isolator problem at Hoody
End
KPTCL
31 400220 kV ICT-2 AT GUTTUR 13-06-2017133000 13-06-2017134500TRIPPED ON EF RELAY
OPERATIONKPTCL To-be-discussed
32400 kV PUGALUR -
KALAIVANTHAPATTU14-06-2017123700 14-06-2017184500 TRIPPED ON Y-N FAULT PGCIL(SR-II) To-be-discussed
33 220 kV KANIAMPET - KADAKOLA 22-06-2017111700 22-06-2017113400EARTH FAULT RELAY
OPERATEDKSEB KPTCL To-be-discussed
34 220 kV KANIAMPET - KADAKOLA 22-06-2017121500 22-06-2017172000EARTH FAULT RELAY
OPERATEDKSEB KPTCL To-be-discussed
35 400 kV KHAMMAM - KALPAKKA 2 03-07-2017092400 03-07-2017104700
DT RECIEVED AT KLPA END
(TRIPPED ONLY AT KLPA
END)
PGCIL (SR-I) APTRANSCO
TSTRANSCO
PGCIL (SR-I)
PLCC belongs to APTRANSCO TSTRANSCO Mal-
operation of PLCC at Kalpaka end Requested
APTRANSCO TSTRANSCO for end to end
testingtunning of PLCC
APTRANSSCO TSTRANSCO
36 400220 kV ICT-1 AT URAVAKONDA 04-07-2017020100 04-07-2017022400MASTER TRIP RELAY
OPERATEDAPTRANSCO To-be-discussed
37 400 kV KAIGA - NARENDRA 2 07-07-2017075000 07-07-2017090800 TRIPPED ON R-Y Ph FAULT NPCIL KPTCL To-be-discussed
Annexure-IV
Page 4 of 6
38 HVDC BHADRAVATHI POLE 1 07-07-2017105900 07-07-2017115400TRIPPED ON NON VALID TAP
CODEPGCIL (SR-I) PGCIL (WR-I)
PGCIL(SR-I)
Tripped due to strucking of OLTC tap during
command execution The same was now working
39 400 kV KHAMMAM - KALPAKKA 2 07-07-2017120300 07-07-2017145000 DT Received PGCIL (SR-I) APTRANSCO
PGCIL(SR-I)
Tripped due to PLCC mal-operation PLCC belongs
to TSTRANSCO APTRANSCO Requested
TSTRANSCO APTRANSCO for end to end testing
tunning of PLCC Khammam end
APTRANSCO
40 400 KV GOOTY - TUMKUR - 1 08-07-2017142200 08-07-2017152600DISTANCE PROTECTION
OPERATEDPGCIL (SR-I) PGCIL (SR-II)
PGCIL(SR-I)
Tripped due to snapping of earth wire while
stringing of OPGW Advised concerned to take
additional precautions while carrying OPGW
stringing
PGCIL(SR-II)
41 400230 Kv ICT-1 AT SVCHATRAM 14-07-2017190300TRIPPED ON RESTRICTED
EARTH FAULTTANTRANSCO
TANTRANSCO
REF protection acted in ICT-1 during Auto Reclose
(AR) attempt of 400kV SVChatram-Alamathy
feeder-2 (through fault condition) As per the relay
manufacturer (GE-T60) guidelines for the one and
half breaker scheme the REF setting will be
revised
42 400 KV GOOTY - TUMKUR - 1 15-07-2017115100 15-07-2017122300Tripped while laying opgw
cablePGCIL (SR-I) PGCIL (SR-II)
PGCIL (SR-I)
Tripped due to snapping of earth wire while
stringing of OPGW Advised concerned to take
additional precautions while carrying OPGW
stringing
PGCIL(SR-II)
43 220 kV AMBEWADI - PONDA 1 16-07-2017113800 16-07-2017120800 DISTANCE PROTECTION KPTCL GED To-be-discussed
44 220 kV AMBEWADI - PONDA 2 20-07-2017013600 LINE FAULT KPTCL GED To-be-discussed
Annexure-IV
Page 5 of 6
45 400 Kv ALM - SVCTM-I 20-07-2017112700 20-07-2017120200 C-N FAULT TANTRANSCO To-be-discussed
46 400 Kv ALM - SVCTM-II 20-07-2017112700 20-07-2017120300 A-N FAULT TANTRANSCO To-be-discussed
47 400 Kv ALM - SVCTM-II 20-07-2017144300 20-07-2017193200TO ATTEND FAULT
LOCATIONTANTRANSCO To-be-discussed
48 HVDC BHADRAVATHI POLE 1 21-07-2017224800 21-07-2017235300 INTERNAL MINOR ALARM PGCIL (SR-I) PGCIL (WR-I) To-be-discussed
49 400 kV KHAMMAM - KALPAKKA 1 21-07-2017103000 21-07-2017204200AC SUPPLY TO BREAKER
PROBLEMPGCIL (SR-I) APTRANSCO To-be-discussed
50 220 kV CHITTOR - THIRUVALEM 22-07-2017080600 22-07-2017144100RELAY MALOPERATION AT
THIRUVALAMAPTRANSCO TANTRANSCO To-be-discussed
51 400 KV GOOTY - TUMKUR - 1 22-07-2017150700 22-07-2017154500TRIPPED DURING OPGW
WORKSPGCIL (SR-I) PGCIL (SR-II) To-be-discussed
52 400 Kv GAJWEL - BHOOPALAPALLY 2 22-07-2017131300 22-07-2017133600 B PHASE FAULT TSTRANSCO TSGENCO To-be-discussed
53 400 kV GUTTUR - HIRIYUR 2 22-07-2017150300 22-07-2017155300TRIPPED DUE TO RELAY MAL
OPERATIONKPTCL PGCIL (SR-II) To-be-discussed
54 400110 kV ICT 2 AT ALAMATHY 24-07-2017091300 24-07-2017162700TRIPPED ON RESTRICTED
EARTH FAULTTANTRANSCO To-be-discussed
Annexure-IV
Page 6 of 6
G1
220kV LINE-1
ICT 220400 KV
G2
GT1 GT2
400kV LINE-1
400kV LINE-2
600MW 600MW
220kV LINE-2
400kV220kVSummary of Various Special Protection Schemes for 2 x 600 MW UPCL TPP
Adani Power Limited Ahmedabad
Adani Power Ltd Ahmedabad 1
Annexure-V
Page 1 of 12
G1
ST-2
220 kV LINE-1
ICT 220400 KV
G2
GT-1 GT-2
400kV LINE-1
400kV LINE-2
600 MW 600 MW
ST-1
220 kV LINE-2
UPCL UDUPI - NETWORK UNDER CONSIDERATION
400 kV220 kV
Adani Power Ltd Ahmedabad 2
315 MVAICT-1
315 MVAICT-2
220 kV ndash KEMMAR BUS 400 kV ndash HASSAN BUS
Annexure-V
Page 2 of 12
Adani Power Ltd Ahmedabad 3
Existing SPS
Benefits of New Proposals
If both the 400kV Lines out of serviceTripped amp Total Generation is gt 650 MW then Trip Unit-2
Existing SPS logic has been developed in Unit-2 DCS
1 Consideration of all possible contingency cases
2 Unit Backdown (AUTOMATIC) has been proposed in certain contingencies
where Unit tripping is not required After restoration of tripped outlets
Unit may ramp up to full generation
3 Comprehensive logic will be developed in Numerical Relays with adequate
security and reliable detection to avoid mal operation of sps logic
4 Monitoring of SPS logic with necessary alarms and events
Annexure-V
Page 3 of 12
Sr UPCL‐Udupi‐SUMMARY OF SPS TO HANDLE ALL POSSIBLE CONTINGENCIES Sh‐1 of 2
Contingency Cases Action Unit SelectionFor Tripping
1 Power Swing Detected in Impedance reach of Zone‐1 in 400 kV Line
Tripping of One selected unit if both Units ON Each Unit Power gt 400 MW
Unit‐2
2Tripping of one 400 kV Line while another 400 kV Line is already in OFF condition
Tripping of One selected unit if both Units ON Each Unit Power gt 400MW
Unit‐2
3 TrippingOffloading of Both 400 kV Line simultaneously (within 3 sec)
Tripping of One selected Unit if both Unit ON Each Unit Power gt 325 MW Unit‐2
4 TrippingOffloading of all four Transmission Lines Tripping of both Units Both Units
4
5
400kVlin
e Overlo
ad Stage PickupSet Point
TimeDelay Action
Stage 1 900 MW 3 Sec Alarm
Stage 2 1100 MW 2 Sec Automatic Backdown upto 450 MW in both Units
Annexure-V
Page 4 of 12
Sr UPCL‐Udupi‐SUMMARY OF SPS TO HANDLE ALL POSSIBLE CONTINGENCIES Sh‐2 of 2
Contingency Cases
Action
6 ICT
Overlo
ading from
400 kV
Line Stage Pickup
Set PointTimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units
7
220 kV
Line
Overlo
ad
Stage 1 250 MW 5 Sec Automatic Backdown upto 300 MW in both Units
5
Sr Consideration Requirements associated with SPS Implementation
1 400 kV LINE Tripping in Zone‐1 will be blocked under Power Swing DetectionOperation
2 Pole Slip Protection of Generator need to be co‐ordinated with 400 kV Line Power Swing Protection
3 Line Overload Detection will be blocked by Power Swing DetectionOperation
4 Line ZeroUnder Power Detection will be blocked by Power Swing DetectionOperation
Annexure-V
Page 5 of 12
G1
ST-2
220 kV LINE-1
ICT 220400 KV
G2
GT-1 GT-2
400kV LINE-1
400kV LINE-2
600 MW 600 MW
ST-1
220 kV LINE-2
UPCL UDUPI - NETWORK UNDER CONSIDERATION
400 kV220 kV
Adani Power Ltd Ahmedabad 6
315 MVAICT-1
315 MVAICT-2
220 kV ndash KEMMAR BUS 400 kV ndash HASSAN BUS
Annexure-V
Page 6 of 12
Contingency 1 Tripping of one 400kV line
It may lead tohellip1 Overloading of another 400 kV Line
2 Power Swing in another 400 kV Line (specially when 220 kV
Lines are not available)
3 Severe oscillations in running Units
4 Units may loose synchronism and disconnect from network
G1 G2
L1 L2L1L2
Following SPS has suggested to address this contingency
Adani Power Ltd Ahmedabad 7
400kV200kV
Contingency Cases
Action
Unit Selection
ForTripping
1
400kVline Overlo
ad
Stage PickupSet Point
TimeDelay
Stage 1 900 MW 3 Sec Alarm ‐‐‐‐‐‐‐
Stage 2 1100 MW 2 Sec Automatic Backdown upto 450 MW in both Units ‐‐‐‐‐‐‐
2 Power Swing Detected in Impedance reach of Zone‐1 in 400 kV Line
Tripping of One selected unit if both Units ON Each Unit Power gt 400 MW Unit‐2
Annexure-V
Page 7 of 12
Contingency 2 Tripping of one 400kV line while other already Tripped
It may lead tohellip
1 Oscillations in running Units
2 Units may loose synchronism and disconnect from
network
3 Overloading of ICTs and subsequent tripping
4 Overloading of 200 kV Lines and subsequent tripping
5 Station blackout
Adani Power Ltd Ahmedabad 8
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases Action Unit SelectionFor Tripping
1Tripping of one 400 kV Line while another 400 kV Line is already in OFF condition
Tripping of One selected Unit if both Unit ON Each Unit Power gt 400 MW Unit‐2
2
ICT Overlo
ading
from
400
kV Side
Stage PickupSetting
TimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units
Annexure-V
Page 8 of 12
Contingency 3 Tripping of both 400kV line simultaneously
It may lead tohellip
1 Severe oscillations in running Units
2 Units may loose synchronism and disconnect from
network
3 Overloading of ICTs and subsequent tripping
4 Overloading of 200 kV Lines and subsequent tripping
5 Station blackout
Adani Power Ltd Ahmedabad 9
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases Action Unit SelectionFor Tripping
1 TrippingOffloading of Both 400 kV Line simultaneously (within 3 sec)
Tripping of One selected Unit if both Unit ON Each Unit Power gt 325 MW Unit‐2
2
ICT Overlo
ading
from
400
kV Side
Stage PickupSetting
TimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units ‐‐‐‐‐‐‐
Annexure-V
Page 9 of 12
Contingency 4 Overloading of any 220 kV line
This contingency may arise due tohellip1 Tripping of both 400 kV Lines and associated SPS logic fails
to operate (Tripping of any One Unit if both Units running)
2 Overloading of ICTs from 400 kV Side and associated SPS
logic fails to operate
3 Tripping of any one 220 kV lines if both 220 kV lines are in
service and 400 kV outlets are not available
Adani Power Ltd Ahmedabad 10
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases
Action
Unit Selection
ForTripping
1
220kV
line
Overlo
ad StagePickupSet Point
TimeDelay
Stage 1 250 MW 5 Sec Automatic Backdown upto 300 MW in both Units ‐‐‐‐‐‐‐
If any SPS does not function Then 200 kV Line will trip by Operation of Line Over Current Function
Annexure-V
Page 10 of 12
Contingency 5 Tripping of all Lines emanating from UPCL (ZERO POWER)
It may lead to1 Over voltage conditions at UPCL Bus
2 Over speed of all the generators because of sudden
load throw
Following SPS has suggested to address these contingencies
1 Zero Power Scheme on 400 kV System and 220 kV System checking the power
flow through 400kV and 200 kV lines and trip all the units in service if there is a
under power condition on all four lines and running units
Adani Power Ltd Ahmedabad 11
G1 G2
L1 L2L1
400kV200kV
L2
Sr Contingency Cases Action Unit SelectionFor Tripping
1 TrippingOffloading of all four Transmission Lines Tripping of both Units Both Units
Annexure-V
Page 11 of 12
G1
220kV LINE-1
ICT 220400 KV
G2
GT1 GT2
400kV LINE-1
400kV LINE-2
600MW 600MW
220kV LINE-2
400kV220kV
THANKShellip
Adani Power Ltd Ahmedabad 12
Annexure-V
Page 12 of 12
65th Protection Coordination Sub-Committee
29-06-2017
Annexure-VI
Page 1 of 40
Complete outage of 230KV Villianur substation of Pondycherry at 1235 hrs on 19-05-2017
bull Triggering incident Failure of CT in 110kV Villianur-Kurumbapet at Villianur substation
bull 230110kV ICT-1amp2 at Villianur substation tripped on operation of backup Over current protection
bull 230KV Neyveli-Villianur and Pondy-Villianur Line got tripped from NLC amp Pondy ends on operation of DEF and Zone-3 respectively
bull Delayed clearance of fault observed from PMU plot ndash 560ms
bull Load loss 140 MW
DEF
ZONE-3
NLC TS-2 BAHUR TrsquoMARTHAN
PONDY
VILLIANUR
Annexure-VI
Page 2 of 40
Fault cleared in 560ms
Annexure-VI
Page 3 of 40
Complete outage of 400kV Uruvakonda and Jamalamadugu Stations at 1744 hrs on 31-05-2017
bull Triggering incident Tripping of 400kV Kurnool-Narnoor line-1 amp 2 and 400kV Kurnool-Jamalamadugu line-2
bull Loss of supply loss to 400kV Uruvakonda and Jamalamadugu
bull Lines out of service 400kV Gooty-Narnoor 400kV Narnoor-Jamalamadugu-1 400kV Srisailam-Narnoor 400kV Uruvakonda-Mahboobnagar-1amp2
Srisailam Narnoor
Kurnool
Ghani
Jrsquomadugu UVrsquokonda
Mbrsquongr
Gooty
Ghanapur
Igt4
Igt4 Z3
Z3
OV DT RCV
Annexure-VI
Page 4 of 40
Annexure-VI
Page 5 of 40
Kurnool Narnoor
DR trigger ndash 174418501 hrs
Ib=5kA
Zone-3 trip EL Stub optd
DR trigger ndash 173620637 hrs
Igt4 trip
3 phase Grp AB optd
Kurnool Narnoor
DR trigger ndash 174418503 hrs
Ib=5kA
Zone-3 trip EL Stub optd
DR trigger ndash 174306388 hrs
Igt4 trip
3 phase Grp AB optd
Kurnool Jamalamadugu
DR trigger ndash 174423979 hrs Vgt1 Trip
DR trigger ndash 174415040 hrs Z3 T1 DT Rcv not observed in DR amp EL
400kV Kurnool-Narnoor line-1
400kV Kurnool-Narnoor line-2
400kV Kurnool-Jamalamadugu line-2
Annexure-VI
Page 6 of 40
bull Points for discussion ndash Location of fault
ndash Zone-3 amp Igt4 trip of 400kV Kurnool-Narnoor line-1amp2
Annexure-VI
Page 7 of 40
Tripping of 220kV Idukki ndashUdumalpet line at 1702 hrs on 05-05-2017
bull B-N and R-N fault in line
bull Delayed clearance observed during 2nd fault
Idukki Udumalpet
DR trigger ndash 170200499 hrs ZONE 1 B-E 366Km
DR trigger ndash 165741849 hrs ZONE 1 B-E amp Zone-2 R-E
Idukki
Udumalpet Lower periyar
New Pallom Kalamassery
Annexure-VI
Page 8 of 40
Annexure-VI
Page 9 of 40
B-N FAULT
R-N FAULT
ZONE-2
Ar attempt
Udumalpet end DR Annexure-VI
Page 10 of 40
bull Points for discussion ndash Reason for 3 phase trip at idukki end
ndash Relay to give a 3 phase trip in the event of 2nd fault during dead time
Annexure-VI
Page 11 of 40
Tripping of 400kV Kudgi(PG)-Tumkur line-2 and Kudgi(PG)- Kudgi(NTPC) line-1 at 1605 hrs on 06-05-2017
bull 400kV Kudgi(PG)-Kudgi(NTPC) ndash line tripped at Kudgi PG end on R-N zone-1
bull 400kV Kudgi(PG)-Tumkur line tripped from both ends
Kudgi(NTPC)
Tumkur
Kudgi(PG) Narendra
Kohapur
Guttur
Kaiga
Annexure-VI
Page 12 of 40
Kudgi (PG) Kudgi(NTPC)
DR trigger 160547438 hrs Zone-1 optd R-N Ar lockout Ov pick up
FIR DR amp EL not furnished
Kudgi (PG) Tumkur
DR trigger 160546957 hrs NGR buchholz trip Dip in R-phase voltage
DR trigger 160512593 hrs DT Rcv Grp AB optd
400kV Kudgi(PG)-Kudgi(NTPC) line-1
400kV Kudgi(PG)-Tumkur line-2
Annexure-VI
Page 13 of 40
Annexure-VI
Page 14 of 40
Annexure-VI
Page 15 of 40
Annexure-VI
Page 16 of 40
Tripping of 220kV Edamon-Tirunelveli-1amp2 at 1809 hrs on 06-05-2017
bull 220kV Edamon-Tirunelveli-1amp2 tripped from Tirunelveli end only and was in service from Edamon end ZONE-1 R-B-E fault
bull Distance protection at Tirunelveli over-reached and tripped for fault in 220kV Edamom-Pothencode lines
Edamon
Sabarigiri
Tirunelveli Pothencode
Kundara
Edappon
Annexure-VI
Page 17 of 40
Annexure-VI
Page 18 of 40
Tripping of 400220 kV Ghani ICT-2amp3 at 1405 hrs on 07-05-2017
bull ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
bull Delayed clearance observed from PMU data
bull DR amp EL not furnished
Srisailam Narnoor
Kurnool
Ghani
Jrsquomadugu UVrsquokonda
Mbrsquongr
Gooty
Ghanapur
Annexure-VI
Page 19 of 40
Annexure-VI
Page 20 of 40
Tripping of 400kV Ghanapur-Mamidapalli line at 1915 hrs on 08-05-2017
bull Line tripped at Ghanapur end only and was holding from Mamidapalli
Ghanapur Mamidapalli
DR trigger ndash 191329917 hrs Z3 Main-2 opts Event logger Main-2 PSB optd ndash 191541751hrs
DR trigger ndash 191458457hrs R-N Start Breakers did not trip
Ghani
Malkaram
Ramagundam
Chpr
Mamidapalli
Nrsquosagar
Gajwel Ghanapur Khammam
Dindi
Annexure-VI
Page 21 of 40
Annexure-VI
Page 22 of 40
Tripping of 400220kV ICT-1 at Guttur at 2215 hrs on 09-05-2017
bull ICT-1 tripped on HV side only without any relay indications
bull No fault observed from PMU data
Annexure-VI
Page 23 of 40
Tripping of 400kV Narsapur-Shankarapalli at 0007 hrs on 10-05-2017
bull line tripped at Narsapur end only and holding from Shankarapalli
Narsapur Shankarapalli
DR trigger ndash 000720147hrs Zp T1 Igt3 Start Event logger 75A relay optd ndash 000720098 hrs
CB did not trip
Singareni
Shankarapalli Gajwel
Narsapur
Suryapet
Brsquoply
Rrsquogm
Annexure-VI
Page 24 of 40
Tripping of 400220kV Hyderabad ICT-4 and 220kV lines at Hyderabad substation at 239 hrs on 10-05-2017
bull Triggering incident Bus fault in 220 kV Ghanapur station
bull Observation from PMU data ndash dip observed in Y amp B phase fault cleared in 120ms
bull Elements tripped 220kV lines amp 400220 kV ICT-4
bull FIR not submitted by TSTRANSCO
Annexure-VI
Page 25 of 40
Tripping of 400220kV ICT-1 at BTPS 13-05-2017 at 1941 hrs
bull ICT-1 got tripped on operation of LV side earth fault protection during R-phase to earth fault in 220kV BTPS-Lingapur line
bull Lingapur line DR amp EL were furnished
BTPS Alipura Regulapadu
Lingapur
Annexure-VI
Page 26 of 40
Tripping of 765 kV Kurnool-Thiruvelam line-2 at 2003 hrs on 19-05-2017
bull Triggering incident Failure of R-phase LA at Thiruvelam end
Kurnool Thiruvelam
DR trigger time ndash 200318272 hrs
Main-1 trip Carrier aided trip
3 ph Grp-AB optd DT RCV
Ir ndash 3kA
Dip in Y-phase current observed
Event logger
REF optd - 200318340 hrs
DT send - 200318343 hrs
DR trigger time ndash 200318269 hrs
Zone-1 trip
Initially 1 ph trip and later 3 ph trip due to DT rcv
Event logger
DT rcv - 200318395 hrs
Raichur Kurnool NPS
Tiruvelam
Solapur
Annexure-VI
Page 27 of 40
Annexure-VI
Page 28 of 40
Tripping of 400220kV ICT-2 at Kalpakka at 1502 hrs on 20-05-2017
bull ICT-2 tripped due to operation of transformer buchholz relay
bull Reason for operation of Buchholz relay may be furnished to PCSC
Annexure-VI
Page 29 of 40
Tripping of 400220kV ICT-2 at KV Kota at 1021 hrs on 23-05-2017
bull ICT-2 got tripped due to mal-operation of transformer oil temperature indicator
bull Remedial actions taken may be furnished to PCSC
Annexure-VI
Page 30 of 40
Tripping of 220kV Kaniambeta-Kadakola line at 1350 hrs on 23-05-2017
bull Line tripped at Kaniambeta end
bull Kaniambeta feeder protection is provided through 220kV bus coupler breaker bay
bull EFR relay operated and B ph pole discrepancy relay operated leading to tripping of Bus coupler CB
bull Loss of infeed to Kaniambeta Ss
Annexure-VI
Page 31 of 40
Tripping of 400220kV ICT-1 at Somanahalli substation at 1724 hrs on 24-05-2017
bull ICT-1 at Somanahalli substation got tripped due to DC Earth fault
bull Findings amp Remedial actions taken may be furnished to PCSC
Annexure-VI
Page 32 of 40
Tripping of HVDC Gazuwaka Pole-1amp2 25-05-2017 at 0945 hrs
bull HVDC pole-1 got tripped due to operation of South filter inter zone protection and
bull HVDC pole-2 got tripped due to operation of differential protection
bull Findings amp remedial actions taken may be furnished to PCSC
Annexure-VI
Page 33 of 40
Tripping of 400kV Kayathar-Karaikudi line 25-05-2017 at 1552 hrs
bull Triggering Incident R-phase to earth fault
Kayathar Karaikudi
DR trigger time ndash 155236585 hrs
Zone-2 3 phase trip
Carrier unhealthy
DR trigger time ndash 155236592 hrs
zone-1 3 phase trip
Kayathar Kamudi Karaikudi
Pugalur
Trichy
Madurai
Annexure-VI
Page 34 of 40
Annexure-VI
Page 35 of 40
Tripping of 400220kV ICT-1amp3 at Hoody substation of KPTCL at 1230 hrs on 26-06-2017
bull ICT-1 tripped due to arc over of pre-close supervision contact of tip coil -2
bull ICT-3 got tripped on over-loading
Annexure-VI
Page 36 of 40
Annexure-VI
Page 37 of 40
Tripping of 400kV Simhadiri-Kalpakka line-2 at 503 hrs on 28-05-2017
bull Line tripped on mal-operation Teed Differential Protection at Simhadiri end and direct trip was received at Kalpakka
bull Y-Phase to earth fault had occurred in 400 kV Vijayawada-Vemagiri line-3
bull Findings amp remedial actions taken may be furnished to PCSC
Annexure-VI
Page 38 of 40
Tripping of 400kV Ramagundam-Gajwel at 0007 hrs on 29-05-2017
bull Over voltage stage-1 had operated at Gajwel end
bull Ramagundam end did not trip as direct trip was received from Gajwel
bull DR amp EL of Gajwel end not furnished
Annexure-VI
Page 39 of 40
Tripping of 400kV Gajwel-Ghanapur line at 0007 hrs on 29-05-2017
bull Line tripped on operation of over voltage protection at Gajwel and direct trip was received at Ghanapur
bull DR and EL of Gajwel end were not furnished
Annexure-VI
Page 40 of 40
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 6
It was further noted that even though KPTCL had furnished the details of 220 kV amp 400 kV lines where AR is already in place the details of 220 kV lines where AR is not presently in service along with Action Plan for implementing same are yet to be furnished
All above Constituents were asked to kindly furnish required details by 08082017
Since the main issues in implementing AR are the adopted conservative protection philosophies lack of proper PLCC communication and breakersrsquo suitability supportability it is intimated in view of above that if there are no issues wrt carrier communication and breakersrsquo supportability concerned Constituents shall make efforts to implement AR immediately in their respective networks Where communication amp breaker related issues stand in the way of implementing AR concerned Constituents shall take steps to address them appropriately on priority basis and implement AR in their respective networks in a phased manner at the earliest
In the previously held PCSC meetings the following logics have been clarified for implementing AR
Normally high speed single-ph single-shot AR scheme (with simultaneous opening at both ends of feeder with a dead-time of 1 sec and reclaim-time of 25 sec) may be used by all Utilities (including Generators)
However those generators (Coal Gas Nuclear Hydro) who have concerns wrt closing on to un-cleared fault can make use of the following time-differentiated single-ph single-shot AR scheme
ldquoIn this after a line has been opened from both ends (generator end amp grid end) on AR operation the grid end will be auto-reclosed as usual after the elapse of its dead-time (say 1 sec) However the generator end relay will check for the line voltage after elapse of an extended dead time say 15 sec [here the additional time delay of 05 sec which has been included as a safety margin shall be so chosen that the extended dead-time is less than the adopted Pole Discrepancy time delay] If the line voltage so sensed is healthy amp normal (which implies that the fault has already been cleared) then generator end will be auto-reclosed else 3-ph trip will be given at generator end to open the other two phase polesrdquo Further wherever Trip-on-Reclose (ToR) feature is available at grid-end station it shall be configured such that it sends Direct Trip (DT) command to generator end upon its operation
It is also clarified that the above scheme can be as it is used to Line-CBrsquos of all bus configurations (including Main-CBrsquos of one-and-half breaker bus configuration) For Tie-CBrsquos in one-and-half breaker configuration employing priority scheme (which also happens to be the recommended practice) above logic is not be required since the employed priority scheme anyway checks for CLOSE_STATUS of Main-CB before closing Tie-CB However if required the above logic can be applied to Tie-CBrsquos also by adopting a suitable extended dead-time considering the remote end stationrsquos AR dead time
It is further clarified that AR functionality for a transmission line shall be preferably put into service using (i) Bay Control Unit (BCU) or (ii) separate External AR Relay Where these are not available only then should the AR functionality of Main protection relays of lines be used
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 7
Here it is assumed that both Main-relays are deriving their Voltage Input from the Line CVTrsquos (from different cores as per the recommended practice) However if this is not the case and the concerned Utility has a practice of using Line-CVT voltage input to one of the Main relays and Bus-CVT voltage input to the other Main relay it is recommended that voltage input to be used in time-differentiated AR logic shall be exclusively derived from the line-CVT for use in both the Main relays
It is also clarified that AR implementation is not required in case of radial feeders cables amp composite feeders and is optional for the lines interconnecting two generating stations
In addition to above the following logics (applicable to the Cases where AR is being proposed to be implemented from Main Protection Relays) are also intimated for the benefit of the Constituents
Since there are two Main protection relays (Main-I and Main- II) to decide upon proper way of implementing AR for achieving fool-proof AR operation it has been advised that instead of implementing AR from only one of the Main relays (in light of its low success rate) the following Alternatives be considered Alternative ndash 1 AR is implemented and kept functional from Main ndash I [Main-II] only but with feedback from Main-II [Main-I]
In this scheme AR is implemented and kept in service from Main-I [Main-II] as usual
Additionally Main-II [Main-I] relay is configured for single-pole (1-ph) tripping and the OPEN (TRIP) status of the concerned trip relay is used for triggering AR functionality in Main-I [Main-II] By this even if the fault is not sensed in the beginning by Main-I [Main-II] but sensed by Main-II [Main-I] AR operation is guaranteed However it may be noted that in cases of permanent faults this scheme may result in unsuccessful AR operation with Pole Discrepancy Relay coming to rescue if the fault is not sensed by Main-I [Main-II] but by Main-II [Main-I] at the time of auto-reclosing instant
Alternative ndash 2 AR is implemented and kept functional from both Main ndash I and Main-II
In this scheme AR is implemented and kept in service from both Main ndash I and Main-II as
usual As can be seen the scheme is reliable and is without any additional logics However to avoid the possibility of both relays racing for CLOSE-OPEN-CLOSE-OPEN operation in case of permanent faults it shall be ensured that along with other conditions ldquoAR BLOCK with 3-ph TRIPrdquo is also effected for the same phase fault as the original one that occurs during AR dead-time
Out of the above two also it has been suggested to consider Alternative-2 for implementing AR in view of its higher success rate
11 Network Configuration Changes
As per the information furnished by SR-Constituents to the OCC forum in their 132nd meeting (held on
09062017 Minutes circulated on 04072017) it is formed that the following configuration changes (additions deletions modifications of transmission elements) took place in the southern grid during
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 8
April 2017
Two STATCOMs (+- 50 MVAR Each) at NP Kunta commissioned on 16052017
Kudgi Unit I 72 Hrs trail run completed Successfully
400 kV Shankarapally-Suryapet I amp II commissioned on 05052017
22033kV SS at Hayathnagar IampII in Ranga reddy district of 50 MVA Capacity was commissioned on 03052017 by TSTRANSCO
SR II Power grid vide letter dated 10062017 had informed that consequent to the successful completion of Trial Operation the following assets under transmission system associated with ldquoSystem strengthening ndashXX in Southern Regional Gridrdquo have been put under Commercial Operation wef 0000 hrs of 10062017 in terms of clause 4 of CERC (Terms and Conditions of Tariff Regulations 2014)
1 x 500 MVA 40022033kV ICT at Trichy Substation along with associated bays and equipments
SR I Power grid vide letter dated 04062017 had informed that consequent to the successful completion of Trial Operation the following assets of ldquoTransmission System for Ultra Mega Solar Park in Anantapur Dist Andhra Pradesh- Part ndash A (Phase-I)rdquo have been put under Commercial Operation wef 0000 hrs of 04062017 in terms of clause 4 of CERC (Terms and Conditions of Tariff Regulations 2014)
+- 100 MVAR STATCOM at NP Kunta Pooling Station along with associated bays and equipment
12 Instances of SPS Operation
Based on the information furnished by SRLDC it is informed that there occurred no SPS operations in SR during the period 25052017 ndash 28062017
13 Status of Implementation of Protection Audit Recommendations (Phase-I amp Phase-II)
With reference to the petitions filed by KSEB (88MP2016) and KPTCL (135MP2016) for seeking further time-extension for completing their respective Protection Audit Recommendations (PAR) the final Order of Honrsquoble CERC disposing of petitions was issued on 15122016 In this Order the Commission apart from granting last-chance time-extensions to various SR-Constituents had also directed SRPC to monitor the status of completion of PAR regularly in PCSC meetings and submit bi-monthly report to the Commission confirming the completion of Phase-I and Phase-II of PAR of the Constituents of Southern Region
In this regard based on the information furnished various Constituents a summary table showing the
compliance status of various SR-Constituents as in July 2017 is given below
SlNo
Constituent
PAR (Phase-I) Activities
PAR (Phase-II) Activities
PAR (Ph-I amp Ph-II) Compliance ()
Remarks
Stipulated Completion
Date
Stipulated Completion
Date
1 APGENCO (Hydel)
31122017 31122017 40 ---
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 9
2 APGENCO (Thermal)
30072017 --- 75 Based on the status furnished timeline for complying with the remaining pending recommendations (3 in no) is expected by 31122017
3 APTRANSCO 31032017 --- 9571 Out of the 3 remaining pending recommendations two are expected to be completed in three months while the other is expected by 31122017
4 TSGENCO (Hydel)
31032017 31032017 8823 Based on the status furnished timeline for complying with the remaining pending recommendations (4 in no) is expected by 31122017
5 TSGENCO (Thermal)
31032017 31032017 80 Based on the status furnished timeline for complying with the remaining pending recommendations (3 in no) is expected by 31072017
6 TSTRANSCO 31032017 31032017 8523 Based on the status furnished timeline for complying with the remaining pending recommendations (13 in no) is expected by 30092017
7 KPCL --- 31112016 100 ---
