DOCUMENT NUMBER VOY-CO-FR 28 JULY 1967
VOLUME 5
DATA MANAGEMENT STUDY
APPENDIX G CONTRACTOR DATA PACKAGE
REt lABIL I TY ASSURANCE (RA)
PREPARED BY:
J.B. SILVERWOOD K.R. THOMAS
RE LIAE ILITY ASSURANCE MANAGEMENT VOYAGER SPACECRAFT SYSTEM PROJECT
APPROVED BY:
A ? d A. FRANK, COGNIZANT ENGINEER DATA MANAGEMENT AND CONTROL TASK VOYAGER SPACECRAFT SYSTEM PRO~ECT
PREPARED FOR
JET PROPULSION LABORATORY CALIFORNIA INSTITUTE OF TECHNOLOGY
4800 OAK GROVE DRIVE PASADENA CALIFORNIA
UNDER JPL CONTRACT No. 951 112
G E N E R A L @ E L E C T R I C M I S S I L E A N D S P A C E D I V I S I O N
V a l l e y Forge Space Technology Center
P.O. Box 8555 Philadelphia. Penna. 19101
https://ntrs.nasa.gov/search.jsp?R=19670031089 2020-08-02T14:47:22+00:00Z
' Pi-iECEDjflG PAGE BLANK NOT FILMED. . .
TABLE OF CONTENTS
Section Page
1 INTRODUCTION. . . . . . m . -1-1
2 DATA ITEM LIST/USER MATRE. . . . . . . . . . . . . . . 2-1 3 USER FLOWDIAGRAMS. . . . . . . . . . . . . . . . . . 3-1
4 DATAREQUIREMENT DESCRIPTIONS (DRD'S) . . . . . . . . 4-1
5 DOCUMENTATIONRELATIONSHIPTREES - . . . 5-1
6 DATAITEM PHASING/FREQUENCY . . . . . . . . . . . . . 6-1
\
iii/iv
INTRODUCTION
This appendix presents the Contractor Data Package (Data Item Matrix, Data Requirement
Descriptions, U s e r Flow Diagram, Document Relationship Tree, and Frequency and
Phasing Charts) for Reliability Assurance (RA).
These data include plans, procedures, reports, and related information necessary to
ensure that a system, subsystem, component, o r part will perform its required functions
under defined conditions at a designated time and for a specified operative period. This
category also includes reliability assessment of test results and tests of a statistical
sampling nature.
The complete list of Contractor Data Package appendixes is a s follows:
Appendix A - Appendix B - Appendix C - Appendix D - Appendix E - Appendix F - Appendix G -
Appendix I - Appendix H -
Technical Description and System Engineering (SE)
Planetary Quarantine (PQ)
Manufacturing (MG)
Configuration Management (CM)
Quality Assurance (QA)
Test (TE) and Mission Operations (MP)
Reliability Assurance (RA)
Logistics and Support (LS)
Overall Management (MA), Scheduling (SC), and Manning
and Financial (MF)
Appendix J - Procurement and Contracting (PC)
Appendix K - Data Management (DM)
Appendix L* - Facilities (FA)
Appendix M* - Safety (SA)
Appendix N* - Site Activation for Launch (AL)
Appendix O* - Science (SI)
Appendix P* - Related Project Interfaces (RP)
Appendix Q* - Advanced Missions (AM) * Appendixes L through Q prepared under Contract NAS 7-584
1-1/2
DATA ITEM
NUMBER
RA- 001
RA- 002
RA- 003
RA- 004
RA- 005
RA- 006
RA- 007
1 of 3
DATA ITEM
RE LIABILITY ASSURANCE
DIRECTIVES
*Reliability Action Directives
LISTS
List, Critical and Limited Life Item
List, Failure Rate Data
List, Flight Critical Processes and Practices
List, Parts Application Data
WGS
Log, Problem/Failure Summary
MINUTES
*Minutes, Failure Analysis Review Board (FARB)
DESCRl PTlON
Formal means of communicating to cognizant groups uals regarding requined actions to be performed in cc with reliability actions or tasks.
Provides identification and description of critical and life items as proposed for use, serves as a design gu selection. test. etc. Provides a common reference for established failure both component or piece par t level, used to dissemim rate data to design and analvsis ~ C J U D S .
Provides identification of flight critical processes anc as a basis for reliability assurance, audits, and appri
Provides application data for par ts contained on apprc Lists, serves as a design guide in selection of items.
Reviews, monitors, and determines the status of the causes of discrepancies and the required corrective ac
* KEY INFORMAL DATA
-
. DATA ITEM LIST/USER MATRIX
APPLICABILITY TO FUNCTIONAL USERS AT CONTRACTOR LEVEL
33: individ- smec tion
limited ide for R
rates on .te failure
~
R
, practices dsals.
I A lved parts
,pecific : tion.
U
U - USE R - REVIEW AUTHORITY A - APPROVAL AUTHORITY
P - 2 - I
PM - PROJECT MANAGER APPROVAL
I PAGE NO. 1 of 3
I
A L I
I
i I
I
APPL I CAB1 L I T Y AT SUBCONTRAC- TOR/VENDOR/SUPPLIER L E V E L S
SI RP
u - -
u u -
- u -
u - -
- - -
NA ~
NA
-
NA -
YA -
NA
APPLICABILITY TO PROJECT BOARDS
- PREPARED BY CONTRACTOR S - PREPARED BY SUBCONTRACTOR/VENDOR/SUPPLIER ( ) - OPTIONAL APPLICATION NA - NOT APPLICABLE
2-1/2 2 - 2 -2
DATA ITEM
NUMBER
RA- 00 8
RA- 009
RA- 010
RA- 011
RA- 012
RA- 0 13
RA- 015
2 of 3
DATA ITEM
RELIABILITY ASSURANCE
PLANS
Plan, Reliability Assessment
Plan, Reliability Program
Plan, Parts Control Program
PROCEDURES
Procedure, Reliability Operating
RECORDS
Card, Parts Data
Chart, Reliability Assurance Control
REPORTS
Report , Failure Review
DESCRI PTlON
Provides a totally integrated definition of the relia requirements and controls to be implemented on bo! and day -by - day basis. !
I !
I
* KEY INFORMAL DATA
1 DATA ITEM LIST/USER MATRIX
1
h milestone
U - USE
APPLICABILITY TO FUNCTIONAL USERS AT CONTRACTOR LEVEL
R - REVIEW AUTHORITY
-
PM
A -
PM
_.
R
U -
-
PM
A - APPROVAL AUTHORITY
MF
PM - PROJECT MANAGER APPROVAL
APPLICABILITY AT SUBCON' TOR/VENDOR/SUPPLIER LE
A L SI
u -
u -
u -
u -
- -
- -
I- 1
-
NA
NA
-
NA
NA
NA -
, C - PREPARED BY CONTRACTOR S - PREPARED BY SUBCONTRACTOR/VENOOR/SUPPLIER
I
0- OPTIONAL APPLICATION NA - NOT APPLICABLE
2-3/4 2-9-z'
I DATA ITEM
RA- 01 6
3 of 3
Report, Summary, Audit and Appraisal
DATA ITEM
RA- 01 8
NUMBER I RELIABILITY ASSURANCE
Report , Reliability Assessment
REPORTS (Cont'd)
RA- 019
I-
Report, Reliability Program status
RA- 014
RA- 017 Report, Design Review
Standard, Rework
lSTANDAR*
fl * K E Y INFORMAL D A T A
DESCRIPTION
Provides a summary of audit and appraisal activitiei processes and practices) which could have a detrime r e l i a b i l i t y e c t s of the program.
Provides periodic growth assessment (evaluation) of as a comparison against reliability design goals.
Provides preestablished control points in the prograi review, hard design review), a complete summary a
Provides description of and allowable limits to rewo: components, equipment.
. D A T A I T E M L I S T / U S E R M A T R I X
I SE
(i. e., critical tal effect on the t
U
systems reliability U
APPLICABILITY TO FUNCTIONAL USERS AT CONTRACTOR LEVEL
R - REVIEW AUTHORITY A - APPROVAL AUTHORITY PM - PROJECT MANAGER APPROVAL ,
PAGE NO. 3 Of 3
APPL ICABl LlTY TO PROJECT BOARDS l P P L l C A B l L l T Y AT SUBCONTRAC- TOR/VENDOR/SUPPLIER L E V E L S
NA
-I- NA
[ ) - OPTIONAL APPLICATION N A - NOT APPLICABLE - PREPARED BY CONTRACTOR S - PREPARED BY SUBCONTRACTOR/VENDOR/SUPPLIER
USER FLOW DIAGRAMS
This section contains User Flow Diagrams, which include functional t racks for those
activities considered to be the major contributors to reliability. The design of these
diagrams shows the progressive nature of most reliability functions when the activity
continues over an extended period of time or when the documents continually become more
complete and complex. Several items a r e influenced by the various program milestones
(e. g. , formal design reviews cease when the design is frozen with the HDR, reliability
program status reports a r e periodic entities, and reliability review and approval of
engineering documentation o r monitoring of manufacturing activities is sporadic in nature).
Key interfaces with the functional groups a r e also shown.
Individual t racks of the major activities a r e a s follows:
a.
b.
C.
d.
e.
f.
g*
System Office - Emphasizes key points of review and control of reliability program.
Reliability Reporting - Highlights major reports provided to the customer. These documents accumulate all important reliability data into a few key reports.
Design Review - Indicates the period over which contractor design reviews will be held. Beyond the HDR, formal reliability reviews will be ineffective. However, design reviews may be called in case of required critical design changes.
Reliability Assessment - Portrays the wide variety of data (reliability analysis reports, performance and failure data, audit and appraisal results, design review results, e tc . ) which wil l contribute to the reliability (probability of success) assessment of the system.
Reliability Analysis - Illustrates how the initial analysis provides apportioned requirements to the elements of the system and shows how the various data i tems a re used to update the analysis of the inherent reliability of the system. The analysis serves as an input to the reliability assessment until the HDR, when the design is essentially frozen.
Pa r t s and Materials - Depicts the growth of activities involved with par ts and materials. Quality Assurance is a major contributor to this program due to the extensive test and vendor control requirements. All parts and materials in the final configuration must appear on the Approved Pa r t s and Materials Lists.
Engineering Standards - Shows the engineering standards effort which is carried out early in the program, i. e. , prior to detailed engineering model design.,
3-1
Figure Number
G-1
G-2
G-3
G-4
Reliability User Flow Diagrams
Reliability Assurance User Flow Diagram - Summary
Reliability Assurance User Flow Diagram - Contract Award Through Preliminary Design Review
Reliability Assurance U s e r Flow Diagram - Preliminary Design Review Through Critical Design Review
Reliability Assurance U s e r Flow Diagram - Critical Design Review Through Joint Flight Acceptance Composite Test
3-3/4
SYSTEM OFFICE
CONTRACTOR 1 I
RELIABILITY REPORTING
DESIGN REVIEW
CONCEPTUAL DESIGN REVIEWS AND REPORTS
* I ------
REUABILITY FLT CRITICAL ASSESSMENT PROC & PRAC-
RA-000 TICES LIST RA-004
----- ------- I REVIEW AND
RELIABILITY ASSESSMENT
XNW2iEERING CATION DATA STANDARLB
CSE REQUElEblEiTS
------------- FAILURE REPORTING 8 ANALYSIS
------ ------ RELIABILITY LIFE TEST
SYSTEM DESIGN
CUSTOMER
( L k )
--- ---I
PROG REVIEW MEETINGS
+
L
DESIW GUIDE- LINES & APPLI- - CATION DATA
PRELIMINARY DESIW
- - -,
CUSTOMER BUY-OFF REPORT
----
RE LIABILITY PROGRAM STA-
PROGRESS TUS REPORTS REPORTS
I---* -------- CONTRACTOR DESIGN REVIEW *
I---- ------- CONDUCT AUDIT AND APPRAISAL ACTlVITIES
ASSESSMENT REPORTS
- 1 I
/ I - I - I I
8
YI --.CY---- I---
BEISABILITY REVIEW AND ANALYSIS
DESIGN, BUILD, TEST SPECIAL BREADBOARD HARDWARE
I BEISABILITY REVIEW AND ANALYSIS
DESIGN, BUILD, TEST SPECIAL BREADBOARD HARDWARE
D
I
REPORT I RA-019 I
t
RELULBILITY PROGRESS REXIRTS
-------- DESIGN
MEETINGS
1 UPDATE
MATIS LISTS
. PARTS QUALIFICATIU4 -
$ P D A T E APPROVED PARTS )JJ I A C ~ V I T Y 1 MATIS LISTS -
A I - , TEST Bhnnu ENGINET--' MODELS
DESIGN, BUILD. TEST - STE 8 ANSEXsE HDW ANALYSIS
1 I
FAILURE RF'C AND ANALYSIS #+- ACTIVITY
-I------ -
I HARDWARE I
PROGRAM STA- TUS REPORTS
---a
1 -T-----
-I---
-t---,
PROG REYIEW MEETINGS
CUSTOMER BW-OFF REPORT
---A RELIABILITY PROGRAM STATUS
1 ----
-I---- -------- APPRAISAL
TEST ENGR MODEL HDW
.-I-
--t-
- I
I
RELIABIUTY REWEWAND . ANALYSB
- 8
7---- -----
I
PLAN-RED- ENGRG MODEL
--I
AND A P P ACTlVlTIE
-1
PARTS
-- I
BUILD A TEST T/ PTM W
TEST - MJ LCE/OSE 1
-1 TEST PLA TPM AND
ENGR MOq
LIFE TEST HWD R E L ~
RELIABILITY PROGRESS RE- VIEW hITGS
I I FMST ARTICLE I
I - I ( CUSTOMER )
BUY-OFF I
-+------- I---
--
E l L-
-- I -
ASSESSMENT REPORTS
------
------- RELIABILITY REVIEW AND ANALYSIS
-------
I FAILURE RPT & ANALYSIS ACTNITY
PROGRESS REVlEW MTGS
RE LU PIIJTY PROGRESS z--- REPORTS
--------
------ BUILD 0 T m T FLIGHT HARW
REVIE PRIME HDW OSE TEST ACTNITIES
&ANALYSIS ACTIVITY
RE LIA PRIME HDW
ACTNITIES * OSE TEST
------ &ANALYSIS ACTIVITY
------ PLAN FLT HDW & CSE T m T
t I CFUTICALT/A I
HDW RELI- A B I W LIFE TEST
4 E F F REPOI
-I--- --
---- MENT FOR FLT READUiESS
----
FAILURE RFT AND ANALYSIS
BILlTY 'EST I'J
LEGEND.
