Upload
mahesh
View
9
Download
0
Tags:
Embed Size (px)
DESCRIPTION
ARCHITECTURAL
Citation preview
UP
UP
MIC
MIC
UP
B 2
(A) PARTITION CONSTRUCTION(B) PARTITION CONDITIONS
PARTITION LEGEND
(A) PARTITION CONSTRUCTION
(B) PARTITION CONDITION
THE FOLLOWING PARTITION GRAPHIC SYMBOL AND TWO PART NOTATION SYSTEMIS USED IN THE CONSTRUCTION DOCUMENTS FOR THIS PROJECT. NOTE: THEPARTITION CONSTRUCTION WILL MAINTAIN ITS DESIGNATION TO THE POINT OF ANINTERSECTION WALL. IF NO CHANGE IN DESIGNATION IS SHOWN BEYOND THEINTERSECTION, THE PREVIOUS PARTITION CONSTRUCTION DESIGNATION APPLIES.REFER TO CODE PLAN G-005 FOR RATED WALLS.
A. METAL STUDS - GYPSUM BOARD ONE SIDEB. METAL STUDS - GYPSUM BOARD EACH SIDEC. METAL STUDS - 2 LAYERS OF GYPSUM BOARD ON EACH SIDED. CMUE. CMU - GYPSUM BOARD ON HAT CHANNELSF. CONCRETEG. SHAFT WALL SYSTEM - GYPSUM BOARD ON FINISHED SIDEH. SHAFT WALL SYSTEM - 2 LAYERS OF GYPSUM BOARD ON EACH SIDEI. METAL STUDS - CEMENTITIOUS BOARD 5/8" THICK ON EACH SIDE
"STRUCTURE ABOVE" (AS NOTED IN THE PARTITION CONDITIONS) IS DEFINED ASTHE UNDERSIDE OF ONE OR MORE OF THE FOLLOWING:
* COMPOSITE FLOOR SLAB* STAIR TREADS/RISERS* METAL ROOF DECK* STEEL BEAMS
TERMINATE METAL STUDS AT "STRUCTURE ABOVE" WITH DEFLECTION TRACKREQUIRED FOR WALL CONDITION SCHEDULED.
(NOTE: IN NO CASE SHALL THE BOTTOM OF STEEL JOISTS BE CONSIDERED BOTTOMOF STRUCTURE ABOVE.)
(NOTE: ALL INTERIOR WALLS ARE "B5" UNLESS NOTED OTHERWISE.)
1. RATED ASSEMBLY EXTENDS TO STRUCTURE ABOVE (SEE DEFINITIONBELOW). PROVIDE UL APPROVED FIRE RATED HEAD OF WALLASSEMBLY TO MATCH RATING OF WALL. WALL HEIGHTS EXCEEDINGSTUD MANUFACTURER'S MAXIMUM (LIMITING) SPAN USING 5PSFLATERAL LOADING SHALL BE BRACED TO STRUCTURE ABOVE. (LAY-IN CEILINGS ARE NOT ACCEPTABLE BRACING, HARD CEILINGS AREACCEPTABLE).
2. RATED ASSEMBLY EXTENDS TO STRUCTURE ABOVE (SEE DEFINITIONBELOW). PROVIDE UL APPROVED FIRE RATED HEAD OF WALLASSEMBLY TO MATCH RATING OF WALL. WALL HEIGHTS EXCEEDINGSTUD MANUFACTURER'S MAXIMUM (LIMITING) SPAN USING 5PSFLATERAL LOADING SHALL BE BRACED TO STRUCTURE ABOVE. (LAY-IN CEILINGS ARE NOT ACCEPTABLE BRACING, HARD CEILINGS AREACCEPTABLE). WALL CAVITY IS FULLY INSULATED WITH SOUNDATTENUATION BATTS. INSTALL ACOUSTICAL SEALANT AT TOP ANDBOTTOM OF WALLS (BOTH SIDES) AND ALL PENETRATIONS PERMANUFACTURER'S INSTRUCTIONS.
3. COMPLETE ASSEMBLY EXTENDS TO STRUCTURE ABOVE. WALLCAVITY IS FULLY INSULATED WITH SOUND ATTENUATION BATTS.INSTALL ACOUSTICAL SEALANT AT TOP AND BOTTOM OF WALLS(BOTH SIDES) AND ALL PENETRATIONS PER MANUFACTURER'SINSTRUCTIONS.
4. COMPLETE ASSEMBLY EXTENDS TO AND IS BRACED TO STRUCTUREABOVE.
5. ASSEMBLY EXTENDS 4" MINIMUM ABOVE HIGHEST ADJACENTCEILING AND IS BRACED EACH WAY TO STRUCTURE ABOVE.
6. EXTEND RATED ASSEMBLY THROUGH THE ROOF. METAL STUDWALLS EXTEND TO 4" MINIMUM ABOVE HIGHEST ADJACENT CEILING.
7. ASSEMBLY EXTENDS 4" MINIMUM ABOVE HIGHEST ADJACENTCEILING AND IS BRACED EACH WAY TO STRUCTURE ABOVE. WALLCAVITY IS FULLY INSULATED WITH SOUND ATTENUATION BATTS.INSTALL ACOUSTICAL SEALANT AT BOTTOM OF WALLS (BOTH SIDES)AND ALL PENETRATIONS PER MANUFACTURER'S INSTRUCTIONS.
8. PARTIAL HEIGHT WALL ASSEMBLY. REFER TO INTERIOR ELEVATIONS& SECTIONS
9. INFILL - MATCH EXISTING ADJACENT PARTITION CONDITIONS
A/V STOR
1520
SUPPORTIVECARE
1506
WORK ROOM
1519
OPEN OFFICE
1738
SCHEDULE
1739
CLEANSTORAGE
1745
MAMMO 7
1743
CORRIDOR
1712
STORAGE/WORK
1735
STAFF TLT
1736
OFFICE
1734
MANAGEROFFICE
1733
MAMMO 5
1741
MAMMO 6
1742
MAMMO 4
1740
TECH WORKAREA
1749
MAMMO 1
1750
MAMMO 2
1751
MAMMO 3
1752
ULTRASOUND
1747
BONE DENSITY
1753
BIOPSY
1746
READING ROOM
1755
CONSULT
1756
OXY TANKSTOR
1757
FILE STORAGE
1759
STAFF TLT
1762
PAT TLT
1763
EVS
1764
FINANCE
1720
DRESS 8
1726
DRESS 5
1725
WAITING
1702
LOBBY
1701
CONSULT
1722
DRESS 1
1732
DRESS 2
1731
DRESS 3
1730
PATIENT TLT TLT
1729
DRESS 4
1728
ELEV 02
1025
ELEV 03
1026
ELEV 04
1027
ELEV 01
1024
ELEV 07
1020
ELEV 08
1021
ELEV 05
1033
MEN'S
1762
WOMEN'S
1761
STAIRS 02
1028
ELEC
1760 ELEC
1759
STAIRS 03
1034
VESTIBULE
1030
MOB GALLERY
1029
ELEV LOBBY
1023
SUBWAIT
1716
ENTRYVESTIBULE
1700
BREAK ROOM
1758
CHANGINGAREA
1718
DIGITIZINGROOM
1761
RAMP
1022STOR
1514
XX
X
X
X
X X X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X X X
X
X
X
X
X
X
X
X
XX
X
X
1506A
1514
1520
1519
X X
X
1753
1764
1759A
1704
1722
1731 1730 1729
1728
X
1718
1732
1726
1724
1725
283
1023
1758
313325
CORRIDOR
1031
CORRIDOR
1032
CORRIDOR
1709
CORRIDOR
1711
CORRIDOR
1708
CORRIDOR
1705
CORRIDOR
1714
CORRIDOR
1704
BIOHAZARD
1606
1714
1715
1723
1727
1720
1748
1747
1706
1740
1743
1744
1755
1759
STOR
1727
DRESS 6
1723
PUB. TLT
1719
/A-401-2C4
/A-401-2C3
STORAGE
1740
CHARTING
1737
DRESS 7
1724
WC ALCOVE
1721
CHECK IN
1703
ULTRASOUND
1748
1719
1733 1734 1735 1737 1739
1745
CORRIDOR
1706
SOCIAL SERV.
1516
SOCIAL SERV.
1515
PAT.NAVIGATOR
1517
PAT.NAVIGATOR
1518
DIETICIAN
1511
145146
CHARTING
1754
AL01-2
AL02-2
/A-401-2A2
C1 / A-213-2
C2 / A
-213-2
C4 / A
-213-2 C6 / A-213-2
C5 / A
-213-2
E4 / A-215-2
E3 / A
-215-2
/A-401-2A1
D6 / A
-212-2
A3 / A-214-2
1601
17001701
1761 1760
D5 / A
-201-2
D4 / A-201-2
SOCIAL SERV.
1513
SOILED
1760
STOR
1744
CORRIDOR
1713
CORRIDOR
1707
CORRIDOR
1710
CORRIDOR
1715
C
O
R
R
I
D
O
R
1717
/A-401-2A6
/A-401-2C6
2
2
2
E2 / A-215-2
2
2
2
B7
B8
A5
A5
B8
B8
B8
B8
B8
B8
B8
B8
B8
B8
B9
B9
B9
A5
B9
B9
B5
B9
B5
A5
A5
A5
A5
A5
A5
A5
B7
A7
A7
-
---
-
---
-
---
B8A5
A5
B8
B8
B8
B8
A5
A5
A5
A5
B8B8
A5
A5
B8
1513
A5
A5
A5
A5
B7
B7
B7
B7
B7 B7
B7
B7
B7
B7
B7
/A-401-2C5
2
2
2
2
-
---
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
PACKAGE 2
A
100% CONSTRUCTIONDOCUMENTS
3/3
0/2
015 6
:03:1
7 P
M
FIRST FLOOR
ANNOTATED FLOOR
PLAN - AREA A
A-103A-2
JACC & MOB
ADDITIONS &
RENOVATIONS
4101 22ND PLACE
LUBBOCK, TX 79410
LUBBOCK 7986.14
03/27/2015
RE
VIT
_v15
REGIST
ERE
D ARCH
ITECT
TSA
ET
FO
ET
XAS
16997
OR
EY
L . BRAN
CH
C
tel: 805.522.5662fax: 805.522.5785
6672 santa susana pass roadsimi valley, ca 93063
dm g
montanio group, inc.
AS INDICATED BY: #
KEY NOTES
GENERAL NOTESA. ALL DIMENSIONS ARE TO FACE OF STUD, CMU, OR CENTERLINE OF STRUCTUREB. ALL NEW WALLS TO BE 3 5/8" METAL STUDS UNLESS NOTED OTHERWISE
CONTRACTOR SHALL VERIFY ALL DIMENSIONSC. GENERAL CONTRACTOR SHALL VERIFY AND CLARIFY ALL DIMENSIONAL
DISCREPANCIES FROM THIS OR ANY PLAN, SECTION, OR ELEVATION W/ THEARCHITECT PRIOR TO CONSTRUCTION
D. UNLESS OTHERWISE NOTED, ALL WALLS TO EXTEND MINIMUM OF 6" ABOVEFINISHED CEILING HEIGHT BRACE TO STRUCTURE ABOVE
E. REFER TO SHEET G-003 FOR TYPICAL MOUNTING LOCATIONS FOR TOILET ROOMACCESSORIES
F. PROVIDE BLOCKING WHERE UPPER MILLWORK CABINETS ARE NOTED
1/8" = 1'-0"A1FIRST FLOOR - ANNOTATED FLOOR PLAN - AREA A
NORTH
1 03/19/15 FOR CONSTRUCTION
2 03/27/15 PKG-2 ADD-001
2
UP
B 2
(A) PARTITION CONSTRUCTION(B) PARTITION CONDITIONS
PARTITION LEGEND
(A) PARTITION CONSTRUCTION
(B) PARTITION CONDITION
THE FOLLOWING PARTITION GRAPHIC SYMBOL AND TWO PART NOTATION SYSTEMIS USED IN THE CONSTRUCTION DOCUMENTS FOR THIS PROJECT. NOTE: THEPARTITION CONSTRUCTION WILL MAINTAIN ITS DESIGNATION TO THE POINT OF ANINTERSECTION WALL. IF NO CHANGE IN DESIGNATION IS SHOWN BEYOND THEINTERSECTION, THE PREVIOUS PARTITION CONSTRUCTION DESIGNATION APPLIES.REFER TO CODE PLAN G-005 FOR RATED WALLS.
