1 © Copyright 2004 The MITRE Corporation Version 1.0 MITRE Acquisition and the CMMI SM - An Update A Presentation to the 4 th Annual CMMI Technology Conference and User Group November 17, 2004 Track 6 – CMMI Extensions Mike Bloom [email protected] SM CMMI is a service mark of Carnegie Mellon University

Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

1

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

Acquisition and the CMMISM

- An Update

A Presentation to the 4th Annual CMMI Technology Conference

and User GroupNovember 17, 2004

Track 6 – CMMI Extensions

Mike [email protected]

SM CMMI is a service mark of Carnegie Mellon University

Page 2: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

2

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

System Engineering in Evolutionary Acquisition is a…

The Users

The Sponsors

The AcquirersThe Contractors

The Testers

The Sustainers

Additional Needs

Page 3: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

3

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

System Engineering in Evolutionary Acquisition needs…

Page 4: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

4

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

Why are the contractors …

the only team member required to have System Engineering processes?

Page 5: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

5

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

This is a familiar industry tune…

The rest of the players need system engineering processes too…

Page 6: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

6

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

And an integrated set of processes for the team …

Would be even better

Page 7: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

7

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

Project ManagementProject Planning (G)Project Monitoring and Control (S)Supplier Agreement Management (G)Integrated Project Management (S)Risk Management (S)

EngineeringRequirements Management (S)Requirements Development (G)Technical Solution (S)Product Integration (S)Product Verification (S)Validation (G)

SupportConfiguration Management (S)Process and Product Quality Assurance (C)Measurement and Analysis (S)Causal Analysis and Resolution (S)Decision Analysis and Resolution (S)

Government (G)[User, SPO, Test]

Contractor (C)

Shared (S)

Acquisition Strategy and / or

Life Cycle Phase

System EngineeringExecution Process

Allocation

Allocation of Process ResponsibilityAllocation of Process Responsibility

Organizational Process ManagementProcess Focus (S)Process Definition (S)Innovation and Deployment (S)Training (S)Process Performance (S)Quantitative Management (S)

Program ProcessPartnering

and Integration

ConsciousAllocation

At the first CMMI Conference in 2001…

I recommended a process sharing concept for CMMI

Page 8: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

8

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

4x1 4

At the second CMMI Conference in 2002…

=

Jack Ferguson and M. Lynn Penn showed us their new math*

Case 4 - Mature Developer and Immature Acquirer*New CMM Math

Jack Ferguson – SEI and M. Lynn Penn - Lockheed Martin M&DSCMMI Conference 14 November, 2002

Page 9: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

9

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

In March 2003, DoD Issued a memo stating…

“Section 804 of the Bob Stump National Defense Authorization Act for Fiscal Year 2003 requires the establishment of software acquisition process improvement programs by Military Departments and those Defense Acquisition Agencies that manage Major Defense Acquisition Programs (MDAPs) with a substantial software component…”

Page 10: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

10

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

In February 2004, The CMMI-AM is published…

Page 11: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

11

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

Over this period of time…

We have matured our System Engineering process approach for the

Air Force Electronics Systems Center

Page 12: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

12

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

We are building a set of Government System Engineering Core processes based on the CMMI

ProcessImplementation

Enterprise Integration

Continuous Program Planning

Ris

k

Req

uire

men

ts

Con

figM

gmt

Inte

grat

ed T

est

Integrated Product and Process Development

Capability Maturity Model - Integrated Lo

gist

ics

Con

trac

ting

Qua

lity

Page 13: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

13

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

InstitutionalizedIndustry Processes

System Development

Program Planning

Ris

k

Req

uire

men

ts

Con

figM

gmt

Inte

grat

ed T

est

Con

trac

ting

Inte

grat

ion

Des

ign

Man

agem

ent

Qua

lity

Capability Maturity Model - Integrated Integrated Product and Process Development

We expect our contractors to have mature System Engineering processes based on the CMMI

Page 14: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

14

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

Post award we expect an integration of System Engineering processes based on the CMMI and IPPD

on

ning

Inte

grat

ed T

est

ring

rated

on

ning

Inte

grat

ed T

est

ring

rated

Ris

kR

isk

InstitutionalizedIndustry Processes

System Development

Program Planning

Ris

k

Req

uire

men

ts

Con

figM

gmt

Inte

grat

ed T

est

Con

trac

ting

Inte

grat

ion

Des

ign

Man

agem

ent

Qua

lity

Capability Maturity Model - Integrated Integrated Product and Process Development

