Accelerating solutions for highway safety, renewal, reliability, and capacity
AASHTO Design Subcommittee
Albuquerque, NM
July 17, 2008
HALLMARKS
• Short-term
• Results-oriented
• Non-traditional areas
• Quantum leaps, major advances
• Inter-related projects
• Emphasis on openness
Safety
Renewal
Reliability
Capacity
Safe Highways
Better TransportDecisions
ReliableTravel Time
Great Customer Service
Rapid Renewal and Lasting Facilities
FOUR FOCUS AREAS
Integrate mobility, economic, environmental, and community needs into the planning and
design of new highway capacity
$18 million 8 Projects
SHRP 2 Capacity Research
Long-Range Corridor Environmental Design Permitting Planning Planning Review
Effects of Congestion
Pricing
Models and Assignments
Performance Measures
Habitats & Wetlands
Planning and NEPA
Economic Impact and Land Use
Effects ofTechnology
Effects of RoadManagement
FHWA
DOTsMPOs
Resource Agencies
Citizens
ElectedOfficials
Advocacy
Decision Points and Decision Makers
Highlights-Capacity
• Travel Demand Model Partnerships (C10): States/MPOs can partner with bidders
• Workshops on Key Decision Points (C01): need folks from “the trenches”
• Web-based Performance Measures (C02): project finishes in a month
• Case studies on economic impacts of highway expansion (C03): suggestions needed for cases
• Contributions of operations, technology, design (C05): need data sources on arterial flow
2 Safety Research Tracks
Data Collection
2500+ Drivers
Data Collection
Vehicles at Intersections
Countermeasures
Data Analysis
Crash R
isk
Crash Risk
In-Vehicle Study
Site-Based Study
Data Analysis
TrafficRoadway Conditions
Traffic ControlsWeather
Distractions
Highlights-Safety
• Finalize sample design: driver and vehicles factors (S05)
• Selection of sites for field study (S07)– Urban, rural, suburban– Weather, topography, design factors– Other data sources– Qualified contractors
• Rodeo to test roadside/roadway data collection capabilities (S03/S04)
SHRP 2 Reliability Research
reduce congestion through incident reduction, management,
response, and mitigation
$18 million 12 projects
Reliability
Performance Measures
• Travel Time Variability
• Travel time index: Average travel time/free-flow travel time
• Planning time index: 95th percentile travel time index
• Buffer time: time added to trip to arrive within a window with acceptable probability
• Buffer index: (mean – 95 percentile)/mean
Traffic Math 10175 vs. 90 Minutes Clearance Time:
Explaining the Value of 15 Minutes Saved
• Example:– I-5 northbound, Fife vicinity
– Average 8% trucks
– Two (of four) lanes blocked
– 6:00 a.m., typical Wednesday
– $14 - $18/hour Auto Delay Cost
– $56/hour Truck Delay Cost
• Cost savings of clearing 15 minutes faster = $146,000
Source: WSDOT
Highlights — Reliability
• Project L06 (PB Consult)– Workshop on Institutional Barriers to Non-
Recurring Congestion Management Strategies
• Project L03 (Cambridge Systematics)– Potential Performance Measures and Mitigation
Strategies for Evaluation
• L01 (Midwest Research Institute)– Identification of Case Studies of Successful
Integration of N-RC Operations Business Processes
RapidApproaches
MinimalDisruption
SuccessfulRenewal
Long-LivedFacilities
3 Strategic Objectives with 5 Integrated Research Tracks for
Successful Highway Renewal
Enable Enable Performance-Based Performance-Based
RenewalRenewal• Rapid Approach• Minimum Disruption• Long Life
R06. High-Speed NDT
R07. Performance Specs Incentive Specs Warranties
R07. Performance Specs Incentive Specs Warranties
R09. Risk Manual for Renewal Contracts
R09. Risk Manual for Renewal Contracts
Integrated Tactic 1
R04: Innovative
Bridge Designs
R04: Innovative
Bridge Designs
R01: Locating & Characterizing Utilities
R01: Locating & Characterizing Utilities
R16: Railroad-DOTMitigation StrategiesR16: Railroad-DOT
Mitigation Strategies
R09: Risk Manual for Rapid Renewal Contracts
R09: Risk Manual for Rapid Renewal Contracts
Facilitate Project Facilitate Project Start-upStart-up
• Minimum Disruption
• Rapid Approach
R15: Integrating Utility and Transp. Agency Priorities
R15: Integrating Utility and Transp. Agency Priorities
R06: High-Speed NDTR06: High-Speed NDT
R11: Approaches atCorridor/Network Level
R11: Approaches atCorridor/Network Level
Integrated Tactic 2
R05. Modular PavementR05. Modular Pavement
R04. Innovative Bridge DesignsR04. Innovative Bridge Designs
R23. Using Existing In-place Pavement
R23. Using Existing In-place Pavement
