ADANSI SOUTH DISTRICT MEDIUM TERM DEVELOPMENT
PLAN (2014 – 2017)
1
CHAPTER ONE
PERFORMANCE REVIEW
REVIEW OF DISTRICT MEDIUM TERM PLAN (2010-2013) UNDER GHANA
SHARED GROWTH AND DEVELOPMENT AGENDA USING SEVEN THEMATIC
AREAS
The Adansi South District Assembly, as the highest political and planning authority, is charged
with the preparation of the District Medium Term Development Plan that would guide the
District Development to meet the goals and aspirations of the people. Such goals and aspirations
should however meet the National Policy Framework within the Ghana Share Growth and
Development Agenda II
Ghana’s Development Policy Framework (2010-2013) was guided by the Ghana Shared Growth
and Development Agenda I with the following thematic Areas:
Enhancing and Sustaining Macro-Economic Development
Ensuring Competiveness in Ghana Private Sector
Accelerated Agriculture Modernization and Sustainable Natural Resource
Management
Oil and Gas Development
Infrastructure, Energy and Human Settlement
Human Development, Productivity and Employment
Transparent and Accountable Governance
The above thematic areas formed the basis for the preparation of the Medium –Term
Development plan (2010 -2013); the plan was however rolled over to 2014
REVIEW OF THE DMTDP (2010-2013)
The Ghana Shared Growth and Development Agenda I (2010-2013) was followed by the Ghana
Shared Growth and Development Agenda II (2014-2017), which has seven broad thematic areas
namely:
2
Ensuring and Sustaining Macroeconomic Stability;
Enhancing Competiveness of Ghana’s Private Sector;
Accelerated Agricultural Modernization and Sustainable Natural Resource
Management;
Oil and Gas Development;
Infrastructure and Human Settlement;
Human Development, Productivity and Employment;
Transparent and Accountable Governance
The Seven major thematic Areas would form the basis for the preparation of the District Medium
Term Plan (2010-2014).
REVIEW PROCESS
An assessment of the performance of the Adansi South District Medium Term Development plan
(2010-2013) was undertaken to review the previous performance to serve as a guide for the
preparation of 2014-2017 Development Plan.
The review was done taken into account the following indicators on the programmes and
projects:
- Fully implemented
- Abandoned/Suspended
- On-going
- Not implemented
- Implemented but not in the MTDP
The District Assembly also took into account the following:
i. The extent of the achievement of the planned goals and objectives
ii. Reasons for the non-achievement of the goals and objectives
iii. Problems /constraints encountered during implementation
iv. Lessons learnt which have implications for DMTDP (2010-2017)
3
The Adansi South District earmarked about One Hundred and (101) programmes and projects for
implementation in the Medium Term Development Plan (2010-2013).The Programmes and
Projects were outlined in Seven Thematic Areas (7) Thematic Areas, namely;
Enhancing and Sustaining Macro-Economic Development
Ensuring Competivenes in Ghana Private Sector
Accelerated Agriculture Modernization and Sustainable Natural Resource
Management
Oil and Gas Development
Infrastructure, Energy and Human Settlement
Human Development, Productivity and Employment
Transparent and Accountable Governance
The interventions in these sectors when implemented were to help achieve the target set in the
District’s Monitoring and Evaluation Plan. The table below indicate the Policy objectives set,
programming, indicators, targets level of achievement.
4
Table 1.1 PERFORMANCE REVIEW OF ADANSI SOUTH DISTRICT ASSEMBLY FROM 2010 - 2013
Thematic
Area Policy Objective Programme Indicator Target
Level of
Achievement Remarks
2010-2013
Ensuring
and
Sustaining
Macroecono
mic
Stability
- Improve access
to financial
services
- Improve fiscal
resource
mobilization
- Improve public
expenditure
management by
equipping the
offices of
Accounts and
Internal Audit
unit
Train management
members and
accounting staff
No. of Management
member and
Accounting staff
trained
8 management staff and 4
accounting staff to be
trained
Fully implemented
Revaluation of
Properties
Properties revaluated Revaluate properties in
five communities the
municipality by 2013
Completed
Train Area Council
staff on basic office
practices, revenue
mobilization and
management
Area Council Members
trained on basic
revenue mobilization
and management
21 Area Council Staff to be
trained
Not implemented In adequate
funding
Submit quarterly
Financial management
reports to appropriate
quarters
Financial management
reports submitted
12 quarterly financial
reports to be submitted
Fully implemented
Equip offices of
Accounting staff and
Internal Audit
Equipped Accounts
offices and Internal
Audit Unit
Fully equip offices Fully implemented
Procure Vehicle for
revenue mobilization
No. of Vehicle supplied Procure a vehicle Fully
Implemented
5
Update the records/data
on all revenue items
Data on item updated Revenue items to be
updated
Fully implemented
Train Revenue staff
on effective revenue
mobilization
Number of Revenue
Staff equip with
revenue mobilization
20 revenue staff to be
trained
Fully implemented
Conduct refresher
courses on Public
procurement
Consultant engage to
train Assembly’s
procurement
practitioners
Refresher course on PP to
be conducted
Fully implemented
Establish revenue task
force
Ensure effective
revenue mobilization
10 member revenue task
force to be formed
On-going The task force
comprise of five
members
Enhance
Competiven
es in
Ghana’s
Private
Sector
1. Improve Private
sector
Competivenes
2. Expand the
opportunities for
Job Creation
3. Promote Public
Private
Partnership
towards
development
Establish database on
all private sectors
operators
Create Data base for
private sector operators
Establish data base on all
operators
Fully completed
Organize Public for at
Area Councils on
Private sector
Fora organized for the
private sector
7 Public fora to be
organized in all Area
Councils
Not Implemented Inadequate funding
Organize District Trade
Fair
Number of trade fairs
organized
2 District fairs to be
organized
Not implemented Inadequate
Funding
Encourage the
establishment of Local
FM Stations.
FM station stations
established
Local FM stations to be
established
Not Implemented A private person
has begun the
establishment of
FM Station at New
Edubiase
Prepare Service
Delivery Charter
Delivery Charter
prepared
Service Delivery Charter to
be prepared
Fully
Implemented
Procure Wireless
Internet
Wireless Internet
facility established
Wireless internet facility to
be procured
Fully
Implemented
The service
Agreement Elapsed
and efforts are
being made to
renew it
6
Conduct Capacity
building programme for
the private Sector
Knowledge of Private
Sector Improved
Improve the capacity of
private sector
Not implemented Private sector not
fully organized
Inadequate funding
Update District
Assembly Website
District Assembly
Website prepared
Access to information from
the Assembly improved
On-going Updates is done by
Marks Publication
Establish Business
Advisory Centre within
the District
BAC established BAC to be established Not implemented Application was
sent to NBSSI but
the Assembly is yet
to receive response
Register all Galamsay
Operators
Galamsay operators
registered
All Galamsey operators to
be registered
Ongoing
Monitor the Activities
of Galamsay operator
Activities of Galamsay
operators monitored
Activities of operators to be
monitored
On-going Inadequate funding
has been a great
challenge to
activity
Accelerate
Agricultural
Modernizati
on and
Sustainable
Natural
Resource
Managemen
t
1.Create Conjugal
environment for
alternative livelihood
programme
2. Reverse forest and land
degradation
3. Enhance community
participation in the
environmental and
natural resource
management by
awareness
4. Improve agricultural
productivity
Encourage
establishment of Oil
Palm Processing
Machine at
Wuruyie,Kotwea and
Atwereboana
Improve the value of
Agricultural Produce in
the District
3 oil palm processing
machines to be established
Not implemented Inadequate
Funding
Donors also folded
up their activities
Encourage
Establishment of Gari
Processing Machines in
needy communities
Improve the quality of
Agricultural Produce
Gari processing machines
to be established
Not Implemented Inadequate
Funding
Donors also folded
up their activities
Encourage formation of
farmer based groups for
access to credit
Farmers formed groups
to access credit
Farmer based groups to be
formed
On-going There several
farming groups but
only two were able
to access credit
Encourage the
formation of Credit
Unions by farmers
Farmers encouraged to
form credit unions
Credit unions to be formed Not Implemented Lack of
commitment from
the farmers
Encourage Agro-
Forestry by Farmers
Farmers encourage to
form Agro Forestry
Agro-forestry encouraged Not implemented Inadequate
Funding
7
Educate farmers in
proper harvesting and
storage practices
Reduced the incidence
of post-harvest losses
5000 farmers to be
educated
On-going
To increase extension
officers from
Access to Extension
officers improved
40 Extension officers to be
available
Not implemented The extension
officers reduced by
One
Increase Cocoa
spraying gangs
Improved the yield of
Cocoa produce in the
district
Cocoa spraying gangs to be
increased to 300
Not implemented The Spraying Gang
had remain 134
from 2010 -2013
Organize sensitization
and training
programmes on fish
farming and animal
rearing
Fish output increased Sensitization and training
programs to be organized
Not implemented Fisheries
Department have
supported 5 Youth
to establish 8 ponds
Conduct sensitization
and training for 200
communities on
alternative livelihood
Access to alternative
livelihood improved
200 benefited from the
training programme
Not Implemented Lack of Funds
Encourage
establishment of Youth
in agriculture
Programme
Agricultural Output
increased
10 youth in agricultural
programmes to be establish
On-going The acceptance
level is very low
Create access roads to
tourist Centres
Access to Tourist sites
improved
Access roads to tourist sites
created
Not implemented Bridge in the road
leading the site
currently under
construction
To publicize tourist
Centres
Knowledge on the
Availability of tourism
improved
Tourist Centres to be
publicized
Implemented
8
Oil and Gas
Developme
nt
1. Create enabling
environment for
establishment of
oil and gas
Provision of training
for the youth in skills
related to the oil and
gas industry
Improved the skills of
the youth in oil and gas
The youth to be
conscientized on the
importance of oil and gas
industry
Not implemented Inadequate
Funding
Zone area for oil and
gas industries
Areas for the oil Gas
Industry zoned
Areas to be demarcated for
the establishment of oil and
gas firms
Not implemented Inadequate
Funding
Capacity building for
oil and gas operators
Capacity for Oil and
Gas operator Built
The youth to be train on
skills related to the oil and
gas industry
Not implemented Inadequate
Funding
Ensure environmental
sustainability for oil
and gas
Improved
environmental
condition
Environmental impact
assessment for oil and gas
firms to be undertaken
Not implemented Inadequate
Funding
Infrastructur
e,
Energy and
Human
settlement
1. Ensure
sustainable
development in
transport
2. Promote the use
of ICT in all
sectors of the
economy
3. Create enabling
environment that
will ensure the
development
Urban and Rural
Areas
4. Minimize the
impact of and
develop adequate
response
strategies to
disaster
Construct Silos at
Strategic Location
Reduce Post Harvest
Loses
3 Silo to be constructed Not Implemented Inadequate
Funding
Embark on routine
maintenance
Improved road
transportation
routine mentainance of 300
km of roads to be embarked
on
Fully implemented
Undertake surfacing
feeder roads
Improved Roads
Transportation
30km of road Surfaced Fully implemented
Undertake periodic
maintenance of existing
roads
Improved road
transportation
150 km of existing road
maintained
Fully implemented
Supply Electricity to
communities and
extension in New
Edubiase,Akrofuom,Pr
aso,Ampunyase,
Apagya and Atobiase
Improved access to
energy
Electricity to be extended
to 20 additional
communities
Ongoing 5 communities
Provide Drainage
facilities in needy
communities
Control erosion Drainage facilities in needy
communities to be provided
Not implemented
9
5. Accelerate the
provision and
improvement of
environmental
sanitation
Encourage the
establishment of
Financial institutions
Access to financial
institution improved
financial institutions
established
Not implemented Financial
institution not
willing to establish
at rural
communities
Encourage mass
acquisition of farming
inputs through farmers
association
Mass acquisition
farming inputs
encouraged
Farming inputs to be
acquired
On-going
Provide proper layout
for sectors
Layout prepared Proper layout for sectors to
be provided
On-going
Support NADMO NADMO supported NADMO to be supported On-going
Human
Developme
nt,
Productivity
and
Employmen
t
1. Increase
access to and
participation
in education
at all levels
2. Improve
quality
teaching and
Learning
3. bridge the
gender gap in
access to
education.
4. improve
management
of education
service
delivery
5. improve
Provide 20 educational
infrastructure at all
level
Educational
infrastructure provided
20 Educational
infrastructure to be
constructed
Fully implemented 31 additional
educational
facilities were
executed outside
the previous frame
work
Increase school feeding School feeding
programme increase
School Feeding
Programmes to be increase
to 20
On-going 12 schools are
benefiting from
GSP
enforce FCUBE
programme
Access to education
increased
FCUBE programme to be
enforce
On-going Inadequate funding
Ensure effective
implementation of
scholarship scheme
Support needy but
brilliant students
Effective implementation
of scholarship scheme to be
ensured
On-going Inadequate funding
Support Non-formal Education of the aged Non-Formal Education On-going
10
governance
and
strengthen
efficiency
and
effectiveness
in health
service
delivery
6. prevent the
spread of
communicabl
e disease and
promote
healthy
lifestyle
7. develop
targeted
social
interventions
for
vulnerable
and
marginalized
groups
Education Division improved Division to be supported
Ensure effective
monitoring and
supervision in schools
Programmes and
projects monitored
Effective monitoring and
supervision in schools to be
ensured
Fully implemented
Organize periodic in-
service training for
teachers
The skills of teachers
improved
Periodic in-service training
for teachers to be organize
Not implemented Inadequate funding
Supply furniture and
other learning materials
for schools
Schools provided with
adequate furniture
Adequate furniture and
other learning materials for
schools to be supplied
On-going
Promote Girl- Child
education in the District
Improved Girl Child
education
Girl child education
promoted in the District
Fully implemented
Provide friendly school
infrastructure for
schools
Schools are user
friendly
Friendly school
infrastructure for schools to
be provided
Fully implemented
Support the
organization of STME
clinics
STME organized
annually
The organization of STME
clinics to be supported
Fully implemented
Educate citizens on
family planning issues
Maternal health
improved
The populace to be
educated on family
planning
Fully implemented
Support HIV/AIDS
programmes and
victims
access to health
improved
HIV/AIDS programmes
and victim to be supported
On-going
Facilitate malaria
control programmes by
AngloGold Ashanti
Malaria control
programme supported
Malaria control programme
by AngloGold Ashanti to
be facilitated
On-going
Promote good
environmental
cleanliness
Environmental
cleanliness supported
Good environmental
cleanliness to be promoted
On-going
Support District
sporting activities
District Sporting
activities supported
District sporting activities
to supported
Fully implemented
Support the
construction of District
District sports stadium
constructed
Construction of sports
stadium to be supported
On-going
11
Sports Stadium
Provide health facilities
in selected
communities
Access to health
facilities improved
Health Facilities in
selected communities to be
provided
Not implemented
Renovate and extend
existing health facilities
in needy communities
Access to health
facilities improved
Health Facilities in selected
communities to be
renovated
Not implemented
Provide additional
health personnel and
logistics
Additional health
personnel provided
additional health personnel
and logistics to be provided
On-going
Sensitize the public on
the importance of
National Health
Insurance
NHIS sentizisation
intensified
Sensitization Fully implemented
Support the needy to
register DHMIS
Needy supported to
register NHIS
The needed to be supported
to register for the District
Mutual Health Insurance
Scheme
Fully implemented
Provide 90 boreholes Improved access to
portable water
90 boreholes provided On-going Only 18 boreholes
constructed
Provide institutional
latrines
Access to toilet
facilities improved
20 institutional latrines
constructed
Not implemented
Facilitate the
construction of
household latrines
Access to toilet
facilities improved
The construction of 300
household latrines to be
facilitated
Not implemented Inadequate funding
Provide additional
public toilets
Access to toilet
facilities improved
10 additional public toilets
to be constructed
Fully implemented Been awarded
Rehabilitate existing
toilet facilities
Access to toilet
facilities improved
15 existing renovated
toilets to be rehabilitated
Not implemented Inadequate funding
Acquire final disposal
site
Final disposal sites
acquired
Final disposable for
communities acquired
Fully implemented
Provide refuse
containers
Ensure good
environmental
cleanliness
20 additional refuse
containers to be provided
Fully implemented
12
Ensure effective
management of
sanitation facilities
Ensure good
environmental
cleanliness
Effective management of
sanitation facilities to be
ensured
Fully implemented
Support income
generating activities of
the poor and the
vulnerable
Income generating
activities supported
The income generating
activities of the poor and
vulnerable to be supported
Fully implemented
Ensure the provision of
antiretroviral drugs
PLWAs provided with
antiretroviral drugs
Provision of antiretroviral
drugs to PLWAs to be
ensured
On-going
Support PWDs in their
activities
PWD supported in their
activities
50 PWD provided with
antiretroviral drugs
On-going
Transparent
and
accountable
governance
1. enhance civil and
private sector
partnership in
governance
2. strengthen and
operationalize the
sub-district
structure and
ensure
consistency with
local government
3. ensure efficient
internal revenue
generation and
transparency in
local resource
management
4. improve
transparency in
public access to
information
5. impose upon the
logistics and
human resource
Facilitate the creation
of additional electoral
an polling stations
Facilitate electoral
process
Creation of additional
electoral and polling station
for Dove and Odumase to
be facilitated
Not implemented
Provide capacity
building programme for
District Assembly Sub-
Structure
Capacity building for
District Assembly
provided
Capacity building
programmes for District
Assembly Sub-structures to
be provided
Not implemented Inadequate funding
Provide additional staff
to run sub-structure
Additional staff to run
sub structure provided
Additional staff to run sub
structures to be provided
Not implemented
Motivate Area Council
staffs
Provide incentives to
Area Council staff
Area council staff to be
motivated
Not implemented
Provide motor bikes for
Revenue collectors at
Area Council level
Sub-structures
operationalize and
functioning
Motorbikes for revenue
collectors at the Area
Council level to be
provided
Fully implemented
Effectively monitor the
activities of Area
Councils
Performance of area
councils improved
The activities of Area
Councils to be monitored
effectively
Fully implemented
Support the NCCE in
their sentizisation
programmes
Citizen participation in
governance improved
NCCE’s sensitization
programmes to be
supported
Not implemented
Organized management
training for District
Capacity of assembly
staff improved
Management training for
District Assembly staff to
Fully implemented
13
management of
the District
6. provide efficient
and residential
accommodation
to staff
good governance
enhanced by
strengthening the
administration set
up of the
assembly
Assembly Staff be organized
Acquire 4WD and other
logistics for DPCU
activities
Ensure effective
functioning of DPCU
A 4WD and other logistics
for activities of the DPCU
to acquired
Fully implemented
Ensure involvement of
women in decision
making process
Women groups
involved in decision
making
Involvement of women in
decision making process to
be ensured
Fully implemented
Prepare District
Assembly By-laws
District assembly
operational and
functioning
District Assembly by-laws
to be prepared
Fully implemented
Ensure the provision of
Police station/post for
selected communities
Security services
supported
The provision of police
station/post for
Ampunyase, Atwereboana,
Wuruyie, Akutreso, Afiaso
and Brekete to be ensured
On-going 3 stations were
establish
Gazzet District
Assembly by laws
District assembly
operational and
functioning
District Assembly by-laws
to be gazzetted
Not implemented
Support District
Cultural Activities
District Cultural activities
to be supported
Encourage
communication service
providers to extend
coverage
Improved
communication in the
District
Communication service
providers to extend
coverage
Fully implemented
Support decentralized
departments in their
yearly activities
Decentralized
departments being
functional and
operational
Decentralized departments
to be supported in their
yearly activities
Fully implemented
14
Renovate existing staff
bungalows
Office and residential
accommodation
improved
3 residential
accommodation provided
Not implemented
Provide adequate
furnishing of Assembly
bungalows
Assembly bungalows
furnished
Furnished 5 residential
bungalows
Not implemented
From the above table it was realize that a total of 10 Programmes earmarked for implementation from 2010-2013 under Ensuring and
Sustaining Micro-economic Stability. 8 programmes were fully implemented, 1 on-going and 1 not implemented. On the thematic area
of Enhancing Competitiveness in Ghana’s Private Sector, 3 out of eleven programmes were fully implemented, five were not
implemented and three on-going. Accelerate Agricultural Modernisation and Sustainable Natural Resource Management had 13
Programmes to be implemented. However only one was implemented with 3 on-going and 9 not implemented at all. Oil and Gas
Development had 5 programmes and they were all not implemented. While Infrastructure, Energy and Human Settlement
Development had 10 programmes, 3 fully implemented, 3 not implemented and 4 on-going. Human Development, Productivity and
Employment had the highest number of programmes totaling 33 with 14 fully implemented, 13 on-going and 6 not implemented.
Transparent and Accountable Governance also had 18 programmes. 7 were fully implemented and, 8 not implemented and 3 on-going.
In all a total of 101 programmes were earmarked for implementation. Out of this 38 were fully implemented representing 38.6%, 27
on-going representing 26.7% and 36 not implemented representing 35.6%
15
PROGRAMMES IMPLEMENTED BUT NOT IN MTDP
The Assembly however implemented certain programmes not in MTDP and they are captured in
the various Thematic Areas as follows:
1. Human Development, Productivity and Employment. 30 additional educational
infrastructures were implemented.
a. teachers quarters - 6
b. dormitories - 6
c. 3 unit classroom - 9
d. 6 unit classroom - 9
Total 30
2. Transparent and Accountable Governance.
The Fire Service Tender bay was rehabilitated and it was not captured in the MTDP.
16
FINANCIAL PERFORMANCE FROM 2010 -2013
The table below examine the financial performance from 2010-2013
Table 1.2 FINANCIAL PERFORMANCE
APPROVED
BUDGET
ACTUAL APPROVED
BUDGET
ACTUAL APPROVED
BUDGET
APPROVED
2010 2010 2011
2012
REVENUE HEAD
Rates 114,900.00 65,344.95 106,900.00 28,381.07 39,300.00 40,010.83
Lands 227,300.00 219,402.82 216,700.00 161,412.82 227,370.00 197,961.06
Fees & Fines 31,820.00 15,432.00 28,935.00 27,632.60 26,365.00 25,956.77
Licenses 15,782.00 17,326.40 15,204.00 21,538.80 26,908.00 35,106.77
Assets,
Property/
Rent 9,690.00 7,743.00 8,304.00 8,354.50 6,414.00 5,287.00
Grant- In-Aid 3,151,845.00 1,160,239.06 2,948,240.15 1,656,363.59 3,366,202.00 1,024,836.85
Investment
Income 3,800.00 0.00 7,100.00 8,361.00 10,100.00 7,359.00
Miscellaneous 3,200.00 5,286.61 20,200.00 25,813.70 4,000.00 5,077.15
TOTAL 3,558,337.00 1,526,033.21 3,351,583.15 1,937,858.08 3,706,659.00 1,460,899.42
17
Table 1.3 EXPENDITURE PATTERN
The table
above shows the Revenue and Expenditure performance from 2010-2012, however the chart of accounts was changed in 2013 and the table shows
the revenue performance for 2013.
APPROVED
BUDGET
ACTUAL APPROVED
BUDGET
ACTUAL APPROVED
BUDGET
ACTUAL
EXPENDITURE
2010 2010 2011
2012
Personal
Emolument 284,214.40 204,633.68 289,214.40 148,402.48 254,402.00 124,675.68
Travelling &
Transport 96,024.00 84,412.14 101,566.00 65,797,03 84,456.00 77,272.72
General
Expenses 30,580.00 15,567.17 31,950.00 20,605.89 30,830.00 26,071.07
Maint./ Repairs
& Renewals 6,500.00 2,084.09 18,000.00 6,212.00 16,500.00 13,251.50
Miscellaneous 71,550.00 44,800.64 80,500.00 66,828.75 58,815.00 70,708.03
Capital
Expenditure 1,492,567.73 983,423.83 1,991,395.15 1,456,073.28 1,986,395.15 791,639.64
Mps Projects 200,000.00 32,469.84 100,000.00 86,859.61 100,000.00 105,441.11
Interventions 200,000.00 158,641.82 100,000.00 58,573.23 100,000.00 251,839.67
Excess of
Revenue over
expenditure 1,176,900.87 638,957.60 1,075,260.85
TOTAL 3,558,337.00 1,526,033.21 3,351,583.15 1,843,555.24 3,706,659.00 1,460,899.42
18
Table 1.4: Revenue and Expenditure for the year 2013
Revenue Head 2013 Expenditure Head
2013
BUDGETED ACTUAL BUDGETED ACTUAL
Income on Property 70,100.16 123,093.89 Compens. Of Employees 853,457.76 506,393.75
Lands & Royalties 226,700.16 84,972.91 National Insurance Con. 42,619.08 3,547.74
Fees 43,200.24 57,120.57 Travel & Transport 97,200.12 113,905.85
Licenses 30,985.56 36,677.10 Utilities 227,383.08 10,305.00
Rent Income 72,400.08 27,266.00 Repairs- Maintenance 143,251.32 50,859.30
Grants 3,120,368.16 1,622,843.21 Mat. Office Supplies 121,185.36 48,387.97
Fines & Penalties 3,600.12 3,172.00 General Cleaning 5,000.04 2,701.00
Misc.& Unidentified
Revenue 2,500.08 1,557.80 Rentals 7,200.00 1,830.00
Other Sources 864,011.28 438,037.21 Special Services 34,400.04 20,028.00
Other Charges 1,200.00 1,545.36
Work in Progress 543,248.04 7,620,25
Infrastructure Assets 60,162.12 18,504.00
Materials Supplies 0 0.00
Transport-Equipment 0 0.00
Emergency Services 0 0.00
Grants 1,551,016.08 1,383,280.73
General Expenses 154,274.04 125,476,35
Dwellings 603,497.16 83,489.93
Non Residential Buildings 846,680.40 267,868.93
Other Structures 78,762.00 75,348.00
Other Machinery-Equip 100,000.08 54,601.83
Training-Seminars 101,010.12 80,416.11
Consulting Services 0 0.00
TOTAL 4,433,865.84 2,394,740.00 5,571,546.84 2,723,013.50
19
ANALYSIS OF REVENUE AND EXPENDITURE PERFORMANCE
The Assembly budgeted a total amount of GHȼ 3,558,339.00 but was able to generate GHȼ 1,526,033.21
representing 42.88% in 2010. In 2011, the total approved revenue estimated was GHȼ 3,351,583.15 and an
amount of GHȼ 1,937,858.08 representing 57.82% while 2012 had an approved revenue estimate of GH₵
3,706,659.00 with GH₵1,460,899.42 generated representing 39.41%. In 2013 total revenue of GH₵
4,433,865.84 was estimated and Assembly was able to generate an amount of GHȼ 2,394,740.00
representing 54.01%.
On the part of expenditure a total amount of GHȼ 3,558,337.00 was approved for spending but
GHȼ1,526,033.21 was actually spent representing 42.87% in 2010. GH₵ 3,351,583.15 was the approved
expenditure for 2011 and out of this; an amount of GHȼ 1,843,555.24 was spent representing 55.01%. 2012
also had an approved expenditure of GHȼ 3,706,659.00 and GHȼ 1,460,899.42 representing 39.41% was
spent. The Assembly in 2013 approved an expenditure of GHȼ 5,571,546.80 and GHȼ2, 723,013.50 spent
represents 48.87%.
The implication for the about financial analysis is that the Assembly was able to achieve an average of
48.53% of its projected revenue, this went a long way to attract programmes and projects implementation.
Shortfalls of the revenue were basically due to the non-release of Grants especially DACF on time. Serious
efforts must be put in place to generate more IGF for development from 2014-2015. Realistic revenue targets
must also be set during budgeting.
On the part of expenditure an average of 46.54% was achieved means that most of the programmes and
projects were not started at all while those started were not completed on time due to delay in the payments
of certificates or activity expenditure.
REASONS FOR THE NON-ACHIEVEMENT OF GOALS AND OBJECTIVES
i. Unreliable and untimely release of Development Budget (DACF) and Development Partners
Funds for project implementation.
20
ii. Some of the goals and objectives were not achievable within the short period set for the plan.
The goals and objectives had long gestation period.
iii. The Vastness of the district makes programmes and projects implementation had little impact
on the lives of the people.
iv. The goals and objectives set were not directly targeted at poverty reduction (unemployment).
v. Absence of periodic review of the Development Plan.
PROBLEMS/CONSTRIANTS ENCOUNTERED DURING PLAN IMPLEMENTATION.
i. Insufficient and reliable data for planning purposes.
ii. Non-functioning of the sub-structures to provide inputs for the plan preparation.
iii. High level of expectations from the electorate for service delivery within a short plan period
iv. Delay in the release of funds for project implementation
v. Too many directives from the ministries as to the use of DACF which affect the Assembly’s
focus and vision on development agenda
vi. Plan not targeted at direct job and wealth creation but rather mainly on infrastructure
provision.
vii. Cumbersome procurement process which delays the implementation of physical programmes
and projects.
LESSONS LEARNT
i. The need for the nation to review the Procurement Act (Act 663) after 4 –years of implementation.
ii. Periodic review of the plan to see if the Assembly is on course in its implementation.
iii. The Assembly should look for other sources of funding for project implementation other than DACF,
DDF and GETFUND. The Assembly should step up its IGF to enable them use some for minor
projects execution .Other sources are Public Private Partnership (PPP)
iv. The 2014-2017 Development plans should focus also on job/wealth creation for Local Economic
Development.
v. Decentralised departments should study the plan and implement their programmes and projects in
line with the district and national goals and aspirations.
vi. Shortfalls in DACF releases greatly affect development projects undertaken by such funding.
Revenue Mobilization would have to be stepped up to fill in the gap
21
vii. The Assembly would focus on the human capacity building which deals with the training of the
people to build their capacity. Such training would empower them economically and financially
to establish jobs on their own to reduce employment pressure on the formal sector.
viii. Operations and maintenance of programmes and projects should be given the needed attention to
sustain the investment for a long time.
ix. The programmes and projects not implemented in the last plan must be evaluated to ascertain
their relevance for inclusion in the next Development Plan.
x. Adequate provision must also be made to complete all on-going programmes and projects.
22
CHAPTER TWO
DISTRICT PROFILE
2.0 THE DISTRICT ASSEMBLY
Adansi South District Assembly (ASDA) is one of the thirty (30) administrative Metropolitan, Municipal
and District Assemblies (MMDAs) in the Ashanti Region of Ghana. It was carved out of the erstwhile
Adansi West District and Adansi East District Assemblies in the year 2004 with Legislative Instrument (LI
1752).
The Assembly’s revised vision and mission statements are as follows:
Vision
To transform the local economy through the creation of a vibrant agro-based sector, training of the youth in
employable skills, while giving the people access to basic services and bringing the vulnerable and excluded
to the mainstream of development.
Mission
The Adansi South District exist to improve the standard of living of the people in the District through the
provision of economic, social and political facilities with the enabling environment for private participation
and investment in the District with qualified human resource. .
2.1 ADANSI SOUTH DISTRICT ASSEMBLY AND ITS OBJECTIVES
The Adansi South District Assembly is the highest political and administrative body of the District and
therefore exercises deliberative, legislative and executive functions. It has the mission and responsibility to
improve the quality of life of the people through sustainable development.
To achieve this mission, the Assembly has set the following objectives:
To facilitate the effective functioning of the local government institutions in the District Assembly
To ensure efficiency and effectiveness in the mobilization and utilization of resources in the District
Assembly and its decentralized departments
To monitor, co-ordinate and harmonize the implementation of development plans and activities in the
District Assembly
To facilitate the provision of basic social and economic infrastructure and services in the District
To facilitate community-based and private sector development in the District.
23
2.2 THE STATE AND FUNCTIONS OF AREA COUNCILS
The District has one Town Council and Six Area councils. They are New Edubiase Town Council,
Akrofuom Area Council, Ampunyasi Area Council, Wuruyie Area Council, Atobiase/Apagya Area Council,
Praso Area Council and Akutreso Area Council. All Councils have chairpersons and secretaries together with
revenue collectors. They also have offices for their daily activities.
2.3 PHYSICAL AND NATURAL ENVIRONMENT
The Adansi South District is one of the thirty (30) Districts in the Ashanti Region of Ghana. The District lies
within Latitude 40” North and 6 degrees 22” North and Longitude 1 degree West and 1 degree 38” West. It
is on the Southern part of the region. Other Districts in the region sharing boundaries with it are Obuasi
Municipal and Adansi North Districts to the North and North East respectively. The District also shares
boundaries with Assin District in the Central Region to the South and to the East by Birim North and South
Districts of the Eastern Region. The position of the District in both national and regional context is shown
on their respective maps (Fig 1 and 2). The District has a total land representing an area of 899sq.km, which
is approximately 4% of the total land area of the Ashanti Region. About 24% (334.5sq km) of this total land
area is made up of forest reserves.
Fig 1: Adansi South District in National Context
24
Fig. 2.2 Adansi South District in Regional Context
25
2.3.1 Relief and Drainage
The land ranges from flat to gentle undulating with average elevation of about 350 metres above sea level.
Generally, the District is hilly with several rivers and streams. Major rivers such as Pra, Fum, Muma, Subin,
Menso, Subri, Supong, Krodua , Offin and Aprapo are in the District and serve as major drainage channels.
Minor streams also drain into the major rivers.
Fig. 2.3 Relief and Drainage Map of Adansi South District
2.3.2 Climate
The Climatic condition in the District is generally, favourable with mean monthly temperatures ranging
between 26 degrees Celsius and 29 degrees Celsius. February and March are the hottest months of the year.
The extensive nature of the forest reserves in the District ensures a very good rainfall distribution pattern,
which is characterized by two rainy seasons with peak periods around May – June and October. The average
annual rainfall figures are between 160 mm and 180mm with an average of 150 rainy days recorded every
year.
2.3.4 Vegetation and Forest Reserves
The Adansi South District is within the rain forest belt and it is characterized by moist semi-deciduous forest
with thick vegetative cover and growth. In some parts of the District, the natural vegetation is steadily
degenerating into secondary forest. Relatively, little virgin forest remains outside the main forest reserves
26
and this condition can be attributed to persistent slash and burn methods as well as the incidence of bush fires
in the dry season. Despite these improper environmental practices with their detrimental effects on the
vegetation of the District, forest reserves still exist and they cover approximately 188sq.km in the total land
area of the District.
Fig. 2.4 Map Showing Vegetation and Forest Reserves of Adansi South District
The Forestry Services Division of the Forestry Commission continues do its work in the District. Protection
of forest reserves, boundary maintenance and inspection, of the following forests reserves is still ongoing;
Onuem Nyamebe, Kunsimoa, Cheremoase, Nyamebe Bepo, Afia Shelter Belt, Onuem Bepo, Kototintin,
Numia all covering a total perimeter of 188.03 km square. Also contract boundary cleaning, boundary
planting, greenbelt maintenance, wildfires/bush fire education, enrichment planting was carried out during
the year. The main offence which is illegal felling and sawing of trees such as Wawa, Danta, Edinam,
Mahogany, Sapele however continues to hamper the work of the division.
27
2.3.5 Soil Types
Knowledge of soil types in an area is an important pre-requisite for planning since it helps to advise on the
type of crops the soil can support. This is particularly true for the District since more than half of the
population depend on farming for their livelihood. The Agricultural Extension Department of the District
describes the soil as very fertile with a high humus content, which have the capacity to support tree crops
such as cocoa, oil palm, cola nuts as well as staples such as cassava, plantain and a variety of vegetables.
The types of soils in the District are:
a) Juaso – Morso Association
These are mainly found in the northern parts of the District. They have been developed over Tarkwaian
rocks. They support crops such as cocoa, coffee, citrus, oil palm, maize, cassava and other root crops.
b) Swedru – Nsaba Simple Association
These are found in the eastern parts of the District, especially around Subriso. They have been developed
over granite and associated rocks. They support crops such as Cocoa, oil palm, plantain, cocoyam, cassava
and maize.
c) Bekwai – Oda Compound Association
This association of soil type has been developed over upper and lower Biriman rocks and is found around
New Edubiase and Akutreso. They support tree crops such as cocoa, oil palm as well as staples such as
cassava, plantain, cocoyam, maize and vegetables.
d) Awaham – Kakum - Kyekyerewere Association
These are mainly found around Adansi Praso. They have been developed over alluvium rocks. Crops that
thrive very well in this soil type include maize, cassava, etc. The various soil types are illustrated on the soil
map.
2.3.6 Agricultural Land Use
Out of the total land area of the District, that is 899sq.Km, 60% (802.8sq.km) is under tree and food crop
production. About 90% of this 802.8 square kilometers land is cultivated by peasant farmers using the
traditional farming implements and methods that is slash and burn and shifting cultivation. The 10% of the
arable land area is cultivated by individuals or organizations whose cultivated acreage is larger (16 acres to
over 25 acres) than the peasant farmers. However, most of these people also practice the slash and burn
system.