A. METAL STUDS - GYPSUM BOARD ONE SIDEB. METAL STUDS - GYPSUM BOARD EACH SIDEC. METAL STUDS - 2 LAYERS OF GYPSUM BOARD ON EACH SIDED. CMUE. CMU - GYPSUM BOARD ON HAT CHANNELSF. CONCRETEG. SHAFT WALL SYSTEM - GYPSUM BOARD ON FINISHED SIDEH. SHAFT WALL SYSTEM - 2 LAYERS OF GYPSUM BOARD ON EACH SIDEI. METAL STUDS - CEMENTITIOUS BOARD 5/8" THICK ON EACH SIDE
"STRUCTURE ABOVE" (AS NOTED IN THE PARTITION CONDITIONS) IS DEFINED ASTHE UNDERSIDE OF ONE OR MORE OF THE FOLLOWING:
* COMPOSITE FLOOR SLAB* STAIR TREADS/RISERS* METAL ROOF DECK* STEEL BEAMS
TERMINATE METAL STUDS AT "STRUCTURE ABOVE" WITH DEFLECTION TRACKREQUIRED FOR WALL CONDITION SCHEDULED.
(NOTE: IN NO CASE SHALL THE BOTTOM OF STEEL JOISTS BE CONSIDERED BOTTOMOF STRUCTURE ABOVE.)
(NOTE: ALL INTERIOR WALLS ARE "B5" UNLESS NOTED OTHERWISE.)
1. RATED ASSEMBLY EXTENDS TO STRUCTURE ABOVE (SEE DEFINITIONBELOW). PROVIDE UL APPROVED FIRE RATED HEAD OF WALLASSEMBLY TO MATCH RATING OF WALL. WALL HEIGHTS EXCEEDINGSTUD MANUFACTURER'S MAXIMUM (LIMITING) SPAN USING 5PSFLATERAL LOADING SHALL BE BRACED TO STRUCTURE ABOVE. (LAY-IN CEILINGS ARE NOT ACCEPTABLE BRACING, HARD CEILINGS AREACCEPTABLE).
2. RATED ASSEMBLY EXTENDS TO STRUCTURE ABOVE (SEE DEFINITIONBELOW). PROVIDE UL APPROVED FIRE RATED HEAD OF WALLASSEMBLY TO MATCH RATING OF WALL. WALL HEIGHTS EXCEEDINGSTUD MANUFACTURER'S MAXIMUM (LIMITING) SPAN USING 5PSFLATERAL LOADING SHALL BE BRACED TO STRUCTURE ABOVE. (LAY-IN CEILINGS ARE NOT ACCEPTABLE BRACING, HARD CEILINGS AREACCEPTABLE). WALL CAVITY IS FULLY INSULATED WITH SOUNDATTENUATION BATTS. INSTALL ACOUSTICAL SEALANT AT TOP ANDBOTTOM OF WALLS (BOTH SIDES) AND ALL PENETRATIONS PERMANUFACTURER'S INSTRUCTIONS.
3. COMPLETE ASSEMBLY EXTENDS TO STRUCTURE ABOVE. WALLCAVITY IS FULLY INSULATED WITH SOUND ATTENUATION BATTS.INSTALL ACOUSTICAL SEALANT AT TOP AND BOTTOM OF WALLS(BOTH SIDES) AND ALL PENETRATIONS PER MANUFACTURER'SINSTRUCTIONS.
4. COMPLETE ASSEMBLY EXTENDS TO AND IS BRACED TO STRUCTUREABOVE.
5. ASSEMBLY EXTENDS 4" MINIMUM ABOVE HIGHEST ADJACENTCEILING AND IS BRACED EACH WAY TO STRUCTURE ABOVE.
6. EXTEND RATED ASSEMBLY THROUGH THE ROOF. METAL STUDWALLS EXTEND TO 4" MINIMUM ABOVE HIGHEST ADJACENT CEILING.
7. ASSEMBLY EXTENDS 4" MINIMUM ABOVE HIGHEST ADJACENTCEILING AND IS BRACED EACH WAY TO STRUCTURE ABOVE. WALLCAVITY IS FULLY INSULATED WITH SOUND ATTENUATION BATTS.INSTALL ACOUSTICAL SEALANT AT BOTTOM OF WALLS (BOTH SIDES)AND ALL PENETRATIONS PER MANUFACTURER'S INSTRUCTIONS.
8. PARTIAL HEIGHT WALL ASSEMBLY. REFER TO INTERIOR ELEVATIONS& SECTIONS
9. INFILL - MATCH EXISTING ADJACENT PARTITION CONDITIONS
A4 / A
-201-2
VESTIBULE
1000
FAMILYRESOURCE
CENTER
1604
READING ROOM
1603
FOYER
1601
CHAPEL
1600
A/V STOR
1520
OFFICE
1522
GENERALSTORAGE
1523
INTERVIEWROOM
1525
MULTI-PURPOSECONFERENCE
1504
STAFF TLT
1505
SUPPORTIVECARE
1506
VOLUNTEERWORK
1115
REGISTRATIONMGR OFFICE
1113
WAITING
1018
NORTH WAITING
1011
CONFERENCE
1503
PATIENT/FAMILYCONFERENCE
1500
GALLERY
1017
VALET/SECURITY
1114
WORK ROOM
1519
INTERVIEWROOM
1524
R. ONC. OFFICE
1125
PROCEDUREROOM
1124
R. ONC. OFFICE
1126
R. ONC. OFFICE
1127
STORAGE
1128
EXAM 7
1123
JAN
1134 SOILED UTILITY
1133
EXAM 8
1132
PROCEDUREROOM #2
1131
EXAM 6
1122
EXAM 5
1121
EXAM 4
1120
EXAM 3
1119
EXAM 2
1118
EXAM 1
1117
WORK
1201
PHYSICISTOFFICE
1202
PHYSICISTOFFICE
1203
DOSIMETRY
1204 PHYSICIST/NURSEWORK
1205
PATIENT TLT
1206
PATIENT TLT
1207
PATIENT TLT
1110
CLEAN STOR
1108
REG 3
1101
REG 2
1102
REG 1
1103
PUBLIC TLT
1104
PUBLIC TLT
1105BUSINESS
1106
WORK AREA
1100
TRIAGE
1107
FAMILYCONSULTATION
1212
STORAGE
1213
RAD/ONC MGR
1214
SCHEDULING
1111
BLOCKS/MOLDS
1400
ELEV 07
1020
ELEV 08
1021
STAIRS 02
1028
CORRIDOR
1012
SCHEDULING
1200
STAIRS
1019
RAMP
1022
CORRIDOR
1009
/A-501-2C6
/A-501-2A6
/A-501-2A3
/ ----
/A-501-2E6
HDR
1300
HOLD
1304
CONTROL RM
1303
STOR
1514
1600
1602
1604
STOR
1605
LIBRARY
1602
X
X
X
X
X
X
X
X
1486
1411
1405
X
X
X
X
1115
1003
1214
15031500
1506A
1514
1505
1504
1506
1523
1520
1012
1519
1525
1524
12131212
1123
1124
1125
1126
1127
1128
1132
1131
1203
1202
1133
1205
1207
1206
1005
1103
1102
1110
1100
1134
15021501
11011102A
1103A
AR
EA
B
AR
EA
CAREA A
AREA B AR
EA
B
AR
EA
C
AREA AAREA A
COURTYARD
STORAGEALCOVE
1116
CORRIDOR
1005
CORRIDOR
1004
CORRIDOR
1003
CORRIDOR
1006
CORRIDOR
1016C
O
R
R
I
D
O
R
1010
STORAGE
1501
AV EQUIP.
1502
BIOHAZARD
1606
A2
A-311-2
X
AL09-2
AL10-2
AL11-2
AL12-2
AL13-2
5' - 0"
RESTRICTED
ACCESS LINE
CHECK OUT
1112
-
---
STAFF TLT
1130
OXY STOR
1129
/A-402-2D1
OFFICE
1521
FIN. COUNSEL
1508
SURVIVORSHIP
1507
FIN. COUNSEL
1510
GENETICS
1509
SOCIAL SERV.
1516
SOCIAL SERV.
1515
PAT.NAVIGATOR
1517
PAT.NAVIGATOR
1518
STAFFREFRESH
1506
/A-501-2C3
/A-501-2A1
DIETICIAN
1511
A6
A-312-2
X X
11291130
1204A
11111104
1105
1605
ENTRYCORRIDOR
1001
CHARTING
1109
1204
11081109
AL04-2
AL05-2
AL08-2
1416
D3 / A-201-2
1001
1601A 1601
1002
1114
1112
1206
D1 / A-201-2
D2 / A
-201-2
SOCIAL SERV.
1513
A3
A-311-2
A1
A-311-2
A6
A-311-2
RECEPTION
1002
A5
A-311-2
A4
A-311-21113
/A-402-2A1
EVS
1406
-
---
-
---
-
---
C1 / A
-218-2
-
---
/A-402-2A3
/A-401-2B3
B8A5
A5
B8
B8
B8
B8
A5
A5
A5
A5
B8B8
A5
A5
A5
A5
B8
B8 B8
2
2
2
2
2
2
B8
B8
1523
B8
1513
B8
A5
A5
A5
A5
B8
B8
B8
A5A
5
B8
B8
B7
A5
A5
B8
A5
A5
A5
A5
A5
A5
A5
2
B7
B7
B7
B7
B7
A5
B7
B7
A5
A5
B7
A5
A5
A5
A5
A7
B7
B7B7
A5
B7
A5
B7
B7
B7
B7
A5
A5
A5
2
A5
A5
A5
A5 A5
A5
2
A5
A5
/A-401-2B1
/A-402-2D4
/A-402-2A4
/A-402-2C3
A7
A7
A5A5
B7
B7
B7
B7
B7
B7
B7
B7
B7
B7
A7
A7
B7
A7
B7
A5 A5 A5
A5
A5
A5
A5
A5 A5
A5
A5
A5
A5
A5
A5
A5
A5
B7
B7
B7
B7
B7
B7B7
B7
B7
B7B
7
B7
B7
B7
A7
A7
A5A7
A5
A5
A7
A5
B7
B7
B7
B7
A5
A5A7
A5
A5
A5
A5
A5
B7
A5
A7
B7
B7
B7
A5
A5
A5
2
A5
A5
A5
A5
A5
A5
A5
A5
A5A
5
B7
A5
B7
2
2
AL03-2
AL07-2
-
---
2
2
2
A5
A-312-2
2
1606
AL06-2
2
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
PACKAGE 2
B
100% CONSTRUCTIONDOCUMENTS
3/3
0/2
015 6
:03:2
0 P
M
FIRST FLOOR
ANNOTATED FLOOR
PLAN - AREA B
A-103B-2
JACC & MOB
ADDITIONS &
RENOVATIONS
4101 22ND PLACE
LUBBOCK, TX 79410
LUBBOCK 7986.14
03/27/2015
RE
VIT
_v15
tel: 805.522.5662fax: 805.522.5785
6672 santa susana pass roadsimi valley, ca 93063
dm g
montanio group, inc.
