14
Dutch Solu*ons for Water Problems: Floods, Early Warning and Waste Water Sarajevo, 31 March 2015 Action Plan for Flood Protection and River Management in B&H 2014-2017 Ministry of Foreign Trade and Economic Rela*ons B&H www.mvteo.gov.ba Boško Kenjić, Head of Department Tel: +387 33 262 155 Email: bosko.kenjic @mvteo.gov.ba

Action Plan for Flood Protection and River Management in · PDF fileDutchSoluonsforWaterProblems:& Floods,&Early&Warning&and&Waste&Water& Sarajevo,&31&March&2015&& Action Plan for

Embed Size (px)

Citation preview

Page 1: Action Plan for Flood Protection and River Management in · PDF fileDutchSoluonsforWaterProblems:& Floods,&Early&Warning&and&Waste&Water& Sarajevo,&31&March&2015&& Action Plan for

Dutch  Solu*ons  for  Water  Problems:  Floods,  Early  Warning  and  Waste  Water  

Sarajevo,  31  March  2015    

Action Plan for Flood Protection and River Management in B&H

2014-2017

Ministry  of  Foreign  Trade  and  Economic  Rela*ons  B&H  www.mvteo.gov.ba    

Boško  Kenjić,  Head  of  Department  Tel:  +387  33  262  155  E-­‐mail:  [email protected]      

Page 2: Action Plan for Flood Protection and River Management in · PDF fileDutchSoluonsforWaterProblems:& Floods,&Early&Warning&and&Waste&Water& Sarajevo,&31&March&2015&& Action Plan for

Content  

•  Floods  in  May  2014  •  Summary  of  Damages  and  Losses  •  Emergency  ac;ons  •  What  to  do  for  future?  •  Ac;on  Plan  for  Flood  Protec;on  and  River  Management  

 

Page 3: Action Plan for Flood Protection and River Management in · PDF fileDutchSoluonsforWaterProblems:& Floods,&Early&Warning&and&Waste&Water& Sarajevo,&31&March&2015&& Action Plan for

Floods  in  May  2014  

Page 4: Action Plan for Flood Protection and River Management in · PDF fileDutchSoluonsforWaterProblems:& Floods,&Early&Warning&and&Waste&Water& Sarajevo,&31&March&2015&& Action Plan for

Floods  in  May  2014  

-­‐  70  municipali;es  affected  

-­‐  2,5  mill.  residents  affected  

-­‐  90.000  people  displaced    

-­‐  Total  damage  2.03  bill.  €  

 

Page 5: Action Plan for Flood Protection and River Management in · PDF fileDutchSoluonsforWaterProblems:& Floods,&Early&Warning&and&Waste&Water& Sarajevo,&31&March&2015&& Action Plan for

Summary  of  damages  and  losses  in  KM  

1  €  =  1,95583  KM  

Page 6: Action Plan for Flood Protection and River Management in · PDF fileDutchSoluonsforWaterProblems:& Floods,&Early&Warning&and&Waste&Water& Sarajevo,&31&March&2015&& Action Plan for
Page 7: Action Plan for Flood Protection and River Management in · PDF fileDutchSoluonsforWaterProblems:& Floods,&Early&Warning&and&Waste&Water& Sarajevo,&31&March&2015&& Action Plan for
Page 8: Action Plan for Flood Protection and River Management in · PDF fileDutchSoluonsforWaterProblems:& Floods,&Early&Warning&and&Waste&Water& Sarajevo,&31&March&2015&& Action Plan for

Emergency  ac*ons  

Reconstruc;on  of  the  most  vital  flood  protec;on  infrastructure  –  Embankments  on  the  Sava  and  Drina  rivers    –  Channels  in  the  Bjeljina  Region  –  Pumping  sta;ons  –  Stabiliza;on  of  river  beds  –  In  total  cca  15  mill.  €  

Page 9: Action Plan for Flood Protection and River Management in · PDF fileDutchSoluonsforWaterProblems:& Floods,&Early&Warning&and&Waste&Water& Sarajevo,&31&March&2015&& Action Plan for

What  to  do  for  future?  

