Overview
Levels of Warnings and
Cautions
Pilot Responsibilities
ECAM Execution
Abnormal and/or Emergency Occurs!
5/23/2018 Abnormal+Emergency Procedures
3/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
Abnormalor
Emergency
Identified by
ECAM
200+ ECAMs Engine Fires/Failures
Electrical Faults Hydraulic Faults
Gear Abnormals
Flight Control Faults, etc...
Levels of Warnings
and Cautions
System abnormalitiesidentified by the ECAM
are prioritized and
categorized based on
severity.
The ECAM categorizessystem abnormalities into
three different levels. In
priority order, the levels
include:
Level 3Warnings
Level 2Cautions
Level 1Cautions
Abnormal and/or Emergency Occurs!
5/23/2018 Abnormal+Emergency Procedures
4/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
Levels of Warnings
and Cautions
Level 3Warnings
Flashing Red Master
Warning lights
Continuous Repetitive
Chime (CRC)
Red ECAM title and
LAND ASAP message
These warnings represent
emergency conditions and
require:
Immediate crew
awareness
Immediate crew action
Abnormal and/or Emergency Occurs!
5/23/2018 Abnormal+Emergency Procedures
5/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
Levels of Warnings
and Cautions
Level 2 Cautions
Steady Amber Master
Caution lights
Single Chime (CRC)
Amber ECAM title
These cautions represent
abnormal conditions and
require:
Immediate crew
awareness
Time and conditions
permitting, these cautions
should be considered
without delay to prevent
further system
degradation.
Abnormal and/or Emergency Occurs!
5/23/2018 Abnormal+Emergency Procedures
6/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
Levels of Warnings
and Cautions
Level 1Cautions
Amber ECAM title
Level 1 Cautions
represent failures leading
to a loss of redundancy or
system degradation.
Level 1 Cautionsdo not
generate an audio alert or
a Master Cautlight.
Abnormal and/or Emergency Occurs!
5/23/2018 Abnormal+Emergency Procedures
7/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
Emergency
Procedures Not
Identified by
ECAM
Levels of Warnings
and Cautions
Please understand, theECAM does not identify
all emergencies.
Some Emergencies NOT
identified by the ECAM
include:
Air Conditioning Smoke
Cabin Smoke/Fire
Emergency Landing
Ditching
Passenger Evacuation
Emergency procedures
NOT identified by the
ECAM are found in the
QRH and FCOM Vol-3.
Abnormal and/or Emergency Occurs!
Air Conditioning Smoke
Cabin Smoke/Fire Emergency Landing
Ditching
Passenger Evacuation
5/23/2018 Abnormal+Emergency Procedures
8/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
Levels of Warnings
and Cautions
Someabnormals NOTidentified by the ECAM
include:
Fuel leak
DU failure
Tailpipe Fire
Double Probe Heat Fault
Cracked/Delaminated
Cockpit Window
Abnormal procedures
NOT identified by theECAM are found in the
QRH and/or FCOM Vol-3.
Abnormal
Procedure Not
Identified by
ECAM
Abnormal and/or Emergency Occurs!
Procedures Fuel Leak
Display Unit Failure
Tailpipe Fire
Double Probe Heat Fault
Cracked/Delaminated
Cockpit Window.
.Others
5/23/2018 Abnormal+Emergency Procedures
9/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
Pilot Responsibilities
Pilot abnormal and
emergencyresponsibilities are
outlined in:
The FCOM VOL-3 (3.02)
The QRH (0.00)
S P I R I TA I R L I N E S
A320 FCOM
VOL-3
S P I R I T
A I R L I N E S
A320 QRH
S P I R I TA I R L I N E S
A320 FCOM
VOL-3
Abnormal and/or Emergency Occurs!
5/23/2018 Abnormal+Emergency Procedures
10/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
Pilot Responsibilities
FCOM VOL-3 specifies
the following procedures
are to be memorized and
applied without referring
to the QRH or FCOM
procedure:
Windshear/Windshear
ahead (FCOM VOL-3
MISC)
TCAS (QRH EMER)
EGPWS (QRH EMER)
Loss of braking (QRH
EMER)
Emergency descent (initial
steps, QRH EMER))
Unreliable speed
indication/ADR check
(immediate actions, QRH
ABN)
Crew incapacitation (FCOM
VOL-3, MISC)
Abnormal and/or Emergency Occurs!
