Ad d e n d u m
10 9th S treet , Lynchburg , Vi rginia 24504 p 434-846-8456 | f 434-846-4534 | www.archi tecturalpar tners.com
Greenhouse Replacement for Nelson County High School DATE: 5/17/2021
TO: All Bidders
FROM: Architectural Partners
COMM. #: 21114
ADDENDUM #: 1
BID DATE: 5/27/2021
BID TIME: 2:00 pm
BID LOCATION: Offices of Architectural Partners
This addendum becomes part of the Construction Documents. The following changes, additions, and deletions shall be made to the following documents; all other conditions shall remain the same. Please attach to all copies of the Construction Documents which you are holding.
All Contractors are to state in their bid the receipt of this addendum.
Instruction to Bidders:
GENERAL:
1. SEE ATTACHED SIGN-IN SHEET 2. SEE ATTACHED PRE-BID MEETING NOTES
ADDENDUM TO THE DRAWINGS:
Number Drawing Detail No.
1 A1.1 1/A1.1 Floor plan: • Clarification added for extent of masonry painting. • Slope of greenhouse floor changed from ¼” per foot to
1/8” per foot. • Length of ramp changed to accommodate the floor
slope revision. • Clarification added to trench drain. Drain cover needs
to comply with ADA requirements. • Under-slab pipe diameter changed from 4” to 3”. Note
referencing Plumbing sheet P1.0 added. 2 A3.1 2/A3.1 Clarification added to address treatment of cut CMU at
locations of new greenhouse columns.
10 9th S treet , Lynchburg , Vi rginia 24504 p 434-846-8456 | f 434-846-4534 | www.archi tecturalpar tners.com
3 A3.1 3/A3.1 Clarification to roof edge detail added.
4 A2.1 various Reference to brick pointing removed on elevations.
5 P1.0 Notes Clarification made for connection of unit heaters to existing propane line. Reference made to drain notes located on sheet A1.1.
ADDENDUM TO THE SPECIFICATIONS:
Number Spec Section
1 00 4100 INVITATION FOR BIDS: Remove current Section 004100-600 BID FORM in its entirety and replace with attached Section 600 BID FORM.
2 04 0100 MAINTENANCE OF MASONRY: • Section 1.01 - Remove items B, C and D. • Section 1.03 – Remove item A. Renumber remaining
items. • Section 2.03 – Remove Section in its entirety. • Section 2.04 – Remove Section in its entirety. • Section 3.03 – Remove Section in its entirety. • Section 3.04 – Renumber Section from 3.04 to 3.03.
QUESTIONS/ANSWERS AND CLARIFICATIONS:
Number
1 Question Are doors 101 and 102 to be abated or are they to remain and be repainted?
Answer The doors in question, 101 and 103 (listed in Table 1 of the Hurt and Proffitt asbestos report as entering the control room and entering the greenhouse) were presumed to contain asbestos based on their labeling as “fire doors”. The work anticipated for these doors is limited to cleaning, preparing, and refinishing the outer surfaces of the doors. The potential asbestos containing material will not be disturbed. The doors will remain and be refinished as indicated on the drawings.
2 Question Spec 004100-5 item #01 notes bid withdrawal or modification 30 days after bid opening. 004100-6 – 1.05.A notes that the bids are irrevocable for 45 days. Please confirm which is correct.
Answer Change the 30 days to 45 days.
3 Question 015000-1 sect 1.04 notes requirements for construction barriers to prevent unauthorized entry to construction areas and to see drawings
10 9th S treet , Lynchburg , Vi rginia 24504 p 434-846-8456 | f 434-846-4534 | www.archi tecturalpar tners.com
for limits. This is not shown on the plans currently, will this be required inside of Door 101 at the existing horticulture classroom? (Exterior areas would be protected with construction fencing)
Answer No interior construction barriers are required, only exterior fencing.
4 Question 017000-1 sect 3.01.A-B notes to verify that existing site conditions and substrates are capable of supporting new work. Please verify if this is to be included by GC.
Answer Clarification- The intent of this section is to make sure that any items that are damaged, rotted, rusted or otherwise not capable of supporting new work is not used. Example would be rusted metal roof deck. We would not want the roofer installing new work on this. These relate to hidden conditions and would most likely result in a change order for repair/replacement.
5 Question 033000-1 sect 2.01.D notes synthetic fiber reinforcing for concrete. Please confirm reinforcing with fiber vs WWF.
Answer Synthetic fiber reinforcing for concrete is to be used.
6 Question 040100 sect 1.01.B notes masonry repairs to include replacement of CMU at interior of greenhouse that have dislodged. Can the architect provide a quantity or indicate locations on plans?
Answer This requirement for repairs/replacement to CMU is not required. We have included in addendum the modification of detail which shows condition at the columns, using a clean/true saw cut and cement parging at columns. Any other masonry repairs will be a change in contract.
7 Question 040100 sect 1.01.D notes repointing of mortar joints that are greater than ¼” deep eroded. Exterior elevations on A2.1 notes to repoint masonry as required. Can a total quantity be provided with unit price on bid form for additional work?
Answer Repointing requirement has been deleted. (cleaning of masonry remains) Any masonry repairs will be a change in contract.
8 Question Floorplan 1/A1.1 notes to daylight new drain piping to outer wall. South Elevation 1/A2.1 indicates drain piping to tie into new downspout. Please clarify which is correct.
Answer This is correct. This drain is turned into the new metal downspout. The PVC pipe size has been resized to 3” diameter in this addendum, and will drop into a metal conductor that Y connects to the downspout.
9 Question Appendix B of Hurt & Proffitt’s Asbestos report included a bid sheet/form. Will this need to be submitted with bid package?
10 9th S treet , Lynchburg , Vi rginia 24504 p 434-846-8456 | f 434-846-4534 | www.archi tecturalpar tners.com
Answer No. This is a form between the general contractor and their asbestos abatement contractor.