0 ACTIVITY, wlth daacrlption inside
Figure G-1. Reliability User Flow
w Diagram - Summary
7 - G - 4
-EM OFFICE
'COWCRACTOR
W P L E M E N T A T D N
RELlABlLlTY REPORTING AND DESIGN REVIEW
RELL4BIL.W AS8EWMENT AND ANALYSE
PAFIl-a al
MATERIAL
ENGINEERING STANDAFIW AND HARDWARE @NCLUDING C6E)
3-7
& RELUBILTCY ASSURANCE 1 PROGRESS R P T
DESIGN REVIEW OPERATING PROCEDURES
CONCEPTUAL DESIGN REVIEW REPORTS RA-01T
l'llCAL\
SUBCONTRACT cI> PREPARE REVIEW & SYSTEM & APPR SYS &-
SUBSYSTEM
RELIABILTTY SYSTEM OPERATING ' ANALYSB
REL R P T SE-038
PROCEDURES RA-011 t (
I
SUBCONTRACT
PROGRAM PLAN blATL LISTS
suB(1oNTRAm
FAILURE RATE DATA I
PARTS & MAT'L APPLICATIONS DATA I RA-005
E N G M E R I N G DESIGN G~DELINES STDS MANUAL &APPLICATION DATA SE-024
3--8 - t
.-----
UPDATE F L T CRITICAL
PRAC LISTS
A P P D PARTS t MATL L a r S
------ QUIDELINE8
CONDUCT AUDIT & A P m A L ACTIVITIES
UPDATED FAILURE RATE DATA L B T S
PARTS A P P L
RA-005 I CRmICAL & LDIlTED LIFE ITEM
CONDUCT PARTS & MATL APPLICATION 4 REVIEW
PARTS & MATL APPLICATION R E m R P T S
'AUDIT LAPPFASAL REPORTS F L T CRITICAL PROCESS LIST RA-004, 016
UPDATE SYS ANALYSE RELIABILITY 3EPORTS
t CERTIFICATION REPORTS PC-023
n BREADBOARD PARTS & MATL LEITS SE-028, 029
ENQlQ DATA
.-
I
CONDUCT BREADBOARD TEST PLAN BREADBOARD TEST REPORTS TE- IS1 TE-054. 165
3-8-a
D A T E D Q T R L Y R E L I A B I L m RELIABILITY ACTION DJRECTNE & RELIABILIIY ASSURANCE CONTROL CHARTS A F'ROGRESS REPORT & RELIABILDY
N RA-029
~
1
7 \ RA-001, 013
CVNDUCT RE-Y REVIEWS & ANALYSB
-------
~
1
UPDATED R E L ASSEPSMENT R E W R T S &PLAN
RELIABILRY ASSESSMENT I
RA-O18,008
CVNDUCT RE-Y REVIEWS & ANALYSB
R P T RA-018
I
I R P T S SE-OS3
SYSTEMS ANALYSB
\ THRUSE-044
.------
UPDATED PARTS A P P L
RA-005
REVIEW LAPPROVE SYS &SUBSYSTEM 1
i
UPDATE SYS ANAL- UPDATED FXS ANA L y s m R E L R P T O R E L OPERATING R E L OPERATING PROCEDURES PROCEDURES RA-011
R E L RPTS SE-OS8 &
PART QUALIFICATION
RA-012 QA -090 DATA cmm STATUS RPTS 1 A
QUAISPY STATUS REPORT8 MATL LIST SE-028. 029
PARTS 0 MATL SPECS SE-015, 016 RA-012
QA-024
APPROVED VENDOR VENLXJR LLSTS SURVEILLANCE PC-019 RPIS PC-022
UPDATEDDESHjN OUIDELR4ES 6 A P P L DATA SE-008, 009
I
AND TEST LXJCUMENTS 8E-009. 047 TE-054. 165
OUIDELR4ES 6 A P P L DATA SE-008, 009
I
AND TEST LXJCUMENTS 8E-009. 047 TE-054. 165
3 -8 -3
PRE-ART DESIGN RE- 1
STATUSREPORT t-' rcI pRMiRAM \ RA-010 1
Figure G-2. Reliability User Flow Diagram - Contract Award Through Preliminary
Design Review
3 4 - 7
STETEM OFFICE
PRELIMINARY DESIGN
--- CONTRACTOR
RELIABILITI REPORTING AND DESDON REVIEW
RE-Y AESESUENT ANE ANALYSIS
---
PARTS AND MATERIAL
ENGCNEERING STANDAROB AND HARDWARE (INCLUDING Osq
FAILURE REV RPTS
SUMMARY WGS CONDUCT AUDIT & APPRAaAL ACTIWI'Y
DESIGN GUmELINES SE-008. 009 P m T S APPL DATA RA-005
I 1
DESIGN AN4LY6B REPORTS SE-035 THRU SE-044
MODEL PARTS
CONDUCT RELIABILITY REVIEW &ANAL
I I I
PARTS SCREENING REQT SE-015
PARTS QUAI.IFICATION- DATA C A R E STATUS RPT RA-012 QA-030
/
! ,.--------e
I I
FAB 0 TEST ENGRGMODEL HARDWARE
TEST PLAN EM TEST
TEST F U N P E )
FAILURE REPORTING I ANALYSIS
3- 9
c
I UPDATE I RELIhBILRY
STATW RPT -019
I
PDATED APPD ’ARTS k MATL LET3
REVIEW ENGRG
1 I ’ I CONDUCT REL REVIEW DESIGN ANALPS5 Lncu-
1 I I .- ..
I 1 UPDATED DWOg k SPECS I
L
)A-021
REPORTS MUiUTES
I- ,- I- -
---------- & RELIABILm ASSURANCE CONTROL CHART
DE8C.N REVIEW MEETING
CONDUCT AUDII PREPARE AUDR & APPRALSAL & APPRABAL ACTNPI‘IES REPORTS
PART8 Q MATL LWIE
UPDATED QC. MFG 9 MONPrOR TEST OF SPEC= TEST MODEL HARDWARE I 1 - 1 ’
PRIME HDW REPORT CSE
c-
3-10 - I
STATUS REPORT TE5T REPORTS TE-165
MODIFICATDN &TEST ENGRG MODEL RDW
,----
REVIEW ENWG MODEL OSE & MATL LISTS & SPECS. T m REPORTS
I I I - I ANALYSB DATA 61 REPORTS
DOCUMENTATQN
Figure G-3. Reliability User Flow Diagram - Preliminary Design Review Through
Critical Design Review - 3 -( 0- z
SYSTEM O F F I C E
-D
CRITICAL DESIGN
- CONDUCT AUDIT AND APPRAISAL A C T M T I E S R E P O R T S RA-016
APPRAISAL SUMMAF
----- CONTRACTOR
REVIEW IN'IEG T E S T P L A N - R E L - LIFE T E S T
RELIABILITY REPORTING & DESIGN REVIEW
CONDUCT L I F E T E S T O N ENGRG MODEL HDWARE
-----
RELIABILITY ASSESSMENT & ANA LYSIS
----- PARTS AND MATERIAIS
-----
ENGINEERING STANDARDS & HARDWARE (INCLUDING O S q
/ RELIABILITY ACTION DIRECTIVES & RELIABI ASSURANCE CONTROL CHARTS RA-001, 013
SCREENING
------- Q C Pi M F G PLANNING DOCUMENTS MG-109 QA-009
MONITOR F A B & T E S T T/A P T M PARTS LIST &
SPECIFICATIONS SE-008, 009, 02'7, 062
P L A N - T/A, P T M HDW TE-001
OSC-MDE & LCE I DESIGN DOCUMENTS I SE-008. 009. 056, 056
OSE - MDE & LCE
REVIEW INTEGRATED T E S T P L A N - OSE
FAILURE REPORTING & ANALYSIS
RELIABILITY LIFE T E S T
3-1 I
RELIA BILITT PROGRAM REVIEW MEETING
UPDATED QTRLY HhLJABlLITY I PROGRESS R P T
I ----------------- SUMMARY WGS REPORTS RA-006. 015
r
TE-165
MATERIAL R E P O R T S
RELIABILITY L I F E T E S T R E P O R T S TE-165
REVIEW T/A P T M T E S T R E W R T S
CERTIFICATION R P T REVIEW OSE/ OSE-MDE & LCE RDW PRIME HDW - TE-165 TEST P I A N
PROBLEM/FAILURE SUMMARY I1)GS RA-006 .
I MINUTES RA-007
FAILURE REVIEW REPORTS RA-015
I - MINUTES RA-007
FAILURE REVIEW Y REPORTS RA-015
t RELIABILITY L I F E TEST REPOR?S TE-165
CONDUCT L I F E T E S T ON CRITICAL T / A HARDWARE
RELIABILITY P R O a A M STATUS
------
)NFIGURATION
w--
-------------------- Y
UPDATED QTRLY RELIABILITY PROGRESS R P T
RELIABILITY ACTIONS DIIIECTIVES & RELIABILITY ASSURANCE CONTROL CHARTS RA-001. 013
/
-------------------- CONDUCT AUDIT
4
AUDIT AND PROBLEM/FAILURE & APPRAISAL APPRAISAL SUMMARY SUMMARY R E P O R T S A C T N I T I E S R E P O R l X RA-016 RA-006
/
- UPDATED RELIABILITY ASSESSMENT R E P O R T S RA-016
Q C Q M F G PLANNING d DOCUMENTS MG-109. QA-009
PARTS LIST & S P E C S
& I E S T FLIGHT HARDWARE
IIARDWARE T E S T R E P O R T S
TESTED CONFIG LIST & DOCUMENT
BOOK & R E P O R T S TE-027, 165 , 1 6 6
SYSTEM T E S T I D G BOOK & R E P O R T S TE-027, 165 , 1 6 6 - ANALYSIS R E P O R T SE-033
NON-CONFORMANCE MATERIAL R E P O R T S
------------------- - CONDUCT L I F E T E S T ON CRITICAL T/A HARDWARE
MINUTES
T E S T REPORT
RELIABILITY PROGRAM STATUS
RELIABILITY ACTIONS DIRECTIVES &RELIABILITY ASSURANCE CONTROL RA-001, 013
RELIABILITY PROGRESS R P T
---------
UPDATED RELIABILITY
-------
ASSESSMENT REPORT
- -, - 7 - - -- -- -
SUMMARY W G RA-006
RELIABILITY PROGRAM STATUS a--- R P T RA-019
FOR F L T READINESS REPORT RA-018
I-------------
LEGEND
ACTIVITY. WITH DESCRIPTION INSlDE
DATA ITEM. WITH TITLE INSIDE 0 -------------
Figure G-4. Reliability User Flow Diagram - Critical Design Review Through Joint
Flight Acceptance Composite Test
Reliability Assurance Data Requirement Descriptions
DRD Number
RA-001
RA-002
RA-003
RA- 004
RA-005
RA-006
RA-007
RA-008
RA-009
RA-010
RA-011
RA-012
RA-013
RA-014
RA-015
RA-016
RA-017
RA-018
RA-019
Title -
*Reliability Action Directives
List, Critical and Limited Life Item
List, Failure Rate Data
List, Flight Critical Processes and Practices
List, Parts Application Data
Log, Problem/Failure Summary
*Minutes, Failure Analysis Review Board (FARB)
Plan, Reliability Assessment
Plan, Reliability Program
Plan, Parts Control Program
Procedure, Reliability Ope rating
Card, Parts Data
Chart, Reliability Assurance Control
Standard, Rework
Report, Failure Review
Report, Summary, Audit and Appraisal
Report, Design Review
Report, Reliability Assessment
Report, Reliability Program Status
* Key Informal Data
4-1/2
GE EXHIBIT DRD RA-001
ORGANIZATION ORIGINATING CODE: REOUl REMENT: RA
~~~ ~
VOYAGER DATA REOUIREMENT DESCRIPTION
OFFICE RESPONSIBLE FOR DRD: CODE DRD PREPARED BY: DATE:
K.R. Thomas 7/28/67
DRD APPROVED BY
DDL N O . F I L E NO
i 1 1 I
TITLE OF OOCUMENT:
*RELIABILITY ACTION DIRECTIVES
lYPE OF CONTROL KIACTION OREFERENCE o INFORMATION
USE OF DOCUMENT This DRD will be used as a formal method of communicating to cognizant groups o r members of the contractors o r subcontractors organization for required actions to be performed in connection with reliability problems o r tasks, to ensure the success of the Relia- bility ro r m irectives will also provide a record and a fask ?or-fofiow-up.
