119
User's Manual AcuRev 1300 3P4W Energy Meter

AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

User's Manual

AcuRev 1300 3P4W Energy Meter

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 2: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 3: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

I

AcuR

ev 1

300

CopyRight © 2015 V2.02

This manual may not be altered or reproduced in whole or in part by any means without the expressed written consent of Accuenergy.

The information contained in this document is believed to be accurate at the time ofpublication, however, Accuenergy assumes no responsibility for any errors which may appear here and reserves the right to make changes without notice. Please ask the local representative for latest product specifications before ordering.

[Document #2300E2202 Revision Date: Sep., 2015]

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 4: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

II

AcuR

ev 1

300

Please read this manual carefully before installation, operation and maintenance of AcuRev 1300 series meter. The following symbols in this manual are used to provide warning of danger or risk during the installation and operation of the meters.

Electric Shock Symbol: Carries information about procedures which must be followed to reduce the risk of electric shock and danger to personal health.

Safety Alert Symbol: Carries information about circumstances which if notconsidered may result in injury or death.

Prior to maintenance and repair, the equipment must be de-energized and grounded. All maintenance work must be performed by qualified, competent accredited professionals who have received formal training and have experience with highvoltage and currentdevices. Accuenergy shall not be responsible or liable for any damages or injuries caused by improper meter installation and/or operation.

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 5: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

III

AcuR

ev 1

300

Content

Chapter 1 Introduction-------------------------------------------------------------------------------------1

1.1 Meter Overview--------------------------------------------------------------------------2

1.2 Areas of Application--------------------------------------------------------------------------3

1.3 Product Features-------------------------------------------------------------------3

Chapter 2 Installation--------------------------------------------------------------------------------------52.1 Appearance and Dimensions---------------------------------------------------------7

2.2 Installation Methods---------------------------------------------------------8

2.3 Wiring-----------------------------------------------------------------------------------------------12

Chapter 3 Operation and Application-----------------------------------------------------------233.1 Display Panel and Keys-----------------------------------------------------------------24

3.2 Display Mode and Key Operations-----------------------------------------------------------25

3.3 Parameter Display and Key Operations-----------------------------------------------------30

3.4 Settings and Operations-----------------------------------------------------------------31

Chapter 4 Functions and Software----------------------------------------------------------354.1 Parameter settings----------------------------------------------------------36

4.2 Basic Measurement Functions----------------------------------------------------------40

4.3 Measurement Functions----------------------------------------------------------40

4.4 Demand------------------------------------------------------------------------------------------47

4 . 5 R O Fu n c t i o n s - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 8

4.6 EventLogging--------------------------------------------------------------------------------48

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 6: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

IV

AcuR

ev 1

300

4.7 Alarm Functions---------------------------------------------------------------------------------50

4.8 Incorrect Connection Detection----------------------------------------------------------54

4.9 Instrument Information----------------------------------------------------------56

4.10 Sealing function---------------------------------------------------------------------------56

Chapter 5 Communication-------------------------------------------------------------------------615.1 Modbus Protocol Introduction-------------------------------------------------------------62

5.2 Communication Format------------------------------------------------------------------------65

5.3 Application Details------------------------------------------------------------------------------70

Appendix-------------------------------------------------------------------------------------105 Appendix A Function List--------------------------------------------------------------------------106 Appendix B Technical Data and Specification-------------------------------------------------107 Appendix C Ordering Information---------------------------------------------------------------109 Appendix D Revision History----------------------------------------------------------------------110

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 7: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

V

AcuR

ev 1

300

Welcome to AcuRev 1300!You have purchased an advanced, versatile, multifunction power meter.Please note the following chapter descriptions in order to utilize the power meter

properly.

Chapter 1 Introduces the basic AcuRev 1300 features and application areas.Chapter 2 Introduces AcuRev 1300 installation and wiring methods in detail.Chapter 3 walks through how to operate AcuRev 1300 via the display panel, display

measurement data and parameter settings.Chapter 4 introduces main functions with the included software.Chapter 5 introduces communication related informations, including communication

protocol format and parameter address table.

Appendix provides AcuRev 1300 technical specifications and ordering information.

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 8: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

VI

AcuR

ev 1

300

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 9: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

1

AcuR

ev 1

300

1.1 Meter Overview

1.2 Areas of Application

1.3 Product Features

Chapter 1 Introduction

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 10: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

2

AcuR

ev 1

300

AcuRev 1300 series rail-mounted three phase energy Meters has a small size and high accuracy, it is ideal for use in distributor and tight spaces. The meter is equipped with an easy to read liquid crystal display (LCD) which displays all the important information. It is ideal for building energy management systems, energy monitoring and energy metering systems.

Energy

AcuRev1300 series support Bi-directional active energy measurements; Two-way reactive power energy metering, four quadrant reactive power energy metering; Two-way apparent energy metering; The cumulative energy metering (Energy Import + Energy Export); Net energy metering (input power - power output); Support rate 4 electric energy metering.

Measurement fuction

AcuRev 1300 series meters provide measurement and indication functions. Which can measure Voltage, Current, Power, Frequency and Power Factor. And which also have load characteristics indication function. Line current measurement ,The calculation of zero sequence current.Different specifications of the meters have different functions.

Demand

This product provides demand forecasting demand measurement and demand climax of Current, Active Power, Reactive Power and Apparent Power.

System Event Logging

The product can record the time and event ID about some important parameter amendment or clearance.

Running time detection

1.1 Meter Overview

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 11: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

3

AcuR

ev 1

300

Support instrument running time of detection and instructions.

Instrument operation temperature indication

Provide instrument internal temperature indicator

Alarm function

Support multiple parameter data detection alarm, and can be configured to RO output.

Communication

Supports RS485 communication open protocol and infrared interface. Support Modbus RTU. Infrared interface supports the on spot infrared meter reading.

Large commercial center Rail transportSchool Public facilitiesHotels and Buildings Smart distribution cabinetSmart building system Energy management systemIndustrial environment Energy saving system

Multifunction, high accuracy

AcuRev 1300 series meter has data collection and management function, energy measurement and multi-parameters measurement function, and demand measurement, event logging.

The measurement accuracy of energy, power, voltage, current is 0.5.

Small size, convenient installation

1.2 Areas of Application

1.3 Product Features

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 12: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

4

AcuR

ev 1

300

AcuRev 1300 series product appearance and dimension fits the IEC 35mm DIN standard, accounts for only 6 mold.

Display is clear

The LCD display is very clear. All measurement parameters could be search through the display easily. The parameter could be set through the display. LCD display has backlight support, which can help users use it in wake light environment.

Safety

AcuRev 1300 series product has electronic sealing function and physical sealing. Users cannot change the parameters through the keys when the electronic sealing closed, and important parameters cannot be changed through communication, preventing maliciousdata changement.

Convenient wiringBoth high pressure system and low pressure systems, both three-phase three-

wire system and three-phase four-wire system, can choose the appropriate wiring way connected to AcuRev1300 series instrument.Almost all of the three-phase system application, and can be used for single phase system.

Connection error automatic judgmentAcuRev 1300 series instrument connection errors of judgment and help in the process

of the project construction cost increase caused by the wrong wiring.

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 13: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

5

AcuR

ev 1

300

Chapter 2 Installation

2.1 Appearance and Dimensions

2.2 Installation Methods

2.3 Wiring

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 14: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

6

AcuR

ev 1

300

Before Installtion The installation must be perfomred by qualified, competent accredited professionals who have received formal training and have experience with high voltage and current devices. Appropriate safety wear (gloves, glasses, arc flush suit, etc.) is mandatory to ensure safe installation.

During normal meter operation, caution should be used when handling the following as high voltage may be present: Terminal Blocks, Current Transformer connection nodes, Potential Transformer connection nodes and the related circuits. All primary and secondary circuits may contain lethal current and voltage. Contact with current channels must be avoided.

The power meter and I/O modules cannot be installed on the primary side of transformers or where VA has limitations. The power meter can be only installed on the secondary side. Avoid contact with meter terminals after the completion of installtion.

Do not input voltage above the rated maximum limit of the power meter and devices connected to it. Before energizing the meter, please refer to the meter's label and specifications.

Do not perform high voltage test / insulation experiment to output, input or communication terminals.

The use of shorting blocks and fuses are recommended. Current transformers need to be grounded.

Use dry cloth to wipe the meter.

The replace of the Battery must be performed by professionals.

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 15: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

7

AcuR

ev 1

300

This chapter mainly described how to install an AcuRev 1300 series meter, which is a very important step of using the meter correctly. This chapter gives some pictures about how to install the meter and some notes. Before installing the meter, please read this fi rst.

Appearance:

Figure 2-1 AcuRev 1300 Appearance

2.1 Appearance and Dimensions

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 16: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

8

AcuR

ev 1

300

Dimensions:

Figure 2-2 Meter base dimensions

EnvironmentalBefore instal lat ion, please check the environment,

temperature and humidity to ensure theAcuRev 1300 series meter is being placed where it will not be damaged.

1. Temperature

AcuRev 1300 operating temperature is -25~70°C. Exceeding this temperature range will cause damage to the meter. Please note

that it can influence the meter life negatively if themeter operates in extremely high or extremely low temperatures. AcuRev 1300 storage temperature range is -40~85°C.

Front View Side View

Unit: mm

2.2 Installation Methods

Temperature and humidity of the environment must accord with the requirement of acurev 1300, Otherwise it may cause the meter damaged.

Note

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 17: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

9

AcuR

ev 1

300

2. Humidity

5% to 95% non-condensing.

3. Location

AcuRev1300 series meter should be installed in a dry and dust free environment. Avoidexposing meter to excessive heat, radiation and high electrical noise sources.

Installation Steps:

This product is DIN railed mounted and fits on the standard 35mm rail.1. To install the meter on the rail insert the top of the rail into the groove on the back

of the meter.Pull the metal clips back and slide the rail across the groove of the meter.

Figure 2-3 Step A

2. Use the metal clips to tighten the rail to complete installation.

Installation Rail

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 18: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

10

AcuR

ev 1

300

Figure 2-4 Step B

3. Before mentioning this step, the steps needed to remove the seal/cover need to be mentioned. I.E. Step 5 below should come first.To attach seal/cover back onto the meter place the left side of the cover down onto meter and press down on the right side. When installed correctly you will hear a clicking sound.The steps to attach the other cover is opposite to the above step.

Figure 2-5 Step C

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 19: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

11

AcuR

ev 1

300

4. After inserting the cover, tighten the sealing screws and lay the seal and tighten the sealing screws, lay the seal.

Figure 2-6 Step D

5. To open the cover, remove the seal if applicable, unscrew the sealing screws and life the cover upwards to remove.

Figure 2-7 Step E

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 20: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

12

AcuR

ev 1

300

2.3 Wiring

Terminals: This manual use L1 L2 L3 to represent three-phase current loop, which are the same as

A, B, C in other manuals.

Figure 2-8 The transformer AcuRev1300 terminal access type distribution

A, B, S: communications terminal; P1, P2: pulse output;L, N: auxiliary power; V1, V2, V3 and.Vn: voltage circuit; I11, I12, I21 I22, I31, I32, I41, I42:

current loop; R1, R2: RO output.

AuxiliaryPower Supply:AcuRev1300 series instrument power supply: ac 100 ~ 415 vac, 50/60 hz, or dc 100-

300 VDC, can be used throughout the world. Other power supply voltage selection please contact manufacturers. Instrument in the typical working conditions of power consumption is very small, so the power supply can by independent power supply, can also be obtained from circuit under test.Suggested that under the condition of power voltage fluctuation is bigger, use the voltagee stabilizer. Power supply terminals, respectively is: L, N. The typical auxiliary power wiring is as follows:

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 21: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

13

AcuR

ev 1

300

Choice of wire of power supply is AWG22-16 or 0.6-1.5mm2. A fuse (typical 1A/250Vac) or small air circuit breaker should be used in the auxillary

power supply loop. Such as the use of small air circuit breaker, it is recommended to use IEC947 standards and through the CE certification of products. An isolated transformer or EMC filter should be used in the control power supply loop if there is a power quality problem in the power supply.

Note: the power before wiring, please confirm that the current power supply and instrument brand logo on the power supply voltage is up!

Voltage Input: Maximum input voltage for the AcuRev1300 series meter shall not exceed

400LN/690LL VAC rms for three phase or 400LN VAC rms for single phase. Voltage input signal circuit must be installed in the air circuit breaker, fuse or small suggestion with 1 a fuse.

Potential Transformer (PT) must be used for high voltage systems. Typical secondary output for PTs shall be 100V or 120V. Please make sure to select an appropriate PT to maintain the measurement accuracy of the meter. When connecting using the star configuration wiring method, the PT's primary side rated voltage should be equal to or close to the phase voltage of the system to utilize the full range of the PT. When connecting using the delta configuration wiring method, the PT's primary side rated voltage should be equal to or close to the line voltage of the system. A fuse (typical 1A/250Vac) should be used in the voltage input loop. The wire for voltage input is AWG16-12 or 1.3-2.0mm2.

AcuRec1300

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 22: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

14

AcuR

ev 1

300

Note: In no circumstance should the secondary of the PT be shorted. The secondary of the PT should be grounded at one end. Please refer to the wiring diagram section for further details.