•  Flood  protec;on  system  in  BiH  has  to  be  improved  

•  Coordinated  and  Harmonised  approach  •  Coopera;on  with  neighbouring  countries  and  interna;onal  organiza;ons  (ICPDR,  Sava  Commission,  WMO)  is  important    

•  Ac*on  Plan  for  Flood  Protec*on  and  River  Management    

Page 10: Action Plan for Flood Protection and River Management in · PDF fileDutchSoluonsforWaterProblems:& Floods,&Early&Warning&and&Waste&Water& Sarajevo,&31&March&2015&& Action Plan for

Ac*on  Plan  for  Flood  Protec*on  and  River  Management  I  

•  Goals:  –  reconstruct   the   damages   on   protec;on   facili;es   and  watercourses   caused   by   the   floods,   erosions   and   torrents   in  2014,  

–  harmonize  the  flood  protec;on  system  with  the  EU  legisla;on,  –  establish  a  more  reliable  hydrological  forecast  system  in  BiH,    –  create   condi;ons   for   the   sustainability   of   the   flood   protec;on  system   and   strengthen   inter-­‐sector   coopera;on   and  coordina;on  in  BiH  and  the  region,    

–  con;nue   with   the   ac;vi;es   on   full   implementa;on   of   the  integrated  water  management  principles  

•  6   key   measures   and   23   sub-­‐measures   (short   term   and  medium  term)  

•  Es;mated   financial   costs   for   the   implementa;on   of   AP   is  303  mil.  €  

•  136,6  mill.  €  secured  so  far,  addi;onal  51  mill.  €  should  be  available  in  2015    (61.9%)  

Page 11: Action Plan for Flood Protection and River Management in · PDF fileDutchSoluonsforWaterProblems:& Floods,&Early&Warning&and&Waste&Water& Sarajevo,&31&March&2015&& Action Plan for

Ac*on  Plan  for  Flood  Protec*on  and  River  Management  II  

•  Measure   1:   Reconstruc;on   of   damages   caused  by  floods  and  erosion  in  2014  –  embankments,   water   channel   network,   pumping  sta;ons,  river  beds  and  debris,  widening  river  profiles,  erosions      

•  Measure   2:   Harmoniza;on   of   the   BiH   flood  protec;on  system  with  the  EU  Direc;ve  2007/60/EC  on  the  assessment  and  management  of  flood  risks  –  Preliminary   flood   risk   assessment,   Flood   hazard   and  flood   risk   maps,   Flood   Risk   Management   Plans,  exchange   of   informa;on,   consulta;on,   public  par;cipa;on        

Page 12: Action Plan for Flood Protection and River Management in · PDF fileDutchSoluonsforWaterProblems:& Floods,&Early&Warning&and&Waste&Water& Sarajevo,&31&March&2015&& Action Plan for

Ac*on  Plan  for  Flood  Protec*on  and  River  Management  III  

•  Measure  3:  Adop;on  of   new   technical   solu;ons  for  the  protec;on  from  floods  and  erosion  in  the  towns  and  villages   that  had  no  water  protec;on  facili;es,  and  construc;on  of  new  facili;es  –  Construc;on   of   new   water   protec;on   facili;es   in  resid.areas,  prepara;on  of  technical  documenta;on    

•  Measure   4:   Establishment   of   a   hydrological  monitoring  system  in  BiH  – Monitoring   network,   hydrological   forecas;ng  models  for  river  basins,  exchange  of  informa;on  

Page 13: Action Plan for Flood Protection and River Management in · PDF fileDutchSoluonsforWaterProblems:& Floods,&Early&Warning&and&Waste&Water& Sarajevo,&31&March&2015&& Action Plan for

Ac*on  Plan  for  Flood  Protec*on  and  River  Management  IV  

•  Measure   5:   Strengthening   of   the   ins;tu;onal  capaci;es  for  WM,  coordina;on  and  coopera;on  with  other   BiH   ins;tu;ons,   relevant   par;cipa;on   in  interna;onal  bodies    –  Strengthening  capaci;es  (HRM,  training,  equipment,  finac.  sustainability),   coordina;on,   implementa;on   of  leg.framework   (urban   planning,   forestry,   energy,  protec;on   and   rescue),   beder   implementa;on   of  interna;onal  agreements  

•  Measure  6:  Water  Management  –  harmoniza;on   of   the   legal   framework   for   WM   with   EU  acquis ,   adop;on   or   RBMPs   and   coord inated  implementa;on,   water   protec;on   measures   in   high-­‐risk  areas      

Page 14: Action Plan for Flood Protection and River Management in · PDF fileDutchSoluonsforWaterProblems:& Floods,&Early&Warning&and&Waste&Water& Sarajevo,&31&March&2015&& Action Plan for

Dutch  Solu*ons  for  Water  Problems:  Floods,  Early  Warning  and  Waste  Water  

Sarajevo,  31  March  2015    

Thank you for your attention!

Ministry  of  Foreign  Trade  and  Economic  Rela*ons  B&H  www.mvteo.gov.ba    

Boško  Kenjić,  Head  of  Department  Tel:  +387  33  262  155  E-­‐mail:  [email protected]