RA-009, Plan, Reliability Program RA-013, Chart, Reliability Assurance Control RA-016, Report, Audit & Appraisal Summary RA-017, Report, Design Review
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
0 GROUP I CLASS I FICATION: 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 N A ~ A DISCREET- - 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY PRO lFrT nlSrRFFT - ---- - -- .--. W UNCLASSI F lED 0 PUBLIC~OMAIN NOFORN
'ORM OF DATA' K IND OF DATA
XI PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 BROCHURE 0 LETTER
0 F I L M (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION Q DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REOUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
REVIEWS AND/OR APPROVALS REOUIRED: (L IST I N ORDER OF SUBMITTAL)
DRAFT DATE
SUBMIT FOR REVIEW TO:
B Y
BY SUBMIT FOR APPROVAL TO
Project Manager
DRGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION
ieliabil i tyA ss uranc t ORGANIZATION RESPONSIBLE 'OR DOCUMENT REPRODUCTlOh
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE
E S T I M A T E D MANHOURS FOR S INGLE PREPARATION
ESTIMATED COST ( $ ) FOR SINGLE PREPARATION
~
FREOUENCY OF ISSUE
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 81-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY M OTHERWIK,AS SPECIFIED
One time REFERENCE DOCUMENTS
TASK OR DRL I T € 7 DRL NO L E V E L NC
NO OF COPIES
15
DATE DA'C. L J E T C U S i R
PUBLICATION DATE
SDR UPDATE ( FREOUEht C Y
OR M I L E S T O N E )
K o t nppl icahl c ESTIMA'EG
EXPIRAT lOh DA'E
APPLICABLE STANDARDS
PREPUBLICATION PROOF DATE
B Y
B Y
GE EXHIBIT DRD RA-001
VOYAGER DATA REaUlREMENT DESCRIPTION - 2ND SHEET
DRD NO.:
RA-00 SPECIAL INSTRUCTIONS'
This DRD is applicable to the prime contractor and principal subcontractors as a method of communicating reliability actions to be taken throughout the period of the contract.
SPECIAL DISTRIBUTION: ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW1
OUTLINE OF CONTENTS:
Although this document will not have a fixed format, it will contain the following minimum requirements :
a. Identity of the area o r item for action b. Mechanism (source) generating requirement for action (i. e . . design reviews) c. Responsibility for accomplishing action d. Schedule for completion e. Step-by-step direction f. Control number g. Authorizing signatures
(CONTINUE ON THIRD SHEET, I F NECESSARY, AND AFFIX TO THIS DRD.1
- 2- J P L 2568-1 CCT 65
DATE DRD APPROVED BY VOYAGER DATA REQUIREMENT DESCRIPTION
DATA CATEGORY
1 I 1 I
TITLE OF DOCUMENT:
I
ORGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE: DRD PREPARED BY: DATE' REOUIREMENT:
RA K.R. Thomas 7/28/67
LET, CRITICAL AND LIMITED LIFE ITEMS
CONTRACT? WD NO.: NO.:
RA-00:
lYPE OF CONTROL OACTION OREFERENCE IP INFORMATIO~
USE OF DOCUMENT: To provide identification of the critical and limited life items used o r proposed for u s e on the Pro- gram, together with data on criticality, limitations and where used information. The list will serve as a guide- line for design, parts o r components selection, test durations, redundancy application, e tc.
QA-020, *Report, Failure Analysis RA-005, List, Par ts Application Data RA-009, Plan, Reliability Program SE-029, List, Approved Parts
INTERRELATIONSHIP WITH OTHER DATA REOUIREMENTS:
OR DOCUMENT REPRODUCTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION
CLASS I FICATION: n cramlo I
DDL NO F I L E NO
- ".."". 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 JPL DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY RPROJECT DISCREET R UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
ORGANIZATION RESPONSIBLE FOR DOCUMENT STONAGE
E S T I M ATE D MAN HOURS FOR S INGLE PREPARATION
ESTIMATED COST ( $ 1 FOR SINGLE PREPARATION
ORM OF DATA: KIND O F DATA:
@ PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN W L IST
0 DRAWING 0 CATALOG 0 LOG
0 F I L M (STATIC OR MOTION) 0 CONTRACT 0 M A N U A L
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 P L A N
0 COMPUTER CARD O R D E R 0 PROCEDURE
0 COMPUTER TAPE 0 REPUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
REVIEWS AND/OR APPROVALS REOUIRED: (L IST IN ORDER OF SUBMITTAL)
- NO OF COPIES
10
Ih:I;RVCT'9s( CJ'LFF
3A'E C Q w-EST9NE
DATE DA'A G i r E T C Lsza
DRAFT DATE
SUBMIT FOR REVIEW TO
B Y
SUBMIT FOR -., U T APPROVAL TO
Manaper. Reliabilitv Assurance
LeliabilityAssurance
FREQUENCY OF ISSUE I PuBLICA'IJN DATE
OR M I L E S T O N E )
R OTHERWIK,AS SPECIFIED
0 81-WEEKLY
0 ANNUALLY
0 QUARTERLY 0 81-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY
0 WEEKLY 0 DAILY
o SEMI-ANNUALLY
One time REFERENCE DOCUMENTS
N P C 250-1
PPPLICABLE STANDARDS
PREPUBLICATION PROOF DATE
B Y
BY
J P L 2566 SCT 65 'Keg Informal Data PAGE I O F 2
GE EXHIBIT DRD RA-002
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
SPECIAL INSTRUCTIONS
This DRD is applicable to the prime contractor and principal subcontractors responsible for the design of subsystem o r components unique to this program.
IRA-00
;PECIAL DISTRIBUTION ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
Critical and limited life item lists will identify all items (components o r parts) used on the Program which are limited to a specified number of operations, o r time period, and which have critical parameters. The list as a minimum shall identify the item by name; common designation; part, drawing, o r model number; manufacturer; where used; and description of the limitation ( i . e . , maximum operating time (hours), number of cycles o r other limitations).
(CONTINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
-2- J P L 2568-1 CCT 65
GE EXHIBIT DRD RA-003
)RGANIZATION ORIGINATING CODE' OFFICE RESPONSIBLE FOR DRD. CODE DRD PREPARED B y 3EOUIREMENT RA K.R. Thomas
VOYAGER DATA REQUIREMENT DESCRIPTION
DATE
7/28b7
~~
DRD APPROVED BY
~~
' ITLE OF DOCUMENT'
LIST, FAILURE RATE DATA
lYPE OF CONTROL OACTION OREFERENCE EXINFDRMATIDN
USE OF DOCUMENT: To provide a common reference for es- ;ablished failure rates on a component and piece part level rhe list is used as a vehicle to record and disseminate failure rate data to design and analysis groups for refer- 3nce in the selection of items with the lowest failure rate
applications, and as an input to reliability NTERRELATIONSH I P WITH OTHER DATA REQUIREMENTS:
2A- 013, Procedure, Testbspection RA-005, List, Par ts Application Data RA-009, Plan, Reliability Program 33-015, Specification, Part ( )
0 GROUP I :LASS IFICATION: 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY RPROJECT DISCREET
UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
ORM OF DATA: KIND OF DATA:
PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETJN w LIST
0 DRAWING 0 CATALOG 0 LOG
0 F I L M (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD OROER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
I
IRGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION
le 1 iabili ty Assuranc c ORGANIZATION RESPONSIBLE 'OR DOCUMENT REPRODUCTlOh
ORGANIZ ATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE:
E S T I MATED MAN HOURS FOR S I N G L E PREPARATION:
ESTIMATED COST ( $ 1 FOR S INGLE PREPARATION:
FREOUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 81-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY m OTHERWISE,AS SPECIFIED
One time
TASK OR D R L I T € SUBTASK: NO.:
DRL NO.: L E V E L NC 7 DDL NO.: F I L E NO. I -~
NO OF COPIES
40 INFORMATION CUTOF
DATE O R MILESTONE
DATE DATA DUE TO USER:
PU B L I CAT I ON DATE:
SDR UPDATE (FREOUENCY
OR MILESTONE) Revise as re-
quired E S T I M A T E D
EXPIRATION DATE
REFERENCE DOCUMENTS.
APPLICABLE STANDARDS
MIL-STD-217
~ _ _ ~
REVIEWS AND/OR APPROVALS REQUIRED' (L IST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO
BY B Y
BY B Y SUBMIT FOR APPROVAL TO
Manager, Reliability Assurance
PAGE I O F 2 J ? L 256P X T 6'
GE EXHIBIT DRD RA-003
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
D R D NO.: SPECIAL INSTRUCTIONS
RA-00: This DRD applies to the prime contractor and to principal subcontractors. The document is to be applicable to designs throughout the system. document, maturing as additional failure rate data is available.
It is to be a growth
SPECIAL DISTRIBUTION: ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
Documents will initially contain failure rate data covering part types on the approved parts list. A s the design stages progress, failure rates will be established at the component level and listed by that designation. the following:
a. Description of part o r component b. Common designation (part, o r drawing number) c. Specification d. Characteristics e. Failure rate (percent per 1000 hours) f. Data source
The list will contain as a minimum
(CONTINUE ON THIRD SHEET, I F NECESSARY, AND AFFIX TO THIS DRD.)
-2- J P L 2568-1 OCT 65
I
i I ,
I I
I I
I I
I I
t I
I i
I
GE EXHIBIT DRD RA-004 DRD APPROVED BY
VOYAGER DATA REOUIREMENT DESCRIPTION
I
IRGANIZATION ORIGINATING CODE: OFFICE RESPONSJBLE FOR DRD: CODE: DRD PREPARED ey: DATE' ?EOUIREMENT.
RA K. R. 'ITLE OF DOCUMENT'
LIST, FLIGHT CRITICAL PROCESSES AND PRACTICES
rYPE OF DOCUMENT: o CONTROL OACTION OREFERENCE w INFORMATION
USE OF DOCUMENT: To provide identification of flight critical processes and practices as a basis for reliability assur- ance audits and appraisals throughout the Program. The list identifies those tasks, which if out of control, would result in sources of unreliability.
NTERRELATIONSH IP WITH OTHER DATA REOUIREMENTS:
MG-009, Plan, Manufacturing QA-009, Plan, Quality Assurance Program RA-009, Plan, Reliability Program RA-011, Procedure, Reliability Operating RA-013, Chart, Reliability Assurance Control :LASS I FICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY B PROJECT DISCREET CX UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFDRN
ORM OF DATA: K IND O F DATA:
aL PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN PI LIST
0 DRAWING 0 CATALOG 0 LOG
0 F I L M (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/D CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
iomas 17/28/237 , , -,
3RGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION
Eeliability Assuranct 0 R G A N I2 AT I 0 N R E SPO N S I B L E :OR DOCUMENT REPRODUCTIOI
ORGAN I2 ATlON RESPONSIBLE FOR DOCUMENT DISTRIBUTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE.
E S T I M ATE D MAN HOURS FOR S I N G L E PREPARATION:
ESTIMATED COST ( $ ) S INGLE PREPARATION:
FREOUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 OUARTERLY 0 81-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY B OTHERWISE,AS SPECIFIED
One time REFERENCE DOCUMENTS:
CATEGORl
RA-00
D R L NO.: L E V E L NO 1 NO OF COPIES
13 INFORMATION CUTOFF
DATE OR MILESTONE
DATE DATA DUE TO USER:
PUBLICATION DATE
SDR - UPDATE (FREOUENCY
OR M I L E S T O N E )
As required E S T I M A T E D
EXPIRATION DATE
APPLICABLE STANGRDS
REVIEWS AND/OR APPROVALS REQUIRED: (L IST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO.
B Y B Y
BY BY SUBMIT FOR APPROVAL TO
Manager, Reliability Assurance
PAGE I O F 2 J P L 256P X T f
GE EXHIBIT DRD RA-004
SPECIAL INSTRUCTIONS:
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
D R D NO.:
RA-004
This DRD is applicable to the prime contractor, and in preparation, would be coordinated with major subcontractors.
SPECIAL DISTRIBUTION: ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DlSTRleUTlON BELOW)
OUTLINE OF CONTENTS:
The list will include those processes and practices which contribute to the reliability of the system and which by audit and appraisal would provide a measure of their accomplishment in terms of reliability. Typical examples of items to be listed include:
a. Vendor rating system b. Problem/failure reporting, analysis system c. Traceability procedures d. Test monitoring; plans
The list will c r o s s r e f < >' t
and procedures. r: published documents used to specify and control the processes
The list is a workinj - 1 1 :.%I 1 ' + wjtl:ii: 1.4-liability assurance. Therefore, specific format is not required.