Current Input:Current Transformers (CTs) are required in most engineering applications. Typical

current rating for the secondary side of the CT shall be 5A (standard) or 1A (Optional), please refer to the ordering information appendix for further details. CTs must be used if the system rated current is over 5A. The accuracy of the CT should be better than 0.5% with rating over 3VA is recommended in order to preserve the meter's accuracy. The wire between CTs and the meter shall be as short as possible. The length of the wire have an effect on the accuracy.The wire size of current input is AWG15-10 or 1.5-2.5mm2.

Note: The secondary side of the CT should not be open circuit in any circumstance when the power is on. There should not be any fuse or switch in the CT loop. One end of the CT loop should be connected to the ground.

Vn Connection:Vn is the reference point of the Acuvim II series meter voltage input. Low wire

resistance helps improve the measurement accuracy. Different system wiring modes require different Vn connection methods. Please refer to the wiring diagram section for more details.

AcuRev1300 series instrument measuring wiring method AcuRev1300 series instrument can satisfy almost any kind of three phase wiring diagrams. Please read this section carefully before choosing the suitable wiring method for your power system. Please make sure the rated voltage grade and PT secondary side voltage is suitable for the current models of AcuRev1300 series. Current rating and CT secondary side current rating is suitable for the current models of AcuRev1300 series.

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 23: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

15

AcuR

ev 1

300

AcuRev1300 series instrument connection mode Settings and the corresponding practical application in engineering and correct, to ensure the measurement accuracy of instrument.

1). 3LN, 3CT; The connection mode set to 3LN

A B C NLINE

1A FUSE

I11I12I21I22I31I32I41I42

VN V3 V2 V1

AcuRev 1300

LOAD

Terminal Block

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 24: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

16

AcuR

ev 1

300

Terminal Block

A B CLINE

1A FUSE

I11I12I21I22I31I32I41I42

VN V3 V2 V1

AcuRev 1300

LOAD

2). 2LL,3CT (using 2CT); The connection mode is set to 2LL; Note: output transformer secondary side is 5A/1A

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 25: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

17

AcuR

ev 1

300

3). 2LL,2CT;The connection mode is set to 2LL; Note: mutual inductance type secondary side output for 5A/1A,Rogowski coil 333mV,200mA

A B CLINE

1A FUSE

I11I12I21I22I31I32I41I42

VN V3 V2 V1

AcuRev 1300

LOAD

Terminal Block

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 26: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

18

AcuR

ev 1

300

4). 1LL , 2CT; the connection mode is set to 1LL.

I11I12I21I22I31I32I41I42

VN V3 V2 V1

AcuRev 1300

A N B

LINE

LOAD

1A FUSE

Terminal Block

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 27: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

19

AcuR

ev 1

300

5) 1LN, 1CT; connection mode is set to 1LN

I11I12I21I22I31I32I41I42

VN V3 V2 V1

AcuRev 1300

A NLINE

LOAD

1A FUSE

Terminal Block

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 28: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

20

AcuR

ev 1

300

Relay output wiring diagram

220Vac

Auxiliary Power Supply

L N G

V+ comR1

R2

Relay Output

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 29: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

21

AcuR

ev 1

300

AcuRev1300 communication utilizes RS485 port, via Modbus-RTU protocol. The wiringterminals are A, B, S. "A" is called differential signal " ", "B" is called differentialsignal"-",

"S" is connected to the shielding of shielded twisted pair cable. The maximumdistance of Shielded Twisted Pair cable is 1200 m. The distance will be shorter if moredevices are on the

same communication link or using a higher baud rate.

If the master device does not have RS485 but RS232 port, a RS232/485 converter can beutilized. Typical RS485 network topologies include line, circle and star.

In order to improve communication quality, please pay attention to:

1. High-quality Shielded Twisted Pair cable is very important, AWG22 (0.6mm2) or lower isrecommended. Two cables should be different colors.

2. Pay attention to "single point earthing". It means there is only one point of the shieldingconnected to ground in a single communication link.

3. Every A(+) should be connected to A(+), B(-) to B(-), or it will influence the network, evendamage the communication interface.

4. "T" type connection topology should be avoided. This means no new branches exceptfrom the starting point.

5.Keep communication cables away as much as possible from sources of electrical noise.When several devices are connected (daisy chain) to the same long communication line, ananti signalrefecting resistor (typical value 120- 300Ohm, 0.25W) is often used at the endof the circuit (the last meter of the chain) if the communication quality is distorted.

6. Use RS232/RS485 or USB/RS485 converter with optical isolated output and surge protection.

7. A infrared port is also available in the Display Module, which supports meterreading.

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 30: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

22

AcuR

ev 1

300

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 31: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

23

AcuR

ev 1

300

Chapter 3 Operation and Application

3.1 Display Panel and Keys

3.2 Display Mode and Key Operations

3.3 Parameter Display and Key Operations

3.4 Settings and Operations

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 32: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

24

AcuR

ev 1

300

In this chapter, you would see some details about human-computer interaction, including how to use the key to browse demanded information, and how to set the parameters correctly.

Chapter 2.1 shows the dimensions of Display Module. It consists of one LCD screen and one key. To make the description clearly, all of the chars and number segments are lighten in the picture below, but when we use it , they would not appear in one page.

Figure 3-1 All LCD display lighten

Table 3-1 Display of content

NO. Content Description

1 Description area To display what kind of parameter in the display area. To distinguish the power of conjunction, split phase, current, demand, parameter Settings, and so on.

2Measurement parameter display area7 decimal point, time signal

To display the main measurement parameters: Energy, Voltage, Current, Power, Frequency, Demand, Settings, Time.

3 Indicate the all information mode

4 Communication icon No icon: no communication; One icon: query sentTwo icons: query sent and response received

5 Load size icon Display in the analog way according to the load frequency

3.1 Display Panel and Keys

1

2

3

4 5 6 7 8 9

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 33: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

25

AcuR

ev 1

300

6 Four-quadrant reactive power display To indicate the first to forth quadrant reactive power

7 Import icon on: display the Energy ImportExport icon on: display the Energy Export

8 Load character indicate Inductance icon on: inductive loadCapacitor icon on: capacitive load

9 unit Unit of the parameter in parameter display area

3.2 Display Mode and Key Operations

The LCD display consists of important parameter display mode, all parameter display mode and setting mode.

1. Important parameter display mode

The important parameter display area mode mainly display the important parameters, including system default display data and custom data. Each page display lasts about 6 seconds. When we press “SCROLL” in a short time, the current screen content would be locked for 1 minute and light up the backlight, during this time, press the same key in the same way another time, it would turn to the next page and lock the display for 1 minute; when we didn’t press any key for one minute, then it would display all the pages in a rate of 6 second per page automatically.

System default display content:

A) the input active power (AcuRev1301 ~ AcuRev1304 support)

B) the output active power (AcuRev1302 ~ AcuRev1304 support)

Custom data content: The 11th -42th screen data could be set to important parameter display mode, and be cycle displayed. See table 3-2 Display coding table.

Note:

Configuration 1: using the communication way , we could add 1 to the corresponding

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 34: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

26

AcuR

ev 1

300

flag, the consequence would be added to the important parameter display area to cycle display. The corresponding flag would be cleared and expelled from important parameters. System default display data content cannot be deleted.Configuration 2: add or delete the corresponding number through pressing keys.

AcuRev1300 instrument power value is positive.The number of significant digits when electricity data (including the number of decimal places) less than 7, normal display; When effective digit is greater than 7, the data in "thousand", for display.

2. All parameters display mode

AcuRev1300 instrument power value is positive.The number of significant digits when electricity data (including the number of decimal places) less than 7, normal display; When effective digit is greater than 7, the data in "thousand", for display.

AcuRev1300 instrument real-time measurements showed that when the data is less than 9999.9, normal, according to data accurate to one decimal places.When the data is greater than 9999.9, no longer show decimal places, integer bit in thousands of units for display.For example: 12345.6, shows 12 k.Does not distinguish between display all of the information and the important parameters.

Active Energy

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 35: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

27

AcuR

ev 1

300

All of the meter supported parameters display are in the table below:

Table 3-2 Display coding table

Page No. Setting flag Content Model 1

Model 2

Model 3

Model 4

1 Voltage wiring detection √ √ √ √

2 Current connection detection √ √ √ √

3 Instrument address √ √ √ √

4 RS485 communication baud rate √ √ √

5 RS485 communication way of checking √ √ √

6 Hardware version √ √ √ √7 Software version √ √ √ √8 The release date √ √ √ √

9 specifications √ √ √ √

10 The input active power √ √ √ √

11-13 1 optional display flag word1 - Bit0

The input active power (A - C) √ √ √ √

14-16 8 optional display flag word1 - Bit7

The voltage (A - C) √ √ √ √

17-19 9 optional display flag word1 - Bit8

Current phase (A - C) √ √ √ √

20 10 optional display flag word1 - Bit9

Line current √ √ √ √

21 11 optional display flag word1 - Bit10

The system active power √ √ √ √

22-24 12 optional display flag word1 - Bit11

Shunt active power √ √ √ √

25 16 optional display flag word1 - Bit15

frequency √ √ √ √

26 17 optional display flag word2 - Bit0

The temperature √ √ √ √

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 36: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

28

AcuR

ev 1

300

27 20 optional display flag word2 - Bit3

Meter run time √ √ √ √

28 21 optional display flag word2 - Bit4

Load running time √ √ √ √

29 end

3. Setting mode

Short press the “set” key, we’ll go into the setting mode: password authentication. When it is succeed then go to the address setting page, or drop out of the setting mode and go to the important parameter setting mode; when the sealing key detected is closed, it will drop out of the setting mode automatically. 1min after the last press, it will drop out of the current mode. Long time press the “SCROLL” key would drop out of the setting mode.The default password is 0000

Table 3-3 Set interface coding table

Content Specification 1

Specification 2

Specification 3

Specification 4

Specification 5

Meter address S-01 S-01 S-01 S-01 S-01Baud rate S-02 S-02 S-02 S-02

Check mode S-03 S-03 S-03 S-03

Energy pulse value option - S-04 S-04 S-04 S-04reactive calculation S-05 S-05 S-05 S-05Change password S-02 S-06 S-06 S-06 S-06Measuring side set S-03 S-07 S-07 S-07 S-07Connection mode S-04 S-08 S-08 S-08 S-08CT2 S-05 S-09 S-09 S-09 S-09CT1 S-06 S-10 S-10 S-10 S-10PT2 S-07 S-11 S-11 S-11 S-11PT1 S-08 S-12 S-12 S-12 S-12The pulse constant S-09 S-13 S-13 S-13 S-13The pulse width S-10 S-14 S-14 S-14 S-14Decimal digits S-11 S-15 S-15 S-15 S-15

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 37: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

29

AcuR

ev 1

300

Display interface customization:increases

S-12 S-16 S-16 S-16 S-16

Display interface customization: cut

S-13 S-17 S-17 S-17 S-17

Incorrect connection detection enable

S-14 S-18 S-18 S-18 S-18

Each mode display area distinction as follows:

Important parameter mode: The first in the first row do not display s, at the same time, the mode setting position do not display in the last row.

All parameter mode: The first in the first row do not display s, at the same time, the mode setting position display in the last row.

Setting mode: The first in the first row display s, at the same time, the mode setting position do not display in the last row.

Keys presentation:

1. Sealing key: Used as electronic sealing function.

2. Set key(SET): Used as LCD parameter setting.

According to the pressing time, there are 2 kinds of function:

A) Short time press (Set) (the press time is shorter than 2 second)

Used to enter the setting mode, enable setting, identify the setting.

3. Cycle key (SCOLL): used to change pages under the important parameter mode and all parameter mode; under the setting mode, the key is used to change pages and data; change the display mode.

According to the pressing time, there are 2 kinds of function:

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 38: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

30

AcuR

ev 1

300

B) Short time press (Sc) (the press time is shorter than 2 second)

Display mode (including important parameter display mode and all parameter display mode): change pages.

Setting mode: change pages and data.

C) Long time press (LSc) (the press time is longer than 2 second)

Display mode: change mode between important parameter display mode and all parameter display mode.

Setting mode: do not save the setting data and quit the setting mode then enter the important parameter display mode.

Mode change description:

Backlight description: there’s any pressing action, the backlight would be lighten, after no action for 90s, the backlight off.

3.3 Parameter Display and Key Operations

Under the all parameter display mode, short time press the “SCOLL” key to display

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 39: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

31

AcuR

ev 1

300

different parameters. The change sequence is from the 1-29 screen(If the chosen specification doesn't support the function , just skip it). When it comes to the last screen, press the same key another time, back to the 1st screen.

3.4 Settings and Operations

Under the setting mode, the meter could complete most of the data setting.

Under the no setting mode, short pressing the “Set” (brief as “Set” blow) enters the Password protection inquiry.

A) Password protectioninquiry

Password protectioninquiry is the key of key setting function. Only if input the correct password, you can enter the parameter setting page. If users input wrong password, it would quit the setting mode and enter the important parameter display mode. The factory default password is 0000

Enter thepass word key operation:

Short press “SCOLL” key (Sc): the number in the cursor position plus 1, when the number was 9, press the Sc would return to 0.