REGIST
ERE
D ARCH
ITECT
TSA
ET
FO
ET
XAS
16997
OR
EY
L . BRAN
CH
C
AS INDICATED BY: #
KEY NOTES
GENERAL NOTESA. ALL DIMENSIONS ARE TO FACE OF STUD, CMU, OR CENTERLINE OF STRUCTUREB. ALL NEW WALLS TO BE 3 5/8" METAL STUDS UNLESS NOTED OTHERWISE
CONTRACTOR SHALL VERIFY ALL DIMENSIONSC. GENERAL CONTRACTOR SHALL VERIFY AND CLARIFY ALL DIMENSIONAL
DISCREPANCIES FROM THIS OR ANY PLAN, SECTION, OR ELEVATION W/ THEARCHITECT PRIOR TO CONSTRUCTION
D. UNLESS OTHERWISE NOTED, ALL WALLS TO EXTEND MINIMUM OF 6" ABOVEFINISHED CEILING HEIGHT BRACE TO STRUCTURE ABOVE
E. REFER TO SHEET G-003 FOR TYPICAL MOUNTING LOCATIONS FOR TOILET ROOMACCESSORIES
F. PROVIDE BLOCKING WHERE UPPER MILLWORK CABINETS ARE NOTED
1/8" = 1'-0"A2FIRST FLOOR - ANNOTATED FLOOR PLAN - AREA B
NORTH
1 03/19/15 FOR CONSTRUCTION
2 03/27/15 PKG-2 ADD-001
2
DN
MICMIC
SPACE FOR WATER
GAUGES & FILTERS
B 2
(A) PARTITION CONSTRUCTION(B) PARTITION CONDITIONS
PARTITION LEGEND
(A) PARTITION CONSTRUCTION
(B) PARTITION CONDITION
THE FOLLOWING PARTITION GRAPHIC SYMBOL AND TWO PART NOTATION SYSTEMIS USED IN THE CONSTRUCTION DOCUMENTS FOR THIS PROJECT. NOTE: THEPARTITION CONSTRUCTION WILL MAINTAIN ITS DESIGNATION TO THE POINT OF ANINTERSECTION WALL. IF NO CHANGE IN DESIGNATION IS SHOWN BEYOND THEINTERSECTION, THE PREVIOUS PARTITION CONSTRUCTION DESIGNATION APPLIES.REFER TO CODE PLAN G-005 FOR RATED WALLS.
A. METAL STUDS - GYPSUM BOARD ONE SIDEB. METAL STUDS - GYPSUM BOARD EACH SIDEC. METAL STUDS - 2 LAYERS OF GYPSUM BOARD ON EACH SIDED. CMUE. CMU - GYPSUM BOARD ON HAT CHANNELSF. CONCRETEG. SHAFT WALL SYSTEM - GYPSUM BOARD ON FINISHED SIDEH. SHAFT WALL SYSTEM - 2 LAYERS OF GYPSUM BOARD ON EACH SIDEI. METAL STUDS - CEMENTITIOUS BOARD 5/8" THICK ON EACH SIDE
"STRUCTURE ABOVE" (AS NOTED IN THE PARTITION CONDITIONS) IS DEFINED ASTHE UNDERSIDE OF ONE OR MORE OF THE FOLLOWING:
* COMPOSITE FLOOR SLAB* STAIR TREADS/RISERS* METAL ROOF DECK* STEEL BEAMS
TERMINATE METAL STUDS AT "STRUCTURE ABOVE" WITH DEFLECTION TRACKREQUIRED FOR WALL CONDITION SCHEDULED.
(NOTE: IN NO CASE SHALL THE BOTTOM OF STEEL JOISTS BE CONSIDERED BOTTOMOF STRUCTURE ABOVE.)
(NOTE: ALL INTERIOR WALLS ARE "B5" UNLESS NOTED OTHERWISE.)
1. RATED ASSEMBLY EXTENDS TO STRUCTURE ABOVE (SEE DEFINITIONBELOW). PROVIDE UL APPROVED FIRE RATED HEAD OF WALLASSEMBLY TO MATCH RATING OF WALL. WALL HEIGHTS EXCEEDINGSTUD MANUFACTURER'S MAXIMUM (LIMITING) SPAN USING 5PSFLATERAL LOADING SHALL BE BRACED TO STRUCTURE ABOVE. (LAY-IN CEILINGS ARE NOT ACCEPTABLE BRACING, HARD CEILINGS AREACCEPTABLE).
2. RATED ASSEMBLY EXTENDS TO STRUCTURE ABOVE (SEE DEFINITIONBELOW). PROVIDE UL APPROVED FIRE RATED HEAD OF WALLASSEMBLY TO MATCH RATING OF WALL. WALL HEIGHTS EXCEEDINGSTUD MANUFACTURER'S MAXIMUM (LIMITING) SPAN USING 5PSFLATERAL LOADING SHALL BE BRACED TO STRUCTURE ABOVE. (LAY-IN CEILINGS ARE NOT ACCEPTABLE BRACING, HARD CEILINGS AREACCEPTABLE). WALL CAVITY IS FULLY INSULATED WITH SOUNDATTENUATION BATTS. INSTALL ACOUSTICAL SEALANT AT TOP ANDBOTTOM OF WALLS (BOTH SIDES) AND ALL PENETRATIONS PERMANUFACTURER'S INSTRUCTIONS.
3. COMPLETE ASSEMBLY EXTENDS TO STRUCTURE ABOVE. WALLCAVITY IS FULLY INSULATED WITH SOUND ATTENUATION BATTS.INSTALL ACOUSTICAL SEALANT AT TOP AND BOTTOM OF WALLS(BOTH SIDES) AND ALL PENETRATIONS PER MANUFACTURER'SINSTRUCTIONS.
4. COMPLETE ASSEMBLY EXTENDS TO AND IS BRACED TO STRUCTUREABOVE.
5. ASSEMBLY EXTENDS 4" MINIMUM ABOVE HIGHEST ADJACENTCEILING AND IS BRACED EACH WAY TO STRUCTURE ABOVE.
6. EXTEND RATED ASSEMBLY THROUGH THE ROOF. METAL STUDWALLS EXTEND TO 4" MINIMUM ABOVE HIGHEST ADJACENT CEILING.
7. ASSEMBLY EXTENDS 4" MINIMUM ABOVE HIGHEST ADJACENTCEILING AND IS BRACED EACH WAY TO STRUCTURE ABOVE. WALLCAVITY IS FULLY INSULATED WITH SOUND ATTENUATION BATTS.INSTALL ACOUSTICAL SEALANT AT BOTTOM OF WALLS (BOTH SIDES)AND ALL PENETRATIONS PER MANUFACTURER'S INSTRUCTIONS.
8. PARTIAL HEIGHT WALL ASSEMBLY. REFER TO INTERIOR ELEVATIONS& SECTIONS
9. INFILL - MATCH EXISTING ADJACENT PARTITION CONDITIONS
B1 / A-201-2
PATIENT TLT
1206
PATIENT TLT
1207
STOR. EQUIP
1329
STOR. EQUIP
1328
HOT LAB
1315
PATIENT TLT
1313
INJECTIONROOM
1312
INJECTIONROOM
1311
HOT CORR.
1309
VAULT #1CONTROL
ROOM
1308
PATIENT HOLD
1307
PATIENT TLT
1306
PET SCAN
1327
GAMMA KNIFE
1305
KITCHEN
1425
STAFFLOCKERS
1423
CHANGE
1420
RESOURCECENTER
1416
STYLE
1419
CHANGE
1421
STOR.
1417DISPLAY
1418
STAFFCORRIDOR
1013
WOMENWAITING
1411
WOMENSDRESS
1412
WOMENSDRESS
1414
W TOILET
1407
W TOILET
1408M TOILET
1409
M TOILET
1410
MENS DRESS
1403
MENS DRESS
1401
BLOCKS/MOLDS
1400
STAIRS 03
1034
CORRIDOR
1012S
T
A
F
F
C
O
R
R
I
D
O
R
1014
LINEARACCELERATOR
1323
VAULT
1318
CONTROL
1317
CONTROL RM
1316
CONTROL
1330
CT ACQ SIM
1208
MODULATOR
1210
MECH
1210
X
X
XX XX
X
X
X
1486
1414
1411 1411A
1405A
1407 1408
1409 14101405
1400
1403
1412
1401
X
X
X
X
XX
1012
X
1015
1422
1207
1206
1314A
1313
1312
1311
1327
1310A
14201417
1013 1013A
1014
AR
EA
B
AR
EA
CA
RE
A B
AR
EA
C
AREA AAREA A
COURTYARD
CONTROL RM
1209
CORRIDOR
1006
ELECT
1404
ELEVATOR 6
1415
CORRIDOR
1016
STAIR 01
1007
BIOHAZARD
1606
STOR
1413
/A-403-2A1
X
1208
1421
1315
1310
1306
X
MEN WAITING
1405
PHYS STOR
1211
HOT VESTIBULE
1310
1416
B4 / A
-211-2
/A-403-2A2
A 6
/ A
-212-2
B1 / A
-212-2
B3 / A
-212-2
X
1422A
1424
/A-403-2A5
STAFF TLT
1424
STAFF BREAKROOM
1422
CORRIDOR
1015
/A-403-2B4
C2 / A
-215-2
C5 / A-215-2
D4 / A
-215-2
1305
STORAGE
1402
EVS
1406
1413
B8
A5A5
A5
1513
A5
A7
B7
A5
B7
A5
A5
B7
A5
B7
A5
2
A5
A5
A5
A5
A5
A5
A5
1406
B7
B7
A7
A7
B7
B7
B7
B7A7
A7
B7
B7
B7
A5A5
B7
A7A5
A7
A5
B7
B7
B7
A5
2
2
A5
A7B
7
B7
A7
A5
A5
A5
A7
A7
B7
B7
1402
2
AL14-2
PET/CT HOTLAB
13141314
1329
1328
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
PACKAGE 2
C
100% CONSTRUCTIONDOCUMENTS
3/3
0/2
015 6
:03:2
2 P
M
FIRST FLOOR
ANNOTATED FLOOR
PLAN - AREA C
A-103C-2
JACC & MOB
ADDITIONS &
RENOVATIONS
4101 22ND PLACE
LUBBOCK, TX 79410
LUBBOCK 7986.14
03/27/2015
RE
VIT
_v15
REGIST
ERE
D ARCH
ITECT
TSA
ET
FO
ET
XAS
16997
OR
EY
L . BRAN
CH
C
tel: 805.522.5662fax: 805.522.5785
6672 santa susana pass roadsimi valley, ca 93063
dm g
montanio group, inc.
AS INDICATED BY: #
KEY NOTES
GENERAL NOTESA. ALL DIMENSIONS ARE TO FACE OF STUD, CMU, OR CENTERLINE OF STRUCTUREB. ALL NEW WALLS TO BE 3 5/8" METAL STUDS UNLESS NOTED OTHERWISE
CONTRACTOR SHALL VERIFY ALL DIMENSIONSC. GENERAL CONTRACTOR SHALL VERIFY AND CLARIFY ALL DIMENSIONAL
DISCREPANCIES FROM THIS OR ANY PLAN, SECTION, OR ELEVATION W/ THEARCHITECT PRIOR TO CONSTRUCTION
D. UNLESS OTHERWISE NOTED, ALL WALLS TO EXTEND MINIMUM OF 6" ABOVEFINISHED CEILING HEIGHT BRACE TO STRUCTURE ABOVE
E. REFER TO SHEET G-003 FOR TYPICAL MOUNTING LOCATIONS FOR TOILET ROOMACCESSORIES
F. PROVIDE BLOCKING WHERE UPPER MILLWORK CABINETS ARE NOTED
1/8" = 1'-0"A2FIRST FLOOR - ANNOTATED FLOOR PLAN - AREA C
1 03/19/15 FOR CONSTRUCTION
2 03/27/15 PKG-2 ADD-001
2
A/V STOR
1520
SUPPORTIVECARE
1506
WORK ROOM
1519
OPEN OFFICE
1738
SCHEDULE
1739
CLEANSTORAGE
1745
MAMMO 7
1743
CORRIDOR
1712
STORAGE/WORK
1735
STAFF TLT
1736OFFICE
1734
MANAGEROFFICE
1733
MAMMO 5
1741
MAMMO 6
1742
MAMMO 4
1740
TECH WORKAREA
1749
MAMMO 1
1750
MAMMO 2
1751
MAMMO 3
1752
ULTRASOUND
1747
BONE DENSITY
1753
BIOPSY
1746
READING ROOM
1755
CONSULT
1756
OXY TANKSTOR
1757
FILE STORAGE
1759
STAFF TLT
1762
PAT TLT
1763
EVS
1764
FINANCE
1720
DRESS 8
1726
WAITING
1702
LOBBY
1701
CONSULT
1722
DRESS 1
1732
DRESS 2
1731
DRESS 3
1730
PATIENT TLT TLT
1729
DRESS 4
1728
ELEV 02
1025
ELEV 03
1026
ELEV 04
1027
ELEV 01
1024
ELEV 07
1020
ELEV 08
1021
ELEV 05
1033
MEN'S
1762
WOMEN'S
1761
STAIRS 02
1028
ELEC
1760 ELEC
1759
STAIRS 03
1034
VESTIBULE
1030
MOB GALLERY
1029
ELEV LOBBY
1023
SUBWAIT
1716
ENTRYVESTIBULE
1700
BREAK ROOM
1758
CHANGINGAREA
1718
DIGITIZINGROOM
1761
RAMP
1022
STOR
1514
( )9' - 0"
( )9' - 0"
DRESS 6
1723
STOR
1727
ULTRASOUND
1748
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0" ( )9' - 0" ( )9' - 0"
( )9' - 0"
( )9' - 0" ( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"( )9' - 0"( )9' - 0"
( )9' - 0"
( )9' - 0"
( )8' - 6"
( )9' - 0"( )9' - 0"
( )9' - 0"( )9' - 0"( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0" ( )9' - 0" ( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
DRESS 7
1724
DRESS 5
1725
( )9' - 0"
PUB. TLT
1719
CHARTING
1737
( )9' - 0"
STORAGE
1740
( )9' - 0"
( )9' - 0"
CORRIDOR
1706
SOCIAL SERV.