28
The cropping pattern in the District is the mixed cropping systems where one parcel of cleared land contains
most, if not all, of the staples produced in the District. Tree crops are also mixed with other crops, especially
during the first two years of planting.
2.3.7 Geology and Minerals
Most of the North Western parts of the District lie within the gold belt. Towns such as Akrofuom, Sikaman,
and Nyankomase have been identified as having gold and diamond deposits.
Fig. 2.5 Geology Map of the District
2.3.8 Surface Accessibility
Surface accessibility in the District is basically in the form of road network/transport system. It has a first
class asphalt road from Amudurase to Adansi Praso on the Cape-Coast – Kumasi trunk road. In addition to
this, there are about 176km network of second and 69km third class roads respectively. Footpath or tractor
paths are a common feature in the District and most of these foot/tractor paths are motorable during the dry
season. However, when the rains set in, due to the numerous streams, these paths become unmotorable.
29
Fig. 2.6 Map showing roads in the District
2.4 CULTURE
Cultural activities in the District are very diverse as a result of the many migrants in the District. There are
two main festivals that are celebrated by the people in the District namely, Akwasidae and Afahyea. Since
the people are predominantly Akans, Akwasidae is usually celebrated on every 40th day in a year in the
District and Afahyea festival is also celebrated from the second week in November to first week in
December annually. There is a vibrant cultural troupe in the District that entertains guests during special
occasions.
Adansi South District is made up of multi-ethnic communities, inhabited by many of the country’s ethnic
groups, including the indigenous Asantes, Ga-Damgbes, Fantis, Ewes, Akwapims, Akims as well as Mole-
Dagbani and other ethnic groups from the North. These multi-ethnic settlers have come from far and near to
engage in production of cocoa crops which is the principal economic activity of the District. The Asantes
constitutes the majority constituting 33 percent.
30
2.4.1 Religious Affiliation
The main religious groups in the District are Christianity, Islam and Traditional Religion. Analysis of
religious composition indicates that about 82 percent of the population are Christians while about seven
percent and two percent are Islam and Traditionalists respectively.
The data from the 2010 PHC revealed that various forms of religious affiliations exist in the District. These
religious affiliations include Catholic, Protestant (Anglican/Lutheran) Pentecostal/Charismatic, Other
Christians, Islam and Traditionalist. As presented in Table 1 Catholic, Protestant, Pentecostal and other
Christians form the larger Christian group (94,259) of the total population 115,378. Islam represents 6.8
percent, Traditionalists represent 1.6 percent while other religions constitute 0.9 percent. The populations
that belong to non-religion however constitute 9.0 percent of the entire District population.
The table further shows that Pentecostal/Charismatic (31.2%) is the highest of the Christian denomination,
followed by Protestants (17%) and then Catholics (8.7%) as well as all the others being 24.7. Proportion
(6.8%) of Islam faith is much lower in the District than in the entire Ashanti Region (15.2%) and in the
country (17.6%).
Moreover all Christian denominations have higher proportion of males than females, except “Other
Christians” (28,479), where the proportion of female (25.6%) is higher than male (23.7%). The figure for the
males belonging to Islam (7.5%) is also higher than the female (6.0%). In the case of Traditionalist and
“Other religion”, the proportion of male and female is 1.6 percent and 0.9 percent respectively).
Table 2.1: Population by religion and sex
Source: Ghana Statistical Service, 2010 Population and Housing Census.
Religion Both sexes Male Female
Number Percent Number Percent Number Percent
Total 115,378 100.0 58,039 100.0 57,339 100.0
No Religion 10,373 9.0 6,846 11.8 3,527 6.2
Catholic 10,032 8.7 5,011 8.6 5,021 8.8
Protestant (Anglican Lutheran
etc.)
19,711 17.1 9,500 16.4 10,211 17.8
Pentecostal/Charismatic 36,037 31.2 17,064 29.4 18,973 33.1
Other Christians 28,479 24.7 13,772 23.7 14,707 25.6
Islam 7,804 6.8 4,377 7.5 3,427 6.0
Traditionalist 1,896 1.6 952 1.6 944 1.6
Other (Specify) 1,046 0.9 517 0.9 529 0.9
31
2.5 SETTLEMENT SYSTEMS
The largest settlement in the District in terms of population is New Edubiase with a population of 19,974. It
has most of the facilities indicated in the scalogram analysis. This makes the community occupy the first
position in terms of settlement hierarchy. The next settlement of importance in terms of facilities is
Akrofuom, which has a population of 10,399. The communities, which follow Akrofuom in terms of
settlement hierarchy, are Atobiase, Apagya, Praso, Ataase Nkwanta, Sikaman, Amudruase, Kubi Kwanto,
Tweapease, Fenaso Nkwanta, Atwereboana and Subriso.
The rest of the communities have a centrality score below 100. These settlements lack a lot of facilities as
indicated in the scalogram analysis. It is worth noting that most of the big communities are found along the
main Kumasi to Cape-Coast road. And this shows the importance of good road network in the development
of communities, as most of the facilities are located in the communities along the major road.
32
Fig. 2.7 Adansi South District Map
33
Table 2.2 Scalogram Analysis
POP
Prim
ary
Sch
.
JHS
SH
S
TA
BS
Clin
ic
Hea
lth C
entre
Hos
pita
l
Han
d D
ug W
ell
Bor
ehol
es
Pip
e B
orne
Wat
er
Pit
Lat
rine
KV
IP
W.C
.
Trib
unal
Pol
ice
Sta
tion
Fire
Sta
tion
Am
bula
nce
Pos
t Offic
e
Tel
epho
ne
Gue
st H
ouse
Fill
ing
Sta
tion
Lor
ry P
ark
Rur
al B
ank
Com
mer
cial
Ban
k
Prim
ary
Roa
d
Sec
onda
ry R
oad
Fee
der R
oad
Agr
ic. E
xt.
Dai
ly M
arke
t
Wee
kly
Mar
ket
No.
of F
acili
ties
Tot
al C
entra
lity
Sco
re
WEIGHT (W) 1 2 3 1 2 3 4 1 2 3 1 2 3 1 1 1 1 1 1 1 1 1 2 3 2 1 1 1 2
New Edubiase 12,046 X X X X X X X X X X X X X X X X X X X X X X X X X X X X 2
8
1
,
8
8
6
Akrofuom 6,477 X X X X X X X X X X X X X X X X X X X X X 2
1
7
1
3
Wamase 1,590 X X X X X X X X X X 1
0
6
7
Sikaman 1,516 X X X X X X X X X X X X X X X 1
5
2
2
5
Apagya 3,312 X X X X X X X X X X X X X X X 1
5
2
2
5
Atobiase 2,948 X X X X X X X X X X X X X X 1
4
1
7
8
Praso 3,069 X X X X X X X X X X X X X X 1
4
1
7
8
Fahiakobo 1,205 X X X X X X X X X X X 1
1
1
4
34
2
Subriso 1,122 X X X X X X X X X X X 1
1
1
4
2
Mensonso No1 1,547 X X X X X X X X X X X 1
1
1
4
2
Ataase Nkwanta 1,626 X X X X X X X X X X X X 1
2
1
5
0
Wamasi 1,590 X X X X X X X X X 9 4
3
Obonsu 1,017 X X X X X X X X X X 1
0
6
7
Amudurase 1,618 X X X X X X X X X X X X X 1
3
1
5
1
Owusukrom 1,029 X X X X X X X X X 9 4
3
Menang 1,387 X X X X X X X X X 9 4
3
Wuruyie 1,603 X X X X X X X X X X 1
0
6
7
Ampunyase 1,786 X X X X X X X X X X 1
0
6
7
Subin Camp 1,110 X X X X X X X X X X 1
0
6
7
Akutreso X X X X X X X X X X 1
0
6
7
Kramokrom 999 X X X X X 7 3
1
Number of facilities in the
District
20 2
0
2 1
9
4 5 1 1
9
1
9
2 2
0
1
8
1
0
1 4 1 1 2 8 1 3 1 3 1 8 3 2
0
8 1
9
5
35
2.6 HOUSEHOLD SIZE / CHARACTERISTICS
The average household size of the District is about 4.4. This compared with the average household
size of 5.2 in 2000 indicates a decline in household size in the District. The predominant household
heads are men. It can be seen from Table 8.1 that the total stock of houses in the District is 20,541
comprising 87 percent in the rural areas and 13 percent in the urban.
Population per house is the proportion of the total population to the number of houses. It can further be
seen that the average household per house for the District is 1.2 and that of rural and urban areas are1.2
and 1.8 respectively. The population per house in the District is 5.5, while that of rural and urban areas
are 5.3 and 6.9 respectively.
The average household size in the District is 4.4 which is same as that of the country (4.4) and slightly
higher than that of the region (4.1). In rural areas, the average household size is 4.6 whereas 3.8 is for
urban areas.
Table 2.3: Stock of houses and households by type of locality
Categories Total country Region District Urban Rural
Total population 24,658,823 4,780,380 115,378 18,966 96,412
Total household population 24,076,327 4,671,982 113,145 18,440 94,705
Number of houses 3,392,745 574,066 20,541 2,663 17,878
Number of households 5,467,054 1,126,205 25,626 4,881 20,745
Average households per house 1.6 2.0 1.2 1.8 1.2
Population per house* 7.1 8.1 5.5 6.9 5.3
Average household size 4.4 4.1 4.4 3.8 4.6
Source: Ghana Statistical Service, 2010 Population and Housing Census.
2.6.1 Economic Status of Population
The 2010 PHC classified the population as economically active and economically inactive population.
Economically active population describes population as employed and unemployed. It also takes into
consideration the reasons why a population is unemployed. Economically inactive population on the
other hand is the population, which can neither be classified as employed nor unemployed. This
category of population was either engaged with household chores, full time education, disable/sick or
is on pension/ retired, and for that matter did not seek job within seven days preceding the Census
Night.
36
Table 4 and Figure 6 present the population 15years and older by activity status and sex. The total
number of the population that is economically active is 52,919. This figure comprises of 26,512 males
and 26,407 females. The population is dominated by employed population (97.2%) which is slightly
higher for the males (97.6%) compared to females (96.9%). This proportion is also mainly (94.8%) for
those who work within seven days preceding Census Night. Majority of those who are unemployed
(65.9%) are those seeking work for the first time and available for work comprising 69.0 percent males
and 63.5 percent females. Whereas the total population 15years and older that are economically not
active is 19.8 percent of the population, proportion of the male is 18.9 percent whiles that of the
females is 20.7 percent. The Census outcome also reveals that, the figure for economically not active
population is mostly pertaining to those who are in full time education (51.1%).
Table 2.4: Population 15 years and older by activity status and sex
Source: Ghana Statistical Service, 2010 Population and Housing Census.
2.6.2 Rural – Urban Split
During the 2000 population census the rural population was 63,895 representing 79.9 percent of the
population. According to the District Data base 2006 the rural population totaled 76,905 representing
78.1% while the urban population was 21,532 representing 21.9%. The Urban population for 2010 is
estimated at 36,667 forming 32.5%. The urban population has been increasing since 1996. The
Activity status
Total Male Female
Number Percent Number Percent Number Percent
Total 65,974 100.0
32,682 100.0
33,292 100.0
Economically active 52,919 80.2
26,512 81.1
26,407 79.3
Employed 51,461 97.2
25,877 97.6
25,584 96.9
Worked 48,767 94.8
24,728 95.6
24,039 94.0
Did not work but had job to go
back to 2,441 4.7
1,021 3.9
1,420 5.6
Did voluntary work without pay 253 0.5
128 0.5
125 0.5
Unemployed 1,458 2.8
635 2.4
823 3.1
Worked before, seeking work and
available 497 34.1
197 31.0
300 36.5
Seeking work for the first time and
available 961 65.9
438 69.0
523 63.5
Economically not active 13,055 19.8
6,170 18.9
6,885 20.7
Did home duties (household chore) 3,123 23.9
955 15.5
2,168 31.5
Full time education 6,672 51.1
3,867 62.7
2,805 40.7
Pensioner/Retired 181 1.4
118 1.9
63 0.9
Disabled/Sick 923 7.1
409 6.6
514 7.5
Too old/young 1,288 9.9
430 7.0
858 12.5
Other 868 6.6 391 6.3 477 6.9
37
indication for development is that social amenities need to be provided for the ever increasing urban
population.
2.6.3 Housing Stock
It can be seen from Table 8.1 that the total stock of houses in the District is 20,541 comprising 87
percent in the rural areas and 13 percent in the urban.
Population per house is the proportion of the total population to the number of houses. It can further be
seen that the average household per house for the District is 1.2 and that of rural and urban areas are
1.2 and 1.8 respectively. The population per house in the District is 5.5, while that of rural and urban
areas are 5.3 and 6.9 respectively.
The average household size in the District is 4.4 which is same as that of the country (4.4) and slightly
higher than that of the region (4.1). In rural areas, the average household size is 4.6 whereas 3.8 is for
urban areas.
Table 2.5: Stock of houses and households by type of locality
Categories Total country Region District Urban Rural
Total population 24,658,823 4,780,380 115,378 18,966 96,412
Total household population 24,076,327 4,671,982 113,145 18,440 94,705
Number of houses 3,392,745 574,066 20,541 2,663 17,878
Number of households 5,467,054 1,126,205 25,626 4,881 20,745
Average households per house 1.6 2.0 1.2 1.8 1.2
Population per house* 7.1 8.1 5.5 6.9 5.3
Average household size 4.4 4.1 4.4 3.8 4.6
Source: Ghana Statistical Service, 2010 Population and Housing Census.
2.6.4 Type of Dwelling, Holding and Tenancy Arrangement
Table 6 shows that there are 25,626 occupied dwelling units in the District out of which 18,083 have
male headed households and 7,543 female headed. And there are more occupied dwelling units in rural
areas (20,745) than in urban areas (4,881). Moreover, 17,414 dwelling units were owned by household
members in the District, followed by those owned by other private individual (3,823) and relative not a
household member (3,459), while other (83) had the lowest share.
38
In rural areas, most dwelling units were owned by household members (15,447) followed by those
owned by relative not a household member (2,408) and other private individual, while other (68) had
the lowest share. On the other hand, in urban areas, 1,967 dwelling units were owned by household
member, and then those owned by other private individual (1,740) and relative not a household
member while those being purchased (6) are the lowest.
Table 2.6: Ownership status of dwelling by sex of household head and type of locality
Ownership status
Total
country Region
District
Total
Male
headed
Female
headed Urban Rural
Total 5,467,054 1,126,205
25,626 18,083 7,543
4,881 20,745
Owned by household member 2,883,236 471,623
17,414 12,456 4,958
1,967 15,447
Being purchased (e.g. mortgage) 45,630 13,648
91 67 24
6 85
Relative not a household member 851,630 218,145
3,459 2,227 1,232
1,051 2,408
Other private individual 1,439,021 370,415
3,823 2,636 1,187
1,740 2,083
Private employer 83,610 20,482
395 359 36
18 377
Other private agency 21,123 5,113
101 88 13
15 86
Public/Government ownership 118,804 22,126
260 193 67
69 191
Other 24,000 4,653 83 57 26 15 68
Source: Ghana Statistical Service, 2010 Population and Housing Census.
The type of occupied dwelling unit by sex of household head and type of locality is presented in Table
2.7. Out of a total of 25,626 occupied dwelling units in the District compound houses (43.7%)
constitute the highest proportion, followed by separate house (40.1%) and semi-detached house
(8.4%).
It can further be seen from Table 8.3 in rural areas, separate house (44.7%) had the highest proportion
of the total occupied dwelling units, followed by compound house (rooms) (38.2%) and semi-detached
house (8.7%). In urban areas, compound house (66.7%) forms the greatest percentage, followed by
separate house (20.2%) and semi-detached house. More so, in separate house, there are more male
household heads (42%) than their female counterparts (35.3%), while in compound house, more
females (50.5%) than males (40.8%) were household heads, (Table 2.7).
Table 2.7: Type of occupied dwelling unit by sex of household head and type of locality
Type of dwelling
Total
country Region
District
Total
Male
headed
Female
headed
Urban Rural
N % % % % %
Total 5,467,054 1,126,205 25,626 100.0
100.0 100.0
100.0 100.0
Separate house 1,471,391 266,516 10,264 40.1
42.0 35.3
20.2 44.7
Semi-detached house 391,548 89,485 2,161 8.4
8.8 7.6
7.3 8.7
Flat/Apartment 256,355 91,227 378 1.5
1.4 1.6
3.2 1.1
39
Compound house (rooms) 2,942,147 605,025 11,188 43.7
40.8 50.5
66.7 38.2
Huts/Buildings (same
compound) 170,957 22,399 1,121 4.4
4.8 3.4
1.0 5.2
Huts/Buildings (different
compound) 36,410 4,176 324 1.3
1.4 0.8
0.1 1.5
Tent 10,343 1,791 27 0.1
0.1 0.1
0.0 0.1
Improvised home
(kiosk/containeretc) 90,934 16,304 35 0.1
0.1 0.2
0.1 0.1
Living quarters attached to
office/shop 20,499 4,046 80 0.3
0.3 0.3
0.7 0.2
Uncompleted building 66,624 23,285 40 0.2
0.2 0.1
0.6 0.1
Other 9,846 1,951 8 0.0 0.0 0.1 0.0 0.0
Source: Ghana Statistical Service, 2010 Population and Housing Census.
2.6.5 Construction Materials
The types of construction materials used for dwelling units in the country, region and the District are
presented in Table 8.4. The most common construction material used for outer wall in the District is
mud brick/earth (69.4%), followed by cement blocks/concrete (24.1%) and wood (1.5%), while stone
(0.1%) and bamboo (0.1%) constitute least used.
Cement blocks (70.4%) were mostly used for outer wall in urban areas followed by mud brick (26.2%)
and burnt bricks (1.0%). On the other hand, in rural areas, mud bricks (79.1%) had the greatest
proportion, followed by cement blocks (13.7%) and landcrete (2.9%) while stone (0.1%) and bamboo
(0.1%) were least used for outer wall.
Table 2.8: Main construction material for outer wall of dwelling units by type of locality
Source: Ghana Statistical Service, 2010 Population and Housing Census.
Material for Outer wall Total country Region
District
Total
Urban Rural
N % % %
Total 5,817,607 1,169,030 27,985 100.0
100.0 100.0
Mud brick/Earth 1,991,540 250,238 19,429 69.4
26.2 79.1
Wood 200,594 27,438 423 1.5
0.8 1.7
Metal sheet/Slate/Asbestos 43,708 10,549 160 0.6
0.7 0.5
Stone 11,330 2,014 23 0.1
0.1 0.1
Burnt bricks 38,237 7,580 328 1.2
1.0 1.2
Cement blocks/Concrete 3,342,462 840,519 6,737 24.1
70.4 13.7
Landcrete 104,270 19,878 702 2.5
0.6 2.9
Bamboo 8,206 1,381 23 0.1
0.1 0.1
Palm leaf/Thatch (grass)/Raffia 38,054 1,768 120 0.4
0.1 0.5
Other 39,206 7,665 40 0.1 0.0 0.2
40
It is further observed that cement (68.5%) was mostly used for the floor of dwelling units in the
District. This was followed by the use of mud (29.1%), whereas burnt brick, terrazzo and other were
least used (0.1%).
In urban areas, the use of cement for floor (85.3%) had the highest proportion, followed by mud
(11.7%) while other materials (0.0%) formed the least. Similarly, in the rural areas, cement (64.5%)
was the most common material used for the floor, followed by mud (33.2%) while burnt brick and
terrazzo had 0%. (Table 2.9)
Table 2.9: Main construction material for the floor of dwelling units by type of locality
Materials for the floor Total country Region
District
Total
Urban Rural
N % % %
Total 5,467,054 1,126,205 25,626 100.0
100.0 100.0
Earth/Mud 872,161 164,333 7,462 29.1
11.7 33.2
Cement/Concrete 4,255,611 875,714 17,550 68.5
85.3 64.5
Stone 32,817 8,731 317 1.2
1.1 1.3
Burnt brick 6,537 1,365 14 0.1
0.1 0.0
Wood 52,856 6,032 70 0.3
0.1 0.3
Vinyl tiles 57,032 15,120 48 0.2
0.5 0.1
Ceramic/Porcelain/Granite/Marble tiles 88,500 19,826 98 0.4
0.6 0.3
Terrazzo/Terrazzo tiles 85,973 32,460 36 0.1
0.6 0.0
Other 15,567 2,624 31 0.1 0.0 0.1
Source: Ghana Statistical Service, 2010 Population and Housing Census.
Table 10 shows that metal sheet was mostly used for roofing of dwelling units in the District accounted
for 81.9 percent, followed by raffia (9.2%) and bamboo (5.8%) while roofing tile (0.1%) was least
used. The distribution by type of locality revealed that in both urban and rural areas, metal sheet was
the main roofing material accounting for 96.2 percent and 78.7 percent respectively.
Table 2.10: Main construction material for roofing of dwelling unit by type of locality
Main Roofing material Total country Region
District
Total
Urban Rural
N % % %
Total 5,817,607 1,169,030 27,985 100.0
100.0 100.0
Mud/Mud bricks/Earth 80,644 4,885 330 1.2
0.3 1.4
Wood 45,547 10,933 156 0.6
0.4 0.6
Metal sheet 4,152,259 1,046,820 22,914 81.9
96.2 78.7
Slate/Asbestos 759,039 12,990 116 0.4
0.2 0.5
Cement/Concrete 141,072 36,284 92 0.3
0.4 0.3
Roofing tile 31,456 4,381 32 0.1
0.0 0.1
41
Bamboo 71,049 13,921 1,637 5.8
0.9 7.0
Thatch/Palm leaf or Raffia 500,606 33,299 2,562 9.2
1.5 10.9
Other 35,935 5,517 146 0.5 0.1 0.6
Source: Ghana Statistical Service, 2010 Population and Housing Census.
2.6.6 Room Occupancy
The distribution of household size and the number of sleeping rooms they occupied is presented in
Table 11. On the whole, single room constitutes the highest percentage (55.9%) of all the types of
rooms occupied, followed by double rooms (24.3%) and three rooms (10.6%). The proportion of
households with size one occupying a single room is 89.0 percent as against 7.5 percent of households
with ten or more members.
Table 2.11: Households by size and number of sleeping rooms occupied in dwelling unit
Household
size
Number of sleeping rooms
Total
One
room
Two
rooms
Three
rooms
Four
rooms
Five
rooms
Six
rooms
Seven
rooms
Eight
rooms
Nine
rooms
or more
Total 25,626 100.0 55.9 24.3 10.6 4.8 2.3 1.1 0.5 0.2 0.4
1 4,494 100.0 89.0 6.7 2.0 1.0 0.5 0.2 0.3 0.1 0.2
2 3,056 100.0 73.0 20.1 3.3 1.5 0.9 0.7 0.3 0.1 0.2
3 3,327 100.0 63.7 24.5 7.6 2.0 0.9 0.6 0.2 0.1 0.4
4 3,406 100.0 57.9 27.1 9.2 3.8 1.0 0.5 0.3 0.1 0.2
5 3,265 100.0 50.2 31.1 11.9 4.1 1.6 0.5 0.3 0.2 0.2
6 2,767 100.0 41.5 34.4 14.8 5.3 2.0 1.2 0.4 0.1 0.4
7 1,875 100.0 33.0 33.5 18.4 8.8 3.7 1.4 0.5 0.2 0.5
8 1,342 100.0 25.8 32.8 21.8 10.4 5.3 2.3 0.6 0.6 0.4
9 795 100.0 17.6 30.2 24.0 14.0 7.9 3.5 1.4 0.5 0.9
10+ 1,299 100.0 7.5 22.0 24.6 18.2 12.2 6.4 4.1 2.0 3.0
Source: Ghana Statistical Service, 2010 Population and Housing Census.
2.6.7 Access to Utilities and Household Facilities
The main source of lighting used by the household is presented in Table 8.8 by type of locality. The
use of flashlight is the most commonly used source of lighting of dwelling units in the District
representing 53 percent. Electricity (mains) (29.1%) and kerosene lamp (15.5%) had the next higher
proportions, while crop residue was least used (Figure 8.1)
In urban areas, electricity (mains) accounts for the highest percentage (77%), followed by flashlight
(13.8%) and kerosene lamp (8.2%), whereas crop residue represents the lowest share (0%). On the
other hand, flashlight (62.3%) was mostly used in rural areas, followed by electricity (mains) and
kerosene lamp with 17.9 percent. Private generator (0.1%) and crop residue (0.1%) were least used as
source of lighting in rural communities. (Table 2.12)
42
Table 2.12: Main source of lighting of dwelling units by type of locality
Main source of light Total country Region
District
Total
Urban Rural
N % % %
Total 5,467,054 1,126,205 25,626 100.0
100.0 100.0
Electricity (mains) 3,511,065 828,924 7,463 29.1
77.0 17.9
Electricity (private generator) 36,142 6,343 44 0.2
0.3 0.1
Kerosene lamp 971,807 78,756 3,975 15.5
8.2 17.2
Gas lamp 9,378 1,881 57 0.2
0.2 0.2
Solar energy 9,194 1,693 196 0.8
0.1 0.9
Candle 41,214 9,472 42 0.2
0.2 0.2
Flashlight/Torch 858,651 195,345 13,593 53.0
13.8 62.3
Firewood 13,241 1,484 77 0.3
0.2 0.3
Crop residue 4,623 414 16 0.1
0.0 0.1
Other 11,739 1,893 163 0.6 0.1 0.8
Source: Ghana Statistical Service, 2010 Population and Housing Census.
Figure 2.8: Source of energy
Source: Ghana Statistical Service, 2010 Population and Housing Census.
Table 2.13 contains the distribution of main source of cooking fuel, and cooking space used by
households in the District. It can be seen from the Table, that 76.4 percent of households use wood as
the major source of cooking fuel, followed by charcoal (15.2%) and gas (3.4%). In urban areas,
charcoal (48.3%) is mostly used, followed by wood (32.4%) and gas (10.7%), while animal waste is
Electricity (mains)
29%
Electricity (private
generator)0%
Kerosene lamp16%
Gas lamp0%Solar energy
1%Candle
0%
Flashlight/Torch
53%
Firewood0%
Crop residue
0%
Other1%
43
least used by households. Conversely, wood accounts for the highest proportion (86.8%), followed by
charcoal (7.4%) in the rural areas, with those who do not cook constituting 3.5 percent.
Moreover, it can be observed from Table 8.9 that households that use separate room exclusively for
cooking has the highest percentage (47.4%) in the District, followed by veranda users (15.3%) and
households using open space in compound (10.9%).The use of bedroom and other spaces for cooking
constitute the lowest share (0.3%).
Table 2.13: Main source of cooking fuel, and cooking space used by households
Source: Ghana Statistical Service, 2010 Population and Housing Census.
2.7 WATER AND SANITATION
The purpose of good drinking water is to a large extent to minimize the prevalence of water borne
diseases among household members. The source of drinking water is important because water borne
diseases are common in Ghana and members of households are better off if they have access to good
drinking water (Eastern Region PHC report, 2013).
Source of cooking fuel/ cooking space
Total
country Region
District
Total
Urban Rural
N % % %
Main source of cooking fuel for household
Total 5,467,054 1,126,205 25,626 100.0
100.0 100.0
None /no cooking 306,118 91,717 1,108 4.3
7.8 3.5
Wood 2,197,083 335,439 19,577 76.4
32.4 86.8
Gas 996,518 237,251 874 3.4
10.7 1.7
Electricity 29,794 7,952 34 0.1
0.2 0.1
Kerosene 29,868 4,263 65 0.3
0.4 0.2
Charcoal 1,844,290 443,144 3,891 15.2
48.3 7.4
Crop residue 45,292 2,573 61 0.2
0.1 0.3
Saw dust 8,000 1,545 5 0.0
0.1 0.0
Animal waste 2,332 427 3 0.0
0.0 0.0
Other 7,759 1,894 8 0.0
0.1 0.0
Cooking space used by household
Total 5,467,054 1,126,205 25,626 100.0
100.0 100.0
No cooking space 386,883 105,491 1,654 6.5
8.9 5.9
Separate room for exclusive use of household 1,817,018 319,235 12,158 47.4
21.1 53.7
Separate room shared with other household(s) 410,765 165,781 2,521 9.8
9.7 9.9
Enclosure without roof 117,614 14,147 337 1.3
1.4 1.3
Structure with roof but without walls 349,832 52,530 2,095 8.2
5.1 8.9
Bedroom/Hall/Living room) 74,525 4,918 77 0.3
0.5 0.3
Verandah 1,173,946 304,294 3,912 15.3
38.9 9.7
Open space in compound 1,115,464 155,848 2,795 10.9
14.2 10.1
Other 21,007 3,961 77 0.3 0.3 0.3
44
Table 14 and Figure 8.2 present information on main source of drinking water and water for other
domestic use, of dwelling unit at the District, regional and national level. The available information
from the 2010 PHC reveals that, a greater proportion (50.8%) of the household use Bore-
hole/Pump/Tube well as their main source of drinking water. This is also true for both regional and
national level. Furthermore, households also derive their drinking water from River/Stream (16.0%)
and protected well (15.3%). These followed Bore-hole/Pump/Tube well in highest order. The table
further shows that, only few of the households have access to pipe-borne water inside dwelling
unit(0.8%) and outside dwelling unit (4.2%). The 2010 Census information also indicates that, 4.3
percent of households drink from Unprotected well and 0.1 percent drinks from Unprotected spring
and Dugout/Pond/Lake/Dam/Canal each. Whereas a higher proportion of the urban households use
Protected well (37.7%) as their main source of drinking water, the rural households derive their main
source of drinking water mainly from Bore-hole/Pump/Tube well (54.7%).
Information on sources of water for other domestic use on the other hand shows that about half of
households use Bore-hole/Pump/Tube well (48.7%) for domestic purposes in the District. This is
followed by Protected well (18.4%) and River/Stream (17.0%). The main source of water for other
domestic use at the regional level is Bore-hole/Pump/Tube well (354,585). It can also be inferred from
Table 8.10 that, the largest proportion of the District urban households (81.4%) uses Bore-
hole/Pump/Tube well or Protected well as their main source of water for domestic use, while more
than half of the rural household (52.3%) derive their main source of water for other domestic use from
Bore-hole/Pump/Tube well.
Table 2.14: Main source of water of dwelling unit for drinking and other domestic purposes
Sources of water
Total
country Region
District
Total
Urban
Rura
l
N % % %
Main source of drinking water for household
Total 5,467,054 1,126,205
25,626 100.0
100.0 100.0
Pipe-borne inside dwelling 790,493 247,769
195 0.8
2.9 0.3
Pipe-borne outside dwelling 1,039,667 210,802
1,072 4.2
8.7 3.1
Public tap/Standpipe 712,375 113,626
1,669 6.5
9.1 5.9
Bore-hole/Pump/Tube well 1,267,688 348,433
13,018 50.8
34.2 54.7
Protected well 321,091 80,800
3,928 15.3
37.7 10.1
Rain water 39,438 1,457
24 0.1
0.1 0.1
Protected spring 19,345 4,692
72 0.3
0.1 0.3
Bottled water 20,261 2,958
20 0.1
0.2 0.1
Sachet water 490,283 41,265
382 1.5
5.9 0.4
45
Tanker supply/Vendor provided 58,400 4,676
0 0.0
0.0 0.0
Unprotected well 112,567 7,652
1,095 4.3
0.9 5.1
Unprotected spring 12,222 1,451
22 0.1
0.0 0.1
River/Stream 502,804 58,333
4,112 16.0
0.2 19.8
Dugout/Pond/Lake/Dam/Canal 76,448 1,441
13 0.1
0.0 0.1
Other 3,972 850
4 0.0
0.0 0.0
Main source of water for other domestic use of household
Total 5,467,054 1,126,205
25,626 100.0
100.0 100.0
Pipe-borne inside dwelling 905,566 257,088
200 0.8
2.8 0.3
Pipe-borne outside dwelling 1,089,030 205,678
913 3.6
6.4 2.9
Public tap/Standpipe 704,293 112,574
1,548 6.0
7.4 5.7
Bore-hole/Pump/Tube well 1,280,465 354,585
12,490 48.7
33.5 52.3
Protected well 465,775 101,863
4,703 18.4
47.9 11.4
Rain water 39,916 2,376
27 0.1
0.1 0.1
Protected spring 18,854 4,323
89 0.3
0.2 0.4
Tanker supply/Vendor provided 100,048 5,110
15 0.1
0.0 0.1
Unprotected well 152,055 10,674
1,153 4.5
0.9 5.4
Unprotected spring 15,738 1,797
35 0.1
0.1 0.2
River/Stream 588,590 65,730
4,357 17.0
0.7 20.8
Dugout/Pond/Lake/Dam/Canal 96,422 2,547
19 0.1
0.0 0.1
Other 10,302 1,860 77 0.3 0.1 0.4
Source: Ghana Statistical Service, 2010 Population and Housing Census.
Figure 2.9: Source of drinking water
Source: Ghana Statistical Service, 2010 Population and Housing Census.
2.90.3 0.8
8.7
3.14.2
9.1
5.96.5
34.2 54.7 50.8
37.710.1 15.3
5.9
0.41.5
0.9
5.14.3
19.816.0
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
Urban Rural Total
Percentage
Sources of Drinking Water
Other
Pond
River/stream
Unprotected spring2
Unprotected spring
Tanker supply
Sachet water
Bottled water
Protected spring
Rain water
Protected well
Borehole
Public tap
Pipe-borne outside dwelling
Pipe borne inside dwelling
46
Table 2.15: Communities in the District with bore holes
TOWN/AREA COUNCIL COMMUNITY NAME
WURUYIE Canada Aboabo No 3
Kotwea Ababio
Atwereboana Akoroso
Odumase Suminamu
Kponyokrom Kyerembebi
Nyamebekyere – Odumase Achiasewa
Dzobokrom Wuruyie
Edwenase
ADANSI PRASO
Quansahkrom Brodikro
Breku – Praso Mankatah
Asonkore Ahomahama
Adansi Kenya Ayaa
Adansi Koforidua Obonsu
Komfokrom Lawyerkrom
Domeabra Adjoam
Opare Kwadwo Adansi Hwidiem
Owusukrom Sarfokrom
Dwendama Agya Mensah
Aniampam Bepoase
Fete Nkrankese
Kofi Tutu Kwabena Essuom
Fremu
AKUTRESO
Maniepe Agravi
Offeikrom Bonkuro
Appiahkrom Breku – Akutreso
Akwa Atwereboana Akutreso
Sasakrom Tonkoase No 1
Kapre No 3 (Kwarkyekrom) Tonkoase No 2
Kapre No 1 Takyi Ntumi
Kapre No 2 Ahinakwa
Kojo Yentumi Kojo Awu
Abankwa
AKROFUOM Sikaman Dunkwawfuom
Esswonkrom Gyeasehenekrom
Pantinpa Mprakyire
Kramekrom Agyir /Boakyekrom
Adjeikrom Anorkrom
Amoakokrom Yaadome
Adwafo (Mensonso No 1) Yawowukrom
Brong/ Yeboakrom Agyaatakrom
Nyamebekyere/Master Nkwanta Nkoransah
Brofoyedru Alata
Addoosu Pewodie
Mensonso No 2 Kakraba
Anokyekrom Akrofuom
Betenase Pompom
Benkumhene Okyerekrom
Kofi Gyaame Danpoase
Asiedukrom Carowner
47
Komfokrom Akuaku
Botwe Mintakrom
ADANSI PRASO Denyase(Akwaku) Nkranfo Nkwanta
Fetefo Kojo Mankrong
Subin Camp Agyarko
Asarekrom(Obonsu) Essuom
Kwasu Ataasi Nkwanta
Adansi Praso
ATOBIASE /APAGYA Oseikrom(Treso) Sakyikrom
Kwame Nkyi Tweapease Apagya
Yaw Tawiah Apagya
Abaase Atobiase
Ankaase
NEW EDUBIASE Memendafuom Breparo
Abusahenekrom Nyamebekyere
Awuroso Nyamebekyere Nkwanta
Kawitirwhe Bronikrom
Krobowanchie Kwame Asare
Dotom Kwame Agyei
Samamkro Afedie
Oyan Adomwuwim
Menang Mpenteembua
Kwabena Sam New Edubiase
Abrosakro Amudurasi
Source: Adansi South CW&SA, 2014
2.7.1 Bathing and Toilet Facilities
This section discusses the use of bathing and toilet facilities in the Adansi South District. The total
number of household using one form of toilet facility or the other is 24,046, representing 98.8 percent
of the entire household in the District. As presented in Table 16 and Figure 8.3, the proportion of the
household population that use public toilet (51.6%) is the highest compared to the national average of
34.6percent and regional proportion of 43.3 percent. The total of 1,580 households representing 6.2
percent however does not have access to any toilet facility and therefore resort to the use of bush, field
or beach. The proportion of household in the rural locality with no access to toilet facility (6.2%), and
those with pit latrine (34.3%) and public toilet facilities (52.9%) are relatively higher compared to
those for urban locality ( 6.1%, 20.6% and 46.0% respectively).