Short press “Set” key (Set): the cursor position move to right one, when the right-most position flashing, press the “Set” again, it would be passwordinquiry. Password correct: go to the meter address setting page. Password wrong: quit the setting mode and go to the

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 40: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

32

AcuR

ev 1

300

important parameter display mode.

B) Data setting

Operation description:

No cursor flashing: press the “Sc” key to change pages.

Cursor flashing: press the “Sc” key to change the number in the flashing position.

“Set” key could change the cursor flashing state, cursor’s movement, confirm to the setting data. Illegal number could not be set and would keep the same data.

Different specifications support different setting data. Take AcuRev 1303 for example.

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 41: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

33

AcuR

ev 1

300

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 42: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

34

AcuR

ev 1

300

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 43: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

35

AcuR

ev 1

300

4.1 Parameter settings

4.2 Basic Measurement Functions

4.3 Measurement function

4.4 Demand

4.5 RO function

4.6 Event Logging

4.7 Alarm function

4.8 Incorrect connection detection

4.9 Instrument information

4.10 Seal function

Chapter 4 Functions and Software

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 44: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

36

AcuR

ev 1

300

This chapter will introduce you about how to use some important functions, many advanced function could not be operated through single key, which also need communication interaction, thus we made PC tools software. This chapter would introduce some functions with the help of these tools.

Different specification of AcuRev 1300 series meters support different parameters, you’ll see the details in the function table. Take AcuRev 1304 for example.

4.1 Parameter settings

AcuRev 1300 series meters need basic settings so that the meters can work in the scheduled way. The figure below is the display of basic parameters that set by PC tools software.

Figure 4-1 Basic setting parameters in the software

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 45: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

37

AcuR

ev 1

300

1) Reactive power calculate pattern

Real reactive:

Generally reactive:

2) Energy pulse output

Used to choose the pulse type that represented by the pulse outputted through P1,P2 terminals.

Active: P1,P2 terminals output pulse is active power pulse.

Reactive: the output pulse is reactive power pulse.

3) Demand

Demand supports 4 kinds of calculate methods, which is Sliding block method, fixed block method, rolling block and thermal demand method.

a) Sliding block method: set a 1-30min window time, that is calculate time of demand. The window slid once per minute, so does the demand value. In this method, in the operation state demand calculation method is displayed to slip.

b) Fixed block method: set 1-30min as a demand calculate cycle. The whole cycle just calculate the demand once. Which means the demand update time is equal to the demand calculate cycle. In this method, in the operation state demand calculation method is displayed to block.

c) Rolling block method: set 1-30min as a demand calculate cycle and 1 slip time. Demand cycle must be integrated multiples of slip time. Calculate 1 cycle’s demand at the end of the slip time. The demand update time is equal to the slip time. In this method, in the operation state demand calculation method is displayed to slip.

d) Thermal demand method: calculate the demand value through analog the theory

222 DPSQ −−=

22 PSQ −=

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 46: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

38

AcuR

ev 1

300

of the thermal demand table. Set 1-30min as a calculate cycle. In the whole cycle, we just need to calculate the demand once. Which means the demand update time is equal to the demand calculate cycle. In this method, in the operation state demand calculation method is displayed to block.

4) Sealing option

Choose the “meter clock + time of use”, the corresponding content(meter clock, TOU parameters, Daylight saving time parameters) can be sealed.(the change of corresponding time must proceed when the seal is open.)

5) Communication permission

Divided into low permission and high permission.

Low permission: important operation (like clear demand event record, programming event record, open cover event record, meter data, energy data initial energy data) disabled. But it can update to high permission through updating the communication permission.

High permission: The communication supports all functions. 30 min after updating to the high permission, the meter would lower its permission to low permission automatically, to keep the meter’s safety.

6) Display scan parameters

Users could add data to the display scan parameters through the PC tools software. The meter would cycling display the elected content.

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 47: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

39

AcuR

ev 1

300

7)Primary side/secondary side to choose

Electricity and electric parameter data for one side or the secondary side of data

8) Connection mode

According to the actual to select the correct connection mode, otherwise it will lead to the measurement data is not correct.

9) CT PT set

According to the practical use of set, otherwise, can lead to inaccurate measurement.

10)The pulse constant and pulse width

According to actual use the set, otherwise, can lead to inaccurate pulse output

11)Electricity decimal digits Settings

According to the set, electric energy according to different decimal digits, when change the Settings, may cause the error of electric energy metering.

12)RO output mode

RO output mode can be configured to remote control or alarm output, output can be configured according to the practical application.

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 48: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

40

AcuR

ev 1

300

4.2 Basic Measurement Functions

AcuRev 1300 mainly measure the Voltage, Current, Power, Frequency, Power Factor, demand. Demand supports power demand,current demand and demand prediction function.Among them, the center line current support calculated value and measured value of two kinds of algorithms, AcuRev1303 and below model using calculated value; AcuRev1304 and above model using measurement values, and support the calculation value of the residual current.

The figure below is the basic measurement parameter display.

Figure 4-2 Basic Measurement Parameter Display

4.3Measurement function

AcuRev 1300 series instrument provide time-sharing two-way total electric energy metering system and split phase electricity.The departed time could be any day during the date 1-28. Real – time energy can change the energy base. Communication only can be changed under the high permission and sealing open condition. Support of electricity data

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 49: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

41

AcuR

ev 1

300

include:Consumed Active Energy,Generated Active Energy,Total Active Energy,Net Active Energy,Consumed Apparent Energy ,Generated Apparent Energy,Four-quadrant Reactive Energy,Consumed Reactive Energy,Generated Reactive Energy,Total Reactive Energy,Net Reactive Energy.

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 50: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

42

AcuR

ev 1

300

Figure 4-3 Calculation and Measurement Parameter Display

System power support time-sharing electricity function, split-phase power does not support this feature

According to the demand of users, we can depart the time to several sequence time segments. Each segment can point to the same or different rate (at most 4 kinds of rates ). The meter decides to which rate the current time should belong to according to its inner clock or communication command. To achieve TOU calculate, it should be calculated separated in different rate.

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 51: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

43

AcuR

ev 1

300

TOU calculation can choose inner clock or communication command mode, which could make the application more flexible.

Figure 4-4 TOU Energy Setting Display

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 52: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

44

AcuR

ev 1

300

a) The currentrate ofvaluefrom theinternalclock

TOU energy time segment setting: at most 14 time blocks.Each block corresponds one segment table (at most 8 time segment tables). Each segment can point to anyone of the 4 rates.

User can use different time block, different time segment to fulfil personality demand. But to make sure the time is valid, the meter would examine the time setting strictly. If it is correct and has opened the TOU function, the meter would process the TOU calculate energy. If it is wrong and has opened the TOU function. The energy just cumulated to rate 1.

Time setting demands:

1. Number of time zone setting: after finishing the time zone number setting, the time zone would be divided according to the number of the time zone. Please attention that the time zone number should be integers from 1-14. And the time zone format should be open from small to large.

2. Time zone setting format: xx month-xx date, xx date time list. Only if the time zone be set according to the closed structure, it considered correct.

3. Date time segment meter's setting: The setting parameters of date time segment meter are interger from 1-14, after finishing the setting, the date time segment's parameters in the date time segment meter would be set in a increasing order according to the date time segment meter's setting.

4. Date time segment setting: the parameter should be integer from 1-14, after the setting finished, we can set the parameter in the date time segment table according to the set parameters.Only if the date time zone be set according to the closed structure, it considered correct.

5. Rate setting: the parameter should be integer from 1-4. It means the maximum that appeared in the TOU energy. After finishing the setting, it would be rate setting in the time

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 53: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

45

AcuR

ev 1

300

segment table. The rate parameter is one of 0,1,2,3(0:sharp; 1:peak; 2:valley; 3:even).

6. Holiday setting: the number of holiday is integer from 0-30, after finishing the setting, it would be holiday setting, which format is xx month-xx date.

Note: User can customarize the factory settings of time zone segment. When no asking, the meter would be set as the default factory settings. Users can recover the time zone segment setting value to the default value through communication.

The use of TOU energy holidays: in the TOU energy parameter setting part, firstly we should set the number of holidays, then set the demanded holiday in the holiday setting bar, the format is xx month- xx date. At this time, through setting the meter operate time, when the meter’s operation time is in the setting time, the energy would increase under the corresponding rate.

Note: time-division energy is with the highest priority on holidays, when the set of special date is valid, the measurement of energy would consider the holidays at first.

Weekly restfunction

The use of TOU energy weekly rest: weekly rest(bit0- Sunday; bit1-bit6: Monday- Saturday . when bit is 1, it means weekday, when bit is 0 , it means weekend.) through setting the clock, when the meter’s clock is under the weekly rest time segments, the energy would increase under the corresponding rate.

b)The value of the currentrate of self-communication order.

Daylight Saving Time function

Under the DST enable condition, if we choose fixed date option, it would change the DST according to the fixed date setting format. The format is month/date/hour/minute/adjust time(unit:min). if we choose unfixed date option, it would change the DST according to the unfixed date setting format.The format is month/ week/which week/hour/minute/

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 54: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

46

AcuR

ev 1

300

adjust time(unit: min), according to the above setting format, it would change the DST automatically.

Through this function, we can achieve the meter’s DST change automatically. When the clock operates to the DST start setting time, the meter could adjust the clock to some certain time segment in advance. But when the clock operate to the DST ending, the meter could adjust the time to some certain time segment pushed back.

Figure 4-5 Daylight Saving Time Setting Display

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 55: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

47

AcuR

ev 1

300

4.4 Demand

Demand have four calculation methods: slipping block method, fixed block method, rolling block method, thermal demand method. Users can clear the demand.Support demand prediction, in each minute a demand forecast.Specific set set is introduced in the chapter 4.1.

Figure 4-6 Demand Parameter Display

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 56: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

48

AcuR

ev 1

300

4.5 RO function

AcuRev1300 have relay output (RO), all the way to realize the remote control or alarm output.

4.6 Event Logging

The meter supports the event logging of important operation. Including programmingevent, open meter cover event, demand clearevent, event clearance event, meter clearance event.

Programming event: record the programming time and programming event flag when programming some important parameters of the meter. When one programming event occur several times within 5 min, the meter just record the first time.

Programming flag Programming event01 Meter address programming event02 RS485 communication programming event03 Reserved04 Reserved05 Energy pulse programming event06 Demand related programming event07 Reactive calculate method programming event08 VAR/PF statute programming event09 Change time programming event

100 Change energy base programming event101 TOU parameter programming event102 Daylight saving time programming event

103 Trend record programming event

Open meter cover event: record the open and close event, support 3 groups of open meter cover event.

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 57: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

49

AcuR

ev 1

300

Demand clearance event: clear the demand record, support 3 groups of demand clearance event.

Event clearance event: clear the event record, support clear demand clearance event, open meter cover event, programming event, support 3 groups of open meter cover event. Support 3 groups of event clearance event.

Meter clearance event: clear parameter record, this event cannot be cleared. Support 3 groups of meter clearance event.

Figure 4-7 Event Clearance Record Display

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 58: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

50

AcuR

ev 1

300

4.7 Alarm function AcuRev1300 series instrument event alarm function, which is of the definition of when a parameter changes make events inequality (or) equation was established, and the duration exceeds the preset time limit, the event alarm will be started at this moment, when the alarm parameters of serial number, number, alarm status and alarm occurs as the event was a record store at all times, there can be a maximum of 20 article such records stored in the event log buffer.And can be set as the limit of the RO as alarm output event alarm signal output.Use the event before the alarm function seriously to complete a number of Settings (conditions of inequality (or equations), can make the switch, etc.), any incomplete or inaccurate setting will lead to the failure of the final output.Set up operations are conducted based on the corresponding register set to complete.Need of special note is: these register setting must be set by communication, and alarm value are the secondary side of the measured values.Tool software setting the alarm display as shown in figure 4 - 8

.

Figure 4 - 8 Alarm Settings Page

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 59: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

51

AcuR

ev 1

300

1.Single event alarm Settings

Table 4 -1 lists the content and address, and the parameters of the first set of set records recorded a total of 12 groups of such Settings, the format is the same.

The Modbus address

Parametric description

Data type Read and write attribute

Numerical range Register number

705 Parameter number

word R/W 0 ~ 28 (see attachment)

1

706 Compare the way

word R/W Is greater than 0; Is equal to

1; Less than 2

1

707 The set value word R/W 1708 Delay time word R/W 0~3000(×10ms) 1

Table 4-1 First set alarm parameters setting

Alarm parameter number: select the group related parameters, such as 12 - frequency (refer to chapter 5 in the "serial number corresponding alarm parameters table"), alarm, the group will judge conditions for this parameter.Comparative way, value: build alarm conditions, such as greater than, equal to, less than set value.If set frequency, is greater than, 50, alarm condition for more than 50 hz frequency.Note: the "set point" is corresponding with the principal part of parameters, it communication value and actual value of the conversion relations in the following table.