10 Clarification All doors and frames within Vestibule will be refinished (painted or stained).
11 Clarification There will be no repointing of masonry on this project.
ATTACHMENTS:
The following items are attached to this Addendum document as a single PDF document:
1. Revised sheets A1.1. A2.1 and A3.1.
2. Pre-Bid meeting notes.
3. Sign-In sheet.
4. Attachment to bid form- Procurement Documents.
5. Revised Section 00 4100-600 Bid Form.
6. Revised sheet P1.0.
S i g n – I n
10 9th S treet , Lynchburg , Vi rginia 24504 p 434-846-8456 | f 434-846-4534 | www.archi tecturalpar tners.com
PROJECT: NCHS GREENHOUSE PRE-BID MEETING
PROJECT: AP #21114
DATE: MAY 13,2021
NAME COMPANY PHONE EMAIL
Shannon Irvin NCPS Assistant Superintendent for Administration 434-260-7646 [email protected]
Margaret Seaman NCHS AG Instructor 434-941-1698 [email protected]
Les Campbell NCPS Supervisor of Maintenance and Transportation
(434) 263-5095 [email protected]
Mark Smith Architectural Partners 434-258-2944 [email protected]
Allan Nixon Wall Contracting 434-942-4474 [email protected]
John Tibbs The J.E.T. Group, Inc/ RSG 434-610-6114 [email protected]
K. O’Brien ACI 660-6916 [email protected]
Scott Harper WACO Inc. 541-280-4737 [email protected]
Page 2
Mike Marks Artisan Const. 434-962-5272 [email protected]
Jerry Jones Unlimited Electrical Contracting 540-586-8846
George Miller Garrett Construction 304-694-6463 [email protected]
Bradley Peters DF Building Inc. 540-915-2499 [email protected]
Robert Deddens Coleman- Adams 434-942-6609 [email protected]
Chris Tolley PRCC 434-610-4624 [email protected]
Will Marshall JLC 434-845-3468 [email protected]
John Fields Montgomery Consulting 804-618-4336 [email protected]
10 9th S treet , Lynchburg , Vi rginia 24504 p 434-846-8456 | f 434-846-4534 | www.archi tecturalpar tners.com
NCHS Greenhouse Pre-Bid Meeting Notes
DATE: 5/13/2021
TIME: 3:00
LOCATION: NCHS Greenhouse
The following were items discussed at the Nelson County High School Greenhouse Pre-Bid Meeting.
1. Introduction and Sign-in was required due to attendance was mandatory for bidders. See attached Sign-In sheet. Introductions were made by all.
2. Announced issue date of Addendum No1 for Pre-Bid meeting notes, Sign-In sheet, questions /answers/clarifications and any RFI's submitted by email to date. Intent for a Monday, May 17th issue was noted.
3. Project description was given by architect. Some items of concern were noted with the ability of bidders to hold their Lump Sum bid for 45 days due to market conditions being instable. There was no answer given. Bidders will be issue bids as deemed allowable by their own business practices.
4. Discussed schedule and the bid form that request the number of weeks for construction. Since there is a possible long lead time for delivery of the greenhouse package, it was discussed to submit a schedule vs. the number of construction weeks. The bid form will be revised under 1.06 to allow for bidder to attach a GANTT or other scheduling outline that shows pertinent dates.
5. Discussed the greenhouse column base connection to the existing concrete foundation wall. Points noted are that the column will set in the same location as the removed column. Coordinate the anchor bolt installation as to not conflict with any anchor bolts that are not removed when demolition takes place. Also, the CMU shall be cut and parged to create a clean condition. The structural drawing has been clarified to show this. No toothing-in CMU is required.
6. Items noted by Architect:
6.1. Generator is existing to remain including the transfer switch.
10 9th S treet , Lynchburg , Vi rginia 24504 p 434-846-8456 | f 434-846-4534 | www.archi tecturalpar tners.com
6.2. A new LED light will be added to the Vestibule and will be noted in Addendum.
6.3. It was uncertain as to how many propane fired unit heaters would be installed. (Architect recommended contractors to ask the greenhouse supplier since they will be the designer of the environmental controls and units).
6.4. Architect noted that the existing grade beam depth was not verified and could be in conflict with the drain lines. (Note: Architect excavated to find the grade beam and notes that it is 16” below the floor line. See attached photo. This will not conflict with plumbing systems and the existing concrete walkways are independent and were measured as 4” thick concrete slab on approximately 4”-6” of stone aggregate base course).
6.5. Noted that there will be a change in the Greenhouse spec where the LED lights mounted in the trusses will be removed from that specification since it is already designed and specified in 22-65100 and drawing E0.2.
6.6. Some electrical work takes place at the panels adjacent to the main corridor inside the school building. (Walk-thru took place). Some questions arose as to alternative methods to bring power into the vestibule. No decision was made to change design and architect noted that any questions or suggestions made should be in written form.
6.7. Liquid tight electrical connections are only required in the greenhouse, not the Vestibule area.
6.8. Noted that all device color is grey with stainless steel cover plates.
6.9. Noted that existing drawings were included in the design submittal, but there are visible differences between designed and as-built. Most visible is the concrete wall as designed was built in CMU.
7. Masonry pointing was discussed and some concern over the quantity to be determined. SF and LF unit pricing suggested, however, since the quantity reviewed showed very small number of repairs, the architect decided to delete the repoint/repair of brick and retain only the masonry cleaning specification.
8. Permits and Fees were discussed, and Les Campbell will ask the County what is required. (Les emailed-on Friday and said the County will require both a business permit and a building permit w/ fees- See the County's website for business fee and application. https://www.nelsoncounty-va.gov/business/business-license/)
10 9th S treet , Lynchburg , Vi rginia 24504 p 434-846-8456 | f 434-846-4534 | www.archi tecturalpar tners.com
9. Bidding Procedures were discussed, and Shannon Irvin added that several Code of Virginia forms will be included in the bid submission. These forms will be included in the addendum.