8 KPTCL 31052017 31052017 2817 Based on the status furnished timeline for complying with the remaining pending recommendations (51 in no) is expected by 30092017
9 TANGEDCO 31122017 31122017 6389 ---
10 TANTRANSCO 31122017 31122017 50 ---
11 KSEB 30112016 31122017 9481 ---
12 NPCIL (MAPS) 31012017 --- 8889 Based on the status furnished timeline for complying with the remaining pending recommendation (ONE in no) is expected by 31122017
All above SR-Constituents are requested to adhere strictly to the time-lines given in the Order for
completing their respective pending PAR The IPPrsquos for whom there are pending PAR [viz Spectrum PGL GMR Barge - Kakinada Konaseema GPL APGPCL Vijjeswaram (Stage-I amp Stage-II) amp LANCO-Kondapalli PL] are also requested to complete them at the earliest
Minutes of the 65th
Meeting of PCSC held on 29th
June 2017 Page 10
14 Nomenclature for naming various files uploaded in web-based Tripping Monitoring
System of SRLDC Portal
The nomenclature to be followed by the Constituents in naming various files (FIR DR EL TR) corresponding to a tripping incident was brought out in the SRPC letter No SRPC SE-III PCSC-45 4609 ndash 649 dated 26062015 and in the minutes of PCSC-45 issued vide SRPC letter No SRPCSE-III PCSC-45 2015 5422-455 dated 21072015 As illustrated therein the format to be followed for the user entered part-name is given below
Transmission Element File Name to be given by the user
Transmission Line SSN_DSN_line_FT
Inter-connecting Transformer SSN_ICT_FT
Generating Transformer SSN_GT_FT
Generating Unit SSN_Unit_FT
Where SSN = Source Station Name From end Station Name Sending end Station Name DSN = Destination Station Name To end Station Name Receiving end Station Name FT = File Type (FIR DR EL TR)
All SR-Constituents are requested to kindly intimate the above file naming nomenclature to all the concerned and ensure that it is strictly followed at all the stations in their respective control areas so that tripping analysis can be done systematically
15 Date amp Venue of the next PCSC Meeting
It is informed that the 66th meeting of PCSC will be held on 17th August 2017 (Thursday) from 1030 hrs onwards in the Conference Hall of SRPC Secretariat Bengaluru
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Annexure - I
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 132
Analysis of Grid Occurrences - 65
I Details of Grid Disturbances
Sl No
Details of Event Date amp Time Reason Remarks Category
1
Complete outage of 230 kV Villianur Substation of Pondicherry
19-05-2017 at 1235 hrs
Triggering incident was failure of CT in 110 kV Villianur-Kurumbapet at Villianur substation 230KV Villianur ndash NLC2 and 230 kV Villianur - Pondy lines got tripped from Pondy end (on operation of DEF) and NLC end (on operation of Zone-3) respectively resulting in loss of supply to 230 kV Villianur substation
Load Loss 140 MW
GD-1
SLD
The single line diagram of 230 kV Villianur SS as furnished by PED is attached at the end 230 kV Villianur ndash Pondy line Villianur (PED) end
As per FIR TR line was kept holding
The following was also stated in FIRTR
Remedial action Relay testing amp calibration proposed during total shutdown on 13062017
DR amp EL not furnished Pondy (PGCIL-SR2) end
As per FIRDRELTR line tripped at 123559270 hrs on B-E fault due to DPR Z3 (98 km 156 kA) operation From DR amp EL Z3 time delay was observed to be about 06 sec
230 kV Villianur ndash NLC2 line Villianur (PED) end
As per FIR TR line was kept holding
The following was also stated in FIRTR
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 232
Remedial action Relay testing amp calibration proposed during total shutdown on 13062017
DR amp EL not furnished NLC2 (NLCIL) end
As per FIRDRELTR line tripped at 123551016 hrs on B-E fault due to DEFR operation From DR amp EL DEFR time of operation was observed to be about 07 sec
Time sync of Protection relays with GPS at NLC TPS-II needed to be ensured SRPC SRLDC
It was noted that the triggering incident was failure of B-ph CT in 110 kV Villianur-Kurumbapet line at Villianur SS
It was noted that for the above fault distance protection at Villianur end on 110 kV Villianur-Kurumbapet line had not operated probably due to absence of current input (hence impedance becoming infinite)
Further since there was no busbar protection to 110 kV buses the fault continued to be fed from the remote ends (Pondy-PG and NLC-2) through 100 MVA Transformers (Txr ndash 1 amp Txr ndash 2)
So the transformersrsquo back-up protections were called into action But since OC protections provided on both HV amp LV sides had no high-set Units and since they were kept non-directional [Relay make ER TJM 10] LV (110 kV) side OC protections of both transformers had acted to give trip command Even though the 110 kV CB of Txr ndash 1 got opened that of Txr-2 had not opened due to which the fault continued to be fed from the remote ends (Pondy-PG amp NLC-2)
It was noted that the HV (230 kV) side OC protection of Txr-2 which was supposed to act under above situation had NOT acted
Due to above the remote end back-up protections were called into action
It was noted that even though Pondy-PG end CB tripped on DPR Z3 protection the time delay observed was on the lower side of about 06 sec
It was also observed that DEF protection had acted to trip its CB at NLC-2 without giving any chance for its distance protection to operate
In view of the above observed inconsistencies at Villianur SS it was decided to review various feeder amp transformer protections kept at Villanur SS during its scheduled protection audit on 10072017
Subsequently protection audit of 230 110 kV Villianur SS of PED was conducted on 10072017 during which several lacunae were noted Accordingly a comprehensive set of recommendations were given to PED for early compliance
Recommendations
PED to furnish an action taken report wrt complying with the protection audit recommendations PGCIL (SR-II) to review Zone-3 and DEF protection setting at Pondicherry end 230 kV Pondicherry ndash
Villianur and 230 kV Pondicherry ndash Bahour line and set them appropriately to achieve required
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 332
time-coordination with OC protections of ICTrsquos at Villianur SS NLCIL to keep DEF protection in blocked condition as long as Distance Protection is active and
configure it to become active only when distance protection does not pickup to avoid time-coordination issues
2
Complete outage of 400kV Uravakonda and Jammalamadugu Substations
31-05-2017 at 1744 hrs
Triggering incident was tripping of 400 kV Kurnool-PG - Narnoor line - 1 amp 2 and 400 kV Narnoor-Jamalamadugu line-2 which led to loss of supply to 400kV Uravakonda and Jamalamadugu 400kV Gooty-Narnoor 400kV Narnoor-Jamalamadugu-1 400kV Srisailam-Narnoor 400kV Uruvakonda-Mahboobnagar-1amp2 were out of service in antecedent condition
Gen Loss 500 MW
GD-1
FNN not followed by APTRANSCO FIR amp TR in prescribed formats not furnished by APTRANSCO SLD
The single line diagram 400 kV Jammalamadugu SS as furnished by APTRANSCO are attached at the end
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 432
Antecedent Conditions
The following lines were kept out of service 400kV Narnoor-Srisailam SC line 400kV Narnoor-Gooty SC line 400kV Narnoor-Hyderabad SC line 400kV Narnoor-Jamalamadugu-1 line 400kV Uravakonda-Jamalamadugu-1 line 400kV Uravakonda-Mahboobnagar line-1amp2
Above means Uravakonda SS and Jammalamadugu SS were effectively hanging on to 400 kV Jamalamadugu - Narnoor line-2 for supply
A Tripping of 400 kV Kurnool (PG) - Narnoor line-1 Kurnool-PG (PGCIL-SR1) end
As per FIRTR line tripped at 174418601 hrs due to DPR Z3 (5703 km) operation
As per DREL line tripped at 174418601 hrs due to Stub Protection operation Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 173620637 hrs due to operation of Igt4 (B-ph) protection
From EL Igt4 time delay was observed as 100 msec
Time sync of protection relays with GPS needed to be ensured B Tripping of 400 kV Kurnool (PG) - Narnoor line-2 Kurnool-PG (PGCIL-SR1) end
As per FIRTR line tripped at 174418601 hrs due to DPR Z3 (5703 km) operation
As per DREL line tripped at 174418601 hrs due to Stub Protection operation Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 174306388 hrs due to operation of Igt4 (B-ph) protection
From EL Igt4 time delay was observed to be about 100 msec
Time sync of protection relays with GPS needed to be ensured C Tripping of 400 kV Narnoor ndash Jammalamadugu line-2 Narnoor (APTRANSCO) end
As per FIRDREL line tripped at 174423979 hrs due to OVR-I operation (From EL OVR-I Time delay was observed as 5 sec which is in line with SRPC provided gradings)
Jammalamadugu (APTRANSCO) end
As per FIR line tripped at 1744 due to DT receipt from Narnoor end
As per DR line tripped at 174415040 hrs (Type of Protection operated was not recorded)
In EL events recording started from 174424037 hrs Line was observed to have got tripped around this time due to 862 operation (Type of Protection operated was not recorded)
Time sync of Protection relays with GPS needed to be ensured SRPC SRLDC
As informed by APTRANSCO it was noted that the triggering cause for operation of Stub protection Igt4 protection was a line fault on 400 kV Ghani ndash Narnoor line-1 Even though Ghani end had tripped on DPR Z1 protection and sent carrier to Narnoor due to unhealthiness of carrier communication (PLCC related issues) Narnoor end tripped on DPR Z2 protection
The above fault was seen by relays at both ends of 400 kV Narnoor ndash Kurnool-PG lines 1 amp 2 (the relays of P444 make are owned by PGCIL-SR1 and the relay settings were also provided by PGCIL-SR1)
As in formed by PGCIL (SR-I) it was noted that there was an instantaneous non-directional Igt4 protection setting in the specific relay style (defined by relay make model and version) which operates without checking for isolator status During the above instant the flow of heavy fault
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 532
current led to its operation both ends
To this PGCIL (SR-I) was informed that by default Igt4 or stub protection is configured for instantaneous operation with corresponding isolator open position interlock So further instantaneous high-set functionality that operates without checking isolator positional status is not desirable since it can lead to unwarranted trippings as in the present case Therefore the said setting shall be kept disabled If there is no provision to effect this (by means of changing relay settings) the issue may be referred to its OEM for obtaining modified firmware suitable solution PGCIL (SR-I) can also make use of other relays with different style in place of the existing relays
Recommendations
For 400 kV Ghani ndashNarnoor line the following shall be carried out by APTRANSCO End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced PGCIL (SR-II) to take appropriate action wrt disabling non-directional instantaneous Igt4 protection
that operates without checking existence of stub If required the issue may be referred to relays OEM for appropriate solution or the present relays may be replaced with other relays with different styles that donrsquot have the issue observed
II Details of Grid Incidents
Sl No Details of Event Date amp Time Reason Category
1 Tripping of 220 kV Idukki ndashUdumalpet line
05-05-2017 at 1702 hrs
Line tripped due to B-N and R-N fault in line
GI-1
Idukki (KSEB) end
As per FIRDREL line tripped (in 3-ph) at 170200500 hrs on B-E fault due to operation of DPR Z1 (3661 km) protection
Udumalpet (TANTRANSCO) end
As per FIRDRELTR line tripped (in B-ph) at 165741907 hrs on B-E fault due to DPR Z2 (CAT AR 1025 km) operation However during AR dead-time another R-E fault was detected at 165742252 hrs in Zone-2 due to which line tripped in 3-ph after Z2 time delay of 350 msec at 165742594 hrs [It may be noted that all this happened during the AR dead-time]
Time-sync of Protection Relays with GPS needed to be ensured at 220 kV Udumalpet SS KSEB
During the instant case line did not try for AR as the external VARM AR relay was faulty and kept out of service
Remedial action Problem with VARM relay had been rectified and put into service on 10052017
SRPC SRLDC
From the DR of Udumalpet it can be seen that the relay had tried for AR even after giving three phase trip during AR dead-time due to occurrence of two different faults which is not desirable
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 632
Recommendations TANTANSCO to correctly configure AR logic at Udumalpet so that in the event of 3-ph trip being
given during AR dead-time the relay will not try for auto-reclosure TANTRANSCO to keep AR dead-time as 1 sec for all 220 kV amp above transmission lines
2
Tripping of 400 kV Kudgi (PG) - Tumkur line-2 and Kudgi (PG) ndash Kudgi (NTPC) line-1
06-05-2017 at 1605 hrs
Kudgi (NTPC) feeder tripped at Kudgi (PG) end on operation of distance protection R-N Zone-1 Tumkur feeder tripped at Kudgi(PG) end on operation of NGR buchholtz relay
GI-2
SLD
The single line diagram of 765 400 kV Kudgi-PG SS as furnished by are attached at the end 400 kV Kudgi (PG) ndash Kudgi (NTPC) line-1 Kudgi (PGCIL-SR2) end
As per FIRDRELTR line tripped (in 3-ph) at 160547499 hrs on R-E fault due to DPR Z1 (M1 79 km 013 kA M2 88 km 318 kA) operation
Kudgi (NTPC) end
FIRDRELTR not furnished 400 kV Kudgi (PG) ndash Tumkur line-2 Kudgi (PGCIL-SR2) end
As per FIRDRELTR line tripped (in 3-ph) at 160547450 hrs due to operation of NGR Buccholtz trip protection
Tumkur (PGCIL-SR2) end
As per FIRELTR line tripped (in 3-ph) at 160547596 hrs due to DT receipt from Kudgi-PG end
In DR this time was mentioned as 160512593 hrs
Time-sync of protection relays with GPS needed to be ensured PGCIL (SR-II)
With regard to tripping of 400 kV Kudgi (PG) ndash Kudgi (NTPC) line ndash 1 and AR non-operation it was informed that prior to above fault there were multiple faults on all four lines between Kudgi (PG) and Kudgi (NTPC) due to prevailing stormy weather
Remedial action Actual reasons for AR failure in the instant case were being investigated The issue was also
referred to its OEM for suitable advice
With regard to tripping 400 kV Kudgi (PG) ndash Tumkur line ndash 2 it was suspected that NGR Buchholtz relay might have mal-functioned as there was no gas collected in the bucholtz relay of NGR It may be noted that NGR buchholtz trip is present in REF relay
Remedial action Oil sample of NGR taken and sent to RTDC
Recommendations PGCIL (SR-II) to sort out AR related issues at Kudgi (PG) end on 400 kV Kudgi (PG) ndash Kudgi (NTPC)
lines and put AR into service PGCIL (SR-II) investigate the reasons for NGR Buccholtz trip on 400 kV Kudgi (PG) ndash Tumkur line-2
and furnish an action taken report wrt rectifying the same
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 732
3 Tripping of 220 kV Edamon-Tirunelveli lines - 1amp2
06-05-2017 at 1809 hrs
220kV Edamon-Tirunelveli - 1amp2 tripped from Tirunelveli end only and was in service from Edamon end
GI-1
Edamon (KSEB) end
As per FIR line was kept holding from Edamon end Tirunelveli (PGCIL-SR2) end
As per FIRDRELTR lines tripped (in 3-ph) at 180921343 hrs on R-B fault due to DPR Z1 (532 km) operation
It was stated in TR that Edamon ndash Pothencode lines 1 amp 2 had tripped around the same time and it was suspected that DPRrsquos at Tirunelveli end on 220 kV Tirunelveli ndash Edamon lines 1 amp 2 might have over-reached for the fault in 220 kV Edamon - Pothencode lines
PGCIL (SR-II)
The instant case was a typical case of overreaching of distance relays at Tirunelveli being experienced for quite a while It may be probably due to bunching of the conductors involved
Remedial action It was proposed to modify Z1 setting as 50 of line impedance with POR and would be done
within one-week time They had also proposed to measure the actual line impedance of the line and adjust Z1 settings
accordingly
06-03-2017at 0607 hrs
4 Tripping of 400220 kV Ghani ICT-2amp3
07-05-2017 at 1405 hrs
ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
GI-2
FNN not followed by APTRANSCO FIRrsquos in prescribed format not furnished by APTRANSCO SLD
The single line diagrams of 400220 kV Ghani SS as furnished by APTRANSCO is attached at the end Tripping of 500 MVA 400 220 kV ICT-2
As per FIR ICT-2 tripped at 1405 hrs due to operation of Y-ph OC amp EF protections
DR amp EL not furnished Tripping of 500 mVA 400 220 kV ICT-3
As per FIR ICT-3 tripped at 1405 hrs due to operation of Y-ph OC amp EF protections
DR amp EL not furnished SRPC SRLDC
When enquired about the reasons for operation of back-up protections of ICTrsquos ndash 2 amp 3 APTRANSCO replied that there was actually a fault on the 220 kV feeders emanating from 400 220 kV Ghani PS However since the CT Neutral connection setting had been wrongly set as ldquoTowards Bus siderdquo instead of the correct ldquoTowards Transformer siderdquo the back-up protections on 220 kV side operated for the said 220 kV line fault
APTRANSCO also informed that first ICT-2 tripped followed by ICT-3
But since it was not clear from the above explanation whether line protection on 220 kV side had operated or not and the delayed clearance of the fault observed during the incident (about 400 msec) APTRANSCO was asked to investigate the reasons for the same
APTRANSCO was also asked to check whether carrier aided protection is healthy on 220 kV lines emanating from 400 220 kV Ghani PS
07-03-2017 at 1602 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 832
Recommendations APTRANSCO to check and correct all CT Neutral Connection settings in various protection relays at
their 400 220 kV Ghani PS APTRANSCO to ensure that PLCC carrier aided protection is maintained healthy on 220 kV lines
emanating from their 400 220 kV Ghani PS APTRANSCO to take steps to complete configuration works of DRrsquos amp ELrsquos of various protection
relays at their 400 220 kV Ghani SS and furnish the same as and when required in compliance of IEGC Regulation 52 (r)
5 Tripping of 400 kV Ghanapur-Mamidapalli line
08-05-2017 at 1915 hrs
Line tripped at Ghanapur end only and was holding from Mamidapalli Ghanapur end protection had sensed R-phase to earth fault
GI-2
Mamidipalli (TSTRANSCO) end
As per FIR line was kept holding from Mamidipalli end
In DR R-E fault current (2894 kA) along with dip in R-ph voltage could be seen but if any protection relay had picked could not be verified Also EL furnished did not contain events for this time (In fact no events were found recorded after 160610859 hrs)
Ghanapur (PGCIL-SR1) end
As per FIRTR line tripped (in 3-ph) at 1915 hrs on R-E fault due to DPR Z1 (49 km 2547 kA) operation
As per DR line tripped (in 3-ph) at 191330020 hrs on R-E fault due to 3-ph Group-B Trip relay operation (Zone-3 pick-up also could be observed)
As per EL line tripped (in 3-ph) at 191541722 hrs on R-E fault due to 3-ph Group-B Protection Trip relay operation
Time-sync of protection relays with GPS needed to be ensured
When enquired about the reasons for observed discrepancies PGCIL (SR-I) informed that line tripped on operation of distance protection Since last 2-3 trippings permissive carrier was not being received at Mamidipally end
Further since PLCC at both ends belong to TSTRANSCO thorough check-up of PLCC carrier communication and tuning of PLCC link needed to be undertaken
For above one-day shut-down of line was requested to which SRLDC agreed
Recommendations For the line under consideration the following shall be carried out by TSTRANSCO in coordination
with PGCIL (SR-I) End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
08-03-2017 at 1033 hrs
6 Tripping of 400220kV ICT-1 at Guttur
09-05-2017 at 2215 hrs
ICT-1 tripped on HV side only without any relay indications GI-2
As per FIRTR ICT-1 tripped at 2215 hrs only on HV side without any relay indications KPTCL
ABB make RXMS trip relays provided in various lineICT panels were found to be mal-operating and the phenomenon observed was suspected due to raise in earth potential during any fault in Guttur substation
10-03-2017 at 1801 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 932
Remedial action Action wass being taken to provide 10kΩ resistor in series with the RXMS relay coil for all trip
relays of this type at Guttur Total 170 nos of such resistors were required Now purchase formalities were finalised and work of supply and fixing of resistors would be taken up and completed within a monthrsquos time
7 Tripping of 400 kV Narsapur-Shankarapalli line
10-05-2017 at 0007 hrs
Line tripped at Narsapur end only on B-Phase to earth fault and line did not trip from Shankarapalli
GI-2
SLD
Shankarapally (TSTRANSCO) end
As per FIR line was kept holding from Shankarapally end Narsapur (TSTRANSCO) end
As per FIRDREL line tripped in 3-ph at 000720105 hrs on B-E fault due 86 Trip relay (130 km) operation
The type of protection operated was not recorded shown in either DR or EL
TR not furnished TSTRANSCO
For the fault on 400 kV Shankarapalli-Mamidapalli line Narsapur end picked up in Z3 However due to configuration issues relating to programmable Zone Zp (this was being used as Zone-3 and its time-setting was found to be kept as zero sec) it tripped instantaneously instead of tripping after Zone3 time delay
Remedial action PSL Configuration for Zp was set right on 01-06-2017
13-03-2017 at 2347 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1032
8
Tripping of 400220 kV Hyderabad ICT-4 and 220 kV lines at Hyderabad substation
10-05-2017 at 239 hrs
Operation of busbar protection due to fault in 220 kV Bus at 220kV Hyderabad Substation
GI-1
SLD
1 2 1 2
Bus-1
Bus-2
x
xx
x
BUS BAR ACTED AT 220KV GHANAPUR SS ON 10-05-2017
CHANDRAYANAGUTTA HAYATHNAGAR
132KV BUS
160MVA-3 100MVA-1
400kV PGCIL
x x
160MVA-2ICT-1 ICT-2 ICT-3
NAGOLE
x x
ICT-4
x
MOULALI
INFOSYS
x
x
1 2
Y-Ph disc
flash over at
LocNo95
Y amp B-Ph
disc flash
over at
LocNo95
RELAY INDICATIONS ON THE FEEDER
AT GHANAPUR END AT CHANDRAYANGUTTA END
Chandrayangutta-I feeder Ghanapur-I feeder
Main-1 relayYNZ1 071kM Main-1 relayYN254kM
Main-2 relayYNZ1 09kM Main-2 relayYN
Chandrayangutta-II feeder Ghanapur-II feeder
Main-1 relayYB Z1378kM Main-1 relayRYB
Main-2 relayYBZ111kM Main-2 relayRYB
BC
14-03-2017 at 1911 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1132
Tripping of ICT-4
As per FIR ICT-4 tripped at 0240 hrs on 220 kV side only due to BBP operation on 220 kV Bus
As per DR ICT-4 tripped at 220941165 hrs apparently due to LBB operation
EL not furnished
Date amp Time-sync of DR not in order (09052017 220940682 hrs)
TR furnished did not contain any analysis or remedial action taken
It was noted that BBP for 220 kV Bus-2 had operated for a close-in line fault on 220 kV Chandrayanagutta line-2 tripping ICT-4 and other connected 220 kV feeders (It was informed that ICT-2 was not in service at the time of instant tripping)
When enquired about the reasons TSTRANSCO informed that presence sudden appearance of current in the corresponding Peripheral Unit (PU-2) of the Chandrayanagutta line-2 had led to BBP operation And the reasons for the same were being investigated
To this it was suggested to check corresponding CT neutral connection integrity of cable wiring from CT to Busbar panel as also carry out stability-check of busbar protection
Recommendations TSTRANSCO to investigate the reasons for BBP operation for 220 kV Bus-2 and furnish a report on
the remedial measures taken
9 Tripping of 400220 kV ICT-1 at BTPS
13-05-2017 at 1941 hrs
ICT-1 got tripped on operation of LV side earth fault protection during R-phase to earth fault in 220 kV BTPS-Lingapur line
GI-1
SLD
The single line diagram of 400220 kV BTPS as furnished by KPCL is attached at the end
As per FIRTR ICT-1 tripped at 1942 hrs on LV side earth fault protection due to fault in 220 kV BTPS ndash Lingapur line It was stated that the line also tripped around the same time on R-E fault due to DPR Z1 (2438 km) operation
DR amp EL pertaining to ICT-1 tripping not furnished
As per furnished DREL 220 kV BTPS ndash Lingapur line tripped from BTPS end at 194124719 hrs due to DT receipt from the remote end
KPCL
ICT-1 tripped due to non-directional sensitive earth fault protection provided on LV (220 kV) side
Remedial action The time lever for above protection was increased from 0025 to 01 in the third week of May
2017 in consultation with KPTCL KPTCL
220kV BTPS- Lingapur line tripped at both the ends with following indications At BTPS Lingapur Line tripped on DPRZone-1RN24km78kA
At Lingapur BTPS line tripped on DPRZone-2RN66km29kA
It was reported that 315MVA ICT-1 tripped on LV side earth fault protection along with Lingapur line
Remedial action Existing settings of ICT back up protection is obtained from local RT wing of KPTCL for review
Revised settings communicated to KPCL for implementation
16- 03-2017 at 0118 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1232
SRPC SRLDC
Since the ICT has been provided with normal back-up directional OC amp EF protections a separate non-directional sensitive earth fault protection is not desirable hence the need for the same may be reviewed Otherwise its time lever shall be suitably increased to a higher value (say 035) so as not to cause unwarranted trippings
Further tripping of 220 kV BTPS ndash Lingapura line from BTPS end on DT receipt was not in order
When enquired about the reasons for AR non-operation in the instant case for the above line KPCL replied that there were issues with PLCC carrier communication hence it was kept out of service
Recommendations KPCL to review the need for providing separate non-directional sensitive earth fault protection for
ICTrsquos at their BTPS station and take steps to disable the same For 220 kV BTPS ndashLingapura line KPCL to resolve issues relating to PLCC carrier communication and
put AR into service
10 Tripping of 765 kV Kurnool-Tiruvalam line-2
19-05-2017 at 2003 hrs
Failure of R-phase LA at Tiruvalam end REF operation and DT send were observed from EL of Kurnool station
GI-2
Kurnool (PGCIL-SR1) end
As per FIRTR the line tripped in 3-ph at 200318272 on R-B-E fault due to DPR Z2 (CDistance = 912) operation
As per DR line tripped in 3-ph at 200318272 hrs on R-E fault (B-E fault did not appear to be strong) due to DPR Z2 (CAT) operation and 3-ph Group - A amp B Trip relay operation (In DR DT receipt event was observed around the same time)
In EL REF protection operation of PU-P141 operation and DT_SEND to the remote end was observed at 200318340 hrs
Tiruvalam (PGCIL-SR2) end
As per FIRDRELTR the line tripped in 3 ph at 200318269 on R-E fault due to DPR Z1 operation and DT receipt from the remote end
It was stated in TR that 707 RLA (Reactor LA) had fallen down due to heavy wind and caused R-E fault
When enquired about the reasons for REF protection operation and consequent sending of DT to the other end PGCIL (SR-I) informed that the fault was detected as R-B-E fault hence three-phase trip was given However even though Main-CB got opened with its three poles opening simultaneously Tie-CB got opened in R-ph immediately while the other two phase poles took a while to open This had caused Tie-CB LB operation Since this protection was implemented in REF relay trip was extended from the same along with sending of DT to the other end
To this it was pointed out that in the instant case only R-E fault was apparent and the current in B-ph was almost at the normal value hence the sensitivity of distance relay zone elements may be checked Further Tie-CB LBB operation points to sluggishness of the CB-poles hence the opening time of tie-CB may be checked and properly set
It was also noted that in the EL of Tiruvalam DT Send event was observed after tripping of the line on R-E fault PGCIL (SR-II) was asked to look into the reasons for the same and take suitable remedial action
16-03-2017 at 1023 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1332
11 Tripping of 400220 kV ICT-2 at Kalpaka SS
20-05-2017 at 1502 hrs
ICT-2 tripped due to operation of Transformer Buchholtz relay
GI-2
As per FIR ICT-2 tripped at 15053283 hrs due to its Buccholtz relay operation It was stated in FIR that heavy rain amp gale had been reported at the time of tripping
APTRANSCO
Just prior to above tripping event station transformer supply went off When the supply came back the two oil cooling pumps which were supposed to start one after another with a time gap of 15 sec had started simultaneously due to problem in the timer module Due to this there was a sudden flow of oil which shorted the contacts of the micro-switch that gives buchholtz trip
Remedial action The faulty timer module of oil cooling pump had been replaced
On this SRPC asked for the details of AC auxiliary supply about its redundancy details of DG-set and the mode of starting (manual or auto) To this APTRANSCO informed that redundancy for AC auxiliary supply is present and the lost supply during the instant case had been restored immediately
Recommendations
APTRANSCO to furnish AC auxiliary supply details including its redundancy DG set details and its mode of starting at their 400 220 kV Kalpaka SS Further corresponding AC auxiliary supply changeover scheme drawing shall also be furnished
16-03-2017 at 1132 hrs
12 Tripping of 400220 kV ICT-2 at KV Kota SS
23-05-2017 at 1021 hrs
ICT-2 got tripped due to mal-operation of transformer oil temperature indicator
GI-2
As per FIR ICT-2 tripped at 1021 hrs on both HV and LV sides due to transformer oil temperature indicator mal-operation
As per EL ICT-2 tripped at 1019XXXXX192 hrs on due to operation of OTI protection
It was stated that DR had not been triggered for the event
Time-sync of protection relays with GPS needed to be ensured
EL was not configured to show SECONDS in time-stamp of the events (This had been brought to APTRANSCOrsquos attention in previous PCSC meetings also)
APTRANSCO
At KV Kota SS OTI got stuck While checking the same its position indicator got changed and mal-operated resulting in 3-ph trip
