© ABB Group
October 23, 2014 | Slide 1
ABB in Kazakhstan Short Internal English
KAZAKHSTAN-SWITZERLAND FORUM, Oct 22, 2014 Igor Almazov
ABB in Kazakhstan Renewable Energy Sector
A global leader in power and automation technologies Leading market positions in main businesses
+145,000 employees
Present
in
countries +100
Formed
in
1988 merger of Swiss (BBC, 1891)
and Swedish (ASEA, 1883)
engineering companies
In revenue
(2013)
billion 42 $
© ABB Group
October 23, 2014 | Slide 3
Power and productivity for a better world ABB’s vision
As one of the world’s leading engineering companies, we
help our customers to use electrical power efficiently, to
increase industrial productivity and to lower environmental
impact in a sustainable way.
© ABB Group
October 23, 2014 | Slide 4
© ABB Group
October 23, 2014 | Slide 5
Ground-breaking and nation-building projects Pushing the boundaries of technology
Longest undegraund
power link
Longest underwater
power link
Largest Static Voltage
Compensator
Most remote offshore
wind farm linked to grid First platform connected
to mainland grid
Europe’s largest thermal
solar power plant
First commercial wave
power plant
Substation in world’s
tallest building
Automation of largest
alumina plant
Largest battery
Largest reverse-
osmosis
desalination plant
Commissioning of world
longest transmission line
© ABB Group
October 23, 2014 | Slide 7
ABB in Kazakhstan
Headquarter: Almaty
Branches and
representative offices
Astana
Atyrau
Aktau
190 Employees
ABB Kazakhstan: ABB LPP and JSC Energia Design Institute are representing ABB Group
© ABB Group
October 23, 2014 | Slide 8
ABB Power Products
ABB Kazakhstan supplies power transformers and
distribution transformers to the Utilities Industry throughout
Kazakhstan to help develop the country’s infrastructure and
improve its grid reliability.
© ABB Group
October 23, 2014 | Slide 9
ABB substations can be found in Kazakhstan power plants,
national power transmission grids and other places where
energy efficiency is critical for the operations of the power
projects.
ABB Power Systems in Kazakhstan
© ABB Group
October 23, 2014 | Slide 10
Many of ABB Process Automation integrated solutions are
used to provide high productivity for industrial plants in
industries, Oil and Gas, Minerals & Metals.
ABB Process Automation in Kazakhstan
© ABB Group
October 23, 2014 | Slide 11
ABB Low Voltage products are widely used to help deliver
major power savings in Kazakhstan’s infrastructure such as
buildings, construction, and transportation.
ABB Low Voltage Products in Kazakhstan
© ABB Group
October 23, 2014 | Slide 12
The Discrete Automation & Motion division provides
products, with related services, that are used as
components in machinery and automation systems. The
offering of the division covers a wide range of products and
services including power electronics systems, motors and
generators, drives and robots. Together we drive our
customer's industrial productivity and energy efficiency.
ABB Discrete Automation & Motion in Kazakhstan
Design Institute ENERGIA Current Competences
© ABB Group
October 23, 2014 | Slide 14
- Innovation and development of grid systems
- Design of relay protection and automation systems
- Design of emergency automation systems
- Design of supervisory and control systems
- Surveyor services (geodesic, geological, hydrological)
- Design of overhead and cable transmission line
from 6 kV to 1150 kV
-Design of AIS substations (6 - 1150 kV) and GIS
substations (6 - 500 kV)
- Design of auxiliary facilities and networks
- Civil construction design
- Engineering and consulting services
Established: 1962
Employees: 115
Joined to ABB Group: 1998
© ABB Group October 23, 2014 | Slide 15
Renewable energy Key growth driver for both power and automation
Generation and
transmission solutions for:
Hydro
Wind
Solar
Wave
Xiangjiaba-Shanghai (China)
Wind Capital (US)
Totana solar (Spain)
Pelamis wave energy (Portugal)
Project examples ABB scope
Grid connection
Transformers
Turnkey execution
Customized generators
© ABB Group
Renewable energy share of global electricity production
Source: REN 21
Renewables 2011
Global Status Report
Fossil fuel 67,6%
Renewables 19,4%
Nuclear 13%
November 08, 2011 | Slide 16
Reneable Energy.
Kazakhstan`s legislation.
1
Law of the Republic of Kazakhstan from
July 4, 2009 № 165-IV
«On Supporting the use of renewable
sources of energy»
«Renewed» renewable energy law ( went
into effect 21 July 2013)
Wind Power
1
ABB Kazakhstan. Design and feasibility study. Wind Parks. The folloing projects are in portfolio: Power delivery scheme of Erementau Wind Park, 50-300 MVA , Astana Power delivery scheme of Zhanatas Wind Park 100-400 МVA , South of KZ Power delivery scheme of Samal Wind Park Feasibility study of Wind Parc 51 MVA, Schelekhskiy Corridor, Almaty Feasibility study “Wind Park in Dzungar Gates”, 50-500 MVA Feasibility study 40-45 MVA , Erementau area Feasibility study “ Zhanatas in Zhambyl” Feasibility study “Samal”
Solar Power
19
ABB Kazakhstan. Design and feasibility study. Power delivery scheme of Solar Plant Zanakorgan, 50 MVA, Balkhash Power delivery scheme of Solar Plant Akermen, 50 МVA, Almaty Feasibility study Solar Plant Zanakorgan, 50 MVA, Balkhash Feasibility Study Solar Plant Akermen, 50 MVA, Almaty
Small scale Hydro Power
20
ABB Kazakhstan. Design and feasibility study. Power delivery scheme Rudnichnukh SHP and cascade SHP in Panfilov area Power delivery scheme Shelekskich HPS-1 – 6 Power delivery scheme Kerbulakskoy HPS Feasibility study Bulakhskoy HPS on Irtysh -river Feasibility study Kerbulakskoy HPS on Ili -river
Renewable Energy
Reference project in Kazakhstan
21
Almaty-area,
ТОО «Green Energy Almaty»
Feasibility study of Wind Power Park
of 51 MVA in Shelekhs Corridor
2014
Renewable Energy
Summary of works
22
•Power Delivery Connection Scheme
• Technical specification for connection to «Аlmaty Zharyk» 110 kВ
• Feasibility Study
• Approval of «StateExpertise»
• MINT approval ( Ministry of Industry and New Technologies)
• Fixed Tariff Approved
• At the present time «Green Energy Almaty» is in talks with investor
© ABB Group
October 23, 2014 | Slide 23
Strengthen the organization
Extend market coverage
Focus on Oil & Gas, Minerals & Metals industry
Focus on renewable energy
Strengthen services and engineering capabilities
ABB in Kazakhstan Strategic focus 2014 - 2016