10. A confirm of the bid date/time/location were announce and any changes will be through the official website.
11. Discussed Owner supplied equipment and/or work. Only items identified were the greenhouse planting benches will be removed before contractor starts work. Also, that the connection of any data related links and IT interface will be by the Owner. The owner will connect to the contractor's provided environmental control panel for the tie-in to the school's server system.
12. Owner and Architect's role in project was identified. Owner will provide access to interior of building and will view site conditions for meeting expectations of cleanliness and order. Architect will be the contact for the project and issue all documents and pay application approvals.
Architect and Owner will be present at progress meeting 1x/month.
Owner will turn-around the pay application for payment in 2 weeks after receipt of approved application from the architect.
13. Discussed the working conditions- restrictions, staging, parking and limits of construction. Construction limits are shown on the drawings. If the area in front of the roll up door is needed by the contractor, this is fine if, with notice by the Owner that the access can be opened for limited use (ie. equipment delivery).
14. Site walk-thru and adjourned at approximately 4:15
15. See attachments.
10 9th S treet , Lynchburg , Vi rginia 24504 p 434-846-8456 | f 434-846-4534 | www.archi tecturalpar tners.com
10 9th S treet , Lynchburg , Vi rginia 24504 p 434-846-8456 | f 434-846-4534 | www.archi tecturalpar tners.com
.End of meeting notes.
21114 / NCHS Greenhouse 00 4100-1 INVITATION FOR BIDS
600 BID FORM
1.01 NELSON COUNTY PUBLIC SCHOOLS GREENHOUSE REPLACEMENT To Ms. Shannon Irvin, Assistant Superintendent for Administration Nelson County Public Schools 84 Courthouse Square Lovingston, VA 22949
1.02 DATE: ______________ (BIDDER TO ENTER DATE) 1.03 SUBMITTED BY: (BIDDER TO ENTER NAME AND ADDRESS)
Bidder's Full Name ___________________________________________________ Address ___________________________________________________________ City, State, Zip_________________________________________________
1.04 OFFER A. Having examined the Place of The Work and all matters referred to in the Invitation for Bids and
the Bid Documents prepared by Architectural Partners for the above mentioned project, we, the undersigned, hereby offer to enter into a Contract to perform the Work for the Sum of:
B. _________________________________________________________ dollars ($______________________), in lawful money of the United States of America.
C. We have included the required bid deposit as required by the Invitation for Bids. D. We will provide the required performance/payment bonds in the Bid Amount as required by the
Invitation for Bids. E. All applicable federal taxes are included and State of Virginia taxes are included in the Bid Sum. F. We will provide a Nelson County Business License.
1.05 ACCEPTANCE A. This offer shall be open to acceptance and is irrevocable for forty-five (45) days from the bid
closing date.
B. If this bid is accepted by Owner within the time period stated above, we will: Execute the Agreement within ten (10) days of receipt of Notice of Award. Furnish the required bonds within ten (10) days of receipt of Notice of Award. Commence work within ten (10) days after written Notice to Proceed of this bid.
C. If this bid is accepted within the time stated, and we fail to commence the Work or we fail to provide the required Bond(s), the security deposit shall be forfeited as damages to Owner by reason of our failure, limited in amount to the lesser of the face value of the security deposit or the difference between this bid and the bid upon which a Contract is signed.
D. In the event our bid is not accepted within the time stated above, the required security deposit shall be returned to the undersigned, in accordance with the provisions of the Invitation for Bids; unless a mutually satisfactory arrangement is made for its retention and validity for an extended period of time.
1.06 CONTRACT TIME If this Bid is accepted, we will:
Complete the Work as scheduled from a start of Notice to Proceed. (Bidder to attach a schedule showing outline of milestones in either days or weeks. Use of GANTT or simple notation that is adequate for seeing any long lead delays and timeline process)
21114 / NCHS Greenhouse 00 4100-2 INVITATION FOR BIDS
1.09 BID FORM SIGNATURE(S) (See attached forms for signature and inclusion with this bid form- see the following forms: A.) CODE OF VIRGINIA 2.2-4311 - EMPLOYMENT DISCRIMINATION
B.) CODE OF VIRGINIA 2.2-4311.1 - COMPLIANCE WITH FEDERAL, STATE, AND LOCAL IMMIGRATION LAWS
C.) CODE OF VIRGINIA 2.2-4312 - DRUG-FREE WORKPLACE
D.) CODE OF VIRGINIA 2.2-4321 – CONTRACTOR’S CERTIFICATION OF NON-DEBARMENT
E.) CERTIFICATION OF CRIMES AGAINST CHILDREN AND ACTS OF MORAL TURPITUDE
1.07 ADDENDA The following Addenda have been received. The modifications to the Bid Documents noted below
have been considered and all costs are included in the Bid Sum. Addendum # _______ Dated ________________. Addendum # _______ Dated ________________. Addendum # _______ Dated ________________.
1.08 BID SECURITY
Enclosed herewith is the following security, offered as evidence that the undersigned will enter into an agreement for the execution and completion of the work in accordance with the specifications and project documents. Use the following line or attached Bid Bond Form AIA A310 to the bid form:
Certified Check for the Sum of _____________________________________________
Name of Bank__________________________________________________________
Bidder’s Bond in Amount of_______________________________________________
Bond Issued By________________________________________________________
1.09 REFERENCES Please provide at least three (3) references with contact names, addresses and telephone numbers for which you have done similar jobs (does not specifically have to be greenhouses) as that specified in this bid request. 1.__________________________________________________________________________________________________________________________________ 2.__________________________________________________________________________________________________________________________________ 3.__________________________________________________________________________________________________________________________________
The Corporate Seal of ____________________________________________
(Bidder - print the full name of your firm)
was hereunto affixed in the presence of: __________________________________________
(Authorized signing officer, Title)
21114 / NCHS Greenhouse 00 4100-3 INVITATION FOR BIDS
(Seal)
____________________________________________
(Authorized signing officer, Title)
Contractor’s Current Virginia Contractor’s License Number _____________ Class ___________
END OF SECTION
21114 / NCHS Greenhouse 00 4100-8 INVITATION FOR BIDS
CODE OF VIRGINIA 2.2-4311
EMPLOYMENT DISCRIMINATION
§ 2.2-4311. Employment discrimination by contractor prohibited; required contract provisions.