(CONTINUE ON THIRD SHEET, I F NECESSARY, AN0 AFFIX TO T H I S DRD.)
- 2- JPL 2568-1 OCT 65
DATE DRD APPROVED BY VOYAGER DATA REOUIREMENT DESCRIPTION
DATA CATEGORl
I I 1 I
l l T L E OF DOCUMENT:
3RGANIZATION ORIGINATING CODE OFFICE RESPONSIBLE FOR DRD CODE DRD PREPARED BY REQUIREMENT RA K.R. Thomas
LISTS, PARTS APPLICATION DATA
NO 7/28/e; 7 &4-00:
____ ~~ ~~~
TYPE OF 0 CONTROL OACTION OREFERENCE WINFORMATION
USE OF DOCUMENT To provide a common source of bonafide application data for parts contained on the Approved Parts Lists. It serves as a design guide in selection of items for equipment design, and as a checklist and control docu- ment in the review and assessment of these designs.
RA-009, Plan, Reliability Program Plan RA-012, Card, Par ts Data RA-017, Report, Design Review
SE-029. List. Amroved Parte
NTERRELATIONSH I P WITH OTHER DATA REOUIREMENTS
SE-015, Specification, Par t ( )
1
ORGANIZATION RESWNSIBLE TASK OR FOR DOCUMENT PREPARATION SUBTASK
leliabil ity Assurance
0 GROUP I CLASS I FICATION: 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY I PROJECT DISCREET E UNCLASSI F I ED 0 PUBLIC DOMAIN 0 NOFORN
'ORM OF DATA: KIND OF DATA.
m PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN w LIST
0 DRAWING 0 CATALOG 0 LOG
o FILM (STATIC OR MOTION) o CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REOUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR WIO CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
REVIEWS AND/OR APPROVALS REOUIRED: (L IST I N ORDER OF SUBMITTAL)
DRL 1% NO
ORGANIZATION RESPONSIBLE -OR DOCUMENT REPRODUCTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION
I ORGANIZATION RESPONSIBLE NO OF COPIES
FOR DOCUMENT STOWAGE
DRL NO L E V E L NO
DDL NO F I L E NO
I 35 E S T I M A T E D MANHOURS INFORMATION CUTOFI
FOR S I N G L E PREPARATION' DATE O R MfLESTONE I DATE DATA DUE
TO USER I ESTIMATED COST ( $ ) FOR SINGLE PREPARATION:
FREOUENCY OF ISSUE: PUBLICATION DATE
0 ANNUALLY I 0 SEMI-ANNUALLY 0 OUARTERLY 0 El-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY
k _ S D R UPDATE lFREOUENCY I OR-MILESTONE)
Revise as 0 81-WEEKLY ~
0 WEEKLY 0 DAILY
One tim'e I REFERENCE DOCUMENTS
APPLICABLE STANDARDS
DRAFT DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO
B Y B Y
BY BY SUBMIT FOR APPROVAL TO
Manager , Product Engineer ing
PAGE I O F 2 J?L 256p CXT t
GE EXHIBIT DRD RA-005
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
DRD NO.:
RA-001 SPECIAL INSTRUCTIONS
Prime contractor will be responsible for document preparation, coordination with affected subcontractors, and dissemination of documents. The document will be released as an original issue and updated as additional data becomes available.
iPEClAL DISTRIBUTION ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
This document contains application data for each item covered by the Approved Parts Lists. Format for the different types of items varies depending upon the specific information to be presented. The data shall be of sufficient detail to ensure a clear understanding of content and ultimate achievement of system design goals. A s a guideline document for the applica- tion of parts, the document will include the following:
a. Description of part o r material b. Common designation c. Specification d. General application criteria and constraints e. Conservative design limit data f. Derating data
(CONTINUE ON THIRD SHEET, I F NECESSARY, AND AFFIX TO THIS DRD.)
-2- JPL 2568-1 OCT 65
GE EXHIBIT DRD RA-006
3RGANIZATION ORIGINATING CODE REOUIREMENT RA
~
VOYAGER DATA REQUIREMENT DESCRIPTION
OFFICE RESPONSIBLE FOR DRD CODE DRD PREPARED BY DATE CONTRACT NO K.R. Thomas 7/28/67
DRD APPROVED BY
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION:
DDL NO.: F I L E N O .
I I I I r l T L E OF DOCUMENT:
ESTIMATED COST ( $ 1 FOR SINGLE PREPARATION.
LOG, PROBLEMrnAILURE SUMMARY
DATE DATA DUE TO USER.
USE OF DOCUMENT
To provide a dynamic means of identifying, categorizing and presenting summary data for all open problems and failures experienced in prime equipment and flight- critical OSE.
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
&A-009, Plan, Quality Assurance Program &A-020, *Report, Failure Analysis &A-021, *Report, Nonconforming Material RA-009, Plan, Reliability Program RA-011. Procedure. Reliabilitv Ooerating
0 GROUP I CLASS I FICATION: 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY R PROJECT DISCREET W UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
’ORM OF DATA: KIND OF DATA:
0 PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG Q LOG
0 F I L M (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL 0 REPORT
OTHER 0 ENGINEERING CHANGE c] SCHEDULE ADP Printout PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
REVIEWS AND/OR APPROVALS REWIRED: (L IST I N ORDER OF SUBMITTAL)
DRAFT DATE
SUBMIT FOR REVIEW TO
BY
BY SUBMIT FOR APPROVAL TO
Manager, Reliability A s s u rance
I I IRGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION:
‘OR DOCUMENT REPRODUCTION:
FOR DOCUMEhT STOWAGE
~~
PUBLICATION DATE
PDR
OR MILESTONE)
Quarterly r
FREQUENCY OF ISSUE
0 ANNUALLY 0 SEMI-ANNUALLY PI QUARTERLY 0 81-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY
REFERENCE DOCUMENTS:
N P C 250-1
APPLICABLE STANDARDS:
PREPUBLICATION PROOF D A T E
B Y
e y
*Key Informal Data PAGE I O F 2 J?L 256F 3CT 65
GE EXHIBIT DRD RA-006
VOYAGER DATA REOUIREMENT DESCRIPTION - 2ND SHEET
SPECIAL INSTRUCTIONS' D R D NO.:
RA - OO( The log will be initiated with problems resulting from preliminary design reviews, and failures commencing with engineering model tests, and will be concluded at the end of mission operations. Problems/failures will be listed chronologically with problems being deleted as corrective actions are finalized. Working reports will be developed bi-weekly. Formal printings will be included in quarterly reliability progress reports.
This DRD is applicable to the prime contractor and principal subcontractors which requires operation and testing at the subcontractors facility.
SPECIAL DISTRIBUTION: ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
The Problem/Failure Summary Log is an EDP printout consisting of a chronological listing of all "open prob1ems"and failures experienced on the prime equipment. wil l include pertinent information such as: problem identification (title), problem analysis report number, operationbardware affected, proposed solution, expected completion date. Failure summaries will include coded information such as: item identification (nomenclature), failure report number, failure analysis report number, description of failure, test in which failure occurred, environmental condition at time of failuE, operating mode at the time of failure, class of failure, accumulated operating hours of item, time to recover, apparent cause of failure. implications of composite failures on systems reliability.
Problem summaries
Failure summaries shall be of sufficient scope to permit analysis and
(CONTINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
-2- JF'L 2560-1 OCT 65
L GE EXHIBIT DRD RA-007 ~~ ~ -~
VOYAGER DATA REOUIREMENT DESCRIPTION DRO APPROVED BY
IRGANIZATION ORIGINATING CODE' OFFICE RESPONSIBLE FOR ORD: CODE. DRD PREPARED BY. DATE REOUIREMENT: IRA I I I K.R. Thomas r lTLE OF DOCUMENT:
*MINUTES, FAILURE ANALYSIS REVIEW BOARD (FARB
rYPE OF O°CUMENT: CONTROL OACTION OREFERENCE KI INFORMATION
To provide a detailed report (i. e., minutes) of the Failure Analysis Review Board (FARB) activities including: identification of unresolved Failure Analysis Reports; status of corrective actions; and conclusions, recom- mendations and action items of the FARB.
USE OF DOCUMENT
NTERRELATIONSH I P WITH OTHER DATA REQUIREMENTS:
QA-009, Plan, Quality Assurance Program QA-020, *Report, Failure Analysis QA-021, *Report, Nonconforming Material (NCMR) RA-001, *Reliability Action Directives RA-009. Plan. Reliabilitv Promam :LASS IFICATION: 0 SECRET
~~
0 GROUP I 0 GROUP 2 0 SPECIAL HANDLING
0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 JPL DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY BPROJECT DISCREET a UNCLASSIFIED o PUBLIC DOMAIN ~"NOFORN
ORM OF DATA: K IND O F DATA:
PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 F I L M (STATIC OR MOTION) 0 CONTRACT 0 M A N U A L
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLEURE a MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 P L A N
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REOUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
As suranck ORGANIZATION RESPONSIBLE 'OR DOCUMENT REPRODUCTlOh
ORGAN I2 ATlON RESPONSIBLE FOR DOCUMENT DISTRIBUTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE
E S T I M A T E D MANHOURS FOR S I N G L E PREPARATION.
ESTIMATED COST ( $ ) FOR S INGLE PREPARATION:
FREOUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 OUARTERLY 0 81-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 El-WEEKLY 0 WEEKLY ~~ ~
0 DAILY Q 0THERWISE.AS SPECIFIED
Per each board mtg
DATE
- CONTRACT
NO
TASK OR SUBTASK
D R L NO.:
DDL NO.:
NO OF
20
- DATA
CATEGORY
DRO NO.:
RA-00' D R L ITEP
NO.:
L E V E L NO
F I L E NO
- OPI ES
INFORMATION CUTOFF DATE O R MILESTONE
DATE DATA DUE TO USER
~~ ~~~ ~
PUBLICATION DATE
SDR UPDATE ( FR EOUENCY
OR MILESTONE)
Weekly E S T I M A T E D
EXPIRATION DATE
REFERENCE DOCUMENTS.
NPC 250-1
APPLICABLE STANDARDS
REVIEWS AND/OR APPROVALS REOUIRED: (L IST IN ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO
B Y B Y
BY BY SUBMIT FOR APPROVAL TO
Chairman, Failure Analysis Review Board
KKey Informal Data PAGE I O F 2 .PL 25';" DCT 6 5
GE EXHIBIT DRD RA -007 3-
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
DRD NO.:
RA-00 SPECIAL INSTRUCTIONS'
This DRD is applicable to the prime contractor and principal subcontractors. FARB minutes will be prepared for each session of the board.
jPEClAL DISTRIBUTION: ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
The Failure Analysis Review Board Minutes will contain the following:
1. 2.
3.
4.
5.
6.
Review of open action items from prior meetings. Identification of new failure analysis reports and the corrective actions pending o r completed. Conclusions, recommendations and assigned action items based on an "in depth" evaluation of the failure analysis reports by the board. Concurrence with the analysis and/or corrective action to designate closing a failure analysis report. Identify deficient analysis or corrective action, and cause the report to remain open for further action. Identify members designated to follow-up on open items.
(CONTINUE ON THIRD SHEET, I F NECESSARY, AND AFFIX TO THIS DRD.)
JpL 2568-1 CCT 65 -2 -
DATE DRD APPROVED BY VOYAGER DATA REOUIREMENT DESCRIPTION
DATE CONTRI \CT NO
RGANIZATION ORIGINATING CODE OFFICE RESPONSIBLE FOR DRD CODE DRD PREPARED BY EOUIREMENT R A K.R. Thomas 7/2 8/67
1 I I I
TLE OF DOCUMENT:
DATA CATECORY
DRD No
RA-OOt
PLAN, RE LIABILITY ASSESSMENT OR DOCUMENT REPRODUCTION
IRGANIZATION RESPONSIBLE :OR DOCUMENT DISTRIBUTION
YPE OF rn CONTROL OACTION OREFERENCE INFORMATION
ISE OF DOCUMENT: To provide a description and definition of the methods to be utilized for the periodic assessment of the Reliability of the system, subsystems, and components juring the progress of the Program. The Plan wil l cover ;he utilization of the data generated as it is related to the 3esign and other significant activities of the Program.
