AN UPDATE IN DISTRICT COOLING
IMPLEMENTATION IN KSA
Prepared by
SAUDI TABREED
8/12/2019 Abdul Jalil Bakhruji
2/45
8/12/2019 Abdul Jalil Bakhruji
3/45
8/12/2019 Abdul Jalil Bakhruji
4/45
The district cooling market in Saudi Arabia is considered to be the strongestdistrict cooling market for in the region with over US $100 B for awarded
construction and infrastructure projects.
The Kingdoms rapidly expanding industrial base and population haveincreased the demands for water, power and cooling. The requirement toncrease e ava a y o a r-con on ng sys ems s r s ng an e powersupply required accounts for almost 70% of the total growth in powerdemand.
The drive to optimize energy efficient air conditioning has resulted in the need
to implement district cooling systems over traditional methods. The market isexpected to have an additional capacity of 4.5 million tons of refrigeration,mainly contributed by Saudi Arabia & Qatar in the coming five years*
8/12/2019 Abdul Jalil Bakhruji
5/45
8/12/2019 Abdul Jalil Bakhruji
6/45
8/12/2019 Abdul Jalil Bakhruji
7/45
8/12/2019 Abdul Jalil Bakhruji
8/45
8/12/2019 Abdul Jalil Bakhruji
9/45
8/12/2019 Abdul Jalil Bakhruji
10/45
8/12/2019 Abdul Jalil Bakhruji
11/45
8/12/2019 Abdul Jalil Bakhruji
12/45
8/12/2019 Abdul Jalil Bakhruji
13/45
Projecst
8/12/2019 Abdul Jalil Bakhruji
14/45
Projecst
RIYADH100,000 TR
8/12/2019 Abdul Jalil Bakhruji
15/45
A contract to design and build a district cooling services for the air-conditioning systems of the office towers at the King Abdullah Financial
District including the operation and maintenance of the system for a period often years.
KING ABDULLAH FINANCIAL DISTRICT (KAFD)
,
the largest of its kind in the Kingdom.
The project will be implemented in two phases and the capacity of each
Phase is Fifty thousand tons of refrigeration.
8/12/2019 Abdul Jalil Bakhruji
16/45
8/12/2019 Abdul Jalil Bakhruji
17/45
8/12/2019 Abdul Jalil Bakhruji
18/45
8/12/2019 Abdul Jalil Bakhruji
19/45
8/12/2019 Abdul Jalil Bakhruji
20/45
8/12/2019 Abdul Jalil Bakhruji
21/45
8/12/2019 Abdul Jalil Bakhruji
22/45
8/12/2019 Abdul Jalil Bakhruji
23/45
8/12/2019 Abdul Jalil Bakhruji
24/45
King Abdullah Financial District - Riyadh
8/12/2019 Abdul Jalil Bakhruji
25/45
8/12/2019 Abdul Jalil Bakhruji
26/45
8/12/2019 Abdul Jalil Bakhruji
27/45
Projecst
,
32,000 TR
8/12/2019 Abdul Jalil Bakhruji
28/45
Components
DCP Plant with capacity(27,000TR) presently, and for Future total capacity is(32,000TR).
115kv Over Head Power Transmission Line with 13 poles.
SAUDI ARAMCO PROJECT
115kv/13.8kv Sub Stations. 15 km Network.
11 Nos Energy Transfer Station distributed chilled water in each existing
plant.
8/12/2019 Abdul Jalil Bakhruji
29/45
Existing AC PlantsDCPChilled Water Network
NorthParkAC Plant
ITCAC Plant
Oil Exhibit
AC Plant
R&D
AC Plant
AC Plant 8
AC Plant 2
AC Plant 4AC Plant 5
AC Plant 7ExpecBldgAC Plant
TowerBldgAC Plant
8/12/2019 Abdul Jalil Bakhruji
30/45
OHTL Route and Power PolesLocation:
PP6
8/12/2019 Abdul Jalil Bakhruji
31/45
ARAMCO Project _ Dhahran
8/12/2019 Abdul Jalil Bakhruji
32/45
8/12/2019 Abdul Jalil Bakhruji
33/45
Summary
() ()
/
()
()
1 3200 17.29 3057.28
2 3000 21.93 3877.5 3424.0
3 1500 9.44 1669.46 1438.0
4 6000 31.07 5493.24 3234.0
5 1 2400 17.39 3075.94 2242.0
6 2 1200 7.9 1398.49 2090.0
7 4 1800 11.84 2093.58 2598.0
. . .