ALL PUBLIC BODIES SHALL INCLUDE IN EVERY CONTRACT OF MORE THAN $10,000 THE
FOLLOWING PROVISIONS:
1. During the performance of this contract, the contractor agrees as follows:
A. The contractor will not discriminate against any employee or applicant for employment because of
race, religion, color, sex, national origin, age, disability, or other basis prohibited by state law relating to
discrimination in employment, except where there is a bona fide occupational qualification reasonably
necessary to the normal operation of the contractor. The contractor agrees to post in conspicuous places,
available to employees and applicants for employment, notices setting forth the provisions of this
nondiscrimination clause.
B. The contractor, in all solicitations or advertisements for employees placed by or on behalf of the
contractor, will state that such contractor is an equal opportunity employer.
C. Notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall
be deemed sufficient for the purpose of meeting the requirements of this section.
2. The contractor will include the provisions of the foregoing paragraphs a, b and c in every subcontract
or purchase order of over $10,000, so that the provisions will be binding upon each subcontractor or
vendor. (1982, c. 647, § 11-51; 2000, c. 628; 2001, c. 844.)
We hereby certify to the Nelson County School Board that in submission of this bid, we agree to conform
to the provisions outlined above.
Certified By: __________________________________________________ (Firm Name, City, and State)
Signed: ________________________________________
(Signature)
________________________________________
(Title)
________________________________________
(Date)
Return with Bid Form
21114 / NCHS Greenhouse 00 4100-9 INVITATION FOR BIDS
CODE OF VIRGINIA 2.2-4311.1
COMPLIANCE WITH FEDERAL, STATE, AND LOCAL IMMIGRATION LAWS
§ 2.2-4311.1 Compliance with federal, state, and local laws and federal immigration law; required
contract provisions.
ALL PUBLIC BODIES SHALL INCLUDE IN EVERY CONTRACT OF MORE THAN $10,000 THE
FOLLOWING PROVISIONS:
3. During the performance of this contract, the contractor agrees as follows:
A. The contractor does not, and shall not during the performance of the contract for goods and services in
the Commonwealth; knowingly employ an unauthorized alien as defined in the federal Immigration
Reform and Control Act of 1986.
We hereby certify to the Nelson County School Board that in submission of this bid, we agree to conform
to the provisions outlined above.
Certified By:
__________________________________________________________________________________
(Firm Name, City, and State)
Signed: ________________________________________
(Signature)
________________________________________
(Title)
________________________________________
(Date)
Return with Bid Form
21114 / NCHS Greenhouse 00 4100-10 INVITATION FOR BIDS
CODE OF VIRGINIA
2.2-4312 DRUG-FREE WORKPLACE
§ 2.2-4312. Drug-free workplace to be maintained by contractor; required contract provisions.
All public bodies shall include in every contract over $10,000 the following provisions:
During the performance of this contract, the contractor agrees to (i) provide a drug-free workplace for the
contractor's employees; (ii) post in conspicuous places, available to employees and applicants for
employment, a statement notifying employees that the unlawful manufacture, sale, distribution,
dispensation, possession, or use of a controlled substance or marijuana is prohibited in the contractor's
workplace and specifying the actions that will be taken against employees for violations of such
prohibition; (iii) state in all solicitations or advertisements for employees placed by or on behalf of the
contractor that the contractor maintains a drug-free workplace; and (iv) include the provisions of the
foregoing clauses in every subcontract or purchase order of over $10,000, so that the provisions will be
binding upon each subcontractor or vendor.
For the purposes of this section, "drug-free workplace" means a site for the performance of work done in
connection with a specific contract awarded to a contractor in accordance with this chapter, the employees
of whom are prohibited from engaging in the unlawful manufacture, sale, distribution, dispensation,
possession or use of any controlled substance or marijuana during the performance of the contract.
(2000, c. 417, § 11-51.1; 2001, c. 844.)
We hereby certify to the Nelson County School Board that in submission of this bid, we agree to conform
to the provisions outlined above.
Certified By: __________________________________________________ (Firm Name, City, and State)
Signed: ________________________________________
(Signature)
________________________________________
(Title)
________________________________________
(Date)
Return with Bid Form
21114 / NCHS Greenhouse 00 4100-11 INVITATION FOR BIDS
CODE OF VIRGINIA
§2.2-4321 – CONTRACTOR’S CERTIFICATION OF NON-DEBARMENT
This is to certify that I (we) have not been barred from bidding on contracts by any agency of the
Commonwealth of Virginia, nor am I (we) a part of any firm/corporation that has been barred from
bidding on contracts by any agency of the Commonwealth of Virginia.
Contractor: ____________________________________
Address: ____________________________________
____________________________________
____________________________________
By: ____________________________________
Signature: ____________________________________
Title: ____________________________________
Date: ____________________________________
Company Seal:
Return with Bid Form
21114 / NCHS Greenhouse 00 4100-12 INVITATION FOR BIDS
CERTIFICATION OF CRIMES AGAINST CHILDREN AND ACTS OF MORAL TURPITUDE
Contractor acknowledges that the implementation of this contract requires Contractor, Contractor’s
employees and/or subcontractors to have direct contact with Nelson County Public Schools’ students.