1516
PAT.NAVIGATOR
1517
PAT.NAVIGATOR
1518
DIETICIAN
1511
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
CORRIDOR
1031
CORRIDOR
1032
CORRIDOR
1709
CORRIDOR
1711
CORRIDOR
1708
CORRIDOR
1705
CORRIDOR
1714
CORRIDOR
1704
BIOHAZARD
1606
CHECK IN
1703WC ALCOVE
1721
CHARTING
1754
SOCIAL SERV.
1515
SOCIAL SERV.
1513
SOILED
1760
( )9' - 0"
-
--- ( )9' - 0"
R 8'
- 3"
2' - 11 3/8"( )8' - 6"
( )8' - 6"
( )8' - 6"
( )7' - 2"
( )9' - 0"
STOR
1513
( )9' - 0"
( )9' - 0"( )9' - 0"
( )9' - 0"( )9' - 0"
( )9' - 0"
( )9' - 0"
D2
A-502-2
D1
A-502-2
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )6' - 6"
( )7' - 2"
( )7' - 2"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
STOR
1744
( )9' - 0"
2
2
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
PACKAGE 2
A
100% CONSTRUCTIONDOCUMENTS
3/3
0/2
015 6
:03:2
3 P
M
FIRST FLOOR
REFLECTED CEILING
PLAN - AREA A
A-104A-2
JACC & MOB
ADDITIONS &
RENOVATIONS
4101 22ND PLACE
LUBBOCK, TX 79410
LUBBOCK 7986.14
03/27/2015
RE
VIT
_v15
REGIST
ERE
D ARCH
ITECT
TSA
ET
FO
ET
XAS
16997
OR
EY
L . BRAN
CH
C
tel: 805.522.5662fax: 805.522.5785
6672 santa susana pass roadsimi valley, ca 93063
dm g
montanio group, inc.
AS INDICATED BY: #
KEY NOTES
GENERAL NOTESA. REFER TO MEP DRAWINGS AND SPECIFICATIONS FOR DESIGN OF
THESE SYSTEMS (DUCT SIZES, CIRCUITING, ETC.) LOCATIONS OFFIXTURES SHALL BE AS SHOWN ON ARCHITECTURAL PLANS ANDDETAILS. NOTIFY ARCHITECT OF ANY CONFLICTS PRIOR TOCONSTRUCTION.
B. FIELD VERIFY CONDITIONS AND LOCATIONS OF ALL PLUMBING,DUCTS, STRUCTURAL ELEMENTS AND OTHER APPLICABLE ITEMS.ARRANGE AND MODIFY NONVISIBLE ITEMS TO ENSURE ADEQUATECLEARANCE FOR CEILING LAY-OUT AS SHOWN.
C. FINAL SPRINKLER HEAD LOCATIONS SHALL BE SET BY THEENGINEER AND COORDINATED WITH ARCHITECT. CENTER HEADS INACOUSTICAL TILE OR CEILING PANEL WHERE POSSIBLE, U.N.O.
D. CEILING HEIGHTS SHALL BE 9' - 0" ABOVE FINISHED FLOOR U.N.O.E. REFER TO ELECTRICAL DRAWINGS FOR FIXTURE TYPE SCHEDULE.F. REFER TO INTERIOR ELEVATIONS AND ROOM FINISH SCHEDULE FOR
ADDITIONAL INFORMATION CONCERNING HEIGHTS, CEILINGMATERIALS AND FURRED CEILINGS.
G. MEASURE EACH CEILING AREA AND ESTABLISH LAYOUT OFACOUSTICAL UNITS AS SHOWN TO BALANCE BORDER WIDTHS ATOPPOSITE EDGES OF EACH CEILING.
H. CEILINGS AND OTHER SUSPENDED ITEMS SHALL BE ATTACHED TOSTRUCTURE BY FULLY EMBEDDED OR "SHEAR" CONNECTIONS. PULLOUT CONNECTIONS ARE NOT ACCEPTABLE.
I. ALL GYPSUM BOARD CEILINGS SHALL BE 5/8" TYPE X GYPSUMBOARD ON SUSPENDED LIGHT GUAGE FRAMING PER THESPECIFICATIONS.
J. CENTER ALL DEVICES, SPRINKLER HEADS, ETC. IN CEILING TILES.K. DIMENSIONS INDICATED ON PLAN ARE FROM FACE OF STUD TO
FACE OF STUD U.N.O.L. AT ALL LOCATIONS OF PERFORATED RETURN AIR GRILLES. ALL
WIRING, CABLING, ETC, TO BE HELD CLEAR OF OPEN LINE OF SITETHROUGH GRILLE. IN CASES WHERE THIS IS UNAVOIDABLE, ITEMVISIBLE ABOVE THE GRILLE ARE TO BE PAINTED FLAT BLACK.
M. GENERAL CONTRACTOR SHALL LOCATE ALL ITEMS NEEDINGACCESS ABOVE LAY-IN TILE CEILINGS. THERE SHALL BE NO ACCESSPANELS IN DRYWALL CEILINGS, U.N.O.
N. PROVIDE CEILING TILE AND DRYWALL AS SPECIFIED AND INDICATEDON DRAWINGS.
1/8" = 1'-0"A1FIRST FLOOR - REFLECTED CEILING PLAN - AREA A
NORTH
1 03/19/15 FOR CONSTRUCTION
2 03/27/15 PKG-2 ADD-001
2
VESTIBULE
1000
FAMILYRESOURCE
CENTER
1604
READING ROOM
1603
FOYER
1601
CHAPEL
1600
A/V STOR
1520
OFFICE
1522
GENERALSTORAGE
1523
INTERVIEWROOM
1525
MULTI-PURPOSECONFERENCE
1504
STAFF TLT
1505
SUPPORTIVECARE
1506
VOLUNTEERWORK
1115
REGISTRATIONMGR OFFICE
1113
WAITING
1018
NORTH WAITING
1011
CONFERENCE
1503PATIENT/FAMILYCONFERENCE
1500
GALLERY
1017
VALET/SECURITY
1114
WORK ROOM
1519
INTERVIEWROOM
1524
R. ONC. OFFICE
1125
PROCEDUREROOM
1124
R. ONC. OFFICE
1126
R. ONC. OFFICE
1127
STORAGE
1128
EXAM 7
1123
JAN
1134
SOILED UTILITY
1133
EXAM 8
1132
PROCEDUREROOM #2
1131
EXAM 6
1122
EXAM 5
1121
EXAM 4
1120
EXAM 3
1119
EXAM 2
1118
EXAM 1
1117
WORK
1201
PHYSICISTOFFICE
1202
PHYSICISTOFFICE
1203
DOSIMETRY
1204
PHYSICIST/NURSEWORK
1205
PATIENT TLT
1206
PATIENT TLT
1207
PATIENT TLT
1110
CLEAN STOR
1108
REG 3
1101
REG 2
1102
REG 1
1103
PUBLIC TLT
1104
PUBLIC TLT
1105
BUSINESS
1106
CHECK OUT
1112
WORK AREA
1100
TRIAGE
1107
FAMILYCONSULTATION
1212
STORAGE
1213
RAD/ONC MGR
1214
SCHEDULING
1111
BLOCKS/MOLDS
1400
ELEV 07
1020
ELEV 08
1021
STAIRS 02
1028
CORRIDOR
1012
SCHEDULING
1200
STAIRS
1019
RAMP
1022
CORRIDOR
1009
HDR
1300
HOLD
1304
CONTROL RM
1303
CT ACQ SIM
1208
STOR
1514
STOR
1605
LIBRARY
1602
STORAGEALCOVE
1116
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )10' - 0"
( )10' - 0"
( )10' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 8"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 8"( )9' - 0"
( )9' - 0"
( )9' - 0"
OPEN TO ABOVE
( )8' - 6"
( )10' - 0"
( )10' - 0"
( )8' - 6"
( )9' - 0"
( )9' - 0"( )9' - 0"
( )9' - 0"
( )8' - 6"
( )8' - 6"
( )8' - 6"
( )11' - 0"( )10' - 0"
( )0"
OXY STOR
1129
STAFF TLT
1130
CORRIDOR
1004
( )9' - 0"
OFFICE
1521
SOCIAL SERV.
1516
PAT.NAVIGATOR
1517
PAT.NAVIGATOR
1518
FIN. COUNSEL
1510
GENETICS
1509
SURVIVORSHIP
1507
FIN. COUNSEL
1508
STAFFREFRESH
1506
DIETICIAN
1511
( )9' - 0"
( )9' - 0"
( )6' - 0"
CHARTING
1109
ENTRYCORRIDOR
1001
CORRIDOR
1005
CORRIDOR
1003
ELEVATOR 6
1415
CORRIDOR
1016
CORRIDOR
1010
STORAGE
1501
AV EQUIP.
1502
BIOHAZARD
1606
SOCIAL SERV.
1515
SOCIAL SERV.
1513
( )8' - 0"
R 6'
- 6"
( )8' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"EVS
1406
E2
A-502-2
( )8' - 6"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
D2
A-502-2
( )9' - 0"
( )7' - 2"
( )7' - 2"
( )9' - 0"
( )7' - 2"( )7' - 2"
( )7' - 2"
( )
7' - 2"
( )7' - 2"
( )8' - 6"
( )9' - 0"
D1
A-502-2
D1
A-502-2
( )9' - 0"
D2
A-502-2
D2
A-502-2
D2
A-502-2
( )8' - 6"
( )8' - 6"
( )7' - 2"
( )9' - 0"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )9' - 0"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"( )9' - 0"
( )9' - 0"
STOR
1513
( )9' - 0"
( )9' - 0"( )9' - 0"
( )9' - 0"( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
D2
A-502-2
2
2
2
2
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
PACKAGE 2
B
100% CONSTRUCTIONDOCUMENTS
3/3
0/2
015 6
:03:2
5 P
M
FIRST FLOOR
REFLECTED CEILING
PLAN - AREA B
A-104B-2
JACC & MOB
ADDITIONS &
RENOVATIONS
4101 22ND PLACE
LUBBOCK, TX 79410
LUBBOCK 7986.14
03/27/2015
RE
VIT
_v15
REGIST
ERE
D ARCH
ITECT
TSA
ET
FO
ET
XAS
16997
OR
EY
L . BRAN
CH
C
tel: 805.522.5662fax: 805.522.5785
6672 santa susana pass roadsimi valley, ca 93063
dm g
montanio group, inc.
AS INDICATED BY: #
KEY NOTES
GENERAL NOTESA. REFER TO MEP DRAWINGS AND SPECIFICATIONS FOR DESIGN OF
THESE SYSTEMS (DUCT SIZES, CIRCUITING, ETC.) LOCATIONS OFFIXTURES SHALL BE AS SHOWN ON ARCHITECTURAL PLANS ANDDETAILS. NOTIFY ARCHITECT OF ANY CONFLICTS PRIOR TOCONSTRUCTION.