Table 2.16: Type of toilet facility and bathing facility used by households by type of locality
Toilet facility/Bathing facility Total country Region
District
Total
Urban Rural
N % % %
Toilet facility used by household
Total 5,467,054 1,126,205 25,626 100.0
100.0 100.0
No facilities (bush/beach/field) 1,056,382 71,322 1,580 6.2
6.1 6.2
48
W.C. 839,611 261,106 636 2.5
8.1 1.2
Pit latrine 1,040,883 200,798 8,129 31.7
20.6 34.3
KVIP 572,824 98,434 1,956 7.6
18.3 5.1
Bucket/Pan 40,678 3,082 44 0.2
0.6 0.1
Public toilet (WC/KVIP/Pit/Pan etc) 1,893,291 487,596 13,222 51.6
46.0 52.9
Other 23,385 3,867 59 0.2
0.3 0.2
Bathing facility used by household
Total 5,467,054 1,126,205 25,626 100.0
100.0 100.0
Own bathroom for exclusive use 1,535,392 280,657 7,864 30.7
18.8 33.5
Shared separate bathroom in the same
house 1,818,522 501,675 6,290 24.5
38.3 21.3
Private open cubicle 381,979 65,409 2,751 10.7
5.3 12.0
Shared open cubicle 1,000,257 158,985 4,473 17.5
27.8 15.0
Public bath house 140,501 16,648 110 0.4
0.9 0.3
Bathroom in another house 187,337 31,329 2,298 9.0
3.7 10.2
Open space around house 372,556 67,321 1,763 6.9
5.0 7.3
River/Pond/Lake/Dam 14,234 1,320 48 0.2
0.1 0.2
Other 16,276 2,861 29 0.1 0.1 0.1
Source: Ghana Statistical Service, 2010 Population and Housing Census.
Figure 2.10: Toilet facilities
2.7.2 Method of Waste Disposal
Analysis of method of solid and liquid waste disposal in the District reveals that most of the
households dispose off their solid waste in open space public dumb (61.8%) and also throw their liquid
waste onto the compound (54.3%). At the regional level, a higher proportion of the households
6.22.5
31.7
7.60.2
51.6
0.26.1 8.1
20.6 18.3
0.6
46.0
0.36.2
1.2
34.3
5.10.1
52.9
0.2
Percentage
Toilet
Both Urban Rural
49
(472,344), representing 41.9 percent dumb their solid waste in the public dumb (open space) whilst
29.4 percent (330,818) throw their liquid waste onto the compound. Comparably, at the national level,
the majority (37.7%) of households dispose off their solid waste in the public dumb (open space)
whilst 1,924,986 (35.2%) households throw their liquid waste onto their compound. The proportion
also varies for both solid and liquid waste disposal in urban and rural households.
Table 2.17: Method of solid and liquid waste disposal of households by type of locality
Method of waste disposal
Total
country Region
District
Total
Urban Rural
N % % %
Solid waste
Total 5,467,054 1,126,205 25,626 100.0
100.0 100.0
Collected 785,889 102,035 410 1.6
0.6 1.8
Burned by household 584,820 59,303 1,083 4.2
8.9 3.1
Public dump (container) 1,299,654 399,121 2,799 10.9
53.6 0.9
Public dump (open space) 2,061,403 472,344 15,832 61.8
28.9 69.5
Dumped indiscriminately 498,868 55,647 4,082 15.9
3.0 19.0
Buried by household 182,615 30,215 887 3.5
4.3 3.3
Other 53,805 7,540 533 2.1
0.7 2.4
Liquid waste
Total 5,467,054 1,126,205 25,626 100.0
100.0 100.0
Through the sewerage system 183,169 35,882 346 1.4
0.3 1.6
Through drainage system into a gutter 594,404 223,451 619 2.4
7.8 1.1
Through drainage into a pit (soak away) 167,555 28,885 263 1.0
1.0 1.0
Thrown onto the street/outside 1,538,550 258,473 8,205 32.0
31.5 32.1
Thrown into gutter 1,020,096 245,146 2,182 8.5
22.7 5.2
Thrown onto compound 1,924,986 330,818 13,904 54.3
36.3 58.5
Other 38,294 3,550 107 0.4 0.3 0.4
Source: Ghana Statistical Service, 2010 Population and Housing Census.
2.8 SERVICES
2.8.1 Tourism
There are a couple of tourist sites identified in the District and some of these include a Birds Sanctuary
at Bonkro (White -Necked Picathartes), a Snake Palm Tree at Pra- Birim Aboi, the Nkabom festival
which is celebrated every three years by Adansi Chiefs, the confluence of rivers Birim and Pra at Birim
Aboye and Hwidiem respectively.
2.8.2 Agro-Based Industry
50
Small scale agro-based processing activities are carried out in the District. Those involved concentrate
their activities on cassava and rice processing, Akpeteshie Distillery and palm oil extraction, honey
production.
2.8.3 Financial Institutions
The District capital has four main banks namely the Ghana Commercial Bank, Agricultural
Development Bank, the Atobiase Rural Bank and the Adansi Rural Bank. The other rural bank in the
District can be found at Atobiase. The banks are highly patronized by cocoa farmers and the few
salaried workers. The cocoa farmers are mostly seen at the bank during the cocoa seasons and for the
salaried workers during the last week of every month.
There exist quite a good number of Susu collectors and money lenders. Their services are highly
patronized due to easy accessibility.
2.8.4 Information, Communication and Technology
Information Communication Technology (ICT) has played transformational roles in the development
of economies worldwide. Due to the important of ICT in socio-cultural and economic development,
several efforts have been made by the government to enhance ICT in the country. Some of these efforts
include the establishment of Community Information Centre (CIC) under ICT4AD programme. This is
to spread ICT infrastructure in the communities and to ensure that Ghana and its people fully
participate in information age, to enjoy the benefits of emerging information revolution.
This charter therefore explores ICT information on mobile phone ownership, access to computer and
internet as well as household ownership of fixed telephone lines. Information on ICT was recorded for
persons 12years and older for the purpose of 2010 Census. This is however the first time such
questions were asked in national Census.
Apart from the land line telephone service the District also has access to all the other communication
mobile service providers namely MTN, Vodafone, TIGO and AIRTEL. It is believed another mobile
network would be joining very soon.
There is one private internet facility in the District which is at New Edubiase. Due to the pressure on
this facility, the few users of internet move to nearby Districts to seek for information when the need
arises. The District Assembly however has plans of increasing the provision of this important service
in the District.
51
2.8.4.1 Ownership of Mobile Phones
Ghana has experienced a rapid increase in mobile phone penetration and usage in recent times. The use
of mobile phones has been an important mode of communication for social and business activities for
the majority of Ghanaian since as far back as 2003.
Table 18 presents information on mobile phone ownership and internet usage by population 12years
and older in the District. The information from Table 5.1 reveals a total of 21,679 mobile phone
owners in the District. This is less than a third (29.0%) of the population 12 year and older from which
the information on ICTs was collected. Also, 62.2 percent representing the majority of mobile phone
owners are male while female owners represent 37.8 percent.
Table 2.18: Population 12 years and older by mobile phone ownership, internet facility usage, and Sex
Population 12
years and older
Population having
mobile phone
Population using
internet facility
I C T Indicators Number Percent Number Percent Number Percent
Total 74,608 100.0
21,679 100.0
1,046 100.0
Male 37,268 50.0
13,486 62.2
758 72.5
Female 37,340 50.0 8,193 37.8 288 27.5
Source: Ghana Statistical Service, 2010 Population and Housing Census.
2.8.4.2 Use of Internet
Just as mobile phone usage, the use of internet facility as a mode of communication provides varieties
of opportunity for business owners as well as public and other private organisations, and even at the
individual level. The use of internet cut across population, sex, rural-urban locality and all levels of
education, from basic to tertiary. There are as low as 1,046 internet users, representing 1.4 percent of
population 12years and older in the District. This is about one (1) out of seventy-four (74) of the
referred population.
2.8.4.3 Household Ownership of Fixed Telephone Lines
Fixed telephone line refers to a telephone lines connecting a customer’s terminal equipment (e.g
telephone set, facsimile machine) to the public switch telephone network. So far as 2010 census is
concerned, information on fixed telephone lines was collected at the household level. 2010 PHC
recorded a very low fixed telephone lines usage in the District. Only 47 households (0.2%) own a fixed
telephone lines. Male headed households (78.7%) own fixed telephone lines while female headed
52
household owners represent 21.3 percent (Table 2.19). The low usage of fixed line is associated with
the increasing usage of mobile phones with its conveniences.
Table 2.19: Households having desktop/laptop computers, fixed telephone lines and Sex of head
Number
of
household
Households having
desktop/laptop computers
Households having fixed
telephone lines
Number Percent Number Percent Number Percent
Total 25,626 100.0 335 100.0 47 100.0
Male 18,083 70.6
269 80.3
37 78.7
Female 7,543 29.4 66 19.7 10 21.3
Source: Ghana Statistical Service, 2010 Population and Housing Census.
2.8.4.5 Household Ownership of Desktop or Laptop Computer
Access to information and internet becomes easier with ownership of desktop/laptop computer in
modern society. The use of desktop/laptop computer is therefore vital for processing information for
both public and private organisations.
Ownership of desktop/laptop computers were examined at the household level during the 2010 PHC,
to find out the extent to which household members have access to internet and other forms of social
media. As depicted in Table 19, there are as low as 335 households (1.3%) owing desktop/laptop
computer in the District. In relation to sex of household head of the households having desktop/laptop
computer, the figure for male headed household owing desktop/laptop computer stands at 269 while
that of female headed household stands at 66.
2.8.4.6 Postal Service
There are two main postal centres in the District. One is in the District capital, New Edubiase and the
other one at Akrofuom. The revenue generated by the post centres per month has fallen for some time
now due to the high use of mobile phones in the District.
There is however the plan for introducing instant money transfers and Expedited Mails Services in the
District hopefully by the end of the year.
2.9 AGRICULTURE
53
2.9.1 Households in Agriculture
Agriculture employs about 78.5% ( 56 %male and female 44 %) of the active population who are
engaged in the production of various crops such as; Cocoa, Oil palm, Maize, Cassava, Rice, Cocoyam,
Plantain and Vegetables. There is no clear cut distinction between farmers who produce either cash or
food crops. Farmers combine food crops, cash crops and rearing of animals e.g. pigs, small ruminants,
cattle, local birds in small scale.
Cocoa: Production of cocoa is dominant. It substantially employs greater number of people in the
district and thus a determinant in the income distribution in the area.
Oil Palm: Oil palm production is also carried out by most of these farmers and termed as both food and
cash crop. Currently a lot of farmers have gone into oil palm production which makes it next to cocoa.
The land is fertile and is suitable to oil palm production.
Cassava: Cassava is more widely grown and has comparative advantage over the other food crops. It is
sold in the raw form or processed into Gari or ‘Agbelima’ (cassava dough). RTIMP has introduced
high yielding varieties (Afisiafi, Bankyehemaa, Abasafitaa, etc) through MoFA.
Plantain: Plantain production is carried out by most farmers and is mostly done as backyard garden
than on the field. Plantain is not grown solely in the district. It’s mostly cultivated on the field to shade
cocoa seedlings and also during the first year of establishing plantation crops.
Rice: Rice production is on the increase; the undulating nature of the terrain and numerous valley
bottoms has given rise to the production of rice. Currently, JICA in collaboration with MOFA are
training farmers in the district on sustainable rainfed rice production and have now increased
production from 4-8 bags per acre to 30 bags per acre. Rice farmers are now producing good quality
grain and rice seed.
Maize: Maize production has potential but not being exploited. Maize is not grown solely in the district
as in the Northern sector of Ghana and in the transitional zone hence optimum yield is never realized.
Farmers in the district still prefer cultivation of local variety to the improved varieties like Obatampa
which by far yields higher than other local varieties. MoFA is encouraging farmers to adopt improve
maize variety in order to obtain higher produce compared to the local variety.
54
Livestock: Majority of the total population are into crop production to the detriment of livestock which
is poorly patronized. Farmers in the livestock production are also in crop production.
They are engaged in small ruminants like sheep and goats, cattle, pigs and grasscutter. Sheep and goats
are on the free range. Low level in livestock production is due to high incidence of diseases and pests
associated with the rain forest ecology coupled with the fact that there is only one veterinary officer
within the district.
Poultry: There is one large scale farm and two medium scale farms with a total of about 10,000 birds,
using deep litter system technology, whilst local birds are on the free range.
Table 2.20 below shows a breakdown of farming methods and the average output for different crops
cultivated in the District and their output.
Table 2.20: Farming methods and the average output/ hectare
Crop Current practice Current output
(ton/ha)
Recommended
practice
Recommended output
(ton/ha)
Cocoa Mono 1.48 Mono 1.562 tons
Oil palm Mono 8 tons/ha/yr Mono 12-15 tons/ha/yr
Cassava Mixed 12.73 Mono 17.3 tons
Plantain Mixed 9.35 Mono 10.50 tons
Maize Mixed 1.50 Mono 2.5 tons
Pepper Mono 7.5 (max bag) Mono 20 (max bag)
Rice Mono 3.5 Mono 5.55 tons
Yam Mixed 2.36 Mono 10.72 tons
Source: DADU 2014
Table 2.21: Production estimates 2008- 2014
55
Crops 2008 2009 2010 2011 2012 2013 2014
Maize 6,430 5,173 5,505 3,597 3,618 5,462 5,399
Rice 1,540 2,145 4,250 4,283 4,495 4,590 4,756
Cassava 59,258 78,733 110,580 113,575 114,716 114,399 114,699
Yam 7,437 10,012 8,635 8,870 7,960 7,590 7,386
Cocoyam 21,254 17,644 16,368 15,600 14,724 14,446 14,212
Plantain 35,324 36,387 29,400 30,210 29,978 30,125 30,188
Source: DADU 2014
Table 2.22: Yield (Metric tonnes/ hectare)
Crops 2008 2009 2010 2011 2012 2013 2014
Maize 1.20 1.40 1.50 1.00 1.00 1.50 1.50
Rice 1.10 1.30 2.50 2.47 2.50 2.50 2.55
Cassava 12.22 12.22 17.00 17.30 17.30 17.26 17.30
Yam 9.79 12.79 11.00 11.20 10.86 10.75 10.72
Cocoyam 6.82 6.82 6.82 6.50 6.33 6.27 6.19
Plantain 10.66 10.66 10.50 10.60 10.50 10.50 10.50
Source: DADU 2014
Table 2.23: Cocoa Production for Adansi South District
2009/2010 2010/2011 2011/2012 2012/2013 2013/2014
Major Minor Major Minor Major Minor Major Minor Major Minor
184,378
19,856
152,171 10,586 278,259 16,303 232,269 11,656 266,066 5,190
Source: QCD 2014
56
Table 2.24: Levels of Post- Harvest Losses
Crop Current Level of Post -Harvest Losses Target By 2015
Maize 38.05 25
Cassava 34.6 20
Yam 24.37 12
Rice 6.93 4
Source: DADU 2014
2.9.2 Food Security
According to the Food and Agriculture Organization (FAO) of UN, food security is a condition that
exist when all people, at all times, have physical and economical access to sufficient, safe and
nutritious food preferences for an active healthy life. About 1.3 million people, representing 5 percent
of Ghana’s population, are food insecure.
Food security is defined by MoFA as good quality nutritious food hygienically packaged and
attractively presented, available in sufficient quantities all year round and located at appropriate places
at affordable prices.
2.9.2.1 Effect of Climate Change on Food Security
Over the past 5 years the district has experienced a highly variable and unpredictable climate. Weather
predictions have evaded us on several occasions. Currently floods and droughts can occur in the same
area within months. This poses a serious threat to food productivity where production is mainly rain
fed. It is projected that agricultural production and access to food in many households would be
severely affected, if nothing is done about it, food security would seriously be affected and the problem
of malnutrition would be exacerbated.
Other possible impact of the climate change on food security in the district will be decrease in yield
due to loss of land, uncertainty about what and when to plant, increase in the number of people at risk
from hunger and fall of net revenues from crops which will eventually affect growth and income levels
of farmers.
57
Therefore food security programs in the district should therefore consider incorporating climate change
adaptation and mitigation aspects in order for farmers to cope with the prevailing increase in the
frequency and intensity droughts and floods.
2.9.3 Coping Mechanism
As mentioned above, farmers are not able to produce enough to last throughout the year and also
unable to store enough produce for home consumption throughout the year. The crucial question is:
how are they able to survive? There are coping strategies adopted by famers during periods of food
insecurity.
They reduce the number of meals served each day, reduce the size of meals, eat less preferred foods
and sell livestock (goats, pigs, sheep, cattle, and poultry).
Other strategies to sustain food security in district include shifting to less expensive and less preferred
foods, borrowing money to buy food, purchasing food on credit, seeking assistance from friends and
relatives, and purchasing food from hawkers and vendors.
2.9.4 Measures to ensure food security in the district
MoFA has embarked on various Food Security programs in collaboration with other institutions in the
district.
The current Block Farm Program implemented by MoFA was to ensure food security. By this program
improved seeds, fertilizer, herbicides and other inputs are provided to farmers who pay the total
amount involved in kind or cash after harvesting.
The Program was initiated by the Government to address three (3) main objectives. The objectives
include;
Support farmers to increase production to ensure food security
Generate employment in rural communities especially among the youth
Increase income of small farm households.
58
The target crops for the program are Rice and Maize which are the main staples and hence increase in
the production of these crops offer a sure way of addressing food security issues in the district.
Japanese International Cooperation Agency (JICA) in collaboration with MoFA have encouraged
farmers in the district to adopt sustainable rainfed lowland rice which has boosted rice production in
the district from 8 bags per acre to 30 bags per acre of paddy rice for the past four years.
The district has not set up any storage facilities to ensure food security thus to purchase and preserve
excess produce from all farmers in order to reduce post-harvest losses, and to insulate farmers against
losses resulting from anticipated increases in production. For that matter, we depend on farmers
produce stored in their cribs and imported rice and local maize from higher growing areas like
Techiman and Abofour, and Kumasi a sales point.
The district faces food insecurity problem on yams since the area is not conducive for its cultivation
and as such, middle women or traders purchase them from Yeji and Techiman into the district.
The insecurity on cassava is mostly experienced 3months after planting the vegetative parts.
Table 2.25: Estimated Average Food Consumption Within The District (2014)
CROP AV. CONSUMPTION (MT) PRODUCTION ESTIMATE (MT)
MAIZE 5,197.5 5,399
RICE 9,135 4,756
CASSAVA 39,241.12 114,699
YAM 21,186 7,386
PLANTAIN 13,880 30,188
COCOYAM 6,548.6 14,212
Source: DADU 2014
59
Table 2.26: Fertilizer Subsidy Programme
Type of Fertilizer Quantity Distributed Outcome
2009 2010 2011 2012 Yield increase for Maize,
Rice and Vegetables NPK 0 52 0 503
SOA 0 50 0 200
UREA 0 112 0 0
SULFAN 0 0 47 0
TOTAL 0 214 47 703
Source: DADU 2014
Table 2.27: MoFA/JICA Sustainable Lowland Rice Project
Activity Target Achievement Outcome Challenge
-Establishment of Trial
and Demonstration plots.
-Form groups in Rice
communities.
70
Demonstrations
to be carried out.
35 communities
35
Demonstrations
were carried
out.
21 communities
Farmers
establish
nursery, select
seed, transplant
in row.
Most farmers not
ready to work in
groups.
Unfavorable
weather conditions.
Manual ploughing
with hoes.
Train DDOs, AEAs Rice
farmers in;
- Land
development
techniques
- Rice cultivation
activities
- Post-harvest
management
activities
- Preparation of
Action plan
6 DDOs, 18
AEAs & 1200
farmers.
4 DDOs, 6
AEAs & 414
farmers.
DDOs, AEAs &
farmers adopted
improved
practices in Rice
cultivation.
- Farm record
keeping
- Rice quality
improvement
promotion.
Source: DADU 2014
INFRASTRUCTURE DEVELOPMENT
Farmers’ Business Service Centre established in 2011
60
Private public / private partnership between MOFA/ACDI-VOCA (NGO) and B.Kaakyire
Agrochemicals (Private company)
Table 2.28: Agro-Processing Industries in the District
Name
Product
Location
Mark & B’ face Ltd Akrofoum Gari Akrofoum
Anidaso Cooperative Palm Oil New Edubiase
Ataase Cooperative Palm Oil Ataase
Bepoase Rice Growers Rice Bepoase
Kroye Women Process. Gari Tonkoase
Abetingo Rice and Palm Oil Asarekrom
Palm Oil Extraction Kojo Yentumi
Palm Oil and Kennel Oil Extraction New Edubiase
Gari processing Tonkoase No. 2
Palm Oil Extraction Apagya
“ Amudruase
“ Ataasi
‘’ Atobiase
Source: DADU 2014
COCOA DISEASE AND PEST CONTROL ( CODAPEC)
The District has 99 capsid gangs with 7 members in a group comprising 6 gang members and a
supervisor. There are also 37 blackpod gangs with 11 members in a group comprising 10 gang
members and a supervisor.
Below is the average performance for Capsid and Blackpod programme from 2008 to 2013
Table 2.29: CAPSID gang and their output
Year Hectareage Sprayed No. of farms sprayed No. of farmers covered
2008 44,352 12,161 12,061
2009 54,961 12,282 12,221
2010 56,631 12,659 12,592
2011 50,493 11,567 11,417
2012 50,562 11,547 11,235
2013 44,361 10,433 10,199
Source: DADU 2014
61
Table 2.30: BLACKPOD gang and their output
Year Hectareage Sprayed No. of farms sprayed No. of farmers covered
2008 10,843 2,079 2,056
2009 10,854 2,167 2,117
2010 12,363 2,183 2,125
2011 13,678 2,208 2,137
2012 14,223 2,198 2,127
2013 15,591 2,124 2,172
Source: DADU 2014
Table 2.31: Staff Situation and Analysis
Type of Staff No. Needed No. at Post Additional Staff
Required
Total MALE FEMALE TOTAL
DDA 1 1 0 1 0
DDOs 8 5 1 6 2
AEAs 40 20 0 20 20
SUPPORTING STAFF 9 3 1 4 5
TOTAL 58 29 2 31 27
Source: DADU 2014.
Table 2.32: Agriculture Extension Capacity
3rd Quarter - 2014
Total
(District)
Average
(Zone)
Min.
(Zone)
Maxi.
(Zone)
New
Edubiase
Praso Asarekrom Akrofoum Overall
District
Human Resources
Number of AEAs
required per Zone 36 9.0 8 12 8 8 8 12 36
Number of AEAs
at post 19 4.8 4 7 4 4 4 7 19
% AEAs at post
compared to
required 52.8% 52.1% 50.0% 58.3% 50.0% 50.0% 50.0% 58.3% 52.8%
Mobility
Number of
running
motorbikes per
Zone
13 3.3 2 4 4 3 4 2 13
Ratio running
motorbike/AEA
at post
0.684210
53 0.8
0.2857
1429 1 1.0 0.8 1.0 0.3 0.7
Extension coverage
Number of
farming
communities 270 67.5 50 96 63 61 50 96 270
62
Total number of
farming
communities
covered by
extension services
this quarter
157 39.3 27 50 50 36 27 44 157
% of farming
communities
covered 58.1% 59.6% 45.8% 79.4% 79.4% 59.0% 54.0% 45.8% 58.1%
Source: DADU 2014
2.10 GOVERNANCE
2.10.1 Key Decentralized Departments in the District
The Adansi South District had not got the full complement of decentralized departments. The
following departments exist to carry out specialized functions.
Department of Social Welfare and Community Development
Ghana National Fire Service
Forestry Services Division
District Education Service
District Health Service
District Ambulance Service
CHRAJ
National Commission for Civic Education
Electoral Commission
Department of Agriculture
Environmental Health Department
National Disaster Management Organization
Department of Co-operatives
Non-Formal Education Division
Births and Deaths
Ghana Water Company
Physical Planning Department
Information Services Department
Stool Lands
2.10.2 Non-Governmental Organisations (NGOs)
The following NGOs with their respective functions operate in the District.
63
TABLE 2.33: List of NGOs Operating in the District
NAME OF NGO OBJECTIVES
CEDEP Supporting of mental health issues
Care International Supporting of education in areas of capacity building
Save Life Foundation To assist the District in Child Labour, Child Protection and assist in
developmental projects like building of classrooms
Ashanti African Tours Tourism Promotion
Positive Footprints Tourism Promotion
Action For Human Building women capacity and support.
Source: SW&CD 2014.
2.10.3 Land Tenure System
The system of land Tenure prevalent in the District is principally the “Abunu” and “Abusa” systems.
Whereas in the case of “Abunu”, the farmer shares his produce equally with the land owner or Lander,
in the case of the “Abusa”, the land owner takes two-thirds of the farm produce. This system does not
serve as motivation for increase productivity on the part of the farmers.
In some instances, the land owner dictates the types of crops to be produced irrespective of the
suitability of the land to the crop in question. One possible advantage of the system is the permanence
of land holding, settler farmers are allowed to hold their farms for a long period of time, creating a
situation of security and permanent settlement in areas like Tweapease, Nkrankese and Menang.
2.10.4 Disaster
The Adansi South District has six disaster management zones namely, Asokwa, Fumso, Praso,
Apagya, Akutreso and New Edubiase. Each zone is being manned by two (2) Zonal Coordinators. A
District Co-coordinator and two supporting members of staff head the District office. With respect to
disaster management at the District level, two main committees are responsible for major management
decisions. The committees are District Disaster technical committee and District Disaster management
committee.
Though some zones are now under Adansi North District but since the District has no coordinator,
zones like Fumso and Asokwa are still under the management of Adansi South District.
2.10.4.1 Rain/Wind Storm
64
This is one of the most recurring disasters in the District. For instance, between January and
December 2005, the District recorded (20) cases in (20) communities namely Birim Aboye, Akroso,
Aboabo III etc. The damage caused to personal and physical property of the victims and their
dependants runs into several millions of Cedis. The basic cause of this disaster is the absence of trees
to serve as wind breaks in the communities.
2.10.4.2 Floods
Flooding in its sense has not been recorded in the District some time now. What the District normally
experienced have been pools of stagnant water witnessed after any heavy rainfall in the communities.
Though personal property destroyed in times like this are minimal, the damage done to the buildings
cannot be under estimated. Indiscriminate situating of physical structures, the nature of the soil and
refuse dumps are responsible for this.
2.10.4.3 Domestic Fire
In the year 2002, 2004/2005 seventeen cases were recorded with estimated cost of ¢850,000,000.00.
Four cases were received from Adansi Kenya, Edwinase, Obonsu, Anhwiaso, Nyankomase, Akrofuom
and Amudurase. The number of cases in this disaster seems insignificant but the cost of damage to
personal property was very high. It was only at Amudurase where one of the fire fighters sustained
slight burns on the left arm. These cases also came about through indiscriminate handling of marked
flames.
2.10.4.4 Natural/Bush Fire
Each year, between January and April, bush fire becomes rampant due to the start of new farming
season. The hills opposite Nyankomase are engulfed in smoke leading to fire-outbreak, which destroy
farms and other flora. The actual cause is not yet scientifically known. But it has been widely
explained that the fire emanates from the rocks on the hill, which sparkle when rolling stones rub one
another.
Bush fires caused by individuals have been on the low side. For instance, only three incidences were
recorded at Praso, Edwinase, and Adansi Kenya in 2010. This could be attributed to the intensive
educational campaign made by NADMO in conjunction with the National Fire Service.
65
2.10.4.5 Chain Saw Operation
Indiscriminate logging and the unethical use of machines have caused substantial damage to the
vegetation in the District. Efforts made to discourage this activity have not been very effective as a
result, several wood felted are not cart and therefore, remain at the mercy of termites.
2.10.4.6 Drought
Many rivers and streams in the District dry up few weeks after the rainy season. This is because
falling of trees, especially along river courses and on mountains, continues to be a major problem in
the District. Water therefore becomes very scarce for both domestic and on-farm activities during
greater part of the year.
2.10.4.7 Conflict
As far as conflict is concerned, the District is among the most peaceful Districts in the country, though
it is predominantly multi-tribal residence. The most conspicuous hazard in the District is the impasse
between stool land lords and the tenant settler farmers on the payment of annual land tribute. There
have been occasional isolated cases of conflict between individuals or small groups. The complaints
and Arbitration sub-committee of the Assembly or by the NADMO Technical committee however,
dispose-off these cases peacefully.
2.11 SOCIAL SERVICES
2.11.1Education
The Adansi South District Assembly Education Directorate seeks to expand and promote access to
quality education and effective management at all levels of education through collaboration with Civil
Society Organizations and stakeholders. The vision of the Directorate is to effectively improve
education management and planning efficiency across all levels. The enrolment level of pupils at the
KG level is presented in Table 2.34 below.
Table 2.34: Kindergarten Enrolment
A. PUBLIC K.G.
Number of Pupils 8,878
66
Males:
Females:
4,416
4,462
No. of Schools 99
No. of Classes 84
No. of Teachers
Males :
Females:
220
60
160
B. PRIVATE
Number of Pupils
Males :
Females :
1,651
815
836
No. of Schools 26
No. of Teachers
Males :
Females:
41
8
33
Source: Ghana Education Service, ASDA, 2013.
Enrolment at the KG level for the District has more females than the males. This shows a commitment
of parents towards girl child education. The number of classrooms however is inadequate to cater for
the population of KG pupils. From the KG level the next level for school pupils is primary school.
Their enrolment level is presented in Table 2.35 below.
Table 2.35: Primary School Enrolment
C. PUBLIC Primary
Number of Pupils
Males:
Females:
22,046
11,506
10,540
No. of Schools 103
No. of Teachers
Males :
Females
681
496
185
D. PRIVATE
Number of Pupils
Males:
Females:
2,727
1,427
1,300
No. of Schools 24
No. of Teachers
Males:
Females:
97
72
25
Source: Ghana Education Service, ASDA, 2013
Enrolment at the primary level of education is seen to be much higher than the KG level. This can be
attributed to the situation where most children are left at home until they are much older to walk to and
back from school on their own.
67
Table 2.36: Junior High School Enrolment
E. PUBLIC JHS
No. of Pupils
Males:
Females :
6,397
3,611
2,786
No. of Schools 51
No. of Teachers
Males:
Females:
434
353
81
F. PRIVATE
No. of Pupils
Males:
Females:
607
324
283
No. of Schools 10
No. of Teachers
Males :
Females:
37
36
1
Source: Ghana Education Service, ASDA, 2013
The enrolment levels at the JHS level are lower than that of the primary level indicating the inability of
pupils to continue their education. Others may have also migrated from the District to other areas. The
numbers of teachers are also inadequate to cater for the pupils. Additional infrastructure is required to
cater for the pupils and help improve their learning conditions. The Senior High School enrolment is
detailed in the table 2.37 below.
Table 2.37: SHS ENROLMENT LEVEL
G. PUBLIC S.H.S
No. of Students
Males:
Females :
3,173
1,702
1,471
No. of Schools 2
No. of Teachers 125
H. PRIVATE
No. of Student
Males:
Females :
409
231
178
No. of Schools 2
No. of Teachers 27
Source: Ghana Education Service, ASDA, 2013
The District has four (4) SHS two being public (2) and two (2) private. At the Senior High School
level, the number of females is also less than the males. The student population in the public schools
far exceeds that of the private school together with the teachers. Enrolment levels are also lower than
68
that recorded at the JHS level thus showing a dropout of students along the educational ladder.
Table 2.38: Gender Parity Index
Level of Educ.
Item
KG PRIMARY JHS SHS
GPI 1.02 0.97 0.89 0.98
Source: Ghana Education Service, ASDA, 2013
The GPI clearly shows the decrease in the number of females as they climb the educational ladder.
Efforts have to be made to help sustain the pupils especially the females so that they can stay in school.
Subject Grades
The BECE candidates for 2013 wrote the under listed papers. The grades scored by the candidates
ranging between aggregates 1-5 are also detailed in the table 2.39.
Table 2.39: BECE Results for 2013.
Table 40: Subjects and the grades BECE candidates scored
Source: Ghana Education Service, ASDA, 2013
From the total number of pupils presented for the BECE, the best performing subject was Mathematics
followed by ICT then English with 107, 89 and 75 students respectively scoring between grades 1-3.
The least performing subject was French which recorded 0 as no student scored between grades 1-3.
Subjects
Total No. Of Candidates
Obtaining Grade 1-3
Total No. Of Candidates
Obtaining Grade 4-5
Overall Total For Grades
1 – 5
Boys Girls Total Boys Girls Total Boys Girls Total
English Language 47 28 75 220 139 359 267 167 434
Social Studies 22 4 26 221 114 335 243 118 361
Mathematics 72 35 107 344 236 580 416 271 687
Integrated Science 26 7 33 177 105 282 203 112 315
French 0 0 0 29 25 54 29 25 54
Ghanaian
Language 27 13 40 247 149 396 274 162 436
RME 44 19 63 288 166 454 332 185 517
ICT 63 26 89 221 124 345 284 150 434
Basic Design &
Tech. 54 20 74 327 209 536 381 229 610
69
Between aggregates 1 and 5, the highest scoring subject was Mathematics (687) followed by Basic
Design &Tech (610) while the least was French (54). It is however important to note that the total
number of pupils presented for French was four-hundred and one (401) as indicated in the table below.
Table 2.40: Languages BECE candidates were assessed on
SUBJECT NO. OF CANDIDATES PRESENTED
BOYS GIRLS TOTAL
FRENCH 218 183 401
GHANAIAN LANG. 1,006 687 1,693
Source: Ghana Education Service, ASDA, 2013
Table 2.41:No. of students and their aggregates obtained
CANDIDATES 6 7 – 10 11 - 24 25 - 40 TOTAL PERCENTAGE
BOYS 0 0 59 432 491 49%
GIRLS 0 0 16 275 291 43%
Source: Ghana Education Service, ASDA, 2013
Science, Technology, Mathematics and Innovation (STMI)
The Assembly supported GES to sponsor 30 girls to attend annual STMI. A total amount of
GHȼ3,900.00 was used to support the programme.
The School Feeding Programme
The District continues to enjoy the benefits of the school feeding program. For the year 2013,
GHȼ374,329.04 was spent on schools on the government’s list. A total number of twelve schools are
currently benefiting from the program. These schools are New Edubiase Exp. School, Akrofuom D/A
Primary, Kojo Yentumi D/A Primary, Nkontem D/A Primary, Fahiakobio D/A Primary, Wuruyie D/A
Primary, Atwereboana D/A Primary, Mprikyire D/A Primary, Mensonso D/A Primary, Menang D/A
Primary, Prekese D/A Primary and Ahomahoma D/A Primary Schools.
TRANSITION RATE
70
The transition rate, which is the proportion of P6 pupils who enter JSS 1 in the year 2003/2004, was
91.4% for the District. By gender, the rate was higher for girls (93.5%) than boys (89.8%). On the
whole, the transition rate ranged between 85.5% and 98.4% in the District by circuits.
Table 2.42: P6-Jss1 Transition Rate by Circuit 2010
CIRCUIT BOYS GIRLS DISTRICT AVERAGE
2009 P6
Enrl.
2010 Jhs 1
Enrl.
Transition
Rate
2009 P6
Enrl.
2010 JHS 1
Enrl.
Transition
Rate
2009 P6
Enrl.
2010 JHS1
Enrl.
Transition
Rate
Adamso 150 101 67 96 68 71 246 169 69
Akrofuom 169 158 93 115 106 92 284 264 93
Akutreso 170 97 57 120 62 52 290 159 55
Grumesa 88 99 113 77 66 86 165 165 100
Mensonso 126 125 99 83 85 102 209 210 100
N/Edubiase 337 378 112 305 312 102 642 690 107
Praso 229 201 88 200 178 89 429 379 88
Subin-Camp 233 149 64 159 104 65 392 253 65
Dist. Average 1502 1308 87 1155 981 85 2657 2289 86
Source; GES, Adansi South District, 2010
The data above explains the percentage of 2009 P6 pupils who entered JHS 1 for the year 2010
(transition). The District’s transition rate for P6 and JHs 1 ranges from 69% to 86%. By gender, the
rate was higher for both Boys which was 87% and for Girls which was 85%. Grumesa, Mensonso and
New Edubiase had 113% boys; 102% girls, 112% boys and 102% girls respectively. This means that
students who entered Junior High School were more than those who completed Primary 6 as shown in
the data. Some of the main causes of such situations are; some dropouts were re-admitted to those
Junior High Schools, and also some other pupils were from different schools but not the supply
schools.