ProcessImplementation

ProcessImplementation

Enterprise IntegrationEnterprise Integration

Continuous Program PlanningContinuous Program Planning

Ris

kR

isk

Req

uire

men

tsR

equi

rem

ents

Con

figM

gmt

Con

figM

gmt

Inte

grat

ed T

est

Inte

grat

ed T

est

Integrated Product and Process DevelopmentIntegrated Product and Process Development

Capability Maturity Model - Integrated Capability Maturity Model - Integrated

Logi

stic

sLo

gist

ics

Con

trac

ting

Con

trac

ting

Qua

lity

Qua

lity

IntegratedProject Processes

Enterprise Integration

Continuous Program Planning

Ris

k

Req

uire

men

ts

Con

figM

gmt

Con

trac

ting

Inte

grat

ion

Des

ign

Man

agem

ent

System Development

Capability Maturity Model - Integrated Collaboration and Shared Processes

Inte

grat

ed T

est

Logi

stic

s

Qua

lity

IntegratedProject Processes

Enterprise Integration

Continuous Program Planning

Ris

k

Req

uire

men

ts

Con

figM

gmt

Con

trac

ting

Inte

grat

ion

Des

ign

Man

agem

ent

System Development

Capability Maturity Model - Integrated Collaboration and Shared Processes

Inte

grat

ed T

est

Logi

stic

s

Qua

lity

Page 15: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

15

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

Over the System Life Cycle We Should Assess the Process Maturity of the Project Team

Integrated System Life Cycle SE Processes

Prime Contractor Integrated SE Processes

Subcontractor / Team Member Integrated SE Processes

Subcontractor / Team Member Integrated SE Processes

Contractor Team Integrated SE Processes

Integrated Government Sustainment SE Processes

Integrated Government Acquisition SE Processes

Integrated Government Sponsor SE Processes

Single Manager Integrated SE Processes

Integrated System Life Cycle SE Processes

Prime Contractor Integrated SE Processes

Subcontractor / Team Member Integrated SE Processes

Subcontractor / Team Member Integrated SE Processes

Contractor Team Integrated SE Processes

Integrated Government Sustainment SE Processes

Integrated Government Acquisition SE Processes

Integrated Government Sponsor SE Processes

Single Manager Integrated SE Processes

Page 16: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

16

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

Processes Developed to date

INTEGRATED PROCESSES

Program Planning

Risk

Requirements

IMP/IMS

TE DATABASETraced Test Plans

& Results

Step 3Design Independent

& Combined Tests

Step 1Prepare

Step 6Analyze Test

Data/Info

Step 4Evaluate Integrated

Test ProgramReadiness

Step 7Report Outcomes& Discrepancies

New Increment or

Change InRisk?

ConfigurationManagement

RequirementsProcess

RiskManagement

N

Y

Y

DeferredReq’ts

N

Y

REQUIREMENTSDatabase

Is IntegratedTest Program

Ready?

Data Adequate?

Data Adequate?

N

ProgramPlanningProcess

ECPs

DecisionAuthority

STOP

Retest

Step 6Analyze Test

Data/Info

Step 6Analyze Test

Data/Info

Data Adequate?

Data Adequate?

Data Adequate

?

Step 7Report Outcomes& Discrepancies

Step 7Report Outcomes& Discrepancies

DecisionAuthority

DecisionAuthority

Proceed

Halt

Proceed

Halt

Step 5Execute

Test

Step 2Identify Detailed

Test Needs

Decision TypesProduction

FieldingCertification

AccreditationAcceptance

ProgramPlanningProcess

IDE

Integrated TestPartnering (IPPD)

Configuration Management

ChangeMgmt.

StrategicVision

Arch.

Impl.

UsersHHQ,CX

Requirements&

Funding

SystemEng.

ChangeMgmt.

StrategicVision

Arch.

Impl.

UsersHHQ,CX

Requirements&

Funding

SystemEng.

Enterprise Integration

Page 17: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

17

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

We have put our process assets in “toolboxes”

ProcessSteps

ProcessTraining

Policy

Templates

Self-Assessments

Links

ToolDiscussion

References

ProcessDescription

Page 18: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

18

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

Web-based “toolkits” have been developed to support our integrated SE processes

• Toolkits Developed:– Risk Management– Requirements D&M– Configuration Mgmt– Enterprise Integration– Integrated Testing– Mission Partnering

(IPPD)• Toolkits Under

Construction:– Program Planning

Page 19: Acquisition and the CMMI - An Update...Web-based “toolkits” have been developed to support our integrated SE processes • Toolkits Developed: – Risk Management – Requirements

19

© Copyright 2004 The MITRE Corporation

Version 1.0

MITRE

Questions?