B. FIELD VERIFY CONDITIONS AND LOCATIONS OF ALL PLUMBING,DUCTS, STRUCTURAL ELEMENTS AND OTHER APPLICABLE ITEMS.ARRANGE AND MODIFY NONVISIBLE ITEMS TO ENSURE ADEQUATECLEARANCE FOR CEILING LAY-OUT AS SHOWN.
C. FINAL SPRINKLER HEAD LOCATIONS SHALL BE SET BY THEENGINEER AND COORDINATED WITH ARCHITECT. CENTER HEADS INACOUSTICAL TILE OR CEILING PANEL WHERE POSSIBLE, U.N.O.
D. CEILING HEIGHTS SHALL BE 9' - 0" ABOVE FINISHED FLOOR U.N.O.E. REFER TO ELECTRICAL DRAWINGS FOR FIXTURE TYPE SCHEDULE.F. REFER TO INTERIOR ELEVATIONS AND ROOM FINISH SCHEDULE FOR
ADDITIONAL INFORMATION CONCERNING HEIGHTS, CEILINGMATERIALS AND FURRED CEILINGS.
G. MEASURE EACH CEILING AREA AND ESTABLISH LAYOUT OFACOUSTICAL UNITS AS SHOWN TO BALANCE BORDER WIDTHS ATOPPOSITE EDGES OF EACH CEILING.
H. CEILINGS AND OTHER SUSPENDED ITEMS SHALL BE ATTACHED TOSTRUCTURE BY FULLY EMBEDDED OR "SHEAR" CONNECTIONS. PULLOUT CONNECTIONS ARE NOT ACCEPTABLE.
I. ALL GYPSUM BOARD CEILINGS SHALL BE 5/8" TYPE X GYPSUMBOARD ON SUSPENDED LIGHT GUAGE FRAMING PER THESPECIFICATIONS.
J. CENTER ALL DEVICES, SPRINKLER HEADS, ETC. IN CEILING TILES.K. DIMENSIONS INDICATED ON PLAN ARE FROM FACE OF STUD TO
FACE OF STUD U.N.O.L. AT ALL LOCATIONS OF PERFORATED RETURN AIR GRILLES. ALL
WIRING, CABLING, ETC, TO BE HELD CLEAR OF OPEN LINE OF SITETHROUGH GRILLE. IN CASES WHERE THIS IS UNAVOIDABLE, ITEMVISIBLE ABOVE THE GRILLE ARE TO BE PAINTED FLAT BLACK.
M. GENERAL CONTRACTOR SHALL LOCATE ALL ITEMS NEEDINGACCESS ABOVE LAY-IN TILE CEILINGS. THERE SHALL BE NO ACCESSPANELS IN DRYWALL CEILINGS, U.N.O.
N. PROVIDE CEILING TILE AND DRYWALL AS SPECIFIED AND INDICATEDON DRAWINGS.
1/8" = 1'-0"A2FIRST FLOOR - REFLECTED CEILING PLAN - AREA B
NORTH
1 03/19/15 FOR CONSTRUCTION
2 03/27/15 PKG-2 ADD-001
2
STAFF TLT
1505
PATIENT TLT
1206
PATIENT TLT
1207
STOR. EQUIP
1329
STOR. EQUIP
1328
HOT LAB
1315
PATIENT TLT
1313
INJECTIONROOM
1312
INJECTIONROOM
1311
HOT CORR.
1309
VAULT #1CONTROL
ROOM
1308
PATIENT HOLD
1307
PATIENT TLT
1306
PET SCAN
1327
GAMMA KNIFE
1305
KITCHEN
1425
STAFFLOCKERS
1423
CHANGE
1420
RESOURCECENTER
1416
STYLE
1419
CHANGE
1421
STOR.
1417
DISPLAY
1418
STAFFCORRIDOR
1013
WOMENWAITING
1411
WOMENSDRESS
1412
WOMENSDRESS
1414
W TOILET
1407
W TOILET
1408
M TOILET
1409
M TOILET
1410
MENS DRESS
1403
MENS DRESS
1401
BLOCKS/MOLDS
1400
CORRIDOR
1012
CORRIDOR
1009
STAFFCORRIDOR
1014
LINEARACCELERATOR
1323
VAULT
1318
CONTROL
1317
CONTROL RM
1316
CONTROL
1330
CT ACQ SIM
1208
MECH
1210
( )9' - 0"
( )9' - 0" ( )9' - 0"( )9' - 0"( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )8' - 6"
( )9' - 0"
( )9' - 0"
( )9' - 0"
MEN WAITING
1405
STOR
1413
CONTROL RM
1209
PHYS STOR
1211
( )9' - 0"
( )9' - 0"
STAFFREFRESH
1506
DIETICIAN
1511
HOT VESTIBULE
1310
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
STAFF TLT
1424
STAFF BREAKROOM
1422
CORRIDOR
1015
( )9' - 0"
( )9' - 0"
( )6' - 0"
MODULATOR
1210
CORRIDOR
1006
ELECT
1404
ELEVATOR 6
1415
CORRIDOR
1016
STAIR 01
1007
BIOHAZARD
1606
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"EVS
1406
STORAGE
1402
( )9' - 0"
( )9' - 0" ( )9' - 0"
( )9' - 0"
( )9' - 0"
CORRIDOR
1008
PET/CT HOTLAB
1314
( )9' - 0"
( )7' - 2"
( )9' - 0"
( )9' - 0"
E2
A-502-2
( )9' - 0"
( )8' - 6"
D2
A-502-2
( )7' - 2"
( )9' - 0"
STOR
1513
( )9' - 0"
( )9' - 0"
2
2
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
PACKAGE 2
C
100% CONSTRUCTIONDOCUMENTS
3/3
0/2
015 6
:03:2
6 P
M
FIRST FLOOR
REFLECTED CEILING
PLAN - AREA C
A-104C-2
JACC & MOB
ADDITIONS &
RENOVATIONS
4101 22ND PLACE
LUBBOCK, TX 79410
LUBBOCK 7986.14
03/27/2015
RE
VIT
_v15
REGIST
ERE
D ARCH
ITECT
TSA
ET
FO
ET
XAS
16997
OR
EY
L . BRAN
CH
C
tel: 805.522.5662fax: 805.522.5785
6672 santa susana pass roadsimi valley, ca 93063
dm g
montanio group, inc.
AS INDICATED BY: #
KEY NOTES
GENERAL NOTESA. REFER TO MEP DRAWINGS AND SPECIFICATIONS FOR DESIGN OF
THESE SYSTEMS (DUCT SIZES, CIRCUITING, ETC.) LOCATIONS OFFIXTURES SHALL BE AS SHOWN ON ARCHITECTURAL PLANS ANDDETAILS. NOTIFY ARCHITECT OF ANY CONFLICTS PRIOR TOCONSTRUCTION.
B. FIELD VERIFY CONDITIONS AND LOCATIONS OF ALL PLUMBING,DUCTS, STRUCTURAL ELEMENTS AND OTHER APPLICABLE ITEMS.ARRANGE AND MODIFY NONVISIBLE ITEMS TO ENSURE ADEQUATECLEARANCE FOR CEILING LAY-OUT AS SHOWN.
C. FINAL SPRINKLER HEAD LOCATIONS SHALL BE SET BY THEENGINEER AND COORDINATED WITH ARCHITECT. CENTER HEADS INACOUSTICAL TILE OR CEILING PANEL WHERE POSSIBLE, U.N.O.
D. CEILING HEIGHTS SHALL BE 9' - 0" ABOVE FINISHED FLOOR U.N.O.E. REFER TO ELECTRICAL DRAWINGS FOR FIXTURE TYPE SCHEDULE.F. REFER TO INTERIOR ELEVATIONS AND ROOM FINISH SCHEDULE FOR
ADDITIONAL INFORMATION CONCERNING HEIGHTS, CEILINGMATERIALS AND FURRED CEILINGS.
G. MEASURE EACH CEILING AREA AND ESTABLISH LAYOUT OFACOUSTICAL UNITS AS SHOWN TO BALANCE BORDER WIDTHS ATOPPOSITE EDGES OF EACH CEILING.
H. CEILINGS AND OTHER SUSPENDED ITEMS SHALL BE ATTACHED TOSTRUCTURE BY FULLY EMBEDDED OR "SHEAR" CONNECTIONS. PULLOUT CONNECTIONS ARE NOT ACCEPTABLE.
I. ALL GYPSUM BOARD CEILINGS SHALL BE 5/8" TYPE X GYPSUMBOARD ON SUSPENDED LIGHT GUAGE FRAMING PER THESPECIFICATIONS.
J. CENTER ALL DEVICES, SPRINKLER HEADS, ETC. IN CEILING TILES.K. DIMENSIONS INDICATED ON PLAN ARE FROM FACE OF STUD TO
FACE OF STUD U.N.O.L. AT ALL LOCATIONS OF PERFORATED RETURN AIR GRILLES. ALL
WIRING, CABLING, ETC, TO BE HELD CLEAR OF OPEN LINE OF SITETHROUGH GRILLE. IN CASES WHERE THIS IS UNAVOIDABLE, ITEMVISIBLE ABOVE THE GRILLE ARE TO BE PAINTED FLAT BLACK.
M. GENERAL CONTRACTOR SHALL LOCATE ALL ITEMS NEEDINGACCESS ABOVE LAY-IN TILE CEILINGS. THERE SHALL BE NO ACCESSPANELS IN DRYWALL CEILINGS, U.N.O.
N. PROVIDE CEILING TILE AND DRYWALL AS SPECIFIED AND INDICATEDON DRAWINGS.
1/8" = 1'-0"A1FIRST FLOOR - REFLECTED CEILING PLAN - AREA C
1 03/19/15 FOR CONSTRUCTION
2 03/27/15 PKG-2 ADD-001
2
RE
F
RE
F
REF
UP
A4 / A
-201-2
APPEARANCE
2100
LAB DRAWWORK
2203
INFUSIONCLINIC WAITING
2004
INJECTION 3
2205
EVS
2218
STAFF BREAK
2213
SCHEDULE
2211
REG 1
2207
REG 2
2208
BMT
2301
BMT
2303
PATIENT TOILET
2305
PATIENT TLT
2304
BMT
2306
CLEAN
2404
STORAGE
2406
STEM CELLOFFICE
2402
CONF.
2405
BMT UNIT EVS
2408
NURSE/Rx MGR.
