Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP with full tables on highly available linux router firewall. Public IPv6 block being advertised, www.adams.edu answers on IPv6. CEPH storage cluster for file serving and "cloud" access to home and shared space. Still using Linux KVM for virtual servers, now on CEPH shared storage, still using VMWare for Banner systems. Workstation cloning and management with Microsoft SCCM. Obtained 2048 more IPv4 addresses for Resnet directly through ARIN. Snowden settings for SSL on web servers (forward secrecy, 256 bit, discrete logs vs elliptic curve) just for fun. Establishing secondary data center for disaster recovery. Power metering in primary data center for each phase. Banner In middle of search committee for Team Lead Ellucian Mobile Server being built Blackboard integration issues since last upgrade to BB Web Time Entry for workstudy timesheets Various payroll, finance and fin aid upgrades Banner XE, will be building test servers soon, still unclear what hardware requirements will be Converting SQRs to Perl/Python to avoid pending SQR upgrade cost Support Services Implemented Impulse Point as a replacement for NAC on wireless, still using Bradford for the small number of wired connections in ResNet Upgrading labs/TEC classrooms- went to Dell all-in-one as a test-Model 9010 Transitioned from Pcounter to papercut RT ticketing system, survey integration Investigating Crestron vs Extron Network/Telecom team VoIP Evaluating Aruba redundant pair to replace HP TMS module ASU and KSPK partnership for sports broadcasting Upgraded wireless service to our faculty drive, hi-rise apartments next Mac Gray Internet-based pay laundry services East Campus now houses HPPE, will become swing space for RH construction

Adams State - checoweb.org · Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Adams State - checoweb.org · Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP

Adams State

Server Team

Investigation/possible transition to Gmail for faculty/staff

2x200Mb Internet links with different providers using Quagga BGP with full tables on highly available linux router firewall.

Public IPv6 block being advertised, www.adams.edu answers on IPv6.

CEPH storage cluster for file serving and "cloud" access to home and shared space.

Still using Linux KVM for virtual servers, now on CEPH shared storage, still using VMWare for Banner systems.

Workstation cloning and management with Microsoft SCCM.

Obtained 2048 more IPv4 addresses for Resnet directly through ARIN.

Snowden settings for SSL on web servers (forward secrecy, 256 bit, discrete logs vs elliptic curve) just for fun.

Establishing secondary data center for disaster recovery.

Power metering in primary data center for each phase.

Banner

In middle of search committee for Team Lead

Ellucian Mobile Server being built

Blackboard integration issues since last upgrade to BB

Web Time Entry for workstudy timesheets

Various payroll, finance and fin aid upgrades

Banner XE, will be building test servers soon, still unclear what hardware requirements will be

Converting SQRs to Perl/Python to avoid pending SQR upgrade cost

Support Services

Implemented Impulse Point as a replacement for NAC on wireless, still using Bradford for the small number of wired connections in ResNet

Upgrading labs/TEC classrooms- went to Dell all-in-one as a test-Model 9010

Transitioned from Pcounter to papercut

RT ticketing system, survey integration

Investigating Crestron vs Extron

Network/Telecom team

VoIP

Evaluating Aruba redundant pair to replace HP TMS module

ASU and KSPK partnership for sports broadcasting

Upgraded wireless service to our faculty drive, hi-rise apartments next

Mac Gray Internet-based pay laundry services

East Campus now houses HPPE, will become swing space for RH construction

Page 2: Adams State - checoweb.org · Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP

Organizational

Cheap in-house remodeling options, hopefully state funded in 3-5 years

Electronic Security Systems policy

IT Governance

Ryan Shiba- Director of AITC has left for DU

ASU President will be leaving in under 2 years

Construction continues- RH funded as state project

as part of the remodel of our main admin bldg, document mgmt project underway

"Bubble building" should be done soon, awaiting manufacturer's delay on dome

Track recently resurfaced with state money

AIMS Community College

Academic Works

Accommodate

Accuplacer/ACT Automation

Active Data Exchange Calendar

Active Data Exchange Event Registration

Aims Online – Migration to hosted services

Aims Online – Integration to Wimba

Aims Online Upgrade

Aims Online WEBDAV integration

Alertus

Alterus/Rave Integration

Annual Banner upgrade and testing

Annual budget roll

ARC ticketing system

Argos upgrade

AT&T mobile app

Campus Labs Student Learning Assessment

Custom web admissions applications

DegreeWorks reporting

DegreeWorks upgrade

eCivis

Electronic Data Warehouse freezing

Employee Directory improvements

Enterprise Mobility Management

Enterprise test environment

eScrip-Safe to Banner interface

Federal negotiated Fringe Agreement

Federal part time benefits (Affordable Care Act)

Fiscal year and close

FormFusion PDF print

Fort Lupton construction & renovation

Fort Lupton phone system upgrade

Page 3: Adams State - checoweb.org · Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP

General Services renovation

GoPrint Mobile App

Gmail for students

Heartland campus card automation

Heartland Student campus card app

ID system enhancements

Inigral/Uversity Facebook app

Kivuto

Labstats

LiveText

Loveland rewiring

Luminis 5 upgrade

Marketing ticketing system

Mentor student in Mobile App program

Online meeting software

Online travel request

Password complexity

Password re-enable script

PeopleAdmin upgrade

Prognosis

Remote Station software upgrade

Replace online catalog product

Reverse Transfer

SAP improvements

Second Life

Self-Service Finance/Budgeting

Spiceworks

Spiceworks technology inventory

Starfish

TDClient

Transfer articulation software

Tuition guarantee

Virtual Orientation

Voicemail system upgrades & virtualization

Voicemail to email fix

VOIP

Website redesign

Wimba replacement

Windows 8 upgrade

Wireless upgrade in AATC – Windsor

Wiring for new ATC sims in Aviation

Workflow

Page 4: Adams State - checoweb.org · Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP

CCCS

1. Upgrading Banner Student through 8.6 to be completed this October.

2. About to begin user testing on a process to load photo IDs into INB which can be views

in INB and will be used to develop a photo roster.

3. Modified SSB registration to comply with state voter laws. Complete.

4. Working on multiple academic initiatives that will re-create academic standing allowing

us to run standing differently on different populations of students in an effort to reach

out to and retain students while increasing their chances of success.

5. We are beginning to re-implement DegreeWorks so that we can fully utilize the new

functionality available.

6. We are about to begin the implementation of Banner Recruiter, a powerful admissions

CRM application.

7. We are about to begin the implementation of Banner Flexible Registration 8.6 allowing

continuing education students to get admitted, pay, and register all at once without any

staff interaction.

Implementing the dashboard components of BRM for Student Retention Performance

We are retiring our old Legacy warehouse the end of this year – going forward just using

ODS/EDW

Looking at all the implications of Health Care reform and IRS regulations on adjunct work

hours

Page 5: Adams State - checoweb.org · Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP

In preparation for Banner XE - Going to Baseline MEP

Will be implementing CAS & BEIS.

Our main focus these days is getting the Exchange 2010 migration started (hopefully in

early October).

We are also working on upgrading our Certificate Services to Server 2012. This will help

on our security scans.

Also planning the rollout of Server 2012-based domain controllers.

Windows Servers

1. Planning a project to upgrade all SQL databases to the latest version of SQL and

clustering two or more servers for high availability and reliability.

2. Built a virtual lab environment from old server equipment for testing and

configuring projects before they are implemented in the production environment.

(Particular with configuration of VMWare related projects)

3. Perform configuration of disk space on HP EVA SAN (HP EVA SANs are being

replaced with new EMC SAN).