Parameter number Communication value of the set value and the actual value of multiple relationship

0~3 10004~11 10

12 100

13~24 125~28 1000

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 60: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

52

AcuR

ev 1

300

Delay time: how long will the alarm conditions keep after that event is established.The setting range of 0 ~ 30000, the per unit time is 1 ms, set to zero without delay, immediately trigger the alarm events.1/10 of the communication value of the actual value.

Output to the relay: set to 0, alarm occurs, the group is not output from RO.If set to 1, assuming the M11 module is connected, and M11 RO work mode setting of alarm mode in the module, alarm occurs, the group output to the RO1, namely RO1 closed, until all the output to the RO1 alarm RO1 to disconnect after recovery.RO2 ~ RO8 and RO1 principle is the same.Note: when the relay is used for alarm output only "level" output mode, there is no "pulse" output mode, the relay output Settings (pulse or level) will be ignored.After completion of a single event of the functions of setting, the need for the following global, alarm function can be normal use.

2. The alarm global Settings

The communication address table 700 h to 704 h address global parameters for alarm correlation.Alarm switch: always determines whether this instrument enable event alarm function, and is set to "1", to enable the alarm function, related to the alarm Settings to take effect.

Each alarm channel stop switch: to determine whether the alarm set in each group.As a 16-bit unsigned integer, the bit0 ~ bit11 respectively corresponding to the group 1 to 12 group can set the alarm, the corresponding bit is "1" when the group alarm set to take effect, otherwise is invalid.

When the alarm events, can be configured RO work mode, make it as an alarm output.AcuRev1300 support 2 alarm output modes, pulse output mode and the level of output, respectively, when choosing pulse output mode, you can set the corresponding pulse width, the range of 50 ~ 3000 ms.And need to configure the various alarm output channel can make logo, the bit0 ~ bit11 respectively corresponding to the group 1 to 12 groups can make alarm output, the corresponding bit is "1", the group of alarm events, RO accordingly output, otherwise is invalid.

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 61: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

53

AcuR

ev 1

300

3. Alarm record

Available for event alarm record store data buffer can store 20 groups of alarm events, not guarantee a set a record, but with the method of circulation records, the events of the new record will cover the earliest records.When the limit of alarm parameter back to normal, normal value and events also referred to as the event log, user access to the limit of time and return to normal time, you can get the limit the duration of the event.

Figure 4-9 Alarm record page

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 62: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

54

AcuR

ev 1

300

4.8 Incorrect connection detection

AcuRev1300 series instrument has the function of connection detection, Can be set in the interface to the function that can, in the case of function can make can automatically detect instrument according to the instrument connection mode of connection is correct,its principle is as follows:

1. Lack of phase detection: a phase voltage value is 0, as lack of phase.

2. Voltage phase sequence detection: A phase voltage as the reference point, determine the voltage phase sequence, such as detected by reverse phase sequence, or could be N lines to meet the current and voltage and voltage is the voltage and the indirect inverse.To determine the voltage value, such as a two phase voltage values are with another phase voltage deviation is too large (0.3 times), was convicted for the phase voltage into the N wrong; Otherwise the sentence to indirect fault voltage, B, C phase fault.

3. Current detection: A phase voltage as the reference point, read the phase current and voltage between A phase Angle, to judge whether its value and standard value Φ Angle deviation within 30 °, if meet the requirements, convicted for the current connection correct; Between Φ +180° ±30°, jailed for current reverse; Other values for the current phase sequence error.

Visible, the calibration method is suitable for the situation that voltage current Angle should not exceed 30 ° (Each phase PF value should be greater than 0.866), and is based on A phase voltage reference direction, therefore should ensure that A phase voltage connection correct; As A phase voltage phase or connect with N, the current test results do not have reference meaning; Like the other two phase with A fault, the test result is correct, but may lead to inconsistent with system parameters.Such as the meter voltage wiring in order for B, C, A, wiring in the system in order for A, B, C, will cause A phase data does not match, need to pay attention to.

The address table 100 h can read wiring test results:

Connection test results:

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 63: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

55

AcuR

ev 1

300

Bit15 Bit14 Bit13 Bit12 Bit11 Bit10 Bit9 Bit8Reserve Phase

Voltage A Missing

Phase Voltage B Missing

Phase Voltage C Missing

Reserve Phase Voltage A wrong

Connecting

Phase Voltage B wrong

Connecting

Phase Voltage C wrong

ConnectingBit7 Bit6 Bit5 Bit4 Bit3 Bit2 Bit1 Bit0

Reserve Phase Current

A Wrong Direction

Phase Current B Wrong Direction

Phase Current C Wrong Direction

Reserve Phase Current

A Wrong Connecting

Phase Current B Wrong

Connecting

Phase Current C Wrong

Connecting

Can also through the LCD to display test results:

The first screen in the entire information mode voltage test results, the format for "UXXXXXX",Where X represents the number "1" or "0", "0", said the incident was not happened ; "1", said the incident was happened.

From left to right 1 ~ 3 digits said Phase Voltage A Missing, Phase Voltage B Missing , Phase Voltage C Missing, 4 ~ 6 said Phase Voltage A wrong Connecting, Phase Voltage B wrong Connecting,Phase Voltage C wrong Connecting.

The second screen in the entire information mode voltage test results, the format for "IXXXXXX",Where X represents the number "1" or "0", "0", said the incident was not happened; "1", said the incident was happened.

From left to right 1 ~ 3 digits said Phase Current A Wrong Direction,Phase Current B Wrong Direction,Phase Current C Wrong Direction ,4 ~ 6 said Phase Current A Wrong Connecting,Phase Current B Wrong Connecting,Phase Current C Wrong Connecting.

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 64: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

56

AcuR

ev 1

300

4.9 Meter Information

Available meter type, hardware version, software version, release date, serial number and other basic informationas well as real-time clock ,load, connection test results and seal condition, etc through the meter’s information interface

Figure 4-10 Meter Information Display

4.10 Sealing function

AcuRev1300 series meters support sealing function. When the sealing is open, the read& write operation is not limited.When the sealing is closed, the read operation is not limited.Sealing function is not allowed write operation, including communication and key change.

From 209H, we could know the user’s content that needed to be shield when the sealing is closed. When the sealing is closed, the user-defined nonstandard contend is valid.

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 65: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

57

AcuR

ev 1

300

From 101H, we can see if the sealing state is valid. When the sealing key is invalid, the address displays open sealing state. When the sealing is valid, the address displays closed sealing state, and the corresponding content would be shield.

209H Sealing optional content

Bit0: TOU setting sealing or not

Other bits are reserved

1:enable

0:disable

Note: The contents of the following table to play "√" address, communications, key exception write operation will return an error code 02H. And you can not change the corresponding content.

Seal standard content:

Address Parameter description Communication Key 203H Pulse quantity choice √ √204H Demand calculation √ -205H Demand calculation cycle √ -206H Slip the time demand calculation √ -207H Reactive power calculation method √ √208H VAR/PFstatute √ -209H Seal the optional content √ -213H Remove electric meter data (except

the data on removal of demand)√ -

216H Measuring side to choose √ √217H Connection mode √ √218H CT2 √ √219H CT1 √ √220H CTN √ -221H PT2 √ √

222H~223H PT1 √ √

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 66: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

58

AcuR

ev 1

300

224H The pulse constant √ √225H The pulse width √ √226H Electricity show decimal digits √ √

Energy :

Modbus address (HEX) Parameter description Communication Key 900H-901H Total Active Energy √ --902H-903H Total Active Energy tariff 1 √ --904H-905H Total Active Energy tariff 2 √ --906H-907H Total Active Energy tariff 3 √ --908H-909H Total Active Energy tariff 4 √ --90AH-90BH Net Active Energy √ --90CH-90DH Net Active Energy tariff 1 √ --90EH-90FH Net Active Energy tariff 2 √ --910H-911H Net Active Energy tariff 3 √ --912H-913H Net Active Energy tariff 4 √ --914H-915H Import Active Energy √ --916H-917H Import Active Energy tariff 1 √ --918H-919H Import Active Energy tariff 2 √ --91AH-91BH Import Active Energy tariff 3 √ --91CH-91DH Import Active Energy tariff 4 √ --91EH-91FH Export Active Energy √ --920H-921H Export Active Energy tariff 1 √ --922H-923H Export Active Energy tariff 2 √ --924H-925H Export Active Energy tariff 3 √ --926H-927H Export Active Energy tariff 4 √ --928H-929H Total Reactive Energy √ --92AH-92BH Total Reactive Energy tariff 1 √ --92CH-92DH Total Reactive Energy tariff 2 √ --92EH-92FH Total Reactive Energy tariff 3 √ --930H-931H Total Reactive Energy tariff 4 √ --932H-933H Net Reactive Energy √ --

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 67: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

59

AcuR

ev 1

300

934H-935H Net Reactive Energy tariff 1 √ --936H-937H Net Reactive Energy tariff 2 √ --938H-939H Net Reactive Energy tariff 3 √ --93AH-93BH Net Reactive Energy tariff 4 √ --93CH-93DH Import Reactive Energy √ --93EH-93FH Import Reactive Energy tariff 1 √ --940H-941H Import Reactive Energy tariff 2 √ --942H-943H Import Reactive Energy tariff 3 √ --944H-945H Import Reactive Energy tariff 4 √ --946H-947H Export Reactive Energy √ --948H-949H Export Reactive Energy tariff 1 √ --94AH-94BH Export Reactive Energy tariff 2 √ --94CH-94DH Export Reactive Energy tariff 3 √ --94EH-94FH Export Reactive Energy tariff 4 √ --950H-951H Apparent Energy √ --

Sealing nonstandard content test

1) When the TOU related is valid, the TOU related content need to be shield:

Address Parameter Communication Key300H clock: year √ √301H clock: month √ √302H clock: date √ √303H clock: hour √ √304H clock: minute √ √305H clock: second √ √306H clock: week √ √

Note: When the sealing is closed, it could be changed when the meter’s change time and current operation time is within 5 minutes.

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 68: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

60

AcuR

ev 1

300

Address Parametric description Communication KeyTOU related parameters

402H-40EH Time-division energy setting parameter 1 √ --420H-5F3H Time-division energy setting parameter 2 √ --Daylight Saving Time related parameters

350H-367H Daylight Saving Time related parameters √ --

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 69: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

61

AcuR

ev 1

300

Chapter 5 Communication

5.1 Modbus Protocol Introduction

5.2 Communication Format

5.3 Application Details

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 70: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

62

AcuR

ev 1

300

This chapter introduced how to use software to manipulate the meter through the communication interface.This chapter content master needs you with MODBUS protocol knowledge reserves and read through the content of all the other chapters in this manual, this product features and applications concept has a more comprehensive understanding.

The chapter’s contents include MODBUS protocol, communication format, application details of AcuRev 1300 series meter.

5.1 Modbus Protocol Introduction

1. Transmission mode

The mode of transmission defines the data structure within a frame and the rules used to transmit data.

Coding System 8 bit

Start bit 1 bit

Data bits 8 bit

Parity No parity / odd parity / even parity

Stop bit 1bit or 2bit

Error checking CRC

2. Frame

When data frame reaches the terminal unit, it goes through the unit via a special "port", theunit removes the data frame's header, reads the data, if there is no error, then it implements the data's task. Afterwards, the unit puts its own data with the acquired header, and sends back the frame to the sender. The response data frame contains: Address, Function, Data and CRC Check. Any error will cause a failure to respond.

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 71: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

63

AcuR

ev 1

300

2.1 Frame Format

Table 5-1 Data Frame Format

2.2 Address Field

The address field is at the start of the frame. It is composed of 1 byte (8 bits), its decimalvalue range is 0-247.

A master addresses a slave by placing the slave address in the address field of the

message. When the slave sends its response, it places its own address in this address fieldof the response to let the master know which slave is responding.

2.3 Function Field

When a message is sent from a master to a slave device the function code field tells theslave what kind of action to perform.

Table 5-2 Function Code

2.4 Data Field

Data field contains the data that terminals need to complete the request and the

Address Function Data Check

8-Bits 8-Bits N x 8-Bits 16-Bits

Code Meaning Action

03 Read data register Obtain current binary of 1 or more register

16 Preset register Set binary value to 1 or more register

01 Reading relay RO status Get the current state of the relay of the RO output (ON/OFF)

05 Control relay RO state Control relay RO output state (ON/OFF)

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 72: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

64

AcuR

ev 1

300

data that terminals respond to the request. This data may be a numerical value, address or setting. For example, Function Code tells the terminal to read one register, Data Field needs to specify reading from which register and how many registers to read.

2.5 Error Check Field

The field allows the error check by master and slave devices. Due to electrical noise andother interferences, a group of data may be changed while transmitting from one location to the other. Error Check ensures master or slave devices do not respond to the distorted data during the transmission, which enhances the system security and efficiency. Error Check uses 16-bit Cyclic Redundancy Check (CRC 16).

3. CRC Check

Every message includes an error checking field which is based on the Cyclical Redundancy Check (CRC) method. The CRC field checks the contents of the entire message. It isapplied regardless of any parity check method used for the individual characters of the message. The CRC field is two bytes long, containing a 16-bit binary value. The CRC valueis calculated by the transmitting device, and is appended to the message.