Therefore, Contractor hereby certifies that neither Contractor nor, to the best of Contractor’s knowledge,
its employees and/or subcontractors have been convicted of a felony or any offense involving the sexual
molestation or physical or sexual abuse or rape of a child.
Contractor further certifies and shall indicate below whether Contractor and, to the best of Contractor’s
knowledge, its employees and/or its subcontractors, who will have direct contact with Nelson County
Public School students, have been convicted of a crime of moral turpitude. Crimes of “moral turpitude”
are those crimes involving lying, cheating or stealing.
For the purposes of this certification, "direct contact with students" means being in the presence of
students during regular school hours or during school sponsored activities.
Contractor understands that, pursuant to Code of Virginia §22.1-296.1(C), making a materially false
statement regarding offenses which are required to be included in the certification referenced above is a
Class 1 misdemeanor and, upon conviction, the fact of such conviction shall be grounds for the revocation
of the contract to provide such services and, when relevant, the revocation of any license required to
provide such services. Nelson County Public Schools shall not be liable for materially false statements
regarding the certifications required under this Contract.
Have you or, to the best of your knowledge, any of your employees and/or subcontractors who will have
direct contact with students been convicted of a crime of moral turpitude?
□ NO
□YES (please explain)
Contractor: Date:
By: _____________________________________________________ _____________
Title: _____________________________________________________ _____________
Return with Bid Form
1A3.1
________________________
10' - 0" +/-
34' - 7" +/-
4A2.1
________________________
____________
A2.11
VESTIBULE
____________
A2.12 ____________
A2.13
PATCH EXIST. WALLS @ UNUSED SUPPORT ATTACHMENT POINTS, TYP
PAINT EXIST. CMU WALLS, ROOF STRUCTURE, TYP
EXIST. HORTICULTURE CLASSROOM, NO WORK
CLEAN, PRIME & PAINT EXIST. DOORS & FRAMES (DR 102 & 103). REPLACE EXIST SEALANT W/ NEW SEALANT, TYP
CONC. RAMP, 1: 12 SLOPE MAX.
CONC. LANDING, ELEVATION SHALL MATCH CLASSROOM FLOOR ELEVATION
EQL 5' - 0" EQLFLO
OR
SLO
PE
12' M
IN. PLU
S A
LLO
WA
NC
E F
OR
5' -
0"
4" CONC SLAB, LIGHT BROOM FINISH, ON VAPOR BARRIER ON 4" POROUS FILL. SLOPE TO TRENCH DRAIN (1/8" PER 1'-0")
ADA TRENCH DRAIN, CONNECT TO NEW UNDERSLAB DRAINAGE SYSTEM & ROUTE TO DAYLIGHT @ SOUTH END OF BUILDING
EXIST. CONC TO REMAIN
EXIST. CONC TO REMAIN
4" CONC SLAB, LIGHT BROOM FINISH, ON VAPOR BARRIER ON 4" POROUS FILL. SLOPE TO AREA DRAIN (1/8" PER 1'-0") AREA DRAIN, CONNECT
TO NEW UNDERSLAB DRAINAGE SYSTEM & ROUTE TO DAYLIGHT @ SOUTH END OF BUILDING
GREENHOUSE WALL SYSTEM MOUNTED ON TOP OF EXIST. WALL, CENTER ON WALL
GREENHOUSE DOOR, LOCATE IN EXIST. MASONRY OPENING. MINIMUM CLEAR OPENING SHALL BE 34"
GREENHOUSE FRAMING, TYP
PREP & PAINT EXIST. MASONRY WALL, TYP
61'
- 5 1/2
" +/-
CONTROLS FOR GREENHOUSE, BY GREENHOUSE VENDOR
3" DIA. PVC PIPING UNDERSLAB, SEE SHEET P1.0
DOWNSPOUT BY GREENHOUSE VENDOR, TYP OF 2
REMOVABLE ALUMINUM HANDRAIL (MAX. 4'-0" SECTIONS), EACH SIDE. SET IN SST SLEEVES
CLIMATEZONE 1
CLIMATEZONE 2
101
103
102
104EXIST. CONC. TO REMAIN
RUBBED FINISH ON CONC. @ SIDE OF RAMP/ LANDING
PROVIDE 1/2" EXPANSION JOINT @ EDGE OF NEW SLAB, TYP
.
MAINTAIN 1'-6" CLEARANCE @ LATCH SIDE OF DOOR
RA
MP
DN
GENERAL NOTESA. DIMENSIONS ARE TO FACE OF EXISTING CMU.
B. CONTRACTOR SHALL VERIFY DIMENSIONS PRIOR TO CONSTRUCTION. REPORT DISCREPANCIES TO ARCHITECT.
C. REPRESENTATION OF GREENHOUSE AND ITS INTERFACE WITH THE EXISTING CONSTRUCTION IS BASED ON THE "BASIS OF DESIGN" GREENHOUSE AS INDICATED IN THE SPECIFICATIONS. IN THE EVENT THAT ANOTHER GREENHOUSE DESIGN IS SELECTED, CURRENT DESIGN DETAILS MAY NOT BE APPLICABLE & THE GREENHOUSE VENDOR SHALL COORDINATE THEIR DESIGN REQUIREMENTS WITH THE EXISTING CONSTRUCTION.
D. EXACT CONFIGURATION OF THE GREENHOUSE FRAMING ELEMENTS IS TO BE DETERMINED BY THE GREENHOUSE MANUFACTURER IN ACCORDANCE WITH CODE REQUIRED LOADINGS, SEE SPECIFICATIONS.
E. TRENCH DRAIN SHALL BE EQUAL TO JOSAM PRO-PLUS 100 CHANNEL WITH NEUTRAL SLOPE, BOTTOM OUTLET, HEEL-PROOF DUCTILE IRON GRATE AND LENGTH PER PLAN.