DDL NO. F I L E NO
4TERRELATIONSHIP WITH OTHER DATA REOUIREMENTS: QA-021, *Report, Nonconforming Material RA-003. List. Failure Rate Data
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE
3E -008,' Specification, System Performance/Design Re uirements
33-065, Loaook, Engineering TE-001, Plan, Integrated Test
- NO OF COPIES
25
~~~~
LASSIFICATION: 0 SECRET
0 GROUP I 0 GROUP 2 0 SPECIAL HANDLING
0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY g) PROJECT DISCREET XI UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
3RM OF DATA: KIND O F DATATA:
gl PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 F I L M (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE rn PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REOUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
REVIEWS AND/OR APPROVALS REWIRED: [ L I S T IN ORDER OF SUBMITTAL)
DRAFT DATE
SUBMIT FOR REVIEW TO'
B Y
BY SUBMIT FOR APPROVAL TO Pro j ec t Manager
IRGANIZATION RESPONSIBLE 'OR DOCUMENT PREPARATION:
Reliability Assurance I I
)RGANIZATION RESPONSIBLE I D R L NO.: 1 L E V E L NO
FOR SINGLE PREPARATION TO USER
FREPUENCY OF ISSUE'
0 ANNUALLY 0 SEMI-ANNUALLY 0 PUARTERLY 0 BI-MONTHLY n MONTHIV - , . . - . . . . . - . 0 SEMI-MONTHLY 0 81-WEEKLY
OTHERWISE,AS SPECIFIED
0 WEEKLY 0 DAILY
One issue REFERENCE DOCUMENTS:
NPC 250-1 Customer Guideline Document
APPLICABLE STANDARDS:
PREPUBLICATION PROOF DATE
B Y
B Y
Key Informal Data PAGE I O F 2 J P L 256e 3CT 6'
GE EXHIBIT DRD RA-008
VOYAGER DATA REQUIREMENT DESCRIPTION - ZND SHEET
SPECIAL INSTRUCTIONS:
Document is applicable to the prime contractor, and to principal subcontractors, responsible for the design of subsystems, or components unique to this program.
SPECIAL DISTRIBUTION. ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
The Reliability Assessment Plan will provide a description of the techniques, materials (data) and controls to be utilized in the periodic assessment of system, subsystem and components. The plan will define: organizational (functional) responsibilities; identifica- tion of test programs from which performance data, failure data and operating times will be accumulated; description of computer programs for r i sk assessment, and systems modeling techniques for reliability assessment; statistical handling of reliability data; methods of utilizing design review, quality assurance, manufacturing, etc., data; and means of calculating and presenting the assessed reliability of the items.
(CONTINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
JPL 2560-1 OCT 65 -2- I
GE EXHIBIT DRD RA-009 DRD APPROVED BY
VOYAGER OATA REQUIREMENT DESCRIPTION
RGANIZATION ORIGINATING CODE OFFICE RESPONSIBLE FOR DRD CODE DRD PREPARED BY fEOUlREMENT
RA K.R. Thomas DATE
7/2 8/ 67 I I I I
ITLE OF DOCUMENT:
RGANIZATION ORIGINATING CODE OFFICE RESPONSIBLE FOR DRD CODE DRD PREPARED BY fEOUlREMENT
RA K.R. Thomas DATE
7/2 8/ 67
PLAN, RELIABILITY PROGRAM
'YPE OF DOCUMENT: m CONTROL OACTION OREFERENCE INFORMATION
JSE OF DOCUMENT.
Provide a totally integrated definition of the reliability r o g r a m requirements and controls to be implemented In the Program
NTERRELATIONSH I P WITH OTHER DATA REOUIREMENTS:
MA-007, Plan, Project Implementation MG-009, Plan, Manufacturing 2A-009, Plan, Quality Assurance Program 33-038, Report, System Analysis, Reliability TE-001. Plan. Integrated Test :LASS I FICATION: 0 GROUP I
0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY Po PROJECT DISCREET Lo UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
ORM OF DATA: K IND OF DATA:
Po PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 F I L M (STATIC OR MOTION) 0 CONTRACT 0 M A N U A L
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE P L A N
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR WIO CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
C MENT REPARATION: 'OR 8 eyiabifity
Assurance ORGANIZATION RESPONSIBLE 'OR DOCUMENT REPRODUCTlOh
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE:
E S T I M ATE D MAN HOURS FOR S I N G L E PREPARATION:
ESTIMATED COST ( $ ) FOR SINGLE PREPARATION.
FREOUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 81-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 BI-WEEKLY 0 WEEKLY 0 DAILY 1 OTHERWISE,AS SPECIFIED
One issue REFERENCE DOCUMENTS:
A-00s TASK OR D R L ITEh
NO OF COPIES:
75
INFORMATION CUTOFF DATE OR MILESTONE
DATE DATA DUE TO USER
PUBLICATION DATE:
SDR U P DATE ( FR E OU ENCY
OR M I L E STONE)
One time E S T I M A T E 0
EXPIRATION DATE
NASA Publication 250-1 J P L Reliability Guidelines Document JPL /Contract0 rBubcontractor Reliability Operating Procedures
APPLICABLE STANDARDS
REVIEWS AND/OR APPROVALS REQUIRED: (L IST I N ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO
B Y B Y
BY BY SUBMIT FOR APPROVAL TO Project Manager
PAGE I O F 2 J P L 256P X T t
#
GE EXHIBIT DRD RA-009 4-
VOYAGER DATA REOUIREMENT DESCRIPTION - 2ND SHEET
DRO NO.:
RA-00s SPECIAL INSTRUCTIONS:
This DRD is applicable to the prime contractor and to principal subcontractors (i. e., those responsible for design, fabrication and test of subsystems or components unique to the Program).
IPECIAL DISTRIBUTION: ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
The Reliability Program Plan must provide a mutually agreed (i. e. , JPL/contractor major subcontractor) contractually binding, clearly defined Reliability Program requirement which can be effectively implemented within cost and time constraints of the overall Program. It must include a definition of:
a. Reliability organization and its interrelation to customer, in-house, and subcontractor management, and the various other functional operations.
b. Milestone tasks and schedules. c. Reliability deliverable items. d. Reliability activities to be implemented throughout the Program (i. e.,
analysis, design review, test, etc. ) e. Reliability surveillance, monitoring and program Control reWirernmts-
The plan should also include a recognition of potential problem areas and predetermined action alternatives to eliminate o r control the problem should it occur.
(CONTINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
DRD APPROVED BY VOYAGER DATA REQUIREMENT DESCRlPTlON
DATE IRGANIZATION ORIGINATING CODE OFFICE RESPONSIBLE FOR DRD CODE DRD PREPARED BY ?EOUIREMENT R A K.R. Thomas 7/28/67
1 I 1 I
'ITLE OF DOCUMENT:
DATE DATA CATEGOR)
C O N T ~ ~ D N O . -
NO $A-Ol(
PLAN, PARTS CONTROL PROGRAM
I 1
ORGANIZATION RESPONSIBLE TASK OR FOR C MEN? YREPARATION: SUBTASK:
!8eYiabilitv
WE OF OOCUMENT: m CONTROL OACTION OREFERENCE INFORMATION
USE OF DOCUMENT. To provide a definition of the parts control requirements and controls to be implemented on the Pro- gram. Document will be used throughout the Program as a guide for the prime contractor and subcontractor organ- izations to accomplish the requirements defined in NPC 250-1 and as further defined and agreed to by contractor.
D R L 1% NO.:
NTERRELATIONSH I P WITH OTHER DATA REQUIREMENTS:
RA-002, List, Critical and Limited Life Items RA-003, List, Failure Rate Data RA-005, List, Parts Application Data RA-009, Plan, Reliability Program
Assurance ORGANIZATION RESPONSIBLE -OR DOCUMENT REPRODUCTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION
:LASS I FICATION: 0 SECRET
I I DRL NO L E V E L NO
DDL NO.. F I L E NO
~ ~
0 GROUP I 0 GROUP 2 0 SPECIAL HANDLING
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE
E S T I M A T E D MANHOURS FOR S I N G L E PREPARATION
0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY PROJECT DISCREET Q UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFDRN
w NO OF COPIES
75
INFORMATION CUTOF! DATE OR MILESTONE
ORM OF DATA: KIND OF DATA:
XI PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 F I L M (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REOUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
ESTIMATED COST ( $ ) FOR S INGLE PREPARATION:
REVIEWS AND/OR APPROVALS REQUIRED: (L IST I N ORDER OF SUBMITTAL)
DATE DATA DUE TO USER:
DRAFT DATE
SUBMIT FOR REVIEW TO
BY
BY SUBMIT FOR APPROVAL TO Proi ect Manager
FREQUENCY OF ISSUE: PUBLICATION DATE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 OUARTERLY 0 El-MONTHLY 0 MONTHLY
EST I M A T E 0
0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY S OTHERWISE,AS SPECIFIED
One issue REFERENCE DOCUMENTS:
NPC 250-1
J P L Guidelines Document
APPLICABLE STANDARDS.
PREPUBLICATION PROOF DATE
B Y
B Y
PAGE I O F L
GE EXHIBIT DRD RA-010
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
SPECIAL INSTRUCTIONS: bA-010
This DRD is applicable to the prime contractor, and to principal subcontractors responsible €or the design, fabrication and test of subsystems or components unique to this Program.
iPEClAL DISTRIBUTION: (IF DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW)
JF'L 2568-1 OCT 65 -2-
OUTLINE OF CONTENTS:
The Parts Control Program Plan will provide a comprehensive outline of the controls and procedures to be implemented and continued throughout the parts activity period of the Program. A s a minimum the plan will include:
a. b.
d. e. f. €5 h.
C.
Organization responsibilities and management Procedures for fulfilling the requirements of NPC 250-1 Part selection and qualification Supplier/selection and qualification Part specifications and standards Part screening Part derating and application Approved parts list
(CONTINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
GE EXHIBIT DRD RA-011
IRGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR SEQUIREMENT: RA
~~
VOYAGER DATA REQUIREMENT DESCRIPTION
DRD:'COOE: DRD PREPARED ay: DATE'
K.R. Thomas 7h8b7
DRD APPROVED BY
1 I 1 I
'ITLE OF DOCUMENT:
PROCEDURE, RELIABILITY OPERATING
rYPE OF DOCUMENT: IXCDNTROL OACTION OREFERENCE INFORMATION
USE OF DOCUMENT: Procedures will be used by contractors and ;ubcontractors Reliability Organizations in accomplishing ;he Reliability Program. Procedures wil l also be made %vailable to customer and other contractors and subcon- ;ractors to provide information and assistance in the inte- gration of activities of the Reliability Program. NTERRELATIONSH I P WITH OTHER DATA REOUIREMENTS:
RA -009, Plan, Reliability Program
0 GROUP I :LASS I FICATION: 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING
CONFIDENTIAL' 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY PI PROJECT DISCREET m UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
ORM OF DATA: KIND OF DATA:
(x PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 F I L M (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 4 PROCEDURE
0 COMPUTER TAPE 0 REOUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
REVIEWS AND/OR APPROVALS REWIRED: (L IST I N ORDER OF SUBMITTAL)
DRAFT DATE
SUBMIT FOR REVIEW TO
a y
SUBMIT FOR BY
APPROVAL TO:
Manager, Reliability Assurance
I
ORGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION:
3eliabilityAssurance ORGANIZATION RESPONSIBLE 'OR DOCUMENT REPRODUCTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION:
ORGANIZATION RESPONSIBLE FOR WCUMENT STOWAGE
~~
E S T I M A T E D MANHOURS FOR S I N G L E PREPARATION
ESTIMATED F S T ( $ 1 FOR S INGLE PREPARATION.
FREQUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 BI-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 BI-WEEKLY 0 WEEKLY 0 DAILY t OTHERWISE,AS SPECIFIED
One time REFERENCE DOCUMENTS:
N P C 250-1
DATE:
NO.
TASK OR SUBTASK.
- DRL NO.
DDL NO.:
- NO OF
- DATA
CATEGORI
DRD NO.:
%A-01. IRL ITEi
NO.:
.EVEL NO
: ILE NO :
- IPI ES'
15
INFORMATION CUTOFI DATE O R MILESTONE
D A T E D ~ T A DUE TO USER
PUBLICATION DATE.
SDR - UPDATE (FREOUENCY
OR M I L E S T O N E ) A s required
E S T I M A T E D EXPIRATION DATE
APPLICABLE STANDARDS
PREPUBLICATION PROOF DATE
B Y
B Y
J P L 2568 X T 65 PAGE I O F 2
UY -Y*-.I*.YIL Y L I I --a ---
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
~
SPECIAL INSTRUCTIONS:
Procedures covered by this document are applicable to prime contractor and to principal subcontractors coordinated.
DRD NO.:
RA-01:
SPECIAL DISTRIBUTION: ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
The Reliability Operating Procedures will cover the major activities of the reliability program as outlined in the approved reliability program plan and other contractual re- liability items as applicable. The total set of documents will include the policies and procedures associated with the preparation and utilization of the reliability data items as listed for this Program. Where needed, specific subjects may be covered in more detail, e. g. , reliability assessment, reliability analysis, etc.
(CONTINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
-2- J-PL 2568-1 OCT 6:
VOYAGER DATA REQUIREMENT DESCRIPTION
I
3RGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DRD: CODE. DRD PREPARED BY: DATE' REQUIREMENT:
7/28/67 RA K. R. Thomas
DAD APPROVED BY
CONTRACT NO.:
DATE.
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 81-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY
0 WEEKLY 0 DAILY XI O T H E ~ l S E . ~ S SPECIFIED
0 81-WEEKLY
)riginal, plus updates
SDR UPDATE (FREQUENCY
R MI1 FSTI-INFI IPevised as Required
E S T I M A T E D EXPIRATION DATE
r i m OF DOCUMENT:
CARD, PARTS DATA
TYPE OF DOCUMENT: CONTROL OACTION OREFERENCE m INFORMATION
USE OF DOCUMENT:
To provide pertinent data relative to each part used on the Voyager Project.