The receiving device recalculates the CRC value during reception of the message, and compares the calculated value to the actual value it received in the CRC field.

An error will be reported if the two values are not equal. CRC calculation is first started by preloading the whole 16-bit register to 1’s. The process begins by applying successive 8-bitbytes of the message to the current contents of the register. Only the eight bits of data ineach character are used for generating the CRC. Start and stop bits, and the parity bit, donot apply to the CRC.

When generating the CRC, each 8-bit character is exclusive ORed with the register 117contents. The result is shifted towards the least signifcant bit (LSB), with a zero filled

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 73: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

65

AcuR

ev 1

300

intothe most signifcant bit (MSB) position. The LSB is extracted and examined, if the LSB equals to 1, the register is exclusive ORed with a preset, fixed value; if the LSB equals to 0, noaction will be taken. This process is repeated until eight shifts have been performed. Afterthe last (eighth) shift, the next 8-bit byte is exclusive ORed with the register’s current value, and the process repeats for eight more shifts as described above. The final contents of the register, after all the bytes of the message have been applied, is the CRC value. Whenthe CRC is appended to the message, the low-order byte is appended first, followed by the high-order byte.

5.2 Communication Format

This section is for instance will be as far as possible use as shown in table 5-3 format, (as hexadecimal Numbers).Table 5-3 Protocol IIIustration

Addr: Slave device address

Fun: Function Code

Data start reg hi: Start register address, high byte

Data start reg lo: Start register address, low byte

Data #of reg hi: Number of registers, high byte

Data #of reg lo: Number of registers, low byte

CRC16 Hi: CRC high byte

CRC16 Lo: CRC low byte

1. Read Data (Function Code 03H)

Query:

Addr Fun Data start reg hi

Data start reg lo

Data #of regs hi

Data #of regs lo

CRC16Hi

CRC16Lo

06H 03H 00H 00H 00H 21H 84H 65H

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 74: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

66

AcuR

ev 1

300

This function allows users to obtain the device received and recorded data and system data.

Table 5-4 depicts reading 3 meters’ received basic data, total active energy, total active energy tariff1,total active energy tariff2 from 17th slave device. The data type of energy is dward. Each parameter takes 2 bits, and each bit takes 2 bytes. AcuRev 1300 series meters’ total active energy address are 900H, 901H. Total Active Energy tariff 1 address is 902H, 903H. Total Active Energy tariff 2 address is 904H, 905H.

Table 5-4 Query Frame of Reading Energy

Response

The slave device anwsers the master device's query. The response frame contains slavedevice address, function code, data quantity and CRC check.

Table 5-5 is an example response of reading Total Active Energy (1.27kwh), Total Active Energy tariff 2 (1.00kwh), Total Active Energy tariff 2 (0.27kwh). (when the energy data is transmitting, real value= communication value/100).

Table 5-5 Response of Total Active Energy,Total Active Energy tariff 1,Total Active Energy tariff 2

Addr Fun Data start addr HI

Data start addr LO

Data #of regs HI

Data #of regs LO

CRC16HI

CRC16LO

11H 03H 09H 00H 00H 06H C4H C4H

Addr Fun Bytecount

Data1 HI

Data1 LO

Data 2 HI

Data2 LO

Data3 HI

Data3 LO

Data4 HI

Data4 LO

11H 03H 0CH 00H 00H 00H 7FH 00H 00H 00H 64H

Data5 hi

Data5 Lo

Data 6 hi

Data6 lo

CRC16 hi

CRC16 lo

00H 00H 00H 1BH 96H 8DH

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 75: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

67

AcuR

ev 1

300

2. Preset/Reset Multi-Register (Function Code 10H)

Set:

Function code 10H allows users to change multiple registers’ content, including system parameter, time-division energy parameter, initialization energy.

Table 5-6 is an example of It's Total Active Energy is 0.20KWh,Total Active Energy tariff 1 is 0.12KWh,Total Active Energy tariff 2 is 0.08KWh 17th slave device.

Table 5-6 Preset Energy Data

Addr Fun Data start reg HI

Data startreg LO

Data #of reg HI

Data #ofreg LO Byte Count

11H 10H 09H 00H 00H 02H 04H

Value HI Value LO Value HI Value LO CRC HI CRC LO00H 00H 00H 14H CDH 30H

3.Read the relay output state (functional code 01 h)

Query data frames:

Query data frame, the host to send data from the machine frame.01 function allows the user to obtain the specified address from the machine5.2 the Modbus protocol communication application format explanation of relay output state ON/OFF (1 = ON, 0 = OFF), in addition to from the machine address and functional domains, still need to be in the data field contains a data frame will be read by the initial address and number of relay to read.

Table 5-7 Reading Relay Output State of Querying Data Frames

Addr Fun Data start reg HI

Data startreg LO

Data #of reg HI

Data #ofreg LO

CRC16HI

CRC16 LO

11H 01H 00H 00H 00H 02H BFH 5BH

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 76: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

68

AcuR

ev 1

300

The response data frames:

Response data frames, respond to the host data from the machine frame. Include address, function code, the amount of data from the machine and CRC error checking, and packet in each relay occupy a (1 = ON, 0 = OFF), the first byte of the lowest for addressing to relay value, the rest in the back.As shown in table 5-5 for instance relay output state response.

Addr Fun Byte count Data CRC16HI

CRC16 LO

11H 01H 01H 02H D4H 89H

The Data byte content

Table 5-8 Read the State of theRelay Response Data

7 6 5 4 3 2 1 00 0 0 0 0 0 1 0

MSB LSB(Relay 1 = OFF , Relay 2=ON)

3.Control relay output (functional code 5 h)

Query data frames:

The data frame to set up an independent relay is ON or OFF.Data FF00H will check relay for state, while 0000 h will set the relay for the OFF state; All other values are ignored, and shall not affect the relay state.

The following example is a request from machine set the relay 1 to 17 ON state.

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 77: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

69

AcuR

ev 1

300

Table 5-9 Independent Control Relay Query

Addr Fun DO addrHI

DO addrLO

Value HI

ValueLO

CRC16HI

CRC16 LO

11H 05H 00H 00H FFH 00H 8EH AAH

The response data frames:

Is a normal response to this command request after the relay state changes back to receive data.

Table 5-10 Independent Relay Control Response Response

Addr Fun DO addrHI

DO addrLO

Value HI

ValueLO

CRC16HI

CRC16 LO

11H 05H 00H 00H FFH 00H 8EH AAH

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 78: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

70

AcuR

ev 1

300

5.3 Application Details

1. Data Type

"Bit"is binary value;

"Word" is 16-bit unsigned integer, using one register address, 2 bytes. The data range is0-65535.

"int16"is 16-bit signed integer, using one register address, 2 bytes. The data range is -32768-32767.

"dword"is 32-bit unsigned integer, using two register addresses, high bytes followed by low bytes, using 4 bytes in total. The data range is 0-4294967295;

"int32"is 32-bit signed integer, using two register addresses, 2 bytes. The data range is -32768-32767.

"float"is single precision floating point, using two register addresses.The data

range is -2147483648~2147483647.

2. The relationship between communication value and real value

The meter's communication value does not always equal the real value. There is a

conversion relationship between them. It is very important to be aware of the parameterrelationship when users design a communication software, otherwise the result may beincorrect.

Table 5-11 The relationship between communication value and real value

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 79: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

71

AcuR

ev 1

300

Parameter Relationship UnitSystem Parameter, Status, Parameter

The communication value equals the real value

No Unit

Real-time Clock, Timestamp The communication value equals the real value

No Unit

Electrical measurement parameters

Used with the scaling factor f of the measurement parameters

Electrical measurement parameters' unit

PT1, PT2 The actual value is equal to the communication / 10

No Unit

Meter run time The actual value is equal to the communication / 100

Unit: hours

Load running time The actual value is equal to the communication / 100

Unit: hours

3. Parameter address table

Model 1,2,3,4means AcuRev1301, AcuRev1302, AcuRev1303, AcuRev1304.

Read only block

03H- read command.

Table 5-12 Meter Running State Display

MODBUS address Parameter description

Data type

Access Property Range Default Model Register

numberHEX Decimal

100H 256 The Result of Wiring Check word R

Refer to Appendix “The Result of Wiring Check”

1, 23, 4 1

101H 257 Seals status word R 0x0A: Seal sealedOthers: Seal opened

1, 23, 4 1

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 80: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

72

AcuR

ev 1

300

System parameter district

System parameter decides the device’s working mode.10H- read command03H- write command

Table 5-13 System Parameters address table

MODBUS address Parameter

descriptionData type

Access Property Range Default

value Model Register number

HEX Decimal200H 512 Meter Address word R/W 1-247 1 1~4 1

201H 513 RS485 Baud Rate word R/W 1200; 2400; 4800; 9600; 19200; 38400 19200 2~4

202H 514 RS485 Parity Bit Setting word R/W

0: Even parity; 1: Odd parity 2: No parity, Stop Bit 23: No parity, Stop Bit 1

3 2~4 1

203H 515 Impulse Choice word R/W 0: Active Power1: Reactive Power 0 2~4 1

204H 516Demand

Calculation Method

word R/W

0: Sliding Window;1: Fixed Window;2: Rolling Window3: Thermal

0 2~4 1

205H 517 Demand Calculation Period word R/W 1-30 minutes 15 2~4 1

206H 518Demand

Calculation Slipping Time

word R/W 1-30minutes 1 2~4 1

207H 519Reactive Power

Calculation Method

word R/W0: True (sinusoidal);1: Generalized (harmonics present)

0 2~4 1

208H 520 VAR/PF Convention word R/W 0:IEC; 1:IEEE 0 2~4 1

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 81: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

73

AcuR

ev 1

300

209H 521 Sealed Parameters Selection word R/W

Bit0:TOUSet is Sealed or NotBit1-Bit5: 01: valid of corresponding Selection;0: invalid of corresponding selection

0 2~4 1

20AH 522Communication Revise Operation

Authorityword R/W

0x02: Meter Reset, Event Reset, write Energy Data0x04: write Data(except Energy Data), Demand Peak resetNote: Register Revise needs correct Password, incorrect password is invalid.

0 2~4 1

20BH 523 Password word W

0000-9999Used for revise Communication Operation Authority, verify password when get new password

2~4 1

20CH 524 New Password word W

0000-9999Note: To get new password needs correct current password, incorrect current password is invalid.

2~4 1

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 82: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

74

AcuR

ev 1

300

20DH 525 Meter Data Reset word W

Bit0: Reset Demand Record;Bit1: Reset Event Record;Bit2: Reset System Event Record;Bit3: Reset Meter Opening Record;Bit4: Reset Demand Event;Bit5: Reset Alarm Event;Bit6: Reset Meter Operation Time;Bit 7: Reset Time of Meter Operation with LoadBit8: Reset Meter Record (Reset energy record, demand peak and happening time record, system event record, etc )0: Reset1: NONote: reset no valid without Communication Revise Operation Authority

2~4 1

20EH 526 Optional Display Symbol 1

Please see Appendix “Optional Display Symbol Setting ”

1~4 1

20FH 527 Optional Display Symbol 2 1~4 1

210H 528 Parameter Measurement side word R/W 0: primary side;

1:Secondary side 0 1~4 1

211H 529 Wiring Mode word R/W 0:3LN 1:2LL 2:1LL 3:1LN 0 1~4 1

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 83: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

75

AcuR

ev 1

300

212H 530 CT2 Value word R/W 1; 5; 100; 200; 333 According to the order

1~4 1

213H 531 CT1 Value word R/W 1~50000/5~50000 5 1~4 1214H 532 CTN Value word R/W 1~50000/5~50000 5 4 1

215H 533 PT2 Value word R/W

50.0~400.0 (Communication value is 10 times of the real value)

220.0 1~4 1

216H-217H

534-535 PT1 Value word R/W

50.0~999999.9 (Communication value is 10 times of the real value)

220.0 1~4 2

218H 536 Energy Pulse Constant word R/W 1-60000 5000 1~4 1

219H 537 Energy Pulse Width word R/W 20-100 ms 80 1~4 1

21AH 538 Energy display Decimal word R/W 0,1, 2, 3 1 1~4 1

21BH 539 Relay Operating Mode word R/W

0: Relay Control1: Alarm Output 0 2~4 1

21CH 540 connection detection enable word R/W 0:No enable 1:Enable 1 1~4 1

Table 5-14 display programming table

Page No. Setting flag Content Model 1

Model 2

Model 3

Model 4

1 Voltage wiring detection √ √ √ √

2 Current connection detection √ √ √ √

3 Instrument address √ √ √ √

4 RS485 communication baud rate √ √ √

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 84: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

