REPUBLICA BOLIVARIANA DE VENEZUELA CONTRATO N°. AUTOGESTION 071-12 Hoja No.INV-OB-C-2002-LEEA-031
EXPEDIENTE No. CONTRATISTAVIALIDAD Y CONSTRUCCIONES SUCRE S.A.
CONSTRUCCIONES E INVERSIONES COINCA, C.A.
OBJETO DEL CONTRATO :TRAMO: 0+000 A 13+000
MEDICIONES DE LA PARTIDA No.: 19 52 CODIGO:
C-06-87-210-00
DESCRIPCION : UNIDAD : KG
ACERO ALCANTARILLAS BARIRO-EL SALADILLO (PROG. 25+660,00)TABLA RESUMEN DESARROLLO ACERO DE REFUERZO
RESUMEN GENERAL ACUMULADO
DESCRIPCION TOTAL PAGINA
LOSA PRINCIPAL 170.10
LOSA REPARTICION 159.17
ALETAS REPARTICION 83.28
PANTALLA- DENTELLONES 236.30
TOTAL GENERAL LADO IZQUIERDO 648.85
TOTAL CABEZAL AGUAS ABAJO
TOTAL = 648.85 x 1.00 = 648.85 KG
TOTAL GENERAL
648.85 KG
NOTAS : C O N T R A T I S T A I N S P E C C I O N
FIRMA: FIRMA: FIRMA: FIRMA:
FECHA: FECHA: FECHA: FECHA:
FIRMA ING. RESIDENTE: FIRMA ING. INSPECTOR:
FECHA: FECHA:
MINISTERIO DEL PODER POPULAR PARA TRANSPORTE Y TERRESTRE
"EMERGENCIA EN LA VIA L002-FA: TRAMO BARRIO - EL SALADILLO, FALLAS DE BORDE, ALCANTARILLAS COLAPSADAS, DETERIORO DEL PAVIMENTO, HUNDIMIENTO DE CALZADA, PROG.: 23+400 A LA 34+800, MUNICIPIO BUCHIVACOA, ESTADO FALCON"
SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE ACERO DE REFUERZO, DE RAT = 2.100 KG/CM2, PARA EL CONCRETO ARMADO CORRESPONDIENTE A OBRAS DE DRENAJE
DISTRIBUCION ACERO DENT.FRONT:
SEP. A CADA: 0.2 DENT. POST.:
DIMENSIONES LOSAACERO PRINCIPAL 1.1
2.84 2.74 0.50 0.45 0.50 0.45
CALCULO Nº DE PIEZAS
SEPARACION
7.10 0.20 35.50 36.00
ACERO PRINCIPAL 1ANGULO= 19º 18.50
CALCULO Nº DE PIEZAS 0.33459532
SEPARACION
2.18 0.20 10.90 10.00NOTA: 2 LADOS(15 PZAS x 2 LADOS = 30 PZAS
Nº SEPARACION FACTOR
1 0.20 0.20 0.33 0.60 0.45 1.052 0.20 0.40 0.33 1.20 0.45 1.653 0.20 0.60 0.33 1.79 0.45 2.244 0.20 0.80 0.33 2.39 0.45 2.845 0.20 1.00 0.33 2.99 0.45 3.446 0.20 1.20 0.33 3.59 0.45 4.047 0.20 1.40 0.33 4.18 0.45 4.638 0.20 1.60 0.33 4.78 0.45 5.239 0.20 1.80 0.33 5.38 0.45 5.83
10 0.20 2.00 0.33 5.98 0.45 6.43
TOTAL 37.38
LONGITUD NOMINAL (1A)
LONGITUD CALCULO
[L1=1A - 0.10]
ALTURA DENT. FRONTAL (1B)
LONGITUD CALCULO
[L2=1B - 0.05]
ALTURA DENT. POSTERIOR
(1C)
LONGITUD CALCULO
[L3=1C - 0.05]
LONGITUD TOTAL
(NP) Nº PIEZAS (LT/S)
TOTAL PZAS (NP+1)
LONGITUD TOTAL
(NP)Nº PIEZAS(LT/S)
TOTAL PZAS(NP)
SEPARACION ACUMULADA
LONG. PARCIAL (LP)
H DENT.FRONTAL
LONG.TOTAL (LP+H)
ACERO REPARTICIONANGULO= 19º 18.50
CALCULO Nº DE PIEZAS 0.33459532
SEPARACION
2.84 0.20 14.20 14.00LONGITUD BASE:
Nº SEPARACION FACTOR