Table 2.43: Availability of Teachers for Basic School
71
Levels
Publc Schools Private Schools
Circuits
Trained
Teachers
Untrained
Teachers
Trained
Teachers
Untrained
Teachers Grand Total
M F T M F T M F T M F T M F T Pre
-Sch
ool
Adamso 1 3 4 2 8 10 1 0 1 3 1 4 7 12 19
Akrofuom 0 6 6 0 15 15 0 0 0 2 5 7 2 26 28
Akutreso 4 3 7 15 19 34 0 0 0 0 1 1 19 23 42
Grumesa 0 0 0 3 3 6 0 0 0 3 3 6 6 6 12
Mensonso 1 2 3 2 2 4 0 0 0 14 19 33 17 23 40
N/Edubiase 6 12 18 32 38 70 0 0 0 2 5 7 40 55 95
Praso 1 4 5 2 16 18 0 0 0 0 1 1 3 21 24
Subin Camp 2 0 2 5 7 12 0 0 0 0 0 0 7 7 14
Total 15 30 45 61 108 169 1 0 1 24 35 59 101 173 274
Prim
ary
Adamso 19 14 33 24 1 25 0 0 0 2 0 2 45 15 60
Akrofuom 23 20 43 12 3 15 0 0 0 14 6 20 49 29 78
Akutreso 15 11 26 47 9 56 0 0 0 0 9 9 62 29 91
Grumesa 21 0 21 6 3 9 0 0 0 6 2 8 33 5 38
Mensonso 14 8 22 11 4 15 1 0 1 15 13 28 41 25 66
N/Edubiase 50 50 100 24 4 28 0 0 0 11 6 17 85 60 145
Praso 28 12 40 40 6 46 0 0 0 2 2 4 70 20 90
Subin Camp 15 5 20 61 2 63 0 0 0 0 0 0 76 7 83
Total 185 120 305 225 32 257 1 0 1 50 38 88 461 190 651
Juni
or H
igh
Sch
.
Adamso 13 6 19 5 0 5 0 0 0 0 0 0 18 6 24
Akrofuom 25 15 40 8 1 9 0 0 0 0 0 0 33 16 49
Akutreso 6 4 10 23 2 25 0 0 0 0 0 0 29 6 35
Grumesa 12 0 12 7 1 8 0 0 0 0 0 0 19 1 20
Mensonso 10 7 17 8 0 8 0 0 0 0 0 0 18 7 25
N/Edubiase 64 31 95 13 2 15 0 0 0 8 7 15 85 40 125
Praso 26 10 36 14 2 16 0 0 0 1 2 3 41 14 55
Subin Camp 19 1 20 33 3 36 0 0 0 4 0 4 56 4 60
TOTAL 175 74 249 111 11 122 0 0 0 13 9 22 299 94 393
GRAND TOTAL 375 224 599 599 599 548 2 0 2 87 82 169 861 457 1318
Source; GES, Adansi South District, 2010
Table 2.43 shows Teacher Population of Basic Schools (Public and Private). From the data, the District
has a total number of 1,318 Teachers made up of 861 males which is 65% of total teacher population
72
with 457 females making up to 35% of the total teacher population. Pre-school has 274 (i.e. 14%) of
teachers, Primary has 651(i.e. 33%) and Junior High School 393 (20%). Currently the District has
student population of 39,469 against a total teacher population of 1,318. This implies that the Pupil-
Teacher Ratio for the District is therefore 30 students (pupils) to one teacher (30:1) which is far below
the National Norm (45:1). This has come about because of the inclusion of the Youth Employment
teachers swelling up the total number of teachers in the District. Percentage of Trained teachers forty-
six (i.e. 46%) and Pupil-Teacher ratio is 66 pupils to 1 trained teacher (i.e. 66:1). The Directorate is
therefore making every effort to improve the above mentioned Ratios for Quality Education in the
District. For the Senior High School the data is shown below.
Table 2.44: AVAILABILITY OF TEACHERS IN THE S. H. S
S/No Name of School
Sch.
Enrol
Trained Trs. Untrained Trs Grand Total Analysis
M F T M F T M F T
% Trained
Trs
Pupil /Trn.
Tr. Ratio Pupil Tr.
Ratio
1
NEW EDUBIASE
SHS 1059 34 6 40 30 17 47 64 23 87 46 26 12
2
AKROFUOM
SHS 389 18 6 24 2 2 4 20 8 28 86 16 14
TOTAL 1448 52 12 64 32 19 51 84 31 115 56 23 13
Source: GES, Adansi South District, 2010
From the data above total teachers for the SHS is 155 made up of 84 (i.e. 54%) males and 31 (i.e. 46%)
females. The SHS level is having a total student population of 1,448 against 115 teachers. The SHS
PTR is therefore 13:1. The percentage of trained teachers is 56%. This implies that the Pupil-Trained
Teacher ratio is 22:1 which is far below the national norm which is 35:1.
Fig. 2.11 Location of educational facilities in the District
73
74
Table 2.45: List of Basic Schools (KG level)
S/No. Name of School Who Runs the
School i.e
Church/DA Etc.
Type of
Building
Material Used
Type of
Roofing
Material
Population of Students Teachers
Male Female Total Male Female Total
1 ADAMSO D/A PRIMARY DA Mud Aluminium 49 40 89 1 3 4
2 ADOM NYAME D/A PRIMARY DA Under tree Under tree 23 23 46 0 1 1
3 ADUBENSASO D/A PRIMARY DA Under tree Under tree 20 21 41 1 0 1
4 ADUKROBA D/A PRIMARY DA Under tree Under tree 24 20 44 1 0 1
5 AMPUNYASE-NKWANTA D/A PRIMARY DA Under shed Undershed 33 42 75 0 2 2
6 ASASEBOMBESEA D/A PRIMARY DA Under shed Aluminium 23 31 54 0 2 2
7 FENASO NKWANTA D/A PRIMARY DA Under shed Aluminium 56 29 85 1 1 2
8 KUBI-KWANTO D/A PRIMARY DA Under shed Aluminium 31 34 65 1 1 2
9 TAKYIKROM D/A PRIMARY DA Cement Aluminium 12 7 19 0 2 2
10
AMPUNYASE ST. JESOPH CATHOLIC
PRIMARY R/C Cement Aluminium 53 48 101 0 3 3
11 AKROFUOM D/A PRIMARY DA Cement Aluminium 65 63 128 0 5 5
12 AKROFUOM METHODIST PRIMARY METH. Cement Aluminium 44 64 108 0 4 4
13 AKROFUOM R/C PRIMARY 'A' DA Cement Aluminium 77 78 155 0 4 4
14 BETENASE D/A PRIMARY SCHOOL DA Under shed Aluminium 28 30 58 0 3 3
15 KOKOTENTEN D/A PRIMARY DA Cement Aluminium 30 29 59 0 2 2
16 OKYEREKROM D/A PRIMARY DA Under shed Aluminium 44 38 82 0 4 4
17 WAMASE D/A PRIMARY DA Cement Aluminium 48 52 100 0 4 4
18 YAADOME D/A PRIMARY DA Under shed Aluminium 30 31 61 0 1 1
19 ADANSI SWEDRU D/A PRIMARY DA Under tree Under tree 22 29 51 1 1 2
20 AKUTRESO D/A PRIMARY DA Under tree Under tree 33 27 60 1 2 3
21 AKWA-ATWEREBOANA D/A PRIMARY DA Under tree Under tree 55 40 95 2 0 2
22 KAPERKROM D/A PRIMARY DA Under tree Under tree 18 22 40 1 0 1
23 KOJO YENTUMI D/A BASIC SCHOOL DA Under tree Under tree 31 47 78 1 3 4
24 KWAKU ADU D/A KG/PRIMARY DA Under tree Under tree 19 18 37 1 1 2
25 NKOTEM D/A PRIMARY DA Cement Aluminium 37 35 72 3 1 4
26 NSATA MANGOASE D/A DA Under shed Aluminium 25 23 48 1 1 2
27 OBUOBIKROM D/A PRIMARY DA Under shed Aluminium 25 25 50 1 1 2
75
28 SUBRISO D/A PRIMARY DA Cement Aluminium 53 40 93 2 2 4
29 SUMUOSO METHODIST PRIMARY METH. Under shed Aluminium 10 31 41 1 1 2
30 TONKOASE No.1 D/A PRIMARY DA Under shed Aluminium 33 30 63 0 2 2
31 TONKOASE No.2 D/A PRIMARY DA Under shed Aluminium 57 61 118 1 3 4
32 TWEAPEASE D/A KG/PRIMARY DA Under shed Aluminium 61 55 116 1 1 2
33 BONKRO KG/PRIMARY SCHOOL DA Cement Aluminium 17 9 26 0 1 1
34 ADANSI AGRAVE D/A PRIMARY DA Mud Aluminium 32 36 68 2 0 2
35 ADANSI KENYA D/A PRIMARY DA Under tree Under tree 22 20 42 1 0 1
36 APAGYA D/A PRIMARY DA Under shed Aluminium 22 25 47 0 4 4
37 ATAASE NKWANTA METHODIST PRIMARY METH. Under shed Aluminium 60 47 107 1 5 6
38 ATOBIASE R/C PRIMARY R/C. Under shed Aluminium 54 44 98 0 4 4
39 AYAA-MANKATA D/A BASIC SCHOOL DA Under shed Aluminium 39 31 70 2 0 2
40 HWIDIEM D/A PRIMARY SCHOOL DA Under shed Aluminium 35 33 68 1 1 2
41 KOJO MANKRONG D/A PRIMARY DA Under shed Aluminium 27 24 51 0 1 1
42 KRAMOKROM D/A PRIMARY DA Under shed Aluminium 26 28 54 1 1 2
43 NKRANFO NKWANTA D/A KG/PRIMARY DA Under shed Aluminium 20 25 45 1 0 1
44 PREKESEASE D/A BASIC SCHOOL DA Under shed Aluminium 62 59 121 1 3 4
45 APAGYA R/C PRIMARY R/C Cement Aluminium 52 62 114 1 4 5
46 DWENDAMBA-BOTWE D/A PRIMARY DA Under shed Aluminium 21 23 44 1 1 2
47 GRUMESA D/A PRIMARY DA Under shed Aluminium 57 49 106 1 2 3
48 JOHNKROM D/A BASIC SCHOOL DA Under shed Aluminium 33 41 74 0 0 0
49 KOFI-GYAME D/A PRIMARY DA Under shed Aluminium 25 28 53 0 2 2
50 MPIREKYIRE D/A BASIC SCHOOL DA Under shed Aluminium 63 50 113 1 1 2
51 OKAI ABABIO D/A PRIMARY DA Under shed Aluminium 9 16 25 0 1 1
52 KRAMOKROM D/A PRIMARY DA Under shed Aluminium 28 22 50 3 0 3
53 AMOAKOKROM D/A PRIMARY DA Cement Aluminium 48 71 119 0 2 2
54 AVORNYO D/A PRIMARY DA Under shed Aluminium 36 28 64 0 0 0
55 BROFOYEDRO D/A PRIMARY SCHOOL DA Cement Aluminium 51 57 108 1 3 4
56 MENSONSO D/A PRIMARY DA Cement Aluminium 54 50 104 1 2 3
57 NKORANSA D/A PRIMARY DA Cement Aluminium 61 66 127 0 5 5
58 SIKAMAN METHODIST PRIMARY METH. Cement Aluminium 78 64 142 0 2 2
76
59 YAW OWUSUKROM D/A PRIMARY DA Under shed Aluminium 23 14 37 0 1 1
60 NYAMEBEKYERE D/A BASIC SCHOOL DA Under shed Aluminium 25 14 39 0 1 1
61 AMUDURASE D/A BASIC SCHOOL DA Landcrete Aluminium 56 66 122 1 4 5
62 ANKAASE D/A PRIMARY DA Under shed Aluminium 17 25 42 0 2 2
63 AWOROSO D/A PRIMARY DA Under shed Aluminium 45 38 83 3 0 3
64 BRONIKROM D/A KG/PRIMARY DA Under shed Aluminium 30 42 72 2 3 5
65 D/A EXPERIMENTAL PRIMARY DA Under shed Aluminium 66 76 142 0 5 5
66 D/A PRIMARY 'A', NEW-EDUBIASE DA Under shed Aluminium 37 32 69 0 4 4
67 DOTOM D/A PRIMARY BASIC SCHOOL DA Under shed Aluminium 32 31 63 1 1 2
68 FAHIAKOBO D/A PRIMARY SCHOOL DA Under shed Aluminium 59 42 101 2 1 3
69 HIDAAYATUL ISLAMIC BASIC SCHOOL ISLAMIC UNIT Cement Aluminium 64 61 125 0 4 4
70 KWAME ADU D/A PRIMARY DA Under shed Aluminium 17 19 36 0 2 2
71 MENANG D/A PRIMARY DA Under shed Aluminium 79 73 152 2 2 4
72 NEW EDUBIASE METHODIST PRIMARY 'A' DA Under shed Aluminium 89 63 152 0 4 4
73 OYAN D/A PRIMARY DA Under shed Aluminium 24 18 42 1 1 2
74 ST. JOHN THE BAPTIST. R/C PRIMARY R/C Under shed Aluminium 47 49 96 0 5 5
75 ABOABO No.3 D/A PRIMARY DA Under shed Aluminium 51 46 97 2 1 3
76 ACHEASEWA D/A PRIMARY DA Under shed Aluminium 20 21 41 2 1 3
77
ADANSI PRASO ROMAN CATHOLIC
PRIMARY R/C Under shed Aluminium 36 50 86 1 3 4
78 ATWEREBOANA D/A BASIC SCHOOL DA Cement Aluminium 101 92 193 0 4 4
79 BIRIM ABOYE D/A PRIMARY DA Under shed Aluminium 25 35 60 2 0 2
80 DANYAMESO D/A PRIMARY DA Under shed Aluminium 19 10 29 1 0 1
81 EDWINASE D/A PRIMARY DA Under shed Aluminium 27 25 52 0 2 2
82 KAWOTRIHWE D/A PRIMARY DA Under shed Aluminium 16 16 32 3 1 4
83 KOTWEA D/A PRIMARY DA Cement Aluminium 100 65 165 0 1 1
84 KWAME-NKYI D/A BASIC SCHOOL DA Under shed Aluminium 43 26 69 1 1 2
85 KYEREMBABI D/A BASIC SCHOOL DA Under shed Aluminium 50 54 104 0 1 1
86 ODUMASI D/A PRIMARY DA Under shed Aluminium 31 45 76 0 1 1
87 QUANSAKROM D/A PRIMARY DA Under shed Aluminium 31 20 51 1 3 4
88 WURUYIE D/A PRIMARY DA Cement Aluminium 71 77 148 1 0 1
89 AHOMAHOMA D/A PRIMARY DA Under shed Aluminium 26 27 53 1 1 2
77
90 ASAREKROM D/A PRIMARY DA Under shed Aluminium 45 47 92 0 0 0
91 DWENDAMA D/A PRIMARY DA Under shed Aluminium 29 41 70 0 3 3
92 OBONSU D/A PRIMARY DA Under shed Aluminium 42 51 93 1 1 2
93 OPARE KOJO D/ABASIC DA Under shed Aluminium 35 35 70 0 1 1
94 SONKROYUWA D/A PRIMARY DA Under shed Aluminium 23 24 47 1 1 2
95 SUBIN CAMP D/A KG/PRIMARY DA Under shed Aluminium 42 34 76 1 0 1
96 AFRICAN FAITH PRIMARY AFRICAN FAITH Under shed Aluminium 40 42 82 1 0 1
97 OWUSUKROM D/A PRIMARY SCHOOL DA Under shed Aluminium 32 20 52 0 1 1
TOTAL 3846 3737 7583 5 8 13
Source: GES- Adansi South District, 2014.
Table 2.46: List of Basic Schools (Primary Level)
S/NO. Name of school Who runs the
school ie
Church/DA etc.
Type of
building
Material
Type of
roofing
material
Population of students Teachers
male female Total male female Total
1 ADAMSO D/A PRIMARY DA Cement Aluminium 119 132 251 4 3 7
2 ADOM NYAME D/A PRIMARY DA Cement Aluminium 40 30 70 3 2 5
3 ADUBENSASO D/A PRIMARY DA Cement Aluminium 43 35 78 6 0 6
4 ADUKROBA D/A PRIMARY DA Cement Aluminium 45 55 100 6 0 6
5 AMPUNYASE-NKWANTA D/A PRIMARY DA Cement Aluminium 78 73 151 5 2 7
6 ASASEBOMBESEA D/A PRIMARY DA Cement Aluminium 66 79 145 4 3 7
7 FENASO NKWANTA D/A PRIMARY DA Cement Aluminium 63 79 142 7 0 7
8 KUBI-KWANTO D/A PRIMARY DA Cement Aluminium 117 112 229 3 3 6
9 TAKYIKROM D/A PRIMARY DA Cement Aluminium 24 23 47 4 3 7
10
AMPUNYASE ST. JESOPH CATHOLIC
PRIMARY DA Cement Aluminium 156 154 310 2 3 5
11 AKROFUOM D/A PRIMARY DA Cement Aluminium 160 157 317 5 6 11
12 AKROFUOM METHODIST PRIMARY METH. Cement Aluminium 209 186 395 4 2 6
13 AKROFUOM R/C PRIMARY 'B' R/C. Cement Aluminium 105 89 194 3 4 7
14 AKROFUOM R/C PRIMARY 'A' R/C. Cement Aluminium 126 116 242 3 3 6
15 BETENASE D/A PRIMARY SCHOOL DA Under Shed Aluminium 46 47 93 4 2 6
78
16 KOKOTENTEN D/A PRIMARY DA Cement Aluminium 57 58 115 6 0 6
17 OKYEREKROM D/A PRIMARY DA Cement Aluminium 76 60 136 5 2 7
18 WAMASE D/A PRIMARY DA Cement Aluminium 185 179 364 5 1 6
19 YAADOME D/A PRIMARY DA Cement Aluminium 77 61 138 5 2 7
20 ADANSI SWEDRU D/A PRIMARY DA Cement Aluminium 69 57 126 4 2 6
21 AKUTRESO D/A PRIMARY DA Under tree Under tree 96 85 181 4 3 7
22 AKWA-ATWEREBOANA D/A PRIMARY DA Under tree Under tree 110 38 148 4 1 5
23 KAPERKROM D/A PRIMARY DA Under tree Under tree 70 55 125 2 2 4
24 KOJO YENTUMI D/A BASIC SCHOOL DA Cement Aluminium 91 96 187 6 1 7
25 KWAKU ADU D/A KG/PRIMARY DA Under tree Aluminium 48 46 94 3 1 4
26 NKOTEM D/A PRIMARY DA Cement Aluminium 86 68 154 3 3 6
27 NSATA MANGOASE D/A DA Under Shed Under tree 84 62 146 4 3 7
28 OBUOBIKROM D/A PRIMARY DA Cement Aluminium 44 47 91 4 3 7
29 SUBRISO D/A PRIMARY DA Cement Aluminium 141 93 234 5 1 6
30 SUMUOSO METHODIST PRIMARY METH. Under Shed Aluminium 42 58 100 5 0 5
31 TONKOASE No.1 D/A PRIMARY DA Cement Aluminium 98 84 182 4 2 6
32 TONKOASE No.2 D/A PRIMARY DA Cement Aluminium 109 116 225 4 3 7
33 TWEAPEASE D/A KG/PRIMARY DA Cement Aluminium 100 96 196 4 2 6
34 BONKRO KG/PRIMARY SCHOOL DA Under tree Under tree 22 20 42 1 1 2
35 ADANSI AGRAVE D/A PRIMARY DA Mud Aluminium 62 70 132 4 0 4
36 ADANSI KENYA D/A PRIMARY DA Uncompleted Uncompleted 56 52 108 3 0 3
37 APAGYA D/A PRIMARY DA Cement Aluminium 113 119 232 5 1 6
38
ATAASE NKWANTA METHODIST
PRIMARY METH. Cement Aluminium 101 102 203 2 5 7
39 ATOBIASE R/C PRIMARY R/C. Cement Aluminium 234 194 428 8 3 11
40 AYAA-MANKATA D/A BASIC SCHOOL DA Landcrete Aluminium 89 91 180 4 1 5
41 BEPOASE D/A PRIMARY DA Cement Aluminium 96 72 168 6 1 7
42 HWIDIEM D/A PRIMARY SCHOOL DA Cement Aluminium 66 62 128 2 1 3
43 KOJO MANKRONG D/A PRIMARY DA Cement Aluminium 93 98 191 5 1 6
44 KRAMOKROM D/A PRIMARY DA Cement Aluminium 44 47 91 4 1 5
45 NKRANFO NKWANTA D/A KG/PRIMARY DA Cement Aluminium 70 61 131 4 2 6
46 PREKESEASE D/A BASIC SCHOOL DA Cement Aluminium 134 113 247 6 0 6
79
47 APAGYA R/C PRIMARY DA Cement Aluminium 211 222 433 5 5 10
48 DWENDAMBA-BOTWE D/A PRIMARY DA Landcrete Aluminium 125 88 213 3 2 5
49 GRUMESA D/A PRIMARY DA Cement Aluminium 144 141 285 3 0 3
50 JOHNKROM D/A BASIC SCHOOL DA Cement Aluminium 56 85 141 3 0 3
51 KOFI-GYAME D/A PRIMARY DA Cement Aluminium 65 42 107 5 0 5
52 MPIREKYIRE D/A BASIC SCHOOL DA Cement Aluminium 102 82 184 5 1 6
53 OKAI ABABIO D/A PRIMARY DA Cement Aluminium 37 30 67 5 1 6
54 KRAMOKROM D/A PRIMARY DA Cement Aluminium 92 78 170 3 0 3
55 AMOAKOKROM D/A PRIMARY DA Cement Aluminium 71 91 162 0 4 4
56 AVORNYO D/A PRIMARY DA Under Shed Under Shed 40 40 80 6 0 6
57 BROFOYEDRO D/A PRIMARY SCHOOL DA Cement Aluminium 142 121 263 5 2 7
58 MENSONSO D/A PRIMARY DA Cement Aluminium 154 108 262 6 0 6
59 NKORANSA D/A PRIMARY DA Cement Aluminium 211 165 376 4 1 5
60 SIKAMAN METHODIST PRIMARY METH. Cement Aluminium 133 117 250 5 0 5
61 YAW OWUSUKROM D/A PRIMARY DA Under Shed Aluminium 50 52 102 2 1 3
62 NYAMEBEKYERE D/A BASIC SCHOOL DA Cement Aluminium 94 62 156 4 2 6
63 AMUDURASE D/A BASIC SCHOOL DA Cement Aluminium 199 178 377 4 3 7
64 ANKAASE D/A PRIMARY DA Under Shed Aluminium 43 30 73 6 0 6
65 AWOROSO D/A PRIMARY DA Cement Aluminium 146 113 259 5 0 5
66 BRONIKROM D/A KG/PRIMARY DA Cement Aluminium 88 64 152 2 3 5
67 D/A EXPERIMENTAL PRIMARY DA Cement Aluminium 186 203 389 2 5 7
68 D/A PRIMARY 'A', NEW-EDUBIASE DA Cement Aluminium 106 100 206 6 1 7
69 DOTOM D/A PRIMARY BASIC SCHOOL DA Cement Aluminium 63 82 145 5 0 5
70 FAHIAKOBO D/A PRIMARY SCHOOL DA Cement Aluminium 72 65 137 7 0 7
71 HIDAAYATUL ISLAMIC BASIC SCHOOL ISLAMIC UNIT Cement Aluminium 156 105 261 6 4 10
72 KWAME ADU D/A PRIMARY DA Cement Aluminium 72 45 117 6 0 6
73 MENANG D/A PRIMARY DA Cement Aluminium 129 112 241 4 2 6
74 NEW EDUBIASE METHODIST PRIMARY 'A' METH. Under Shed Aluminium 187 174 361 3 5 8
75 OYAN D/A PRIMARY DA Cement Aluminium 72 49 121 2 1 3
76 ST. JOHN THE BAPTIST. R/C PRIMARY R/C. Cement Aluminium 200 190 390 4 5 9
77 NEW EDUBIASE METHODIST PRIMARY 'B' METH. Under Shed Aluminium 145 157 302 1 6 7
80
78 NEW EDUBIASE D/A PRIMARY DA Cement Aluminium 84 105 189 3 4 7
79 ABOABO No.3 D/A PRIMARY DA Cement Aluminium 70 82 152 6 0 6
80 ACHEASEWA D/A PRIMARY DA Landcrete Aluminium 87 79 166 3 0 3
81
ADANSI PRASO ROMAN CATHOLIC
PRIMARY R/C. Cement Aluminium 214 237 451 8 4 12
82 ATWEREBOANA D/A BASIC SCHOOL DA Cement Aluminium 187 156 343 1 2 3
83 BIRIM ABOYE D/A PRIMARY DA Cement Aluminium 63 52 115 5 0 5
84 DANYAMESO D/A PRIMARY DA Cement Aluminium 30 48 78 5 0 5
85 EDWINASE D/A PRIMARY DA Cement Aluminium 109 92 201 6 0 6
86 KAWOTRIHWE D/A PRIMARY DA Under tree Under tree 23 28 51 1 0 1
87 KOTWEA D/A PRIMARY DA Cement Aluminium 133 124 257 5 2 7
88 KWAME-NKYI D/A BASIC SCHOOL DA Under tree Under tree 45 36 81 2 0 2
89 KYEREMBABI D/A BASIC SCHOOL DA Cement Aluminium 107 87 194 5 0 5
90 ODUMASI D/A PRIMARY DA Cement Aluminium 96 65 161 5 1 6
91 QUANSAKROM D/A PRIMARY DA Cement Aluminium 77 63 140 4 2 6
92 WURUYIE D/A PRIMARY DA Cement Aluminium 242 140 382 5 2 7
93 AHOMAHOMA D/A PRIMARY DA Cement Aluminium 81 61 142 5 0 5
94 ASAREKROM D/A PRIMARY DA Cement Aluminium 85 88 173 3 2 5
95 DWENDAMA D/A PRIMARY DA Cement Aluminium 112 91 203 6 1 7
96 OBONSU D/A PRIMARY DA Cement Aluminium 121 116 237 6 0 6
97 OPARE KOJO D/A PRIMARY DA Cement Aluminium 56 37 93 4 1 5
98 SONKROYUWA D/A PRIMARY DA Under Shed Aluminium 64 36 100 2 0 2
99 SUBIN CAMP D/A KG/PRIMARY DA Cement Aluminium 112 92 204 6 1 7
100 AFRICAN FAITH PRIMARY AFRICAN FAITH Under tree Under tree 78 67 145 5 1 6
101 OWUSUKROM D/A PRIMARY SCHOOL DA Under Shed Aluminium 42 40 82 5 1 6
TOTAL 10069 9040 19109 427 163 590
Source: GES- Adansi South District, 2014
Table 2.47: List of Basic Schools (JHS Level)
81
S/No. Name of School Who Runs the
School i.e.
Church/DA Etc.
Type Of
Building
Material
Type Of
Roofing
Materials
Population of Students Teachers
Male Female Total Male Female Total
1 ADAMSO D/A J.H.S DA Cement Aluminium 94 66 160 8 3 11
2 AMPUNYASE D/A J.H.S DA Cement Aluminium 91 89 180 7 1 8
3 KUBI KWANTO D/A J.H.S DA Under Shed Under Shed 58 43 101 5 1 6
4 AKROFUOM D/A J.H.S DA Cement Aluminium 93 99 192 7 8 15
5 AKROFUOM METHODIST J.H.S METH. Cement Aluminium 69 65 134 8 3 11
6 AKROFUOM R/C J.H.S R/C. Cement Aluminium 86 74 160 5 4 9
7 WAMASE D/A J.H.S DA Cement Aluminium 100 76 176 7 1 8
8 YAADOME D/A J.H.S DA Cement Aluminium 42 27 69 7 1 8
9 AKUTRESO D/A J.H.S DA Cement Aluminium 64 34 98 8 2 10
10 SUBRISO D/A J.H.S DA Cement Aluminium 82 55 137 6 2 8
11 TONKOASE D/A J.H.S DA Cement Aluminium 60 37 97 7 1 8
12 TWEAPEASE D/A J.H.S DA Cement Aluminium 40 35 75 6 2 8
13 KOJO YENTUMI D/A JHS DA Under Shed Under Shed 67 52 119 6 1 7
14 APAGYA D/A J.H.S DA Cement Aluminium 72 57 129 7 3 10
15 APAGYA R/C J.H.S R/C. Cement Aluminium 80 86 166 7 2 9
16 ATAASE NKWANTA D/A J.H.S DA Cement Aluminium 71 65 136 8 2 10
17 ATOBIASE D/A J.H.S DA Cement Aluminium 128 102 230 8 3 11
18 AYAA-MANKATA D/A BASIC SCHOOL DA Under Shed Under Shed 17 9 26 4 0 4
19 PREKESEASE D/A BASIC SCHOOL DA Cement Under Shed 50 29 79 5 1 6
20 HWIDIEM D/A J.H.S DA Under Shed Under Shed 30 27 57 5 0 5
21 BEPOASE D/A J.H.S DA Cement Aluminium 36 20 56 3 3 6
22 ADANSI AGRAVE D/A JHS DA Under tree Under tree 47 24 71 5 0 5
23 DWENDAMBA -BOTWE D/A J.H.S DA Under Tree Under tree 49 41 90 3 0 3
24 GRUMESA D/A J.H.S DA Cement Aluminium 105 63 168 4 1 5
25 JOHNKROM D/A BASIC SCHOOL DA Landcrete Aluminium 29 43 72 6 0 6
26 MPIREKYIRE D/A BASIC SCHOOL DA Cement Aluminium 53 29 82 6 0 6
27 AMOAKOKROM D/A PRIMARY DA Cement Aluminium 43 34 77 5 1 6
28 MENSONSO D/A J.H.S DA Cement Aluminium 97 45 142 7 0 7
82
29 NKORANSA D/A J.H.S DA Cement Aluminium 78 56 134 6 0 6
30 SIKAMAN METHODIST J.H.S METH. Cement Aluminium 103 88 191 10 1 11
31 BROFOYEDRU D/A J. H. S. DA Cement Aluminium 91 51 142 4 3 7
32 NYAMEBEKYERE D/A BASIC SCHOOL DA Under tree Under tree 16 10 26 4 1 5
33 AMUDURASE D/A BASIC SCHOOL DA Cement Aluminium 55 57 112 5 2 7
34 D/A EXPERIMENTAL J.H.S DA Cement Aluminium 118 122 240 6 5 11
35 HIDAAYATUL ISLAMIC BASIC SCHOOL ISLAMIC UNIT Under shed Under Shed 29 21 50 2 1 3
36 MENANG D/A J.H.S DA Cement Aluminium 87 23 110 5 3 8
37 NEW EDUBIASE D/A J.H.S 'B' DA Cement Aluminium 107 78 185 11 2 13
38 NEW EDUBIASE D/A J.H.S 'A' DA Cement Aluminium 167 144 311 10 3 13
39 OBUOBI D/A J.H.S DA Cement Aluminium 67 35 102 6 1 7
40 OYAN DOTOM D/A J.H.S DA Under Shed Under Shed 51 26 77 6 0 6
41 ST. JOHN THE BAPTIST. R/C J.H.S R/C. Cement Aluminium 77 83 160 6 3 9
42 NEW EDUBIASE METHODIST J.H.S METH. Cement Aluminium 141 136 277 8 5 13
43 ACHEASEWA D/A J.H.S DA Cement Aluminium 38 22 60 6 0 6
44 ATWEREBOANA D/A BASIC SCHOOL DA Cement Aluminium 70 56 126 5 1 6
45 EDWINASE D/A J.H.S DA Under Shed Under Shed 41 27 68 7 1 8
46 KOTWEA D/A J.H.S DA Under Shed Under Shed 55 36 91 5 0 5
47 KYEREMBABI D/A BASIC SCHOOL DA Under Shed Under Shed 29 30 59 2 2 4
48 ODUMASI D/A J.H.S DA Landcrete Aluminium 54 35 89 7 0 7
49 PRASO D/A J.H.S DA Cement Aluminium 134 107 241 12 2 14
50 WURUYIE D/A J.H.S DA Cement Aluminium 79 51 130 5 3 8
51 DWENDAMA D/A JHS DA Under Shed Aluminium 30 21 51 5 0 5
52 ASAREKROM D/A J.H.S DA Cement Aluminium 33 31 64 5 0 5
53 OPARE KOJO D/ABASIC DA Under Shed Aluminium 12 12 24 0 0 0
54 SUBIN CAMP D/A J.H.S, DA Cement Aluminium 55 50 105 5 0 5
55 OBONSU D/A J.H.S DA Cement Aluminium 67 51 118 7 0 7
TOTAL 3737 2885 6622 330 85 415
Source: GES- Adansi South District, 2014
83
2.11.2 Non Formal Education
The District is current ly having two batches of literacy classes functioning. They are batch 17 which is
comprised of eight classes and batch 18 also comprised of eight classes. Batch 17 is located in the
following communities: Atobiase, Apagya, Apagya Central, Akwaku, Bepoase, Musa, Afiaso and
Tonkoase, batch 18 also operates in : Asarekrom, Kojo Yentumi, Master Nkwanta, Dotom, Kwame
Adu, Kwabena Essuon , Twetwebuoso and Nyamebekyere. There is one Nissan pick-up and six motor
bikes aiding the work of the staff however the poor nature of the roads continues to hamper the work
of the centre.
2.11.3 HEALTH CARE
The District has the following health care facilities outlined below, which are accessible to all
individuals.
New Edubiase Sub-District- New Edubiase Government Hospital
Hilltop Maternity Home (Private)
Akutreso Sub-District- Akutreso Health Centre
Ataase Sub-District- Ataase Health Centre
Atwereboana CHPS Compound
Hwidiem CHPS Compound
Obonsu CHPS Compound
Akrofuom Sub-District Akrofuom Health Centre
Grumesa CHPS Compound
Mensonso CHPS Compound
Sikaman/ CHAG CHPS Compound
Ampunyase Sub- District Ampunyase Health Centre
Wamasi CHPS Compound
84
Fig. 2.11 Shows the location of health facilities in the District
Health Related Issues
Some of the cases recorded in the District are summarised in the table below:
Table 2.48: Cases recorded at the New Edubiase District Hospital
S/N Disease No. recorded( Jan- Sept 2014)
1. Acute eye infection 422
2. Cataract 99
3. Otitis media 51
4. Other acute ear infection 34
5. Dental carriers 4
6. Dental swellings 9
7. Acute urinary tract infection 124
8. Skin diseases 287
9. Ulcer 39
10. Kidney related diseases 22
11. Gynaecological 21
12. Pregnancy related complications 61
13. Anaemia in pregnancy 2
14. Genital ulcer 4
15. Vaginal discharge 34
85
16. Urethral discharge 3
17. Other diseases of the male reproductive system 2
18. Other diseases of the female reproduction system 1
19. Malnutrition 26
20. Anaemia 731
21. Hypertension 518
22. Stroke 1
23. Diabetes Mellitus 84
24. Rheumatism and joint pains 334
25. Sickle cell disease 9
26. Asthma 64
Source: District Health Services, 2014.