5/23/2018 Abnormal+Emergency Procedures
11/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
Brief
Each
Other
Review STATUSPage
Refer to QRH
and/or
FCOM VOL-3
ECAM Actions
Pilot Responsibilities
This flow diagram
generalizes and illustratesthe flight crews
responsibilities should an
emergency or abnormal
condition develop in flight.
Communicate
Navigation
Request Configuration
Changes as Appropriate
FLY THE AIRCRAFT!
Command
ECAM Actions PNF
PF
Abnormal and/or Emergency Occurs
Cancel the Warning/Caution
Flight Path Established
Above 400 ft AGL
I have the
airplane and
ATC. Perform
ECAM.
PNF
PF
5/23/2018 Abnormal+Emergency Procedures
12/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
Abnormal and/or Emergency OccursPilot Responsibilities
The first responsibility of
the flight crew during anabnormal/emergency is to
cancel the warning or
caution.
The first pilot to recognize
the abnormal/emergency
condition must:
Cancel the CRC or
SC, if any
The pilot that cancels the
warning/caution should
clearly and distinctly
identify the condition.
For example
Cancel the Warning/Caution
Engine
Fire !
5/23/2018 Abnormal+Emergency Procedures
13/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
Abnormal and/or Emergency OccursPilot Responsibilities
No action is taken (except
canceling the
warning/caution)
until :
The appropriate flight
path is established
If a failure occurs during
takeoff, approachor go-around, the aircraft
is above 400 feet AGL.
A height of 400 feet is
recommended because it
gives a good compromise
between time
necessary for stabilizationand excessive delay for
procedure initiation.
Cancel the Warning/Caution
Flight Path Established
Above 400 ft AGL
In some emergency cases,
provided the appropriate flight
path is established, the pilot flying
may initiate actions before this
height.
5/23/2018 Abnormal+Emergency Procedures
14/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
Abnormal and/or Emergency OccursPF Responsibilities
Abnormal/Emergency
procedures are initiatedon the pilot flying's
command.
To initiate
abnormal/emergency
procedures, the PF states:
Cancel the Warning/Caution
Flight Path Established
Above 400 ft AGL
I have control andATC. Perform ECAM.
If a transfer of control
occurs, the pilot giving up
control must respond by
stating: You have
control. Some
conditions will require thecaptain to be the PF (i.e.,
Avionics Smoke).
Perform ECAM
FLY THE AIRCRAFT!
Command
ECAM Actions PNF
I have control
and
ATC. Perform
ECAM.
PF
5/23/2018 Abnormal+Emergency Procedures
15/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
Abnormal and/or Emergency OccursPF Responsibilities
Airbus recognizes that
continuing to fly theaircraft is the single most
important consideration in
almost every situation.
As the PF, guard against
becoming overly
distracted by other
abnormal/emergencysteps at the expense of
flying the aircraft.
Cancel the Warning/Caution
Flight Path Established
Above 400 ft AGL
FLY THE AIRCRAFT!
Command
ECAM Actions
PF
5/23/2018 Abnormal+Emergency Procedures
16/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
PF Responsibilities
The PF is responsible for
aircraft navigation.
However, during
abnormal/emergencyprocedures, inputs via the
MCDU are to be minimized
and accomplished only if
workload permits.
The PF may accomplish
short term inputs via the
MCDU, such as:
Direct To
Activating the
Approach Phase
Inputs that require lengthy
typing (i.e., programming a
re-route) should be avoided.
Concentrating on MCDUinputs have caused pilots to
become distracted and
subsequently miss assigned
altitudes and headings,
ATC calls, etc.
Navigation
Abnormal and/or Emergency Occurs
Cancel the Warning/Caution
Flight Path Established
Above 400 ft AGL
FLY THE AIRCRAFT!
Command
ECAM Actions
PF
5/23/2018 Abnormal+Emergency Procedures
17/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
PF Responsibilities
Communication with ATC
is accomplished by thePF.
The PF should coordinate
a plan of action with ATC
and if applicable, declare
an emergency.
ATC must be immediately
notified if:
Pilot uses
emergency authority
A Deviation from
ATC assigned route
or clearance occurs
Priority handling is
required
Navigation
Abnormal and/or Emergency Occurs
Cancel the Warning/Caution
Flight Path Established
Above 400 ft AGL
Communicate
FLY THE AIRCRAFT!