1 0.20 0.20 0.33 0.07 7.10 2.562 0.20 0.40 0.33 0.13 7.10 2.423 0.20 0.60 0.33 0.20 7.10 2.294 0.20 0.80 0.33 0.27 7.10 2.155 0.20 1.00 0.33 0.33 7.10 2.016 0.20 1.20 0.33 0.40 7.10 1.877 0.20 1.40 0.33 0.47 7.10 1.748 0.20 1.60 0.33 0.54 7.10 1.609 0.20 1.80 0.33 0.60 7.10 1.46
10 0.20 2.00 0.33 0.67 7.10 1.3211 0.20 2.20 0.33 0.74 7.10 1.1812 0.20 2.40 0.33 0.80 7.10 1.0513 0.20 2.60 0.33 0.87 7.10 0.9114 0.20 2.80 0.33 0.94 7.10 0.77
LONGITUD TOTAL
(NP) Nº PIEZAS (LT/S)
TOTAL PZAS (NP)
7.1
SEPARACION ACUMULADA
LONG. PARCIAL (LP)
LONGITUD BASE (LB)
LONG L2
COMPLEMENTO ACERO REPARTICION LOSA L2
CALCULO Nº DE PIEZAS
SEPARACION
2.84 0.20 14.20 14.00LONGITUD BASE:
Nº SEPARACION FACTOR (K)
1 0.26 0.26 0.53 1.76 0.80 2.562 0.26 0.52 0.53 1.62 0.80 2.423 0.26 0.78 0.53 1.49 0.80 2.294 0.26 1.04 0.53 1.35 0.80 2.155 0.26 1.30 0.53 1.21 0.80 2.016 0.26 1.56 0.53 1.07 0.80 1.877 0.26 1.82 0.53 0.94 0.80 1.748 0.26 2.08 0.53 0.80 0.80 1.609 0.26 2.34 0.53 0.66 0.80 1.46
10 0.26 2.60 0.53 0.52 0.80 1.3211 0.26 2.86 0.53 0.38 0.80 1.1812 0.26 3.12 0.53 0.25 0.80 1.0513 0.26 3.38 0.53 0.11 0.80 0.9114 0.26 3.64 0.53 -0.03 0.80 0.77
TOTAL 23.33
LONGITUD TOTAL
(NP) Nº PIEZAS (LT/S)
TOTAL PZAS (NP)
0.8
SEPARACION ACUMULADA
LONG. PARCIAL (LP)
LONGITUD BASE (LB)
LONG L2
ACERO REPARTICION ALETAS13.50 13.00 0.50
CALCULO Nº DE PIEZAS
SEPARACION H=2.70 0.20 13.50 14.00
LONGITUD BASE:
Nº SEPARACION FACTOR (K)
1 0.20 0.20 1.55 0.31 0.80 1.112 0.20 0.40 1.55 0.62 0.80 1.423 0.20 0.60 1.55 0.93 0.80 1.734 0.20 0.80 1.55 1.24 0.80 2.045 0.20 1.00 1.55 1.55 0.80 2.356 0.20 1.20 1.55 1.86 0.80 2.667 0.20 1.40 1.55 2.17 0.80 2.978 0.20 1.60 1.55 2.48 0.80 3.289 0.20 1.80 1.55 2.79 0.80 3.59
10 0.20 2.00 1.55 3.10 0.80 3.9011 0.20 2.20 1.55 3.41 0.80 4.2112 0.20 2.40 1.55 3.41 0.80 4.2113 0.20 2.60 1.55 3.41 0.80 4.2114 0.20 2.80 1.55 3.41 0.80 4.21
TOTAL 41.89
LONGITUD TOTAL
(NP) Nº PIEZAS (LT/S)
TOTAL PZAS (NP)
3.60
SEPARACION ACUMULADA
LONG. PARCIAL (LP)
LONGITUD BASE (LB)
LONG L2
0.50 LOSA0.50 7.10
2.84
0.08 3.72
2.18
11.45
L2 L2
ACERO 2
L1ACERO PRINCIPAL 1.1
Nº SEPARACION
1 0.20 0.20 0.45 2.82 0.45 3.722 0.20 0.40 0.45 2.82 0.45 3.723 0.20 0.60 0.45 2.82 0.45 3.724 0.20 0.80 0.45 2.82 0.45 3.725 0.20 1.00 0.45 2.82 0.45 3.726 0.20 1.20 0.45 2.82 0.45 3.727 0.20 1.40 0.45 2.82 0.45 3.728 0.20 1.60 0.45 2.82 0.45 3.729 0.20 1.80 0.45 2.82 0.45 3.72