F. FLOOR DRAIN SHALL BE EQUAL TO JOSAM 34710 SERIES WITH CAST IRON BODY, HEAVY DUTY SECURED GRATE AND 4" NO-HUB OUTLET.
PREP & PAINT EXIST. MASONRY WALL, TYP
SEE SHEET P1.0
REMOVE EXIST. CONC. WALK
REMOVE EXIST. CONTROL PANELS, MISTER CONTROLS, WATER LINES & HEATING LINES
REMOVE EXIST. UNUSED UTILITY SUPPORTS
CLEAN EXIST. WALLS, ROOF JOISTS & DECK & PREPARE TO RECEIVE NEW PAINT FINISH
EXIST. HORTICULTURE CLASSROOMREMOVE EXIST. ROOFING & INSUL. PREPARE REMAINING DECK TO RECEIVE NEW ROOF SYSTEM
REMOVE EXIST. STONE FILL. PREPARE EXIST. SUBGRADE TO RECEIVE NEW CONC. SLAB
REMOVE EXIST. CONC. WALK
REMOVE EXIST. SLOPED CONC. PERIMETER STRIP
REMOVE EXIST. CAST IRON DRAIN HUBS, TYP OF 6. ABANDON & CAP EXIST. DRAIN LINES BELOW LEVEL OF NEW POROUS FILL
REMOVE EXIST. GREENHOUSE STRUCTURE COMPLETE. REMOVE EXIST. ANCHOR BOLTS FLUSH W/ FOUNDATION WALL
REMOVE EXIST. HEATING RADIATORS COMPLETE
REMOVE EXIST. CEMENT WASH ON TOP OF EXIST. CMU WALL. PREPARE WALL TO RECEIVE NEW GREENHOUSE CONSTRUCTION
REMOVE CMU @ LOCATIONS OF GREENHOUSE FRAMING, SEE STRUCTURAL DETAILS SHEET A3.1
REMOVE EXIST. STONE FILL. PREPARE EXIST. SUBGRADE TO RECEIVE NEW CONC. SLAB
5A2.1
________________________
3A3.1
________________________
4A3.1
________________________
PROVIDE SINGLE PLY MEMBRANE FLASHING W/ STANDARD TERMINATION BAR
PREFINISHED METAL FASCIA, TYP BOTH SIDES
SINGLE PLY MEMBRANE ROOFING ON TAPERED RIGID INSUL
RETROFIT ROOF DRAIN
GR
EE
NH
OU
SE
3' x 12'
MOVABLE PLANTING BENCH, SIZE AS NOTED
3' x 8'3' x 6'
1' - 6" CLR
3' x 12'
2' - 4 9/16"2' - 4 9/16"
2' -
6"
EQ EQ
2' - 8 9/16"
2' - 8 9/16"
3' x 12'
3' x
12'
3' x
12'
3' x
12'
3' x
12'
3' x
12'
3' x
12'
3' x
12'
3' x
12'
3' x
12'
3' x
12'
3' x
12'
3' x
12'
3' x 8' 3' x 8'
3' x 8' 3' x 8'
3' x
8'
3' x
8'
3' x
8'
3' x
8'
3' x
6'
3' x
6'
3' x
6'
3' x
6'
3' x
6'
3' x
6'
ARCHITECT
COMMO
NWEA
LTH OF VIRGIN
AIMARK W. SMITHLic. No. 8622
DATE:
DESIGNED:
DRAWN:
CHECKED:
REVISIONS:
WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. CONTRACTORS SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE JOB AND THIS OFFICE MUST BE NOTIFIED OF ANY VARIATION FROM THE DIMENSIONS AND CONDITIONS SHOWN BY THESE DRAWINGS
© 2
018
AR
CH
ITE
CT
UR
AL
PA
RT
NE
RS
, P
.C.
5/1
7/2
02
1 2
:23:3
0 P
M
DEMOLITION& NEW WORK
PLANS
04/19/21
PR
OJE
CT
NO
.: 21
114
LOV
ING
STO
N, V
IRG
INIA
BLS
BLS/KTG
MWS
BID SET
GR
EEN
HO
USE
REP
LAC
EMEN
T FO
R
NELS
ON C
OUNT
Y HI
GH SC
HOOL
04/19/2021
A1.1TN PN
1/4" = 1'-0"A1.11 FLOOR PLAN
TN PN
1/8" = 1'-0"A1.12 DEMOLITION PLAN
TN PN
1/4" = 1'-0"A1.13 ROOF PLAN @ VESTIBULE
BUILDING CODE DATA
APPLICABLE CODES VIRGINIA CONSTRUCTION CODE (VCC) 2015 EDITIONVIRGINIA EXISTING BUILDING CODE (VEBC) 2015 EDITION
USE GROUP -- E - EDUCATION
CONSTRUCTION TYPE -- IIB, NON-SPRINKLERED
GREENHOUSE IS BEING EVALUATED USING VEBC AS LEVEL 1 ALTERATION - REMOVAL AND REPLACEMENT OF ELEMENTS, EQUIPMENT OR FIXTURES WITH NEW ELEMENTS, EQUIPMENT OR FIXTURES THAT SERVE THE SAME PURPOSE.
GREENHOUSE ACCESSIBILITY IS BEING MAINTAINED IN ACCORDANCE WITH ICC A117.1- 2009
NO NEW AREA IS BEING ADDED IN THIS PROJECT. AREA OF GREENHOUSE IS 2125 SF.OCCUPANT LOAD -- EDUCATION - VOCATIONAL AREA 50 OCC / SF. TOTAL OCCUPANCY IS 43. NO CHANGE.
