Accommodation Pavilion and MCR Photo Report No 32a
Brickwork commenced Brick ties installed
Precast concrete fins installed to the front of the building Precast concrete fins installed to the rear of the building
Examples of damaged precast concrete fins
Accommodation Pavilion and MCR Photo Report No 32b
Examples of unfinished repairs to the precast concrete fins at the rear of the building
Steel reinforcing extending the lift shaft RC wall to the second floor
Sound deadening matting installed to the second floor
Accommodation Pavilion and MCR Photo Report No 32c
Steel reinforcing being installed to the second floor of the graduates centre
Steel reinforcing being installed to the second floor of the graduates centre