4. Maintain backup of all windows servers with the exception of Domain Controllers

and Exchange/exchange related servers using NetBackup. (Working with new

product called AVAMAR which will be replacing NetBackup as the primary backup

hardware/software)

Network projects

1. Wireless upgrade and installation of Cisco ISE for BYOD

2. Migration of VoIP for college that decided to hold out on original project

Page 6: Adams State - checoweb.org · Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP

3. TelePresence infrastructure replacing Meeting Place

4. Student E-Mail migration – as we speak

Security

- Nessus security scanning – Partnering with CCCS member college staff to remediate

vulnerabilities. -- Started Fall 2012, ongoing..

- Security Awareness – October training campaign for staff & starting monthly e-

mail newsletter. -- Fall 2013

- Cisco ISE – Implementation and deployment of ISE for BYOD & NAC. -- Fall 2013 -

> Spring 2014.

- Standardized Internal SSL CA - Deployment & member college adoption. -- Fall

2013.

Banner Mobile

PPCC went live with Ellucian Go on August 22nd.

- Had one issue but it was a successful go-live.

- PPCC is receiving positive feedback from students.

- So far the mobile app has had 5085 unique visitors and 7145 number of visitors.

- Some of the most used features have been: faculty search, events,

course calendar view and important phone numbers.

Fun Facts

1. Month of August processed 970K telephone calls through telephony system, 48% of

these are inbound calls to colleges. Less than .5% are in-state long distance calls and 1.6%

are out of state long distance.

2. WebEx – currently have 700 users that are scheduling and running meetings

regularly. Month of August had 108K people minutes. So far for September we have 60K

people minutes. We are fully integrated with VoIP and TelePresence environments. Have

Page 7: Adams State - checoweb.org · Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP

one college today that is teaching to K-12 school using TelePresence/WebEx integration.

3. TelePresence – Is growing fast and colleges are ordering new units to replace the old

Polycom systems. We currently run about 35 conferences weekly primarily for distance

education between campuses or to rural K-12 schools.

August, 1.5M student transactions (add/drops) 99,000 highest one day total

1.9M portal visits in August 2013

Refunded $202M through e-refund last year.

49M in tuition dollars collected via our payment gateway last year

Paid 208M in payrolls last year

Deflected 3.2M spam or threat emails in one week

Deliver 369,000 valid emails that same week. Colorado College 1. New CTO : Brian Young, CTO from Creighton University Starts October 1st

2. Virtualized Banner/Oracle database servers

Upgraded banner servers from 2003 to 2008r2

3. Moved all students to Office 365

4. Standing up DR site hosted at University of Wyoming using Vmware Site

Recovery Manager

5. Major upgrades to video surveillance systems 40 cameras to over 250 high

def cams

6. Implemented F5 virtual load balancer/web app firewall

7. Starting PCI compliance activities

8. New fitness center with 25 smart treadmil/elliptical on the network Colorado Mesa University CMU is currently undergoing a comprehensive review for continued accreditation by the HLC. We have

just completed our self-study report, and the site visit is scheduled for Nov. 18-20.

Upgraded our Internet bandwidth from 400 to 600 Mb/s, and we worked with CenturyLink to get fiber

installed to our Forensic Investigation Resource Station approximately 10 miles south of main campus.

Developing a 12-month transition plan to move from Novell to Microsoft Active Directory.

Reviewing Microsoft EES contract for Office 365. We plan to move all students and faculty and most of

staff this Spring

We are moving from Luminis CPIP to CAS Single Sign-On Connectors and are developing the pre-portal

login screen to SSO to applications

Page 8: Adams State - checoweb.org · Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP

CMU installed a pair of FortiGate 800c firewalls this summer. This project also involved re-architecting

the network around a single firewall/router before separating the two into distinct devices. As a result,

we purchased a second NetEqualizer bandwidth shaping appliance.

Completed our SAN upgrade, replacing two HP EVA 4000s with a pair of HP 3PAR StoreServ 7200s. Data

is synchronously replicated between the nodes.

Reconfigured our Cisco wireless deployment. We upgraded firmware on our Cisco wireless controllers

to fix a problem supporting multicast traffic. We repositioned/reoriented 138 APs in four of our older

residence halls.