76

AcuR

ev 1

300

5 RS485 communication way of checking √ √ √

6 Hardware version √ √ √ √7 Software version √ √ √ √8 The release date √ √ √ √9 specifications √ √ √ √

10 The input active power √ √ √ √

11-13 1 optional display flag word1 - Bit0

The input active power (A - C) √ √ √ √

14-16 8 optional display flag word1 - Bit7 The voltage (A - C) √ √ √ √

17-19 9 optional display flag word1 - Bit8 Current phase (A - C) √ √ √ √

20 10 optional display flag word1 - Bit9 Line current √ √ √ √

21 11 optional display flag word1 - Bit10 The system active power √ √ √ √

22-24 12 optional display flag word1 - Bit11 Shunt active power √ √ √ √

25 16 optional display flag word1 - Bit15 frequency √ √ √ √

26 17 optional display flag word2 - Bit0 The temperature √ √ √ √

27 20 optional display flag word2 - Bit3 Meter run time √ √ √ √

28 21 optional display flag word2 - Bit4 Load running time √ √ √ √

29 end

Clock (03H: read 10H: write)

Table 5-15 Clock Address

Modbus address Parameter description

Data type R/W Data range Default Model Register

numberHEX Decimal300H 768 clock: year word R/W 2000-2099 2000 2~4 1

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 85: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

77

AcuR

ev 1

300

301H 769 clock: month word R/W 1-12 1 2~4 1302H 770 clock: date word R/W 1-31 1 2~4 1303H 771 clock: hour word R/W 0-23 0 2~4 1304H 772 clock: minute word R/W 0-59 0 2~4 1305H 773 clock: second word R/W 0-59 0 2~4 1306H 774 Week word R/W 0~6

0: Sunday1~6 Monday-

Saturday

6 2~4 1

310H-311H

784-785 Run_tim Uint32 0-999999999(Communication value is 100 times o0f the real value)

1~4 2

312H-313H

786-787 Load_tim Uint32 0-999999999(Communication value is 100 times of the real value)

1~4 2

Daylight saving time setting (03H:read 10H: write)

Table 5-16 Daylight saving time address table

Modbus addressParameter description Data

type R/W Data range Default Model Register numberHEX Decimal

Daylight Saving Time Setting350H 848 DST enable Word R/W 0: disable;

1: enable0 2~4 1

351H 849 DST format Word R/W 0: format 1(fixed date)

1: format 2 (non fixed

date)

0 2~4 1

Format 1: Fixed Date352H 850 DST Start Month Word R/W 1~12 1 2~4 1353H 851 DST Start Day Word R/W 1~31 1 2~4 1354H 852 DST Start Hour Word R/W 0~23 0 2~4 1

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 86: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

78

AcuR

ev 1

300

355H 853 DST Start Min Word R/W 0-59 0 2~4 1356H 854 DST Start Adjust time

(Unit: Minute)Word R/W 1-120 60 2~4 1

357H 855 DST Ending Month Word R/W 1-12 1 2~4 1358H 856 DST Ending Date Word R/W 1-31 1 2~4 1359H 857 DST Ending Hour Word R/W 0-23 0 2~4 135AH 858 DST Ending Minute Word R/W 0-59 0 2~4 135BH 859 DST Ending Adjust

time (Unit: minute)Word R/W 1-120 60 2~4 1

Format 2: Non Fixed Date35CH 860 DST Start Month Word R/W 1~12 1 2~4 135DH 861 DST Start Day Word R/W 0~6

0: Sunday1~6

Monday-Saturday

0 2~4 1

35EH 862 DST Start Week Word R/W 1~5 1 2~4 135FH 863 DST Start Hour Word R/W 0~23 0 2~4 1360H 864 DST Start Minute Word R/W 0~59 0 2~4 1361H 865 DST Start Adjust time

(Unit: minute)Word R/W 1~120 60 2~4 1

362H 866 DST Ending Month Word R/W 1~12 1 2~4 1363H 867 DST Ending Day Word R/W 0~6

0: Sunday1~6

Monday-Saturday

0 2~4 1

364H 868 DST Ending Week Word R/W 1~5 1 2~4 1365H 869 DST Ending Hour Word R/W 0~23 0 2~4 1366H 870 DST Ending Minute Word R/W 0~59 0 2~4 1367H 871 DST Ending Adjust

time (Unit: minute)Word R/W 1~120 60 2~4 1

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 87: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

79

AcuR

ev 1

300

Time of use(TOU) energy

Table 5-17 TOU Energy Address

Modbus addressParameter description Data

type R/W Data range Default Model Register numberHEX Decimal

TOU Parameter

400H 1024 Wrong Parameter Setting 1

See Appendix “Tariff

Parameter Wrong

Information 1”

2~4 1

401H 1025 Wrong Parameter Setting 2

See Appendix “Tariff

Parameter Wrong

Information 1”

2~4 1

402H 1026 Time Zone Selecting Word R/W 1-14 1 2~4 1

403H 1027Schedule Setting:

number of schedules to configure

Word R/W 1-8 2 2~4 1

404H 1028

Segment Setting: number of time segments per

schedule

Word R/W 1-14 2 2~4 1

405H 1029 Tariff: number of tariffs to configure Word R/W 1-4 4 2~4 1

406H 1030 Weekend Setting: Word R/W Bit0-bit6

1: weekdays; 0: weekends

0 2~4 1

407H 1031 Weekend Schedule Word R/W 1-8 1 2~4 1408H 1032 Number of Holidays Word R/W 0-30 0 2~4 1

409H 1033 TOU auto reset fixed date: day (default is 1) Word R/W 1-28 1 2~4 1

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 88: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

80

AcuR

ev 1

300

40AH 1034TOU auto reset fixed date: hour (default is

0)Word R/W 0-23 0 2~4 1

40BH 1035 TOU Enable Word R/W 0: disable; 1: enable 0 2~4 1

40CH 1036 TOU Settings Number Word R/W

0: System Setting

1: Communication

0 2~4 1

40DH 1037 Current number of tariffs to configure Word R/W

1-4Only can change

when TPU Tariff Number

is set as 1, Communication

1 2~4 1

40EH 1038 TOU Settings - reset to factory default Word W Only “0x0A” Valid 2~4 1

TOU Schedule Parameters

420H-422H

1056-1058

Time Zone 1: starting Month, Day, schedule

Table numberR/W 02-01 01 2~4 3

423H-425H

1059-1061

Time Zone 2: starting Month, Day, schedule

Table numberR/W 06-01 02 2~4 3

426H-428H

1062-1064

Time Zone 3: starting Month, Day, schedule

Table numberR/W 10-01 03 2~4 3

429H-42BH

1065-1067

Time Zone 4: starting Month, Day, schedule

Table numberR/W 00-00 00 2~4 3

42CH-42EH

1068-1070

Time Zone 5: starting Month, Day, schedule

Table numberR/W 00-00 00 2~4 3

42FH-431H

1071-1073

Time Zone 6: starting Month, Day, schedule

Table numberR/W 00-00 00 2~4 3

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 89: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

81

AcuR

ev 1

300

432H-434H

1074-1076

Time Zone 7: starting Month, Day, schedule

Table numberR/W 00-00 00 2~4 3

435H-437H

1077-1079

Time Zone 8: starting Month, Day, schedule

Table numberR/W 00-00 00 2~4 3

438H-43AH

1080-1082

Time Zone 9: starting Month, Day, schedule

Table numberR/W 00-00 00 2~4 3

43BH-43DH

1083-1085

Time Zone 10: starting Month, Day, schedule

Table numberR/W 00-00 00 2~4 3

43EH-440H

1086-1088

Time Zone 11: starting Month, Day, schedule

Table numberR/W 00-00 00 2~4 3

441H-443H

1089-1091

Time Zone 12: starting Month, Day, schedule

Table numberR/W 00-00 00 2~4 3

444H-446H

1092-1094

Time Zone 13: starting Month, Day, schedule

Table numberR/W 00-00 00 2~4 3

447H-449H

1095-1097

Time Zone 14: starting Month, Day, schedule

Table numberR/W 00-00 00 2~4 3

44AH-44CH

1098-1100

Schedule Table 1, 1st segment

(Hour, Minute, Tariff Number)

R/W 07:12 01 2~4 3

44DH-44FH

1101-1103

Schedule Table 1, 2nd segment

(Hour, Minute, Tariff Number)

R/W 15:22 03 2~4 3

450H-452H

1104-1106

Schedule Table 1, 3rd segment

(Hour, Minute, Tariff Number)

R/W 00:00 00 2~4 3

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 90: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

82

AcuR

ev 1

300

453H-455H

1107-1109

Schedule Table 1, 4th segment

(Hour, Minute, Tariff Number)

R/W 00:00 00 2~4 3

456H-458H

1110-1112

Schedule Table 1, 5th segment

(Hour, Minute, Tariff Number)

R/W 00:00 00 2~4 3

459H-45BH

1113-1115

Schedule Table 1, 6th segment

(Hour, Minute, Tariff Number)

R/W 00:00 00 2~4 3

45CH-45EH

1116-1118

Schedule Table 1, 7th segment

(Hour, Minute, Tariff Number)

R/W 00:00 00 2~4 3

45FH-461H

1119-1121

Schedule Table 1, 8th segment

(Hour, Minute, Tariff Number)

R/W 00:00 00 2~4 3

462H-464H

1122-1124

Schedule Table 1, 9th segment

(Hour, Minute, Tariff Number)

R/W 00:00 00 2~4 3

465H-467H

1125-1127

Schedule Table 1, 10th segment

(Hour, Minute, Tariff Number)

R/W 00:00 00 2~4 3

468H-46AH

1128-1130

Schedule Table 1, 11th segment

(Hour, Minute, Tariff Number)

R/W 00:00 00 2~4 3

46BH-46DH

1131-1133

Schedule Table 1, 12th segment

(Hour, Minute, Tariff Number)

R/W 00:00 00 2~4 3

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 91: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

83

AcuR

ev 1

300

46EH-470H

1134-1136

Schedule Table 1, 13th segment

(Hour, Minute, Tariff Number)

R/W 00:00 00 2~4 3

471H-473H

1137-1139

Schedule Table 1, 14th segment

(Hour, Minute, Tariff Number)

R/W 00:00 00 2~4 3

474H-49DH

1140-1181

Schedule Table 2, 1st -14th segment

(Hour, Minute, Tariff Number)

R/W 00:00:00 2~4 42

49EH-4C7H

1182-1223

Schedule Table 3, 1st -14th segment

(Hour, Minute, Tariff Number)

R/W 00:00:00 2~4 42

4C8H-4F1H

1224-1265

Schedule Table 4, 1st -14th segment

(Hour, Minute, Tariff Number)

R/W 00:00:00 2~4 42

4F2H-51BH

1266-1307

Schedule Table 5, 1st -14th segment

(Hour, Minute, Tariff Number)

R/W 00:00:00 2~4 42

51CH-545H

1308-1349

Schedule Table 6, 1st -14th segment

(Hour, Minute, Tariff Number)

R/W 00:00:00 2~4 42

546H-56FH

1350-1391

Schedule Table 7, 1st -14th segment

(Hour, Minute, Tariff Number)

R/W 00:00:00 2~4 42

570H-599H

1392-1433

Schedule Table 8, 1st -14th segment

(Hour, Minute, Tariff Number)

R/W 00:00:00 2~4 42

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 92: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

84

AcuR

ev 1

300

59AH-59CH

1434-1436

The 1st special day( Month, Day, schedule

Table number)R/W 03-12 01 2~4 3

59DH-59FH

1437-1439

The 2nd special day( Month, Day, schedule

Table number)R/W 09-10 02 2~4 3

5A0H-5A2H

1440-1442

The 3rd special day( Month, Day, schedule

Table number)R/W 05-02 03 2~4 3

5A3H-5A5H

1443-1445

The 4th special day( Month, Day, schedule

Table number)R/W 00-00 00 2~4 3

5A6H-5A8H

1446-1448

The 5th special day( Month, Day, schedule

Table number)R/W 00-00 00 2~4 3

5A9H-5ABH

1449-1451

The 6th special day( Month, Day, schedule

Table number)R/W 00-00 00 2~4 3

5ACH-5AEH

1452-1454

The 7th special day( Month, Day, schedule

Table number)R/W 00-00 00 2~4 3

5AFH-5B1H

1455-1457

The 8th special day( Month, Day, schedule

Table number)R/W 00-00 00 2~4 3

5B2H-5B4H

1458-1460

The 9th special day( Month, Day, schedule

Table number)R/W 00-00 00 2~4 3

5B5H-5B7H

1461-1463

The 10th special day( Month, Day, schedule

Table number)R/W 00-00 00 2~4 3

5B8H-5F3H

1464-1523

The 11th ~30th special day( Month, Day, schedule Table

number)

R/W 2~4 3*20

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 93: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

85

AcuR

ev 1

300

Rate parameter error information word 1(basic parameter)

Table 5-18 Rate parameter error information word 1

Bit7 Bit6 Bit5 Bit4 Bit3 Bit2 Bit1 Bit01 1 1 1 1 1 1 1

Weekend seg set error

Holiday set error

Holiday no. over

Time zone set error

Time zone no. over

Time seg table no. over

Time seg no. over

Rate no. over

Rate parameter error information word 2(time segment table parameter)

Table 5-19 Rate parameter error information word 2

Bit7 Bit6 Bit5 Bit4 Bit3 Bit2 Bit1 Bit01 1 1 1 1 1 1 1Time seg table 8 error

Time seg table 7 error

Time seg table 6 error

Time seg table 5 error

Time seg table 4 error

Time seg table 3 error

Time seg table 2 error

Time seg table 1 error

Alarm Parameter Setting(Function Code: 03H to Read; 10H to Write)