2.11.4 Health Insurance
Table 2.49: Number of Clients Registered In 2010
2010 NEW
REGISTRATION
RENEWALS PREGNANT WOMEN TOTAL
MONTHS NEW EXISTING
JANUARY 284 775 188 - 1,247
FEBRUARY 250 394 207 07 858
MARCH 115 874 171 12 1,172
APRIL 200 1,161 184 - 1,545
MAY 162 1,084 302 26 1,574
JUNE 164 1,145 233 35 1,577
JULY 255 1,336 245 21 1,857
AUGUST 330 934 233 42 1,539
SEPTEMBER 224 934 263 51 1,472
OCTOBER 478 1,904 327 77 2,786
NOVEMBER 887 2827 315 36 4,065
DECEMBER 734 1725 236 33 2728
TOTAL 4,083 15,093 2,904 340 22,420
Source: NHIS Office, 2014
Table 2.50: Claims Paid
YEAR 2010 2011 2012 2013
MONTHS PAYMENT PAYMENT PAYMENT PAYMENT
JANUARY 41,045.15 112,157.71 277,901.77 -
FEBRUARY 134,494.41 81,140.66 145,701.09 214,430.68
MARCH 88,783.72 145,951.74 159,878.39 261,584.53
APRIL 85,960.75 132,923.69 - 97,653.31
MAY 107,947.09 98,878.52 78,559.24 -
JUNE 125,572.96 126,073.97 73,259.92 140,908.03
JULY 70,132.10 -- 54,628.20 14,071.00
AUGUST - 116,551.57 - -
SEPTEMBER 102,958.24 141,617.96 150,547.20 23,553.62
OCTOBER 158,305.54 265,377.02 156,707.16 41,008.29
86
NOVEMBER - 19,127.20 126,430.18 25,225.73
DECEMBER 123,201.74 144,845.94 147,969.51 -
TOTAL 1,038,401.70 1,384,645.98 1,371,582.66 1,052,400.90
Source: NHIS Office, 2014
Table 2.51: Number of Clients Registered in 2011
2011 FRESH
REGISTRATION
RENEWALS PREGNANT WOMEN TOTAL
NEW EXISTING
JANUARY 527 1,616 259 38 2,440
FEBRUARY 1,665 2,423 213 35 4,336
MARCH 334 955 236 36 1,561
APRIL 570 2,001 182 53 2,806
MAY 547 2,409 195 64 3,215
JUNE 464 1,506 201 88 2,259
JULY 309 1,172 162 51 1,694
AUGUST 587 1,308 214 37 2,146
SEPTEMBER 673 1,485 222 56 2,436
OCTOBER 660 1,735 202 88 2,685
NOVEMBER 1,577 2,582 313 46 3,393
DECEMBER 961 1468 218 34 2,681
TOTAL
Source: NHIS Office, 2014
Table 2.52: ID Cards Distribution
YEAR 2010 2011 2012 2013
MONTHS
JANUARY 1,355 2,565 1,712 5,240
FEBRUARY 863 1,712 1,723 3,475
MARCH 1,156 1,139 1,382 4,983
APRIL 1,512 2,007 993 3,086
MAY 1,180 1,511 840 1,640
JUNE 1,720 1,035 450 697
JULY 1,291 1,045 541 1,101
AUGUST 865 1,143 1,030 1,408
SEPTEMBER 976 819 479 1,355
OCTOBER 1,324 667 931 1,126
NOVEMBER 1,845 1,182 2,029 1,058
DECEMBER 1,276 779 227 1,048
TOTAL 15,848 15,604 12,337 26,217
Source: NHIS Office, 2014
Table 2.53: Number of Clients Registered in 2012
87
2012 NEW
REGISTRATION
RENEWALS PREGNANT WOMEN TOTAL
NEW EXISTING
JANUARY 863 1,342 225 64 2,494
FEBRUARY 342 800 169 55 1,366
MARCH 431 996 160 60 1,647
APRIL 273 1,271 203 70 1,817
MAY 575 2,742 210 85 3,612
JUNE 389 1,559 149 60 2,157
JULY 518 1,820 141 90 2,569
AUGUST 752 1,599 259 114 2,724
SEPTEMBER 346 1,247 206 89 1,888
OCTOBER 349 1,001 268 79 1,697
NOVEMBER 389 1,021 140 63 1,613
DECEMBER 176 637 89 51 953
TOTAL 5,403 16,035 2,224 880 214,542
Source: NHIS Office, 2014
Table 2.54: Number of Clients Registered in 2013
2013 NEW
REGISTRATION
RENEWALS PREGNANT WOMEN TOTAL
NEW EXISTING
JANUARY 289 1,076 93 84 1,542
FEBRUARY 2,760 4,261 211 79 7,311
MARCH 306 751 105 70 1,232
APRIL 233 803 71 87 1,194
MAY 392 1,743 97 116 2,348
JUNE 676 1,819 141 98 2,734
JULY 282 1,174 128 61 1,645
AUGUST 329 1,251 156 51 1,787
SEPTEMBER 763 1,685 56 65 2,569
OCTOBER 3,546 459 134 70 4,209
NOVEMBER 348 1,340 116 81 1,885
DECEMBER 1,358 3,100 103 81 4,642
TOTAL 11,282 19,462 1,411 943 33,103
Source: NHIS Office, 2014
2.12 VULNERABILITY ANALYSIS
Persons with disability (PWD) have been defined as those who are unable to or are restricted in the
performance of specific tasks/ activities due to loss of functions of some part of the body as a result of
impairment or malformation (Ghana Statistical Service, 2012). As a result, PWDs face a wide range of
life challenges because disability in whatever form or type, can reduce an individual’s ability to
function to his/her full potential. Disability can limit an individual’s full participation in a number of
activities in life.
88
In an attempt to understand the situation of PWDs as a guide for policy formulation, the Ghana
Statistical Service, for the first time, collected specific data on PWDs in the 2010 Population and
Housing Census. This chapter discusses the socio-economic and demographic characteristics of PWDs
from the data. It describes population with disability, type of disability, distribution by type of locality,
disability and activity, and disability, education and literacy.
2.12.1 Population with Disability
Generally, there are 3, 633 persons with one form of disability or the other in the District. The number
of disable persons in the District (3.1%) is relatively higher than the regional and national figure of 2.6
and 3.0 respectively (Table 6.1). Also there are slightly more males persons (51.8%) with disability
than females (48.2%).
2.12.2 Types of Disability
Table 6.1 and Figure 6.1 present type of disability with their corresponding shares of the population in
the District. The population with some form of disability, visual/sight impairment (36.6%) is the most
common disability, followed by physical challenges (23.6%) and emotional problems (16.0%). Visual
or sight impairment is also the most common form of disability among both males (35.9%) and
females (37.4%).
Figure 2.12: Type of disability
Source: Ghana Statistical Service, 2010 Population and Housing Census.
Sight29%
Hearing11%
Speech12%
Physical 18%
Intellect9%
Emotion12%
Other9%
89
2.12.3 Distribution by Type of Locality
In urban communities, there are 704 persons with disability, representing about 19.4 percent, out of
which 320 PWDs are males (3.5%) while 384 are females (3.9%). Persons with sight impairment
(42.6%) top the list with 42.6percent, followed by those with emotional problems (24.6%), and
physical challenges (23.0%). The lowest proportion is persons with other disability.
On the other hand, there are 2,929 persons with disability, representing 80.6 percent of the rural
population. The highest disability rate in the rural communities are persons with visual or sight
impairment (35.2%), followed by those with physical challenges (23.8%) and speech disorder (16.1%)
while the lowest are persons with intellectual malfunctioning (12.3%), as shown in Table 2.55.
Table 2.55: Population by type of locality, disability type and sex
Disability Type
Both sexes Male Female
Number percent Number percent Number Percent
All localities
Total 115,378 100.0 58,039 100.0 57,339 100.0
Without disability 111,745 96.9 56,157 96.8 55,588 96.9
With disability 3,633 3.1 1,882 3.2 1,751 3.1
Sight 1,330 36.6 676 35.9 654 37.4
Hearing 530 14.6 262 13.9 268 15.3
Speech 560 15.4 325 17.3 235 13.4
Physical 858 23.6 436 23.2 422 24.1
Intellect 420 11.6 222 11.8 198 11.3
Emotion 581 16.0 283 15.0 298 17.0
Other 397 10.9 199 10.6 198 11.3
Urban
Total 18,966 100.0 9,047 100.0 9,919 100.0
Without disability 18,262 96.3 8,727 96.5 9,535 96.1
With disability 704 3.7 320 3.5 384 3.9
Sight 300 42.6 137 42.8 163 42.4
Hearing 74 10.5 27 8.4 47 12.2
Speech 89 12.6 42 13.1 47 12.2
Physical 162 23.0 72 22.5 90 23.4
Intellect 61 8.7 29 9.1 32 8.3
Emotion 173 24.6 78 24.4 95 24.7
Other 34 4.8 21 6.6 13 3.4
Rural
Total 96,412 100.0 48,992 100.0 47,420 100.0
Without disability 93,483 97.0 47,430 96.8 46,053 97.1
With disability 2,929 3.0 1,562 3.2 1,367 2.9
Sight 1,030 35.2 539 34.5 491 35.9
Hearing 456 15.6 235 15.0 221 16.2
Speech 471 16.1 283 18.1 188 13.8
Physical 696 23.8 364 23.3 332 24.3
90
Intellect 359 12.3 193 12.4 166 12.1
Emotion 408 13.9 205 13.1 203 14.9
Other 363 12.4 178 11.4 185 13.5
Source: Ghana Statistical Service, 2010 Population and Housing Census.
2.12.4 Disability and Activity Status
The population 15 years and older is 65,974 of which 4.5% are persons with some form of disability
while 95.5% are without disability.
The horizontal analysis of Table 6.2 suggests that, about 7 in ten (1,949) disable persons constituting
66.3 percent are economically active, while 33.7 percent (992) are economically not active. Also, there
are 1,905 persons with disability that are employed, representing 97.7%, compared to 2.3 percent of
unemployed (44). Moreover, a greater percentage of disable persons is by sight (40.0%), followed by
physical and hearing (23.6 and 14.1 respectively). 365 persons, representing 12.4 percent, are also
disable with speech in the District. Additionally, almost all persons disable by sight (98.2%), physical
(96.8%), hearing (98.2%), including those with speech disability (98.8%) are employed in the District.
In contrast, 33.9, 50.2, 32.8 and 29.9 percent of these form of disabilities, respectively, are
economically not active.
In terms of sex, there are more disabled males (1,525) representing 51.9 percent than their female
counterparts, constituting 7.5 percent (1,416). Also, there are greater percentage of disable males that
are employed (1,037) representing 97.6 percent than females (97.9%). From Table 6.2, it can also be
construed that, the number of unemployed disable males (30.4%) and females (37.4%) that are not
available for work (not economically active) are greater than the disable males (2.4%) and females
(2.1%) that are unemployed.
Table 2.56: Persons 15 years and older with disability by economic activity status and sex
Sex/Disability
type
All Status Employed Unemployed Economically Not
Active
Number Percent Number Percent Number Percent Number Percent
Total 65,974 100.0 51,461 100.0 1,458 100.0 13,055 100.0
Without
disability 63,033 95.5 49,556 96.3 1,414 97.0 12,063 92.4
With
disability 2,941 4.5 1,905 3.7 44 3.0 992 7.6
Sight 1,176 1.8 763 1.5 14 1.0 399 3.1
Hearing 415 0.6 274 0.5 5 0.3 136 1.0
91
Speech 365 0.6 253 0.5 3 0.2 109 0.8
Physical 693 1.1 334 0.6 11 0.8 348 2.7
Intellect 322 0.5 177 0.3 4 0.3 141 1.1
Emotion 478 0.7 310 0.6 8 0.5 160 1.2
Other 305 0.5 208 0.4 6 0.4 91 0.7
Male
Total 32,682 100.0 25,877 100.0 635 100.0 6,170 100.0
Without
disability 31,157 95.3 24,840 96.0 610 96.1 5,707 92.5
With disability 1,525 4.7 1,037 4.0 25 3.9 463 7.5
Sight 605 1.9 407 1.6 8 1.3 190 3.1
Hearing 194 0.6 141 0.5 3 0.5 50 0.8
Speech 216 0.7 151 0.6 2 0.3 63 1.0
Physical 360 1.1 195 0.8 6 0.9 159 2.6
Intellect 172 0.5 97 0.4 2 0.3 73 1.2
Emotion 242 0.7 162 0.6 5 0.8 75 1.2
Other 148 0.5 108 0.4 3 0.5 37 0.6
Female
Total 33,292 100.0 25,584 100.0 823 100.0 6,885 100.0
Without
disability 31,876 95.7 24,716 96.6 804 97.7 6,356 92.3
With disability 1,416 4.3 868 3.4 19 2.3 529 7.7
Sight 571 1.7 356 1.4 6 0.7 209 3.0
Hearing 221 0.7 133 0.5 2 0.2 86 1.2
Speech 149 0.4 102 0.4 1 0.1 46 0.7
Physical 333 1.0 139 0.5 5 0.6 189 2.7
Intellect 150 0.5 80 0.3 2 0.2 68 1.0
Emotion 236 0.7 148 0.6 3 0.4 85 1.2
Other 157 0.5 100 0.4 3 0.4 54 0.8
Source: Ghana Statistical Service, 2010 Population and Housing Census.
2.12.5 Disability, Education and Literacy
Table 6.3 presents the population three years and older with disability by sex, disability type and level
of education. Among persons with disability, about 41 percent (41.1%) had never attended school
while over 58 percent (58.9%) had obtained some level of education of which 48 percent had basic
(Primary, Middle/JSS/JHS) education. Among persons with hearing impairments, 51.4 percent had
92
never attended school, while, out of those who had any form of education, primary school (20.4) is the
highest level majority had attended, followed by middle/JSS/JHS (20.0%).
Only 32.1 percent of males with disabilities had never attended school, and for those who had some
form of education, 40 percent of males with sight and emotional problems had attended
middle/JSS/JHS which is their highest level. On the other hand, a little more than half (50.8%) of
females with various type of disabilities had never been to school. Among those with sight
impairments, JSS/JHS is the highest level (24.0%) attended by those who had attended school.
2.13 GENDER
Accessibility to land which is one of the basic determinants of economic opportunities favors men due
to cultural factors. Inheritance of property in the family usually favors the male folk.
Participation of women in decision making especially at the Unit, Area Council levels and District
Assembly is not encouraging. Women are usually relegated to the background. Here again cultural
factors are among some of the reasons for preventing participation of women.
The parity of boys and girls in schools is however encouraging at the Primary and JHS levels of the
educational ladder. However, the same cannot be said of the SHS and Tertiary levels.
The implication of these is that more women should be encouraged to take up political appointments at
all levels of decision making. Girl-Child education at the SHS and Tertiary levels must also be
promoted.
2.14 POPULATION
Every population has its important elements such as the size, composition and structure. The statistics
from these indicators thus provide the bases for socio-economic planning at District, regional and
nation levels. The fertility, mortality and migration trends affect the population dynamics.
2.14.1 Population Size and Distribution
The total population for the District according to the 2010 Population and Housing Census is 115,378
comprising 58,039 (50.3%) males and 57,339 (49.7) females. This gives a sex ratio (i.e. number of
93
males to 100 females), of 101.2 (Table 2.1).More so, the share of the population by type of locality,
reveals that 18,966 (16.4%) live in the urban areas as against 96,412 (83.6%) who reside in the rural
area. The dependency ratio for the District is 90.2 comprising 92.7 for males and 87.8 for females.
Urban and rural localities have their age-dependency ratio as 81.5 and 92.0 respectively.
2.14.2 Age-Sex Structure
Figure 2.1 shows the relationship between the age structure and the population distribution by sex.
The results show that Adansi South District has a youthful population (Table 58 and Figure 2.1),
consisting of a large proportion (15.6%) of children under 15 years, and a small proportion (4.6%) of
elderly persons (65 years and older). The age structure of the District’s population is basically shaped
by the effects of high fertility and decreasing mortality rate.
Figure 2.13 :Population pyramid of Adansi South District
Source: Ghana Statistical Service, 2010 Population and Housing Census
10,000 5,000 0 5,000 10,000
0-4 5-9
10-14 15-19 20-24 25-29 30-34 35-39 40-44 45-49 50-54 55-59 60-64 65-69 70-74 75-79 80-84
85+
Population
Age
Male
Female
94
CHAPTER THREE
LOCAL/ COMMUNITY DEVELOPMENT PLANS
3.0 COMMUNITY NEEDS AND ASPIRATIONS
This section of the report presents problems that were outlined after consultation with the people. The
following are the problems and key development issues of the people summarised under the seven (7)
thematic areas of the GSGDA II.
Problems Identified:
Ensuring and Sustaining Macroeconomic Stability
1. Inadequate financial support from DA for community initiated projects
2. Low income levels
3. Low revenue mobilization
Enhanced competitiveness of Ghana’s private sector
1. Inadequate financial assistance to support farming
2. Inadequate markets
3. Low price for cocoa beans
Accelerated agricultural modernization and natural resource management
1. Land degradation and pollution of water bodies by mining activities
2. Deforestation by chain saw operators
3. Inadequate cocoa spraying gangs
4. Inadequate cocoa inputs for farmers e.g. fertilizer, chemicals
5. Lack of irrigation facilities
6. Inadequate palm oil extraction machines
7. Low access to improved seeds
8. Low interest of youth in agriculture
9. Under development of tourist sites
Infrastructure and Human Settlements Development
1. Poor drainage system
2. Poor nature of roads
3. Inadequate street lights
4. Soil erosion
5. Inadequate planning schemes for communities
6. Inadequate community centers
7. Lack of electricity in some communities
8. Inadequate staff accommodation (including teachers and nurses)
9. Inadequate health facilities and wards
10. Poor telecommunication network service
95
11. Frequent accidents on some roads
Human development, productivity and employment
1. Inadequate doctors and nurses
2. Long distance covered to attend school
3. Teenage pregnancy
4. Inadequate ICT centers
5. Inadequate trained teachers
6. Inadequate provision of food for some children (school feeding programme)
7. Inadequate employment opportunities
8. Inadequate scholarships for children
9. Inadequate water and sanitation facilities
Transparent and accountable governance
1. Inadequate funds to run unit committees
2. Inadequate law courts
3. Inadequate police posts
4. Inadequate security personnel
5. Inadequate training for Assembly members and unit committee members
6. Increase in social vices
7. Inadequate support to the disabled in society
8. Inadequate training for Assembly members and District Assembly Staff
KEY DEVELOPMENT ISSUES
The following issues were outlined after a thorough assessment of the problems identified:
Ensuring and Sustaining Macroeconomic Stability
1. Improve financial management of District Assembly revenues
2. Improve revenue generation
Enhancing competitiveness of Ghana’s Private sector
1. Establish database on all private sector operations in the District
2. Improve access to credit support for businesses
3. Improve access to marketing for private sector operations
Accelerated Agricultural Modernization and Natural Resource Management
1. Provision of agro-based industries for palm oil processing
2. Promote re-afforestation and protect the forest
3. Improve access to high yielding seedlings for farmers and better farming practices
4. Improve access to farming inputs
5. Expansion of mass spraying for cocoa
6. Encourage establishment of fish farming and animal rearing
96
7. Expand youth employment programmes especially in agriculture
8. Development of tourist sites
9. Protection of land and water bodies from mining activities
Infrastructure and Human Settlements Development
1. Improve drainage systems
2. Preparation of planning schemes for communities
3. Improve staff accommodation( teachers, health care staff)
4. Improve upon road surface conditions and transport infrastructure
5. Improve upon telecommunication network service
6. Provide additional community centers
7. Expansion of electricity supply
Human Development, Productivity and Employment
1. Improve access to doctors and nurses
2. Improve quality and access to educational infrastructure at all levels
3. Provision of sports facilities
4. Promote family planning methods
5. Improve access to water
6. Improve access to sanitary facilities
7. Create employment opportunities
8. Ensure FCUBE
9. Improve road safety education
10. Enhance access to COCOBOD scholarships
Transparent and Accountable Governance
1. Improve revenue generation
2. Strengthening District Assembly Structures to promote good governance and participation
3. Adequately resource District Planning Coordinating Unit (DPCU) to perform its statutory roles
4. Strengthen public awareness and advocacy on civic rights and responsibilities
5. Provide adequate support to the disabled in society
6. Enforcement of District Assembly by-laws
7. Promotion of cultural activities
8. Provision of adequate security
9. Provide training for Assembly members and District Assembly Staff
Community needs and aspirations identified have been harmonized by relating them to the key gaps/
problems or issues identified under the review of performances of the GSGDA I, the profile and other
interventions. To ensure coherence, each community’s needs and aspirations is scored against the key
gaps/ problems or issues identified under the review of performance. This is outlined in the table below
97
Table 3.1: HARMONISED COMMUNITY NEEDS/ ASPIRATIONS AND IDENTIFIED KEY DEVELOPMENT ISSUES
Thematic Area
Community Needs and Aspirations Identified key development gaps/ problems/ issues Score
Ensuring and
Sustaining
Macroeconomic
Stability
Inadequate financial support from DA for community
initiated projects
Low income levels
Low revenue mobilization
Improve financial management of District Assembly
revenues
Improve revenue generation
2
2
2
Enhancing
competitiveness
of Ghana’s
private sector
Inadequate financial assistance to support farming
Inadequate markets
Low price for cocoa beans
Establish database on all private sector operations in the
District
Improve access to credit support for businesses
Improve access to marketing for private sector operations
2
2
2
Accelerated
agricultural
modernization
and sustainable
natural
resource
management
Land degradation and pollution of water bodies by
mining activities
Deforestation by chain saw operators
Inadequate cocoa spraying gangs
Inadequate cocoa inputs for farmers e.g. fertilizer,
chemicals
Lack of irrigation facilities
Inadequate palm oil extraction machines
Low access to improved seeds
Low interest of youth in agriculture
Under development of tourist sites
Provision of agro-based industries for palm oil
processing
Promote re-afforestation and protect the forest
Improve access to high yielding seedlings for farmers
and better farming practices
Improve access to farming inputs
Expansion of mass spraying for cocoa
Encourage establishment of fish farming and animal
rearing
Expand youth employment programmes especially in
agriculture
Development of tourist sites
Protection of land and water bodies from mining
activities
2
2
2
2
2
0
2
2
2
Infrastructure
and Human
Settlements
Development
Poor drainage system
Poor nature of roads
Inadequate street lights
Soil erosion
Inadequate planning schemes for communities
Poor telecommunication network coverage
Inadequate community centers
Improve drainage systems
Preparation of planning schemes for communities
Improve staff accommodation( including teachers, health
care staff)
Improve upon road surface conditions and transport
infrastructure
Improve upon telecommunication network service
2
2
2
2
2
98
Definition Score: Strong relationship -2, Weak relationship -1, No relationship- 0
Frequent accidents on some roads
Lack of electricity in some communities
Inadequate health centers and wards
Inadequate staff accommodation( including teachers,
health care staff)
Provide additional community centers
Expansion of electricity supply
Improve road safety education
Improve access to health facilities
Provide additional streetlight bulbs
2
2
2
2
2
Human
development,
productivity
and
employment
Inadequate doctors and nurses
Long distance covered to attend school
Teenage pregnancy
Inadequate trained teachers
Inadequate provision of food for some children
(school feeding programme)
Inadequate employment opportunities
Inadequate scholarships for children
Inadequate water and sanitation facilities
High rate of traditional birth attendant deliveries
Improve access to doctors and nurses
Improve quality and access to educational infrastructure
at all levels
Provision of sports facilities
Promote family planning methods
Improve access to potable water
Improve access to sanitary facilities
Create employment opportunities
Ensure FCUBE
Enhance road safety education
Improve access to COCOBOD scholarships
Provide maternal waiting homes
2
2
2
2
2
2
2
2
2
2
2
2
Transparent
and
accountable
governance
Inadequate funds to run unit committees
Inadequate law courts
Inadequate police posts
Inadequate security personnel
Inadequate training for Assembly members and unit
committee members
Increase in social vices
Inadequate support to the disabled in society
Improve revenue generation
Strengthening District Assembly Structures to promote
good governance and participation
Adequately resource District Planning Coordinating Unit
(DPCU) to perform its statutory roles
Strengthen public awareness and advocacy on civic
rights and responsibilities
Provide adequate support to the disabled in society
Enforcement of District Assembly by-laws
Promotion of cultural activities
Provision of adequate security
Provide training for Assembly members and District
Assembly Staff
2
2
2
2
2
0
0
2
0
99
Table 3.2 HARMONISE KEY DEVELOPMENT ISSUES UNDER 2010-2013
S/N NMTDPF 2014-2017
THEMATIC AREA
ADOPTED ISSUES
1 Ensuring and Sustaining
Macroeconomic Stability
1. Improve financial management of District Assembly
revenues
2. Improve revenue generation
2 Enhancing
Competitiveness of
Ghana’s Private Sector
1. Establish database on all private sector operations in the
District
2. Improve access to credit support for businesses
3. Improve access to marketing for private sector
operations
3 Accelerated Agricultural
Modernization and
Sustainable Natural
Resource Management
1. Provision of agro-based industries for palm oil
processing
2. Promote re-afforestation and protect the forest
3. Improve access to high yielding seedlings for farmers
and better farming practices
4. Improve access to farming inputs
5. Expansion of mass spraying for cocoa
6. Encourage establishment of fish farming and animal
rearing
7. Expand youth employment programmes especially in
agriculture
8. Development of tourist sites
9. Protection of land and water bodies from mining
activities
4 Infrastructure and Human
Settlements
1. Improve drainage systems
2. Preparation of planning schemes for communities
3. Improve staff accommodation( teachers, health care
staff)
4. Improve upon road surface conditions and transport
infrastructure
5. Improve upon telecommunication network service
6. Provide additional community centers
7. Expansion of electricity supply
8. Improve additional health care facilities and wards
9. Provide maternal waiting homes
10. Improve quality and access to educational infrastructure
at all levels
11. Provision of sports facilities
5 Human Development,
Productivity and
Employment
1. Improve access to doctors and nurses
2. Promote family planning methods
3. Improve access to water
4. Improve access to sanitary facilities
5. Create employment opportunities
6. Ensure FCUBE
100
7. Improve road safety education
8. Improve access to trained teachers
9. Increase access to COCOBOD scholarships
6 Transparent and
Accountable Governance
1. Improve revenue generation
2. Strengthening District Assembly Structures to promote
good governance and participation
3. Adequately resource District Planning Coordinating
Unit (DPCU) to perform its statutory roles Strengthen
public awareness and advocacy on civic rights and
responsibilities
4. Provide adequate support to the disabled in society
5. Enforcement of District Assembly by-laws
6. Promotion of cultural activities
7. Provision of adequate security
8. Provide training for Assembly members and District
Assembly Staff
101
Table 3.3 Adopted issues of the NMTDPF 2014-2017 linked to the harmonized issues of the GSGDA 2010-2013
S/N NMTDPF 2014-2017
Thematic Area
Adopted Issues of NMTDPF 2014-2017 Harmonised Issues 2010-2013
1 Ensuring and
Sustaining
Macroeconomic
Stability
Weak institutional collaboration for fiscal policy
management
Leakages in revenue collection
Improve financial management of District
Assembly revenues
Improve revenue generation
2 Enhancing
competitiveness of
Ghana’s private sector
Informal nature of businesses
Limited access to finance
Lack of adequate market information
Establish database on all private sector operations
in the District
Improve access to credit support for businesses
Improve access to marketing for private sector
operations
3 Accelerated
agricultural
modernisation and
sustainable natural
resource management
Low adoption of technology
Negative impact of some farm practices
Forest destruction by chainsaw operators
Limited multiplication and production of planting
materials and certification of seeds
Inadequate dissemination of information on
business opportunities along the agriculture value
chain
Inadequate investment in the tourism sector
Negative impact of mining on the environment and
host communities
Provision of agro-based industries for palm oil
processing
Promote re-afforestation and protect the forest
Improve access to high yielding seedlings for
farmers and better farming practices
Improve access to farming inputs
Expansion of mass spraying for cocoa
Encourage establishment of fish farming and
animal rearing
Expand youth employment programmes especially
in agriculture
Development of tourist sites
Protection of land and water bodies from mining
activities
4 Infrastructure and
human settlements
development
Inadequate Investments in infrastructure in support
of hazard prevention and mitigation
Haphazard land development
Poor quality and inadequate road transport
network
Inadequate ICT infrastructure base across the
country
Inadequate community/social centers especially in
the urban areas
Inadequate infrastructure to support the delivery of
Improve drainage systems
Preparation of layouts for communities
Improve upon road surface conditions and
transport infrastructure
Improve telecommunication
Provide additional community centers
Expansion of electricity supply
102
energy service
5 Human development,
productivity and
employment
Huge gaps in geographical and financial access to
quality health care (e.g. urban and rural as well as
rich and poor)
Inadequate and inequitable access particularly after
the basic level and for persons with special needs
Inadequate and poor quality infrastructure and
absence of disability-friendly facilities in
communities and schools
Weak management and capacity for sports
development
Unacceptably high number of untrained teachers at
the basic level
Low coverage of reproductive health and family
planning (FP) services
Inadequate access to quality and affordable water
Inadequate access to environmental sanitation
facilities
High levels of unemployment and under-
employment especially among the youth and groups
with special needs
Weak management and supervision
Improve access to doctors and nurses
Improve access to educational infrastructure at all
levels
Improve access to education for people with
disability improve upon water and sanitation
Provision of sports facilities
Increase the number of teachers quarters
Provide additional accommodation for health care
personnel
Provide additional health facilities and wards
Increase the numbers of schools
Promote family planning methods
Increase the number of trained teachers
Improve upon water and sanitation facilities
Create employment opportunities
Ensure FCUBE
6 Transparent and
accountable
governance
Weak leadership and managerial capacity at
MMDA level
Non-functioning sub-District structures
Limited awareness, advocacy and enforcement of
rights and responsibilities
Inefficient and ineffective implementation of
development policies and plans
Inadequate social intervention and weak
coordination of programmes for the vulnerable and
excluded
Inadequate representation and participation of
women in public life and governance
Inadequate support to the disabled in society
Strengthening District Assembly Structures to
promote good governance and participation
Motivation of Area Council Staff
Strengthen public awareness and advocacy on
civic rights and responsibilities
Improve service delivery of District Assembly
Inadequate support to the disabled in society
Adequately resource District Planning
Coordinating Unit (DPCU) to perform its statutory
roles
Build capacities at District Assembly and Area
Council Staff to ensure good governance and
transparency
103
Ineffective enforcement of laws
Inadequate human and institutional capacity
Prevalence of fires, floods and other disasters
Limited attention to issues of culture in national
development
Promote Women’s participation in decision
making processes
Enforcement of District Assembly by-laws
Provide adequate support to the disabled in society
Provision of adequate Security
Promotion of cultural activities
PRIORITIZATION OF OPPORTUNITIES FOR THE PROMOTION OF CROSS- CUTTING ISSUES TO BE ADDRESSED
This section of the MTDPF highlights the relationship between the harmonised issues and their ability to :
impact on a large proportion of citizens
have a significant linkage effect i.e with other sectors of the economy
have a significant multiplier effect on the local economy
have a significant effect on reducing poverty levels of citizens
Table 3.4Harmonised Issues and their effects on citizens and the local economy
CRITERIA
HARMONIZED ISSUES
Impact on
Large
Proportions
of the
Citizens
Significan
t Linkage
Effect
Significant
Multiplier
Effect on
the Local
Economy
Significant
Effect on
Reducing
Poverty
Total
1. Improve financial management of District Assembly revenues
2. Improve revenue generation
2
2
2
2
2
2
2
2
8
8
3. Establish database on all private sector operations in the District
4. Improve access to credit support for businesses
5. Improve access to marketing for private sector operations
2
2
2
2
2
2
2
2
2
1
2
2
7
8
8
6. Provision of agro-based industries for palm oil processing
7. Promote re-afforestation and protect the forest
8. Improve access to high yielding seedlings for farmers and better farming
practices
9. Improve access to farming inputs
10. Expansion of mass cocoa spraying for cocoa
2
2
2
2
2
1
2
2
2
1
1
2
2
1
2
2
1
1
1
1
6
7
7
6
6
104
11. Encourage establishment of fish farming and animal rearing
12. Expand youth employment programmes especially in agriculture
13. Development of tourist sites
14. Protection of land and water bodies from mining activities
2
2
2
2
1
1
1
1
1
2
1
2
1
2
1
1
5
7
5
6
15. Improve drainage systems
16. Preparation of planning schemes for communities
17. Improve staff accommodation( teachers, health care staff)
18. Improve upon road surface conditions and transport infrastructure
19. Improve upon telecommunication network service
20. Provide additional community centers
21. Expansion of electricity supply
22. Provide additional wards and health facilities
2
2
2
2
2
2
2
2
1
1
2
2
2
1
2
1
1
2
1
2
2
1
2
1
0
0
1
1
1
0
1
1
4
5
6
7
7
4
7
5
23. Improve access to doctors and nurses
24. Improve quality and access to educational infrastructure at all levels
25. Provision of sports facilities
26. Promote family planning methods
27. Improve access to water
28. Improve access to sanitary facilities
29. Create employment opportunities
30. Ensure FCUBE
2
2
2
2
2
2
2
2
2
2
1
1
2
2
2
2
2
2
1
1
2
2
2
2
1
1
1
1
1
1
2
1
7
7
5
5
7
7
8
7
31. Improve revenue generation
32. Strengthening District Assembly Structures to promote good governance
and participation
33. Adequately resource District Planning Coordinating Unit (DPCU) to
perform its statutory roles
34. Strengthen public awareness and advocacy on civic rights and
responsibilities
35. Provide adequate support to the disabled in society
36. Enforcement of District Assembly by-laws
37. Promotion of cultural activities
38. Provision of adequate security
2
2
2
2
2
2
2
2
2
2
2
2
2
2
1
2
2
2
2
1
2
2
1
2
2
1
1
1
2
0
1
1
8
7
7
6
8
6
5
7
105
Table 3.5 Potential, Opportunity Constraints and Challenges (POCC) ANALYSIS
Program/ Project Potential Opportunities Constraints Challenges
Ensuring and sustaining
macro-economic stability
Improve revenue generation
Availability of laid down
procedures on public
spending
Availability of skilled
personnel
Training from RCC and
NDPC
Inadequate funds
Untimely release of
funds from central gov’t
Improve financial
management of District
assemblies revenues
Availability of laid down
procedures on public
spending
Availability of skilled
personnel
External auditors
Training by RCC/ NDPC,
etc
Bureaucratic procedures
Inadequate funds for
regular training
Untimely release of
funds from central gov’t
Enhancing competitiveness
of Ghana’s private sector
Establish data base on all
private sector operations in
the District
Implementation of street
naming and property
addressing system
Availability of skilled
personnel and logistics
Favourable government
policy
Availability of software
developers
Inadequate funds
Unreliable electricity
supply and network for
communication
Improve credit support for
businesses
Presence of banks and
other financial institutions
Presence of cooperative
credit union
Availability of NBSSI
Lack of collateral
Absence of business
advisory board
Inflation
Delay in approval and
granting of loans
Improve access to
marketing for private sector
operations
Availability of markets
Availability of land for
new markets
Patronage of markets by
consumers
Presence of information
centres
Availability of technology
to preserve products
Availability of radio/ TV
stations
Poor nature of roads
High cost of production
Inadequate market stalls
and warehouses
Inflation
Low educational levels
of producers
Competition from other
producers
106
Accelerated agricultural
modernization and
sustainable natural resource
management
Provision of agro- based
industries for palm oil
Availability of labour
Availability of oil palm
plantations
Availability of fertile land
for cultivation of oil palm
trees
Availability of export
opportunity
Improved technology for
production
Support from other
investors
Inadequate potable water
Unreliable electricity
supply
Promote re-afforestation
and protect the forest
Presence of Forestry
Services Division
Availability of land
Favourable climate
Presence of forest guards
Presence of community
watchdog committees
Availability of seedlings for
tree planting
Availability of improved
technology
Availability of security
personnel (Military and
Police)
Inadequate funds
Lack of commitment
from forest guards
Inadequate logistics
Illegal timber felling and
political influence when
arrests are made
Improve access to high
yielding seedlings for
farmers and better farming
practices
Presence of Agric. Dept.
Availability of extension
officers
Availability of seeds
Availability of improved
technology
Inadequate funds
Low technical know-how
of farmers
Increment in prices of
seeds/ seedlings
Improve access to farming
inputs
Presence of Agric Dept.
Availability of fertilizer
collection point in New
Edubiase
Availability of chemical
shops
Uneven distribution of
farm inputs
Collection of inputs from
Ansa (Adansi North)
Untimely supply of
inputs from central
gov’t
Expansion of mass spraying
for cocoa
Availability of spraying
gangs
Availability of premix fuel
Availability of chemical
shops
Office responsible
located in Obuasi
Municipal
Inadequate premix fuel
Untimely supply of
premix fuel from central
gov’t
Encourage establishment of
fish farming and animal
rearing
Availability of land for
farming
Interest of people in the
activity
Availability of pasture
Presence of Agric. Dept.
Availability of animals and
fishlings
Availability of drugs and
other supplements
Inadequate capital
Inadequate financial
support from banks
Inflation
107
and extension officers
Expand youth employment
programmes especially in
agriculture
Interest of the youth in
agriculture
Availability of fertile lands
for cultivation
Presence of Agric. Dept.