10 0.20 2.00 0.45 2.82 0.45 3.7211 0.20 2.20 0.45 2.82 0.45 3.7212 0.20 2.40 0.45 2.82 0.45 3.7213 0.20 2.60 0.45 2.82 0.45 3.7214 0.20 2.80 0.45 2.82 0.45 3.7215 0.20 3.00 0.45 2.82 0.45 3.7216 0.20 3.20 0.45 2.82 0.45 3.7217 0.20 3.40 0.45 2.82 0.45 3.7218 0.20 3.60 0.45 2.82 0.45 3.7219 0.20 3.80 0.45 2.82 0.45 3.7220 0.20 4.00 0.45 2.82 0.45 3.7221 0.20 4.20 0.45 2.82 0.45 3.7222 0.20 4.40 0.45 2.82 0.45 3.7223 0.20 4.60 0.45 2.82 0.45 3.7224 0.20 4.80 0.45 2.82 0.45 3.7225 0.20 5.00 0.45 2.82 0.45 3.7226 0.20 5.20 0.45 2.82 0.45 3.7227 0.20 5.40 0.45 2.82 0.45 3.72
1/2 ESPESOR LOSA (L4)
LONGITUD TOTAL
(L1+L2+L3+L4)
SEPARACION ACUMULADA
DENTELLON POSTERIOR
LONG. PARCIAL (LP)
H DENT.FRONTAL
LONG.TOTAL (LP+H)
28 0.20 5.60 0.45 2.82 0.45 3.7229 0.20 5.80 0.45 2.82 0.45 3.72
30 0.20 6.00 0.45 2.82 0.45 3.7231 0.20 6.20 0.45 2.82 0.45 3.7232 0.20 6.40 0.45 2.82 0.45 3.72
33 0.20 6.60 0.45 2.82 0.45 3.7234 0.20 6.80 0.45 2.82 0.45 3.7235 0.20 7.00 0.45 2.82 0.45 3.7236 0.20 7.20 0.45 2.82 0.45 3.72
TOTAL 133.92
0.00 12.360.14 12.480.24 12.560.34 12.620.45 12.680.55 12.74 LA ALTURA DE CALCULO ES= LAS GRAFICAS + 1/2 H LOSA0.65 12.820.75 12.880.85 12.920.95 12.981.05 13.041.16 13.121.26 13.181.36 13.24
0.8
3.60
TOTAL 179.62
LONG L3
LONG.TOTAL (2LP+LB+2L2+2
L3)
13.00
2.317
0
ACERO1 ACERO 1.1
LA ALTURA DE CALCULO ES= LAS GRAFICAS + 1/2 H LOSA
2.7
3.60
ACERO ALCANTARILLAS BARIRO-EL SALADILLO (PROG. 25+660,00)TABLA RESUMEN DESARROLLO ACERO DE REFUERZO
ACERO PRINCIPAL LOSA
No. Pieza Pieza Diámetro ML/PZA Cant. Pza Ml Totales Factor(Kg/Ml) Total (KG)
2.82
1/2 3.72 36.00 133.74 0.994 132.940.45
0.45
0.60
1/2 1.05 1.00 1.05 0.994 1.040.45
1.20
1/2 1.65 1.00 1.65 0.994 1.640.45
1.79
1/2 2.24 1.00 2.24 0.994 2.230.45
2.39
1/2 2.84 1.00 2.84 0.994 2.820.45
2.99
1/2 3.44 1.00 3.44 0.994 3.420.45
3.59
1/2 4.04 1.00 4.04 0.994 4.020.45
4.18
1/2 4.63 1.00 4.63 0.994 4.600.45
4.78
1/2 5.23 1.00 5.23 0.994 5.200.45
5.38
1/2 5.83 1.00 5.83 0.994 5.800.45
5.98
1/2 6.43 1.00 6.43 0.994 6.390.45
0.00
1/2 0.00 1.00 0.00 0.994 0.000.00
TOTAL KG ESTA PAGINA 170.10
LOSA REPARTICION
LOSA PRINCIPAL
LOSA PRINCIPAL
LOSA PRINCIPAL
LOSA PRINCIPAL
LOSA PRINCIPAL
LOSA PRINCIPAL
LOSA PRINCIPAL
LOSA PRINCIPAL
LOSA PRINCIPAL
LOSA PRINCIPAL
LOSA PRINCIPAL
ACERO ALCANTARILLAS BARIRO-EL SALADILLO (PROG. 25+660,00)TABLA RESUMEN DESARROLLO ACERO DE REFUERZO
ACERO PANTALLA Y DENTELLON
No. Pieza Pieza Diámetro ML/PZA Cant. Pza Ml Totales Factor(Kg/Ml) Total (KG)
11.60
1/2 11.60 3.00 34.80 0.994 34.59
-
-
7.10
1/2 7.10 3.00 21.30 0.994 21.17
-
-
7.10
1/2 7.10 6.00 42.60 0.994 42.34
-
-
3.55
1/2 3.55 12.00 42.60 0.994 42.34
-
-
2.37
1/2 2.37 12.00 28.40 0.994 28.23
-
-
2.62
1/2 2.62 26.00 68.04 0.994 67.63