Remedial action Ms CGL had visited the substation and declared the relay faulty It was proposed to replace the faulty OTI on 10072017
APTRANSCO was asked to configure Event Loggers at their KV Kota SS properly so that SECONDS are also displayed in the time stamp of the events recorded
16-03-2017 at 1245 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1432
13
Tripping of 220 kV Kaniampeta - Kadakola line (Load Loss at Kaniampeta = 36 MW)
23-05-2017 at 1350 hrs
EFR relay operated and B-ph pole discrepancy relay operated leading to tripping of Bus-Coupler CB
GI-1
Kaniampeta (KSEB) end
As per FIR in Kaniyampetta 220 kV substation all transformers tripped (Load loss 36 MW) at 1339 hrs due to the tripping of 220 kV Kaniyampetta-Kadakola feeder (B phase) at Kadakola end Later 220 kV Kaniyampetta-Kadakola feeder was hand tripped at 1426 hrs from Kaniyampetta end
Kadakola (KPTCL) end
As per FIR line tripped at 1350 hrs due to EFR operation of Bus-Coupler CB and PDR operation
It was also stated that at the time of tripping Kaniampeta panel had been taken up for RampU work hence distance relay was not in service Kaniampeta CB was bypassed by keeping protection through 220 kV Bus-Coupler CB
DR amp EL not furnished KPTCL
At Kadakola during the instance protection to Kaniambetta line was provided through 220kV bus coupler breaker bay as Kadakola relay panel was taken out for M-2 retrofitting work under RampU
Bus coupler breaker tripping was suspected due to problem in the pole discrepancy relay and there was no fault in the line
Remedial action Problem with the PD relay of Bus coupler breaker was rectified on 24052017
16-03-2017 at 2026 hrs
14 Tripping of 400 220 kV ICT-1 at Somanahalli substation
24-05-2017 at 1724 hrs
ICT-1 at Somanahalli substation got tripped due to DC Earth fault
GI-2
Somanahalli (PGCIL-SR2) end
As per FIRTR ICT-1 tripped (on HV side) at 172809 hrs on momentary DC Earth fault
As per DREL ICT-1 tripped (on HV side) at 172809812 hrs due to operation of Group AB trip relays In DR manual trigger signal becoming HIGH was observed at above instant
In EL time resolution for recording events was limited to seconds (events were not shown at msec level)
PGCIL (SR-II)
At Somanahally SS 3x167 MVA single phase units had been replaced by 1x500 MVA ICT Subsequently CSD works were taken up At the time of tripping event CSD wiring works were going on During the process positive DC supply got extended to 86A trip relay inadvertently
Remedial action DC earth fault had been removed
PGCIL (SR-II) was asked to configure Event Loggers at their Somanahalli SS properly so that time resolution for recording events was set u pto msec
16-03-2017 at 118 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1532
15 Tripping of HVDC Gazuwaka Pole-1amp2
25-05-2017 at 0945 hrs
HVDC pole-1 got tripped due to operation of South filter inter zone protection and HVDC pole-2 got tripped due to operation of differential protection
GI-2
SLD
Pole-1
27-03-2017 at 1016 hrs
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1632
Pole-2
Tripping of HVDC Pole-1 (PGCIL-SR1)
As per FIRELTR Pole-1 tripped at 094513960 hrs due to operation of South Filter inter-zone protection [
It was stated that DR was not available Tripping of HVDC Pole-2 (PGCIL-SR1)
As per FIRDRELTR Pole-2 tripped at 094512906 hrs due to operation of WIN Differential protection
It was noted that no representative from Gajuwaka (HVDC amp HVAC) SS had come to attend the meeting to explain as to what caused the pole trippings
PGCIL (SR-I) representative informed that at the time of tripping RTV Coating works for switchyard equipment were going on In the process when CWC35 filterrsquos bus-side isolator was opened it feel down unexpectedly and resulted in inter-zone filter protection operation
Wrt HVDC Pole-2 tripping PGCIL (SR-I) representative informed that oscillations in voltage and current were noticed prior to tripping of HVDC Pole-2 And differential current was also observed for the extended AC bus Due to this WIN differential protection had operated resulting in tripping of HVDC Pole-2 It was also informed that the issue was referred to its OEM ABB (Sweden) for suitable advice
However since no detailed tripping report explaining the causes that led to tripping of HVDC poles and the remedial action taken had been furnished PGCIL (SR-I) was asked to submit the same
Recommendations PGCIL (SR-I) to furnish detailed report on the events that led to tripping of HVDC Poles ndash 1 amp 2
including remedial measures taken to PCSC forum Further the OEM report wrt tripping of HVDC Pole-2 shall also be furnished
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1732
16 Tripping of 400 kV Kayathar-Karaikudi line
25-05-2017 at 1552 hrs
R-phase to earth fault had occurred in line There was Zone-2 3 phase trip operation at Kayathar end and Zone-1 3 phase trip at Karaikudi end
GI-2
Kayathar (TANTRANSCO) end
As per FIRDRELTR line tripped in 3-ph at 155236989 hrs on R-E fault due to DPR Z2 operation (Z2 time delay observed was about 390 msec)
It was stated in TR that carrier channel was not healthy at the time of tripping and carrier signal was not received at this end during the fault
Remedial action Protection Coupler and OLTE were reset at both Karaikudi amp Kayathar ends and carrier channel
was made available Karaikudi (PGCIL-SR2) end
As per FIRDRELTR line tripped in 3-ph at 155236592 hrs on R-E fault due to DPR Z1 (186 km) operation
It was stated in TR that DPC had failed at the other end and resulted in Carrier Fail alarm at Karaikudi end issuing 3-ph trip
Recommendations
For the line under consideration the following shall be carried out by TANTRANSCO in coordination with PGCIL (SR-II) End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
17
Tripping of 400220 kV ICT - 1 amp 3 at Hoody substation of KPTCL (Load Loss 750 MW)
26-05-2017 at 1230 hrs
R phase limb of ICT-1 bank pre-close supervision contact of trip coil -2 had arc over ICT-3 got tripped on over-loading
GI-2
Tripping of ICT-1
As per FIR ICT-1 tripped at 1230 hrs due to arcing over of R phase limb of ICT-1 bankrsquos pre-close supervision contact of trip coil -2
As per DR the tripping took place at 114128806 hrs (Type of protection operated not recorded)
EL not furnished
Time sync of PRrsquos with GPS needed to be ensured
Remedial action The same was rectified and the circuit was changed by utilizing the spare auxiliary contact of CB
for R-ph limb by availing LC on 29052017 and charged the ICT-1 bank at 0432 hrs by getting the SRLDC code 1360
Tripping of ICT-3
As per FIR ICT-3 tripped at 1230 hrs due to operation of INV OC FWD protection amp 86A master trip relay
From the DR furnished (with trigger time = 114254202 hrs) tripping of ICT-3 and the type of protection operated were not clear
EL not furnished
Time sync of protection relays with GPS needed to be ensured at Hoody
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1832
KPTCL
At Hoody 500 MVA ICT-1 tripped without any relay indication ICT-1 and 3 were in parallel each ICT carrying about 390MW of load Due to tripping of ICT-1 ICT-3 got over loaded and hence tripped on over current protection
Remedial action After detailed inspection it was observed that pre-close supervision contact of trip coil -2 arced
over in R phase limb of the 400kV side breaker Hence it was suspected that R-pole might have opened initially and remaining poles on PD operation
The problem was rectified and attended on 29052017 by availing shut down In order to avoid tripping of another ICT operating in parallel whenever one ICT trips on fault an
SPS is being finalized by KPTCL which is to be implemented at Hoody Any time each ICT at Hoody will be catering around 400MW of load Such huge load shedding by tripping 66kV loads of Hoody station is difficult to achieve Hence 220kV radial feeders may also have to be tripped to get desired load shedding
It was noted that frequent tripping of 400 2220 kV ICTrsquos at Hoody SS had been observed in the past few months And during their discussion in various PCSC meetings the following issues have come to the for urgent action by KPTCL Implementation of Special Protection Scheme (SPS) to take care of over-loading of the other ICT
when one out of two ICTrsquos operating in parallel trips Provision of Bus-bar protection to 220 kV buses Compliance of Third Party Protection Audit Recommendations Ensuring supply reliability to Metro-services Action plan on the proposed system strengthening measures in Bengaluru area in the context
of continued use of Split-Bus operation
Thus to ascertain the action taken by KPTCL wrt above issues a Protection System Analysis Group (PSAG-18) meeting was proposed to be conducted on 03082017
Recommendations KPTCL to furnish compliance report on the recommendations given in PSAG-18 meeting to PCSC
forum
18 Tripping of 400 kV Simhadri - Kalpaka line-2
28-05-2017 at 503 hrs
Line tripped on mal-operation of Tee Differential Protection at Simhadri end and Direct Trip was received at Kalpaka
GI-2
Kalpaka (APTRANSCO) end
As per FIR line tripped at 0503 hrs due to DT receipt from the remote end
DR amp RL amp TR not furnished Simhadri STPS (NTPC) end
As per FIRTR line tripped at 050350408 hrs due to operation T-differential protection which in turn was attributed to spurious pick-up during the fault at Vemagiri end
The following was stated in TR Kalpaka Line-1amp2 Tie bays were under PTW And R-Ph CT (16CTA R-Ph) was under erection Primary connection was over secondary
connection was pending The CT secondary wires used in T-Diff protection of Kalpaka Line-2 might be touching the earth and during fault at Vemagiri some stray voltage developed across CT secondary cores might have resulted into operation of T-Diff protection Trip values are 100mA in secondary
During the operation of T-diff protection there was no change in current magnitudes of Kalpaka Line-2 and hence the tripping could be considered as spurious one
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 1932
As per DR line tripped at 050350442 hrs But the type protection operated was not recorded in it
EL not furnished (In place of EL DRrsquos eventsrsquo summary was furnished)
19 Tripping of 400 kV Ramagundam - Gajwel line
29-05-2017 at 0007 hrs
Over Voltage Stage-1 had operated at Gajwel end Ramagundam end did not trip as Direct Trip was not received from Gajwel end
GI-2
Ramagundam STPS (NTPC) end
As per FIR line was kept holding from Ramagundam end Gajwel (TSTRANSCO) end
As per FIR line tripped at 0007 hrs due to OVR-I operation
DR amp EL amp TR not furnished
The tripping was not in order as per the SRPC given OVR gradings as shown below
When enquired about the reasons for OVR-I operation TSTRANSCO informed that OVR functionality implemented in REL 521 had mal-operated
Remedial action The OVR functionality had been moved to an external Over Voltage relay
Recommendations
For the line under consideration the following shall be carried out by TSTRANSCO in coordination with NTPC-Ramagundam End-to-end communication for DT permissive amp other signals may be ensured by testing at
both the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
20 Tripping of 400 kV Gajwel-Ghanapur line
29-05-2017 at 0007 hrs
Line tripped on operation of over voltage protection at Gajwel and direct trip was received at Ghanapur DR and EL of Gajwel end were not furnished
GI-2
Ghanapur (PGCIL-SR1) end
As per FIRELTR line tripped at 000731885 hrs due to DT receipt from the remote end
As per DR line tripped at 000257163 hrs due to DT receipt from the remote end
Time-sync of DR amp EL with GPS needed to be ensured Gajwel (TSTRANSCO) end
As per FIR line tripped at 0007 hrs due to OVR-I operation
DR amp EL amp TR not furnished
The tripping was not in order as per the SRPC given OVR gradings as shown below
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2032
When enquired about the reasons for OVR-I operation TSTRANSCO informed that there was a loose
wiring in Y-ph CVT wiring which resulted in mal-operation of OVR-I protection
Remedial action All CVT wirings had been tightened for fool-proof operation
III Details of Trippings due to Failure or Non-operation of Auto-Reclose
Sl No Element Date amp Time Reason
Category
1 Tripping of 400 kV Hiryur-
BTPS line-1 06-05-2017 at 1401 hrs
Y-phase to earth fault had occurred in line Direct trip was sent from BTPS to Hiryur end
GI-2
Hiryur (PGCIL-SR1) end
As per FIRDRELTR line tripped (in Y-ph) at 140009730 hrs on Y-E fault due to DPR Z1 (AR 82 km 1034 kA) operation Just prior to auto-reclosing DT was received at 140010730 hrs and line tripped in 3-ph
BTPS (KPCL) end
As per FIRTR line tripped (in Y-ph) at 1400 hrs on Y-E fault due to DPR Z1 (AR 1173 km) operation AR was stated to be attempted but unsuccessful due to persistent fault
As per DREL line tripped (in Y-ph) at 125520000 hrs on Y-E fault due to DPR Z2 (CAT AR) operation and tried to auto-reclose after about 1 sec but tripped in 3-ph due to persistent (Z1) fault
Time-sync of Protection Relayrsquos with GPS needed to be ensured at BTPS
When enquired about the reasons for sending of DT to Hiriyur end KPCL informed that when the line tripped on Y-E fault and the AR operation was in progress Under-Voltage relay at BTPS end had sensed under-voltage and sent DT to Hiriyur end
It was noted that instantaneous tripping of UV relay and consequent of sending of DT to the other end are undesirable It was therefore suggested to introduce suitable delay (say 3 sec) for UVR tripping and disable sending of DT to the other end
Recommendations
KPCL to introduce suitable delay (say 3 sec) for UVR tripping and disable sending of DT to the other end on UVR operation at their BTPS station
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2132
2 Tripping of 400 kV Munirabad-Guttur line
06-05-2017 at 1702 hrs
R-phase to earth fault Auto-reclose was successful at Guttur and Breakers at Munirabad end got tripped
GI-2
Munirabad (PGCIL-SR1) end
As per FIRDRELTR line tripped (in 3-ph) at 170231624 hrs on Y-E fault due to DPR Z2 (AR CAT 1145 km) operation
Guttur (KPTCL) end
As per FIR line tripped (in R-ph) at 1702 hrs on Y-E fault due to DPR Z1 (AR 4708 km Ir=6877 kA) operation and successfully auto-reclosed
As per DREL line tripped (in R-ph) at 165933499 hrs on Y-E fault due to DPR Z1 (AR) and successfully auto-reclosed after about 1 sec
Time-sync of Protection Relays with GPS needed to be ensured at Guttur SS
When enquired about the reasons for AR non-operation at Munirabad end PGCIL (SR-I) informed that the external VARM relay through which AR had been implemented had not operated Since the relay belonged to KPTCL suitable action needed to be taken by them
On this KPTCL was asked to look into the issue and replace the relay if required PGCIL (SR-I) was also requested to coordinate with KPTCL in attending to this matter
3
Tripping of 765kV Kurnool-NPS line -2
07-05-2017 at 1405 hrs
Y phase to earth fault had occurred in line Auto-reclose was successful at Kurnool end and AR was not attempted at NPS end
GI-2
Kurnool-PG (PGIL-SR1) end
As per FIRELTR line tripped (in Y-ph) at 140543316 hrs on Y-E fault due to DPR Z1 (AR 328 km 166 kA) operation and successfully auto-reclosed after about 11 sec After about further 6 sec (ie at 140550470) line tripped in 3-ph due to receipt of DT from the remote end
It was stated in FIR that 765 kV Kurnool ndash NPS line-1 was under LVRD
As per DR line tripped (in 3-ph) at 140550470 hrs due to DT receipt from remote end
DR corresponding to successful AR operation not furnished NPS (PGIL-SR1) end
FIR amp TR furnished were that of Kurnool station
As per DREL line tripped (in 3-ph) at 140543351 hrs on Y-E fault due to AR (Z2 CAT) operation It was noted from EL that AR LOCKOUT had operated around the same time due to which line had not tried for AR
From EL it was further observed that DT was sent to the remote end at 020550419 hrs However the cause of DT send was not recorded in EL
DR pertaining to DT send was not furnished
If DT send was because of OVR-I protection operation then also tripping was not in order as it does not match with the settings provided
PGCIL (SR-I)
Non-operation of AR from NPS was due to wiring mistake made during installation of Controlled Switching Devices (CSD) for the line reactor on this line
Remedial action The wiring issues in CSD installation were rectified on 18052017
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2232
4
Tripping of 400 kV Krishnapatnam-Chittoor line-1
07-05-2017 at 1441 hrs
R-phase to earth fault Main CB Auto-reclose was successful at Chittoor end and Tie CB got tripped Breakers tripped at Krishnapatnam end and did not attempt auto-reclose
GI-2
FNN not followed by APTRANSCO and APGENCO SDSTPS (APGENCO) end
As per FIRDREL line tripped (in 3-ph) at 144113756 hrs on R-E fault due to DPR Z1 (628 km) operation It was observed from EL that the line was given 3-ph trip straight way without initiating AR
Chittoor (APTRANSCO) end
As per FIRDRELTR line tripped (in R-ph) at 144113759 hrs on R-E fault due to DPR Z1 (1147 km) operation and successfully auto-reclosed after about 1sec However it was observed that only Main-CB got auto-reclosed successfully whereas Tie-CB got tripped in 3-ph while attempting AR
Remedial action When enquired about the reasons for AR failure at SDSTPS end APGENCO representative
informed that as informed in last PCSC meeting AR configuration logic is scheduled to be reviewed by ABB in July 2017 when all issues pertaining to AR operation would be sorted out
When asked about the reasons for AR failure for Tie-CB at Chittoor end APTRANSCO informed that Tie-CB AR dead-time and PDR operational time were inadvertently kept equal As remedial action PDR operational time was increased to 25 sec
5 Tripping of 765 kV Raichur-Solapur line-2
07-05-2017 at 1918 hrs
Y-phase to earth fault Auto-reclose was successful at Solapur and breakers at Raichur end got tripped
GI-2
Solapur (PGCIL-WR1) end
As per FIRTR line tripped (in Y-ph) at 1918 hrs on Y-E fault due to DPR Z1 (AR 66 km 572 kA) operation and successfully auto-reclosed
DR amp EL not furnished Raichur (PGCIL (SR-I) end
As per FIRDRELTR line tripped (in 3-ph) at 191836810 hrs on Y-E fault due to DPR Z1 (145 km) operation It was observed from DR that AR lock-out had operated that resulted in tripping of Main-CB and Tie-CB But while Main-CB got tripped immediately Tie-CB got tripped in Y-ph only And the other two phase poles got tripped due to PDR operation after about 21 sec at 191838910 hrs
EL time-stamp resolution was limited to SECONDS instead of millisec
Tie-CB OPEN digital signals were observed to have employed NEGATIVE LOGIC PGCIL (SR-I)
The observed discrepancies at Raichur end were due to the hardware error caused by hanging of Main-CBrsquos BCU
Remedial action The problem with Main-CBrsquos BCU had been resolved by restarting it
Recommendations
PGCIL (SR-I) to configure Event Loggerrsquos time-resolution up to millisec level in all protection relays at their 765 400 kV Raichur SS
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2332
6
Tripping of 400 kV Neyveli TS2-Pugalur line
07-05-2017 at 1955 hrs
Y-phase to earth fault Neyveli TS2 end relay issued a 3-phase trip 220ms after issue of Y phase trip Direct Trip was sent to Pugalur end preventing auto-reclose
GI-2
NLC TS2 (NLCIL) end
As per FIRDRELTR line tripped in 3-ph at 195526677 hrs due to DT receipt from the other end
It was stated in TR that even though respective zones had picked up on fault DT receipt at the same time resulted in tripping of the line in 3-ph
In DR 3-ph trip was found to be issued 220 msec after Y-ph trip was issued It was also noted that DT receipt signal remained high for a duration of about 220 msec
Time sync of Protection Relays with GPS needed to be ensured at NLC-TS2
Pugalur (PGCIL-SR2) end
As per FIRDRELTR line tripped (in Y-ph) at 195534241 hrs on Y-E fault due to DPR Z1 (AR) operation However line tripped in 3-ph during AR dead-time at 195534353 hrs due to DT receipt from Neyveli end
In view of DT receipt at both ends it was suggested to carry out PLCC end-to-end testing to ensure healthiness of carrier communication
Recommendations
For the line under consideration the following shall be carried out by NLCIL in coordination with PGCIL (SR-II) End-to-end communication for DT permissive amp other signals may be ensured by testing at both
the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
7 Tripping of 400 kV NCTPS -SVChatram line-2
09-05-2017 at 1843 hrs
R-phase to earth fault Auto-reclose is not in service since Fibre optic cable link is not healthy
GI-2
NCTPS (TANGEDCO) end
As per FIRDRELTR the line tripped in 3-ph at 184223424 hrs on R-E fault due to DPR Z1 (9159 km 29 kA) operation (Given the length of this line as 95 km it may be verified whether Z1 setting is correct)
It was stated in FIR that AR was kept out of service due to defective FO communication link
Remedial action Line patrol done by lines wing and declared No Visible fault FO link cut was rectified on 13052017 and AR scheme restored
S V Chatram (TANTRANSCO) end
As per FIRDRELTR the line tripped in 3-ph at 184357616 hrs on R-E fault due to operation of DPR Z1 (32 km) operation
Time sync of protection relays with GPS needed to be ensured at both NCTPS and SV Chatram stations
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2432
8 Tripping of 400 kV Madurai-Kudankulam line
10-05-2017 at 1940hrs
B-E Fault Auto-reclose successful at Madurai and breakers tripped at Kudankulam
GI-2
Madurai (PGCIL-SR2) end
As per FIRDRELTR line tripped (in B-ph) at 194040402 hrs on B-E fault due to DPR Z1 (AR 137 km 114 kA) operation and successfully auto-reclosed after about 11 sec
Kudankulam NPP (NPCIL) end
As per FIRTR line tripped (in 3-ph) at 192936910 hrs on B-E fault due to DPR Z2 (CAT 2071 km) operation
It was informed that AR had not been kept in service as per SRPC decision Hence the tripping was in order
9 Tripping of 220 kV Idukki-Udumalpet line
14-05-2017 at 1345 hrs
Y-phase to earth fault had occurred in line Auto-reclose was successful at Idukki and breakers at Udumalpet end tripped on pole discrepancy
GI-2
Idukki (KSEB) end
As per DRTR line tripped (in Y-ph) at 134620509 hrs on Y-E fault due to DPR Z2 (CAT 83125 km) and successfully auto-reclosed after about 08 sec
EL not submitted (In its place DRrsquos events summary was furnished)
Udumalpet (TANTRANSCO) end
As per FIRTR line tripped in Y-ph at 1345 hrs on Y-N fault on DPR Z1 (2834 km) operation Subsequently tripped in 3-ph on PDR operation
As per DR line tripped in Y-ph at 134151100 hrs on Y-E fault due to DPR (AR) operation But as DRrsquos time scale was limited to 1 sec post triggering AR complete operation could not be verified
From EL line all poles dead was observed at 134152102 hrs Cause of line tripping as stated in FIRTR was not observed in EL
The following was stated in TR The fault resistance measured in the M1 relay (MicomP442) was high resulting in Z3 pickup It was
evident from the fault record that M2 relay (7SA522) had cleared the fault in Z1 by opening Y-ph pole However since AR was implemented in only M1 relay and M2 (Z1) operation had not initiated AR in M1 it resulted in opening of the other two phase poles on PDR operation
The cause of non-initiation of AR of M1 relay on external initiation was found to be logic configuration mistake in the Main 1 relay
Remedial action The AR logic configuration in the PSL of Main 1 relay had been corrected However a special relay
test would be conducted to verify AR operation during the next opportunity shutdown
Time sync of protection relays with GPS needed to be ensured at Idukki and Udumalpet
10 Tripping of 400 kV Vemagiri - Gazuwaka line
14-05-2017 at 1654 hrs
Y-phase to earth fault Auto-reclose was not successful due to persistent fault Vemagiri end had sent a Direct Trip after un-successful Auto-reclose AR attempt was observed in Gazuwaka end DR after 3 phase trip
GI-2
Vemagiri (PGCIL-SR1) end
As per FIRDRELTR line tripped in (Y-ph) at 165411968 hrs on Y-E fault due to operation of DPR Z1 (AR 1512 km) operation It tried to auto-reclose after about 11 sec but tripped in 3-ph due to persistent fault
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2532
It was noted that AR was attempted by Tie-CB only the Main-CB tripped in 3-ph at the beginning of AR initiation
Also Tie-CB AR dead-time was observed to be one second
Reasons 3-ph trip of Main-CB needed to be furnished Gazuwaka (PGCIL-SR1) end
As per FIRDRTR line tripped in Y-ph at 165330242 hrs on Y-E fault due to operation of DPR Z1 (AR 1677 km) operation But during AR dead-time it tripped in 3-ph after about 115 sec due to DT receipt from the remote end This resulted in 3-ph opening of both Main-CB and Tie-CB However after 125 sec Main-CB Y-ph limb tried for auto-reclosure and tripped due to persistent fault
As per EL line tripped in (Y-ph) at 165351597 hrs on Y-E fault due to operation of DPR Z1 (AR) operation But during AR dead-time it tripped in 3-ph at 165352620 hrs due to DT receipt from the remote end This resulted in 3-ph opening of both Main-CB and Tie-CB However at 165352687 hrs Main-CB Y-ph limb tried for auto-reclosure and tripped due to persistent fault
Reasons for AR attempt by Main-CB event after opening in 3-ph due to DT receipt needed to be explained
Time sync of DRrsquos amp ELrsquos with GPS needed to be ensured at Gajuwaka SS Recommendations
PGCIL (SR-I) to sort out issues relating to AR functionality operation for both Main-CB and Tie-CB at both Vemagiri and Gajuwaka substations
For the line under consideration the following shall be carried out by PGCIL (SR-I) End-to-end communication for DT permissive amp other signals may be ensured by testing at both
the ends Healthiness of PLCC system components (hardware and software) at both ends shall be checked
and faulty components shall be repaired replaced
11 Tripping of 400 kV VTPS-Sattenapalli line-2
21-05-2017 at 1706 hrs
B-phase to earth fault Auto-reclose successful at Sattenapalli and breakers got tripped at VTPS end
GI-2
Sattenapalli (APTRANSCO) end
As per FIRDRELTR line tripped (in Y-ph) at 170653038 hrs on B-E fault due to DPR Z1 operation and successfully auto-reclosed after about 1 sec
VTPS (APGENCO) end
As per FIRDRELTR line tripped in 3-ph at 170653133 hrs on B-E fault due to DEFR (33 kA) operation (DPR Z2 had picked up and Carrier was also received from the other end)
APGENCO
Before the LILOing of 400 kV VTPS-Srisailam DC line at Sattenapalli DEF protection had been provided from a separate REX521 relay Subsequently even though all protections at VTPS had been revised the above DEF protection implemented from the REX521 relay had been somehow left out and it only had extended 3-ph trip during the current instant
Remedial action The DEF functionality from the said REX521 had been disabled
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2632
12 Tripping of 400 kV Srisailam-Dindi line-2
24-05-2017 at 1502 hrs
R-phase to earth fault Auto-reclose was successful at Dindi and Zone - 1 3-phase trip at Srisailam
GI-2
Srisailam (TSGENCO) end
As per FIRDREL line tripped in 3-ph at 150253522 hrs on R-E fault due to DPR Z1 operation
TR contained no information Dindi (TSTRANSCO) end
As per FIRDRELTR line tripped (in R-ph) at 150253487 hrs on R-E fault due to DPR Z1 operation and successfully auto-reclosed after about 1 sec
Recommendations Since all 400 kV lines emanating from Srisailam LB are composite feeders APTRANSCO TSTRANSCO
can keep AR functionality disabled at respective remote end stations under their control
IV Details of Trippings due to PLCC mal-operation
Sl No Element Date amp Time Reason
Category
1 Tripping of 400 kV Kalpakka-Gazuwaka line-1amp2
18-05-2017 at 1108 hrs
Line tripped at Kalpakka end only on Direct Trip receive and was holding from Gazuwaka
GI-2
Tripping of 400 kV Kalpaka ndash Gajuwaka line-1
Gazuwaka (PGCIL-SR-2) end
As per FIR line was kept holding from Gazuwaka end Kalpakka (APTRANSCO) end
As per FIREL line tripped at 110625955 hrs to DT receipt from Gazuwaka end
Tripping of 400 kV Kalpaka ndash Gajuwaka line-2
Gazuwaka (PGCIL-SR2) end
As per FIR line was kept holding from Gazuwaka end Kalpakka (APTRANSCO) end
As per FIREL line tripped at 110625955 hrs to DT receipt from Gazuwaka end
Remedial action taken by APTRANSCO subsequent PCSC-65 meeting as informed vide their internal communication dated 20072017
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2732
2 Tripping of 400 kV Tumkur-Bidadi line-1 amp 2
30-05-2017 at 1139 hrs
Line tripped due to suspected PLCC mal-operation at Tumkur end and direct trip was received at Bidadi
GI-2
Tripping of 400 kV Tumkur ndash Bidadi line-1 Tumkur (PGCIL-SR2)) end
As per FIRDRELTR line tripped in 3-ph at 113515534 along with DT SEND to the remote end
PLCC mal-operation was suspected to have caused above tripping Bidadi(PGCIL-SR2) end
As per FIRTR line tripped in 3-ph at 113515 hrs due to DT receipt from Tumkur end Tripping of 400 kV Tumkur ndash Bidadi line-2 Tumkur (PGCIL-SR2)) end
As per FIRDRELTR line tripped in 3-ph at 113515534 along with DT SEND to the remote end
PLCC mal-operation was suspected to have caused above tripping Bidadi(PGCIL-SR2) end
As per FIRTR line tripped in 3-ph at 113515 hrs due to DT receipt from Tumkur end PGCIL (SR-II)
Remedial action The above trippings were due to PLCC mal-operation which in turn was due to shifting of its
coaxial cable The related circuitry was subsequently rectified
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2832
Single Line Diagram of 230 kV Villianur SS of PED [Ref I1]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 2932
Single Line Diagram of 400 kV Jammalamadugu SS of APTRANSCO [Ref I2]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3032