Availability of books and
other materials
Availability of books and
research materials
Availability of Agric.
institutions
Inadequate funds for
training
Development of tourist sites
Availability of forest
reserves, water bodies and
other tourist sites
Presence of FSD
Presence of skilled
personnel
Presence of Wild Life
Conservation Dept.
Support from Ministry of
Tourism
Support from other
interested organisations
Inadequate budgetary
allocation
Inadequate funds from
central gov’t
Infrastructure and Human
Settlements
Protection of land and water
bodies from mining
activities
Presence of DISEC
Presence of Environmental
Health Dept.
Presence of Immigration
Officers
Support from Ministry
Support from Minerals
Commission
Inadequate logistics for
monitoring
Inadequate funds for fuel
Interference from
“influential people”
when arrests are made
Preparation of planning
schemes for communities
Presence of Physical
Planning Dept.
Support from TA
Available logistics
Improved technology Inadequate logistics “
Provide additional staff
accommodation (teachers
and health care staff)
Presence of Works Dept.
Availability of land
Budgetary allocation
Support from Ministry of
Water Resources, Works &
Housing
Inadequate funds “
Improve upon road surface
conditions and transport
infrastructure
Presence of Engineers
( Feeder Roads and Works)
Availability of grader
Support from Ministry of
Roads and Highways
Inadequate funds to fuel
grader
High cost of maintaining
the grader
Inadequate funds from
central gov’t and its
untimely release
Improve telecommunication
network service
Presence of
telecommunication
networks
ICT facility and internet
café
Support from National
Communications Authority
Poor network coverage “
108
Provide additional
community centres
Availability of land
Budgetary allocation
Availability of skilled
personnel
Funds from NGOs Inadequate funds
Expansion of electricity
Presence of ECG District
Office
Support from Ministry of
Energy
“
Human Development,
Productivity and
Employment
Improve access to doctors
and nurses
Willingness of personnel to
work in the District
Presence of DHD
Support from Ministry of
Health
Support from International
Organisations
Inadequate
accommodation and
other infrastructure
Untimely postings of
personnel
Improve quality and access
to educational infrastructure
at all levels
Budgetary allocation
Presence of DED
Support from Ministry of
Education
Inadequate funds to
complete projects on
schedule
Inadequate funds from
central gov’t
Improve upon water and
sanitation
Presence of Environmental
Health Office
Presence of WATSAN in
communities
Budgetary allocation
Presence of Zoomlion
Availability of land for
dump sites
Availability of Small Town
Water System
High water table
Availability of waste
management companies
Support from Ministry
Support from Zoomlion
Availability of borehole
drilling companies
Availability of improved
technology
Support from NGOs and
other donors
Inadequate funds
Indiscriminate littering
by inhabitants
Untimely release of
funds from central gov’t
Promote Family Planning
Methods
Budgetary allocation
Presence of DHD
Support from Ministry of
Health and UNFPA
Inadequate funds
“
Provision of sports facilities Presence of a premier
division football club
Interest of the youth in
sports
Availability of land for
dev’t
Support from Ministry of
Youth & Sports
Support from other
sponsors/ donors
Inadequate funds
“
109
Create employment
opportunities
Willingness of community
to venture into new areas
Availability of skilled
personnel
Availability of financial
institutions
Availability of NBSSI/ BAS
Inadequate start-up
capital
Inflation
Ensure FCUBE Interest of parents
Interest of children to stay
in school
Presence of DEOC
Support from GES
“
“
Transparent and
accountable governance
Strengthening District
Assembly Structures to
promote good governance
and participation.
Availability of skilled
personnel
Budgetary allocation
Enactment of DAs by-laws
Availability of funds
Support from central gov’t
Availability of training
materials
Consultants
Inadequate funds
By-laws yet to be
gazetted
Untimely release of
funds
Improve revenue generation Availability of revenue
collectors
Availability of qualifies
staff
Implementation of street
naming and property
addressing system
Availability of rateable
items
Favourable government
policies
Availability of revenue
collection agencies
Inadequate revenue
collectors
Reluctance to pay rates/
fees
Leakages in revenue
collection
Inaccessibility to some
communities
Inadequate public
education
Unwillingness of
businesses to register
with DA
Inadequate funds from
central government
Deductions made at
source to DACF, DDF,
etc
Untimely release of
funds to DA
Strengthen public awareness
and advocacy on civic rights
and responsibilities.
Presence of NCCE,
CHRAJ, ISD and
information centres
Budgetary allocation
Presence of skilled
personnel
Support from Ministry
Availability of FM stations,
TV stations
Resource persons
Inadequate funds
Adequately resource
District Planning
Coordinating Unit (DPCU)
Budgetary allocation
Available logistics and
office space
Support from MLGRD Inadequate funds
Inadequate logistics
including vehicles
Untimely release of
funds from central gov’t
110
to perform its statutory roles
Skilled personnel
Provide adequate support to
the disabled in society
Presence of Social Welfare
and Community Dev’t
Department
Budgetary allocation
Support from NGOs e.g
CEDEP
Support from Ministry
Inadequate funds Untimely release of
funds
Enforcement of District
Assembly by-laws
Enactment of by-laws
Presence of skilled
personnel
Availability of logistics
Budgetary allocation
Legal backing Inadequate funds to
gazette by-laws
Bureaucratic process in
gazetting by-laws
Provision of adequate
Security
Interest of security
personnel in working in the
District
Availability of logistics
Budgetary allocation
Availability of a magistrate
court
Presence of community
watchdog committees
Presence of security
personnel (police,
immigration, fire service)
Support from Ministry
Availability of prisons
Availability of other courts
Availability of lawyers
Inadequate security
personnel
Inadequate logistics e.g.
vehicles
Untimely postings of
personnel
Inadequate funds from
central gov’t and its
untimely release
Promotion of cultural
activities.
Interest of inhabitants in
cultural activities
Centre for National Culture
in Kumasi
Inadequate funds
“
Provide training for
Assembly members and
District Assembly Staff
Availability of venue for
training
Budgetary allocation
Consultants
Support from NDPC/ RCC
Inadequate funds “
111
Table 3.6 ADOPTED DEVELOPMENTAL ISSUES/ STRATEGIES
S/N NMTDPF 2014-2017
Thematic Area
Adopted Issues of NMTDPF
2014-2017
Harmonised Issues 2010-
2013
Adopted Policy
Objectives
Adopted Strategies
1 Ensuring and
Sustaining
Macroeconomic
Stability
Weak institutional
collaboration for fiscal
policy management
Improve financial
management of District
Assembly revenues
Improve public
expenditure
management
Review the administrative
framework for earmarked
funds to ensure efficiency in
the management of public
funds
Leakages in revenue
collection
Improve revenue generation Improve the legislative and
institutional framework for
budget formulation and
implementation
2 Enhancing
Competitiveness of
Ghana’s Private
Sector
Informal nature of
businesses
Establish database on all
private sector operations in
the District
Improve efficiency
and competitiveness
of MSMEs
Facilitate the provision of
training and business
development services
Limited access to finance Improve access to credit
support for businesses
Expand access to both
domestic and
international markets
Promote regional and intra-
regional trade
Lack of adequate market
information
Improve access to marketing
for private sector operations
3 Accelerated
Agricultural
Modernisation and
Sustainable Natural
Resource
Management
Inadequate access to
appropriate financial
products
Inadequate support for the
establishment of fish farming
and animal rearing
Improve Agriculture
Financing
Provide appropriate
framework to ensure
adequate flow of financial
resources to the agriculture
and aquaculture
Low adoption of technology
Provision of agro-based
industries for palm oil
processing
Improve science,
technology and
innovation application
Improve the effectiveness of
Research-Extension-Farmer
Linkages (REFLs) and
integrate the concept into
the agriculture research
system to increase
participation of end users in
technology development
Forest destruction by
chainsaw operators
Promote re-afforestation and
protect the forest
Reverse forest and
land degradation
Intensify implementation of
national forest plantation
development programme
Negative impact of mining Protection of land and water Promote sustainable Enforce compliance of
112
on the environment and host
communities
bodies from mining activities extraction and use of
mineral resources
relevant regulations and
guidelines on small scale
mining
Inadequate investment in the
tourism sector
Development of tourist sites
Diversify and expand
the tourism industry
for economic
development
Strengthen collaboration
and coordination among key
stakeholders to develop the
tourism sector
4 Infrastructure and
Human Settlements
Development
Inadequate Investments in
infrastructure in support of
hazard prevention and
mitigation
Improve drainage systems
Promote proactive
planning for disaster
prevention and
mitigation
Haphazard land
development
Preparation of planning
schemes for communities
Improve and
accelerate housing
delivery in the rural
areas
Review building codes and
planning laws and
strengthen institutions to
enforce them within urban
settlements and rural areas
Promote orderly growth of
settlements through
effective land use planning
and management
Huge housing deficit Inadequate staff
accommodation (teachers and
health)
Increase access to
adequate, safe, secure
and affordable shelter
Promote the manufacture
and use of standardised
local building materials and
appropriate technologies in
housing including use of
bricks, tiles and pozzolana
cement in the construction
industry
Provide support for private
sector involvement in the
delivery of rental housing
Poor quality and inadequate
road transport network
Improve upon road surface
conditions and transport
infrastructure
Establish Ghana as a
transportation hub for
the West African sub-
region
Improve and develop the
physical infrastructure
across all modes for
transport
113
Inadequate ICT
infrastructure base across
the country
Improve telecommunication
network service
Promote rapid
development and
deployment of the
national ICT
infrastructure
Create the enabling
environment to promote the
mass use of ICT
Inadequate community/social
centres especially in the urban
areas
Provide additional community
centres
Develop social,
community and
recreational facilities
Develop and maintain
community and social
centres countrywide
Inadequate infrastructure to
support the delivery of energy
service
Expansion of electricity
supply
Provide adequate,
reliable and affordable
energy to meet the
national needs and for
export
Increase access to energy by
the poor and vulnerable
5 Human
Development,
Productivity and
Employment
Huge gaps in geographical and
financial access to quality health
care (e.g. urban and rural as
well as rich and poor)
Improve access to doctors and
nurses
Bridge the equity gaps
in access to health care
Strengthen the District and
sub-District health systems
as the bed-rock of the
national primary health care
strategy
Inadequate and poor quality
infrastructure and absence of
disability-friendly facilities in
communities and schools
Improve quality and access to
education at all levels
Increase inclusive and
equitable access to,
and participation in
education at all levels
Remove the physical,
financial and social barriers
and constraints to access to
education at all levels
Unacceptably high number of
untrained teachers at the basic
level
Weak management and capacity
for sports development
Provision of sports facilities
Provide adequate and
disability friendly
infrastructure for
sports in communities
and schools
Rehabilitate existing and
construct new sports
infrastructure and provide
sports equipment at all
levels
Low coverage of reproductive
health and family planning (FP)
services
Promote family planning
methods
Reinforce family
planning as a priority
in national
Expand coverage,
availability and accessibility
of reproductive health and
114
development Family Planning services
including adolescents/youth
Inadequate access to quality and
affordable water
improve access to water Accelerate the
provision of adequate,
safe and affordable
water
Ensure sustainable funding
for rural water delivery
Inadequate access to
environmental sanitation
facilities
Improve access to sanitary
facilities
Accelerate the
provision of improved
environmental
sanitation facilities
Review, gazette and enforce
MMDAs bye-laws on
sanitation
Facilitate the acquisition of
land for the development of
engineered land-fill sites for
the treatment and disposal
of solid and liquid waste in
all major cities and towns
High levels of unemployment
and under-employment
especially among the youth and
groups with special needs
Create employment
opportunities
Improve the policy,
environment and
institutional capacity
for effective human
capital development,
and employment
policy management
Ensure integration of
employment issues in
policies and programmes at
all levels
Weak management and
supervision
Ensure FCUBE
Advance the
implementation of the
compulsory
component of FCUBE
Ensure the implementation
of the compulsory
component of the Free
Compulsory Universal
Basic Education (FCUBE)
6 Transparent and
Accountable
Governance
Weak financial base and
management capacity of the
District Assemblies
Improve revenue generation Ensure effective and
efficient resource
mobilisation, internal
revenue generation
and resource
management
Improve the capacity of
finance and administrative
staff of MMDAs
Non-functioning sub-District Strengthening District Ensure effective Enforce compliance of LI.
115
structures
Assembly Structures to
promote good governance and
participation
implementation of the
decentralisation policy
and programmes
1967
Limited awareness, advocacy
and enforcement of rights and
responsibilities
Strengthen public awareness
and advocacy on civic rights
and responsibilities
Strengthen and
promote the culture of
rights and
responsibilities
Intensify and sustain
awareness of rights and
responsibilities at all levels
Inefficient and ineffective
implementation of development
policies and plans
Adequately resource District
Planning Coordinating Unit
(DPCU) to perform its
statutory roles
Strengthen policy
formulation,
development planning,
and M&E processes
for equitable and
balanced spatial and
socio- economic
development
Strengthen engagement
between Assembly
members and citizens
Build capacity of MDAs
and MMDAs in the public
policy and planning
processes including
considerations for gender
and women empowerment
Inadequate social intervention
and weak coordination of
programmes for the vulnerable
and excluded
Provide adequate support to
the disabled in society
Ensure equity and
social cohesion at all
levels of society
Strengthen institutions to
programme and offer
support to the vulnerable
and excluded at all levels
Enhance coordination and
implementation of social
protection initiatives for the
vulnerable and excluded at
all level
Ineffective enforcement of laws
Enforcement of District
Assembly by-laws
Enhance public
confidence in the
justice delivery and
administrative systems
Strengthen the
administrative structures of
the Legal Service
Limited attention to issues of
culture in national development
Promotion of cultural
activities
Harness culture for
national development
Mainstream culture in the
nation’s social and
economic development
agenda
Inadequate human and
institutional capacity
Provision of adequate
Security
Improve internal
security for protection
of life and property
Improve internal security
for protection of life and
property
116
SUSTAINABILITY ANALYSIS OF PROGRAMMES / PROJECTS
After a comprehensive analysis of policy objectives, each developed strategy was analysed suing the sustainability test tool. The tool has three criteria
for assessment namely; economic, social and environmental sustainability. The table below shows a the various development strategies and their score.
S/N Strategy/ Activity Economic
Sustainability
Social
Sustainability
Environmental
Sustainability
Total Average
1 Revalue property 4 4 4 12 4
2 Prepare District Composite Budget 4 4 5 13 4.3
3 Create data base on revenue items 4 4 5 13 4.3
4 Construct market stalls 5 5 3 13 4.3
5 Renovate and expand markets 5 5 3 13 4.3
6 Support street naming exercise 4 4 3 11 3.7
7 Organise training for MSMEs 4 5 4 13 4.3
8 Organise training for farmers in accessing financial support 4 4 4 12 4
9 Facilitate cocoa spraying programme 4 4 3 11 3.7
10 Provide extension services to farmers 4 4 5 13 4.3
11 Organise training for AEA’s annually 4 4 4 12 4
12 Provide extension knowledge and vaccination in livestock
production
4 4 4 12 4
13 Plants trees in affected communities 4 5 5 14 4.6
14 Monitor activities of illegal lumbering/ chainsaw activities 4 4 5 13 4.3
15 Organise training for small scale mining companies in the District 4 4 4 12 4
16 Monitor activities of small scale mining companies 4 4 4 12 4
17 Engage private sector and other stakeholders in development of
tourist sites
5 4 4 13 4.3
18 Support NADMO to perform its functions of disaster prevention and
management annually
4 5 4 13 4.3
19 Renovate and maintain staff quarters 4 5 3 12 4
20 Construct 10No. Teachers Quarters 4 5 3 12 4
21 Construction of Dormitories for Women and Children 4 5 3 12 4
22 Prepare planning schemes for communities 4 4 4 12 4
23 Construct drains to improve upon the drainage system 4 4 4 12 4
24 Construct 2 No. Staff Quarters at New Edubiase 4 5 3 12 4
117
25 Repair and maintain 80 km feeder/ access roads 4 4 3 11 3.7
26 Expansion and maintenance of lorry parks 5 4 3 12 4
27 Construction of culverts 4 4 3 11 3.7
28 Service and repair 14 No. computers and accessories, photocopier
and intercom annually
4 4 4 12 4
29 Provide low tension poles to extend electricity to selected
communities
5 5 3 13 4.3
30 Construct CHPS Compound 4 4 3 11 3.7
31 Construct additional wards for Health Centre 4 5 3 12 4
32 Provide maternal waiting homes 4 5 3 12 4
33 Construct sheds and toilets for NHIS office 4 5 3 12 4
34 Construct 1 No. 6 Unit Classroom Block 4 5 3 12 4
35 Construct 10 No.3 Unit Classroom Block 4 4 3 11 3.7
36 Education fund disbursed to needy students 4 5 3 12 4
37 Construct 1 No.12 Unit Classroom block with ancillary facilities 4 4 3 11 3.7
38 Construct 5 No.6 Unit Classroom Block 4 4 3 11 3.7
39 Construct 1 No. 3 Unit Classroom with ancillary facilities 4 5 3 12 4
40 Rehabilitation of 10 No. Schools 4 5 3 12 4
41 Organise mass education meetings annually 4 4 3 11 3.7
42 Support the development of sports in the District annually 5 4 3 12 4
43 Facilitate school feeding programme 5 5 3 13 4.3
44 Organise workshop on Family Planning Methods 5 5 3 13 4.3
45 Subsidise FP methods 5 5 3 13 4.3
46 Support WATSAN and other agencies in potable water delivery 5 5 3 13 4.3
47 Provide for fumigation and sanitation 4 4 5 13 4.3
48 Clearing of final dump sites 4 4 5 13 4.3
49 Construction of K.V.I.Ps 5 4 4 13 4.3
50 Construct 1 No. 14 Seater Water Closet with mechanised borehole 4 4 3 11 3.7
51 Support District Response Initiative (Malaria Control Programme)
annually
4 4 3 11 3.7
52 Pay transfer grants to officials posted to the District 4 4 3 11 3.7
53 Pay responsibility allowance to staff 4 4 3 11 3.7
54 Ensure minor repair/ maintenance of office machines and furniture 4 4 3 11 3.7
55 Purchase adequate stationary for office use annually 4 4 3 11 3.7
56 Print calendars and other materials annually 4 4 3 11 3.7
57 Procure office facilities and furniture for the Assembly office every 4 4 3 11 3.7
118
year
58 Purchase 10 newspapers and publications to offices and library daily 4 4 3 11 3.7
59 Provide refreshment items to the Assembly office 4 4 3 11 3.7
60 Provide protocol fuel to Assembly officials and official guests for
official duties throughout the year
4 4 3 11 3.7
61 Organise workshops and other training programmes for Assembly
staff, Assembly members, Heads of Department annually
4 5 3 12 4
62 Organise end of year best worker award and staff durbars 4 5 3 12 4
63 Sponsor Assembly staff, Assembly members and others to attend
workshop and other training programmes throughout the year
4 5 3 12 4
64 Provide for travelling and transport for staff who perform official
duties
4 4 3 11 3.7
65 Maintain and repair official vehicle and Assembly grader 4 5 3 12 4
66 Engage consultants to train relevant staff of the Assembly and
Assembly members
4 4 3 11 3.7
67 Screening of food vendors 5 5 3 13 4.3
68 Support DEOC in its activities 4 5 3 12 4
69 Provide adequate value books for revenue collection 5 4 3 12 4
70 Give logistics to revenue collectors 5 5 3 13 4.3
71 Organise revenue mobilisation campaign and education quarterly
each year
4 4 3 11 3.7
72 Revise and gazette fee-fixing resolutions annually 5 4 3 12 4
73 Pay commission to commissioned collectors 5 5 3 13 4.3
74 Organise stakeholders meetings / public fora 4 4 3 11 3.7
75 Ensure effective implementation of DPCU activities 4 5 3 12 4
76 Preparation of District Medium Term Development Framework 4 4 3 11 3.7
77 Pay utility bills for the Assembly 4 5 3 12 4
78 Purchase building materials to support community initiated projects 4 5 3 12 4
79 Support Town/ Area Councils in performing their duties 4 5 3 12 4
80 Implement MP constituency programmes and projects annually 4 5 3 12 4
81 Organise quarterly Heads of Department meetings 4 4 3 13 4.3
82 Publish Assembly activities and gazette by-laws 5 5 3 13 4.3
83 Monitor and evaluate District Assembly projects 4 4 3 11 3.7
84 Support HIV/AIDS (MSHAP) annually 4 4 3 11 3.7
85 Organise site inspections throughout the year 4 4 3 11 3.7
86 Implement Disability Fund 4 5 3 12 4
119
87 Support paupers, children and physically challenged annually 4 5 3 12 4
88 Support Traditional Authorities Allowance 4 4 3 11 3.7
89 Organise 4 Official National Day Celebrations 4 5 3 12 4
90 Construct 1 No.4 Unit Police Staff Quarters 5 5 3 13 4.3
91 Provide legal/security expenses of the Assembly 4 4 3 11 3.7
92 Organise monthly District Security Committee (DISEC) meetings 4 4 3 11 3.7
93 Procure insurance cover for Assembly official vehicles and valuable
properties
4 5 3 12 4
94 Organise a road safety campaign 4 5 3 12 4
95 Support UNFPA Sixth Country Programme 4 4 3 11 3.7
96 Renovation of District Health Directorate Offices 4 5 2 11 3.7
97 Organise a workshop on the role of Judiciary in development 4 5 3 12 4
98 Renovate and maintain Assembly Guest House 5 5 2 12 4
99 Construct community centres 4 5 2 11 3.7
100 Organise a training on fire prevention and management 4 4 3 11 3.7
101 Construct 1 No. 3 Unit teachers quarters 4 4 3 11 3.7
102 Renovate and maintain Assembly centres 5 5 3 13 4.3
103 Provide a quantity of streetlight bulbs 4 4 3 11 3.7
104 Procure septic tank emptier 5 5 4 14 4.6
Total 415 473 321
Average 3.9 4.5 3 3.8
Score: 5- Strongly support the aim
4- Supports the aim
3- On balance. Has a neutral effect on the aim
2- Works against the aim
1- Works strongly against the aim
The results of the sustainability test show an average of 3.8 which shows a strong relationship Thus when the programmes and projects are implemented
there will be economic sustainability, social sustainability and environmental sustainability.
120
CHAPTER FOUR
PROGRAMME OF ACTION
This chapter outlines the development programmes under the MTDPF 2014-2017 of Adansi South District Assembly. It shows the programmes/
projects under the various thematic areas of the NMTDPF, the indicative budget, sources of funds and stakeholder responsible. The time frame is also
indicated in the table.
SECTOR LOCATION TIME FRAME INDICATIVE
BUDGET
INDICATORS SOURCES OF FUNDING IMPLEMENTI
NG DEPT OF
DA
2014 2015 2016 2017 IGF GOG
/
DDF
Dono
r
DAC
F
Lead Colla
bo.
Thematic Area: Ensuring and Sustaining Macroeconomic Stability
District Goal: Promoting and Sustaining Efficient Public Expenditure
Objective: Improve Public Expenditure Management
Re-value property DA 40,000.00 Property
revaluation
completed
√ Central
Admin.
DA
Prepare District Composite
Budget
DA 20,000.00 District Composite
Budget prepared
√ Central
Admin.
DA
Create a data base on revenue
items
DA 10,000.00 Data base on
revenue items
created
√ Central
Admin.
DA
Thematic Area: Enhancing competitiveness of Ghana’s private sector
District Goal: Enhancing Sustained MSMEs Performance
Objective :Expand access to both domestic and international markets
Construct market stalls/ stores Adansi
Praso,
N/E Mk.
Wuruyie
Jun.
Akrofuom
300,000.00 Market stalls
constructed
10.
000
.00
10,0
00.0
0
10,00
0.00
Works
Dept.
DA
121
Renovate and expand
markets
Subriso,
Akrofuom
100,000.00 Market renovated √ Works
Dept.
DA
Support street naming
exercise
District
Wide
80,000.00 Street naming
implemented
40,
000
.00
40,00
0.00
Physical
Plannin
g Dept.
DA
Objective : Improve efficiency and competitiveness of MSMEs
Organise Training for
MSMEs
District
Wide
20,000.00 MSMEs trained √ Central
Admin.
DA
Thematic Area: Accelerated agricultural modernisation and sustainable natural resource management
District Goal: Sustained Agricultural Production and Natural Resource Management
Objective: Improve Agriculture Financing
Organise training for farmers
in accessing financial support
District
Wide
10,000.00 Farmers trained on
how accessing
financial support
5,0
00.
00
5,000
.00
Agric.
Dept.
DA
Objective: Improve science, technology and innovation application
Facilitate cocoa spraying
programme
District
Wide
50,000.00 Cocoa spraying
facilitated
10,
000
.00
10,0
00.0
0
10,0
00.0
0
20,00
0.00
Agric.
Dept.
DA
Provide extension services to
farmers
District
Wide
20,000.00 Extension services
provided to
farmers
10,0
00.0
0
10,00
0.00
Agric.
Dept.
Organise training for AEA’s
annually
District
Wide
20,000.00 Training organised
for AEAs
10,
000
.00
10,0
00.0
0
Agric.
Dept.
DA
Provide extension knowledge
and vaccination in livestock
production
District
Wide
20,000.00 Vaccination given
to livestock
10,0
00.0
0
10,00
0.00
Agric.
Dept.
DA
Objective: Reverse forest and land degradation
Plants trees in affected
communities
District
Wide
30,000.00 Trees planted in
communities
10,
000
.00
20,00
0.00
FSD DA
Monitor activities of illegal
lumbering/ chainsaw activities
District
Wide
20,000.00 Forest activities
monitored √ FSD DA
122
Objective: Promote sustainable extraction and use of mineral resources
Organise training for small
scale mining companies in the
District
New
Edubiase
10,000.00 Training organised
for small scale
mining companies
√ Central
Admin.
DA
Monitor activities of small
scale mining companies
District
Wide
20,000.00 Mining companies
monitored on their
activities
10,
000
.00
10,00
0.00
Central
Admin
DISE
C
Objective: Diversify and expand the tourism industry for economic development
Engage private sector and
other stakeholders in
development of tourist sites
Bonkro,
Birim Aboi,
Hwidiem
30,000.00 Stakeholders
consulted in
developing tourist
sites
10,0
00.0
0
20,00
0.00
Central
Admin
DA/
FSD/
NGO
s/ TA
Thematic Area: Infrastructure and Human Settlements Development
District Goal:
Objective: Promote proactive planning for disaster prevention and mitigation
Support NADMO to perform
its functions of disaster
prevention and management
annually
District
Wide
20,000.00 NADMO
supported in its
activities
√ NADMO DA
Organise a training on fire
prevention and management
District
Wide
15,000.00 Training on fire
prevention and
management
organised
√ GNFS DA
Objective: Improve and accelerate housing delivery in the rural areas
Renovate and maintain staff
quarters
New
Edubiase
100,000.00 Staff quarters
renovated and
maintained
√ Works
Dept.
DA
Construct 1 No.3 Unit
teachers quarters
Akrofuom 80,000.00 1No. 3 unit
teachers quarters
constructed
√ Works
Dept.
DA
Construct 10 No. Teachers
quarters
District
Wide
2,000,000.00 10 No. teachers
quarters
constructed
1,50
0.00
0.00
500,0
00.00
Works
Dept.
DA
123
Construction of Dormitories
for Women and Children
Akrofuom 400,000.00 Dormitories for
women and
children
constructed
√ Works
Dept.
DA
Prepare planning schemes for
communities
New
Edubiase,
Akrofuom,
Apagya,
Atobiase,
Amudurasi,
Praso, etc.
80,000.00 Layouts for
settlements
prepared
√ Physical
Planning
Dept.
DA/
TA
Construct drains to improve
upon the drainage system
District
Wide
100,000.00 Drains constructed
in communities
50,0
00.0
0
50,00
0.00
Works
Dept.
DA
Objective: Increase access to adequate , safe, secure and affordable shelter
Construct 2 No. Staff
Quarters at New Edubiase
New
Edubiase
200,000.00 2 No. Staff
Quarters
constructed
√ Works
Dept.
DA
Objective : Establish Ghana as a transportation hub for the West African sub-region
Repair and maintain 80 km
feeder/ access roads
District
Wide
40,000.00 Feeder and access
roads maintained
200
,00
0.0
0
200,0
00.00
Feeder
Rds.
Dept.
DA
Expansion and maintenance
of lorry parks
New
Edubiase,
Akrofuom
80,000.00 Lorry parks
expanded and
maintained
20,0
00.0
0
60,00
0.00
Works
Dept.
DA
Construction of culverts Tonkoase,
Boatenkrom
Akrofuom,
Denyameso,
Old Asaman
120,000.00 Culverts
constructed
60,0
00.0
0
60,00
0.00
Works
Dept.
DA
Objective: Promote rapid development and deployment of the national ICT infrastructure
Service and repair 14 No.
computers and accessories,
photocopier and intercom
DA 10,000.00 Computers and
accessories,
photocopier and
5,0
00.
00
5,000
.00
Central
Admin.
DA
124
annually intercom serviced
Objective: Develop social, community and recreational facilities
Renovate and maintain
Assembly Guest House
New
Edubiase
40,000.00 Assembly Guest
House maintained
√ Works
Dept.
DA
Construct community centres District
Wide
100,000.00 Community
centres constructed
50,
000
.00
50,00
0.00
Objective :Provide adequate, reliable and affordable energy to meet the national needs and for export
Provide low tension poles to
extend electricity to selected
communities
District
Wide
150,000.00 Electricity
extended to
communities
√ ECG DA
Provide a quantity of street
light bulbs to communities
District
Wide
60,000.00 Street light bulbs
provided
√ Works
Dept.
DA
Thematic Area: Human Development, Productivity and Employment
District Goal:
Objective: Bridge the equity gaps in access to health care
Construct CHPS Compound Tweapiase,
Mprechre
and other
two
communitie
s
600,000.00 CHPS Compound
constructed
√ Works
Dept.
DA
Construct additional wards for
Health Centre
Ataase 120,000.00 Additional wards
constructed
60,0
00.0
0
60,00
0.00
Works
Dept.
DA
Provide maternal waiting
homes
All health
centers
30,000.00 Maternal waiting
homes provided
15,0
00.0
0
15,00
0.00
Works
Dept.
DA
Construct sheds and toilet
facilities for NHIS office
New
Edubiase
10,000.00 Shed and toilets
constructed
√ Works
Dept.
DA
Objective: Increase inclusive and equitable access to, and participation in education at all levels
Construct 1 No. 6 Unit
Classroom Block
Akrofuom 100,000.00 1No. 6 Unit
Classroom Block
constructed
√ Works
Dept.
DA
125
Construct 10 No.3 Unit
Classroom Block
Ankaase,
Kramokrom
, Ataase
Nkwanta,
Samamkro
m and other
communitie
s
1,500,000.0
0
10 No.3 Unit
Classroom Blocks
constructed
1,00
0,00
0.00
500,0
00.00
Works
Dept.
DA
Education fund disbursed to
needy students
District
Wide
20,000.00 Education fund
provided
√ DED DA
Construct 1 No.12 Unit
Classroom block with
ancillary facilities
New
Edubiase
Methodist
640,000.00 1 No. 12 Unit
Classroom Block
with ancillary
facilities
constructed
√ Works
Dep.
DA
Construct 5 No.6 Unit
Classroom Block
District
Wide
1,000,000.0
0
5 No.6 Unit
Classroom Blocks
constructed
600,
000.
00
400,0
00.00
Works
Dept.
DA
Construct 1 No. 3 Unit
Classroom with ancillary
facilities
Avornyokro
m
100,000.00 1 No. 3 Unit
Classroom Block
constructed
√ Works
Dept.
DA
Rehabilitation of 10 No.
Schools
District
Wide
300,000.00 10 No. Schools
rehabilitated
√ Works
Dept.
DA
Organise mass education
meetings annually
District
Wide
10,000.00 Mass education
meetings
organised
5,0
00.
00
5,000
.00
SW&CD DA
Objective: Provide adequate and disability friendly infrastructure for sports in communities and schools
Support the development of
sports in the District annually
District
Wide
20,000.00 Sports
development
supported
√ Central
Admin.
DA
Facilitate school feeding
programme
District
Wide
1,772,000.0
0
School feeding
program facilitated
√ NSFP/
DED
DA
Objective: Reinforce family planning as a priority in national development
Organise workshop on Family
Planning Methods
District
Wide
20,000.00 Workshop
organised
10,0
00.0
10,00
0.00
DHD DA
126
0
Subsidise FP methods District
Wide
10,000.00 FP methods
subsidised
5,00
0.00
5,000
.00
DHD DA
Objective: Accelerate the provision of adequate, safe and affordable water
Support WATSAN and other
agencies in potable water
delivery
District
Wide
100,000.00 Potable water
provided
√ Works
Dept.
DA
Objective: Accelerate the provision of improved environmental sanitation facilities
Provide for fumigation and
sanitation
District
Wide
848,000.00 Sanitation and
fumigation
provided
√ Environ
mental.
Health
Dept.
DA
Clearing of final dump sites District
Wide
100,000.00 Dump sites cleared √ “ DA
Construction of K.V.I.P Tonkoase,
Hwidiem,
Suminam,
Akrofuom
East, Kojo
Yentumi,
Wuruyie,
Nana Okai,
Yaa Dome,
Anokyekro
m
300,000.00
K.V.I.Ps
constructed
√ Works
Dept.
DA
Construct 1 No. 14 Seater
Water Closet with
mechanised borehole
New
Edubiase
Market
90,000.00 1 No. 14 Seater
WC constructed
DDF Works
Dept.
DA
Procure septic tank emptier DA 120,000.00 Septic tank
emptier procured
DDF √ Central
Admin.
DA
Support District Response
Initiative (Malaria Control
Programme) annually
District
Wide
25,000.00 Malaria Control
Program supported
√ AGA
Mal
DA
Objective: Improve the policy, environment and institutional capacity for effective human capital development, and employment policy
127
Pay transfer grants to officials
posted to the District
DA 20,000.00 Transfer grants
provided √ Central
Admin.
DA
Pay responsibility allowance
to staff
DA 10,000.00 Responsibility
allowance paid √ Central
Admin.
DA
Ensure minor repair/
maintenance of office
machines and furniture
DA 10,000.00 Office machines
and furniture
repaired
√ Central
Admin.
DA
Purchase adequate stationary
for office use annually
DA 20,000.00 Stationary
purchased for use √ Central
Admin.
DA
Print calendars and other
materials annually
DA 10,000.00 Calendars printed √ Central
Admin.
DA
Procure office facilities and
furniture for the Assembly
office every year
DA 100,000.00 Office facilities
and furniture
provided
√ Central
Admin.
DA
Purchase 10 newspapers and
publications to offices and
library daily
DA 10,000.00 Newspapers and
publications
provided
√ Central
Admin.
DA
Provide refreshment items to
the Assembly office
DA 10,000.00 Refreshment items
procured √ Central
Admin.
DA
Provide protocol fuel to
Assembly officials and
official guests for official
duties throughout the year
DA 40,000.00 Protocol fuel
provided for
official activities
√ Central
Admin.
DA
Organise workshops and other
training programmes for
Assembly staff, Assembly
members, Heads of
Department annually
DA 40,000.00 Workshops and
other training
organised
√ Central
Admin.
DA
Organise end of year best
worker award and staff
durbars
DA 20,000.00 Awards and staff
durbars organised √ Central
Admin.
DA
Sponsor Assembly staff,
Assembly members and
others to attend workshop and
other training programmes
throughout the year
DA 20,000.00 Assembly
members and staff
supported to attend
training
√ Central
Admin.
DA
Provide for travelling and DA 20,000.00 Travelling and √ Central DA
128
transport for staff who
perform official duties
transport provided Admin.
Maintain and repair official
vehicle and Assembly grader
DA 40,000.00 Office vehicles
and grader
maintained
√ √ Central
Admin.
DA
Engage consultants to train
relevant staff of the Assembly
and Assembly members
DA 100,000.00 Assembly staff and
members trained
by consultant
√ Central
Admin
DA
Support UNFPA Sixth
Country Programme
DA 100,000.00 UNFPA Sixth
Country
Programme
supported
√ DED/
SW&CD
/ DHS
DA
Screening of food vendors District
Wide
10,000.00 Food vendors
screened for
diseases
√ Environ
mental
Health
Dept.
DA
Renovation of District Health
Directorate Offices
New
Edubiase
30,000.00 DHD offices
renovated √ Works
Dept.