R03. Reducing Personnel FatigueR03. Reducing
Personnel Fatigue
R10. Innovative Project Management
R10. Innovative Project Management
R02. Geotechnical Solutions
R02. Geotechnical Solutions
R06. High-Speed NDTR06. High-Speed NDT
Integrated Tactic 3
Accelerate Accelerate ConstructionConstruction
• Rapid Approach
• Minimum Disruption
R21. Composite Systems
R21. Composite Systems
R02. Geotechnical Solutions
R02. Geotechnical Solutions
R26. Preservation Approaches
R26. Preservation Approaches
R23. Using Existing In-place Pavement
R23. Using Existing In-place Pavement
R19. Durable Bridge Systems
R19. Durable Bridge Systems
R06. High-Speed NDT
R06. High-Speed NDT
Integrated Tactic 4
Reduce MaintenanceReduce MaintenanceFrequencyFrequency
• Minimum Disruption• Extends Life
R10. Innovative Project Management
R10. Innovative Project Management
R07. Performance Specs Incentive Spec
Warranties
R07. Performance Specs Incentive Spec
Warranties
R09. Risk Manual for Renewal Contracts
R09. Risk Manual for Renewal Contracts
R04. Innovative Bridge DesignsR04. Innovative Bridge Designs
Integrated Tactic 5Facilitate Facilitate
Responsive ContractingResponsive Contracting• Rapid Approach• Minimum Disruption• Long Life
R03. Reducing Personnel FatigueR03. Reducing
Personnel Fatigue
Highlights - Renewal
• Preliminary results:– Approaches for mitigating impacts of
utility relocation (R15)– Locating underground utilities (R01)– Non-destructive testing (R06)
• Refined research plans for follow on detailed development project
SHRP 2 Research Related to Design• Primarily in 2 focus areas
– Renewal– Reliability
• Deliverables– Design Guidelines– Procedures– Other tools (data gathering, etc)– Training programs– Design specifications (bridges)
Design Guidelines
Develop design guidelines for mechanical and chemical treatment of base, sub-base and subgrade layers
Identify state of reliability-related design practice. Develop guide book and dissemination plan
R02 Geotechnical Solutions for Soil Improvements, Rapid Embankment Construction and Stabilization of the Pavement Working Platform $3.0M
R23 Using Existing Pavement in Place and Achieving Long Life $1.0 M
L07 Evaluation of Costs and Effectiveness of Highway Design Features to Improve Travel Time Reliability $2.5 M
Develop design guidelines and criteria for the use of various options
State DOT help needed (R23)
1. Guideline development (4 DOTs min)
2. Workshops planned for 2009 and 2010
Design Procedures
Feasibility study of potential uses. Develop generic Modular Pavement Design Procedures
Procedures for development of composite pavement systems. Development of design manuals
R05 Modular Pavement Technology $1.0 M
R21 Composite Pavement Systems $4M
Data gathering and such
Report documenting current techniques and practices, software toolbox, R&D plan Future SHRP2 Projects
RFP advertisement July 29
R01 Encouraging Innovation in Locating and Characterizing Underground Utilities $300K ($5M)
R06-D NDT to identify Delaminations between HMA Layers
R06-A NDT to Identity Bridge Deck Deterioration
R06-E Development of Continuous Deflection Sensors
R15-B Utility Conflict Identification and Solutions
RFP advertisement July 29
RFP advertisement July 29
RFP advertisement July 29
Training Programs
R15-A Model Curricula and Certification Programs for Utility Relocation
RFP advertisement July 29
Design Specifications
New methods for accelerated bridge design and construction. AASHTO-formatted LRFD design specifications
AASHTO-formatted LRFD design specifications
R04 Innovative Bridge Designs for Rapid Renewal $2.0 M
R19-A & B Bridges for Service Life beyond 100 years
$2M + $1M
RFPs to be released on July 29
R06-A: NDT to identify concrete bridge decks deterioration
R06-B: Evaluating Applications of Field Spectroscopy Devices to Fingerprint Commonly Used Construction Materials
R06-C: Using Infrared and High Speed Ground Penetrating Radar for Uniformity measurement on New HMA Layers
R06-D: NDT to identify Delimitations between HMA Layers
R06-E: Development of Continuous Deflection Sensors
R06-F: Real-Time smoothness measurements of PCC Pavements During Constructions
R06. Plan for Developing High-Speed NDT Procedures for Design Evaluation and Construction Inspection
R15. Strategies for Integrating Utility and
Transportation Agency Priorities in Renewal Projects
RFPs to be released on July 29
R15-A: Model Curriculum and Certification Programs in Utility Relocation Engineering
R15-B: Utility Conflict Identification and Solutions