ACE Platforms
The ACE Range covers most fixed platform requirements
MonoACE
TwinACE
MiniACE
DrillACE
ProductionACE
MaxiACE
Equivalent Integrated Deck Weight - te (indicative)
The ACE Range covers most fixed platform requirements
Wat
er D
epth
- m
>100
100
80
60
40
20
>20,00020,00010,0005,0001,0005002001000
0
Equivalent Integrated Deck Weight - te (indicative)
MiniACEDrillACE MonoACE
ProductionACE
Arup and Clough have teamed up to deliver the industry award winning ACE platform range. Together our capabilities cover the full spectrum of engineering, project management, fabrication, installation and commissioning. We can provide turnkey solutions for the smallest well-head structure to large-scale facilities.
ACE (Arup Concept Elevator) platforms have a proven, successful track record. They are cost effective and have low implementation risk. This is achieved by using tried and tested technologies in a new way. The range covers water depths from 15m up to 120m, and deck weights from 100te to 30,000te.
Topside equipment is preassembled on a single level deck ensuring rapid delivery and minimal offshore hookup and commissioning. Topsides can be readily expanded or modified as field requirements change.
ACE platforms have been specifically developed to combine the advantages of traditional fixed platforms with the flexibility offered by a mobile unit.
They comprise three main steel components: a barge deck, tubular or lattice legs and the foundation unit (either a gravity base, or piles). ACE platforms can be fabricated at local yards without the need for extensive equipment or specialist expertise, and require only tugs and strand jacks for installation and relocation.
The fact that ACE platforms are not reliant on heavy lift crane vessels is one of the keys to their economic success. This lowers the risk profile of projects for developers as installation of the platform is less sensitive to adverse weather than traditional solutions. In many cases installation can be completed within two days of arrival at the platform site.
At the end of their operational life, ACE platforms can be completely removed for recycling, or reconfigured for reuse at an alternative location.
OMV New Zealand’s Maari DrillACE is on target for installation in the second quarter of 2008. It will be the third ACE platform to be delivered.
Ocean transportation of Hang Tuah ProductionACE
Yolla DrillACE well installation
Maari DrillACE fabrication
ACE Platforms
Self-installing fixed platforms that are relocatable and suit a wide range of offshore developments.
Arup
Arup is an international consulting firm providing business solutions, engineering design, environmental, planning and project management services in the industrial infrastructure, and building consulting sectors. Arup has over 9000 staff based in 92 offices in 37 countries. Our projects have taken us to more than 160 countries.
Our offshore team is focused on delivery of value added design solutions to energy clients. This has included a number of world-class platform structures, all of which were delivered successfully, meeting key project drivers, including construction and installation.
We provide services worldwide from offices in Perth, London and Houston. Our services range from initial conceptual design to project delivery, as well as facilities reassessment and decommissioning.
Our industry-leading skills cover all types of fixed and floating substructures. Core skills include:
• Structural design
• Geotechnics
• Naval architecture
• Specialist analysis
• Installation engineering
We bring our experience and successful track record to every project where we are involved, and help Clients meet their most demanding goals.
Clough
Clough is recognised world-wide as one of Australia’s foremost engineering, construction and asset support groups.
Established in 1919 as a small privately-owned building firm, Clough’s business has matured to a diversified public company providing services to the upstream oil and gas, mining and water infrastructure markets. A workforce of approximately 4,000 employees and contractors deliver world-class projects regionally focussed on Australia and South East Asia.
Clough undertakes complex and challenging work, which is engineering rich in an international environment. We provide full project life cycle solutions to our clients for Capital Projects, Asset Support, Marine Construction, Fabrication and Mining. Clough projects are supported by an integrated engineering and project management capability.
Hang Tuah, 2001
Maari, 2008
Yolla, 2004
ACE Projects
Clough Limited
Ground Floor, 22 Mount Street Perth, WA 6000, Australia
T +61 8 9281 9481 F +61 8 9481 8202 E [email protected]
www.clough.com.au
Arup Energy Energy Business Leader
PO Box 629, West Perth, WA 6872, Australia11 Harvest Terrace, West Perth WA 6005, Australia
T +61 8 9322 1400 F +61 8 9481 1334 E [email protected]
www.arup.com/energy
Load out and tow to offshore field Offload Position at field using tugs Lower base to seabed Raise deck, completions & commission
This publication is printed by a level 3 green stamp accredited business, using vegetable based inks on paper that is chlorine free and manufactured from pulp sourced from plantation grown
timber. Both paper manufacturer and printer are certified to ISO 14001, the internationally recognised standard for
environmental management