DA
Organise a road safety
campaign
District
Wide
15,000.00 Road safety
campaign
organised
√ Central
Administ
ration
DA
Objective: Advance the implementation of the compulsory component of FCUBE
Support DEOC in its activities DA 10,000.00 DEOC supported
in its activities
√ DED DA
Thematic Area: Transparent and Accountable Governance
District Goal:
Objective: Ensure effective and efficient resource mobilization, internal revenue generation and resource management
Provide adequate value books
for revenue collection
DA 6,000.00 Value books
provided to
revenue collectors
√ Central
Admin.
DA
Give logistics to revenue
collectors
DA 10,000.00 Logistics provided
to revenue
collectors
√ Central
Admin.
DA
Organise revenue
mobilisation campaign and
DA 10,000.00 Revenue
mobilisation √ Central
Admin.
DA
129
education quarterly each year campaign and
education
organised
Revise and gazette fee-fixing
resolutions annually
DA 20,000.00 Fee fixing revised
and gazetted √ Central
Admin.
DA
Pay commission to
commissioned collectors
DA 20,000.00 Commission paid
to commissioned
collectors
√ Central
Admin.
DA
Objective: Ensure effective implementation of the decentralisation policy and programmes
Organise stakeholders
meetings / public for a
DA 20,000.00 Stakeholders
meetings
organised
10,
000
.00
10,00
0.00
Central
Admin.
DA
Ensure effective
implementation of DPCU
activities
DA 20,000.00 DPCU activities
implemented
√ DPCU DA
Preparation of District
Medium Term Development
Framework
DA 40,000.00 DMTDF prepared √ DPCU DA
Pay utility bills for the
Assembly
DA 20,000.00 Utility bills paid √ Central
Admin.
DA
Purchase building materials to
support community initiated
projects
DA 60,000.00 Building materials
purchased to
support
community
initiated projects
30,
000
.00
30,00
0.00
Works
Dept.
DA
Support Town/ Area Councils
in performing their duties
DA 20,000.00 Town/ Area
Councils
supported
√ Central
Admin.
DA
Implement MPs constituency
programmes and projects
annually
District
Wide
400,000.00 MPs constituency
programmes
implemented
MP MPs DA
Organise quarterly Heads of
Department meetings
DA 10,000.00 Heads of
Department
meetings
organised
√ Central
Admin.
DA
Organise 10 durbars for DA 60,000.00 10 durbars 3,0 3,000 Central DA
130
official functions annually organised for
official functions
00.
00
.00 Admin.
Objective: Strengthen and promote the culture of rights and responsibilities
Publish Assembly activities
and gazette by-laws
DA 30,000.00 Assembly by-laws
gazetted √ Central
Admin.
DA
Objective: Strengthen policy formulation, development planning, and M&E processes for equitable and balanced spatial and socio- economic
development
Monitor and evaluate District
Assembly projects
District
Wide
40,000.00 M&E carried out
on projects
√ DPCU DA
Support HIV/AIDS (MSHAP)
annually
DA 20,000.00 MSHAP activities
supported
√ Central
Admin.
DA
Organise site inspections
throughout the year
DA 20,000.00 Site inspections
organised
10,
000
.00
10,00
0.00
Works
Dept.
DA
Objective: Ensure equity and social cohesion at all levels of society
Implement Disability Fund 100,000.00 Disability Fund
implemented
√ SW&CD DA
Support paupers, children and
physically challenged
annually
District
Wide
20,000.00 Paupers, children
and physically
challenged
supported
10,
000
.00
10,0
00.0
0
SW&CD DA
Objective: Enhance public confidence in the justice delivery and administrative systems
Organise a workshop on role
of Judiciary in development
District
Wide
10,000.00 Workshop
organised √ Central
Admin.
DA
Objective: Harness culture for national development
Support Traditional
Authorities Allowance
District
Wide
20,000.00 Traditional
Authority
Allowance
provided
√ Central
Admin.
DA
Organise 4 Official National
Day Celebrations
DA 100,000.00 4 Official National
Day Celebrations
organised
√ Central
Admin.
DA
131
Objective: Improve internal security for protection of life and property
Construct 1 No.4 Unit Police
Staff Quarters
Akrofuom 150,000.00 1 No 4 Unit police
Staff Quarters
constructed
√ GPS DA
Construct Police Post Obonsu,
Atwereboa,
Akrofuom
West
200,000.00 Police Post
constructed
10,
000
.00
10,00
0.00
GPS DA
Provide legal/security
expenses of the Assembly
DA 10,000.00 Legal/ security
services provided
5,0
00.
00
5,000
.00
Central
Admin.
DA
Organise monthly District
Security Committee (DISEC)
meetings
DA 10,000.00 DISEC meetings
organised
√ Central
Admin.
DA
Procure insurance cover for
Assembly official vehicles
and valuable items
DA 40,000.00 Insurance cover
procured √ Central
Admin.
DA
Maintain adequate security in
the District annually
District
Wide
20,000.00 Security
maintained in the
District
√ GPS DA
132
CHAPTER FIVE
DISTRICT ANNUAL ACTION PLANS
This section of the report presents the Annual Action Plans for the four year period (2014-2017)
Table 5.1 ANNUAL ACTION PLAN 2014
S/
N PLANNED
PROGRAMME/
PROJECTS/
ACTIVITY
LOCATION INDICATOR TIMING RESP.
PERS/DEPT/
AGENCY
COLLABORATING
PERSON/
DEPARTMENT
AGENCY
COST SOURCE
OF
FUNDS
RE
MA
RKS START END
1 Revalue property District
Wide
Properties
revaluation
done
Jan Dec Central
Admin.
ASDA 10,000.00 DACF
2 Prepare District
Composite Budget
DA District
Composite
Budget
prepared
Jun Oct Central
Admin.
ASDA 5,000.00 DACF
3 Create data base on
revenue items
DA Data base on
revenue
items created
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
4 Construct market
stalls
Adansi
Praso, New
Edubiase,
Wuruyie
Junction,
Akrofuom
Market stalls
constructed
Jan Dec Works Dept. ASDA 100,000.00 IGF,
DACF,
DDF
5 Renovate and
expand markets
Subriso ,
Akrofuom
Markets
renovated
and
expanded
Jan Dec Works Dept. ASDA 5,000.00 IGF
6 Support street
naming exercise
District
Wide
Street
naming
implemented
Jan Dec Physical
Planning
Dept.
ASDA 40,000.00 DACF
7 Organise training for
MSMEs
District
Wide
MSMEs
training
Jan Sept Central
Admin.
ASDA 5,000.00 DACF
133
organised
8 Facilitate cocoa
spraying programme
District
Wide
Cocoa
spraying
facilitated
Jan Dec Agric. Dept. ASDA 12,500.00 IGF,
DDF,
Donor,
DACF
9 Provide extension
services to farmers
District
Wide
Extension
services
provided to
farmers
Jan Dec Agric. Dept. ASDA 5,000.00 DDF,
DACF
10 Organise training for
AEA’s annually
District
Wide
Training
organised for
AEAs
Jan Sept Agric. Dept. ASDA 5,000.00 IGF,
DDF
11 Provide extension
knowledge and
vaccination in
livestock production
District
Wide
Vaccination
given to
livestock
Jan Dec Agric. Dept. ASDA 5,000.00 DDF,
DACF
12 Monitor activities of
illegal lumbering/
chainsaw activities
District
Wide
Forest
activities
monitored
Jan Dec FSD ASDA 5,000.00 IGF
13 Support NADMO to
perform its functions
of disaster prevention
and management
annually
District
Wide
NADMO
supported in
its activities
Jan Dec NADMO ASDA 5,000.00 DACF
14 Construct 1 No.3
Unit Teachers
Quarters
Akrofuom 1 No. 3 Unit
Teachers
Quarters
constructed
Jan Dec Works Dept. ASDA 80,000.00 DACF
15 Construct 10No.
Teachers Quarters
District
Wide
10 No.
Teachers
Quarters
constructed
Jan Dec Works Dept. ASDA 20,000.00 DACF,
DDF
16 Construction of
Dormitories for
Women and Children
Akrofuom Dormitories
for women
and children
constructed
Jan Dec Works Dept. ASDA 100,000.00 DDF/
GOG
17 Prepare planning New Layouts for Jan Dec Physical ASDA 20,000.00 DACF,
134
schemes for
communities
Edubiase,
Akrofuom,
Apagya,
Atobiase,
Amudurasi,
Praso
settlements
prepared
Planning
Dept.
DDF
18 Repair and maintain
80 km feeder/ access
roads
District
Wide
80km feeder/
access roads
repaired
Jan Dec Works Dept. ASDA 10,000.00 DACF,
IGF
19 Service and repair 14
No. computers and
accessories,
photocopier and
intercom annually
DA Computers,
accessories,
photocopier
and intercom
serviced
Jan Dec Central
Admin.
ASDA 2,500.00 DACF,
IGF
20 Construct CHPS
Compound
Tweapiase
and
Mprechre
CHPS
Compound
constructed
Jan Dec Works Dept. ASDA 150,000.00 DACF
21 Construct 1 No. 6
Unit Classroom
Block
Akrofuom 1 No. 6 Unit
Classroom
Block
constructed
Jan Dec Works Dept. ASDA 50,000.00 DDF
22 Construct 10 No.3
Unit Classroom
Block
District
Wide
10 No. 3
Unit
Classroom
Block
constructed
Jan Dec Works Dept. ASDA 500,000.00 DACF,
DDF
23 Construct 1 No.12
Unit Classroom
block with ancillary
facilities
New
Edubiase
1 No. 12
Unit
Classroom
Block with
ancillary
facilities
constructed
Jan Dec Works Dept. ASDA 180,000.00 DDF
24 Construct 5 No.6
Unit Classroom
Block
District
Wide
5 No. 6 Unit
Classroom
Block
constructed
Jan Dec Works Dept. ASDA 250,000.00 DACF,
DDF
135
25 Construct 1 No. 3
Unit Classroom with
ancillary facilities
Avornyokro
m
1 No.3 Unit
Classroom
Block
constructed
Jan Dec Works Dept. ASDA 50,000.00 DDF
26 Support the
development of
sports in the District
annually
District
Wide
Sports
development
supported
Jan Dec Central
Admin.
ASDA 2,500.00 DACF
27 Facilitate school
feeding programme
District
Wide
School
feeding
program
facilitated
Jan Dec NSFP/ GES ASDA 60,000.00 Donor
28 Organise workshop
on Family Planning
Methods
District
Wide
Workshop
organised
Jan Dec DHD ASDA 5,000.00 Donor,
DACF
29 Support WATSAN
and other agencies in
potable water
delivery
District
Wide
Potable water
provided
Jan Dec CWSA ASDA 25,000.00 DACF,
DDF,
IGF,
Donor
30 Provide for
fumigation and
sanitation
District
Wide
Sanitation
and
fumigation
provided
Jan Dec Environment
al Health
Dept.
ASDA 212,000.00 DACF
31 Clearing of final
dump sites
District
Wide
Dump sites
cleared
Jan Dec Environment
al Health
Dept.
ASDA 25,000.00 DACF
32 Construct 1 No. 14
Seater Water Closet
with mechanised
borehole
New
Edubiase
Market
1 No. 14
seater WC
constructed
Jan Dec Works Dept. ASDA 20,000.00 DDF
33 Support District
Response Initiative
(Malaria Control
Programme)
annually
District
Wide
Malaria
control
program
supported
Jan Dec AGA Mal ASDA 5,000.00 DACF
34 Pay transfer grants to
officials posted to the
DA Transfer
grants
Jan Dec Central
Admin
ASDA 5,000.00 IGF
136
District provided
35 Pay responsibility
allowance to staff
DA Responsibilit
y allowance
paid
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
36 Ensure minor repair/
maintenance of
office machines and
furniture
DA Office
machines and
furniture
repaired
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
37 Purchase adequate
stationary for office
use annually
DA Stationary
purchased for
use
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
38 Print calendars and
other materials
annually
DA Calendars
printed
Jan March Central
Admin
ASDA 2,500.00 IGF
39 Procure office
facilities and
furniture for the
Assembly office
every year
DA Office
facilities and
furniture
provided
Jan Dec Central
Admin.
ASDA 25,000.00 IGF
40 Purchase 10
newspapers and
publications to
offices and library
daily
DA Newspapers
and
publications
provided
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
41 Provide refreshment
items to the
Assembly office
DA Refreshment
items
provided
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
42 Provide protocol fuel
to Assembly officials
and official guests
for official duties
throughout the year
DA Protocol fuel
provided for
official
activities
Jan Dec Central
Admin.
ASDA 10,000.00 IGF
43 Organise workshops
and other training
programmes for
Assembly staff,
Assembly members,
DA Workshops
and other
training
organised
Jan Dec Central
Admin.
ASDA 10,000.00 IGF
137
Heads of Department
annually
44 Organise end of year
best worker award
and staff durbars
DA Awards and
staff durbars
organised
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
45 Sponsor Assembly
staff, Assembly
members and others
to attend workshop
and other training
programmes
throughout the year
DA Assembly
members and
staff
supported to
attend
training
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
46 Provide for travelling
and transport for
staff who perform
official duties
DA Travelling
and transport
provided
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
47 Maintain and repair
official vehicle and
Assembly grader
DA Office
vehicles and
grader
maintained
Jan Dec Central
Admin.
ASDA 10,000.00 IGF,
DACF
48 Engage consultants
to train relevant staff
of the Assembly and
Assembly members
DA Assembly
staff and
members
trained by
consultant
Jan Dec Central
Admin.
ASDA 25,000.00 DDF
49 Support UNFPA
Sixth Country
Programme
DA UNFPA
Sixth
Country
Programme
supported
Jan Dec DED/
SW&CD/
DHS
ASDA 100,000.00 UNFPA
50 Screening of food
vendors
District
Wide
Food vendors
screened
Jan Dec Environment
al Health
Dept.
ASDA 2,500.00 IGF
51 Support DEOC in its
activities
DA DEOC
Supported
Jan Dec DED ASDA 2,500.00 IGF,
DACF
52 Provide adequate
value books for
DA Value books
provided to
Jan Dec Central
Admin.
ASDA 1,500.00 IGF
138
revenue collection revenue
collectors
53 Give logistics to
revenue collectors
DA Logistics
provided to
revenue
collectors
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
54 Organise revenue
mobilisation
campaign and
education quarterly
each year
District
Wide
Revenue
mobilization
campaign
and
education
organised
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
55 Revise and gazette
fee-fixing resolutions
annually
DA Fee fixing
revised and
gazetted
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
56 Pay commission to
commissioned
collectors
DA Commission
paid to
commissione
d collectors
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
57 Organise
stakeholders
meetings / public for
a
DA Stakeholders
meeting
organised
Jan Dec Central
Admin.
ASDA 5,000.00 IGF,
DACF
58 Ensure effective
implementation of
DPCU activities
DA DPCU
activities
implementati
on
Jan Dec Central
Admin.
ASDA 5,000.00 DACF
59 Preparation of
District Medium
Term Development
Framework
DA DMTPF
prepared
Jan March DPCU ASDA 20,000.00 DACF
60 Pay utility bills for
the Assembly
DA Utility bills
paid
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
61 Purchase building
materials to support
community initiated
projects
DA Building
materials
purchased to
support
Jan Dec Works Dept. ASDA 15,000.00 IGF,
DACF
139
community
initiated
projects
62 Support Town/ Area
Councils in
performing their
duties
District
Wide
Town/ Area
Councils
supported
Jan Dec Central
Admin.
ASDA 5,000.00 DACF
Implement MP
constituency
programmes and
projects annually
District
Wide
MPs
constituency
programmes
implemented
Jan Dec MP ASDA 100,000.00 MPs
share of
DACF
63 Organise quarterly
Heads of Department
meetings
DA Heads of
Department
meetings
organised
Jan Dec Central
Admin.
ASDA 1,500.00 IGF
64 Organise 10 durbars
for official functions
annually
DA 10 durbars
organised for
official
functions
Jan Dec Central
Admin.
ASDA 2,500.00 IGF,
DACF
65 Publish Assembly
activities and gazette
by-laws
DA Assembly
by-laws
gazetted and
activities
gazetted
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
66 Monitor and evaluate
District Assembly
projects
DA M&E carried
out on
projects
Jan Dec DPCU ASDA 10,000.00 DACF
67 Support HIV/AIDS
(MSHAP) annually
DA MSHAP
activities
supported
Jan Dec Central
Admin.
ASDA 5,000.00 DACF
68 Organise site
inspections
throughout the year
DA Site
inspections
organised
throughout
the year
Jan Dec Works Dept. ASDA 5,000.00 IGF,
DACF
69 Implement Disability
Fund
DA Disability
fund
Jan Dec SW&CD ASDA 25,000.00 DACF
140
implemented
70 Support paupers,
children and
physically
challenged annually
District
Wide
Paupers,
children and
physically
challenged
supported
Jan Dec SW&CD ASDA 5,000.00 IGF,
GOG
71 Support Traditional
Authorities
Allowance
District
Wide
Traditional
authority
allowance
provided
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
72 Organise 4 Official
National Day
Celebrations
District
Wide
4 official
national day
celebrations
organised
Jan Dec Central
Admin.
ASDA 25,000.00 DACF
73 Construct 1 No.4
Unit Police Staff
Quarters
Akrofuom 1 No. 4 Unit
Police Staff
quarters
constructed
Jan Dec Works Dept. ASDA 50,000.00 DDF
74 Provide
legal/security
expenses of the
Assembly
DA Legal/
security
services
provided
Jan Dec Central
Admin.
ASDA 2,500.00 DACF,
IGF
75 Organise monthly
District Security
Committee (DISEC)
meetings
DA DISEC
meetings
organised
Jan Dec Central
Admin.
ASDA 2,500.00 DACF
76 Procure insurance
cover for Assembly
official vehicle
DA Insurance
cover
procured
Jan Dec Central
Admin.
ASDA 5,000.00 DACF
141
Table 5.2 ANNUAL ACTION PLAN 2015
S/
N PLANNED
PROGRAMME/
PROJECTS/
ACTIVITY
LOCATION INDICATOR TIMING RESP.
PERS/DEPT/
AGENCY
COLLABORATING
PERSON/
DEPARTMENT
AGENCY
COST SOURCE
OF
FUNDS
RE
MA
RKS START END
1 Revalue property District
Wide
Properties
revaluation
done
Jan Dec Central
Admin.
ASDA 10,000.00 DACF
2 Prepare District
Composite Budget
DA District
Composite
Budget
prepared
Jun Oct Central
Admin.
ASDA 5,000.00 DACF
3 Create data base on
revenue items
DA Data base on
revenue
items created
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
4 Construct market
stalls
Adansi
Praso, New
Edubiase,
Wuruyie
Junction,
Akrofuom
Market stalls
constructed
Jan Dec Works Dept. ASDA 150,000.00 IGF,
DACF,
DDF
5 Renovate and
expand markets
Subriso ,
Akrofuom
Markets
renovated
and
expanded
Jan Dec Works Dept. ASDA 5,000.00 IGF
6 Support street
naming exercise
District
Wide
Street
naming
implemented
Jan Dec Physical
Planning
Dept.
ASDA 40,000.00 DACF
7 Organise training for
MSMEs
District
Wide
MSMEs
training
organised
Jan Sept Central
Admin.
ASDA 5,000.00 DACF
8 Organise training for
farmers in accessing
financial support
District
Wide
Farmers
training
organised
Jan Sept Agric. Dept. ASDA 5,000.00 IGF,
DACF
9 Facilitate cocoa
spraying programme
District
Wide
Cocoa
spraying
facilitated
Jan Dec Agric. Dept. ASDA 12,500.00 IGF,
DDF,
Donor,
142
DACF
10 Provide extension
services to farmers
District
Wide
Extension
services
provided to
farmers
Jan Dec Agric. Dept. ASDA 5,000.00 DDF,
DACF
11 Organise training for
AEA’s annually
District
Wide
Training
organised for
AEAs
Jan Sept Agric. Dept. ASDA 5,000.00 IGF,
DDF
12 Provide extension
knowledge and
vaccination in
livestock production
District
Wide
Vaccination
given to
livestock
Jan Dec Agric. Dept. ASDA 5,000.00 DDF,
DACF
13 Plants trees in
affected communities
District
Wide
Trees planted
in
communities
March Oct FSD ASDA 10,000.00 IGF,
DACF
14 Monitor activities of
illegal lumbering/
chainsaw activities
District
Wide
Forest
activities
monitored
Jan Dec FSD ASDA 5,000.00 IGF
15 Organise training for
small scale mining
companies in the
District
District
Wide
Training
organised for
small scale
mining
companies
Jan Dec Central
Admin.
ASDA 10,000.00 IGF
16 Monitor activities of
small scale mining
companies
District
Wide
Mining
companies
activities
monitored
Jan Dec DISEC ASDA 10,000.00 IGF,
DACF
17 Engage private sector
and other
stakeholders in
development of
tourist sites
Bonkro,
Birim Aboi,
Hwidiem
Stakeholders
consulted in
developing
tourist sites
Jan Dec Central
Admin.
ASDA 10,000.00 DDF,
DACF
18 Support NADMO to
perform its functions
of disaster prevention
and management
annually
District
Wide
NADMO
supported in
its activities
Jan Dec NADMO ASDA 5,000.00 DACF
143
19 Renovate and
maintain staff
quarters
New
Edubiase
Staff quarters
renovated
and
maintained
Jan Dec Works Dept. ASDA 50,000.00 DACF
20 Construct 10No.
Teachers Quarters
District
Wide
10 No.
Teachers
Quarters
constructed
Jan Dec Works Dept. ASDA 600,000.00 DACF
21 Construction of
Dormitories for
Women and Children
Akrofuom Dormitories
for women
and children
constructed
Jan Dec Works Dept. ASDA 200,000.00 DDF/
GOG
22 Prepare planning
schemes for
communities
New
Edubiase,
Akrofuom,
Apagya,
Atobiase,
Amudurasi,
Praso
Layouts for
settlements
prepared
Jan Dec Physical
Planning
Dept.
ASDA 20,000.00 DACF,
DDF
23 Construct drains to
improve upon the
drainage system
District
Wide
Drains
constructed
in
communities
Jan Dec Works Dept. ASDA 30,000.00 DACF
24 Construct 2 No. Staff
Quarters at New
Edubiase
New
Edubiase
2 No. Staff
Quarters
constructed
Jan Dec Works Dept. ASDA 100,000.00 DACF
25 Repair and maintain
80 km feeder/ access
roads
District
Wide
80km feeder/
access roads
repaired
Jan Dec Works Dept. ASDA 10,000.00 DACF,
IGF
26 Expansion and
maintenance of lorry
parks
Akrofuom Lorry parks
expanded
and
maintained
Jan Dec Works Dept. ASDA 40,000.00 DACF,
DDF
Construction of
culverts
Tonkoase,
Danyeso,
Old Asaman
Culverts
constructed
Jan Dec Works Dept. ASDA 20,000.00 DACF,
DDF
27 Service and repair 14 DA Computers, Jan Dec Central ASDA 2,500.00 DACF,
144
No. computers and
accessories,
photocopier and
intercom annually
accessories,
photocopier
and intercom
serviced
Admin. IGF
28 Provide low tension
poles to extend
electricity to selected
communities
District
Wide
Electricity
extended to
communities
Jan Dec ECG ASDA 50,000.00 DACF
29 Construct CHPS
Compound
Tweapiase
and
Mprechre
CHPS
Compound
constructed
Jan Dec Works Dept. ASDA 150,000.00 DACF
30 Construct additional
wards for Health
Centre
Ataase Additional
wards
constructed
Jan Dec Works Dept. ASDA 60,000.00 DACF
31 Provide maternal
waiting homes
All health
centers
Maternal
waiting
homes
provided
Jan Dec Works Dept. ASDA 10,000.00 DDF,
DACF
32 Construct sheds and
toilets for NHIS
office
New
Edubiase
Sheds and
toilets
constructed
Jan Dec Works Dept. ASDA 10,000.00 DACF
33 Construct 1 No. 6
Unit Classroom
Block
Akrofuom 1 No. 6 Unit
Classroom
Block
constructed
Jan Dec Works Dept. ASDA 50,000.00 DDF
34 Construct 10 No.3
Unit Classroom
Block
District
Wide
10 No. 3
Unit
Classroom
Block
constructed
Jan Dec Works Dept. ASDA 400,000.00 DACF,
DDF
35 Education fund
disbursed to needy
students
District
Wide
Education
fund
provided
Jan Dec GES ASDA 10,000.00 DACF
36 Construct 1 No.12
Unit Classroom
block with ancillary
facilities
New
Edubiase
1 No. 12
Unit
Classroom
Block with
Jan Dec Works Dept. ASDA 460,000.00 DDF
145
ancillary
facilities
constructed
37 Construct 5 No.6
Unit Classroom
Block
District
Wide
5 No. 6 Unit
Classroom
Block
constructed
Jan Dec Works Dept. ASDA 250,000.00 DACF,
DDF
38 Construct 1 No. 3
Unit Classroom with
ancillary facilities
Avornyokro
m
1 No.3 Unit
Classroom
Block
constructed
Jan Dec Works Dept. ASDA 50,000.00 DDF
39 Rehabilitation of 10
No. Schools
District
Wide
10 No.
Schools
rehabilitated
Jan Dec Works Dept. ASDA 100,000.00 DACF
40 Organise mass
education meetings
annually
District
Wide
Mass
education
meetings
organised
Jan Dec SW&CD ASDA 30,000.00 IGF,
DACF
41 Support the
development of
sports in the District
annually
District
Wide
Sports
development
supported
Jan Dec Central
Admin.
ASDA 2,500.00 DACF
42 Facilitate school
feeding programme
District
Wide
School
feeding
program
facilitated
Jan Dec NSFP/ GES ASDA 60,000.00 Donor
43 Organise workshop
on Family Planning
Methods
District
Wide
Workshop
organised
Jan Dec DHD ASDA 5,000.00 Donor,
DACF
44 Subsidise FP
methods
District
Wide
FP methods
subsidised
Jan Dec DHD ASDA 3,000.00 Donor,
DACF
45 Support WATSAN
and other agencies in
potable water
delivery
District
Wide
Potable water
provided
Jan Dec CWSA ASDA 25,000.00 DACF,
DDF,
IGF,
Donor
46 Provide for
fumigation and
District
Wide
Sanitation
and
Jan Dec Environment
al Health
ASDA 212,000.00 DACF
146
sanitation fumigation
provided
Dept.
47 Clearing of final
dump sites
District
Wide
Dump sites
cleared
Jan Dec Environment
al Health
Dept.
ASDA 25,000.00 DACF
48 Construction of
K.V.I.P
District
Wide
K.V.I.Ps
constructed
Jan Dec Works Dept. ASDA 100,000.00 DACF
49 Construct 1 No. 14
Seater Water Closet
with mechanised
borehole
New
Edubiase
Market
1 No. 14
seater WC
constructed
Jan Dec Works Dept. ASDA 70,000.00 DDF
50 Support District
Response Initiative
(Malaria Control
Programme)
annually
District
Wide
Malaria
control
program
supported
Jan Dec AGA Mal ASDA 50,000.00 DACF
51 Pay transfer grants to
officials posted to the
District
DA Transfer
grants
provided
Jan Dec Central
Admin
ASDA 5,000.00 IGF
52 Pay responsibility
allowance to staff
DA Responsibilit
y allowance
paid
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
53 Ensure minor repair/
maintenance of
office machines and
furniture
DA Office
machines and
furniture
repaired
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
54 Purchase adequate
stationary for office
use annually
DA Stationary
purchased for
use
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
55 Print calendars and
other materials
annually
DA Calendars
printed
Jan March Central
Admin
ASDA 2,500.00 IGF
56 Procure office
facilities and
furniture for the
Assembly office
every year
DA Office
facilities and
furniture
provided
Jan Dec Central
Admin.
ASDA 25,000.00 IGF
147
57 Purchase 10
newspapers and
publications to
offices and library
daily
DA Newspapers
and
publications
provided
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
58 Provide refreshment
items to the
Assembly office
DA Refreshment
items
provided
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
59 Provide protocol fuel
to Assembly officials
and official guests
for official duties
throughout the year
DA Protocol fuel
provided for
official
activities
Jan Dec Central
Admin.
ASDA 10,000.00 IGF
60 Organise workshops
and other training
programmes for
Assembly staff,
Assembly members,
Heads of Department
annually
DA Workshops
and other
training
organised
Jan Dec Central
Admin.
ASDA 10,000.00 IGF
61 Organise end of year
best worker award
and staff durbars
DA Awards and
staff durbars
organised
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
62 Sponsor Assembly
staff, Assembly
members and others
to attend workshop
and other training
programmes
throughout the year
DA Assembly
members and
staff
supported to
attend
training
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
63 Provide for travelling
and transport for
staff who perform
official duties
DA Travelling
and transport
provided
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
64 Maintain and repair
official vehicle and
Assembly grader
DA Office
vehicles and
grader
Jan Dec Central
Admin.
ASDA 10,000.00 IGF,
DACF
148
maintained
65 Engage consultants
to train relevant staff
of the Assembly and
Assembly members
DA Assembly
staff and
members
trained by
consultant
Jan Dec Central
Admin.
ASDA 25,000.00 DDF
66 Screening of food
vendors
District
Wide
Food vendors
screened
Jan Dec Environment
al Health
Dept.
ASDA 2,500.00 IGF
67 Support DEOC in its
activities
DA DEOC
Supported
Jan Dec DED ASDA 2,500.00 IGF,
DACF
68 Provide adequate
value books for
revenue collection
DA Value books
provided to
revenue
collectors
Jan Dec Central
Admin.
ASDA 1,500.00 IGF
69 Give logistics to
revenue collectors
DA Logistics
provided to
revenue
collectors
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
70 Organise revenue
mobilisation
campaign and
education quarterly
each year
District
Wide
Revenue
mobilization
campaign
and
education
organised
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
71 Revise and gazette
fee-fixing resolutions
annually
DA Fee fixing
revised and
gazetted
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
72 Pay commission to
commissioned
collectors
DA Commission
paid to
commissione
d collectors
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
73 Organise
stakeholders
meetings / public
fora
DA Stakeholders
meeting
organised
Jan Dec Central
Admin.
ASDA 5,000.00 IGF,
DACF
74 Ensure effective DA DPCU Jan Dec Central ASDA 5,000.00 DACF
149
implementation of
DPCU activities
activities
implementati
on
Admin.
75 Preparation of
District Medium
Term Development
Framework
DA DMTPF
prepared
Jan March DPCU ASDA 20,000.00 DACF
76 Pay utility bills for
the Assembly
DA Utility bills
paid
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
77 Purchase building
materials to support
community initiated
projects
DA Building
materials
purchased to
support
community
initiated
projects
Jan Dec Works Dept. ASDA 15,000.00 IGF,
DACF
78 Support Town/ Area
Councils in
performing their
duties
District
Wide
Town/ Area
Councils
supported
Jan Dec Central
Admin.
ASDA 5,000.00 DACF
79 Implement MP
constituency
programmes and
projects annually
District
Wide
MPs
constituency
programmes
implemented
Jan Dec MP ASDA 100,000.00 MPs
share of
DACF
80 Organise quarterly
Heads of Department
meetings
DA Heads of
Department
meetings
organised
Jan Dec Central
Admin.
ASDA 10,000.00 IGF
81 Publish Assembly
activities and gazette
by-laws
DA Assembly
by-laws
gazetted and
activities
gazetted
Jan Dec Central
Admin.
ASDA 10,000.00 IGF
82 Monitor and evaluate
District Assembly
projects
DA M&E carried
out on
projects
Jan Dec DPCU ASDA 10,000.00 DACF
83 Support HIV/AIDS DA MSHAP Jan Dec Central ASDA 5,000.00 DACF
150
(MSHAP) annually activities
supported
Admin.
84 Organise site
inspections
throughout the year
DA Site
inspections
organised
throughout
the year
Jan Dec Works Dept. ASDA 5,000.00 IGF,
DACF
85 Implement Disability
Fund
DA Disability
fund
implemented
Jan Dec SW&CD ASDA 25,000.00 DACF
86 Support paupers,
children and
physically
challenged annually
District
Wide
Paupers,
children and
physically
challenged
supported
Jan Dec SW&CD ASDA 5,000.00 IGF,
GOG
87 Support Traditional
Authorities
Allowance
District
Wide
Traditional
authority
allowance
provided
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
88 Organise 4 Official
National Day
Celebrations
District
Wide
4 official
national day
celebrations
organised
Jan Dec Central
Admin.
ASDA 25,000.00 DACF
89 Construct 1 No.4
Unit Police Staff
Quarters
Akrofuom 1 No. 4 Unit
Police Staff
quarters
constructed
Jan Dec Works Dept. ASDA 100,000.00 DDF
90 Provide
legal/security
expenses of the
Assembly
DA Legal/
security
services
provided
Jan Dec Central
Admin.
ASDA 2,500.00 DACF,
IGF
91 Organise monthly
District Security
Committee (DISEC)
meetings
DA DISEC
meetings
organised
Jan Dec Central
Admin.
ASDA 2,500.00 DACF
92 Procure insurance
cover for Assembly
DA Insurance
cover
Jan Dec Central
Admin.
ASDA 5,000.00 DACF
151
official vehicle procured for
official
vehicles
93 Organise a road
safety campaign
District
Wide
Road safety
campaign
organised
Jan Dec Central
Admin.
ASDA 5,000.00 DACF
94 Organise training on
fire prevention and
management
District
Wide
Training
organised on
fire
prevention
and
management
Jan Dec GNFS ASDA 5,000.00 DACF
95 Procure septic tank
emptier
New
Edubiase
Septic tank
emptier
procured
Jan Dec Central
Admin
ASDA 40,000.00 DACF
152
Table 5.3 ANNUAL ACTION PLAN 2016
PLANNED
PROGRAMME/
PROJECTS/
ACTIVITY
LOCATION INDICATOR TIMING RESP.
PERS/DEPT/
AGENCY
COLLABORATING
PERSON/
DEPARTMENT
AGENCY
COST SOURCE
OF
FUNDS
RE
MA
RKS START END
1 Revalue property District Wide Properties
revaluation
done
Jan Dec Central
Admin.
ASDA 10,000.00 DACF
2 Prepare District
Composite Budget
DA District
Composite
Budget
prepared
Jun Oct Central
Admin.
ASDA 5,000.00 DACF
3 Create data base on
revenue items
DA Data base on
revenue
items created
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
4 Construct market
stalls
Adansi
Praso, New
Edubiase,
Wuruyie
Junction,
Akrofuom
Market stalls
constructed
Jan Dec Works Dept. ASDA 50,000.00 IGF,
DACF,
DDF
5 Organise training for
MSMEs
District Wide MSMEs
training
organised
Jan Sept Central
Admin.
ASDA 5,000.00 DACF
6 Organise training for
farmers in accessing
financial support
District Wide Farmers
training
organised
Jan Sept Agric. Dept. ASDA 5,000.00 IGF
7 Facilitate cocoa
spraying programme
District Wide Cocoa
spraying
facilitated
Jan Dec Agric. Dept. ASDA 12,500.00 IGF,
DDF,
Donor,
DACF
8 Provide extension
services to farmers
District Wide Extension
services
provided to
farmers
Jan Dec Agric. Dept. ASDA 5,000.00 DDF,
DACF
9 Organise training for
AEA’s annually
District Wide Training
organised for
Jan Sept Agric. Dept. ASDA 5,000.00 IGF,
DDF
153
AEAs
10 Provide extension
knowledge and
vaccination in
livestock production
District Wide Vaccination
given to
livestock
Jan Dec Agric. Dept. ASDA 5,000.00 DDF,
DACF
11 Plants trees in
affected
communities
District Wide Trees planted
in
communities
March Oct FSD ASDA 5,000.00 IGF,
DACF
12 Monitor activities of
illegal lumbering/
chainsaw activities
District Wide Forest
activities
monitored
Jan Dec FSD ASDA 5,000.00 IGF
13 Monitor activities of
small scale mining
companies
District Wide Mining
companies
activities
monitored
Jan Dec DISEC ASDA 10,000.00 IGF,
DACF
14 Engage private
sector and other
stakeholders in
development of
tourist sites
Bonkro,
Birim Aboi,
Hwidiem
Stakeholders
consulted in
developing
tourist sites
Jan Dec Central
Admin.
ASDA 10,000.00 DDF,
DACF
15 Support NADMO to
perform its functions
of disaster
prevention and
management
annually
District Wide NADMO
supported in
its activities
Jan Dec NADMO ASDA 5,000.00 DACF
16 Renovate and
maintain staff
quarters
New
Edubiase
Staff quarters
renovated
and
maintained
Jan Dec Works Dept. ASDA 50,000.00 DACF
17 Construct 10No.
Teachers Quarters
District Wide 10 No.