~~
NTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
RA-009, Plan, Reliability Program RA-019, Report, Reliability Program
SE-029, List, Approved Parts SE-015, Specification, Part ( )
0 GROUP I CLASS I FICATION: 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 o JPL DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY a PROJECT DISCREET m UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
ORM OF DATA: KIND O F DATA.
0 PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 FILM (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REOUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL 0 REPORT
p OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
Preprinted Form PROPOSAL m SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
'OR DOCUMENT REPRODUCTION:
FOR DOCUMENT DISTRIBUTION:
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE.
- DATA
CATEGORY
DRD NO.'
RA-01: D R L l T E l
NO
L E V E L NO
F I L E NO
- OPI ES
E S T I M A T E D MANHOURS INFORMATION CUTOFF FOR S I N G L E PREPARATION' DATE O R MILESTONE I
DATE DATA DUE TO USER. I ESTIMATED COST ( $ 1
FOR S INGLE PREPARATION:
FREQUENCY OF ISSUE: PUBLICATION DATE:
None
APPLICABLE STANDARDS:
~ ~~ ~~
REVIEWS AND/OR APPROVALS REQUIRED: (L IST I N ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO
B Y B Y
SUBMIT FOR APPROVAL TO B Y B Y
Manawr, Product Engineering
PAGE I O F 2 J P L 256P X T 5'
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
IRA-012 SPEC I A L INSTRUCTIONS:
This DRD is applicable to the prime contractor and to principal subcontractors (i. e. , those responsible for design, fabrication and test of subsystems and components inique to this Program. )
SPECIAL DISTRIBUTION: ( IF DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
The part data card shall be prepared for each part selected for use on the Program. The data provided will become the basis for the part classification as required by the parts control program, In addition to complete part identification, name, description, source, etc. , the card will provide data on characteristics, acceptance parameters, rejection criteria, screening requirements, test data and complete par t qualification data. card with completed data is the basic record for the parts control procedure.
This
(CONTINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
JPL 2568-1 OCT 65 -2-
GE EXHIBIT DRD RA-013
)RGANIZATION ORIGINATING REOUIREMENT
CODE: OFFICE RESPONSIBLE FOR DRD: CODE DRO PREPARED BY' DATE
RA K. R. Thomas 7/28/6'
~~ ~-
VOYAGER DATA REOUIREMENT DESCRIPTION DATE. DATA
CATEGORY DRD APPROVED BY
RA-0 1: r lTLE OF DOCUMENT: ORGANIZATION RESPONGBLE-
FOR DOCUMENT PREPARATION
teliability Assuranct ORGANIZATION RESPONSIBLE -OR DOCUMENT REPRODUCTlOl CHART, RELIABILITY ASSURANCE CONTROL
ORGAN IZ ATlON RESPONSIBLE FOR DOCUMENT DISTRIBUTION
rYPE OF DOCUMENT: CONTROL OACTION OREFERENCE 8 INFORMATION
Used to display the status of reliability assurance activities, documents due to, or from the customer/ contractor/subcontractors, and action items pending or completed.
USE OF DOCUMENT: ORGANIZATITION RESPONSIBLE FOR DOCUMENT STOWAGE.
NO OF COPIES
1
INFORMATION CUTOFF DATE OR MILESTONE.
E S T I M A T E D MAN HOURS FOR S I N G L E PREPARATION'
ESTIMATED COST ( $ 1 FOR SINGLE PREPARATION
DATE DATA DUE TO USER: NTERRELATIONSHIP WITH OTHER DATA REOUtREMENTS:
MA-008, Plan, Project Control RA-009, Plan, Reliability Program RA-019, Report., Reliability Program Status S E -0 08, Specification, System Per formanc e/Des ign
R equ frements
~~
FREOUENCY OF ISSUE: PUBLICATION DATE:
SDR 0 ANNUALLY 0 SEMI-ANNUALLY . 0 QUARTERLY 0 81-MONTHLY 0 MONTHLY
UP DATE (FREOUENCY OR M I L E S T O N E )
2 ontinuous :LASS I FICATION: 0 GROUP I 0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY [x OTHERWISE,AS SPECIFIED
0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 J P L DISCREET
E S T I M A T E D EXPIRATION DATE _ _
0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY W PROJECT DISCREET 1 UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN One time
REFERENCE DOCUMENTS: ORM OF DATA: K IND OF DATA:
0 ABSTRACT 0 INSTRUCTION 0 PRINTED DOCUMENT
Q CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 F I L M (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION 0 MICROFILM (W/OR WIO CARD) ING CHANGE PROPOSAL Ip REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
NPC 250-1
APPLICABLE STANDARDS:
REVIEWS AND/OR APPROVALS REQUIRED: (LIST I N ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO
B Y B Y
B Y SUBMIT FOR APPROVAL TO
Reliabilitv Assurance
BY
PAGE I O F 2 J P L 256P SCT 6<
GE EXHIBIT DRD RA-013
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEEl
D R D NO.:
RA-01: SPECIAL INSTRUCTIONS:
Data on Reliability Assurance Control Charts is accrued from many sources throughout the Program. It is reduced to those elements which have a major impact upon the success of the Program, maintained accurate through close surveillance by reliability project personnel. Format for the control charts is not specifically defined, but must be compatible with other project control charts.
This DRD is applicable to the prime contractor and to principal subcontractor (i.e. , those responsible for design, fabrication and test of subsystems or components unique to the Program).
SPECIAL DISTRIBUTION: ( IF DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
Rcliability Assurance Control Charts must provide that information necessary to achieve management decisions required to eliminate sources of unreliability. indicators to be provided are divided into three categories:
The standard
a.
b. c.
Items for action and decision relating to outstanding current problems, ancitipated critical problems, and actions for solution as required. Information relating to technical performance versus requirements. Information relating to program activity versus schedule.
Examples of indicators to be maintained on control charts are: a. b.
Current estimate of mission success probability versus goal. Proportion of delinquent or suspected program activities under surveillance , and number cleared, versus previous period showing trend of exceptions taken to standards conformity. Specific areas currently under appraisal, categorized by criticality and reason for appraisal; i. e. , random selection, suspect problem, or known problem. Problem/failures to date, percent cleared, and forecast of trend. Piece-part count trend curves; planned versus actual, preferred versus nonpreferred high versus low usage.
c.
d. e.
(CONTINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
JPL 2568-1 OCT 65 -2-
GE EXHIBIT DRD RA-014 DRD APPROVED BY
VOYAGER DATA REQUIREMENT DESCRIPTION
CONTRACT NO
TASK OR
)RGANIZATION ORIGINATING CODE: OFFICE RESPONSIBLE FOR DAD: CODE DRD PREPARED BY: 3EOUIREMENT. RA K. R. Thomas
No
RA-011 D R L l T E l .ITLE OF DOCUMENT:
DRL NO
STANDARDy REWORK L E V E L NO
lYPE OF DOCUMENT: m CONTROL OACTION OREFERENCE INFORMATION
To control the incorporation of design changes into previously fabricated hardware, o r rework of T/A, PTM and Flight hardware to ensure against endangering the "designed and built-in'' reliability.
USE OF DOCUMENT:
DDL NO.
NTERRELATIONSH I P WITH OTHER DATA REOUIREMENTS:
2M-003, Change Notice MG-009, Plan, Manufacturing Program &?A-009, Plan, Quality Program &?A-014 Procedure, Rework RA-009, Plan, Reliability Program
0 GROUP I :LASS I FICATION: 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 JPL DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY PROJECT DISCREET 0 UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFDRN
F I L E NO
ORM OF DATA: K IND OF DATA:
XI PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 F I L M (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 I LLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 OISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR WIO CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK m STANDARD
0 INDEX 0 VOUCHER
REVIEWS AND/OR APPROVALS REOUIRED: (L IST IN ORDER OF SUBMITTAL)
DRAFT DATE
SUBMIT FOR REVIEW TO.
ey
B Y SUBMIT FOR APPROVAL TO
P r oiec t Manager
I
3RGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION
&liability Assurancc ORGANIZATION RESPONSIBLE :OR DOCUMENT REPRODUCTlOb
ORGANIZATION RESPONSI BLE FOR DOCUMENT DISTRIBUTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE:
E S T I M ATE D MAN HOURS FOR S I N G L E PREPARATION:
ESTIMATED COST ( $ 1 FOR S INGLE PREPARATION.
FREQUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 OUARTERLY 0 El-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY fD OTHERWISE,AS SPECIFIED
Original issue REFERENCE DOCUMENTS:
20 INFORMATION CUTOFF
DATE O R MILESTONE
DATE DATA DUE TO USER'
PUBLICATION DATE.
SDR UPDATE ( FR E OU ENCY
OR MILESTONE) Final by HDR
E S T I M A T E D EXPIRATION DATE
APPLICABLE STANDARDS
PREPUBLICATION PROOF DATE
B Y
B Y
PAGE I O F L J P L 256e X T 65
GE EXHIBIT DRD RA-014
VOYAGER DATA RE9UlREMENT DESCRIPTION - 2ND SHEET
DRD NO.
RA-01 SPECIAL INSTRUCTIONS'
This DRD is applicable to the prime contractor and principal subcontractors. These documents , are prepared coincident with the design or manufacturing and quality control planning cycle for the hardware.
SPECIAL DISTRIBUTION. ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DOL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS:
Rework Standards will be formally prepared, published and controlled documents providing:
a. Standards (limitations) for rework (i.e., what elements may or may not be reworked) as applicable to various elements of hardware.
b. Standards (limitations) for extent (i. e. , complexity) of rework as applicable to various elements of hardware.
c. Standards (limitations) for frequency (i.e. , number of times) of rework f o r various elements of hardware.
d. Standards (procedures) for methods and equipment for rework as applicable for various elements of rework.
e. Standards (controls) for acceptance cri teria (Le., inspection and test) of rework as applicable to various elements of hardware.
(CONTINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
GE EXHIBIT DRD RA-015
~RGANIZATION ORIGINATING REQUIREMENT
- VOYAGER DATA REOUIREMENT DESCRIPTION
CODE OFFICE RESPONSIBLE FOR DRD CODE DRD PREPARED ey DATE
7/28/67 RA K. R. Thomas
DRD APPROVED BY
1 I I I
l l T L E OF DOCUMENT'
REPORT, FAILURE REVIEW
TYPE Of 0 CONTROL =ACTION OREFERENCE 0 INFORMATION
USE OF DOCUMENT.
Reports the results of the Failure Analysis Review Board's review of the adequacy of individual Failure Analysis Reports, and the conclusions, recommendations, and action items issued by the Board.
NTERRELATIONSH IP WITH OTHER DATA REOUIREMENTS:
'C-013, List, Bidder JA-009, Plan, Quality Program LA-007, Minutes, Failure Analysis Review Board LA-009, Plan, Reliability Program LA-011, Procedure , Reliability Operating :LASSIFICATION:
0 SECRET 0 GROUP I 0 GROUP 2 0 SPECIAL HANDLING
0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY PROJECT DISCREET XJ UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
ORM OF DATA: KIND OF DATA.
H PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 F I L M (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR WIO CARD) ING CHANGE PROPOSAL I REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
I
IRGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION:
leliability Assurance ORGANIZATION RESPONSIBLE 'OR DOCUMENT REPRODUCTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION:
ORGAN1 ZATI ON RESPONSIBLE FOR DOCUMENT STOWAGE
~ ~~
E S T I M A T E D MAN HOURS FOR S I N G L E PREPARATION'
ESTIMATED COST ( $ ) FOR SINGLE PREPARATION.
FREQUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY 0 OUARTERLY 0 BI-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 BI-WEEKLY PP WEEKLY 0 DAILY 0 OTHERWISE,AS SPECIFIED
TASK OR i D R L 1%
DRL NO L E V E L NC i- NO OF COPIES
20 INFORMATION CUTOFI
DATE OR MILESTONE
DATE OATA DUE TO USER
PUBLICATION DATE.
PDR - UPDATE ( FR EOU ENCY
OR MILESTONE)
Not applicable E S T I M A T E D
EXPIRATION DATE
REFERENCE DOCUMENTS.
NPC 250-1
APPLICABLE STANDARDS
REVIEWS AND/OR APPROVALS REOUIRED: (L IST I N ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO
BY B Y
BY B Y SUBMIT FOR APPROVAL TO
Chairman, Failure Review Board ~
PAGE I O F 2 P L 256P X T 6
GE EXHIBIT DRD RA-015
SPECIAL INSTRUCTIONS
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEEl
ORD NO.
RA-Olt
SPECIAL DISTRIBUTION ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW)
OUTLINE OF CONTENTS.
The Failure Review Report will document the results of the FARB's review and evaluation of all failure analysis and corrective action reports. The report will include an analysis of:
a. b.
c. d.