TN PN
1/8" = 1'-0"A1.14 PLANTING BENCH LAYOUT
0 2' 8'4' 16'
1/4" = 1'-0"
0 4' 16'8' 32'
1/8" = 1'-0"
ADDENDUM #1 5/17/211
1
1
1
11
1
1
GREENHOUSE FLOOR0"
HIGH SCHOOL FLOOR1' - 0"
EXIST. BRICK MASONRY TO REMAIN. CLEAN ENTIRE SURFACE, SEE SPECS
GREENHOUSE STRUCTURE TO MATCH EXIST. GREENHOUSE, SEE SPECS
EXIST. BRICK ROWLOCK SILL TO REMAIN
EXIST. SCHOOL BUILDING BEYOND, NO WORK
UNDERSLAB PIPING TIE-IN TO DOWNSPOUT
PREFINISHED DOWNSPOUT BY GREENHOUSE SUPPLIER, DISCHARGE TO GRADE, TYP
GREENHOUSE GUTTER W/ END PIECE, TYP
PREFINISHED METAL FLASHING @ SILL
GREENHOUSE FLOOR0"
1A3.1
________________________
HIGH SCHOOL FLOOR1' - 0"
3A3.1
________________________
APPROX. LINE OF EXISTIING GRADE
GREENHOUSE STRUCTURE TO MATCH EXIST. IN SIZE, SEE SPECS
EXIST. BRICK MASONRY TO REMAIN. CLEAN ENTIRE SURFACE, SEE SPECS
EXIST. SCHOOL BUILDING, NO WORK
EXIST. VESTIBULE, CLEAN BRICK MASONRY
CLEAN, PRIME & PAINT EXIST. STEEL LINTEL
CLEAN, PRIME & PAINT EXIST. HM DOOR & FRAME
REPLACE EXIST. SEALANT W/ NEW SEALANT
INSTALL SINGLE PLY MEMBRANE ROOFING ON TAPERED RIGID INSUL. PROVIDE MEMBRANE FLASHING @ EXIST. SCHOOL BUILDING & GREENHOUSE
PREFINISHED METAL COPING TO MATCH EXIST. IN COLOR
EXIST. BRICK ROWLOCK SILL TO REMAIN
GREENHOUSE GUTTER
PREFINISHED DOWNSPOUT BY GREENHOUSE SUPPLIER, DISCHARGE TO GRADE
PRECAST SPLASHBLOCK, TYP OF 2
PREFINISHED METAL FLASHING @ SILL
CROSS-BRACING AS REQUIRED BY GREENHOUSE MANUFACTURER. SIDEWALL BRACING SHALL NOT EXTEND BELOW THE TOP ON EXISTING MASONRY WALL
GREENHOUSE PANELS
GREENHOUSE PANELS
REPLACE EXIST. WALL HYDRANT, SEE PLUMBING DRAWINGS
GREENHOUSE FLOOR0"
HIGH SCHOOL FLOOR1' - 0"
APPROX. LINE OF EXISTING GRADE
GREENHOUSE STRUCTURE TO MATCH EXIST., SEE SPECS
EXIST. BRICK MASONRY TO REMAIN. CLEAN ENTIRE SURFACE, SEE SPECS
EXIST. SCHOOL BUILDING, NO WORK
EXIST. VESTIBULE, CLEAN BRICK MASONRY
INSTALL SINGLE PLY MEMBRANE ROOFING ON TAPERED RIGID INSUL. PROVIDE FLASHING @ EXIST. SCHOOL BUILDING & @ GREENHOOUSE
PREFINISHED METAL FASCIA TO MATCH EXIST. IN COLOR & SIZE
EXIST. BRICK ROWLOCK SILL TO REMAIN
GREENHOUSE GUTTER
PREFINISHED DOWNSPOUT BY GREENHOUSE SUPPLIER, DISCHARGE TO GRADE
3A3.1
OPPSIM
________________________
CROSS-BRACING AS REQUIRED BY GREENHOUSE MANUFACTURER. SIDEWALL BRACING SHALL NOT EXTEND BELOW THE TOP ON EXISTING MASONRY WALL
GREENHOUSE PANELS
GREENHOUSE PANELS
EXIST. WALL MOUNTED HOES BIBB, SEE PLUMBING DRAWINGS FOR WORK
GREENHOUSE FLOOR0"
GREENHOUSE CLIMATE SEPARATION WALL
GREENHOUSE DOOR
GREENHOUSE STRUCTURE TO MATCH EXIST.
EXIST. MASONRY WALL TO REMAIN. PROVIDE PAINT FINISH
4" CONC. SLAB, LIGHT BROOM FINISH, ON VAPOR BARRIER ON 4" POROUS FILL
EXIST. MASONRY WALL TO REMAIN
EXIST. MASONRY WALL TO REMAIN
6"
12"
6"
12"
.
HEIGHT OF SIDEWALL AS REQUIRED TO PROVIDE MANUFACTURER STANDARD AUTOMATED SHADE SYSTEM
REMOVE WOOD CANT
EXIST BLOCKING MODIFY AS REQUIRED FOR NEW ROOF SYSTEM
EXIST WALL AND JOIST
REMOVE METAL FASCIA
PARTIAL REMOVAL OF ROOF DRAIN AS REQUIRED FOR RETRO-FIT
REMOVE EPDM & INSUL./RECOVERY BOARD REMOVE EXIST.
B.U.R. & INSUL.
ARCHITECT
COMMO
NWEA
LTH OF VIRGIN
AIMARK W. SMITHLic. No. 8622
DATE:
DESIGNED:
DRAWN:
CHECKED:
REVISIONS:
WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. CONTRACTORS SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE JOB AND THIS OFFICE MUST BE NOTIFIED OF ANY VARIATION FROM THE DIMENSIONS AND CONDITIONS SHOWN BY THESE DRAWINGS
© 2
018
AR
CH
ITE
CT
UR
AL
PA
RT
NE
RS
, P
.C.