2410
RESEARCHDRUG STORAGE
2504
DIRTY PUMPRECEIVE
2506
BMT ROOM
2307
PATIENTTLT
2308
SOILED
2407
WAITING
2009
INFUS. BAY
2606
INFUS. BAY
2611
INFUSIONSTORAGE
2641
INFUS. BAY
2639
INFUS. BAY
2638
INFUS. BAY
2637
INFUS. BAY
2635
CHART WORK
2401
NURSE STATION
2400
WAITING
2009
CHANGE 2
2106
CHANGE 1
2107 STORAGE
2104
OVERSIGHTPHARMCIST
OFFICE
2502
REG 3
2209
INFUS. BAY
2647
INFUS. BAY
2646
INFUS. BAY
2645
INFUS. BAY
2613
INFUS. BAY
2615
NURSE STATION
2644
INFUS. BAY
2661
INFUS. BAY
2660
INFUS. BAY
2659
DISPENSINGVESTIBULE
2636
ORDER/CHECK
2507
DISPENSING
2500
/ ----
/ ----
/ ----
/ ----
OPEN
PATIENT TLT
2600
FAMILY
2649
PAT. TLT
2650
GUEST GALLEY
2651
PAT. TLT
2652
SECUREGALLEY
2654
STAFF GALLEY
2653 CLEAN
2658
STORAGE
2657
SOILED
2656
INFUS. BAY
2609
INFUS. BAY
2604
INFUS. BAY
2602
INFUS. BAY
2601
STAFF TLT
2655
MEDS
2403
CHANGE 3
2105
DISPLAY
2108
DISPLAY
2101
STYLE
2102
FITTING
2103
DRAW 5
2225
DRAW 4
2226
DRAW 6
2224
DRAW 3
2227
DRAW 2
2228
DRAW 1
2229
DRAW 8
2222
DRAW 7
2223
NURSE STATION
2200
PATIENT TLT
2214
INJECTION 2
2215
INJECTION 1
2216
GEN STOR
2219
STAFF TLT
2212
RECEPTION
2003
STORAGE
2206
SOILED STOR
2220
PATIENT TLT
2302
X
X
X
X
2407
2006B
2306
2301
2303
2006
2006A
2401
2404
2406 2405
2402
2410
2409
2408
2506
2504
2205
2400
2208A
2207A
2100
2200
2208
2207
2201
2213
2218
2636
2503
2502 2501
2010
2307
2107
2106
2104
2105
2403
2654
2656
2202
2215 2216
2212
2206
2657
2658
2200
2220
2008
2520
LOBBY
2000
BMT CORR
2006
CONF
2503
INJECTIONWORK
2201
AL12-2
AL13-2
IN FLOOR
SCALE
COAT RACK
CLEAN PUMPSTOR
2505
2219
-
---
MEN TLT
2002WOMEN TLT
2001
/A-403-2C3
/A-403-2D3
/A-404-2A2
/A-404-2A3
/A-404-2A4
/A-404-2A6
20012002
FAMILYWAITING
2109
TUBE STATION
2217
NURSE STATION
2202
CHECK-OUT
2005
HALL
2008
HALL
2007
HALL
2010
HALL
2011
STORAGE
2648
OXY TANKSTORAGE
2520
2220A
2223
2204
2662
2603
RAMP
1022
EVS
2603
INFUS. BAY
2605
INFUS. BAY
2607
INFUS. BAY
2608
INFUS. BAY
2610INFUS. BAY
2612 INFUS. BAY
2614
2648
2653A
C1 / A-214-2
C2 / A
-214-2
/A-404-2C6
D3 / A-201-2
D1 / A-201-2
D2 / A
-201-2
B3 / A
-216-2
B2 / A-216-2
B1 / A-216-2
A6
A-311-2
A5
A-311-2
A4
A-311-2
D5 / A
-216-2
E1 / A-216-2
D4 / A-216-2
D2 / A
-216-2
D3 / A-216-2
2302
2214
2304
2305
2308
2600
2650
26522652
2650
2305
2304
2308
2600
2302
2214
/A-404-2B4
/A-404-2A5
A3 / A-216-2
A2 / A-216-2
2
2
2
2
2
2
2
2
2
2
2
CONF
2409
2
E2 / A-216-2
B3 / A
-217-2
/A-404-2B32
2
2
STRETCHERALCOVE
2521
/A-403-2E2
2
2
2
2 22
2
D4 / A
-217-2
D3 / A
-217-2
/A-403-2D2
2
22
2103
/A-403-2D1
2
/A-403-2C2
/A-403-2D52
2
STAIRS
2019
-
---
-
---
-
---
/A-404-2A1
WORK
2210
/A-404-2B2
2
2210
D6 / A-216-2
E4 / A-217-2
E5 / A-217-2
HALL
2012
2
2
2
2211
22092
2
A5 / A
-218-2
2
A5
A5 A5
A5
A5
A5
A5A
5A5
A5
A5
A5
A5
B7
B7
B7
B7
B7
A5
A5
A5
A5A
5A5
A5
A5
A5
B7
B7
B7
B7
B7
A7A7
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5A
5A5
A5
A5
A5
A5
A5
A5
A5
A5A5
A5
A5
A5 A5
A5
A5
A5
A5A5
A5
A5
A5
A5
A5
A5
B7
B7
A7
B7
A7
A5
A5
A7
A7
H5
H5
H5H5
B7
B7
A7
B7
B7
B7
B7
B7
B7
B7
A7
A7
A5
A5
A5A5A5
A5
A5
A5
B7
B7
B7A7
A5
A5
A5
A5
A5
A5
A5
A5
A5
B7
B7
B7
B7
B7
B7
B7
B7
B7
B7
B7
A5
A5
A5
A5
A5
A5
A7A7
INFUS. BAY
2642
INFUS. BAY
2643
A7
A5
A5
A7
A5
A5 A5
A5
A5
B7
B7
B7
B7
B7
B7
A7
B7
A5
A5
A5
A5
A7
A7
B7
A7
A5
A7
B7
B7
A7
A5
AL15-2
AL16-2
AL17-2
AL17-2
AL18-2
AL19-2
AL20-2
AL22
-2
AL23-2
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A7
B7
B7
A5
A7
B7
A7A7
B7
A5
A5A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5 A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
-
---
A5
A5
A5
A-312-2
2651
2655
2
A4 / A-216-2C2 / A-218-2
C3 / A-218-2
B 2
(A) PARTITION CONSTRUCTION(B) PARTITION CONDITIONS
PARTITION LEGEND
(A) PARTITION CONSTRUCTION
(B) PARTITION CONDITION
THE FOLLOWING PARTITION GRAPHIC SYMBOL AND TWO PART NOTATION SYSTEMIS USED IN THE CONSTRUCTION DOCUMENTS FOR THIS PROJECT. NOTE: THEPARTITION CONSTRUCTION WILL MAINTAIN ITS DESIGNATION TO THE POINT OF ANINTERSECTION WALL. IF NO CHANGE IN DESIGNATION IS SHOWN BEYOND THEINTERSECTION, THE PREVIOUS PARTITION CONSTRUCTION DESIGNATION APPLIES.REFER TO CODE PLAN G-005 FOR RATED WALLS.
A. METAL STUDS - GYPSUM BOARD ONE SIDEB. METAL STUDS - GYPSUM BOARD EACH SIDEC. METAL STUDS - 2 LAYERS OF GYPSUM BOARD ON EACH SIDED. CMUE. CMU - GYPSUM BOARD ON HAT CHANNELSF. CONCRETEG. SHAFT WALL SYSTEM - GYPSUM BOARD ON FINISHED SIDEH. SHAFT WALL SYSTEM - 2 LAYERS OF GYPSUM BOARD ON EACH SIDEI. METAL STUDS - CEMENTITIOUS BOARD 5/8" THICK ON EACH SIDE
"STRUCTURE ABOVE" (AS NOTED IN THE PARTITION CONDITIONS) IS DEFINED ASTHE UNDERSIDE OF ONE OR MORE OF THE FOLLOWING:
* COMPOSITE FLOOR SLAB* STAIR TREADS/RISERS* METAL ROOF DECK* STEEL BEAMS
TERMINATE METAL STUDS AT "STRUCTURE ABOVE" WITH DEFLECTION TRACKREQUIRED FOR WALL CONDITION SCHEDULED.
(NOTE: IN NO CASE SHALL THE BOTTOM OF STEEL JOISTS BE CONSIDERED BOTTOMOF STRUCTURE ABOVE.)
(NOTE: ALL INTERIOR WALLS ARE "B5" UNLESS NOTED OTHERWISE.)
1. RATED ASSEMBLY EXTENDS TO STRUCTURE ABOVE (SEE DEFINITIONBELOW). PROVIDE UL APPROVED FIRE RATED HEAD OF WALLASSEMBLY TO MATCH RATING OF WALL. WALL HEIGHTS EXCEEDINGSTUD MANUFACTURER'S MAXIMUM (LIMITING) SPAN USING 5PSFLATERAL LOADING SHALL BE BRACED TO STRUCTURE ABOVE. (LAY-IN CEILINGS ARE NOT ACCEPTABLE BRACING, HARD CEILINGS AREACCEPTABLE).
2. RATED ASSEMBLY EXTENDS TO STRUCTURE ABOVE (SEE DEFINITIONBELOW). PROVIDE UL APPROVED FIRE RATED HEAD OF WALLASSEMBLY TO MATCH RATING OF WALL. WALL HEIGHTS EXCEEDINGSTUD MANUFACTURER'S MAXIMUM (LIMITING) SPAN USING 5PSFLATERAL LOADING SHALL BE BRACED TO STRUCTURE ABOVE. (LAY-IN CEILINGS ARE NOT ACCEPTABLE BRACING, HARD CEILINGS AREACCEPTABLE). WALL CAVITY IS FULLY INSULATED WITH SOUNDATTENUATION BATTS. INSTALL ACOUSTICAL SEALANT AT TOP ANDBOTTOM OF WALLS (BOTH SIDES) AND ALL PENETRATIONS PERMANUFACTURER'S INSTRUCTIONS.
3. COMPLETE ASSEMBLY EXTENDS TO STRUCTURE ABOVE. WALLCAVITY IS FULLY INSULATED WITH SOUND ATTENUATION BATTS.INSTALL ACOUSTICAL SEALANT AT TOP AND BOTTOM OF WALLS(BOTH SIDES) AND ALL PENETRATIONS PER MANUFACTURER'SINSTRUCTIONS.
4. COMPLETE ASSEMBLY EXTENDS TO AND IS BRACED TO STRUCTUREABOVE.
5. ASSEMBLY EXTENDS 4" MINIMUM ABOVE HIGHEST ADJACENTCEILING AND IS BRACED EACH WAY TO STRUCTURE ABOVE.
6. EXTEND RATED ASSEMBLY THROUGH THE ROOF. METAL STUDWALLS EXTEND TO 4" MINIMUM ABOVE HIGHEST ADJACENT CEILING.
7. ASSEMBLY EXTENDS 4" MINIMUM ABOVE HIGHEST ADJACENTCEILING AND IS BRACED EACH WAY TO STRUCTURE ABOVE. WALLCAVITY IS FULLY INSULATED WITH SOUND ATTENUATION BATTS.INSTALL ACOUSTICAL SEALANT AT BOTTOM OF WALLS (BOTH SIDES)AND ALL PENETRATIONS PER MANUFACTURER'S INSTRUCTIONS.
8. PARTIAL HEIGHT WALL ASSEMBLY. REFER TO INTERIOR ELEVATIONS& SECTIONS
9. INFILL - MATCH EXISTING ADJACENT PARTITION CONDITIONS
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
PACKAGE 2
B
100% CONSTRUCTIONDOCUMENTS
3/3
0/2
015 6
:03:5
2 P
M
SECOND FLOOR
ANNOTATED FLOOR
PLAN - AREA B
A-113B-2
JACC & MOB
ADDITIONS &
RENOVATIONS
4101 22ND PLACE
LUBBOCK, TX 79410
LUBBOCK 7986.14
03/27/2015
RE
VIT
_v15
REGIST
ERE
D ARCH
ITECT
TSA
ET
FO
ET
XAS
16997
OR
EY
L . BRAN
CH
C
tel: 805.522.5662fax: 805.522.5785
6672 santa susana pass roadsimi valley, ca 93063
dm g
montanio group, inc.