Teachers
Quarters
constructed
Jan Dec Works Dept. ASDA 600,000.00 DACF
18 Construction of
Dormitories for
Women and
Akrofuom Dormitories
for women
and children
Jan Dec Works Dept. ASDA 100,000.00 DDF/
GOG
154
Children constructed
19 Prepare planning
schemes for
communities
New
Edubiase,
Akrofuom,
Apagya,
Atobiase,
Amudurasi,
Praso
Layouts for
settlements
prepared
Jan Dec Physical
Planning
Dept.
ASDA 20,000.00 DACF,
DDF
20 Construct drains to
improve upon the
drainage system
District Wide Drains
constructed
in
communities
Jan Dec Works Dept. ASDA 30,000.00 DACF
21 Construct 2 No.
Staff Quarters at
New Edubiase
New
Edubiase
2 No. Staff
Quarters
constructed
Jan Dec Works Dept. ASDA 50,000.00 DACF
22 Repair and maintain
80 km feeder/ access
roads
District Wide 80km feeder/
access roads
repaired
Jan Dec Works Dept. ASDA 10,000.00 DACF,
IGF
23 Expansion and
maintenance of lorry
parks
Akrofuom Lorry parks
expanded
and
maintained
Jan Dec Works Dept. ASDA 20,000.00 DACF,
DDF
24 Construction of
culverts
Tonkoase,
Danyeso,
Old Asaman
Culverts
constructed
Jan Dec Works Dept. ASDA 20,000.00 DACF,
DDF
25 Service and repair
14 No. computers
and accessories,
photocopier and
intercom annually
DA Computers,
accessories,
photocopier
and intercom
serviced
Jan Dec Central
Admin.
ASDA 2,500.00 DACF,
IGF
26 Construct
community centres
District Wide Community
centres
constructed
Jan Dec Works Dept. ASDA 50,000.00 IGF,
DACF
27 Renovate and
maintain Assembly
Guest House
New
Edubiase
Assembly
Guest House
maintained
Jan Dec Central
Admin.
ASDA 40,000.00 IGF
28 Provide low tension District Wide Electricity Jan Dec ECG ASDA 50,000.00 DACF
155
poles to extend
electricity to
selected
communities
extended to
communities
29 Provide a quantity of
street light bulbs to
communities
District Wide Street light
bulbs
provided
Jan Dec Works Dept. ASDA 2,500.00 DACF
30 Construct CHPS
Compound
Tweapiase
and
Mprechre
CHPS
Compound
constructed
Jan Dec Works Dept. ASDA 150,000.00 DACF
31 Construct additional
wards for Health
Centre
Ataase Additional
wards
constructed
Jan Dec Works Dept. ASDA 60,000.00 DACF
32 Provide maternal
waiting homes
All health
centers
Maternal
waiting
homes
provided
Jan Dec Works Dept. ASDA 10,000.00 DDF,
DACF
33 Construct 10 No.3
Unit Classroom
Block
District Wide 10 No. 3
Unit
Classroom
Block
constructed
Jan Dec Works Dept. ASDA 300,000.00 DACF,
DDF
34 Education fund
disbursed to needy
students
District Wide Education
fund
provided
Jan Dec GES ASDA 5,000.00 DACF
35 Construct 5 No.6
Unit Classroom
Block
District Wide 5 No. 6 Unit
Classroom
Block
constructed
Jan Dec Works Dept. ASDA 250,000.00 DACF,
DDF
36 Rehabilitation of 10
No. Schools
District Wide 10 No.
Schools
rehabilitated
Jan Dec Works Dept. ASDA 100,000.00 DACF
37 Organise mass
education meetings
annually
District Wide Mass
education
meetings
organised
Jan Dec SW&CD ASDA 30,000.00 IGF,
DACF
38 Support the District Wide Sports Jan Dec Central ASDA 2,500.00 DACF
156
development of
sports in the District
annually
development
supported
Admin.
39 Facilitate school
feeding programme
District Wide School
feeding
program
facilitated
Jan Dec NSFP/ GES ASDA 60,000.00 Donor
40 Organise workshop
on Family Planning
Methods
District Wide Workshop
organised
Jan Dec DHD ASDA 5,000.00 Donor,
DACF
41 Subsidise FP
methods
District Wide FP methods
subsidised
Jan Dec DHD ASDA 4,000.00 Donor,
DACF
42 Support WATSAN
and other agencies in
potable water
delivery
District Wide Potable water
provided
Jan Dec CWSA ASDA 25,000.00 DACF,
DDF,
IGF,
Donor
43 Provide for
fumigation and
sanitation
District Wide Sanitation
and
fumigation
provided
Jan Dec Environment
al Health
Dept.
ASDA 212,000.00 DACF
44 Clearing of final
dump sites
District Wide Dump sites
cleared
Jan Dec Environment
al Health
Dept.
ASDA 25,000.00 DACF
45 Construction of
K.V.I.P
District Wide K.V.I.Ps
constructed
Jan Dec Works Dept. ASDA 100,000.00 DACF
46 Support District
Response Initiative
(Malaria Control
Programme)
annually
District Wide Malaria
control
program
supported
Jan Dec AGA Mal ASDA 10,000.00 DACF
47 Pay transfer grants
to officials posted to
the District
DA Transfer
grants
provided
Jan Dec Central
Admin
ASDA 5,000.00 IGF
48 Pay responsibility
allowance to staff
DA Responsibilit
y allowance
paid
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
49 Ensure minor repair/ DA Office Jan Dec Central ASDA 2,500.00 IGF
157
maintenance of
office machines and
furniture
machines and
furniture
repaired
Admin.
50 Purchase adequate
stationary for office
use annually
DA Stationary
purchased for
use
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
51 Print calendars and
other materials
annually
DA Calendars
printed
Jan March Central
Admin
ASDA 2,500.00 IGF
52 Procure office
facilities and
furniture for the
Assembly office
every year
DA Office
facilities and
furniture
provided
Jan Dec Central
Admin.
ASDA 25,000.00 IGF
53 Purchase 10
newspapers and
publications to
offices and library
daily
DA Newspapers
and
publications
provided
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
54 Provide refreshment
items to the
Assembly office
DA Refreshment
items
provided
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
55 Provide protocol
fuel to Assembly
officials and official
guests for official
duties throughout
the year
DA Protocol fuel
provided for
official
activities
Jan Dec Central
Admin.
ASDA 10,000.00 IGF
56 Organise workshops
and other training
programmes for
Assembly staff,
Assembly members,
Heads of
Department annually
DA Workshops
and other
training
organised
Jan Dec Central
Admin.
ASDA 10,000.00 IGF
57 Organise end of year
best worker award
DA Awards and
staff durbars
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
158
and staff durbars organised
58 Sponsor Assembly
staff, Assembly
members and others
to attend workshop
and other training
programmes
throughout the year
DA Assembly
members and
staff
supported to
attend
training
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
59 Provide for
travelling and
transport for staff
who perform official
duties
DA Travelling
and transport
provided
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
60 Maintain and repair
official vehicle and
Assembly grader
DA Office
vehicles and
grader
maintained
Jan Dec Central
Admin.
ASDA 10,000.00 IGF,
DACF
61 Engage consultants
to train relevant staff
of the Assembly and
Assembly members
DA Assembly
staff and
members
trained by
consultant
Jan Dec Central
Admin.
ASDA 25,000.00 DDF
62 Screening of food
vendors
District Wide Food vendors
screened
Jan Dec Environment
al Health
Dept.
ASDA 2,500.00 IGF
63 Renovation of
District Health
Directorate Offices
New
Edubiase
DHD Offices
renovated
Jan Dec Works Dept. ASDA 30,000.00 DACF
64 Support DEOC in its
activities
DA DEOC
Supported
Jan Dec DED ASDA 2,500.00 IGF,
DACF
65 Provide adequate
value books for
revenue collection
DA Value books
provided to
revenue
collectors
Jan Dec Central
Admin.
ASDA 1,500.00 IGF
66 Give logistics to
revenue collectors
DA Logistics
provided to
revenue
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
159
collectors
67 Organise revenue
mobilisation
campaign and
education quarterly
each year
District Wide Revenue
mobilization
campaign
and
education
organised
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
68 Revise and gazette
fee-fixing
resolutions annually
DA Fee fixing
revised and
gazetted
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
69 Pay commission to
commissioned
collectors
DA Commission
paid to
commissione
d collectors
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
70 Organise
stakeholders
meetings / public
fora
DA Stakeholders
meeting
organised
Jan Dec Central
Admin.
ASDA 5,000.00 IGF,
DACF
71 Ensure effective
implementation of
DPCU activities
DA DPCU
activities
implementati
on
Jan Dec Central
Admin.
ASDA 5,000.00 DACF
72 Pay utility bills for
the Assembly
DA Utility bills
paid
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
73 Purchase building
materials to support
community initiated
projects
DA Building
materials
purchased to
support
community
initiated
projects
Jan Dec Works Dept. ASDA 15,000.00 IGF,
DACF
74 Support Town/ Area
Councils in
performing their
duties
District Wide Town/ Area
Councils
supported
Jan Dec Central
Admin.
ASDA 5,000.00 DACF
75 Implement MP
constituency
District Wide MPs
constituency
Jan Dec MP ASDA 100,000.00 MPs
share of
160
programmes and
projects annually
programmes
implemented
DACF
76 Organise quarterly
Heads of
Department
meetings
DA Heads of
Department
meetings
organised
Jan Dec Central
Admin.
ASDA 1,500.00 IGF
77 Publish Assembly
activities and gazette
by-laws
DA Assembly
by-laws
gazetted and
activities
gazetted
Jan Dec Central
Admin.
ASDA 10,000.00 IGF
78 Monitor and
evaluate District
Assembly projects
DA M&E carried
out on
projects
Jan Dec DPCU ASDA 10,000.00 DACF
79 Support HIV/AIDS
(MSHAP) annually
DA MSHAP
activities
supported
Jan Dec Central
Admin.
ASDA 5,000.00 DACF
80 Organise site
inspections
throughout the year
DA Site
inspections
organised
throughout
the year
Jan Dec Works Dept. ASDA 5,000.00 IGF,
DACF
81 Implement
Disability Fund
DA Disability
fund
implemented
Jan Dec SW&CD ASDA 25,000.00 DACF
82 Support paupers,
children and
physically
challenged annually
District Wide Paupers,
children and
physically
challenged
supported
Jan Dec SW&CD ASDA 5,000.00 IGF,
GOG
83 Organise a
workshop on the role
of the Judiciary in
development
District Wide Workshop
organised
Jan Dec Central
Admin
ASDA 5,000.00 IGF
84 Support Traditional
Authorities
Allowance
District Wide Traditional
authority
allowance
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
161
provided
85 Organise 4 Official
National Day
Celebrations
District Wide 4 official
national day
celebrations
organised
Jan Dec Central
Admin.
ASDA 25,000.00 DACF
86 Construct Police
Post
Wuruyie
East,
Atwereboana
, Akrofuom
West
Police post
constructed
Jan Dec Works Dept. ASDA 50,000.00 DDF
87 Provide
legal/security
expenses of the
Assembly
DA Legal/
security
services
provided
Jan Dec Central
Admin.
ASDA 2,500.00 DACF,
IGF
88 Organise monthly
District Security
Committee (DISEC)
meetings
DA DISEC
meetings
organised
Jan Dec Central
Admin.
ASDA 2,500.00 DACF
89 Procure insurance
cover for Assembly
official vehicle
DA Insurance
cover
procured for
official
vehicles
Jan Dec Central
Admin.
ASDA 5,000.00 DACF
162
5.4 ANNUAL ACTION PLAN 2017
PLANNED PROGRAMME/
PROJECTS/
ACTIVITY
LOCATION INDICATOR TIMING RESP.
PERS/DEPT
/
AGENCY
COLLABORA
TING
PERSON/
DEPT/
AGENCY
COST SOURCE
OF
FUNDS
RE
MA
RK
S
Start End
1 Revalue property District Wide Properties revaluation
done
Jan Dec Central
Admin.
ASDA 10,000.00 DACF
2 Prepare District Composite
Budget
DA District Composite
Budget prepared
Jun Oct Central
Admin.
ASDA 5,000.00 DACF
3 Create data base on revenue
items
DA Data base on revenue
items created
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
4 Organise training for
MSMEs
District Wide MSMEs training
organised
Jan Sept Central
Admin.
ASDA 5,000.00 DACF
5 Facilitate cocoa spraying
programme
District Wide Cocoa spraying
facilitated
Jan Dec Agric. Dept. ASDA 12,500.00 IGF,
DDF,
Donor,
DACF
6 Provide extension services
to farmers
District Wide Extension services
provided to farmers
Jan Dec Agric. Dept. ASDA 5,000.00 DDF,
DACF
7 Organise training for AEA’s
annually
District Wide Training organised
for AEAs
Jan Sept Agric. Dept. ASDA 5,000.00 IGF,
DDF
8 Provide extension
knowledge and vaccination
in livestock production
District Wide Vaccination given to
livestock
Jan Dec Agric. Dept. ASDA 5,000.00 DDF,
DACF
9 Monitor activities of illegal
lumbering/ chainsaw
activities
District Wide Forest activities
monitored
Jan Dec FSD ASDA 5,000.00 IGF
10 Engage private sector and
other stakeholders in
development of tourist sites
Bonkro,
Birim Aboi,
Hwidiem
Stakeholders
consulted in
developing tourist
sites
Jan Dec Central
Admin.
ASDA 10,000.00 DDF,
DACF
11 Support NADMO to
perform its functions of
disaster prevention and
management annually
District Wide NADMO supported
in its activities
Jan Dec NADMO ASDA 5,000.00 DACF
12 Construct 10No. Teachers District Wide 10 No. Teachers Jan Dec Works ASDA 600,000.0 DACF
163
Quarters Quarters constructed Dept. 0
13 Prepare planning schemes
for communities
New
Edubiase,
Akrofuom,
Apagya,
Atobiase,
Amudurasi,
Praso
Layouts for
settlements prepared
Jan Dec Physical
Planning
Dept.
ASDA 20,000.00 DACF,
DDF
14 Construct drains to improve
upon the drainage system
District Wide Drains constructed in
communities
Jan Dec Works
Dept.
ASDA 40,000.00 DACF
15 Construct 2 No. Staff
Quarters at New Edubiase
New
Edubiase
2 No. Staff Quarters
constructed
Jan Dec Works
Dept.
ASDA 50,000.00 DACF
16 Repair and maintain 80 km
feeder/ access roads
District Wide 80km feeder/ access
roads repaired
Jan Dec Works
Dept.
ASDA 10,000.00 DACF,
IGF
17 Expansion and maintenance
of lorry parks
Akrofuom Lorry parks expanded
and maintained
Jan Dec Works
Dept.
ASDA 20,000.00 DACF,
DDF
18 Construction of culverts Tonkoase,
Danyeso,
Old Asaman
Culverts constructed Jan Dec Works
Dept.
ASDA 20,000.00 DACF,
DDF
19 Service and repair 14 No.
computers and accessories,
photocopier and intercom
annually
DA Computers,
accessories,
photocopier and
intercom serviced
Jan Dec Central
Admin.
ASDA 2,500.00 DACF,
IGF
20 Provide low tension poles to
extend electricity to selected
communities
District Wide Electricity extended
to communities
Jan Dec ECG ASDA 50,000.00 DACF
21 Provide a quantity of street
light bulbs to communities
District Wide Street light bulbs
provided
Jan Dec Works
Dept.
ASDA 2,500.00 DACF
22 Construct CHPS Compound Tweapiase
and
Mprechre
CHPS Compound
constructed
Jan Dec Works
Dept.
ASDA 150,000.0
0
DACF
23 Construct additional wards
for Health Centre
Ataase Additional wards
constructed
Jan Dec Works
Dept.
ASDA 60,000.00 DACF
24 Provide maternal waiting
homes
All health
centers
Maternal waiting
homes provided
Jan Dec Works
Dept.
ASDA 10,000.00 DDF,
DACF
25 Construct 10 No.3 Unit
Classroom Block
District Wide 10 No. 3 Unit
Classroom Block
Jan Dec Works
Dept.
ASDA 300,000.0
0
DACF,
DDF
164
constructed
26 Education fund disbursed to
needy students
District Wide Education fund
provided
Jan Dec GES ASDA 5,000.00 DACF
27 Construct 5 No.6 Unit
Classroom Block
District Wide 5 No. 6 Unit
Classroom Block
constructed
Jan Dec Works
Dept.
ASDA 250,000.0
0
DACF,
DDF
28 Rehabilitation of 10 No.
Schools
District Wide 10 No. Schools
rehabilitated
Jan Dec Works
Dept.
ASDA 100,000.0
0
DACF
29 Organise mass education
meetings annually
District Wide Mass education
meetings organised
Jan Dec SW&CD ASDA 40,000.00 IGF,
DACF
30 Support the development of
sports in the District
annually
District Wide Sports development
supported
Jan Dec Central
Admin.
ASDA 2,500.00 DACF
31 Facilitate school feeding
programme
District Wide School feeding
program facilitated
Jan Dec NSFP/ GES ASDA 60,000.00 Donor
32 Organise workshop on
Family Planning Methods
District Wide Workshop organised Jan Dec DHD ASDA 5,000.00 Donor,
DACF
33 Subsidise FP methods District Wide FP methods
subsidised
Jan Dec DHD ASDA 4,000.00 Donor,
DACF
34 Support WATSAN and
other agencies in potable
water delivery
District Wide Potable water
provided
Jan Dec CWSA ASDA 25,000.00 DACF,
DDF,
IGF,
Donor
35 Provide for fumigation and
sanitation
District Wide Sanitation and
fumigation provided
Jan Dec Environmen
tal Health
Dept.
ASDA 212,000.0
0
DACF
36 Clearing of final dump sites District Wide Dump sites cleared Jan Dec Environmen
tal Health
Dept.
ASDA 25,000.00 DACF
37 Construction of K.V.I.P District Wide K.V.I.Ps constructed Jan Dec Works
Dept.
ASDA 100,000.0
0
DACF
38 Support District Response
Initiative (Malaria Control
Programme) annually
District Wide Malaria control
program supported
Jan Dec AGA Mal ASDA 5,000.00 DACF
39 Pay transfer grants to
officials posted to the
District
DA Transfer grants
provided
Jan Dec Central
Admin
ASDA 5,000.00 IGF
165
Pay responsibility
allowance to staff
DA Responsibility
allowance paid
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
40 Ensure minor repair/
maintenance of office
machines and furniture
DA Office machines and
furniture repaired
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
41 Purchase adequate
stationary for office use
annually
DA Stationary purchased
for use
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
42 Print calendars and other
materials annually
DA Calendars printed Jan Mar
ch
Central
Admin
ASDA 2,500.00 IGF
43 Procure office facilities and
furniture for the Assembly
office every year
DA Office facilities and
furniture provided
Jan Dec Central
Admin.
ASDA 25,000.00 IGF
44 Purchase 10 newspapers and
publications to offices and
library daily
DA Newspapers and
publications provided
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
45 Provide refreshment items
to the Assembly office
DA Refreshment items
provided
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
46 Provide protocol fuel to
Assembly officials and
official guests for official
duties throughout the year
DA Protocol fuel
provided for official
activities
Jan Dec Central
Admin.
ASDA 10,000.00 IGF
47 Organise workshops and
other training programmes
for Assembly staff,
Assembly members, Heads
of Department annually
DA Workshops and other
training organised
Jan Dec Central
Admin.
ASDA 10,000.00 IGF
48 Organise end of year best
worker award and staff
durbars
DA Awards and staff
durbars organised
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
49 Sponsor Assembly staff,
Assembly members and
others to attend workshop
and other training
programmes throughout the
year
DA Assembly members
and staff supported to
attend training
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
50 Provide for travelling and DA Travelling and Jan Dec Central ASDA 5,000.00 IGF
166
transport for staff who
perform official duties
transport provided Admin.
51 Maintain and repair official
vehicle and Assembly
grader
DA Office vehicles and
grader maintained
Jan Dec Central
Admin.
ASDA 10,000.00 IGF,
DACF
52 Engage consultants to train
relevant staff of the
Assembly and Assembly
members
DA Assembly staff and
members trained by
consultant
Jan Dec Central
Admin.
ASDA 25,000.00 DDF
53 Screening of food vendors District Wide Food vendors
screened
Jan Dec Environmen
tal Health
Dept.
ASDA 2,500.00 IGF
54 Support DEOC in its
activities
DA DEOC Supported Jan Dec DED ASDA 2,500.00 IGF,
DACF
55 Provide adequate value
books for revenue collection
DA Value books provided
to revenue collectors
Jan Dec Central
Admin.
ASDA 1,500.00 IGF
56 Give logistics to revenue
collectors
DA Logistics provided to
revenue collectors
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
57 Organise revenue
mobilisation campaign and
education quarterly each
year
District Wide Revenue mobilization
campaign and
education organised
Jan Dec Central
Admin.
ASDA 2,500.00 IGF
58 Revise and gazette fee-
fixing resolutions annually
DA Fee fixing revised
and gazetted
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
59 Pay commission to
commissioned collectors
DA Commission paid to
commissioned
collectors
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
60 Organise stakeholders
meetings / public for a
DA Stakeholders meeting
organised
Jan Dec Central
Admin.
ASDA 5,000.00 IGF,
DACF
61 Ensure effective
implementation of DPCU
activities
DA DPCU activities
implementation
Jan Dec Central
Admin.
ASDA 5,000.00 DACF
62 Pay utility bills for the
Assembly
DA Utility bills paid Jan Dec Central
Admin.
ASDA 5,000.00 IGF
63 Purchase building materials
to support community
initiated projects
DA Building materials
purchased to support
community initiated
Jan Dec Works
Dept.
ASDA 15,000.00 IGF,
DACF
167
projects
64 Support Town/ Area
Councils in performing their
duties
District Wide Town/ Area Councils
supported
Jan Dec Central
Admin.
ASDA 5,000.00 DACF
65 Implement MP constituency
programmes and projects
annually
District Wide MPs constituency
programmes
implemented
Jan Dec MP ASDA 100,000.0
0
MPs
share of
DACF
66 Organise quarterly Heads
of Department meetings
DA Heads of Department
meetings organised
Jan Dec Central
Admin.
ASDA 1,500.00 IGF
67 Organise 10 durbars for
official functions annually
DA 10 durbars organised
for official functions
Jan Dec Central
Admin.
ASDA 25,000.00 IGF,
DACF
68 Publish Assembly activities
and gazette by-laws
DA Assembly by-laws
gazetted and
activities gazetted
Jan Dec Central
Admin.
ASDA 10,000.00 IGF
69 Monitor and evaluate
District Assembly projects
DA M&E carried out on
projects
Jan Dec DPCU ASDA 10,000.00 DACF
70 Support HIV/AIDS
(MSHAP) annually
DA MSHAP activities
supported
Jan Dec Central
Admin.
ASDA 5,000.00 DACF
71 Organise site inspections
throughout the year
DA Site inspections
organised throughout
the year
Jan Dec Works
Dept.
ASDA 5,000.00 IGF,
DACF
72 Implement Disability Fund DA Disability fund
implemented
Jan Dec SW&CD ASDA 25,000.00 DACF
73 Support paupers, children
and physically challenged
annually
District Wide Paupers, children and
physically challenged
supported
Jan Dec SW&CD ASDA 5,000.00 IGF,
GOG
74 Organise a workshop on the
role of the Judiciary in
development
District Wide Workshop organised Jan Dec Central
Admin
ASDA 5,000.00 IGF
75 Support Traditional
Authorities Allowance
District Wide Traditional authority
allowance provided
Jan Dec Central
Admin.
ASDA 5,000.00 IGF
76 Organise 4 Official National
Day Celebrations
District Wide 4 official national day
celebrations
organised
Jan Dec Central
Admin.
ASDA 25,000.00 DACF
77 Construct Police Post Wuruyie
East,
Atwereboana
Police post
constructed
Jan Dec Works
Dept.
ASDA 50,000.00 DDF
168
, Akrofuom
West
78 Provide legal/security
expenses of the Assembly
DA Legal/ security
services provided
Jan Dec Central
Admin.
ASDA 2,500.00 DACF,
IGF
79 Organise monthly District
Security Committee
(DISEC) meetings
DA DISEC meetings
organised
Jan Dec Central
Admin.
ASDA 2,500.00 DACF
80 Procure insurance cover for
Assembly official vehicle
DA Insurance cover
procured for official
vehicles
Jan Dec Central
Admin.
ASDA 5,000.00 DACF
81 Maintain adequate security
in the District annually
District Wide Security Jan Dec GPS ASDA 5,000.00 DACF
169
CHAPTER SIX
MONITORING AND EVALUATION
MONITORING AND EVALUATION ARRANGEMENT FOR DISTRICT MEDIUM TERM
DEVELOPMENT PLAN (2010 – 2013)
INTRODUCTION
Planning is not an end in itself but only means of achieving a specific objective. The main objective of the
planning process is the improvement in the well-being of the people, not the planning document. District
Assemblies, as planning authorities are responsible not only for the formulation of plans but also for their
implementation, monitoring and evaluation. One instrument which can be used to measure the success of a
project/programme is the monitoring and evaluation system (M&E).
MONITORING
Monitoring is the continuous or periodic review of the implementation of an activity to ensure that input deliveries,
work schedules, targeted outputs and other required actions are proceeding according to plan. Monitoring as a
management instrument, pre-supposes that development programmes must be managed as planned. Monitoring
measures, records progress of implementation and focuses on the compliance with the plan. It is therefore a
continuous task during the whole life cycle of a programme. The monitoring process requires the timely collection
and analysis of data during the analysis, planning and implementation of the District Three-year Medium Term
(2010 – 2013) Development Plan (DMTDP).
Monitoring is important in achieving efficient and effective project or programme performance by providing
feedback to project management. This enables management to improve operational plans and take timely
corrective action in case of shortfalls and constraints.
Monitoring is important in achieving efficient and effective project or programme performance by providing
feedback to project management. This enables management to improve operational plans and take timely
corrective action in case of shortfalls and constraints.
At the planning level, monitoring process under the 3-year Medium Term Development Plan would compare the
planned time schedules, organizational structure, and financial provisions against actual achievement.
While monitoring is correct oriented, taking the logical framework (log frame) as the core element, four major
areas would be measured and analyzed, based on the indicators which were developed in the planning process.
170
1. The target set in the objectively verifiable indicators (OVI) which measure the achievement of the programme
objective (that is, goal, purpose and outputs.) In this case, direct and indirect impact indicators reflect that the
extent of which projects or programmes in the 3-year medium term development plan is impacting on the lives
of the target population or beneficiaries would be measured.
2. The important assumption which is incorporated into a set of indicators would be continuously observed ad a
measure of external conditions. For the purpose of monitoring development programme, the assumptions upon
which plans have been based and the objectives to be achieved must be clearly spelt out. The assumptions are
very important in monitoring projects because they serve as the pivot around which development programmes
from which project emanate. Assumptions are the necessary conditions that must prevail for projects and
programmes to be implemented successfully. Hence, an assumption must be continuously monitored to test
their validity.
3. Operational indicators have been developed to measure the control of resources, personnel, financial
disbursements, expenditure, incomes and time.
4. Performance and efficiency indicator have been developed to indicate whether activities have been completed.
Monitoring assesses the extent to which the activities are being implemented according to schedule.
5. The means of verification (MOV) would indicate where data can be gathered in a cost-effective way.
The monitoring system devised for the District’s Medium Term Development Plan seeks to examine compliance
with the plan. Simple monitoring techniques like the use of charts indicating time table, responsibility matrix,
financial schedules, completion dates and when monitoring should take place are mainstreamed in the monitoring
arrangements.
There are development programmes or projects implemented by line ministries, non-governmental organizations,
para-statal and the private sector which would be monitored to avert duplication of efforts.
Monitoring the implementation of the District Medium term plan based on the Ghana Poverty Reduction Strategy
1(GPRS 1) would be done through the use of poverty monitory systems. These would facilitate the tracking of
projected periods to assess the effectiveness and efficiency of wealth and growth inducing pro-pro intervention for
beneficiary communities during the planning process.
Participatory monitoring would be used to record the periodically keep track of progress towards objectives on a
day-to-day, week-to-week and monthly basis. Participatory monitoring would be locally tailored in recording
information which meets local needs and aspirations. Monitoring tools selected primary address cultural, social,
economic factors operating in the community.
171
Pending the release of monitoring and evaluation guidelines from the National Development Planning Commission
(NDPC), a tentative monitoring format has been devised.
The monitoring and evaluation or programmes and projects for the four year planned period (2014-2017) would be
undertaken by the District Monitoring and Evaluation Team. The composition of the team is:
The District Co-coordinating Director
The District Planning Officer
The District Budget Officer
The District Works Engineer
The District Finance Officer
The Chairman Works Sub-committee
The Relevant Heads of the Departments e.g. Agriculture, Education, and Health etc.
PROJECT MONITORING REPORT
A. Project Identification No. ……………………………………………………………
B. Project Title: ………………………………………………………………………….
C. Project Objectives: …………………………………………………………………..
D. Project Location: …………………………………………………………………….
E. Data Source: ………………………………………………………………………….
F. Methods/Tools of Monitoring: ……………………………………………………….
G. Implementation Agency (ies): ………………………………………………………..
H. Monitoring Agency (ies): …………………………………………………………….
I. Collaborating Agency (ies): ………………………………………………………….
J. Person (s) Responsible: ……………………………………………………………...
K. Project Start: …………………………………………………………………………
L. Project End: …………………………………………………………………………..
172
M. Date of Monitoring: ………………………………………………………………….
N. Commencement of Earliest Start (ES) and Earliest Finish (EF)………………………
………………………………………………………………………………………………….
PROJECT IMPLEMENTATION
Construction Works Planned to Date Actual to date Variance
(%) (%)
Objective A……………….
Objective B……………….
Objective C……………….
EVALUATION
Evaluation determines the causes of deviations from the plan, the initial effects, (planned/unplanned) as well as the
impact the programme has had, e.g., the effect on the target group and many others. Evaluation provides the
planner with the explanation of why things have happened the way they have, thereby giving the beneficiary
communities the necessary information to rectify the anomaly.
Participatory evaluation encourages and reflects on what has happened in the past in order to make decisions about
the future. By evaluation, beneficiary communities learn about things that have worked well and vice versa and
through the process, it becomes more likely that corrective measures will be implemented. The effectiveness of
participatory evaluation lies in the understanding of the community to agree on the purpose of the evaluation. The
objectives of the project, as well as the expected outputs provide a forum for changes and adjustments if the need
arises in order to achieve desired results. In the preparation of the three-year medium term development plan,
173
community evaluation teams are envisaged to play active roles in information gathering, and analysis to ensure that
recommendations from evaluations reach the intended beneficiaries. Decisions made and feedback is incorporated
into the project or activities, to ensure re-planning where necessary.
Terminal, ex-ante and ex-post evaluation would be undertaken to ensure whether the intended result has been
achieved or not as well as the reasons for failure. Terminal evaluation would be undertaken immediately the
programme is completed, while “ex-post” evaluation would be undertaken after some years after completion of
programme. Ex-post evaluation would be undertaken to analyse the goals and objective of the project to determine
the impact which the development plan has had on the target population. Monitoring and evaluation (M&E) to a
larger extent could be seen as involving different planning processes, such as data collection and analysis,
documentation, assessment and interpretation, decision making and remedial action. Participatory Impact
Monitoring and Evaluation System (PIMES) would be used to analyse and establish correlation between poverty
focused intervention and impact on livelihood.
The tentative Evaluation Report underneath is prepared to spearhead the evaluation process under the District
Medium Term Development Plan .
PROJECT EVALUATION REPORT
A. Project Title: …………………………………………………………………………
B. Project Identification No: ……………………………………………………………
C. Project Location: …………………………………………………………………….
D. Implementation: ………………………………………………………………………
E. Evaluation Agency (ies): ……………………………………………………………
F. Date of Evaluation: ………………………………………………………………….
G. Estimated Cost of Project: …………………………………………………………..
H. Actual Cost of Project: ………………………………………………………………
I. State length of over-run, if any: ……………………………………………………..
J. Has project objectives achieved……………………………………………………
K. Are project objectives still relevant: …………………………………………………
174
L. Did funds released as planned: ……………………………………………………….
M. Are benefits reaching the target beneficiaries: ……………………………………….
N. If not, why? : …………………………………………………………………………..
O. Is project operating as planned: ……………………………………………………….
P. If not, state reasons: ……………………………………………………………………
Q. Are project assets being maintained: ………………………………………………….
R. Where appropriate reasons for failure: ………………………………………………
175
CHAPTER SEVEN
FINANCIAL COMMUNICATION STRATEGY/ PLAN
DISSEMINATION OF THE DISTRICT MEDIUM TERM DEVELOPMENT PLAN (DMTDP) 2014 –2017
This section looks at the dissemination of the DMTDP (2014 –2017) to the relevant stakeholders and decision
makers. This is very important as knowing and sharing the contents with the key stakeholders – Traditional
Authority, Opinion Leaders, Religious Leaders, Sub-District Structures and Civil Society would ensure
accountability and transparency. The tendency is that once accountability and transparency become the bedrock of
governance. It would galvanize their support and commitment towards the implementation of the interventions
contained in the Plan.
In summary, Adansi South District Assembly will implement its communication strategy in order to:
disseminate its programmes, projects, activities and Annual Progress Reports to inform/create awareness
create awareness on the roles and expectations of the stakeholders in the implementation of the District
programmes to improve their living conditions for the period 2014-2017
promote dialogue and generate feedback on the performance of the District
promote access and manage expectations of the public concerning the services of the District
The dissemination strategies of the District Planning and Coordinating Unit (DPCU) would include;
Public Hearing of the DMTDP at the District Level
Organize meetings and workshops with the Sub-District Structures
Meetings with Traditional Rulers, Religious Bodies, Communities and Civil Society Organizations.
Produce and distribute 20 copies of the District Medium Term Development Plan 2014 –2017 to the
National Development Planning Commission, Regional Planning and Coordinating Unit (RPCU), District
Directors of Departments and others.
Organise Quarterly, Annual, Mid-Term and End of Term performance review workshops and disseminate
outcomes to all stakeholders.
176
INDICATIVE BUDGET
The estimated cost for the implementation of the Adansi South District Medium Term Development Plan (2014-
2017) is as follows:
IGF 1,176,000.00
GOG/DDF 1,075,000.00
DONOR 3,223,500.00
DACF 4,843,000.00
Total 10,317,500.00
177
ADANSI SOUTH DISTRICT ASSEMBLY
NEW EDUBIASE – ASHANTI
1ST PUBLIC HEARING REPORT
NAME OF DISTRICT : ADANSI SOUTH
REGION : ASHANTI
NAME OF AREA/URBAN COUNCIL : NEW EDUBIASE
VENUE : DIST. ASSEMBLY HALL
DATE : 20TH JANUARY 201
(a) Medium of Invitation, Notice, and Announcement issued for participation:
Letters, Making Phone Calls and the use of Public Address system
(b) Names of Special/ Interest Group and individuals invited:
Chiefs, Heads of Departments, Assemblymen, Non-Governmental Organizations, Area Council
Chairmen and Secretaries
(c) Identifiable representations at Hearing: District Assembly members, Heads of Departments, Security Agencies, Traders, Farmer, Teachers, Beautician
and the General Public.
(d) Total Number of Persons at Hearing and Languages used: 119 with 97 being males and 22 being
females (List of participants attached). The mode of communication was mostly Twi and at times
English
(e) Major Issues at Public Hearing
Extension of Electricity to other communities without electricity
Provision of Potable water
Rehabilitation of roads
Provision of Drainage Facilities
Adequately protect the Forest Reserves in the District
Improve Sports Development
Improved Maternity Wards
(f) Main controversies and Major Areas of Complaint
Institute best Teacher award
Operation of illegal Mining
Procurement Cesspool Emptier
(g) Proposal for the Resolution of the above controversies
Facilitated the registration of illegal Miners and monitor their activities
Organization of best Teacher awards to be captured In the plan
Procurement of Cesspool Emptier to be captured in Plan
(h) Unresolved Questions or Queries - Not Applicable
(i) At what level are these unresolved problems going to be resolved and why - Not Applicable.
(j) General comments on level of Participation
178
The participation of the people was ensured with all stakeholders fully represented.
Client acceptance of public hearing report
1) District Chief Executive --------------------------------------------------
(HON. BENJAMIN ANHWERE)
2) Presiding Member of District Assembly --------------------------------------------------
(HON.OHENEBA K.ANDOH
3) District Co-ordinating Director -------------------------------------------------- (SAMUEL NNURO AMPOSAH)