5/1
7/2
02
1 2
:23:3
2 P
M
ELEVATIONS& SECTION
04/19/21
PR
OJE
CT
NO
.: 21
114
LOV
ING
STO
N, V
IRG
INIA
BLS
BLS/KTG
MWS
BID SET
GR
EEN
HO
USE
REP
LAC
EMEN
T FO
R
NELS
ON C
OUNT
Y HI
GH SC
HOOL
04/19/2021
A2.1
1/4" = 1'-0"A2.11 SOUTH ELEVATION
1/4" = 1'-0"A2.12 WEST ELEVATION
1/4" = 1'-0"A2.13 EAST ELEVATION
1/4" = 1'-0"A2.14 CROSS SECTION
1 1/2" = 1'-0"A2.15 VESTIBULE ROOF REPLACEMENT 0 3" 6" 1' 2'
1 1/2" = 1'-0"
ADDENDUM #1 5/17/21111
1
1
1
5"
5"
5"
5"
2'-0"
2'-0"
(2) 1/2"∅ HILTI KWIK HUSW/1/8"x11/2" SQ PL WASHERS
& 2" MIN EMBED (OR EQUAL)
GREENHOUSE COLUMN& BASE
EXIST CONC WALL
EXIST BRICK
EXIST CMUBEYOND, PARGE FACE
INSTALL GREENHOUSECOLUMN AT EXIST
COLUMN LOCATIONS
SAW CUT AND REMOVEMIMIMUM AMOUNT OF
EXIST CMU REQUIRED TOREMOVE
EXIST COLUMN ANDINSTALL NEW COLUMN
REMOVE EXIST COLUMNAND ANCHOR BOLTS
TO TOP/EXIST CONC WALL
EXIST CONC WALL
EXIST BRICK
EXIST CMU(BEYOND)
SHIM AS REQ'D TOOBTAIN PRESCRIBED
GUTTER SLOPE
FLOOR LINEFLOOR LINE
CEMENT PARGEMASONRY @
PERIMETER OFCOLUMN POCKET
GREENHOUSE FLOOR0"
GREENHOUSE COLUMN
4" CONC. SLAB ON VAPOR BARRIER ON 4" POROUS FILL
EXIST. FACE BRICK TO REMAIN
EXIST. CONC. FOUNDATION WALL
EXIST. BRICK ROWLOCK SILL
1/2" EXPANSION JOINT @ PERIMETER
PREFINISHED METAL FLASHING, INSTALL BEHIND POLYCARBONATE PANEL & BED IN SEALANT
GREEENHOUSE POLYCARBONATE PANEL
GREENHOUSE GIRT
EXIST. CMU
METAL CLEAT, ANCHOR TO EXIST. BRICK SILL
EXIST. STL BAR JOIST, CLEAN & PAINT
EXIST METAL DECK, CLEAN & PAINT
4" RIGID INSUL, TAPER TO EXIST. ROOF DRAIN
SINGLE-PLY MEMBRANE ROOFING
EXIST. CMU, CLEAN & PAINT
EXIST. FACE BRICK
6 3
/4"
PREFINISHED METAL FASCIA COVER
MEMBRANE FLASHING, STANDARD TERMINATION DETAIL TO FASCIA
TRTD WD NAILERS @ ROOF PERIMETER
GREENHOUSE SIDE
GREENHOUSE END COLUMN
GREENHOUSE GLAZING PANEL
GREENHOUSE GIRT
SST COUNTER FLASHING
ROOF MANUFACTURER'S STANDARD TERMINATION BARMEMBRANE FLASHING
SINGLE-PLY MEMBRANE ROOFING
RIGID INSUL
EXIST. STEEL ROOF DECK, CLEAN & PAINT
EXIST. STEEL JOIST, CLEAN & PAINT
POTENTIAL LAY-DOWN AREA
SITEMAINTAIN ACCESS TO EXISTING ROLL-UP DOOR
LIMIT OF CONSTRUCTION
ARCHITECT
COMMO
NWEA
LTH OF VIRGIN
AIMARK W. SMITHLic. No. 8622
DATE:
DESIGNED:
DRAWN:
CHECKED:
REVISIONS:
WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. CONTRACTORS SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE JOB AND THIS OFFICE MUST BE NOTIFIED OF ANY VARIATION FROM THE DIMENSIONS AND CONDITIONS SHOWN BY THESE DRAWINGS
© 2
018
AR
CH
ITE
CT
UR
AL
PA
RT
NE
RS
, P
.C.
5/1
7/2
02
1 2
:23:3
3 P
M
SECTIONS &DETAILS
04/19/21
PR
OJE
CT
NO
.: 21
114
LOV
ING
STO
N, V
IRG
INIA
BLS
BLS
MWS
BID SET
GR
EEN
HO
USE
REP
LAC
EMEN
T FO
R
NELS
ON C
OUNT
Y HI
GH SC
HOOL
04/19/2021
A3.1
1 1/2" = 1'-0"A3.11 WALL SECTION
1 1/2" = 1'-0"A3.12 STRUCTURAL DETAILS
1 1/2" = 1'-0"A3.13 ROOF DETAIL @ VESTIBULE
1 1/2" = 1'-0"A3.14 WALL DETAIL @ GREENHOUSE
N.T.S.A3.15 LIMITS OF CONSTRUCTION
1 ADDENDUM #1 5/17/21
1
1
1
1
1
DN
CLSATECLS
PLUMBINGFLOOR PLANS
P1.0423-270
NEW WORK PLAN NOTES
DEMOLITION PLAN NOTES
PLUMBING DEMOLITION PLANNORTH
PLUMBING NEW WORK PLANNORTH
423-270
DATE:DESIGNED:DRAWN:CHECKED:REVISIONS:
© 2
01
8 A
RC
HIT
EC
TU
RA
L P
AR
TN
ER
S,
P.C
.
5/17
/202
1 3:
49:2
6 PM
GRE
ENH
OU
SE R
EPLA
CEM
ENT
FOR
NELS
ON C
OUNT
Y HI
GH SC
HOOL
LOV
ING
STO
N, V
IRG
INIA
RO
JEC
T N
O.:
2111
4
BID SET
04/19/2021
423-270