Purchased SANS Securing the Human (STH) Security Awareness Training Program materials

Replaced the batteries in our data center UPS(s) and completed DR test of our data center

environmental controls.

Upgrading our Banner Oracle Database Production and Test servers to HP rx2800 Itanium servers.

Upgrade to Banner Accounts Receivable 8.4, Finance 8.8, Position Control 8.9, and Payroll 8.9 are

scheduled for Fall Break.

Implementing OrgSync for Student Services

Instituted a policy/methodology for Delayed Financial Aid Disbursement for students who were at risk

for collecting Financial Aid and not actually showing up to class.

Signed an agreement for Adobe Creative Cloud

Upgraded our IBM SPSS Perpetual Licenses to a Term Campus Agreement

Implemented Academic Works for scholarship application and review. This required implementing

Shibboleth identity and authentication providers.

We implemented a dual stack IPv6 configuration so each device currently has both an IPv4 and an IPv6

address. We have configured the firewall rules and started to prepare for IPv6 pilot testing.

Buildings:

Opened a new 209 bed Residence Hall this fall.

New Language, Lit and Mass Communications building to open next fall.

Tomlinson Library renovation is in Design Development stage.

Personnel:

Mike Kansgen, Director of Computing and Network Systems started in May. He is taking lead

on information security initiatives.

Hired a System Administrator position starting October 15. He’s coming from UofWisc.

Madison.

We still have two vacant Banner Programmer positions.

Upcoming Projects:

Page 9: Adams State - checoweb.org · Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP

Support the Registrar’s Office implementation of Degree Works - Spring 2014

Integrate Library fine charges/payments between Banner and Marmot's Millennium using web services

Business Continuity and Risk Assessment Interviews

Penetration Testing and Vulnerability Assessment (3rd Party and Internal)

Mobile Device Management standards

CSU Blackboard Analytics (Learn module) being implemented as a part of a student success and retention

initiative and will also be used by Teaching and Learning unit to improve course design.

Moving away from home-grown Program Review and Assessment software (PRISM) in favor of modules

from Campus Labs.

In addition to data analytics, continue to look into big data issues, how to handle them. New campus

committee on data management .

Implementing PeopleAdmin for hiring, onboarding, position management, performance management.

Implementing Event Management Systems (EMS) from Dean Evans as centralized classroom scheduling

system.

Implementing base functionality of Ellucian Mobile in October 2013, and then continue to roll-out

mobile apps

New cellular partnership with Verizon started in May, to include a stipend option

Continue to struggle with what to do about DAS

About ready to go live with Teamdynamix (project management).

Echo360 deployment expanding as the centrally supported lecture capture solution for the campus.

Implementing Slate this fall for our Admissions office, replacing Recruitment Plus

Continue to engage the cities of Fort Collins and Boulder in Gig.U conversations.

Still very active in the Kuali Foundation

primarily Financial and Research Systems; o Go-live for Coeus, late this fall. o Major upgrade planned for KFS this fall as well

Considering Kuali Human Resources (KPME) for leave reporting , travel management, contracts and grants billing.

Working with CSU-Pueblo on KFS implementation.

Page 10: Adams State - checoweb.org · Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP

NSF Cyber Infrastructure grant - $486K awarded late 2012 to upgrade core data network (hopefully to

100 Gbps), wide area capacity, and to establish a research DMZ in support of big data and the research

community.

Hoping to implement Office365 for faculty-staff email soon; Contract from Internet2 Net+ pending.

