2
Abbey Place Apartments CHARLOTTE, NORTH CAROLINA Sheet Index: C1.0 MULTI-FAMILY DEVELOPMENT Chapter 1 - Existing Conditions Cover Sheet Land Development 1st Submittal CONSTRUCTION DOCUMENTS May 1, 2015 C1.4 Existing Conditions Plan C2.0 Chapter 2 - Site Layout Plan C3.0 Chapter 3 - Grading Overall Grading Plan C5.2 Chapter 5 - Storm Drainage Storm Drainage Plan C5.3 - C5.4 Storm Drainage Notes and Details C8.0 Abbey Place Roadway Plan and Profile R.B. Pharr & Associates, P.A. 420 Hawthorne Lane Charlotte, NC 28204 (704)376-2186 Spectrum Properties 210 South Tryon Street Charlotte, NC 28202 (704)358-1000 DEVELOPER LandDesign, Inc. 223 N. Graham Street Charlotte, NC 28202 (704)333-0325 CIVIL ENGINEER LandDesign, Inc. 223 N. Graham Street Charlotte, NC 28202 (704)333-0325 LANDSCAPE ARCHITECT SURVEYOR ARCHITECT BB+M Architecture 1435 West Morehead Street Charlotte, NC 28208 (704)334-1716 SITE Park Rd COVER SHEET RAK RPG RAK NLD N.T.S. C-1.0 Montford Dr Abbey Place Mockingbird Ln C1.5 Demolition Plan C4.0 Chapter 4 - Erosion Control Erosion Control Plan Phase 1 C4.1 Erosion Control Plan Phase 2 C4.2 Erosion Control Notes and Details C1.1-C1.3 Rezoning Plan C5.0 Post Developed Impervious Area Plan C5.1 Storm Drainage Area Plan C5.5 Sand Filter 1 Detail C5.6 Sand Filter 2 Detail C3.3-C3.6 Driveway Sight Distance C6.0 Chapter 6 - Utility Utility Plan C6.1-C6.2 Utility Notes and Details C5.7 Sand Filter Riser Detail C7.0-C7.1 Chapter 7 - Planting Plan Required Planting Plan C2.1-C2.2 Amenity Area Detail C2.3-C2.12 Site Details C3.1-C3.2 Detailed Grading Plan Chapter 8 - Abbey Place Roadway Improvements C8.1-C8.5 Abbey Place Cross Sections C8.6 Traffic Control Plan C5.0A 50-50 Woods-Grass Pre-Developed Map May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 May 1, 2015 Pool Storm Drainage Plan C5.1A May 1, 2015 Land Development 2nd Submittal July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 July 10, 2015 REVISIONS: DATE: DESIGNED BY: DRAWN BY: CHECKED BY: Q.C. BY: SHEET #: SCALE: PROJECT #: ABBEY PLACE APARTMENTS SPECTRUM PROPERTIES RESIDENTIAL, INC. 1415 ABBEY PLACE, CHARLOTTE, NC 28209 MAY 1, 2015 1014311 SEAL 07/10/15 - PER CITY COMMENTS (1ST REVIEW) 07/15/15 - GMP PACKAGE 08/21/15 - PER CITY COMMENTS (2ND REVIEW) 09/21/15 - BUILDING PERMIT SUBMITTAL 09/22/15 - PER CITY COMMENTS (3RD REVIEW) C7.2 Planting Plan C7.3-C7.7 Detailed Planting Plan C7.8 Planting Plan Schedule GMP Package July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 Chapter 9 - Lighting E1.0 Site Lighting Plan July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 July 15, 2015 Land Development 3rd Submittal August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 August 21, 2015 E1.1 Photometric Plan Building Standards 1st Submittal September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 21, 2015 May 1, 2015 July 10, 2015 July 15, 2015 August 21, 2015 September 21, 2015 Land Development 4th Submittal September 22, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 22, 2015 September 22, 2015 September 21, 2015 September 22, 2015 September 22, 2015 September 22, 2015 September 21, 2015 September 22, 2015 September 21, 2015 September 21, 2015 September 22, 2015 September 22, 2015 September 22, 2015 September 22, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 22, 2015 September 21, 2015 September 22, 2015 September 22, 2015 September 22, 2015 September 21, 2015 September 21, 2015 September 22, 2015 September 21, 2015 September 21, 2015 September 21, 2015 September 22, 2015 September 21, 2015

Abbey Place Apartmentsww.charmeck.org/Planning/Subdivision/Approvals/2015/AbbeyPlaceApts(MF).pdfAbbey Place Apartments CHARLOTTE, NORTH CAROLINA Sheet Index: C1.0 MULTI-FAMILY DEVELOPMENT

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Abbey Place Apartmentsww.charmeck.org/Planning/Subdivision/Approvals/2015/AbbeyPlaceApts(MF).pdfAbbey Place Apartments CHARLOTTE, NORTH CAROLINA Sheet Index: C1.0 MULTI-FAMILY DEVELOPMENT

Abbey Place Apartments

CHARLOTTE, NORTH CAROLINA

Sheet Index:

C1.0

MULTI-FAMILY DEVELOPMENT

Chapter 1 - Existing Conditions

Cover Sheet

LandDevelopment1st Submittal

CONSTRUCTION DOCUMENTS

May 1, 2015

C1.4 Existing Conditions Plan

C2.0

Chapter 2 - Site

Layout Plan

C3.0

Chapter 3 - Grading

Overall Grading Plan

C5.2

Chapter 5 - Storm Drainage

Storm Drainage Plan

C5.3 - C5.4 Storm Drainage Notes and Details

C8.0 Abbey Place Roadway Plan and Profile

R.B. Pharr & Associates, P.A.420 Hawthorne Lane

Charlotte, NC 28204

(704)376-2186

Spectrum Properties

210 South Tryon Street

Charlotte, NC 28202(704)358-1000

DEVELOPER

LandDesign, Inc.223 N. Graham Street

Charlotte, NC 28202

(704)333-0325

CIVIL ENGINEER LandDesign, Inc.

223 N. Graham Street

Charlotte, NC 28202(704)333-0325

LANDSCAPE ARCHITECT

SURVEYOR

ARCHITECT BB+M Architecture

1435 West Morehead StreetCharlotte, NC 28208

(704)334-1716

SITE

Park Rd

CO

VER

SH

EET

RA

KR

PG RA

KN

LD

N.T

.S.

C-1

.0

Montford Dr

Abbey Place

Mockingbird Ln

C1.5 Demolition Plan

C4.0

Chapter 4 - Erosion Control

Erosion Control Plan Phase 1

C4.1 Erosion Control Plan Phase 2

C4.2 Erosion Control Notes and Details

C1.1-C1.3 Rezoning Plan

C5.0 Post Developed Impervious Area Plan

C5.1

Storm Drainage Area Plan

C5.5 Sand Filter 1 Detail

C5.6 Sand Filter 2 Detail

C3.3-C3.6 Driveway Sight Distance

C6.0

Chapter 6 - Utility

Utility Plan

C6.1-C6.2 Utility Notes and Details

C5.7 Sand Filter Riser Detail

C7.0-C7.1

Chapter 7 - Planting Plan

Required Planting Plan

C2.1-C2.2 Amenity Area Detail

C2.3-C2.12 Site Details

C3.1-C3.2 Detailed Grading Plan

Chapter 8 - Abbey Place Roadway Improvements

C8.1-C8.5 Abbey Place Cross Sections

C8.6 Traffic Control Plan

C5.0A 50-50 Woods-Grass Pre-Developed Map

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

May 1, 2015

Pool Storm Drainage PlanC5.1A May 1, 2015

LandDevelopment2nd Submittal

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

July 10, 2015

REV

ISIO

NS:

DA

TE:

DESIG

NED

BY

:D

RA

WN

BY

:C

HEC

KED

BY

:Q

.C. B

Y:

SH

EET

#:

SC

ALE:

PR

OJE

CT

#:

AB

BEY

PLA

CE A

PA

RT

MEN

TS

SPEC

TR

UM

PR

OPER

TIE

S R

ESI

DEN

TIA

L, IN

C.

1415 A

BBEY

PLA

CE, C

HA

RLO

TT

E, N

C 2

8209

MA

Y 1

, 2015

1014311

SEAL

07/1

0/1

5 -

PER

CIT

Y C

OM

MEN

TS (

1ST

REV

IEW

)07/1

5/1

5 -

GM

P P

AC

KA

GE

08/2

1/1

5 -

PER

CIT

Y C

OM

MEN

TS (

2N

D R

EV

IEW

)09/2

1/1

5 -

BU

ILD

ING

PER

MIT

SU

BM

ITT

AL

09/2

2/1

5 -

PER

CIT

Y C

OM

MEN

TS (

3R

D R

EV

IEW

)C7.2 Planting Plan

C7.3-C7.7 Detailed Planting Plan

C7.8 Planting Plan Schedule

GMPPackage

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

Chapter 9 - Lighting

E1.0 Site Lighting Plan

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

July 15, 2015

LandDevelopment

3rd Submittal

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

August 21, 2015

E1.1 Photometric Plan

Building

Standards1st Submittal

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 21, 2015

May 1, 2015 July 10, 2015 July 15, 2015 August 21, 2015 September 21, 2015

LandDevelopment4th Submittal

September 22, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 22, 2015

September 22, 2015

September 21, 2015

September 22, 2015

September 22, 2015

September 22, 2015

September 21, 2015

September 22, 2015

September 21, 2015

September 21, 2015

September 22, 2015

September 22, 2015

September 22, 2015

September 22, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 22, 2015

September 21, 2015

September 22, 2015

September 22, 2015

September 22, 2015

September 21, 2015

September 21, 2015

September 22, 2015

September 21, 2015

September 21, 2015

September 21, 2015

September 22, 2015

September 21, 2015

RZINK
Approved
RZINK
commercial
RZINK
Approved
RZINK
Approved
RZINK
Approved
BWILKINSON
Multi-Family Approval
BWILKINSON
Text Box
By Brent Wilkinson 9/28/15
Page 2: Abbey Place Apartmentsww.charmeck.org/Planning/Subdivision/Approvals/2015/AbbeyPlaceApts(MF).pdfAbbey Place Apartments CHARLOTTE, NORTH CAROLINA Sheet Index: C1.0 MULTI-FAMILY DEVELOPMENT