Table 5-20 Alarm Parameter

Modbus addressParameter description Data

type R/W Data range Default Model Register numberHEX Decimal

700H 1792 Alarm Switch word R/W 1: Enable; 0: Disable

0 2~4 1

701H 1793 Alarm Channel word R/W Bit0~ Bit11: Alarm Channel

0-111: Enable; 0:

Disable

0 2~4 1

702H 1794 Alarm Channel Output

word R/W Bit0~ Bit11: Alarm Channel

0-111: Enable; 0:

Disable

0 2~4 1

703H 1795 Alarm Output Mode word R/W 0: level; 1: pulse 0 2~4 1

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 94: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

86

AcuR

ev 1

300

704H 1796 Pulse Output Time word R/W 50~3000ms (valid with Pulse Output Mode)

1000 2~4 1

Alarm Parameter Setting for the 1st group 705H 1797 Parameter Number Word R/W 0~28 (please see

appendix “Alarm Parameters comparison

table”)

0 2~4 1

706H 1798 Comparing Method Word R/W 0: larger; 1: equal; 2: less

0 2~4 1

707H 1799 Setpoint Value Word R/W 0 2~4 1708H 1800 Delay Time Word R/W 0~3000 (×10ms) 0 2~4 1

Alarm Parameter Setting for the 2nd 12th group709H-73BH

1801-1851

The same as above word R/W 2~4 44

Table 5-21 SunSpec System Information Address

Modbus addressParameter

descriptionData type R/W Data range Default Model Register

numberHEX Decimal

1000H-1001H

4096-4097 SunSpec_ID Uint16 R 0x53756e53 1 1~4 2

1002H 4098 ID Uint16 R 1 1 1~4 11003H 4099 Lenth Uint16 R 65 65 1~4 1

1004H-1013H

4100-4115 Manufacturer string R

Well known value registered with SunSpec for compliance

Accuenergy 1~4 16

1014H-1023H

4116-4131 Model string R

Manufacturer specific value (32 chars)

AcuRev1300 1~4 16

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 95: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

87

AcuR

ev 1

300

1024H-102BH

4132-4139 Options string R

Manufacturer specific value (16 chars)

AcuRev130X 1~4 8

102CH-1033H

4140-4147 Version string R

Manufacturer specific value (16 chars)

H:1.10 S:1.01 1~4 8

1034H-1043H

4148-4163 Serial Number string R

Manufacturer specific value (32 chars)

1~4 16

1044H 4164 Device Address uint16 R/W Modbus device address 1~4 1

1045H 4165 ID Uint16 R

Meter (Single Phase)single phase (AN or AB) meter --201split single phase (ABN) meter –202wye-connect three phase (abcn) meter—203delta-connect three phase (abc) meter --204

1~4 1

1046H 4166 Lenth Uint16 R 105 1~4 1

1047H 4167

Amps (total): Sunspec;

Total Current: Acurev 1300

int16 R 0~9999 A 1~4 1

1048H 4168

Amps Phase A: Sunspec;

Phase A Current: Acurev 1300

int16 R 0~9999 A 1~4 1

1049H 4169

Amps Phase B: Sunspec;

Phase B Current: Acurev 1300

int16 R 0~9999 A 1~4 1

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 96: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

88

AcuR

ev 1

300

104AH 4170

Amps Phase C: Sunspec;

Phase C Current: Acurev 1300

int16 R 0~9999 A 1~4 1

104BH 4171

Current scale factor: Sunspec;CT Ratio: Acurev

1300

sunssf R-3~+5 (used as exponent of a power of 10)

1~4 1

104CH 4172

Voltage LN (average): Sunspec;

Phase Average Voltage: Acurev

1300

int16 R 0~9999 V 1~4 1

104DH 4173

Phase Voltage AN: Sunspec;

Phase A Voltage: Acurev 1300

int16 R 0~9999 V 1~4 1

104EH 4174

Phase Voltage BN: Sunspec;

Phase B Voltage: Acurev 1300

int16 R 0~9999 V 1~4 1

104FH 4175

Phase Voltage CN: Sunspec;

Phase C Voltage: Acurev 1300

int16 R 0~9999 V 1~4 1

1050H 4176

Voltage LL (average): Sunspec;

Line Average Voltage: Acurev

1300

int16 R 0~9999 V 1~4 1

1051H 4177

Phase Voltage AB: Sunspec;

Line AB Voltage: Acurev 1300

int16 R 0~9999 V 1~4 1

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 97: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

89

AcuR

ev 1

300

1052H 4178

Phase Voltage BC: Sunspec;

Line BC Voltage: Acurev 1300

int16 R 0~9999 V 1~4 1

1053H 4179

Phase Voltage CA: Sunspec;

Line CA Voltage: Acurev 1300

int16 R 0~9999 V 1~4 1

1054H 4180 Voltage scale factor: Sunspec; sunssf R -2~2 1~4 1

1055H 4181 Frequency int16 R 45Hz—65Hz 1~4 1

1056H 4182 Frequency scale factor sunssf R -2 1~4 1

1057H 4183

Total Real Power: Sunspec;

Total Active Power: Acurev

1300

int16 R 0~9999 W 1~4 1

1058H 4184

Watts phase A: Sunspec;

Phase A Active Power: Acurev

1300

int16 R 0~9999 W 1~4 1

1059H 4185

Watts phase B: Sunspec;

Phase B Active Power: Acurev

1300

int16 R 0~9999 W 1~4 1

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 98: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

90

AcuR

ev 1

300

105AH 4186

Watts phase C: Sunspec;

Phase C Active Power: Acurev

1300

int16 R 0~9999 W 1~4 1

105BH 4187 Real Power scale factor: Sunspec; sunssf R 0 ~ 4 1~4 1

105CH 4188

AC Apparent Power VA: Sunspec;

Total Apparent Power: Acurev

1300

int16 R 0~9999 VA 1~4 1

105DH 4189

VA phase A: Sunspec;

Phase A Apparent Power: Acurev

1300

int16 R 0~9999 VA 1~4 1

105EH 4190

VA phase B: Sunspec;

Phase B Apparent Power: Acurev

1300

int16 R 0~9999 VA 1~4 1

105FH 4191

VA phaseCA: Sunspec;

Phase C Apparent Power: Acurev

1300

int16 R 0~9999 VA 1~4 1

1060H 4192Apparent Power

scale factor: Sunspec;

sunssf R 0 ~ 4 1~4 1

1061H 4193

Reactive Power VAR: Sunspec;Total Reactive Power: Acurev

1300

int16 R 0~9999 var 1~4 1

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 99: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

91

AcuR

ev 1

300

1062H 4194

VAR phase A: Sunspec;

Phase A Reactive Power: Acurev

1300

int16 R 0~9999 var 1~4 1

1063H 4195

4195 VAR phase B: Sunspec;Phase B Reactive

Power: Acurev 1300

int16 R 0~9999 var 1~4 1

1064H 4196

VAR phase C: Sunspec;

Phase C Reactive Power: Acurev

1300

int16 R 0~9999 var 1~4 1

1065H 4197 Reactive Power scale factor sunssf R 0 ~ 4 1~4 1

1066H 4198 Power Factor int16 R -1000 ~ 1000 1~4 11067H 4199 PF phase A int16 R -1000 ~ 1000 1~4 11068H 4200 PF phase B int16 R -1000 ~ 1000 1~4 11069H 4201 PF phase C int16 R -1000 ~ 1000 1~4 1

106AH 4202 Power Factor scale factor sunssf R -3 1~4 1

106BH-106CH

4203-4204

Total Real Energy Exported: Sunspec

Total Active Energy Exported:

Acurev 1300

acc32 R/W 0-999999999 Wh 2~4 2

106DH-106EH

4205-4206

Total Watt-hours Exported in phase

A: Sunspec;Total Active

Energy Exported in Phase A: Acurev

1300

acc32 R/W 0-999999999 Wh 2~4 2

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 100: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

92

AcuR

ev 1

300

106FH-1070H

4207-4208

Total Watt-hours Exported in phase

B: Sunspec;Total Active

Energy Exported in Phase B: Acurev

1300

acc32 R/W 0-999999999 Wh 2~4 2

1071H-1072H

4209-4210

Total Watt-hours Exported in phase

C: Sunspec;Total Active

Energy Exported in Phase C: Acurev

1300

acc32 R/W 0-999999999 Wh 2~4 2

1073H-1074H

4211-4212

Total Real Energy Imported: Sunspec;

Total Active Energy Imported:

Acurev 1300

acc32 R/W 0-999999999 Wh 1~4 2

1075H-1076H

4213-4214

Total Watt-hours Imported phase

A: Sunspec;Total Active

Energy Imported in Phase A: Acurev

1300

acc32 R/W 0-999999999 Wh 1~4 2

1077H-1078H

4215-4216

Total Watt-hours Imported phase B:

Sunspec;Total Active

Energy Imported in Phase B: Acurev

1300

acc32 R/W 0-999999999 Wh 1~4 2

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 101: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

93

AcuR

ev 1

300

1079H-107AH

4217-4218

Total Watt-hours Imported phase

C: Sunspec;Total Active

Energy Imported in Phase C: Acurev

1300

acc32 R/W 0-999999999 Wh 1~4 2

107B 4219

TotWh_SF: Sunspec;

CT ratio X PT ratio: Acurev 1300

sunssf R -3 ~ 0 1~4 1

107CH-107DH

4220-4221

Total VA-hours Exported: Sunspec;

Total Apparent Power Exported:

Acurev 1300

acc32 R/W 0-999999999 VAh 3~4 2

107EH-107FH

4222-4223

Total VA-hours Exported phase A:

Sunspec;Total Apparent

Power Exported in Phase A: Acurev

1300

acc32 R/W 0-999999999 VAh 3~4 2

1080H-1081H

4224-4225

Total VA-hours Exported phase B:

Sunspec;Total Apparent

Power Exported in Phase B: Acurev

1300

acc32 R/W 0-999999999 VAh 3~4 2

1082H-1083H

4226-4227

Total VA-hours Exported phase C:

Sunspec;Total Apparent

Power Exported in Phase C: Acurev

1300

acc32 R/W 0-999999999 VAh 3~4 2

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 102: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

94

AcuR

ev 1

300

1084H-1085H

4228-4229

Total VA-hours Imported: Sunspec;

Total Apparent Power Imported:

Acurev 1300

acc32 R/W 0-999999999 VAh 2~4 2

1086H-1087H

4230-4231

Total VA-hours Imported phase

A: Sunspec;Total Apparent

Power Imported in Phase A: Acurev

1300

acc32 R/W 0-999999999 VAh 2~4 2

1088H-1089H

4232-4233

Total VA-hours Imported phase B:

Sunspec;Total Apparent

Power Imported in Phase B: Acurev

1300

acc32 R/W 0-999999999 VAh 2~4 2

108AH-108BH

4234-4235

Total VA-hours Imported phase

C: Sunspec;Total Apparent

Power Imported in Phase C: Acurev

1300

acc32 R/W 0-999999999 VAh 2~4 2

108CH 4236

TotVAh_SF: Sunspec;

CT ratio X PT ratio: Acurev 1300

sunssf R -3 ~ 0 2~4 1

108DH-108EH

4237-4238

Total VAR-hours Imported Q1:

Sunspec;acc32 R/W 0-999999999 varh 2~4 2

108FH-1090H

4239-4240

Total VAR-hours Imported Q1

phase Aacc32 R/W 0-999999999 varh 2~4 2

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 103: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

95

AcuR

ev 1

300

1091H-1092H

4241-4242

Total VAR-hours Imported Q1

phase Bacc32 R/W 0-999999999 varh 2~4 2

1093H-1094H

4243-4244

Total VAR-hours Imported Q1

phase Cacc32 R/W 0-999999999 varh 2~4 2

1095H-1096H

4245-4246

Total VAR-hours Imported Q2 acc32 R/W 0-999999999 varh 2~4 2

1097H-1098H

4247-4248

Total VAR-hours Imported Q2

phase Aacc32 R/W 0-999999999 varh 2~4 2

1099H-109AH

4249-4250

Total VAR-hours Imported Q2

phase Bacc32 R/W 0-999999999 varh 2~4 2

109BH-109CH

4251-4252

Total VAR-hours Imported Q2

phase Cacc32 R/W 0-999999999 varh 2~4 2

109DH-109EH

4253-4254

Total VAR-hours Exported Q3 acc32 R/W 0-999999999 varh 2~4 2

109FH-10A0H

4255-4256

Total VAr-hours Exported Q3

phase Aacc32 R/W 0-999999999 varh 2~4 2

10A1H-10A2H

4257-4258

Total VAr-hours Exported Q3

phase Bacc32 R/W 0-999999999 varh 2~4 2

10A3H-10A4H

4259-4260

Total VAr-hours Exported Q3

phase Cacc32 R/W 0-999999999 varh 2~4 2

10A5H-10A6H

4261-4262

Total VAr-hours Exported Q4 acc32 R/W 0-999999999 varh 2~4 2

10A7H-10A8H

4263-4264

Total VAr-hours Exported Q4

phase Aacc32 R/W 0-999999999 varh 2~4 2

10A9H-10AAH

4265-4266

Total VAr-hours Exported Q4

phase Bacc32 R/W 0-999999999 varh 2~4 2

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 104: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