Single Line Diagram of 400 kV Judgi-PG GIS SS of PGCIL (SR-II) [Ref II4]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3132
Single Line Diagram of 400 kV Ghani SS of APTRANSCO [Ref II4]
Annexure-II
Grid Occurrences discussed in the 65th Meeting of PCSC held on 29th June 2017 3232
Single Line Diagram of 400 kV BTPS of KPCL [Ref II9]
Annexure-II
Meeting No
Index
Details of Event Date amp Time Reason PCSC Recommendations Utility responsible for
Implementation
Status of Recommendations
as on 25072017
Remarks
Pending Implementation of PCSC Recommendations (up to 65th Meeting)
Complete outage of 220kV Yerraguntla
substation and tripping of running Units
at Rayalaseema TPS
52I2 (GD) PendingMail received on 27-07-2016
1The drop out relays of reducer oil pumps time setting was increased for
all millsSo there will not be any trip under transient low voltage condition--
--Complied
2The recommendation regarding 2 sec time delay will be implemented
during unit shut down and will be intimated immediately after
implementation------Pending
APGENCO 1 APGENCO to check associated logic for lube oil pump for correct
operation under transient low voltage conditions at Rayalaseema TPS
Unit-1
2 APGENCO to keep appropriate time delay fault ride through
delay (typically 2 sec) in VFD speed sensor relay at all its generating
Units including Rayalaseema TPS Units
HV B-Ph Current transformer of 100MVA Power
Transformer -1 failed resulting into a bus fault on
220KV Bus-1 Unit-1 and Unit-5 at RYTPS tripped
during the fault at Yerraguntla substation
21-02-2016 at
1039 hrs
Andhra Pradesh
APGENCO to furnish a report on the remedial action implemented
wrt overreaching of Krishnapatnam end distance relays during the
tripping of 400 kV Nellore (PG) - NPS line-1
APGENCO Yet to be informed Pending57II9 Tripping of 400 kV Nellore (PG) - NPS
line-1 400 kV Krishnapatnam-Nellore
(AP) lines -1amp2 and 400kV NPS -
MEPL line
18-07-2016 at
1905 hrs
Triggering incident was snapping of Y phase
conductor in 400kV Nellore (PG) - NPS line-1
Distance relay at Krishnapatnam end over-reached in
Zone-1 and resulted in tripping of 400kV
Krishnapatnam ndash Nellore (AP) lines - 1amp2 from
Krishnapatnam end Distance relay at MEPL over-
reached and resulted in tripping of MEPL-NPS line
from MEPL end
Yet to be informed Pending
APTRANSCO mail dated on 31-08-2016
To avoid the unwanted malopeartions due to the external LBB trip
initiation from PGCIL Vide letter Dt 04-08-2016 APTRANSCO has
requsted the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1 amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 15-11-2016
To avoid the unwanted maloperations due to the external LBB trip
initiation from PGCIL vide letter Dt 04-08-2016 ARTRANSCO has
requested the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 20-12-2016
Waiting for the PGCIL response
APTRANSCO mail dated 04032017 amp 24052017
SRPC is requested to coordinate with PGCIL in takind necessary action
Pending
Tripping of 400kV Krishnapatnam-
Nellore line-1
Line tripped on B-phase to earth fault and auto-
reclose was successful at Nellore(AP) end and un-
successful at Krishnapatnam end
APGENCO
56II13 Tripping at 220kV Gooty Substation of
APTRANSCO
24-06-2016 at
1604 hrs
LBB protection got operated for 400220kV ICT-2
breaker which had resulted in tripping of 220kV Bus-
2 at 220kV Gooty Substation
1 APGENCO SDSTPS to correct logic and ensure healthiness of ARscheme employed for transmission lines emanating from SDSTPSand furnish an action taken report to PCSC forum
2 APGENCO SDSTPS to configure DRrsquos of line protection relaysfor a post triggering period of 2 sec to capture complete ARoperation at their SDSTPS
Yet to be informed Pending63III1 28-02-2017 at
0516 hrs
1 APGENCO SDSTPS to correct logic and ensure healthiness of AR
scheme employed for transmission lines emanating from SDSTPS
and furnish an action taken report to PCSC forum
2 APGENCO SDSTPS to configure DRrsquos of line protection relays
for a post triggering period of 2 sec to capture complete AR
operation at their SDSTPS
Tripping of 400kV Krishnapatnam-Nellore line-2
R-phase to earth fault had occurred in line Auto reclose was successful at Nellore however protection at Krishnapatnam end issued a 3 phase
trip
APGENCO63III3 02-03-2017 at 455 hrs
1APTRANSCO to check the healthiness of the connecting cable
between Gooty (PGCIL) and Gooty (APTRANSCO) and replace it
if required
2APTRANSCO to ensure that the distributed architecture employed
in implementing busbar protection at their Gooty 220 kV SS does not
introduce any unwarranted delays in transmitting the triggering signals
to the Central Unit
APTRANSCO
Annexure-III
Page 1 of 31
63II2 Tripping of 400 kV KV Kota-Suryapet
line
01-03-2017 at
2005 hrs
Line tripped on operation of over-voltage protection
at KV Kota and Direct Trip was received at Suryapet
1 APTRANSCO to furnish (i) FIR amp TR for tripping events as
per SRLDC provided formats and (ii) DR amp EL within 24-hrs of
occurrence of tripping event in line with IEGC Regulation 52
(r)
2 APTRANSCO to adopt new OVR gradings for KV Kota
feeders and confirm the same
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
1 FIR furnished amp DR configured
Pending
63II16 Multiple Trippings at 220kV Vizag
Switching Station (VSS) of APTRANSCO
27-03-2017 at
1016 hrs
Bus-2 bus bar protection operated at 220kV VSS
end resulting in the tripping of all the elements
connected to bus-2
1 APTRANSCO to furnish a detailed report on the reasons for LBB
BBP operation at 220 kV VSS for a fault on 220 kV Gangavaram
feeder and remedial action taken to prevent recurrence of such
events
APTRANSCO Yet to be informed Pending
64II1 Tripping of 400220KV 315MVA ICT-
1and 230kV elements at 400kV Vemagiri
substation of APTRANSCO
09-04-2017
at 1231 hrs
Suspected mal-operation of Busbar protection had
caused tripping of 220kV Bus-1 at Vemagiri
APTRANSCO to furnish a report on the remedial action taken along
with single line diagram of 400220 kV Vemagiri SS indicating fault
location and CBs involved and protections operated
APTRANSCO Yet to be informed Pending
64II2 Tripping of 400220 kV ICTrsquos ndash 2 amp 3 at
400 kV Ghani substation of APTRANSCO
10-04-2017
at 1729 hrs
ICTrsquos ndash 2 amp 3 got tripped due to operation of 220 kV
Bus-2 busbar protection at 400220KV Ghani
substation
APTRANSCO to furnish single line diagram of 400 220 kV Ghani SS
clearly indicating (i) bus-configuration (ii) location of fault (iii)
breakers involved and type of protections operated
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
Single line diagram sent vide mail dated 27062017
Pending
64III1 Tripping of 400 kV Uravakonda-
Jammalamadugu line-1
02-04-2017 at
1758 hrs
R-phase to earth fault and line did not auto-reclose
Fault clearing time - 500ms
For the line under consideration APTRANSCO to check amp ensure
healthiness of carrier protection and make Auto-Reclosure
functional
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
Carrier aided protection scheme has been tested end to end and rectified
the problem
Pending
64III5 Tripping of 400kV Krishnapatnam-
Nellore line-2
11-04-2017 at
241 hrs
Line tripped on Y-phase earth fault Line auto-
reclosed at Krishnapatnam and did not auto-reclose
at Nellore-AP (Manubolu)
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a report
on the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64III6 Tripping of 400kV Krishnapatnam-
Nellore line-1
12-04-2017 at
251 hrs
Line tripped on Y-phase earth fault Line auto-
reclosed at Krishnapatnam and did not auto-reclose
at Nellore-AP (Manubolu)
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a report
on the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64III10 Tripping of 400kV Krishnapatnam ndash
Nellore_AP line-1
13-04-2017 at
438hrs
Y-phase to earth fault Line auto-reclosed from
Krishnapatnam end and did not auto-reclose fromNellore-AP end
For the line under consideration APTRANSCO to look into reasons
for AR failure at Nellore-AP (Manubolu) end and furnish a reporton the remedial action taken
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
The ABB make REL 670 type main-2 distance relay seen the fault as R-
Y phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
64IV4 Tripping of 400 kV VTPS-Malkaram line 20-04-2017 at
1624 hrs
Line tripped on Direct Trip Receive at Malkaram and
was in service from VTPS
For the line under consideration APTRANSCO to check the
healthiness of protection couplers and take suitable remedial action including replacement of the same
APTRANSCO Yet to be informed Pending
65II10 Tripping of 400220 kV ICT-2 at Kalpaka
SS
20-05-2017 at
1502 hrs
ICT-2 tripped due to operation of Transformer
Buchholtz relay
APTRANSCO to furnish details of AC auxiliary supply details
including its redundancy DG set details and its mode of
starting AC auxiliary supply changeover scheme drawing shall
also be furnished
APTRANSCO Yet to be informed Pending
1 APTRANSCO to check and correct all CT Neutral
Connection settings in various protection relays at their 400
220 kV Ghani PS
2 APTRANSCO to ensure that PLCC carrier aided protection
is maintained healthy on 220 kV lines emanating from their
400 220 kV Ghani PS
3 APTRANSCO to take steps to complete configuration works
of DR‟s amp EL‟s of various protection relays at their 400 220
kV Ghani SS and furnish the same as and when required in
compliance of IEGC Regulation 52 (r)
ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
07-05-2017Tripping of 400220 kV Ghani ICT-2amp3 65II4 APTRANSCO Yet to be informed Pending
APTRANSCO mail dated on 31-08-2016
To avoid the unwanted malopeartions due to the external LBB trip
initiation from PGCIL Vide letter Dt 04-08-2016 APTRANSCO has
requsted the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1 amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 15-11-2016
To avoid the unwanted maloperations due to the external LBB trip
initiation from PGCIL vide letter Dt 04-08-2016 ARTRANSCO has
requested the PGCIL to arrange the Master trip relay and breaker contacts
of ICT-1amp2 LV side to enable the internal LBB feature in the Busbar
protection scheme at 220kV Gooty Switching station Waiting for the
PGCIL response
APTRANSCO mail dated on 20-12-2016
Waiting for the PGCIL response
APTRANSCO mail dated 04032017 amp 24052017
SRPC is requested to coordinate with PGCIL in takind necessary action
Pending56II13 Tripping at 220kV Gooty Substation of
APTRANSCO
24-06-2016 at
1604 hrs
LBB protection got operated for 400220kV ICT-2
breaker which had resulted in tripping of 220kV Bus-
2 at 220kV Gooty Substation
63III2 02-03-2017 at
157 hrs
1 APTRANSCO to check and ensure correctness of AR operation
for the lines emanating from their Nellore-AP (Manubolu) SS
2 APTRANSCO to configure DR‟s of line protection relays for a
post triggering period of 2 sec to capture complete AR operation at
their Nellore-AP (Manubolu) SS
APTRANSCO Status vide APTRANSCO mail dated on 28-06-2017
1The ABB make REL 670 type main-2 distance relay seen the fault as Y-
B phase to phase fault Hence AR is not operated For the similar incident
on 07062017 the operation of AR is successful
Pending
1APTRANSCO to check the healthiness of the connecting cable
between Gooty (PGCIL) and Gooty (APTRANSCO) and replace it
if required
2APTRANSCO to ensure that the distributed architecture employed
in implementing busbar protection at their Gooty 220 kV SS does not
introduce any unwarranted delays in transmitting the triggering signals
to the Central Unit
APTRANSCO
Tripping of 400kV Krishnapatnam-
Nellore line-1
Line tripped on B-phase to earth fault and line auto-
reclosed from Krishnapatnam end but did not auto-
reclose from Nellore-AP end
Annexure-III
Page 2 of 31
64II16 Tripping of 400 kV VTPS-Satenapalli line-
2
30-Apr-17 at
428 hrs
Line tripped on B-phase to earth fault FIR DR and
EL of both ends were not furnished to validate the
tripping
APGENCO and APTRANSCO to furnish a detailed report on the
events leading to tripping of the line along with remedial measures
taken to PCSC forum
APGENCO
APTRANSCO
Yet to be informed Pending
65II8 Tripping of 400220 kV Hyderabad ICT-
4 and 220 kV lines at Hyderabad
substation
10-05-2017 at
239 hrs
Operation of busbar protection due to fault in 220 kV
Bus at 220kV Hyderabad Substation
TSTRANSCO to investigate the reasons for BBP operation for 220
kV Bus-2 and furnish a report on the remedial measures taken
TSTRANSCO Yet to be informed Pending
24-12-2016 at
1052 hrs
Line tripped on B-phase to earth fault First fault was
persistent for 380 ms Auto-reclose was successful at
Khammam end during 1st fault 2nd fault occurred
during re-claim time of breaker hence Khammam end
breakers also got tripped
1 TSGENCO to implement the SRPC agreed philosophy for Power
Swing Blocking in all distance relays on the feeders emanating from
KTPS
2 For the line under consideration TSGENCO to consult relays
OEM to migrate to new versions of Firmware (from to 47201) and
Pset (to 47002)
61III5 Tripping of 400 kV Khammam - KTPS
line-2
The issue was discussed in PCSC-58 meeting held on 18102016 when
PCSC forum agreed to de-link the implementation of the Item from the
scope of Protection Audit Recommendations (PAR) and pursue it as part
of PCSC Recommendations
TSGENCO mail dated 30-05-2017
Procurement of Differential Protection relays is under process and the
work will be completed by the end of November 2017
TSGENCOProvision of line differential protection for Jurala line 1 amp 2 (line length-145 KM) feeders at 220 kV Jurala HPS [Carry-Over from Protection Audit Recommendations]58 Pending
Pendingline tripped on direct trip receive at Gajwel and was
holding from Hyderabad
Pending
06-10-2016 at
1216 hrs
For the line under consideration TSTRANSCO to carry out the
following in coordination with TSGENCO
(i) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
(ii) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(iii) Frequency bandwidth tuning of PLCC link for faithful
transmission of signals shall be carried out
62IV5 Tripping of 400 kV Gajwel-
Bhoopalapalli line-1
Telangana
TSGENCO TSGENCO mail dated 30032017
1 According to SRPC phylosphy power swing block settings are changed
to ALL ZONES BLOCK EXCEPT ZONE1
---------- Completed
2 Ms Siemens is requested to depute the service Engineer to update the
firm ware of existing SIPROTEC relays in 400KV switch yard This work
will be completed on or before 15042017 -------------- Pending
Pending
TSGENCO
TSTRANSCO
TSTRANSCO mail dated on 31-05-2017
1 Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Bhoopalpalli-1 line
59IV3
Line tripped at Bhoopalapally on DT receive and was
holding from Gajwel
TSTRANSCO mail dated on 21-12-2016
(i) Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Ghanapur line
(ii) Healthiness of PLCC system components will be checked while
conducting end to end testing
TSTRANSCO mail dated on 31-05-2017
1 Letter is been given to field for conducting end to end testing of 400kV
Gajwel-Ghanapur line
TSTRANSCO
16-02-2017
at 1500 hrs
For the line under consideration the following shall be carried out by
TSTRANSCO in coordination with PGCIL (SR-I)
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
Tripping of 400 kV Gaiwel-Hyderabad
line
Annexure-III
Page 3 of 31
Karnataka
Annexure-III
Page 4 of 31
KPCL
38GD35 Pending13-11-2014 at
1931hrs
1 KPCL to make functional the Main2 (EPAC) relay with the
help of KPTCL at the earliest
2 KPCL to investigate the reason for DC fuse fail during
transient fault in 220kV Kadra-Kodasalli line including the testing
checking of DC supply cables breaker control cables and trip coils
3 KPCL to ensure supply for Main-1amp Main-2 protections Trip
Coils (TC1 TC2) from separate battery banks
Triggering incident was B-phase to earth fault had
occurred in 220kV Kadra-Kodasalli line Line tripped
from Kodasalli end only 220kV Kaiga-Kadra tripped
in Zone-3 from Kaiga end Tripping of evacuating
lines caused bus shut down at Kadra hydro station
16-02-2015 at
1256 hrs
GD-1 at Kadra and Kodasalli hydro
power station
GD-1 at 220kV Kadra power Station of
KPCL
41I1 Mail received on 28-05-2015
1 Main-2 relays already installed and commissioned
2 DC fuses are intact Till date no such incidence occurred
3 Possibility of DC-1 amp DC-2 arrangement and splitting of DC will be
reviewed
Mail received on 07-07-2015 21-10-2015 and 23-11-2015
1 Completed
2 Completed
3 Possibility of DC-1 amp DC-2 arrangement and splitting of DC will be
reviewed
Status received vide KPCL mail dated 14062017
1 Completed
2 Completed
3 Providing 2 separate DC sources is under process
Pending
Mail recieved on 28-05-2015
1) e-NIT floated on 28072014 for procurement of Numerical distance
relays amp GPS As there is change in scope of work and quantity of relays
by more than 25 which is not permitted as per KTPP act Hence tender
cancelled and refloated on 05052015 with revised scope of work and
revised PQR
2 However as per the recommendations of PSAG Relays were
temporarily rearranged replaced and wired up testing amp commissioning
shall be completed with the assistance of KPTCL
Mail recieved on 07-07-2015
1 Cover -1 of the bid is scheduled for open eing on 25062015
2 As per the recommendations of PSAG Relays were temporarily
rearranged testing amp commissioning completed with the assistance of
KPTCL
Mail recieved on 07-09-2015
NIT floated on 5515 through e-portal Bid evaluation completed
Obtaining of Administration approval to place PO is in progress
However as per therecommendationsof PSAG-10 Relays
weretemporarilyrearrangedTesting amp commissioning completed with the
assistanceofKPTCL
Mail recieved on 21-10-2015
NIT floated on 5515 through e-portal Bid evaluation completed LOAs
issued to Ms Schneider Electric Infrastructure Ltd on 08102015
Mail recieved on 23-11-2015
LOAs issued to Ms Schneider Electric Infrastructure Ltd on 08102015
Engineering work is in progress
Status informed during Special Meeting held on 03062016
LOA‟s issued to Ms Schneider on 08102015 Inspection of relays
completed and received at site DI issued for all balance materials except
furnitures
Status received vide KPCL mail dated 14062017
Numerical Distance Protection relays commissioned on 12042017
for all 4 lines at Kadra PH
Installation Testing and commissioning of Numerical Distance Protection
Relays for all the 4 outgoing lines is completed in all respect at Kodasalli
power house
KPCL1 The PCSC forum requested KPCL to speed up the installation of
Numerical Distance Protection relay in Kadra ndashKaiga and
Kodasalli ndashKaiga
2 The PCSC forum requested KPCL to submit the implementation
status of PSAG-10 recommendations within a week‟s time
A fault had occurred in 220 kV Kadra and Kodasalli
As A result de-energization of 220kV bus occurred at
Kadra and Kodasalli
Annexure-III
Page 5 of 31
49II15
54II4 Tripping of 400 kV Raichur TPS-
Mahboobnagar line
05-04-2016 at
1023 hrs
Line tripped on operation of Backup impedance
protection of line reactor Direct trip was received at
Mahboobnagar end
KPCL to keep the functioning of the concerned electro-mechanical
back-up impedance protection relay under observation and replace it
with a spare at the earliest
KPCL Status received vide KPCL mail dated 10072017
The electro-mechanical back-up impedance protection relay is in service
However Budgetary offer obtained for the retrofitting of Line reactor
protection with Numerical relay and is under process
Pending
54II9
Pending
PendingStatus informed during Special Meeting held on 03062016
1 Hot line washing was done previouslytender process is on for silicon
coating of insulators
Status received vide mail dated 10-07-2017
1 Off line water washing is being carried out whenever the Unit or Line is
under shutdown Silicon coating for Unit8 main amp tie breakers carried
out in Sep16 and same is under observation Till today in order and good
condition For remaining breakers since it is big order approval for the
same is under process
2 Static Electromechanical relays are existing in all 1 to 7 units Breaker
flash over protection feature will be enabled (if available) in the numerical
relays which will be retrofitted in phased manner during RampM works
KPCL1 KPCL to carry out hot-line washing of RTPS-connected lines
regularly to avoid trippings due to fog and dust
2 KPCL may see the feasibility of providing breaker flashover
protection at RTPS and implement the same if possible
Running Unit-4 5 and Unit-8 and 400kV RTPS-
Yeramaras TPS feeder got tripped due to de-
energization of both 400kV Bus-1amp2 at Raichur TPS
12-11-2015 at
0030 hrs
54I4 220 kV Nagjheri - Bidnal line tripped on B-E fault at
1228 Hrs At the same time five running generating
units (1 2 3 4 amp 6) at Nagjheri tripped on operation
of Generator Transformer‟s back-up Over Current amp
Earth Fault protection
PendingKPCL
1 KPCL to revise the settings of GT‟s back-up OC and EF
protections considering their individual contribution to solid bus fault
at 220 kV bus of Nagjheri PH
2 KPCL to upload make available various tripping files
(FIRDRELTR) for all tripping involving their stations in compliance
of IEGC Regulation 52 (r)
14-04-2016 at
1229 hrs
Tripping of Nagjheri Generators Pending
Trippings at 220kV Raichur TPS
13-04-2016 at
2112 hrs
1KPCL to undertake the following remedial measures to avoid
breaker flashovers
(i) Replacing all porcelain insulators with composite insulators
(ii) Carrying out hot-line water washing of all insulators on regular
basis
(iii) Applying Room Temperature Vulcanizing (RTV) Silicone high
voltage insulator coatings to all bus-connected ceramic insulators of
equipment like CT PT CB Isolators etc
2KPCL to take steps to provide dedicated breaker flashover
protection to all breakers at Raichur TPS at the earliest
KPCL
Tripping of 400kV Raichur TPS Bus-2
46II21
Trippings at Raichur TPS
Status received vide KPCL mail dated 10072017
1 i) Silicon coating for Unit8 main amp tie breakers carried out in Sep16
and same is under observation Till today in order and good condition For
remaining breakers since it is big order approval for the same is under
process ii) Hot line
water washing stopped and off line water washing is carried out whenever
the 400 KV Unit or line is under tripped condition Shutdown condition
2 Static Electromechanical relays are existing in all 1 to 7 units Breaker
flash over protection feature will be enabled (if available) in the numerical
relays which will be retrofitted in phased manner during RampM works
Status received vide KPCL mail dated 14062017
1 GT backup overcurrent amp earth fault settings are revised as per the
recommendations of our head office CEEDBangalore copy of letter
enclosed
2 FIRDRELTR are being uploaded in the recent incidences as all the
main-2 relays are replaced with new numerical relays
Mail received on 21-10-2015
1) Anti-pumping contactors of all the nine 220KV Lines are in circuit and
tested periodically during AOH works of lines along with other protections
2) Completed
3) Possibility to use both the 220kV buses as main bus under normal
operation is under review
Mail recieved on 23-11-2015
1) Completed
3) Two bus operation for 220kV buses In place of existing CT switching
relays High speed manual heavy duty change over switch of sufficient
current capacity will be retrofitted to all feeders at 220kV station and same
will be operated manually during changeover of feeder by one bus to the
other and this arrangement may facilitate to put both buses in service Time
required for this retrofit is around 90days However this work will be
taken up only after retrofitting of electromagnetic relays with numerical
relays for Main-2 protection of all 220kV lines for which work is in
progress
Status received vide mail dated 10-07-2017
1) Completed
2) Completed
3) Two Bus operation for 220kV bus is being carried out whenever
required However scheme for tripping of one bus during LBBfault and
maintaining the other bus intact by tripping BC breaker will be taken up in
RampM works
KPCL1 KPCL to check the operation of anti-pumping relay on 220 kV side
and keep it in healthy condition
2 KPCL to provide manual reset to the 220 kV side master trip relay
3 KPCL to use both the 220 kV buses as main buses under normal
operation and should go for single bus operation only during
emergencies
07-06-2015 at
0135 hrs
Y-ph Pole of Tie-breaker of Unit-4 at RTPS failed
Unit-4 got tripped on operation of Generator
Differential Reverse power amp LBB protection
Operation of LBB protection led to tripping of BUS-2
at RTPS
Annexure-III
Page 6 of 31
55II1
56I2 Complete outage of 220kV Sedam
Substation of KPTCL
19-06-2016 at
1527hrs
220kV Sedam-Humnabad-2 tripped at Sedam on
Distance protection Zone-2 Sedam-RTPS-1 amp2 lines
tripped at RTPS end only 220kV Tandoor inter-state
line was hand tripped due to incoming supply failure
KPCL to disable GFC protection on all lines emanating from their
generating stations
KPCL Status received vide KPCL mail dated 10072017
As per the reccomndations of KPTCL in Feb16 the settings are done with
a time delay of 2 secs
Pending
57II3 Tripping of 400220 kV ICT-2 at Raichur
TPS
07-07-2016 at
332 hrs
ICT-2 tripped on operation 400220KV ICT-2 was
tripped on operation of 220KV side Instantaneous
over current protection during B-phase to earth fault
in 220kV RTPS-Sedam-II line
KPCL to review appropriately the high-set of ICT‟s back-up OC
protection at their 220 kV RTPS so that they do not operate for a
normal through fault
KPCL Status received vide KPCL mail dated 10072017
The settings will be reviewed in co-ordination with KPTCL amp OEM
Pending
KPCL
Pending
Pending
KPCL Status received vide KPCL mail dated 14062017
1 All logics checked and found normal LBB timing checked and found
200msec as per KPTCL MRT recommendation - Completed
2 Work Under Progress
3 New GPS System commissioned along with new numerical and
synchronised with GPS system - Complied
4 Work Under Progress
Status received vide KPCL mail dated 14062017
1 DEF settings in lines are made as per recommendations of CE(RT) amp
RampD KPTCL Bangalore amp EE(RT) KPTCL Hubli
High set operation of DEF relays is disabled at Kodasalli end
2 All these guidelines are incorporated by KPTCL during the replacement
of line protection relays
3 New stand alone event logger is to be procured since spares for old
stand alone event logger are obsolete
KPCL (i) KPCL to disable high-set operation of DEF relays
(ii) KPCL to block DEF relays whenever corresponding distance
protection relays pick up at Kodasally end on Nagjheri ndash Kodasalli
lines and
(iii)KPCL to provide stand-alone Event Logger at their 220 kV
Nagjheri PH
Bus dead occurred at 220kV Nagjheri PH due to
tripping of evacuating lines
KPCL
31-08-2016 at
1247hrs
Pending
Tripping of 400kV Bellary TPS-
Yeramarus TPS line and
400kVYeramarus TPS - Raichur TPS
line
PendingYet to be informed55II19
Tripping of Units at Raichur TPS During testing of retrofitted distance protection in
400kV Raichur-2 feeder LBB protection trip DC got
extended to Bus trip This resulted in tripping of
220kV bus at RTPS and all connected 220 kV
elements Unit-4 which is connected to 400 kV Bus
got tripped due to tripping of Station Utility
Transformer that is connected 220 kV bus
58I2 (GD)
Complete outage of 220 kV Kadra power
station of KPCL
54II13
1KPCL to properly configure the distance relays at YTPS end on
both YTPS ndash BTPS line and YTPS-RTPS line with specific focus on
reaches and timings of Zone-2 Zone-3 and Zone-4 (reverse)
2KPCL to ensure the healthiness of Direct Trip circuits and relay
coils at YTPS
3KPCL to ensure time sync of DR‟s and EL‟s at YTPS with GPS
06-09-2016
at 1440 hrs
31-05-2016 at
1721 hrs
Direct Trip was sent from YTPS to RTPS and BTPS
01-05-2016 at
2144 Hrs
LBB of 220kV Kodasalli breaker at Kadra end got
operated which resulted in tripping of Bus at Kadra
and in turn led to tripping of all elements
(i) KPCL to check settings of LBB protection in all relays from which
it was implemented and ensure that their configuration logic and
timing are in order at their 220 kV Kadra PH
(ii) KPCL to furnish details regarding the existing LT auxiliary
supply arrangement at their 220 kV Kadra PH and take steps to
provide a suitable Auto-Main-Fail (AMF) panel for DG set to effect
its auto-starting in case of failure of LT supply
(iii) KPCL to ensure time-sync of all relays (DR‟s amp EL‟s) with GPS
at their 220 kV Kadra PH
(iv) KPCL to provide stand-alone Event Logger at their 220 kV
Nagjheri PH
Complete outage of 220 kV Nagjheri PH
of KPCL
Multiple tripping at 400 kV Raichur TPS
Station
15-04-2016 at
1536 hrs
Triggering incident was failure of R-phase CT of
400220kV ICT-1 400kV YTPS-RTPS line got
tripped from YTPS end 400kV RTPS-
Mehaboobnagar line tripped on a B-phase to earth
fault
In view of the availability of two buses along with healthy bus-
coupler at 220 kV RTPS KPCL is recommended to put in service the
double-bus operation at 220 kV RTPS by suitably distributing loads
within 15 days
Status received vide KPCL mail dated 10072017
Two Bus operation for 220kV bus is being carried out whenever required
However scheme for tripping of one bus during LBBfault and maintaining
the other bus intact by tripping BC breaker will be taken up in RampM
works
1KPCL to enable zero-sequence compensation feature if not already
done in all differential relays of transformers at RTPS
2KPCL to examine in detail the reasons for SOTF operation at RTPS
end for the fault on RTPS-Veltoor line and if required relay
(configuration) settings at RTPS end may be suitably got revised with
the help of their OEM
3KPCL to take steps to enable auto-reclose for the Tie-CB‟s in the
dias containing Munirabad and Veltoor (Mehboobnagar) at RTPS
KPCL Status received vide KPCL mail dated 10072017
1) Zero-sequence compensation feature is already enabled in all the
differential relays of transformers ---Completed
2) Referred to OEM for the tripping of line on SOTF protection
3) Action has been taken to retrofit the protection relays of tie bays of