Command
ECAM Actions
PF
5/23/2018 Abnormal+Emergency Procedures
18/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
PF Responsibilities
The PF continues to
request configurationchanges.
It is not acceptable for the
PF to make a
configuration change
because the PNF is busy.
The PNF, upon request
from the PF will stop and
make the configuration
change if it is safe to do
(i.e., after checking
airspeed).
Navigation
Abnormal and/or Emergency Occurs
Cancel the Warning/Caution
Flight Path Established
Above 400 ft AGL
Communicate
Request Configuration
Changes as Appropriate
FLY THE AIRCRAFT!
Command
ECAM Actions
PF
5/23/2018 Abnormal+Emergency Procedures
19/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
PNF Responsibilities
The PNF is responsible
for the completion of theECAM
abnormal/emergency
procedure.
Upon the PFs Perform
ECAM statement, the
PNF initiates the ECAM
procedure.
Abnormal and/or Emergency Occurs
Cancel the Warning/Caution
Flight Path Established
Above 400 ft AGL
Perform
ECAM
Communicate
Navigation
Request Configuration
Changes as Appropriate
FLY THE AIRCRAFT!
Command
ECAM Actions PNF
PF
5/23/2018 Abnormal+Emergency Procedures
20/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
PNF Responsibilities
The A320 Series aircraft
is certified with an ECAM.Therefore, the ECAM
must always be performed
initially from start to finish.
The PNF uses the READ
and DO oral reading
principle when performing
the abnormal/emergencyprocedures.
The crew should always
keep in mind the
advantages and
disadvantages of the
ECAM
checklist/procedure
PerformECAM
PNF
5/23/2018 Abnormal+Emergency Procedures
21/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
ECAM Advantages
Constantly monitorsmost aircraft systems.
Displays essential steps
to be accomplished,stabilizing the situation
prior to landing.
Prioritizes abnormalsand emergencies.
ECTURE TOPIC
5/23/2018 Abnormal+Emergency Procedures
22/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
ECAM Disadvantages
ECAM software is notcustomized for
individual operators.ECAM does not have
the same reasoningabilities as pilots do
(Cargo Smoke)
ECAM cant recognizeall abnormals and
emergencies.
LECTURE TOPIC
5/23/2018 Abnormal+Emergency Procedures
23/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
PNF Responsibilities
Executing the ECAM
actions, when directed bythe PF, should be
accomplished in a
deliberate and unhurried
manner.
The PNF obtains
confirmation from the PF
whenever an action couldsignificantly affect aircraft
performance such as:
ENG Master switch
Thrust Lever
Fire pb
Other guarded
switches
AND
before using the CLR pb
ECAM Actions
PNF
LECTURE TOPIC C
5/23/2018 Abnormal+Emergency Procedures
24/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
LAND ASAP
PNF Responsibilities
In the execution of ECAM
actions, the goal is to getto a lights out condition.
That is, the ECAM must
be returned to a normal
condition.
To achieve lights out, the
PNF:
Completes the blue
ECAM action items
Uses the CLR pb
ECAM Actions
PNF
LECTURE TOPIC Ab l d E ECAM P d
5/23/2018 Abnormal+Emergency Procedures
25/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
- ATC . . . . . . . . . . . . . . . . . . . . . . NOTIFY
- MAX SPEED 320 KTS
- MANEUVER WITH CARE
Examples of unmonitoredECAM action items:
PNF Responsibilities
ECAM action items:
Display in blue
Automatically clear after
completion if monitored by
the FWCs. Most action
items are monitored by
the FWCs.
Some action items are
NOT monitored and
remain displayed after
completion.
ECAM Actions
PNF
LECTURE TOPIC Ab l d E ECAM P d
5/23/2018 Abnormal+Emergency Procedures
26/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
EMER REALLY BAD FAILURE 2
- ACTION ITEM 1 . . . . . . . . . JUST DO IT
- ACTION ITEM 2 . . PUSH SOMETHING
ABNORM NOT SO BAD FAULT 1
- ACTION ITEM 1. . . PUSH SOMETHING
ABNORM LESS BAD FAULT 2
-MANEUVER WITH CARE
ABNORM MINOR FAILURE
ABNORM NOT SO BAD FAULT 1
- ACTION ITEM 1. . . PUSH SOMETHING
ABNORM LESS BAD FAULT 2
-MANEUVER WITH CARE
ABNORM MINOR FAILURE
PNF Responsibilities
The proper use of the CLR
pb is as follows:
Only after all displayed
blue action items for the
highest underlined
procedure are completed
AND
Only after confirmation
from the PF
In the following example,the blue action items under
REALLY BAD FAILURE 2
have not been completed.