AS INDICATED BY: #
KEY NOTES
GENERAL NOTESA. ALL DIMENSIONS ARE TO FACE OF STUD, CMU, OR CENTERLINE OF STRUCTUREB. ALL NEW WALLS TO BE 3 5/8" METAL STUDS UNLESS NOTED OTHERWISE
CONTRACTOR SHALL VERIFY ALL DIMENSIONSC. GENERAL CONTRACTOR SHALL VERIFY AND CLARIFY ALL DIMENSIONAL
DISCREPANCIES FROM THIS OR ANY PLAN, SECTION, OR ELEVATION W/ THEARCHITECT PRIOR TO CONSTRUCTION
D. UNLESS OTHERWISE NOTED, ALL WALLS TO EXTEND MINIMUM OF 6" ABOVEFINISHED CEILING HEIGHT BRACE TO STRUCTURE ABOVE
E. REFER TO SHEET G-003 FOR TYPICAL MOUNTING LOCATIONS FOR TOILET ROOMACCESSORIES
F. PROVIDE BLOCKING WHERE UPPER MILLWORK CABINETS ARE NOTED
1/8" = 1'-0"A2SECOND FLOOR - ANNOTATED FLOOR PLAN - AREA B
NORTH
1 03/19/15 FOR CONSTRUCTION
2 03/27/15 PKG-2 ADD-001
2
UP
DN
B1 / A-201-2
EVS
2218
MIXING ROOM
2508
PRIVATEINFUSION ROOM
2628
PRIVATEINFUSION ROOM
2627
STORAGE
2626
PATIENTTLT
2623
FAMILY
2621
INFUS. BAY
2635
INFUS. BAY
2625
INFUS. BAY
2624
STORAGE
2104
OVERSIGHTPHARMCIST
OFFICE
2502
PHARMACYMGR OFFICE
2501
DELIVERY
2519
INFUS. BAY
2615
INFUS. BAY
2616
INFUS. BAY
2619
INFUS. BAY
2620
NURSE STATION
2663
INFUS. BAY
2661
INFUS. BAY
2660
INFUS. BAY
2659
WORK
2515
ORDER/CHECK
2507
DISPENSING
2500
STORAGE
2510
MIXING ROOM
2509
HAZ DRUGSTORAGE
2511
GENERALSTORAGE
2518
PHARMACY HDRECEIVING &BREAK DOWN
2519
- / ---
CLEAN
2658
STORAGE
2657
SOILED
2656
PATIENTNOURISH
2664
CHANGE 3
2105
DRAW 7
2223
GEN STOR
2219
- / ---
X
X
X X X
X X
X
X
2502 2501
2514 2511A
2510
2013
2519
2518
2519A
2010
2511
2512
2513
2518A
2519
2015
2654
2656
2202
2657
2658
2520
GOWNING
2514
ANTE ROOM
2513
EVS
2629
210
/A-401-2A5
STRECHERALCOVE
2622
HALL
2012
HALL
2017
HALL
2014
HALL
2015
HALL
2016
HALL
2011
HALL
2013
OXY TANKSTORAGE
2520
2220A
EVS
2512
STAFFLOCKERS
2517
STAFFBREAKROOM
2516
2516
2662 STORAGE
2662
INFUS. BAY
2634
INFUS. BAY
2633
INFUS. BAY
2632
INFUS. BAY
2631
INFUS. BAY
2630
INFUS. BAY
2614INFUS. BAY
2617
INFUS. BAY
2618
2653A
2628
2629
2017
2623
A3 / A-216-2
A2 / A-216-2
2
2
C4 / A
-216-2
C5 /
A-21
6-2
2
EXIST- NORTHMECH ROOM
X
EXIST OXYGENMANIFOLD
X
EXIST.LIFT
C6 / A
-216-2
2
D1 / A-216-2
2
NURSE CALLEQUIP CLOSET
X
/A-404-2B12
B1 / A
-218-2
A6 / A
-218-2
2
2
E3 / A-21
6-2
A1 / A
-217-2
E5 / A-216-2
E4 / A
-216-2E2 / A-
216-2
A2 / A-21
7-2
A3 / A
-217-2
A5 / A-217-2
A6 / A-217-2
C1 / A-217-2
B3 / A
-217-2
/A-404-2B5
EXIST STOR
X
EXIST ELEVMECH ROOM
X
EXIST TLT
X
EXIST TLT
X
EXIST IDF
2415
EXIST CLOSET
X
C2 / A
-217-2
C3 / A-217-2
C4 / A
-217-2
B4 / A-217-2
B5 / A
-217-2
B6 / A
-217-2
EXIST MECHCLOSET
X
D1 / A
-217-2
C6 / A
-217-2
C5 / A-217-2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
EXIST SOUTHMECHANICAL
ROOM
X
2
/ ----
STRETCHERALCOVE
2521
X
2
D5 / A
-217-2
HALL
2012
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
B7
B7
B7
B7
A5
A5
A5
A5
A5
AL21-2
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
B4 / A
-218-2
B2 / A-218-2
B3 / A-218-2
2
A5
A5
A5
B7
B7
A5
A5
A5
A7B7
A5
A5
A5A
5
A5
A5
A5
A5
A5
A5
B7
A5
A5
A5A5
A5
A5
A5
A5
A5
A5
A5
A5A5
A5
B9
B5 / A-218-2
B6 / A
-218-2
B9
C4 / A-218-2
B 2
(A) PARTITION CONSTRUCTION(B) PARTITION CONDITIONS
PARTITION LEGEND
(A) PARTITION CONSTRUCTION
(B) PARTITION CONDITION
THE FOLLOWING PARTITION GRAPHIC SYMBOL AND TWO PART NOTATION SYSTEMIS USED IN THE CONSTRUCTION DOCUMENTS FOR THIS PROJECT. NOTE: THEPARTITION CONSTRUCTION WILL MAINTAIN ITS DESIGNATION TO THE POINT OF ANINTERSECTION WALL. IF NO CHANGE IN DESIGNATION IS SHOWN BEYOND THEINTERSECTION, THE PREVIOUS PARTITION CONSTRUCTION DESIGNATION APPLIES.REFER TO CODE PLAN G-005 FOR RATED WALLS.
A. METAL STUDS - GYPSUM BOARD ONE SIDEB. METAL STUDS - GYPSUM BOARD EACH SIDEC. METAL STUDS - 2 LAYERS OF GYPSUM BOARD ON EACH SIDED. CMUE. CMU - GYPSUM BOARD ON HAT CHANNELSF. CONCRETEG. SHAFT WALL SYSTEM - GYPSUM BOARD ON FINISHED SIDEH. SHAFT WALL SYSTEM - 2 LAYERS OF GYPSUM BOARD ON EACH SIDEI. METAL STUDS - CEMENTITIOUS BOARD 5/8" THICK ON EACH SIDE
"STRUCTURE ABOVE" (AS NOTED IN THE PARTITION CONDITIONS) IS DEFINED ASTHE UNDERSIDE OF ONE OR MORE OF THE FOLLOWING:
* COMPOSITE FLOOR SLAB* STAIR TREADS/RISERS* METAL ROOF DECK* STEEL BEAMS
TERMINATE METAL STUDS AT "STRUCTURE ABOVE" WITH DEFLECTION TRACKREQUIRED FOR WALL CONDITION SCHEDULED.
(NOTE: IN NO CASE SHALL THE BOTTOM OF STEEL JOISTS BE CONSIDERED BOTTOMOF STRUCTURE ABOVE.)
(NOTE: ALL INTERIOR WALLS ARE "B5" UNLESS NOTED OTHERWISE.)
1. RATED ASSEMBLY EXTENDS TO STRUCTURE ABOVE (SEE DEFINITIONBELOW). PROVIDE UL APPROVED FIRE RATED HEAD OF WALLASSEMBLY TO MATCH RATING OF WALL. WALL HEIGHTS EXCEEDINGSTUD MANUFACTURER'S MAXIMUM (LIMITING) SPAN USING 5PSFLATERAL LOADING SHALL BE BRACED TO STRUCTURE ABOVE. (LAY-IN CEILINGS ARE NOT ACCEPTABLE BRACING, HARD CEILINGS AREACCEPTABLE).
2. RATED ASSEMBLY EXTENDS TO STRUCTURE ABOVE (SEE DEFINITIONBELOW). PROVIDE UL APPROVED FIRE RATED HEAD OF WALLASSEMBLY TO MATCH RATING OF WALL. WALL HEIGHTS EXCEEDINGSTUD MANUFACTURER'S MAXIMUM (LIMITING) SPAN USING 5PSFLATERAL LOADING SHALL BE BRACED TO STRUCTURE ABOVE. (LAY-IN CEILINGS ARE NOT ACCEPTABLE BRACING, HARD CEILINGS AREACCEPTABLE). WALL CAVITY IS FULLY INSULATED WITH SOUNDATTENUATION BATTS. INSTALL ACOUSTICAL SEALANT AT TOP ANDBOTTOM OF WALLS (BOTH SIDES) AND ALL PENETRATIONS PERMANUFACTURER'S INSTRUCTIONS.
3. COMPLETE ASSEMBLY EXTENDS TO STRUCTURE ABOVE. WALLCAVITY IS FULLY INSULATED WITH SOUND ATTENUATION BATTS.INSTALL ACOUSTICAL SEALANT AT TOP AND BOTTOM OF WALLS(BOTH SIDES) AND ALL PENETRATIONS PER MANUFACTURER'SINSTRUCTIONS.
4. COMPLETE ASSEMBLY EXTENDS TO AND IS BRACED TO STRUCTUREABOVE.
5. ASSEMBLY EXTENDS 4" MINIMUM ABOVE HIGHEST ADJACENTCEILING AND IS BRACED EACH WAY TO STRUCTURE ABOVE.
6. EXTEND RATED ASSEMBLY THROUGH THE ROOF. METAL STUDWALLS EXTEND TO 4" MINIMUM ABOVE HIGHEST ADJACENT CEILING.
7. ASSEMBLY EXTENDS 4" MINIMUM ABOVE HIGHEST ADJACENTCEILING AND IS BRACED EACH WAY TO STRUCTURE ABOVE. WALLCAVITY IS FULLY INSULATED WITH SOUND ATTENUATION BATTS.INSTALL ACOUSTICAL SEALANT AT BOTTOM OF WALLS (BOTH SIDES)AND ALL PENETRATIONS PER MANUFACTURER'S INSTRUCTIONS.
8. PARTIAL HEIGHT WALL ASSEMBLY. REFER TO INTERIOR ELEVATIONS& SECTIONS
9. INFILL - MATCH EXISTING ADJACENT PARTITION CONDITIONS
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
PACKAGE 2
C
100% CONSTRUCTIONDOCUMENTS
3/3
0/2
015 6
:03:5
4 P
M
SECOND FLOOR
ANNOTATED FLOOR
PLAN - AREA C
A-113C-2
JACC & MOB
ADDITIONS &
RENOVATIONS
4101 22ND PLACE
LUBBOCK, TX 79410
LUBBOCK 7986.14
03/27/2015
RE
VIT
_v15
REGIST
ERE
D ARCH
ITECT
TSA
ET
FO
ET
XAS
16997
OR
EY
L . BRAN
CH
C
tel: 805.522.5662fax: 805.522.5785
6672 santa susana pass roadsimi valley, ca 93063
dm g
montanio group, inc.
AS INDICATED BY: #
KEY NOTES
210 COAT HOOKS (10)
GENERAL NOTESA. ALL DIMENSIONS ARE TO FACE OF STUD, CMU, OR CENTERLINE OF STRUCTUREB. ALL NEW WALLS TO BE 3 5/8" METAL STUDS UNLESS NOTED OTHERWISE
CONTRACTOR SHALL VERIFY ALL DIMENSIONSC. GENERAL CONTRACTOR SHALL VERIFY AND CLARIFY ALL DIMENSIONAL
DISCREPANCIES FROM THIS OR ANY PLAN, SECTION, OR ELEVATION W/ THEARCHITECT PRIOR TO CONSTRUCTION
D. UNLESS OTHERWISE NOTED, ALL WALLS TO EXTEND MINIMUM OF 6" ABOVEFINISHED CEILING HEIGHT BRACE TO STRUCTURE ABOVE
E. REFER TO SHEET G-003 FOR TYPICAL MOUNTING LOCATIONS FOR TOILET ROOMACCESSORIES
F. PROVIDE BLOCKING WHERE UPPER MILLWORK CABINETS ARE NOTED
1/8" = 1'-0"A2SECOND FLOOR - ANNOTATED FLOOR PLAN - AREA C
1 03/19/15 FOR CONSTRUCTION
2 03/27/15 PKG-2 ADD-001
2
APPEARANCE
2100
CHANGE 2
2106
CHANGE 1
2107
STORAGE
2104
LOBBY
2000
STYLE
2102
FITTING
2103
LAB DRAWWORK
2203
INFUSIONCLINIC WAITING
2004
INJECTION 3
2205
EVS
2218
STAFF BREAK
2213
SCHEDULE
2211
REG 1
2207
REG 2
2208
BMT
2301
BMT
2303
PATIENT TOILET
2305
PATIENT TLT
2304
BMT
2306
CHART WORK
2401
CLEAN
2404
STORAGE
2406
STEM CELLOFFICE
2402
CONF.
2405
BMT UNIT EVS
2408
NURSE/Rx MGR.