Mahbubnagar and Munirabad line to enable Auto-reclosure function
58I3 (GD)
Pending
Annexure-III
Page 7 of 31
Status received vide KPCL mail dated 14062017
1 On 09092016 at STRPTwo units were running(Unit-3 amp Unit-4It is
to clarify that Station tripped due to spurious operationLBB relay in Unit-
4 and not due to operation of Unit-3 LBB as indicated in PCSC
recommendations Unit-3 which was in service tripped as a consequence of
LBB ProtectionHow ever following actions performed in both Units
a) Trip coil-1 and Trip coil-2 circuit (including cable from protection panel
to GCB Marshaling Box)of GT Breakers of Unit 03 and 04 checked found
ok
b) Integrity of Connecting cableconductor from Generating unit no3 and
also to its corresponding GT Breakers inspected and found ok
c) Regarding Spurious operation of Unit No04 LBB relay and its
timerChecked the operation of the LBB overcurrent relay with its external
Timer for repeated correct operations it was found that LBB Timer was
giving correct timing operation for 1 in 3 operations only ie for one of the
operation it was operating within 40ms compare to set value(200ms) hence
declared as faulty and the same has been replaced with new one later
operation of the new Timer checked and found okoperating for gt200mse
only With this cause for spurious operation of LBB and resulting in
complete outage of STRP has been identified and solved -----
Completed
2 In Unit -3MCR is working satisfactorilyit is to clarify that problem was
existing in Unit No4 AVR manual channel reference value of Generator
The Same has been replaced with spare one Manual channel AVR is
found to be Ok ------Completed
3 All the units AVRs Healthyness checked and found Ok -
-----
Completed
4 Presently at GPHno stand alone Event logger exists Since the subject
requirement pertains to all the Generating units and in view of
Standardization of the complete system Networking of numerical relays
carried out and events are availble in networking system
KPCL
Pending
(i) KPCL to ensure the integrity of the connecting cable conductor
from Generating Unit-3 to its corresponding GT breaker at their STR
PH
(ii) KPCL to ensure the healthiness of Manual Current Regulator
(MCR) of Unit-3‟s AVR at their STR PH
(iii) KPCL to ensure the healthiness of AVR‟s of all Units of STR
PH
(iv) KPCL to provide stand-alone Event Logger at their 220 kV STR
PH
Spurious operation of LBB protection of line feeder
had led to tripping of 220 kV bus at Sharavathy Tail
Race power house
9-09-2016 at
1119 hrs
Pending
12-09-2016 at
1447 hrs
(i) KPCL to check and correct configuration settings of LBB
protection in all relays from which it was implemented at their 220
kV Varahi PH
(ii) KPCL to provide stand-alone Event Logger at their 220 kV STR
PH
KPCLLBB protection operated and caused bus shut down at
Varahi PH
Pending
Partial disturbance occurred in central Kerala grid due
to overloading and tripping of 220 kV lines Loss of in-
feed to 220 kV Kalamassery 220 kV Brahmapuram
220 kV Ambalamugal 220 Pallom amp 220 kV Kochi
occurred Generation at Neriamangalam Panniar
Chengulam and Pallivasal also got affected during the
incident
(i) SLDC KSEB to put in place proper mechanism to ensure
adequate load-generation balance is maintained in their control area at
all times and due vigilance is exercised in operating an already
depleted transmission network
(ii) KSEB to put UFR in service at New Pallom end on 220 kV New
Pallom ndash Amabalamugal line as part of Kudankulam Regional
Islanding Scheme
KPCL
Status received vide mail dated 14062017
LBB Protection system is in Bus bar Protection PanelThe Configuration
settings are checkedThey are as follows
Minimum operating primary current is 160A
Stage IIssue of Retrip to the feeder is 100ms after the action of main
distance protection Relayinitiation of LBB
Stage IIBus bar LBB Trip -200ms
Total time of LBB trip is 300ms from the time of occurrence of Line Fault
(i) KPCL to adopt the following VT fuse-fail logic for all 220 kV
lines emanating from NPH
ldquoUnder VT fuse fail condition distance protection shall normally be
kept blocked However upon detection of a fault (sensed by negative
sequence component) blocking of distance protection shall give rise
to operation of its inherent Over-Current protection set with a definite
time delay of 500 msecrdquo
(ii) KPTCL KPCL to revise Zone-2 Zone-3 and Zone-4 (reverse)
timings of DPR of all 220 kV lines emanating from Nagjheri PH in
line with Ramakrishna Committee guidelines
Triggering event was the fault on 220 kV Nagjheri
ndashKodasalli line-2 Both buses of 220 kV Nagjeri
power station of KPCL got
de-energized
62I1 KPCL Status received vide mail dated 14062017
1 Already settings are discussed with EE(RT) Hubli and soon relays will
be tested for VT fuse fail condition
2 Timings of Zones were set as per the recommendations of CE(RT) amp
RampD KPTCL Bangalore amp EE(RT) KPTCL HubliRegarding revision
of timings will be carried out in co- ordination with EE(RT) KPTCL
Hubli
15-09-2016 at
1406 hrs
Complete outage at Varahi Hydro Power
Station
Disturbance in Kerala system Yet to be informed Pending
58I5 (GD)
58I7 (GD)
21-01-2017
at 0038 hrs
Complete outage of 220 kV Sharavathy
Tail Race PH
58I6 (GD)
Complete outage of 220 kV Nagjheri
substation of KPCL
Annexure-III
Page 8 of 31
65II9 Tripping of 400220 kV ICT-1 at BTPS 13-05-2017 at
1941 hrs
ICT-1 got tripped on operation of LV side earth fault
protection during R-phase to earth fault in 220 kV
BTPS-Lingapur line
1 KPCL to review the need for providing separate non-directional
sensitive earth fault protection for ICT‟s at their BTPS station and
take steps to disable the same
2 For 220 kV BTPS ndashLingapura line KPCL to resolve issues relating
to PLCC carrier communication and put AR into service
KPCL Yet to be informed Pending
65III2 Tripping of 400 kV Hiryur-BTPS line-1 06-05-2017
at 1401 hrs
Y-phase to earth fault had occurred in line Direct
trip was sent from BTPS to Hiryur end
KPCL to introduce suitable delay (say 3 sec) for UVR tripping and
disable sending of DT to the other end on UVR operation at their
BTPS station
KPCL Yet to be informed Pending
PendingMail received on 27-05-2015 (KPTCL) amp 29-07-2015
1Existing Back up relays will be replaced by numerical type distance
relaysProcurement is in tendering stage
2 Completed
3 Completed
KPTCL Mail recieved on 23-01-2016
1 Existing back up relays will be replaced by Main-2 protection LOI
issued Ms Alstom for taking up the works
KPTCL Mail Recieved dated 25-05-2016
Under the Scope of RampU The work will be taken up by Ms Alstom
shortly
KPTCL Mail Recieved dated 25-04-2017
1 ALSTOM make P442 type Numerical relays are supplied to the site
replacement of M-1 relays(OPTIMHO) by new relays will be taken up
shortly
KPTCL
KPCL Status received vide mail dated 10072017
1 Furnishing FIR amp TR of the tripping events as per the formats provided
by SRLDC
4 Refered to OEM for the tripping of Tie CB of Munirabad line on SOTF
protection
Pending
1 PCSC forum recommended KPTCL to replace the old static
distance protection relays with numerical relays
2 PCSC forum also requested KPTCL to provide a broken conductor
alarm indication in Control Room
3 Standing instruction needed to be given to the all substation
personnel for not changing the relay settings without approval of
RTMRT wing
Fault had occurred in 220kV
Mahalingapura-Narendra line-2 Due to the failure of
relay operation at Mahalingapura breakers at remote
end tripped which resulted in bus dead condition
1 KPCL to start furnishing FIR and TR of their tripping events as
per the formats provided by SRLDC
2 KPCL to check earth-mat resistance for 400 kV switchyard and
ensure that it is within prescribed limits
3 KPCL to set right operation of SER in CampI Control Room of Unit-
4
4 KPCL to furnish action taken wrt tripping of Tie-CB of
Munirabad line on SOTF protection OEM report in this regsrd may
be furnished
25-10-2014GD-1 at Mahalingapura Substation of
KPTCL
38GD31
63II10 Multiple trippings at 400 kV RTPS
substation of KPCL
16- 03-2017 at
0118 hrs
Bus-2 B-Ph differential bus bar protection operated
at 400 kV RTPS end tripping all the main breakers
connected to Bus-2
Annexure-III
Page 9 of 31
Pending
Suspected mal-operation of 220kV side Rphase
over current relay
Line tripped on Yphase to earth fault from both the
ends
20-12-2014
at 2220 hrs
KPTCL was requested to explore the possibility of providing AR
feature to this line and submit the remedial measures to the PCSC
forum
Pending
KPTCL1 Till the completion of RampM works for bus bar and LBB protection
KPTCL shall explore the possibility of having split bus operation at
Ambewadi and submit the details of the same to PCSC forum
2 KPTCL shall provide the details of the tripping of Supa hydro
station connected downstream from 110 kV bus
39I5
40I1
220kV Sedam-
Tandur line
Triggering incident was B-phase to earth fault in
220kV Ambewadi- Nagzari line-1 B-pole of breaker
did not open at Ambewadi end LBB protection not
available at Ambewadi end All elements tripped on
Zone-2 from remote ends
01-12-2014Tripping of 400220kV
ICT-2 at Hoody
substation of KPTCL
40IV1
Mail received on 27-05-2015 amp 29-07-2015
1 CampR panels of 500MVA ICT 1amp2 will be replaced under scheduled
RampM works
2 OampM personnel are instructed to take sufficient care in order to avoid
unwarrented trippings --- Completed
KPTCL mail received on 23-01-2016
1 New CampR panels(with numerical relays) erected for 500MVA ICT-1
amp2 under RampM work which will be commissioned shortly
KPTCL mail received on 25-05-2016
1 New CampR panels(with numerical relays) erected for 500MVA ICT-1
amp2 under RampM work which will be commissioned shortly
KPTCL mail received on 25-04-201
1 New CRPs mounted in bay KIOSK commissioned under RampM works
KPTCL1 PCSC forum recommended KPTCL to replace the relay with a
different make
2 KPTCL was also requested to train the OampM personnel
adequately before performing any maintenance works to avoid such
unwanted trippings
PendingMail recieved on 29-07-2015
Carrier protection is being restored for 220kV Sedam-Tandoor line at
Sedam end After restoring the carrier protection AR will be enabled
KPTCL mail recieved on 23-01-2016
Carrier protection is being restored for 220kV Sedam-Tandoor line at
Sedam end After restoring the carrier protection AR will be enabled
KPTCL mail recieved on 25-05-2016
SEESCADA to update the latest status
KPTCL mail recieved on 28-06-2016
Action is being taken to restore carrier protectionAR will be enabled once
carrier signal is restored
KPTCL
22-12-2014 at
2122 hrs
Mail received on 28-04-2015
1 In view of operating 220kV Ambewadi SS in split bus mode action is
being taken up by KPTCL Problem in the 220kV bus coupler breaker is
attended and isolator overhauling work is under progress Spilt bus
operation at Ambewadi will be made possible at the earliest
2 ICT Protection system at Ambewadi and trippings occured at Supa GS
during the instance is checked up and remedial measures already furnished
in this regard
---- Completed
Mail recieved on 29-07-2015
1 Action is being taken by KPTCL for operating Ambewadi in split bus
mode Problem in bus coupler breaker is attendedIsolator overhaulling
work is completedPTs are already provided to 220kV Bus-II After
commissioning of Bus-II PTs Ambewadi can be operated in split bus
mode Pending works will be completed within a months time
KPTCL mail recieved on 23-01-2016
1 Bus-II PTs yet to be commissionedPlanned to complete before end of
April-2016
KPTCL mail recieved on 25-04-2017
1 Yet to be attended
GD-1 at 220kV Ambewadi Station of
KPTCL
Annexure-III
Page 10 of 31
1 KPTCL to provide Bus Bar protection and LBB protection at
Sedam Ss and furnish the status of their implementation to PCSC
forum
2 KPTCL to implement AR feature on 220 kV Sedam-Tandur inter-
state line
Mail received on 28-04-2015
Procurement of Bus bar and LBB protection is in the final tendering stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
KPTCL mail received on 23-01-2016
1 Bus bar protection panels pocured and erected at Sedam Wiring
testing commissioning is being taken upPlanned to complete by April
2016
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
KPTCL
12-03-2015 at
751 hrs
1 KPTCL shall provide AR feature on Ambewadi ndash Ponda 220 kV
DC inter-state line
2 Till the completion of RampM works for bus bar and LBB protection
KPTCL shall explore the possibility of having split bus operation at
Ambewadi and submit the details of the
same to PCSC forum
Mail received on 27-05-2015
1 Bus Bar protection will be provded under RampU
2 AR yet to be enabled
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
Fault occurred in 220kV Sedam-Shahpur line
All connected 220kV lines and transformers were
taken on 220kV North bus as South bus was under
shut down for conversion of strung bus to rigid bus
and isolator replacement under RampM works Failure
of HV side Y phase CT of 150MVA Transformer-3
occurred at Peenya Substation which resulted in
operation of Differential and HV REF protection The
failure of CT also resulted in a 220kV bus fault in
North Bus
KPTCL to revise distance relay settings at Nelamangala end for 220
kV Nelamangala ndash Hebbal - Peenya line ndash 1 for the effective line
length of 17 km These new settings can be appropriately reviewed as
and when the tie-arrangement at Hebbal is done away with
Mail received on 29-07-2015
1 Procurement of Bus bar and LBB protection is in the final tendering
stage
2 Action is being taken to restore the carrier protection for 220kV Sedam-
Tandoor line AR will be enabled after restoration of PLCC
Pending
PendingKPTCL
30-09-2015 at
1041 hrs
Pending
Outage of 220kV Ambewadi station in
Karnataka
Pending
PendingKPTCL mail received on 23-01-2016
Will be complied in a months time
220kV Ambewadi-Nagjheri line-2 tripped on B-phase
to earth fault This resulted in loss of supply to 220kV
Ambewadi bus 220kV Ambewadi-Ponda line-1amp2
were hand tripped after deenergization of bus at
Ambewadi
KPTCL
Complete outage of 220kV Ambewadi
substation of KPTCL
42I2 (GD)
27-09-2015 at
42317 hrs
Fault in 220kV Ambewadi-Nagjheri line-2
KPTCL
KPTCL
KPTCL mail received on 25-05-2016
Presentl 220kV Nelamangala -Hoody(ie nelamangala-Peenya-Hebbal -
Hoody line is made LIILO at Yelahanka sub station and breaker at
Peenya is kept open necessary modification in distance relay settings
adopted for new configuration
15-02-2015 at
1424 hrs
Complete outage of 220kV Peenya
Substation in Karnataka
R-Phase to ground fault occurred on 220kV Sedam-
Shahpur line Fault not cleared from Sedam end due
to stuck-breaker condition While the Sedam- Sahapur
line tripped from Shahapur end in Zone-1 the other
220 kv lines from Sedam tripped at remote ends in
Zone-2 This caused complete outage of 220kV
Sedam substation
42I1 (GD)
41I4
Complete outage of 220kV Sedam
substation of KPTCL
48I2 (GD)
48I3 (GD) KPTCL to fast-track providing AR on all 220 kV lines emanating
from Ambewadi SS to prevent Station shut-down on temporary faults
06-08-2015 at
451 hrs
220kV RTPS-Lingasugur line-2 tripped at TPS end
on operation of distance
protection zone-1 400220kV ICT-2 got tripped on
operation of earth fault
protection 220kV RTPS-Lingasugur line-1amp3 tripped
on distance protection zone-2 and zone-3
respectively Due to tripping of ICT-2 the running
units got overloaded and it was mentioned that under
frequency occurred as units are on load control The
Units got tripped on under frequency
KPTCL to activate non-directional Over Current protection with a
time delay of 600-800 msec for Fuse
failure condition at Lingasugur
KPTCL Status received vide KPCL mail dated 10072017
LV earth fault relay had an additional default Ef setting having a definite
time which resulted in tripping of ICT-2 and the same was rectified and
already complied
Pending
1 KPTCL to provide Bus bar and LBB protections for 220 kV
bus at Sedam Ss
2 KPTCL to implement AR feature on 220 kV Sedam-Tandur
inter-state line
27-01-2015 at
800 hrs
Complete outage at 220kV Sedam
Substation of KPTCL (GD-1)
Tripping of Unit-1amp2
along with 400220kV
ICT-2 at Raichur TPS
47II13
Annexure-III
Page 11 of 31
52I3 (GD) Complete outage of 220kV Shimoga
substation
22-02-2016 at
1503 hrs
220kV Bus Bar protection operated during failure of
R phase CT in DVG-2 line bay
KPTCL to operate 220 kV Shimoga on multi-bus operation under
normal conditions put it on single-bus operation only under
emergency conditions
KPTCL KPTCL Mail received dated 25-04-2017
Replacement of existing BBP by new BBP with 4 zone protection is being
taken up under RampU
Pending
56II6 Tripping of 220kV Ambewadi-Ponda
(Xeldam) line-1
10-06-2016 at
1333 hrs
Line tripped on Y-E faut due to DPR Z1 operation KPTCL to keep AR for Ambewadi ndash Ponda (Xeldam) line-1 in
service with immediate effect
KPTCL Yet to be informed Pending
59II13 Tripping of 220 kV Bidadi (PG) - Bidadi
lines - 1amp2
02-10-2016 at
1032 hrs
Line-2 tripped in DPR Zone-2 and Line-1 tripped on
operation of EF protection from Bidadi end
KPTCL to resolve PLCC carrier communication issues on 220 kV
Bidadi ndash Bidadi-PG DC lines and subsequently restore Zone-2
timing to normal values
KPTCL Yet to be informed Pending
1 KPTCL to configure all DR‟s and EL‟s at 400 kV Guttur SS so
that they will also get triggered for BBP operation
2 KPTCL to ensure time-synchronization of all DR‟s and EL‟s with
GPS at their 400 kV Guttur SS
KPTCL17-01-2016 at
1853 hrs
Pending
Pending
Yet to be informed PendingKPTCL
KPTCL
30-09-2015 at
1041 hrs
Complete outage of 220kV Ambewadi
Substation of KPTCL
Multiple tripping at 400kV Guttur sub-
station
Outage of 220kV Ambewadi station in
Karnataka
29102015 at
1434 hrs
Complete outage of 220kV Peenya
Substation of KPTCL
PendingKPTCL mail received on 23-01-2016
Will be complied in a months time
220kV Peenya-Nelamangala-3 tripped on B-E fault at
both ends At the same time 220kV Peenya-
Nelamangala-4 tripped on R-Y fault only at
Nelamangala end and was in service from Peenya
end Due to tripping of these two lines 220kV Peenya-
Nelamangala-2 tripped on overcurrent protection
KPTCL to furnish a report on the tripping of 220 kV Peenya-
Nelamangala line-4 Nelamangala detailing the remedial measures
taken including the settings adopted for Z1B (Zone extension) and
Power Swing Block
Pending220kV Nagjheri-Ambewadi line-1 tripped at 1333
hrs due to B phase to earth fault Ambewadi was
radially fed from Nagjheri power station through
220kV Nagjheri-Ambewadi line-2 Tripping of this
line caused 220kV Bus shut down at Ambewadi and
remaining lines and transformers were hand tripped
220kV Ambewadi-Nagjheri line-2 tripped on B-phase
to earth fault This resulted in loss of supply to 220kV
Ambewadi bus 220kV Ambewadi-Ponda line-1amp2
were hand tripped after deenergization of bus at
Ambewadi
KPTCL
Yet to be informedKPTCL
KPTCL Mail received dated 25-05-2016
SEE RTC Bangalore to update the status
KPTCL Mail received dated 28-06-2016
Providing numerical bus bar protection to 400kV buses and GPS time
synchronising equipment at Guttur is considered under RampU Work is
awarded to Ms Alstom execution will be taken up shortly
KPTCL Mail received dated 25-04-2017
GPS and accessories will be supplied during May 2017 expected to
complete the work within a month after supply of materials
53I1
1KPTCL to take steps to provide busbar protection at their 220 kV
Chikkodi inter-regional substation and furnish a time-line for the
same
2KPTCL to review distance protection settings for 220 kV Chikkodi
ndash Kudachi line
3KPTCL to furnish equipment failure report of the current incident to
PSEampTD Division of CEA with a copy marked to SRPC
KPTCL Mail received dated 25-05-2016
SEE RTC Bangalore to update the status
1 KPCL to provide AR on all 220 kV lines emanating from Nagjheri
PH
2 KPTCL to provide AR on all 220 kV lines emanating from
Ambewadi SS
Failure of Lightning Arrestor of Y-phase Line Reactor
of 400kV Guttur-Hiriyur line-1 and line tripped on
distance protection Zone-1 Bus-bar protection of
400kV Bus-2 at Guttur substation also got operated
during the event sensing this through fault 400220
kV ICT-1 amp 2 at Guttur 400kV Kaiga-Guttur-2
400kV
Guttur-Narendra-2 400kV Guttur-Hiriyur-2 and
400kV Guttur-Munirabad which are on 400kV Bus-2
got tripped during the incident 400kV Guttur-
Narendra-1 which was on Bus-1 also tripped at the
same time
49I13 (GD)
Triggering incident was failure of B-ph PT of 220kV
Bus-2 (western bus) at 220KV Chikkodi substation
220KV Chikodi- Belgaum-I line tripped on DEFR
(Inst) 220KV Chikkodi-Kudachi line tripped on
Distance protection and also 100MVA transformer-2
tripped on EF protection
57II1 01-07-2016 at
0303 hrs
Tripping of 220 kV Chikkodi-Mudshingi
and 220 kV Chikkodi-Talandage lines
48I3 (GD) KPTCL to fast-track providing AR on all 220 kV lines emanating
from Ambewadi SS to prevent Station shut-down on temporary faults
51II21
16-03-2016 at
1139 Hrs
Annexure-III
Page 12 of 31
62II3 Tripping of 220 kV Bus 2 and connected
elements (220kV HAL 1 and 2
400220 kV ICT- 1 2 and 22066 kV
ICT-2) at 400220 kV Hoody substation
of KPTCL (Load loss 590 MW)
09-01-2017 at
2306 hrs
Failure of R-phase CT of 220 66 kV transformer-2 at
220kV Hoody end resulted in a bus fault in 220kV
Bus-2 Fault was cleared by backup protection of
ICTs (220kV lines were being radially operated) due
to absence of busbar protection
1 KPTCL to provide Busbar protection at their 220 kV Hoody SS at
the earliest
2 KPTCL to furnish an Equipment Failure Report on CT failure to
CEA with a copy marked to SRPC
KPTCL KPTCL mail received dated 25042017
Numerical BBP is being provided under RampM works
Pending
64II9 Tripping of 400 220 kV ICT-2 and 3 at
Hoody substation of KPTCL
26-04-2017 at
1540 hrs
ICT-2 tripped on suspected mal-operation Oil surge
relay of B-phase Transformer ICT-3 tripped due to
overloading
KPTCL to put in place a suitable SPS at their 400 220 kV Hoody SS
that takes care of over-loading of the other ICT when one ICT out of
ICT‟s ndash 2 amp 3 trips at the earliest and furnish the details of
implemented SPS to PCSC forum
KPTCL Yet to be informed Pending
65II17 Tripping of 400220 kV ICT - 1 amp 3 at
Hoody substation of KPTCL
(Load Loss 750 MW)
26-05-2017 at
1230 hrs
R phase limb of ICT-1 bank pre-close supervision
contact of trip coil -2 had arc over ICT-3 got tripped
on over-loading
KPTCL to furnish compliance report on the recommendations given
in PSAG-18 meeting to PCSC forum
KPTCL Yet to be informed Pending
Complete outage of 220kV Nagjheri
power station and 220kV Ambewadi
substation of KPTCL
51I3 PendingStatus informed during Special Meeting held on 03062016
1 KPTCL informed that the matter had been taken up with concerned Line
Operation and Maintenance wing to carry out corridor clearance and
maintenance as per schedule to avoid frequent line faults in this corridor A
letter had also been addressed to Chief Engineer Bhagalkot zone to ensure
lines in amp around Kali complex are maintained in healthy condition ---
Completed
2 KPTCL assurd that the final modified SPS would be implemented at
Nagjheri PH at the earliest ------ Pending
3 KPCL informed that Nagjhari- Kodasalli Lines 1 amp 2 had been kept in
service since 23052016 0806hrs ---- Completed
KPTCL Mail received dated 28-06-2016
Modifications to be carried in Nagzari SPS logic is submitted to
SRLDCSRPC for verification and approval
Status received vide KPCL mail dated 14062017
1 Will be reviewed in consultation with EE(RT) KPTCL Hubli
2 Both the lines are in charged condition
KPCL KPTCL 1 To avoid tripping of transmission lines on transient faults KPCL
KPTCL is recommended to carry out periodic patrolling of lines and
ensure their proper maintenance by carrying out jungle bushing
clearance and trimming of tree branches within the RoW of
transmission lines as per the SRPC transmission line patrolling
guidelines (available under the menu item All Uploads Operation
Miscellaneous Transmission Line Patrolling Protocol
Guidelines for Southern Region on SRPC website)
2 KPCL KPTCL to review operation of SPS at NPH for
functionality (reduction of generation with tripping of evacuating
lines) and healthiness
3 KPCL to put 220 kV Kodasalli - Nagjheri DC lines into service if
more than 200 MW generation from Kali Complex (with Nagheri
Contribution not less than 50 MW) is ensured on sustained basis
220kV lines from Nagjheri power house started
tripping from 1100 hrs due to fault in lines The
sequence of tripping is shown in SOE list At 1233
hrs 220kV Narendra-Ambewadi lines-1amp2 got
tripped which resulted in loss of evacuation path to
Nagjheri station resulting in tripping of running Units
and complete outage at Nagjhheri power station
220kV Ambewadi station also got de-energized due
to tripping of source feeders ie 220kV Narendra-
Ambewadi-1amp2 and 220kV Nagjheri-Ambewadi-
1amp2
22-02-2016 at
1236 hrs
Pending
Pending
KPTCL
For the line under consideration the following shall be carried out by
KPTCL in coordination with
PGCIL (SR-II)
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
KPTCLLine tripped at Hiryur end due to direct trip receive
and was holding from Guttur
KPTCL mail received dated 25042017
Numerical BBP is being provided under RampM works
KPTCL to provide numerical Busbar Protection at their 220 kV
Somanahalli SS at the earliest
Tripping of 400 kV Neelamangala-
Hoody line-1
KPTCL to carry out the following for the line under consideration
(i) Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
(ii) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
Tripping of 400 kV Guttur-Hiryur line-1 10-10-2016 at
315 hrs
62IV4
59IV4
62II5 Tripping of 220 kV South Bus and
connected elements (220kV HSR 220kV
Nagnathpura 220 kV Harohalli 220 kV
Subramanyapura 220 kV Tataguni 220
kV Mallur and 400220kV ICT-2 and 3)
at 400220kV Somanhalli substation of
KPTCL
(Load loss 850 MW)
20-01-2017 at
1434 hrs
Triggering incident was fault in 66 kV Somanahalli -
Bannerghatta line and fault was cleared by operation
of Back-up OCR at Somanahalli end
15-02-2017
at 1344 hrs
Line tripped at Hoody end on direct trip receive and
was holding from Neelamangala end
Yet to be informed
KPTCL
Yet to be informed Pending
Annexure-III
Page 13 of 31
56I3 Complete outage of 220kV Ambewadi
Substation of KPTCL
24-06-2016 at
2057hrs
B phase to earth fault had occurred in 220 kV
Ambewadi-Ponda line-2 Fault was cleared by
tripping of feeders from remote end
1KPCL amp KPTCL to furnish an action taken report on the
recommendations given by PSAG-16 to PCSC forum
2KPTCL to keep AR for Ambewadi ndash Ponda line-2 in non-auto
mode (ie only 3-ph trip should get extended on occurrence of a
fault) till the line is closed from Ponda end
KPCLKPTCL Yet to be informed Pending
Complete outage of 220kV Ambewadi
station of KPTCL and 220kV Nagjheri
of KPCL
Ambewadi Narendra line-2 tripped on fault and
220kV ambewadi Narendra line-1 tripped due to over-
loading Running Units at Nagjheri also tripped during
the event due to tripping of evacuating lines
KPCL KPTCL18-03-2016 at
1440 hrs
1 TANGEDCO to replace existing Check-Zone relay with a new one
possessing required performance
2 TANGEDCO to take steps to provide numerical busbar protection
at their 220 kV Tuticorin TPS TANGEDCO may also explore
providing dual CT‟s (on either side) for all BS breaakers at the time
of commissioning of numerical BBP if there were no space
constraints
3 TANGEDCO to take steps to provide for standalone Event Logger
(EL) and standalone Disturbance Recorder (DR) with automatic
downloading facility to a centralized server
Failure of Bus Section-I Y-ph CT resulted in
operation of bus-bar protection for Bus Sections -I amp
II Running Units1 4 and 5 230 kV Kayathar
230kV Kudankulam 230kV Sterlite Station
Transformer-1 2 amp 3 got tripped during the incident
Unit ndash 2 amp 3 were not in service
22-02-2017 at
0616 hrs
KPCLKPTCL
25-01-2017 at
2236 hrs
R-phase to earth fault due to de-capping of insulator
Auto-reclose attempt was unsuccessful
Tripping of ICT-3 at Raichur Substation
TANGEDCO
Pending
Tripping of running Units amp 230kV
feeders at Tuticorin TPS of TANGEDCO
(Gen Loss 640 MW)
62II7
1 KPCL to furnish a report on the reasons for Unit-6 tripping at
Nagjheri PH
2 KPCL KPTCL to modify suitably the SPS at Nagjheri Power
House such that it would also factor in the over loading of Ambewadi-
Narendra lines
3 KPCL to put 220 kV Kodasalli - Nagjheri DC lines into service if
more than 200 MW generation from Kali Complex (with Nagheri
Contribution not less than 50 MW) is ensured on sustained basis
Pending53I3 (GD)
15-03-2016 at
1228 hrs
ICT-3 tripped due to operation of back-up earth fault
protection during fault in 220kV RTPS-Raichur line-
1
KPCL KPTCL to check the ICT‟s back-up (high-set) protection
settings and ensure that they operate with a time delay of 100 msec
TANTRANSCO mail dated 12042017
1 The recommendation will be ensured AR logic will be configured in
Distance Protection relay itself instead of BCU OEM has been addressed
2 Post triggering period of 2 sec to cover AR operation in DR time scale
will be provided
TANTRANSCO mail dated 01062017 amp 15062017
1 The recommendation will be ensured AR logic will be configured in
Distance Protection relay itself instead of BCU OEM has been addressed
Main-1 amp 2 relays will be replaced for the requirement of more output
contacts for AR logic implementation
2 Post triggering period of 2 sec to cover AR operation in DR time scale
is being provided
TANGEDCO1 TANGEDCO to take properly configure AR logic at NCTPS-II in
that in case of unsuccessful auto-reclsoure three-phase trip shall be
given along with AR block
2 TANGEDCO to configure all protection relays DR‟s time scale at
NCTPS-II for a post-triggering period of 2 sec to capture events such
as complete AR operation
Tripping of 400 kV NCTPS-
SVChatram line-2
KPTCL Mail received dated 28-06-2016
Modifications to be carried in Nagzari SPS logic is submitted to