Therefore, the use of the
CLR pb is improper at this
time.
The CLR pb cleared all blue
action items associated withthe underlined title (REALLY
BAD FAULT 2).
The CLR pb does not clear
an ECAM procedure line-
by-line.
ECAM Actions
PNF
LECTURE TOPIC Ab l d E ECAM P d
5/23/2018 Abnormal+Emergency Procedures
27/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
ABNORM NOT SO BAD FAULT 1
- ACTION ITEM 1. . . PUSH SOMETHING
ABNORM LESS BAD FAULT 2
-MANEUVER WITH CARE
ABNORM MINOR FAILURE
ABNORM LESS BAD FAULT 2
-MANEUVER WITH CARE
ABNORM MINOR FAILURE
PNF Responsibilities
If the blue action item
under NOT SO BADFAULT 1 is not
accomplished, the use of
the CLR pb is still
improper.
As a general rule, the
CLR pb clears all items
associated with thehighest underlined
procedure.
ECAM Actions
PNF
LECTURE TOPIC Ab l d E ECAM P d
5/23/2018 Abnormal+Emergency Procedures
28/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
ABNORM LESS BAD FAULT 2
-MANEUVER WITH CARE
ABNORM MINOR FAILURE
ABNORM MINOR FAILURE
PNF Responsibilities
Here is an example of the
proper use of the CLR pb.
MANEUVER WITH CARE
is an unmonitored ECAM
action item. All blue
action items for the
underlined procedure are
accomplished and
therefore, the use of theCLR pb is now proper.
Also, the proper use of the
CLR pb calls for the
confirmation of the PF.
Clear
ABNORM
Clear
ABNORM2?
ECAM Actions
PNF
LECTURE TOPIC Ab l d E ECAM P d
5/23/2018 Abnormal+Emergency Procedures
29/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
ABNORM MINOR FAILURE
PNF Responsibilities
Another example of the
proper use of the CLR pb.
No blue action
items remain for the
underlined
procedure
Clear
ABNORM
Clear
ABNORM?
ECAM Actions
PNF
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
30/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
ENG BAD FAILURE * ELEC
* HYD
Primary Failure
System with Secondary Failure(s)
STS
Additional Indications
A failure/fault that causes
the loss or degradation of
other system components is
called a Primary failure.
A Primary failure, indicated
by a box, generates
Secondary failure(s). A
Secondary Failure is a loss
or degradation of a system
component as a result of a
Primary Failure.
Systems with Secondary
Failures are listed on the
right side preceded by an
asterisk.
If a Primary failure occurs,
the PNF needs to continue
using the CLR pb to cycle
through the SecondaryFailure(s).
Soas the PNF continues
to use the CLR pb, the
listed system pages will be
displayed on the SD.
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
31/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
Additional Indications
A system without an
asterisk, listed on the rightside, is an overflow failure
message.
A green overflow symbol
indicates one of the
following:
Overflow failure
message(s)
Overflow blue
action items
By executing the ECAM
(completing blue action
items and/or using the
CLR pb) the overflowfailure(s) eventually
display when enough
space becomes available.
Overflow Failures
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
32/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
PNF Responsibilities
If any indications appear
on the right side, the PNFwill need to continue
executing the ECAM.
Remember the goal:
lights out. Notice the
lights on the ECAM
Control panel during each
clear.
The Secondary Failure
depictions (with asterisks)
indicate the corresponding
system page that will be
displayed following the
use of the CLR pb.
Note the system page
displayed after using the
CLR pb.
Clear bad
failure
Clear bad
failure?
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
33/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
PNF Responsibilities
System pages that are
displayed provide a
reminder to the pilot of
how the system is
affected by the abnormal.
The PNF does not need to
spend a great deal of time
analyzing the entiresystem.
Time for the CLR pb
again.
Clear electric Clear electric?