9 7 5400 34.34 6073.15 6585.0
10 8 2400 14.6 2581.46 3425.0
11 & 8800 46.22 8173 3685.0
12 2300 14.1 2493.35 2112.0
13 400 2.83 500.15 770.0
14 40200.00 241.01 42619.78 36711.00
15 10% 0.00 24.10 4261.90 0.00
16
5% ,, ( &
).
0.00 7.96 1406.85 0.00
17 40200.00 273.07 48288.53 36711.00
8/12/2019 Abdul Jalil Bakhruji
34/45
Summary
1
/
/
()
/
()
/
()
1 1 641 641 600 833.3 7990.5 239715.4 108.8
2 2 422 422 600 548.6 5260.5 157815.8 71.6
3 3 422 422 600 548.6 5260.5 157815.8 71.6
. . . .
5 1 117 117 1800 152.1 1458.5 43754.6 19.9
6 2 117 117 1800 152.1 1458.5 43754.6 19.9
7 3 117 117 1800 152.1 1458.5 43754.6 19.9
8 4 117 117 1800 152.1 1458.5 43754.6 19.9
9 5 117 117 1800 152.1 1458.5 43754.6 19.9
10 6 117 117 1800 152.1 1458.5 43754.6 19.9
11 1 44.83 44.83 2000 58.3 558.8 16765.1 7.6
12 2 44.83 44.83 2000 58.3 558.8 16765.1 7.6
13 3 44.83 44.83 2000 58.3 558.8 16765.1 7.6
14 4 44.83 44.83 2000 58.3 558.8 16765.1 7.6
15 5 44.83 44.83 2000 58.3 558.8 16765.1 7.6
16 6 44.83 44.83 2000 58.3 558.8 16765.1 7.6
8/12/2019 Abdul Jalil Bakhruji
35/45
Carbon Emission Summary
.
=40,200
(10+5)% = 273.07 /
(10+5)% = 48,288.53 .
, () = (273.07/40200)*365 = 2.479 /.
.(20000)
=20,000
10% = 130.98 /.
10% =23,160.88
, ( ) = (130.98/20000) *365= 2.39 /.
(1) 1 = 142.09 /.
(2) 1 =51,862.85 /.
8/12/2019 Abdul Jalil Bakhruji
36/45
Projecst
,
55,000 TR
8/12/2019 Abdul Jalil Bakhruji
37/45
Plant Capacity at 55,000 TR under a 25 year BOO District Cooling scheme.
Servicing 13 twin towers catering for Hotels, Malls, commercial outlets and ResidentialBuildings
Exclusive agreement with NWC to supply TSE water to JODC scheme (CDCC)
.
Upfront CAPEX savings of about SAR 384 M (including substations & distribution networks)
Saving in Crude Oil BBLs exceeds 330,750 BBLs / Year
Power Consumption at 353 Kwh vs. 595 Kwh for conventional systems.
Saving of 87,720 Carbon emissions in Metric Ton annually compared to conventional systems
8/12/2019 Abdul Jalil Bakhruji
38/45
8/12/2019 Abdul Jalil Bakhruji
39/45
6 0 M W
1 6 0 M W
8/12/2019 Abdul Jalil Bakhruji
40/45
3 5 0 K w h
5 9 5 K w h
8/12/2019 Abdul Jalil Bakhruji
41/45
1 6 0 M W
6 0 M W
5 9 5 K w h
3 5 0 K w h
8/12/2019 Abdul Jalil Bakhruji
42/45
PROJECTS
8/12/2019 Abdul Jalil Bakhruji
43/45
KAFD 100,000 TR
8/12/2019 Abdul Jalil Bakhruji
44/45
1.
4.6
1.06
2. &
0.116 ( )
1.8
3.
2
8/12/2019 Abdul Jalil Bakhruji
45/45