SRLDCSRPC for verification and approval
Status received vide KPCL mail dated 14062017
1 Tripped since there was evacuation problem and there were only two
lines NA-1 and NA-2
2 Will be reviewed in consultation with EE(RT) KPTCL Hubli
3 Both the lines are in charged condition
TANGEDCO mail dated 15042017
1) New Relay is tested and ready for replacementNow all 5 units are in
serviceThe relay will be replaced when lesser units are in service ---
Pending
2a)Steps are taken to renovate amp mordernization of all the control panel
into Numerical based control panels --- Pending
2b) Since 230 KV indoor switchyard has no spare space providing dual
CT`s is not fessible -- Completed
3) Procurement of EL amp DR is under progress --- Pending
TANGEDCO mail dated 26042017
1) Check zone New Relay is replaced on 17042017 -- Completed
2 Pending
3 Pending
KPTCL Mail Recieved dated 25-05-2016
SEESCADA to update the status of healthiness of carrier protection of
220kV RTPS-Raichur 1 amp2 lines
KPTCL Mail Recieved dated 28-06-2016
Details sought from KPCL for review of ICTs back up (high set) proection
settings as suggested KPCL is yet to furnish the details required to give
the revised settings
Status received vide mail dated 10-07-2017
As requested by EEE (protection) CEERT KPTCL the details were sent
to through e-mail dtd 08082016 After receipt of reply from KPTCL will
be implemented accordingly
62V3 Pending
Pending
Tamil Nadu
53II1
Annexure-III
Page 14 of 31
05-09-2015 at
1404 hrs
TANTRANSCO to take suitable measures like installing more stub-
towers along 230 kV OK Mandapam ndash Myvady line to avoid
excessive sag due to over-loading
TANTRANSCO PendingComplete outage of 230kV Palladam 230 kV
Othakalmandapam Ss 230 kV Coimbatore Ss 230
kV Thudialur and 230 kV Sadayapalayam Ss
Pending
Disturbance in 220kV Tamilnadu system48I1 (GD)
TANTRANSCO TANTRANSCO vide their mail dated 240615 informed that different
relays in Main-I amp Main-II would be ensured at the earliest
Mail recieved on 24-07-2015 19-02-2016 and 24-03-2016
Different relays in Main-I amp Main-II will be ensured
Mail received on 27-04-2016
TANTRANSCO Not feasible in the existing SAS sub stations Hence
exemption may be given for these sub stations
Mail received on 20-05-2016 16-06-201625-07-2016 amp 24-09-2016
As discussed in the 52nd PCSC meeting Swapping of Relays between two
stations is not feasible in the existing SAS sub stations Hence exemption
may be given for these sub stations
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15062017
Different make Relays will be ensured for Main-I amp II relays at Alamathy
end
TANTRANSCO Mail received on 19-02-2016 24-03-2016 and 27-04-
2016
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
Mail Received on 20-05-2016 16-06-201625-07-2016 amp 24-09-2016
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
230kV Othakalmandapam - Myvadi feeder will be made LILO at Kongal
Nagar Line restringing will be carried out along with the above proposal
29-03-2015 at
1529 hrs
43II5 Line-2 tripped on R-phase to earth fault
Line autoreclosed at SVChatram end and failed to
reclose at Alamathy end Bphase to earth fault in line-
1 Line tried for Ar but due to permanent fault line
did not reclose ICT tripped on operation of over flux
protection
TANTRANSCO was requested to swap the relays between two
stations so that
Main-1 and Main-2 will be of different make at each station
Tripping of 400kV
Alamathy-
SVChatram line-1amp2
and 400230kV ICT
at SVChatram
Annexure-III
Page 15 of 31
14-09-2016 at 1113Hrs
Bus Bar Protection (Zone-2) of 230 kV Bus-B got operated at Alamathy Station during fault in 230 kV
Alamathy-Korattur feeder
51I1 (GD)
12-05-2016 at
1215 hrs
Fault had occurred in 230kV Madurai-Sembatty line
Trip from distance relay was not extended to breaker
due to protection DC fail LBB protection got
operated resulting in a busbar trip at 230kV Madurai
substation All elements got tripped as there is a
single bus operation at 230kV Madurai Ss
58II17
TANTRANSCO
TANTRANSCODifferent type and Make of distance protection relays to be provided for Main-I amp Main-II protection for 230kV feeders at 400 kV Sunguvarchathiram amp 230 kV Sunguvarchathiram Substation [Carry-Over from Protection Audit Recommendations]
Mail recieved on 25-07-2016 amp 24-09-2016
TANTRANSCO Auto Transformer-2 HV side Bus isolator C-phase
support insulator of 230kV Southern Bus was replaced and Bus Bar
Protection scheme was restored on 12052016
Status received vide mails received on 10-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
CT is not available in the Bus Coupler bay for zone segregation CT latch
relay is to be provided for all bays for zone segregation
TANTRANSCO mail received on 24-03-2016
CMR relay for extending LBB protection was released and LBB extended
from Distance Protection relay directly CT is not available in the Bus
Coupler bay for zone segregation However during commissioning of third
ICT Bus section Breaker will be provided for zone segregation Numerical
BBP relay will be provided
Status received vide mails recieved on 27-04-2016 and 20-05-2016 16-
06-2016 25-07-2016 24-09-201610-11-2016 amp 20122016 amp
12042017 amp 01062017 amp 15-06-2017
CT is not available in the Bus Coupler bay for zone segregation However
during commissioning of third ICT Bus section Breaker will be provided
for zone segregation Numerical BBP relay will be provided
PendingComplete outage of 230kV Madurai Ss
(Chekanaurani) of TANTRANSCO
TANTRANSCO
Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
TANTRANSCOMultiple tripping at 230 kV Alamathy Station
Pending
Pending
1 TANTRANSCO to check the healthiness of BBP relay by conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
TANTRANSCO to take steps to provide double-bus operation at
their 230 kV Gummidipoondi SS
Pending
Complete outage of 230 kV
Gummidipoondi Station of
TANTRANSCO
19-01-2016 at
1156 hrs
Flashover of Auto Transformer- 2 HV
B-phase Isolator supporting insulator of 230kV
Southern Bus occurred at Gummidipoondi station At
the time of fault Bus bar protection relay was not in
service for pre-commissioning testing of Auto
Transformer-2 All feeders got tripped due to
operation of zone-2 protection from remote ends
TANTRANSCO1 TANTRANSCO to examine the feasibility of providing two main-
zone operation for bus bar protection by exploring various alternatives
like replacing existing bus-coupler CB with a hybrid bus-coupler CB
that comes with inbuilt CT replacing existing BBP relay with another
suitable relay that supports two main-zone operation and implement
the same
Busbar protection got operated for a fault in 230kV
Mywadi-Anaikadavu line
21-12-2015 at
628 hrs
Complete outage of 230kV Mywadi
station of TANTRANSCO
50I3 (GD) TANTRANSCO Mail received on 19-02-2016 and 24-03-2016
Revision of Bus Bar Protection setting was carried out The stabilizing
voltage setting was raised from 410 to 450 volts After completing the
necessary test the bus bar protection put in to service on 29122015
Mail Received on 27-04-2016 16-06-201625-07-2016 amp 24-09-2016
Revision of Bus Bar Protection setting was carried out After completing
the necessary test the bus bar protection put in to service on 29122015
Mail received on 10-11-2016 amp 20122016
Provision of Bus Coupler bay arrangement was included in the
Upgradation works proposed and the same was sanctioned by MoP
through PSDF
Numerical relay allotted and being commissioned
Mail received on 20-02-2017
Numerical BBP relay was commissioned on 02022017
Status received vide mail dated 12042017 amp 01062017 amp 15-06-
2017
Numerical BBP relay was commissioned on 02022017
Provision of Bus Coupler bay arrangement was included in the
Upgradation works proposed and the same was sanctioned by MoP
through PSDF
The issue was discussed in PCSC-58 meeting held on 18102016 when
PCSC forum agreed to de-link the implementation of the Item from the
scope of Protection Audit Recommendations (PAR) and pursue it as part
of PCSC Recommendations
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp15-06-2017
Different make Relays will be provided for Main-I amp II relays at
Sunguvarchatram end in a phased manner
Pending
1 TANTRANSCO to provide split-bus operation with bus
sectionalizer CB for their 230 kV Madurai (Chekanurani) SS
2 TANTRANSCO to provide two main-zone operation for the
numerical BBP that is being commissioned
3 TANTRANSCO to examine the feasibility of providing Re-Trip
feature for the LBB protection and accordingly take steps for
implementing the same
58
55I1 (GD)
Annexure-III
Page 16 of 31
58II17 Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
TANTRANSCOMultiple tripping at 230 kV Alamathy
Station
15-09-2016 at
2214 hrs
Bus Bar Protection (Zone1) of 230kV Bus-A got
operated at Alamathy Station during fault in 230 kV
Alamathy-OPG-1 feeder
1 TANTRANSCO to check the healthiness of BBP relay by
conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal
winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
Pending
Annexure-III
Page 17 of 31
6414 Complete outage of North Chennai TPS
STG-1
26-03-2017
at 2314hrs
Tripping of evacuating lines due to fault led to
tripping of running Unit at NCTPS Stg-1
1 TANTRANSCO to take steps to complete insulator replacement
works on the 230 kV lines owned by them in NCTPS area within 6
months
2 TANTRANSCO to take steps to implement AR on all 230 kV lines
emanating from NCTPS-I at the earliest
TANTRANSCO Yet to be informed Pending
65II1 Tripping of 220 kV Idukki ndashUdumalpet
line
05-05-2017 at
1702 hrs
Line tripped due to B-N and R-N fault in line 1 TANTANSCO to correctly configure AR logic at Udumalpet so
that in the event of 3-ph trip being given during AR dead-time the
relay will not try for auto-reclosure
2 TANTRANSCO to keep AR dead-time as 1 sec for all 220 kV amp
above transmission lines
TANTRANSCO Yet to be informed Pending
58II17
44I1 (GD)
Mail received on 10-11-2016 amp 20122016
1 The Bus Bar Protection scheme will be tested for healthiness including
the CT circuits
2 High impedance BBP relay will be replaced by Numerical relay
Status received vide mails dated 10012017 amp 12042017 amp
01062017 amp 15-06-2017
1 The Bus Bar Protection scheme was tested for healthiness including the
CT circuits AREVA make CTs in Alamathy SS are having different
kneepoint voltage for the cores CT cores of higher knee point voltage has
been choosen for BBP in 230kV Korattur 230kV OPG-1 amp 230kV OPG-
2 feeders on 29112016 ---- Completed
2 High impedance BBP relay will be replaced by Numerical relay ---
Pending
KSEB Mail received vide dated 17012017
1 110 kV bus bar protection progressing ----Pending
2 Connection of 220kV earth mat and 110 kV plate earthing system
completed---- Completed
3 Redundancy of 110V DC system in progress Complete independent
redundancy is not practical for the time being 48 V DC redundancy was
already there----Pending
4 Instead of stand alone event logger SCADA system of 110 kV feeder is
expected to be completed by the end of 2017 SCADA system of 220kV
side will be taken up after that----Pending
28-04-2015 at
1230 Hrs
Mail received on 31-07-2015
1 Reducing the sensitivity of REF protection of Unit 4 5 6 at Idukki
PH - Generation wing is planning to purchase new transformer
management relays with low impedance REF protection Purchase
procedures initiated ---------Pending
2 The replacement repair of faulty breakers are under the consideration of
Generation wing Breakers will be replaced repaired in a phased manner
Unit 3 breaker was replaced with available breaker from the 220kV
IDMD feeder The 220kV CBs of unit 2 and unit 3 will be replaced with
in two months
3 No abnormalities were noticed in the PLCC equipment at New Pallom
station It is kept under observation
Mail recieved on 30-10-2015
1 Purchase procedures is still in progress
2 Replaced
3 PLCC equipment Tested and found OK
Mail recieved on 03-03-2016
1 Even though repeated plans to have a joint inspection with MsABB
who is the OEM of the relay panel for replacing the relays with numerical
ones the same could not become successful Finally the inspection has
been fixed on 15032016 It has been planned to replace existing REF
protection with low impedance ones after retrofitting the numerical ones of
OEM
Mail recieved on 25-05-2016
1Generation wing is planning ti provide low impedance REF protection by
retrofitting numerical ABB make transformer management relay in the
existing panel ---- Pending
2Faulty breaker of Unit3 has been replaced ---- Completed
3PLCC equipments in the feeder were checked and found OK ------
Completed
TANTRANSCO
KSEB
Complete outage of Idukki Hydro Power
Station (GD-1)
Multiple tripping at 230 kV Alamathy
Station
15-09-2016 at
2214 hrs
58I1 (GD) Complete outage of 220 kV Kalamassery
Substation
23-08-2016
at 1120 hrs
Triggering incident was conductor snapping in 110
kV Kalamassery- Kaloor feeder
KSEB to take steps to provide the following at their 220 110 kV
Kalamassery SS
1 Busbar protection at 110 kV level
2 Connecting 220 kV and 110 kV sides on to a common earthmat
3 Redundant DC supply for both protection (220 V) and
communication (48 V) applications
4 Stand-alone Event Logger
Bus Bar Protection (Zone1) of 230kV Bus-A got
operated at Alamathy Station during fault in 230 kV
Alamathy-OPG-1 feeder
1 TANTRANSCO to check the healthiness of BBP relay by
conducting stability test and take appropriate remedial action like
increasing voltage settings ensuring the healthiness of CTrsquos using
CTrsquos with similar characteristics (equal saturation effects amp equal
winding resistances) etc at their 230 kV Alamathy SS
2 TANTRANSCO to replace the existing high-impedance BBP relay
with its low-impedance numerical variant so as to accommodate
variation in CT characteristics at their 230 kV Alamathy SS
KSEB
Pending
220 kV breaker of unit-3 at Idukki Power
house flashed and bus differential protection
acted All Generators (6Nos) along with all
220 kV feeders tripped during the incident
1 KSEB to reduce sensitivity of REF protection appropriately at
Idukki PH
2 KSEB to replace repair the faulty breaker
3 KSEB to check the PLCC equipment at New Pallam and inform
the remedial measures taken to PCSC forum
Kerala
Pending
Pending
(Recommendat
ion No1)
Annexure-III
Page 18 of 31
08-05-2016at
457 hrs
Tripping of 400kV Hyderabad - N‟sagar
line
PGCIL (SR-I amp SR-II)
PendingLine tripped on operation of over-voltage protection at
Hyderabad end and Direct Trip was received at
N‟sagar Over-voltage Stg-2 operation was observed
in EL of Hyderabad station
55II5 1PGCIL (SR-I) to properly configure EL‟s at Hyderabad station
with time-scale resolution up to msec further DR‟s should also be
configured for showing both Analog and Digital data with properly
defined X-axis and Y-axis scales
2PGCIL (SR-I) to follow the FILE Naming Nomenclature provided
by SRPC in naming various tripping files (FIRDRELTR) being
uploaded in SRLDC‟s Tripping Monitor System (TMS) portal
PGCIL (SR-I) Yet to be informed
Annexure-III
Page 19 of 31
55II9 Tripping of HVDC Gazuwaka pole-2 19-05-2016 at
1141 hrs
Pole tripped on operation of differential current
protection of east side of Pole-2
PGCIL (SR-I) to take up the issue of differential protection operation
of converter transformer on low voltage fluctuations with their OEM
and submit a detailed report on it
PGCIL (SR-I) Yet to be informed Pending
56II11 Tripping of HVDC GazuwakaPole-2 19-06-2016 at
520 Hrs
HVDC Pole-2 got tripped on operation of Bus
differential protection
PGCIL (SR-I) to get the tripping of HVDC Pole-2 tripping on Win-
Bus differential protection thoroughly investigated for correctness of
operation and submit a report thereon
PGCIL (SR-I) Yet to be informed Pending
56III7 Tripping of 400 kV Khammam-N‟sagar
line-1
05-06-2016 at
2241 hrs
Line tripped on B-phase to earth fault Line auto-
reclosed successfully at N‟sagar and failed to auto-
reclose at Khammam
1PGCIL (SR-I) to configure DR amp EL at N‟sagar (Tallapalli) end so
that full operation of AR is captured
2PGCIL (SR-I) to investigate the reasons for non-operation of AR of
Tie-CB at N‟Sagar end and resolve them suitably
PGCIL (SR-I) Yet to be informed Pending
58II13 (GI) Tripping of 400 kV Raichur-Gooty line-1
and 400 kV Gooty-Tumkur line-2
01-09-2016 at
517 hrs
400kV Gooty-Raichur line tripped at Gooty end only
and was holding from Raichur 400kV Gooty-Tumkur
line-2 tripped on over voltage
PGCIL (SR-I) to check the operation of OVR relays at their Gooty
SS and properly configure lines‟ DRs amp ELs so that events pertaining
to OVR (Stage-I amp Stage-II) operation (START amp TRIP) get
explicitly recorded
PGCIL (SR-I) Yet to be informed Pending
58II14 (GI) Tripping of 400 kV Gooty-Tumkur line-2 02-09-2016 at
2156 hrs
Line tripped on operation of over-voltage protection at
Gooty end and Direct Trip was received at Tumkur
PGCIL (SR-I) to check the operation of OVR relays at their Gooty
SS and properly configure lines‟ DRs amp ELs so that events pertaining
to OVR (Stage-I amp Stage-II) operation (START amp TRIP) get
explicitly recorded
PGCIL (SR-I) Yet to be informed Pending
61II4 Tripping of HVDC Gazuwaka Pole-2 05-12-2016
at 1503 hrs
Pole-2 tripped due to tripping of AC filter banks
which was due to voltage disturbance in eastern bus at
Gazuwaka
PGCIL (SR-I) to refer the instant trippings to their OEM to ensure
that the settings adopted for pole trippings for low-voltage power
swing and ferro-resonance phenomena are in order and have been set
properly A copy of the OEM‟s reply in this regard shall be furnished
to PCSC forum
PGCIL (SR-I) Yet to be informed Pending
62II4 Tripping of 400 kV Gazuwaka-Vemagiri
(PG) line and 400kV Vemagiri(PG)-
Nunna line
18-01-2017 at
2203 hrs
400 kV Gazuwaka - Vemagiri (PG) line and 400 kV
Vemagiri (PG) - Nunna line got tripped due to Direct
Trip receive at Gazuwaka and Vijayawada respectively
PGCIL (SR-I) to configure triggering of DR amp EL for SF6 gas
compartment Zone trip with suitable legend
PGCIL (SR-I) Yet to be informed Pending
63II11 Tripping of 765 kV Vemagiri-Srikakulam
line-1 and 765400kV ICT-1 at Vemagiri-
PG SS
16-03-2017 at
1023 hrs
Line-1 and ICT-1 which are in the same diameter got
tripped due to operation of Tie bay gas
compartment trip
1 Since tripping of elements on Gas Compartment Trip has been
observed frequently in the past few months at 765 400 kV
Vemagiri SS PGCIL (SR-I) shall furnish a comprehensive report
detailing the remedial measures taken including OEMrsquos suggestions
to prevent their occurrence
PGCIL (SR-I) Yet to be informed Pending
PGCIL (SR-I)12-09-2016 at
1203 hrs
Line tripped on Direct Trip receipt at Ramagundam
end and line was holding from Warangal end
Pending58IV1
400 kV Gazuwaka-Vemagiri (PG) line tripped on Y-E fault However for 400 kV Gazuwaka-Vemagiri (PG) line Direct Trip was received at Gazuwaka after
250ms of occurrence of fault and fault was
persistent for 250ms Then Over-Voltage Stage-1 protection operated from Vemagiri (PG) end in 400 kV Vemagiri (PG) - Nunna line and tripped it
62II1
For the line under consideration the following shall be carried out
by PGCIL (SR-I) in coordination with NTPC-Ramagundam
I)End-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
II)Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be
repaired replaced
Yet to be informedTripping of 400 kV Ramagundam-
Warangal line
Yet to be informed05-01-2017 at 1305 hrs
Tripping of 400kV Gazuwaka - Vemagiri (PG) line and 400 kV Vemagiri (PG ) - Nunna line
1 PGCIL (SR-I) to ensure time-sync of all protections relays at their Vemagiri Gajuwaka and Vijayawada substations2 PGCIL (SR-I) to check OVR settings for correctness of operation
along with proper drop-off to pick-up ratio (gt 097) and configure
OVR_START event in the corresponding Relay BCU Event Logger for all 400 kV lines emanating from their Vemagiri (PG) SS
PGCIL (SR-I) Pending
Annexure-III
Page 20 of 31
64III16 Tripping of 76 5kV Kurnool-Nellore PS
line-2
27-04-2017 at
2222 hrs
R-phase to earth fault had occurred in line Auto-
reclose was successful at Kurnool end and breaker
at Nellore PS end tripped and did not attempt for
auto-reclose
For the line under consideration PGCIL (SR-I) to Configure Event
Logger (EL) to record events at msec level
PGCIL (SR-I) Yet to be informed Pending
65II15 Tripping of HVDC Gazuwaka Pole-1amp2 25-05-2017 at
0945 hrs
HVDC pole-1 got tripped due to operation of South
filter inter zone protection and HVDC pole-2 got
tripped due to operation of differential protection
PGCIL (SR-I) to furnish detailed report on the events that led to
tripping of HVDC Poles ndash 1 amp 2 including remedial measures taken
to PCSC forum Further the OEM report wrt tripping of HVDC
Pole-2 shall also be furnished
PGCIL (SR-I) Yet to be informed Pending
65III5 Tripping of 765 kV Raichur-Solapur line-
2
07-05-2017
at 1918 hrs
Y-phase to earth fault Auto-reclose was successful
at Solapur and breakers at Raichur end got tripped
PGCIL (SR-I) to configure Event Loggerrsquos time-resolution up to
millisec level in all protection relays at their 765 400 kV Raichur SS
PGCIL (SR-I) Yet to be informed Pending
55II7 Tripping of 400kV Kudgi PG (Narendra
New) - Narendra-PG line-2
18-05-2016 at
1625 hrs
line tripped on B-phase to earth fault and line auto-
reclosed successfully from Narendra end Line tripped
from Kudgi-PG due to operation of over-voltage stage-
1
PGCIL (SR-II) to properly configure dead-time of AR (typically 1
sec) on all lines emanating from Narendra (PG) substation
PGCIL (SR-II) Yet to be informed Pending
54II3 Tripping of 400kV Sriperambudur -
SVChartam and 400kV Nellore-
Sriperambudur line-1
05-04-2016 at
0011 hrs
400kV Nellore-Sriperambudur line-1 tripped on a R-
phase to earth fault 400kV Sriperambudur-
SVChatram line tripped at Sriperambudur end only
on operation of over current protection
PGCIL (SR-II) to check and revise Pole Discrepancy Relay (PDR)
time setting appropriately based on the type of AR scheme being
implemented at their 400 kV Sriperambudur SS
PGCIL (SR-II) Yet to be informed Pending
54III3 Tripping of 400 kV Kalvindapattu-Vallur
line
10-04-2016 at
1459 hrs
R-phase to earth fault had occurred in line Auto
reclose attempt is unsuccessful auto-reclose could not
be established from provided DR EL
PGCIL (SR-II) to furnish a report on the tripping event detailing the
reasons for unsuccessful AR operation at Kalvindapattu end and the
remedial action taken to restore AR to normalcy
PGCIL (SR-II) Yet to be informed Pending
55II17 Tripping of HVDC Talcher-Kolar pole-1 30-05-2016 at
0949 Hrs
Failure of main CT of AC filter (20C08A) occurred
and it in turn caused the operation of filter bank
differential protection HVDC Pole-1 got tripped on
group Differential protection operation
PGCIL (SR-II) to take up the issue of Pole-1 tripping on Group
Differential Protection (Stage-II) due to multiple commutation failures
with their OEM and furnish a report on it
PGCIL (SR-II) Yet to be informed Pending
56II8 Tripping of HVDC Talcher-Kolar Pole-1 17-06-2016 at
1635 Hrs
Talcher-Kolar HVDC Pole-1 got tripped on line fault
and Pole-2 went to ground return mode with 150MW
PGCIL (SR-II) to address amp resolve DTPC and fibre-optic link
related issues raised by KSEB at Thrissur Madakathara substations
and conduct a mock-test in coordination with KSEB to verify integrity
of signal transmission from Kolar to Thrissur Makadathara
PGCIL (SR-II) Yet to be informed Pending
64II14
PGCIL (SR-I)14-05-2017
at 1654 hrs
Tripping of 400 kV Vemagiri - Gazuwaka
line
PGCIL (SR-I) to sort out issues relating to AR functionality
operation for both Main-CB and Tie-CB at both Vemagiri and
Gajuwaka substations
For the line under consideration the following shall be carried out
by PGCIL (SR-I)
End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be
repaired replaced
Y-phase to earth fault Auto-reclose was not
successful due to persistent fault Vemagiri end had
sent a Direct Trip after un-successful Auto-reclose
AR attempt was observed in Gazuwaka end DR
after 3 phase trip
65III10
Yet to be informed PendingPole-1 got tripped due to failure of auxiliary supply
changeover 400kV Jeypore-Gazuwaka line-2 got
tripped on operation of over-voltage protection
Pole-2 east shunt reactor got failed and this in turn
resulted in tripping of HVDC pole-2 due to Pole-2 Y
block activation 400kV Jeypore-Gazuwaka line -1
also got tripped during the incident
28-Apr-17 Pole-
1 at 844 hrs
and Pole-2 at
907 hrs
Tripping of HVDC Gajuwaka Pole-1amp2
and 400 kV Jeypore-Gazuwaka line-1amp2
PGCIL (SR-I)1 PGCIL (SR-I) to provide fully automatic supply-changeover
scheme for Pole-1 auxiliaries at the earliest
2PGCIL (SR-I) to furnish a detailed report on the reasons for East
Shunt Reactor failure including remedial action taken OEM report in
this regard also shall be shared
3PGCIL (SR-I) to provide redundant AC auxiliary supply to both
Pole-1 amp Pole-2 either by making use of tertiary of ICT-1 or from
external dedicated feeder
Yet to be informed Pending
Annexure-III
Page 21 of 31
58II3 (GI) Tripping of 400 kV Sriperambudur-
SVChatram line
14-08-2016 at
1349 hrs
Line tripped at Sriperambudur end only on
operation of directional earth fault protection
(i) PGCIL (SR-II) to disable high-set of line DEFRrsquos and
(ii) PGCIL (SR-II) to block line DEFR operation when DPR is in active
condition (has picked up) at their Sriperambudur SS
PGCIL (SR-II) Yet to be informed Pending
58II5 (GI) Tripping of 400 kV Neyveli TS2-Pugalur
line and 400 kV Neyveli TS2-Neyveli TS2
EXP line
21-08-2016 at
1035 hrs
Failure of Y-Ph tension insulator of tie feeder bay at
Neyveli TS2 Neyveli-Pugalur line tripped due to over
voltage at Neyveli TS2 and direct trip was received
at Pugalur
PGCIL (SR-II) to check the operation of the DPR relays at Pugalur
end NLC TS2 - Pugalur line by trans-playing the event on another
healthy relay and take suitable action including replacement of the
relay accordingly
PGCIL (SR-II) Yet to be informed Pending
58II19 (GI) Tripping of 400 kV Madurai-Karaikudi
line
15-09-2016 at
0302hrs
Line tripped on operation of OVR Stage-I protection
at Karaikudi and Direct Trip was received at Madurai
PGCIL (SR-II) to check the operation of OVR relays at their 400 kV
Karaikudi SS and properly configure linesrsquo DRs amp ELs so that events
pertaining to OVR (Stage-I amp Stage-II) protection operation (START
amp TRIP) get explicitly recorded
PGCIL (SR-II) Yet to be informed Pending
59II20 (GI) Tripping of HVDC Talcher-Kolar pole-1 10-10-2016 at
1635 hrs
Pole-1 of HVDC Talcher-Kolar tripped due to receipt
of lsquorsquoPole block command from Talcher end due to
tripping Pole-1 DC filter at Talchar end Pole 2 went
into metallic return mode after tripping of pole-1
PGCIL (SR-II) to check the correctness of non-operation of SPS
(Talcher ndashKolar Trip Signal-1) in the instant case by comparing it
with the incident of tripping of HVDC Talcher-Kolar pole-1 on
05102016 and furnish a report on it to PCSC forum
PGCIL (SR-II) Yet to be informed Pending
59II24 (GI) Tripping of 400220kV ICT-2 at
Somanahalli SS
24-10-2016 at
354 hrs
ICT-2 tripped on operation of Buchholz relay PGCIL (SR-II) to properly configure ICT protection relay DR so that
digital signals are recorded with proper names at their 400220 kV
Somanahalli SS
PGCIL (SR-II) Yet to be informed Pending
59III4 Tripping of 400 kV Salem -Udumalpet line-2
13-10-2016 at 0306 hrs
Line tripped on R-phase to earth fault Line auto-reclosed at Udumalpet end and did not reclose at
Salem
Line tripped on R-phase to earth fault Line auto-reclosed at Udumalpet end and did not reclose at Salem
PGCIL (SR-II) Yet to be informed Pending
62II6 Tripping of 400 kV Trichy-Karaikudi line 21-01-2017 at 2145 hrs
Line tripped on operation of over voltage protection at Karaikudi end and direct trip was received at Trichy Voltage recorded in DR in antecedent
conditions were 2454 kV 2432 kV 2536 kV
respectively
1 PGCIL (SR-II) to ensure OVR settings adopted for 400 kV lines at Karaikudi SS are as per SRPC provided settings with a drop-off to pick-up ratio gt 097
2 PGCIL (SR-II) to configure OVR_START event in the corresponding Relay BCU Event Logger for all 400 kV lines emanating from their
Karaikudi SS
PGCIL (SR-II) Yet to be informed Pending
62III5 Tripping of 400 kV Tumkur ndash Bidadi line 17-02-2017
at 1044 hrs
B-E fault Line did not auto-reclose 1 PGCIL (SR-II) to properly configure AR logic operation at Bidadi
end and ensure itrsquos correct operation for a fault during reclaim time
2 PGCIL (SR-II) to ensure time-sync of protection relays with GPS at
both Tumkur and Bidadi substations
PGCIL (SR-II) Yet to be informed Pending
62III6 Tripping of 400 kV Tumkur ndash Bidadi line 18-02-2017
at 1036 hrs
B-E fault Line did not auto-reclose PGCIL (SR-II) to properly configure AR logic operation at Bidadi
end and ensure itrsquos correct operation for a fault during reclaim time
PGCIL (SR-II) Yet to be informed Pending
62V1 Tripping of 400kV Vallur-Kalivandapattu
line-2
22-02-2017 at
455 hrs
Line tripped due to failure of R phase jumper Two
faults observed from DR 2nd fault cleared in 500ms
from Kalavindapattu end
PGCIL (SR-II) to enable Trip on Reclose (TOR) at Kalavindapattu end
on all 400 kV lines emanating from it
PGCIL (SR-II) Yet to be informed Pending
57II2 Tripping of 400 kV Mywady-Salem line-1
and 400 kV Mywady-Madurai line
PGCIL (SR-II) Yet to be informed03-07-2016 at
0306 hrs
400kV Mywady- Madurai line tripped on a Y-phase
to earth fault due to agriculture fire Tie-CB LBB
relay got operated at Mywady end and resulted in
tripping of Main breakers of 400kV Mywady-
Madurai and 400kV Mywady-Salem line-1 which are
in the same diameter
PGCIL (SR-II) to furnish a report on the remedial action taken after
ascertaining the reasons for (i) non-opening of Main-CB of Mywady
ndash Madurai line at Mywady end on Tie-CB LBB operation and (ii)
delay in sending DT to the remote ends after Tie-CB LBB operation
Pending