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
34/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
PNF Responsibilities
Clearing the last system
page, automatically callsup the STATUS page.
The STATUS page is
always the last page
displayed during an
ECAM procedure.
Are we lights out?
NO!!!
Clear
hydraulic
Clear
hydraulic?
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
35/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
Review STATUS
Page
ECAM Actions
PNFPNF ResponsibilitiesBefore using the CLR pb
again, the PNF should
review the STATUS page.
The STATUS page
provides a review of the
inoperative systems,
approach procedures, and
notes.
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
36/71
LECTURE TOPICAbnormal and Emergency ECAM Procedures
Clear status Clear status?PNF Responsibilities
After reviewing the
STATUS page, the PNFuses the CLR pb to clear
the STATUS page and
return the ECAM to a
lights out condition.
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
37/71
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
STS
Review STATUS
Page
ECAM Actions
PNFPNF ResponsibilitiesThe ECAM procedure is
complete when:
No ECAMmessages are
displayed on the
E/WD
No pb lights on the
ECAM control panel
Also, the SD returns to
the page appropriate tothe current phase of flight
(e.g., CRUISE page).
Lights out
ECAM actions
completed
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
38/71
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
PNF Responsibilities
The STS symbol provides
a reminder that theSTATUS page contains
unusual items caused by
system abnormals.
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
39/71
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
PNF Responsibilities
After the ECAM is
complete (lights out), thePNF should refer to the
QRH and/or FCOM VOL-
3.
Review STATUS
Page
Refer to QRH
and/or
FCOM VOL-3
ECAM Actions
Communicate
Navigation
Request Configuration
Changes as Appropriate
FLY THE AIRCRAFT!
Command
ECAM Actions PNF
Abnormal and/or Emergency Occurs
Cancel & Identify
Flight Path Established
Above 400 ft AGLPF
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
40/71
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
PNF Responsibilities
QRH or FCOM?
The QRH contains somespecific procedures which
are NOT identified by the
ECAM.
As a general rule, the
procedures displayed on
the ECAM are not
provided in the QRH
Review STATUS
Page
Refer to QRH
and/or
FCOM VOL-3
ECAM Actions
PNF
The QRH is
REQUIRED to be
carried by the pilot
in paper form.
FCOM VOL-3 isonly available
using the LPC
system.
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
41/71
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
PNF Responsibilities
However, in the case of
an electrical emergency
configuration or a dual
hydraulic failure, which
generates an ECAM
procedure/checklist, the
PNF should refer to the
corresponding QRH
SUMMARY.
Note: the QRH also
contains landing distance
multipliers and approach
speed adjustments under
ABNORMAL
PROCEDURES
MISCELLANEOUS.
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
42/71
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
Emergency or
AbnormalNot
Identified by
ECAM
PNF Responsibilities
The PNF should refer to
the QRH if :an abnormal or
emergency arises
without ECAM
procedure
A landing distance
multiplier is required
A dual hydraulic or
emergency
electrical
configuration (QRH
Summaries)
condition arises
Dual Hydraulic
and Emergency
Electrical
Configuration
Landing Distance
Multipliers
LECTURE TOPIC Abnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
43/71
g y
Emergencyor
Abnormal
Identified byECAM
PNF Responsibilities
For all other ECAM
procedures/checklists, thePNF should refer to the
FCOM VOL-3 for
additional information
after completing the
ECAM!
The FCOM VOL-3
contains additional noteson ECAM procedures and
is a good source of
abnormal information.
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
44/71
g yBrief PF
Forgot the name of the
ECAM procedure?
ELEC TR 1 FAULT
The Recall (RCL) pb
The RCL pb allows the
pilot to re-display ECAMfailure messages. Any
blue action items that
were not completed also
reappear.
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
45/71
g yBrief PF
Pilot Responsibilities
After completing ECAM
actions and reviewing theQRH and/or FCOM VOL-
3, both pilots should brief
each other.
Brief
Each
Other
Review STATUS
Page
Refer to QRH
and/or
FCOM VOL-3
ECAM Actions
Communicate
Navigation
Request Configuration
Changes as Appropriate
FLY THE AIRCRAFT!
