Background
• University of Iowa• Senior Year
• Industrial Engineer, • EFA in management
• Solar Cooker• Remote Control Car• Softball• Cubs and Bears Fan• Dance Marathon
3 3
Major Projects
• Assisted with the ISO Audit• Goal: Receive less than 3 findings
• Corrective action from ISO Audit• Goal: Dispose all paint while updating SAP on hand
• Adjusted bulk lead-time• Goal: Update SAP with current lead-times of each vendor
• Decal digital printing• Goal: Implement a faster way to receive decals with Standard Register
• New work center• Goal: Design a more efficient layout for the paint shed, using the FIFO method
4 4
Accomplishment – ISO Audit
• Responsibilities:• Static measuring devices• Check
• Process Qualification Plan (PQP)• Process Qualification Guide (PQG)• Visual Operating Procedure (VOP)• Playbooks
• Outcome:• 100% success under my responsibilities• 2 findings overall
• Expired paint• Gage in Maintenance was not calibrated
• Take corrective action
Goal: Receive less than 3 findings
5 5
Accomplishment – Expired Paint
• Corrective Action from ISO Audit• Paint cans – 2 years• Aerosol cans – 1 year
• Took inventory• Dispose of paint in
• 55 gallon drums and Gaylord box (yard boxes)
• Issue part out of location• From 7000 to 2000
• 7000 – in location• 2000 – on the floor
• Adjusted off in SAP• B01
Goal: Dispose all paint while updating SAP on hand
6 6
Accomplishment – Bulk Lead-Time Update
• Verified 79 vendors’ current lead-times• Compared current vs. new lead-times• Pulled spend history over last 12 months
• Eaton’s business warehouse tools• Updated in SAP
• Decreased lead-times• Decrease WIP (work in progress)
Goal: Update SAP with current lead-times of each vendor
7 7
Accomplishment – Standard Register
• Problem:• 14 day lead-time• Completed transformer could be sitting for two weeks• Variability in stock on hand and what SAP states
• Digital printing:• Overnight shipping• First Cooper Facility
• Process:• Met with Standard Register• Sent engineering drawings with current quantities• Received quotes and updated in SAP
• Outcome:• Decreased lead-time
• 14 days to 2 days
• Increase throughput• Increase cash flow per month
Goal: Implement a faster way to receive decals with Standard Register
8 8
Accomplishment – New Work Center
• Measured the shed, racks and cabinets to get accurate data and positioning• Based on what we have, what would be the best layout?• Researched different racking systems – Pallet flow rack
• Quoted 6 vendors for Pallet Flow Rack• Presented it to the team
Goal: Design a more efficient layout for the paint shed, using the FIFO method
9 9
Other Projects
• Designed and printed a new VOP for the Adjustable Jib Boom, Fall Protection System• Ensure safety on the floor
• Learned SAP fundamental aspects for purchasing• MD04, MM03, ME11… etc.
• Interplant rescheduling via scheduling agreements • Communicating with other plants to expedite materials• Low in stock and need sooner than delivery time
• Shipping Status• Confirm part shortages for each tank
• Implement a new process for Kirk Keys• Keep getting new materials• Standardize?
10 10
Training and Development
• Toured our plant and others• Badger and Watertown• Understand the difference and similarities between all the plants• How each plant connects to one another
• Learned several programs in SAP (System Application Products)• Quantity and Location of Part• Create and/or update PO’s• Enter PIRs, Source Lists• Translate into Spanish if necessary• Updated Expedites to pull in or push out• Cleared MRBR issues
• invoice receipt = goods receipt
• Sat in on vendor meetings• Their contribution to Eaton• What is needed or what can be changed
11 11
My Experience Going Forward
• ASK QUESTIONS!• Never a bad question and everyone is always willing to help
• Work relationships are extremely important within the field• Build trust and respect
• Always give 110% • Better to work hard the first time than to work on the same thing several times
• Absorb EVERYTHING!• There’s so much to learn from every single person in the plant, learn it!
12 12
Next Steps
Graduation: December 2016
Stay in contact with co-workers• Forms a work
relationship• Stay updated with Eaton
One more summer for an internship
• Engineering Experience• Hands on projects
• Broaden my experience
Leadership Development
Program• Opportunities to learn
about Eaton