The completeness of the cause and effect analysis of the failure (discrepancy); The adequacy of the recommended or implemented corrective action, and the means of verifying i ts effectiveness; The criticality of the failure and its impact on other elements of the system; The conclusions, recommendations and assigned action items.
The Failure Review Report will also include identifying information such as : identification number, cross-referenc.e to failure analysis reports , cross-reference to other supporting documentation , corrective action implementation schedule , authorized signatures .
(CONTINUE ON THIRD SHEET, I F NECESSARY, AND AFFIX TO THIS DRD.)
J P L 2568-1 OCT 65 -2-
GE EXHIBIT DRD RA-016 DRD APPROVED BY
VOYAGER DATA REQUIREMENT DESCRIPTION
ORGANIZATION ORIGINATING CODE REOUIREMENT
RA OFFICE RESPONSIBLE FOR DRD CODE DRD PREPARED BY DATE
K . R.
REPORTS, SUMMARY, AUDIT AND APPRAISAL
TYPE OF DOCUMENT: o CONTROL DACTION OREFERENCE % INFDRMATIOD
USE OF DOCUMENT:
To provide management with an up-to-date summary of audit and appraisal activities of those critical processe: and practices which could have a detrimental affect on the reliability aspects of the Program. This is a tool of management control.
RA-009, Plan, Reliability Program RA-013, Chart, Reliability Assurance Control RA-019, Report, Reliability Program Status
INTERRELATIONSHIP WITH OTHER DATA REQUIREMENTS:
0 GROUP I CLASS I FICATION: 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY $1 PROJECT DISCREET E UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
FORM OF DATA: KIND OF DATA:
PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 F I L M (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL BREWRT 0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE
PROPOSAL 0 SPECIFICATION
0 HANDBOOK
0 INDEX
0 STANDARD
0 VOUCHER
homas 17/28/67 IRGANIZATION RESPONSIBLE FOR DOCUMENT PREPARATION: t eliabilityhsur ance
DRG~NIZATION RESPONSIBLE 'OR DOCUMENT REPRODUCTlOh
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION
ORGAN1 ZATloN RESPONSIBLE FOR DOCUMENT STOWAGE.
E S T I M A T E D MANHOURS FOR S I N G L E PREPARATION:
ESTIMATE0 COST ( $ ) FOR SINGLE PREPARATION
FREOUENCY OF ISSUE:
0 ANNUALLY 0 SEMI-ANNUALLY
0 81-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY 0 OTHERWISE,AS SPECIFIED
OUARTERLY
REFERENCE DOCUMENTS
NPC 250-1
- 7
DRL NO.: L E V E L NO 1 NO OF COPIES.
10 INFORMATION CUTOFF
DATE O R MILESTONE
DATE DATA DUE TO USER
PUBLICATION DATE.
SDR UPDATE (FREOUENCY
OR M I L E S T O N E )
Not applicable EST I M A T ED
EXPIRATION DATE
APPLICABLE STANDARDS
REVIEWS AND/OR APPROVALS REQUIRED: (L IST I N ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
I SUBMIT FOR REVIEW TO
I
-- BY B Y
B Y BY SUBMIT FOR APPROVAL TO
Manager , R eli ability A s surance
PAGE I O F 2 P i ?56P ,TT 6
GE EXHIBIT DRD RA-016
VOYAGER DATA REOUIREMENT DESCRIPTION - 2ND SHEET
1 D R D N O . SPECIAL INSTRUCTIONS:
IRA-011
This DRD is applicable to the prime contractor who will maintain "audit and appraisal" responsibility for both contractor and principle subcontractor activities.
SPECIAL DISTRIBUTION. ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DlSTRlEUTlON BELOW)
OUTLINE OF CONTENTS:
The Audit and Appraisal Summary Report must serve as a management control and awareness document over "critical processes and practices" (i. e. , sources of unreliability) which could materially affect the success of the program. The report, therefore, must provide:
1.
2. 3. 4. 5.
Identification of the subject critical processes and practices audited during the period. Summary of appraisal results both lrproll and t'conl'. Discussion of the detected potential problem areas. Recommendations for corrective actions and status of in-process corrective action: Recommended follow-up plan and responsible parties.
(CONTINUE ON THIRD SHEET, I F NECESSARY, AND AFFIX TO THIS DRD.1
JPL 2568-1 OC? 65 -2-
GE EXHIBIT DRD RA-017
DRD APPROVED BY VOYAGER DATA REQUIREMENT DESCRIPTION
K. R . Thomas )RGANIZATION ORIGINATING CODE OFFICE RESPONSl9LE FOR DRD CODE DRD PREPARED BY DATE
RA 7/28/67 ?EQUIREMENT
DATE DATA CATEGORY
CONTRACT DRD No NO
RA-017 I I 1 I
' ITLE OF DOCUMENT: 3RGANIZATION RESPONSIBLE TASK OR FOR DOCUMENT PREPARATION SUBTASK
! e lia bili ty Ass u rance 1
ORGANIZATION RESPONSIBLE D R L NO 'OR DOCUMENT REPRODUCTION
ORGANIZATION RESPONSIBLE DDL NO FOR DOCUMENT DISTRIBUTION
I
REPORT, DESIGN REVIEW
-- D R L I T E I
NO
L E V E L NO
FILE NO
WE OF DOCUMENT: CONTROL OACTION OREFERENCE o INFORMATION
JSE OF To provide a detailed report (i. e. ,minutes) ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE if: attendees, discussions, uestions and answers; identifie'(
items, and scheduled action completion dates. To provide management and design control by both engineering and i ro j ec t manage rs . iroblem areas, recommen 8 ed solutions, assigned action
NO OF COPIES
35
. -
NTERRELATIONSH I P WITH OTHER DATA REOUIREMENTS:
SE-013, Contract End Item. (CEI) Detail Specification (Identification Iteml
:LASS1 FICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY m PROJECT DISCREET
UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
ORM OF DATA: KIND OF DATA:
PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 F I L M (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MODEL 0 DISCLOSURE MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REOUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR WIO CARD) ING CHANGE PROPOSAL 0 REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
E S T I M A T E D MANHOURS INFORMATION CUTOFF FOR S I N G L E PREPARATION: DATE OR MILESTONE I
DATE DATA DUE TO USER I ESTIMATED COST ( $ )
FOR S INGLE PREPARATION
FREOUENCY OF ISSUE. PUBLICATION DATE
SDR t N ot applicable
UPDATE ( F R E Q U ENCY OR MILESTONE)
0 ANNUALLY 0 SEMI-ANNUALLY 0 QUARTERLY 0 El-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY n 81-WEEKLY
0 DTHERWISE,AS SPECIFIED
@ WEEKLY 0 DAILY
1 REFERENCE DOCUMENTS:
NPC 250-1
APPLICABLE STANDARDS
REVIEWS AND/OR APPROVALS REOUIRED: (L IST I N ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
-- SUBMIT FOR REVIEW TO
BY B Y
BY B Y SUBMIT FOR APPROVAL TO
Chairman, Design Review Board
PAGE I OF> JY 256' T T 6
GE EXHIBIT DRD RA-017
VOYAGER DATA REOUIREMENT DESCRIPTION - 2ND SHEET
SPECIAL INSTRUCTIONS: D R D NO.:
RA- 01 This DRD is applicable to the prime contractor and to principal subcontractors (i. e., those responsible for design, fabrication and test of subsystems or components unique to the program)
jPEClAL DISTRIBUTION: ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW)
A l l attendees of specific design review meetings. Managers of individual assigned action items.
OUTLINE OF CONTENTS:
The Design Review Reports must provide a comprehensive report of all proceedings and results in the design review meeting. It must include:
a. b. c. d. e. f. g.
Identification of all attendees of the review meeting. Identification of item being reviewed. A summary of the various presentations and identification of responsible parties. A brief description of questions and ensuing discussions. Description of all detected problems and recommendations. Identification of all action items, responsible parties, and due dates. Review of status of previous design review action items.
The Design Review Report must serve as a suitable record of all design review activities and follow-up on I1actions".
(CONTINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
- - JPL 2568-1 OCT 6 5
GE EXHIBIT DRD RA-018 DRD APPROVED BY
VOYAGER DATA REQUIREMENT DESCRIPTION
)RGANIZATION ORIGINATING CODE OFFICE RESPONSIBLE FOR DRD COO€ 3EOUIREMENT RA
DRD PREPARED BY I DATE
K. R. ' ITLE OF DOCUMENT
homas
REPORT, RELIABILITY ASSESSMENT
7/28/67.
WE OF DOCUMENT: CONTROL OACTION OREFERENCE BINFORMATION
Provide Project management with a periodic growth assessment of Sys tems reliability. Through reliability assessment, design and performance weak-links will bf identified on a timely basis permitting corrective actio] to be taken as necessary.
QA-020, *Report, Failure Analysis RA-009, Plan, Reliability Program SE-038, Report, System Analysis, Reliability TE-001, Plan, Integrated Test
USE OF DOCUMENT:
NTERRELATIONSH IP WITH OTHER DATA REOUIREMENTS:
:LASS I FICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET
CONFIDENTIAL RESTRICTED DATA PROPRIETARY B PROJECT DISCREET UNCLASSIFIED 0 PUBLIC DOMAIN E NOFORN
ORM OF DATA: K IND OF DATA.
[x PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE 0 LETTER
0 DIAGRAM 0 BULLETIN 0 LIST
0 DRAWING 0 CATALOG 0 LOG
0 F I L M (STATIC OR MOTION) 0 CONTRACT 0 MANUAL
0 ILLUSTRATION 0 DIRECTIVE 0 MEMORANDUM
0 MOOEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR WIO CARD) ING CHANGE PROPOSAL $REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
-~ REVIEWS AND/OR APPROVALS REOUIRED: (L IST IN ORDER OF SUBMITTAL)
DRAFT DATE
SUBMIT FOR REVIEW TO
B Y
BY SUBMIT FOR APPROVAL TO
Manager, Reliability Assurance
I eliabilityps sur ance ORGANIZATION RESPONSIBLE :OR DOCUMENT REPRODUCTION
ORGANIZATION RESPONSIBLE FOR DOCUMENT DISTRIBUTION:
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE:
~~~~
EST I MATED MAN HOURS FOR S I N G L E PREPARATION
ESTIMATED COST ( $ ) FOR SINGLE PREPARATION.
FREQUENCY OF ISSUE.
0 ANNUALLY 0 SEMI-ANNUALLY
0 81-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 81-WEEKLY 0 WEEKLY 0 DAILY 0 OTHERWISE,AS SPECIFIED
QUARTERLY
DATE
- :ONTRACT
NO.
~
TASK OR SUBTASK. - D R L NO..
DDL NO:
- NO OF
OATA CMTEGWY
DRD NO
RA-O1t I R L l T E f
NO
- E V E L NO
F I L E NO
- 3PIES
20 INFORMATION CUTOFf
DATE O R MILESTONE
DATE DATA DUE TO USER
PUBLICATION DATE
PDR - UPDATE (FREOUENCY
OR M I L E S T O N E ) Jot applicable
E S T I M A T E D EXPIRATION DATE
REFERENCE DOCUMENTS:
NPC 250-1
APPLICABLE STANDARDS
PREPUBLICATION PROOF DATE
-- B Y
BY
PAGE I OF? P L ?56' LXT 6 5 *Key Informal Data
SPECIAL INSTRUCTIONS
SPECIAL DISTRIBUTION. ( I F DISTRIBUTION IS NOT COVERED BY AN EXISTING DDL WRITE IN DISTRIBUTION BELOW)
DRD NO.
OUTLINE OF CONTENTS.
The Reliability Assessment Report will be developed around a basic set of reliability growth curves which reflect reliability probability of success values at the successive assessment intervals. Basically, the report will provide a comprehensive assessment of the inherent/operational reliability of the system, subsystem and components in quantitative terms on a comparative basis with the apportioned reliability design goals. Initially, the assessment will be dependent upon reliability analysis (predictions) design reviews, and related engineering inputs. A s test data, operating time and failure date become available, the assessment will be operationally oriented. Continued engineering judgement will be applied to the reliability assessment. The report will include: identification of any serious reliability problems, a description of the consequences, and the degree of risk involved.
(CONTINUE ON THIRD SHEET, IF NECESSARY, AND AFFIX TO THIS DRD.)
P L 2568-1 OCT 65 -2-
DATE ORD APPROVED BY VOYAGER DATA REOUIREMENT DESCRIPTION
-- )RGANIZATION ORIGINATING ?EOUIREMENT
DATA CATEGORY
I
CODE OFFICE RESPONSIBLE FOR DRD CODE DRD PREPARED BY
T ) A V D 1
ESTIMATED COST ( $ ) FOR S INGLE PREPARATION
in^ I
DATE DATA DUE TO USER
I I n. 11.
I FREOUENCY OF ISSUE
0 ANNUALLY 0 SEMI -ANNUALLY 0 OUARTERLY 0 BI-MONTHLY 0 MONTHLY 0 SEMI-MONTHLY 0 El-WEEKLY 0 WEEKLY 0 DAILY
OTHERWISESAS SPECIFIED
As required
ITLE OF DOCUMENT.