2410
RESEARCHDRUG STORAGE
2504
DIRTY PUMPRECEIVE
2506
BMT ROOM
2307
PATIENTTLT
2308
STAFF TLT
2655
SOILED
2407
NURSE STATION
2400
WAITING
2009
INFUS. BAY
2647
INFUS. BAY
2606
INFUS. BAY
2611
INFUSIONSTORAGE
2641
INFUS. BAY
2639 INFUS. BAY
2638
INFUS. BAY
2637
INFUS. BAY
2635
INFUS. BAY
2646
INFUS. BAY
2645
INFUS. BAY
2613
INFUS. BAY
2615
NURSE STATION
2644
INFUS. BAY
2659
DISPENSINGVESTIBULE
2636
OVERSIGHTPHARMCIST
OFFICE
2502
ORDER/CHECK
2507
DISPENSING
2500
REG 3
2209
BMT CORR
2006
CONF
2503
CHANGE 3
2105
DISPLAY
2108
DISPLAY
2101
PATIENT TLT
2600
FAMILY
2649
PAT. TLT
2650
GUEST GALLEY
2651
PAT. TLT
2652
SECUREGALLEY
2654
STAFF GALLEY
2653
CLEAN
2658
STORAGE
2657
SOILED
2656
PATIENT TLT
2214
DRAW 1
2229
DRAW 2
2228
DRAW 3
2227
DRAW 4
2226
DRAW 5
2225
DRAW 6
2224DRAW 7
2223
DRAW 8
2222
INJECTION 2
2215
INJECTION 1
2216
NURSE STATION
2200
GEN STOR
2219
INJECTIONWORK
2201
STAFF TLT
2212
INFUS. BAY
2609
INFUS. BAY
2604
INFUS. BAY
2602
INFUS. BAY
2601
STORAGE
2206
SOILED STOR
2220
RECEPTION
2003
PATIENT TLT
2302
( )10' - 1 1/4"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"( )9' - 0"
( )9' - 0"
( )9' - 0"
( )8' - 6"
( )9' - 0"
( )9' - 0" ( )9' - 0"
( )9' - 0"
( )9' - 0"
CLEAN PUMPSTOR
2505
WOMEN TLT
2001
MEN TLT
2002
CLEANSTORAGE
2204
TUBE STATION
2217
( )9' - 6"
( )9' - 6"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0" ( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 6"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0" ( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )10' - 1 1/4"
( )9' - 0" ( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 6"
( )9' - 6"
( )9' - 0"
( )9' - 0"
( )8' - 6"
RAMP
1022
FAMILYWAITING
2109
HALL
2012
NURSE STATION
2202
CHECK-OUT
2005
HALL
2008
HALL
2007
HALL
2010
HALL
2011
STORAGE
2648
STORAGE
2662
EVS
2603
INFUS. BAY
2605
INFUS. BAY
2607
INFUS. BAY
2608
INFUS. BAY
2610
INFUS. BAY
2612
INFUS. BAY
2614
INFUS. BAY
2642
INFUS. BAY
2643
( )7' - 2"
( )9' - 11"
( )9' - 0"
( )10' - 1"
( )10' - 1"
( )10' - 1"
( )10' - 1"
( )10' - 1"
( )10' - 1"
( )10' - 1"
( )10' - 1"
( )10' - 1"
( )10' - 1"
( )10' - 1"
( )10' - 1"
( )10' - 1"
( )9' - 6"
( )9' - 0"
( )7' - 2"
( )9' - 6"
( )9' - 6"
( )9' - 6"
( )9' - 6"
( )9' - 6"
( )9' - 0"
MEDS
2403
( )9' - 0"
WORK
2210
( )9' - 6"
( )9' - 6"
( )9' - 0"
( )9' - 0"
( )7' - 2"
( )9' - 0"
( )9' - 0"
( )9' - 6" ( )9' - 6"
( )9' - 0"
2
2 2
2
2
( )9' - 0"
( )7' - 2"
( )9' - 0"
( )7' - 2"
( ) 9' - 0"
( )8' - 6"
( )8' - 6"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )9' - 0"
( )9' - 0"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )9' - 0"( )9' - 0"
( )7' - 2"( )7' - 2"( )7' - 2"
( )7' - 2"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )7' - 2"
( )9' - 0"
( )9' - 0"
( )10' - 0"
( )9' - 6"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )7' - 2"
( )9' - 0"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )
7' - 2"
( )7' - 2"
( )
7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )9' - 0"
( )7' - 2"
( )7' - 2" ( )7' - 2"
( )
7' - 2"
( )9' - 0"
( )
7' - 2"
OPEN
( )8' - 6"
( )
5' - 0"
( )9' - 11"( )9' - 11"
( )9' - 11"
( )9' - 11"
( )9' - 11"
( )9' - 11"
E2
A-502-2
D2
A-502-2
D2
A-502-2
( )9' - 11"( )9' - 11"
E2
A-502-2
D1
A-502-2
( )8' - 6"
D2
A-502-2
( )7' - 2"
( )9' - 11"
( )9' - 11"
( )9' - 11"
E2
A-502-2
D2
A-502-2
D2
A-502-2
( )9' - 0"
( )9' - 6"
( )9' - 6"
E2
A-502-2
D2
A-502-2
D1
A-502-2
E2
A-502-2
D2
A-502-2
D2
A-502-2
( )7' - 2"
( )9' - 0"
( )7' - 2"
( )7' - 2"
( )7' - 2"
( )7' - 2"
2
2
2
2
2
2
2
2
2
2
2
2
2
2
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
PACKAGE 2
B
100% CONSTRUCTIONDOCUMENTS
3/3
0/2
015 6
:03:5
7 P
M
SECOND FLOOR
REFLECTED CEILING
PLAN - AREA B
A-114B-2
JACC & MOB
ADDITIONS &
RENOVATIONS
4101 22ND PLACE
LUBBOCK, TX 79410
LUBBOCK 7986.14
03/27/2015
RE
VIT
_v15
REGIST
ERE
D ARCH
ITECT
TSA
ET
FO
ET
XAS
16997
OR
EY
L . BRAN
CH
C
tel: 805.522.5662fax: 805.522.5785
6672 santa susana pass roadsimi valley, ca 93063
dm g
montanio group, inc.
AS INDICATED BY: #
KEY NOTES
GENERAL NOTESA. REFER TO MEP DRAWINGS AND SPECIFICATIONS FOR DESIGN OF
THESE SYSTEMS (DUCT SIZES, CIRCUITING, ETC.) LOCATIONS OFFIXTURES SHALL BE AS SHOWN ON ARCHITECTURAL PLANS ANDDETAILS. NOTIFY ARCHITECT OF ANY CONFLICTS PRIOR TOCONSTRUCTION.
B. FIELD VERIFY CONDITIONS AND LOCATIONS OF ALL PLUMBING,DUCTS, STRUCTURAL ELEMENTS AND OTHER APPLICABLE ITEMS.ARRANGE AND MODIFY NONVISIBLE ITEMS TO ENSURE ADEQUATECLEARANCE FOR CEILING LAY-OUT AS SHOWN.
C. FINAL SPRINKLER HEAD LOCATIONS SHALL BE SET BY THEENGINEER AND COORDINATED WITH ARCHITECT. CENTER HEADS INACOUSTICAL TILE OR CEILING PANEL WHERE POSSIBLE, U.N.O.
D. CEILING HEIGHTS SHALL BE 9' - 0" ABOVE FINISHED FLOOR U.N.O.E. REFER TO ELECTRICAL DRAWINGS FOR FIXTURE TYPE SCHEDULE.F. REFER TO INTERIOR ELEVATIONS AND ROOM FINISH SCHEDULE FOR
ADDITIONAL INFORMATION CONCERNING HEIGHTS, CEILINGMATERIALS AND FURRED CEILINGS.
G. MEASURE EACH CEILING AREA AND ESTABLISH LAYOUT OFACOUSTICAL UNITS AS SHOWN TO BALANCE BORDER WIDTHS ATOPPOSITE EDGES OF EACH CEILING.
H. CEILINGS AND OTHER SUSPENDED ITEMS SHALL BE ATTACHED TOSTRUCTURE BY FULLY EMBEDDED OR "SHEAR" CONNECTIONS. PULLOUT CONNECTIONS ARE NOT ACCEPTABLE.
I. ALL GYPSUM BOARD CEILINGS SHALL BE 5/8" TYPE X GYPSUMBOARD ON SUSPENDED LIGHT GUAGE FRAMING PER THESPECIFICATIONS.
J. CENTER ALL DEVICES, SPRINKLER HEADS, ETC. IN CEILING TILES.K. DIMENSIONS INDICATED ON PLAN ARE FROM FACE OF STUD TO
FACE OF STUD U.N.O.L. AT ALL LOCATIONS OF PERFORATED RETURN AIR GRILLES. ALL
WIRING, CABLING, ETC, TO BE HELD CLEAR OF OPEN LINE OF SITETHROUGH GRILLE. IN CASES WHERE THIS IS UNAVOIDABLE, ITEMVISIBLE ABOVE THE GRILLE ARE TO BE PAINTED FLAT BLACK.
M. GENERAL CONTRACTOR SHALL LOCATE ALL ITEMS NEEDINGACCESS ABOVE LAY-IN TILE CEILINGS. THERE SHALL BE NO ACCESSPANELS IN DRYWALL CEILINGS, U.N.O.
N. PROVIDE CEILING TILE AND DRYWALL AS SPECIFIED AND INDICATEDON DRAWINGS.
1/8" = 1'-0"A2FIRST FLOOR - REFLECTED CEILING PLAN - AREA B
NORTH
1 03/19/15 FOR CONSTRUCTION
2 03/27/15 PKG-2 ADD-001
2
CHILD LIFEOFFICE
207
TOILET
261
CONFERENCE
262
PATIENT TOILET
274
BAY 3
277
( )10' - 6"
( )9' - 0"
WORKSTATIONS
281B
( )9' - 0"
( )8' - 6" ( )8' - 6"
( )8' - 6"( )8' - 0"
BAY 1
275BAY 2
276
BAY 4
278BAY 5
279
STORAGE
2104
( )
8' - 6"
( )9' - 0"
INFUS. BAY
2635
INFUS. BAY
2615
INFUS. BAY
2616
INFUS. BAY
2661
INFUS. BAY
2660
INFUS. BAY
2659
OVERSIGHTPHARMCIST
OFFICE
2502
PHARMACYMGR OFFICE
2501
ORDER/CHECK
2507
DISPENSING
2500
CHANGE 3
2105
CLEAN
2658
STORAGE
2657
SOILED
2656
MIXING ROOM
2508
PRIVATEINFUSION ROOM
2628
PRIVATEINFUSION ROOM
2627
STORAGE
2626
PATIENTTLT
2623
FAMILY
2621
INFUS. BAY
2625
INFUS. BAY
2624
INFUS. BAY
2619
INFUS. BAY
2620
NURSE STATION
2663
WORK
2515
STORAGE
2510
MIXING ROOM
2509HAZ DRUGSTORAGE
2511
GENERALSTORAGE
2518
PHARMACY HDRECEIVING &BREAK DOWN
2519
DELIVERY
2519
PATIENTNOURISH
2664
GOWNING
2514
ANTE ROOM
2513
( )9' - 0"
EVS
2629
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 6"
( )9' - 0"
( )9' - 0"
( )9' - 0" ( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
( )9' - 0"
STRECHERALCOVE
2622
( )9' - 6"
( )9' - 6"
( )9' - 6"
HALL
2012
HALL
2017
HALL
2014
HALL
2015
HALL
2016
HALL
2010
HALL
2011HALL
2013
OXY TANKSTORAGE
2520
EVS
2512
STORAGE
2662
INFUS. BAY
2634
INFUS. BAY
2633
INFUS. BAY
2632
INFUS. BAY
2631
INFUS. BAY
2630
INFUS. BAY
2614
INFUS. BAY
2617
INFUS. BAY
2618
( )10' - 1"( )10' - 1"( )10' - 1"
( )10' - 1"
( )10' - 1"
( )10' - 1"
( )10' - 1"
( )9' - 6"
( )9' - 6"
( )9' - 6"
( )9' - 6"
( )9' - 6"
( )9' - 6" ( )9' - 0"
( )7' - 2"
( )9' - 6"
( )9' - 6"
( )9' - 6"( )9' - 0"
( )7' - 2"
( )9' - 0"
( )9' - 0"
( )9' - 0"
2
2
( )7' - 2"
( )9' - 0"
( )7' - 2"
( )7' -