Command
ECAM Actions PNF
PF
Abnormal and/or Emergency Occurs
Cancel & Identify
Flight Path Established
Above 400 ft AGL
PNF
PF
LECTURE TOPICAbnormal and Emergency ECAM ProceduresB i f PF
5/23/2018 Abnormal+Emergency Procedures
46/71
g yBrief PF
Pilot Responsibilities
After completing ECAM
actions and reviewing theQRH and/or FCOM VOL-
3, both pilots should brief
each other.
Brief
Each
OtherPF PNF
Ive declared an
emergency. Were beingvectored for an ILS.
ECAM actions and
QRH/FCOM
completed
LECTURE TOPICAbnormal and Emergency ECAM ProceduresB i f PF
5/23/2018 Abnormal+Emergency Procedures
47/71
g yBrief PF
Pilot Responsibilities
In addition, other people
should be advised of thesituation including:
Dispatch
Flight Attendants
Passengers
Brief
Each
OtherPF PNF
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
48/71
g y
Additional ECAM Topic
The guarded Emergency
Cancel (EMER CANC) pbis used for canceling
nuisance messages, (i.e.,
preventing them from
reappearing) It is not for
canceling legitimate
ECAM messages! USE
IT WITH CARE!!!
NUISANCE MESSAGE
- TURN THIS THING! . . . . . . . . . OFF
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
49/71
EMER CANC
EMER CANC pb allows
the pilot to cancel the
warning lights and aural
warnings as long as the
condition is present.
The EMER CANC pb
DOES NOT cancel the
ECAM warning message.
V
DvD
SMOKE AFT CARGO SMOKE
- AFT ISOL VALVE . . . . . . . . . . . .OFF
- CARGO SMOKE DISCH . . . . . .SH
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
50/71
EMER CANC
EMER CANC pb allows
the pilot to cancel anycurrentCAUTIONlisted
on the top line of the
ECAM, preventing it from
reappearing for the rest of
the flight.
The ECAM message,master caution, and
single chime are all
canceled.
Examples of appropriate use of the
EMER CANC pb would be:
A CAUTION message generated as a result of
a deferred discrepancyper the MEL/CDL
Intermittent and random nuisance CAUTION
messages that have been dealt with previously
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
51/71
NOTE: A canceled caution message may be
recalled by pressing the RCL pb for a shorttime.
EMER CANC
When aCAUTIONis
canceled, the STATUS
page is automatically
displayed. The message
CANCELED CAUTION
and the title of the failure
that has been inhibited
appear.
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
52/71
Continue with the trip?
ASAP?
Additional Considerations
Deactivate the CVR?
NASA Form?
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
53/71
Some Common Mistakes
PF becoming PNF.
PNF becoming PF.
Going straight to the FCOM or QRH(bypassing the ECAM).
Failing to achieve lights out
Executing the wrong FCOM or QRHprocedure (read the warning/caution title
carefully)
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
54/71
Example of an In-Flight
Emergency Procedure
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
55/71
ENG 1 FIRE
ENGINE FIRE
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
56/71
I have control
and ATC.ECAM actions
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
57/71
Confirm Thrust
Lever 1?
Confirm
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
58/71
ENG 1 SHUTDOWN
ENG 1 FIRE
Confirm ENG
MASTER 1?
Confirm
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
59/71
ENG 1 FIRE
ENG 1 SHUTDOWNENG 1 SHUTDOWN
ENG 1 FIRE
ENG 1 SHUTDOWN
ENG 1 FIRE
Confirm Fire pb
1?
Confirm
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
60/71
ENG 1 SHUTDOWN
ENG 1 FIRE
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
61/71
LAND ASAP
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
62/71
LAND ASAP
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
63/71
LAND ASAP
Clear ENG 1
shutdown?
Clear ENG 1
shutdown
LAND ASAP
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
64/71
LAND ASAPLAND ASAPClear
hydraulic?
Clear
hydraulic
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
65/71
LAND ASAPLAND ASAPClear electric?Clear electric.
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
66/71
LAND ASAPLAND ASAPClear bleed?Clear bleed
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
67/71
LAND ASAPLAND ASAPLAND ASAP
STS
Clear status?Clear status
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
68/71
LAND ASAP
STS
LAND ASAPECAM actions
completed.
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
69/71LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
70/71
Questions
LECTURE TOPICAbnormal and Emergency ECAM Procedures
5/23/2018 Abnormal+Emergency Procedures
71/71
You have the
airplane and
ATC.