Annexure-III
Page 22 of 31
65II2 Tripping of 400 kV Kudgi (PG) - Tumkur
line-2 and Kudgi (PG) ndash Kudgi (NTPC)
line-1
06-05-2017 Kudgi (NTPC) feeder tripped at Kudgi (PG) end on
operation of distance protection R-N Zone-1
Tumkur feeder tripped at Kudgi(PG) end on
operation of NGR buchholtz relay
1 PGCIL (SR-II) to sort out AR related issues at Kudgi (PG) end on
400 kV Kudgi (PG) ndash Kudgi (NTPC) lines and put AR into service
2 PGCIL (SR-II) investigate reasons for NGR Buccholtz trip on 400
kV Kudgi (PG) ndash Tumkur line-2 and furnish action taken report wrt
rectifying the same
PGCIL (SR-II) Yet to be informed Pending
58II16 (GI) Multiple tripping at 400 kV Kalpaka SS 06-09-2016 at
1643 Hrs
Y-Pole breaker of Bus reactor-3 got failed during its
charging This resulted in a bus fault in 400kV bus-1
resulting in tripping of 400kV elements connected to
Bus-1
PGCIL (SR-I) amp PGCIL (SR-II) to review their Reverse Zone settings of
distance relays so as to bring them in line with Ramakrishna
Committee guidelines at all their substations in the southern
region
PGCIL (SR-I) amp PGCIL
(SR-II)
Yet to be informed Pending
51II4 NTECLTripping of 400kV Alamathy-Tiruvalam
line-1 and 400kV Alamathy-Vallur line-2
NTECL Vallur to furnish a report detailing the reasons for mal-
operation of Vallur end relays for a fault on Alamathy-Tiruvalam line-
1 and remedial measures taken to PCSC forum In the report their
preparedness for implementing line differential protection on Vallur-
Alamathy lines may also be indicated
400kV Vallur-Alamathy Line-2 got tripped from
Vallur end during failure of Y-phase LA in 400kV
Alamathy-Tiruvalam line Protection at Vallur end
tried for an auto-reclose and gave a 3 phase trip
TANTRANSCO mail received on 24-03-2016
3Ф Trip at 400kV Alamathy end due to DT received from vallur end for
BФ LAS bursted in Alamathy -Thiruvalam - 1 at Alamathy end
Mail received on 27-04-2016 and 20-05-2016
3Ф Trip at 400kV Alamathy end due to DT received from vallur end for
BФ LAS bursted in Alamathy -Thiruvalam - Line-1 at Alamathy end
Pending13-12-2015 at
2242 hrs
Others
Annexure-III
Page 23 of 31
56III5 Tripping of 400 kV Neyveli TS-2-
Pugalur line
04-06-2016 at
1636 hrs
B phase to earth fault occurred in line Auto-reclose
had not operated at NLC TS-2 and DT was sent to
Pugalur end resulting in a 3 phase trip
NLC to review the necessity of providing Relay Definitive Trip and
accordingly take steps to disable it on all lines emanating from their
generating stations
NLC Direct trip triggering of DR wii be carried out at TS2 end during the next
planned shutdown of the Pugalur Ts2 feeder
Mail received on 22-02-2017
Direct trip triggering of DR carried out at TS2 end for the TS2-Pugalur
feeder on 25-01-17
Pending
56II16 Tripping of 400 kV Gajwel-Singareni
line-2
30062016 at
2343 hrs
Tripped on 3-phase Trip at Gajwel end SCCL to configure Jaipur end relay‟s EL properly so that the time-
stamp resolution is extended downwards up to milli-second level
SCCL Yet to be informed Pending
1Singareni TPS to furnish single line diagram of their switchyard
along with the Over Voltage Relay settings adopted for various
transmission lines and to ensure that they are in line with the SRPC
provided gradings
2Singareni TPS to upload various tripping files (FIRDRELTR)
pertaining to a tripping event involving their station in SRLDC web-
portal within 24-hrs of occurrence of that event in compliance of
IEGC Regulation 52(r)
Line tripped on operation of Over-Voltage
protection at Singareni and Direct Trip was received
at Gajwel DR amp EL of Singareni was not furnished
59III3
57II8 NTPC (Ramagundam)
10-07-2016 at
156 hrs
Line tripped at Ramagundam end on operation of over-
voltage protection Dichipally end tripped due to
receipt of Direct Trip signal
1NTPC-Ramagundam to ensure correctness of operation of Over
Voltage relays by taking remedial measures like maintaining
healthiness of concerned CVT‟s setting drop-off to pick-up ratio at
097 amp above etc
2NTPC-Ramagundam to ensure time sync of their station‟s DR amp
EL with GPS
3NTPC-Ramagundam to sort out analog values indication amp
overlapping issue of time-stamp in their station DR‟s
4NTPC-Ramagundam to properly configure their EL‟s so that events
are recorded with msec resolution
Line tripped on B-phase to earth fault Line auto
reclosed at Chandrapur end and did not reclose at
Ramagundam
57II4
16-07-2016 at
438 hrs
Tripping of 400 kV Ramagundam -
Chandrapur line -2
1NTPC-Ramagundam to furnish remedial measures taken wrt AR
non-operation and unwarranted DT sending to other end
2NTPC-Ramagundam to configure protection relays DR‟s such that
events get recorded for at leas
2000 msec post-triggering so as to cover complete AR operation
Tripping of 400 kV Ramagundam -
Dichipally line
NTPC-Ramagundam mail dated 09032017
1 Main-II relay replaced Over voltage relays pickup to reset ratio is 098
--- Completed
2 DR and EL are time synchronized with GPS clock
-------- Completed
3DR alalog overlaping issue is sloved ---- Completed
4 ----- Pending
Yet to be informed
Pending
54I1
Tripping of 400 kV Gajwel-Singareni line-
2
02-04-2016 at
1708 hrs 1MAPS to furnish a detailed report on the tripping of SP Koil ndash
MAPS lines 1 amp 2 at MAPS end with focus on the correctness of the
settings of Main-I amp Main-II relays (for primary amp back-up
protections) on both the lines
2MAPS to take steps to provide down-loading facility for DR amp EL
from Main-I amp Main-II relays on all 230 kV lines emanating from
MAPS
3MAPS in co-ordination with SP Koil to carry out PLCC end-to-
end testing on SP Koil ndash MAPS lines 1 amp 2 and ensure healthiness
of PLCC communication amp carrier-aided protection
4MAPS to put in service Auto-Reclosure feature on all four 230 kV
lines emanating from MAPS by June 2016
Pending
Complete outage of 230 kV SPKoil
Station of TANTRANSCO
B-phase CT failure occurred in 230 kV SPKoil -
MAPS line-1 Busbar protection got operated at
SPKoil station All elements except 230kV
Oragadam and 230kV Kalivandapattu got tripped at
230kV SPKoil station bdquoY‟ phase CT and support
insulators also got damaged
27-09-2016 at
0101 hrs
Status revided vide MAPS mail dated 06122016
1 The settings given by Ms TANTRANSCO were adopted for Main ndashI amp
Main- II relays for both the lines The same settings were verified to be
same Subsequently calibrated was done and no drift was observed
--- Complied
2 From May 2016 onwards the DR EL and trip report are being sent by
mail to SRLDC Bengaluru by MAPS
--- Complied
3 Monthly maintenance of PLCC equipments is being done by Ms
TANTRANSCO At present PLCC telephone is not working it is being
followed up
--- Complied
4 CVTs are planned to be procured from Ms TANTRANSCO by the end
of February 2017 and AR will be implemented for all the lines emanating
from MAPS by July-2017 as discussed in the current SRPC meeting on
25112016
--- Pending
PendingNPCIL (MAPS)
SCCL
NTPC-Ramagundam mail dated 09032017
1 The relay will be checked in next opportunity if required it will be
changed with new one------------- Pending
2DR time recording increased to 2 sec --------- Completed
NTPC Pending
Annexure-III
Page 24 of 31
62III2 Tripping of 400 kV Kaiga-Guttur line-1 06-02-2017
at 0501 hrs
B-phase to earth fault Line did not auto-reclose at
Kaiga end
1 KGS to properly configure all relays DR‟s time scale for a post-
triggering period of 2 sec to capture events such as complete AR
operation
2 KGS to ensure time-synchronization of all protection relays with
GPS in their 400 kV switchyard
NPCIL (KGS) Yet to be informed Pending
63III4 Tripping of 400 kV Gajwel-Singareni line-
2
07-03-2017 at
1652 hrs
Line tripped on B-phase to earth fault Line did not
auto-reclose
1 SCCL to properly configure LBB logic for all line relays
where AR has been put into service for 1-ph initiation based
on phase segregation (ie for the faulted phase) at their
Singareni TPS
SCCL Yet to be informed Pending
64II8 Tripping of 400 kV Tirunelveli-
Kudankulam line-3
23-04-2017 at
0556hrs
R-phase to earth fault had occurred in Tirunelveli -
Udumalpet line-2 During the incident Tie-CB LBB
got operated at Tirunelveli end due to sluggish
operation and tripped 400 kV Tirunelveli -
Kudankulam line-3
NPCIL (KKNPP) to configure DRrsquos amp ELrsquos of protection relays at their
station for recording DT receipt event at their Kudankulam NPP
NPCIL(KKNP) Yet to be informed Pending
Yet to be informed63III8 NPCIL (KGS)Tripping of 400kV Kaiga-Guttur line-2 Line tripped on Y-phase to earth fault Line auto-
reclosed from Guttur end and failed to re-close from
Kaiga end
1 NPCIL (KGS) to furnish an action taken report on the
reasons for AR lock-out and remedial action taken to rectify
the same
2 NPCIL (KGS) to configure DR‟s of line protection relays for
a post triggering period of 2 sec to capture complete AR
operation at their Kaiga GS
3NPCIL (KGS) to furnish FIR amp TR for tripping events as
per SRLDC provided formats
27-03-2017 at
706 hrs
Pending
Annexure-III
Page 25 of 31
34I6
01-01-2015 at
1338 hrs
42II18 400kV Raichur TPS-Raichur(PG) line-
1amp2 400kV Raichur-Mahboobnagar
Unit7 and ICT-2 at RTPS tripped
during the incident B phase to earth
fault had occurred in 400kV Raichur
TPS-Raichur line-1
1 Bus bar protection shall be provided by asset owner ( ie
KPTCL)
2 Settings for main distance protection amp Overcurrent protection
shall be examined and reviewed
3 Time synchronization of the Substation shall be ensured
As reported directional over current relay of ICTrsquos
operated due to snapping of line jumper in 220kV
Lingapur line
1 KPCL to review REF setting (DMT or IDMTL) for unit-7 by first
week of April 2015 and inform the same to PCSC forum
2 TSTRANSCO to furnish Mehaboobnagar‟s DR and EL and the
reasons for distance relay operation at their end within a week‟s time
3 PGCIL (SR-I) to rectify the issues relating to AR operation relay
reach (Z2) reverse reach (Z4) and SOTF auxiliary contacts within a
week‟s time and submit the actions taken to PCSC forum
16-07-2014400220 kV ICT-1 amp 2 at
MUNIRABAD
On account of R-phase to earth fault line tripped at
Hassan end due to operation of distance Zone-2 and
non-receipt of carrier From DR of Talaguppa end it
is observed that fault had occurred in Yphase
09-03-2015 at
0636 hrs
Tripping of 400
kV TALAGUPPA
ndash HASSAN line
40II3
Multiple tripping at Raichur TPS of
KPCL
Miscellaneous
1 PGCIL and KPTCL to ascertain the reason for the phase
discrepancy in the relay operation and take suitable remedial
measures
2 KPTCL to check the PLCC operation at Talaguppa end and submit
the report to the PCSC forum
1 Yet to be informed by KPCL ---- Pending
2 Mail received on 26-05-2015 from TSTRANSCO
It is found that the main-2 ABB make REL316 type distance relay was
defective and same was replaced with MICOM P444 by MsPGCIL on
2304-2015 After replacement of main-II DR can be extracted from this
relay For EL in to service some field winding is pending which is being
taken up in this month -- Complied with
3
PGCIL mail recieved on 27-04-2016
End to end PLCC tunning carried out
PGCIL (SR-I) RVMD 14072016
Relay settings of all the stations in SRTS-1 were derived as per
Ramakrishna Commettee recomendations and implemented - Complied
with
KPCL
TSTRANSCO
PGCIL (SR-I)
PGCIL (SR-II) KPTCL
KPTCL
PGCIL (SR-I)
Mail recieved on 28-04-2015
End to end testing of PLCC has been done and problem in the PLCC is
atttended
Mail received on 27-05-2015 (KPTCL) amp 29-07-2015
End to end testing of PLCC has been done and problem in the PLCC is
atttended Phase discrepancy in the relay operation is to be checked jointly
Mail recieved on 02-09-2015 from PGCIL (SR-II)
Problem is in identification of phases at Talguppa end To be rectified by
Ms KPTCL
Mail recieved on 28-06-2016 from KPTCL
The matter is reffered to the concerned Operation and maintance wing to
set right the mismatch of phases in 400kV Talaguppa-Nelamangala and
Talaguppa-Shantigrma lines at Talaguppa in cordination with PGCIL
Pending
(with KPTCL)
Mail recieved on 27-05-2015 (KPTCL)
1 KPTCL has taken action to provide bus bar protection to 220kV buses
2 Over current relay Settings of ICTs to be reviewed by PGCIL
Mail received on 29-07-2015 (KPTCL)
Initial Tendering stage
KPTCL Mail recieved on 23-01-2016
Detailed estimate prepared for taking up the work CEE Transmission
Zone Gulbarga will take up necessary procurement and further execution
----------------------------------------------------------------------
1 Pending from KPTCL side
2 Complied with as per PGCIL (SR-I) RVMD 14072016 which stated
that Relay settings of all the stations in SRTS-1 were derived as per
Ramakrishna Commettee recomendations and implemented
3 Pending from KPTCL side
Pending (with
KPCL)
Pending
(with KPTCL)
Annexure-III
Page 26 of 31
Tripping of Unit 1 at NCTPS 24-05-2015
at 1913 hrs
ID Fan trip
Tripping of Unit 1 at MEPL 24-05-2015
at 1913 hrs
Coal Mill tripped
Tripping of Unit 1 at
Krishnapatnam
24-05-2015
at 1917 hrs
Generator Protection operated
Tripping of Unit-8 at RTPS 24-05-2015
at 1919 hrs
Tripped on Overvoltage
47I2
1 All Tripped units viz Krishnapatinam MEPL Raichur NCTPS
to submit a detailed report on this event including the remedial
measures taken to PCSC forum
2 KPCL to check the excitation system of Unit 8 of RTPS and
submit the remedial measures taken to PCSC forum
KPCL MEPL
APGENCO TNEB
As per FIR submitted CT damage observed in
Chitoor-Main bay (404) Main breakers connected to
bus-1 (401 404 407 410) got tripped on operation of
bus bar protection Unit-1 tripped on operation of
MFT Unit-2 was not in service
Complete outage of Krishnapatnam TPS
Pending (with
KPCL)
APGENCO letter dated 18032016
1SOE and SLD are attached The DR of 405 CB is not generated during
the incident Now the problem is identified and rectified
--------- Completed
2All the 3 lines ie CHTR-2 MNBL-I amp II tripped in zone
protection The fault was in Blind zone ie P2 side of CT where it was
covered under Bus fault by the time fault moved on to P1 side when the
fault comes under STUBTEED zone after 330msec all the feeders expect
CHTR-1 tripped in Zone-II and total fault persisted for 500msec before the
405 TIE CB opens and clear the fault As a remedial the STUB protection
operation also checked and found OK-------Completed
3The Time Sync was missed on the day and found there was problem with
LAN Timer same was rectified Now found OK
-----------Completed
4Now the DR Time scale changed to 1 sec for Pre fault and 3 sec for Post
fault and STATE of events are corrected wherever found wrongor
misguiding during analysis---------Completed
5
PGCIL-SR1 RVMD 27-04-2016
Procurement of differential protection for 400kV NPS-NLR DC and
400kV RCR-RTPS-DC is under tendering
PGCIL-SR1 RVMD 14-07-2016
The proposal for procurement of Line differential Protections for 400kV
Raichur - RTPS-1 amp 2 and 400kV Nellore - NPS - 1 amp 2 lines has been
approved and tender is under technical evaluation
Pending with
PGCIL(SR-I)
08-09-2015 at
1820 hrs
44I3
1 APGENCO to furnish to PCSC forum (i) A3-size Single Line
Diagram of SDSTPS and (ii) the sequence of events with time stamp
showing the protection that opened Tie-CB (405) at SDSTPS
2 APGENCO to review STUBTEED protection in all dias at
SDSTPS and ensure that they are configured for instantaneous
operation
3 APGENCO to properly configure the STATE of the tripping events
so that they get recorded appropriately like TRIP OPERATED in
their corresponding Event Loggers
4 APGENCO to ensure time sync of all DR‟s and EL‟s at SDSTPS
5 PGCIL (SR-I) to provide line differential protection for 400 kV
NPS ndashNellore-PG lines 1 amp 2
TANGEDCO vide their mail dated 07072015 informed that as per the
discussion and recommendation of 44th meeting of PCSC held on
28052015 a time delay of 2 Sec had been introduced for the above
tripping for all the ID fans at NCTPS-II
MEPL vide their mail dated 14092015 informed that they had
implemented 2 seconds delay for under voltage tripping of all Drag Chain
Feeder Conveyors And this has been done for both the Units
APGENCO letter dated 18032016
The unit not tripped on Generator protection but tripped on Economiser
inlet flow protection consequent to tripping of TDBFP on lube oil pressure
lowBefore tripping dip in voltage was observed in the LT system which
caused tripping od lube oil pumpsAfter the incidentChangeover scheme
on under voltage of LT System was reduced from 80 with 2 sec delay to
40 with 200msec delay
APGENCO PGCIL (SR-
I)
Annexure-III
Page 27 of 31
12-11-2015 at
0020 hrs
Tripping of 400kV Gooty-Nelamangala
line
KPTCL KPCL NPCIL
(KAPS)
1 KPTCL KPCL to see the possibility of implementing Weak Infeed
logic with Echo feature enabled by Under
Voltage (27) element on Kadra-Karwar lines 1 amp2 and implement
the same if feasible
2 NPCIL to time-coordinate Kaiga‟s DEFR settings with (i) Zone-2
settings at Kaiga and (ii) primary protections of the lines emanating
from Kadra and Kodasalli
3 KPCL to ensure time-sync of EL‟s and healthiness of the Fault
Locators at Kadra
220kV Kadra-Karwar lines-1amp2 tripped
on earth fault in B-phase in zone-2
Kaiga-Kadra line tripped at Kaiga end
only on operation of directional eath
fault protection
31-07-2015 at
1144 hrs
Tripping of 220kV Kadra-Karwar lines -
1amp2 and 220kV Kaiga-Kadra line
PGCIL (SR-I) mail received on 27-04-2016
1 The firmware of REL670 is being upgraded ------- Completed
2 The recording of events in msec interval is being taken up with OEM
Henceforth for analysis purpose we will provide larm list which has msec
time stamp -------- Completed
3 End to end testing of PLCC code transmision and tuning of channels
carried out ------- Completed
4 Procurement of differential protection for 400kV NPS-NLR DC and
400kV RCR-RTPS-DC is under tendering The legends modified in
Eventalarm list Provision of diff relay for all short lines emanating from
NPS is being taken up with our corporate -------- Pending
PGCIL(SR-I) RVMD 14-07-2016
The proposal for procurement of Line differential Protections for 400kV
Raichur - RTPS-1 amp 2 and 400kV Nellore - NPS - 1 amp 2 lines has been
approved and tender is under technical evaluation
1
PGCIL RVMD 27042016
AR blocked due to failure of PLCC link The defective PLCCcards
replaced at Neelamgala end
PGCIL RVMD 14072016
AR blocked due to failure of PLCC link The defective PLCCcards
replaced at Neelamgala end End to end testing of PLCC carried out and
PLCC link is healthy ------ Pending
2 Gooty end Time syc unit is replaced with new one and commissioned ---
----- Completed
3 Yet to be informed by KPTCL --- Pending
PGCIL (SR-I) KPTCL 1 For Gooty ndashNelamangala line PGCIL (SR-I) and KPTCL to
provide 3-ph trip logic at their respective ends upon detection of
PLCC link failure during dead-time of AR operation
2 PGCIL (SR-I) to make GPS functional at Gooty SS and ensure
time-sync of various DR‟s and EL‟s with it (GPS)
3 PGCIL (SR-I) KPTCL to furnish reason for the operation of
Backup impedance protection of the line reactor at Nelamangala end
and the remedial measures taken to PCSC forum
Pending (with
KPTCL)
1PGCIL (SR-I) to furnish Action Taken Report on the findings of
OEM on relay mal-operation at NPS end on 400 kV NPS ndash NCCK
line to PCSC forum
2 PGCIL (SR-I) to appropriately configure Station Event Logger at
NPS to record events at msec interval
3 PGCIL (SR-I) to carry out PLCC end-to-end testing in coordination
with TPCIL for 400 kV NPS ndashTPCIL line
4PGCIL (SR-I) MEPL SEL TPCIL amp NCC to take steps to
provide line differential protection at their respective ends on all 400
kV lines (except Gooty line) emanating from Nellore Pooling Station
and furnish an action plan to implement the same
Pending
1
Mail recieved on 25-05-2016 from KPTCL
Availability of week end infeed with eco feature to be confirmed by
SEERTCHubli --- Pending
2
Mail recieved on 03-12-2016 from NPCIL(KGS)
The 200 ms Definite time DEFR element in both Kaiga Kadra and Kaiga
Kodasally lines were disabled IDMT DEFR is retained The 200 ms
Definite time back up oc element in both Kaiga Kadra and Kaiga
Kodasally lines were disabled IDMT is retained
------ Completed
3 Yet to be informed by KPCL
Status received vide KPCL mail dated 14062017
1 Since PT blasted (B phase) at Karwar end resistive over reach occurred
hence Backup protecion operated at Kadra end (zone-2 not sensed) ---
Pending
3Newly commissioned micom P444 relay time synchronised with GPS
------ Completed
Running units at Thermal Powertech power Station
tripped due to tripping of 400kV Nellore pooling
station (NPS)-TPCIL line and 400kV Nellore pooling
station (NPS)-ECC line
30-12-2015 at
0602hrs
R-phase to earth fault had occurred in Line Line did
not auto-reclose from both ends It was mentioned that
YampB pole breakers at Neelamangala tripped on
operation of pole discrepancy and backup impedence
protection for line reactor got operated
Complete outage of TPCIL power station 50I2
50II8
47II7
PGCIL (SR-I)
MEPL SEL TPCIL
NCC
Pending
Annexure-III
Page 28 of 31
52I8 Complete outage of 400kV NTPL station
and CEPL Stations
14-03-2016 at
0136 hrs
Running Units at NTPL and Coastal Energen power
station got tripped due to tripping of evacuating lines
NTPL and PGCIL (SR-II) to furnish compliance report of the
recommendations given by PSAG-15 Committee that held its meeting
on 12-13 April 2016 at NTPL Tuticorin
PGCIL (SR-II)
NTPL
NTPL mail received on 19052016
All General Recommendations will be done in the second week of June
2016 ---------- Complied by NTPL
Yet to be informed by PGCIL (SR-II)
Pending
[with PGCIL
(SR-II)]
56III4 Tripping of 220 kV Sedam-Tandur line 03-06-2016 at
2152 hrs
Line tripped on B-phase to earth fault Auto-reclose is
not enabled for line
KPTCL and TSTRANSCO to fast-track providing AR on 220 kV
Sedam ndash Tandur line and furnish an action plan of providing the same
by next PCSC meeting (PCSC-57)
KPTCL
TSTRANSCO
Yet to be informed Pending
KPTCL and TSTRANSCO to take steps to provide AR feature on
220 kV Sedam ndash Tandur inter-state line at their respective ends at the
earliest
KPTCL
TSTRANSCO
PGCIL mail received on 27-04-2016
Being pursued with APTRANSCO
APTRANSCO mail dated on 22-06-2016
AS maintenance being carrired out by PGCIL(SR-1) the required relay
replacement (wiringprogramming) may also be carried out by PGCIL(SR-
1)
PGCIL RVMD 14072016
1 The CB problem has been attended by POWERGRID by using OEM
Ms BHEL services amp POWERGRIDs OampM spares
------ Completed
2 Being pursued with APTRANSCO to replace the faulty Event Logger at
Vijayawada (Nunna) SS -------- Pending
APTRANSCO mail dated on 31-08-2016 amp 04032017 amp 24052017
As maintenance being carrired out by PGCIL(SR-1) the required relay
replacement (wiringprogramming) may also be carried out by PGCIL(SR-
1)
PGCIL (SR-I)
APTRANSCO
1 PGCIL (SR-I) in co-ordination with APTRANSCO to address
the problem with CB at the earliest opportune time
2 APTRANSCO to take steps to replace the faulty Event Logger at
Vijayawada (Nunna) SS
Line tripped at Mamidipally end only on Direct Trip
receipt from Ghanapur end
30-04-2016 at
1640 hrs
Line tripped due to operation of over voltage
protection at Vijayawada end and Direct Trip was
received at Sattenapalli end
25-12-2015 at
301 hrs
Tripped on 3-phase Trip at Gajwel end30062016 at
2343 hrs
19-06-2016 at
1527hrs
220kV Sedam-Humnabad-2 tripped at Sedam on
Distance protection Zone-2 Sedam-RTPS-1 amp2 lines
tripped at RTPS end only 220kV Tandoor inter-state
line was hand tripped due to incoming supply failure
54IV2 Tripping of 400kV Ghanapur-
Mamidapalli line
56II16
Tripping of 400kV Sattenapalli-
Vijayawada line
56I2
51II6
Tripping of 400 kV Gajwel-Singareni
line-2
Complete outage of 220kV Sedam
Substation of KPTCL
Pending
PendingFor the line under consideration the following shall be carried out by
TSTRANSCO and PGCL (SR-I) in co-ordination
iEnd-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
iiHealthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
PGCIL (SR-I)
TSTRANSCO
Yet to be informed
Pending
1TSTRANSCO and SCCL to check drop-off to pick-up ratio of OV
relay and ensure that it is kept at 097 amp above
2TSTRANSCO and SCCL to configure respective end bdquos DR amp EL
so that they get triggered on OVR protection and record relevant
events
3SCCL to configure Jaipur end relay‟s EL properly so that the time-
stamp resolution is extended downwards up to milli-second level
TSTRANSCO
SCCL
Yet to be informed
Yet to be informed
Pending
Annexure-III
Page 29 of 31
R-phase to earth had occurred in 400kV BTPS-JSWEL
line and protection issued a 3 phase trip
64I1 Complete outage of North Chennai TPS
STG-2
24-04-2017
at 2102hrs
Tripping of evacuating lines due to fault led to
tripping of Units
Pending
64I2 Complete outage of North Chennai TPS
STG-2
25-04-2017
at 1827hrs
Tripping of evacuating lines due to fault led to
tripping of Unit
64I3 Complete outage of North Chennai TPS STG-2
26-03-2017at 2109 hrs
Tripping of evacuating lines due to fault led to tripping of running Unit at NCTPS Stg-2
64III2 Tripping of 400 kV Ghanapur-
Mamidapalli line
04-04-2017 at
1901hrs
B-phase to earth fault Line auto-reclosed from
Mamidapalli end and tripped from Ghanapur
For the line under consideration PGCIL (SR-I) TSTRANSCO to (i)
rectify issues wrt PLCC channels (ii) restore PLCC carrier
communication and (iii) put AR into service at the earliest
PGCIL (SR-I)
TSTRANSCO
Yet to be informed Pending
APGENCO
TSTRANSCO
Direct Trip was received at VTPS and line was
holding from Suryapet end
13-06-2016 at
1655 hrs
56IV2 Tripping of 400 kV VTPS-Suryapet line
57I1 Complete outage of 220 kV Karwar
Substation of KPTCL
12-07-2017 at
1136 hrs
Triggering incident was failure of R phase PT in Bus-
1 at 220kV Karwar substation 220kV Kaiga-
Kodasalli tripped during the incident Also bus shut
down occurred at Kadra and Kodasally stations
1NPCIL (KAPS) to disable DefiniteTime OC relay and put in its
place by IDMT OC relay for backup protection on both 220 kV
Kaiga ndash Kadra line and 220 kV Kaiga ndash Kodasalli line at Kaiga end
2KPTCL to put bus bar protection in service at their 220 kV Karwar
SS at the earliest
3KPCL KPTCL to implement Weak In-feed Logic with Echo
feature enabled by Under Voltage (27) element on Kadra ndash Karwar
lines 1 amp 2
4KPTCL to furnish equipment failure report of the current incident to
PSEampTD Division of CEA with a copy marked to SRPC
KPTCL KPCL NPCIL
(KAPS)
NPCIL(KGS) mail dated on 03-12-2016
AThe 200 ms Definite time DEFR element in both Kaiga Kadra and
Kaiga Kodasally lines were disabled IDMT DEFR is retained
B The 200 ms Definite time back up oc element in both Kaiga Kadra and
Kaiga Kodasally lines were disabled IDMT is retained
------Completed
APTRANSCO mail dated on 20-12-2016
Issue was addressed to the concerned for necessary action
APTRANSCO mail dated on 24-05-2017
Meeting was conducted and the relays procurement for all the locations is
under progress
Pending57II9 Tripping of 400 kV Nellore (PG) - NPS
line-1 400 kV Krishnapatnam-Nellore
(AP) lines -1amp2 and 400kV NPS -
MEPL line
18-07-2016 at
1905 hrs
Triggering incident was snapping of Y phase
conductor in 400kV Nellore (PG) - NPS line-1
Distance relay at Krishnapatnam end over-reached in
Zone-1 and resulted in tripping of 400kV
Krishnapatnam ndash Nellore (AP) lines - 1amp2 from
Krishnapatnam end Distance relay at MEPL over-
reached and resulted in tripping of MEPL-NPS line
from MEPL end
PGCIL (SR-I) TPCIL MEPL SEL SGPL APTRANSCO
APGENCO and SDSTPS to implement line differential protection on
all 400 kV transmission lines (of length less than 50 km) emanating
from Nellore PS Nellore (PG) SS and Nellore (AP) SS [It may be
noted here that the cut-off length of 50 km has been specified with a
view to exclude only long transmission lines]
APGENCO PGCIL(SR-
I) TPCILMEPL
SELSGPL
APTRANSCO
Pending
63II9 KPCLJSWEL Yet to be informed Pending
1 TANTRANSCO and PGCIL (SR-II) to take steps to complete
insulator replacement works on the 400 kV lines owned by them in
Chennai area within 3 months
1 JSWEL to follow file naming terminology provided by SRPC
for various tripping files uploaded in SRLDCrsquos TMS portal
2JSWEL to furnish reasons for AR-BLOCK observed during
the instant tripping and remedial action taken by them to
keep AR in service
3 KPCL to configure DR amp EL properly to record OVR Stage-I
amp Stage-II protections at their BTPS station
14-03-2017 at
1911 hrs
Tripping of 400 kV YTPS-BTPS line and
400 kV BTPS-JSWEL line
Status received vide TANTRANSCO mail dated 15-06-2017
1 All the Porcelain insulators of 400kV NCTPS-II - Vallur feeders-1amp2
were replaced with Polymer insulators by 20052017
2 Existing Porcelain insulators of all other 400kV feeders are being
replaced with Polymer insulators in a phased manner
TANTRANSCO
PGCIL(SR-II)
For the line under consideration the following shall be carried out by
APGENCO in coordination with TSTRANSCO
1End-to-end communication for DT permissive amp other signals may
be ensured by testing at both the ends
2Healthiness of PLCC system components (hardware and software)
at both ends shall be checked and faulty components shall be repaired
replaced
PendingYet to be informed
Annexure-III
Page 30 of 31
65II5 Tripping of 400 kV Ghanapur-
Mamidapalli line
08-05-2017 at
1915 hrs
Line tripped at Ghanapur end only and was holding
from Mamidapalli Ghanapur end protection had
sensed R-phase to earth fault
For the line under consideration the following shall be carried out
by TSTRANSCO in coordination with PGCIL (SR-I)
1 End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
TSTRANSCO PGCIL
(SR-I)
Yet to be informed Pending
65III12 Tripping of 400 kV Srisailam-Dindi line-2 24-05-2017
at 1502 hrs
R-phase to earth fault Auto-reclose was successful
at Dindi and Zone - 1 3-phase trip at Srisailam
Since all 400 kV lnies emanating from Srisailam LB are composite
feeders APTRANSCO TSTRANSCO can keep AR functionality disabled at respective remote end stations under their control