-
-
TOTAL KG ESTA PAGINA 236.30
DENTELLON FRONTAL
DENTELLON POSTERIOR
PANTALLA
PANTALLA
PANTALLA
PANTALLA
ACERO ALCANTARILLAS BARIRO-EL SALADILLO (PROG. 25+660,00)TABLA RESUMEN DESARROLLO ACERO DE REFUERZO
ACERO ALETAS
No. Pieza Pieza Diámetro ML/PZA Cant. Pza Ml Totales Factor(Kg/Ml) Total (KG)
1.11
1/2 1.11 2.00 2.22 0.994 2.21
-
-
1.42
1/2 1.42 2.00 2.84 0.994 2.82
-
-
1.73
1/2 1.73 2.00 3.46 0.994 3.44
-
-
2.04
1/2 2.04 2.00 4.08 0.994 4.06
-
-
2.35
1/2 2.35 2.00 4.70 0.994 4.67
-
-
2.66
1/2 2.66 2.00 5.32 0.994 5.29
-
-
2.97
1/2 2.97 2.00 5.94 0.994 5.90
-
-
3.28
1/2 3.28 2.00 6.56 0.994 6.52
-
-
3.59
1/2 3.59 2.00 7.18 0.994 7.14
-
-
3.90
1/2 3.90 2.00 7.80 0.994 7.75
-
-
ALETAS
ALETAS
ALETAS
ALETAS
ALETAS
ALETAS
ALETAS
ALETAS
ALETAS
ALETAS
ACERO ALCANTARILLAS BARIRO-EL SALADILLO (PROG. 25+660,00)TABLA RESUMEN DESARROLLO ACERO DE REFUERZO
ACERO ALETAS4.21
1/2 4.21 2.00 8.42 0.994 8.37
-
-
4.21
1/2 4.21 2.00 8.42 0.994 8.37
-
-
4.21
1/2 4.21 2.00 8.42 0.994 8.37
-
-
4.21
1/2 4.21 2.00 8.42 0.994 8.37
-
-
TOTAL KG ESTA PAGINA 83.28
ALETAS
ALETAS
ALETAS
ALETAS
ACERO ALCANTARILLAS BARIRO-EL SALADILLO (PROG. 25+660,00)TABLA RESUMEN DESARROLLO ACERO DE REFUERZO
ACERO REPARTICION LOSA
No. Pieza Pieza Diámetro ML/PZA Cant. Pza Ml Totales Factor(Kg/Ml) Total (KG)
7.24
1/2 12.36 1.00 12.36 0.994 12.292.56
2.56
7.36
1/2 12.20 1.00 12.20 0.994 12.132.42
2.42
7.50
1/2 12.08 1.00 12.08 0.994 12.012.29
2.29
7.64
1/2 11.94 1.00 11.94 0.994 11.872.15
2.15
7.76
1/2 11.78 1.00 11.78 0.994 11.712.01
2.01
7.90
1/2 11.64 1.00 11.64 0.994 11.571.87
1.87
8.04
1/2 11.52 1.00 11.52 0.994 11.451.74
1.74
8.18
1/2 11.38 1.00 11.38 0.994 11.311.60
1.60
8.30
1/2 11.22 1.00 11.22 0.994 11.151.46
1.46
8.44
1/2 11.08 1.00 11.08 0.994 11.011.32
1.32
8.58
1/2 10.94 1.00 10.94 0.994 10.871.18
1.18
8.70
1/2 10.80 1.00 10.80 0.994 10.741.05
1.05
8.84
1/2 10.66 1.00 10.66 0.994 10.600.91
0.91
8.98
1/2 10.52 1.00 10.52 0.994 10.460.77
0.77
LOSA REPARTICION
LOSA REPARTICION
LOSA REPARTICION
LOSA REPARTICION
LOSA REPARTICION
LOSA REPARTICION
LOSA REPARTICION
LOSA REPARTICION
LOSA REPARTICION
LOSA REPARTICION
LOSA REPARTICION
LOSA REPARTICION
LOSA REPARTICION
LOSA REPARTICION
0.00
1/2 0.00 1.00 0.00 0.994 0.000.00
0.00
0.00
1/2 0.00 1.00 0.00 0.994 0.000.00
0.00
0.00
1/2 0.00 1.00 0.00 0.994 0.000.00
0.00
0.00
1/2 0.00 5.00 0.00 0.994 0.000.00
0.00
0.00
1/2 0.00 5.00 0.00 0.994 0.000.00
0.00
TOTAL KG ESTA PAGINA 159.17
LOSA REPARTICION
LOSA REPARTICION
LOSA REPARTICION
LOSA PRINCIPAL
LOSA PRINCIPAL