96

AcuR

ev 1

300

10ABH-10ACH

4267-4268

Total VAr-hours Exported Q4

phase Cacc32 R/W 0-999999999 varh 2~4 2

10ADH 4269

TotVArh_SF: Sunspec;

CT ratio X PT ratio: Acurev 1300

sunssf R All the energy use the same SF 2~4 1

10AEH-10AFH

4270-4271 Meter Event Flags bitfield32 R 0 0 1~4 2

10B0H 4272 SunSpec_end_ID: Sunspec; Uint16 0xFFFF 1~4 1

10B1H 4273 SunSpec_end_lenth: Sunspec Uint16 0x0000 1~4 1

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 105: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

97

AcuR

ev 1

300

Maximum demand and time of occurrence(03H:read)

Table 5-22 Maximum demand and time of occurrence address

M o d b u s address(HEX) Parameter description Data

type R/W Data range Default Model Register number

Currentmaximum demand and time of occurrence data1600H-1601H1602H-1604H

Input active power’s total max demand and occur time

FloatDword

R Xx.xxxx kwYYMMDDhhmmss(Second always be 0)

3,4

23

1605H-1606H1607H-1609H

Input active power rate1 max demand and occur time

FloatDword

R Xx.xxxx kwYYMMDDhhmmss 3,4

23

160AH-160BH160CH-160EH

Input active power rate2 max demand and occur time

FloatDword

R Xx.xxxx kwYYMMDDhhmmss 3,4

23

160FH-1600H1611H-1613H

Input active power rate3 max demand and occur time

FloatDword

R Xx.xxxx kwYYMMDDhhmmss 3,4

23

1614H-1615H1616H-1618H

Input active power rate4 max demand and occur time

FloatDword

R Xx.xxxx kwYYMMDDhhmmss 3,4

23

1619H-161AH161BH-161DH

output active power’s total max demand and occur time

FloatDword

R Xx.xxxx kwYYMMDDhhmmss 3,4

23

161EH-161FH1620H-1622H

output active power rate1 max demand and occur time

FloatDword

R Xx.xxxx kwYYMMDDhhmmss 3,4

23

1623H-1624H1625H-1627H

output active power rate2 max demand and occur time

FloatDword

R Xx.xxxx kwYYMMDDhhmmss 3,4

23

1628H-1629H162AH-162CH

output active power rate3 max demand and occur time

FloatDword

R Xx.xxxx kwYYMMDDhhmmss 3,4

23

162DH-162EH162FH-1631H

output active power rate4 max demand and occur time

FloatDword

R Xx.xxxx kwYYMMDDhhmmss 3,4

23

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 106: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

98

AcuR

ev 1

300

1632H-1633H1634H-1636H

Input reactive power’s total max demand and occur time

FloatDword

R Xx.xxxx kvarYYMMDDhhmmss 3,4

23

1637H-1638H1639H-163BH

Input reactive power rate1 max demand and occur time

FloatDword

R Xx.xxxx kvarYYMMDDhhmmss 3,4

23

163CH-163DH163EH-1640H

Input reactive power rate2 max demand and occur time

FloatDword

R Xx.xxxx kvarYYMMDDhhmmss 3,4

23

1641H-1642H1643H-1645H

Input reactive power rate3 max demand and occur time

FloatDword

R Xx.xxxx kvarYYMMDDhhmmss 3,4

23

1646H-1647H1648H-164AH

Input reactive power rate4 max demand and occur time

FloatDword

R Xx.xxxx kvarYYMMDDhhmmss 3,4

23

164BH-164CH164DH-164FH

output reactive power’s total max demand and occur time

FloatDword

R Xx.xxxx kvarYYMMDDhhmmss 3,4

23

1650H-1651H1652H-1654H

output reactive power rate1 max demand and occur time

FloatDword

R Xx.xxxx kvarYYMMDDhhmmss 3,4

23

1655H-1656H1657H-1659H

output reactive power rate2 max demand and occur time

FloatDword

R Xx.xxxx kvarYYMMDDhhmmss 3,4

23

165AH-165BH165CH-165EH

output reactive power rate3 max demand and occur time

FloatDword

R Xx.xxxx kvarYYMMDDhhmmss 3,4

23

165FH-1660H1661H-1663H

output reactive power rate4 max demand and occur time

FloatDword

R Xx.xxxx kvarYYMMDDhhmmss 3,4

23

1664H-1665H1666H-1668H

apparent power total max demand and occur time

FloatDword

R Xx.xxxx kvarYYMMDDhhmmss 3,4 2

31669H-166AH166BH-166DH

A phase current max demand and occur time

FloatDword

R Xx.xxxx kvarYYMMDDhhmmss 3,4 2

3166EH-166FH1670H-1672H

B phase current max demand and occur time

FloatDword

R Xx.xxxx kvarYYMMDDhhmmss 3,4 2

3

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 107: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

99

AcuR

ev 1

300

1673H-1674H1675H-1677H

C phase current max demand and occur time

FloatDword

R Xx.xxxx kvarYYMMDDhhmmss 3,4 2

31678H-1690H reserved

Event logging (03H:read)

Table 5-23 Event logging

Modbus address Parameter description

Data type R/W Data range Default Model Register

numberHEX Decimal

1 D 0 0 H -1D01H 7424-7425

Total times of Event Reset (Total Reset and Each Parameter Reset)

word R 0~0xFFFFFFFF 2~4 2

Last Event Reset Record

1 D 0 2 H -1D04H 7426-7428

Event Reset Happening Time

word R YY/MM/DD/hh/mm/ss 2~4 3

1D05H 7429 Event Reset Marking Code word R

1: Reset Event Record;2: Reset Demand Record;3:Reset Meter Opening Record;4: Reset Alarm;5: Reset Meter Operation Time;6:Reset Time of Meter Operation with Load;

2~4 1

Last 2nd Event Reset Record1 D 0 6 H -1D09H 7430-7433 2~4 8

Last 3rd Event Reset Record1D0AH-1D0DH 7434-7437

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 108: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

100

AcuR

ev 1

300

Programming record

Table 5-24 Programming record address

Modbus address Parameter description

Data type R/W Data range Default Model Register

numberHEX Decimal1A00H-1A01H

6656-6657

total programming

time

Dword R 0-9999992~4

2

last time programming record1A02H-1A04H

6658-6660

occur time word R YYMMDDhhmmss 2~4 3

1A05H 6661 programming event flag

word R 2~4 1

last 2nd time –last 3rd time1A06H-1A0DH

6662-6669 2~4 8

Note*:System Event Marking:01: Meter Address Change 02: RS485 Parameter Change (including Baud Rate and Parity bit setting ) 03: Energy Pulse Setting 04: Demand Parameter Setting(calculation method, demand period, slipping time) 05: Reactive power calculation method 06: VAR/PF Convention 07: Date and Time Setting 08: Measure side change 09: Wiring Mode 10: CT or PT change 11: Pulse Constant and Pulse Width 12: Decimal Digits 13: RO Output Mode 14: Alarm Setting Parameter100: Energy Value Base 101: TOU Parameter Setting102: Daylight Saving Time 103: Trend Record104: Alarm set parameters change

Demand clearance event

Table 5-25 Demand clearance address

Modbus address Parameter description

Data type R/W Data range Default Model Register

numberHEX Decimal

1B00H-1B01H 6912-6913

Total Times of Demand

Resetword R 0~0xFFFFFFFF 2~4 2

last time demand clearance record

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 109: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

101

AcuR

ev 1

300

1B02H-1B04H 6914-6916 occur time word R YYMMDDhhmmss 2~4 3

last 2nd -3rd time1B05H-1B0AH 6917-6922 2~4 6

Open cover record

Table 5-26 Open cover record address

Modbus address Parameter description Data type R/W Data range Default Model Register

numberHEX Decimal1C00H-1C01H

7168-7169

total open cover time word R 0-999999 2~4 2

last time open cover record1C02H-1C04H

7170-7172 occur time word R YYMMDDhhmmss 2~4 3

1C05H-1C07H

7173-7175 end time word R 2~4 3

last 2nd -3rd time1C08H-1C13H

7176-7187 2~4 12

Event clearance

Table 5-27 Event clearance address

Modbus addressParameter description Data

type R/W Data range Default Model Register numberHEX Decimal

1D00H-1D01H

7424-7425

total event clearance time word R 2~4 2

last time event clearance record1D02H-1D04H

7426-7428 occur time word R YYMMDDhhmmss 2~4 3

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 110: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

102

AcuR

ev 1

300

1D05H 7429 event clearance data flag word R

1 : c l e a r t h e p r o g r a m m i n g records2: clear demand records3: clear open cover records

2~4 1

last 2nd -3rd time1D06H-1D0DH

7430-7437 2~4 8

Meter clearance event

Table 5-28 Meter clearance address

Modbus address Parameter description

Data type R/W Data range Default Model Register

numberHEX

1E00H-1E01H

7680-7681

total meter clearance

timeword R 0-999999 2~4 2

last time meter clearance record1E02H-1E04H

7682-7684 occur time word R YYMMDDhhmmss 2~4 3

last 2nd -3rd time1E05H-1E0AH

7685-7690 2~4 6

RO control function(01H read,05H write)

RO state read(01H)

Table 5-29 RO control function-01H Read

Modbus address(HEX)

Parameter description Data type R/W Data range Default Model Register

number0000H RO state word R 1:ON 0:OFF 1

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 111: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

103

AcuR

ev 1

300

RO control(05H)

Table 5-30 RO control function-05H Write

Modbus address(HEX)

Parameter description Data type R/W Data range Default Model Register

number

0000H RO control word W FF00: ON 0000: OFF 1

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 112: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

104

AcuR

ev 1

300

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 113: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

105

AcuR

ev 1

300

Appendix

Appendix A Function List

Appendix B Technical Data and Specification

Appendix C Ordering Information

Appendix D Revision History

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 114: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

106

AcuR

ev 1

300

Appendix A Function List

Function AcuRev 1301 AcuRev 1302 AcuRev 1303 AcuRev 1304Bi-directional Energy Measurements

Active Energy

Reactive Energy

Apparent Energy

TOU

Power Demand

Peak Power Demand

Predictive Demand

Current Demand

Peak Current Demand

Voltage

Current

Neutral Current Calculated Calculated Calculated

Residual current CalculatedActive Power

Reactive Power

Apparent Power

Power Factor

Frequency

Clock

Running TIme

Energy Pulse Output

Alarm Output

Alarm event

Relay Output

RS485 Modbus-RTU

Wiring Check

Tempreture

fixed function Optional function Blank: no this function

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 115: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

107

AcuR

ev 1

300

Pulse OutputIsolation voltage 2500VacLoad Voltage 0-25VacLoad current 10mA(max)

Power SupplyWorking Power Supply 100-415Vac,50/60Hz; 100-300Vdc

Power Consumption <2W or <10VA

Appendix B Technical Specifications and Parameters

The transformer connected to the measurement

Parameter Accuracy Resolution Range

Active energy 0.5% 0.1kWh 0-999999.9Reactive energy 0.5% 0.1kvar 0-999999.9Apparent energy 0.5% 0.1kVAh 0-999999.9

Voltage 0.5% 0.1V 175.0V-265.0VCurrent 0.5% 0.001A 100mA-80A

Active power 0.5% 0.1W -80-80kW

Reactive power 0.5% 0.1var -80-80kvarApparent power 0.5% 0.1VA -80-80kVA

Power factor 0.5% 0.001 -1.000-1.000Frequency 0.2% 0.01Hz 50/60

Power demand 0.5% 0.1W/var/VA 80kW/kvar/KVACurrent demand 0.5% 0.001A 80A

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 116: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

108

AcuR

ev 1

300

Environment Working temperature -25-70°CStorage temperature -40-85°C

Relay OutpurLoad Voltage 250Vac30VdcMax Load current 5A(Resistant Load)Isolation voltage 2000Vac(1min)

Action Time 10msMechanical Life 20million timesElectrical Life Above 50,000Times(5A,250Vac,Resistant Load)

Communication RS485Baud Rate 1200-38400Communication protocol Modbus-RTUInfrared Communication Non- contact infrared

Infrared Baud Rate 1200

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 117: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

109

AcuR

ev 1

300

A3: 5A/1AA4: 333mVA5: 200mA/100mA/80mAA6: Rogowski coil

Model AcuRev 1301AcuRev 1302AcuRev 1303AcuRev 1304

Appendix C Ordering Information

Ordering description

AcuRev

Current

0RO1RO

RO

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 118: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

110

AcuR

ev 1

300

Appendix D Revision History

Version Date Description V2.01 20141021 First version V2.02 20150923

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca

Page 119: AcuRev 1300 - PowerMeterStore.ca · 1.1 Meter Overview-----2 1.2 Areas of Application-----3 ... Hotels and Buildings Smart distribution cabinet Smart building system Energy management

111

AcuR

ev 1

300

Shop for Power Metering products online at: 1.800.561.8187www.PowerMeterStore.ca