Implementing Slate, a cloud-based admissions support package; first stage of implementation going live

in August for Fall 2014 applicants

IAM-related:

Continuing to pursue silver-level assurance for campus; application to be submitted to InCommon this fall

o 15-character password minimum (no complexity) went into effect for campus; email notifications for students start this week. PW expirations moving from 6 months to one year

Using Grouper as a prototype for providing authorization services

Exploring CIFER project as IAM framework

Getting involved early in the social to SAML project, allowing external users to authenticate to campus services using social identities

InCommon certificate program in place; fine tuning the process

Implementing federated identity via Shibboleth for administrative applications, including Kuali systems allowing SSO internally and access from authorized external partners (like CSU-P)

Clustering Shibboleth IDP in a HA environment

Exploring more extensive and formal flipping of classrooms and what technologies may be needed

Pilot, phase 2 of eText content being delivered through Blackboard this fall

Automatically provisioning graduates into Google-hosted alumni domain

VoIP update (3,300 phones deployed, ~ 50% complete)

Expanding the usage of Kaltura (self-hosted) for media streaming

In process of implementing u.Achieve module from CollegeSource to replace current DARS (degree audit

system). Will also implement u.Select module.

Nearing completion of in-house developed online catalog and curriculum application. CSU is also

investigating commercial solutions in this area as a longer-term solution.

CSU-Pueblo Domain name change to CSUPUEBLO Forklift network --Compellent 125 TB SAN x 2 with 100% replication --New Firewall - Sonic Wall --Solidstate back up system --new Dell redundant blade server arrays

Page 11: Adams State - checoweb.org · Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP

AIS - online leave system ESET antivirus Wireless moving to Aruba Migration to Windows 7 Migration to Office 2010 Student email migration to Microsoft Office 365 Fort Lewis College

1. Accreditation 2015

2. College Source - Uachieve Degree Audit

3. Curriculog - Curriculum Management Committee software

4. Education Advisory Board - Student Success Initiative - Student Analytic System

5. MyFiles - web based file transfer

6. Updated our SAN environment HP, continue Virtualization, Veam backups

7. Updated our Internet bandwidth to 600mbs 300/300

8. Consulting engagement for a complete network review and documentation.

9. Pilot program to switch from Moodle to Canvas

10. Positions

1. Promoted Patrick Gaughan to Manager of Technology Support Services

2. Open

1. 2 x Help Desk Technicians

2. 1 Technology Support Specialist

3. Manager of Administrative Information Systems

4. DBA - January 1

5. Banner Programmer Analyst January 1

6. Manager of Networking and Infrastructure - June

11. CATV content transition - DishNetwork to EBH/Direct TV

12. Bradford to PacketFence transition

13. Wireless controller and application transitions

14. Upgraded uPortal to version 4

15. Academic Policy/Term Changes

Metropolitan State University of Denver - Completed an IT strategic plan, including the formation of a new organizational structure and

department of Information Technology Services, which is still in progress, as well as the creation of a

new campus-wide IT Governance structure

- Implementing Ellucian Recruiter, DegreeWorks, and will be engaging in the Action Planning program

with Ellucian

Page 12: Adams State - checoweb.org · Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP

- Continuing migration to Blackboard Learn and elimination of duplicate LMSs, to be completed in

Spring 2014

- Integrating BB mobile with Ellucian Mobile

- Banner XE: Hope to be in production with at least one module by 12/31.

* because of that, reviewing Banner XE SSO with an Ellucian BEIS/CAS workshop

- Java and Groovy Grails classes from Ellucian later in the Fall

* Have limited openings for other schools to participate - see Rick

- Significant upgrades and investments in infrastructure, including new enterprise storage, datacenter

enhancements, replacement/upgrade 20% of campus networking infrastructure, and creation of a

redundant campus network connection

- Planning for a new, consolidated Active Directory Architecture, followed by an identity management

solution, and potential migration to Office365

- Planning for a new Aerospace Engineering Technologies Building

- Completed Phase I of new athletic fields and complex

NCAR

* S-Pol field site networking - staff support for local connectivity (SkyBeam) and a point to point WWAN

link back to UCAR Mesa Lab in Boulder:

-- ~22 mile microwave shot using 4' antennas in 6 GHz licensed band -- http://www.eol.ucar.edu/rsf/spol/spol.html -- as part of FRONT, the Front Range Operational Network Testbed (project working with Colorado State University CSU-CHILL National Radar Facility and the National Science Foundation for the two radar Facilities to more closely align their missions) -- https://ams.confex.com/ams/36Radar/webprogram/Paper228862.html -- http://www.eol.ucar.edu/system/files/files/observing_facility/FRONT/OverviewFRONT.pdf * continued support and slow, incremental growth of Vidyo deployment at UCAR -- http://www.vidyo.com/ * UCAR Information Technology Council strategic plan work organization wide

Page 13: Adams State - checoweb.org · Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP

* 802.11n upgrade completed * converted an upgrade to our trouble ticket system (ExtraView) -- and moved it off Oracle to MySQL * eduroam deployed at UCAR -- very well received in each direction (i.e., visitors to UCAR and our staff on travel to other eduroam enabled institutions); very convenient and lots of good feedback. * couple network engineering staff turnover recently -- one filled internally -- position open for network engineer -- send interested folks my way -- will be posted to https://ucarcareers.silkroad.com/ -- and hopefully hiring soon * new Nagios server hardware to help with increased monitoring load at NWSC -- NETS continues to run our own Nagios instances (which feed alarms up to central NOC Nagios instance) * ICmyNet.Flow for netflow analysis -- http://www.icmynet.com/ -- http://www.icmynet.com/products/icmynet.flow/overview.html -- in place now for UCAR and FRGP -- since we're an early US customer, they've agreed to extend our pricing to other CO EDUs if interest * early phase of migration of rack documentation to OpenDCIM -- http://www.opendcim.org/ * early phase of evaluation of how to use NetDot for various network documentation purposes -- https://osl.uoregon.edu/redmine/projects/netdot * UCAR moving to Google apps for government this year * early testing/use of Everbridge emergency notifcation system (ENS) -- DR/BCP rework for NETS and our lab (CISL) - ongoing work there

Page 14: Adams State - checoweb.org · Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP

* CSM Supercomputer on floor at the UCAR ML -- completed and in use (temp WAN link (GRE tunnel) in place - eventually BRAN and BiSON 10G link here) -- http://minesnewsroom.com/press-releases/mines%E2%80%99-powerful-new-supercomputer-focus-energy-research * IPv6 deployment at UCAR -- just got our own block from ARIN -- will move toward that as opposed to shared Internet2 block we got for FRGP members (been doing v6 at UCAR and FRGP since ~2000 in very limited use) -- deploying Infoblox servers for DDI -- will include NetMRI deployment/use -- http://www.infoblox.com/ * Cellular support by our networking group at UCAR in flux -- we have spoken to AT&T and they will not approve our existing cellular amplification systems per the FCC ruling requirement. -- looking at options - first one is to contact AT&T and Verizon and will see if they will pursue a business case to install and support cellular in all buildings on all campuses - hopefully, agreeing to use some of our imbedded infrastructure - at their cost based on our contracts and commitments. * FRGP/UPoP items -- BiSON fiber ring: McCleod fiber move on Hwy287 between Laramie and Fort Collins to be completed soon -- 10G MOE active at 1200 Larimer (moving to that now; FLC completed today; other moves off our old 1G are scheduled next week; so increased capacity/headroom there) -- NREL - fiber connectivity to ESnet through CSM and BiSON still pending -- Jeffco Schools: discussions about possible UPoP membership also via CSM connection -- NEON connection to UPoP underway -- National Ecological Observatory Network (NEON) -- http://www.neoninc.org/ -- working with NEON and CU to establish a physical fiber connection to interface to the BRAN fiber network. -- recently completed effort to do a rough estimate (high level count) of people using our (FRGP/UPoP and all secondaries) networks (currently estimated to be at about one million) -- PerfSonar maintenance / use continues (good follow up after the workshop we held at NCAR in April) -- http://www.perfsonar.net/

Page 15: Adams State - checoweb.org · Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP

-- FRGP/UPoP Traffic - same overall 2013 traffic mix to date continues along these lines -eg: ~14% commercial ~60% peering ~26% other -- TR/CPS: approaching 140Gig deployed (tomorrow promises to be a high-traffic day because of the release of IOS 7). -- Quilt -- AirWatch ( http://www.air-watch.com ) buying agreement in place -- CIS survey highlights -- ~150Gbps actual inbound bandwidth to tracked program participants -- Cogent, Level3, CenturyLink, Hurricane Electric (top bandwidth) top providers across Quilt membership * Oh, and flood update -- UCAR closed Thu and Fri last week -- minor water damage to many UCAR facilities (roof leaks/damage and minor standing water and wall damage in some locations); all networking gear and related ok. -- Foothills lab campus inaccessible during flooding (Mitchell road flooded) -- Mesa Lab closed yesterday (debris on Table Mesa; plus work on cleanup and gas main problem there) -- most of plant appears ok and intact; one major problem ID'd on Table Mesa Drive -- City, Xcel, and Sturgeon working on a fix to that BRAN fiber today -- right near an Xcel major gas main that serves all of south Boulder - have to get that stabilized first (in process today) -- City urban drainage want to remediate water flow and avoid undercutting in the future -- To date, there has been no fiber signal degradation

UNC

Technology Systems and Services Network Services –

Load Balancer (A10) Call Manager Upgrade Business School Incubator ISP Design and Increase Stanchion Upgrade Complete Campus Fiber Project Complete Campus Televideo (waiting on contract)

TSC/LMS/Classroom – Reviewing BB Mobile

Page 16: Adams State - checoweb.org · Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP

Analog to Digital Conversion Reviewing Streaming Media Proposal Security – Data Security Policy Review (IRB) Reviewing IPS design for future upgrades Physical Security Audit of all IT spaces Enterprise Support Services --

Completed UCS Migration Migration from @live to Office 365 is Complete Evaluating Office 365 for faculty and staff Evaluating online storage solution Implementing a new disk to disk backup appliance (Data Domain 670) Moving from VTL to OST on Data Domain Implementing new Cisco SAN Switches (MDS 9148) Researching Fiber Storage Array Replacement Investigating Virtualization of Banner Production Oracle Server Replacing Symantec Endpoint Protection with Microsoft System Center EndPoint Protection Implemented Sierra in the Library Implementing ILLiad for interlibrary loan Updated to SharePoint 2010 Enterprise Upgraded print servers to Windows Server 2012 defaulted to duplex as sustainability counsel initiative

Desktop Support Team --

WASP Asset Management Solution Upgrading to APP-V 5.0

Institutional Systems Architecture We are upgrading to - Student 8.5.8 HR 8.9 ODS 8.4 Rap 1.3 Completed Database Extension Utilities Installing - Cognos 10.2 Degree Works Investigating - Recruiter On Demand Training from Ellucian

Page 17: Adams State - checoweb.org · Adams State Server Team Investigation/possible transition to Gmail for faculty/staff 2x200Mb Internet links with different providers using Quagga BGP

Western State

Redesigning primary public web site, including switching CMS's as well as deploying Sharepoint as an Intranet Expanding our in-house data warehouse for IR and beginning to build data dashboards in Sharepoint Switched internet connection to MOE, already gone from 200 to 300MB. Upgraded ARUBA controller Redeploying wireless network with N ap's at a much higher density

Added Visitor wireless access with self-registration

Migrating to AD 2012 native domain, 75% done

Upgrading windows servers to 2012 as appropriate

Replaced end of life EMC SAN with Nimble SAN

Preparing to roll out Ellucian Mobile

Deploying a CMS for our Education Department (TK20) Commissioning a new Field House opening early spring, with most equipment on the internet Usual Banner upgrades, also Degreeworks

Investigating Office 365

Investigating SIP trunking for phone service

In the middle of a Presidential search with interim President and interim Provot