APTRANSCO TSTRANSCO Yet to be informed Pending
Yet to be informed PendingTriggering incident was failure of CT in 110 kV
Villianur-Kurumbapet at Villianur substation 230KV
Villianur ndash NLC2 and 230 kV Villianur - Pondy lines
got tripped from Pondy end (on operation of DEF)
and NLC end (on operation of Zone-3) respectively
resulting in loss of supply to 230 kV Villianur
substation
65I2 Complete outage of 400kV Uravakonda
and Jammalamadugu Substations
31-05-2017 at
1744 hrs
Triggering incident was tripping of 400 kV Kurnool-
PG - Narnoor line - 1 amp 2 and 400 kV Narnoor-
Jamalamadugu line-2 which led to loss of supply to
400kV Uravakonda and Jamalamadugu 400kV Gooty-
Narnoor 400kV Narnoor-Jamalamadugu-1 400kV
Srisailam-Narnoor 400kV Uruvakonda-
Mahboobnagar-1amp2 were out of service in
antecedent condition
1 For 400 kV Ghani ndashNarnoor line the following shall be carried out
by APTRANSCO
(i) End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
(ii) Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
2 PGCIL (SR-II) to take appropriate action wrt disabling non-
directional instantaneous Igt4 protection that operates without
checking existence of stub If required the issue may be referred to
relays OEM for appropriate solution or the present relays may be
replaced with other relays with different styles that donrsquot have the
issue observed
APTRANSCO PGCIL
(SR-II)
Yet to be informed Pending
1 PED to furnish an action taken report wrt complying with the
protection audit recommendations
2 PGCIL (SR-II) to review Zone-3 and DEF protection setting at
Pondicherry end 230 kV Pondicherry ndash Villianur and 230 kV
Pondicherry ndash Bahour line and set them appropriately to achieve
required time-coordination with OC protections of ICTrsquos at Villianur
SS
3 NLCIL to keep DEF protection in blocked condition as long as
Distance Protection is active and configure it to become active only
when distance protection does not pickup to avoid time-
coordination issues
19-05-2017 at
1235 hrs
Complete outage of 230 kV Villianur
Substation of Pondicherry
65I1 PED PGCIL (SR-II)
NLCIL
For the line under consideration the following shall be carried out
by TANTRANSCO in coordination with PGCIL (SR-II)
1 End-to-end communication for DT permissive amp other signals
may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components
shall be repaired replaced
PGCIL (SR-II)
TANTRANSCO
Yet to be informed Pending
For the line under consideration the following shall be carried out
by NLCIL in coordination with PGCIL (SR-II)1 End-to-end communication for DT permissive amp other signals may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and software) at both ends shall be checked and faulty components
shall be repaired replaced
Y-phase to earth fault Neyveli TS2 end relay issued
a 3-phase trip 220ms after issue of Y phase trip Direct Trip was sent to Pugalur end preventing auto-reclose
07-05-2017
at 1955 hrs
Tripping of 400 kV Neyveli TS2-Pugalur
line
65III6 PGCIL (SR-II) NLCIL Yet to be informed Pending
For the line under consideration the following shall be carried out
by TSTRANSCO in coordination with NTPC-Ramagundam1 End-to-end communication for DT permissive amp other signals may be ensured by testing at both the ends
2 Healthiness of PLCC system components (hardware and
software) at both ends shall be checked and faulty components shall be repaired replaced
Over Voltage Stage-1 had operated at Gajwel end
Ramagundam end did not trip as Direct Trip was not received from Gajwel end
29-05-2017
at 0007 hrs
Tripping of 400 kV Ramagundam -
Gajwel line
65II19 TSTRANSCO NTPC
(Ramagundam)
Yet to be informed Pending
65II16 Tripping of 400 kV Kayathar-Karaikudi
line
25-05-2017 at
1552 hrs
R-phase to earth fault had occurred in line There
was Zone-2 3 phase trip operation at Kayathar end
and Zone-1 3 phase trip at Karaikudi end
Annexure-III
Page 31 of 31
SlNo Element NameOutage
datetime
Revival
datetimeReason for Outage Sender Receiver
Remedial Measures Actions taken
1 400 kV KAIGA - GUTTUR 1 27-03-2017153800 27-03-2017164800 RELAY MALOPERATION NPCIL (KGS) KPTCL
KPTCL
At Guttur end DPR operated in Z1 R phase AR
unsucessful due to persistant fault
At Kaiga end DPR operated in Zone-1 RN
fault145km AR attempt is observed from Kaiga
end DR
Reason Transient fault Stood OK after test
charging
NPCIL (KGS)
2 400 kV KHAMMAM - KALPAKKA 1 10-04-2017125800 DISTANCE PROTECTION PGCIL (SR-I) APTRANSCO
PGCIL (SR-I)
Tripped on operation of distance protection Line
belongs to APTARSNCOTSTRANSCO
APTRANSCO TSTRANSCO Momentary fault
3 400 kV KHAMMAM - KALPAKKA 2 11-04-2017115000 11-04-2017175900 Y-N faultPGCIL (SR-I) APTRANSCO
TSTRANSCO
PGCIL (SR-I) Tripped on operation of distance
protection Line belongs to
APTRANSCOTSTRANSCO
APTRANSCO TSTRANSCO Momentary fault
4 400 Kv RAICHUR - YTPS 18-04-2017131400 18-04-2017150100 DPR ZONE 1-B-PH FAULT KPCL KPTCL To-be-discussed
5 400220 Kv ICT-3 AT NEELAMANGALA 20-04-2017162100 20-04-2017170100DUE TO HEAVY ARCING AT B-
PH ISOLATORKPTCL To-be-discussed
6 400 Kv VTPS - MALKARAM 1 23-04-2017150500 SOTF OPERATED APGENCO TSTRANSCO
TSTRANSCOTripped at both ends Tripped on R-
phase to ground Zone-1 indications AR acted and
was unsucessful at Malkaram end
APGENCO
Pending Remedial Measures Actions taken
for the Critical Tripping Incidents (as on 25072017)
Annexure-IV
Page 1 of 6
7 400 kV KHAMMAM - MAMIDIPALLY 2 08-05-2017160600 08-05-2017174900 R PHASE TO GROUND FAULT PGCIL (SR-I) TSTRANSCO
PGCIL(SR-I)
Tripped on operation of distance protection Line
belongs to APTARSNCO
TSTRANSCO
Tripped at both ends Tripped on R-phase to
ground Zone-1 indications AR acted and was
unsucessful at Mamidipally end
8 400 kV TALAGUPPA - NEELAMANGALA 09-05-2017163600 Y TO GROUND FAULT KPCL KPTCL To-be-discussed
9 400 kV MUNIRABAD - GUTTUR 20-05-2017064100 20-05-2017211000BUS BAR PROTECTION
OPERATEDPGCIL (SR-I) KPTCL
KPTCL
No abnormality found at Munirabad end and line
was in service
PGCIL (SR-I)
Tripped at Guttur end only and line was holding
from Munirabad end
10 400 kV GUTTUR - HIRIYUR 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II) PGCIL (SR-II) Due to Problem at Guttur end
11 400 kV KAIGA - GUTTUR 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDNPCIL (KGS) KPTCL To-be-discussed
12 400 kV GUTTUR - NARENDRA 2 20-05-2017204100BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II) PGCIL (SR-II) Due to Problem at Guttur end
13 400 kV MUNIRABAD - GUTTUR 20-05-2017160000 20-05-2017170400 B-n fault PGCIL (SR-I) KPTCL
PGCIL (SR-I)
As informed by Guttur Substation line tripped at
Guttur end only without any faciaalarms Line
holding from Munirabad end Suspected mal-
operation at Guttur end
KPTCL
14 400 kV GUTTUR - HIRIYUR 1 20-05-2017204100 20-05-2017211800BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II)
PGCIL (SR-II) Due to Problem at Guttur end
KPTCL
15 400 kV BTPS-JSW TORANAGALLU 20-05-2017064100 20-05-2017210300BUS BAR PROTECTION
OPERATEDKPCL JSWEL To-be-discussed
16 400 kV KAIGA - GUTTUR 1 20-05-2017204100 20-05-2017213800BUS BAR PROTECTION
OPERATEDNPCIL (KGS) KPTCL To-be-discussed
17 400 kV GUTTUR - NARENDRA 1 20-05-2017204100 20-05-2017211200BUS BAR PROTECTION
OPERATEDKPTCL PGCIL (SR-II)
PGCIL (SR-II) Due to Problem at Guttur end
KPTCL
Annexure-IV
Page 2 of 6
18 400220 kV ICT-1 AT HOODY 20-05-2017110700 20-05-2017180500 220KV SIDE WORKS KPTCL To-be-discussed
19 220 kV AMBEWADI - PONDA 1 22-05-2017121100 22-05-2017123000 EARTH FAULT KPTCL GED To-be-discussed
20 400 Kv VTPS - MALKARAM 1 22-05-2017145200 22-05-2017185800 B phase fault APGENCO TSTRANSCO
TSTRANSCOTrippedat both ends Tripped on B-
Phase to ground and Zone-1 indications AR acted
and was unsucessful at Malkaram end
APGENCO
21 220 kV KANIAMPET - KADAKOLA 23-05-2017143200 23-05-2017162400 BREAKER PDR RELAY ACTED KSEB KPTCL To-be-discussed
22 400 kV TALAGUPPA - HASSAN 30-05-2017014600 B PHASE TO GROUND FAULT KPTCL PGCIL (SR-II)
PGCIL(SR-II) Due to persisting fault in KPTCL
portion
KPTCL
23HVDC TALCHER - KOLAR POLE 1 AT
TALCHER01-06-2017232200 02-06-2017001100
DC DIFFERENTIAL
PROTECTION OPERATEDPGCIL (SR-II) PGCIL (ER-I)
PGCIL(SR-II) Due to DC filter Diff relay operation at
Talcher end
24 400 KV NIZAMABAD- DICHPALLY-1 05-06-2017191500 3 PHASE FAULT TSTRANSCO
TSTRANSCOTrippedat both ends Tripped on 3
Phase B-Phase to ground fault and Zone-2
indications at Dichpally end
25 400220 kV ICT-1 AT DICHPALLY 05-06-2017191500 06-06-2017003200 BUCHHOLZ RELAY OPERATED TSTRANSCO
TSTRANSCO 400kv 315MVA ICT-1 at Dichpally
tripped on OSR indications which was a mal
operation of the relay At the same time there was
3 Phase fault in 400kV Dichpally to Nizamabad line
At Nizamabad end(PGCIL) Line Isolator 3 phases
shorted in GIS Module
26400 kV RAMAGUNDAM -
DICHCHIPPALLI05-06-2017191500 05-06-2017223700 3 PHASE FAULT NTPC TSTRANSCO
TSTRANSCO Line did not trip at Dichpally end At
the same time there was 3 Phase fault in 400kV
Dichpally to Nizamabad line for which the line
tripped at Both ends Relay settings need to be
reviewed at NTPC Ramagundam end
NTPC-Ramagundam
27 400 Kv BTPS - YTPS 05-06-2017194800 05-06-2017204400 DISTANCE PROTECTION KPCL To-be-discussed
Annexure-IV
Page 3 of 6
28 400 Kv SATTENAPALLI - SRISAILAM 2 05-06-2017125500 05-06-2017144700 R-n fault APTRANSCO TSGENCO
APTRANSCO
For a momentary fault feeder tripped on R-Ph Z1
indications and AR successful at Sattenapalli end
TSGENCO
Feeder tripped on R-phase to ground Zone-2 at
Srisailam end Due to Feeder consistsing of Under
Ground cable AR was disabled at Srisailam end
29 400220 kV ICT-2 AT KOLAR 06-06-2017191000 06-06-2017223700 DUE TO HEAVY WIND PGCIL (SR-II)
PGCIL (SR-II)
Flashover between 220kV jumper dropper of B
phase and Gantry towards 220kV bus due to heavy
swing of conductor during the unprecedented
heavy winds
30 400 kV KOLAR - HOODY 2 06-06-2017200800 DUE TO HEAVY WIND PGCIL (SR-II) KPTCL
PGCIL (SR-2)
Hand Tripped due to Isolator problem at Hoody
End
KPTCL
31 400220 kV ICT-2 AT GUTTUR 13-06-2017133000 13-06-2017134500TRIPPED ON EF RELAY
OPERATIONKPTCL To-be-discussed
32400 kV PUGALUR -
KALAIVANTHAPATTU14-06-2017123700 14-06-2017184500 TRIPPED ON Y-N FAULT PGCIL(SR-II) To-be-discussed
33 220 kV KANIAMPET - KADAKOLA 22-06-2017111700 22-06-2017113400EARTH FAULT RELAY
OPERATEDKSEB KPTCL To-be-discussed
34 220 kV KANIAMPET - KADAKOLA 22-06-2017121500 22-06-2017172000EARTH FAULT RELAY
OPERATEDKSEB KPTCL To-be-discussed
35 400 kV KHAMMAM - KALPAKKA 2 03-07-2017092400 03-07-2017104700
DT RECIEVED AT KLPA END
(TRIPPED ONLY AT KLPA
END)
PGCIL (SR-I) APTRANSCO
TSTRANSCO
PGCIL (SR-I)
PLCC belongs to APTRANSCO TSTRANSCO Mal-
operation of PLCC at Kalpaka end Requested
APTRANSCO TSTRANSCO for end to end
testingtunning of PLCC
APTRANSSCO TSTRANSCO
36 400220 kV ICT-1 AT URAVAKONDA 04-07-2017020100 04-07-2017022400MASTER TRIP RELAY
OPERATEDAPTRANSCO To-be-discussed
37 400 kV KAIGA - NARENDRA 2 07-07-2017075000 07-07-2017090800 TRIPPED ON R-Y Ph FAULT NPCIL KPTCL To-be-discussed
Annexure-IV
Page 4 of 6
38 HVDC BHADRAVATHI POLE 1 07-07-2017105900 07-07-2017115400TRIPPED ON NON VALID TAP
CODEPGCIL (SR-I) PGCIL (WR-I)
PGCIL(SR-I)
Tripped due to strucking of OLTC tap during
command execution The same was now working
39 400 kV KHAMMAM - KALPAKKA 2 07-07-2017120300 07-07-2017145000 DT Received PGCIL (SR-I) APTRANSCO
PGCIL(SR-I)
Tripped due to PLCC mal-operation PLCC belongs
to TSTRANSCO APTRANSCO Requested
TSTRANSCO APTRANSCO for end to end testing
tunning of PLCC Khammam end
APTRANSCO
40 400 KV GOOTY - TUMKUR - 1 08-07-2017142200 08-07-2017152600DISTANCE PROTECTION
OPERATEDPGCIL (SR-I) PGCIL (SR-II)
PGCIL(SR-I)
Tripped due to snapping of earth wire while
stringing of OPGW Advised concerned to take
additional precautions while carrying OPGW
stringing
PGCIL(SR-II)
41 400230 Kv ICT-1 AT SVCHATRAM 14-07-2017190300TRIPPED ON RESTRICTED
EARTH FAULTTANTRANSCO
TANTRANSCO
REF protection acted in ICT-1 during Auto Reclose
(AR) attempt of 400kV SVChatram-Alamathy
feeder-2 (through fault condition) As per the relay
manufacturer (GE-T60) guidelines for the one and
half breaker scheme the REF setting will be
revised
42 400 KV GOOTY - TUMKUR - 1 15-07-2017115100 15-07-2017122300Tripped while laying opgw
cablePGCIL (SR-I) PGCIL (SR-II)
PGCIL (SR-I)
Tripped due to snapping of earth wire while
stringing of OPGW Advised concerned to take
additional precautions while carrying OPGW
stringing
PGCIL(SR-II)
43 220 kV AMBEWADI - PONDA 1 16-07-2017113800 16-07-2017120800 DISTANCE PROTECTION KPTCL GED To-be-discussed
44 220 kV AMBEWADI - PONDA 2 20-07-2017013600 LINE FAULT KPTCL GED To-be-discussed
Annexure-IV
Page 5 of 6
45 400 Kv ALM - SVCTM-I 20-07-2017112700 20-07-2017120200 C-N FAULT TANTRANSCO To-be-discussed
46 400 Kv ALM - SVCTM-II 20-07-2017112700 20-07-2017120300 A-N FAULT TANTRANSCO To-be-discussed
47 400 Kv ALM - SVCTM-II 20-07-2017144300 20-07-2017193200TO ATTEND FAULT
LOCATIONTANTRANSCO To-be-discussed
48 HVDC BHADRAVATHI POLE 1 21-07-2017224800 21-07-2017235300 INTERNAL MINOR ALARM PGCIL (SR-I) PGCIL (WR-I) To-be-discussed
49 400 kV KHAMMAM - KALPAKKA 1 21-07-2017103000 21-07-2017204200AC SUPPLY TO BREAKER
PROBLEMPGCIL (SR-I) APTRANSCO To-be-discussed
50 220 kV CHITTOR - THIRUVALEM 22-07-2017080600 22-07-2017144100RELAY MALOPERATION AT
THIRUVALAMAPTRANSCO TANTRANSCO To-be-discussed
51 400 KV GOOTY - TUMKUR - 1 22-07-2017150700 22-07-2017154500TRIPPED DURING OPGW
WORKSPGCIL (SR-I) PGCIL (SR-II) To-be-discussed
52 400 Kv GAJWEL - BHOOPALAPALLY 2 22-07-2017131300 22-07-2017133600 B PHASE FAULT TSTRANSCO TSGENCO To-be-discussed
53 400 kV GUTTUR - HIRIYUR 2 22-07-2017150300 22-07-2017155300TRIPPED DUE TO RELAY MAL
OPERATIONKPTCL PGCIL (SR-II) To-be-discussed
54 400110 kV ICT 2 AT ALAMATHY 24-07-2017091300 24-07-2017162700TRIPPED ON RESTRICTED
EARTH FAULTTANTRANSCO To-be-discussed
Annexure-IV
Page 6 of 6
G1
220kV LINE-1
ICT 220400 KV
G2
GT1 GT2
400kV LINE-1
400kV LINE-2
600MW 600MW
220kV LINE-2
400kV220kVSummary of Various Special Protection Schemes for 2 x 600 MW UPCL TPP
Adani Power Limited Ahmedabad
Adani Power Ltd Ahmedabad 1
Annexure-V
Page 1 of 12
G1
ST-2
220 kV LINE-1
ICT 220400 KV
G2
GT-1 GT-2
400kV LINE-1
400kV LINE-2
600 MW 600 MW
ST-1
220 kV LINE-2
UPCL UDUPI - NETWORK UNDER CONSIDERATION
400 kV220 kV
Adani Power Ltd Ahmedabad 2
315 MVAICT-1
315 MVAICT-2
220 kV ndash KEMMAR BUS 400 kV ndash HASSAN BUS
Annexure-V
Page 2 of 12
Adani Power Ltd Ahmedabad 3
Existing SPS
Benefits of New Proposals
If both the 400kV Lines out of serviceTripped amp Total Generation is gt 650 MW then Trip Unit-2
Existing SPS logic has been developed in Unit-2 DCS
1 Consideration of all possible contingency cases
2 Unit Backdown (AUTOMATIC) has been proposed in certain contingencies
where Unit tripping is not required After restoration of tripped outlets
Unit may ramp up to full generation
3 Comprehensive logic will be developed in Numerical Relays with adequate
security and reliable detection to avoid mal operation of sps logic
4 Monitoring of SPS logic with necessary alarms and events
Annexure-V
Page 3 of 12
Sr UPCL‐Udupi‐SUMMARY OF SPS TO HANDLE ALL POSSIBLE CONTINGENCIES Sh‐1 of 2
Contingency Cases Action Unit SelectionFor Tripping
1 Power Swing Detected in Impedance reach of Zone‐1 in 400 kV Line
Tripping of One selected unit if both Units ON Each Unit Power gt 400 MW
Unit‐2
2Tripping of one 400 kV Line while another 400 kV Line is already in OFF condition
Tripping of One selected unit if both Units ON Each Unit Power gt 400MW
Unit‐2
3 TrippingOffloading of Both 400 kV Line simultaneously (within 3 sec)
Tripping of One selected Unit if both Unit ON Each Unit Power gt 325 MW Unit‐2
4 TrippingOffloading of all four Transmission Lines Tripping of both Units Both Units
4
5
400kVlin
e Overlo
ad Stage PickupSet Point
TimeDelay Action
Stage 1 900 MW 3 Sec Alarm
Stage 2 1100 MW 2 Sec Automatic Backdown upto 450 MW in both Units
Annexure-V
Page 4 of 12
Sr UPCL‐Udupi‐SUMMARY OF SPS TO HANDLE ALL POSSIBLE CONTINGENCIES Sh‐2 of 2
Contingency Cases
Action
6 ICT
Overlo
ading from
400 kV
Line Stage Pickup
Set PointTimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units
7
220 kV
Line
Overlo
ad
Stage 1 250 MW 5 Sec Automatic Backdown upto 300 MW in both Units
5
Sr Consideration Requirements associated with SPS Implementation
1 400 kV LINE Tripping in Zone‐1 will be blocked under Power Swing DetectionOperation
2 Pole Slip Protection of Generator need to be co‐ordinated with 400 kV Line Power Swing Protection
3 Line Overload Detection will be blocked by Power Swing DetectionOperation
4 Line ZeroUnder Power Detection will be blocked by Power Swing DetectionOperation
Annexure-V
Page 5 of 12
G1
ST-2
220 kV LINE-1
ICT 220400 KV
G2
GT-1 GT-2
400kV LINE-1
400kV LINE-2
600 MW 600 MW
ST-1
220 kV LINE-2
UPCL UDUPI - NETWORK UNDER CONSIDERATION
400 kV220 kV
Adani Power Ltd Ahmedabad 6
315 MVAICT-1
315 MVAICT-2
220 kV ndash KEMMAR BUS 400 kV ndash HASSAN BUS
Annexure-V
Page 6 of 12
Contingency 1 Tripping of one 400kV line
It may lead tohellip1 Overloading of another 400 kV Line
2 Power Swing in another 400 kV Line (specially when 220 kV
Lines are not available)
3 Severe oscillations in running Units
4 Units may loose synchronism and disconnect from network
G1 G2
L1 L2L1L2
Following SPS has suggested to address this contingency
Adani Power Ltd Ahmedabad 7
400kV200kV
Contingency Cases
Action
Unit Selection
ForTripping
1
400kVline Overlo
ad
Stage PickupSet Point
TimeDelay
Stage 1 900 MW 3 Sec Alarm ‐‐‐‐‐‐‐
Stage 2 1100 MW 2 Sec Automatic Backdown upto 450 MW in both Units ‐‐‐‐‐‐‐
2 Power Swing Detected in Impedance reach of Zone‐1 in 400 kV Line
Tripping of One selected unit if both Units ON Each Unit Power gt 400 MW Unit‐2
Annexure-V
Page 7 of 12
Contingency 2 Tripping of one 400kV line while other already Tripped
It may lead tohellip
1 Oscillations in running Units
2 Units may loose synchronism and disconnect from
network
3 Overloading of ICTs and subsequent tripping
4 Overloading of 200 kV Lines and subsequent tripping
5 Station blackout
Adani Power Ltd Ahmedabad 8
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases Action Unit SelectionFor Tripping
1Tripping of one 400 kV Line while another 400 kV Line is already in OFF condition
Tripping of One selected Unit if both Unit ON Each Unit Power gt 400 MW Unit‐2
2
ICT Overlo
ading
from
400
kV Side
Stage PickupSetting
TimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units
Annexure-V
Page 8 of 12
Contingency 3 Tripping of both 400kV line simultaneously
It may lead tohellip
1 Severe oscillations in running Units
2 Units may loose synchronism and disconnect from
network
3 Overloading of ICTs and subsequent tripping
4 Overloading of 200 kV Lines and subsequent tripping
5 Station blackout
Adani Power Ltd Ahmedabad 9
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases Action Unit SelectionFor Tripping
1 TrippingOffloading of Both 400 kV Line simultaneously (within 3 sec)
Tripping of One selected Unit if both Unit ON Each Unit Power gt 325 MW Unit‐2
2
ICT Overlo
ading
from
400
kV Side
Stage PickupSetting
TimeDelay
Stage 1 250 MW 2 Sec Automatic Backdown upto 300 MW in both Units ‐‐‐‐‐‐‐
Annexure-V
Page 9 of 12
Contingency 4 Overloading of any 220 kV line
This contingency may arise due tohellip1 Tripping of both 400 kV Lines and associated SPS logic fails
to operate (Tripping of any One Unit if both Units running)
2 Overloading of ICTs from 400 kV Side and associated SPS
logic fails to operate
3 Tripping of any one 220 kV lines if both 220 kV lines are in
service and 400 kV outlets are not available
Adani Power Ltd Ahmedabad 10
G1 G2
L1 L2L1
400kV200kV
L2
Following SPS has suggested to address this contingency
Contingency Cases
Action
Unit Selection
ForTripping
1
220kV
line
Overlo
ad StagePickupSet Point
TimeDelay
Stage 1 250 MW 5 Sec Automatic Backdown upto 300 MW in both Units ‐‐‐‐‐‐‐
If any SPS does not function Then 200 kV Line will trip by Operation of Line Over Current Function
Annexure-V
Page 10 of 12
Contingency 5 Tripping of all Lines emanating from UPCL (ZERO POWER)
It may lead to1 Over voltage conditions at UPCL Bus
2 Over speed of all the generators because of sudden
load throw
Following SPS has suggested to address these contingencies
1 Zero Power Scheme on 400 kV System and 220 kV System checking the power
flow through 400kV and 200 kV lines and trip all the units in service if there is a
under power condition on all four lines and running units
Adani Power Ltd Ahmedabad 11
G1 G2
L1 L2L1
400kV200kV
L2
Sr Contingency Cases Action Unit SelectionFor Tripping
1 TrippingOffloading of all four Transmission Lines Tripping of both Units Both Units
Annexure-V
Page 11 of 12
G1
220kV LINE-1
ICT 220400 KV
G2
GT1 GT2
400kV LINE-1
400kV LINE-2
600MW 600MW
220kV LINE-2
400kV220kV
THANKShellip
Adani Power Ltd Ahmedabad 12
Annexure-V
Page 12 of 12
65th Protection Coordination Sub-Committee
29-06-2017
Annexure-VI
Page 1 of 40
Complete outage of 230KV Villianur substation of Pondycherry at 1235 hrs on 19-05-2017
bull Triggering incident Failure of CT in 110kV Villianur-Kurumbapet at Villianur substation
bull 230110kV ICT-1amp2 at Villianur substation tripped on operation of backup Over current protection
bull 230KV Neyveli-Villianur and Pondy-Villianur Line got tripped from NLC amp Pondy ends on operation of DEF and Zone-3 respectively
bull Delayed clearance of fault observed from PMU plot ndash 560ms
bull Load loss 140 MW
DEF
ZONE-3
NLC TS-2 BAHUR TrsquoMARTHAN
PONDY
VILLIANUR
Annexure-VI
Page 2 of 40
Fault cleared in 560ms
Annexure-VI
Page 3 of 40
Complete outage of 400kV Uruvakonda and Jamalamadugu Stations at 1744 hrs on 31-05-2017
bull Triggering incident Tripping of 400kV Kurnool-Narnoor line-1 amp 2 and 400kV Kurnool-Jamalamadugu line-2
bull Loss of supply loss to 400kV Uruvakonda and Jamalamadugu
bull Lines out of service 400kV Gooty-Narnoor 400kV Narnoor-Jamalamadugu-1 400kV Srisailam-Narnoor 400kV Uruvakonda-Mahboobnagar-1amp2
Srisailam Narnoor
Kurnool
Ghani
Jrsquomadugu UVrsquokonda
Mbrsquongr
Gooty
Ghanapur
Igt4
Igt4 Z3
Z3
OV DT RCV
Annexure-VI
Page 4 of 40
Annexure-VI
Page 5 of 40
Kurnool Narnoor
DR trigger ndash 174418501 hrs
Ib=5kA
Zone-3 trip EL Stub optd
DR trigger ndash 173620637 hrs
Igt4 trip
3 phase Grp AB optd
Kurnool Narnoor
DR trigger ndash 174418503 hrs
Ib=5kA
Zone-3 trip EL Stub optd
DR trigger ndash 174306388 hrs
Igt4 trip
3 phase Grp AB optd
Kurnool Jamalamadugu
DR trigger ndash 174423979 hrs Vgt1 Trip
DR trigger ndash 174415040 hrs Z3 T1 DT Rcv not observed in DR amp EL
400kV Kurnool-Narnoor line-1
400kV Kurnool-Narnoor line-2
400kV Kurnool-Jamalamadugu line-2
Annexure-VI
Page 6 of 40
bull Points for discussion ndash Location of fault
ndash Zone-3 amp Igt4 trip of 400kV Kurnool-Narnoor line-1amp2
Annexure-VI
Page 7 of 40
Tripping of 220kV Idukki ndashUdumalpet line at 1702 hrs on 05-05-2017
bull B-N and R-N fault in line
bull Delayed clearance observed during 2nd fault
Idukki Udumalpet
DR trigger ndash 170200499 hrs ZONE 1 B-E 366Km
DR trigger ndash 165741849 hrs ZONE 1 B-E amp Zone-2 R-E
Idukki
Udumalpet Lower periyar
New Pallom Kalamassery
Annexure-VI
Page 8 of 40
Annexure-VI
Page 9 of 40
B-N FAULT
R-N FAULT
ZONE-2
Ar attempt
Udumalpet end DR Annexure-VI
Page 10 of 40
bull Points for discussion ndash Reason for 3 phase trip at idukki end
ndash Relay to give a 3 phase trip in the event of 2nd fault during dead time
Annexure-VI
Page 11 of 40
Tripping of 400kV Kudgi(PG)-Tumkur line-2 and Kudgi(PG)- Kudgi(NTPC) line-1 at 1605 hrs on 06-05-2017
bull 400kV Kudgi(PG)-Kudgi(NTPC) ndash line tripped at Kudgi PG end on R-N zone-1
bull 400kV Kudgi(PG)-Tumkur line tripped from both ends
Kudgi(NTPC)
Tumkur
Kudgi(PG) Narendra
Kohapur
Guttur
Kaiga
Annexure-VI
Page 12 of 40
Kudgi (PG) Kudgi(NTPC)
DR trigger 160547438 hrs Zone-1 optd R-N Ar lockout Ov pick up
FIR DR amp EL not furnished
Kudgi (PG) Tumkur
DR trigger 160546957 hrs NGR buchholz trip Dip in R-phase voltage
DR trigger 160512593 hrs DT Rcv Grp AB optd
400kV Kudgi(PG)-Kudgi(NTPC) line-1
400kV Kudgi(PG)-Tumkur line-2
Annexure-VI
Page 13 of 40
Annexure-VI
Page 14 of 40
Annexure-VI
Page 15 of 40
Annexure-VI
Page 16 of 40
Tripping of 220kV Edamon-Tirunelveli-1amp2 at 1809 hrs on 06-05-2017
bull 220kV Edamon-Tirunelveli-1amp2 tripped from Tirunelveli end only and was in service from Edamon end ZONE-1 R-B-E fault
bull Distance protection at Tirunelveli over-reached and tripped for fault in 220kV Edamom-Pothencode lines
Edamon
Sabarigiri
Tirunelveli Pothencode
Kundara
Edappon
Annexure-VI
Page 17 of 40
Annexure-VI
Page 18 of 40
Tripping of 400220 kV Ghani ICT-2amp3 at 1405 hrs on 07-05-2017
bull ICTrsquos-2amp3 got tripped on operation of Y-phase over-current protection
bull Delayed clearance observed from PMU data
bull DR amp EL not furnished
Srisailam Narnoor
Kurnool
Ghani
Jrsquomadugu UVrsquokonda
Mbrsquongr
Gooty
Ghanapur
Annexure-VI
Page 19 of 40
Annexure-VI
Page 20 of 40
Tripping of 400kV Ghanapur-Mamidapalli line at 1915 hrs on 08-05-2017
bull Line tripped at Ghanapur end only and was holding from Mamidapalli
Ghanapur Mamidapalli
DR trigger ndash 191329917 hrs Z3 Main-2 opts Event logger Main-2 PSB optd ndash 191541751hrs
DR trigger ndash 191458457hrs R-N Start Breakers did not trip
Ghani
Malkaram
Ramagundam
Chpr
Mamidapalli
Nrsquosagar
Gajwel Ghanapur Khammam
Dindi
Annexure-VI
Page 21 of 40
Annexure-VI
Page 22 of 40
Tripping of 400220kV ICT-1 at Guttur at 2215 hrs on 09-05-2017
bull ICT-1 tripped on HV side only without any relay indications
bull No fault observed from PMU data
Annexure-VI
Page 23 of 40
Tripping of 400kV Narsapur-Shankarapalli at 0007 hrs on 10-05-2017
bull line tripped at Narsapur end only and holding from Shankarapalli
Narsapur Shankarapalli
DR trigger ndash 000720147hrs Zp T1 Igt3 Start Event logger 75A relay optd ndash 000720098 hrs
CB did not trip
Singareni
Shankarapalli Gajwel
Narsapur
Suryapet
Brsquoply
Rrsquogm
Annexure-VI
Page 24 of 40
Tripping of 400220kV Hyderabad ICT-4 and 220kV lines at Hyderabad substation at 239 hrs on 10-05-2017
bull Triggering incident Bus fault in 220 kV Ghanapur station
bull Observation from PMU data ndash dip observed in Y amp B phase fault cleared in 120ms
bull Elements tripped 220kV lines amp 400220 kV ICT-4
bull FIR not submitted by TSTRANSCO
Annexure-VI
Page 25 of 40
Tripping of 400220kV ICT-1 at BTPS 13-05-2017 at 1941 hrs
bull ICT-1 got tripped on operation of LV side earth fault protection during R-phase to earth fault in 220kV BTPS-Lingapur line
bull Lingapur line DR amp EL were furnished
BTPS Alipura Regulapadu
Lingapur
Annexure-VI
Page 26 of 40
Tripping of 765 kV Kurnool-Thiruvelam line-2 at 2003 hrs on 19-05-2017
bull Triggering incident Failure of R-phase LA at Thiruvelam end
Kurnool Thiruvelam
DR trigger time ndash 200318272 hrs
Main-1 trip Carrier aided trip
3 ph Grp-AB optd DT RCV
Ir ndash 3kA
Dip in Y-phase current observed
Event logger
REF optd - 200318340 hrs
DT send - 200318343 hrs
DR trigger time ndash 200318269 hrs
Zone-1 trip
Initially 1 ph trip and later 3 ph trip due to DT rcv
Event logger
DT rcv - 200318395 hrs
Raichur Kurnool NPS
Tiruvelam
Solapur
Annexure-VI
Page 27 of 40
Annexure-VI
Page 28 of 40
Tripping of 400220kV ICT-2 at Kalpakka at 1502 hrs on 20-05-2017
bull ICT-2 tripped due to operation of transformer buchholz relay
bull Reason for operation of Buchholz relay may be furnished to PCSC
Annexure-VI
Page 29 of 40
Tripping of 400220kV ICT-2 at KV Kota at 1021 hrs on 23-05-2017
bull ICT-2 got tripped due to mal-operation of transformer oil temperature indicator
bull Remedial actions taken may be furnished to PCSC
Annexure-VI
Page 30 of 40
Tripping of 220kV Kaniambeta-Kadakola line at 1350 hrs on 23-05-2017
bull Line tripped at Kaniambeta end
bull Kaniambeta feeder protection is provided through 220kV bus coupler breaker bay
bull EFR relay operated and B ph pole discrepancy relay operated leading to tripping of Bus coupler CB
bull Loss of infeed to Kaniambeta Ss
Annexure-VI
Page 31 of 40
Tripping of 400220kV ICT-1 at Somanahalli substation at 1724 hrs on 24-05-2017
bull ICT-1 at Somanahalli substation got tripped due to DC Earth fault
bull Findings amp Remedial actions taken may be furnished to PCSC
Annexure-VI
Page 32 of 40
Tripping of HVDC Gazuwaka Pole-1amp2 25-05-2017 at 0945 hrs
bull HVDC pole-1 got tripped due to operation of South filter inter zone protection and
bull HVDC pole-2 got tripped due to operation of differential protection
bull Findings amp remedial actions taken may be furnished to PCSC
Annexure-VI
Page 33 of 40
Tripping of 400kV Kayathar-Karaikudi line 25-05-2017 at 1552 hrs
bull Triggering Incident R-phase to earth fault
Kayathar Karaikudi
DR trigger time ndash 155236585 hrs
Zone-2 3 phase trip
Carrier unhealthy
DR trigger time ndash 155236592 hrs
zone-1 3 phase trip
Kayathar Kamudi Karaikudi
Pugalur
Trichy
Madurai
Annexure-VI
Page 34 of 40
Annexure-VI
Page 35 of 40
Tripping of 400220kV ICT-1amp3 at Hoody substation of KPTCL at 1230 hrs on 26-06-2017
bull ICT-1 tripped due to arc over of pre-close supervision contact of tip coil -2
bull ICT-3 got tripped on over-loading
Annexure-VI
Page 36 of 40
Annexure-VI
Page 37 of 40
Tripping of 400kV Simhadiri-Kalpakka line-2 at 503 hrs on 28-05-2017
bull Line tripped on mal-operation Teed Differential Protection at Simhadiri end and direct trip was received at Kalpakka
bull Y-Phase to earth fault had occurred in 400 kV Vijayawada-Vemagiri line-3
bull Findings amp remedial actions taken may be furnished to PCSC
Annexure-VI
Page 38 of 40
Tripping of 400kV Ramagundam-Gajwel at 0007 hrs on 29-05-2017
bull Over voltage stage-1 had operated at Gajwel end
bull Ramagundam end did not trip as direct trip was received from Gajwel
bull DR amp EL of Gajwel end not furnished
Annexure-VI
Page 39 of 40
Tripping of 400kV Gajwel-Ghanapur line at 0007 hrs on 29-05-2017
bull Line tripped on operation of over voltage protection at Gajwel and direct trip was received at Ghanapur
bull DR and EL of Gajwel end were not furnished
Annexure-VI
Page 40 of 40