REPORT, RELIABILITY PROGRAM STATUS
PUBLICATION DATE
SDR UPDATE (FREOUENCY
OR MILESTONE) Each major Proiect review
E S T I M A T E D EXPIRATION OAT€
WE OF DOCUMENT o CONTROL OACTION OREFERENCE 8i INFORMATION
Used to provide Project management with a complete summary assessment of the reliability status of the Program. These reports provide management w i t h a fundamental means of obtaining a "point of achievement" appraisal p r ior to proceeding further with the Promam.
JSE OF DOCUMENT
NTERRELATIONSH IP WITH OTHER DATA REOUIREMENTS:
PC-002, Report, Contract Status RA-009, Plan, Reliability Program RA-016, Report, Audit and Appraisal Summary RA-017, Report, Design Review TE-165, Report Test
:LASS IF ICATION: 0 GROUP I 0 SECRET 0 GROUP 2 0 SPECIAL HANDLING 0 CONFIDENTIAL 0 GROUP 3 0 NASA DISCREET 0 SECRET RESTRICTED DATA 0 GROUP 4 0 J P L DISCREET 0 CONFIDENTIAL RESTRICTED DATA 0 PROPRIETARY RPROJECT DISCREET W UNCLASSIFIED 0 PUBLIC DOMAIN 0 NOFORN
ORM OF DATA: KIND OF DATA:
a PRINTED DOCUMENT 0 ABSTRACT 0 INSTRUCTION
0 CHART 0 BROCHURE
0 OIAGRAM 0 BULLETIN
0 DRAWING 0 CATALOG
0 F I L M (STATIC OR MOTION) 0 CONTRACT
0 ILLUSTRATION 0 DIRECTIVE
0 LETTER
0 LIST
0 LOG
0 MANUAL
0 MEMORANDUM
0 MODEL 0 DISCLOSURE 0 MINUTES
0 RECORDING (TAPE OR DISC) 0 ENGINEERING CHANGE 0 PLAN
0 COMPUTER CARD ORDER 0 PROCEDURE
0 COMPUTER TAPE 0 REQUEST FOR ENGINEER- 0 REGULATION
0 MICROFILM (W/OR W/O CARD) ING CHANGE PROPOSAL $REPORT
0 OTHER 0 ENGINEERING CHANGE 0 SCHEDULE PROPOSAL 0 SPECIFICATION
0 HANDBOOK 0 STANDARD
0 INDEX 0 VOUCHER
iomas 17/28/67 RA-019 IRGANIZATION RESPONSIBLE TASK OR D R L l T E k FOR DOCUMENT PREPARATION. SUBTASK NO
'OR DOCUMENT REPRODUCTION.
ORGANIZATION RESPONSIBLE FOR DOCUMENT DlSTRl BUT1 0 N.
ORGANIZATION RESPONSIBLE FOR DOCUMENT STOWAGE
E S T I M A T E D MANHOURS FOR S I N G L E PREPARATION'
NO OF COPIES
40 INFORMATION CUTOFF
DATE O R MILESTONE
NPC 250-1
APPLICABLE STANDARDS.
REVIEWS AND/OR APPROVALS REOUIRED: ( L I S T I N ORDER OF SUBMITTAL)
DRAFT DATE PREPUBLICATION PROOF DATE
SUBMIT FOR REVIEW TO
B Y B Y
BY BY SUBMIT FOR APPROVAL TO
Proiect Manarrer J 7 L 2 5 6 : .V? ( 1 PAGE I O F A
GE EXHIBIT DRD RA-019
VOYAGER DATA REQUIREMENT DESCRIPTION - 2ND SHEET
SPECIAL INSTRUCTIONS' DRD NO.:
RA-Ol! 1 L
The Reliability Program Status Report is developed for accumulative data provided by all available Program data items. The data is analyzed and formalized into a measure of its impad on probability of success of the mission from both a subjective and objective viewpoint. These reports are to provide management with sufficient data to equate reliability growth (status) to time and cost curves for the Project.
SPECIAL DISTRIBUTION ( IF DISTRIBUTION IS NOT COVERED BY AN EXISTING DOL WRITE I N DISTRIBUTION BELOW)
~~
OUTLINE OF CONTENTS
The Reliability Program Status Report need not conform to any specific format requirements. However, it must present to management a concise appraisal of the total Program activities as they affect, or potentially affect, reliability growth during the specified assessment period. The report may include: narrative discussion, summary datl tables, charts, graphs, computer printouts, etc. The report will include summary information from sources such as:
a. Design review - status of design reviews and approvals, identification of problem areas, corrective actions, etc.
b. Reliability assessment - quantitative o r statistical assessment resulting from existing data, design margin analysis, etc.
c. Reliability analysis - analytical prediction of inherent reliability, failure mode, effects and criticality analysis, redundancy analysis, etc.
d. Problem/failure summary logs - identification of manufacturing inconsistencies and impact of rework.
(CONTINUE ON THIRD SHEET, I F NECESSARY, AND AFFIX TO THIS DRD.)
-2- JF'L 2568-1 OCT 65
GE EXHIBIT DRD RA- 01 9
e. Manufacturing degradation analysis reports - deficiencies in the production cycle which require corrective actions.
f. Quality assurance inspection records - identification of manufacturing inconsistencies and impact of rework.
g. Parts and materials qualification status - determine percentage of items qualified t o those specified and used in early stage hardware.
All information must be reducible to an indicator of llriskl ' resulting from the activity if full conformance to established performance standards is not maintained.
-3 -
DOCUMEFTATION RELATIONSHIP TREES
A documentation relationship tree has been prepared to show the relationships of data
i tems within each functional category as well as their relationships across categories.
Relationships within each functional category are shown by constructing a t ier pattern beginning
with the top-level (or governing) data item and relating in descending order all data items
within the category to this top-level data item. (The location of a data item at a given level
on the diagram does not necessarily indicate the importance of that specific item but iden-
tifies and defines its relation to all other data items in that category. )
Relationships between data items in one category and data items in other functional categories
are shown by (1) shaded arrows to indicate the direction of the relationship and (2) an
alphabetic code to indicate the nature of the interrelationship as follows:
a.
b.
Data items needed for preparation and/or support of the referenced item. (I)
Data items that a r e supported o r needed by this data item. (S)
c. Data items that relate 77t077 and provide information of a general nature but a r e not required in an input or support role. (G)
Each data item appearing on the Data Item List (DIL) was examined and evaluated with
respect to its contribution to, o r dependence upon, data items appearing in other categories
and is included in the diagrams. Additionally, certain data elements indicated in the user
flow diagrams (but currently not identified as individual data items) have been shown within
a dashed rectangle to clarify relationships.
5-lb
LEGEND: m INDICATES DATA ITEMS NEEDED FOR PREPARATDN OR SUPPORT
O F THE REFERENCED ITEM (lNPv?).
(S) INDICATES DATA ITEMS THAT ARE SUPPORTED OR NEEDED BY T H I ITEM.
(0) DATA ITEMS THAT RELATE TO AND PROVIDE INFQRhfATlON O F A GENERAL NATURE BUT ARE NOT REQUIRED IN AN INPUT OR SUPPORT ROLE
INDICATES PRINCIPAL RELATQNSHIP 0. 8. OR 0) BETWEEN DATA ITEMS
TE-181 0 MG-006 m r QA-014 iri,
SE-048 0 QA-009 0 MA-007 0 QA-029 m .- TE-046 hi
LET. FAILURE RATE DATA @A-003)
QA-013 (I) SE-015 m SE-012 (SI
PLAN, PARTS CONTROL PROGRAM
(RA-010)
PLAN, PARTS CONTROL PROGRAM
(RA-010)
LIST, PARTS APPLICATION DATA @A-005)
Q SE-015 0 S E - 0 1 1 4 SE-024 0 SE-013 m SE-010 0 SE-014 (l)
QA-005
1 I
LIST. FLIGHT CRITICAL PROCESSES Q PRACTICES @A-004)
~
QA. SE. MG. TE, MP. P C 0
1 LIST. CRITICAL & LIMITED LIFE
@A-002)
QA-013 (I) SE-029 (sl QA-020 (I)
LIST. CRITICAL & LIMITED LIFE I ITEMS 1 @A-002)
QA-013 (I) SE-029 (sl QA-020 (I)
1 CARD. P A R l S STANDARD. I REWORK
1 6) SE-059 CM-002 i- 0 QA-009 (S)
QA-014 0
b SE:OI~ m QA-013 0 SE-029 0
I sc-002 m
REPORT. RELIABIIXTY PROGRAM STATUS (RA-019)
\-,
8c-004 (s) ,N, RELIABILJTY KIIIAM MG-009 0 -009) M G O l l RI
MA-001 (s) 0 PC-002 (S)
PROCEDURE. RELIABILmY OPERATING @A-011)
SE-014 6 93-065 0 QA-021 (8)
QA-021 (Q LOG. PROBLEM/ FAILURE SUMMARY a zag::;: $ (RA-006) QA-009 (9
SE-008 B) MA-008 (s)
{LIABILITY ;TION DIRECTIVE b-001)
TE-165 (l)
I I
REPORT, SUMMARY REPORT, RELIABIIXTY AUDIT & APPRAISAL
TE-001 (S) TE-131 (s) TE-030 (6) SE-008 (S) SE-010 0 SE-011 SE-013 Is) 7
REPORT, DESIGN
@A-Ol?)
is SE-010 (l) SE-013 (I) SE-011 (l) SE-014 (l)
1
I QA-020 (l) MINUTES, FAILWE QA-OM m c 3 I ANALYSE REVIEW
QA-021 (l)
Figure G-5. Reliability Assurance Documentation Relationship
Tree (RA)
DATA ITEM PHASING/FREQUENCY
Figure G-6, Reliability Assurance Data Item Phasing and Frequency Matrix, provides a
detailed picture of data item preparation requirements by the reliability function. Control
and reporting requirements a r e of particular significance. Not reflected, however, but of
equal significance, is the interrelationship with and surveillance by reliability of the:
engineering, manufacturing, and quality, assuraiice functions.
Figure G-7, Reliability Assurance Data Item Density Profile, reflects the distribution
and density of data item preparation requirements in monthly averages by major project
review periods.
Requirements for preparation of Parts Data Cards (RA-012) early in the project cause
some distortion to an otherwise well-distributed data item preparation cycle.
6-1/2
RELIABILITY
I I I I I I I MU m n T I T U . Q W " I T Y iWQUENCf 'I0UL'QW"ITY €WZQLENCf TOTAL Q W " I T Y €WZQUENCY TOThL QUAmTY ALBPLENCY
DIRECTIVES Da 75 75 Da 75 200 Da 200 260 Da 260 RA-001 * R e l i a b i l i t y Action Direc t ives 75 .
0 SDB
t
0 PDP
RA-002 L i s t , C r i t i c a l and Limited L i f e Item
RA-003 L i s t . F a i l u r e Rate Data RA-004 L i s t , F l i g h t C r i t i c a l Processes and PraCt.
RA-005 L i s t , P a r t s Appl ica t ion Data
0 HDU
I
1 I 1 1 U 1
1 I 1 1 U 1
1 I 1 1 U 1 1 I 1 1 U 1
0 CDR
RA-008 Plan , R e l i a b i l i t y Assesment
RA-009 Plan , R e l i a b i l i t y Program
RA-010 Plan, P a r t s Cont ro l Program
1 I 1 1 U 1
1 I 1 1 U 1
1 I 1 1 U 1
STANDARDS
RA-014 Standard, Rework
TOTA Ls
1 M 3 1 F 1
98 20124 21,857 3,695
MINUITS I ! I I I I I I I I I 1 I ( F m ) I I I I I I I I I I 1 I I
I I I I I I I 1 I I I I I RA-007 +Minutes, F a i l u r e Analys is Review Board I 1 wk 1 1 5 1 1 1 wk I 40 I 1 1 wk I 52 I
I I I I I I I I I I 1 I I I . I I I a I I 1 I I I
*Key Informal Data
A Annual S/A Semi-Annual WK Weekly MO Monthly B/W Bi-Weekly B/M Bi-Monthly
O/T One Time A/R As Required U update VU One Update DA Daily Q Quarterly
I Initial F Final N/R New and Revised SDR System Design Review PDR Prel iminary Design Review HDR Hard Design Review
CDR Cri t ical Design Re. FACI First Article Confi
Mission Acceptancl MAR J FACT Joint Flight Accept
Composite Testii
6 -3
0 FACI
370
I
0 lull
da 370 305 da 305 50 da 50 1335 5 da wk
0 JFACT
I
1 I
0 U L R l C H
2 2
4/u 5 1 4 u 5 1 3/u 4 1 1/u 2 23
1
I I I I I I I I I I 1 2 I 2
I wk 74 1 wk 61 242
6
40000 O/T 6 6 O/T 6 6 OIT 6 6 O/T 6 42
60 1
I wk 6 wk 4500 14 wk 850 1
0 4 Q 6 1 18 Lm
1
1
594 Q 4 1 Q 6 1 9 1 1 Q 1 19 O/T 1 1 . O h 1 5 Following ea major design review
iew pration Inspection Review
ulce I
4964
Figure G-6. Reliability Assurance Data Item Phasing and Frequency Matrix
4
1240 61 9 52,054